Realisasi Trend Susut
Realisasi Trend Susut
Realisasi Realisasi Realisasi Realisasi
Bulan Kumulatif Kumulatif Target 2019
Bulanan 2018 Bulanan 2019 Realisasi Bulanan 2018 Realisasi Bulanan 2019 Realisasi Kumulatif 2018
2018 2019
Realisasi Kumulatif 2019 Target 2019
Jan 4.00 4.50 4.00 4.50 4.42
6.00
Feb 4.03 4.44 4.02 4.47 4.33
Mar 4.94 3.77 4.35 4.24 4.31
Apr 5.60 4.28 4.69 4.25 4.32
5.50
Mei 4.27 3.40 4.60 4.08 4.30
Jun 4.45 2.26 4.58 3.79 4.29
Jul 4.57 3.80 4.58 3.79 4.29 5.00
Ags 4.12 3.32 4.52 3.74 4.28
Sep 3.78 3.90 4.44 3.75 4.29
Okt 5.06 4.19 4.51 3.80 4.09 4.504.424.50 4.334.47 4.31 4.32 4.30 4.29 4.29 4.28 4.29
Nov 3.82 3.75 4.44 3.80 3.92
4.24 4.25 4.09
Des 2.86 3.37 4.30 3.75 3.76
4.08 3.92
4.00
3.76
3.79 3.79 3.75 3.80 3.80 3.75
3.74
Susut Bulanan
3.50
Unit NOV DES Penurunan
Edit unit --> ULP KUTA 3.75 3.37 0.38 Emoji 3.00
2.50
TARGET SUSUT
TARGET 2019 GAP TARGET WCC 2020 GAP
3.76 -0.01 4.00 -0.25 2.00
Jan Feb Ma r Apr Mei Jun Jul Ags Sep Okt Nov Des
kWh Produksi
Pembangkit
kWh Terima di GI kWh Exim kWh IPP (PLTS Banglet)
Sendiri NO URAIAN ANALISA
Bulan kWh
Total
kWh Transaksi kWh Pembanding Deviasi (kWh) Deviasi (%) dengan ULP Mengwi dengan ULP Denpasar dengan ULP Sanur kWh Transaksi Deviasi (kWh) Deviasi (%) PLTD Kutampi
Pembanding
kWh Terima di GI turun dari bulan sebelumnya Susut distribusi menurun
Jan 164,617,191 164,895,580 - 278,389 -0.17% 507,120 707,180 1,117,020 - #DIV/0! 1
kWh EXIM dengan semua ULP Naik Terjadi manuver pada penyulang ... Yang disuplai dari penyulang ...
Feb 152,348,326 153,229,050 - 880,724 -0.58% 288,640 442,390 618,539 - #DIV/0! 2 Selama .... Hari
Mei 84,241,608 74,830,000 153,508 211,668 7,514 418,199 114,479 84,241,608 75,202,690 159,444,298 5
Jun 80,226,497 67,572,852 47,002 216,988 - 405,265 114,479 80,226,497 67,836,842 148,063,339 6
Jul 80,225,777 66,359,756 168,615 176,697 3,753 360,305 114,479 80,225,777 66,708,821 146,934,598
Ags 80,592,020 66,964,757 607,318 186,352 3,108 412,442 114,479 80,615,020 67,784,535 148,399,555
Sep 79,653,966 66,655,817 152,366 156,924 6,751 352,527 114,479 79,674,966 66,992,858 146,667,824
Okt 88,075,177 76,243,949 149,388 184,494 4,213 359,536 114,479 88,097,625 76,450,891 164,548,516
Nov 86,957,252 77,698,382 74,192 155,553 7,570 345,247 114,479 86,979,252 77,853,935 164,833,187 22000
Des 95,462,187 85,927,824 535,106 178,040 65 352,180 114,479 95,489,187 86,105,864 181,595,051 27000
