Anda di halaman 1dari 14

JADWAL PELAKSANAAN PEKERJAAN

PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT


NAMA PERSH. : CV. DINAMIKA TEKNIK
NO. KONTRAK : HK.02.03/03/BWS/SUM-VI/D2/2019
TGL. KONTRAK : 28 MARET 2019 100.00 0.50 2.33 6.63 11.94 17.94 31.46 40.96

BULAN
Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5
No. URAIAN PEKERJAAN BOBOT RENCANA BOBOT REALISASI Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 KETERANGAN
4/1/2019 4/9/2019 4/16/2019 4/23/2019 5/1/2019 5/9/2019 5/16/2019 5/23/2019 5/31/2019 6/8/2019 6/15/2019 6/22/2019 6/30/2019 7/8/2019 7/15/2019 7/22/2019 7/30/2019 8/7/2019 8/14/2019 8/21/2019
4/8/2019 4/15/2019 4/22/2019 4/30/2019 5/8/2019 5/15/2019 5/22/2019 5/30/2019 6/7/2019 6/14/2019 6/21/2019 6/29/2019 7/7/2019 7/14/2019 7/21/2019 7/29/2019 8/6/2019 8/13/2019 8/20/2019 8/28/2019
100
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1.1 Persiapan dan Penyusunan Program Kerja 0.50
0.50 0.50 0.50

0.39 0.39 0.39


1.2 Pengumpulan Data dan Studi Terdahulu
1.17 1.17 0.45 0.72

0.85 1.24
1.3 Survey Lapangan Pendahuluan
2.09 2.09 1.00 1.09 90

0.80
1.4 Penyusunan Rencana Kerja
0.80 0.80 0.80

1.05
1.5 Penyusunan Laporan Pendahuluan
1.05 1.05 1.05

II KEGIATAN B : PENGUMPULAN DATA


0.25 0.65 0.85 5.45 80
2.1 Pengumpulan Data Sekunder
7.20 7.20 0.25 0.65 3.00 3.30

2.2 Pengumpulan Data Primer


3.00 3.00 3.00 1.50
a. Survey Penelusuran Bangunan dan Saluran
10.50 10.50 3.00 3.00 3.00 1.50

2.65 2.65 2.50 2.70


b. Survey Inventarisasi dan Penelusuran Kondisi Prasarana
10.50 10.15 4.00 3.65 2.50
70
3.00 2.65 2.50 1.28
c. Survey Kelembagaan dan Ekonomi Pertanian
9.43 9.22 3.22 3.50 2.50

III KEGIATAN C : EVALUASI & ANALISA DATA


1.55 1.55 1.55 1.31
3.1 Analisa Kesusaian Lahan dan Tata Guna Lahan
5.96 1.55 1.55

1.40 1.40 1.50 1.54


3.2 Analisa Kapasitas Kinerja Prasarana 60
5.84 1.40 1.40

1.35 2.24 2.23 2.05


3.3 Analisa Produktifitas Lahan dan Sosial Ekonomi
7.87 0.00
1.00 1.00 1.70 2.05
3.4 Analisa Ketenaga Kerjaan dan Pengupahan
5.75 0.00

50
IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. Rawa
2.32 2.20 2.55 2.20
4.1 Manual Operasi
9.26 0.00
2.25 2.50 2.00 1.90
4.2 Manual Pemeliharaan Rutin dan Berkala
8.65 0.00

V KEGIATAN E : LAPORAN DAN DISKUSI 40


1.08
5.1 Laporan Pendahuluan
1.08 1.08 1.08

0.38 0.38 0.38


5.2 Rencana Mutu Kontrak
1.15 1.15 0.38 0.38 0.38

0.20 0.20 0.20 0.20 0.20


5.3 Laporan Bulanan
1.00 0.40 0.20 0.20
30
0.75 0.75 0.75
5.4 Laporan Antara (Interim Report)
2.25 0.00
0.28 0.30 1.07
5.5 Draft Laporan Akhir
1.65 0.00
0.53 0.53
5.6 Laporan Akhir
1.05 0.00
0.90
5.7 Buku Manual O&P 20
0.90 0.00
0.35 0.35 0.35
5.8 Laporan Survey Lapangan
1.05 0.00
0.50
5.9 Rekaman Laporan dalam Hardisk 1 TB
0.50 0.00

5,10 Diskusi :
10
0.85
1. Laporan Pendahuluan
0.85 0.85 0.85

0.85
2. Laporan Antara
0.85 0.00
1.10
3. Laporan Akhir
1.10 0.00

Rencana Kemajuan Pekerjaan 100.00 49.11 0.50 1.87 4.51 5.90 9.30 8.65 6.80 8.15 7.28 5.75 6.44 5.73 4.85 3.07 4.45 5.25 4.48 3.10 2.70 1.23
Komulatif Rencana Kemajuan Pekerjaan 0.00 0.00 0.50 2.37 6.89 12.79 22.09 30.74 37.54 45.69 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100
Realisasi Kemajuan Pekerjaan 0.50 1.83 4.29 5.31 6.00 13.52 9.50 8.15 - - - - - - - - - - - -
Komulatif Realisasi Kemajuan Pekerjaan 0.00 0.50 2.33 6.63 11.94 17.94 31.46 40.96 49.11
Deviasi 0.00 -0.04 -0.26 -0.85 -4.15 0.72 3.42 3.42 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100.00
0.95 13.61 36.35 57.95
Disetujui : Dikoreksi,

