PERHITUNGAN VOLUME TIMBUNAN PILIHAN / SIRTU

REKAPITUSASI

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON

PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA

LOKASI : DPPU RANAI ( HANG NADIM GROUP)

KONTRAKTOR : PT. ANEKA PRATAMA

1 AGREGAT KELAS A

No Luas Luas Jarak Volume


Keterangan
Patok (m') Rata-2 (m) (m3)

0+000 0.637
0.624 50.00 31.215
0+050 0.612
0.620 50.00 30.993
0+100 0.628
0.624 50.00 31.207
0+150 0.620
0.646 50.00 32.295
0+200 0.671
0.669 50.00 33.458
0+250 0.667
0.690 50.00 34.499
0+300 0.713
0.658 50.00 32.922
0+350 0.604
0.690 50.00 34.490
0+400 0.776
0.698 50.00 34.897
0+450 0.620
0.634 50.00 31.680
0+500 0.647
0.638 50.00 31.923
0+550 0.630
0.661 50.00 33.028
0+600 0.691
0.664 50.00 33.217
0+650 0.637
0.632 50.00 31.578
0+700 0.626
0.636 50.00 31.807
0+750 0.647
0.628 50.00 31.414
0+800 0.610
0.620 50.00 30.982
0+850 0.629
0.628 50.00 31.413
0+900 0.627
0.638 50.00 31.883
0+950 0.648
0.643 40.00 25.731
0+990 0.638

JUMLAH 990.00 640.632

990.00 640.632
TOTAL KUMULATIF VOLUME
M' M3

DIPERIKSA OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON

PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA

LOKASI : DPPU RANAI ( HANG NADIM GROUP)

KONTRAKTOR : PT. ANEKA PRATAMA


SKETSA GAMBAR

0+000

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.1 2.61 2.91 1.34

25.365

25.364

25.495

25.405

25.369
ELEVASI

3.71

6.62

7.96
JARAK LANGSUNG

1.1
0
25.255

25.332
25.34
ELEVASI
26.00
Y ELEVASI ( M)

25.259
25.259

25.50
25.137
25.005

25.176
25.131

25.053
25.00 ` 5.00
(5.00) (3.00) (1.00) X JARAK ( M) 1.00 3.00

AGREGAT KELAS A

0+000
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,108.45 276,935.45 0.00 25.259 0.000 -63.071
2 283,105.95 276,935.32 -2.50 25.137 -62.438 -62.767
3 283,105.95 276,935.19 -2.50 25.005 -62.751 0.000
4 283,108.45 276,935.32 0.00 25.131 0.000 62.792
5 283,110.95 276,935.24 2.50 25.053 62.904 62.598
6 283,110.95 276,935.36 2.50 25.176 63.111 0.000
283,108.45 276,935.45 0.00 25.259 0.000 0.000

jumlah 0.826 -0.45


2 Luas 1.274
Luas (m2) 0.637

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+050

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.17 2.79 2.8 1.07

25.551

25.593

25.595
25.66

25.62
ELEVASI

1.17

3.96

6.76

7.83
JARAK LANGSUNG

25.453

25.535

25.493
ELEVASI

26.00

25.536
25.535
25.579

25.417
Y ELEVASI ( M)

25.50
25.512

25.453
25.393

25.535
`
25.00
(5.00) (3.00) X JARAK ( M) (1.00) 1.00

AGREGAT KELAS A

0+050
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,110.027 276,959.330 0.000 25.535 0.000 -1.522
2 283,109.967 276,959.330 -0.06 25.536 -1.524 -63.829
3 283,107.527 276,959.373 -2.50 25.579 -63.771 -127.860
4 283,105.028 276,959.307 -5.00 25.512 -126.930 -127.529
5 283,105.028 276,959.187 -5.00 25.393 -127.230 -63.471
6 283,107.527 276,959.247 -2.50 25.453 -63.532 0.000
283,110.027 276,959.211 0.00 25.417 0.000 0.000
283,110.027 276,959.330 0.00 25.535 0.000 0.000

