Anda di halaman 1dari 34

ITEM PEMBAYARAN No.

JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.4 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KET.

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat DUMP TRUCK 3-4 M3 100.0 HP 6.0 Ton 5.0 Tahun 2,000 Jam 120,176,000 Rupiah (E08)

Pw Cp A W B

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 9,240,454 0.29128 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

16,156.85

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

120.18

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

16,277.03

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 34,375.00 17,500.00 7,511.00 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,714.29 4,285.71 69,386.00 85,663.03

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i L M Mb Ms Mp 14.00 5,714.29 4,285.71 3,240.00 2,750.00 17,500.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.5 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat FLAT BED TRUCK 3-4 M3 Pw 125.0 HP Cp 4.0 M3 A 5.0 Tahun W 2,000 Jam B 105,005,159 Rupiah (E11)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 10,500,516 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

15,800.22

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

105.01

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

15,905.22

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 6,562.82 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 60,022.64 75,927.86

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.6 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat WATER TANKER 3000-4500 L. Pw 125.0 HP Cp 4,000.0 Liter A 5.0 Tahun W 2,000 Jam B 105,005,159 Rupiah (E23)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 10,500,516 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

15,800.22

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

105.01

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

15,905.22

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 6,562.82 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 60,022.64 75,927.86

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.7 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat BULLDOZER 100-150 HP Pw 140.0 HP Cp A 5.0 Tahun W 2,000 Jam B 588,028,890 Rupiah (E04)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 58,802,889 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

88,481.22

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

588.03

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

89,069.25

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 33,075.00 16,800.00 36,751.81 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 95,555.38 184,624.62

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.8 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat MOTOR GRADER >100 HP Pw 125.0 HP Cp A 5.0 Tahun W 2,000 Jam B 424,220,842 Rupiah (E13)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 42,422,084 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

63,832.88

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

424.22

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

64,257.10

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 26,513.80 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 79,973.62 144,230.72

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.9 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat WHEEL LOADER 1.0-1.6 M3 Pw 125.0 HP Cp 1.5 M3 A 5.0 Tahun W 2,000 Jam B 399,019,604 Rupiah (E15)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 39,901,960 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

60,040.83

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

399.02

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

60,439.85

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 24,938.73 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 78,398.55 138,838.39

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.10 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat TRACK LOADER 75-100 HP Pw 95.0 HP Cp 1.5 M3 A 5.0 Tahun W 2,000 Jam B 504,024,763 Rupiah (E14)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 50,402,476 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

75,841.04

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

504.02

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

76,345.07

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 22,443.75 11,400.00 31,501.55 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 74,273.87 150,618.94

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.11 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat EXCAVATOR 80-140 HP Pw 80.0 HP Cp 0.5 M3 A 5.0 Tahun W 2,000 Jam B 504,024,763 Rupiah (E10)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 50,402,476 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

75,841.04

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

504.02

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

76,345.07

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 18,900.00 9,600.00 31,501.55 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 68,930.12 145,275.19

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.12 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat CRANE 10-15 TON 150.0 HP 25.0 Ton 5.0 Tahun 2,000 Jam 777,038,177 Rupiah (E07)

Pw Cp A W B

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 77,703,818 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

116,921.61

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

777.04

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

117,698.65

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 35,437.50 18,000.00 48,564.89 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 110,930.96 228,629.60

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.13 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat STEEL WHEEL ROLLER 6-9 T. Pw 60.0 HP Cp 8.0 Ton A 5.0 Tahun W 2,000 Jam B 155,407,635 Rupiah (E16)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 15,540,764 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

23,384.32

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

155.41

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

23,539.73

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 14,175.00 7,200.00 9,712.98 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 40,016.55 63,556.28

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.14 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat VIBRATORY ROLLER 5-8 T. Pw 60.0 HP Cp 8.0 Ton A 4.0 Tahun W 2,000 Jam B 197,409,699 Rupiah (E19)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 19,740,970 0.38629 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

34,315.75

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

197.41

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

34,513.16

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 14,175.00 7,200.00 12,338.11 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 42,641.68 77,154.83

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.15 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat VIBRATORY COMPACTOR Pw 5.0 HP Cp 0.200 Ton A 4.0 Tahun W 1,000 Jam B 6,720,330 Rupiah (E25)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 672,033 0.38629 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

2,336.39

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

13.44

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

2,349.83

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 1,181.25 600.00 840.04 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 11,549.86 13,899.69

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.16 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat TIRE ROLLER 8-10 T. 60.0 HP 10.0 Ton 5.0 Tahun 1,800 Jam 176,408,667 Rupiah (E18)

Pw Cp A W B

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 17,640,867 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

29,493.74

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

196.01

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

29,689.75

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 14,175.00 7,200.00 12,250.60 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 42,554.17 72,243.92

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.17 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat COMPRESSOR 4000-6500 L\M Pw 80.0 HP Cp A 5.0 Tahun W 2,000 Jam B 54,602,683 Rupiah (E05)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 5,460,268 0.33438 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

