Anda di halaman 1dari 19

ANALISA HIDROLOGI

DAN HIDROLIKA
PEMBANGUNAN DAN OPERASIONAL TERMINAL UNTUK KEPENTINGAN SENDIRI
( T U K S ) , T E R M I N A L K H U S U S ( T A R S U S ) , S T O C K P I L E B AT U S P L I T, PA S I R ,
B A T U B A R A D A N M I N E R A L L A I N N YA PA D A L A H A N S E L U A S ± 9 , 4 5 H E K T A R D I
D E S A T A L A N G D U K U K E C A M A T A N T A M A N R A J O K A B U P AT E N M U A R O J A M B I
PROPINSI JAMBI

PT. HEKSA NENGGALA INDONUSA


Jl. Jalur Sutera Ruko Element Kav. 25 BC No. CI, Alam Sutera, Kel. Pakualam,
Kec. Serpong Utara, Kota Tangerang Selatan, Prop Banten.
Telp. 081212224561
IDENTITAS PEMRAKARSA
Nama Perusahaan / : PT. Heksa Nenggala Indonusa
Pemrakarsa
Nomir Induk Berusaha : 8120219141559

Alamat perusahaan : Jl. Jalur Sutera Ruko Element Kav. 25 BC No. CI,
Alam Sutera, Kel. Pakualam, Kec. Serpong Utara,
Kota Tangerang Selatan, Prop Banten
Alamat Usaha : Desa Talang Duku, Kecamatan Taman Rajo,
Kabupaten Muaro Jambi Provinsi Jambi.
Jenis Usaha : Perdagangan Besar Berbagai Macam Material
Bangunan (KBLI 46638);
Email : legal@hniberlian.co.id
No. Telp : (021)30055123

Penanggungjawab
Nama : Haliem Kawatu
Jabatan : Direktur Utama
Alamat : Jalan Kepodang No. 39 Kavling Blok F RT 02/07
Kel, Ciwaduk Kec. Cilegon Kota Cilegon Provinsi
Banten
No KTP : 3672020805790002
No. Hp : 081212224561
LOKASI PEKERJAAN
Lokasi Pembangunan dan operasional Terminal Untuk Kepentingan Sendiri (TUKS), Stockpile Batu
Split, Pasir, Batubara dan Mineral Lainnya pada lahan seluas ± 9,45 Hektar berdasarkan :
 Surat Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu Kabupaten Muaro Jambi
Nomor 503/01/06/II/DPMPTSP tanggal 26 Februari 2019 perihal Persetujuan Prinsip (Lampiran
B.1);
 Surat Dinas Pekerjaan Umum dan Penataan Ruang Nomor
695/008/RPPR/TKPRTD-MJ/DPUPR/2019 tanggal 28 Maret 2019 perihal Rekomendasi
Perizinan Pemanfaatan Ruang Daerah Kabupaten Muaro Jambi (Lampiran B.2);
berada di :
Desa : Talang Duku;
Kecamatan : Taman Rajo;
Kabupaten : Muaro Jambi
Provinsi : Jambi.
PEMBANGUNAN TURAP

