Rab RMH Type 42
Rab RMH Type 42
RAB
JUMLAH
NO URAIAN PEKERJAAN
HARGA (Rp)
I PEKERJAAN PERSIAPAN 5,000,000.00
II PEKERJAAN TANAH 6,849,388.94
III PEKERJAAN PASANGAN DAN PLESTERAN 3,754,585.15
IV PEKERJAAN BETON BERTULANG 7,473,263.82
V PEKERJAAN KOSEN, PINTU DAN JENDELA 9,097,352.40
VI PEKERJAAN RANGKA ATAP 6,513,103.20
VII PEKERJAAN PENUTUP ATAP 5,281,135.00
VIII PEKERJAAN PLAFOND 11,050,123.20
IX PEKERJAAN LANTAI BANGUNAN INDUK 10,733,109.21
X PEKERJAAN ALAT PENGGANTUNG/KUNCI 1,260,000.00
XI PEKERJAAN PENGECATAN 14,109,487.26
XII PEKERJAAN INSTALASI LISTRIK 3,189,500.00
XIII PEKERJAAN SANITASI 8,688,000.00
XIV PEKERJAAN LAIN - LAIN 4,850,000.00
JUMLAH 97,849,048.18
TOTAL 97,849,048.18
DIBULATKAN 97,849,000.00
Terbilang: Err:511
RIF'AN AJRI, ST
Direktur
DAFTAR KUANTITAS DAN HARGA
ENGINEERING ESTIMATE (EE)
LOKASI : JLN. KAMPUNG DALAM KECAMATAN KARANG BARU - KABUPATEN ACEH TAMIANG
TAHUN : 2021
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Ls 500,000.00 500,000.00
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls 750,000.00 750,000.00
3 Direksi Keet / Barak Kerja 1.00 Ls 750,000.00 750,000.00
4 Mobilisasi 1.00 Ls 2,000,000.00 2,000,000.00
5 Administrasi dan Dokumentasi 1.00 Ls 1,000,000.00 1,000,000.00
Jumlah 5,000,000.00
II PEKERJAAN TANAH
1 Galian tanah pondasi 40.44 M3 70,250.00 2,841,085.62
2 Urugan kembali bekas galian 10.11 M3 50,500.00 510,586.56
3 Urugan tanah bawah lantai 25.95 M3 117,620.00 3,052,239.00
4 Pasir urug bawah pondasi 3.06 M3 145,700.00 445,477.75
Jumlah 6,849,388.94
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Aanstamping / Pas. batu kosong 1.30 M3 458,406.00 595,927.80
2 Pondasi batu kali 0.80 M3 897,548.50 718,038.80
3 Pasangan bata trasram 1 : 2 6.23 M² 117,896.53 734,495.35
4 Pasangan bata merah 1 : 4 6.30 M² 106,586.65 671,495.89
5 Plesteran 1 : 2 8.50 M² 67,650.04 575,025.34
6 Plesteran 1 : 4 7.43 M² 61,857.60 459,601.97
Jumlah 3,754,585.15
IV PEKERJAAN BETON BERTULANG
1 Sloof beton 15/18 cm 0.20 M3 6,338,140.00 1,267,628.00
2 Kolom praktis beton 15/15 cm 8.00 M' 96,273.00 770,184.00
3 Balok latai 15/18 cm 5.40 M' 145,018.50 783,099.90
4 Ring balok beton 15/18 cm 3.23 M' 145,018.50 468,409.76
5 Balok tombak layar 15/15 cm 6.30 M' 145,018.50 913,616.55
6 Plat meja dapur 0.06 M3 4,513,951.00 270,837.06
Teras
1 Sloof beton 15/18 cm 0.12 M3 6,338,140.00 760,576.80
2 Kolom praktis beton 15/15 cm 7.10 M' 96,273.00 683,538.30
3 Ring balok beton 15/18 cm 4.50 M' 145,018.50 652,583.25
4 Plat dak teras Depan & Belakang t = 8 cm 0.20 M3 4,513,951.00 902,790.20
Jumlah 7,473,263.82
V PEKERJAAN KOSEN, PINTU DAN JENDELA
1 Perkayuan kosen pintu kayu klas I 0.12 M3 13,525,500.00 1,623,060.00
2 Daun pintu panel Uk. 210 x 90 cm kayu klas II 1.24 M² 766,060.00 949,914.40