8,216.11

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

54.60

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

8,270.72

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 18,900.00 9,600.00 3,412.67 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 40,841.24 49,111.95

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.18 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat CONCRETE MIXER 0.3-0.6 M3 Pw 15.0 HP Cp 500.0 Liter A 4.0 Tahun W 2,000 Jam B 117,605,778 Rupiah (E06)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 11,760,578 0.38629 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

20,443.42

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

117.61

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

20,561.03

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 3,543.75 1,800.00 7,350.36 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 21,622.68 42,183.71

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.19 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat WATER PUMP 70-100 mm Pw 6.0 HP Cp A 2.0 Tahun W 2,000 Jam B 9,450,464 Rupiah (E22)

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 945,046 0.65455 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

2,783.59

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

9.45

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

2,793.04

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 1,417.50 720.00 590.65 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 11,656.72 14,449.77

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

ITEM PEMBAYARAN No. JENIS PEKERJAAN SATUAN PEMBAYARAN

: 9.20 : PEKERJAAN HARIAN : JAM

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEF.

SATUAN

KETERANGAN

A. 1. 2. 3. 4. 5. 6.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat JACK HAMMER 3.0 HP 4.0 Tahun 1,000 Jam 27,721,362 Rupiah E26

Pw Cp A W B

Alat Baru Alat Baru Alat Baru

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 2,772,136 0.38629 Rupiah -

Faktor Angsuran Modal

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

9,637.61

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

55.44

Rupiah

Biaya Pasti per Jam C. 1. 2. 3.

9,693.06

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 708.75 360.00 3,465.17 Rupiah Rupiah Rupiah

Perawatan dan perbaikan

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

5,000.00 3,928.57 13,462.49 23,155.55

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter

File : 89627764.xls.ms_office

Analisa EI-94 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.4 : PEKERJAAN HARIAN DUMP TRUCK 3-4 M3 : JAM (E08)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

140.00 9,906,118.60 0.03

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT DUMP TRUCK 3-4 M3 jam jam 1.0000 85,663.03 85,663.03 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 85,663.03 OVERHEAD & PROFIT 10.0 % x D 8,566.30 HARGA SATUAN PEKERJAAN ( D + E ) 94,229.33 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-95 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.5 : PEKERJAAN HARIAN FLAT BED TRUCK 3-4 M3 : JAM (E11)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

140.00 11,692,891.00 0.04

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
FLAT BED TRUCK 3-4 M3

jam jam

1.0000 -

75,927.86 -

75,927.86 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 75,927.86 OVERHEAD & PROFIT 10.0 % x D 7,592.79 HARGA SATUAN PEKERJAAN ( D + E ) 83,520.65 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-96 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.6 : PEKERJAAN HARIAN WATER TANKER 3000-4500 L. : JAM (E23)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 5,846,445.50 0.02

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
WATER TANKER 3000-4500 L.

jam jam

1.0000 -

75,927.86 -

75,927.86 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 75,927.86 OVERHEAD & PROFIT 10.0 % x D 7,592.79 HARGA SATUAN PEKERJAAN ( D + E ) 83,520.65 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-97 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.7 : PEKERJAAN HARIAN BULLDOZER 100-150 HP : JAM (E04)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 14,216,095.60 0.05

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
BULLDOZER 100-150 HP

jam jam

1.0000 -

184,624.62 -

184,624.62 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 184,624.62 OVERHEAD & PROFIT 10.0 % x D 18,462.46 HARGA SATUAN PEKERJAAN ( D + E ) 203,087.08 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-98 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.8 : PEKERJAAN HARIAN MOTOR GRADER >100 HP : JAM (E13)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 11,105,765.30 0.04

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
MOTOR GRADER >100 HP

jam jam

1.0000 -

144,230.72 -

144,230.72 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 144,230.72 OVERHEAD & PROFIT 10.0 % x D 14,423.07 HARGA SATUAN PEKERJAAN ( D + E ) 158,653.79 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-99 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.9 : PEKERJAAN HARIAN WHEEL LOADER 1.0-1.6 M3 : JAM (E15)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 10,690,556.06 0.04

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
WHEEL LOADER 1.0-1.6 M3

jam jam

1.0000 -

138,838.39 -

138,838.39 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 138,838.39 OVERHEAD & PROFIT 10.0 % x D 13,883.84 HARGA SATUAN PEKERJAAN ( D + E ) 152,722.23 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-910 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.10 : PEKERJAAN HARIAN TRACK LOADER 75-100 HP : JAM (E14)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 11,597,658.10 0.04

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
TRACK LOADER 75-100 HP

jam jam

1.0000 -

150,618.94 -

150,618.94 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 150,618.94 OVERHEAD & PROFIT 10.0 % x D 15,061.89 HARGA SATUAN PEKERJAAN ( D + E ) 165,680.83 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-911 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.11 : PEKERJAAN HARIAN EXCAVATOR 80-140 HP : JAM (E10)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 11,186,189.00 0.04