jumlah -382.988 -384.21


2 Luas 1.224
Luas (m2) 0.612

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+100

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.15 2.52 2.93 1.25

25.617

25.655

25.633
25.71

25.71
ELEVASI

1.15

3.67

7.85
JARAK LANGSUNG

6.6
0

25.606

25.592
25.55

ELEVASI

26.00
25.609

25.608
25.483
25.555
Y ELEVASI ( M)
25.554

25.50
25.483
25.428

25.00 `
(5.00) (3.00) (1.00) X JARAK ( M) 1.00 3.00 5.00

AGREGAT KELAS A

0+100
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,107.39 276,983.12 0.000 25.608 0.000 -64.020
2 283,104.89 276,983.13 -2.50 25.609 -63.887 -126.765
3 283,102.44 276,983.07 -4.95 25.555 -126.490 -127.757
4 283,102.39 276,983.07 -5.00 25.554 -127.125 -127.750
5 283,102.39 276,982.94 -5.00 25.428 -127.397 -63.571
6 283,104.89 276,983.00 -2.50 25.483 -63.708 0.000
283,107.39 276,983.00 0.00 25.483 0.000 0.000

jumlah -508.607 -509.86


2 Luas 1.256
Luas (m2) 0.628

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+150

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.09 2.55 2.56 1.05

25.737

25.781

25.884

25.857

25.78
ELEVASI

1.09

3.64

7.25
JARAK LANGSUNG

6.2
0

25.724

25.724

25.725
ELEVASI

26.00
25.632

25.608
25.480
25.534
25.523 ( M)

25.506

25.50
Y ELEVASI
25.405

`
X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+150
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,154.29 276,935.74 0.000 25.608 0.000 -64.017
2 283,151.79 276,935.77 -2.50 25.632 -63.833 -120.725
3 283,149.58 276,935.67 -4.71 25.534 -120.211 -127.607
4 283,149.29 276,935.66 -5.00 25.523 -126.963 -127.551
5 283,149.29 276,935.54 -5.00 25.405 -127.467 -63.511
6 283,151.79 276,935.64 -2.50 25.506 -63.697 0.000
283,154.29 276,935.61 0.00 25.480 0.000 0.000

jumlah -502.171 -503.41


2 Luas 1.241
Luas (m2) 0.620

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+200

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.25 2.29 2.67 1.25


25.906

25.959

26.016

25.998

25.99
ELEVASI
1.25

3.54

6.21

7.46

JARAK LANGSUNG
0

25.842

25.935

25.937

ELEVASI

26.00
25.610
25.608
25.488
25.650
25.447
Y ELEVASI ( M)
25.572
25.569

25.50
25.439

25.504

`
X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+200
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,153.91 276,960.58 0.000 25.608 0.000 -8.184
2 283,153.59 276,960.58 -0.32 25.610 -8.198 -64.016
3 283,151.41 276,960.62 -2.50 25.650 -63.921 -126.189
4 283,148.99 276,960.54 -4.92 25.572 -125.789 -127.818
5 283,148.91 276,960.54 -5.00 25.569 -127.149 -127.802
6 283,148.91 276,960.41 -5.00 25.439 -127.193 -121.840
7 283,149.12 276,960.42 -4.79 25.447 -122.155 -63.608
283,151.41 276,960.47 -2.50 25.504 -63.709 0.000
283,153.91 276,960.46 0.00 25.488 0.000 0.000
- -

jumlah -638.114 -639.46


2 Luas 1.343
Luas (m2) 0.671

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+250

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.04 2.58 2.66 1.07

25.939

25.996

25.982
25.93

25.98
ELEVASI

1.04

3.62

6.28

7.35
JARAK LANGSUNG

0
25.755

25.814

25.76
ELEVASI

26.00

25.608
25.607

25.484
25.624
Y ELEVASI ( M)
25.591

25.50
25.497
25.433

`
25.00
(5.00) (3.00) (1.00) X JARAK ( M) 1.00 3.00 5.00

AGREGAT KELAS A

0+250
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,153.63 276,982.38 0.000 25.608 0.000 -4.863
2 283,153.44 276,982.38 -0.19 25.607 -4.866 -64.016
3 283,151.13 276,982.39 -2.50 25.624 -63.975 -128.114
4 283,148.63 276,982.36 -5.00 25.591 -127.159 -127.947
5 283,148.63 276,982.20 -5.00 25.433 -127.479 -63.581
6 283,151.13 276,982.27 -2.50 25.497 -63.708 0.000
283,153.63 276,982.25 0.00 25.484 0.000 0.000
- -
- -

