SPESIFIKASI
NO. URAIAN PEKERJAAN ( SEMUA PRODUCT YANG DIPAKAI ADALAH KW1 VOL. SAT. HARGA SATUAN JUMLAH
DAN TEBAL PROFIL ADALAH SKET LAPANGAN)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pagar Keliling, Seng t= 1,8m Rangka Kaso 184.00 m' Rp 135,000.00 Rp 24,840,000.00
2 Gudang, Barak, Direksi Keet 46.80 m2 Rp 265,000.00 Rp 12,402,000.00
3 Perapihan Puing Existing 1.00 ls Rp 10,000,000.00 Rp 10,000,000.00
4 Mobilisasi dan demobilisasi 1.00 ls Rp 10,000,000.00 Rp 10,000,000.00
5 APD dan Proteksi Pekerjaan 1.00 ls Rp 6,500,000.00 Rp 6,500,000.00
6 Gambar Kerja dan As Build Drawing 1.00 ls Rp 25,000,000.00 Rp 25,000,000.00
7 Pek. Pasangan bowplank 212.00 m' Rp 85,000.00 Rp 18,020,000.00
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 106,762,000.00
B. PEKERJAAN BETON
1 Pek. Pondasi beton Tapak K300, NFA ( Beton, Tulangan, Begistink ) 31.82 m3 Rp 3,275,000.00 Rp 104,221,143.75
2 Pek. Kolom pedestal 40/30, 35/25, 20/30 K300, NFA ( Beton, Tulangan, Begistink ) 8.62 m3 Rp 4,150,000.00 Rp 35,756,400.00
3 Pek. Tiebeam 20/30 K300, NFA ( Beton, Tulangan, Begistink ) 20.66 m3 Rp 5,020,000.00 Rp 103,703,160.00
4 Pek Kolom praktis 13/20 K175 ( Beton, Tulangan, Begistink ) 5.47 m3 Rp 6,850,000.00 Rp 37,472,240.00
5 Pek. Balok beton 13/20 K176 ( Beton, Tulangan, Begistink ) 9.36 m3 Rp 7,525,000.00 Rp 70,453,565.00
6 Pek. Balok lintel 13/13 K177 ( Beton, Tulangan, Begistink ) 2.75 m3 Rp 5,220,000.00 Rp 14,332,032.00
7 Pek Plat Lantai Beton tbl. 12cm Lantai Pabrik K300, NFA ( Beton, Begistink ) 129.96 m3 Rp 2,750,000.00 Rp 357,390,000.00
8 Pek Plat Lantai Beton tbl. 12cm ( Lantai Kantor ) K175 ( Beton, Begistink ) 29.18 m3 Rp 2,750,000.00 Rp 80,241,480.00
9 Pek. Wiremesh M-8 untuk lantai 2 lapis 27,037.72 kg Rp 16,500.00 Rp 446,122,374.08
10 Pek Plat Lantai Beton tbl. 20cm area bongkar muat K177 ( Beton, Begistink ) 3.60 m3 Rp 2,450,000.00 Rp 8,820,000.00
11 Pek. Wiremesh M-8 untuk lantai 2 lapis area bongkar muat 247.16 kg Rp 16,500.00 Rp 4,078,140.00
12 Pek. Lantai kerja beton bawah pondasi Beton Setara B0 7.40 m3 Rp 1,050,000.00 Rp 7,770,000.00
13 Pek. Lantai Kerja Bawah Plat Lantai 1 : 3 : 5 (tebal 5 cm) Beton Setara B0 54.15 m3 Rp 1,050,000.00 Rp 56,857,500.00
14 Pek. Rabat Selasar Bangunan L=1m, t=7cm Beton Setara B0 13.43 m3 Rp 1,050,000.00 Rp 14,097,300.00
15 Pek. Beton Tangga K225 1.81 m3 Rp 4,150,000.00 Rp 7,514,820.00
16 Pek. Floor hardenner finish epoxy 1000 micron 1,083.00 m2 Rp 400,000.00 Rp 433,200,000.00
17 Pek. Beton Meja Dapur 0.18 m3 Rp 2,450,000.00 Rp 441,000.00
18 Pek. Beton Topi Jendela Luar 0.84 m3 Rp 6,850,000.00 Rp 5,754,000.00
JUMLAH B. Rp 1,788,225,154.83
C. PEKERJAAN BAJA
1 Pek. Pasang Baud angkur M-19 panjang 60cm 88.00 set Rp 96,000.00 Rp 8,448,000.00
2 Pek. Pasang Baseplate, Plat Joint, Stifner tbl. 12mm 2,062.80 kg Rp 31,000.00 Rp 63,946,886.11
3 Pek. Pasang Kolom IWF 300.150 11,451.00 kg Rp 31,000.00 Rp 354,981,000.00
4 Pek. Pasang balok IWF 200.100 5,896.32 kg Rp 31,000.00 Rp 182,785,920.00
5 Pek. Pasang rafter IWF 300.150 2,356.20 kg Rp 31,000.00 Rp 73,042,200.00
6 Pek. Rangka Plat Lt.2 Kantor IWF 250.125 1,420.00 kg Rp 31,000.00 Rp 44,020,000.00
9 Pek. Pasang Gording CNP 125.3,2 7,507.20 kg Rp 31,000.00 Rp 232,723,200.00
10 Pek. Pasang siku dudukan Gording 5.5 116.55 kg Rp 31,000.00 Rp 3,613,050.00
11 Pek. Pasang trekstang Ø 12mm 237.92 kg Rp 65,000.00 Rp 15,464,779.20
12 Pek. Pasang Crossing Ø 12mm 284.79 kg Rp 65,000.00 Rp 18,511,571.52
13 Pek. Pasang spand mur kait angin Ø 16mm 80.00 set Rp 360,000.00 Rp 28,800,000.00
14 Pek. Baud HTB M-16 780.00 bh Rp 37,000.00 Rp 28,860,000.00
15 Pek. Baud HTB M-14 360.00 bh Rp 29,000.00 Rp 10,440,000.00
16 Pek. Baud HTB M-12 672.00 bh Rp 26,000.00 Rp 17,472,000.00
JUMLAH C. Rp 1,083,108,606.83
B. PEKERJAAN LANTAI
1 Pek. Keramik Lantai 60x60 Granit tile 233.26 m2 Rp 325,000.00 Rp 75,809,500.00
2 Pek. Keramik Lantai KM 40x40 Unpolised 4.34 m2 Rp 287,000.00 Rp 1,245,580.00
3 Pek. Keramik Dinding KM 25x40 15.20 m2 Rp 265,000.00 Rp 4,028,000.00
4 Pek. Keramik Tangga 30x60 12.38 m2 Rp 325,000.00 Rp 4,024,800.00
5 Pek. Plint Lantai 10x60 74.20 m' Rp 65,000.00 Rp 4,823,000.00
6 Pek. Keramik Meja Dapur 60x60 2.74 m2 Rp 325,000.00 Rp 890,500.00
7 Pek. Keramik Dinding Meja Dapur 30x40 2.88 m2 Rp 265,000.00 Rp 763,200.00
JUMLAH B. Rp 91,584,580.00
SPESIFIKASI
NO. URAIAN PEKERJAAN ( SEMUA PRODUCT YANG DIPAKAI ADALAH KW1 VOL. SAT. HARGA SATUAN JUMLAH
DAN TEBAL PROFIL ADALAH SKET LAPANGAN)
1 2 3 4 5 6
C PEKERJAAN PLAFON
1 Pek. Rangka Plafon Hollow 20x40, 40x40 Galvanized 238.27 m2 Rp 87,000.00 Rp 20,729,490.00
