JENIS PEKERJAAN
No.
: 1.2
: MOBILISASI
URAIAN
A.
Sewa Tanah
B.
PERALATAN
Periksa lembar 1.2-2
SATUAN
FASILITAS KONTRAKTOR
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
......................
D.
1
2
3
4
5
6
7
PEMERIKSAAN LABORATORIUM
Pembuatan Job Mix
Pemeriksaan Laboratorium
......................
......................
......................
......................
....
....
....
....
E.
E.I.
1
2
3
4
5
6
MOBILISASI LAINNYA
PEKERJAAN DARURAT
Perkuatan Jembatan Lama
Pemeliharaan Jalan Kerja / Samping
......................
......................
......................
......................
LS
LS
....
....
....
....
E.II.
1
2
3
4
5
6
LAIN-LAIN
Komunikasi Lapangan Lengkap
Papan Nama Proyek
......................
......................
......................
......................
DEMOBILISASI
Total Biaya Mobilisasi
Lembar 1.2-1
JUMLAH
HARGA
(Rp.)
7,450,000
C.
1
2
3
4
5
6
F.
VOL.
HARGA
SATUAN
(Rp.)
M2
M2
M2
M2
M2
....
1
1
1
1
1
0
50,000
75,000
45,000
25,000
25,000
0
50,000
75,000
45,000
25,000
25,000
0
set
set
6
6
500,000
500,000
3,000,000
3,000,000
0
0
0
0
10,000,000
10,000,000
Set
....
....
....
....
....
1
2
0
0
0
0
5,000,000
350,000
0
0
0
0
5,000,000
700,000
0
0
0
0
LS
3,240,000
3,240,000
32,610,000
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
File : 89627200.xls.ms_office
No.
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
: 1.2
: MOBILISASI
JENIS ALAT
SATUAN
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
-
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
SET
Unit
SET
VOL.
HARGA
SATUAN
(Rp.)
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
PERALATAN
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3-4 M3
DUMP TRUCK
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
SCALE BRIDGE, 35 T.
PICK UP TRUCK, 1 T.
SURVEY EQUIPMENT
File : 89627200.xls.ms_office
KODE
ALAT
0 200,000,000
1
500,000
1
100,000
1
500,000
1
150,000
0
100,000
0
150,000
5
150,000
5
150,000
1
500,000
2
150,000
1
300,000
1
500,000
0
500,000
1
500,000
1
500,000
1
500,000
1
500,000
1
500,000
0
50,000
0 40,000,000
0
50,000
1
150,000
0
50,000
1
50,000
0
50,000
0
500,000
0
500,000
0
1,000,000
0
1,000,000
0
1,000,000
0
200,000
0
500,000
0
300,000
0
1,500,000
2
100,000
2
100,000
0
500,000
100,000
500,000
150,000
0
0
750,000
750,000
500,000
300,000
300,000
500,000
0
500,000
500,000
500,000
500,000
500,000
0
0
0
150,000
0
50,000
0
0
0
0
0
0
0
0
0
0
200,000
200,000
7,450,000
Nama Alat
No Item Pekerjaan
Kode
Alat
E01
2 Asphalt Finisher
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(5)
E02
3 Asphalt Sprayer
6.1(1)
6.1(2)
E03
4 Bulldozer
9.7
E04
5 Concrete Mixer
7.1(5)
7.1(6)
7.1(8)
7.9
9.18
E06
6 Concrete Vibrator
7.1(5)
7.1(6)
7.1(8)
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
Target
Produksi
Tiap Jam
koefisien alat
per item
8=7:6
10=8x9
11
12
13
6=4x5
9
9
9
9
2
225
225
225
225
50
7
7
7
7
7
1575
1575
1575
1575
350
74,900
3,745
3,745
3,745
200
m2
m3
m3
m3
m3
47.556
2.378
2.378
2.378
0.571
0.002
0.054
0.055
0.055
0.002
0.103
0.129
0.132
0.132