jumlah -387.188 -388.52


2 Luas 1.334
Luas (m2) 0.667

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+300

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.85
JARAK 1.05 2.52 2.74

25.843
25.914

25.992

25.971
25.843
ELEVASI

1.05

3.57

6.31
7.16
JARAK LANGSUNG

0
25.776

25.829

25.81
ELEVASI

26.00

25.608
25.646

25.484
Y ELEVASI ( M)
25.586

25.50
25.503
25.425

`
25.00
(5.00) (3.00) (1.00) X JARAK ( M) 1.00 3.00 5.00

AGREGAT KELAS A

0+300
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,205.08 276,934.75 0.000 25.608 0.000 -0.248
2 283,205.07 276,934.75 -0.01 25.608 -0.249 -64.012
3 283,202.58 276,934.79 -2.50 25.646 -63.957 -128.203
4 283,200.08 276,934.73 -5.00 25.586 -127.102 -127.904
5 283,200.08 276,934.57 -5.00 25.425 -127.488 -63.556
6 283,202.58 276,934.64 -2.50 25.503 -63.701 0.000
283,205.08 276,934.63 0.00 25.484 0.000 0.000
- -
- -

jumlah -382.497 -383.92


2 Luas 1.426
Luas (m2) 0.713

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+350

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.93
JARAK 2.68 2.61 1.04

25.732
25.847

25.914

25.875
25.87
ELEVASI

0.93

3.61

6.22
7.26
JARAK LANGSUNG

25.714
25.74
25.7
ELEVASI

26.00
25.647

25.608
25.484
Y ELEVASI25.580
25.563( M)

25.50
25.522
25.459

25.00
(5.00) (3.00) (1.00) X JARAK ( M) 1.00 3.00 5.00

AGREGAT KELAS A

0+350
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,205.11 276,960.22 0.000 25.608 0.000 -64.012
2 283,202.61 276,960.26 -2.50 25.647 -63.942 -119.762
3 283,200.44 276,960.19 -4.67 25.580 -119.372 -127.855
4 283,200.11 276,960.17 -5.00 25.563 -127.253 -127.773
5 283,200.11 276,960.07 -5.00 25.459 -127.565 -63.640
6 283,202.61 276,960.13 -2.50 25.522 -63.703 0.000
7 283,205.11 276,960.10 0.00 25.484 0.000 0.000
- -

jumlah -501.835 -503.04


2 Luas 1.208
Luas (m2) 0.604

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+400

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.91
JARAK 2.83 2.49 1.11

25.972
25.676

25.784

25.692

25.672
ELEVASI

0.91

3.74

6.23

7.34
JARAK LANGSUNG

25.525

25.525
25.89
ELEVASI

26.00

25.608
25.597
25.592

25.388
Y ELEVASI ( M)

25.50
25.480
25.385

25.388
25.542
`

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+400
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,202.63 276,984.63 0.000 25.608 0.000 -56.594
2 283,200.42 276,984.62 -2.21 25.597 -56.559 -63.993
3 283,200.13 276,984.61 -2.50 25.592 -63.461 -63.981
4 283,200.13 276,984.41 -2.50 25.385 -63.700 0.000
5 283,202.63 276,984.50 0.00 25.480 0.000 63.445
6 283,205.12 276,984.41 2.49 25.388 63.216 63.447
7 283,205.13 276,984.41 2.50 25.388 63.832 63.447
8 283,205.13 276,984.56 2.50 25.542 63.997 0.000
283,202.63 276,984.63 0.00 25.608 0.000 0.000

jumlah 7.323 5.77


2 Luas 1.552
Luas (m2) 0.776

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+450

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 0.97 2.87 2.59 1.39

25.715

25.778

25.719

25.651
25.69
ELEVASI

0.97

3.84

6.43

7.82
JARAK LANGSUNG
0

25.446

25.471

25.446
ELEVASI
25.66

26.00
25.60
4

8
25.48
25.59

0
25.599
Y ELEVASI ( M)

25.53

25.50
25.48
28

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+450
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,248.73 276,934.61 0.000 25.608 0.000 -64.005
2 283,246.23 276,934.66 -2.50 25.664 -63.982 -125.995
3 283,243.82 276,934.60 -4.91 25.599 -125.668 -127.957
4 283,243.73 276,934.60 -5.00 25.598 -127.373 -127.949
5 283,243.73 276,934.48 -5.00 25.482 -127.647 -63.690
6 283,246.23 276,934.54 -2.50 25.537 -63.685 0.000
7 283,248.73 276,934.48 0.00 25.480 0.000 0.000

jumlah -508.356 -509.60


2 Luas 1.240
Luas (m2) 0.620

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+500

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.05 2.53 2.68 0.99

25.657

25.696

25.643
25.573
25.72
ELEVASI

1.05

3.58

6.26
7.25
JARAK LANGSUNG

25.415

25.417
25.42
ELEVASI

26.00
25.60
25.45 225.57

8
9
25.57
Y ELEVASI ( M)