2 Pek. Plafon Gypsum 9mm 238.27 m2 Rp 125,000.00 Rp 29,783,750.00
3 Pek. Plafon GRC 6mm ( Atap Bagian Luar ) 208.00 m2 Rp 245,000.00 Rp 50,960,000.00
4 Pek. Up Ceilling Ruang Direktur 14.2 m' Rp 186,000.00 Rp 2,641,200.00
5 Pek. Shadowline 169.52 m' Rp 21,500.00 Rp 3,644,680.00
JUMLAH C. Rp 107,759,120.00
G. PEKERJAAN LINGKUNGAN
1 Pek. Saluran Uditch+ Cover 40x40x120 191.80 m' Rp 1,150,000.00 Rp 220,570,000.00
2 Pek. Jalan lingkungan 1.00 ls Rp 45,000,000.00 Rp 45,000,000.00
3 Pek. IPAL 2.00 unit Rp 10,000,000.00 Rp 20,000,000.00
JUMLAH G. Rp 285,570,000.00
JUMLAH A. Rp 207,574,467.65
1 2 3 4 5 6
Spesifikasi :
Floodlight INF027 - Cooldaylight
- Lampu Sorot 30 Watt ex. InLite 2.00 bh Rp 158,338.57 Rp 316,677.14
white
- Titik Instalasi Lampu ex. Supreme NYY 3x4mm + HIC 20mm 2.00 ttk Rp 248,817.75 Rp 497,635.50
- Saklar tunggal 1.00 bh Rp 150,000.00 Rp 150,000.00
3 Lampu selang strip untuk roster sign + list U
Spesifikasi :
- LED Strip untuk dinding sign ex. Philips DLI 31087 Warmwhite 15.00 m Rp 36,191.67 Rp 542,875.05
- Titik Instalasi Lampu (Kabel NYM 2x2.5 mm + Conduit Pipa 20 mm) ex. Eterna NYY 2x2,5mm + HIC 20mm 1.00 titik Rp 248,817.75 Rp 248,817.75
- Saklar Tunggal ex. Panasonic 1x WEJ5541, WEJ78029W 1.00 bh Rp 150,000.00 Rp 150,000.00
4 Pembuatan Bak kontrol untuk uk.60x60 cm + tutup tebal 10 cm tulangan
4.00 unit Rp 5,000,000.00 Rp 20,000,000.00
tunggal dim 10-150mm
JUMLAH C. Rp 70,340,563.19
9 Lampu TKO TL LED 2x16 Watt ex. Philips TL LED ecofit 2x 16w 17.00 titik Rp 235,000.00 Rp 3,995,000.00
10 Kap lampu waterproof + TL LED 1x16 watt nyala white untuk belakang
ex. Philips 2.00 titik Rp 226,197.95 Rp 452,395.90
kitchen
11 Ceiling fan 56" untuk area dapur c/w instalasi ex. KDK WZ56P-W putih 4.00 titik Rp 814,312.62 Rp 3,257,250.48
12 Exhaust fan ceiling 10" untuk dry storage c/w instalasi ex. KDK 25TGQ2 2.00 titik Rp 407,156.31 Rp 814,312.62
13 Wall fan 16" untuk ruang manager ex. Sekai WFN 1627 1.00 titik Rp 339,296.93 Rp 339,296.93
14 LED strip untuk bawah top table meja saji ex. Philips 31087 warmwhite 16.35 m Rp 36,191.67 Rp 591,733.80
1 2 3 4 5 6
3 Kran stainless steel untuk kran kitchen ex. Onda FJ 09 LA 3.00 bh Rp 135,718.77 Rp 407,156.31
4 Floor drain stainless ex. ex. Mitoyo 3.00 titik Rp 135,718.77 Rp 407,156.31
5 Stop kran stainless 1/2" ex. San-Ei Y20C-HM 13.00 unit Rp 113,098.98 Rp 1,470,286.74
JUMLAH D. Rp 56,286,078.54
F. PEKERJAAN OUTDOOR
I. PEKERJAAN INSTALASI LISTRIK
1 Titik instalasi lampu (Kabel NYM 2x2.5 mm + Conduit Pipa 20 mm) ex. Eterna NYM 2x2,5mm + HIC 20mm 4.00 titik Rp 248,817.75 Rp 995,271.00
2 Titik instalasi stopkontak (Kabel NYM 3x2.5 mm + Conduit Pipa 20 mm) ex. Eterna NYM 3x2,5mm + HIC 20mm 4.00 titik Rp 248,817.75 Rp 995,271.00
3 Saklar ganda ex. Panasonic 2x WEJ5531, WEJ78029W 1.00 bh Rp 38,001.26 Rp 38,001.26
4 Stopkontak outbow untuk stage ex. Broco Atlantic IP44 4.00 bh Rp 38,001.26 Rp 152,005.04
5 Lampu gantung cafe (renceng) fitting setiap 100cm
Spesifikasi :
- Kabel lampu renceng include acesoris 88.00 m Rp 31,667.71 Rp 2,786,758.48
- Seling baja 6mm 88.00 m Rp 4,523.96 Rp 398,108.48
- Lampu LED 4 watt kuning LED Classic Edison ST64 4w 88.00 titik Rp 67,859.39 Rp 5,971,626.32
6 Lampu selang LED strip + list U untuk stage ex. Philips 31087 Warmwhite 12.00 m Rp 75,540.00 Rp 906,480.00
7 Lampu selang LED strip + list U untuk dinding stage ex. Philips 31087 Warmwhite 14.00 m Rp 75,540.00 Rp 1,057,560.00
Pembuatan sumur resapan Ø100 cm dalam 150 cm untuk area outdoor (4
8
unit)
Spesifikasi :
- Galian tanah 6.00 m3 Rp 58,811.47 Rp 352,868.82
- Buis beton bertulang untuk resapan Ø100 cm, tinggi 150 cm Mutu beton buis K-300 12.00 bh Rp 452,395.90 Rp 5,428,750.80
Ready Mix K.250 (Tul.Rangkap
- Penutup plat beton bertulang t= 10 cm 0.31 m3 Rp 836,932.42 Rp 259,449.05
Lx=Ly, Ø10-150 mm)
JUMLAH F Rp 19,342,150.25
JUMLAH G Rp 125,123,060.16
1 2 3 4 5 6
( N. HENDRIYAN )
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB) - PABRIK TAHU - CIBUBUR
JUMLAH
NO URAIAN PEKERJAAN KETERANGAN
( Rp )
I. PEKERJAAN PERSIAPAN
A. PEKERJAAN PERSIAPAN Rp 106,762,000.00
II. PEKERJAAN STRUKTUR
A. PEKERJAAN GALIAN DAN URUGAN Rp 184,711,066.00
B. PEKERJAAN BETON Rp 1,788,225,154.83
C. PEKERJAAN BAJA Rp 1,083,108,606.83
III. PEKERJAAN ARSlTEKTUR
A. PEKERJAAN DINDING Rp 91,584,580.00
B. PEKERJAAN LANTAI Rp 327,259,810.25
C. PEKERJAAN PLAFON Rp 363,882,000.00
D. PEKERJAAN PENGECATAN DAN FINISHING Rp 202,920,000.00
E. PEKERJAAN PENUTUP ATAP dan TALANG Rp 285,570,000.00
F. PEKERJAAN PINTU & JENDELA Rp 202,920,000.00
G. PEKERJAAN LINGKUNGAN Rp 285,570,000.00
IV. PEKERJAAN MEKANICAL, ELECTRIKAL & PLUMBING