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
EXCAVATOR 80-140 HP

jam jam

1.0000 -

145,275.19 -

145,275.19 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 145,275.19 OVERHEAD & PROFIT 10.0 % x D 14,527.52 HARGA SATUAN PEKERJAAN ( D + E ) 159,802.70 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-912 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.12 : PEKERJAAN HARIAN CRANE 10-15 TON : JAM (E07)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 17,604,479.20 0.06

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT CRANE 10-15 TON jam jam 1.0000 228,629.60 228,629.60 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 228,629.60 OVERHEAD & PROFIT 10.0 % x D 22,862.96 HARGA SATUAN PEKERJAAN ( D + E ) 251,492.56 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-913 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.13 : PEKERJAAN HARIAN STEEL WHEEL ROLLER 6-9 T. : JAM (E16)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 4,893,833.00 0.02

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
STEEL WHEEL ROLLER 6-9 T.

jam jam

1.0000 -

63,556.28 -

63,556.28 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 63,556.28 OVERHEAD & PROFIT 10.0 % x D 6,355.63 HARGA SATUAN PEKERJAAN ( D + E ) 69,911.90 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-914 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.14 : PEKERJAAN HARIAN VIBRATORY ROLLER 5-8 T. : JAM (E19)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 5,940,922.40 0.02

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
VIBRATORY ROLLER 5-8 T.

jam jam

1.0000 -

77,154.83 -

77,154.83 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 77,154.83 OVERHEAD & PROFIT 10.0 % x D 7,715.48 HARGA SATUAN PEKERJAAN ( D + E ) 84,870.32 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-915 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.15 : PEKERJAAN HARIAN VIBRATORY COMPACTOR : JAM (E25)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 1,070,276.20 0.00

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
VIBRATORY COMPACTOR

jam jam

1.0000 -

13,899.69 -

13,899.69 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 13,899.69 OVERHEAD & PROFIT 10.0 % x D 1,389.97 HARGA SATUAN PEKERJAAN ( D + E ) 15,289.66 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-916 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.16 : PEKERJAAN HARIAN TIRE ROLLER 8-10 T. : JAM (E18)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

70.00 5,562,781.70 0.02

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT TIRE ROLLER 8-10 T. jam jam 1.0000 72,243.92 72,243.92 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 72,243.92 OVERHEAD & PROFIT 10.0 % x D 7,224.39 HARGA SATUAN PEKERJAAN ( D + E ) 79,468.31 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-917 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.17 : PEKERJAAN HARIAN COMPRESSOR 4000-6500 L\M : JAM (E05)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

49.00 2,647,134.35 0.01

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
COMPRESSOR 4000-6500 L\M

jam jam

1.0000 -

49,111.95 -

49,111.95 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 49,111.95 OVERHEAD & PROFIT 10.0 % x D 4,911.20 HARGA SATUAN PEKERJAAN ( D + E ) 54,023.15 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-918 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.18 : PEKERJAAN HARIAN CONCRETE MIXER 0.3-0.6 M3 : JAM (E06)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

49.00 2,273,701.92 0.01

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
CONCRETE MIXER 0.3-0.6 M3

jam jam

1.0000 -

42,183.71 -

42,183.71 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 42,183.71 OVERHEAD & PROFIT 10.0 % x D 4,218.37 HARGA SATUAN PEKERJAAN ( D + E ) 46,402.08 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-919 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.19 : PEKERJAAN HARIAN WATER PUMP 70-100 mm : JAM (E22)

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

49.00 778,842.26 0.00

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
WATER PUMP 70-100 mm

jam jam

1.0000 -

14,449.77 -

14,449.77 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 14,449.77 OVERHEAD & PROFIT 10.0 % x D 1,444.98 HARGA SATUAN PEKERJAAN ( D + E ) 15,894.74 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.

File : 89627764.xls.ms_office

Analisa EI-920 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

AIAN ANALISA HARGA SATUAN

PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN

: : : : : 9.20 : PEKERJAAN HARIAN JACK HAMMER : JAM E26

PERKIRAAN VOL. PEK. TOTAL HARGA (Rp.) % THD. BIAYA PROYEK

: : :

0.00 778,842.26 0.00

NO.

KOMPONEN

PERKIRAAN SATUAN KUANTITAS

HARGA SATUAN (Rp.)

JUMLAH HARGA (Rp.)

A. 1. 2.

PEKERJA -

B. 1. 2.

BAHAN -

C. 1. 2.

ALAT
JACK HAMMER

jam jam

1.0000 -

23,155.55 -

23,155.55 -

D. E. F. Note: 1 2 3 4

JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 23,155.55 OVERHEAD & PROFIT 10.0 % x D 2,315.55 HARGA SATUAN PEKERJAAN ( D + E ) 25,471.10 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.