Rata-Rata 84,049,103 72,697,339 219,383 193,877 4,837 #DIV/0! 378,571 114,479 84,058,724 73,056,762 157,115,486
KWH JUAL DI LAPORAN SUSUT BATAN EIS : TUL 309 EIS : AP2T TAGIHAN
SUMBER DATA DIKURANGI EXTRAORDINARY LAPORAN TS P2TL + (LIHAT AP2T) PRA BAYAR (Stand LUNAS TERPUSAT
PENETAPAN TS KWH MONITORING PESTA Bongkar yg di Lunas DPDT)
oleh UJL) LAPORAN LEGALISASI
kWh Jual
kWh Jual TM Tanpa kWh Jual TR Tanpa Extraordinary PJU
Bulan Extraordinary Extraordinary kWh Jual TM kWh Jual TR Total
P2TL Multiguna Kompensasi UJL kWh Import Meterisasi Non Meterisasi
November 86,957,252 77,698,382 74,192 155,553 7,570 - 345,247 114,479 86,979,252 77,853,935 164,833,187
Desemeber 95,462,187 85,927,824 535,106 178,040 65 - 352,180 114,479 95,489,187 86,105,864 181,595,051 10.2%
%thd bulan lalu 110% 111% 721% 114% 1% #DIV/0! 102% 100% 110% 111% 110%
%thd rata-rata 114% 118% 244% 92% 1% #DIV/0! 93% 100% 114% 118% 116%
200,000,000
180,000,000 kWh Jual
160,000,000
140,000,000
120,000,000
100,000,000
80,000,000
60,000,000
40,000,000
20,000,000
-
1 2 3 4 5
Komposisi kWh Jual Cluster Asset
Unit RATA2 PANJANG PENY. Jumlah Trafo Per Peny. Rata2 Panjang Jurusan
(KMS) kVA Rata2 per Trafo (kVA) (buah) Pembebanan Trafo (%) (kms) Rata2 Panjang SR (ms)
TT & TM (%) TR (%)
Desember November Desember November Desember November Desember November Desember November Desember November
ULP KUTA 54% 46% 16.89 18.52 195 194.72 22 24 0.32 0.30 0.194 0.19 13.478 13.23
Oktober 5
%naik -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% 6
250.00
Monitoring Tegangan
22.0
21.5 200.00
21.0
150.00
20.5
20.0
100.00
19.5
19.0
50.00
18.5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SEPTEMBER
TERTINGGI TERENDAH
1 2 3 4 MAX 1 2 3 4 MIN
ANTOSARI I 20.27 20.94 21.02 21.03 21.03 20.27 20.27 20.06 20.05 20.05
II 20.44 21.12 21.07 21.09 21.12 20.44 20.44 20.22 20.15 20.15
BATURITI I 20.15 20.89 20.99 20.98 20.99 20.15 20.15 20.31 20.30 20.15
II 20.26 20.94 21.18 21.15 21.18 20.26 20.26 20.41 20.43 20.26
GIANYAR I 20.39 21.17 21.07 20.93 21.17 20.39 20.39 20.22 20.20 20.20
II 20.39 21.19 21.24 20.99 21.24 20.39 20.39 20.27 20.31 20.27
KAPAL I 20.15 20.99 21.19 21.19 21.19 20.15 20.15 20.38 20.36 20.15
II 20.17 20.98 21.17 21.19 21.19 20.17 20.17 20.38 20.41 20.17
III 20.14 20.77 20.95 20.98 20.98 20.14 20.14 20.30 20.25 20.14
