Anda di halaman 1dari 68

BACKUP

NO. URAIAN SAT P L T JUMLAH

1 PONDASI FOOTPLAT
m3 1 1 0.25 4 V

NO. URAIAN SAT P L T JUMLAH

2 KOLOM
a. Kolom 1 (K1)
m3 0.25 0.25 4 4

b. Kolom 2 (K2) m3 0.15 0.15 2.5 2

c. Kolom 3 (K3) m3 0.15 0.15 2 2

NO. URAIAN SAT P L T JUMLAH

3 BALOK
a. Balok 1 (B1) m3 17 0.15 0.3 1

NO. URAIAN SAT P L T JUMLAH

4 PLAT LANTAI m3 4 3 0.12 1


BACKU

Jarak
NO. URAIAN SAT Diameter L Koef Tinggi
Sengkang
1 PONDASI FOOTPLAT Kg 16 4.92 0.006165 - -
Fx : ᴓ16 - 170
Fy : ᴓ16 - 170
Selimut = 3 cm
Px : 2.46
Py : 2.46

Jarak Tinggi
NO. URAIAN SAT Diameter L Koef
Sengkang Kolom
2 KOLOM
a. Kolom 1 (K1)
utama ᴓ16 - 200 Kg 16 - 0.006165 - 4
sengkang ᴓ16 - 200
25x25
selimut 3 cm

Kg 16 0.88 0.006165 0.2 4

Jarak Tinggi
NO. URAIAN SAT Diameter L Koef
Sengkang Kolom
b. Kolom 2 (K2)
utama ᴓ12 - 150 Kg 12 - 0.006165 - 2.5
sengkang ᴓ12 - 150
15x15
selimut 3cm

Kg 12 0.48 0.006165 0.2 2.5


Jarak Tinggi
NO. URAIAN SAT Diameter L Koef
Sengkang Kolom
c. Kolom 3 (K3)
utama ᴓ12 - 150 Kg 12 - 0.006165 - 2
sengkang ᴓ12 - 150
15x15
selimut 3cm

Kg 12 0.48 0.006165 0.2 2

Jarak
NO. URAIAN SAT Diameter L Bj L Balok
Sengkang
3 BALOK
utama ᴓ12 - 150 Kg 12 - 0.006165 - 17
sengkang ᴓ12 - 150
15x30
selimut 3 cm

Kg 12 0.78 0.006165 0.2 17


BACKUP VOLUM

NO. URAIAN SAT Tebal (mm) P L

1 BONDEK
1x4 Lbr 7 4 3 V =
=
=

Vol bondek per lembar

Kebutuhan bondek

Diameter
NO. URAIAN SAT P L
(mm)
2 WIREMESH
Luasan 1 Lbr 6 4 3 V butuh =
2,1x5,4 =
M6 =

Vol wiremesh per Lbr

Kebutuhan wiremesh

BACKUP V
NO. URAIAN SAT P L Jumlah
1 PONDASI FOOTPLAT
m2 4 0.3 4 V =
=
=
NO. URAIAN SAT P L Jumlah
2 KOLOM
a. Kolom 1 (K1)
m2 16 1 2 V =
=
=

b. Kolom 2 (K2) m2 10 0.6 1 V =


=
=

c. Kolom 3 (K3) m2 8 0.6 1 V =


=
=

NO. URAIAN SAT P L Jumlah


3 BALOK
a. Balok 1 (B1)
Bekisting 1 m2 12 0.75 2 V =
=
=

Bekisting 2 m2 9 0.75 2 V =
=
=

V bekisting =

NO. URAIAN SAT P L Jumlah


4 PLAT LANTAI
Bekisting 1 m3 4 0.12 2 V =
=
=

Bekisting 2 m3 3 0.12 2 V =
=
=
BACKUP V

NO. URAIAN SAT P L T Jumlah

1 GALIAN TANAH m3 1.2 1.2 2 4 -

NO. URAIAN SAT P L T Jumlah

2 LANTAI KERJA m3 1.2 1.2 0.05 4 -

NO. URAIAN SAT P L T Jumlah

3 URUGAN PASIR m3 1.2 1.2 0.1 4 -

NO. URAIAN SAT P L T Jumlah

4 AANSTAMPING m3 1.2 1.2 0.2 4 -

NO. URAIAN SAT P L T Jumlah

5 URUGAN TANAH KEMBALI m3 1.2 1.2 2 4 -

BACKUP

NO. URAIAN SAT P L T Jumlah

1 DINDING BATA MERAH


Dinding 1 m2 - 9.7 2.2 - -
Dinding 2 m2 - 5 2 - -

NO. URAIAN SAT P L T Jumlah

2 PLESTERAN
Dinding 1 m2 - 9.7 2.2 2 -

Dinding 2 m2 - 5 2 2 -

NO. URAIAN SAT P L T Jumlah

3 ACIAN
Dinding 1 m2 - 9.7 2.2 2 -

Dinding 2 m2 - 5 2 2 -

BACKU

NO. URAIAN SAT P L T Jumlah

1 BAJA RINGAN m2 3 3 - - -

NO. URAIAN SAT P L T Jumlah

2 GENTENG METAL m2 3 3 - - -
NO. URAIAN SAT P L T Jumlah

3 KANOPI GALVALUM m2 3 1.5 - - -

NO. URAIAN SAT P L T Jumlah

4 KANOPI GALVALUM
Luasan 1 m2 3 2.5 - - -

Luasan 2 m2 4 3 - - -
BACKUP VOLUME BETON

VOLUME

= P x L x T x Jumlah
= 1 x 1 x 0.25 x 4
= 1.00 m3

VOLUME

V = P x L x T x Jumlah
= 0.25 x 0.25 x 4 x 4
= 1.00 m3

V = P x L x T x Jumlah
= 0.15 x 0.15 x 2.5 x 2
= 0.11 m3

V = P x L x T x Jumlah
= 0.15 x 0.15 x 2 x 2
= 0.09 m3

VOLUME

V = P x L x T x Jumlah
= 17 x 0.15 x 0.3 x 1
= 0.76 m3

VOLUME

V1 = P x L x T x Jumlah
= 4 x 3 x 0.12 x 1
= 1.44 m3
BACKUP VOLUME BESI

P lengkung Jumlah VOLUME

- 4 V = Koefisien x D2 x L x Jumlah
= 0.01 x 256 x 4.92 x 4.00
= 31.060 Kg

P lengkung Jumlah VOLUME

Besi Utama K1 :
0.35 4.00 V = Koefisien x D^2 x (T kolom + P lengkung)
= 0.006165 x 256 x 4 + 0.35
= 27.46 Kg

Besi Sengkang K1 :
0.08 4.00 P = T kolom : Jarak sengkang x L +
= 4.000 : 0.2 x 0.88 +
= 17.680 m
V = Koefisien x D^2 x P x Jumlah
= 0.006165 x 256 x 17.680 x 4.00
= 111.613 Kg

Volume total besi K1 = V besi utama + V besi sengkang


= 27.46 + 111.613
= 139.075 Kg

P lengkung Jumlah VOLUME

Besi Utama K2 :
0 4.00 V = Koefisien x D^2 x T Kolom x Jumlah
= 0.006165 x 144 x 2.5 x 2.00
= 4.44 Kg

Besi Sengkang K2 :
0.08 4.00 P = T kolom : Jarak sengkang x L +
= 2.500 : 0.2 x 0.48 +
= 6.080 m
V = Koefisien x D^2 x P x Jumlah
= 0.006165 x 144 x 6.080 x 2.00
= 10.795 Kg

Volume total besi K2 = V besi utama + V besi sengkang


= 4.44 + 10.795
= 15.234 Kg

P lengkung Jumlah VOLUME

Besi Utama K3 :
0 4.00 V = Koefisien x D^2 x T Kolom x Jumlah
= 0.006165 x 144 x 2 x 4.00
= 7.10 Kg

Besi Sengkang K3 :
0.08 4.00 P = T kolom : Jarak sengkang x L +
= 2.000 : 0.2 x 0.48 +
= 4.880 m
V = Koefisien x D^2 x P x Jumlah
= 0.006165 x 144 x 4.880 x 4.00
= 17.329 Kg

Volume total besi K3 = V besi utama + V besi sengkang


= 7.10 + 17.329
= 24.431 Kg
P lengkung Jumlah VOLUME

Besi Utama B1 :
- 1.00 V = Koefisien x D^2 x T Kolom x Jumlah
= 0.006165 x 144 x 17 x 1.00
= 15.09 Kg

Besi Sengkang B1 :
0.08 1.00 P = L balok : Jarak sengkang x L +
= 17.000 : 0.2 x 0.78 +
= 66.380 m
V = Koefisien x D^2 x P x Jumlah
= 0.006165 x 144 x 66.380 x 1.00
= 58.930 Kg