A. PEKERJAAN ME PERSIAPAN Rp 207,574,467.65
B. PEKERJAAN MEP AREA LANDSCAPE Rp 42,168,653.12
C. PEKERJAAN BANGUNAN UTAMA (AREA RUANG CONTROL
INDOOR) Rp 70,340,563.19
JUMLAH Rp 5,462,812,979.32
PPN 11% Rp -
JUMLAH Rp 5,462,812,979.32
DIBULATKAN Rp 5,463,000,000.00
( N. HENDRIYAN )
I PEKERJAAN TANAH
Galian Tanah
Pondasi
a. P1 Vol. =
Jumlah 31 ttk
Panjang 2 m
Lebar 2 m
Dalam 1.65 m
Vol. =
b. P2 Vol. =
Jumlah 6 ttk
Panjang 1.5 m
Lebar 1.5 m
Dalam 1.65 m
Vol. =
c. P3 Vol. =
Jumlah 3 ttk
Panjang 1.2 m
Lebar 1.2 m
Dalam 1.1 m
Vol. =
BETON
A Pondasi
P1 Vol. =
Jumlah 31 ttk
Panjang 1.75
Lebar 1.75
Tebal 0.3
Vol. =
P2 Vol. =
Jumlah 6 ttk
Panjang 1.2
Lebar 1.2
Tebal 0.3
Vol. =
P3 Vol. =
Jumlah 3 ttk
Panjang 1
Lebar 1
Tebal 0.25
Vol. =
Total Beton Pondasi =
B. PEDESTAL
P1 Vol. =
Jumlah 31 ttk
Panjang 0.4
Lebar 0.3
Tinggi 2
Vol. =
P2 Vol. =
Jumlah 6 ttk
Panjang 0.35
Lebar 0.25
Tinggi 2
Vol. =
P3 Vol. =
Jumlah 3 ttk
Panjang 0.2
Lebar 0.3
Tinggi 0.7
Vol. =
C. Tie Beam
TB1 Vol. =
Panjang 241.6 m'
Tinggi 0.4 m'
Lebar 0.2 m'
Vol. =
TB2 Vol. =
Panjang 19 m'
Tinggi 0.35 m'
Lebar 0.2 m'
Vol. =
I BETON LINTEL
Uk. 13x20 Vol. =
Panjang 105.6 m'
Vol. =
J BETON RAM
Luas 3.6 m
Vol. =
K BETON TANGGA
Lebar 1.2 m' Vol. =
Tebal 0.12 m'
Panjang 8.3 m'
Trap 0.0324 m3
Vol. =
TOTAL BETON
PEMBESIAN
a. Tapak
P1 Vol. =
Jumlah 31 ttk =
Uk. Besi 13mm =
Jarak 0.15 m' =
Panjang Besi 4.10 m' =
Isi Tulangan 12 bh =
Jumlah Vol. =
Berat =
P2 Vol. =
Jumlah 6 ttk =
Uk. Besi 13mm =
Jarak 0.15 m' =
Panjang Besi 3.00 m' =
Isi Tulangan 8 bh =
Jumlah Vol. =
Berat =
P3 Vol. =
Jumlah 3 ttk =
Uk. Besi 13mm =
Jarak 0.15 m' =
Panjang Besi 2.50 m' =
Isi Tulangan 7 bh =
Jumlah Vol. =
Berat =
b. Pedestal
P1 Vol. =
Jumlah 31 ttk =
Uk. Besi 16mm =
Panjang Besi 2.52 m' =
Isi Tulangan 10 bh =
=
Jumlah Vol. =
Berat =
P2 Vol. =
Jumlah 6 ttk =
Uk. Besi 16mm =
=
Panjang Besi 2.52 m' =
Isi Tulangan 8 bh =
Jumlah Vol. =
Berat =
P3 Vol. =
Jumlah 3 ttk =
Uk. Besi 13mm =
Jarak 0.15 m' =
Panjang Besi 1.47 m' =
Isi Tulangan 6 bh =
Jumlah Vol. =
Berat =
c. Tibeam
1. TB1 Vol. =
Panjang 241.60 m' =
ukuran 20x40 m' =
Jarak Cincin 0.15 m' =
Jumlah Tul. 8 =
Besi 13mm =
Jumlah Vol. =
Berat =
2. TB2 Vol. =
Panjang 19.00 m' =
ukuran 20x35 m' =
Jarak Cincin 0.15 m' =
Jumlah Tul. 6 =
Besi 13mm =
Jumlah Vol. =
Berat =
Jumlah Vol. =
Berat =
Jumlah =
Berat =
Jumlah =
Berat =
Jumlah =
Berat =
Jumlah =
Berat =
J BETON RAM
Vol 3.6 m
Luas 18 m2
Wiremesh M8, 2 Lapis 4 Lmbr
K BETON TANGGA Vol. =
Lebar 1.2 m' =
Tebal 0.12 m' =
Panjang 8.3 m' =
Trap 0.0324 m3
Besi d10
Jarak 0.15 m' =
=
Total Wiremesh M8
Lembar 222.79 Lembar
Berat 13,766 Kg
BAJA
D. BAJA KOLOM
K1
Kolom Utama, IWF 300.150.6,5.9 Vol. =
Jumlah 22 titik =
Panjang 6 m' =
Berat/m' 36.67 m' Cat =
Luas Permukaan 1.16 m'
SKOOR P=100CM 22 m'
K1
Kolom Kantor
IWF 300.150.6,5.9 Vol. =
Jumlah 9 titik =
Panjang 2.9 m' =
Berat/m' 36.67 m' Cat =
Luas Permukaan 1.16 m'
K2
Kolom Utama IWF 200.100.5,5.8 Vol. =
Jumlah 6 titik =
Panjang 6 m' =
Jumlah 2 titik
Panjang 4.3
Berat/m' 21.33 m' Cat =
Luas Permukaan 0.74 m'
F. BAJA KUDA2
IWF 300.150.6,5.9 Vol. =
Jumlah 12 titik =
Panjang 10.56 m' =
Jumlah 10 titik
Panjang 9.57 m'
Berat/m' 36.67 m' Cat =
Luas Permukaan 1.16 m'
SKOOR P=60CM 13.2 m'
I. BAJA KONSUL
IWF 200.100.5,5.8 Vol. =
Jumlah 22 titik =
Panjang 1 m' =
Berat/m' 21.33 m'
Luas Permukaan 0.74 m'
Skoor 8.8 m' Cat =
124.00 m2 e. TB1
13.50 m2 Panjang 241.6 m'
4.32 m2 Tebal 0.05 m'
141.82 m2 Lebar 0.4 m'
f. TB2
150.35 m3 Panjang 19 m'
15.57 m3 Tebal 0.05 m'
2.898 m3 Lebar 0.4 m'
219.4634 m3
1.75 x 1.75 x 0.3 x 31 i. Pasir urug Bawah Rabat Beton Keliling Bangunan
Panjang 191.8 m'
Lebar 1.00 m'
Tebal 0.05 m'
28.48 m3
i. Rabat Beton Keliling Bangunan
1.2 x 1.2 x 0.3 x 6 Panjang 191.8 m'
Lebar 1.00 m'
Tebal 0.07 m'
2.59 m3
Total Pasir Urug
1 x 1 x 0.25 x 3 Total Lantai Kerja
Total Rabat Beton Selasar
0.75 m3
31.82 m3
0.4 x 0.3 x 2 x 31
7.44 m3
0.35 x 0.25 x 2 x 6
1.05 m3
0.126 m3
8.616 m3
19.328
0.35 x 0.2 x 19
1.33 m3
20.658 m3
129.96 m3
129.96 m3
29.18 m3
29.18 m3
5.23 m3
0.24 m3
9.36 m3
2.75 m3
3.60 m3
1.81 m3
243.23 M3
4.1 x 12 x 2 x 31
3,050 m' + 10%
305 m'
3,355 m'
280 btg
3,496 kg
280 Btg
3,496 kg
3 x 8 x 2 x 6
288 m' + 10%
29 m'
317 m'
26 btg
330 kg
26 Btg
330 kg
2.5 x 7 x 2 x 3
105 m' + 10%
11 m'
116 m'
10 btg
120 kg
10 Btg
120 kg
1,083 m2
198.35 lmbr 396.7033
12,256 kg x 2 24,512
198 Lmbr
12,256 kg
223.16 m2
20.44 lmbr
1,263 kg
20 Lmbr 41
1,263 kg x 2 2,525
221 m'
221 + 10%
22
243 m'
20 btg
150 kg
20 btg
150 kg
D13 D16
506 btg 83 kg
6,322 btg 1,566 kg 12,032.64 kg Besi Beton
22 x 6
154 m'
5,647 kg
178.64 m2
9 x 2.9
26.1 m'
957 kg
30.28 m2