25.50
25.48

25.40
1
7

9
`

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+500
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,245.45 276,959.44 0.000 25.608 0.000 -58.642
2 283,243.16 276,959.41 -2.29 25.579 -58.559 -63.940
3 283,242.95 276,959.40 -2.50 25.572 -63.636 -63.922
4 283,242.95 276,959.28 -2.50 25.457 -63.695 0.000
5 283,245.45 276,959.31 0.00 25.481 0.000 63.687
6 283,247.95 276,959.24 2.50 25.409 63.870 63.508
283,247.95 276,959.38 2.50 25.554 64.005 0.000
283,245.45 276,959.44 0.00 25.608 0.000 0.000
- -

jumlah -58.015 -59.31


2 Luas 1.294
Luas (m2) 0.647

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+550

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 0.9 2.77 2.69 1.04

25.636
25.608

25.684

25.552
25.6
ELEVASI

3.67

6.36
JARAK LANGSUNG

0.9

7.4
0

25.385
25.35

25.35
ELEVASI

26.00

25.608
25.410 25.531
25.533
Y ELEVASI ( M)

25.50
25.479

25.401
`
X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+550
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,245.46 276,985.21 0.000 25.608 0.000 -62.484
2 283,243.02 276,985.13 -2.44 25.531 -62.299 -63.799
3 283,242.96 276,985.14 -2.50 25.533 -63.498 -63.803
4 283,242.96 276,985.01 -2.50 25.410 -63.669 0.000
5 283,245.46 276,985.08 0.00 25.479 0.000 63.664
6 283,247.96 276,985.00 2.50 25.401 63.787 63.469
283,247.96 276,985.13 2.50 25.528 63.987 0.000
283,245.46 276,985.21 0.00 25.608 0.000 0.000

jumlah -61.693 -62.95


2 Luas 1.260
Luas (m2) 0.630

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+600

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.01 2.98 2.57 1.09

25.463
25.494

25.582

25.477

25.447
ELEVASI

1.01

3.99

6.56

7.65
JARAK LANGSUNG

0
25.271

25.321

25.271
ELEVASI

26.00

25.608
25.553

25.533
25.544
Y ELEVASI ( M)

25.50
25.480
25.608
25.406

25.378
X25.00
JARAK ( M) `
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+600
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,302.80 276,936.72 0.000 25.608 0.000 -59.154
2 283,300.49 276,936.67 -2.31 25.553 -59.006 -63.860
3 283,300.30 276,936.66 -2.50 25.544 -63.493 -63.836
4 283,300.30 276,936.52 -2.50 25.406 -63.677 0.000
5 283,302.80 276,936.60 0.00 25.480 0.000 63.672
6 283,305.30 276,936.49 2.50 25.378 63.805 63.417
283,305.30 276,936.65 2.50 25.533 63.992 0.000
283,302.80 276,936.72 0.00 25.608 0.000 0.000

jumlah -58.379 -59.76


2 Luas 1.383
Luas (m2) 0.691

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+650

DL = 20M
NOMOR TITIK 1 2 AS 3 4

JARAK 1.01 2.56 2.82 1.25

25.433
25.436

25.465

25.419

25.386
ELEVASI

1.01

3.57

6.39

7.64
JARAK LANGSUNG

0
25.229

25.289

25.222
ELEVASI

26.00

25.608
25.452 25.580

25.565
25.580
Y ELEVASI ( M)

25.50
25.480
25.608

25.439
`
X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+650
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,302.44 276,961.34 0.000 25.608 0.000 -63.764
2 283,299.95 276,961.31 -2.49 25.580 -63.694 -63.947
3 283,299.94 276,961.31 -2.50 25.580 -63.627 -63.947
4 283,299.94 276,961.18 -2.50 25.452 -63.697 0.000
5 283,302.44 276,961.21 0.00 25.480 0.000 63.690
6 283,304.94 276,961.17 2.50 25.439 63.902 63.588
283,304.94 276,961.30 2.50 25.565 64.010 0.000
283,302.44 276,961.34 0.00 25.608 0.000 0.000