Pejabat Pembuat Komitmen O& P Sumber Daya Air I Direksi CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA

Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT
NAMA PERSH. : CV. DINAMIKA TEKNIK
NO. KONTRAK : HK.02.03/03/BWS/SUM-VI/D2/2019
TGL. KONTRAK : 28 MARET 2019 100.00 0.50 2.33 6.63 11.94 17.94 31.46 40.11

BULAN
Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5
No. URAIAN PEKERJAAN BOBOT RENCANA BOBOT REALISASI Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 KETERANGAN
4/1/2019 4/9/2019 4/16/2019 4/23/2019 5/1/2019 5/9/2019 5/16/2019 5/23/2019 5/31/2019 6/8/2019 6/15/2019 6/22/2019 6/30/2019 7/8/2019 7/15/2019 7/22/2019 7/30/2019 8/7/2019 8/14/2019 8/21/2019
4/8/2019 4/15/2019 4/22/2019 4/30/2019 5/8/2019 5/15/2019 5/22/2019 5/30/2019 6/7/2019 6/14/2019 6/21/2019 6/29/2019 7/7/2019 7/14/2019 7/21/2019 7/29/2019 8/6/2019 8/13/2019 8/20/2019 8/28/2019
100
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1.1 Persiapan dan Penyusunan Program Kerja 0.50
0.50 0.50 0.50

0.39 0.39 0.39


1.2 Pengumpulan Data dan Studi Terdahulu
1.17 1.17 0.45 0.72

0.85 1.24
1.3 Survey Lapangan Pendahuluan
2.09 2.09 1.00 1.09 90

0.80
1.4 Penyusunan Rencana Kerja
0.80 0.80 0.80

1.05
1.5 Penyusunan Laporan Pendahuluan
1.05 1.05 1.05

II KEGIATAN B : PENGUMPULAN DATA


0.25 0.65 0.85 5.45 80
2.1 Pengumpulan Data Sekunder
7.20 7.20 0.25 0.65 3.00 3.30

2.2 Pengumpulan Data Primer


3.00 3.00 3.00 1.50
a. Survey Penelusuran Bangunan dan Saluran
10.50 10.50 3.00 3.00 3.00 1.50

2.65 2.65 2.50 2.70


b. Survey Inventarisasi dan Penelusuran Kondisi Prasarana
10.50 7.65 4.00 3.65
70
3.00 2.65 2.50 1.28
c. Survey Kelembagaan dan Ekonomi Pertanian
9.43 6.72 3.22 3.50

III KEGIATAN C : EVALUASI & ANALISA DATA


1.55 1.55 1.55 1.31
3.1 Analisa Kesusaian Lahan dan Tata Guna Lahan
5.96 0.00
1.40 1.40 1.50 1.54
3.2 Analisa Kapasitas Kinerja Prasarana 60
5.84 0.00
1.35 2.24 2.23 2.05
3.3 Analisa Produktifitas Lahan dan Sosial Ekonomi
7.87 0.00
1.00 1.00 1.70 2.05
3.4 Analisa Ketenaga Kerjaan dan Pengupahan
5.75 0.00

50
IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. Rawa
2.32 2.20 2.55 2.20
4.1 Manual Operasi
9.26 0.00
2.25 2.50 2.00 1.90
4.2 Manual Pemeliharaan Rutin dan Berkala
8.65 0.00

V KEGIATAN E : LAPORAN DAN DISKUSI 40


1.08
5.1 Laporan Pendahuluan
1.08 1.08 1.08

0.38 0.38 0.38


5.2 Rencana Mutu Kontrak
1.15 1.15 0.38 0.38 0.38

0.20 0.20 0.20 0.20 0.20


5.3 Laporan Bulanan
1.00 0.20 0.20
30
0.75 0.75 0.75
5.4 Laporan Antara (Interim Report)
2.25 0.00
0.28 0.30 1.07
5.5 Draft Laporan Akhir
1.65 0.00
0.53 0.53
5.6 Laporan Akhir
1.05 0.00
0.90
5.7 Buku Manual O&P 20
0.90 0.00
0.35 0.35 0.35
5.8 Laporan Survey Lapangan
1.05 0.00
0.50
5.9 Rekaman Laporan dalam Hardisk 1 TB
0.50 0.00

5,10 Diskusi :
10
0.85
1. Laporan Pendahuluan
0.85 0.00
0.85
2. Laporan Antara
0.85 0.00
1.10
3. Laporan Akhir
1.10 0.00

Rencana Kemajuan Pekerjaan 100.00 40.11 0.50 1.87 4.51 5.90 9.30 8.65 6.80 8.15 7.28 5.75 6.44 5.73 4.85 3.07 4.45 5.25 4.48 3.10 2.70 1.23
Komulatif Rencana Kemajuan Pekerjaan 0.00 0.00 0.50 2.37 6.89 12.79 22.09 30.74 37.54 45.69 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100
Realisasi Kemajuan Pekerjaan 0.50 1.83 4.29 5.31 6.00 13.52 8.65 - - - - - - - - - - - - -
Komulatif Realisasi Kemajuan Pekerjaan 0.00 0.50 2.33 6.63 11.94 17.94 31.46 40.11
Deviasi 0.00 -0.04 -0.26 -0.85 -4.15 0.72 2.57 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100.00
0.95 13.61 36.35 57.95
Disetujui : Dikoreksi,