6 x 6 + 4.3 x 2
44.6 m'
951 kg
33.00 m2
12 x 4.85 + 10 x 6
132.2 m'
4,847 kg
153.35 m2
8 x 6
48 m'
1,420 kg
46.56 m2
39 x 2.61
101.79 m'
2,172 kg
75.32 m2
12 x 10.56 + 10 x 9.57
235.62 m'
2,356 kg
273.32 m2
18 x 6
108.00 m'
2,304 kg
79.92 m2
22 x 32 + 20 x 26
1,224 m'
7,507 kg
648.72 m2
22 x 1
22 m'
469 kg
16.28 m2
8.75 kg x 11 = 96.25 kg
10.21 kg x 22 = 224.583 kg
5.83 kg x 22 = 128.333 kg
5.10 kg x 8 = 40.8333 kg
5.83 kg x 20 = 116.667 kg
5.83 kg x 22 = 128.333 kg
3.65 kg x 6 = 21.875 kg
3.35 kg x 20 = 67.0833 kg
2.63 kg x 64 = 168 kg
1.63 kg x 386 = 630.467 kg
1.34 kg x 96 = 128.8 kg
1.05 kg x 256 = 268.8 kg
1.94 kg x 22 = 42.7778 kg
Jumlah 2062.8 kg
Vol. = 6.20 m3
Vol. = 0.90 m3
Vol. = 0.30 m3
Vol. = 5.10 m3
Vol. = 4.83
Vol. = 0.38 m3
Vol. = 54.15 m3
Vol. = 9.59 m3
Vol. = 13.43 m3
Vol. = 81.45 m3
Vol. = 71.86 m3
Vol. = 13.43 m3
= 747.72 m'
= 747.72 + 10%
= 74.772 m'
= 822.492
= 68.541
324.52
68.54 btg
324.52 kg
= 123.12 m'
= 123.12 + 10%
= 12.312 m'
= 135.432 m'
= 11.286 btg
= 53.44 kg
11.29 btg
53.44 kg
= 22.56 m'
= 22.56 + 10%
= 2.256 m'
= 24.816 m'
= 2.068 btg
= 9.79 kg
2.07 btg
9.79 kg
= 1,836.16 m'
= 1,836.16 + 10%
= 183.62
= 2,019.78
= 168.31 btg
= 796.92 kg
= 168 Btg
= 797 kg
= 131.73 m'
= 131.73 + 10%
= 13.17
= 144.91
= 12.08 btg
= 57.17 kg
= 12 Btg
= 57 kg
= 617.32 m'
= 617.32 + 10%
= 61.73
= 679.05
= 56.59 btg
= 267.93 kg
= 57 Btg
= 268 kg
= 39.20 m'
= 39.20 + 10%
= 3.92
= 43.12
= 3.59 btg
= 17.01 kg
= 3.59 Btg
= 17.01 kg
= 1,104.31 m'
= 1,104.31 + 10%
= 110.43
= 1,214.74
= 101.23 btg
= 479.29 kg
= 101.23 Btg
= 479.29 kg
= 323.84 m'
= 323.84 + 10%
= 32.38
= 356.22
= 29.69 btg
= 140.55 kg
= 29.69 Btg
= 140.55 kg
RENCANA ANGGARAN BIAYA (RAB) - PABRIK TAHU - CIBUBUR
SPESIFIKASI
NO. URAIAN PEKERJAAN ( SEMUA PRODUCT YANG DIPAKAI ADALAH KW1 DAN VOL. SAT. HARGA SATUAN JUMLAH
TEBAL PROFIL ADALAH SKET LAPANGAN)
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pagar Keliling, Seng t= 1,8m Rangka Kaso 184.00 m' Rp 155,000.00 Rp 28,520,000.00
2 Gudang, Barak, Direksi Keet 46.80 m2 Rp 265,000.00 Rp 12,402,000.00
3 Perapihan Puing Existing 1.00 ls Rp 10,000,000.00 Rp 10,000,000.00
4 Mobilisasi dan demobilisasi 1.00 ls Rp 10,000,000.00 Rp 10,000,000.00
5 APD dan Proteksi Pekerjaan 1.00 ls Rp 135,000.00 Rp 3,500,000.00
6 Gambar Kerja dan As Build Drawing 1.00 ls Rp 5,000,000.00 Rp 3,500,000.00
7 Pek. Pasangan bowplank 212.00 m' Rp 55,000.00 Rp 11,660,000.00
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 79,582,000.00
B. PEKERJAAN BETON
1 Pek. Pondasi beton Tapak K300, NFA ( Beton, Tulangan, Begistink ) 31.82 m3 Rp 2,575,000.00 Rp 81,944,868.75
2 Pek. Kolom pedestal 40/30, 35/25, 20/30 K300, NFA ( Beton, Tulangan, Begistink ) 8.62 m3 Rp 4,150,000.00 Rp 35,756,400.00
3 Pek. Tiebeam 20/30 K300, NFA ( Beton, Tulangan, Begistink ) 20.66 m3 Rp 4,020,000.00 Rp 83,045,160.00
4 Pek Kolom praktis 13/20 K175 ( Beton, Tulangan, Begistink ) 5.47 m3 Rp 4,850,000.00 Rp 26,531,440.00
5 Pek. Balok beton 13/20 K176 ( Beton, Tulangan, Begistink ) 9.36 m3 Rp 4,525,000.00 Rp 42,365,765.00
6 Pek. Balok lintel 13/13 K177 ( Beton, Tulangan, Begistink ) 2.75 m3 Rp 5,220,000.00 Rp 14,332,032.00
7 Pek Plat Lantai Beton tbl. 12cm Lantai Pabrik K300, NFA ( Beton, Begistink ) 105.00 m3 Rp 2,750,000.00 Rp 288,750,000.00
8 Pek Plat Lantai Beton tbl. 12cm ( Lantai Kantor ) K175 ( Beton, Begistink ) 29.18 m3 Rp 2,750,000.00 Rp 80,241,480.00
9 Pek. Wiremesh M-8 untuk lantai 2 lapis 18,037.72 kg Rp 16,500.00 Rp 297,622,374.08
10 Pek Plat Lantai Beton tbl. 20cm area bongkar muat K177 ( Beton, Begistink ) 3.60 m3 Rp 2,450,000.00 Rp 8,820,000.00
11 Pek. Wiremesh M-8 untuk lantai 2 lapis area bongkar muat 247.16 kg Rp 16,500.00 Rp 4,078,140.00
12 Pek. Lantai kerja beton bawah pondasi Beton Setara B0 7.40 m3 Rp 1,050,000.00 Rp 7,770,000.00
13 Pek. Lantai Kerja Bawah Plat Lantai 1 : 3 : 5 (tebal 5 cm) Beton Setara B0 54.15 m3 Rp 1,050,000.00 Rp 56,857,500.00
14 Pek. Rabat Selasar Bangunan L=1m, t=7cm Beton Setara B0 13.43 m3 Rp 1,050,000.00 Rp 14,097,300.00
15 Pek. Beton Tangga K225 1.81 m3 Rp 4,150,000.00 Rp 7,514,820.00
16 Pek. Floor hardenner finish epoxy 1000 micron 1,083.00 m2 Rp 350,000.00 Rp 379,050,000.00
17 Pek. Beton Meja Dapur 0.18 m3 Rp 2,450,000.00 Rp 441,000.00
18 Pek. Beton Topi Jendela Luar 0.84 m3 Rp 6,850,000.00 Rp 5,754,000.00
JUMLAH B. Rp 1,434,972,279.83
C. PEKERJAAN BAJA
1 Pek. Pasang Baud angkur M-19 panjang 60cm 88.00 set Rp 96,000.00 Rp 8,448,000.00
2 Pek. Pasang Baseplate, Plat Joint, Stifner tbl. 12mm 2,062.80 kg Rp 29,500.00 Rp 60,852,681.94
3 Pek. Pasang Kolom IWF 300.150 10,420.00 kg Rp 29,500.00 Rp 307,390,000.00
