CATATAN

-SEMUA UKURAN ADALAH DALAM MILIMETER,


KECUALI DITENTUKAN LAIN DALAM GAMBAR.
-ELEVASI ADALAH DALAM METER
-KOORDINAT ADALAH DALAM METER

15.0 15.0

AC-WC (T : 0.03 m)
AC-BC (T : 0.05 m) AC-WC (T : 0.03 m)
LPA (T : 0.1 m) AC-BC (T : 0.05 m)
LPB (T : 0.1 m) LPA (T : 0.1 m)
LPB (T : 0.1 m)

Timbunan Tanah

1,170
SHOP DRAWING
Timbunan Tanah

1,170
1,800

1,800
Pipa HDPE Ø 630 mm

630
Pipa HDPE Ø 630 mm

630
10.0 10.0
630
285 285 630 NAMA PROYEK
1,200 285 285
1,200

PEMILIK PROYEK

Datum: 5.0 Datum: 5.0


No.Point 1 2 3 4 No.Point 1 2 3 4 ..\..\..\EXCEL\QUANTITY\MEI ASTUTI\JTL LOGO.png

12.011

11.939

11.939

11.994

11.877

11.742

11.754
11.96
Elevasi Eksisting Elevasi Eksisting

DIKETAHUI OLEH,

1.871

4.778

1.841

4.068

4.759
3.89
Jarak Jarak
0

0
25+025 25+125
NANDANG MUNANDAR
Direktur Utama

MANAJEMEN KONSTRUKSI :

PT. INDRA KARYA (PERSERO)


ENGINEERING, DEVELOPER and INDUSTRY
SAFER,STRONGER AND FASTER
INDRA KARYA Kantor Pusat : Jalan Biru laut X Kav. 9 Cawang Jakarta Timur 13340 Telp. : (021)8192638 Fax : (021)8192179 Website : www.indrakarya.co.id E-mail : indrakarya@indrakarya.co.id

DISETUJUI OLEH :

BUKHARI ABDULLAH
Team Leader

KONTRAKTOR PELAKSANA :

PT. NINDYA KARYA

DIAJUKAN OLEH :

NANANG SANTOSA
Project Manager

NAMA PARAF TANGGAL

DIGAMBAR Arief A. Yahya

DIPERIKSA Fata Hanifa

JUDUL GAMBAR

POTONGAN MELINTANG
STA.25+025 S/D STA.25+125

SKALA

HALAMAN KODE GAMBAR TANGGAL

OF

REVISI KETERANGAN TANGGAL