PEKERJAAN PERSIAPAN
PA 6.1.
1 m' Pagar Sementara dari kayu tinggi 2 meter
6.1.1. Bahan
Kayu Laut/Dolken
1.250 Btg x
Semen Portland
2.500 Kg x
Pasir Beton
0.005 M3 x
Koral Beton
0.009 M3 x
Kayu 5/7
0.072 M3 x
Paku Biasa 2" - 5"
0.060 Kg x
Residu/colter
0.400 Lt
x
6.1.2. Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor
0.200
0.400
0.020
0.020
Oh
Oh
Oh
Oh
Rp
20,750
Rp
1,200
Rp
102,000
Rp
159,500
Rp
3,144,900
Rp
10,120
Rp
20,460
Jumlah (1)
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
25,937.50
3,000.00
510.00
1,435.50
226,432.80
607.20
8,184.00
266,107.00
Rp
65,000
Rp
45,000
Rp
75,000
Rp
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,000.00
18,000.00
1,500.00
1,100.00
33,600.00
299,707.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
25,937.50
3,000.00
65,064.00
510.00
1,435.50
607.20
19,750.50
116,304.70
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,000.00
18,000.00
1,500.00
1,100.00
33,600.00
149,904.70
x Rp
3,144,900
x Rp
10,120
x Rp
3,144,900
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
37,738.80
202.40
22,014.30
59,955.50
x
x
x
x
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,500.00
4,500.00
750.00
275.00
12,025.00
71,980.50
45,000 = Rp
55,000 = Rp
= Rp
4,500.00
2,750.00
7,250.00
x
x
x
x
PA 6.2.
1 m' Pagar sementara dari seng gelombang tinggi 2 meter
6.2.1. Bahan
Kayu Laut/Dolken
1.250 Btg x Rp
20,750
Semen Portland
2.500 Kg x Rp
1,200
Seng gelombang
1.200 Lbr x Rp
54,220
Pasir beton
0.005 M3 x Rp
102,000
Koral beton
0.009 M3 x Rp
159,500
Paku biasa 2" - 5"
0.060 Kg x Rp
10,120
Meni besi
0.450 Kg x Rp
43,890
Jumlah (1)
6.2.2. Tenaga
Tukang kayu
0.200 Oh x Rp
65,000
Pekerja
0.400 Oh x Rp
45,000
Kepala tukang
0.020 Oh x Rp
75,000
Mandor
0.020 Oh x Rp
55,000
Jumlah (2)
Jumlah (1) + (2)
PA 6.4
Pengukuran dan Pemasangan bouplank
6.4.1. Bahan
Kayu 5/7
0.012 M3
Paku biasa 2" - 5"
0.020 Kg
Kayu papan 3/20
0.007 M3
6.4.2. Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor
PA 6.8
6.8.1
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
PA 6.12
1 m Pembuatan jalan sementara
6. 12.1 Bahan
Batu belah 15/20
0.150 M
Batu pecah 5/7
0.090 M
Pasir pasang
0.010 M
6.12.2 Tenaga
Pekerja
Mandor
1.000 Oh
0.050 Oh
Rp
65,000
Rp
45,000
Rp
75,000
Rp
55,000
Jumlah (2)
Jumlah (1) + (2)
x Rp
x Rp
Jumlah
x Rp
131,670
x Rp
143,430
x Rp
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
19,750.50
12,908.70
945.00
33,604.20
x Rp
45,000
x Rp
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp
Rp
Rp
Rp
45,000.00
2,750.00
47,750.00
81,354.20
PA 6.13
1 m Bongkaran beton betulang
6.13.1 Tenaga
Pekerja
Mandor
6.667 Oh
0.333 Oh
PA 6.14
1m Bongkaran dinding tembok bata merah
6.14.1 Tenaga
Pekerja
6.667 Oh
Mandor
0.033 Oh
x Rp
x Rp
Jumlah
45,000 = Rp
55,000 = Rp
= Rp
300,015.00
18,315.00
318,330.00
x Rp
x Rp
Jumlah
45,000 = Rp
55,000 = Rp
= Rp
300,015.00
1,815.00
301,830.00
PA 6.15
1m Pasangan pagar kawat jaring galvanis, tinggi 1.00 m
6.15.1 Bahan
Kawat jaring galvanis/BRC
0.434 Lbr x Rp
184,800
Jumlah (1)
6.15.2. Tenaga
Pekerja
0.042 Oh x Rp
45,000
Kepala tukang
0.004 Oh x Rp
75,000
Tukang
0.042 Oh x Rp
65,000
Mandor
0.002 Oh x Rp
55,000
Jumlah (2)
Jumlah (1) + (2)
BERSAMBUNG : ABK PEKERJAAN TANAH
= Rp
= Rp
80,203.20
80,203.20
=
=
=
=
=
=
1,890.00
300.00
2,730.00
110.00
5,030.00
85,233.20
Rp
Rp
Rp
Rp
Rp
Rp
=
=
=
Rp.
Rp.
Rp.
18,000.00
2,200.00
20,200.00
=
=
=
Rp.
Rp.
Rp.
18,000.00
2,200.00
20,200.00
=
=
=
Rp.
Rp.
Rp.
18,000.00
2,200.00
20,200.00
=
=
=
Rp.
Rp.
Rp.
28,125.00
3,410.00
31,535.00
=
=
=
Rp.
Rp.
Rp.
56,250.00
6,875.00
63,125.00
=
=
=
Rp.
Rp.
Rp.
37,035.00
4,565.00
41,600.00
=
=
=
Rp.
Rp.
Rp.
2,250.00
275.00
2,525.00
=
=
Rp.
Rp.
Rp.
2,250.00
275.00
2,525.00
=
=
=
Rp.
Rp.
Rp.
8,640.00
1,045.00
9,685.00
=
=
=
Rp.
Rp.
Rp.
22,500.00
2,750.00
25,250.00
=
=
Rp.
Rp.
78,240.00
78,240.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
22,500.00
2,750.00
25,250.00
103,490.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
37,661.25
4,785.00
4,725.00
47,171.25
=
=
=
=
Rp.
Rp.
Rp.
Rp.
22,500.00
2,750.00
25,250.00
72,421.25
PP 6.1.
1 M Pasangan pondasi batu kali, 1 Pc : 1 Ps
6.1.1. Bahan :
Batu belah 15/20
1.100 M
Semen porland
392.000 Kg
Pasir pasang
0.314 M
6.1.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
PP 6.2.
1 M Pasang pondasi batu kali 1 Pc : 2 Ps
6.2.1. Bahan
Batu belah 15/20 cm
1.100 M
Semen porland
267.000 Kg
Pasir Pasang
0.427 M
6.2.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
PP 6.3.
1 M Pasang pondasi batu kali, 1 Pc : 2,5 Ps
6.3.1. Bahan
Batu belah 15/20 cm
1.100 M
Semen porland
392.000 Kg
Pasir Pasang
0.314 M
6.3.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
PP 6.4.
1 M Pasang pondasi batu kali, Pc : 3 Ps
6.4.1. Bahan
Batu belah 15/20 cm
1.100 M
Semen porland
202.000 Kg
Pasir Pasang
0.485 M
6.4.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
PP 6.5.
1 M Pasang pondasi batu kali, 1 Pc : 4 Ps.
6.5.1. Bahan
Batu belah 15/20 cm
1.100 M
Semen porland
163.000 Kg
Pasir Pasang
0.520 M
6.5.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
470,400.00
29,673.00
644,910.00
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
760,035.00
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
320,400.00
40,351.50
505,588.50
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
620,713.50
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
470,400.00
29,673.00
644,910.00
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
760,035.00
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
242,400.00
45,832.50
433,069.50
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
548,194.50
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
195,600.00
49,140.00
389,577.00
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
504,702.00
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PP 6.6.
1 M Pasang pondasi batu kali, 1 Pc : 5 Ps
6.6.1. Bahan
Batu belah 15/20 cm
1.100 M
Semen porland
136.000 Kg
Pasir Pasang
0.544 M
6.6.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
PP 6.7.
1 M Pasang pondasi batu kali, 1 Pc : 6 Ps
6.7.1. Bahan
Batu belah 15/20 cm
1.100 M
Semen porland
117.000 Kg
Pasir Pasang
0.561 M
6.7.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.500
0.600
0.060
0.075
Oh
Oh
Oh
Oh
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
163,200.00
51,408.00
359,445.00
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
474,570.00
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
144,837.00
140,400.00
53,014.50
338,251.50
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
67,500.00
39,000.00
4,500.00
4,125.00
115,125.00
453,376.50
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
1.200 M
0.300 M
x Rp.
136,950.00
x Rp.
94,500.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
164,340.00
28,350.00
192,690.00
0.780
0.390
0.039
0.039
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,100.00
25,350.00
2,925.00
2,145.00
65,520.00
258,210.00
Kg
Kg
Kg
M
Kg
x
x
x
x
x
Rp.
12,390.00
Rp.
1,200.00
Rp.
102,000.00
Rp.
175,890.00
Rp.
11,620.00
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
929,250.00
242,400.00
32,640.00
86,186.10
9,296.00
1,299,772.10
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
135,000.00
55,250.00
6,375.00
8,250.00
204,875.00
1,504,647.10
x Rp.
131,670.00
x Rp.
1,200.00
x Rp.
94,500.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
59,251.50
336,000.00
63,315.00
458,566.50
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
107,100.00
19,500.00
2,250.00
4,400.00
133,250.00
591,816.50
6.14.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.15.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
3.000
0.850
0.085
0.150
2.380
0.300
0.030
0.080
Oh
Oh
Oh
Oh
Rp.
45,000.00
Rp.
65,000.00
Rp.
75,000.00
Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,238.80
9,588.00
26,383.50
72,600.00
557,550.00
10,458.00
100,636.80
1,214.40
514.80
3,432.00
783,616.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000.00
43,550.00
5,025.00
2,750.00
96,325.00
879,941.30
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,043.20
8,160.00
21,986.25
58,800.00
427,455.00
8,134.00
84,912.30
1,214.40
514.80
2,860.00
615,079.95
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
32,500.00
3,750.00
2,200.00
74,450.00
689,529.95
PD 6.1.
1 M Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps
6.1.1. Bahan
Bata merah 5 x 10 x 20 cm
140.000 Bh x
Semen portland
64.030 Kg x
Pasir pasang
0.059 M x
6.1.2
PD 6.2
6.2.1
6.2.2
PD 6.3
6.3.1
6.3.2
PD 6.4
6.4.1
6.4.2
PD 6.8
6.8.1
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
91,000.00
76,836.00
5,575.50
173,411.50
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
29,250.00
13,000.00
1,500.00
1,650.00
45,400.00
218,811.50
x
x
x
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
91,000.00
52,200.00
7,560.00
150,760.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
29,250.00
13,000.00
1,500.00
1,650.00
45,400.00
196,160.00
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
91,000.00
39,540.00
8,599.50
139,139.50
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
29,250.00
13,000.00
1,500.00
1,650.00
45,400.00
184,539.50
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
91,000.00
31,860.00
8,788.50
131,648.50
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
29,250.00
13,000.00
1,500.00
29,250.00
43,750.00
175,398.50
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
45,500.00
33,360.00
2,646.00
81,506.00
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,400.00
6,500.00
750.00
825.00
22,475.00
103,981.00
6.8.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.650
0.200
0.020
0.030
Rp.
Rp.
Rp.
0.650
0.200
0.020
0.030
0.650
0.200
0.020
0.030
0.650
0.200
0.020
0.030
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
PD 6.9
6.9.1
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
45,500.00
22,740.00
3,591.00
71,831.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,400.00
6,500.00
750.00
825.00
22,475.00
94,306.00
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
45,500.00
17,244.00
3,780.00
66,524.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,400.00
6,500.00
750.00
825.00
22,475.00
88,999.00
Rp.
Rp.
Rp.
650
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
45,500.00
13,800.00
4,063.50
63,363.50
6.9.2
6.10.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.11.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.320
0.100
0.010
0.015
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
0.320
0.100
0.010
0.015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,400.00
6,500.00
750.00
825.00
22,475.00
85,838.50
Bh
Kg
M
M
Bh
Kg
M
Kg
M
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,650
1,200
102,000
94,500
15,000
10,120
3,144,900
11,620
175,890
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
33,125.00
16,860.00
408.00
3,969.00
58,050.00
60.72
3,144.90
348.60
879.45
116,845.67
0.370
0.157
0.007
0.0164
0.0185
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
75,000
75,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
16,650.00
10,205.00
455.00
1,230.00
1,387.50
29,927.50
146,773.17
Bh
Kg
M
M
Bh
Kg
M
M
M
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,450
1,200
102,000
94,500
15,000
10,120
3,144,900
11,620
175,890
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
18,125.00
12,552.00
306.00
3,024.00
13,050.00
40.48
3,144.90
232.40
703.56
51,178.34
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
75,000
75,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
15,300.00
8,450.00
455.00
1,027.50
1,275.00
26,507.50
77,685.84
6.21.2 Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor
6.22.2 Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor
0.340
0.130
0.007
0.0137
0.017
Bh
Kg
M
M
Bh
Kg
M
M
M
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675
1,200
102,000
94,500
15,000
10,120
3,144,900
11,620
175,890
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
8,437.50
8,640.00
204.00
1,984.50
38,100.00
30.36
3,144.90
174.30
527.67
61,243.23
0.340
0.107
0.007
0.0114
0.017
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
75,000
75,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
15,300.00
6,955.00
455.00
855.00
1,275.00
24,840.00
86,083.23
2.500
5.100
0.080
1.500
0.150
Bh
Kg
M
Kg
M
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
31,120
1,200
102,000
12,390
175,890
Jumlah (1)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
77,800.00
6,120.00
8,160.00
18,585.00
26,383.50
137,048.50
0.100
0.030
0.030
0.006
0.005
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,500.00
1,950.00
1,950.00
450.00
275.00
9,125.00
146,173.50
36.000 Bh
12.800 Kg
0.035 M
x
x
x
Rp.
Rp.
Rp.
6,960
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
250,560.00
15,360.00
3,307.50
269,227.50
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,500.00
6,500.00
750.00
825.00
21,575.00
290,802.50
Rp.
Rp.
Rp.
6,960
1,200
94,500
Jumlah (1)
=
=
=
=
Rp
Rp
Rp
Rp
556,800.00
28,380.00
53,865.00
639,045.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,400.00
9,750.00
1,125.00
825.00
26,100.00
665,145.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
14,850
5,131,500
10,120
5,131,500
Jumlah (1)
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
22,275.00
71,841.00
121.44
15,394.50
109,631.94
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,500.00
3,250.00
375.00
110.00
8,235.00
117,866.94
6.23.2 Tenaga
Pekerja
Tukang batu
Tukang besi
Kepala tukang
Mandor
PD 6.26
6.26.1
6.26.2
-
0.300
0.100
0.010
0.015
0.320
0.150
0.015
0.015
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
0.100
0.050
0.005
0.002
Oh
Oh
Oh
Oh
6.1.2.
PPL 6.2.
6.2.1.
6.2.2.
PPL 6.3.
6.3.1.
6.3.2.
PPL 6.4.
6.4.1.
6.4.2.
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
15,504.00
1,228.50
16,732.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
9,750.00
1,125.00
550.00
20,425.00
37,157.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
10,224.00
1,606.50
11,830.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
9,750.00
1,125.00
550.00
20,425.00
32,255.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
7,776.00
1,795.50
9,571.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
9,750.00
1,125.00
550.00
20,425.00
29,996.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
6,240.00
1,890.00
8,130.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
9,750.00
1,125.00
550.00
20,425.00
28,555.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
17,136.00
2,173.50
19,309.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
13,000.00
1,500.00
687.50
26,437.50
45,747.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
12,960.00
2,457.00
15,417.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
11,250.00
13,000.00
1,500.00
687.50
26,437.50
41,854.50
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.250
0.200
0.020
0.0125
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.250
0.200
0.020
0.013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.250
0.200
0.020
0.013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.300
0.200
0.020
0.013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.320
0.250
0.025
0.015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.320
0.250
0.025
0.015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
10,416.00
2,646.00
13,062.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
13,000.00
1,500.00
687.50
26,437.50
39,499.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
18,600.00
1,228.50
19,828.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
13,000.00
1,500.00
687.50
26,437.50
46,266.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
14,100.00
3,307.50
17,407.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
13,000.00
1,500.00
715.00
26,465.00
43,872.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
11,376.00
3,591.00
14,967.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
13,000.00
1,500.00
715.00
28,715.00
43,682.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
22,380.00
3,307.50
25,687.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
16,250.00
1,875.00
825.00
33,350.00
59,037.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
16,980.00
3,685.50
20,665.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
14,400.00
16,250.00
1,875.00
825.00
33,350.00
54,015.50
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.320
0.250
0.025
0.015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.057
0.038
0.038
0.002
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.250
0.100
0.010
0.015
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.150
0.070
0.007
0.008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
13,656.00
3,969.00
17,625.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
16,250.00
1,875.00
825.00
33,350.00
50,975.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
11,160.00
1,701.00
12,861.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
13,000.00
1,500.00
715.00
26,915.00
39,776.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
8,484.00
1,984.50
10,468.50
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
13,000.00
1,500.00
715.00
26,915.00
37,383.50
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
600.00
189.00
789.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,565.00
2,470.00
2,850.00
110.00
7,995.00
8,784.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
5,184.00
1,512.00
6,696.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
6,500.00
750.00
825.00
19,325.00
26,021.00
1,200 = Rp.
94,500 = Rp.
Jumlah (1)
= Rp.
5,184.00
1,512.00
6,696.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
4,550.00
525.00
440.00
12,265.00
18,961.00
PK 6.1.
6.1.1.
6.1.2.
PK 6.2.
6.2.1.
6.2.2.
PK 6.3.
6.3.1.
6.3.2.
PK 6.4.
6.4.1.
6.4.2.
PK 6.5.
6.5.1.
6.5.2.
PK 6.6.
6.6.1.
6.6.2.
= Rp.
= Rp.
23,925,000.00
23,925,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
270,000.00
1,300,000.00
150,000.00
16,500.00
1,736,500.00
25,661,500.00
= Rp.
= Rp.
10,182,480.00
10,182,480.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
270,000.00
1,170,000.00
150,000.00
16,500.00
1,606,500.00
11,788,980.00
= Rp.
= Rp.
6,157,800.00
6,157,800.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
270,000.00
1,170,000.00
150,000.00
16,500.00
1,606,500.00
7,764,300.00
= Rp.
= Rp.
9,966,000.00
9,966,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
270,000.00
1,170,000.00
150,000.00
16,500.00
1,606,500.00
11,572,500.00
= Rp.
= Rp.
= Rp.
310,056.48
506.00
310,562.48
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,750.00
68,250.00
7,875.00
990.00
92,865.00
403,427.48
= Rp.
= Rp.
= Rp.
788,872.68
506.00
789,378.68
=
=
=
=
=
=
15,750.00
68,250.00
7,875.00
990.00
92,865.00
882,243.68
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PK 6.7.
6.7.1.
6.7.2.
PK 6.8.
6.8.1.
6.8.2.
PK 6.9.
6.9.1.
6.9.2.
0.350
1.050
0.105
0.018
= Rp.
788,872.68
788,872.68
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,750.00
68,250.00
7,875.00
990.00
92,865.00
881,737.68
x Rp.
8,612,680.00
Jumlah (1)
= Rp.
= Rp.
344,507.20
344,507.20
Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
x
x
x
x
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000.00
162,500.00
18,750.00
2,750.00
229,000.00
573,507.20
= Rp.
= Rp.
= Rp.
766,959.55
105,600.00
766,959.55
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
130,000.00
15,000.00
2,200.00
183,200.00
950,159.55
= Rp.
= Rp.
= Rp.
301,443.80
105,600.00
301,443.80
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
130,000.00
15,000.00
2,200.00
183,200.00
484,643.80
= Rp.
= Rp.
= Rp.
182,296.45
105,600.00
182,296.45
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
130,000.00
15,000.00
2,200.00
183,200.00
365,496.45
x Rp. 21,913,130.00
Jumlah (1)
= Rp.
= Rp.
1,402,440.32
1,402,440.32
x
x
x
x
=
=
=
=
=
=
45,000.00
195,000.00
22,500.00
16,500.00
279,000.00
1,681,440.32
1.000
2.500
0.250
0.050
Oh
Oh
Oh
Oh
x Rp. 21,913,130.00
Jumlah (1)
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
PK 6.10.
1 M Pasang pintu dan jendela kaca panel kayu meranti batu :
6.10.1. Bahan
Kayu meranti batu, papan
0.035 M x Rp. 8,612,680.00
Kaca polos 5 mm
0.800 M x Rp.
132,000.00
Jumlah (1)
6.10.2. Tenaga
Pekerja
0.800 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.040 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.11.
1 M Pasang pintu dan jendela kaca panel kayu meranti :
6.11.1. Bahan
Kayu meranti, papan
0.035 M x Rp. 5,208,470.00
Kaca polos 5 mm
0.800 M x Rp.
132,000.00
Jumlah (1)
6.11.2. Tenaga
Pekerja
0.800 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.040 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.12.
1 M Pasang pintu dan jendela jalusi kayu jati
6.12.1. Bahan
Kayu jati, papan
0.064 M
6.12.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.000
3.000
0.300
0.300
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PK 6.13.
1 M Pasang pintu dan jendela jalusi kayu damar laut :
6.13.1. Bahan
Kayu damar laut, papan
0.064 M x Rp. 8,429,580.00
Jumlah (1)
6.13.2. Tenaga
Pekerja
1.000 Oh x Rp.
45,000.00
Tukang kayu
3.000 Oh x Rp.
65,000.00
Kepala tukang
0.300 Oh x Rp.
75,000.00
Mandor
0.500 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.14.
1 M Pasang pintu plywood rangka, rangka kayu jati :
6.14.1. Bahan
Kayu jati, papan
0.0196 M x Rp. 21,913,130.00
Paku biasa " - 1"
0.030 Kg x Rp.
10,930.00
Lem kayu
0.300 Lt
x Rp.
32,500.00
Playwood 4' x 3' x 4 mm
1.000 Lbr x Rp.
64,520.00
Jumlah (1)
6.14.2. Tenaga
Pekerja
0.600 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.030 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.15.
1 M Pasang pintu plywood rangka, rangka kayu Meranti batu :
6.15.1. Bahan
Kayu meranti batu, papan
0.0196 M x Rp. 8,612,680.00
Paku biasa " - 1"
0.030 Kg x Rp.
10,930.00
Lem kayu
0.300 Lt
x Rp.
32,500.00
Playwood 4' x 3' x 4 mm
1.000 Lbr x Rp.
64,520.00
Jumlah (1)
6.15.2. Tenaga
Pekerja
0.600 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.030 Oh x Rp.
55,000.00
Jumlah (2)
PK 6.16.
1 M Pasang jalusi mati kusen kayu jati :
Jumlah (1) +(2)
6.16.1. Bahan
Kayu jati, papan
0.060 M x Rp. 21,913,130.00
Paku biasa " - 1"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.16.2. Tenaga
Pekerja
0.500 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.025 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.17.
1 M Pasang jalusi mati kusen kayu damar laut :
6.17.1. Bahan
Kayu meranti batu, papan
0.060 M x Rp. 8,612,680.00
Paku biasa " - 1"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.17.2. Tenaga
Pekerja
0.500 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.025 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.18.
1 M Pasang pintu plywood rangka, rangka kayu meranti :
6.18.1. Bahan
Kayu meranti, papan
0.0196 M x Rp. 5,208,470.00
Paku biasa " - 1"
0.030 Kg x Rp.
10,930.00
Lem kayu
0.300 Lt
x Rp.
32,500.00
Playwood 4' x 3' x 4 mm
1.000 Lbr x Rp.
64,520.00
Jumlah (1)
6.18.2. Tenaga
Pekerja
0.600 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.030 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
= Rp.
= Rp.
539,493.12
539,493.12
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000.00
195,000.00
22,500.00
27,500.00
290,000.00
829,493.12
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
429,497.35
327.90
9,750.00
64,520.00
504,095.25
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
130,000.00
15,000.00
1,650.00
173,650.00
677,745.25
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
168,808.53
327.90
9,750.00
64,520.00
243,406.43
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
130,000.00
15,000.00
1,650.00
173,650.00
417,056.43
= Rp.
= Rp.
= Rp.
1,314,787.80
1,639.50
1,316,427.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,500.00
130,000.00
15,000.00
1,375.00
168,875.00
1,485,302.30
= Rp.
= Rp.
= Rp.
516,760.80
1,639.50
518,400.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,500.00
130,000.00
15,000.00
1,375.00
168,875.00
687,275.30
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
102,086.01
327.90
9,750.00
64,520.00
74,270.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
130,000.00
15,000.00
1,650.00
173,650.00
247,920.00
PK 6.19.
1 M Pasang pintu teakwood rangka, rangka kayu jati :
6.19.1. Bahan
Kayu jati, papan
0.0196 M x Rp. 21,913,130.00
Paku biasa " - 1"
0.300 Kg x Rp.
10,930.00
Lem kayu
0.300 Lt
x Rp.
32,500.00
Teakwood 4' x 8' x 4 mm
1.000 Lbr x Rp.
96,250.00
Jumlah (1)
6.19.2. Tenaga
Pekerja
0.600 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.030 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.20.
1 M Pasang pintu teakwood rangka, rangka kayu meranti batu :
6.20.1. Bahan
Kayu meranti batu, papan
0.0196 M x Rp. 8,612,680.00
Paku biasa " - 1"
0.300 Kg x Rp.
10,930.00
Lem kayu
0.300 Lt
x Rp.
32,500.00
Teakwood 4' x 8' x 4 mm
1.000 Lbr x Rp.
96,250.00
Jumlah (1)
6.20.2. Tenaga
Pekerja
0.600 Oh x Rp.
45,000.00
Tukang kayu
2.000 Oh x Rp.
65,000.00
Kepala tukang
0.200 Oh x Rp.
75,000.00
Mandor
0.030 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.21.
1 M Pasang pintu plywood & formika, rangka kayu jati :
6.21.1. Bahan
Kayu jati, papan
0.0196 M x Rp. 21,913,130.00
Paku biasa " - 1"
0.300 Kg x Rp.
10,930.00
Lem kayu
0.800 Lt
x Rp.
32,500.00
Plywood 4' x 8' x 4 mm
1.000 Lbr x Rp.
64,520.00
Formica 4' x 8'
1.000 Lbr x Rp.
81,950.00
Jumlah (1)
6.21.2. Tenaga
Pekerja
0.800 Oh x Rp.
45,000.00
Tukang kayu
2.500 Oh x Rp.
65,000.00
Kepala tukang
0.250 Oh x Rp.
75,000.00
Mandor
0.040 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.22.
1 M Pasang pintu plywood & formika, rangka kayu Meranti batu :
6.22.1. Bahan
Kayu meranti batu, papan
0.0196 M x Rp. 8,612,680.00
Paku biasa " - 1"
0.300 Kg x Rp.
10,930.00
Lem kayu
0.800 Lt
x Rp.
32,500.00
Plywood 4' x 8' x 4 mm
1.000 Lbr x Rp.
64,520.00
Formica 4' x 8'
1.000 Lbr x Rp.
81,950.00
Jumlah (1)
6.22.2. Tenaga
Pekerja
0.800 Oh x Rp.
45,000.00
Tukang kayu
2.500 Oh x Rp.
65,000.00
Kepala tukang
0.250 Oh x Rp.
75,000.00
Mandor
0.040 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.23.
1 M Pasang pintu teakwood & formika, rangka kayu jati :
6.23.1. Bahan
Kayu jati, papan
0.0196 M x Rp. 21,913,130.00
Paku biasa " - 1"
0.300 Kg x Rp.
10,930.00
Lem kayu
0.800 Lt
x Rp.
32,500.00
Teakwood 4' x 8' x 4 mm
1.000 Lbr x Rp.
96,250.00
Formica 4' x 8'
1.000 Lbr x Rp.
81,950.00
Jumlah (1)
6.23.2. Tenaga
Pekerja
0.800 Oh x Rp.
45,000.00
Tukang kayu
2.500 Oh x Rp.
65,000.00
Kepala tukang
0.250 Oh x Rp.
75,000.00
Mandor
0.040 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
429,497.35
3,279.00
9,750.00
96,250.00
538,776.35
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
130,000.00
15,000.00
1,650.00
173,650.00
712,426.35
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
168,808.53
3,279.00
9,750.00
96,250.00
278,087.53
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
130,000.00
15,000.00
1,650.00
173,650.00
451,737.53
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
429,497.35
3,279.00
26,000.00
64,520.00
81,950.00
605,246.35
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
162,500.00
18,750.00
2,200.00
219,450.00
824,696.35
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
168,808.53
3,279.00
26,000.00
64,520.00
81,950.00
344,557.53
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
162,500.00
18,750.00
2,200.00
219,450.00
564,007.53
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
429,497.35
3,279.00
26,000.00
96,250.00
81,950.00
636,976.35
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
36,000.00
162,500.00
18,750.00
2,200.00
219,450.00
856,426.35
PK 6.24.
1 M Pasang pintu Teakwood & formika, rangka kayu meranti batu (divermis) :
6.24.1. Bahan
Kayu meranti batu, papan
0.0196 M x Rp. 8,612,680.00 = Rp.
Paku biasa " - 1"
0.300 Kg x Rp.
10,930.00 = Rp.
Lem kayu
0.800 Lt
x Rp.
32,500.00 = Rp.
Teakwood 4' x 8' x 4 mm
0.500 Lbr x Rp.
96,250.00 = Rp.
Vernis
0.500 Lt
x Rp.
43,890.00 = Rp.
Formica 4' x 8'
0.500 Lbr x Rp.
81,950.00 = Rp.
Jumlah (1)
= Rp.
6.24.2. Tenaga
Pekerja
0.800 Oh x Rp.
45,000.00 = Rp.
Tukang kayu
2.500 Oh x Rp.
65,000.00 = Rp.
Kepala tukang
0.250 Oh x Rp.
75,000.00 = Rp.
Mandor
0.040 Oh x Rp.
55,000.00 = Rp.
Jumlah (2)
= Rp.
Jumlah (1) +(2) = Rp.
PK 6.29.
1 M Pasang konstruksi kuda-kuda kayu damar laut :
6.29.1. Bahan
Kayu damar laut, balok
1.1000 M x Rp.
Besi strip
15.000 Kg x Rp.
Paku biasa 2" - 5"
0.800 Kg x Rp.
6.29.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
x
x
x
x
PK 6.30.
1 M Pasang konstruksi kuda-kuda kayu meranti
6.30.1. Bahan
Kayu meranti, balok
1.1000 M x
Besi strip
15.000 Kg x
Paku biasa 2" - 5"
0.800 Kg x
6.30.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
x
x
x
x
168,808.53
3,279.00
26,000.00
48,125.00
21,945.00
40,975.00
309,132.53
36,000.00
162,500.00
18,750.00
2,200.00
219,450.00
528,582.53
8,305,000.00
12,620.00
10,930.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
9,135,500.00
189,300.00
8,744.00
9,333,544.00
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
180,000.00
780,000.00
90,000.00
11,000.00
1,061,000.00
10,394,544.00
Rp.
Rp.
Rp.
5,131,500.00
12,620.00
10,930.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
5,644,650.00
189,300.00
8,744.00
5,842,694.00
Rp.
Rp.
Rp.
Rp.
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
180,000.00
780,000.00
90,000.00
11,000.00
1,061,000.00
6,903,694.00
= Rp.
= Rp.
= Rp.
61,578.00
1,639.50
63,217.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
275.00
12,025.00
75,242.50
= Rp.
= Rp.
= Rp.
99,660.00
1,639.50
101,299.50
=
=
=
=
=
=
4,500.00
6,500.00
750.00
275.00
12,025.00
113,324.50
Rp.
Rp.
Rp.
Rp.
PK 6.31.
1 M Pasang kaso + reng genteng kodok kayu meranti :
6.31.1. Bahan
Kayu meranti, balok
0.012 M x Rp. 5,131,500.00
Paku biasa 2" - 5"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.31.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.32.
1 M Pasang kaso + reng genteng kodok kayu damar laut :
6.32.1. Bahan
Kayu damar laut, balok
0.012 M x Rp. 8,305,000.00
Paku biasa 2" - 5"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.32.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PK 6.33.
1 M Pasang kaso + reng genteng monier kayu jati :
6.33.1. Bahan
Kayu jati, balok
0.014 M x Rp. 21,750,000.00
Paku biasa 2" - 5"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.33.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.34.
1 M Pasang kaso + reng genteng monier kayu damar laut :
6.34.1. Bahan
Kayu damar laut, balok
0.014 M x Rp. 8,305,000.00
Paku biasa 2" - 5"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.34.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.35.
1 M Pasang kaso + reng genteng beton kayu damar laut :
6.35.1. Bahan
Kayu damar laut, balok
0.014 M x Rp. 8,305,000.00
Paku biasa 2" - 5"
0.150 Kg x Rp.
10,930.00
Jumlah (1)
6.35.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.36.
1 M Pasang kaso + reng atap sirap kayu damar laut :
6.36.1. Bahan
Kayu damar laut, balok
0.165 M x Rp. 8,305,000.00
Paku biasa 2" - 5"
0.200 Kg x Rp.
10,930.00
Jumlah (1)
6.36.2. Tenaga
Pekerja
0.120 Oh x Rp.
45,000.00
Tukang kayu
0.120 Oh x Rp.
65,000.00
Kepala tukang
0.012 Oh x Rp.
75,000.00
Mandor
0.006 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.37.
1 M Pasang kaso + reng atap sirap kayu meranti :
6.37.1. Bahan
Kayu meranti, balok
0.165 M x Rp. 5,131,500.00
Paku biasa 2" - 5"
0.200 Kg x Rp.
10,930.00
Jumlah (1)
6.37.2. Tenaga
Pekerja
0.120 Oh x Rp.
45,000.00
Tukang kayu
0.120 Oh x Rp.
65,000.00
Kepala tukang
0.012 Oh x Rp.
75,000.00
Mandor
0.006 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.38.
1 M Pasang rangka langit-langit (1.00 x 1.00) m, kayu jati :
6.38.1. Bahan
Kayu jati, balok
0.012 M x Rp. 21,750,000.00
Paku biasa 2" - 5"
0.100 Kg x Rp.
10,930.00
Jumlah (1)
6.38.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000.00
Tukang kayu
0.250 Oh x Rp.
65,000.00
Kepala tukang
0.025 Oh x Rp.
75,000.00
Mandor
0.075 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
= Rp.
= Rp.
= Rp.
304,500.00
1,639.50
306,139.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
275.00
12,025.00
318,164.50
= Rp.
= Rp.
= Rp.
116,270.00
1,639.50
117,909.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
275.00
12,025.00
129,934.50
= Rp.
= Rp.
= Rp.
116,270.00
1,639.50
117,909.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
275.00
12,025.00
129,934.50
= Rp.
= Rp.
= Rp.
1,370,325.00
2,186.00
1,372,511.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
7,800.00
900.00
330.00
14,430.00
1,386,941.00
= Rp.
= Rp.
= Rp.
846,697.50
2,186.00
848,883.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
7,800.00
900.00
330.00
14,430.00
863,313.50
= Rp.
= Rp.
= Rp.
261,000.00
1,093.00
262,093.00
=
=
=
=
=
=
6,750.00
16,250.00
1,875.00
4,125.00
29,000.00
291,093.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
= Rp.
= Rp.
= Rp.
99,660.00
1,093.00
100,753.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
16,250.00
1,875.00
4,125.00
29,000.00
129,753.00
= Rp.
= Rp.
= Rp.
61,578.00
1,093.00
62,671.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
16,250.00
1,875.00
4,125.00
29,000.00
91,671.00
= Rp.
= Rp.
= Rp.
587,250.00
2,186.00
589,436.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
22,750.00
2,625.00
687.50
37,312.50
626,748.50
= Rp.
= Rp.
= Rp.
224,235.00
2,186.00
226,421.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
22,750.00
2,625.00
687.50
37,312.50
263,733.50
= Rp.
= Rp.
= Rp.
138,550.50
2,186.00
140,736.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
22,750.00
2,625.00
687.50
37,312.50
178,049.00
= Rp.
= Rp.
= Rp.
37,500.98
546.50
38,047.48
=
=
=
=
=
=
4,500.00
13,000.00
1,875.00
275.00
19,650.00
57,697.48
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PK 6.48.
1 M Pasang lisplang ukuran (3 x 20) cm, kayu meranti batu :
6.48.1. Bahan
Meranti batu, papan
0.0072 M x Rp. 8,612,680.00
Paku biasa 2" - 5"
0.050 Kg x Rp.
10,930.00
Jumlah (1)
6.48.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.200 Oh x Rp.
65,000.00
Kepala tukang
0.020 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.49.
1 M Pasang lisplang ukuran (3 x 30) cm, kayu jati :
6.49.1. Bahan
Kayu jati, papan
0.0110 M x Rp. 21,913,130.00
Paku biasa 2" - 5"
0.050 Kg x Rp.
10,930.00
Jumlah (1)
6.49.2. Tenaga
Pekerja
0.110 Oh x Rp.
45,000.00
Tukang kayu
0.220 Oh x Rp.
65,000.00
Kepala tukang
0.022 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.50.
1 M Pasang lisplang ukuran (3 x 30) cm, kayu meranti batu :
6.50.1. Bahan
Meranti batu, papan
0.011 M x Rp. 8,612,680.00
Paku biasa 2" - 5"
0.050 Kg x Rp.
10,930.00
Jumlah (1)
6.50.2. Tenaga
Pekerja
0.110 Oh x Rp.
45,000.00
Tukang kayu
0.220 Oh x Rp.
65,000.00
Kepala tukang
0.022 Oh x Rp.
75,000.00
Mandor
0.005 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.51.
1 M Pasang lisplang ukuran 2 x (3 x 20) cm, kayu meranti batu :
6.51.1. Bahan
Meranti batu, papan
0.0145 M x Rp. 8,612,680.00
Paku biasa 2" - 5"
0.060 Kg x Rp.
10,930.00
Jumlah (1)
6.51.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000.00
Tukang kayu
0.250 Oh x Rp.
65,000.00
Kepala tukang
0.025 Oh x Rp.
75,000.00
Mandor
0.075 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.52.
1 M Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti batu :
6.52.1. Bahan
Meranti batu, papan
0.0086 M x Rp. 8,612,680.00
Paku biasa 2" - 5"
0.060 Kg x Rp.
10,930.00
Jumlah (1)
6.52.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.050 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.53.
1 M Pasang lisplang ukuran 2 x (2 x 20) cm, kayu meranti :
6.53.1. Bahan
Kayu meranti, papan
0.0086 M x Rp. 5,208,470.00
Paku biasa 2" - 5"
0.060 Kg x Rp.
10,930.00
Jumlah (1)
6.53.2. Tenaga
Pekerja
0.100 Oh x Rp.
45,000.00
Tukang kayu
0.100 Oh x Rp.
65,000.00
Kepala tukang
0.010 Oh x Rp.
75,000.00
Mandor
0.050 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
= Rp.
= Rp.
= Rp.
62,011.30
546.50
62,557.80
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
13,000.00
1,500.00
275.00
19,275.00
81,832.80
= Rp.
= Rp.
= Rp.
241,044.43
546.50
241,590.93
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,950.00
14,300.00
1,650.00
275.00
21,175.00
262,765.93
= Rp.
= Rp.
= Rp.
94,739.48
546.50
95,285.98
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,950.00
14,300.00
1,650.00
275.00
21,175.00
116,460.98
= Rp.
= Rp.
= Rp.
124,883.86
655.80
125,539.66
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
16,250.00
1,875.00
4,125.00
29,000.00
154,539.66
= Rp.
= Rp.
= Rp.
74,069.05
655.80
74,724.85
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
2,750.00
14,500.00
89,224.85
= Rp.
= Rp.
= Rp.
44,792.84
655.80
45,448.64
=
=
=
=
=
=
4,500.00
6,500.00
750.00
2,750.00
14,500.00
59,948.64
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PK 6.54.
1 M Pasang rangka dinding pemisah, kayu damar laut :
6.54.1. Bahan
Kayu damar laut, balok
0.0195 M x Rp. 8,305,000.00
Kayu meranti batu, papan
0.007 M x Rp. 8,612,680.00
Paku biasa 2" - 5"
0.100 Kg x Rp.
10,930.00
Jumlah (1)
6.54.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000.00
Tukang kayu
0.450 Oh x Rp.
65,000.00
Kepala tukang
0.045 Oh x Rp.
75,000.00
Mandor
0.075 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
161,947.50
60,288.76
1,093.00
223,329.26
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
29,250.00
3,375.00
4,125.00
43,500.00
266,829.26
=
=
=
=
Rp.
Rp.
Rp.
Rp.
100,064.25
36,459.29
1,093.00
137,616.54
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
29,250.00
3,375.00
4,125.00
43,500.00
181,116.54
=
=
=
=
Rp.
Rp.
Rp.
Rp.
161,947.50
96,250.00
1,093.00
259,290.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
29,250.00
3,375.00
4,125.00
43,500.00
302,790.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
161,947.50
1,093.00
18,200.00
64,520.00
245,760.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
39,000.00
4,500.00
550.00
53,050.00
298,810.50
Rp. 21,750,000.00
Rp.
10,930.00
Rp.
17,250.00
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
152,250.00
1,093.00
2,587.50
155,930.50
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
117,000.00
13,500.00
1,650.00
159,150.00
315,080.50
PK 6.55.
1 M Pasang rangka dinding pemisah, kayu meranti :
6.55.1. Bahan
kayu meranti, balok
0.0195 M x Rp. 5,131,500.00
kayu meranti, papan
0.007 M x Rp. 5,208,470.00
Paku biasa 2" - 5"
0.100 Kg x Rp.
10,930.00
Jumlah (1)
6.55.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000.00
Tukang kayu
0.450 Oh x Rp.
65,000.00
Kepala tukang
0.045 Oh x Rp.
75,000.00
Mandor
0.075 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.56.
1 M Pasang dinding pemisah teakwood, rangka kayu damar laut :
6.56.1. Bahan
Kayu damar laut, balok
0.0195 M x Rp. 8,305,000.00
Teakwood 4' x 8'
1.000 Lbr x Rp.
96,250.00
Paku biasa 2" - 5"
0.100 Kg x Rp.
10,930.00
Jumlah (1)
6.56.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000.00
Tukang kayu
0.450 Oh x Rp.
65,000.00
Kepala tukang
0.045 Oh x Rp.
75,000.00
Mandor
0.075 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.57.
1 M Pasang dinding pemisah plywood, rangka kayu damar laut :
6.57.1. Bahan
Kayu damar laut, balok
0.0195 M x Rp. 8,305,000.00
Paku biasa 2" - 5"
0.100 Kg x Rp.
10,930.00
Lem kayu
0.560 Lt
x Rp.
32,500.00
Plywood 4' x 8' x 4 mm
1.000 Lbr x Rp.
64,520.00
Jumlah (1)
6.57.2. Tenaga
Pekerja
0.200 Oh x Rp.
45,000.00
Tukang kayu
0.600 Oh x Rp.
65,000.00
Kepala tukang
0.060 Oh x Rp.
75,000.00
Mandor
0.010 Oh x Rp.
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.58.
1 M Pasang dinding lambriziring dari papan jati
6.58.1. Bahan
Kayu jati, balok
0.0070 M x
Paku biasa 2" - 5"
0.100 Kg x
Paku skrup 3,5"
0.150 Kg x
6.58.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.600
1.800
0.180
0.030
Oh
Oh
Oh
Oh
x
x
x
x
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
PK 6.59.
1 M Pasang plywood tebal 4 mm, untuk dinding :
6.59.1. Bahan
Plywood 4' x 8' x 4 mm
0.4000 Lbr x Rp.
Paku biasa 2" - 5"
0.050 Kg x Rp.
6.59.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.025
0.075
0.0075
0.0013
Oh
Oh
Oh
Oh
PK 6.60.
1 M' Pasang list plafond kayu profil :
6.60.1. Bahan
Kayu profil 2"
1.050 M'
6.60.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.021
0.021
0.002
0.001
Oh
Oh
Oh
Oh
64,520.00
10,930.00
Jumlah (1)
= Rp.
= Rp.
= Rp.
25,808.00
546.50
26,354.50
Rp.
Rp.
Rp.
Rp.
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,125.00
4,875.00
562.50
71.50
6,634.00
32,988.50
x Rp.
11,400.00
Jumlah (1)
= Rp.
= Rp.
11,970.00
11,970.00
x
x
x
x
45,000.00
65,000.00
75,000.00
55,000.00
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
945.00
1,365.00
150.00
55.00
2,515.00
14,485.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PB 6.1.
6.1.1
6.1.2.
PB 6.2.
6.2.1
6.2.2.
PB 6.3.
6.3.1
6.3.2.
PB 6.4.
6.4.1
6.4.2.
PB 6.5.
6.5.1.
6.5.2.
Rp.
Rp.
Rp.
1,200
102,000
159,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
261,600.00
53,040.00
138,765.00
453,405.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
550,180.00
Rp.
Rp.
Rp.
1,200
102,000
159,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
236,400.00
47,940.00
149,930.00
434,270.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
531,045.00
Rp.
Rp.
Rp.
1,200
102,000
159,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
207,600.00
58,140.00
138,765.00
404,505.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
501,280.00
1.650
0.250
0.025
0.080
1.650
0.250
0.025
0.080
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
1,200
102,000
159,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
12,000.00
2,652.00
7,018.00
21,670.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
51,750.00
1,300.00
150.00
330.00
53,530.00
75,200.00
Rp.
Rp.
Rp.
1,200
102,000
159,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
278,400.00
53,040.00
124,410.00
455,850.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
552,625.00
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
10.000 Kg x
0.026 M x
0.044 M x
1.150
0.020
0.002
0.006
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
PB 6.6.
6.6.1.
6.6.2.
PB 6.7.
6.7.1.
6.7.2.
PB 6.8.
6.8.1.
6.8.2.
PB 6.9.
6.9.1.
6.9.2.
PB 6.10.
280.000 Kg x
0.450 M x
0.900 M x
Rp.
Rp.
Rp.
1,200
102,000
175,890
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
336,000.00
45,900.00
158,301.00
540,201.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
636,976.00
352.000 Kg x
0.560 M x
0.700 M x
Rp.
Rp.
Rp.
1,200
102,000
175,890
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
422,400.00
57,120.00
123,123.00
602,643.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
699,418.00
357.000 Kg x
0.420 M x
0.540 M x
Rp.
Rp.
Rp.
1,200
102,000
175,890
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
428,400.00
42,840.00
94,980.60
566,220.60
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
662,995.60
386.000 Kg x
0.470 M x
0.780 M x
Rp.
Rp.
Rp.
1,200
102,000
175,890
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
463,200.00
47,940.00
137,194.20
648,334.20
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
745,109.20
479.000 Kg x
0.370 M x
0.740 M x
Rp.
Rp.
Rp.
1,200
102,000
175,890
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
574,800.00
37,740.00
130,158.60
742,698.60
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
839,473.60
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
6.10.1. Bahan
Semen portland
Pasir beton
Koral beton 3/5
6.10.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.650
0.250
0.025
0.080
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
1,200 =
102,000 =
168,180 =
=
Jumlah (1)
=
Rp.
Rp.
Rp.
Rp.
Rp.
528,000.00
51,000.00
134,544.00
0.00
713,544.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,250.00
16,250.00
1,875.00
4,400.00
96,775.00
810,319.00
PB 6.13
1 M Membuat beton bertulang 1 Pc : 2 Ps : 3 Kr
6.13.1. Bahan
Semen portland
336.000 Kg x
Pasir beton
0.540 M x
Koral Beton/batu pecah 2/3
0.810 M x
Rp.
Rp.
Rp.
1,200
102,000
168,180
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
403,200.00
55,080.00
136,225.80
594,505.80
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
22,750.00
2,625.00
55,000.00
170,375.00
764,880.80
Rp.
Rp.
Rp.
1,200
102,000
168,180
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
349,200.00
47,940.00
156,407.40
553,547.40
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
22,750.00
2,625.00
55,000.00
170,375.00
723,922.40
Rp.
Rp.
Rp.
1,200
102,000
168,180
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
440,400.00
44,880.00
147,998.40
633,278.40
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
22,750.00
2,625.00
55,000.00
170,375.00
803,653.40
x
x
x
Rp.
Rp.
Rp.
1,200
102,000
168,180
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
480,000.00
48,960.00
147,998.40
676,958.40
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
22,750.00
2,625.00
55,000.00
170,375.00
847,333.40
Rp.
Rp.
Rp.
1,200
102,000
168,180
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
738,000.00
53,040.00
87,453.60
878,493.60
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
90,000.00
22,750.00
2,625.00
55,000.00
170,375.00
1,048,868.60
6.11.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.13.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.14.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
PB 6.15.
6.15.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.650
0.250
0.025
0.080
2.000
0.350
0.035
1.000
2.000
0.350
0.035
1.000
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
6.17.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
2.000
0.350
0.035
1.000
2.000
0.350
0.035
1.000
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
Kr
x
x
x
x
PB 6.25.
6.25.1. Bahan
Besi beton polos
Kawat beton
1.050 Kg x
0.015 Kg x
Rp.
Rp.
12,390 =
11,620 =
Jumlah (1)
=
Rp.
Rp.
Rp.
13,009.50
174.30
13,183.80
6.25.2. Tenaga
Pekerja
Tukang besi
Kepala tukang
Mandor
0.007
0.007
0.007
0.003
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
315.00
455.00
525.00
165.00
1,460.00
14,643.80
6.26.1. Bahan
Besi Prestressed polos
Kawat beton
1.050 Kg x
0.010 Kg x
Rp.
Rp.
12,390 =
11,620 =
Jumlah (1)
=
Rp.
Rp.
Rp.
13,009.50
116.20
13,125.70
6.26.2. Tenaga
Pekerja
Tukang besi
Kepala tukang
Mandor
0.005
0.005
0.005
0.003
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
225.00
325.00
375.00
165.00
1,090.00
14,215.70
6.28.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
0.040 M x
0.300 Kg x
0.100 Ltr x
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
125,796.00
3,036.00
572.00
129,404.00
6.28.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.300
0.260
0.026
0.005
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
16,900.00
1,950.00
275.00
32,625.00
162,029.00
6.29.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
0.045 M x
0.300 Kg x
0.100 Ltr x
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
141,520.50
3,036.00
572.00
145,128.50
6.29.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.300
0.260
0.026
0.005
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
16,900.00
1,950.00
275.00
32,625.00
177,753.50
6.30.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu sembarang
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
0.040
0.400
0.200
0.015
0.350
2.000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
3,144,900
156,530
20,750
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
125,796.00
4,048.00
1,144.00
47,173.50
54,785.50
41,500.00
274,447.00
6.30.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.300
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,500.00
21,450.00
2,475.00
330.00
37,755.00
312,202.00
PB 6.26.
PB 6.28.
PB 6.29.
PB 6.30.
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
PB 6.31.
6.31.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu sembarang
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
0.040
0.400
0.200
0.018
0.350
2.000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
3,144,900
156,530
20,750
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
125,796.00
4,048.00
1,144.00
56,608.20
54,785.50
41,500.00
283,881.70
6.31.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
21,450.00
2,475.00
330.00
38,655.00
322,536.70
6.32.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu sembarang
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
0.040
0.400
0.200
0.015
0.350
6.000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
3,144,900
156,530
20,750
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
125,796.00
4,048.00
1,144.00
47,173.50
54,785.50
124,500.00
357,447.00
6.32.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
21,450.00
2,475.00
330.00
38,655.00
396,102.00
6.33.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu sembarang
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
Formtie/penjaga jarak bekisting/space
0.030
0.400
0.200
0.020
0.350
3.000
4.000
M
Kg
Ltr
M
Lbr
Btg
Btg
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
3,144,900
156,530
20,750
5,000
Jumlah (1)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
94,347.00
4,048.00
1,144.00
62,898.00
54,785.50
62,250.00
20,000.00
299,472.50
6.33.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
21,450.00
2,475.00
330.00
38,655.00
338,127.50
6.34.1. Bahan
Kayu Sembarang
Paku biasa 2' - 5"
Minyak bekisting
Balok Kayu sembarang
Plywood tebal 9 mm
Kayu Dolken/Laut 3'-4'/4 m
0.030
0.400
0.150
0.015
0.350
2.000
M
Kg
Ltr
M
Lbr
Btg
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
3,144,900
156,530
20,750
Jumlah (1)
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
94,347.00
4,048.00
858.00
47,173.50
54,785.50
41,500.00
242,712.00
6.34.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
21,450.00
2,475.00
330.00
38,655.00
281,367.00
PB 6.32.
PB 6.33.
PB 6.34.
Rp.
Rp.
Rp.
1,200
102,000
184,680
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
465,600.00
66,300.00
120,042.00
651,942.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
270,000.00
65,000.00
7,500.00
16,500.00
359,000.00
1,010,942.00
Rp.
Rp.
Rp.
1,200
102,000
184,680
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
480,000.00
40,800.00
151,437.60
672,237.60
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
270,000.00
65,000.00
7,500.00
16,500.00
359,000.00
1,031,237.60
0.0264 M x
0.600 Kg x
0.500 Btg x
Rp.
Rp.
Rp.
3,144,900
10,120
20,750
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
83,025.36
6,072.00
10,375.00
99,472.36
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
1 M Membuat pondasi beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Sembarang, Papan
0.2000 M x Rp.
3,144,900
Paku biasa 2" - 5 "
1.500 Kg x Rp.
10,120
Minyak bekisting
0.400 Ltr x Rp.
5,720
Besi beton polos
150.000 Kg x Rp.
12,390
Kawat beton
2.250 Kg x Rp.
11,620
Semen portland
323.000 Kg x Rp.
1,200
Pasir beton
0.520 M x Rp.
102,000
Koral beton
0.780 M x Rp.
184,680
Jumlah (1)
Tenaga
Pekerja
3.900 Oh x Rp.
45,000
Tukang batu
0.350 Oh x Rp.
65,000
Tukang kayu
1.040 Oh x Rp.
65,000
Tukang besi
1.050 Oh x Rp.
65,000
Kepala tukang
0.245 Oh x Rp.
75,000
Mandor
0.165 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
1 M Membuat sloof beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Sembarang, Papan
0.2700 M x Rp.
3,144,900
Paku biasa 2" - 5 "
2.000 Kg x Rp.
10,120
Minyak bekisting
0.600 Ltr x Rp.
5,720
Besi beton polos
200.000 Kg x Rp.
12,390
Kawat beton
3.000 Kg x Rp.
11,620
Semen portland
323.000 Kg x Rp.
1,200
Pasir beton
0.520 M x Rp.
102,000
Koral beton
0.780 M x Rp.
184,680
Jumlah (1)
Tenaga
Pekerja
4.850 Oh x Rp.
45,000
Tukang batu
0.350 Oh x Rp.
65,000
Tukang kayu
1.560 Oh x Rp.
65,000
Tukang besi
1.400 Oh x Rp.
65,000
Kepala tukang
0.331 Oh x Rp.
75,000
Mandor
0.170 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
3,250.00
375.00
385.00
10,760.00
110,232.36
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
628,980.00
15,180.00
2,288.00
1,858,500.00
26,145.00
387,600.00
53,040.00
144,050.40
3,115,783.40
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
175,500.00
22,750.00
67,600.00
68,250.00
18,375.00
9,075.00
361,550.00
3,477,333.40
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
849,123.00
20,240.00
3,432.00
2,478,000.00
34,860.00
387,600.00
53,040.00
144,050.40
3,970,345.40
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
218,250.00
22,750.00
101,400.00
91,000.00
24,825.00
9,350.00
467,575.00
4,437,920.40
6.35.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.36.2. Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
PB 6.38.
6.38.1.
6.38.2.
PB 6.39.
6.39.1.
6.39.2.
6.000
1.000
0.100
0.300
6.000
1.000
0.100
0.300
0.150
0.050
0.005
0.007
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
PB 6.40.
6.40.1. Bahan
Kayu Sembarang, Papan
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu Dolken/Laut 3'-4'/4 m
6.40.2. Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
0.4000
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000
M
Kg
Ltr
Kg
Kg
Kg
M
M
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
12,390
11,620
1,200
102,000
184,680
3,144,900
156,530
20,750
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,257,960.00
40,480.00
11,440.00
3,717,000.00
52,290.00
387,600.00
53,040.00
144,050.40
471,735.00
547,855.00
415,000.00
7,098,450.40
7.300
0.350
3.300
2.100
0.570
0.250
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
328,500.00
22,750.00
214,500.00
136,500.00
42,750.00
13,750.00
758,750.00
7,857,200.40
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,006,368.00
32,384.00
9,152.00
2,478,000.00
34,860.00
387,600.00
53,040.00
144,050.40
440,286.00
438,284.00
332,000.00
5,356,024.40
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
268,200.00
22,750.00
182,000.00
91,000.00
34,125.00
11,440.00
609,515.00
5,965,539.40
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,006,368.00
32,384.00
9,152.00
1,858,500.00
26,145.00
387,600.00
53,040.00
144,050.40
377,388.00
438,284.00
664,000.00
4,996,911.40
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
261,000.00
22,750.00
182,000.00
68,250.00
31,500.00
10,175.00
575,675.00
5,572,586.40
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
754,776.00
32,384.00
9,152.00
1,858,500.00
26,145.00
387,600.00
53,040.00
144,050.40
503,184.00
438,284.00
498,000.00
4,705,115.40
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
252,000.00
22,750.00
171,600.00
68,250.00
30,000.00
10,615.00
555,215.00
5,260,330.40
6.44.1. Bahan
Kayu Sembarang, Papan
Paku biasa 2" - 5 "
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu sembarang balok
Plywood 9 mm
Kayu Dolken/Laut 3'-4'/4 m
6.44.2. Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
PB 6.46.
=
=
=
=
=
=
=
=
=
=
=
=
0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000
M
Kg
Ltr
Kg
Kg
Kg
M
M
M
Lbr
Btg
x
x
x
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
5,720
12,390
11,620
1,200
102,000
184,680
3,144,900
156,530
20,750
Jumlah (1)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
786,225.00
30,360.00
6,864.00
2,478,000.00
34,860.00
387,600.00
53,040.00
144,050.40
330,214.50
391,325.00
290,500.00
4,933,038.90
5.600
0.350
2.300
1.400
0.405
0.202
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
252,000.00
22,750.00
149,500.00
91,000.00
30,375.00
11,110.00
556,735.00
5,489,773.90
6.46.1. Bahan
Kayu Sembarang, Papan
Paku biasa 2" - 5 "
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
0.003
0.020
3.600
0.050
5.500
0.009
0.015
M
Kg
Kg
Kg
Kg
M
M
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,900
10,120
12,390
11,620
1,200
102,000
184,680
Jumlah (1)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,434.70
202.40
44,604.00
581.00
6,600.00
918.00
2,770.20
65,110.30
6.46.2. Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang besi
Kepala tukang
Mandor
0.100
0.033
0.033
0.033
0.010
0.005
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
65,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
2,145.00
2,145.00
2,145.00
750.00
275.00
11,960.00
77,070.30
PPA 6.1
1 M Pasang atap genteng palentong kecil
6.1.1 Bahan
Genteng Pelantong
25.00 Buah x Rp.
1,520
Jumlah (1)
6.1.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang Kayu
0.075 Oh x Rp.
65,000
Kepala Tukang
0.008 Oh x Rp.
75,000
Mandor
0.008 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.2
1 M Pasang atap genteng kodok / glazzur
6.2.1 Bahan
Genteng kodok
25.00 Buah x Rp.
1,970
Jumlah (1)
6.2.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang Kayu
0.075 Oh x Rp.
65,000
Kepala Tukang
0.008 Oh x Rp.
75,000
Mandor
0.008 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.3
1 M Pasang atap genteng palentong super / besar
6.3.1 Bahan
Genteng pelantong super
12.00 Buah x Rp.
3,620
Jumlah (1)
6.3.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang Kayu
0.060 Oh x Rp.
65,000
Kepala Tukang
0.006 Oh x Rp.
75,000
Mandor
0.008 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.4
1 M Pasang genteng bubung palentong
6.4.1 Bahan
Bubung genteng pelantong
5.00 Buah x Rp.
8,500
Semen portland
8.000 Kg x Rp.
1,200
Pasir Pasang
0.032 M x Rp.
94,500
Jumlah (1)
6.4.2 Tenaga
Pekerja
0.400 Oh x Rp.
45,000
Tukang Kayu
0.200 Oh x Rp.
65,000
Kepala Tukang
0.020 Oh x Rp.
75,000
Mandor
0.002 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.5
1 M' Pasang bubung genteng kodok glazzuur
6.5.1 Bahan
Bubung genteng kodok
5.00 Buah x Rp.
8,690
Semen portland
8.000 Kg x Rp.
1,200
Pasir Pasang
0.032 M x Rp.
94,500
Jumlah (1)
6.5.2 Tenaga
Pekerja
0.400 Oh x Rp.
45,000
Tukang Kayu
0.200 Oh x Rp.
65,000
Kepala Tukang
0.020 Oh x Rp.
75,000
Mandor
0.002 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
= Rp.
= Rp.
38,000.00
38,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
4,875.00
600.00
440.00
12,665.00
50,665.00
= Rp.
= Rp.
49,250.00
49,250.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
4,875.00
600.00
440.00
12,665.00
61,915.00
= Rp.
= Rp.
43,440.00
43,440.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
3,900.00
450.00
440.00
11,540.00
54,980.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
42,500.00
9,600.00
3,024.00
55,124.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
18,000.00
13,000.00
1,500.00
110.00
32,610.00
87,734.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
43,450.00
9,600.00
3,024.00
56,074.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
18,000.00
13,000.00
1,500.00
110.00
32,610.00
88,684.00
PPA 6.6
1 M' Pasang bubung genteng palentong besar
6.6.1 Bahan
Bubung genteng pelantong besar
4.00 Buah x Rp.
11,580
Semen portland
8.000 Kg x Rp.
1,200
Pasir Pasang
0.032 M x Rp.
94,500
Jumlah (1)
6.6.2 Tenaga
Pekerja
0.400 Oh x Rp.
45,000
Tukang Kayu
0.200 Oh x Rp.
65,000
Kepala Tukang
0.020 Oh x Rp.
75,000
Mandor
0.002 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.7
1 M Pasang roof light fiberglass ( 180 x 90 ) cm
6.7.1 Bahan
Roof light fibreglass
0.600 Lbr x Rp.
41,170
Paku biasa " - 1"
0.050 Kg x Rp.
10,930
Jumlah (1)
6.7.2 Tenaga
Pekerja
0.140 Oh x Rp.
45,000
Tukang Kayu
0.067 Oh x Rp.
65,000
Kepala Tukang
0.007 Oh x Rp.
75,000
Mandor
0.007 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.8
1 M Pasang atap asbes gelombang ( 2,70 x 0,92 m ) x 5 mm
6.8.1 Bahan
Atap asbes gelombang
0.450 Lbr x Rp.
91,300
Paku seng
0.120 Kg x Rp.
18,500
Jumlah (1)
6.8.2 Tenaga
Pekerja
0.140 Oh x Rp.
45,000
Tukang Kayu
0.075 Oh x Rp.
65,000
Kepala Tukang
0.008 Oh x Rp.
75,000
Mandor
0.008 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.9
1 M Pasang atap asbes gelombang ( 2,40 x 0,92 m ) x 5 mm
6.9.1 Bahan
Atap asbes gelombang
0.500 Lbr x Rp.
83,000
Paku seng
0.120 Kg x Rp.
18,500
Jumlah (1)
6.9.2 Tenaga
Pekerja
0.140 Oh x Rp.
45,000
Tukang Kayu
0.075 Oh x Rp.
65,000
Kepala Tukang
0.008 Oh x Rp.
75,000
Mandor
0.008 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.10 1 M Pasang atap asbes gelombang ( 2,1 x 0,92 m ) x 5 mm
6.10.1 Bahan
Atap asbes gelombang
0.600 Lbr x Rp.
76,090
Paku seng
0.120 Kg x Rp.
18,500
Jumlah (1)
6.10.2 Tenaga
Pekerja
0.140 Oh x Rp.
45,000
Tukang Kayu
0.075 Oh x Rp.
65,000
Kepala Tukang
0.008 Oh x Rp.
75,000
Mandor
0.008 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPA 6.11 1 M Pasang atap asbes gelombang ( 1,80 x 0,92 m ) x 5 mm
6.11.1 Bahan
Atap asbes gelombang
0.750 Lbr x Rp.
60,860
Paku seng
0.120 Kg x Rp.
18,500
Jumlah (1)
6.11.2 Tenaga
Pekerja
0.140 Oh x Rp.
45,000
Tukang Kayu
0.070 Oh x Rp.
65,000
Kepala Tukang
0.007 Oh x Rp.
75,000
Mandor
0.007 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
46,320.00
9,600.00
3,024.00
58,944.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
18,000.00
13,000.00
1,500.00
110.00
32,610.00
91,554.00
= Rp.
= Rp.
= Rp.
24,702.00
546.50
25,248.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,355.00
525.00
385.00
11,565.00
36,813.50
= Rp.
= Rp.
= Rp.
41,085.00
2,220.00
43,305.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,875.00
600.00
440.00
12,215.00
55,520.00
= Rp.
= Rp.
= Rp.
41,500.00
2,220.00
43,720.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,875.00
600.00
440.00
12,215.00
55,935.00
= Rp.
= Rp.
= Rp.
45,654.00
2,220.00
47,874.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,875.00
600.00
440.00
12,215.00
60,089.00
= Rp.
= Rp.
= Rp.
45,645.00
2,220.00
47,865.00
=
=
=
=
=
=
6,300.00
4,550.00
525.00
385.00
11,760.00
59,625.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
= Rp.
= Rp.
= Rp.
42,525.00
2,220.00
44,745.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,550.00
525.00
385.00
11,760.00
56,505.00
= Rp.
= Rp.
= Rp.
40,765.00
2,220.00
42,985.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,550.00
525.00
385.00
11,760.00
54,745.00
= Rp.
= Rp.
= Rp.
31,188.00
2,220.00
33,408.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,355.00
525.00
385.00
11,565.00
44,973.00
= Rp.
= Rp.
= Rp.
49,829.40
2,220.00
52,049.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,355.00
525.00
385.00
11,565.00
63,614.40
= Rp.
= Rp.
= Rp.
48,748.50
2,220.00
50,968.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,355.00
525.00
385.00
11,565.00
62,533.50
= Rp.
= Rp.
= Rp.
49,833.00
2,220.00
52,053.00
=
=
=
=
=
=
6,300.00
4,355.00
525.00
385.00
11,565.00
63,618.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
1.20 Lbr
6.00 Bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
1.20 Lbr
6.00 Bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
= Rp.
= Rp.
= Rp.
49,829.40
2,220.00
52,049.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,300.00
4,355.00
525.00
385.00
11,565.00
63,614.40
x Rp.
17,810 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
42,744.00
111,000.00
153,744.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,780.00
8,125.00
975.00
220.00
13,100.00
166,844.00
x Rp.
23,630 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
49,623.00
111,000.00
160,623.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,780.00
8,125.00
975.00
220.00
13,100.00
173,723.00
x Rp.
25,920 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
53,136.00
111,000.00
164,136.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,780.00
8,125.00
975.00
220.00
13,100.00
177,236.00
x Rp.
33,460 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
40,152.00
111,000.00
151,152.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,780.00
8,125.00
975.00
220.00
13,100.00
164,252.00
x Rp.
28,140 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
33,768.00
111,000.00
144,768.00
x
x
x
x
3,780.00
8,125.00
975.00
220.00
13,100.00
157,868.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.20 Lbr
6.00 Bh
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
1.10 Lbr
6.00 Bh
0.100
0.150
0.013
0.004
Oh
Oh
Oh
Oh
x Rp.
39,050 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
46,860.00
111,000.00
157,860.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,780.00
8,125.00
975.00
220.00
13,100.00
170,960.00
x Rp.
32,800 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
36,080.00
111,000.00
147,080.00
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
9,750.00
975.00
220.00
15,445.00
162,525.00
x Rp.
27,500
x Rp.
18,500
Jumlah (1)
x Rp.
45,000
x Rp.
65,000
x Rp.
75,000
x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
30,250.00
111,000.00
141,250.00
3,780.00
8,125.00
975.00
220.00
13,100.00
154,350.00
0.084
0.125
0.013
0.004
11.00 Bh
0.03 Kg
x Rp.
5,430 = Rp.
x Rp.
10,120 = Rp.
Jumlah (1)
= Rp.
59,730.00
303.60
60,033.60
0.200
0.100
0.010
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
6,500.00
750.00
550.00
16,800.00
76,833.60
6.900
0.350
0.030
0.500
Lbr
Lbr
Kg
Bh
x
x
x
x
Rp.
10,290
Rp.
102,410
Rp.
10,930
Rp.
25,000
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
71,001.00
35,843.50
327.90
12,500.00
119,672.40
0.200
0.300
0.003
0.010
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
19,500.00
225.00
550.00
29,275.00
148,947.40
x Rp.
96,250 = Rp.
x Rp.
10,120 = Rp.
Jumlah (1)
= Rp.
98,175.00
2,024.00
100,199.00
x
x
x
x
9,000.00
6,500.00
750.00
550.00
16,800.00
116,999.00
6.30.2 Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1.10 Lbr
6.00 Bh
Oh
Oh
Oh
Oh
0.200
0.100
0.010
0.010
Oh
Oh
Oh
Oh
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
60.00 Bh
0.200 Kg
x Rp.
940 = Rp.
x Rp.
10,930 = Rp.
Jumlah (1)
= Rp.
56,400.00
2,186.00
58,586.00
0.166
0.250
0.025
0.008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,470.00
16,250.00
1,875.00
440.00
26,035.00
84,621.00
3.50
0.050
10.800
0.032
1.000
Bh
Kg
Kg
M
Kg
x
x
x
x
x
Rp.
12,220
Rp.
10,120
Rp.
1,200
Rp.
94,500
Rp.
1,800
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
42,770.00
506.00
12,960.00
3,024.00
1,800.00
61,060.00
0.400
0.200
0.020
0.020
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
18,000.00
13,000.00
1,500.00
1,100.00
33,600.00
94,660.00
x Rp.
10,290
x Rp.
10,930
x Rp.
8,429,580
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
20,580.00
546.50
29,503.53
50,630.03
x
x
x
x
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,625.00
16,250.00
1,875.00
330.00
24,080.00
74,710.03
1.10 Bh
0.050 Kg
x Rp.
37,400 = Rp.
x Rp.
10,930 = Rp.
Jumlah (1)
= Rp.
41,140.00
546.50
41,686.50
0.250
0.150
0.015
0.013
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
9,750.00
1,125.00
715.00
22,840.00
64,526.50
0.400
0.060
0.050
0.004
Lbr
Kg
Kg
M
x
x
x
x
Rp.
105,000
Rp.
10,930
Rp.
10,120
Rp.
8,429,580
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
42,000.00
655.80
506.00
33,718.32
76,880.12
0.125
0.250
0.025
0.006
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,625.00
16,250.00
1,875.00
330.00
24,080.00
100,960.12
0.700 Lbr
0.040 Kg
x Rp.
54,220 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
37,954.00
740.00
38,694.00
0.120
0.060
0.006
0.006
x
x
x
x
5,400.00
3,900.00
450.00
330.00
10,080.00
48,774.00
2.00 Bh
0.050 Kg
0.0035 M
0.125
0.250
0.025
0.006
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.300 Lbr
0.020 Kg
x Rp.
105,000 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
31,500.00
370.00
31,870.00
0.150
0.070
0.008
0.006
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
4,550.00
600.00
330.00
12,230.00
44,100.00
1.050 M
0.020 Kg
x Rp.
89,250 = Rp.
x Rp.
27,750 = Rp.
Jumlah (1)
= Rp.
93,712.50
555.00
94,267.50
0.150
0.750
0.008
0.006
x
x
x
x
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
6,750.00
48,750.00
600.00
330.00
56,430.00
150,697.50
1.200 M
0.040 Kg
x Rp.
43,540 = Rp.
x Rp.
27,750 = Rp.
Jumlah (1)
= Rp.
52,248.00
1,110.00
53,358.00
0.100
1.000
0.010
0.010
x
x
x
x
Oh
Oh
Oh
Oh
0.150
0.050
0.005
0.008
Oh
Oh
Oh
Oh
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
65,000.00
750.00
550.00
70,800.00
124,158.00
x Rp.
70,180 = Rp.
Jumlah (1)
= Rp.
73,689.00
73,689.00
x
x
x
x
6,750.00
3,250.00
375.00
440.00
10,815.00
84,504.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
JENIS PEKERJAAN
ANA
LISA
VOLU
ME
HARGA
BAHAN
( Rp )
HARGA
UPAH
( Rp )
JUMLAH
HARGA
( Rp )
A. PEKERJAAN PERSIAPAN
1
PA 6. 1
1 M'
266,107.00
33,600.00
299,707.00
PA 6. 2
1 M'
116,304.70
33,600.00
149,904.70
PA 6. 4
1 M'
59,955.50
12,025.00
71,980.50
PA 6. 8
1 M
0.00
7,250.00
7,250.00
PA 6. 12
1 M
33,604.20
47,750.00
81,354.20
PA 6. 13
1 M
0.00
318,330.00
318,330.00
PA 6. 14
1 M
0.00
301,830.00
301,830.00
PA 6. 15
1 M'
80,203.20
5,030.00
85,233.20
B. PEKERJAAN TANAH
1
PT 6. 1
1 M
0.00
20,200.00
20,200.00
PT 6. 2
1 M
0.00
20,200.00
20,200.00
PT 6. 3
1 M
0.00
20,200.00
20,200.00
PT 6. 4
1 M
0.00
31,535.00
31,535.00
PT 6. 5
1 M
0.00
63,125.00
63,125.00
PT 6. 6
1 M
0.00
41,600.00
41,600.00
PT 6. 7
1 M
0.00
2,525.00
2,525.00
PT 6. 8
1 M
0.00
2,525.00
2,525.00
Urugan Kembali
PT 6. 9
1 M
0.00
9,685.00
9,685.00
10 Pemadatan Tanah
PT 6. 10
1 M
0.00
25,250.00
25,250.00
11 Urugan Pasir
PT 6. 11
1 M
78,240.00
25,250.00
103,490.00
PT 6. 16
1 M
1,000.00
25,250.00
26,250.00
C. PEKERJAAN PONDASI
1
PP 6. 1
1 M
644,910.00
115,125.00
760,035.00
PP 6. 2
1 M
505,588.50
115,125.00
620,713.50
PP 6. 3
1 M
644,910.00
115,125.00
760,035.00
PP 6. 4
1 M
433,069.50
115,125.00
548,194.50
PP 6. 5
1 M
389,577.00
115,125.00
504,702.00
PP 6. 6
1 M
359,445.00
115,125.00
474,570.00
PP 6. 7
1 M
338,251.50
115,125.00
453,376.50
PP 6. 14
1 M
192,690.00
65,520.00
258,210.00
PP 6. 15
1 M
1,299,772.10
204,875.00
1,504,647.10
PP 6. 16
1 M
458,566.50
133,250.00
591,816.50
PP 6. 17
1 M
783,616.30
96,325.00
879,941.30
PP 6. 18
1 M
615,079.95
74,450.00
689,529.95
D. PEKERJAAN DINDING
1
PD 6. 1
1 M
173,411.50
45,400.00
218,811.50
PD 6. 2
1 M
150,760.00
45,400.00
196,160.00
PD 6. 3
1 M
139,139.50
45,400.00
184,539.50
PD 6. 4
1 M
131,648.50
43,750.00
175,398.50
PD 6. 8
1 M
81,506.00
22,475.00
103,981.00
PD 6. 9
1 M
71,831.00
22,475.00
94,306.00
PD 6. 10
1 M
94,306.00
22,475.00
116,781.00
PD 6. 11
1 M
63,363.50
22,475.00
85,838.50
PD 6. 21
1 M
116,845.67
29,927.50
146,773.17
PD 6. 22
1 M
51,178.34
26,507.50
77,685.84
PD 6. 23
1 M
61,243.23
24,840.00
86,083.23
PD 6. 24
1 M
137,048.50
9,125.00
146,173.50
PD 6. 25
1 M
269,227.50
21,575.00
290,802.50
PD 6. 26
1 M
639,045.00
26,100.00
665,145.00
PD 6. 27
1 M
109,631.94
8,235.00
117,866.94
E. PEKERJAAN PELESTERAN
1
PPL 6. 1
1 M
16,732.50
20,425.00
37,157.50
PPL 6. 2
1 M
11,830.50
20,425.00
32,255.50
PPL 6. 3
1 M
9,571.50
20,425.00
29,996.50
PPL 6. 4
1 M
8,130.00
20,425.00
28,555.00
PPL 6. 13
1 M
19,309.50
26,437.50
45,747.00
PPL 6. 14
1 M
15,417.00
26,437.50
41,854.50
PPL 6. 15
1 M
13,062.00
26,437.50
39,499.50
PPL 6. 19
1 M
19,828.50
26,437.50
46,266.00
PPL 6. 20
1 M
17,407.50
26,465.00
43,872.50
PPL 6. 21
1 M
14,967.00
28,715.00
43,682.00
PPL 6. 23
1 M
20,665.50
33,350.00
54,015.50
PPL 6. 24
1 M
20,665.50
33,350.00
54,015.50
PPL 6. 25
1 M
17,625.00
33,350.00
50,975.00
PPL 6. 29
1 M
12,861.00
26,915.00
39,776.00
PPL 6. 30
1 M
10,468.50
26,915.00
37,383.50
16 Plesteran Skoning 1 Pc : 2 Ps
PPL 6. 31
1 M
789.00
7,995.00
8,784.00
PPL 6. 34
1 M
6,696.00
19,325.00
26,021.00
PPL 6. 35
1 M
6,696.00
12,265.00
18,961.00
F. PEKERJAAN KAYU
1
PK 6. 1
1 M
PK 6. 2
1 M
PK 6. 3
1 M
6,157,800.00 1,606,500.00
PK 6. 4
1 M
PK 6. 5
1 M
310,562.48
92,865.00
403,427.48
PK 6. 6
1 M
789,378.68
92,865.00
882,243.68
PK 6. 7
1 M
788,872.68
92,865.00
881,737.68
PK 6. 8
1 M
344,507.20
229,000.00
573,507.20
PK 6. 9
1 M
766,959.55
183,200.00
950,159.55
PK 6. 10
1 M
301,443.80
183,200.00
484,643.80
PK 6. 11
1 M
182,296.45
183,200.00
365,496.45
PK 6. 12
1 M
1,402,440.32
279,000.00
1,681,440.32
PK 6. 13
1 M
539,493.12
290,000.00
829,493.12
PK 6. 14
1 M
504,095.25
173,650.00
677,745.25
PK 6. 15
1 M
243,406.43
173,650.00
417,056.43
PK 6. 16
1 M
1,316,427.30
168,875.00
1,485,302.30
PK 6. 17
1 M
518,400.30
168,875.00
687,275.30
PK 6. 18
1 M
74,270.00
173,650.00
247,920.00
PK 6. 19
1 M
538,776.35
173,650.00
712,426.35
PK 6. 20
1 M
278,087.53
173,650.00
451,737.53
PK 6. 21
1 M
605,246.35
219,450.00
824,696.35
PK 6. 22
1 M
344,557.53
219,450.00
564,007.53
PK 6. 23
1 M
636,976.35
219,450.00
856,426.35
PK 6. 24
1 M
309,132.53
219,450.00
528,582.53
PK 6. 29
1 M
PK 6. 30
1 M
5,842,694.00 1,061,000.00
PK 6. 31
1 M
63,217.50
12,025.00
75,242.50
PK 6. 32
1 M
101,299.50
12,025.00
113,324.50
PK 6. 33
1 M
306,139.50
12,025.00
318,164.50
1 M
117,909.50
12,025.00
129,934.50
1 M
117,909.50
12,025.00
129,934.50
7,764,300.00
6,903,694.00
PK 6. 36
1 M
1,372,511.00
14,430.00
1,386,941.00
PK 6. 37
1 M
848,883.50
14,430.00
863,313.50
PK 6. 38
1 M
262,093.00
29,000.00
291,093.00
PK 6. 38 A 1 M
100,753.00
29,000.00
129,753.00
PK 6. 38 B 1 M
62,671.00
29,000.00
91,671.00
3
PK 6. 44
1 M
589,436.00
37,312.50
626,748.50
1 M
226,421.00
37,312.50
263,733.50
1 M
140,736.50
37,312.50
178,049.00
PK 6. 47
1 M'
38,047.48
19,650.00
57,697.48
PK 6. 48
1 M'
62,557.80
19,275.00
81,832.80
PK 6. 49
1 M'
241,590.93
21,175.00
262,765.93
PK 6. 50
1 M'
95,285.98
21,175.00
116,460.98
PK 6. 51
1 M'
125,539.66
29,000.00
154,539.66
PK 6. 52
1 M'
74,724.85
14,500.00
89,224.85
PK 6. 53
1 M'
45,448.64
14,500.00
59,948.64
PK 6. 54
1 M
223,329.26
43,500.00
266,829.26
PK 6. 55
1 M
137,616.54
43,500.00
181,116.54
PK 6. 56
1 M
259,290.50
43,500.00
302,790.50
PK 6. 57
1 M
245,760.50
53,050.00
298,810.50
PK 6. 58
1 M
155,930.50
159,150.00
315,080.50
PK 6. 59
1 M
26,354.50
6,634.00
32,988.50
PK 6. 60
1 M'
11,970.00
2,515.00
14,485.00
G. PEKERJAAN BETON
1
PB 6. 1
1 M
453,405.00
96,775.00
550,180.00
PB 6. 2
1 M
434,270.00
96,775.00
531,045.00
PB 6. 3
1 M
404,505.00
96,775.00
501,280.00
PB 6. 4
1 M
21,670.00
53,530.00
75,200.00
PB 6. 5
1 M
455,850.00
96,775.00
552,625.00
PB 6. 6
1 M
540,201.00
96,775.00
636,976.00
PB 6. 7
1 M
602,643.00
96,775.00
699,418.00
PB 6. 8
1 M
566,220.60
96,775.00
662,995.60
PB 6. 9
1 M
648,334.20
96,775.00
745,109.20
PB 6. 10
1 M
742,698.60
96,775.00
839,473.60
PB 6. 11
1 M
713,544.00
96,775.00
810,319.00
PB 6. 13
1 M
594,505.80
170,375.00
764,880.80
PB 6. 14
1 M
553,547.40
170,375.00
723,922.40
PB 6. 15
1 M
633,278.40
170,375.00
803,653.40
PB 6. 16
1 M
676,958.40
170,375.00
847,333.40
PB 6. 17
1 M
878,493.60
170,375.00
1,048,868.60
PB 6. 25
1 Kg
13,183.80
1,460.00
14,643.80
PB 6. 26
1 Kg
13,125.70
1,090.00
14,215.70
PB 6. 28
1 M
129,404.00
32,625.00
162,029.00
PB 6. 29
1 M
145,128.50
32,625.00
177,753.50
PB 6. 30
1 M
274,447.00
37,755.00
312,202.00
PB 6. 31
1 M
283,881.70
38,655.00
322,536.70
PB 6. 32
1 M
357,447.00
38,655.00
396,102.00
PB 6. 33
1 M
299,472.50
38,655.00
338,127.50
PB 6. 34
1 M
242,712.00
38,655.00
281,367.00
PB 6. 35
1 M
651,942.00
359,000.00
1,010,942.00
PB 6. 36
1 M
672,237.60
359,000.00
1,031,237.60
PB 6. 37
1 M
99,472.36
10,760.00
110,232.36
PB 6. 38
1 M
3,115,783.40
361,550.00
3,477,333.40
PB 6. 39
1 M
3,970,345.40
467,575.00
4,437,920.40
PB 6. 40
1 M
7,098,450.40
758,750.00
7,857,200.40
PB 6. 41
1 M
5,356,024.40
609,515.00
5,965,539.40
PB 6. 42
1 M
4,996,911.40
575,675.00
5,572,586.40
PB 6. 43
1 M
4,705,115.40
555,215.00
5,260,330.40
PB 6. 44
1 M
4,933,038.90
556,735.00
5,489,773.90
PB 6. 46
1 M
65,110.30
11,960.00
77,070.30
29
30
31
32
33
34
35
(
(
(
(
(
PPA 6 1
1 M
38,000.00
12,665.00
50,665.00
PPA 6 2
1 M
49,250.00
12,665.00
61,915.00
PPA 6 3
1 M
43,440.00
11,540.00
54,980.00
PPA 6 4
1 M'
55,124.00
32,610.00
87,734.00
PPA 6 5
1 M'
56,074.00
32,610.00
88,684.00
PPA 6 6
1 M'
58,944.00
32,610.00
91,554.00
PPA 6 7
1 M
25,248.50
11,565.00
36,813.50
PPA 6 8
1 M
43,305.00
12,215.00
55,520.00
PPA 6 9
1 M
43,720.00
12,215.00
55,935.00
PPA 6 10
1 M
47,874.00
12,215.00
60,089.00
PPA 6 11
1 M
47,865.00
11,760.00
59,625.00
PPA 6 12
1 M
44,745.00
11,760.00
56,505.00
PPA 6 13
1 M
42,985.00
11,760.00
54,745.00
PPA 6 14
1 M
33,408.00
11,565.00
44,973.00
PPA 6 18
1 M
52,049.40
11,565.00
63,614.40
PPA 6 19
1 M
50,968.50
11,565.00
62,533.50
PPA 6 20
1 M
52,053.00
11,565.00
63,618.00
PPA 6 21
1 M
52,049.40
11,565.00
63,614.40
PPA 6 22
1 M'
153,744.00
13,100.00
166,844.00
8
9
10
11
12
13
14
15
16
17
18
PPA 6 23
1 M'
160,623.00
13,100.00
173,723.00
PPA 6 24
1 M'
164,136.00
13,100.00
177,236.00
PPA 6 25
1 M'
151,152.00
13,100.00
164,252.00
PPA 6 26
1 M'
144,768.00
13,100.00
157,868.00
PPA 6 27
1 M'
157,860.00
13,100.00
170,960.00
PPA 6 28
1 M'
147,080.00
15,445.00
162,525.00
PPA 6 29
1 M'
141,250.00
13,100.00
154,350.00
PPA 6 30
1 M
60,033.60
16,800.00
76,833.60
PPA 6 31
1 M
119,672.40
29,275.00
148,947.40
PPA 6 32
1 M
100,199.00
16,800.00
116,999.00
PPA 6 33
1 M
58,586.00
26,035.00
84,621.00
PPA 6 34
1 M'
61,060.00
33,600.00
94,660.00
PPA 6 35
1 M'
50,630.03
24,080.00
74,710.03
PPA 6 36
1 M'
41,686.50
22,840.00
64,526.50
PPA 6 37
1 M'
76,880.12
24,080.00
100,960.12
PPA 6 38
1 M
38,694.00
10,080.00
48,774.00
PPA 6 39
1 M'
31,870.00
12,230.00
44,100.00
PPA 6 40
1 M
94,267.50
56,430.00
150,697.50
PPA 6 41
1 M'
53,358.00
70,800.00
124,158.00
PPA 6 42
1 M
73,689.00
10,815.00
84,504.00
PLL 6 1
1 M
17,351.80
6,507.50
23,859.30
PLL 6 2
1 M
14,477.50
6,507.50
20,985.00
PLL 6 3
1 M
11,604.30
6,507.50
18,111.80
PLL 6 4
1 M
9,184.30
6,507.50
15,691.80
PLL 6 5
1 M
94,041.50
11,565.00
105,606.50
PLL 6 6
1 M
94,042.50
10,115.00
104,157.50
PLL 6 7
1 M
94,046.00
10,115.00
104,161.00
PLL 6 8
1 M
23,555.10
10,592.50
34,147.60
PLL 6 9
1 M
37,195.50
10,592.50
47,788.00
PLL 6 10
1 M
24,522.90
10,592.50
35,115.40
PLL 6 11
1 M
38,731.65
10,592.50
49,324.15
PLL 6 12
1 M
34,977.90
10,592.50
45,570.40
PLL 6 13
1 M
36,421.65
10,592.50
47,014.15
PLL 6 14
1 M
526,886.92
53,050.00
579,936.92
PLL 6 16
1 M
205,721.80
53,050.00
258,771.80
PLL 6 17
1 M
19,896.80
34,415.00
54,311.80
PLL 6 18
1 M
126,341.00
43,412.50
169,753.50
PLL 6 19
1 M'
18,919.30
6,040.00
24,959.30
PLL 6 20
1 M
73,728.80
31,795.00
105,523.80
PLL 6 21
1 M
143,843.10
41,892.50
185,735.60
PLL 6 22
1 M
212,176.30
41,415.00
253,591.30
PLL 6 23
1 M
232,701.30
48,877.50
281,578.80
PLL 6 24
1 M
36,331.90
8,400.00
44,731.90
PEKERJAAN SANITASI
PS 6
1 Bh
1,862,102.00
266,050.00
2,128,152.00
PS 6
1 Bh
212,965.00
164,300.00
377,265.00
PS 6
1 Bh
489,795.00
159,250.00
649,045.00
Urinoir
PS 6
1 Bh
591,057.00
123,000.00
714,057.00
Washtafel
PS 6
1 Bh
544,065.00
165,000.00
709,065.00
PS 6
1 Bh
173,145.00
154,925.00
328,070.00
PS 6
1 Bh
194,700.00
126,200.00
320,900.00
PS 6
1 Bh
690,250.00
369,000.00
1,059,250.00
PS 6
1 Bh
3,300,000.00
180,625.00
3,480,625.00
PS 6
10
1 Bh
3,407,536.44
567,000.00
3,974,536.44
PS 6
11
1 Bh
184,800.00
544,500.00
729,300.00
PS 6
15
1 M'
114,638.30
31,920.00
146,558.30
PS 6
16
1 Bh
191,546.90
210,967.50
402,514.40
PS 6
17
1 Bh
311,535.20
102,075.00
413,610.20
PS 6
18
1 Bh
472,725.07
159,840.00
632,565.07
PS 6
19
1 M'
127,100.00
10,440.00
137,540.00
PS 6
20
1 M'
178,250.00
10,440.00
188,690.00
PS 6
21
1 M'
260,400.00
10,440.00
270,840.00
PS 6
22
1 M'
333,250.00
18,207.00
351,457.00
PS 6
23
1 M'
399,900.00
18,207.00
418,107.00
PS 6
24
1 M'
443,300.00
18,207.00
461,507.00
PS 6
25
1 M'
46,887.50
6,069.00
52,956.50
PS 6
26
1 M'
62,829.25
6,069.00
68,898.25
PS 6
27
1 M'
104,625.00
6,069.00
110,694.00
PS 6
28
1 M'
151,125.00
6,069.00
157,194.00
PS 6
29
1 M'
178,250.00
9,103.50
187,353.50
PS 6
30
1 M'
204,600.00
6,069.00
210,669.00
PS 6
31
1 M'
237,150.00
13,658.00
250,808.00
PS 6
32
1 M'
398,350.00
13,658.00
412,008.00
PS 6
33
1 Bh
439,270.00
23,182.50
462,452.50
PS 6
34
1 Bh
291,225.00
38,637.50
329,862.50
PS 6
35
1 Bh
26,963.75
7,975.00
34,938.75
PS 6
36
1 Bh
15,000.00
7,975.00
22,975.00
PBA 6 1
1 Kg
17,140.20
3,556.50
20,696.70
PBA 6 1
2 M
458,850.00
78,135.00
536,985.00
PBA 6 1
3 M
316,250.00
123,663.75
439,913.75
PBA 6 1
5 M
500,250.00
141,330.00
641,580.00
PBA 6 1
6 M
517,500.00
123,661.00
641,161.00
PBA 6 1
7 M
488,750.00
61,820.00
550,570.00
PBA 6 1
8 M
477,250.00
152,911.00
630,161.00
PBA 6 1
9 M
546,250.00
123,661.00
669,911.00
PBA 6 1
10 M
146,625.00
40,092.50
186,717.50
PBA 6 1
11 M
155,250.00
40,092.50
195,342.50
PBA 6 1
12 M
145,130.00
129,063.00
274,193.00
PBA 6 1
13 M
48,043.30
11,777.50
59,820.80
PBA 6 1
14 M
22,919.30
11,777.50
34,696.80
PBA 6 1
15 M
44,248.30
11,777.50
56,025.80
PBA 6 1
16 M
44,242.80
11,777.50
56,020.30
PBA 6 1
17 M
207,358.60
23,555.00
230,913.60
PBA 6 1
18 M'
112,898.85
34,693.75
147,592.60
PBA 6 1
19 M'
163,329.45
34,693.75
198,023.20
PBA 6 1
20 M'
136,401.50
24,943.75
161,345.25
PKK 6 1
1 Bh
203,500.00
46,365.00
249,865.00
PKK 6 2
1 Bh
81,840.00
33,975.00
115,815.00
PKK 6 3
1 Bh
49,720.00
33,237.50
82,957.50
PKK 6 4
1 Bh
167,750.00
33,113.75
200,863.75
PKK 6 5
1 Bh
13,750.00
11,591.25
25,341.25
PKK 6 6
1 Bh
10,230.00
7,727.50
17,957.50
PKK 6 7
1 Bh
22,770.00
15,950.00
38,720.00
PKK 6 8
1 Bh
8,250.00
11,591.25
19,841.25
PKK 6 9
1 Bh
17,380.00
11,591.25
28,971.25
PKK 6 10
1 Bh
99,770.00
38,637.50
138,407.50
PKK 6 11
1 Bh
40,370.00
15,455.00
55,825.00
PKK 6 12
1 Bh
102,740.00
38,637.50
141,377.50
PKK 6 13
1 Bh
34,650.00
7,727.50
42,377.50
PKK 6 14
1 Bh
145,750.00
46,365.00
192,115.00
PKK 6 15
11,220.00
19,318.75
30,538.75
PKK 6 16
87,120.00
11,591.25
98,711.25
PKK 6 17
145,200.00
11,591.25
156,791.25
PKK 6 18
232,320.00
12,749.00
245,069.00
PKK 6 19
122,787.50
19,318.75
142,106.25
PKK 6 20
161,700.00
11,591.25
173,291.25
PKK 6 21
193,600.00
11,591.25
205,191.25
PKK 6 23
151,250.00
11,591.25
162,841.25
PPL 6 1
48,798.15
20,637.50
69,435.65
PPL 6 2
49,285.65
21,477.50
70,763.15
PPL 6 3
49,633.50
22,317.50
71,951.00
PPL 6 4
83,364.00
20,637.50
104,001.50
PPL 6 5
60,020.00
20,637.50
80,657.50
PPL 6 6
58,525.50
22,317.50
80,843.00
PPL 6 7
135,019.25
20,637.50
155,656.75
PPL 6 8
37,192.25
22,152.50
59,344.75
PPL 6 9
310,332.25
20,637.50
330,969.75
PPL 6 10
300,893.65
21,477.50
322,371.15
PPL 6 13
571,689.75
20,637.50
592,327.25
PPL 6 14
290,646.75
48,320.00
338,966.75
PPL 6 15
311,339.25
58,075.00
369,414.25
PPL 6 16
M'
7,980.00
5,040.00
13,020.00
PPL 6 17
M'
7,980.00
5,040.00
13,020.00
PPL 6 18
M'
12,066.50
5,040.00
17,106.50
PPL 6 19
M'
8,000.00
5,040.00
13,040.00
PPL 6 20
M'
12,388.60
5,040.00
17,428.60
PPL 6 21
M'
15,367.50
6,720.00
22,087.50
PPL 6 22
M'
30,074.50
6,720.00
36,794.50
PPL 6 23
M'
31,108.50
6,720.00
37,828.50
PPL 6 24
M'
153,265.90
5,040.00
158,305.90
PPL 6 25
M'
87,132.70
47,272.50
134,405.20
PPL 6 28
M'
68,517.40
47,272.50
115,789.90
PPL 6 29
M'
68,517.40
47,272.50
115,789.90
PPL 6 30
M'
51,967.90
47,272.50
99,240.40
PPL 6 34
103,650.00
54,925.00
158,575.00
PPL 6 35
63,575.00
54,925.00
118,500.00
PPL 6 36
103,650.00
54,925.00
158,575.00
PPL 6 37
M'
10,767.40
10,822.50
21,589.90
PPL 6 38
M'
10,814.40
10,822.50
21,636.90
PPL 6 39
M'
5,635.40
10,822.50
16,457.90
PPL 6 39A 1
M'
7,010.40
10,822.50
17,832.90
PPL 6 39B 1
M'
11,430.20
10,822.50
22,252.70
PPL 6 39C 1
M'
16,360.40
10,822.50
27,182.90
PPL 6 41
M'
29,300.00
9,620.00
38,920.00
PPL 6 42
76,150.00
54,925.00
131,075.00
PPL 6 43
74,390.00
54,925.00
129,315.00
PPL 6 44
76,150.00
54,925.00
131,075.00
PPL 6 45
89,350.00
54,925.00
144,275.00
PPL 6 46
65,150.00
54,925.00
120,075.00
PPL 6 47
76,194.00
54,925.00
131,119.00
PPL 6 48
92,650.00
54,925.00
147,575.00
PPL 6 49
76,150.00
54,925.00
131,075.00
PPL 6 50
177,165.50
54,925.00
232,090.50
PPL 6 51
275,899.30
54,925.00
330,824.30
PPL 6 52
95,025.00
20,442.50
115,467.50
PPL 6 53
97,125.00
20,442.50
117,567.50
PPL 6 55
100,275.00
20,442.50
120,717.50
PPL 6 56
375,150.00
56,412.50
431,562.50
PPL 6 58
107,686.00
65,800.00
173,486.00
PPL 6 59
125,946.00
65,800.00
191,746.00
PPL 6 60
110,436.00
61,275.00
171,711.00
PPL 6 61
120,336.00
61,275.00
181,611.00
PPL 6 64
181,386.00
61,275.00
242,661.00
PPL 6 65
98,886.00
61,275.00
160,161.00
PPL 6 66
71,386.00
61,275.00
132,661.00
PPL 6 67
70,836.00
61,275.00
132,111.00
PPL 6 68
71,386.00
38,525.00
109,911.00
PPL 6 69
71,386.00
37,712.50
109,098.50
PPL 6 70
265,028.50
81,450.00
346,478.50
PPL 6 71
136,376.50
67,150.00
203,526.50
PPL 6 73
1,337,707.50
54,925.00
1,392,632.50
PPL 6 74
1,219,307.50
54,925.00
1,274,232.50
PPL 6 75
101,574.00
18,037.50
119,611.50
PPL 6 76
94,050.00
18,037.50
112,087.50
PPL 6 77
85,272.00
18,037.50
103,309.50
PPL 6 78
97,812.00
18,037.50
115,849.50
PPL 6 79
77,625.00
46,542.50
124,167.50
PPL 6 82
M'
53,516.51
14,430.00
67,946.51
PPL 6 82A 1
M'
21,595.43
14,430.00
36,025.43
PC 6
1,023.00
6,887.50
7,910.50
PC 6
687.50
6,887.50
7,575.00
PC 6
687.50
6,887.50
7,575.00
K. PEKERJAAN PENGECATAN
1
2
3
PC 6
687.50
6,887.50
7,575.00
PC 6
1,370.60
7,537.50
8,908.10
PC 6
185,000.00
8,725.00
193,725.00
PC 6
13
7,513.00
18,937.50
26,450.50
PC 6
14
7,352.40
5,605.00
12,957.40
15
7,946.40
4,442.50
12,388.90
17
7,609.80
14,571.60
22,181.40
PC 6
18
37,677.00
2,300.00
39,977.00
PC 6
19
40,796.00
14,187.50
54,983.50
PC 6
20
4,471.50
15,950.00
20,421.50
PC 6
21
10,761.30
27,975.00
38,736.30
PC 6
23
13,662.00
2,760.00
16,422.00
PC 6
24
12,617.00
108,000.00
120,617.00
PC 6
25
4,125.00
89,500.00
93,625.00
Medan,
DIKETAHUI OLEH :
Kepala Dinas Penataan Ruang dan
Maret 2008
( . )
2. Ir. Herimas
( . )
3. H. Sugiarto Bharata, ST
( . )
4. H. Ali Muhar, ST
( . )
( . )
6. Ebenser Saragih, SE
( . )
7. Sahat Hasudungan, ST
( . )
( . )
9. Ali Fauzan, ST
( . )
NIP. 400025884
( . )
11. Chandra, ST
( . )
PKK 6.1
6.1.1
6.1.2
PKK 6.2
6.2.1
6.1.2
PKK 6.3
6.3.1
6.3.2
PKK 6.4
6.4.1
6.4.2
PKK 6.5
6.5.1
6.5.2
PKK 6.6
6.6.1
6.6.2
1.000 Bh
x Rp.
203,500 = Rp.
Jumlah (1)
= Rp.
203,500.00
203,500.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.060
0.600
0.060
0.003
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
39,000.00
4,500.00
165.00
46,365.00
249,865.00
1.000 Bh
x Rp.
81,840 = Rp.
Jumlah (1)
= Rp.
81,840.00
81,840.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.010
0.500
0.010
0.005
x
x
x
x
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
0.005
0.500
0.005
0.0025
Oh
Oh
Oh
Oh
1.000 Bh
0.005
0.500
0.005
0.00025
Oh
Oh
Oh
Oh
1.000 Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
0.010
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
450.00
32,500.00
750.00
275.00
33,975.00
115,815.00
x Rp.
49,720 = Rp.
Jumlah (1)
= Rp.
49,720.00
49,720.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
225.00
32,500.00
375.00
137.50
33,237.50
82,957.50
x Rp.
167,750 = Rp.
Jumlah (1)
= Rp.
167,750.00
167,750.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
225.00
32,500.00
375.00
13.75
33,113.75
200,863.75
x Rp.
13,750 = Rp.
Jumlah (1)
= Rp.
13,750.00
13,750.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
25,341.25
x Rp.
10,230 = Rp.
Jumlah (1)
= Rp.
10,230.00
10,230.00
x
x
x
x
450.00
6,500.00
750.00
27.50
7,727.50
17,957.50
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PKK 6.7
6.7.1
6.7.2
PKK 6.8
6.8.1
6.8.2
PKK 6.9
6.9.1
6.9.2
1.000 Bh
x Rp.
22,770 = Rp.
Jumlah (1)
= Rp.
22,770.00
22,770.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.020
0.200
0.020
0.010
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
13,000.00
1,500.00
550.00
15,950.00
38,720.00
1.000 Bh
x Rp.
8,250 = Rp.
Jumlah (1)
= Rp.
8,250.00
8,250.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
1.000 Bh
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
1.000 Bh
0.050
0.500
0.050
0.0025
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
19,841.25
x Rp.
17,380 = Rp.
Jumlah (1)
= Rp.
17,380.00
17,380.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
28,971.25
x Rp.
99,770 = Rp.
Jumlah (1)
= Rp.
99,770.00
99,770.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
1.000 Bh
x Rp.
40,370 = Rp.
Jumlah (1)
= Rp.
40,370.00
40,370.00
0.020
0.200
0.020
0.001
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
13,000.00
1,500.00
55.00
15,455.00
55,825.00
x Rp.
102,740 = Rp.
Jumlah (1)
= Rp.
102,740.00
102,740.00
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,250.00
32,500.00
3,750.00
137.50
38,637.50
141,377.50
x Rp.
34,650 = Rp.
Jumlah (1)
= Rp.
34,650.00
34,650.00
x
x
x
x
450.00
6,500.00
750.00
27.50
7,727.50
42,377.50
0.050
0.500
0.050
0.0025
Oh
Oh
Oh
Oh
1.000 Bh
0.010
0.100
0.010
0.0005
Oh
Oh
Oh
Oh
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
2,250.00
32,500.00
3,750.00
137.50
38,637.50
138,407.50
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1.000 Bh
x Rp.
145,750 = Rp.
Jumlah (1)
= Rp.
145,750.00
145,750.00
0.060
0.600
0.060
0.003
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
39,000.00
4,500.00
165.00
46,365.00
192,115.00
x Rp.
11,220 = Rp.
Jumlah (1)
= Rp.
11,220.00
11,220.00
Oh
Oh
Oh
Oh
1.000 Bh
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
0.025
0.250
0.025
0.00125
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,125.00
16,250.00
1,875.00
68.75
19,318.75
30,538.75
1.100
x Rp.
79,200 = Rp.
Jumlah (1)
= Rp.
87,120.00
87,120.00
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
98,711.25
1.100
x Rp.
132,000 = Rp.
Jumlah (1)
= Rp.
145,200.00
145,200.00
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
156,791.25
1.100
x Rp.
211,200 = Rp.
Jumlah (1)
= Rp.
232,320.00
232,320.00
0.0165
0.165
0.0165
0.0008
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
742.50
10,725.00
1,237.50
44.00
12,749.00
245,069.00
x Rp.
110,000 = Rp.
x Rp.
35,750 = Rp.
Jumlah (1)
= Rp.
121,000.00
1,787.50
122,787.50
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.025
0.250
0.025
0.00125
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,125.00
16,250.00
1,875.00
68.75
19,318.75
142,106.25
x Rp.
147,000 = Rp.
Jumlah (1)
= Rp.
161,700.00
161,700.00
Oh
Oh
Oh
Oh
x
x
x
x
675.00
9,750.00
1,125.00
41.25
11,591.25
173,291.25
6.20.2 Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.015
0.150
0.015
0.00075
x Rp.
176,000 = Rp.
Jumlah (1)
= Rp.
193,600.00
193,600.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
205,191.25
x Rp.
137,500 = Rp.
Jumlah (1)
= Rp.
151,250.00
151,250.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
0.015
0.150
0.015
0.00075
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
675.00
9,750.00
1,125.00
41.25
11,591.25
162,841.25
x Rp.
154,000 = Rp.
Jumlah (1)
= Rp.
169,400.00
169,400.00
Oh
Oh
Oh
Oh
x
x
x
x
675.00
9,750.00
1,125.00
41.25
11,591.25
180,991.25
6.24.2 Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.015
0.150
0.015
0.00075
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PPL 6.1
6.1.1
6.1.2
PPL 6.2
6.2.1
6.2.2
PPL 6.3
6.3.1
6.3.2
PPL 6.4
6.4.1
6.4.2
PPL 6.5
6.5.1
6.5.2
=
=
=
=
Rp.
Rp.
Rp.
Rp.
35,006.40
11,760.00
2,031.75
48,798.15
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
7,800.00
900.00
687.50
20,637.50
69,435.65
=
=
=
=
Rp.
Rp.
Rp.
Rp.
35,253.90
12,000.00
2,031.75
49,285.65
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
8,125.00
937.50
715.00
21,477.50
70,763.15
=
=
=
=
Rp.
Rp.
Rp.
Rp.
34,980.00
12,480.00
2,173.50
49,633.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
12,150.00
8,450.00
975.00
742.50
22,317.50
71,951.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
69,283.50
9,792.00
2,173.50
2,115.00
83,364.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
7,800.00
900.00
687.50
20,637.50
104,001.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
45,699.50
10,032.00
2,173.50
2,115.00
60,020.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
7,800.00
900.00
687.50
20,637.50
80,657.50
PPL 6.6
6.6.1
6.6.2
PPL 6.7
6.7.1
6.7.2
PPL 6.8
6.8.1
6.8.2
PPL 6.9
6.9.1
6.9.2
PPL 6.10
1 M Pasang lantai ubin granito ukuran 30 x 30 cm
6.10.1 Bahan
Ubin granito 30 x 30 cm
11.870 Bh x Rp.
23,870
Semen portland
10.000 Kg x Rp.
1,200
Pasir pasang
0.0215 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.10.2 Tenaga
Pekerja
0.260 Oh x Rp.
45,000
Tukang batu
0.125 Oh x Rp.
65,000
Kepala tukang
0.0125 Oh x Rp.
75,000
Mandor
0.013 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
43,725.00
10,512.00
2,173.50
2,115.00
58,525.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
12,150.00
8,450.00
975.00
742.50
22,317.50
80,843.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
120,312.50
10,560.00
2,031.75
2,115.00
135,019.25
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
7,800.00
900.00
687.50
20,637.50
155,656.75
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
19,541.50
12,000.00
2,031.75
3,619.00
37,192.25
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
8,125.00
1,612.50
715.00
22,152.50
59,344.75
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
293,485.50
11,760.00
2,031.75
3,055.00
310,332.25
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
7,800.00
900.00
687.50
20,637.50
330,969.75
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
283,336.90
12,000.00
2,031.75
3,525.00
300,893.65
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
8,125.00
937.50
715.00
21,477.50
322,371.15
PPL 6.13
1 M Pasang lantai ubin teralux marmer ukuran 60 x 60 cm
6.13.1 Bahan
Ubin marmar 60 x 60 cm
5.600 Bh x Rp.
99,550
Semen portland
8.190 Kg x Rp.
1,200
Pasir pasang
0.0215 M x Rp.
94,500
Semen warna
1.000 Kg x Rp.
2,350
Jumlah (1)
6.13.2 Tenaga
Pekerja
0.250 Oh x Rp.
45,000
Tukang batu
0.120 Oh x Rp.
65,000
Kepala tukang
0.012 Oh x Rp.
75,000
Mandor
0.0125 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.14
1 M Pasang lantai ubin teralux marmer ukuran 40 x 40 cm
6.14.1 Bahan
Ubin marmar 40 x 40 cm
6.250 Bh x Rp.
44,000
Semen portland
8.800 Kg x Rp.
1,200
Pasir pasang
0.0215 M x Rp.
94,500
Semen warna
1.300 Kg x Rp.
2,350
Jumlah (1)
6.14.2 Tenaga
Pekerja
0.672 Oh x Rp.
45,000
Tukang batu
0.224 Oh x Rp.
65,000
Kepala tukang
0.022 Oh x Rp.
75,000
Mandor
0.034 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.15
1 M Pasang lantai ubin teralux marmer ukuran 30 x 30 cm
6.15.1 Bahan
Ubin marmar 30 x 30 cm
11.870 Bh x Rp.
24,750
Semen portland
10.000 Kg x Rp.
1,200
Pasir pasang
0.0215 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.15.2 Tenaga
Pekerja
0.700 Oh x Rp.
45,000
Tukang batu
0.340 Oh x Rp.
65,000
Kepala tukang
0.034 Oh x Rp.
75,000
Mandor
0.035 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.16
1 M' Pasang plint ubin pc abu-abu ukuran 10 x 20 cm
6.16.1 Bahan
Plint ubin 10 x 20 cm
5.300 Bh x Rp.
935
Semen portland
1.560 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Jumlah (1)
6.16.2 Tenaga
Pekerja
0.060 Oh x Rp.
45,000
Tukang batu
0.030 Oh x Rp.
65,000
Kepala tukang
0.003 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.17
1 M' Pasang plint ubin pc abu-abu ukuran 10 x 30 cm
6.17.1 Bahan
Plint ubin 10 x 30 cm
3.530 Bh x Rp.
1,650
Semen portland
1.560 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Jumlah (1)
6.17.2 Tenaga
Pekerja
0.060 Oh x Rp.
45,000
Tukang batu
0.030 Oh x Rp.
65,000
Kepala tukang
0.003 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
557,480.00
9,828.00
2,031.75
2,350.00
571,689.75
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
7,800.00
900.00
687.50
20,637.50
592,327.25
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
275,000.00
10,560.00
2,031.75
3,055.00
290,646.75
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
30,240.00
14,560.00
1,650.00
1,870.00
48,320.00
338,966.75
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
293,782.50
12,000.00
2,031.75
3,525.00
311,339.25
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
31,500.00
22,100.00
2,550.00
1,925.00
58,075.00
369,414.25
=
=
=
=
Rp.
Rp.
Rp.
Rp.
4,955.50
1,872.00
283.50
7,111.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
1,950.00
225.00
165.00
5,040.00
12,151.00
=
=
=
=
Rp.
Rp.
Rp.
Rp.
5,824.50
1,872.00
283.50
7,980.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
1,950.00
225.00
165.00
5,040.00
13,020.00
PPL 6.18
1 M' Pasang plint ubin pc abu-abu ukuran 10 x 40 cm
6.18.1 Bahan
Plint ubin 10 x 40 cm
2.650 Bh x Rp.
3,740
Semen portland
1.560 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Jumlah (1)
6.18.2 Tenaga
Pekerja
0.060 Oh x Rp.
45,000
Tukang batu
0.030 Oh x Rp.
65,000
Kepala tukang
0.003 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.19
1 M' Pasang plint ubin pc warna ukuran 10 x 20 cm
6.19.1 Bahan
Plint ubin pc warna 10 x 20 cm
5.300 Bh x Rp.
1,100
Semen portland
1.200 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Semen warna
0.190 Kg x Rp.
2,350
Jumlah (1)
6.19.2 Tenaga
Pekerja
0.060 Oh x Rp.
45,000
Tukang batu
0.030 Oh x Rp.
65,000
Kepala tukang
0.003 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.20
1 M' Pasang plint ubin pc warna ukuran 10 x 30 cm
6.20.1 Bahan
Plint ubin pc warna 10 x 30 cm
3.330 Bh x Rp.
2,970
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.20.2 Tenaga
Pekerja
0.060 Oh x Rp.
45,000
Tukang batu
0.030 Oh x Rp.
65,000
Kepala tukang
0.003 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.21
1 M' Pasang plint ubin pc warna ukuran 10 x 40 cm
6.21.1 Bahan
Plint ubin pc warna 10 x 40 cm
2.650 Bh x Rp.
5,060
Semen portland
1.200 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.21.2 Tenaga
Pekerja
0.080 Oh x Rp.
45,000
Tukang batu
0.040 Oh x Rp.
65,000
Kepala tukang
0.004 Oh x Rp.
75,000
Mandor
0.004 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.22
1 M' Pasang plint ubin teraso ukuran 10 x 30 cm
6.22.1 Bahan
Plint ubin teraso 10 x 30 cm
3.330 Bh x Rp.
8,250
Semen portland
1.560 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Semen warna
0.190 Kg x Rp.
2,350
Jumlah (1)
6.22.2 Tenaga
Pekerja
0.080 Oh x Rp.
45,000
Tukang batu
0.040 Oh x Rp.
65,000
Kepala tukang
0.004 Oh x Rp.
75,000
Mandor
0.004 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
9,911.00
1,872.00
283.50
12,066.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
1,950.00
225.00
165.00
5,040.00
17,106.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,830.00
1,440.00
283.50
446.50
8,000.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
1,950.00
225.00
165.00
5,040.00
13,040.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
9,890.10
1,980.00
283.50
235.00
12,388.60
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
1,950.00
225.00
165.00
5,040.00
17,428.60
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
13,409.00
1,440.00
283.50
235.00
15,367.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,600.00
2,600.00
300.00
220.00
6,720.00
22,087.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
27,472.50
1,872.00
283.50
446.50
30,074.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,600.00
2,600.00
300.00
220.00
6,720.00
36,794.50
PPL 6.23
1 M' Pasang plint ubin teraso ukuran 10 x 40 cm
6.23.1 Bahan
Plint ubin teraso 10 x 40 cm
2.650 Bh x Rp.
11,000
Semen portland
1.200 Kg x Rp.
1,200
Pasir pasang
0.003 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.23.2 Tenaga
Pekerja
0.080 Oh x Rp.
45,000
Tukang batu
0.040 Oh x Rp.
65,000
Kepala tukang
0.004 Oh x Rp.
75,000
Mandor
0.004 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.24
1 M' Pasang plint ubin granito ukuran 10 x 40 cm
6.24.1 Bahan
Plint ubin granito 10 x 40 cm
2.650 Bh x Rp.
57,090
Semen portland
1.200 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.24.2 Tenaga
Pekerja
0.060 Oh x Rp.
45,000
Tukang batu
0.030 Oh x Rp.
65,000
Kepala tukang
0.003 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.25
1 M' Pasang plint ubin granito ukuran 10 x 30 cm
6.25.1 Bahan
Plint ubin granito 10 x 40 cm
3.330 Bh x Rp.
25,410
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.25.2 Tenaga
Pekerja
0.900 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.28
1 M' Pasang plint ubin teralux marmer ukuran 10 x 60 cm
6.28.1 Bahan
Plint ubin marmer 10 x 60 cm
1.700 Bh x Rp.
59,730
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.28.2 Tenaga
Pekerja
0.900 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.29
1 M' Pasang plint ubin teralux marmer ukuran 10 x 40 cm
6.29.1 Bahan
Plint ubin marmer 10 x 40 cm
2.500 Bh x Rp.
26,400
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.29.2 Tenaga
Pekerja
0.900 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
29,150.00
1,440.00
283.50
235.00
31,108.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,600.00
2,600.00
300.00
220.00
6,720.00
37,828.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
151,288.50
1,440.00
302.40
235.00
153,265.90
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
1,950.00
225.00
165.00
5,040.00
158,305.90
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
84,615.30
1,980.00
302.40
235.00
87,132.70
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,500.00
5,850.00
675.00
247.50
47,272.50
134,405.20
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
101,541.00
1,980.00
302.40
235.00
104,058.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,500.00
5,850.00
675.00
247.50
47,272.50
151,330.90
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
66,000.00
1,980.00
302.40
235.00
68,517.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,500.00
5,850.00
675.00
247.50
47,272.50
115,789.90
PPL 6.30
1 M' Pasang plint ubin teralux marmer ukuran 10 x 30 cm
6.30.1 Bahan
Plint ubin marmer 10 x 30 cm
3.330 Bh x Rp.
14,850
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.30.2 Tenaga
Pekerja
0.900 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.34
1 M Pasang lantai keramik artistik 10 x 20 cm
6.34.1 Bahan
Keramik artistik 10 x 20 cm
50.000 Bh x
Semen portland
11.380 Kg x
Pasir pasang
0.042 M x
Semen warna
1.500 Kg x
6.34.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
PPL 6.35
1 M Pasang lantai keramik artistik 10 x 10 cm
6.35.1 Bahan
Keramik artistik 10 x 10 cm
50.000 Bh x
Semen portland
11.380 Kg x
Pasir pasang
0.042 M x
Semen warna
2.000 Kg x
6.35.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
49,450.50
1,980.00
302.40
235.00
51,967.90
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,500.00
5,850.00
675.00
247.50
47,272.50
99,240.40
Rp.
1,650
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
82,500.00
13,656.00
3,969.00
3,525.00
103,650.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
158,575.00
Rp.
825
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
41,250.00
13,656.00
3,969.00
4,700.00
63,575.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
118,500.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
82,500.00
13,656.00
3,969.00
3,525.00
103,650.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
158,575.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
8,250.00
1,980.00
302.40
235.00
10,767.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,050.00
5,850.00
675.00
247.50
10,822.50
21,589.90
PPL 6.36
1 M Pasang lantai keramik artistik ukuran 5 x 20 cm
6.36.1 Bahan
Keramik artistik 5 x 20 cm
100.000 Bh x Rp.
825
Semen portland
11.380 Kg x Rp.
1,200
Pasir pasang
0.042 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.36.2 Tenaga
Pekerja
0.620 Oh x Rp.
45,000
Tukang batu
0.350 Oh x Rp.
65,000
Kepala tukang
0.035 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.37
1 M' Pasang plint keramik artistik ukuran 10 x 20 cm
6.37.1 Bahan
Keramik artistik 10 x 20 cm
5.000 Bh x Rp.
1,650
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.100 Kg x Rp.
2,350
Jumlah (1)
6.37.2 Tenaga
Pekerja
0.090 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.38
1 M' Pasang plint keramik artistik ukuran 10 x 10 cm
6.38.1 Bahan
Keramik artistik 10 x 10 cm
10.000 Bh x Rp.
825
Semen portland
1.650 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.120 Kg x Rp.
2,350
Jumlah (1)
6.38.2 Tenaga
Pekerja
0.090 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
8,250.00
1,980.00
302.40
282.00
10,814.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,050.00
5,850.00
675.00
247.50
10,822.50
21,636.90
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
4,125.00
1,020.00
302.40
188.00
5,635.40
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,050.00
5,850.00
675.00
247.50
10,822.50
16,457.90
Rp.
1,100
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
5,500.00
1,020.00
302.40
188.00
7,010.40
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,050.00
5,850.00
675.00
247.50
10,822.50
17,832.90
Rp.
2,970
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
9,919.80
1,020.00
302.40
188.00
11,430.20
PPL 6.39
1 M' Pasang plint keramik artistik ukuran 5 x 20 cm
6.39.1 Bahan
Keramik artistik 5 x 20 cm
5.000 Bh x Rp.
825
Semen portland
0.850 Kg x Rp.
1,200
Pasir pasang
0.0032 M x Rp.
94,500
Semen warna
0.080 Kg x Rp.
2,350
Jumlah (1)
6.39.2 Tenaga
Pekerja
0.090 Oh x Rp.
45,000
Tukang batu
0.090 Oh x Rp.
65,000
Kepala tukang
0.009 Oh x Rp.
75,000
Mandor
0.0045 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6,39 A 1 M' Pasang plint keramik ukuran 10 x 20 cm
6.39.1 Bahan
Keramik 10 x 20 cm
5.000 Bh x
Semen portland
0.850 Kg x
Pasir pasang
0.0032 M x
Semen warna
0.080 Kg x
6.39.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.090
0.090
0.009
0.0045
Oh
Oh
Oh
Oh
x
x
x
x
0.090
0.090
0.009
0.0045
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,050.00
5,850.00
675.00
247.50
10,822.50
22,252.70
Bh
Kg
M
Kg
x
x
x
x
Rp.
5,940
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
14,850.00
1,020.00
302.40
188.00
16,360.40
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,050.00
5,850.00
675.00
247.50
10,822.50
27,182.90
6.39.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.090
0.090
0.009
0.0045
PPL 6.41
1 M' Pasang plint vinyil tanpa adukan
6.41.1 Bahan
Vinyl 30 x 30 cm
3.500 Bh
Lem vinyl
0.080 Kg
x Rp.
7,480 = Rp.
x Rp.
39,000 = Rp.
Jumlah (1)
= Rp.
26,180.00
3,120.00
29,300.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,600.00
5,200.00
600.00
220.00
9,620.00
38,920.00
PPL 6.42
1 M Pasang lantai keramik 10 x 20 cm
6.42.1 Bahan
Ubin keramik 10 x 20 cm
50.000 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
1,100
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
13,656.00
3,969.00
3,525.00
76,150.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
131,075.00
PPL 6.43
1 M Pasang lantai keramik 15 x 15 cm
6.43.1 Bahan
Ubin keramik 15 x 15 cm
44.000 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
1,210
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
53,240.00
13,656.00
3,969.00
3,525.00
74,390.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
129,315.00
PPL 6.44
1 M Pasang lantai keramik 20 x 20 cm
6.44.1 Bahan
Ubin keramik 20 x 20 cm
25.000 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
2,200
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
13,656.00
3,969.00
3,525.00
76,150.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
131,075.00
PPL 6.45
1 M Pasang lantai keramik 20 x 25 cm
6.45.1 Bahan
Ubin keramik 20 x 25 cm
20.000 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
3,410
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
68,200.00
13,656.00
3,969.00
3,525.00
89,350.00
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
144,275.00
6.41.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.42.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.43.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.44.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.45.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.080
0.080
0.008
0.004
0.620
0.350
0.035
0.030
0.620
0.350
0.035
0.030
0.620
0.350
0.035
0.030
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
PPL 6.46
1 M Pasang lantai keramik 25 x 25 cm
6.46.1 Bahan
Ubin keramik 25 x 25 cm
16.000 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
2,750
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
44,000.00
13,656.00
3,969.00
3,525.00
65,150.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
120,075.00
PPL 6.47
1 M Pasang lantai keramik 30 x 30 cm
6.47.1 Bahan
Ubin keramik 30 x 30 cm
11.120 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
4,950
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,044.00
13,656.00
3,969.00
3,525.00
76,194.00
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
131,119.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
71,500.00
13,656.00
3,969.00
3,525.00
92,650.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
147,575.00
6.46.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.47.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.620
0.350
0.035
0.030
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
PPL 6.48
1 M Pasang lantai keramik 30 x 30 cm anti slip
6.48.1 Bahan
Keramik 30 x 30 cm anti slip
10.000 Bh x Rp.
7,150
Semen portland
11.380 Kg x Rp.
1,200
Pasir pasang
0.042 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.48.2 Tenaga
Pekerja
0.620 Oh x Rp.
45,000
Tukang batu
0.350 Oh x Rp.
65,000
Kepala tukang
0.035 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.49
1 M Pasang lantai keramik 40 x 40 cm
6.49.1 Bahan
Ubin keramik 40 x 40 cm
6.250 Bh
Semen portland
11.380 Kg
Pasir pasang
0.042 M
Semen warna
1.500 Kg
6.49.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
8,800
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
13,656.00
3,969.00
3,525.00
76,150.00
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
131,075.00
Rp.
12,650
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
151,800.00
16,980.00
3,685.50
4,700.00
177,165.50
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
232,090.50
PPL 6.50
1 M Pasang lantai mosaik 30 x 30 cm, ex lokal
6.50.1 Bahan
Mosaik 30 x 30 cm
12.000 Bh x
Semen portland
14.150 Kg x
Pasir pasang
0.039 M x
Semen warna
2.000 Kg x
6.50.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
PPL 6.51
1 M Pasang lantai marmer
6.51.1 Bahan
Marmer
Semen portland
Pasir pasang
Semen warna
6.51.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
1.052
14.150
0.039
2.000
Bh
Kg
M
Kg
x
x
x
x
Rp.
238,150
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
250,533.80
16,980.00
3,685.50
4,700.00
275,899.30
0.620
0.350
0.035
0.030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
330,824.30
x Rp.
77,500 = Rp.
x Rp.
39,000 = Rp.
Jumlah (1)
= Rp.
81,375.00
13,650.00
95,025.00
PPL 6.52
1 M Pasang lantai karpet 100% wool
6.52.1 Bahan
Karpet wool
1.050 M
Lem vinyl
0.350 Kg
6.52.2 Tenaga
Pekerja
Tukang
Kepala tukang
Mandor
0.170
0.170
0.017
0.0085
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.53
1 M Pasang lantai karpet 80% wool, 20% nylon
6.53.1 Bahan
Karpet wool+nylon
1.050 M x Rp.
79,500
Lem vinyl
0.350 Kg x Rp.
39,000
Jumlah (1)
6.53.2 Tenaga
Pekerja
0.170 Oh x Rp.
45,000
Tukang
0.170 Oh x Rp.
65,000
Kepala tukang
0.017 Oh x Rp.
75,000
Mandor
0.0085 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.55
1 M Pasang lantai karpet
6.55.1 Bahan
Carpet
1.050 M x Rp.
82,500
Lem vinyl
0.350 Kg x Rp.
39,000
Jumlah (1)
6.55.2 Tenaga
Pekerja
0.170 Oh x Rp.
45,000
Tukang
0.170 Oh x Rp.
65,000
Kepala tukang
0.017 Oh x Rp.
75,000
Mandor
0.0085 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.56
1 M Pasang lantai parquet jati
6.56.1 Bahan
Perquet jati
1.050 M x Rp.
335,000
Lem vinyl
0.600 Kg x Rp.
39,000
Jumlah (1)
6.56.2 Tenaga
Pekerja
0.650 Oh x Rp.
45,000
Tukang
0.350 Oh x Rp.
65,000
Kepala tukang
0.035 Oh x Rp.
75,000
Mandor
0.0325 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.58
1 M Pasang dinding porselin 11 x 11 cm, putih
6.58.1 Bahan
Porselin 11 x 11 cm
83.000 Bh x Rp.
1,100
Semen portland
9.300 Kg x Rp.
1,200
Pasir pasang
0.018 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.58.2 Tenaga
Pekerja
0.620 Oh x Rp.
45,000
Tukang batu
0.500 Oh x Rp.
65,000
Kepala tukang
0.050 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,650.00
11,050.00
1,275.00
467.50
20,442.50
115,467.50
= Rp.
= Rp.
= Rp.
83,475.00
13,650.00
97,125.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,650.00
11,050.00
1,275.00
467.50
20,442.50
117,567.50
= Rp.
= Rp.
= Rp.
86,625.00
13,650.00
100,275.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,650.00
11,050.00
1,275.00
467.50
20,442.50
120,717.50
= Rp.
= Rp.
= Rp.
351,750.00
23,400.00
375,150.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
29,250.00
22,750.00
2,625.00
1,787.50
56,412.50
431,562.50
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
91,300.00
11,160.00
1,701.00
3,525.00
107,686.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
32,500.00
3,750.00
1,650.00
65,800.00
173,486.00
PPL 6.59
1 M Pasang dinding porselin 11 x 11 cm, warna
6.59.1 Bahan
Porselin 11 x 11 cm warna
83.000 Bh x Rp.
1,320
Semen portland
9.300 Kg x Rp.
1,200
Pasir pasang
0.018 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.59.2 Tenaga
Pekerja
0.620 Oh x Rp.
45,000
Tukang batu
0.500 Oh x Rp.
65,000
Kepala tukang
0.050 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.60
1 M Pasang dinding porselin 15 x 15 cm, putih
6.60.1 Bahan
Porselin 15 x 15 cm putih
45.000 Bh x
Semen portland
9.300 Kg x
Pasir pasang
0.018 M x
Semen warna
1.500 Kg x
6.60.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.600
0.450
0.045
0.030
Oh
Oh
Oh
Oh
x
x
x
x
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
109,560.00
11,160.00
1,701.00
3,525.00
125,946.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
32,500.00
3,750.00
1,650.00
65,800.00
191,746.00
Rp.
2,090
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
94,050.00
11,160.00
1,701.00
3,525.00
110,436.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
29,250.00
3,375.00
1,650.00
61,275.00
171,711.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
103,950.00
11,160.00
1,701.00
3,525.00
120,336.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
29,250.00
3,375.00
1,650.00
61,275.00
181,611.00
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
165,000.00
11,160.00
1,701.00
3,525.00
181,386.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
29,250.00
3,375.00
1,650.00
61,275.00
242,661.00
Rp.
825
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
82,500.00
11,160.00
1,701.00
3,525.00
98,886.00
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
29,250.00
3,375.00
1,650.00
61,275.00
160,161.00
PPL 6.61
1 M Pasang dinding porselin 15 x 15 cm, warna
6.61.1 Bahan
Porselin 15 x 15 cm warna
45.000 Bh x Rp.
2,310
Semen portland
9.300 Kg x Rp.
1,200
Pasir pasang
0.018 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.61.2 Tenaga
Pekerja
0.600 Oh x Rp.
45,000
Tukang batu
0.450 Oh x Rp.
65,000
Kepala tukang
0.045 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.64
1 M Pasang dinding keramik artistik 10 x 20 cm
6.64.1 Bahan
Keramik artistik 10x20 cm
100.000 Bh x Rp.
1,650
Portland Cement
9.300 Kg x Rp.
1,200
Pasir pasang
0.018 M x Rp.
94,500
Semen warna
1.500 Kg x Rp.
2,350
Jumlah (1)
6.64.2 Tenaga
Pekerja
0.600 Oh x Rp.
45,000
Tukang batu
0.450 Oh x Rp.
65,000
Kepala tukang
0.045 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.65
1 M Pasang dinding keramik artistik 5 x 20 cm
6.65.1 Bahan
Keramik artistik 5x20 cm
100.000 Bh x
Portland Cement
9.300 Kg x
Pasir pasang
0.018 M x
Semen warna
1.500 Kg x
6.65.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.600
0.450
0.045
0.030
Oh
Oh
Oh
Oh
x
x
x
x
PPL 6.66
1 M Pasang dinding keramik 10 x 20 cm
6.66.1 Bahan
Keramik 10 x 20 cm
50.000 Bh
Portland Cement
9.300 Kg
Pasir pasang
0.018 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
1,100
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
11,160.00
1,701.00
3,525.00
71,386.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
29,250.00
3,375.00
1,650.00
61,275.00
132,661.00
PPL 6.67
1 M Pasang dinding keramik 15 x 15 cm
6.67.1 Bahan
Keramik 15 x 15 cm
45.000 Bh
Portland Cement
9.300 Kg
Pasir pasang
0.018 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
1,210
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
54,450.00
11,160.00
1,701.00
3,525.00
70,836.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
29,250.00
3,375.00
1,650.00
61,275.00
132,111.00
PPL 6.68
1 M Pasang dinding keramik 20 x 20 cm
PPL 6.68.1 Bahan
Keramik 20 x 20 cm
25.000 Bh
Portland Cement
9.300 Kg
Pasir pasang
0.018 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
2,200
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
11,160.00
1,701.00
3,525.00
71,386.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
6,500.00
3,375.00
1,650.00
38,525.00
109,911.00
PPL 6.69
1 M Pasang dinding keramik 20 x 25 cm
6.69.1 Bahan
Keramik 10 x 20 cm
20.000 Bh
Portland Cement
9.300 Kg
Pasir pasang
0.018 M
Semen warna
1.500 Kg
x
x
x
x
Rp.
2,750
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.00
11,160.00
1,701.00
3,525.00
71,386.00
6.66.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.67.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.68.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
6.69.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
PPL 6.70
1 M Pasang dinding marmer
6.70.1 Bahan
Marmer
Paku pancing
Portland Cement
Pasir pasang
Semen warna
6.70.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
0.600
0.450
0.045
0.030
0.600
0.450
0.045
0.030
0.600
0.100
0.045
0.030
0.600
0.125
0.0125
0.030
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
8,125.00
937.50
1,650.00
37,712.50
109,098.50
1.020
2.000
12.440
0.025
1.500
M
Bh
Kg
M
Kg
x
x
x
x
x
Rp.
238,150
Rp.
650
Rp.
1,200
Rp.
94,500
Rp.
2,350
Jumlah (1)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
242,913.00
1,300.00
14,928.00
2,362.50
3,525.00
265,028.50
0.720
0.650
0.065
0.035
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
32,400.00
42,250.00
4,875.00
1,925.00
81,450.00
346,478.50
PPL 6.71
1 M Pasang dinding bata pelapis 7 x 3 x 20 cm
6.71.1 Bahan
Bata pelapis dinding
60.000 Bh x Rp.
1,850
Portland Cement
12.440 Kg x Rp.
1,200
Pasir pasang
0.025 M x Rp.
94,500
Jumlah (1)
6.71.2 Tenaga
Pekerja
0.650 Oh x Rp.
45,000
Tukang batu
0.500 Oh x Rp.
65,000
Kepala tukang
0.050 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.73
1 M Pasang dinding batu poros
6.73.1 Bahan
Batu poros
1.050 M x Rp.
104,250
Portland Cement
11.750 Kg x Rp.
1,200
Pasir pasang
0.035 M x Rp.
94,500
Jumlah (1)
6.73.2 Tenaga
Pekerja
0.620 Oh x Rp.
45,000
Tukang batu
0.350 Oh x Rp.
65,000
Kepala tukang
0.035 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.74
1 M Pasang dinding batu tempel hitam
6.74.1 Bahan
Batu tempel hitam
1.050 M x Rp.
95,000
Portland Cement
11.750 Kg x Rp.
1,200
Pasir pasang
0.035 M x Rp.
94,500
Jumlah (1)
6.74.2 Tenaga
Pekerja
0.620 Oh x Rp.
45,000
Tukang batu
0.350 Oh x Rp.
65,000
Kepala tukang
0.035 Oh x Rp.
75,000
Mandor
0.030 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.75
1 M Pasang lantai vinyl karet 30 x 30 cm Kls I
6.75.1 Bahan
Vinyl karet
11.050 Bh x Rp.
8,910
Lem vinyl
0.350 Kg x Rp.
39,000
Jumlah (1)
6.75.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang batu
0.150 Oh x Rp.
65,000
Kepala tukang
0.015 Oh x Rp.
75,000
Mandor
0.0075 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.76
1 M Pasang lantai vinyl karet 30 x 30 cm Kls II
6.76.1 Bahan
Vinyl karet
11.050 Bh x Rp.
8,250
Lem vinyl
0.350 Kg x Rp.
39,000
Jumlah (1)
6.76.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang batu
0.150 Oh x Rp.
65,000
Kepala tukang
0.015 Oh x Rp.
75,000
Mandor
0.0075 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.77
1 M Pasang lantai vinyl asbes 30 x 30 cm
6.77.1 Bahan
Vinyl asbes 30 x 30 cm
11.050 Bh x Rp.
7,480
Lem vinyl
0.350 Kg x Rp.
39,000
Jumlah (1)
6.77.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang batu
0.150 Oh x Rp.
65,000
Kepala tukang
0.015 Oh x Rp.
75,000
Mandor
0.0075 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
111,000.00
23,014.00
2,362.50
136,376.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
29,250.00
32,500.00
3,750.00
1,650.00
67,150.00
203,526.50
=
=
=
=
Rp.
Rp.
Rp.
Rp.
109,462.50
1,224,937.50
3,307.50
1,337,707.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
1,392,632.50
=
=
=
=
Rp.
Rp.
Rp.
Rp.
99,750.00
1,116,250.00
3,307.50
1,219,307.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,900.00
22,750.00
2,625.00
1,650.00
54,925.00
1,274,232.50
= Rp.
= Rp.
= Rp.
98,455.50
3,118.50
101,574.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
9,750.00
1,125.00
412.50
18,037.50
119,611.50
= Rp.
= Rp.
= Rp.
91,162.50
2,887.50
94,050.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
9,750.00
1,125.00
412.50
18,037.50
112,087.50
= Rp.
= Rp.
= Rp.
82,654.00
2,618.00
85,272.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
9,750.00
1,125.00
412.50
18,037.50
103,309.50
PPL 6.78
1 M Pasang lantai vinyl motif kembang 30 x 30 cm
6.78.1 Bahan
Vinyl motif kembang
11.050 Bh x Rp.
8,580
Lem vinyl
0.350 Kg x Rp.
39,000
Jumlah (1)
6.78.2 Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang batu
0.150 Oh x Rp.
65,000
Kepala tukang
0.015 Oh x Rp.
75,000
Mandor
0.0075 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PPL 6.79
1 M Pasang wall corvering lebar 50 cm
6.79.1 Bahan
Coverting L.50 cm
1.100 M
Lem
0.250 Kg
6.79.2 Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
PPL 6.82
1 M Plint kayu Jati 2 x 10 cm
6.82.1 Bahan
Kayu jati papan
Paku skrup 3,5"
6.82.2 Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.750
0.170
0.017
0.0085
Oh
Oh
Oh
Oh
0.0024 M
0.050 Kg
0.120
0.120
0.012
0.006
Oh
Oh
Oh
Oh
0.120
0.120
0.012
0.006
Oh
Oh
Oh
Oh
= Rp.
= Rp.
= Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
9,750.00
1,125.00
412.50
18,037.50
115,849.50
x Rp.
57,500 = Rp.
x Rp.
39,000 = Rp.
Jumlah (1)
= Rp.
63,250.00
14,375.00
77,625.00
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
94,809.00
3,003.00
97,812.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,750.00
11,050.00
1,275.00
467.50
46,542.50
124,167.50
52,591.51
925.00
53,516.51
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,400.00
7,800.00
900.00
330.00
14,430.00
67,946.51
x Rp.
8,612,680 = Rp.
x Rp.
18,500 = Rp.
Jumlah (1)
= Rp.
20,670.43
925.00
21,595.43
x
x
x
x
5,400.00
7,800.00
900.00
330.00
14,430.00
36,025.43
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PC 6.1
6.1.1
6.1.2
PC 6.2.
6.2.1
6.2.2
PC 6.3.
6.3 .1
6.3.2
PC 6.4
6.4 .1
6.4.2
PC 6.6
6.4 .1
6.4.2
PC 6.7
6.7.1
6.7.2
Rp.
Rp.
1,023.00
1,023.00
Rp.
Rp.
Rp.
Rp.
6,750.00
137.50
6,887.50
7,910.50
Rp.
Rp.
687.50
687.50
Rp.
Rp.
Rp.
Rp.
6,750.00
137.50
6,887.50
7,575.00
Rp.
Rp.
687.50
687.50
Rp.
Rp.
Rp.
Rp.
6,750.00
137.50
6,887.50
7,575.00
Rp.
Rp.
687.50
687.50
Rp.
Rp.
Rp.
Rp.
6,750.00
137.50
6,887.50
7,575.00
Rp.
Rp.
Rp.
Rp.
862.40
200.20
308.00
1,370.60
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,800.00
2,600.00
3,000.00
137.50
7,537.50
8,908.10
Rp.
Rp.
Rp.
Rp.
45,000.00
65,000.00
75,000.00
185,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
4,875.00
562.50
137.50
8,725.00
193,725.00
PC 6.13
1M Peleburan bidang kayu dan vernis
6.13.1 Bahan
Vernis
0.150
Dempul
0.050
Ampelas
0.100
Kuas
0.010
6.13.2
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
0.160
0.160
0.016
0.0025
Ltr
Kg
Lbr
bh
x
x
x
x
Rp.
43,890
Rp.
10,780
Rp.
3,080
Rp.
8,250
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
6,583.50
539.00
308.00
82.50
7,513.00
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,200.00
10,400.00
1,200.00
137.50
18,937.50
26,450.50
PC 6.14
1M Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
6.14.1 Bahan
Plamir
0.100 Kg x Rp.
14,300 = Rp.
1,430.00
Cat dasar
0.100 Kg x Rp.
13,750 = Rp.
1,375.00
Cat Tembok 2 x
0.260 Kg x Rp.
17,490 = Rp.
4,547.40
Jumlah (1)
= Rp.
7,352.40
6.14.2 Tenaga
Pekerja
0.020 Oh x Rp.
45,000 = Rp.
900.00
Tukang cat
0.063 Oh x Rp.
65,000 = Rp.
4,095.00
Kepala tukang
0.0063 Oh x Rp.
75,000 = Rp.
472.50
Mandor
0.0025 Oh x Rp.
55,000 = Rp.
137.50
Jumlah (2)
= Rp.
5,605.00
Jumlah (1) + (2) = Rp.
12,957.40
PC 6.15
1M Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
6.15.1 Bahan
Cat dasar
0.120 Kg x Rp.
13,750 = Rp.
Cat Tembok 2 x
0.360 Kg x Rp.
17,490 = Rp.
Jumlah (1)
= Rp.
6.15.2 Tenaga
Pekerja
0.028 Oh x Rp.
45,000 = Rp.
Tukang cat
0.042 Oh x Rp.
65,000 = Rp.
Kepala tukang
0.0042 Oh x Rp.
75,000 = Rp.
Mandor
0.0025 Oh x Rp.
55,000 = Rp.
Jumlah (2)
= Rp.
Jumlah (1) + (2) = Rp.
PC 6.17
1M Melebur tembok dengan kapur sirih
6.17.1 Bahan
Ampelas
0.100
Alang - alang
0.250
Perancah kayu
0.002
Kapur sirih
0.150
6.17.2
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
0.150
0.001
0.0001
0.0025
1,650.00
6,296.40
7,946.40
1,260.00
2,730.00
315.00
137.50
4,442.50
12,388.90
Lbr
Ikat
M
Kg
x
x
x
x
Rp.
3,080
Rp.
2,200
Rp. 3,144,900
Rp.
3,080
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
308.00
550.00
6,289.80
462.00
7,609.80
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,361.60
65.00
7.50
137.50
14,571.60
22,181.40
PC 6.18
1M Melebur tembok lama dengan kapur sirih ( untuk pemeriharaan )
6.18.1 Bahan
Perancah kayu
0.002 M x Rp. 3,144,900 = Rp.
Kapur sirih
0.300 Kg x Rp.
3,080 = Rp.
Jumlah (1)
= Rp.
6.18.2 Tenaga
Pekerja
0.040 Oh x Rp.
45,000 = Rp.
Tukang cat
0.005 Oh x Rp.
65,000 = Rp.
Kepala tukang
0.0005 Oh x Rp.
75,000 = Rp.
Mandor
0.0025 Oh x Rp.
55,000 = Rp.
Jumlah (2)
= Rp.
Jumlah (1) + (2) = Rp.
36,753.00
924.00
37,677.00
1,800.00
325.00
37.50
137.50
2,300.00
39,977.00
PC 6.19
1M Pemasangan wall paper
6.19.1 Bahan
wall paper
Perekat lem karet
6.19.2
Tenaga
Pekerja
Tukang cat
Kepala tukang
Mandor
1.200 M x Rp.
27,830 = Rp.
0.200 Kg x Rp.
37,000 = Rp.
Jumlah (1)
= Rp.
0.020
0.200
0.002
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
45,000
Rp.
65,000
Rp.
75,000
Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
PC 6.20
1M Pengecatan permukaan baja dengan meni besi
6.20.1 Bahan
Meni besi
0.100 Kg x Rp.
43,890
Kuas
0.010 Bh x Rp.
8,250
Jumlah (1)
6.20.2 Tenaga
Pekerja
0.020 Oh x Rp.
45,000
Tukang cat
0.200 Oh x Rp.
65,000
Kepala tukang
0.02 Oh x Rp.
75,000
Mandor
0.01 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) + (2)
=
=
=
=
=
=
33,396.00
7,400.00
40,796.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
13,000.00
150.00
137.50
14,187.50
54,983.50
= Rp.
= Rp.
= Rp.
4,389.00
82.50
4,471.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
13,000.00
1,500.00
550.00
15,950.00
20,421.50
Rp.
Rp.
Rp.
Rp.
4,389.00
82.50
6,289.80
10,761.30
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,250.00
14,625.00
1,687.50
412.50
27,975.00
38,736.30
PC 6.23.
13,662.00
13,662.00
270.00
390.00
1,687.50
412.50
2,760.00
16,422.00
PC 6.24.
1,512.50
7,461.30
3,643.20
12,617.00
22,500.00
52,000.00
22,500.00
11,000.00
108,000.00
120,617.00
PC 6.25.
Medan,
DIKETAHUI OLEH :
4,125.00
4,125.00
18,000.00
45,500.00
15,000.00
11,000.00
89,500.00
93,625.00
Maret 2008
{.)
2. Ir. Herimas
{.)
3. H. Sugiarto Bharata, ST
{.)
4. H. Ali Muhar, ST
{.)
{.)
6. Ebenser Saragih, SE
{.)
7. Sahat Hasudungan, ST
{.)
{.)
9. Ali Fauzan, ST
{.)
{.)
11. Chandra, ST
{.)
PS 6.1.
6.1.1.
6.1.2.
PS 6.2.
6.2.1.
6.2.2.
PS 6.3.
6.3.1.
6.3.2.
PS 6.4
6.4.1.
6.4.2.
PS 6.5
6.5.1.
6.5.2.
1,756,700.00
105,402.00
1,862,102.00
148,500.00
97,500.00
11,250.00
8,800.00
266,050.00
2,128,152.00
204,820.00
7,200.00
945.00
212,965.00
49,500.00
97,500.00
11,250.00
6,050.00
164,300.00
377,265.00
478,500.00
3,150.00
7,200.00
945.00
489,795.00
45,000.00
97,500.00
11,250.00
5,500.00
159,250.00
649,045.00
506,880.00
76,032.00
7,200.00
945.00
591,057.00
45,000.00
65,000.00
7,500.00
5,500.00
123,000.00
714,057.00
478,500.00
57,420.00
7,200.00
945.00
544,065.00
54,000.00
94,250.00
11,250.00
5,500.00
165,000.00
709,065.00
PS 6.6.
6.6.1.
6.6.2.
PS 6.7.
6.7.1.
6.7.2.
PS 6.8.
6.8.1.
6.8.2.
PS 6.9.
6.9.1.
6.9.2.
3.500
4.500
0.900
0.900
Oh
Oh
Oh
Oh
x
x
x
x
165,000.00
7,200.00
945.00
173,145.00
94,500.00
48,750.00
5,625.00
6,050.00
154,925.00
328,070.00
165,000.00
29,700.00
194,700.00
81,000.00
35,100.00
4,050.00
6,050.00
126,200.00
320,900.00
28,600.00
144,000.00
28,350.00
475,200.00
14,100.00
690,250.00
135,000.00
195,000.00
22,500.00
16,500.00
369,000.00
1,059,250.00
2,750,000.00
550,000.00
3,300,000.00
112,500.00
48,750.00
5,625.00
13,750.00
180,625.00
3,480,625.00
Rp.
12,500 = Rp.
Rp.
12,390 = Rp.
Rp. 3,144,900 = Rp.
Rp.
1,320 = Rp.
Rp. 3,097,760 = Rp.
Jumlah (1) = Rp.
11,250.00
2,230,200.00
301,910.40
554,400.00
309,776.04
3,407,536.44
Rp.
Rp.
Rp.
Rp.
157,500.00
292,500.00
67,500.00
49,500.00
567,000.00
3,974,536.44
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
PS 6.15.
6.15.1.
6.15.2.
PS 6.16.
6.16.1.
6.16.2.
PS 6.17.
6.17.1.
6.17.2.
PS 6.18.
6.18.1.
6.18.2.
3.000
4.500
0.900
0.900
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
165,000 = Rp.
165,000 = Rp.
Jumlah (1) = Rp.
165,000.00
19,800.00
184,800.00
45,000 = Rp.
135,000.00
65,000 = Rp.
292,500.00
75,000 = Rp.
67,500.00
55,000 = Rp.
49,500.00
Jumlah (2) = Rp.
544,500.00
Jumlah (1) +(2)
= Rp.
729,300.00
Memasang 1 m' pipa beton, diameter 30 cm - 100 cm
Bahan
Pipa beton
1.100 Bh x Rp.
51,150 = Rp.
56,265.00
Batu bata
55.000 Bh x Rp.
650 = Rp.
35,750.00
Semen portland
10.300 Kg x Rp.
1,200 = Rp.
12,360.00
Pasir pasang
0.061 M x Rp.
94,500 = Rp.
5,764.50
Pasir urug
0.069 M x Rp.
65,200 = Rp.
4,498.80
Jumlah (1) = Rp.
114,638.30
Tenaga
Pekerja
0.380 Oh x Rp.
45,000 = Rp.
17,100.00
Tukang batu
0.190 Oh x Rp.
65,000 = Rp.
12,350.00
Kepala tukang
0.019 Oh x Rp.
75,000 = Rp.
1,425.00
Mandor
0.019 Oh x Rp.
55,000 = Rp.
1,045.00
Jumlah (2) = Rp.
31,920.00
Jumlah (1) +(2)
= Rp.
146,558.30
Memasang 1 buah Bak Kontrol pasangan batu bata uk.(30 x 30) cm tinggi 35 cm
Bahan
Batu bata
145.000 Bh x Rp.
650 = Rp.
94,250.00
Semen portland
44.000 Kg x Rp.
1,200 = Rp.
52,800.00
Pasir pasang
0.070 M x Rp.
94,500 = Rp.
6,615.00
Batu kerikil
0.070 M x Rp. 175,890 = Rp.
12,312.30
Besi beton
1.600 Kg x Rp.
12,390 = Rp.
19,824.00
Pasir beton
0.060 M x Rp.
95,760 = Rp.
5,745.60
Jumlah (1) = Rp.
191,546.90
Tenaga
Pekerja
3.200 Oh x Rp.
45,000 = Rp.
144,000.00
Tukang batu
1.015 Oh x Rp.
65,000 = Rp.
65,975.00
Kepala tukang
0.0015 Oh x Rp.
75,000 = Rp.
112.50
Mandor
0.016 Oh x Rp.
55,000 = Rp.
880.00
Jumlah (2) = Rp.
210,967.50
Jumlah (1) +(2)
= Rp.
402,514.40
Memasang 1 buah Bak Kontrol pasangan batu bata uk.(45 x 45) cm tinggi 50 cm
Bahan
Batu bata
250.000 Bh x Rp.
650 = Rp.
162,500.00
Semen portland
77.000 Kg x Rp.
1,200 = Rp.
92,400.00
Pasir pasang
0.130 M x Rp.
94,500 = Rp.
12,285.00
Batu kerikil
0.020 M x Rp. 175,890 = Rp.
3,517.80
Besi beton
2.600 Kg x Rp.
12,390 = Rp.
32,214.00
Pasir beton
0.090 M x Rp.
95,760 = Rp.
8,618.40
Jumlah (1) = Rp.
311,535.20
Tenaga
Pekerja
1.420 Oh x Rp.
45,000 = Rp.
63,900.00
Tukang batu
0.473 Oh x Rp.
65,000 = Rp.
30,745.00
Kepala tukang
0.047 Oh x Rp.
75,000 = Rp.
3,525.00
Mandor
0.071 Oh x Rp.
55,000 = Rp.
3,905.00
Jumlah (2) = Rp.
102,075.00
Jumlah (1) +(2)
= Rp.
413,610.20
Memasang 1 buah Bak Kontrol pasangan batu bata uk.(60 x 60) cm tinggi 65 cm
Bahan
Batu bata
371.000 Bh x Rp.
650 = Rp.
241,150.00
Semen portland
114.000 Kg x Rp.
1,200 = Rp.
136,800.00
Pasir pasang
0.184 M x Rp.
94,500 = Rp.
17,388.00
Batu koral
0.033 M x Rp. 175,890 = Rp.
5,804.37
Besi beton
4.850 Kg x Rp.
12,390 = Rp.
60,091.50
Pasir beton
0.120 M x Rp.
95,760 = Rp.
11,491.20
Jumlah (1) = Rp.
472,725.07
Tenaga
Pekerja
2.160 Oh x Rp.
45,000 = Rp.
97,200.00
Tukang batu
0.720 Oh x Rp.
65,000 = Rp.
46,800.00
Kepala tukang
0.072 Oh x Rp.
75,000 = Rp.
5,400.00
Mandor
0.108 Oh x Rp.
55,000 = Rp.
5,940.00
Tukang gali
0.100 Oh x Rp.
45,000 = Rp.
4,500.00
Jumlah (2) = Rp.
159,840.00
Jumlah (1) +(2)
= Rp.
632,565.07
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.054
0.090
0.009
0.027
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.108
0.180
0.018
0.0054
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
82,000 = Rp.
82,000 = Rp.
Jumlah (1) = Rp.
98,400.00
28,700.00
127,100.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
2,430.00
5,850.00
675.00
1,485.00
10,440.00
137,540.00
115,000 = Rp.
115,000 = Rp.
Jumlah (1) = Rp.
138,000.00
40,250.00
178,250.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
2,430.00
5,850.00
675.00
1,485.00
10,440.00
188,690.00
168,000 = Rp.
168,000 = Rp.
Jumlah (1) = Rp.
201,600.00
58,800.00
260,400.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
2,430.00
5,850.00
675.00
1,485.00
10,440.00
270,840.00
215,000 = Rp.
215,000 = Rp.
Jumlah (1) = Rp.
258,000.00
75,250.00
333,250.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
4,860.00
11,700.00
1,350.00
297.00
18,207.00
351,457.00
258,000 = Rp.
258,000 = Rp.
Jumlah (1) = Rp.
309,600.00
90,300.00
399,900.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
4,860.00
11,700.00
1,350.00
297.00
18,207.00
418,107.00
286,000 = Rp.
286,000 = Rp.
Jumlah (1) = Rp.
343,200.00
100,100.00
443,300.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
4,860.00
11,700.00
1,350.00
297.00
18,207.00
461,507.00
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.054
0.090
0.009
0.0027
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.036
0.060
0.006
0.0018
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
30,250 = Rp.
30,250 = Rp.
Jumlah (1) = Rp.
36,300.00
10,587.50
46,887.50
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
1,620.00
3,900.00
450.00
99.00
6,069.00
52,956.50
40,535 = Rp.
40,535 = Rp.
Jumlah (1) = Rp.
48,642.00
14,187.25
62,829.25
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
1,620.00
3,900.00
450.00
99.00
6,069.00
68,898.25
67,500 = Rp.
67,500 = Rp.
Jumlah (1) = Rp.
81,000.00
23,625.00
104,625.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
1,620.00
3,900.00
450.00
99.00
6,069.00
110,694.00
97,500 = Rp.
97,500 = Rp.
Jumlah (1) = Rp.
117,000.00
34,125.00
151,125.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
1,620.00
3,900.00
450.00
99.00
6,069.00
157,194.00
115,000 = Rp.
115,000 = Rp.
Jumlah (1) = Rp.
138,000.00
40,250.00
178,250.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
2,430.00
5,850.00
675.00
148.50
9,103.50
187,353.50
132,000 = Rp.
132,000 = Rp.
Jumlah (1) = Rp.
158,400.00
46,200.00
204,600.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
1,620.00
3,900.00
450.00
99.00
6,069.00
210,669.00
153,000 = Rp.
153,000 = Rp.
Jumlah (1) = Rp.
183,600.00
53,550.00
237,150.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
3,645.00
8,775.00
1,012.50
225.50
13,658.00
250,808.00
257,000 = Rp.
257,000 = Rp.
Jumlah (1) = Rp.
308,400.00
89,950.00
398,350.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
3,645.00
8,775.00
1,012.50
225.50
13,658.00
412,008.00
424,270 = Rp.
15,000 = Rp.
Jumlah (1) = Rp.
424,270.00
15,000.00
439,270.00
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
1,350.00
19,500.00
2,250.00
82.50
23,182.50
462,452.50
Bh x Rp.
Bh x Rp.
Kg x Rp.
M x Rp.
247,500
15,000
1,200
94,500
Jumlah (1)
Rp.
Rp.
Rp.
Rp.
Rp.
247,500.00
15,000.00
24,000.00
4,725.00
291,225.00
Oh
Oh
Oh
Oh
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2) = Rp.
Jumlah (1) +(2)
= Rp.
2,250.00
32,500.00
3,750.00
137.50
38,637.50
329,862.50
24,860 = Rp.
84,150 = Rp.
Jumlah (1) = Rp.
24,860.00
2,103.75
26,963.75
Rp.
Rp.
Rp.
Rp.
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2)
Jumlah (1) +(2)
450.00
6,500.00
750.00
275.00
7,975.00
34,938.75
1.000 Bh x Rp.
15,000 = Rp.
Jumlah (1) = Rp.
15,000.00
15,000.00
0.010
0.100
0.010
0.005
45,000 = Rp.
65,000 = Rp.
75,000 = Rp.
55,000 = Rp.
Jumlah (2)
Jumlah (1) +(2)
450.00
6,500.00
750.00
275.00
7,975.00
22,975.00
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.030
0.300
0.030
0.0015
0.050
0.500
0.050
0.0025
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
0.010
0.100
0.010
0.005
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
PBA 6.1
6.1.1
6.1.2. Tenaga
Tukang besi
Pekerja
Kepala tukang
Mandor
PBA 6.2
6.2.1
6.2.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
PBA 6.3
6.3.1
6.3.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
PBA 6.5
6.5.1
6.5.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
PBA 6.6
6.6.1
6.6.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
PBA 6.7
6.7.1
1.100 Kg
0.080 Kg
0.006
0.060
0.006
0.0003
Oh
Oh
Oh
Oh
12,390 = Rp.
43,890 = Rp.
Jumlah (1)
= Rp.
13,629.00
3,511.20
17,140.20
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
390.00
2,700.00
450.00
16.50
3,556.50
20,696.70
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
1.000 M
x Rp.
458,850 = Rp.
Jumlah (1)
= Rp.
458,850.00
458,850.00
0.650
0.650
0.065
0.032
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
42,250.00
29,250.00
4,875.00
1,760.00
78,135.00
536,985.00
x Rp.
316,250 = Rp.
Jumlah (1)
= Rp.
316,250.00
316,250.00
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,250.00
47,250.00
7,875.00
288.75
123,663.75
439,913.75
Oh
Oh
Oh
Oh
1.000 M
1.050
1.050
0.105
0.00525
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
=
=
=
=
1.000 M
x Rp.
500,250 = Rp.
Jumlah (1)
= Rp.
500,250.00
500,250.00
1.200
1.200
0.120
0.006
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
78,000.00
54,000.00
9,000.00
330.00
141,330.00
641,580.00
x Rp.
517,500 = Rp.
Jumlah (1)
= Rp.
517,500.00
517,500.00
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,250.00
47,250.00
7,875.00
286.00
123,661.00
641,161.00
x Rp.
488,750 = Rp.
Jumlah (1)
= Rp.
488,750.00
488,750.00
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
52,000.00
3,600.00
6,000.00
220.00
61,820.00
550,570.00
Oh
Oh
Oh
Oh
1.000 M
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
6.7.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
x Rp.
x Rp.
0.800
0.080
0.080
0.004
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PBA 6.8
6.8.1
6.8.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
PBA 6.9
6.9.1
6.9.2. Tenaga
Tukang besi konstruksi
Pekerja
Kepala tukang
Mandor
1.000 M
1.500
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
1.000 M
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
1.000 M
0.350
0.350
0.035
0.00175
Oh
Oh
Oh
Oh
1.000 M
0.350
0.350
0.035
0.00175
Oh
Oh
Oh
Oh
x Rp.
477,250 = Rp.
Jumlah (1)
= Rp.
477,250.00
477,250.00
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
97,500.00
47,250.00
7,875.00
286.00
152,911.00
630,161.00
x Rp.
546,250 = Rp.
Jumlah (1)
= Rp.
546,250.00
546,250.00
x
x
x
x
65,000
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,250.00
47,250.00
7,875.00
286.00
123,661.00
669,911.00
x Rp.
146,625 = Rp.
Jumlah (1)
= Rp.
146,625.00
146,625.00
x
x
x
x
61,775
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
21,621.25
15,750.00
2,625.00
96.25
40,092.50
186,717.50
x Rp.
155,250 = Rp.
Jumlah (1)
= Rp.
155,250.00
155,250.00
x
x
x
x
61,775
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
21,621.25
15,750.00
2,625.00
96.25
40,092.50
195,342.50
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
11.500 Kg
x Rp.
12,620 = Rp.
Jumlah (1)
= Rp.
145,130.00
145,130.00
1.200
1.200
0.012
0.0006
x
x
x
x
Rp.
Rp.
Rp.
Rp.
61,775
45,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,130.00
54,000.00
900.00
33.00
129,063.00
274,193.00
1.100 M
0.020 Kg
0.0018 M
x Rp.
x Rp.
x Rp.
35,080
10,930
5,131,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
38,588.00
218.60
9,236.70
48,043.30
0.100
0.100
0.010
0.0005
x
x
x
x
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
27.50
11,777.50
59,820.80
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
6.15.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
1.100 M
0.020 Kg
0.0018 M
x Rp.
x Rp.
x Rp.
12,240
10,930
5,131,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
13,464.00
218.60
9,236.70
22,919.30
0.100
0.100
0.010
0.0005
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
27.50
11,777.50
34,696.80
1.100 M
0.020 Kg
0.0018 M
x Rp.
x Rp.
x Rp.
31,630
10,930
5,131,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
34,793.00
218.60
9,236.70
44,248.30
0.100
0.100
0.010
0.0005
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
27.50
11,777.50
56,025.80
1.100 M
0.020 Kg
0.0018 M
x Rp.
x Rp.
x Rp.
31,625
10,930
5,131,500
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
34,787.50
218.60
9,236.70
44,242.80
0.100
0.100
0.010
0.0005
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500.00
6,500.00
750.00
27.50
11,777.50
56,020.30
x Rp.
x Rp.
x Rp.
171,100
10,930
12,620
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
188,210.00
218.60
18,930.00
207,358.60
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
6.17.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.200
0.200
0.020
0.001
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
13,000.00
1,500.00
55.00
23,555.00
230,913.60
Lbr
Kg
M
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
105,000
10,930
5,131,500
43,890
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
52,500.00
163.95
49,262.40
10,972.50
112,898.85
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
26,000.00
1,875.00
68.75
34,693.75
147,592.60
6.18.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.150
0.400
0.025
0.00125
6.19.2. Tenaga
Pekerja
Tukang kayu
Kepala tukang
Mandor
0.150
0.400
0.025
0.00125
Lbr
Kg
M
Kg
x
x
x
x
Rp.
Rp.
Rp.
Rp.
105,000
10,930
5,131,500
43,890
Jumlah (1)
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
52,500.00
163.95
97,498.50
13,167.00
163,329.45
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
26,000.00
1,875.00
68.75
34,693.75
198,023.20
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
31,500.00
1,093.00
97,498.50
6,310.00
136,401.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
16,250.00
1,875.00
68.75
24,943.75
161,345.25
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
28,350.00
1,093.00
97,498.50
6,310.00
133,251.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
16,250.00
1,875.00
68.75
24,943.75
158,195.25
PBA 6.20 1 M' Pasang talang lingkaran D-10 cm, seng bjls 35
6.20.1 Bahan
Seng plat 3' x 6' bjls 35
0.300 Lbr x Rp.
105,000
Paku biasa " - 1" atau skrup
0.100 Kg x Rp.
10,930
Kayu Meranti
0.019 M x Rp.
5,131,500
Besi strip
0.500 Kg x Rp.
12,620
Jumlah (1)
6.20.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang kayu
0.250 Oh x Rp.
65,000
Kepala tukang
0.025 Oh x Rp.
75,000
Mandor
0.00125 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) +(2)
PBA 6.21 1 M' Pasang talang lingkaran D-10 cm, seng bjls 30
6.21.1 Bahan
Seng plat 3' x 6' bjls 30
0.300 Lbr x Rp.
94,500
Paku biasa " - 1" atau skrup
0.100 Kg x Rp.
10,930
Kayu Meranti
0.019 M x Rp.
5,131,500
Besi strip
0.500 Kg x Rp.
12,620
Jumlah (1)
6.21.2. Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang kayu
0.250 Oh x Rp.
65,000
Kepala tukang
0.025 Oh x Rp.
75,000
Mandor
0.00125 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) +(2)
BERSAMBUNG :..
PLL 6.1
6.1.1
6.1.2
PLL 6.2
6.2.1
6.2.2
PLL 6.3
6.3.1
6.3.2
PLL 6.4
6.4.1
6.4.2
PLL 6.5
6.5.1
6.5.2
= Rp.
= Rp.
= Rp.
17,242.50
109.30
17,351.80
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,350.00
4,550.00
525.00
82.50
6,507.50
23,859.30
= Rp.
= Rp.
= Rp.
14,368.20
109.30
14,477.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,350.00
4,550.00
525.00
82.50
6,507.50
20,985.00
= Rp.
= Rp.
= Rp.
11,495.00
109.30
11,604.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,350.00
4,550.00
525.00
82.50
6,507.50
18,111.80
= Rp.
= Rp.
= Rp.
9,075.00
109.30
9,184.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,350.00
4,550.00
525.00
82.50
6,507.50
15,691.80
= Rp.
= Rp.
= Rp.
93,495.00
546.50
94,041.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
7,800.00
900.00
165.00
11,565.00
105,606.50
PLL 6.6
6.6.1
6.6.2
PLL 6.7
6.7.1
6.7.2
PLL 6.8
6.8.1
6.8.2
PLL 6.9
6.9.1
6.9.2
0.060
0.100
0.010
0.003
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
0.060
0.100
0.010
0.003
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
16,120 = Rp.
10,930 = Rp.
Jumlah (1)
= Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
6,500.00
750.00
165.00
10,115.00
104,157.50
62,333 = Rp.
10,930 = Rp.
Jumlah (1)
= Rp.
93,499.50
546.50
94,046.00
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
93,496.00
546.50
94,042.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,700.00
6,500.00
750.00
165.00
10,115.00
104,161.00
= Rp.
= Rp.
= Rp.
23,227.20
327.90
23,555.10
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
6,500.00
750.00
192.50
10,592.50
34,147.60
= Rp.
= Rp.
= Rp.
36,867.60
327.90
37,195.50
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
6,500.00
750.00
192.50
10,592.50
47,788.00
= Rp.
= Rp.
= Rp.
24,195.00
327.90
24,522.90
=
=
=
=
=
=
3,150.00
6,500.00
750.00
192.50
10,592.50
35,115.40
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
= Rp.
= Rp.
= Rp.
38,403.75
327.90
38,731.65
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
6,500.00
750.00
192.50
10,592.50
49,324.15
= Rp.
= Rp.
= Rp.
34,650.00
327.90
34,977.90
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
6,500.00
750.00
192.50
10,592.50
45,570.40
= Rp.
= Rp.
= Rp.
36,093.75
327.90
36,421.65
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,150.00
6,500.00
750.00
192.50
10,592.50
47,014.15
0.024 M x Rp.
0.010 Kg x Rp.
0.050 Kg x Rp.
21,913,130
10,930
17,250
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
525,915.12
109.30
862.50
526,886.92
0.200
0.600
0.060
0.010
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
39,000.00
4,500.00
550.00
53,050.00
579,936.92
2
1.000 M x Rp.
0.010 Kg x Rp.
0.050 Kg x Rp.
204,750
10,930
17,250
Jumlah (1)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
204,750.00
109.30
862.50
205,721.80
0.200
0.600
0.060
0.010
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
39,000.00
4,500.00
550.00
53,050.00
258,771.80
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
x
x
x
x
x
x
x
x
Rp.
Rp.
Rp.
Rp.
PLL 6.18
6.18.1
6.18.2
PLL 6.19
6.19.1
6.19.2
0.600
0.100
0.010
0.003
Oh
Oh
Oh
Oh
x
x
x
x
55,990 = Rp.
10,010 = Rp.
Jumlah (1)
= Rp.
Rp.
Rp.
Rp.
Rp.
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
1 M Langit - langit akustik 60 x 120 cm + rangka alluminium
Bahan
Profil alluminium "T"
3.600 M' x Rp.
8,050
Kawat seng polos
0.150 Kg x Rp.
21,410
Ramset/dina bolt
1.000 Bh x Rp.
650
Akustik arm strong 60/120 cm
1.500 Lbr x Rp.
62,333
Jumlah (1)
Tenaga
Pekerja
0.150 Oh x Rp.
45,000
Tukang kayu
0.500 Oh x Rp.
65,000
Kepala tukang
0.050 Oh x Rp.
75,000
Mandor
0.0075 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) +(2)
1 M' List Langit - langit Kayu profil 3"
Bahan
List kayu profil
1.100 M' x Rp.
17,100
Paku
0.010 Kg x Rp.
10,930
Jumlah (1)
Tenaga
Pekerja
0.050 Oh x Rp.
45,000
Tukang kayu
0.050 Oh x Rp.
65,000
Kepala tukang
0.005 Oh x Rp.
75,000
Mandor
0.003 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) +(2)
19,596.50
300.30
19,896.80
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
27,000.00
6,500.00
750.00
165.00
34,415.00
54,311.80
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
28,980.00
3,211.50
650.00
93,499.50
126,341.00
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.00
32,500.00
3,750.00
412.50
43,412.50
169,753.50
= Rp.
= Rp.
= Rp.
18,810.00
109.30
18,919.30
=
=
=
=
=
=
2,250.00
3,250.00
375.00
165.00
6,040.00
24,959.30
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
PLL 6.20 1 M Langit - langit asbes (1,00 x 1,00) m, tebal 3,2 mm, rangka Kayu Meranti
6.20.1 Bahan
Kayu Meranti
0.012 M x Rp.
5,131,500 = Rp.
61,578.00
Paku
0.060 Kg x Rp.
10,930 = Rp.
655.80
Asbes 1,00 x 1,00 m
1.100 Lbr x Rp.
10,450 = Rp.
11,495.00
Jumlah (1)
= Rp.
73,728.80
6.20.2 Tenaga
Pekerja
0.180 Oh x Rp.
45,000 = Rp.
8,100.00
Tukang kayu
0.320 Oh x Rp.
65,000 = Rp.
20,800.00
Kepala tukang
0.032 Oh x Rp.
75,000 = Rp.
2,400.00
Mandor
0.009 Oh x Rp.
55,000 = Rp.
495.00
Jumlah (2)
= Rp.
31,795.00
Jumlah (1) +(2) = Rp.
105,523.80
PLL 6.21 1 M Langit - langit plywood 4 mm + rangka kayu Meranti
6.21.1 Bahan
Kayu Meranti
0.023 M x Rp.
5,131,500
Paku biasa 2" - 5"
0.060 Kg x Rp.
10,930
Plywood 4' x 8' x 4 mm
0.390 Lbr x Rp.
64,520
Jumlah (1)
6.21.2 Tenaga
Pekerja
0.270 Oh x Rp.
45,000
Tukang kayu
0.400 Oh x Rp.
65,000
Kepala tukang
0.040 Oh x Rp.
75,000
Mandor
0.0135 Oh x Rp.
55,000
Jumlah (2)
Jumlah (1) +(2)
=
=
=
=
Rp.
Rp.
Rp.
Rp.
118,024.50
655.80
25,162.80
143,843.10
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
12,150.00
26,000.00
3,000.00
742.50
41,892.50
185,735.60
=
=
=
=
Rp.
Rp.
Rp.
Rp.
118,024.50
655.80
93,496.00
212,176.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,700.00
26,000.00
3,000.00
715.00
41,415.00
253,591.30
=
=
=
=
Rp.
Rp.
Rp.
Rp.
138,550.50
655.80
93,495.00
232,701.30
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
13,950.00
30,550.00
3,525.00
852.50
48,877.50
281,578.80
94,600 = Rp.
17,250 = Rp.
Jumlah (1)
= Rp.
34,434.40
1,897.50
36,331.90
45,000
65,000
75,000
55,000
Jumlah (2)
Jumlah (1) +(2)
4,500.00
3,250.00
375.00
275.00
8,400.00
44,731.90
0.100
0.050
0.005
0.005
Oh
Oh
Oh
Oh
x
x
x
x
Rp.
Rp.
Rp.
Rp.
=
=
=
=
=
=
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
HARGA
SATUAN
4
Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OM
@Rp.
-"-"-"-"-"-"-"-"-"-"-
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat
Kepala Tukang
Jaga Malam
45,000.00
55,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
75,000.00
30,000.00
NO.
HARGA
SATUAN
A.
1
2
3
4
5
6
TIMBUNAN / GALIAN
Tanah Timbun/Merah
Pasir Timbun / urug
Pasir Pasang
Pasir Beton
Sirtu
Tanah Humus
@Rp.
-"-"-"-"-"-
57,500.00
65,200.00
94,500.00
102,000.00
95,760.00
57,000.00
M3
M3
M3
M3
M3
M3
B.
1
2
3
4
5
7
8
BAHAN PEREKAT
Portland Cement (PC)
Cement Putih
Lem Kayu
Lem Karet
Lem Vinyl
Perekat Kaca
Waterfroof
@Rp.
-"-"-"-"-"-"-
1,200.00
2,350.00
32,500.00
37,000.00
39,000.00
52,400.00
47,500.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
175,890.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
tbl 6 cm
tbl 6 cm
tbl 6 cm
tbl 6 cm
159,500.00
145,750.00
136,950.00
131,670.00
184,680.00
168,180.00
154,430.00
143,430.00
182,820.00
189,200.00
450.00
650.00
3,660.00
6,960.00
6,300.00
7,660.00
675.00
1,450.00
2,650.00
31,120.00
1,850.00
1,730.00
1,990.00
1,890.00
1,900.00
3,110.00
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
KAYU / LANGIT-LANGIT
Balok Kayu Jati
Papan Kayu Jati
Balok Kayu Meranti Batu
Papan Kayu Meranti Batu
Balok Kayu Damar Laut
Papan Kayu Damar Laut
Balok Kayu Meranti Kls.II
Papan Kayu Meranti Kls.II
Kayu Sembarang/Bekisting
Kayu Bakar
Papan Lambsering/Rider
Kayu Lat Asbes 5x30x400 mm
Kayu Kaso 5 - 7 / 400 cm
Kayu Dolken / kayu laut 7,5 - 10 / 400 cm
Bambu 6 - 8 / 600 cm
Bilik bambu
Kayu Profil 1"
Kayu Profil 2"
Kayu Profil 3"
Kayu Profil 4"
Profil Gypsum 2"
Profil Gypsum 3"
Profil Gypsum 4"
Profil Gypsum 6"
Playwood 120 x 240 tbl.18 mm
Playwood 120 x 240 tbl.12 mm
Playwood 120 x 240 tbl. 9 mm
Playwood 120 x 240 tbl. 6 mm
Playwood 120 x 240 tbl. 4 mm
Teakwood 120 x 240 tbl. 3 mm
Triplek Jati 120 x 240 tbl. 3 mm
TriplekSungkai 120 x 240 tbl.3 mm
Formica 120 x 240 cm
Soft Board 120 x 240 tbl. 4 mm
Soft Board 120 x 240 tbl. 6 mm
Soft Board 120 x 240 tbl. 9 mm
Soft Board 120 x 240 tbl.12 mm
Gypsum 120 x 240 tbl. 6 mm
Gypsum 120 x 240 tbl. 9 mm
Gypsum 120 x 240 tbl.12 mm
Asbes Lokal 100 x 100 cm
Asbes Atrisco 100 x 100 cm
Akustik
@Rp. 21,750,000.00
-"- 21,913,130.00
-"8,485,400.00
-"8,612,680.00
-"8,305,000.00
-"8,429,580.00
-"5,131,500.00
-"5,208,470.00
-"3,144,900.00
-"174,900.00
-"204,750.00
-"8,125.00
-"51,750.00
-"20,750.00
-"12,500.00
-"14,850.00
-"5,700.00
-"11,400.00
-"17,100.00
-"22,800.00
-"4,180.00
-"4,950.00
-"6,050.00
-"7,150.00
-"233,640.00
-"191,950.00
-"156,530.00
-"102,410.00
-"64,520.00
-"96,250.00
-"104,720.00
-"93,830.00
-"81,950.00
-"55,990.00
-"84,150.00
-"126,230.00
-"168,250.00
-"71,500.00
-"94,600.00
-"104,500.00
-"8,250.00
-"10,450.00
-"93,500.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Btg
Btg
Btg
Btg
M2
M'
M'
M'
M'
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M2
E.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
BESI / ALLUMINIUM
Besi Beton Polos
Besi Beton Ulir
Besi Profil
Besi Siku
Besi CNP 100.50.2,3 - 6 m
Besi Plat Strip
Besi Plat Polos
Besi Plat Bordes
Kawat Besi Beton
Kawat Licin / seng polos
Kawat Duri
Kawat Nyamuk
Kawat Kasa
Kawat Harmonika # 1"
Kawat Burung
Pagar Kawat BRC 120
Pintu Besi
Pintu Gulung Besi
Pintu Lipat Besi
Pintu Rolling Door
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
Kg
Kg
Kg
Kg
Btg
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
Lbr
M2
M2
M2
M2
12,390.00
12,590.00
14,060.00
13,050.00
212,750.00
12,620.00
12,820.00
13,230.00
11,620.00
21,410.00
3,820.00
12,240.00
31,630.00
35,080.00
31,625.00
184,800.00
458,850.00
500,250.00
517,500.00
477,250.00
1
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
2
Jerajak Jendela Besi
Terali Besi Strip
Rangka Baja Ringan
Pintu Alluminium
Jendela Alluminium
Profil Alluminium T
Profil Alluminium Kosen Pintu
Profil Alluminium Kosen Jendela
Profil Alluminium Daun Pintu
Profil Alluminium Daun Jendela
Vention Blinds
Verticals Blinds
Bingkai Naco Niki hitam
Paku Beton 0,5 - 2"
Paku Beton 2" - 5"
Paku Biasa 0,5 - 2"
Paku Biasa 2 - 5"
Sekrup macam Ukuran
Sekrup 0,5 - 2"
Sekrup fisher
Bout 5/8" - 8"
Bout Angker 3/4" - 10"
Bout Ramset / Dina bolt
F.
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
3
316,250.00
258,750.00
181,125.00
546,250.00
488,750.00
8,050.00
45,885.00
43,125.00
51,980.00
48,875.00
146,625.00
155,250.00
345.00
500.00
17,500.00
27,500.00
650.00
4
M2
M2
M2
M2
M2
M'
M'
M'
M'
M'
M2
M2
M2
Bh
Bh
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
1,320.00
2,970.00
5,280.00
1,650.00
3,850.00
6,820.00
10,450.00
19,250.00
23,870.00
42,350.00
95,150.00
12,650.00
238,150.00
24,750.00
44,000.00
99,550.00
1,100.00
1,210.00
2,200.00
2,750.00
3,410.00
4,950.00
7,150.00
8,800.00
825.00
825.00
1,650.00
19,250.00
34,210.00
1,100.00
1,320.00
2,090.00
2,310.00
1,650.00
3,740.00
935.00
1,100.00
2,970.00
5,060.00
8,250.00
11,000.00
14,850.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
171,100.00
400.00
490.00
10,930.00
10,120.00
17,250.00
1
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
2
Plint ubin teralux marmer 10 x 40 cm
Plint ubin teralux marmer 10 x 60 cm
Plint ubin granito 10 x 30 cm
Plint ubin granito 10 x 40 cm
Plint ubin granito 10 x 60 cm
Plint ubin keramik 10 x 30 cm
Plint ubin keramik 10 x 40 cm
Plint ubin keramik 10 x 60 cm
Plint ubin keramik 15 x 30 cm
Plint ubin keramik 15 x 40 cm
Plint ubin keramik 15 x 60 cm
Batu Lapis Dinding 7x3x24
Batu tempel hitam
Batu Poros
Carpet
Carpet 80 % wool, 20 % nylon
Feltex carpet 100 % wool-T-21
Underlyer tebal 6 mm / rubber corrugated
Vynil asbes 30 x 30 cm
Vynil karet 30 x 30 cm KL I
Vynil karet 30 x 30 cm KL II
Vynil motif kembang ex DN 30 x 30 cm
Vynil wall covering lebar 50 cm
Perquet Jati
Gymfloor
Paku Pancing 60 - 230
Sekrup 3,5"
Sekrup 3,5"
G.
1
2
3
4
5
6
7
8
9
10
11
12
25
13
14
15
16
17
18
19
20
21
22
23
24
26
27
28
29
30
31
32
33
34
35
36
PENUTUP ATAP
Atap Genteng Palentong
Atap Genteng Palentong super
Atap Genteng Kodok
Atap Genteng Beton
Atap Genteng Keramik
Atap Genteng Aspal
Atap Genteng Metal/Multi Roof 35
Atap Genteng Asbes Cement 0,35
Atap Sirap
Atap Aluminium gelombang tebal 0,55
Atap Seng gelombang 3' x 6' bjls 35
Atap Seng Super Deck 3' x 6' tbl.0,30
Roof light fibreglass gelombang 180 x 90 cm
Atap Asbes gelombang 1,8 x 1,05 tbl.4 mm
Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm
Atap Asbes gelombang 2,4 x 1,05 tbl.4 mm
Atap Asbes gelombang 2,7 x 1,05 tbl.4 mm
Atap Asbes gelombang 1,8 x 0,92 tbl.5 mm
Atap Asbes gelombang 2,1 x 0,92 tbl.5 mm
Atap Asbes gelombang 2,4 x 0,92 tbl.5 mm
Atap Asbes gelombang 2,7 x 0,92 tbl.5 mm
Atap Asbes gelombang 1,8 x 1,08 tbl.6 mm
Atap Asbes gelombang 2,1 x 1,08 tbl.6 mm
Atap Asbes gelombang 2,4 x 1,08 tbl.6 mm
Atap Asbes gelombang 2,7 x 1,08 tbl.6 mm
Genteng bubung palentong
Genteng bubung palentong super
Genteng bubung kodok
Nok genteng Beton
Nok genteng Keramik
Nok genteng Aspal
Nok genteng Metal/Multi Roof (Decra bond)
Nok genteng Asbes gelomang Cement 0,35
Nok Alluminium standard 40 cm 18 swg 22
Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm
Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm
3
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
26,400.00
59,730.00
25,410.00
57,090.00
142,890.00
2,970.00
3,960.00
5,940.00
4,510.00
5,940.00
8,910.00
1,850.00
95,000.00
104,250.00
82,500.00
79,500.00
77,500.00
95,000.00
7,480.00
8,910.00
8,250.00
8,580.00
57,500.00
335,000.00
72,500.00
650.00
370.00
18,500.00
1,520.00
3,620.00
1,970.00
5,430.00
10,350.00
10,290.00
96,250.00
60,720.00
940.00
89,250.00
54,220.00
85,250.00
41,170.00
51,980.00
81,530.00
94,500.00
99,000.00
60,860.00
76,090.00
83,000.00
91,300.00
87,420.00
101,700.00
108,330.00
131,130.00
8,500.00
11,580.00
8,690.00
12,220.00
13,670.00
26,680.00
37,400.00
30,700.00
43,540.00
17,810.00
23,630.00
4
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
M2
M2
M2
Bh
Kg
Kg
Bh
Bh
Bh
Bh
Bh
Lbr
Lbr
Lbr
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
Lbr
1
37
38
39
40
41
42
43
44
45
46
47
48
49
50
2
Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm
Bubung/Nok Paten 0,92 m' tbl.5 mm
Bubung/Nok Paten 1,05 m' tbl.4 mm
Bubung/Nok Paten 1,08 m' tbl.6 mm
Bubung/Nok Stel Rata 0,92 m' tbl.5 mm
Bubung/Nok Stel Rata 1,05 m' tbl.4 mm
Bubung/Nok Stel Rata 1,08 m' tbl.6 mm
Seng plat 3" x 6" bjls 35
Seng plat 3" x 6" bjls 30
Plastic aerator
Sisalation / aluminium foil
Paku Seng + Ring karet
Paku Seng + Ring karet
Paku hak panjang 15 cm
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
CAT / MINYAK
Cat Dasar
Cat Tembok
Cat Minyak Kayu
Cat Minyak Besi
Cat Menie Kayu
Cat Menie Besi
Cat Sending
Cat Melamix
Vernis
Plamir
Dempul Cat
Minyak Cat
Minyak Bekisting
Residu / Kolter
Soda Api
Sabun
Kapur Sirih
18,500.00
370.00
27,750.00
4
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
M2
Kg
Bh
Kg
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
203,500.00
81,840.00
49,720.00
167,750.00
40,370.00
11,220.00
13,750.00
10,230.00
22,770.00
17,380.00
145,750.00
35,750.00
8,250.00
99,770.00
102,740.00
34,650.00
80,410.00
27,500.00
79,200.00
132,000.00
211,200.00
172,000.00
275,200.00
66,000.00
110,000.00
176,000.00
147,000.00
176,400.00
235,200.00
154,000.00
137,500.00
12,350.00
9,750.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Lbr
Lbr
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
13,750.00
17,490.00
42,350.00
45,540.00
41,140.00
43,890.00
55,440.00
58,520.00
43,890.00
14,300.00
10,780.00
10,010.00
5,720.00
5,940.00
20,460.00
13,750.00
3,080.00
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Kg
Kg
Kg
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
25,920.00
33,460.00
28,140.00
39,050.00
32,800.00
27,500.00
36,910.00
105,000.00
94,500.00
25,000.00
70,180.00
1
18
19
20
21
22
23
24
Kuas
Ampelas/Kertas Pasir
Alang-alang
Wall paper
Perekat
Aluminium B
Aluminium C
J.
1
2
3
4
5
6
7
9
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
SANITASI / PIPA
Kloset duduk / monoblok Lengkap tangki
Kloset duduk / monoblok tanpa tangki
Kloset jongkok porselin
Bakkif Porselen
Wastafel
Urinoir
Kran air 1/2" - 3/4"
Kran air leher angsa 1/2"
Kran Shower
Kran Cebok
Bak fibreglass 0,3 M3
Bak fibreglass 1 M3
Bak cuci piring steinless 2 Lobang
Bak cuci piring teraso 2 Lobang
Tempat sabun keramik
Floor Drain 4" steinlees
Stop Kran 3/4"
Tutup Bak air 1" Kuningan
Instalasi air Bersih
Instalasi air Kotor/Limbah
Buis Beton 1/2 15 cm
Buis Beton 1/2 20 cm
Buis Beton 1/2 30 cm
Buis Beton 15 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Buis Beton 100 cm
Pipa PVC Tipe AW 1/2"
Pipa PVC Tipe AW 3/4"
Pipa PVC Tipe AW 1"
Pipa PVC Tipe AW 11/2"
Pipa PVC Tipe AW 2"
Pipa PVC Tipe AW 21/2"
Pipa PVC Tipe AW 3"
Pipa PVC Tipe AW 4"
Pipa Besi Hitam 1/2"
Pipa Besi Hitam 3/4"
Pipa Besi Hitam 1"
Pipa Besi Hitam 11/2"
Pipa Besi Hitam 2"
Pipa Besi Hitam 21/2"
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1"
Pipa Galvanis 11/4"
Pipa Galvanis 11/2"
Pipa Galvanis 2"
Pipa Galvanis 21/2"
Fitting Pipa AW 1"
Knee AW 1"
Tee AW 1"
Socht AW 1"
F-Knee 1"
2
-"-"-"-"-"-"-"-
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
8,250.00
3,080.00
2,200.00
27,830.00
15,950.00
46,750.00
42,350.00
4
Bh
Lbr
Ikat
M2
Kg
Kg
Kg
1,756,700.00
1,265,000.00
204,820.00
2,750,000.00
478,500.00
506,880.00
24,860.00
70,180.00
84,150.00
65,670.00
165,000.00
475,200.00
424,270.00
247,500.00
51,150.00
15,000.00
27,500.00
12,500.00
100,000.00
125,000.00
10,230.00
16,170.00
18,260.00
17,490.00
24,860.00
51,150.00
57,640.00
87,230.00
123,640.00
182,820.00
314,380.00
30,250.00
40,535.00
67,500.00
97,500.00
115,000.00
132,000.00
153,000.00
257,000.00
75,000.00
105,000.00
158,000.00
210,000.00
248,000.00
274,000.00
82,000.00
115,000.00
168,000.00
172,000.00
215,000.00
258,000.00
286,000.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
4,750.00
6,500.00
4,250.00
7,250.00
Bh
Bh
Bh
Bh
1
58
59
60
57
58
59
60
F-Tee 1"
DOP AW 1:
Bocht LL-D 1"
Union Socht 1"
D-Nipple 1"
Water Moer 1"
Plug 1"
K.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
LISTRIK / ACSESORIES
Lampu TL 1 x 20 W Lengkap
Lampu TL 1 x 40 W Lengkap
Lampu TL 2 x 20 W Lengkap
Lampu TL 2 x 40 W Lengkap
Lampu TL Bambu 1 x 20 W Lengkap
Lampu TL Bambu 1 x 40 W Lengkap
Lampu XL 5 W + Fitting
Lampu XL 8 W + Fitting
Lampu XL10 W + Fitting
Lampu XL14 W + Fitting
Lampu XL18 W + Fitting
Lampu XL24 W + Fitting
Lampu Downlight 5 W Lengkap
Lampu Pijar 5 w + Fitting
Lampu Pijar 10 w + Fitting
Lampu Pijar 15 w + Fitting
Lampu Pijar 20 w + Fitting
Lampu Pijar 25 w + Fitting
Lampu Pijar 40 w + Fitting
Stop Kontak Tanam
Saklar Tunggal
Saklar Ganda
Saklar Triple
Zekring box 1 grup
Zekring box 2 grup
Zekring box 3 grup
Zekring box 4 grup
MCB 2 Ampere
MCB 4 Ampere
MCB 6 Ampere
MCB 8 Ampere
Kabel Listrik NGA 1,5 mm
Kabel Listrik NGA 2,5 mm
Kabel Listrik NGA 3 mm
Kabel Listrik NGA 4 mm
Kabel Listrik NYM 2 1,5 mm
Kabel Listrik NYM 2 2,5 mm
Kabel Listrik NYM 2 3 mm
Kabel Listrik NYM 2 4 mm
Instalasi listrik titik api
Instalasi listrik Lampu Nyala
Medan,
DIKETAHUI OLEH :
Kepala Dinas Penataan Ruang dan
-"-"-"-"-"-"-"-
11,500.00
4,500.00
22,500.00
6,750.00
16,500.00
29,500.00
3,500.00
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-
60,500.00
78,650.00
112,500.00
127,500.00
75,000.00
87,500.00
9,500.00
15,500.00
17,500.00
27,500.00
31,000.00
38,500.00
45,500.00
3,000.00
4,000.00
4,750.00
6,500.00
7,500.00
9,500.00
7,250.00
15,100.00
16,950.00
21,200.00
48,500.00
65,000.00
95,000.00
125,000.00
30,250.00
36,300.00
90,000.00
135,000.00
750.00
900.00
1,150.00
1,500.00
1,600.00
2,085.00
2,375.00
2,875.00
85,000.00
75,000.00
Maret 2008
(....)
2. Ir. Herimas
(....)
3. H. Sugiarto Bharata, ST
(....)
4. H. Ali Muhar, ST
(....)
(....)
6. Ebenser Saragih, SE
(....)
7. Sahat Hasudungan, ST
(....)
(....)
9. Ali Fauzan, ST
(....)
NIP. 400025884
(....)
11. Chandra, ST
(....)
4
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Unt
Unt
Unt
Unt
Unt
Unt
Unt
Unt
M'
M'
M'
M'
M'
M'
M'
M'
Ttk
Ttk