0.001
0.49701101
9
9
9
9
2
225
225
225
225
50
7
7
7
7
7
1575
1575
1575
1575
350
74,900
3,745
3,745
3,745
200
m2
m3
m3
m3
m3
47.556
2.378
2.378
2.378
0.571
0.003
0.075
0.069
0.069
0.000
0.129
0.178
0.165
0.165
0.000
0.63670013
9
9
225
225
7
7
1575
1575
4,800
2,400
liter
liter
3.048
1.524
0.003
0.003
0.009
0.005
0.01376936
175
1225
70
jam
0.057
1.000
0.057
0.05714286
4
4
4
4
7
100
100
100
100
175
7
7
7
7
7
700
700
700
700
1225
150
200
150
79
49
m3
m3
m3
m3
jam
0.214
0.286
0.214
0.113
0.040
0.442
0.442
0.442
0.683
1.000
0.095
0.126
0.095
0.077
0.040
0.43259897
4
4
4
100
100
100
7
7
7
700
700
700
150
200
150
m3
m3
m3
0.214
0.286
0.214
0.442
0.442
0.442
0.095
0.126
0.095
0.31554791
No
Nama Alat
No Item Pekerjaan
1
2
7 Compressor
6.1(1)
9.17
Kode
Alat
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
Target
Produksi
Tiap Jam
koefisien alat
per item
8=7:6
10=8x9
11
12
13
6=4x5
9
7
225
175
7
7
1575
1225
4,800
49
liter
jam
3.048
0.040
0.003
1.000
0.010
0.040
0.04952381
175
1225
70
jam
0.057
1.000
0.057
0.05714286
7
6
6
7
5
5
9
9
9
9
9
9
2
2
2
2
7
175
150
150
175
125
125
225
225
225
225
225
225
50
50
50
50
175
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
1225
1050
1050
1225
875
875
1575
1575
1575
1575
1575
1575
350
350
350
350
1225
10,000
31,890
4,657
5,936
891
26,750
4,800
2,400
74,900
3,745
3,745
3,745
500
200
84
10
140
m3
m3
m3
m3
m3
m3
liter
liter
m2
m3
m3
m3
m3
m3
bh
bh
jam
8.163
30.371
4.435
4.846
1.018
30.571
3.048
1.524
47.556
2.378
2.378
2.378
1.429
0.571
0.240
0.029
0.114
0.095
0.154
0.581
0.145
0.068
0.145
0.003
0.003
0.012
0.308
0.315
0.315
0.254
1.211
0.155
0.092
1.000
0.780
4.669
2.578
0.705
0.070
4.446
0.009
0.005
0.586
0.733
0.749
0.749
0.363
0.692
0.037
0.003
0.114
17.2855044
18
18
7
6
7
175
150
175
7
7
7
1225
1050
1225
10,000
31,890
70
m3
m3
jam
8.163
30.371
0.057
0.054
0.054
1.000
0.437
1.626
0.057
2.12058028
175
1225
140
jam
0.114
1.000
0.114
0.11428571
9
9
9
9
2
225
225
225
225
50
7
7
7
7
7
1575
1575
1575
1575
350
74,900
3,745
3,745
3,745
200
m2
m3
m3
m3
m3
47.556
2.378
2.378
2.378
0.571
0.002
0.054
0.055
0.055
0.002
0.103
0.129
0.132
0.132
0.001
0.49701101
E05
8 Crane
9.12
E07
9 Dump Truck
2.1
3.1(1)
3.2(2)
4.2(1)
5.1(1)
5.1(2)
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(1)
8.1(5)
8.4(4)
8.4(6)
9.4
E08
10 Excavator
2.1
3.1(1)
9.11
E10
E11
12 Generator Set
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(5)
E12
No
Nama Alat
No Item Pekerjaan
1
2
13 Motor Grader
3.2(2)
3.3(1)
4.2(1)
5.1(1)
5.1(2)
9.8
Kode
Alat
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
Target
Produksi
Tiap Jam
koefisien alat
per item
8=7:6
10=8x9
11
12
13
6=4x5
6
6
7
5
5
7
150
150
175
125
125
175
7
7
7
7
7
7
1050
1050
1225
875
875
1225
4,657
53,500
5,936
891
26,750
70
m3
m2
m3
m3
m3
jam
4.435
50.952
4.846
1.018
30.571
0.057
0.006
0.003
0.012
0.012
0.012
1.000
0.027
0.128
0.057
0.012
0.358
0.057
0.63903322
7
5
5
9
9
9
175
125
125
225
225
225
7
7
7
7
7
7
1225
875
875
1575
1575
1575
891
26,750
74,900
3,745
3,745
3,745
m3
m3
m2
m3
m3
m3
0.727
30.571