3 Daun pintu panel Uk. 210 x 80 cm kayu klas II 0.80 M² 766,060.00 612,848.00
4 Daun pintu fiber kamar mandi 1.00 Unit 450,000.00 450,000.00
5 Kosen Jendela 0.06 M 3
13,525,500.00 811,530.00
6 Daun Jendela + Kaca bening 5 mm Uk. 52 x 150 cm 6.00 Set 650,000.00 3,900,000.00
+ Assesoris lengkap terpasang
8 Daun Jendela Ventilasi + Kaca bening 5 mm Uk. 40 x 30 c 1.00 Set 350,000.00 350,000.00
+ Assesoris lengkap terpasang (KM/WC)
9 Ventilasi / Lubang Angin 16.00 Bh 25,000.00 400,000.00
Jumlah 9,097,352.40
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
(Rp.) (Rp)
SNI 3434-2008-6.5 : Membuat dan Memasang 1 M2 Daun Pintu Panel, Kayu Kelas II
1.000 Orang Pekerja @Rp 90,000.00 Rp. 90,000.00
0.300 Orang Kepala Tukang @Rp 120,000.00 Rp. 36,000.00
0.050 Orang Mandor @Rp 110,000.00 Rp. 5,500.00
3.000 Orang Tukang Kayu @Rp 110,000.00 Rp. 330,000.00
0.040 M3 Papan Kayu Klas II @Rp 7,464,000.00 Rp. 298,560.00
0.500 Kg Lem Kayu @Rp 12,000.00 Rp. 6,000.00
Jumlah Rp. 766,060.00
A. UPAH KERJA
1 Mandor 110,000.00 / Hari
2 Pekerja 90,000.00 / Hari
3 Tukang 110,000.00 / Hari
4 Kepala Tukang 120,000.00 / Hari
B. HARGA BAHAN
1 Atap Seng Genteng Metal 0.30 98,000.00 / M2
2 Air 65.00 / Ltr
3 Aquafroof (Pelapis Beton) 60,000.00 / Kg
4 Pemasukan Arus Listrik PLN 4 Amper 1,800,000.00 Unit
5 Batu Bata 550.00 / Bh
6 Baja Ringan Zincallum C Truss (C75) 170,000.00 / M2
7 Batu Gunung/Kali 245,000.00 / M3
8 Bak mandi Fiber 600,000.00 / Bh
9 Besi Beton Polos 17,600.00 / Kg
10 Bubungan Genteng Metal 0.30 98,000.00 / Lbr
11 Bon-Bon Keramik 20,000.00 / M'
12 Box zekering 115,000.00 / Bh
13 Cat Dasar 35,000.00 / Kg
14 Cat Menie 32,000.00 / Kg
15 Cat Minyak 55,000.00 / Kg
16 Cat Tembok Merk Jotun 140,000.00 / Kg
17 Daun Jendela + Asesoris Uk. 52 x 150 cm 650,000.00 / Unit
18 Daun Jendela + Asesoris Uk. 50 x 170 cm 450,000.00 / Unit
19 Daun Jendela + Asesoris Uk. 90 x 95 cm 350,000.00 / Unit
20 Daun Pintu Fiber 450,000.00 / Unit
21 Engsel Jendela Kuningan 3" 21,500.00 / Bh
22 Engsel Pintu kuningan 4" 23,000.00 / Bh
23 Floor Drain 75,000.00 / Bh
24 Giypsum VPC + Rangka Furing 180,000.00 / M2
25 Grendel Pintu 15,000.00 / Bh
26 Hak Angin 25,000.00 / Bh
27 Kawat Beuhel / Beton 17,000.00 / Kg
28 Kayu Kelas I (Damar Laut) 9,330,000.00 / M3
29 Kayu Kelas II (Meranti) 7,464,000.00 / M3
30 Kayu Kelas III (Sembarang) 5,598,000.00 / M3
31 Kayu Bekisting / Mal 4,602,800.00 / M3
NO URAIAN HARGA SATUAN (Rp) SATUAN
RIF'AN AJRI, ST
Direktur
BACK UP DATA PERHITUNGAN PEMBANGUNAN RUMAH DINAS
SMAN 1 KECAMATAN TAMIANG HULU KAB. ACEH TAMIANG
B. PEKERJAAN TANAH
- Galian Tanah
Pondasi Batu Kali
Ruangan 86.00 0.35 1.30 39.13 M3
Volume 40.44 M3
Volume 3.06 M3
- Urugan Pasir Bawah Lantai
Ruangan