Pejabat Pembuat Komitmen O& P Sumber Daya Air I Direksi CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA

Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT
Rekaitulasi Bulanan
LOKASI : Kabupaten Tanjung Jabung Timur Bulan : 1 (Ke Satu)
SUMBER DANA : APBN TANGGAL : 01 April - 30 April 2019
KONSULTAN PERENCANA : CV. DINAMIKA TEKNIK RENCANA : 12.790 %
REALISASI : 11.940 %
DEVIASI (+/-) : -0.850 %
BOBOT AKTUAL/REALISASI
BOBOT
NO URAIAN PEKERJAAN S/D BULAN PROGRES (%) KET.
RENCANA (%) BULAN INI S/D BULAN INI
LALU
1 2 5 6 7 8=6+7 9 = (8/5x100) 10
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1 Persiapan dan Penyusunan Program Kerja 0.500 0.000 0.500 0.500 100.00
2 Pengumpulan Data dan Studi Terdahulu 1.170 0.000 1.170 1.170 100.00
3 Survey Lapangan Pendahuluan 2.090 0.000 2.090 2.090 100.00
4 Penyusunan Rencana Kerja 0.800 0.000 0.800 0.800 100.00
5 Penyusunan Laporan Pendahuluan 1.050 0.000 1.050 1.050 100.00
Total Bobot Kerja dan Progress Pada Tahap Pendahuluan 5.610 0.000 5.610 5.610 100.000

II KEGIATAN B : PENGUMPULAN DATA


1 Pengumpulan Data Sekunder 7.200 0.000 0.900 0.900 12.500
2 Pengumpulan Data Primer
a. Survey Penelusuran Bangunan dan Saluran 10.500 0.000 3.000 3.000 28.571
b. Survey Inventarisasi dan Penelusuran 10.500 0.000 0.000 0.000 0.000
Kondisi Prasarana
c. Survey Kelembagaan dan Ekonomi Pertanian 9.430 0.000 0.000 0.000 0.000
Total Bobot Kerja dan Progress Tahapan Pengumpulan Data 37.630 0.000 3.900 3.900 10.364

III Analisa dan Elaborasi Data


1 Analisa Kesusaian Lahan dan Tata Guna Lahan 5.960 0.000 0.000 0.000 0.000
2 Analisa Kapasitas Kinerja Prasarana 5.840 0.000 0.000 0.000 0.000
3 Analisa Produktifitas Lahan dan Sosial Ekonomi 7.870 0.000 0.000 0.000 0.000
4 Analisa Ketenaga Kerjaan dan Pengupahan 5.750 0.000 0.000 0.000 0.000
Total Bobot Kerja dan Progress Tahap Analisa dan Elaborasi Data 25.420 0.000 0.000 0.000 0.000

IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. RAWA


1 Manual Operasi 9.260 0.000 0.000 0.000 0.000
2 Manual Pemeliharaan Rutin dan Berkala 8.650 0.000 0.000 0.000 0.000

Total Bobot Kerja dan Progress Tahap penyusunan Manual O dan P Rawa 17.910 0.000 0.000 0.000 0.000

V KEGIATAN E : LAPORAN DAN DISKUSI


1 Laporan Pendahuluan 1.080 0.000 1.080 1.080 100.000
2 Laporan RMK 1.150 0.000 1.150 1.150 100.000
3 Laporan Bulanan 1.000 0.000 0.200 0.200 20.000
4 Laporan Interim 2.250 0.000 0.000 0.000 0.000
5 Draft Laporan Akhir 1.650 0.000 0.000 0.000 0.000
6 Laporan Akhir 1.050 0.000 0.000 0.000 0.000
7 Buku Manual O&P 0.900 0.000 0.000 0.000 0.000
8 Laporan Survey Lapangan 1.050 0.000 0.000 0.000 0.000
9 Rekaman Laporan dalam Hardisk 1 TBLaporan Invoice 0.500 0.000 0.000 0.000 0.000
10 Diskusi
- Diskusi Pendahuluan 0.850 0.000 0.000 0.000 0.000
- Diskusi Antara 0.850 0.000 0.000 0.000 0.000
- Diskusi Akhir 1.100 0.000 0.000 0.000 0.000

Total Bobot Kerja dan Progress Tahap Pelaporan dan Pelaporan 13.430 0.000 2.430 2.430 18.094

JUMLAH I + II + III + IV + V 100.000 0.000 11.940 11.940 11.940

Diketahui Dikoreksi, Dibuat :


Pejabat Pembuat Komitmen O& P Sumber Daya Air I Pengawas Pekerjaan CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA
Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT
NAMA PERSH. : CV. DINAMIKA TEKNIK
NO. KONTRAK : HK.02.03/03/BWS/SUM-VI/D2/2019
TGL. KONTRAK : 28 MARET 2019 100.00 0.50 2.33 6.63 11.94 17.94 31.46 40.96

BULAN
Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5
No. URAIAN PEKERJAAN BOBOT RENCANA BOBOT REALISASI Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 KETERANGAN
4/1/2019 4/9/2019 4/16/2019 4/23/2019 5/1/2019 5/9/2019 5/16/2019 5/23/2019 5/31/2019 6/8/2019 6/15/2019 6/22/2019 6/30/2019 7/8/2019 7/15/2019 7/22/2019 7/30/2019 8/7/2019 8/14/2019 8/21/2019
4/8/2019 4/15/2019 4/22/2019 4/30/2019 5/8/2019 5/15/2019 5/22/2019 5/30/2019 6/7/2019 6/14/2019 6/21/2019 6/29/2019 7/7/2019 7/14/2019 7/21/2019 7/29/2019 8/6/2019 8/13/2019 8/20/2019 8/28/2019