4 Pek. Pasang balok IWF 200.100 5,896.32 kg Rp 29,500.00 Rp 173,941,440.00
5 Pek. Pasang rafter IWF 300.150 2,356.20 kg Rp 29,500.00 Rp 69,507,900.00
6 Pek. Rangka Plat Lt.2 Kantor IWF 250.125 1,420.00 kg Rp 29,500.00 Rp 41,890,000.00
9 Pek. Pasang Gording CNP 125.3,2 6,507.00 kg Rp 29,500.00 Rp 191,956,500.00
10 Pek. Pasang siku dudukan Gording 5.5 116.55 kg Rp 29,500.00 Rp 3,438,225.00
11 Pek. Pasang trekstang Ø 12mm 237.92 kg Rp 65,000.00 Rp 15,464,779.20
12 Pek. Pasang Crossing Ø 12mm 284.79 kg Rp 65,000.00 Rp 18,511,571.52
13 Pek. Pasang spand mur kait angin Ø 16mm 80.00 set Rp 360,000.00 Rp 28,800,000.00
14 Pek. Baud HTB M-16 780.00 bh Rp 37,000.00 Rp 28,860,000.00
15 Pek. Baud HTB M-14 360.00 bh Rp 29,000.00 Rp 10,440,000.00
16 Pek. Baud HTB M-12 672.00 bh Rp 26,000.00 Rp 17,472,000.00
JUMLAH C. Rp 976,973,097.66
B. PEKERJAAN LANTAI
1 Pek. Keramik Lantai 60x60 Granit tile 233.26 m2 Rp 325,000.00 Rp 75,809,500.00
2 Pek. Keramik Lantai KM 40x40 Unpolised 4.34 m2 Rp 287,000.00 Rp 1,245,580.00
3 Pek. Keramik Dinding KM 25x40 15.20 m2 Rp 265,000.00 Rp 4,028,000.00
4 Pek. Keramik Tangga 30x60 12.38 m2 Rp 325,000.00 Rp 4,024,800.00
5 Pek. Plint Lantai 10x60 74.20 m' Rp 65,000.00 Rp 4,823,000.00
6 Pek. Keramik Meja Dapur 60x60 2.74 m2 Rp 325,000.00 Rp 890,500.00
7 Pek. Keramik Dinding Meja Dapur 30x40 2.88 m2 Rp 265,000.00 Rp 763,200.00
SPESIFIKASI
NO. URAIAN PEKERJAAN ( SEMUA PRODUCT YANG DIPAKAI ADALAH KW1 DAN VOL. SAT. HARGA SATUAN JUMLAH
TEBAL PROFIL ADALAH SKET LAPANGAN)
1 2 3 4 5 6
JUMLAH B. Rp 91,584,580.00
C PEKERJAAN PLAFON
1 Pek. Rangka Plafon Hollow 20x40, 40x40 Galvanized 238.27 m2 Rp 87,000.00 Rp 20,729,490.00
2 Pek. Plafon Gypsum 9mm 238.27 m2 Rp 125,000.00 Rp 29,783,750.00
3 Pek. Plafon GRC 6mm ( Atap Bagian Luar ) 208.00 m2 Rp 245,000.00 Rp 50,960,000.00
4 Pek. Up Ceilling Ruang Direktur 14.2 m' Rp 186,000.00 Rp 2,641,200.00
5 Pek. Shadowline 169.52 m' Rp 21,500.00 Rp 3,644,680.00
JUMLAH C. Rp 107,759,120.00
G. PEKERJAAN LINGKUNGAN
1 Pek. Saluran Uditch+ Cover 40x40x120 191.80 m' Rp 1,150,000.00 Rp 220,570,000.00
2 Pek. Jalan lingkungan 1.00 ls Rp 45,000,000.00 Rp 45,000,000.00
3 Pek. IPAL 2.00 unit Rp 10,000,000.00 Rp 20,000,000.00
JUMLAH G. Rp 285,570,000.00
A. PEKERJAAN ME PERSIAPAN
a. Pengadaan Sumber Air Bersih
1 Jasa Pengurusan geser meteran dan upgrade kelas PDAM (ke tarif Niaga
1.00 Ls Rp 12,500,000.00 Rp 12,500,000.00
Kecil 1'')
Note : (Pengurusan sampai dengan air menyala)
- Biaya penyambungan resmi dari PDAM menjadi tanggungan Owner
2 Sumur bor + pipa casing PVC AW Ø 4", debit minimal 0,5 liter /detik 1.00 Ls Rp 31,667,713.00 Rp 31,667,713.00
- include hasil tes lab. kondisi air layak konsumsi
- include metode analisa penentuan tittik sumur bor yang dikeluarkan oleh
lembaga resmi
3 Panel pompa otomatis (Water level control) 61F-G1-AP 1.00 set Rp 3,450,000.00 Rp 3,450,000.00
4 Pelampung dan pipa sambungan PDAM 1.00 unit Rp 1,500,000.00 Rp 1,500,000.00
5 Test & Commissioning 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
- Test tekan air bersih kapasitas 4 bar min. 4 jam
- Tes glontor
- Merger
b. Jasa Pengurusan Pasang Baru Listrik PLN ke Cap. 33000 VA 1.00 Ls Rp 92,500,000.00 Rp 92,500,000.00
- Include SLO & NIDI
catatan : untuk biaya penyambungan resmi dari PLN menjadi tanggungan
owner
c. Pompa Distribusi
1 Pompa distribusi jet pump untuk ke toilet atas PW 381-EA (Automatic) 1.00 Ls Rp 9,047,918.00 Rp 9,047,918.00
2 Pompa distribusi jet pump untuk area penunjang PW 381-EA (Automatic) 1.00 Ls Rp 2,035,781.55 Rp 2,035,781.55
3 Pompa hisap tipe submersible 3" SQ3-80 2Pk 1.00 Ls Rp 18,095,836.00 Rp 18,095,836.00
4 Instalasi perpipaan termasuk fitting pipa dan valve untuk pompa 1.00 Ls Rp 1,809,583.60 Rp 1,809,583.60
5 Titik instalasi stopkontak (Kabel NYM 3x2.5 mm + Conduit Pipa 20 mm) NYM 3x2,5mm + HIC 20mm 2.00 titik Rp 248,817.75 Rp 497,635.50
6 Stop kontak dinding outbow Atlantic IP44 2.00 titik Rp 185,000.00 Rp 370,000.00
d. CCTV Kerja
1 CCTV (IP Camera merk HIK-Vision Multi view online 5 MP, dengan Type Camera Muti View + Monitor
perangkat NVR, Aksesories dan instalasi pendukung 4 Titik) 6.00 titik Rp 4,850,000.00 Rp 29,100,000.00
JUMLAH A. Rp 207,574,467.65
1 2 3 4 5 6
2 Instalasi Lampu Sorot Spotlight
Spesifikasi :
Floodlight INF027 - Cooldaylight
- Lampu Sorot 30 Watt ex. InLite 2.00 bh Rp 158,338.57 Rp 316,677.14
white
- Titik Instalasi Lampu ex. Supreme NYY 3x4mm + HIC 20mm 2.00 ttk Rp 248,817.75 Rp 497,635.50
- Saklar tunggal 1.00 bh Rp 150,000.00 Rp 150,000.00
3 Lampu selang strip untuk roster sign + list U
Spesifikasi :