Volume total besi B1 = V besi utama + V besi sengkang


= 15.09 + 58.930
= 74.021 Kg
BACKUP VOLUME BONDEK & WEIRMESH

VOLUME

P x L
4 x 3.00
12 m2

= 1x4 = 4 m2

= V = 12 = 3 Lbr
V bondek per lembar 4

VOLUME

P x L
4 x 3.00
12 m2

= 2,1 x 5,4 = 11.34 m2

= V
V bondek per lembar
= 12
11.34
= 1.058 Lbr

BACKUP VOLUME BEKISTING


VOLUME

P x L x Jumlah
4 x 0.3 x 4
4.8 m2
VOLUME

P x L x Jumlah
16 x 1 x 2
32 m2

P x L x Jumlah
10 x 0.6 x 1
6 m2

P x L x Jumlah
8 x 0.6 x 1
4.8 m2

VOLUME

P x L x Jumlah
12 x 0.75 x 2
18 m2

P x L x Jumlah
9 x 0.75 x 2
13.5 m2

31.5 m2

VOLUME

P x L x Jumlah
4 x 0.12 x 2
0.96 m2

P x L x Jumlah
3 x 0.12 x 2
0.72 m2
BACKUP VOLUME FOOTPLAT

VOLUME

- - V = P x L x T x Jumlah
= 1.20 x 1 x 2 x 4.00
= 11.520 m3

VOLUME

- - V = P x L x T x Jumlah
= 1.20 x 1 x 0.05 x 4.00
= 0.288 m3

VOLUME

- - V = P x L x T x Jumlah
= 1.20 x 1 x 0.1 x 4.00
= 0.576 m3

VOLUME

- - V = P x L x T x Jumlah
= 1.20 x 1 x 0.2 x 4.00
= 1.152 m3

VOLUME

- - V = P x L x T x Jumlah
= 1.20 x 1 x 2 x 4.00
= 3.840 m3

BACKUP VOLUME DINDING

VOLUME

- - V = L x T
= 9.70 x 2.20
= 21.340 m2
- - V = L x T
= 5.00 x 2.00
= 10.000 m2

VOLUME

- - V = L x T x Jumlah
= 9.70 x 2.20 x 2
= 42.680 m2

- - V = L x T x Jumlah
= 5.00 x 2.00 x 2
= 20.000 m2

VOLUME

- - V = L x T x Jumlah
= 9.70 x 2.20 x 2
= 42.680 m2

- - V = L x T x Jumlah
= 5.00 x 2.00 x 2
= 20.000 m2

BACKUP VOLUME ATAP

VOLUME

- - V = P x L
= 3.00 x 3.00
= 9.000 m2

VOLUME

- - V = P x L
= 3.00 x 3.00
= 9.000 m2

VOLUME

- - V = P x L
= 3.00 x 1.50
= 4.500 m2

VOLUME

- - V = P x L
= 3.00 x 2.50
= 7.500 m2

- - V = P x L
= 4.00 x 3.00
= 12.000 m2
x Jumlah
x 4.00

P Lengkung
0.08

V besi sengkang

P Lengkung
0.08
V besi sengkang

P Lengkung
0.08

V besi sengkang

P Lengkung
0.08

V besi sengkang
: 3
: 3
DAFTAR HARGA SATUAN BAHAN DAN UPAH BANGUNAN

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

I BAHAN DASAR
1 BATU KALI
Batu Bulat Utuh m3 290,800.00
Batu Bulat Belah m3 332,800.00
Batu Pecah ukuran 10/15 cm m3 305,500.00
Batu Pecah ukuran 5/7 cm m3 282,000.00
Batu Pecah ukuran 3/5 cm m3 338,000.00
Batu sodong m3 245,000.00
2 KERIKIL
Kerikil Timbun m3 170,000.00
Sawur / Koral m3 170,000.00
Batu Split Pecah Mesin (0,5-<1 cm) (Screening) m3 282,000.00
Batu Split Pecah Mesin (0,5-<1 cm) (Screening) kg 352.50
Batu Split Pecah Mesin (1-2cm) m3 295,000.00
Batu Split Pecah Mesin (2-3 cm) m3 295,000.00
Batu Split Pecah Mesin (2-3 cm) kg 368.75
Batu Split Pecah Mesin (3-5 cm) m3 338,000.00
Batu Pecah dg tangan (5-7 cm) m3 282,000.00
Abu batu m3 275,000.00
Abu batu kg 343.75
Kerikil Biasa m3 170,000.00
Tras Giling m3 305,500.00
Batu kerikil pecah tersaring m3 423,000.00
3 BATU BATA
Batu Bata 3 x 11 x 22 (20) bh 1,050.00
Batu Bata 5 x 11 x 22 (20) bh 1,150.00
Bata ringan / Hebel (10 x 20 x 60) m3 750,000.00
Bata ringan / Hebel (10 x 20 x 60) bh 9,036.00
Bata ringan / Hebel (7,5 x 20 x 60) m3 585,000.00
Bata ringan / Hebel (7,5 x 20 x 60) bh 5,270.00
Batako Berlubang Hollow Blok HB-20 bh 2,100.00
Batako Berlubang Hollow Blok HB-15 bh 1,800.00
Batako Berlubang Hollow Blok HB-10 bh 1,620.00
Batu bata expose 4,5x11x22 bh 2,300.00
Bata Terakota 20x5x2 bh 2,100.00
4 PASIR
Pasir Urug m3 197,000.00
Pasir Pasang m3 318,000.00
Pasir Beton m3 345,000.00
Pasir Beton kg 431.25
Pasir Halus (untuk HRS) m3 318,000.00
Pasir Batu (Sirtu) m3 167,500.00
5 TANAH
Tanah Padas m3 70,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Tanah Liat m3 70,000.00


Tanah Urug pilihan m3 80,000.00
Tanah Humus (untuk tanaman) m3 170,000.00
Batu kapur/ Limestone m3 100,000.00
Tanah batu (nahtu) m3 125,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

6 KAPUR
Kapur Pasang m3 200,000.00
Kapur Semen Merah kg 125.00
Kapur Semen Merah m3 175,000.00
7 PORTLAND CEMENT
Portland Cement (PC) 50 kg zak 56,000.00
Portland Cement (PC) 50 kg kg 1,120.00
Semen Putih 40 kg zak 78,000.00
Semen Putih 50 kg zak 87,000.00
Semen warna (40 kg) zak 95,000.00
Semen warna kg 2,375.00
Mortar Perekat Hebel (40 kg) setara MU-380 zak 115,000.00
Mortar Perekat Hebel (40 kg) setara MU-380 kg 2,875.00
Semen Grouting MU (40 kg) setara MU-800 zak 157,000.00
Semen Grouting MU (40 kg) setara MU-800 kg 3,925.00
Semen mortar warna abu (Acian bata ringan) 30 kg/zak zak 112,500.00
Semen mortar warna abu (Acian bata ringan) 30 kg/zak kg 3,750.00
Semen instan perekat material lantai zak 129,400.00
Semen instan perekat material dinding zak 223,600.00
Semen instan nat lantai & dinding kg 19,400.00
Floor hardener instan kg 16,000.00
Gypsump powder kg 5,500.00
II BAHAN PENUTUP ATAP
1 SIRAP
SIRAP (100 lbr) pak 180,000.00
SIRAP lbr 1,800.00
2 GENTENG BETON
Genteng Beton Warna standard isi 10/m2 42x33 cm bh 7,500.00
Genteng Beton Warna Special isi 10/m2 42x33 cm bh 8,000.00
Genteng Beton Warna Khusus isi 10/m2 42x33 cm bh 8,500.00
Kerpus Beton Warna Standard isi 3,3/m 35x27 cm bh 8,000.00
Kerpus Beton Warna Special isi 3,3/m 35x27 cm bh 8,500.00
Kerpus Beton Warna Khusus isi 3,3/m 35x27 cm bh 9,000.00
3 GENTENG TANAH LIAT
Nok kerpus Kodok isi 4/m 30x22 cm bh 4,000.00
Nok kerpus Kodok Glasur isi 4/m 30x22 cm bh 7,000.00
Nok kerpus plentong super isi 4/m 30x22 cm bh 7,500.00
Bubungan Genteng keramik "KIA" isi 4/m 29,5x21 cm bh 10,700.00
Bubungan Genteng Morando isi 4/m 29,3x24 cm bh 8,800.00
Bubungan Genteng Morando Glazur isi 4/m 29,3x24 cm bh 9,500.00
Bubungan genteng pres jtw isi 4/m 29,3x24 cm bh 6,500.00
Bubungan genteng pres kebumen isi 4/m 29,3x24 cm bh 5,400.00
Nok Genteng Metal polos bh 27,000.00
Nok Genteng Metal pasir bh 30,000.00
Nok Genteng galvalum m' 27,000.00
Genteng Kodok isi 24/m2 27,5x20,5 cm bh 3,000.00
Genteng Kodok Glasur isi 24/m2 27,5x20,5 cm bh 4,400.00
Genteng Vlaam/Plentong isi 25/m2 29x20,5 cm bh 2,100.00
Genteng Plentong super besar 18 bh/m2 bh 4,500.00
Genteng Keramik Glazur KIA isi 15/m2 warna muda bh 7,000.00
Genteng Keramik Glazur KIA isi 14/m2 warna tua bh 6,850.00
Genteng Morando Natural isi 18/m2 oven 33x25 cm bh 3,100.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Genteng Morando Glazur isi 18/m2 33x25 cm bh 4,800.00


Genteng Pres Jatiwangi isi 25/m2 29x20,5 cm bh 2,400.00
Genteng Pres Kebumen isi 25/m2 29x20,5 cm bh 2,650.00
Genteng metal type 2x4 82x75x0,35 (polos) Lb 62,000.00
Genteng metal type 2x4 82x75x0,35 (berpasir) Lb 94,000.00
Genteng bekas (pres) bh 600.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

4 GENTENG KACA
Genteng kaca Vlaam tebal 8 mm isi 25/m2 29x20,5 cm bh 45,000.00
Genteng kaca Vlaam tebal 10 mm isi 25/m2 29x20,5 cm bh 55,000.00
Genteng kaca Kodok tebal 8 mm isi 24/m2 27,5x20,5 cm bh 47,000.00
Genteng kaca Kodok tebal 10 mm isi 24/m2 27,5x20,5 cm bh 57,000.00
5 ASBES GELOMBANG
Asbes gelombang besar
Bubungan asbes gelombang besar m1 30,000.00
Asbes gelombang besar 200 cm X 102 cm X 5 mm Lbr 85,000.00
Asbes gelombang besar 225 cm X 102 cm X 5 mm Lbr 90,000.00
Asbes gelombang besar 250 cm X 102 cm X 5 mm Lbr 95,000.00
Asbes gelombang besar 200 cm X 102 cm X 6 mm Lbr 85,000.00
Asbes gelombang besar 225 cm X 102 cm X 6 mm Lbr 90,000.00
Asbes gelombang besar 250 cm X 102 cm X 6 mm Lbr 96,000.00
Asbes Gelombang Kecil
Bubungan asbes gelombang kecil m1 25,000.00
Asbes Gelombang Kecil 150 cm X 105 cm X 4 mm Lbr 32,000.00
Asbes Gelombang Kecil 180 cm X 105 cm X 4 mm Lbr 38,000.00
Asbes Gelombang Kecil 210 cm X 105 cm X 4 mm Lbr 42,000.00
Asbes Gelombang Kecil 240 cm X 105 cm X 4 mm Lbr 59,000.00
Asbes Gelombang Kecil 270 cm X 105 cm X 4 mm Lbr 65,000.00
Asbes Gelombang Kecil 300 cm X 105 cm X 4 mm Lbr 73,500.00
Atap bitumen ex. ONDULINE : 95 cm x 200cm x 0.3mm Lbr 165,000.00
Atap bitumen type ONDUVILLA : 40cm x 106 cm x 0,3mm Lbr 105,000.00
Nok atap bitumen (ex. onduline / onduvilla) Uk. 50cm x 50 cm x 0,3mm Lbr 125,000.00
NOK Jabes nok
. Kerpus Genteng bh 41,000.00
. Stel Besar bh 65,000.00
. Paten Besar bh 45,000.00
Nokstel gelombang harflex
. Stel Besar bh 44,000.00
. Patent Besar bh 27,000.00
. Plat besar bh 49,000.00
6 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 16,000.00
. 100cm X 100 cm X 5 mm bh 17,000.00
. 50 cm X 200 cm X 3 mm bh 14,800.00
. 40 cm X 200 cm X 3 mm bh 13,500.00
FIBER PLAT uk. 100cm x 100cm x 4mm lbr 30,000.00
Untuk Plafond uk. 120cm x 240cm x 4mm lbr 80,000.00
uk. 122cm x 244cm x 4mm lbr 85,200.00
GRC BOARD uk.122cm x 244cm x 5mm lbr 112,000.00
uk.122cm x 244cm x 6mm lbr 135,000.00
uk.122cm x 244cm x 8mm lbr 201,500.00
uk.122cm x 244cm x 10mm lbr 260,000.00
7 FIBER GLASS (JABES)
180 X 92 cm bh 42,000.00
200 X 92 cm bh 48,000.00
250 X 92 cm bh 56,000.00
180 X 105 cm bh 47,000.00
210 X 105 cm bh 55,000.00
250 X 105 cm bh 65,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

8 SENG PLAT
BJLS 0,20 lebar 55 cm m2 23,000.00
BJLS 0,20 lebar 55 cm m' 41,500.00
BJLS 0,30 lebar 55 cm m2 35,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

BJLS 0,30 lebar 55 cm m' 51,000.00


BJLS 0,30 lebar 90 cm m' 55,000.00
BJLS 0,20 lebar 90 cm m' 30,000.00
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 48,000.00
BJLS 0,20 panjang 180 cm lbr 52,000.00
BJLS 0,30 panjang 180 cm lbr 58,000.00
BJLS 0,40 panjang 180 cm lbr 65,000.00
Seng bekas (laik pakai) lbr 24,200.00
Seng bekas (belum laik pakai) lbr 18,000.00
III. BAHAN KAYU
1 JATI
Papan m3 11,000,000.00
Balok/pesagen m3 10,800,000.00
2 KAMPER
Papan m3 13,600,000.00
Balok/pesagen m3 12,800,000.00
3 KRUING
Papan m3 8,000,000.00
Balok/pesagen m3 7,500,000.00
Kayu Kruing 5/7 m3 4,730,000.00
Kayu Kruing 4/6 m3 4,470,000.00
Kayu Kruing 3/5 m3 5,575,000.00
Kayu Kruing 3/4 m3 5,575,000.00
Kayu Kruing 2/3 m3 4,470,000.00
4 MERANTI
Papan m3 5,000,000.00
Balok/pesagen m3 4,200,000.00
Kayu Meranti 5/7 m3 3,110,000.00
Kayu Meranti 4/6 m3 3,000,000.00
Kayu Meranti 3/5 m3 3,025,000.00
Kayu Meranti 2/3 m3 3,000,000.00
5 LANAN
Papan m3 2,250,000.00
Balok/pesagen m3 1,900,000.00
6 BENGKIRAI
Papan m3 13,200,000.00
Balok/pesagen m3 12,500,000.00
Kayu Bengkir 5/7 cm m3 10,000,000.00
Kayu Bengkir 4/6 cm m3 9,000,000.00
Kayu Bengkir 3/4 cm m3 9,000,000.00
Kayu Bengkir 2/ 3 cm m3 9,000,000.00
7 DOLKEN
Sedang 8 x 10 x 400 cm bt 22,000.00
Kecil 6 x 7 x 400 cm bt 18,000.00
Besar 10 x 12 x 400 cm bt 28,000.00
Kayu cetakan m3 2,200,000.00
Bambu btg 17,500.00
Papan cetak pinus m3 2,800,000.00
8 KEMPAS
Papan m3 6,000,000.00
Balok/pesagen m3 5,000,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kayu Kempas 5/7 m3 4,354,300.00


