No.
URAIAN
KODE
KOEF.
SATUAN
KET.
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat DUMP TRUCK 3-4 M3 100.0 HP 6.0 Ton 5.0 Tahun 2,000 Jam 120,176,000 Rupiah (E08)
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 9,240,454 0.29128 Rupiah -
16,156.85
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
120.18
Rupiah
16,277.03
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 34,375.00 17,500.00 7,511.00 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i L M Mb Ms Mp 14.00 5,714.29 4,285.71 3,240.00 2,750.00 17,500.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat FLAT BED TRUCK 3-4 M3 Pw 125.0 HP Cp 4.0 M3 A 5.0 Tahun W 2,000 Jam B 105,005,159 Rupiah (E11)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 10,500,516 0.33438 Rupiah -
15,800.22
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
105.01
Rupiah
15,905.22
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 6,562.82 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat WATER TANKER 3000-4500 L. Pw 125.0 HP Cp 4,000.0 Liter A 5.0 Tahun W 2,000 Jam B 105,005,159 Rupiah (E23)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 10,500,516 0.33438 Rupiah -
15,800.22
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
105.01
Rupiah
15,905.22
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 6,562.82 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat BULLDOZER 100-150 HP Pw 140.0 HP Cp A 5.0 Tahun W 2,000 Jam B 588,028,890 Rupiah (E04)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 58,802,889 0.33438 Rupiah -
88,481.22
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
588.03
Rupiah
89,069.25
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 33,075.00 16,800.00 36,751.81 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat MOTOR GRADER >100 HP Pw 125.0 HP Cp A 5.0 Tahun W 2,000 Jam B 424,220,842 Rupiah (E13)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 42,422,084 0.33438 Rupiah -
63,832.88
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
424.22
Rupiah
64,257.10
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 26,513.80 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat WHEEL LOADER 1.0-1.6 M3 Pw 125.0 HP Cp 1.5 M3 A 5.0 Tahun W 2,000 Jam B 399,019,604 Rupiah (E15)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 39,901,960 0.33438 Rupiah -
60,040.83
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
399.02
Rupiah
60,439.85
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 29,531.25 15,000.00 24,938.73 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat TRACK LOADER 75-100 HP Pw 95.0 HP Cp 1.5 M3 A 5.0 Tahun W 2,000 Jam B 504,024,763 Rupiah (E14)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 50,402,476 0.33438 Rupiah -
75,841.04
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
504.02
Rupiah
76,345.07
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 22,443.75 11,400.00 31,501.55 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat EXCAVATOR 80-140 HP Pw 80.0 HP Cp 0.5 M3 A 5.0 Tahun W 2,000 Jam B 504,024,763 Rupiah (E10)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 50,402,476 0.33438 Rupiah -
75,841.04
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
504.02
Rupiah
76,345.07
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 18,900.00 9,600.00 31,501.55 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat CRANE 10-15 TON 150.0 HP 25.0 Ton 5.0 Tahun 2,000 Jam 777,038,177 Rupiah (E07)
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 77,703,818 0.33438 Rupiah -
116,921.61
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
777.04
Rupiah
117,698.65
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 35,437.50 18,000.00 48,564.89 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat STEEL WHEEL ROLLER 6-9 T. Pw 60.0 HP Cp 8.0 Ton A 5.0 Tahun W 2,000 Jam B 155,407,635 Rupiah (E16)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 15,540,764 0.33438 Rupiah -
23,384.32
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
155.41
Rupiah
23,539.73
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 14,175.00 7,200.00 9,712.98 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat VIBRATORY ROLLER 5-8 T. Pw 60.0 HP Cp 8.0 Ton A 4.0 Tahun W 2,000 Jam B 197,409,699 Rupiah (E19)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 19,740,970 0.38629 Rupiah -
34,315.75
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
197.41
Rupiah
34,513.16
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 14,175.00 7,200.00 12,338.11 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat VIBRATORY COMPACTOR Pw 5.0 HP Cp 0.200 Ton A 4.0 Tahun W 1,000 Jam B 6,720,330 Rupiah (E25)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 672,033 0.38629 Rupiah -
2,336.39
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
13.44
Rupiah
2,349.83
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 1,181.25 600.00 840.04 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat TIRE ROLLER 8-10 T. 60.0 HP 10.0 Ton 5.0 Tahun 1,800 Jam 176,408,667 Rupiah (E18)
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 17,640,867 0.33438 Rupiah -
29,493.74
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
196.01
Rupiah
29,689.75
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 14,175.00 7,200.00 12,250.60 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat COMPRESSOR 4000-6500 L\M Pw 80.0 HP Cp A 5.0 Tahun W 2,000 Jam B 54,602,683 Rupiah (E05)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 5,460,268 0.33438 Rupiah -
8,216.11
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
54.60
Rupiah
8,270.72
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 18,900.00 9,600.00 3,412.67 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat CONCRETE MIXER 0.3-0.6 M3 Pw 15.0 HP Cp 500.0 Liter A 4.0 Tahun W 2,000 Jam B 117,605,778 Rupiah (E06)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 11,760,578 0.38629 Rupiah -
20,443.42
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
117.61
Rupiah
20,561.03
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 3,543.75 1,800.00 7,350.36 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat WATER PUMP 70-100 mm Pw 6.0 HP Cp A 2.0 Tahun W 2,000 Jam B 9,450,464 Rupiah (E22)
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 945,046 0.65455 Rupiah -
2,783.59
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
9.45
Rupiah
2,793.04
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 1,417.50 720.00 590.65 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
No.
URAIAN
KODE
KOEF.