IV 20.24 21.01 21.01 20.95 21.01 20.24 20.24 20.20 20.14 20.14
NUSA DUA I 19.80 20.68 20.81 20.82 20.82 19.80 19.80 20.15 20.16 19.80
II 20.23 20.95 20.68 20.72 20.95 20.23 20.23 20.11 19.93 19.93
III 20.08 20.82 20.70 20.73 20.82 20.08 20.08 20.11 19.94 19.94
PESANGGARAN III 20.48 20.47 20.99 21.01 21.01 20.48 20.48 20.20 20.19 20.19
IV 20.82 20.82 20.99 21.02 21.02 20.82 20.82 20.17 20.19 20.17
V 20.07 20.07 20.81 20.84 20.84 20.07 20.07 20.10 20.11 20.07
SANUR I 20.07 20.89 21.02 20.98 21.02 20.07 20.07 20.29 20.38 20.07
II 20.27 21.04 21.05 21.09 21.09 20.27 20.27 20.32 20.31 20.27
III 20.21 21.01 20.58 20.60 21.01 20.21 20.21 20.16 20.15 20.15
IV 20.06 21.00 21.00 20.06 20.06 20.06
AMLAPURA I 20.10 21.08 20.91 20.90 21.08 20.10 20.10 20.11 20.18 20.10
II 20.19 21.05 20.79 20.74 21.05 20.19 20.19 20.17 20.22 20.17
GILIMANUK I 20.56 20.48 20.56 19.99 19.99 19.99
II 20.23 20.94 20.55 20.51 20.94 20.23 20.23 20.03 20.04 20.03
NEGARA I 20.32 20.99 20.65 20.56 20.99 20.32 20.32 20.08 20.07 20.07
II 20.16 20.60 20.85 20.75 20.85 20.16 20.16 20.24 20.26 20.16
III 20.96 21.01 21.01 20.27 20.24 20.24
PEMARON I 20.32 20.99 21.11 21.10 21.11 20.32 20.32 20.36 20.36 20.32
II 20.18 20.94 21.00 20.91 21.00 20.18 20.18 20.31 20.30 20.18
PADANGSAMBIAN I 20.07 20.81 21.46 20.92 21.46 20.07 20.07 20.28 20.31 20.07
II 20.12 20.95 20.52 20.77 20.95 20.12 20.12 19.94 19.97 19.94
III 20.28 20.96 20.67 20.64 20.96 20.28 20.28 20.09 20.15 20.09
PAYANGAN I 20.25 20.98 20.85 20.84 20.98 20.25 20.25 20.26 20.24 20.24
II 20.34 21.13 20.74 20.72 21.13 20.34 20.34 19.89 20.25 19.89
PEMECUTAN I 20.04 20.80 20.56 20.52 20.80 20.04 20.04 19.98 20.01 19.98
II 20.08 20.84 20.56 20.49 20.84 20.08 20.08 19.99 20.04 19.99
III 20.20 21.01 20.54 20.56 21.01 20.20 20.20 19.97 20.01 19.97
IV 19.99 20.95 20.91 20.60 20.95 19.99 19.99 20.10 20.55 19.99
GIS BANDARA I 20.03 20.75 20.93 20.89 20.93 20.03 20.03 20.24 20.81 20.03
II 20.05 20.78 20.88 20.30 20.88 20.05 20.05 20.21 20.26 20.05
GIS CELUKAN BAWANG I 20.13 20.80 20.54 20.60 20.80 20.13 20.13 20.03 19.97 19.97
AGUSTUS
ANTOSARI I 20.72 20.98 20.98 20.98 20.10 20.30 20.30 20.10
II 20.76 21.16 21.16 21.16 20.09 20.42 20.43 20.09
BATURITI I 21.10 20.90 20.91 21.10 20.28 20.19 20.21 20.19
II 20.94 20.98 20.98 20.98 20.12 20.27 20.29 20.12
GIANYAR I 21.10 21.20 21.22 21.22 20.33 20.41 20.40 20.33