100
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1.1 Persiapan dan Penyusunan Program Kerja 0.50
0.50 0.50 0.50
0.39 0.39 0.39
1.2 Pengumpulan Data dan Studi Terdahulu
1.17 1.17 0.45 0.72
0.85 1.24
1.3 Survey Lapangan Pendahuluan
2.09 2.09 1.00 1.09 90

0.80
1.4 Penyusunan Rencana Kerja
0.80 0.80 0.80
1.05
1.5 Penyusunan Laporan Pendahuluan
1.05 1.05 1.05

II KEGIATAN B : PENGUMPULAN DATA


0.25 0.65 0.85 5.45 80
2.1 Pengumpulan Data Sekunder
7.20 7.20 0.25 0.65 3.00 3.30

2.2 Pengumpulan Data Primer


3.00 3.00 3.00 1.50
a. Survey Penelusuran Bangunan dan Saluran
10.50 10.50 3.00 3.00 3.00 1.50
2.65 2.65 2.50 2.70
b. Survey Inventarisasi dan Penelusuran Kondisi Prasarana
10.50 10.50 4.00 3.65 2.85
70
3.00 2.65 2.50 1.28
c. Survey Kelembagaan dan Ekonomi Pertanian
9.43 9.43 3.22 3.50 2.71

III KEGIATAN C : EVALUASI & ANALISA DATA


1.55 1.55 1.55 1.31
3.1 Analisa Kesusaian Lahan dan Tata Guna Lahan
5.96 1.55 1.55
1.40 1.40 1.50 1.54
3.2 Analisa Kapasitas Kinerja Prasarana 60
5.84 1.40 1.40
1.35 2.24 2.23 2.05
3.3 Analisa Produktifitas Lahan dan Sosial Ekonomi
7.87 0.00
1.00 1.00 1.70 2.05
3.4 Analisa Ketenaga Kerjaan dan Pengupahan
5.75 0.00

50
IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. Rawa
2.32 2.20 2.55 2.20
4.1 Manual Operasi
9.26 0.00
2.25 2.50 2.00 1.90
4.2 Manual Pemeliharaan Rutin dan Berkala
8.65 0.00

V KEGIATAN E : LAPORAN DAN DISKUSI 40


1.08
5.1 Laporan Pendahuluan
1.08 1.08 1.08
0.38 0.38 0.38
5.2 Rencana Mutu Kontrak
1.15 1.15 0.38 0.38 0.38
0.20 0.20 0.20 0.20 0.20
5.3 Laporan Bulanan
1.00 0.40 0.20 0.20
30
0.75 0.75 0.75
5.4 Laporan Antara (Interim Report)
2.25 0.00
0.28 0.30 1.07
5.5 Draft Laporan Akhir
1.65 0.00
0.53 0.53
5.6 Laporan Akhir
1.05 0.00
0.90
5.7 Buku Manual O&P 20
0.90 0.00
0.35 0.35 0.35
5.8 Laporan Survey Lapangan
1.05 0.00
0.50
5.9 Rekaman Laporan dalam Hardisk 1 TB
0.50 0.00

5,10 Diskusi :
10
0.85
1. Laporan Pendahuluan
0.85 0.85 0.85
0.85
2. Laporan Antara
0.85 0.00
1.10
3. Laporan Akhir
1.10 0.00

Rencana Kemajuan Pekerjaan 100.00 49.67 0.50 1.87 4.51 5.90 9.30 8.65 6.80 8.15 7.28 5.75 6.44 5.73 4.85 3.07 4.45 5.25 4.48 3.10 2.70 1.23
Komulatif Rencana Kemajuan Pekerjaan 0.00 0.00 0.50 2.37 6.89 12.79 22.09 30.74 37.54 45.69 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100
Realisasi Kemajuan Pekerjaan 0.50 1.83 4.29 5.31 6.00 13.52 9.50 8.71 - - - - - - - - - - - -
Komulatif Realisasi Kemajuan Pekerjaan 0.00 0.50 2.33 6.63 11.94 17.94 31.46 40.96 49.67
Deviasi 0.00 -0.04 -0.26 -0.85 -4.15 0.72 3.42 3.98 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100.00
0.95 13.61 36.35 57.95
Disetujui : Dikoreksi,

Pejabat Pembuat Komitmen O& P Sumber Daya Air I Direksi CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA

Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT
NAMA PERSH. : CV. DINAMIKA TEKNIK
NO. KONTRAK : HK.02.03/03/BWS/SUM-VI/D2/2019
TGL. KONTRAK : 28 MARET 2019 100.00 0.50 2.33 6.63 11.94 17.94 31.46 40.96

BULAN
Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5
No. URAIAN PEKERJAAN BOBOT RENCANA BOBOT REALISASI Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 KETERANGAN
4/1/2019 4/9/2019 4/16/2019 4/23/2019 5/1/2019 5/9/2019 5/16/2019 5/23/2019 5/31/2019 6/8/2019 6/15/2019 6/22/2019 6/30/2019 7/8/2019 7/15/2019 7/22/2019 7/30/2019 8/7/2019 8/14/2019 8/21/2019
4/8/2019 4/15/2019 4/22/2019 4/30/2019 5/8/2019 5/15/2019 5/22/2019 5/30/2019 6/7/2019 6/14/2019 6/21/2019 6/29/2019 7/7/2019 7/14/2019 7/21/2019 7/29/2019 8/6/2019 8/13/2019 8/20/2019 8/28/2019