- LED Strip untuk dinding sign ex. Philips DLI 31087 Warmwhite 15.00 m Rp 36,191.67 Rp 542,875.05
- Titik Instalasi Lampu (Kabel NYM 2x2.5 mm + Conduit Pipa 20 mm) ex. Eterna NYY 2x2,5mm + HIC 20mm 1.00 titik Rp 248,817.75 Rp 248,817.75
- Saklar Tunggal ex. Panasonic 1x WEJ5541, WEJ78029W 1.00 bh Rp 150,000.00 Rp 150,000.00
4 Pembuatan Bak kontrol untuk uk.60x60 cm + tutup tebal 10 cm tulangan
4.00 unit Rp 5,000,000.00 Rp 20,000,000.00
tunggal dim 10-150mm
JUMLAH C. Rp 70,340,563.19
9 Lampu TKO TL LED 2x16 Watt ex. Philips TL LED ecofit 2x 16w 17.00 titik Rp 235,000.00 Rp 3,995,000.00
10 Kap lampu waterproof + TL LED 1x16 watt nyala white untuk belakang
ex. Philips 2.00 titik Rp 226,197.95 Rp 452,395.90
kitchen
11 Ceiling fan 56" untuk area dapur c/w instalasi ex. KDK WZ56P-W putih 4.00 titik Rp 814,312.62 Rp 3,257,250.48
12 Exhaust fan ceiling 10" untuk dry storage c/w instalasi ex. KDK 25TGQ2 2.00 titik Rp 407,156.31 Rp 814,312.62
13 Wall fan 16" untuk ruang manager ex. Sekai WFN 1627 1.00 titik Rp 339,296.93 Rp 339,296.93
14 LED strip untuk bawah top table meja saji ex. Philips 31087 warmwhite 16.35 m Rp 36,191.67 Rp 591,733.80
1 2 3 4 5 6
3 Kran stainless steel untuk kran kitchen ex. Onda FJ 09 LA 3.00 bh Rp 135,718.77 Rp 407,156.31
4 Floor drain stainless ex. ex. Mitoyo 3.00 titik Rp 135,718.77 Rp 407,156.31
5 Stop kran stainless 1/2" ex. San-Ei Y20C-HM 13.00 unit Rp 113,098.98 Rp 1,470,286.74
JUMLAH D. Rp 56,286,078.54
F. PEKERJAAN OUTDOOR
I. PEKERJAAN INSTALASI LISTRIK
1 Titik instalasi lampu (Kabel NYM 2x2.5 mm + Conduit Pipa 20 mm) ex. Eterna NYM 2x2,5mm + HIC 20mm 4.00 titik Rp 248,817.75 Rp 995,271.00
2 Titik instalasi stopkontak (Kabel NYM 3x2.5 mm + Conduit Pipa 20 mm) ex. Eterna NYM 3x2,5mm + HIC 20mm 4.00 titik Rp 248,817.75 Rp 995,271.00
3 Saklar ganda ex. Panasonic 2x WEJ5531, WEJ78029W 1.00 bh Rp 38,001.26 Rp 38,001.26
4 Stopkontak outbow untuk stage ex. Broco Atlantic IP44 4.00 bh Rp 38,001.26 Rp 152,005.04
5 Lampu gantung cafe (renceng) fitting setiap 100cm
Spesifikasi :
- Kabel lampu renceng include acesoris 88.00 m Rp 31,667.71 Rp 2,786,758.48
- Seling baja 6mm 88.00 m Rp 4,523.96 Rp 398,108.48
- Lampu LED 4 watt kuning LED Classic Edison ST64 4w 88.00 titik Rp 67,859.39 Rp 5,971,626.32
6 Lampu selang LED strip + list U untuk stage ex. Philips 31087 Warmwhite 12.00 m Rp 75,540.00 Rp 906,480.00
7 Lampu selang LED strip + list U untuk dinding stage ex. Philips 31087 Warmwhite 14.00 m Rp 75,540.00 Rp 1,057,560.00
Pembuatan sumur resapan Ø100 cm dalam 150 cm untuk area outdoor (4
8
unit)
Spesifikasi :
- Galian tanah 6.00 m3 Rp 58,811.47 Rp 352,868.82
- Buis beton bertulang untuk resapan Ø100 cm, tinggi 150 cm Mutu beton buis K-300 12.00 bh Rp 452,395.90 Rp 5,428,750.80
Ready Mix K.250 (Tul.Rangkap
- Penutup plat beton bertulang t= 10 cm 0.31 m3 Rp 836,932.42 Rp 259,449.05
Lx=Ly, Ø10-150 mm)
JUMLAH F Rp 19,342,150.25
JUMLAH G Rp 75,123,060.16
1 2 3 4 5 6
Jakarta, 22 Februari 2024
Dibuat Oleh,
( N. HENDRIYAN )
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB) - PABRIK TAHU - CIBUBUR
JUMLAH
NO URAIAN PEKERJAAN KETERANGAN
( Rp )
I. PEKERJAAN PERSIAPAN
A. PEKERJAAN PERSIAPAN Rp 79,582,000.00
II. PEKERJAAN STRUKTUR
A. PEKERJAAN GALIAN DAN URUGAN Rp 184,711,066.00
B. PEKERJAAN BETON Rp 1,434,972,279.83
C. PEKERJAAN BAJA Rp 976,973,097.66
III. PEKERJAAN ARSlTEKTUR
A. PEKERJAAN DINDING Rp 397,002,466.25
B. PEKERJAAN LANTAI Rp 91,584,580.00
C. PEKERJAAN PLAFON Rp 107,759,120.00
D. PEKERJAAN PENGECATAN DAN FINISHING Rp 289,320,747.75
E. PEKERJAAN PENUTUP ATAP dan TALANG Rp 342,598,000.00
F. PEKERJAAN PINTU & JENDELA Rp 202,920,000.00
G. PEKERJAAN LINGKUNGAN Rp 285,570,000.00
IV. PEKERJAAN MEKANICAL, ELECTRIKAL & PLUMBING
A. PEKERJAAN ME PERSIAPAN Rp 207,574,467.65
B. PEKERJAAN MEP AREA LANDSCAPE Rp 42,168,653.12
C. PEKERJAAN BANGUNAN UTAMA (AREA RUANG CONTROL
INDOOR) Rp 70,340,563.19
JUMLAH Rp 4,883,293,118.91
PPN 11% Rp -
JUMLAH Rp 4,883,293,118.91
DIBULATKAN Rp 4,883,000,000.00
TERBILANG : Empat Milyar Delapan Ratus Delapan Puluh Tiga Juta Rupiah
( N. HENDRIYAN )
RENCANA ANGGARAN BIAYA (RAB) - PABRIK TAHU - CIBUBUR
1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pagar Keliling, Seng t= 1,8m Rangka Kaso 184.00 m' Rp 155,000.00 Rp 28,520,000.00
2 Gudang, Barak, Direksi Keet 46.80 m2 Rp 265,000.00 Rp 12,402,000.00
3 Perapihan Puing Existing 1.00 ls Rp 10,000,000.00 Rp 10,000,000.00
4 Mobilisasi dan demobilisasi 1.00 ls Rp 10,000,000.00 Rp 10,000,000.00
5 APD dan Proteksi Pekerjaan 1.00 ls Rp 135,000.00 Rp 3,500,000.00
6 Gambar Kerja dan As Build Drawing 1.00 ls Rp 5,000,000.00 Rp 3,500,000.00