II 21.12 21.16 21.15 21.16 20.34 20.40 20.35 20.34
KAPAL I 21.15 20.96 20.96 21.15 20.24 20.17 20.18 20.17
II 21.15 20.98 20.96 21.15 20.20 20.17 20.14 20.14
III 20.84 20.76 20.77 20.84 20.14 20.14 20.13 20.13
IV 21.07 21.01 20.97 21.07 20.30 20.28 20.23 20.23
NUSA DUA I 20.60 20.56 20.63 20.63 19.85 19.80 19.84 19.80
II 20.67 20.70 20.91 20.91 20.05 20.08 20.27 20.05
III 20.37 20.35 20.76 20.76 19.64 19.72 20.16 19.64
PESANGGARAN III 20.57 20.83 20.83 20.83 19.93 20.06 20.08 19.93
IV 20.54 20.83 20.85 20.85 19.93 20.05 20.05 19.93
V 20.56 20.84 20.84 20.84 19.94 20.05 20.07 19.94
SANUR I 20.80 20.89 20.85 20.89 19.72 20.01 20.08 19.72
II 21.06 21.08 21.08 21.08 20.04 20.22 20.29 20.04
III 21.01 21.03 21.03 21.03 20.25 20.22 20.21 20.21
IV 20.82 20.80 20.83 20.83 19.95 20.05 20.04 19.95
AMLAPURA I 21.08 21.05 21.09 21.09 20.07 20.06 20.06 20.06
II 21.00 21.11 21.06 21.11 19.41 20.19 20.18 19.41
GILIMANUK I 21.04 20.97 20.97 21.04 20.26 20.29 20.32 20.26
II 21.01 21.22 21.30 21.30 20.19 20.03 20.16 20.03
NEGARA I 21.04 20.97 21.05 21.05 20.29 20.26 20.32 20.26
II 20.81 20.71 20.61 20.81 20.07 20.10 20.16 20.07
III 20.82 20.82 20.20 20.20
PEMARON I 20.99 20.94 20.94 20.99 20.17 20.30 20.30 20.17
II 21.40 21.42 20.92 21.42 20.20 20.22 20.21 20.20
PADANGSAMBIAN I 20.64 20.63 20.81 20.81 19.85 19.82 20.05 19.82
II 20.71 20.68 20.92 20.92 19.93 20.04 20.18 19.93
III 20.82 20.88 20.96 20.96 20.14 20.15 20.38 20.14
PAYANGAN I 20.73 20.95 20.93 20.95 20.02 20.20 20.25 20.02
II 20.73 21.07 21.05 21.07 20.01 20.04 20.35 20.01
PEMECUTAN I 20.52 20.79 20.79 20.79 19.83 19.98 20.04 19.83
II 20.56 20.83 20.83 20.83 19.97 20.10 20.10 19.97
III 20.64 21.01 20.99 21.01 19.76 19.88 20.18 19.76
IV 20.78 20.96 20.96 20.96 20.13 20.26 20.29 20.13
GIS BANDARA I 20.67 20.68 20.68 20.68 19.97 20.08 20.08 19.97
II 20.65 20.70 20.70 20.70 19.98 20.10 20.05 19.98
GIS CELUKAN BAWANG I 20.85 20.80 20.77 20.85 19.96 20.12 20.20 19.96
ASSET (FORMULA JOGJA) Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nov Des Gap Bulan ini
thd Bulan Lalu
JTM
JUMLAH PENYULANG (Penyulang) 91 91 91 93 93 93 93 93 93 93 93 102 9.00
PANJANG PENYULANG (kms) 1712.213 1712.226 1712.226 1716.599 1716.454 1716.297 1716.297 1716.297 1716.465 1722.067 1722.395 1722.434 0.04
RATA-RATA PANJANG PENYULANG (kms) 19 19 19 18 18 18 18 18 18 19 19 17 -1.63
