6 samb. K1 mati di Lt.3 29 36 4 144 4600 3434.39 dr No. 1 7 samb. K1 mati di Lt.Atap 25 34 4 136 3000 1572.08 dr No. 2 8 samb. K2 mati di Lt.Atap 25 20 2 40 3200 493.20 dr No. 4 9 samb. K4 mati di Lt.Atap 25 26 2 52 3300 661.20 dr No. 2 10 samb. K3 mati di Lt.Atap 25 20 4 80 3700 1140.53 dr No. 3 11 samb. K12 mati di Lt.4 29 42 4 168 4300 3745.47 dr No. 5 12 samb. K12 mati di Lt.Atap 25 34 4 136 3000 1572.08 dr No. 2 13 Stek K15 Utility 25 20 14 280 4000 4315.50 dr No. 2 14 samb. K15 mati di atap Utility 25 20 14 280 4000 4315.50 dr No. 2 15 samb. CW1 mati di Lt.3 25 16 2 32 4000 493.20 dr No. 2 16 Samb. Tul.bwh P20-B (rata-rata) 25 17 1 17 3500 229.26 dr No. 2 17 Extra Balok Lt. 2 & 3 25 27 1 27 4000 416.14 dr No. 2 Volume yg dpt dipasang dr Potongan bekas Stek Kolom (B) : 22,388.53
Waste (C) = (A) -(B) : 2,034.12
(C) / (A) x 100% : 8.33% Keterangan : 1. Kolom K15 memakai D22, terdiri dari Stek+Samb.tengah+Samb.mati. karena untuk pengalihan, maka Stek & Samb.mati K15 memakai D25 (pengalihan), (isi/jumlah batang sama), tetapi untuk Samb. tengahnya tetap memakai D22 2. Extra Balok di Lt. 2 dan 3 memakai D22, karena untuk pengalihan beberapa yg ukurannya sesuai dapat memakai D25 (pengalihan) 3. Samb. Mati di Lt. Atap pada Kolom K2,K10,K11,CW1, semuanya memakai sisa potongan dr Stek kolom tinggi 1,5 Lantai yg sekarang telah diterapkan sekarang