100
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1.1 Persiapan dan Penyusunan Program Kerja 0.50
0.50 0.50 0.50
0.39 0.39 0.39
1.2 Pengumpulan Data dan Studi Terdahulu
1.17 1.17 0.45 0.72
0.85 1.24
1.3 Survey Lapangan Pendahuluan
2.09 2.09 1.00 1.09 90

0.80
1.4 Penyusunan Rencana Kerja
0.80 0.80 0.80
1.05
1.5 Penyusunan Laporan Pendahuluan
1.05 1.05 1.05

II KEGIATAN B : PENGUMPULAN DATA


0.25 0.65 0.85 5.45 80
2.1 Pengumpulan Data Sekunder
7.20 7.20 0.25 0.65 3.00 3.30

2.2 Pengumpulan Data Primer


3.00 3.00 3.00 1.50
a. Survey Penelusuran Bangunan dan Saluran
10.50 10.50 3.00 3.00 3.00 1.50
2.65 2.65 2.50 2.70
b. Survey Inventarisasi dan Penelusuran Kondisi Prasarana
10.50 10.50 4.00 3.65 2.85
70
3.00 2.65 2.50 1.28
c. Survey Kelembagaan dan Ekonomi Pertanian
9.43 9.43 3.22 3.50 2.71

III KEGIATAN C : EVALUASI & ANALISA DATA


1.55 1.55 1.55 1.31
3.1 Analisa Kesusaian Lahan dan Tata Guna Lahan
5.96 5.96 1.55 1.55 1.55 1.31
1.40 1.40 1.50 1.54
3.2 Analisa Kapasitas Kinerja Prasarana 60
5.84 5.84 1.40 1.40 1.50 1.54
1.35 2.24 2.23 2.05
3.3 Analisa Produktifitas Lahan dan Sosial Ekonomi
7.87 3.59 1.35 2.24
1.00 1.00 1.70 2.05
3.4 Analisa Ketenaga Kerjaan dan Pengupahan
5.75 2.00 1.00 1.00

50
IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. Rawa
2.32 2.20 2.55 2.20
4.1 Manual Operasi
9.26 0.00
2.25 2.50 2.00 1.90
4.2 Manual Pemeliharaan Rutin dan Berkala
8.65 0.00

V KEGIATAN E : LAPORAN DAN DISKUSI 40


1.08
5.1 Laporan Pendahuluan
1.08 1.08 1.08
0.38 0.38 0.38
5.2 Rencana Mutu Kontrak
1.15 1.15 0.38 0.38 0.38
0.20 0.20 0.20 0.20 0.20
5.3 Laporan Bulanan
1.00 0.40 0.20 0.20
30
0.75 0.75 0.75
5.4 Laporan Antara (Interim Report)
2.25 0.00
0.28 0.30 1.07
5.5 Draft Laporan Akhir
1.65 0.00
0.53 0.53
5.6 Laporan Akhir
1.05 0.00
0.90
5.7 Buku Manual O&P 20
0.90 0.00
0.35 0.35 0.35
5.8 Laporan Survey Lapangan
1.05 0.70 0.35 0.35
0.50
5.9 Rekaman Laporan dalam Hardisk 1 TB
0.50 0.00

5,10 Diskusi :
10
0.85
1. Laporan Pendahuluan
0.85 0.85 0.85
0.85
2. Laporan Antara
0.85 0.00
1.10
3. Laporan Akhir
1.10 0.00

Rencana Kemajuan Pekerjaan 100.00 64.81 0.50 1.87 4.51 5.90 9.30 8.65 6.80 8.15 7.28 5.75 6.44 5.73 4.85 3.07 4.45 5.25 4.48 3.10 2.70 1.23
Komulatif Rencana Kemajuan Pekerjaan 0.00 0.00 0.50 2.37 6.89 12.79 22.09 30.74 37.54 45.69 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100
Realisasi Kemajuan Pekerjaan 0.50 1.83 4.29 5.31 6.00 13.52 9.50 8.71 2.95 5.75 6.44 - - - - - - - - -
Komulatif Realisasi Kemajuan Pekerjaan 0.00 0.50 2.33 6.63 11.94 17.94 31.46 40.96 49.67 52.62 58.37 64.81
Deviasi 0.00 -0.04 -0.26 -0.85 -4.15 0.72 3.42 3.98 -0.35 -0.35 -0.35 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100.00
0.95 13.61 36.35 57.95
Disetujui : Dikoreksi,

Pejabat Pembuat Komitmen O& P Sumber Daya Air I Direksi CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA

Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
JADWAL PELAKSANAAN PEKERJAAN
PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT
NAMA PERSH. : CV. DINAMIKA TEKNIK
NO. KONTRAK : HK.02.03/03/BWS/SUM-VI/D2/2019
TGL. KONTRAK : 28 MARET 2019 100.00 0.50 2.33 6.63 11.94 17.94 31.46 40.11