BEBAN PENYULANG (kVA) 226,024 226,024 213,982 226,748 216,524 206,518 206,817 207,958 212,554 231,419 241,802 260,127 18325.24 akar3.V.I
BEBAN PENYULANG RATA-RATA (kVA) 3,293 3,357 2,719 2,772 2,891 2,621 2,717 2,526 2,947 3,093 3,525 2,578 -947.38
TRAFO
JUMLAH TRAFO (unit) 2,209 2,209 2,209 2,228 2,237 2,238 2,238 2,238 2,238 2,258 2,267 2,270 3.00
JUMLAH KVA TRAFO (kVA) 428345 428345 428345 433695 435025 435225 435225 435225 435225 439,825 441,435 442,035 600.00
JARAK ANTAR DUA TRAFO (kms) 0.78 0.78 0.78 0.77 0.77 0.77 0.77 0.77 0.77 0.76 0.76 0.76 0.00 Panjang JTM dibagi jumlah trafo
KVA RATA-RATA TRAFO (kVA) 193.91 193.91 193.91 194.66 194.47 194.47 194.47 194.47 194.47 195 195 195 0.01
PEMBEBANAN TRAFO (kVA) 57 58 55 58 55 50 50 50 52 57 59 63 3.89 Iek per item
PEMBEBANAN TRAFO (%) 29.31% 30.04% 28.21% 30.03% 28.47% 25.87% 25.49% 25.67% 26.51% 29.15% 30.21% 32.20% 0.02
JTR
PANJANG JTR (kms) 819.131 819.131 819.131 837.494 842.06 841.951 841.951 841.951 841.951 845.81 853.296 858.44 5.14
RATA-RATA PANJANG JTR (kms) 0.193 0.193 0.193 0.195 0.195 0.195 0.195 0.195 0.195 0.193 0.194 0.194 0.00
BEBAN RATA-RATA JTR (kVA) 62.05 63.73 59.71 67.63 44.93 40.81 40.21 40.50 57.49 63.04 58.04 50.59 -7.45 beban trafo /jurusan
JUMLAH JURUSAN (Jurusan) 4234 4234 4234 4291 4318 4321 4321 4321 4321 4,381 4,408 4,417 9.00
SR
PANJANG SR (kms) 1,647 1,647 1,647 1,667 1,673 1,678 1,678 1,678 1,679 1,705 1,721 1,762 41.16
PANJANG RATA-RATA SR (ms) 13.268 13.203 13.144 13.252 13.222 13.232 13.166 13.107 13.037 13.213 13.231 13.478 0.25
JUMLAH PELANGGAN (Pelanggan) 124,096 124,711 125,269 125,825 126,510 126,844 127,478 128,054 128,758 129,037 130,044 130,715 671.00
PENGUKURAN Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nov Des Gap Bulan ini
thd Bulan Lalu
BEBAN PENYULANG
JUMLAH PENYULANG BEBAN < 50% 45 45 65 58 57 61 67 17 19 52 41 67 26
JUMLAH PENYULANG BEBAN 50% - 70% 30 30 22 28 23 29 24 73 60 33 36 22 -14
JUMLAH PENYULANG BEBAN >70% 15 15 4 5 11 1 2 3 14 8 16 13 -3
BEBAN TRAFO
JUMLAH TRAFO BEBAN < 30% 249 360 556 764 372 -392
JUMLAH TRAFO BEBAN 30% - 50% 68 101 255 334 209 -125
JUMLAH TRAFO BEBAN 50% - 70% 26 40 109 127 77 -50
JUMLAH TRAFO BEBAN > 70% 5 5 13 49 35 -14
ABB 25
Jumlah Yang Diperiksa Penggantian Meter Tua Data kWh Meter Rusak ACTAR 32
NO URAIAN Rencana Tindak Waktu penyelesaian
Lanjut (tgl/bln/thn) Pasca Thn % THD JUMLAH