Kayu Kempas 4/6 m3 4,072,400.00
Kayu Kempas 3/5 m3 5,100,000.00
Kayu Kempas 3/4 m3 5,100,000.00
Kayu Kempas 2/3 m3 4,000,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

9 LOKAL
Papan m3 1,450,000.00
Balok/pesagen m3 2,100,000.00
Kayu Lokal 5/7 m3 2,200,000.00
Kayu Lokal 4/6 m3 2,200,000.00
Kayu Lokal 2/3 m3 2,672,200.00
IV . BAHAN PENUTUP DINDING/LANTAI
1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2 41,000.00
PC polos 30 X 30 cm bh 3,727.27
20 X 20 cm m2 38,000.00
20 X 20 cm bh 3,454.55
PC warna 30 X 30 cm m2 45,000.00
30 X 30 cm bh 4,090.91
20 X 20 cm m2 42,000.00
20 X 20 cm bh 3,818.18
Teraso 30 X 30 cm m2 58,000.00
2 TEGEL PLINT
PC warna 10 X 20 cm bh 5,500.00
PC abu-abu 15 x 20 bh 6,000.00
3 UBIN PORSELIN
Lokal 11 X 11 putih dos 42,000.00
11 X 11 warna dos 46,000.00
Lokal 15 X 15 putih dos 51,000.00
15 X 15 warna dos 54,000.00
4 MOZAIK PORSELIN
10 X 20 cm m2 56,000.00
15 X 15 cm m2 56,000.00
20 X 20 cm m2 57,000.00
20 X 25 cm m2 57,000.00
5 Keramik
Keramik 20/25, putih M2 54,000.00
Keramik 20/25, warna M2 56,000.00
Keramik 20/25, warna (bisa untuk dinding) buah 3,100.00
Keramik 25/40, warna (bisa untuk dinding) M2 80,000.00
Keramik 20/20, anti slip ( u/.lantai Km/wc) M2 63,000.00
Keramik 20/20, anti slip ( u/.lantai Km/wc) buah 2,500.00
Keramik 20/20, warna M2 55,000.00
Keramik 20/20, warna (bisa untuk dinding) buah 2,250.00
Keramik 25/25, (anti slip) M2 85,000.00
Keramik 10/20, warna M2 55,000.00
Keramik 10/20, warna buah 1,100.00
Keramik 30/30 (putih polos) M2 48,000.00
Keramik 30/30 (putih polos) buah 4,400.00
Keramik 30/30, warna M2 51,500.00
Keramik 30/30, anti selip M2 57,000.00
Keramik 40/40, (putih polos) M2 52,200.00
Keramik 40/40, (putih polos) buah 8,700.00
Keramik 40/40, warna M2 56,200.00
Keramik 40/40, warna buah 9,366.67
Keramik 40/40, Anti Slip M2 60,000.00
Keramik Uk. 5 x 20 cm Plint Bh 7,500.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Keramik Uk. 10 x 20 cm Plint Bh 9,000.00


Keramik Uk. 10 x 30 cm Plint Bh 16,500.00
Keramik Uk. 10 x 40 cm Plint Bh 15,000.00
Keramik lis Uk. 7 x 20 Bh 9,000.00
Keramik lis Uk. 7 x 30 Bh 11,000.00
Keramik lis Uk. 13 x 40 Bh 14,000.00
Keramik kuku macan M' 7,500.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

6 Parquet Jati m2 185,000.00


lantai karpet vinyl m2 30,000.00
7 Batu Paras uk. 10x20 cm m2 120,000.00
8 Batu Tempel Hitam m2 120,000.00
9 Granite Tile
Granite tile Uk. 40 x 40 cm M2 169,300.00
Granite tile Uk. 40 x 40 cm 6bh / duz buah 28,250.00
Granite tile Uk. 30 x 30 cm M2 125,000.00
Granite tile Uk. 30 x 30 cm buah 11,400.00
Granite tile uk. 60 x 60 cm (nano) duz 165,000.00
Granite tile uk. 60 x 60 cm (nano) 4bh / duz buah 62,000.00
Granite tile uk. 60 x 60 cm (Garuda) duz 130,000.00
Granite tile uk. 60 x 60 cm (Garuda) 4bh / duz buah 43,500.00
Granite tile uk. 60 x 60 cm (Ezenza ivori) duz 190,000.00
Granite tile uk. 60 x 60 cm (Ezenza ivori) buah 47,500.00
Plint Granit 10 x 30 cm buah 3,850.00
Plint Granit 10 x 40 cm buah 4,400.00
Plint Granit 10 x 60 cm buah 15,000.00
Hospital plint granite 10x30 cm buah 42,500.00
Hospital plint PVC 5x30x5 r7 cm buah 40,000.00
10 Marmer m2 850,000.00
Batu Koral sikat 1-2 cm (putih) Kg 3,500.00
Batu Koral sikat 3-5 cm (putih) Kg 5,000.00
Batu Koral sikat 1-2 cm (warna) Kg 4,500.00
Batu Koral sikat 3-5 cm (warna) Kg 6,000.00
V BAHAN CETAK
1 BUIS BETON
Buis beton Ø 10 cm - 100 cm bh 30,000.00
Buis beton Ø 20 cm - 100 cm bh 60,000.00
Buis beton Ø 30 cm - 100 cm bh 80,000.00
Buis beton Ø 50 cm - 100 cm bh 110,000.00
Buis beton Ø 60 cm - 100 cm bh 150,000.00
Buis beton Ø 70 cm - 100 cm bh 170,000.00
Buis beton U 10 cm - 100 cm bh 30,000.00
Buis beton U 15 cm - 100 cm bh 40,000.00
Buis beton U 20 cm - 100 cm bh 50,000.00
Buis beton U 30 cm - 100 cm bh 60,000.00
2 LUBANG ANGIN (ROSTER) PC + PASIR
Lubang angin (roster) Pc+pasir ukuran 10 X 20 cm bh 5,600.00
Lubang angin (roster) Pc+pasir ukuran 20 X 20 cm bh 6,200.00
Lubang angin (roster) Pc+pasir ukuran 25 X 25 cm bh 6,800.00
Lubang angin (roster) Pc+pasir ukuran 12 X 11 X 24 cm bh 7,000.00
Lubang angin (roster) Pc+pasir ukuran 30 X 30 cm bh 7,000.00
Lubang angin (roster) Pc+pasir ukuran 15 X 25 cm bh 7,250.00
Lubang angin (roster) Pc+pasir ukuran 15 X 30 cm bh 7,500.00
Roster bata bh 2,500.00
Glass Block bh 21,000.00
3 PAVING BLOCK (ex. ALDAS)
Paving block Persegi (model bata)tbl. 6 cm (K-175) ex. ALDAS m2 85,000.00
Paving block Persegi (model bata) tbl. 8 cm (K-175) ex. ALDAS m2 92,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm (K-175) ex. ALDAS m2 85,000.00
Paving block Persegi (model bata) tbl. 6 cm warna (K-175) ex. ALDAS m2 95,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Paving block Persegi (model bata) tbl. 8 cm warna (K-175) ex. ALDAS m2 102,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm warna (K-175) ex. ALDAS m2 95,000.00
Kanstin beton uk. 50x12,5x30 (K-175) ex. ALDAS pcs 30,000.00
Kanstin beton uk. 15x25x40 (K-175) ex. ALDAS pcs 25,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Paving block Persegi (model bata) tbl. 6 cm (K-225) ex. ALDAS m2 90,000.00
Paving block Persegi (model bata) tbl. 8 cm (K-225) ex. ALDAS m2 100,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm (K-225) ex. ALDAS m2 90,000.00
Paving block Persegi (model bata) tbl. 6 cm warna (K-225) ex. ALDAS m2 100,000.00
Paving block Persegi (model bata) tbl. 8 cm warna (K-225) ex. ALDAS m2 110,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm warna (K-225) ex. ALDAS m2 100,000.00
Paving block Persegi (model bata) tbl. 6 cm warna (K-250) ex. ALDAS m2 110,000.00
Paving block Persegi (model bata) tbl. 8 cm warna (K-250) ex. ALDAS m2 122,300.00
Kanstin beton uk. 50x12,5x30 (K-225) ex. ALDAS pcs 35,000.00
Kanstin beton uk. 15x25x40 (K-225) ex. ALDAS pcs 30,000.00
11 STANDARD GRASS BLOCK ABU-ABU BH 6,250.00
VI . BAHAN BESI
1 BESI BETON
Besi beton polos kg 11,500.00
Besi beton prestress kg 10,500.00
Besi beton ulir kg 11,800.00
2 BESI PLAT
Besi Strip uk. 3 mm x 3 cm x 6 m kg 15,000.00
Besi Strip uk. 3 mm x 3 cm x 6 m m' 5,500.00
3 BESI PROFIL
Besi Profil kg 15,000.00
Besi Baja IWF kg 15,000.00
a BAJA RINGAN GALVALUME type CT 75
lebar : 7,5cm tebal : 1mm panj : 6 m (berat SNI 6,8 kg/ btg) btg 140,000.00
lebar : 7,5cm tebal : 1mm panj : 6 m (berat SNI 6,8 kg/ btg) kg 20,588.24
lebar : 7,5cm tebal : 0.75mm panj : 6 m (berat SNI 5,1 kg/ btg) btg 115,000.00
lebar : 7,5cm tebal : 0.75mm panj : 6 m (berat SNI 5,1 kg/ btg) kg 22,549.02
lebar : 7,5cm tebal : 0,65mm panj : 6 m (berat SNI 4,3 kg/ btg) btg 105,000.00
lebar : 7,5cm tebal : 0,65mm panj : 6 m (berat SNI 4,3 kg/ btg) kg 24,418.60
b type RT 12 tinggi : 3,5 cm, tebal : 0,45mm panj : 6 m btg 62,500.00
type RT 10 tinggi : 3,0 cm, tebal : 0,45mm panj : 6 m btg 55,000.00
c HOLLOW GALVANIS LIPAT
Hollow galvanis uk.2/4 cm; tebal : 0,3 mm panj : 4 m btg 25,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm panj : 4 m btg 37,000.00
Hollow galvanis uk.2/4 cm; tebal : 0,3 mm m' 15,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm m' 21,000.00
Besi Hollow 4x 4 cm, tbl. 2mm panj : 6 m m' 31,500.00
Besi Hollow 2x 4 cm, tbl. 2mm panj : 6 m m' 23,000.00
Besi Hollow Panjang 4 m (Semua ukuran) kg 13,650.00
Spandex tbl. 0,3 mm m2 40,000.00
Bondex tbl. 0,75 mm m2 123,200.00
4 JARING - JARING BAJA (RAM-RAMAN)
Jaring-jaring baja (ram-raman) Diameter 4 - 15 kg 15,000.00
Jaring-jaring baja (ram-raman) Diameter 6 - 15 kg 16,000.00
Wiremesh M.6 uk. 5,4 m x 2,1 m m2 310,000.00
Wiremesh M.8 uk. 5,4 m x 2,1 m m2 610,000.00
Wiremesh M.10 uk. 5,4 m x 2,1 m m2 960,000.00
5 BESI SIKU
Besi siku L 40 X 40 X 4 panj : 6 m btg 137,500.00
Besi siku L 50 X 50 X 5 panj : 6 m btg 220,000.00
Besi siku L 60 X 60 X 6 btg 360,000.00
Besi List Kaca 1 x 1 cm m' 100,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

6 KAWAT
- Ikat beton/bendrat kg 20,000.00
- Harmonika 12 X 45 mm m2 21,000.00
- Harmonika 12 X 24 mm m2 22,500.00
- Harmonika 14 X 30 mm m2 20,000.00
- Harmonika 14 X 35 mm m2 19,000.00
- Kawat Nyamuk Nylon m2 10,000.00
- Kawat Kasa m2 13,000.00
- Saringan pasir m2 14,500.00
- Kawat loket m2 12,000.00
- Kawat duri rol 80,000.00
- Kawat duri m' 1,333.33
- Kawat bronjong kg 25,000.00
- Kawat bronjong pabrikasi (2x1x0,5 m) bh 355,000.00
- Kawat las doz 60,000.00
7 BAHAN ALUMUNIUM
Kusen Aluminium uk. 3" Silver (ex. Alexindo) m' 70,000.00
Kusen aluminium uk. 3" Brown (ex. Alexindo) m' 75,000.00
Kusen aluminium uk. 3" White (ex. Alexindo) m' 80,000.00
Kusen Aluminium uk. 4" Silver (ex. Alexindo) m' 96,500.00
Kusen aluminium uk. 4" Brown (ex. Alexindo) m' 98,500.00
Kusen aluminium uk. 4" White (ex. Alexindo) m' 102,000.00
Rangka pintu dan jendela (ex. Alexindo) m' 98,500.00
Allumunium Strip m' 28,000.00
VII . BAHAN PIPA
1 Pipa PVC
Pipa PVC AW ½" Merk Rucika panjang 4 m btg 25,000.00
Pipa PVC AW ½" Merk Rucika m' 6,250.00
Pipa PVC type AW ¾" Merk Rucika panjang 4 m btg 34,000.00
Pipa PVC type AW ¾" Merk Rucika m' 8,500.00
Pipa PVC type AW 1" Merk Rucika panjang 4 m btg 44,500.00
Pipa PVC type AW 1" Merk Rucika m' 11,125.00
Pipa PVC type AW 1 ½" Merk Rucika panjang 4 m btg 55,000.00
Pipa PVC type AW 1 ½" Merk Rucika m' 13,750.00
Pipa PVC type AW 2" Merk Rucika panjang 4 m btg 79,000.00
Pipa PVC type AW 2" Merk Rucika m' 19,750.00
Pipa PVC type AW 2 ½" " Merk Rucika panjang 4 m btg 80,000.00
Pipa PVC type AW 2 ½" " Merk Rucika m' 20,000.00
Pipa PVC type AW 3" Merk Rucika panjang 4 m btg 127,000.00
Pipa PVC type AW 3" Merk Rucika m' 31,750.00
Pipa PVC type AW 4" Merk Rucika panjang 4 m btg 172,000.00
Pipa PVC type AW 4" Merk Rucika m' 43,000.00
Pipa PVC type AW 6" Merk Rucika panjang 4 m btg 423,000.00
Pipa PVC type AW 6" Merk Rucika m' 105,750.00
Pipa PVC type AW 8" Merk Rucika panjang 4 m btg 660,000.00
Pipa PVC type AW 8" Merk Rucika m' 165,000.00
Pipa PVC type AW 10" Merk Rucika panjang 4 m btg 1,025,000.00
Pipa PVC type AW 10" Merk Rucika m' 256,250.00
Pipa PVC type AW 12" Merk Rucika panjang 4 m btg 1,390,000.00
2 PIPA GALVANISHED IRON (Medium A)
Pipa Medium Galvanis 0,50" panjang 6 m btg 165,000.00
Pipa Medium Galvanis 0,50" m' 27,500.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa Medium Galvanis 0,75" panjang 6 m btg 205,000.00


Pipa Medium Galvanis 0,75" m' 34,166.67
Pipa Medium Galvanis 1" panjang 6 m btg 315,000.00
Pipa Medium Galvanis 1" m' 52,500.00
Pipa Medium Galvanis 1,25" panjang 6 m btg 390,000.00
Pipa Medium Galvanis 1,25" m' 65,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa Medium Galvanis 1,25" panjang 6 m btg 450,000.00


Pipa Medium Galvanis 1,25" m' 75,000.00
Pipa Medium Galvanis 2" panjang 6 m btg 600,000.00
Pipa Medium Galvanis 2" m' 100,000.00
Pipa Medium Galvanis 2,50" panjang 6 m btg 750,000.00
Pipa Medium Galvanis 2,50" m' 125,000.00
Pipa Medium Galvanis 3" panjang 6 m btg 980,000.00
Pipa Medium Galvanis 3" m' 163,333.33
Pipa Medium Galvanis 4" panjang 6 m btg 1,435,000.00
Pipa Medium Galvanis 4" m' 239,166.67
Pipa Medium Galvanis 5" panjang 6 m btg 1,910,000.00
Pipa Medium Galvanis 5" m' 318,333.33
Pipa Medium Galvanis 6" panjang 6 m m' 377,600.00
Pipa Medium Galvanis 8" m' 668,600.00
Pipa Medium Galvanis 10" m' 1,200,000.00
3 PIPA AIR BERSIH
PIPA PVC
Pipa PVC SNI (S 12,5) DN 100 mm (Ø 4") Solvent Cement Joint (SCJ); P = 6m m' 60,500.00
Pipa PVC SNI (S 12,5) DN 100 mm (Ø 4") Rubber Ring Joint (RRJ); P = 6m m' 63,000.00
Pipa PVC SNI (S 12,5) DN 150 mm (Ø 6") Solvent Cement Joint (SCJ); P = 6m m' 129,400.00
Pipa PVC SNI (S 12,5) DN 150 mm (Ø 6") Rubber Ring Joint (RRJ); P = 6m m' 133,300.00
Pipa PVC SNI (S 12,5) DN 200 mm (Ø 8") Rubber Ring Joint (RRJ); P = 6m m' 211,800.00
Pipa PVC SNI (S 12,5) DN 250 mm (Ø 8") Rubber Ring Joint (RRJ); P = 6m m' 336,600.00
Pipa PVC SNI (S 10) DN 100 mm (Ø 4") Solvent Cement Joint (SCJ); P = 6m m' 75,000.00
Pipa PVC SNI (S 10) DN 100 mm (Ø 4") Rubber Ring Joint (RRJ); P = 6m m' 77,800.00
Pipa PVC SNI (S 10) DN 150 mm (Ø 6") Solvent Cement Joint (SCJ); P = 6m m' 158,800.00
Pipa PVC SNI (S 10) DN 150 mm (Ø 6") Rubber Ring Joint (RRJ); P = 6m m' 162,900.00
Pipa PVC SNI (S 10) DN 200 mm (Ø 8") Rubber Ring Joint (RRJ); P = 6m m' 260,700.00
Pipa PVC SNI (S 10) DN 250 mm (Ø 10") Rubber Ring Joint (RRJ); P = 6m m' 404,400.00
PIPA HDPE/High Density Polyethylene SDR 17 (PN 10)
Pipa HDPE DN 50 mm (Ø 2") m' 37,500.00
Pipa HDPE DN 75 mm (Ø 3") m' 75,500.00
Pipa HDPE DN 100 mm (Ø 4") m' 112,800.00
Pipa HDPE DN 150 mm (Ø 6") m' 136,100.00
Pipa HDPE DN 200 mm (Ø 8") m' 367,700.00
Pipa HDPE DN 250 mm (Ø 10") m' 571,300.00
PIPA PVC SEWAGE
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas A; MOF m' 20,225.00
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas A; RR m' -
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas B; MOF m' 34,616.67
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas B; RR m' -
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas A; MOF m' 27,741.67
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas A; RR m' -
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas B; MOF m' 43,600.00
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas B; RR m' -
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas A; MOF m' 32,908.33
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas A; RR m' 33,891.67
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas B; MOF m' 55,766.67
Pipa PVC Sewage Ø 2" ; Outside 63 mm panjang 6 m; kelas B; RR m' 56,691.67
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas A; MOF m' 45,983.33
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas A; RR m' 47,166.67
Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas B; MOF m' 65,333.33
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa PVC Sewage Ø 2 1/2" ; Outside 75 mm panjang 6 m; kelas B; RR m' 66,650.00


Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas A; MOF m' 55,691.67
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas A; RR m' 57,283.33
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas B; MOF m' 83,891.67
Pipa PVC Sewage Ø 3" ; Outside 90 mm panjang 6 m; kelas B; RR m' 85,558.33
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas A; MOF m' 79,266.67
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas A; RR m' 81,450.00
Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas B; MOF m' 103,600.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa PVC Sewage Ø 4" ; Outside 110 mm panjang 6 m; kelas B; RR m' 105,783.33
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas A; MOF m' 163,283.33
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas A; RR m' 167,058.33
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas B; MOF m' 179,725.00
Pipa PVC Sewage Ø 6" ; Outside 160 mm panjang 6 m; kelas B; RR m' 183,575.00
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas A; MOF m' 247,500.00
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas A; RR m' 254,633.33
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas B; MOF m' 309,208.33
Pipa PVC Sewage Ø 8" ; Outside 200 mm panjang 6 m; kelas B; RR m' 316,391.67
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas A; MOF m' 414,741.67
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas A; RR m' 426,025.00
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas B; MOF m' 521,766.67
Pipa PVC Sewage Ø 10" ; Outside 250 mm panjang 6 m; kelas B; RR m' 533,100.00
ASESORIS PIPA
GATE VALVE
Gate Valve All Flange DN 75 mm bh 1,050,000.00
Gate Valve All Flange DN 100 mm bh 1,310,000.00
Gate Valve All Flange DN 150 mm bh 2,310,000.00
Gate Valve All Flange DN 200 mm bh 3,780,000.00
Gate Valve All Flange DN 250 mm bh 5,510,000.00
FLANGE SOCKET PVC
Flange All Socket PVC DN 100 mm Rubber Ring Joint (RRJ) bh 260,000.00
Flange All Socket PVC DN 150 mm Rubber Ring Joint (RRJ) bh 577,500.00
Flange All Socket PVC DN 200 mm Rubber Ring Joint (RRJ) bh 843,500.00
Flange All Socket PVC DN 250 mm Rubber Ring Joint (RRJ) bh 1,617,000.00
TEE HDPE (PE 100)
Tee HDPE DN 150 x 100 mm Las bh 738,000.00
Tee HDPE DN 150 x 150 mm Las bh 670,000.00
Tee HDPE DN 200 x 150 mm Las bh 1,331,000.00
Tee HDPE DN 200 x 200 mm Las bh 1,100,000.00
Tee HDPE DN 250 x 150 mm Las bh 2,420,000.00
Tee HDPE DN 250 x 200 mm Las bh 2,420,000.00
Tee HDPE DN 250 x 250 mm Las bh 1,855,000.00
ALL FLANGE TEE
All Flange Tee GI DN 100 x 100 mm (4x4) bh 375,000.00
All Flange Tee GI DN 150 x 100 mm (6x4) bh 510,000.00
All Flange Tee GI DN 150 x 150 mm (6x6) bh 550,000.00
All Flange Tee GI DN 200 x 150 mm (8x6) bh 910,000.00
All Flange Tee GI DN 200 x 200 mm (8x8) bh 960,000.00
All Flange Tee GI DN 250 x 150 mm (10x6) bh 1,260,000.00
All Flange Tee GI DN 250 x 200 mm (10x8) bh 1,350,000.00
All Flange Tee GI DN 250 x 250 mm (10x10) bh 1,400,000.00
BEND
BEND ALL FLANGE
Bend All Flange DN 100 mm x 45º CI/ Cast Iron bh 349,000.00
Bend All Flange DN 100 mm x 90º CI/ Cast Iron bh 386,400.00
Bend All Flange DN 150 mm x 45º CI/ Cast Iron bh 538,300.00
Bend All Flange DN 150 mm x 90º CI/ Cast Iron bh 587,000.00
Bend All Flange DN 200 mm x 45º CI/ Cast Iron bh 821,400.00
Bend All Flange DN 200 mm x 90º CI/ Cast Iron bh 905,000.00
Bend All Flange DN 250 mm x 45º CI/ Cast Iron bh 1,182,600.00
Bend All Flange DN 250 mm x 90º CI/ Cast Iron bh 1,205,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

BEND PE-100
BEND PE-100 DN 150 mm x 22,5º Las bh -
BEND PE-101 DN 150 mm x 45º Las bh 540,000.00
BEND PE-102 DN 150 mm x 90º Las bh 680,000.00
BEND PE-100 DN 200 mm x 22,5º Las bh -
BEND PE-101 DN 200 mm x 45º Las bh 920,000.00
BEND PE-102 DN 200 mm x 90º Las bh 970,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

BEND PE-100 DN 250 mm x 22,5º Las bh -


BEND PE-101 DN 250 mm x 45º Las bh 1,420,000.00
BEND PE-102 DN 250 mm x 90º Las bh 1,695,000.00
BEND ALL SOCKET PVC
Bend All Socket PVC DN 100 mm x 90º Rubber Ring Joint (RRJ) bh 248,000.00
Bend All Socket PVC DN 150 mm x 90º Rubber Ring Joint (RRJ) bh 500,000.00
Bend All Socket PVC DN 200 mm x 90º Rubber Ring Joint (RRJ) bh 920,000.00
LAS FLANGE (steel)
Las Flange DN 50 mm (Ø 2") Flange + Packing bh 56,500.00
Las Flange DN 75 mm (Ø 3") Flange + Packing bh 66,700.00
Las Flange DN 100 mm (Ø 4") Flange + Packing bh 84,500.00
Las Flange DN 150 mm (Ø 6") Flange + Packing bh 139,900.00
Las Flange DN 200 mm (Ø 8") Flange + Packing bh 208,000.00
Las Flange DN 250 mm (Ø 10") Flange + Packing bh 314,000.00
FLANGE SPIGOT
Flange Spigot DN 150 mm (Ø 6") CI/ Cast Iron bh 344,500.00
Flange Spigot DN 200 mm (Ø 8") CI/ Cast Iron bh 508,500.00
Flange Spigot DN 250 mm (Ø 10") CI/ Cast Iron bh 803,000.00
DOUBLE AIR VALVE
Air Valve DN 250 mm (Ø 10") single bh 735,000.00
STUB END
Stub End PE DN 150 mm (Ø 6") bh 318,000.00
Stub End PE DN 200 mm (Ø 8") bh 686,500.00
Stub End PE DN 250 mm (Ø 10") bh 927,500.00
STUB END FLANGE
Stub End Flange DN 100 mm (Ø 4") Stub End + Flange las bh 380,500.00
Stub End Flange DN 150 mm (Ø 6") Stub End + Flange las bh 613,000.00
Stub End Flange DN 200 mm (Ø 8") Stub End + Flange las bh 1,086,500.00
Stub End Flange DN 250 mm (Ø 10") Stub End + Flange las bh 1,542,500.00
STRAINER
Strainer DN 100 mm (Ø 4") bh -
Strainer DN 150 mm (Ø 6") bh -
Strainer DN 200 mm (Ø 8") bh -
Strainer DN 250 mm (Ø 10") bh -
WALL PIPE
Wall Pipe All Flange DN 100 mm (Ø 4") bh 390,000.00
Wall Pipe All Flange DN 150 mm (Ø 6") bh 650,000.00
Wall Pipe All Flange DN 200 mm (Ø 8") bh 710,000.00
Wall Pipe All Flange DN 250 mm (Ø 10") bh 850,000.00
STREET BOX
Street Box DN 100 mm (Ø 4") bh 254,000.00
DOP PVC
Dop PVC DN 100 mm (Ø 4") Rubber Ring Joint (RRJ) bh 132,800.00
Dop PVC DN 150 mm (Ø 6") Rubber Ring Joint (RRJ) bh 254,000.00
FLANGE STEEL
Flange Steel DN 150 mm (Ø 6") bh -
Flange Steel DN 200 mm (Ø 8") bh -
Flange Steel DN 250 mm (Ø 10") bh -
METER INDUK
Meter Induk DN 200 mm (Ø 8") bh -
Meter Induk DN 250 mm (Ø 10") bh 11,150,000.00
GIBOULT JOINT
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Giboult Joint DN 200 mm (Ø 8") bh 741,800.00


Giboult Joint DN 250 mm (Ø 10") bh 1,028,400.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

VIII . BAHAN LANGIT - LANGIT


1 ACOUSTIC BOARD
Acoustic Board uk. 30 X 30 cm lbr 25,000.00
Acoustic Board uk. 30 X 60 cm lbr 35,000.00
Acoustic Board uk. 60 X 120 cm lbr 146,000.00
List Kayu Profil m' 7,900.00
2 SOFT BOARD-uk 4'X 8'
Gypsum board uk. 1,2 x 2,4 tebal 9 mm lbr 53,000.00
Gypsum board uk. 1,2 x 2,4 tebal 9 mm (Lapis allumunium foil) lbr 77,000.00
Lis gypsum 2 meter m' 19,500.00
Lis kayu 2/4 m' 4,600.00
3 HARD BOARD-uk: 4'X 8' lbr 68,000.00
GYPROC uk.120cmx240cmx9mm lbr 65,000.00
4 PLY WOOD
Teak wood
Teakwood uk. 90 X 210 cm tbl = 3 mm lbr 154,000.00
Teakwood uk. 120 X 240 cm tbl =3 mm lbr 180,000.00
Teakwood uk. 90 X 210 cm tbl =4 mm lbr 160,000.00
Teakwood uk. 90 X 210 cm tbl = 9 mm lbr 155,000.00
Teakwood uk. 90 X 210 cm tbl =12 mm lbr 185,000.00
Teakwood uk. 90 X 210 cm tbl =15 mm lbr 245,000.00
Teakwood uk. 90 X 210 cm tbl =18 mm lbr 290,000.00
Tripleks
Triplek 1.2 x 2.4 m tbl = 3 mm lbr 75,000.00
Triplek 1.2 x 2.4 m tbl = 4 mm lbr 85,000.00
Triplek 1.2 x 2.4 m tbl = 6 mm lbr 110,000.00
Triplek 1.2 x 2.4 m tbl = 9 mm lbr 145,000.00
Triplek 0.9 x 2.1 m uk pintu tbl 4 mm lbr 85,000.00
Triplek 0.9 x 2.1 m uk pintu tbl 3 mm lbr 50,000.00
Phenol film 12 mm lbr 150,000.00
Multipleks
Multipleks uk.120 X 240 cm tbl= 9 mm lbr 130,000.00
Multipleks uk.120 X 240 tbl= 12 mm lbr 160,000.00
Multipleks uk.120 X 240 tbl= 15 mm lbr 200,000.00
Multipleks uk.120 X 240 tbl= 18 mm lbr 240,000.00
Formika (pelapis tripleks) ukuran pintu lbr 56,000.00
Eternit (GRC) 1mx1m2 tebal 4mm m2 19,000.00
Eternit (safleks) 1mx1m2 tebal 5mm m2 17,000.00
IX . BAHAN FINISHING
1 CAT KAYU
Menie kayu kg 35,000.00
Dempul/plamur kayu kg 25,000.00
Ambril/amplas lbr 5,000.00
Batu Apung kg 27,000.00
Cat dasar kayu kg 35,000.00
Cat kayu kg 55,000.00
Cat kayu ex. Emco kg 61,000.00
Cat kayu ex. Yunior 66 (nippon paint) kg 62,000.00
Cat kayu ex. Deculux kg 10,000.00
Cat genteng ex. Avian Paint 4 Kg 125,000.00
Cat genteng ex. Dulux Wathershield Roof Paint 2,5 lt 185,000.00
Cat genteng ex. Jotun Jotaroof 2,5 lt 165,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Koas/ kuas bh 63,000.00


Sirlak (bahan politur) ons 32,000.00
Spiritus ltr 16,000.00
Politur jadi ltr 42,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

2 CAT TEMBOK
Kalkarium kg 7,000.00
Kapur sirih kg 5,400.00
Plamur tembok kg 36,000.00
Cat tembok (dasar) kg 25,000.00
Cat Tembok kg 25,000.00
Cat Tembok ex. Sintex 5 kg 110,000.00
Cat Tembok ex. Danabride 5 kg 115,000.00
Cat Tembok ex. Catylac (interior) 5 kg 120,000.00
Cat Tembok ex. Catylac (exterior) 5 kg 230,000.00
Cat Tembok ex. Mowilex 2,50 kg 280,000.00
Cat Tembok ex. Jotun (interior) 5 kg 350,000.00
Cat Tembok ex. Jotun (exterior) 5 kg 400,000.00
Cat Tembok ex. Dulux (interior) 2,5 Kg 215,000.00
Cat Tembok ex. Dulux (exterior) 2,5 Kg 295,000.00
Cat Waterproofing ex. No Drop 1 kg 82,000.00
Cat Waterproofing ex. Aquaproof 1 kg 90,000.00
Cat Waterproofing ex. Dulux Aquashield 1 kg 112,000.00
3 CAT BESI
Menie besi kg 26,000.00
Cat besi mengkilat kg 60,000.00
Cat kg 32,000.00
Thinner A ltr 27,000.00
Minyak cat ltr 20,000.00
Thinner Super ltr 18,000.00
Residu (teer/aspal) ltr 3,600.00
Vernis kg 54,000.00
Vernis batu alam kg 62,000.00
Lem Aica Aibon/ lem kuning kg 35,000.00
Minyak Beton & bekisting ltr 10,000.00
Minyak aspal/ Kerosen / Minyak Tanah ltr 9,650.00
Air ltr 50.00
Air m3 50,000.00
Sealent tube 60,000.00
Soda api kg 13,000.00
Sabun kg 13,000.00
wallpaper m' 25,000.00
HPL putih lbr 115,000.00
HPL polos lbr 130,000.00
HPL motif/tekture lbr 235,000.00

X. BAHAN KACA
1 Kaca polos/ bening tebal 3 mm m2 125,000.00
Kaca polos/ bening tebal 5 mm m2 150,000.00
2 Kaca Es/ Buram tebal 3 mm m2 85,000.00
Kaca Es/ Buram tebal 5 mm m2 95,000.00
3 Kaca ray band 3mm m2 140,000.00
Kaca ray band 5mm m2 165,000.00
Cermin tebal 5 mm m2 275,000.00
Kaca Tempered Flat tebal 8 mm m2 450,000.00
Kaca Tempered Flat tebal 10 mm m2 510,000.00
Kaca Tempered Flat tebal 12 mm m2 585,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

kaca patri m2 150,000.00


Profil kaca m' 6,500.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

XI . BAHAN INSTALASI LISTRIK


1 KABEL LISTRIK
NYA : 1 X 1 1/2 mm2 m' 3,300.00
SPLN LMK 1 X 2 1/2 mm2 m' 3,800.00
. 1X4 mm2 m' 6,000.00
1X6 mm2 m' 8,600.00
NYY : 2 X 1 1/2 mm2 m' 9,000.00
PRIMA 2 X 2 1/2 mm2 m' 15,500.00
. 2X4 mm2 m' 27,500.00
2X6 mm2 m' 36,000.00
3 X 1 1/2 mm2 m' 13,500.00
3 X 2 1/2 mm2 m' 21,000.00
3X4 mm2 m' 36,000.00
3X6 mm2 m' 51,000.00
NYM : 2 X 1 1/2 mm2 m' 7,500.00
PRIMA 2 X 2 1/2 mm2 m' 11,000.00
. 2X4 mm2 m' 23,000.00
3 X 1 1/2 mm2 m' 14,000.00
3 X 2 1/2 mm2 m' 22,000.00
3X4 mm2 m' 32,000.00
3X6 mm2 m' 45,000.00
2 SAKLAR
Out bauw . Seri (double) ex. Panasonic bh 25,000.00
. Engkel (tunggal) ex. Panasonic bh 15,000.00
In bauw . Seri (double) ex. Panasonic bh 21,000.00
. Engkel (tunggal) ex. Panasonic bh 18,000.00
3 FUSE BOX (SEKERING KASA)
1 group bh 130,000.00
2 group bh 230,000.00
3 group bh 320,000.00
4 STEKER -
Biasa bh 10,000.00
Arde bh 15,000.00
T Biasa bh 12,500.00
T dengan Arde bh 17,000.00
5 FITING
Flaon bh 15,000.00
Gantung bh 17,500.00
Kap bh 19,250.00
Kombinasi bh 20,000.00
6 STOP KONTAK
Arde Outbow putih bh 12,500.00
Arde Outbow hitam bh 5,000.00
Arde Inbouw bh 20,000.00
Arde Putar bh 35,000.00
7 LAIN - LAIN
Outlet TV ex. Broco bh 35,000.00
Outlet Telephone ex. Broco bh 50,000.00
Down light / PLC 13 watt ex. Philips bh 33,000.00
Fitting Plafond ex. Panasonic bh 10,000.00
RM 2x TL LED 18 watt ex. Philips bh 270,000.00
RM 2x TL LED 36 watt ex. Philips bh 370,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

XII . ALAT-ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
Union : 1 X slag bh 55,000.00
2 X slag bh 70,000.00
Yale : 1 X slag bh 85,000.00
2 X slag bh 130,000.00
Kuda : 1 X slag bh 60,000.00
2 X slag bh 70,000.00
2 ENGSEL DAN GERENDEL
Engsel Angin bh 16,000.00
Engsel Kupu-kupu biasa bh 2,500.00
Engsel Jendela Kuning bh 8,500.00
Engsel Pintu Kuning bh 25,000.00
Engsel Pintu biasa bh 25,000.00
kunci selot bh 20,000.00
Kunci silinder bh 75,000.00
Nylon kupu-kupu bh 9,000.00
Espagnolet bh 32,000.00
Grendel Tanam bh 8,250.00
Grendel biasa bh 10,000.00
Gerendel jendela kuning bh 7,000.00
Gerendel jendela biasa bh 6,000.00
Kait Angin bh 15,000.00
Door Stop bh 150,000.00
Door Closer bh 195,000.00
2 Sliding Pintu bh 235,000.00
3 Naco per Daun bh 41,000.00
4 Rolling door Besi m2 325,000.00
Rolling door Almunium m2 275,000.00
5 Awning Almunium m2 225,000.00
Pintu Lipat Besi tebal 0,23 mm m2 425,000.00
Sunscreen Allumunim m2 350,000.00
11 PAGAR BRC. 90 A2 /lb 280,000.00
PAGAR BRC. 120 A2 /lb 350,000.00
Allumunium Foil m2 8,000.00
Handle pintu Stainless 500 mm bh 375,000.00
Patch fitting 1 set 1,500,000.00
Rambuncis bh 40,000.00
Engsel Casement 8" bh 30,000.00
Engsel Casement 10" bh 35,000.00
Engsel Casement 12" bh 45,000.00
Engsel Casement 16" bh 55,000.00

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,450,000.00
2 KLOSET JONGKOK bh 155,000.00
3 WASTAFEL PEDESTAL bh 1,250,000.00
4 WASTAFEL MEJA OVAL bh 950,000.00
5 WASTAFEL GANTUNG BULAT bh 450,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

6 WASTAFEL GANTUNG SUDUT bh 310,000.00


7 WASTAFEL GANTUNG SUDUT KECIL bh 275,000.00
8 WASTAFEL BAK CUCI bh 160,000.00
Bak cuci stainless steel (1,00 x 0,90) m2 bh 150,000.00
Bak mandi fiber glass, vol 120 ltr sudut bh 180,000.00
9 TEMPAT SABUN GANTUNG bh 35,000.00
10 TEMPAT SABUN TANAM bh 45,000.00
Kran Air 1/2" bh 22,000.00
Kran Air 3/4" bh 18,000.00
Seal tape bh 7,000.00
Floor drain bh 25,000.00
urionir bh -
Bak tandon air fiber isi 500 Ltr bh 1,000,000.00
Bak tandon air fiber isi 1000 Ltr bh 1,700,000.00
XIV . ALAT PENGIKAT KAYU
1 PAKU - (reng, usuk, plafond) kg 21,000.00
2 PAKU - payung kg 20,000.00
3 PAKU - sekrup kg 15,000.00
4 PAKU - beton kg 21,000.00
PAKU - asbes kg 20,000.00
PAKU - 12 cm kg 18,000.00
PAKU - eternit kg 25,000.00
5 MUR BAUT (kuda-kuda) kg 15,000.00
6 ANGKUR BAUT bh 13,500.00
7 LEM KAYU kg 20,000.00
Lem khusus wallpapaer kg 30,000.00
8 Tali Ijuk kg 6,250.00
Ijuk kg 10,000.00
Skrup Fixer bh 800.00
Dinabolt Ø 12 mm (10 s/d 15 cm) bh 8,000.00
XV . POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 350,000.00
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 1,050,000.00
Fuji 250 watt bh 1,500,000.00
Shimizu . 100 watt bh 510,000.00
. 90 watt bh 380,000.00
Dab . 125 watt bh 400,000.00
. 175 watt bh 450,000.00
XVI. LAIN -LAIN
Venetions Blinds atau Vertical Blinds (tirai) m2 50,000.00
ASPAL
Aspal curah kg 11,220.00
Aspal drum kg 12,320.00
Sand Sheet AMP ton 1,688,864.00
Kayu bakar m3 220,000.00
Alat Bantu Ls 2,000.00
Alat Bantu (BPJK) set 50,000.00
Solar (Industri) ltr 10,500.00
Premium (Industri) ltr 7,800.00
Pelumas / olie ltr 30,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Beton K-125 produk ready mix m3 900,625.00


Beton K-175 produk ready mix m3 925,375.00
Beton K-250 produk ready mix m3 996,875.00
Beton K-300 produk ready mix m3 1,032,625.00
Beton K-350 produk ready mix m3 1,082,125.00
Beton fs 45 produk Ready Mix m3 1,149,500.00
Joint Sealent Kg 68,750.00
Polytene (plastik cor) Kg 30,000.00
Curing Compound Ltr 38,500.00
Epoxy Bahan Penutup (sealant) Kg 68,750.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

U-DITCH
U 300 x 300 x 1200 mm, K. 350 Tbl. 5 CM Unit 450,000.00
U 300 x 400 x 1200 mm, K. 350 Tbl. 5 CM Unit 510,000.00
U 300 x 500 x 1200 mm, K. 350 Tbl. 5 CM Unit 580,000.00
Cover LC 400 x 1200 mm, K. 350 Tbl. 10 CM Unit 300,000.00
Cover HD 400 x 1200 mm, K. 350 Tbl. 15 CM Unit 400,000.00
U 400 x 400 x 1200 mm , K. 350 Tbl. 5 CM Unit 540,000.00
U 400 x 500 x 1200 mm , K. 350 Tbl. 5 CM Unit 610,000.00
U 400 x 600 x 1200 mm , K. 350 Tbl. 5 CM Unit 670,000.00
Cover LC 500 x 1200 mm, K. 350 Tbl. 10 CM Unit 320,000.00
Cover HD 500 x 1200 mm, K. 350 Tbl. 15 CM Unit 440,000.00
U 500 x 500 x 1200 mm, K. 350 Tbl. 7 CM Unit 800,000.00
U 500 x 600 x 1200 mm, K. 350 Tbl. 7 CM Unit 880,000.00
U 500 x 700 x 1200 mm, K. 350 Tbl. 7 CM Unit 970,000.00
Cover LC 640 x 1200 mm, K. 350 Tbl. 10 CM Unit 390,000.00
Cover HD 640 x 1200 mm, K. 350 Tbl. 15 CM Unit 550,000.00
U 600 x 600 x 1200 mm . K. 350 Tbl. 7 CM Unit 920,000.00
U 600 x 700 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,010,000.00
U 600 x 800 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,090,000.00
Cover LC 740 x 1200 mm, K. 350 Tbl. 10 CM Unit 440,000.00
Cover HD 740 x 1200 mm, K. 350 Tbl. 15 CM Unit 620,000.00
U 800 x 800 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,350,000.00
U 800 x 1000 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,490,000.00
Cover LC 940 x 1200 mm, K. 350 Tbl. 10 CM Unit 550,000.00
Cover HD 940 x 1200 mm, K. 350 Tbl. 15 CM Unit 790,000.00
U 1000 x 1000 x 1200 mm . K. 350 Tbl. 10 CM Unit 2,110,000.00
Cover LC 940 x 1200 mm, K. 350 Tbl. 12 CM Unit 800,000.00
Cover HD 940 x 1200 mm, K. 350 Tbl. 15 CM Unit 980,000.00
U 1200 x 1200 x 1200 mm . K. 350 Tbl. 10 CM Unit 2,550,000.00
Cover LC 940 x 1200 mm, K. 350 Tbl. 12 CM Unit 920,000.00
Cover HD 940 x 1200 mm, K. 350 Tbl. 15 CM Unit 1,130,000.00
BOX CULVERT
Box Culvert 400 x 400 x 1200mm, K.350 Tbl. 8 cm Unit 1,080,000.00
Box Culvert 500 x 500 x 1200mm, K.350 Tbl. 8 cm Unit 1,330,000.00
Box Culvert 600 x 600 x 1200mm, K.350 Tbl. 8,5 cm Unit 1,480,000.00
Box Culvert 600 x 600 x 1200mm, K.350 Tbl. 16 cm Unit 2,900,000.00
Box Culvert 800 x 800 x 1200mm, K.350 Tbl. 10 cm Unit 2,750,000.00
Box Culvert 800 x 800 x 1200mm, K.350 Tbl. 15 cm Unit 3,650,000.00
Box Culvert 1000 x 1000 x 1200mm, K.350 Tbl. 12 cm Unit 3,700,000.00
Box Culvert 1200 x 1200 x 1200mm, K.350 Tbl. 14 cm Unit 5,200,000.00
Box Culvert 1200 x 1500 x 1500mm, K.350 Tbl. 17 cm Unit 6,900,000.00
Catatan :
- Mutu besi U-24 (polos), U-40 (ulir)
- Kondisi terkirim dilokasi proyek Kab. Tegal yang bisa dijangkau truck
- Harga sudah termasuk penurunan dari tuck
- Harga tidak termasuk pemasangan
- Survei harga dari PT. JKS periode bulan November 2019

Panel Beton Bertulang uk 240 x 40 x 5 cm Lbr 110,000.00


Panel Beton Bertulang uk 240 x 40 x 8 cm Lbr 165,000.00
Kolom Beton Bertulang uk 225 x 18 x 17 cm tebal 5 cm (Tinggi 1,6 m) Btg 245,500.00
Kolom Beton Bertulang uk 280 x 18 x 17 cm tebal 5 cm (Tinggi 2,0 m) Btg 298,600.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kolom Beton Bertulang uk 320 x 18 x 17 cm tebal 5 cm (Tinggi 2,4 m) Btg 336,600.00


Kolom Beton Bertulang uk 370 x 18 x 17 cm tebal 5 cm (Tinggi 2,8 m) Btg 384,000.00
Kolom Beton Bertulang uk 425 x 18 x 17 cm tebal 5 cm (Tinggi 3,2 m) Btg 436,200.00
Kolom Beton Bertulang uk 225 x 18 x 17 cm tebal 8 cm (Tinggi 1,6 m) Btg 267,500.00
Kolom Beton Bertulang uk 280 x 18 x 17 cm tebal 8 cm (Tinggi 2,0 m) Btg 320,600.00
Kolom Beton Bertulang uk 320 x 18 x 17 cm tebal 8 cm (Tinggi 2,4 m) Btg 358,600.00
Kolom Beton Bertulang uk 370 x 18 x 17 cm tebal 8 cm (Tinggi 2,8 m) Btg 406,000.00
Kolom Beton Bertulang uk 425 x 18 x 17 cm tebal 8 cm (Tinggi 3,2 m) Btg 458,200.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

ALUMUNIUM COMPOSIT / ACP


ACP Perpotated PVDF 4 mm (terpasang) m2 850,000.00
ACP PVDF 4 mm polos (terpasang) m2 550,000.00
ACP PE 4 mm m2 450,000.00
ACP PE 3 mm m2 450,000.00
TANAMAN
Jenis Peneduh
Ketapang kencana (tinggi 1 m) bh 75,000.00
Pohon pulai (tinggi 1 m) bh 750,000.00
Bambu kuning (isi 3-5 btg) bh 60,000.00
Pohon Tabebuia ungu (tinggi 30 cm) bh 30,000.00
Jenis Perdu
Tanaman cincau hijau (tinggi 50 cm) bh 10,000.00
Krokot merat bh 2,000.00
Cemara laut (tinggi 30 cm) bh 15,000.00
Rombusa mini hijau bh 8,500.00
Sri gading kuning bh 5,500.00
Pucuk merah (tinggi 30 cm) bh 17,500.00
Rumput gajah mini m2 55,000.00
Cendrawasih bh 11,000.00

HARGA SATUAN
NO. URAIAN SAT
UPAH (Rp.)

1 Pekerja OH 80,000.00
2 Mandor OH 105,000.00
3 Tukang Kayu OH 100,000.00
4 Kepala Tukang Kayu OH 105,000.00
5 Tukang Batu OH 100,000.00
6 Kepala Tukang Batu OH 105,000.00
7 Tukang Besi OH 100,000.00
8 Kepala Tukang Besi OH 105,000.00
9 Tukang Cat OH 100,000.00
10 Kepala Tukang Cat OH 105,000.00
11 Tukang Plitur OH 100,000.00
12 Tukang Jalan OH 100,000.00
13 Tukang Gali OH 100,000.00
14 Tukang Masak Aspal OH 100,000.00
15 Tukang Ledeng OH 100,000.00
16 Tukang Listrik OH 100,000.00
17 Kepala Tukang Listrik OH 105,000.00
18 Tukang Vibrator OH 100,000.00
19 Tukang Erection OH 100,000.00
20 Tukang Las OH 100,000.00
21 Kepala Tukang Cat OH 105,000.00
22 Masinis OH 105,000.00
23 Pembatu Masinis/ Pembantu Operator OH 80,000.00
24 Penjaga Malam OH 75,000.00
25 Operator Terlatih OH 105,000.00
HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

26 Buruh Tak Terlatih OH 50,000.00


27 Buruh Terampil OH 100,000.00
28 Buruh Semi Terampil OH 80,000.00
29 Mekanik OH 105,000.00
30 Sopir OH 105,000.00
31 Pembantu Sopir OH 75,000.00
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

I A. 2.2.1 K.3 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.10 K.3 1 m2 Pembuatan Steger/Perancah dari Bambu
A TENAGA 280,000.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
2.000 OH Tukang Kayu 100,000.00 200,000.00
B BAHAN 23,037.50
1.250 Btg Bambu diameter 6 - 8 / 600 cm 17,500.00 21,875.00
0.186 Kg Tali Ijuk 6,250.00 1,162.50
C PERALATAN -
D JUMLAH A + B + C 303,037.50
E OVERHEAD & PROFIT (maksimal 10%) 10% 30,303.75
F HARGA SATUAN PEKERJAAN (D+E) 333,341.25
2 A.2.2.1.11 1 bh Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm
A TENAGA 30,000.00
L.02 0.300 OH Tukang Kayu 100,000.00 30,000.00
B BAHAN 129,480.00
0.036 m3 Kayu Papan lokal 1,450,000.00 52,200.00
0.036 m3 Kayu Balok lokal 2,100,000.00 75,600.00
0.080 kg Paku Biasa 21,000.00 1,680.00
C PERALATAN -
D JUMLAH A + B + C 159,480.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 15,948.00
F HARGA SATUAN PEKERJAAN (D+E) 175,428.00
3 A.2.2.1.13 1 m3 Bongkaran Beton Bertulang
A TENAGA 1,066,720.00
L.01 13.334 OH Pekerja 80,000.00 1,066,720.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 1,066,720.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 106,672.00
F HARGA SATUAN PEKERJAAN (D+E) 1,173,392.00
4 A.2.2.1.17 1 m3 Bongkaran Pasangan batu kali
A TENAGA 240,000.00
L.01 3.000 OH Pekerja 80,000.00 240,000.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 240,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 24,000.00
F HARGA SATUAN PEKERJAAN (D+E) 264,000.00
5 A.2.2.1.20 1 m2 Bongkaran Atap
A TENAGA 1,600.00
L.01 0.020 OH Pekerja 80,000.00 1,600.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 1,600.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 160.00
F HARGA SATUAN PEKERJAAN (D+E) 1,760.00
II A.2.2.1. HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.2 1 m3 Menggali Tanah Biasa Sedalam 2 m
A TENAGA 72,000.00
L.01 0.900 OH Pekerja 80,000.00 72,000.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 72,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 7,200.00
F HARGA SATUAN PEKERJAAN (D+E) 79,200.00
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

2 A.2.3.1.8 1 m3 Membuang Tanah sejauh 30 m'


A TENAGA 26,400.00
L.01 0.330 OH Pekerja 80,000.00 26,400.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 26,400.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 2,640.00
F HARGA SATUAN PEKERJAAN (D+E) 29,040.00
3 A.2.3.1.9a 1 m3 Pengurugan Kembali
di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA 20,000.00
L.01 0.250 OH Pekerja 80,000.00 20,000.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 20,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 2,000.00
F HARGA SATUAN PEKERJAAN (D+E) 22,000.00
4 A.2.3.1.11 1 m3 Urugan Pasir
A TENAGA 24,000.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
B BAHAN 236,400.00
1.200 m3 Pasir Urug 197,000.00 236,400.00
C PERALATAN -
D JUMLAH A + B + C 260,400.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 26,040.00
F HARGA SATUAN PEKERJAAN (D+E) 286,440.00
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping
A TENAGA 101,400.00
L.01 0.780 OH Pekerja 80,000.00 62,400.00
L.02 0.390 OH Tukang Batu 100,000.00 39,000.00
B BAHAN 484,464.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
0.432 m3 Pasir Urug 197,000.00 85,104.00
C PERALATAN -
D JUMLAH A + B + C 585,864.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 58,586.40
F HARGA SATUAN PEKERJAAN (D+E) 644,450.40
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
A TENAGA 159,500.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
B BAHAN 1,100,415.00
352.000 Kg Portland Semen 1,120.00 394,240.00
731.000 Kg Pasir Beton 431.25 315,243.75
1,031.000 Kg Kerikil (maksimum 30 mm) 368.75 380,181.25
215.000 ltr Air 50.00 10,750.00
C PERALATAN -
D JUMLAH A + B + C 1,259,915.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 125,991.50
F HARGA SATUAN PEKERJAAN (D+E) 1,385,906.50
2 A.4.1.1.17a 1 Kg Pembesian dg Besi Polos
A TENAGA 1,260.00
L.01 0.0070 OH Pekerja 80,000.00 560.00
L.02 0.0070 OH Tukang Besi 100,000.00 700.00
B BAHAN 12,375.00
1.050 Kg Besi Beton Polos 11,500.00 12,075.00
0.015 Kg Kawat Beton 20,000.00 300.00
C PERALATAN -
D JUMLAH A + B + C 13,635.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 1,363.50
F HARGA SATUAN PEKERJAAN (D+E) 14,998.50
4 1 Lbr Jaring Kawat baja/Wire Mesh
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

A TENAGA -
L.01 - OH Pekerja 80,000.00 -
L.02 - OH Tukang Besi 100,000.00 -
B BAHAN 263,750.00
1.000 Lbr Jaring Kawat Baja dilas 263,750.00 263,750.00

C PERALATAN -
D JUMLAH A + B + C 263,750.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 26,375.00
F HARGA SATUAN PEKERJAAN (D+E) 290,125.00
5 1 Lbr Pemasangan Bondek untuk Plat Lantai
A TENAGA 4,500.00
L.01 0.025 OH Pekerja 80,000.00 2,000.00
L.02 0.025 OH Tukang Besi 100,000.00 2,500.00
B BAHAN 105,000.00
1.000 Lbr Bondek 1x5x7,5mm 105,000.00 105,000.00
C PERALATAN -
D JUMLAH A + B + C 109,500.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 10,950.00
F HARGA SATUAN PEKERJAAN (D+E) 120,450.00
6 A.4.1.1.20a 1 m2 Memasang Bekisting untuk Pondasi (papan kayu lokal)
A TENAGA 67,600.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
B BAHAN 65,300.00
0.040 m3 Papan kayu lokal 1,450,000.00 58,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 132,900.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 13,290.00
F HARGA SATUAN PEKERJAAN (D+E) 146,190.00
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

8 A.4.1.1.22d 1 m2 Memasang Bekisting untuk Kolom (papan kayu lokal, 2x pakai)


A TENAGA 85,800.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
B BAHAN 38,400.00
0.020 m3 Papan kayu lokal 1,450,000.00 29,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 124,200.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 12,420.00
F HARGA SATUAN PEKERJAAN (D+E) 136,620.00
9 A.4.1.1.23a 1 m2 Memasang Bekisting untuk Balok
A TENAGA 85,800.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
B BAHAN 122,400.00
0.040 m3 Papan cetak pinus 2,800,000.00 112,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
C PERALATAN -
D JUMLAH A + B + C 208,200.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 20,820.00
F HARGA SATUAN PEKERJAAN (D+E) 229,020.00
10 A.4.1.1.24a 1 m2 Memasang Bekisting untuk Lantai (papan kayu lokal)
A TENAGA 85,800.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
B BAHAN 224,650.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.015 m3 Balok Kayu lokal 2,100,000.00 31,500.00
0.350 Lbr tripleks tebal 9mm 145,000.00 50,750.00
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 132,000.00
C PERALATAN -
D JUMLAH A + B + C 310,450.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 31,045.00
F HARGA SATUAN PEKERJAAN (D+E) 341,495.00
V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1 1 m2 Pemasangan Baja Ringan
A TENAGA -
L.01 - OH Pekerja - -
L.02 - OH Tukang Besi - -
B BAHAN 150,000.00
1.000 m Baja Ringan 150,000.00 150,000.00
C PERALATAN -
D JUMLAH A + B + C 150,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 15,000.00
F HARGA SATUAN PEKERJAAN (D+E) 165,000.00
2 1 m' Pemasangan Tangga Besi
A TENAGA -
L.01 - OH Pekerja - -
L.02 - OH Tukang Besi - -
B BAHAN 500,000.00
1.000 m' Tangga Besi 500,000.00 500,000.00
C PERALATAN -
D JUMLAH A + B + C 500,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 50,000.00
F HARGA SATUAN PEKERJAAN (D+E) 550,000.00
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

3 1 m' Pemasangan Railing


A TENAGA -
L.01 - OH Pekerja - -
L.02 - OH Tukang Besi - -
B BAHAN 300,000.00
1.000 m' Railing 300,000.00 300,000.00
C PERALATAN -
D JUMLAH A + B + C 300,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 30,000.00
F HARGA SATUAN PEKERJAAN (D+E) 330,000.00
VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.10 1 m2 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:5PP
A TENAGA 34,000.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
B BAHAN 105,651.60
70.000 Buah Bata Merah 1,150.00 80,500.00
9.680 Kg Portland Semen (PC) 1,120.00 10,841.60
0.045 m3 Pasir Pasang (PP) 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 139,651.60
E OVERHEAD & PROFIT (maksimal 10%) 10% 13,965.16
F HARGA SATUAN PEKERJAAN (D+E) 153,616.76
VII A.4.4.2 HARGA SATUAN PEKERJAAN PASANGAN PLESTERAN
1 A.4.4.2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
A TENAGA 39,000.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
B BAHAN 14,620.80
6.240 Kg Portland Semen 1,120.00 6,988.80
0.024 m3 Pasir Pasang 318,000.00 7,632.00
C PERALATAN -
D JUMLAH A + B + C 53,620.80
E OVERHEAD & PROFIT (maksimal 10%) 10% 5,362.08
F HARGA SATUAN PEKERJAAN (D+E) 58,982.88
2 A.4.4.2.27 1 m2 Pemasangan Acian
A TENAGA 26,000.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang batu 100,000.00 10,000.00
B BAHAN 3,640.00
3.250 Kg Portland Semen 1,120.00 3,640.00
C PERALATAN -
D JUMLAH A + B + C 29,640.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 2,964.00
F HARGA SATUAN PEKERJAAN (D+E) 32,604.00
VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal polos
A TENAGA 26,000.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang Besi 100,000.00 10,000.00
B BAHAN 66,240.00
1.020 m2 Genteng Metal polos 62,000.00 63,240.00
0.200 Kg Paku Biasa Ø ½" - 1" (sekrup) 15,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 92,240.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 9,224.00
F HARGA SATUAN PEKERJAAN (D+E) 101,464.00
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

2 1 m2 Pemasangan Kanopi Galvalum


A TENAGA -
L.01 - OH Pekerja - -
L.02 - OH Tukang Besi - -
B BAHAN 180,000.00
1.000 m2 Kanopi Galvalum 180,000.00 180,000.00
C PERALATAN -
D JUMLAH A + B + C 180,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 18,000.00
F HARGA SATUAN PEKERJAAN (D+E) 198,000.00
3 1 m2 Pemasangan Kanopi Alderon
A TENAGA -
L.01 - OH Pekerja - -
L.02 - OH Tukang Besi - -
B BAHAN 250,000.00
1.000 m2 Kanopi Alderon 250,000.00 250,000.00
C PERALATAN -
D JUMLAH A + B + C 250,000.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 25,000.00
F HARGA SATUAN PEKERJAAN (D+E) 275,000.00
XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
1 A.5.1.1.19 1 bh Pemasangan Kran Ø ½"
A TENAGA 40,800.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.400 OH Tukang Batu 100,000.00 40,000.00
B BAHAN 22,017.50
1.000 bh Kran Air 22,000.00 22,000.00
0.003 bh Sealtape 7,000.00 17.50
C PERALATAN -
D JUMLAH A + B + C 62,817.50
E OVERHEAD & PROFIT (maksimal 10%) 10% 6,281.75
F HARGA SATUAN PEKERJAAN (D+E) 69,099.25
2 A.5.1.1.25 1 m' Pemasangan Pipa PVC tipe AW Ø ½"
A TENAGA 8,880.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
B BAHAN 10,125.00
1.200 m' Pipa PVC Ø ½" 6,250.00 7,500.00
0.350 Ls Perlengkapan 35% x pipa 7,500.00 2,625.00
C PERALATAN -
D JUMLAH A + B + C 19,005.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 1,900.50
F HARGA SATUAN PEKERJAAN (D+E) 20,905.50
3 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW Ø ¾"
A TENAGA 8,880.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
B BAHAN 13,770.00
1.200 m' Pipa PVC Ø ¾" 8,500.00 10,200.00
0.350 Ls Perlengkapan 35% x pipa 10,200.00 3,570.00
C PERALATAN -
D JUMLAH A + B + C 22,650.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 2,265.00
F HARGA SATUAN PEKERJAAN (D+E) 24,915.00
4 A.5.1.1.27 1 m' Pemasangan Pipa PVC tipe AW Ø 1"
A TENAGA 8,880.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
B BAHAN 18,022.50
1.200 m' Pipa PVC Ø 1" 11,125.00 13,350.00
0.350 Ls Perlengkapan 35% x pipa 13,350.00 4,672.50
C PERALATAN -
D JUMLAH A + B + C 26,902.50
E OVERHEAD & PROFIT (maksimal 10%) 10% 2,690.25
HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

F HARGA SATUAN PEKERJAAN (D+E) 29,592.75


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

5 A.5.1.1.29 1 m' Pemasangan Pipa PVC tipe AW Ø 2"


A TENAGA 13,320.00
L.01 0.054 OH Pekerja 80,000.00 4,320.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
B BAHAN 31,995.00
1.200 m' Pipa PVC Ø 2" 19,750.00 23,700.00
0.350 Ls Perlengkapan 35% x pipa 23,700.00 8,295.00
C PERALATAN -
D JUMLAH A + B + C 45,315.00
E OVERHEAD & PROFIT (maksimal 10%) 10% 4,531.50
F HARGA SATUAN PEKERJAAN (D+E) 49,846.50
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu m2 378,680.63
2 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm bh 187,024.50
3 A.2.2.1.13 Bongkaran Beton Bertulang m3 1,307,147.50
4 A.2.2.1.17 Bongkaran Pasangan batu kali m3 294,112.50
5 A.2.2.1.20 Bongkaran Atap m2 3,047.50
6 A.2.2.1.21 Bongkaran Rangka Atap (Reng, Usuk) m2 14,705.63
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m m3 88,233.75
2 A.2.3.1.8 Membuang Tanah sejauh 30 m' m3 31,567.50
3 A.2.3.1.9a Pengurugan Kembali (Dihitung dari 1/3 kali koef. Pekerjaan galian) m3 26,018.75
4 A.2.3.1.11 Urugan Pasir m3 300,667.50
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 683,162.10
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1,462,305.50
2 A.4.1.1.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa(K275),slum(12±2)cm,w/c=0,53 m3 1,506,428.13
3 A.4.1.1.17a Pembesian dg Besi Polos Kg 15,813.08
4 A.4.1.1.17b Pembesian dg Besi ulir Kg 16,175.33
5 A.4.1.1.19 Jaring Kawat baja/Wire Mesh Lbr 194,367.25
6 Pemasangan Bondek untuk Plat Lantai Lbr 120,450.00
7 A.4.1.1.20a Memasang Bekisting untuk Pondasi (papan kayu lokal) m2 159,114.00
8 A.4.1.1.21b Memasang Bekisting untuk Sloof (Papan kayu lokal, 2x pakai) m2 129,357.75
9 A.4.1.1.22d Memasang Bekisting untuk Kolom (Papan kayu lokal, 2x pakai) m2 150,799.50
10 A.4.1.1.23d Memasang Bekisting untuk Balok (papan kayu lokal, 2x pakai) m2 150,799.50
11 A.4.1.1.24a Memasang Bekisting untuk Lantai (papan kayu lokal) m2 364,987.00
V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1 Pemasangan Baja Ringan m2 165,000.00
2 Pemasangan Tangga Besi m' 550,000.00
3 Pemasangan Railing m' 330,000.00
VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.10 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm tbl 1/2 Bata Camp. 1SP:5PP m2 163,618.09
VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm m2 65,286.42
2 A.4.4.2.27 Pemasangan Acian m2 36,501.00
VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 A.4.5.2.32 Pemasangan Atap Genteng Metal m2 108,491.00
2 Pemasangan Kanopi Galvalum m2 198,000.00
3 Pemasangan Kanopi Alderon m2 275,000.00
IX A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
1 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" bh 77,673.88
2 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" m' 22,821.75
3 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" m' 27,013.50
4 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1" m' 31,903.88
5 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" m' 53,561.25
BILL OF QUANTITY

HARGA SATUAN
No. URAIAN PEKERJAAN SAT. VOLUME TOTAL HARGA (Rp)
(Rp)

I PEKERJAAN PERSIAPAN 1,776,011.70


1 Pembuatan Steger/Perancah dari Bambu m2 2 378,680.63 757,361.25
2 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm bh 1 187,024.50 187,024.50
3 Bongkaran Beton Bertulang m3 0.27 1,307,147.50 352,929.83
4 Bongkaran Pasangan batu kali m3 0.36 294,112.50 105,880.50
5 Bongkaran Atap m2 21 3,047.50 63,997.50
6 Bongkaran Rangka Atap (Reng, Usuk) m2 21 14,705.63 308,818.13
II PEKERJAAN PONDASI 5,591,263.98
1 Menggali Tanah Biasa Sedalam 2 m m3 11.52 88,233.75 1,016,452.80
2 Membuang Tanah sejauh 30 m' m3 11.52 31,567.50 363,657.60
3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa(K275),slum(12±2)cm,w/c=0,53 m3 0.288 1,506,428.13 433,851.30
4 Urugan Pasir m3 0.576 300,667.50 173,184.48
5 Pemasang Batu Kosong/Anstamping m3 1.152 683,162.10 787,002.74
6 Pembesian dg Besi Polos Kg 31.060 15,813.08 491,150.36
7 Memasang Bekisting untuk Pondasi (papan kayu lokal) m2 4.8 159,114.00 763,747.20
8 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1.00 1,462,305.50 1,462,305.50
9 Pengurugan Kembali (Dihitung dari 1/3 kali koef. Pekerjaan galian) m3 3.84 26,018.75 99,912.00
III PEKERJAAN KOLOM 11,039,064.07
1 Pembesian dg Besi Polos Kg 178.740 15,813.08 2,826,423.11
2 Memasang Bekisting untuk Kolom (Papan kayu lokal, 2x pakai) m2 42.8 150,799.50 6,454,218.60
3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1.20 1,462,305.50 1,758,422.36
IV PEKERJAAN BALOK 7,039,354.36
1 Pembesian dg Besi Polos Kg 74.021 15,813.08 1,170,506.41
2 Memasang Bekisting untuk Balok (papan kayu lokal, 2x pakai) m2 31.5 150,799.50 4,750,184.25
3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 0.76 1,462,305.50 1,118,663.71
V PEKERJAAN PLAT LANTAI 3,285,927.71
1 Pemasangan Bondek untuk Plat Lantai Lbr 3 120,450.00 361,350.00
2 Jaring Kawat baja/Wire Mesh Lbr 1.058 194,367.25 205,679.63
3 Memasang Bekisting untuk Lantai (papan kayu lokal) m2 1.68 364,987.00 613,178.16
4 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1.44 1,462,305.50 2,105,719.92
VIII PEKERJAAN ATAP 6,253,500.00
2 Pemasangan Kanopi Galvalum m2 4.5 198,000.00 891,000.00
3 Pemasangan Kanopi Alderon m2 19.5 275,000.00 5,362,500.00
VI PEKERJAAN FINISHING 5,060,000.00
2 Pemasangan Tangga Besi m' 3.5 550,000.00 1,925,000.00
3 Pemasangan Railing m' 9.5 330,000.00 3,135,000.00
IX PEKERJAAN PLUMBING 277,014.88
1 Pemasangan Kran Ø ½" atau Ø ¾" bh 1 77,673.88 77,673.88
2 Pemasangan Pipa PVC tipe AW Ø ½" m' 4 22,821.75 91,287.00
3 Pemasangan Pipa PVC tipe AW Ø ¾" m' 4 27,013.50 108,054.00

TOTAL BIAYA SELURUH PEKERJAAN 40,322,136.70


REKAPITULASI
RENCANA ANGGARAN BIAYA

No. URAIAN PEKERJAAN HARGA PEKERJAAN (Rp)

1 PEKERJAAN PERSIAPAN Rp1,776,012

2 PEKERJAAN STRUKTUR Rp26,955,610

A. PONDASI Rp5,591,264

B. KOLOM Rp11,039,064

C. BALOK Rp7,039,354

D. PLAT LANTAI Rp3,285,928

3 PEKERJAAN ARSITEKTUR Rp6,253,500

A. ATAP Rp6,253,500

4 PEKERJAAN PLUMBING Rp277,015

5 PEKERJAAN FINISHING Rp5,060,000

TOTAL BIAYA SELURUH PEKERJAAN Rp40,322,137

PEMBULATAN Rp40,322,137

TERBILANG LIMA PULUH SEMBILAN JUTA DUA RATUS SEBELAS RIBU ENAM RUPIAH

Anda mungkin juga menyukai