BULAN
Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5
No. URAIAN PEKERJAAN BOBOT RENCANA BOBOT REALISASI Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16 Minggu 17 Minggu 18 Minggu 19 Minggu 20 KETERANGAN
4/1/2019 4/9/2019 4/16/2019 4/23/2019 5/1/2019 5/9/2019 5/16/2019 5/23/2019 5/31/2019 6/8/2019 6/15/2019 6/22/2019 6/30/2019 7/8/2019 7/15/2019 7/22/2019 7/30/2019 8/7/2019 8/14/2019 8/21/2019
4/8/2019 4/15/2019 4/22/2019 4/30/2019 5/8/2019 5/15/2019 5/22/2019 5/30/2019 6/7/2019 6/14/2019 6/21/2019 6/29/2019 7/7/2019 7/14/2019 7/21/2019 7/29/2019 8/6/2019 8/13/2019 8/20/2019 8/28/2019
100
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1.1 Persiapan dan Penyusunan Program Kerja 0.50
0.50 0.50 0.50

0.39 0.39 0.39


1.2 Pengumpulan Data dan Studi Terdahulu
1.17 1.17 0.45 0.72

0.85 1.24
1.3 Survey Lapangan Pendahuluan
2.09 2.09 1.00 1.09 90

0.80
1.4 Penyusunan Rencana Kerja
0.80 0.80 0.80

1.05
1.5 Penyusunan Laporan Pendahuluan
1.05 1.05 1.05

II KEGIATAN B : PENGUMPULAN DATA


0.25 0.65 0.85 5.45 80
2.1 Pengumpulan Data Sekunder
7.20 7.20 0.25 0.65 3.00 3.30

2.2 Pengumpulan Data Primer


3.00 3.00 3.00 1.50
a. Survey Penelusuran Bangunan dan Saluran
10.50 10.50 3.00 3.00 3.00 1.50

2.65 2.65 2.50 2.70


b. Survey Inventarisasi dan Penelusuran Kondisi Prasarana
10.50 7.65 4.00 3.65
70
3.00 2.65 2.50 1.28
c. Survey Kelembagaan dan Ekonomi Pertanian
9.43 6.72 3.22 3.50

III KEGIATAN C : EVALUASI & ANALISA DATA


1.55 1.55 1.55 1.31
3.1 Analisa Kesusaian Lahan dan Tata Guna Lahan
5.96 0.00
1.40 1.40 1.50 1.54
3.2 Analisa Kapasitas Kinerja Prasarana 60
5.84 0.00
1.35 2.24 2.23 2.05
3.3 Analisa Produktifitas Lahan dan Sosial Ekonomi
7.87 0.00
1.00 1.00 1.70 2.05
3.4 Analisa Ketenaga Kerjaan dan Pengupahan
5.75 0.00

50
IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. Rawa
2.32 2.20 2.55 2.20
4.1 Manual Operasi
9.26 0.00
2.25 2.50 2.00 1.90
4.2 Manual Pemeliharaan Rutin dan Berkala
8.65 0.00

V KEGIATAN E : LAPORAN DAN DISKUSI 40


1.08
5.1 Laporan Pendahuluan
1.08 1.08 1.08

0.38 0.38 0.38


5.2 Rencana Mutu Kontrak
1.15 1.15 0.38 0.38 0.38

0.20 0.20 0.20 0.20 0.20


5.2 Laporan Bulanan
1.00 0.20 0.20
30
0.75 0.75 0.75
5.3 Laporan Antara (Interim Report)
2.25 0.00
0.28 0.30 1.07
5.4 Draft Laporan Akhir
1.65 0.00
0.53 0.53
5.5 Laporan Akhir
1.05 0.00
0.90
5.6 Buku Manual O&P 20
0.90 0.00
0.35 0.35 0.35
5.7 Laporan Survey Lapangan
1.05 0.00
0.50
5.8 Rekaman Laporan dalam Hardisk 1 TB
0.50 0.00

5.9 Diskusi :
10
0.85
1. Laporan Pendahuluan
0.85 0.00
0.85
2. Laporan Antara
0.85 0.00
1.10
3. Laporan Akhir
1.10 0.00

Rencana Kemajuan Pekerjaan 100.00 40.11 0.50 1.87 4.51 5.90 9.30 8.65 6.80 8.15 7.28 5.75 6.44 5.73 4.85 3.07 4.45 5.25 4.48 3.10 2.70 1.23
Komulatif Rencana Kemajuan Pekerjaan 0.00 0.00 0.50 2.37 6.89 12.79 22.09 30.74 37.54 45.69 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100
Realisasi Kemajuan Pekerjaan 0.50 1.83 4.29 5.31 6.00 13.52 8.65 - - - - - - - - - - - - -
Komulatif Realisasi Kemajuan Pekerjaan 0.00 0.50 2.33 6.63 11.94 17.94 31.46 40.11
Deviasi 0.00 -0.04 -0.26 -0.85 -4.15 0.72 2.57 52.97 58.72 65.16 70.89 75.74 78.81 83.26 88.51 92.98 96.08 98.78 100.00
0.95 13.61 36.35 57.95
Disetujui : Dikoreksi,

Pejabat Pembuat Komitmen O& P Sumber Daya Air I Direksi CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA

Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
PEKERJAAN : MANUAL OP DAERAH RAWA SUNGAI JAMBAT
Rekaitulasi Bulanan
LOKASI : Kabupaten Tanjung Jabung Timur Bulan : 2 (Ke Dua)
SUMBER DANA : APBN TANGGAL : 01 Mei - 30 Mei 2019
KONSULTAN PERENCANA : CV. DINAMIKA TEKNIK RENCANA : 45.690 %
REALISASI : 49.670 %
DEVIASI (+/-) : 3.980 %
BOBOT AKTUAL/REALISASI
BOBOT
NO URAIAN PEKERJAAN S/D BULAN PROGRES (%) KET.
RENCANA (%) BULAN INI S/D BULAN INI
LALU
1 2 5 6 7 8=6+7 9 = (8/5x100) 10
I KEGIATAN A : PERSIAPAN / PENDAHULUAN
1 Persiapan dan Penyusunan Program Kerja 0.500 0.500 0.000 0.500 100.00
2 Pengumpulan Data dan Studi Terdahulu 1.170 1.170 0.000 1.170 100.00
3 Survey Lapangan Pendahuluan 2.090 2.090 0.000 2.090 100.00
4 Penyusunan Rencana Kerja 0.800 0.800 0.000 0.800 100.00
5 Penyusunan Laporan Pendahuluan 1.050 1.050 0.000 1.050 100.00
Total Bobot Kerja dan Progress Pada Tahap Pendahuluan 5.610 5.610 0.000 5.610 100.000

II KEGIATAN B : PENGUMPULAN DATA


1 Pengumpulan Data Sekunder 7.200 0.900 6.300 7.200 100.000
2 Pengumpulan Data Primer
a. Survey Penelusuran Bangunan dan Saluran 10.500 3.000 7.500 10.500 100.000
b. Survey Inventarisasi dan Penelusuran 10.500 0.000 10.500 10.500 100.000
Kondisi Prasarana
c. Survey Kelembagaan dan Ekonomi Pertanian 9.430 0.000 9.430 9.430 100.000
Total Bobot Kerja dan Progress Tahapan Pengumpulan Data 37.630 3.900 33.730 37.630 100.000

III Analisa dan Elaborasi Data


1 Analisa Kesusaian Lahan dan Tata Guna Lahan 5.960 0.000 1.550 1.550 26.007
2 Analisa Kapasitas Kinerja Prasarana 5.840 0.000 1.400 1.400 23.973
3 Analisa Produktifitas Lahan dan Sosial Ekonomi 7.870 0.000 0.000 0.000 0.000
4 Analisa Ketenaga Kerjaan dan Pengupahan 5.750 0.000 0.000 0.000 0.000
Total Bobot Kerja dan Progress Tahap Analisa dan Elaborasi Data 25.420 0.000 2.950 2.950 11.605

IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. RAWA


1 Manual Operasi 9.260 0.000 0.000 0.000 0.000
2 Manual Pemeliharaan Rutin dan Berkala 8.650 0.000 0.000 0.000 0.000

Total Bobot Kerja dan Progress Tahap penyusunan Manual O dan P Rawa 17.910 0.000 0.000 0.000 0.000

V KEGIATAN E : LAPORAN DAN DISKUSI


1 Laporan Pendahuluan 1.080 1.080 0.000 1.080 100.000
2 Laporan RMK 1.150 1.150 0.000 1.150 100.000
3 Laporan Bulanan 1.000 0.200 0.200 0.400 40.000
4 Laporan Interim 2.250 0.000 0.000 0.000 0.000
5 Draft Laporan Akhir 1.650 0.000 0.000 0.000 0.000
6 Laporan Akhir 1.050 0.000 0.000 0.000 0.000
7 Buku Manual O&P 0.900 0.000 0.000 0.000 0.000
8 Laporan Survey Lapangan 1.050 0.000 0.000 0.000 0.000
9 Rekaman Laporan dalam Hardisk 1 TBLaporan Invoice 0.500 0.000 0.000 0.000 0.000
10 Diskusi
- Diskusi Pendahuluan 0.850 0.000 0.850 0.850 100.000
- Diskusi Antara 0.850 0.000 0.000 0.000 0.000
- Diskusi Akhir 1.100 0.000 0.000 0.000 0.000

Total Bobot Kerja dan Progress Tahap Pelaporan dan Pelaporan 13.430 2.430 1.050 3.480 25.912

JUMLAH I + II + III + IV + V 100.000 11.940 37.730 49.670 49.670

Diketahui Dikoreksi, Dibuat :


Pejabat Pembuat Komitmen O& P Sumber Daya Air I Pengawas Pekerjaan CV. DINAMIKA TEKNIK
Satuan Kerja Operasi dan Pemeliharaan SDA
Sumatera VI

WIDIYANTO BUDISETIAWAN, S.kom, MT RHEINHARDT MAUPA, ST.MT MUSTAMIN,SST.MT


NIP : 19841226 201012 1 002 NIP : 19881019 201012 1 004 Team Leader
BOBOT
No. URAIAN PEKERJAAN
RENCANA

I KEGIATAN A : PERSIAPAN / PENDAHULUAN


1.1 Persiapan dan Penyusunan Program Kerja 0.50
1.2 Pengumpulan Data dan Studi Terdahulu 1.17
1.3 Survey Lapangan Pendahuluan 2.09
1.4 Penyusunan Rencana Kerja 0.80
1.5 Penyusunan Laporan Pendahuluan 1.05