SATUAN
KETERANGAN
A. 1. 2. 3. 4. 5. 6.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Umur Ekonomis Jam Operasi Dalam 1 Tahun Harga Alat JACK HAMMER 3.0 HP 4.0 Tahun 1,000 Jam 27,721,362 Rupiah E26
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x Harga Alat Baru = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W C D 2,772,136 0.38629 Rupiah -
9,637.61
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
55.44
Rupiah
9,693.06
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp (12,5 % - 17,5 %) x B W H I K 708.75 360.00 3,465.17 Rupiah Rupiah Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas i U1 U2 Mb Ms Mp 20.00 5,000.00 3,928.57 1,810.00 1,890.00 12,000.00 % / Tahun Rp./Jam Rp./Jam Liter Liter Liter
File : 89627764.xls.ms_office
Analisa EI-94 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 85,663.03 OVERHEAD & PROFIT 10.0 % x D 8,566.30 HARGA SATUAN PEKERJAAN ( D + E ) 94,229.33 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-95 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
FLAT BED TRUCK 3-4 M3
jam jam
1.0000 -
75,927.86 -
75,927.86 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 75,927.86 OVERHEAD & PROFIT 10.0 % x D 7,592.79 HARGA SATUAN PEKERJAAN ( D + E ) 83,520.65 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-96 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
WATER TANKER 3000-4500 L.
jam jam
1.0000 -
75,927.86 -
75,927.86 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 75,927.86 OVERHEAD & PROFIT 10.0 % x D 7,592.79 HARGA SATUAN PEKERJAAN ( D + E ) 83,520.65 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-97 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
BULLDOZER 100-150 HP
jam jam
1.0000 -
184,624.62 -
184,624.62 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 184,624.62 OVERHEAD & PROFIT 10.0 % x D 18,462.46 HARGA SATUAN PEKERJAAN ( D + E ) 203,087.08 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-98 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
MOTOR GRADER >100 HP
jam jam
1.0000 -
144,230.72 -
144,230.72 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 144,230.72 OVERHEAD & PROFIT 10.0 % x D 14,423.07 HARGA SATUAN PEKERJAAN ( D + E ) 158,653.79 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-99 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
WHEEL LOADER 1.0-1.6 M3
jam jam
1.0000 -
138,838.39 -
138,838.39 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 138,838.39 OVERHEAD & PROFIT 10.0 % x D 13,883.84 HARGA SATUAN PEKERJAAN ( D + E ) 152,722.23 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-910 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
TRACK LOADER 75-100 HP
jam jam
1.0000 -
150,618.94 -
150,618.94 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 150,618.94 OVERHEAD & PROFIT 10.0 % x D 15,061.89 HARGA SATUAN PEKERJAAN ( D + E ) 165,680.83 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-911 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
EXCAVATOR 80-140 HP
jam jam
1.0000 -
145,275.19 -
145,275.19 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 145,275.19 OVERHEAD & PROFIT 10.0 % x D 14,527.52 HARGA SATUAN PEKERJAAN ( D + E ) 159,802.70 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-912 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 228,629.60 OVERHEAD & PROFIT 10.0 % x D 22,862.96 HARGA SATUAN PEKERJAAN ( D + E ) 251,492.56 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-913 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
STEEL WHEEL ROLLER 6-9 T.
jam jam
1.0000 -
63,556.28 -
63,556.28 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 63,556.28 OVERHEAD & PROFIT 10.0 % x D 6,355.63 HARGA SATUAN PEKERJAAN ( D + E ) 69,911.90 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-914 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
VIBRATORY ROLLER 5-8 T.
jam jam
1.0000 -
77,154.83 -
77,154.83 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 77,154.83 OVERHEAD & PROFIT 10.0 % x D 7,715.48 HARGA SATUAN PEKERJAAN ( D + E ) 84,870.32 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-915 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
VIBRATORY COMPACTOR
jam jam
1.0000 -
13,899.69 -
13,899.69 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 13,899.69 OVERHEAD & PROFIT 10.0 % x D 1,389.97 HARGA SATUAN PEKERJAAN ( D + E ) 15,289.66 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-916 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 72,243.92 OVERHEAD & PROFIT 10.0 % x D 7,224.39 HARGA SATUAN PEKERJAAN ( D + E ) 79,468.31 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-917 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
COMPRESSOR 4000-6500 L\M
jam jam
1.0000 -
49,111.95 -
49,111.95 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 49,111.95 OVERHEAD & PROFIT 10.0 % x D 4,911.20 HARGA SATUAN PEKERJAAN ( D + E ) 54,023.15 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-918 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
CONCRETE MIXER 0.3-0.6 M3
jam jam
1.0000 -
42,183.71 -
42,183.71 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 42,183.71 OVERHEAD & PROFIT 10.0 % x D 4,218.37 HARGA SATUAN PEKERJAAN ( D + E ) 46,402.08 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-919 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
WATER PUMP 70-100 mm
jam jam
1.0000 -
14,449.77 -
14,449.77 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 14,449.77 OVERHEAD & PROFIT 10.0 % x D 1,444.98 HARGA SATUAN PEKERJAAN ( D + E ) 15,894.74 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office
Analisa EI-920 FORMULIR STANDAR UNTUK PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK No. PAKET KONTRAK NAMA PAKET PROP / KAB / KODYA ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : :
NO.
KOMPONEN
A. 1. 2.
PEKERJA -
B. 1. 2.
BAHAN -
C. 1. 2.
ALAT
JACK HAMMER
jam jam
1.0000 -
23,155.55 -
23,155.55 -
D. E. F. Note: 1 2 3 4
JUMLAH HARGA TENAGA, BAHAN DAN ALAT ( A + B + C ) 23,155.55 OVERHEAD & PROFIT 10.0 % x D 2,315.55 HARGA SATUAN PEKERJAAN ( D + E ) 25,471.10 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
File : 89627764.xls.ms_office