7 Pek. Pasangan bowplank 212.00 m' Rp 55,000.00 Rp 11,660,000.00
TOTAL BIAYA PEKERJAAN PERSIAPAN Rp 79,582,000.00
B. PEKERJAAN BETON
1 Pek. Pondasi beton Tapak 31.82 m3 Rp 2,575,000.00 Rp 81,944,868.75
2 Pek. Kolom pedestal 40/30, 35/25, 20/30 8.62 m3 Rp 4,150,000.00 Rp 35,756,400.00
3 Pek. Tiebeam 20/30 20.66 m3 Rp 4,020,000.00 Rp 83,045,160.00
4 Pek Kolom praktis 13/20 5.47 m3 Rp 4,850,000.00 Rp 26,531,440.00
5 Pek. Balok beton 13/20 9.36 m3 Rp 4,525,000.00 Rp 42,365,765.00
6 Pek. Balok lintel 13/13 2.75 m3 Rp 5,220,000.00 Rp 14,332,032.00
7 Pek Plat Lantai Beton tbl. 12cm Lantai Pabrik 105.00 m3 Rp 2,750,000.00 Rp 288,750,000.00
8 Pek Plat Lantai Beton tbl. 12cm ( Lantai Kantor ) 29.18 m3 Rp 2,750,000.00 Rp 80,241,480.00
9 Pek. Wiremesh M-8 untuk lantai 2 lapis 18,037.72 kg Rp 16,500.00 Rp 297,622,374.08
10 Pek Plat Lantai Beton tbl. 20cm area bongkar muat 3.60 m3 Rp 2,450,000.00 Rp 8,820,000.00
11 Pek. Wiremesh M-8 untuk lantai 2 lapis area bongkar muat 247.16 kg Rp 16,500.00 Rp 4,078,140.00
12 Pek. Lantai kerja beton bawah pondasi 7.40 m3 Rp 1,050,000.00 Rp 7,770,000.00
13 Pek. Lantai Kerja Bawah Plat Lantai 1 : 3 : 5 (tebal 5 cm) 54.15 m3 Rp 1,050,000.00 Rp 56,857,500.00
14 Pek. Rabat Selasar Bangunan L=1m, t=7cm 13.43 m3 Rp 1,050,000.00 Rp 14,097,300.00
15 Pek. Beton Tangga 1.81 m3 Rp 4,150,000.00 Rp 7,514,820.00
16 Pek. Floor hardenner finish epoxy 1,083.00 m2 Rp 350,000.00 Rp 379,050,000.00
17 Pek. Beton Meja Dapur 0.18 m3 Rp 2,450,000.00 Rp 441,000.00
18 Pek. Beton Topi Jendela Luar 0.84 m3 Rp 6,850,000.00 Rp 5,754,000.00
JUMLAH B. Rp 1,434,972,279.83
C. PEKERJAAN BAJA
1 Pek. Pasang Baud angkur M-19 panjang 60cm 88.00 set Rp 96,000.00 Rp 8,448,000.00
2 Pek. Pasang Baseplate, Plat Joint, Stifner tbl. 12mm 2,062.80 kg Rp 29,500.00 Rp 60,852,681.94
3 Pek. Pasang Kolom IWF 300.150 10,420.00 kg Rp 29,500.00 Rp 307,390,000.00
4 Pek. Pasang balok IWF 200.100 5,896.32 kg Rp 29,500.00 Rp 173,941,440.00
5 Pek. Pasang rafter IWF 300.150 2,356.20 kg Rp 29,500.00 Rp 69,507,900.00
6 Pek. Rangka Plat Lt.2 Kantor IWF 250.125 1,420.00 kg Rp 29,500.00 Rp 41,890,000.00
9 Pek. Pasang Gording CNP 125.3,2 6,507.00 kg Rp 29,500.00 Rp 191,956,500.00
10 Pek. Pasang siku dudukan Gording 5.5 116.55 kg Rp 29,500.00 Rp 3,438,225.00
11 Pek. Pasang trekstang Ø 12mm 237.92 kg Rp 65,000.00 Rp 15,464,779.20
12 Pek. Pasang Crossing Ø 12mm 284.79 kg Rp 65,000.00 Rp 18,511,571.52
13 Pek. Pasang spand mur kait angin Ø 16mm 80.00 set Rp 360,000.00 Rp 28,800,000.00
14 Pek. Baud HTB M-16 780.00 bh Rp 37,000.00 Rp 28,860,000.00
15 Pek. Baud HTB M-14 360.00 bh Rp 29,000.00 Rp 10,440,000.00
16 Pek. Baud HTB M-12 672.00 bh Rp 26,000.00 Rp 17,472,000.00
JUMLAH C. Rp 976,973,097.66
B. PEKERJAAN LANTAI
1 Pek. Keramik Lantai 60x60 Granit tile 233.26 m2 Rp 325,000.00 Rp 75,809,500.00
2 Pek. Keramik Lantai KM 40x40 Unpolised 4.34 m2 Rp 287,000.00 Rp 1,245,580.00
3 Pek. Keramik Dinding KM 25x40 15.20 m2 Rp 265,000.00 Rp 4,028,000.00
4 Pek. Keramik Tangga 30x60 12.38 m2 Rp 325,000.00 Rp 4,024,800.00
5 Pek. Plint Lantai 10x60 74.20 m' Rp 65,000.00 Rp 4,823,000.00
6 Pek. Keramik Meja Dapur 60x60 2.74 m2 Rp 325,000.00 Rp 890,500.00
7 Pek. Keramik Dinding Meja Dapur 30x40 2.88 m2 Rp 265,000.00 Rp 763,200.00
NO. URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JUMLAH
1 2 3 4 5 6
JUMLAH B. Rp 91,584,580.00
C PEKERJAAN PLAFON
1 Pek. Rangka Plafon Hollow 20x40, 40x40 Galvanized 238.27 m2 Rp 87,000.00 Rp 20,729,490.00
2 Pek. Plafon Gypsum 9mm 238.27 m2 Rp 125,000.00 Rp 29,783,750.00
3 Pek. Plafon GRC 6mm ( Atap Bagian Luar ) 208.00 m2 Rp 245,000.00 Rp 50,960,000.00
4 Pek. Up Ceilling Ruang Direktur 14.2 m' Rp 186,000.00 Rp 2,641,200.00
5 Pek. Shadowline 169.52 m' Rp 21,500.00 Rp 3,644,680.00
JUMLAH C. Rp 107,759,120.00
G. PEKERJAAN LINGKUNGAN
1 Pek. Saluran Uditch+ Cover 191.80 m' Rp 1,150,000.00 Rp 220,570,000.00
2 Pek. Jalan lingkungan 1.00 ls Rp 45,000,000.00 Rp 45,000,000.00
3 Pek. IPAL 2.00 unit Rp 10,000,000.00 Rp 20,000,000.00
JUMLAH G. Rp 285,570,000.00
A. PEKERJAAN ME PERSIAPAN
a. Pengadaan Sumber Air Bersih
1 Jasa Pengurusan geser meteran dan upgrade kelas PDAM (ke tarif Niaga
1.00 Ls Rp 12,500,000.00 Rp 12,500,000.00
Kecil 1'')
Note : (Pengurusan sampai dengan air menyala)
- Biaya penyambungan resmi dari PDAM menjadi tanggungan Owner
2 Sumur bor + pipa casing PVC AW Ø 4", debit minimal 0,5 liter /detik 1.00 Ls Rp 31,667,713.00 Rp 31,667,713.00
- include hasil tes lab. kondisi air layak konsumsi
- include metode analisa penentuan tittik sumur bor yang dikeluarkan oleh
lembaga resmi