LOKASI PEKERJAAN
LOKASI PEKERJAAN
ANALISA HIDROLOGI
DATA CURAH HUJAN
Bulan Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Curah Hujan Maksimum
1995 0 332 305 184 190 190 99 81.4 116 225.9 290.7 221.1 332.0
1996 109.1 276.3 110.1 427.2 45.5 124.1 78.7 235.5 182.4 248.2 245.3 230.4 427.2
1997 100.7 97.4 361.8 182.4 163 33 36.7 26.2 0 13.8 111.7 111.7 361.8
1998 151.7 106.7 281.7 88.7 136.2 186.9 224.9 153 257.2 364.8 300.5 261.5 364.8
1999 306.1 192 224.5 275.6 175.8 95.2 180.8 43.7 105.5 253.7 312.8 182 312.8
2000 240.4 207.3 290 207.2 143.4 256.1 306.5 59.5 74.3 209.6 231.4 234.3 306.5
2001 202.1 231.2 244 301.8 144.9 112.9 57.8 270.4 109.2 337.1 390.2 405.5 405.5
2002 182.8 81 205 140.9 249.9 115.1 171 31.6 56.7 87.2 194.7 262.8 262.8
2003 231 307.4 174.6 220.4 76.9 2.3 79.2 219.6 189.2 284.3 139.8 344.2 344.2
2004 378.6 174.6 338.6 203.2 264.1 46.5 224.1 12.5 157.6 215.6 247.1 259.3 378.6
2005 75.9 116.2 263.8 99.8 209.6 143.7 144.3 179 287.7 203.2 337.5 260.1 337.5
2006 166.2 328.7 272 259.8 186.2 144.6 97.7 142.7 118 52.1 156 171.2 328.7
2007 210.7 89.9 234.1 293 210.7 103.9 208 198.6 85.7 238.1 100.9 238.1 293.0
2008 185.3 97.7 331.2 258.2 82.3 26.8 69.1 245.4 104.7 202.2 303.8 322.4 331.2
2009 118.3 342.1 193.8 177.2 122.4 117.1 60.2 154.6 162.5 171.3 345 333.9 345.0
2010 111.9 290.2 203 219.7 279.1 167.8 389 345.8 262.3 357 333.8 230 389.0
2011 313 173.5 226.5 267.8 119.4 93.7 144.1 29.5 36.3 211.4 285.8 180.3 313.0
2012 135.5 130.2 222.4 244.4 266.1 52.7 108 54.5 55.5 276.9 149.9 225.2 276.9
2013 144.7 176.6 326 277.3 182.8 83 209.1 162 235.4 301.3 170.7 291.1 326.0
2014 91.9 26.2 101 338.1 108.9 102.1 195.1 184.7 67 56.3 290.4 204.4 338.1
2015 143 122.5 169.7 266.8 126.2 34.6 73.1 37.4 0 36 294.4 325.1 325.1
2016 106.1 190.4 80.2 160.7 76 62.8 75.5 198.6 109.4 119.5 207.3 104.4 207.3
2017 128.7 181.1 194 311.1 168 146.4 54.6 68.1 205.5 228.2 336.8 236 336.8
2018 137 216.6 285.6 221 286.6 86.3 31.3 62 219 127.1 388.9 272 388.9
2019 173.1 291.2 142.9 343.7 148.6 140.8 20.8 2.8 48 176.2 115.2 147.5 343.7
2020 150.1 89.3 222.6 213.2 218.7 95.1 95.1 95.9 142.5 346.7 290.3 321.7 346.7
Sumber : Data Klimatologi BMKG Bandara Sultan Thaha
ANALISA HIDROLOGI
DATA CURAH HUJAN
Bulan Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
2011 31.0 67.0 67.0 39.0 77.0 28.0 16.0 58.0 24.0 40.0 43.0 69.0
2012 46.0 56.0 37.0 66.0 79.0 44.0 49.0 1.0 38.0 48.0 29.0 17.0
2013 29.0 42.0 54.0 32.0 39.0 28.0 47.0 47.0 84.0 72.0 54.0 91.0
2014 25.0 0.0 39.0 60.0 74.0 49.0 29.0 57.0 48.0 32.0 33.0 76.0
2015 57.0 37.0 42.0 39.0 85.0 41.0 44.0 0.0 0.0 14.0 42.0 77.0
2016 38.0 64.0 42.0 40.0 56.0 24.0 28.0 70.0 16.0 25.0 57.0 55.0
2017 58.0 86.0 45.0 89.0 66.0 135.0 25.0 32.0 34.0 44.0 68.0 38.0
2018 46.0 60.0 88.0 44.0 115.0 60.0 40.0 55.0 77.0 50.0 105.0 84.0
2019 86.0 39.0 51.0 71.0 56.0 49.0 7.0 22.0 15.0 45.0 52.0 57.0
2020 37.0 39.0 51.0 71.0 56.0 49.0 72.0 61.0 50.0 91.0 65.0 125.0