II KEGIATAN B : PENGUMPULAN DATA


2.1 Pengumpulan Data Sekunder 7.20
2.2 Pengumpulan Data Primer
a. Survey Penelusuran Bangunan dan Saluran 10.50
b. Survey Inventarisasi dan Penelusuran Kondisi P 10.50
c. Survey Kelembagaan dan Ekonomi Pertanian 9.43

III KEGIATAN C : EVALUASI & ANALISA DATA


3.1 Analisa Kesusaian Lahan dan Tata Guna Lahan 5.96
3.2 Analisa Kapasitas Kinerja Prasarana 5.84
3.3 Analisa Produktifitas Lahan dan Sosial Ekonomi 7.87
3.4 Analisa Ketenaga Kerjaan dan Pengupahan 5.75

IV KEGIATAN D : PENYUSUNAN MANUAL O&P DR. Rawa


4.1 Manual Operasi 9.26
4.2 Manual Pemeliharaan Rutin dan Berkala 8.65

V KEGIATAN E : LAPORAN DAN DISKUSI


5.1 Laporan Pendahuluan 1.08
5.2 Rencana Mutu Kontrak 1.15
5.2 Laporan Bulanan 1.00
5.3 Laporan Antara (Interim Report) 2.25
5.4 Draft Laporan Akhir 1.65
5.5 Laporan Akhir 1.05
5.6 Buku Manual O&P 0.90
5.7 Laporan Survey Lapangan 1.05
5.8 Rekaman Laporan dalam Hardisk 1 TB 0.50
5.9 Diskusi :
1. Laporan Pendahuluan 0.85
2. Laporan Antara 0.85
3. Laporan Akhir 1.10

Rencana Kemajuan Pekerjaan Per Bulan 100.00


Komulatif Rencana Kemajuan Pekerjaan Per Bulan 0.00

Realisasi Kemajuan Pekerjaan Per Bulan


Komulatif Realisasi Kemajuan Pekerjaan Per Bulan
Deviasi
BOBOT RENCANA BOBOT REALISASI

Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 1 Bulan 2 Bulan 3 Bulan 4

0.500 - - - 0.500 - - -
1.170 - - - - 1.170 - - -
2.090 - - - - 2.090 - - -
0.800 - - - - 0.800 - - -
1.050 - - - - 1.050 - - -

1.750 5.450 - - - 0.900 6.300 - -

3.000 7.500 - - - 3.000 7.500 - -


- 7.800 2.700 - - - 10.500 - -
- 8.150 1.280 - - - 9.430 - -

- 1.550 4.410 - - - 1.550 - -


- 1.400 4.440 - - - 1.400 - -
- - 5.820 2.050 - - - - -
- - 3.700 2.050 - - - - -

- - - 7.065 2.195 - - - -
- - - 4.750 3.900 - - - -

1.080 - - - - 1.080 - - -
1.150 - - - - 1.150 - - -
0.200 0.200 0.200 0.200 0.200 0.200 0.200 - -
- - 0.750 1.500 - - - - -
- - - - 1.650 - - - -
- - - - 1.050 - - - -
- - - - 0.900 - - - -
- - 1.050 - - - - - -
- - - - 0.500 - - - -

- 0.850 - - - - 0.850 - -
- - 0.850 - - - - - -
- - - - 1.100 - - - -

12.79 32.90 25.20 17.62 11.50


12.79 45.69 70.89 88.51 100.00

11.94 37.73 0.00 0.00


11.94 49.67 49.67 49.67
-0.85 3.98
ISASI

Bulan 5

-
-
-
-
-

- 7.200

- 10.500
- 10.500
- 9.430

- 1.550
- 1.400
- -
- -

- -
- -

- 1.080
- 1.150
- 0.400
- -
- -
- -
- -
- -
- -
-
- 0.850
- -
- -

0.00
49.67
Bulan 1 ( April ) 30 Hari
Bulan 2 ( Mei ) 31 Hari
Bulan 3 ( Juni ) 30 Hari
Bulan 4 ( juli ) 31 Hari
Bulan 5 ( Agustus ) 28 Hari
150

Minngu 1 4/1/2019 s/d 4/8/2019 8


Minngu 2 4/9/2019 s/d 4/15/2019 7
Bulan 1
Minngu 3 4/16/2019 s/d 4/22/2019 7
Minngu 4 4/23/2019 s/d 4/30/2019 8 30
Minngu 5 5/1/2019 s/d 5/8/2019 8
Minngu 6 5/9/2019 s/d 5/15/2019 7
Bulan 2
Minngu 7 5/16/2019 s/d 5/22/2019 7
Minngu 8 5/23/2019 s/d 5/30/2019 8
Minngu 9 5/31/2019 s/d 6/7/2019 8
Minngu 10 6/8/2019 s/d 6/14/2019 7
Bulan 3
Minngu 11 6/15/2019 s/d 6/21/2019 7
Minngu 12 6/22/2019 s/d 6/29/2019 8
Minngu 13 6/30/2019 s/d 7/7/2019 8
Minngu 14 7/8/2019 s/d 7/14/2019 7
Bulan 4
Minngu 15 7/15/2019 s/d 7/21/2019 7
Minngu 16 7/22/2019 s/d 7/29/2019 8
Minngu 17 7/30/2019 s/d 8/5/2019 7
Minngu 18 8/6/2019 s/d 8/12/2019 7
Bulan 5
Minngu 19 8/13/2019 s/d 8/20/2019 8
Minngu 20 8/21/2019 s/d 8/28/2019 8
150