Farrel Gantt Chart
Farrel Gantt Chart
PENGGATIAAN BOX CULVERT RUAS JALAN SP. TALEGONG (SUKAMULYA OWNER START DATE
WK01
WK02
WK03
WK04
WK05
WK06
WK07
WK08
WK09
Task ID Task Name Resources
This project was initiated to Week Week
improve the attendance of
students at all level from 80% to DIVISI 1 U M U M
95% within a one-month period. 1.8.(1) Manajemen dan Keselamatan Lalu Lintas
1.19 Keselamatan dan Kesehatan Kerja
1.20.(2) Sondir termasuk Laporan WK02 WK03 1 1
DIVISI 2 DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air WK08 WK09 1 1
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm WK15 WK16
2.3.(24) Saluran berbentuk U Tipe DS 2
DIVISI 7 STRUKTUR
7.1 (7a) Beton struktur, fc’20 MPa WK14 WK16
7.1 (10) Beton, fc’10 Mpa WK14 WK16
7.3 (2) Baja Tulangan Sirip BjTP 280 WK14 WK16
7.3 (3) Baja Tulangan Sirip BjTs 420A WK14 WK16
7.6.(11a) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 WK14 WK16
7.6.(17a) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 4 WK14 WK16
7.9.(1) Pasangan Batu WK14 WK16
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis WK14 WK16
7.15.(1) Pembongkaran Pasangan Batu WK14 WK16
7.15.(2) Pembongkaran Beton WK14 WK16
WK11
WK12
WK13
WK14
WK15
WK16
WK17
WK18
1 1
1 1 1 1
1
1
1
1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1