1 Longsoran
2 Drainase
3 Cross Drain
4 Bahu diperkeras
5 Blackspot
6 Fasilitas Keselamatan Jalan
7 Trotoar
Keterangan
1 Program 2022
2 Program 2023
3 Usulan 2024
4
5
USULAN OFF PAVEMENT TA 2024
BPJN KALIMANTAN SELATAN
BTS. KOTA AMUNTAI - DS. TABUR (BTS. KAB. LONGSOR BARU, ON-GOING 2023,
2 2 KALSEL 36026 STA. 2+550 STA. 2+750 200 3.00 DINDING PENAHAN 2024 LINTAS PENGHUBUNG 5,000,000 Longsoran LERENG TIDAK PERLU ok
TABALONG) BADAN JALAN TANAH PR-04
BRONJONG +
LONGSOR BARU,
24 5 KALSEL 046 LUMPANGI - BTS. KAB. TANAH BUMBU KM 148+350 KM 148+400 50 9.00 SALURAN 2022 2024 LINTAS PENGHUBUNG 5,064,385 Longsoran LERENG TIDAK PERLU ok
BADAN JALAN PENGHANTAR +
DRAINASE SAMPING
BRONJONG +
LONGSOR BARU,
4 7 KALSEL 047 LUMPANGI - BTS. KAB. TANAH BUMBU KM 182+050 KM 182+085 35 10.00 SALURAN 2022 2024 LINTAS PENGHUBUNG 3,926,438 Longsoran LERENG TIDAK PERLU ok
BADAN JALAN PENGHANTAR +
DRAINASE SAMPING
BRONJONG +
LONGSOR BARU,
17 9 KALSEL 048 BTS. KAB. TANAH BUMBU - MENTEWE KM 218+050 KM 218+075 25 18.00 SALURAN 2022 2024 LINTAS PENGHUBUNG 3,775,858 Longsoran LERENG TIDAK PERLU ok
BADAN JALAN PENGHANTAR +
DRAINASE SAMPING
BRONJONG +
LONGSOR BARU,
19 10 KALSEL 048 BTS. KAB. TANAH BUMBU - MENTEWE KM 229+800 KM 229+815 15 15.00 SALURAN 2022 2024 LINTAS PENGHUBUNG 2,674,463 Longsoran LERENG TIDAK PERLU ok
BADAN JALAN PENGHANTAR +
DRAINASE SAMPING
LONGSOR BARU,
6 11 KALSEL 048 BTS. KAB. TANAH BUMBU - MENTEWE KM 231+830 KM 231+850 20 5.00 DINDING PENAHAN 2022 2024 LINTAS PENGHUBUNG 2,500,000 Longsoran LERENG TIDAK PERLU ok
BADAN JALAN TANAH
PENANGANAN CROSS
DRAIN - PENGGANTIAN
BOX CULVERT ON-GOING 2023,
8 14 KALSEL 049 MENTEWE - BATU LICIN KM 270+640 3.2 2024 LINTAS PENGHUBUNG 3,000,000 Cross Drain TIDAK PERLU GKI/PTI ok
STANDARD PR-01
(SERDANGAN II - BOX
CULVERT STANDAR)
PENANGANAN CROSS
DRAIN - PENGGANTIAN
BOX CULVERT ON-GOING 2023,
9 15 KALSEL 049 MENTEWE - BATU LICIN KM 276+630 4.7 2024 LINTAS PENGHUBUNG 3,000,000 Cross Drain TIDAK PERLU GKI/PTI ok
STANDARD PR-01
(SARIMULYA B I - BOX
CULVERT STANDAR)
PENANGANAN CROSS
DRAIN - PENGGANTIAN
BOX CULVERT ON-GOING 2023,
10 16 KALSEL 049 MENTEWE - BATU LICIN KM 277+560 3.8 2024 LINTAS PENGHUBUNG 3,000,000 Cross Drain TIDAK PERLU GKI/PTI ok
STANDARD PR-01
(SARIMULYA B IV - BOX
CULVERT STANDAR)
PENANGANAN CROSS
BOX CULVERT ON-GOING 2023,
21 17 KALSEL 049 MENTEWE - BATU LICIN STA 8+525 2 2024 LINTAS PENGHUBUNG 1,000,000 Cross Drain TIDAK PERLU DRAIN ok
STANDARD PR-01
(BOX CULVERT STANDAR)
PENANGANAN CROSS
BOX CULVERT ON-GOING 2023,
22 18 KALSEL 012.1 BATULICIN - SERONGGA (BTS. KAB. KOTABARU) STA 6+050 1 2024 LINTAS SELATAN 1,000,000 Cross Drain TIDAK PERLU DRAIN ok
STANDARD PR-01
(BOX CULVERT STANDAR)
BOX CULVERT
STANDARD & ON-GOING 2023,
STA 15+200 STA 15+600 50 2024 LINTAS SELATAN 1,500,000 Cross Drain 10-Nov-21 ok
SALURAN DRAINASE PR-01
SAMPING
STA 18+500 STA 18+600 100 CROSS DRAIN DAN ON-GOING 2023, 2024 10-Nov-21 no
PR-01 LINTAS SELATAN 1,500,000 Cross Drain
SALURAN DRAINASE
TOTAL 94,895,280
Rekap Total
Longsoran Drainase
No. Prov Provinsi Panjang Alokasi Panjang
Titik Titik
(m) (Rp. ribu) (m)
36 Kalimantan Selatan 14 1,649.00 53,482,780 9 14,291.00
Trotoar Total
Alokasi Panjang Alokasi
Titik
(Rp. ribu) (m) (Rp. ribu)
0 28 15,904.70 81,082,780