Sumber : Data Pos Hidrologi Simp. III Sipin BWS Sumatera VI


ANALISA HIDROLOGI
CURAH HUJAN MAKSIMUM
X X terurut X X terurut
No. Tahun No. Tahun
(mm) (mm) (mm) (mm)
1 1995 332.00 138.65 14 2008 331.20 312.80
2 1996 427.20 177.95 15 2009 345.00 328.70
3 1997 361.80 195.00 16 2010 389.00 331.20
4 1998 364.80 205.05 17 2011 195.00 332.00
5 1999 312.80 207.05 18 2012 177.95 337.50
6 2000 306.50 208.50 19 2013 208.50 344.20
7 2001 405.50 214.85 20 2014 207.05 345.00
8 2002 262.80 235.85 21 2015 205.05 361.80
9 2003 344.20 235.90 22 2016 138.65 364.80
10 2004 378.60 251.95 23 2017 235.90 378.60
11 2005 337.50 262.80 24 2018 251.95 389.00
12 2006 328.70 293.00 25 2019 214.85 405.50
13 2007 293.00 306.50 26 2020 235.85 427.20
ANALISA HIDROLOGI
CURAH HUJAN RENCANA
Untuk perhitungan selanjutnya menggunakan metode Log Perason Type III untuk mendapatkan
curah hujan rencana. Pemilihan ini dikarenakan metode ini tidak terikat dengan parameter
apapun/bebas.
No. Xi Log Xi (Log Xi - rerata Log X) (Log Xi - rerata Log X)2 (Log Xi - rerata Log X)3 (Log Xi - rerata Log X)4
1 138.65 2.1419 -0.3796 0.1441 -0.0547 0.0208
2 177.95 2.2503 -0.2712 0.0735 -0.0199 0.0054
3 195.00 2.2900 -0.2314 0.0536 -0.0124 0.0029
4 205.05 2.3119 -0.2096 0.0439 -0.0092 0.0019
5 207.05 2.3161 -0.2054 0.0422 -0.0087 0.0018
6 208.50 2.3191 -0.2024 0.0410 -0.0083 0.0017
7 214.85 2.3321 -0.1893 0.0359 -0.0068 0.0013
8 235.85 2.3726 -0.1488 0.0222 -0.0033 0.0005
9 235.90 2.3727 -0.1488 0.0221 -0.0033 0.0005
10 251.95 2.4013 -0.1202 0.0144 -0.0017 0.0002
11 262.80 2.4196 -0.1019 0.0104 -0.0011 0.0001
12 293.00 2.4669 -0.0546 0.0030 -0.0002 0.0000
13 306.50 2.4864 -0.0350 0.0012 0.0000 0.0000
14 312.80 2.4953 -0.0262 0.0007 0.0000 0.0000
15 328.70 2.5168 -0.0047 0.0000 0.0000 0.0000
16 331.20 2.5201 -0.0014 0.0000 0.0000 0.0000
17 332.00 2.5211 -0.0003 0.0000 0.0000 0.0000
18 337.50 2.5283 0.0068 0.0000 0.0000 0.0000
19 344.20 2.5368 0.0153 0.0002 0.0000 0.0000
20 345.00 2.5378 0.0163 0.0003 0.0000 0.0000
21 361.80 2.5585 0.0370 0.0014 0.0001 0.0000
22 364.80 2.5621 0.0406 0.0016 0.0001 0.0000
23 378.60 2.5782 0.0567 0.0032 0.0002 0.0000
24 389.00 2.5899 0.0685 0.0047 0.0003 0.0000
25 405.50 2.6080 0.0865 0.0075 0.0006 0.0001
26 427.20 2.6306 0.1092 0.0119 0.0013 0.0001

TOTAL 7591.3500 63.6645 -1.8940 0.5390 -0.1270 0.0372

Rerata Log X = 2.4486


Standar Deviasi (S . Log X) = 0.1267
CS = -0.6253
CK = -0.3905
ANALISA HIDROLOGI
CURAH HUJAN RENCANA
T P(%) Cs G Log X X (mm)
2 50 -1.2723 0.1051 2.5281 337.40
5 20 -1.2723 0.8570 2.5758 376.56
10 10 -1.2723 1.1939 2.5972 395.54
20 5 -1.2723 1.4603 2.6141 411.24
25 4 -1.2723 1.5135 2.6175 414.45
50 2 -1.2723 1.6994 2.6293 425.85
100 1 -1.2723 1.8533 2.6390 435.53

Keterangan:
G = Lihat Tabel. (Hubungan Cs dengan Kala Ulang (T) atau dengan Percent Chance (P%)
Log X = Rerata Log X + G.S
X = Curah hujan rancangan metoda Log Pearson Tipe III

