Gambar Rabat Beton 2 - Compressed (1) - 2
Gambar Rabat Beton 2 - Compressed (1) - 2
538
4.750
4.596
4.769
Mushola
4.049
4.301
4.992
4.684
Fakultas Pertania
5.095
5.049
4.982
5.181
n
Jalan Existing 5.179 5.189
5.069 5.184
4.920 5.234
5.101
4.610 4.301
4.049 4.836 4.7
4.508 35
4.7
4.816 4.2 93
4.462 4.8 47
5.0 82
5.0 02 4.194 4.172
5.1 84 3.756 4.984
STA STA 5.1 47 4.263 4.192
0+000 0+018 07 3.567 4.937
3.072
elu
0+ TA 3.917 3.590
06 4.464 4.137 3.813
B 8
ak 4.406 4.079
Sem
r
ka STA STA
10.000
9.000
8.000
5.000
4.000
5.179
5.189
5.084
5.012
4.917
4.937
4.937
4.992
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
18.000 50.000 50.000 50.000 50.000
DISTANCE (m)
5.355
5.355
5.350
2.236
5.122
5.008
0+215,5 5.008
5.000
ELEVASI RENCANA
PLANE LEVEL
0+215,5
0+219
PATOK
STATION
0+000 0+018 0+068 0+118 0+168
MENGETAHUI/MENYETUJUI
PEKERJAAN : KETERANGAN NAMA PARAF JUDUL GAMBAR
PEJABAT PEMBUAT KOMITMEN -(PPK)
UNIVERSITAS TEUKU UMAR
LANJUTAN PENINGKATAN JALAN RABAT BETON SBSN
GEDUNG KULIAH TERINTEGRASI U-2 TAHAP IV UNIVERSITAS TEUKU UMAR DIRENCANA
KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN