GAMBARAN UMUM PROYEK PENGURUGAN JALAN TOLL PEJAGAN - PEMALANG

OWNER MAIN KONTRAKTOR

: BAKRIE BROTHERS : PT. SMR (PT. SEMESTA MARGA RAYA) PT. TRI MANUNGGAL : PER 500.000 M3. (SKBDN / BANK GARANSI)

PEMBAYARAN

VOLUME KONTRAK : HARGA KONTRAK

5.000.000

M3.

ATAU : Rp.

250,000 DUMP 72,000.00 / M3. PADAT VIBRO

RENCANA ANGGARAN PELAKSANAAN ( PER M3. ) BIAYA RITASI DT & QUARRY : 1. SEWA DUMP TRUCK 2. BIAYA BBM DT 3. BIAYA SUPIR DT 4. DEPOSIT TANAH 5. SEWA EXCAVATOR 6. BIAYA BBM ALAT 7. BIAYA OPERATOR ALAT BIAYA PEMADATAN : 1. SEWA VIBRO & BULDOZER 2. BIAYA BBM ALAT 3. BIAYA OPERATOR ALAT BIAYA UMUM & ADMIN. : 1. PEMOTONGAN OLEH MAIN KONTRAKTOR ( UNTUK BIAYA PAJAK & ADMINISTRASI ) 2. BIAYA PERSIAPAN/PENDAHULUAN JUMLAH PROFIT JUMLAH CATATAN : PROFIT Rp 30,665 /M3.

= Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp. = Rp.

8,910 6,000 2,255 6,250 935 802 167 1,007 807 203

= Rp. = Rp. = Rp. = Rp. = Rp.

12,000 2,000 41,336 30,665 72,000

BELUM TERMASUK UNTUK FEE SUKSES PHK MEDIASI

ASUMSI - ASUMSI : WAKTU PELAKSANAAN : VOLUME KONTRAK 1. EXCAVATOR (BEKO) KEMAMPUAN ALAT (EXCAVATOR) GALI/MUAT PER HARI = 10 JAM JML PEMAKAIAN ALAT GALI/MUAT PER HARI = 10 JAM JML WAKTU PELAKSANAAN 2. DUMP TRUCK : Kapasitas Dump truk Frequensi Dump Truk Jumlah armada Frequensi tiap 1 DT WAKTU SIKLUS ALAT/DT : 1. EXCAVATOR (BEKO) Kapasitas Bucket Kapasitas Produksi Per Jam Jumlah Jam Kerja Jumlah Produksi/Alat Jumlah Pemakaian Alat Jumlah Produksi Per Hari 1.2 50 10 500 10 5,000 M3. M3. Jam M3. Unit M3. : 5,000,000 M3. 50 500 10 5,000 M3./JAM M3. UNIT M3.

1,000 HARI 33 BULAN 20 250 8 33 m3/DT trip/hari DT trip

GAMBARAN UMUM PROYEK PENGURUGAN JALAN TOLL PEJAGAN - PEMALANG

OWNER MAIN KONTRAKTOR

: BAKRIE BROTHERS : PT. SMR (PT. SEMESTA MARGA RAYA) PT. TRI MANUNGGAL

PEMBAYARAN : PER 500.000 M3. (SKBDN / BANK GARANSI) 2. DUMP TRUCK : Jarak Tempuh Waktu muat dan manouver Kecepatan (dgn muatan) Waktu tempuh (dgn muatan) Waktu bongkar dan manouver Kecepatan (tanpa muatan) Waktu tempuh (tanpa muatan) Jml Waktu Bongkar/Muat/Perjalanan Jumlah trip tiap jam Jam kerja per hari Total trip per hari (real time) Total daya angkut per hari/DT Target Volume Angkut per hari Jumlah Dump Truk yg diperlukan

2 6 20 6 2 30 4 18 3.33 0.30 10 33

km menit km/jam menit menit km/jam menit menit/trip trip/jam jam/trip jam/hari trip/hari
3

667 m /hr/DT 3 5,000 m 8 Unit DT

PREDIKSI PELAKSANAAN PEKERJAAN PENGURUGAN : 1 PEKERJAAN PERSIAPAN : 2 DIREKSI KEET / SITE OFFICE MOBILISASI DAN DEMOBILISASI PERLATAN & PERSONIL PENGUKURAN LEVELING TANAH DASAR PEMBUATAN JALAN AKSES DARI QUARRY KE JALAN UMUM

PEKERJAAN PEMATANGAN LAHAN SEPANJANG DAERAH TIMBUNAN TANAH : PEMBONGKARAN TERHADAP PENGHALANG YANG MUNGKIN ADA MEMINDAHKAN DAN MENANGANI AIR YANG ADA AGAR TIDAK TERHENTI MEMBUANG DAN MENANGANI LOKASI TIMBUNAN TANAH YANG BERLUMPUR MENGHENTIKAN / MENYUMBAT SUMBER AIR TANAH YANG TIMBUL APABILA ADA

3 4

PEKERJAAN PEMADATAN TANAH DASAR SEPANJANG LOKASI KERJA PEKERJAAN PENIMBUNAN TANAH DAN PEMADATAN - SETIAP PENGHAMPARAN 30 CM. ATAU SESUAI KETENTUAN YANG ADA DALAM SPESIFIKASI YANG DIKELUARKAN PIHAK OWNER DAN ATAU STANDAR PT. JASA MARGA

PEKERJAAN COMMISIONING TEST PEMADATAN DENGAN MENGGUNAKAN PERALATAN SAND CONE DAN ATAU SHEEP FOOT ROLLER SAMPAI DENGAN MEMENUHI TINGKAT KEPADATAN DAN DAYA DUKUNG YANG DITETAPKAN SESUAI PERATURAN UNTUK JALAN TOLL. PERALATAN YANG DIGUNAKAN :

1 2 3 4

EXCAVATOR DUMP TRUCK BULDOZER COMPACTOR / VIBRO ROLLER

5 6 7 8

MOTOR GRADER SHEEP FOOT ROLLER TRUCK TANGKI AIR PERALATAN PENDUKUNG LAINNYA

CILEGON, 12 DESEMBER 2009 S E & O JAUHARY

RENCANA ANGGARAN PENDAPATAN DAN BIAYA OPERASIONAL


PROYEK PENGURUGAN JALAN TOLL PEJAGAN - PEMALANG
I. PENDAPATAN : NILAI KONTRAK PENGURUGAN TANAH MERAH : 5.000.000 M3. x Rp. 72.000,= Rp. 360,000,000,000