jumlah -63.106 -64.38


2 Luas 1.275
Luas (m2) 0.637

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+700

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.89
JARAK 2.67 2.77 1.04

25.327
25.355

25.439

25.381
25.392
ELEVASI

0.89

3.56

6.33
7.37
JARAK LANGSUNG

0
25.114

25.187

25.124
ELEVASI
25.656

26.00

25.608
25.476
25.568
Y ELEVASI ( M)
25.562

25.528

25.50
25.449

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+700
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,305.01 276,985.25 0.000 25.608 0.000 -64.010
2 283,302.51 276,985.30 -2.50 25.656 -63.910 -123.908
3 283,300.18 276,985.21 -4.83 25.568 -123.454 -127.783
4 283,300.01 276,985.21 -5.00 25.562 -127.191 -127.754
5 283,300.01 276,985.10 -5.00 25.449 -127.583 -63.613
6 283,302.51 276,985.17 -2.50 25.528 -63.679 0.000
283,305.01 276,985.12 0.00 25.476 0.000 0.000
- -
- -

jumlah -505.816 -507.07


2 Luas 1.251
Luas (m2) 0.626

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+750

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.82
JARAK 2.85 2.73 1.09

25.173
25.249

25.321

25.303

25.26
ELEVASI

0.82

3.67

7.49
JARAK LANGSUNG

6.4
0

25.032

25.092

25.032
ELEVASI

26.00
25.61
25.60
0
25.48
8
25.63

3
25.50 1
Y ELEVASI ( M)
25.56

25.50
7 6
25.43

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+750
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,348.59 276,936.73 0.000 25.608 0.000 -1.278
2 283,348.54 276,936.73 -0.05 25.610 -1.279 -64.022
3 283,346.09 276,936.75 -2.50 25.631 -63.912 -128.131
4 283,343.59 276,936.69 -5.00 25.566 -127.160 -127.806
5 283,343.59 276,936.56 -5.00 25.437 -127.476 -63.589
6 283,346.09 276,936.62 -2.50 25.500 -63.706 0.000
283,348.59 276,936.60 0.00 25.483 0.000 0.000
- -
- -

jumlah -383.533 -384.83


2 Luas 1.293
Luas (m2) 0.647

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+800

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.89
JARAK 1.09 2.94 2.65

25.303

25.356

25.413

25.396
25.417
ELEVASI

1.09

4.03

6.68
7.57
JARAK LANGSUNG

25.087

25.147

25.097
ELEVASI

26.00
25.60
8
25.62
25.49 2
Y ELEVASI ( M)
25.55

25.50
25.44
75

`
X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+800
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,349.39 276,963.66 0.000 25.608 0.000 -0.512
2 283,349.37 276,963.66 -0.02 25.608 -0.512 -64.019
3 283,346.89 276,963.67 -2.50 25.622 -63.888 -128.084
4 283,344.39 276,963.60 -5.00 25.555 -127.212 -127.753
5 283,344.39 276,963.50 -5.00 25.447 -127.455 -63.618
6 283,346.89 276,963.55 -2.50 25.496 -63.699 0.000
7 283,349.39 276,963.53 0.00 25.479 0.000 0.000
- -

jumlah -382.765 -383.99


2 Luas 1.220
Luas (m2) 0.610

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+850

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.93
JARAK 2.47 2.8 1.32

25.369
25.364

25.416

25.416

25.369
ELEVASI

0.93

7.52
JARAK LANGSUNG

3.4

6.2
0

25.118

25.181

25.181
ELEVASI

26.00
25.61
25.60
7
8
25.61
25.43

5
7
Y ELEVASI ( M)
25.56

25.50
25.43
7 21

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+850
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283347.3455 276984.8902 0.000 25.608 0.000 -6.402
2 283347.0955 276984.8993 -0.25 25.617 -6.404 -64.043
3 283344.8455 276984.8973 -2.50 25.615 -63.903 -127.563
4 283342.3655 276984.8433 -4.98 25.561 -127.299 -127.790
5 283342.3461 276984.8443 -5.00 25.562 -127.171 -127.795
6 283342.3461 276984.7194 -5.00 25.437 -127.170 -126.423
7 283342.3755 276984.7193 -4.97 25.437 -126.681 -63.593
283344.8455 276984.7713 -2.50 25.489 -63.723 0.000
283347.3455 276984.7713 0.00 25.489 0.000 0.000

jumlah -642.350 -643.61


2 Luas 1.259
Luas (m2) 0.629

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+900

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.87
JARAK 0.96 2.88 2.39

25.264

25.196
25.31

25.24
25.2
ELEVASI

0.96

3.84

6.23
JARAK LANGSUNG

7.1
0

24.994

25.033

24.997
ELEVASI

26.00
25.483 25.608
25.571

25.517
25.443
Y ELEVASI ( M)