3 Panel pompa otomatis (Water level control) 1.00 set Rp 3,450,000.00 Rp 3,450,000.00
4 Pelampung dan pipa sambungan PDAM 1.00 unit Rp 1,500,000.00 Rp 1,500,000.00
5 Test & Commissioning 1.00 Ls Rp 5,000,000.00 Rp 5,000,000.00
- Test tekan air bersih kapasitas 4 bar min. 4 jam
- Tes glontor
- Merger
b. Jasa Pengurusan Pasang Baru Listrik PLN ke Cap. 33000 VA 1.00 Ls Rp 92,500,000.00 Rp 92,500,000.00
- Include SLO & NIDI
catatan : untuk biaya penyambungan resmi dari PLN menjadi tanggungan
owner
c. Pompa Distribusi
1 Pompa distribusi jet pump untuk ke toilet atas 1.00 Ls Rp 9,047,918.00 Rp 9,047,918.00
2 Pompa distribusi jet pump untuk area penunjang 1.00 Ls Rp 2,035,781.55 Rp 2,035,781.55
3 Pompa hisap tipe submersible 3" 1.00 Ls Rp 18,095,836.00 Rp 18,095,836.00
4 Instalasi perpipaan termasuk fitting pipa dan valve untuk pompa 1.00 Ls Rp 1,809,583.60 Rp 1,809,583.60
5 Titik instalasi stopkontak (Kabel NYM 3x2.5 mm + Conduit Pipa 20 mm) 2.00 titik Rp 248,817.75 Rp 497,635.50
6 Stop kontak dinding outbow 2.00 titik Rp 185,000.00 Rp 370,000.00
d. CCTV Kerja
1 CCTV (IP Camera merk HIK-Vision Multi view online 5 MP, dengan
perangkat NVR, Aksesories dan instalasi pendukung 4 Titik) 6.00 titik Rp 4,850,000.00 Rp 29,100,000.00
JUMLAH A. Rp 207,574,467.65
1 2 3 4 5 6
2 Instalasi Lampu Sorot Spotlight
Spesifikasi :
- Lampu Sorot 30 Watt 2.00 bh Rp 158,338.57 Rp 316,677.14
- Titik Instalasi Lampu 2.00 ttk Rp 248,817.75 Rp 497,635.50
- Saklar tunggal 1.00 bh Rp 150,000.00 Rp 150,000.00
3 Lampu selang strip untuk roster sign + list U
Spesifikasi :
- LED Strip untuk dinding sign 15.00 m Rp 36,191.67 Rp 542,875.05
- Titik Instalasi Lampu (Kabel NYM 2x2.5 mm + Conduit Pipa 20 mm) 1.00 titik Rp 248,817.75 Rp 248,817.75
- Saklar Tunggal 1.00 bh Rp 150,000.00 Rp 150,000.00
4 Pembuatan Bak kontrol untuk uk.60x60 cm + tutup tebal 10 cm tulangan
4.00 unit Rp 5,000,000.00 Rp 20,000,000.00
tunggal dim 10-150mm
JUMLAH C. Rp 70,340,563.19
1 2 3 4 5 6
3 Kran stainless steel untuk kran kitchen 3.00 bh Rp 135,718.77 Rp 407,156.31
4 Floor drain stainless 3.00 titik Rp 135,718.77 Rp 407,156.31
5 Stop kran stainless 1/2" 13.00 unit Rp 113,098.98 Rp 1,470,286.74
JUMLAH D. Rp 56,286,078.54
F. PEKERJAAN OUTDOOR
I. PEKERJAAN INSTALASI LISTRIK
1 Titik instalasi lampu (Kabel NYM 2x2.5 mm + Conduit Pipa 20 mm) 4.00 titik Rp 248,817.75 Rp 995,271.00
2 Titik instalasi stopkontak (Kabel NYM 3x2.5 mm + Conduit Pipa 20 mm) 4.00 titik Rp 248,817.75 Rp 995,271.00
3 Saklar ganda 1.00 bh Rp 38,001.26 Rp 38,001.26
4 Stopkontak outbow untuk stage 4.00 bh Rp 38,001.26 Rp 152,005.04
5 Lampu gantung cafe (renceng) fitting setiap 100cm
Spesifikasi :
- Kabel lampu renceng 88.00 m Rp 31,667.71 Rp 2,786,758.48
- Seling baja 6mm 88.00 m Rp 4,523.96 Rp 398,108.48
- Lampu LED 4 watt kuning 88.00 titik Rp 67,859.39 Rp 5,971,626.32
6 Lampu selang LED strip + list U untuk stage 12.00 m Rp 75,540.00 Rp 906,480.00
7 Lampu selang LED strip + list U untuk dinding stage 14.00 m Rp 75,540.00 Rp 1,057,560.00
Pembuatan sumur resapan Ø100 cm dalam 150 cm untuk area outdoor (4
8
unit)
Spesifikasi :
- Galian tanah 6.00 m3 Rp 58,811.47 Rp 352,868.82
- Buis beton bertulang untuk resapan Ø100 cm, tinggi 150 cm 12.00 bh Rp 452,395.90 Rp 5,428,750.80
JUMLAH F Rp 19,342,150.25
JUMLAH G Rp 75,123,060.16
1 2 3 4 5 6
Jakarta, 22 Februari 2024
Dibuat Oleh,
( N. HENDRIYAN )
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB) - PABRIK TAHU - CIBUBUR
JUMLAH
NO URAIAN PEKERJAAN KETERANGAN
( Rp )
I. PEKERJAAN PERSIAPAN
A. PEKERJAAN PERSIAPAN Rp 79,582,000.00
II. PEKERJAAN STRUKTUR
A. PEKERJAAN GALIAN DAN URUGAN Rp 184,711,066.00
B. PEKERJAAN BETON Rp 1,434,972,279.83
C. PEKERJAAN BAJA Rp 976,973,097.66
III. PEKERJAAN ARSlTEKTUR
A. PEKERJAAN DINDING Rp 397,002,466.25
B. PEKERJAAN LANTAI Rp 91,584,580.00
C. PEKERJAAN PLAFON Rp 107,759,120.00
D. PEKERJAAN PENGECATAN DAN FINISHING Rp 289,320,747.75
E. PEKERJAAN PENUTUP ATAP dan TALANG Rp 342,598,000.00
F. PEKERJAAN PINTU & JENDELA Rp 202,920,000.00
G. PEKERJAAN LINGKUNGAN Rp 285,570,000.00
IV. PEKERJAAN MEKANICAL, ELECTRIKAL & PLUMBING
A. PEKERJAAN ME PERSIAPAN Rp 207,574,467.65
B. PEKERJAAN MEP AREA LANDSCAPE Rp 42,168,653.12
C. PEKERJAAN BANGUNAN UTAMA (AREA RUANG CONTROL
INDOOR) Rp 70,340,563.19
JUMLAH Rp 4,883,293,118.91
PPN 11% Rp -
JUMLAH Rp 4,883,293,118.91
DIBULATKAN Rp 4,883,000,000.00
TERBILANG : Empat Milyar Delapan Ratus Delapan Puluh Tiga Juta Rupiah
( N. HENDRIYAN )
Rp 4,883,000,000
Rp 146,490,000 3%
Rp 976,600,000 20%
Rp 1,220,750,000 25%
Rp 1,220,750,000 25%
Rp 1,220,750,000 25%
Rp 244,150,000 5%
Progres
DP 20 0
2 25 30
3 25 65
4 25 95
5 5 100