TOTAL Tindak Lanjut Progress (%) KRN 1 2000-2009 Pasca < Thn 2000 NO MERK KWH METER POPULASI RUSAK RUSAK
populasi Des
Bulan ACTARIC2 19
Kondisi Fisik Target Realisasi Target Realisasi Target Realisasi 1 ACTARIS 4587 0.00% 4587 ACTARIS 263
I.1 Normal - Jan 82 397 2 CANNET 3760 0.00% 3760 ACTARIS3 19
I.2 Kaca Buram / Pecah 43 43 100.00% Feb 186 213 3 EDMI 2987 2 0.07% 2989 2 ATLAS 2
I.3 Segel Tidak Ada / Tidak Lengkap - Mar 950 4 FDE 2818 23 0.82% 2841 23 AUSTR 1
I.4 MCB Tidak Sesuai Daya Kontrak - - - Apr 1178 46 5 ITRON 24144 1 0.00% 24145 1 BBC 1
I.5 Time Switch Tidak Ada - Mei 987 891 6 LIPUVINDO 25 2 8.00% 27 2 CANNET 2331
I.6 Time Switch Error - Jun 273 678 7 MECOINDO 153 0.00% 153 DLMS 13
I.7 Tidak Ada kWh Meter - Jul 1076 1629 8 MELCOINDA 8872 32 0.36% 8904 32 DSM 1
Jumlah 43 43 100% Agu 1236 653 9 METBELOSA 1903 19 1.00% 1922 19 EDMATLAS 2
Penempatan Sep 1924 398 10 OSAKI 25 1 4.00% 26 1 EDMI 1508
I.8 Normal - Okt 1321 230 492 11 SANXING 5757 4 0.07% 5761 4 ELSTE 2
I.9 Tinggi, tidak terjangkau 90 0.00% Nov 296 660 3 12 SCHLUMBERGER 1318 11 0.83% 1329 11 FDE 149
I.10 Di dalam bangunan 28 0.00% Des 7 6 6 13 SIGMA 56 1 1.79% 57 1 FUJI 97
I.11 Pagar terkunci 647 0.00% Total 0 9516 0 5801 0 501 14 SMART METER 35960 3 0.01% 35963 3 FUJI DARM 104
I.12 Bangunan Kosong 1,011 0.00% 15 WASION 3409 8 0.23% 3417 8 FUJI DHA 452
I.13 Persil ada anjing galak 56 0.00% 16 GOLDSTAR 6 0.00% 6 FUJI DHAR 634
jumlah 1,832 - 0.00% 17 SAINT 64 0.00% 64 FUJI ELECT 39
Performansi 18 HEXING 25760 0.00% 25760 FUJII 1
I.14 Pengukuran Normal - 19 MITSUBISHI 26 0.00% 26 GANZ 3
I.15 Pengukuran mundur - TOTAL 121630 107 0% GOLD STAR 5
I.16 Pengukuran Berhenti 26 26 100.00% HEX 188
Jumlah 26 26 100.00% HEXING 23
HEXING EL 1
I TRON 166
ILATO 1
INTI 1
ITRON 25
ITRONS 6
JASA 1
LANDIS GI 2
LANDZ 1
LESTR 1
LG 1
LIPOPINDO 14
LIPOVINDO 11
LIPUVINDO 5
LKNES 6
MECIN 2
MECOINDO 177
MELCO 11
MELCO IN 3616
MELCOIND 3222
MELCOIND 54
MEP1 1
MEPI 3
METBE 4
METBELOS 2137
METBELOS 18
METBELOS 12
METRICO 1
MITSB 2
MITSUBISH 30
OSAKI 13
OSAKI ELE 21
PAFAL 1
PRODIGY 1
SAINT 66
SANXING 3024
SCHLUMBE 1472
SGRID 332
SHANG 1
SIGMA 7
SIGMA BIN 18
SIGMA E 9
SIGMA ELE 23
SLOVENIA 5
SMAR T 13
SMART 14980
SMART ME 196
SMARTMET 29
SMC 34
TRAFINDO 1
VC 1
VILINDO 1
VLNDO 2
WASION 3242
WATTHOU 2
(blank)
- 4269
Grand Tota 43211
Jumlah Gangguan
Jenis Gangguan Jan Feb Mar Apr Mei Jun Jul Agu Sep Okt Nov Des
1. JTM 1708 2379
2. Gardu 837 664