II. A.

BIAYA OPERASIONAL (PENGELUARAN PROYEK) : BIAYA RITASE DUMP TRUCK DAN QUARRY : 1 DUMP TRUCK : SEWA : 135 UNIT x Rp. 30.000.000,- x 11 BULAN BBM : 20 LTR/TRIP x 250.000 TRIP x Rp. 6.000,SUPIR : Rp. 250.000,-/HARI x 334 HARI x 135 UNIT EXCAVATOR : SEWA : 10 UNIT x 3.340 JAM x Rp. 140.000,- / JAM BBM : 20 LTR x 3.340 JAM x 10 UNIT x Rp. 6.000,OPERATOR : Rp. 250.000,-/HARI x 334 HARI x 10 UNIT 3 PEMBELIAN TANAH MERAH : : 250.000 DUMP (RIT) x Rp. 125.000,-/DUMP JUMLAH BIAYA RITASE DUMP TRUCK DAN QUARRY : B. BIAYA PEMADATAN : 1 SEWA ALAT : 2 BULDOZER D6 COMPACTOR/VIBRO R. MOTOR GRADER SHEEP FOOT ROLLER TRUK TANGKI AIR : : : : : 6 UNIT 3 UNIT 3 UNIT 1 UNIT 2 UNIT x x x x x 3.340 JAM x Rp. 135.000,-/JAM 2.338 JAM x Rp. 130.000,-/JAM 2.338 JAM x Rp. 130.000,-/JAM 500 JAM x Rp. 135.000,-/JAM Rp. 20.000.000,- x 11 BULAN = = = = = Rp. Rp. Rp. Rp. Rp. 2,705,400,000 911,820,000 911,820,000 67,500,000 440,000,000 = Rp. BBM ALAT : - BULDOZER D6 - COMPACTOR/VIBRO R. - MOTOR GRADER - SHEEP FOOT ROLLER - TRUK TANGKI AIR OPERATOR ALAT : BULDOZER D6 COMPACTOR/VIBRO R. MOTOR GRADER SHEEP FOOT ROLLER TRUK TANGKI AIR : : : : : Rp. 250.000,-/HARI Rp. 250.000,-/HARI Rp. 250.000,-/HARI Rp. 250.000,-/HARI Rp. 250.000,-/HARI x x x x x 334 224 224 50 334 HARI HARI HARI HARI HARI x x x x x 6 UNIT 3 UNIT 3 UNIT 1 UNIT 2 UNIT = = = = = Rp. Rp. Rp. Rp. Rp. 501,000,000 168,000,000 168,000,000 12,500,000 167,000,000 = Rp. JUMLAH BIAYA PEMADATAN : C. BIAYA PEMOTONGAN DARI MAIN KONTRAKTOR : UNTUK BIAYA PPH PAJAK KONSTRUKSI DAN BIAYA ADMINISTRASI : 5.000.000 M3. x Rp. 12.000,-/M3. D. BIAYA PERSIAPAN / PENDAHULUAN PROYEK : 1 2 3 4 5 6 BIAYA BIAYA BIAYA BIAYA BIAYA BIAYA BIKIN DIREKSI KIT / SITE OFFICE MOBILISASI DAN DEMOBILISASI PERALATAN & PERSONIL PENGUKURAN LEVELING TANAH DASAR BIKIN JALAN AKSES DARI QUARRY KE JALAN UMUM PEMATANGAN LAHAN SEPANJANG LOKASI KERJA OVERHEAD PROYEK, BIAYA COMMISIONING TEST PEMADATAN DAN BIAYA TAK TERDUGA LAINNYA = = = = = = Rp. Rp. Rp. Rp. Rp. Rp. 75,000,000 230,000,000 100,000,000 3,500,000,000 2,750,000,000 3,345,000,000 10,000,000,000 = Rp. 60,000,000,000 = Rp. 1,016,500,000 10,086,000,000 : : : : : 20 LTR 15 LTR 15 LTR 15 LTR 80 LTR x x x x x 3.340 JAM x 6 UNIT x Rp. 6.000,2.338 JAM x 3 UNIT x Rp. 6.000,2.338 JAM x 3 UNIT x Rp. 6.000,500 JAM x 1 UNIT x Rp. 6.000,334 HARI x 2 UNIT x Rp. 6.000,= = = = = Rp. Rp. Rp. Rp. Rp. 2,404,800,000 631,260,000 631,260,000 45,000,000 320,640,000 = Rp. 3 4,032,960,000 5,036,540,000 = Rp. = Rp. = Rp. 4,676,000,000 4,008,000,000 835,000,000 = Rp. = Rp. = Rp. 9,519,000,000 31,250,000,000 126,591,500,000 = Rp. = Rp. = Rp. 44,550,000,000 30,000,000,000 11,272,500,000 = Rp. 2 85,822,500,000

JUMLAH BIAYA PERSIAPAN / PENDAHULUAN PROYEK :

= Rp.

REKAPITULASI :
PENDAPATAN : BIAYA OPERASIONAL (PENGELUARAN PROYEK) :
A. B. C. D. JUMLAH JUMLAH JUMLAH JUMLAH BIAYA RITASE DUMP TRUCK DAN QUARRY BIAYA PEMADATAN PEMOTONGAN OLEH MAIN KONTRAKTOR BIAYA PERSIAPAN / PENDAHULUAN PROYEK = = = = Rp. Rp. Rp. Rp. 126,591,500,000 10,086,000,000 60,000,000,000 10,000,000,000 206,677,500,000 153,322,500,000 = Rp. 360,000,000,000

= Rp.

KEUNTUNGAN KOTOR PROYEK :

= Rp.

NOTE : BELUM TERMASUK FEE SUKSES UNTUK PIHAK MEDIASI.-

CILEGON, 12 DESEMBER 2009.