Kala ulang Curah hujan rencana (mm)


2 337.403
5 376.558
10 395.545
20 411.236
25 414.449
50 425.851
100 435.528
ANALISA HIDROLIKA
BATHIMETRI
12.00

10.00

8.00

6.00

4.00

2.00

0.00
0.00 50.00 100.00 150.00 200.00 250.00 300.00 350.00 400.00 450.00

Sumber : Survey Bathimetri Sungai Batanghari 2021


ANALISA HIDROLIKA
DATA DEBIT SUNGAI
Bulan
Tahun
Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
2011 537.925 956.125 854.3725 1159.398 1480.46 502.9325 350.825 315.89 472.7875 813.445 1410.59 1600.8025
2012 1552.635 1310.025 1261.613 1183.64 787.6825 726.8 612.785 350.825 324.71 711.5525 1445.24 1747.385
2013 1803.6 2036.295 1743.415 1310.025 1132.525 652.725 578.28 511.5325 422.255 1080.055 1277.6125 1704.0575
2014 1844.493 618.6675 502.9325 790.0025 1445.24 1108.998 556.025 486.03 464.635 276.49 1505.4575 1665.305
2015 1220.648 1129.568 1271.195 1284.05 1214.425 787.6825 331.1125 299.945 291.5875 270.825 837.355 1255.25
2016 1534.373 1498.288 1610.803 1589.6 1684.608 861.7375 506.3625 486.56 364.4 608.8825 1704.0575 1509.0525
2017 378.325 1153.388 1907.003 1147.403 1527.11 982.785 561.5325 790.0025 603.065 879.0875 1563.6625 1646.155
2018 1037.608 917.0575 1410.59 1487.573 1420.925 1051.628 466.2575 299.945 392.6075 508.0825 1545.3125 1823.9675
2019 925.645 1462.778 1608.303 1462.778 1516.258 720.2375 367.1575 368.54 410.22 423.7775 792.325 1627.155
2020 1844.493 1836.265 1342.988 1743.415 2194.483 1271.195 630.5475 849.4875 904.28 1310.025 1983.8875 2194.4825
Sumber : Dinas PU Kab. Muaro Jambi
ANALISA HIDROLIKA
DATA DEBIT SUNGAI
X X terurut
No. Tahun
(m3/dt) (m3/dt)
1 2011 1600.803 1284.05
2 2012 1747.385 1600.803
3 2013 2036.295 1627.155
4 2014 1844.493 1704.058
5 2015 1284.05 1747.385
6 2016 1704.058 1823.968
7 2017 1907.003 1844.493
8 2018 1823.968 1907.003
9 2019 1627.155 2036.295
10 2020 2194.483 2194.483
Sumber : Analisa Data 2021
ANALISA HIDROLIKA
DEBIT SUNGAI RENCANA
Untuk perhitungan selanjutnya menggunakan metode Log Perason Type III untuk mendapatkan
debit sungai rencana. Pemilihan ini dikarenakan metode ini tidak terikat dengan parameter
apapun/bebas.
No. Xi Log Xi (Log Xi - rerata Log X) (Log Xi - rerata Log X)2 (Log Xi - rerata Log X)3 (Log Xi - rerata Log X)4
1 1284.05 3.1086 -0.1370 0.0188 -0.0026 0.0004
2 1600.80 3.2043 -0.0412 0.0017 -0.0001 0.0000
3 1627.16 3.2114 -0.0341 0.0012 0.0000 0.0000
4 1704.06 3.2315 -0.0141 0.0002 0.0000 0.0000
5 1747.39 3.2424 -0.0032 0.0000 0.0000 0.0000
6 1823.97 3.2610 0.0155 0.0002 0.0000 0.0000
7 1844.49 3.2659 0.0203 0.0004 0.0000 0.0000
8 1907.00 3.2804 0.0348 0.0012 0.0000 0.0000
9 2036.30 3.3088 0.0633 0.0040 0.0003 0.0000
10 2194.48 3.3413 0.0958 0.0092 0.0009 0.0001