85.600
2.378
2.378
2.378
0.004
0.004
0.002
0.026
0.026
0.021
0.003
0.131
0.196
0.061
0.061
0.051
0.50368146
9
9
9
9
2
225
225
225
225
50
7
7
7
7
7
1575
1575
1575
1575
350
74,900
3,745
3,745
3,745
200
m2
m3
m3
m3
m3
47.556
2.378
2.378
2.378
0.571
0.003
0.034
0.046
0.038
0.111
0.153
0.082
0.109
0.091
0.063
0.49821296
6
5
5
7
150
125
125
175
7
7
7
7
1050
875
875
1225
4,657
891
26,750
70
m3
m3
m3
jam
4.435
1.018
30.571
0.057
0.010
0.018
0.018
1.000
0.045
0.018
0.546
0.057
0.66551976
6
7
5
4
4
4
4
2
7
150
175
125
100
100
100
100
50
175
7
7
7
7
7
7
7
7
7
1050
1225
875
700
700
700
700
350
1225
53,500
5,936
891
150
200
150
79
500
70
m2
m3
m3
m3
m3
m3
m3
m3
jam
50.952
4.846
1.018
0.214
0.286
0.214
0.113
1.429
0.057
0.003
0.021
0.021
0.053
0.055
0.046
0.424
0.021
1.000
0.153
0.102
0.021
0.011
0.016
0.010
0.048
0.030
0.057
0.44921323
E13
E17
16 Vibrator Roller
3.2(2)
5.1(1)
5.1(2)
9.14
E19
17 Water Tank
3.3(1)
4.2(1)
5.1(1)
7.1(5)
7.1(6)
7.1(8)
7.9
8.1(1)
9.6
E23
No
Nama Alat
No Item Pekerjaan
1
2
18 Wheel Loader
3.2(2)
4.2(1)
5.1(1)
5.1(2)
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(1)
8.1(5)
9.9
19 Pedestrian Roller
8.1(1)
Kode
Alat
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
Target
Produksi
Tiap Jam
koefisien alat
per item
8=7:6
10=8x9
11
12
13
6=4x5
6
7
5
5
9
9
9
9
2
2
7
150
175
125
125
225
225
225
225
50
50
175
7
7
7
7
7
7
7
7
7
7
7
1050
1225
875
875
1575
1575
1575
1575
350
350
1225
4,657
5,936
891
26,750
74,900
3,745
3,745
3,745
500
200
70
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
jam
4.435
4.846
1.018
30.571
47.556
2.378
2.378
2.378
1.429
0.571
0.057
0.018
0.018
0.036
0.036
0.001
0.037
0.038
0.038
0.036
0.002
1.000
0.079
0.086
0.036
1.091
0.071
0.088
0.090
0.090
0.051
0.001
0.057
1.74237698
50
350
500
m3
1.429
0.059
0.085
0.08473454
E15
E24
: 1.8 (1)
: Pemeliharaan & Perlindungan Lalu Lintas
No.
URAIAN
SATUAN
I.
1
2
3
4
5
II.
1
2
3
III.
1
2
3
4
5
6
7
8
2
2
1
Lokasi
Hari
Hari
Lokasi
Org/hari
Org/hari
Org/hari
Lokasi
Buah
Buah
Buah
Buah
Buah
Set
Set
LS
VOL.
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
5
360
270
5
2,700
2,700
270
3,143
3,143
3,536
8,485,706
8,485,706
954,644
5
10
15
30
10
25
5
21
1
25,000
25,000
15,000
100,000
35,000
40,000
50,000
500,000
250,000
375,000
450,000
1,000,000
875,000
200,000
1,050,000
500,000
22,626,056
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
File : 89627200.xls.ms_office
: 1.8 (2)
: Pemasangan & Pemeliharaan Jembatan Sementara
No.
URAIAN
SATUAN
I.
1
2
3
4
5
6
II.
1
2
3
4
5
6
III.
1
2
3
Pekerja
Tukang ( Batu/Cat/Las)
Pemimpin Regu (Mandor)
9
3
1
VOL.
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
M2
M2
250
150
M2
Hari
Hari
1,200
360
180
M2
M2
M3
M3
Liter
M2
250
150
120
120
1,200
1,300
115,000
100,000
280,043
273,072
2,917
500
28,750,000
15,000,000
33,605,156
32,768,626
3,500,280
650,000
Org/hari
Org/hari
Org/hari
1,620
540
180
2,857
5,357
3,214
4,628,567
2,892,857
578,572
122,374,058
Catatan : Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
File : 89627200.xls.ms_office