3. JTR 271 729 171 194 127 104 111 27 116 154 179 323
4. SR 932.0 162.0 838 725 776 558 472 146 528 591 663 808
5. APP Periksa 777 85 674 681 551 467 535 99 657 724 684 787
6. APP Rusak
NO URAIAN ANALISA
kWh Produksi naik Sebesar 10 % kwh salur naik dikarenakan pemakaian pelanggan bertambah drpd bulan
1 sebelumnya
kWh Jual naik Sebesar 10 % kwh jual naik baik dari sisi kwh jual TR,TM maupun extraordinary
2
Penyebab Anomali (Naik/Turun kWh Produksi tidak tidak ada anomali, kWh produksi naik begitupun kWh jual
3 sama dengan Naik/Turun kWh Jual)
Penyebab Susut Teknis, Aset dan Tegangan Susut teknis turun karena oeprasi GIS Pecatu dengan penambahan
4 (Pekerjaan Penurunan Susut) penyulang dengan total 102 penyulang
Penyebab Susut Non Teknis (APP, P2TL, PJU) Perolehan kwh p2tl naik 140% dari bulan lalu, untuk penggantian APP
5 turun karena realisasi kontrak sudah terpenuhi
Lain-lain
6
pro jualan
170726779.815058 164548516
170220001.160984 164833187
-506778.65407455 284,671
-0.2968360644 0.173
NO KESIMPULAN
1 Susut bulan Desember 2019 turun 0.38 % dari bulan November 2019
5
KETERANGAN
Bulan Lalu dan Bulan-Bulan Lalu yang belum terealisasi
November
NO PERMASALAHAN PENYEBAB TINDAK LANJUT KET KETERANGAN PIC Status
M1 M2 M3 M4
1 MASIH ADA SUSUT NON TEKNIS
MASIH ADA PENYALAH GUNAAN TENAGA LISTRIK MELAKSANAKAN P2TL REN 66,863 66,863 66,863 66,863
REAL 19 19 19 19
2 MASIH ADA SUSUT NON TEKNISkWh meter Tua & pemeriksaan LPB blm optimal
melaksanakan program GM dan pemeriksaan LPB REN
REAL 129 129 129 129
3 SUSUT TEKNIS MASIH TINGGI MASIH ADA TRAFO OVER/UNDER LOAD MANAJAMEN TRAFO REN 5 5 5 5
REAL 4 4 5 5
4 SUSUT TEKNIS MASIH TINGGI TRAFO UNBALANCE PENYEIMBANGAN BEBAN TRAFO REN
REAL
Bulan Ini
Desember
NO PERMASALAHAN PENYEBAB TINDAK LANJUT KET KETERANGAN PIC Status
M1 M2 M3 M4
1 MASIH ADA SUSUT NON TEKNIS
MASIH ADA PENYALAH GUNAAN TENAGA LISTRIK MELAKSANAKAN P2TL REN 66,863 66,863 66,863 66,863
REAL 133,777 133,777 133,777 133,777
2 MASIH ADA SUSUT NON TEKNISkWh meter Tua & pemeriksaan LPB blm optimal
melaksanakan program GM dan pemeriksaan LPB REN
REAL 84 84 84 84
3 SUSUT TEKNIS MASIH TINGGI MASIH ADA TRAFO OVER/UNDER LOAD MANAJAMEN TRAFO REN 5 5 5 5
REAL
4 SUSUT TEKNIS MASIH TINGGI TRAFO UNBALANCE PENYEIMBANGAN BEBAN TRAFO REN
REAL
TUJUAN USULAN
NO USULAN BULAN INI DAN BULAN LALU YANG BELUM DITANGGAPI TANGGAPAN
KE UP3 KE UID
1 V
2 V