Rumah 3.50 4.00 0.05 0.70 M3
3.50 4.00 0.05 0.70 M3
3.50 3.50 0.05 0.61 M3
3.00 3.00 0.05 0.45 M3
3.50 3.00 0.05 0.53 M3
Volume 0.53 M3
- Urugan Tanah Bawah Lantai
Ruangan
Rumah 3.00 3.00 0.40 3.60 M3
3.50 3.00 0.40 4.20 M3
2.00 1.50 0.30 0.90 M3
2.00 3.00 0.30 1.80 M3
4.00 3.00 0.30 3.60 M3
Volume 6.12 M3
- Pondasi Pasangan Batu Kali
0.25
0.45
Volume 16.05 M3
- Pas. Dinding Bata 1 : 2
Ruangan
Volume 34.40 M2
Volume 68.80 M2
- Pas. Dinding Bata 1 : 4
Dinding Ruangan 86.00 3.30 283.80 M2
Volume 303.10 M2
- Luas Kosen P1 (3 Unit) 0.90 2.15 3.00 5.81 M2
P2 (3 Unit) 0.80 2.15 3.00 5.16 M2
P3 (2 Unit) 0.70 2.00 2.00 2.80 M2
J1 (6 Unit) 0.90 1.40 6.00 7.56 M2
J2 (1 Unit) 0.90 0.95 1.00 0.86 M2
J3 (2 Unit) 0.50 1.40 2.00 1.40 M2
J4 (2 Unit) 0.70 0.50 2.00 0.70 M2
Volume 24.28 M2
- Luas Dinding Pas. Bata 1 : 4
303.10 278.82 M2
Volume 278.82 M2
Volume 542.94 M2
Volume 0.03 M3
- Sloof 15x 18 cm
Ruangan 86.00 0.15 0.20 2.58 M3
Volume 2.58 M3
Teras 8.75 0.15 0.20 0.26 M3
Volume 0.26 M3
- Ring Balk 15 x 18 cm
Volume 65.75 M3
Volume 0.12 M3
- Balok Latai 15 x 18 cm
44.75 M'
M3
Volume 44.75 M3
- Top Guevel/Tombak Layar 15 x 15
8.84 M'
21.00 M'
Volume 459.80 M2
- Atap Seng Genteng Metal 459.80 M2
Volume 0.26 M3
Kosen Jendela
2.15 J1 (5 Unit) 5.00 0.13 0.05 5.00 0.16 M3
J2 (15 Unit) 14.77 0.13 0.05 15.00 1.44 M3
V1 (5 Unit) 1.40 0.13 0.05 5.00 0.05 M3
Volume 1.65 M3
Daun Pintu
P1 (2 Unit) 2.10 0.90 2.00 3.78 M2
P2 (5 Unit) 2.10 0.80 5.00 8.40 M2
0.90
Volume 15.74 M2
G. PEKERJAAN LANGIT-LANGIT
- Pekerjaan Plafond Gypsum Ruangan
Rumah Dinas 2.85 2.85 8.12 M2
3.35 2.85 9.55 M2
1.85 1.50 2.78 M2
1.85 2.85 5.27 M2
3.85 2.85 10.97 M2
Volume 66.34 M2
- Pekerjaan Plafond Gypsum Luar
Depan / Belakang 13.00 0.90 2.00 23.40 M2
Samping
Kiri/Kanan 5.24 0.90 2.00 9.43 M2
Volume 48.67 M2
Volume Total 115.01 M2
- Pekerjaan List Profil Gypsum
Dalam
Rumah Dinas 55.00 M'
Ruang Periksa 36.00 M'
Luar
56.16 M'
Volume 0.45 M3
- Pekerjaan DAK Teras
3.35 1.80 0.08 0.48 M3
Volume 0.48 M3
- Pekerjaan Water Proofing
3.35 1.80 6.03 M2
Volume 6.03 M2
Volume 0.06 M3
- Pekerjaan Keramik 40 x 40 cm
Lantai Ruangan 40 x 40 3.00 3.00 9.00 M2
3.50 3.00 10.50 M2
2.00 1.50 3.00 M2
2.00 3.00 6.00 M2
4.00 3.00 12.00 M2
Volume 9.00 M2
- Keramik Dinding KM /WC 20 x 25 cm 13.00 1.20 15.60 M2
Volume 15.60 M2
- Keramik Lantai KM /WC 20 x 20 cm 1.75 1.50 2.63 M2
Volume 115.01 M2
- Pekerjaan Cat Papan Lisplank
56.92 0.25 2.00 28.46 M2
Volume 28.46 M2
- Pekerjaan Cat Kosen Pintu dan Daun Pintu
Volume 39.24 M2
Total Volume 67.70 M2
J. PEK. PENGUNCI/PENGGANTUNG
- Pekerjaan Kunci Pintu 4.00 Bh
- Pekerjaan Engsel Pintu 12.00 Psg
L. PEKERJAAN LAIN-LAIN
- Pekerjaan Pembersihan Akhir 1.00 Ls
Konsultan Perencana
CV. GANESSA CONSULTANT GROUP