Anda di halaman 1dari 4

14,768 2,947 2,779 2,999 9,246 12,172 14,851 25,123 7,176

RUANG RUANG TOILET


GENSET PLUMBING RUANG GUDANG ALAT DAN
LOADING DOCK RUANG AHU RUANG MEE FOODCOURT FOODCOURT WANITA
PENGUMPU
LAN
PERLENGKAPAN
SAMPAH
9,794

AREA SIRKULASI SERVIS

TOILET
WANITA
RUANG PANTRY
GUDANG
PEKERJA TOKO SOVENIR
PENYELENGGARA EKSHIBISI
8,000

TOILET
PRIA AREA
SIRKULASI

RUANG
1
2 35

3 34
33

DUDUK
4
5 32

6 31
30
8,000

7
8 29
28

34G x 0,250
35R x 0,200
9
10 27

11 26

12 25

13 24

14 23

15 22

16 21

17 20

18
19

RUANG RUANG
8,000

EKSHIBISI EKSHIBISI

LOBI UTAMA
8,000
8,000

8,239 7,940 8,000 8,000 8,000 8,000 6,009 5,752 5,739 7,782 7,737 9,018

1. Story 1:300

GSPublisherVersion 0.0.100.100
30,260

23,026 11,839 7,176 2,636 8,950 9,419 4,000 2,020 4,981 6,869 8,004 10,821

LOKER

3,988

3,987
TOILET PRIA WANITA
TOILET WANITA PANTRY RUANG RUANG RUANG RUANG
KANTOR TAMU RAPAT KEPALA KEPALA
LOKER
RUANG KONVENSI KECIL PERPUSTAKAAN PRIA RUANG ADMIN
DAN

4,013

4,014
MARKETING

8,798
AREA SIRKULASI LANTAI 2

8,000

32,798
8,000
8,000
7,186
30,275 8,000 8,000 8,000 8,000 8,000 8,000 8,000 3,725

2. Story 1:300

GSPublisherVersion 0.0.100.100
GSPublisherVersion 0.0.100.100
MATA KULIAH

UJIAN AKHIR SEMESTER

STUDIO PERANCANGAN ARSITEKTUR 5

DOSEN PEMBIMBING

INDRA KUSWOYO, ST., MT.


NIP. : -

NAMA GAMBAR

DENAH STRUKTURAL

NAMA MAHASISWA

MUHAMMAD SALIM ADNIN


2107113127

PARAF TUGAS

KETERANGAN
A B C D E F G H I J
South Elevation 1:300
K L
J M
K N
L M
O N
P O
Q R P S Q R
South Elevation 1:300

GSPublisherVersion 0.0.100.100

Anda mungkin juga menyukai