TOTAL 17769.6900 32.4556 0.0000 0.0369 -0.0015 0.0005

Rerata Log X = 3.2456


Standar Deviasi (S . Log X) = 0.0640
CS = -0.7929
CK = 1.6183
ANALISA HIDROLIKA
DEBIT SUNGAI RENCANA
T P(%) Cs G Log X X (m3/dt)
2 50 -0.7929 0.1309 3.2539 1794.49
5 20 -0.7929 0.8561 3.3004 1996.92
10 10 -0.7929 1.1672 3.3203 2090.62
20 5 -0.7929 1.4036 3.3354 2164.74
25 4 -0.7929 1.4508 3.3384 2179.87
50 2 -0.7929 1.6101 3.3486 2231.63
100 1 -0.7929 1.7382 3.3568 2274.18

Keterangan:
G = Lihat Tabel. (Hubungan Cs dengan Kala Ulang (T) atau dengan Percent Chance (P%)
Log X = Rerata Log X + G.S
X = Curah hujan rancangan metoda Log Pearson Tipe III

Kala ulang Banjir rencana (m3/dt)


2 1794.487
5 1996.918
10 2090.623
20 2164.737
25 2179.873
50 2231.629
100 2274.176
ANALISA HIDROLIKA
SIMULASI BANJIR MENGGUNAKAN HECRAS
ANALISA HIDROLIKA
SIMULASI BANJIR MENGGUNAKAN HECRAS
ANALISA HIDROLIKA
SIMULASI BANJIR MENGGUNAKAN HECRAS
Q Total Min Ch El W.S. Elev Left Bank Right Bank Overflow (m) Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width
Reach River Sta Profile Froude # Chl
(m3/s) (m) (m) (m) (m) Left Right (m) (m) (m/m) (m/s) (m2) (m)
1 2 Q2 1794.49 4.1 13.96 11.4 11.3 2.56 2.66 13.99 0.00005 0.89 2120.97 415.35 0.12
1 2 Q5 1996.92 4.1 14.31 11.4 11.3 2.91 3.01 14.35 0.00005 0.92 2265.87 415.35 0.12
1 2 Q 10 2090.62 4.1 14.46 11.4 11.3 3.06 3.16 14.5 0.00005 0.94 2330.92 415.35 0.12
1 2 Q 20 2164.74 4.1 14.58 11.4 11.3 3.18 3.28 14.63 0.00005 0.95 2381.54 415.35 0.12
1 2 Q 25 2179.87 4.1 14.61 11.4 11.3 3.21 3.31 14.65 0.00005 0.96 2391.8 415.35 0.12
1 2 Q 50 2231.63 4.1 14.69 11.4 11.3 3.29 3.39 14.74 0.00005 0.96 2426.88 415.35 0.12
1 2 Q 100 2274.18 4.1 14.76 11.4 11.3 3.36 3.46 14.81 0.00005 0.97 2455.27 415.35 0.12

1 1 Q2 1794.49 4.1 13.95 11.4 11.3 2.55 2.65 9.44 13.99 0.00005 0.9 2119.79 415.35 0.12
1 1 Q5 1996.92 4.1 14.3 11.4 11.3 2.9 3 9.6 14.34 0.00005 0.93 2264.68 415.35 0.12
1 1 Q 10 2090.62 4.1 14.46 11.4 11.3 3.06 3.16 9.67 14.5 0.00005 0.95 2329.74 415.35 0.12
1 1 Q 20 2164.74 4.1 14.58 11.4 11.3 3.18 3.28 9.72 14.62 0.00005 0.96 2380.36 415.35 0.12
1 1 Q 25 2179.87 4.1 14.61 11.4 11.3 3.21 3.31 9.72 14.65 0.00005 0.96 2390.62 415.35 0.12
1 1 Q 50 2231.63 4.1 14.69 11.4 11.3 3.29 3.39 9.77 14.74 0.00005 0.97 2425.7 415.35 0.12
1 1 Q 100 2274.18 4.1 14.76 11.4 11.3 3.36 3.46 9.79 14.8 0.00005 0.98 2454.09 415.35 0.12

Dari tabel diatas,untuk desain tanggul menggunakan Q 20 maupun Q 25 ketinggian banjir yang
akan terjadi ± 3 meter, sehingga desain tanggul yang akan dilaksanakan di lokasi kegiatan
setinggi 3 m dengan jagaan 1 m total tinggi tanggul 4 m.
TERIMA KASIH