25.50

25.413
25.408
25.547
`

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+900
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,403.27 276,935.23 0.000 25.608 0.000 -64.015
2 283,400.77 276,935.19 -2.50 25.571 -63.603 -63.923
3 283,400.77 276,935.06 -2.50 25.443 -63.702 0.000
4 283,403.27 276,935.10 0.00 25.483 0.000 60.904
5 283,405.66 276,935.03 2.39 25.413 60.724 63.489
6 283,405.77 276,935.03 2.50 25.408 63.748 63.476
7 283,405.77 276,935.14 2.50 25.517 63.824 54.350
283,405.40 276,935.17 2.13 25.547 54.545 0.000
283,403.27 276,935.23 0.00 25.608 0.000 0.000
- -

jumlah 115.536 114.28


2 Luas 1.254
Luas (m2) 0.627

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+950

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.67

0.71
JARAK 2.8 2.58

25.226

25.274

25.212
25.2

25.2
ELEVASI

0.67

3.47

6.05
6.76
JARAK LANGSUNG

25.068

25.089

25.019
ELEVASI
25.521 25.646

26.00
25.608
25.461
25.600
Y ELEVASI ( M)
25.597

25.50
25.478

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+950
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,404.91 276,966.67 0.000 25.608 0.000 -64.012
2 283,402.41 276,966.70 -2.50 25.646 -63.991 -127.194
3 283,399.95 276,966.66 -4.96 25.600 -126.955 -127.980
4 283,399.91 276,966.66 -5.00 25.597 -127.371 -127.969
5 283,399.91 276,966.54 -5.00 25.478 -127.585 -63.687
6 283,402.41 276,966.58 -2.50 25.521 -63.644 0.000
283,404.91 276,966.52 0.00 25.461 0.000 0.000
- -
- -

jumlah -509.545 -510.84


2 Luas 1.296
Luas (m2) 0.648

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana
LEMBAR PERHITUNGAN KUANTITAS

AGREGAT KELAS A

PAKET : REVITALISASI JALAN AKSES REFUELLER DARI DAN KE DPPU RANAI MENUJU APRON
PEMILIK PROYEK : PT PERTAMINA PATRA NIAGA
LOKASI : DPPU RANAI ( HANG NADIM GROUP)
KONTRAKTOR : PT. ANEKA PRATAMA
SKETSA GAMBAR

0+990

DL = 20M
NOMOR TITIK 1 2 AS 3 4

0.89

0.88
JARAK 2.44 2.62

25.199

25.282

25.169
25.13

25.22
ELEVASI

0.89

3.33

5.95
6.83
JARAK LANGSUNG

0
24.946

25.007

24.948
ELEVASI

26.00
25.67

25.60
0

25.48
8
Y ELEVASI 25.59

4
25.45 8
( M)

25.54

25.50
25.46

25.59
3
05

X25.00
JARAK ( M)
(5.00) (3.00) (1.00) 1.00 3.00 5.00

AGREGAT KELAS A

0+990
No Koordinat Perhitungan
Titik X Y X = x2-x1 ( m ) Y = y2-y1 ( m ) 2L ∑ ( Xn*(Yn+1) - ∑ (Yn*(Xn+1)
Jarak Elevasi Xn*(Yn+1) Yn*(Xn+1)
1 283,403.07 276,989.07 0.000 25.608 0.000 -58.386
2 283,400.79 276,989.13 -2.28 25.670 -58.363 -122.674
3 283,398.29 276,989.05 -4.78 25.598 -121.649 -122.328
4 283,398.29 276,988.91 -4.78 25.455 -121.671 -120.149
5 283,398.35 276,988.92 -4.72 25.460 -120.563 -58.049
6 283,400.79 276,989.00 -2.28 25.543 -58.103 5.591
7 283,403.29 276,988.94 0.22 25.484 5.602 5.578
283,403.29 276,989.05 0.22 25.593 5.606 0.000
283,403.07 276,989.07 0.00 25.608 0.000 0.000

jumlah -469.140 -470.42


2 Luas 1.277
Luas (m2) 0.638

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


KONTRAKTOR PELAKSANA
PT. ANEKA PRATAMA

ARIA YOGA ADITAMA, ST


Inspector Pelaksana