DAFTAR ANALISA HARGA SATUAN

Lokasi : kab. Tabalong


No.
Uraian Pekerjaan
1 Pengukuran & Pemasangan Bouwplank

2 Galian Tanah Biasa

3 Urugan kembali

4 Urugan Pasir Dibawah


Lantai

5 Urugan tanah Dibawah


Lantai

6 Pasangan Batu Bata


Campuran 1 : 4 (1/2 batu)

7 Pasangan Batu Bata


Campuran 1 :2 (1/2 batu)

Analisa / Satuan
/m'
0.012 m3
0.020 kg
0.007 m3
0.010
0.100
0.100
0.005

Satuan
Rp.
Kayu 5/7
Paku biasa
Kayu papan
Kepala Tukang
Tukang Kayu
Pekerja
Mandor

900,000.00
15,000.00
900,000.00
67,200.00
65,100.00
42,700.00
67,200.00

Upah
Rp.

10,800.00
300.00
6,300.00
672.00
6,510.00
4,270.00
336.00
11,788.00

/m3
0.750
0.025

Pekerja
Mandor

42,700.00
67,200.00

32,025.00
1,680.00
33,705.00

/m3
0.250
0.0083

Pekerja
Mandor

42,700.00
67,200.00

10,675.00
560.00
11,235.00

/m3
1.200 m3
0.300
0.010

Pasir Urug
Pekerja
Mandor

100,000.00
42,700.00
67,200.00

/m3
1.200 m3
0.500
0.050
/m2
70.000 bh
11.500 kg
0.043 m3
0.010
0.100
0.300
0.015
/m2
70.000 bh
18.950 kg
0.038 m3
0.010
0.100
0.300
0.015

Tanah urug
Pekerja
Mandor

Batu Bata
Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Batu Bata
Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

110,000.00
42,700.00
67,200.00

700.00
5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

700.00
5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

Bahan
Rp.

17,400.00

120,000.00
12,810.00
672.00
13,482.00

120,000.00
132,000.00

21,350.00
3,360.00
24,710.00

132,000.00
49,000.00
57,500.00
4,300.00

672.00
6,510.00
12,810.00
1,008.00
21,000.00

110,800.00
49,000.00
94,750.00
3,800.00

672.00
6,510.00
12,810.00
1,008.00
21,000.00

147,550.00

No.

Uraian Pekerjaan

8 Plesteran batu bata


Campuran 1 : 2
tebal 15 mm

9 Plesteran batu bata


Campuran 1 : 4
tebal 15 mm

10 Pas. Keramik Lantai 50 x 50 cm

11 Pas. Keramik Lantai 60 x 60 cm

Analisa / Satuan
/m2
10.2240 kg
0.0200 m3
0.0150
0.1500
0.3000
0.0150
/m2
6.2400 kg
0.0240 m3
0.0150
0.1500
0.3000
0.0150
/m2
1.000
11.380
0.004
1.500
0.035
0.350
0.620
0.030
/m2
1.000
11.380
0.004
1.500
0.035
0.350
0.620
0.030

m2
kg
m3
kg

m2
kg
m3
kg

Satuan
Rp.
Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Ubin Keramik
Semen
Pasir pasang
Semen putih
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Ubin Keramik
Semen
Pasir pasang
Semen putih
Kepala Tukang
Tukang Batu
Pekerja
Mandor

5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

110,000.00
5,000.00
100,000.00
10,000.00
67,200.00
65,100.00
42,700.00
67,200.00

110,000.00
5,000.00
100,000.00
10,000.00
67,200.00
65,100.00
42,700.00
67,200.00

Upah
Rp.

Bahan
Rp.
51,120.00
2,000.00

1,008.00
9,765.00
12,810.00
1,008.00
24,591.00

53,120.00
31,200.00
2,400.00

1,008.00
9,765.00
12,810.00
1,008.00
24,591.00

33,600.00
110,000.00
56,900.00
420.00
15,000.00

2,352.00
22,785.00
26,474.00
2,016.00
53,627.00

182,320.00
110,000.00
56,900.00
420.00
15,000.00

2,352.00
22,785.00
26,474.00
2,016.00
53,627.00

182,320.00

12 Pas. Keramik Lantai 33,3 x 33,3 cm


1.000
11.380
0.042
1.500
0.035
0.350
0.620
0.030

m2
kg
m3
kg

Ubin Keramik
Semen
Pasir pasang
Semen putih
Kepala Tukang
Tukang Batu
Pekerja
Mandor

119,520.00
5,000.00
100,000.00
10,000.00
67,200.00
65,100.00
42,700.00
67,200.00

119,520.00
56,900.00
4,200.00
15,000.00
2,352.00
22,785.00
26,474.00
2,016.00
53,627.00

195,620.00

No.

Uraian Pekerjaan

13 Pas. Keramik Dinding 20 x 40 cm

14 Pas. Batu candi

15 Pas. Batu alam

16 Pas.Plint Keramik

17 Pekerjaan Beton mutu f'c 19,3 MPa


(K225)

Analisa / Satuan
/m2
1.000
9.300
0.018
1.940
0.045
0.450
0.900
0.045

m2
kg
m3
kg

/m2
1.000 m2
11.750 kg
0.035 m3
0.035
0.350
0.700
0.035
/m2
1.000 m2
11.750 kg
0.035 m3
0.035
0.350
0.700
0.035
/m'
1.0000
1.1400
0.0030
0.0250
0.0090
0.0900
0.0900
0.0050
/m3
0.776
0.499
371.000
215.000
0.028
0.275
1.650
0.083

m'
kg
m3
kg

m3
m3
kg
ltr

Satuan
Rp.
Ubin Keramik
Semen
Pasir pasang
Semen putih
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Batu candi
Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Batu alam
Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Plint keramik
Semen
Pasir pasang
Semen putih
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Kerikil
Pasir pasang
Semen
Air Kerja
Kepala Tukang
Tukang Batu
Pekerja
Mandor

55,000.00
5,000.00
100,000.00
10,000.00
67,200.00
65,100.00
42,700.00
67,200.00

120,000.00
5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

200,000.00
5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

15,000.00
5,000.00
100,000.00
10,000.00
67,200.00
65,100.00
42,700.00
67,200.00

280,000.00
100,000.00
5,000.00
25.00
67,200.00
65,100.00
42,700.00
67,200.00

Upah
Rp.

Bahan
Rp.
55,000.00
46,500.00
1,800.00
19,400.00

3,024.00
29,295.00
38,430.00
3,024.00
73,773.00

122,700.00
120,000.00
58,750.00
3,500.00

2,352.00
22,785.00
29,890.00
2,352.00
57,379.00

182,250.00
200,000.00
58,750.00
3,500.00

2,352.00
22,785.00
29,890.00
2,352.00
57,379.00

262,250.00
15,000.00
5,700.00
300.00
250.00

604.80
5,859.00
3,843.00
336.00
10,642.80

21,250.00
217,155.56
49,857.14
1,855,000.00
5,375.00

1,881.60
17,902.50
70,455.00
5,577.60
95,816.70

2,127,387.70

No.

Uraian Pekerjaan

18 Pekerjaan Beton mutu f'c 14,5 MPa


(K175)

19 Pekerjaan Lantai kerja beton


mutu f'c 7,4 MPa (K100)

20 Pekerjaan Tulangan Besi

21 Pekerjaan Bekisting poer

Analisa / Satuan
/m3
0.762
0.543
326.000
215.000
0.028
0.275
1.650
0.083
/m3
0.761
0.638
230.000
200.000
0.020
0.200
1.200
0.060

m3
m3
kg
ltr

m3
m3
kg
ltr

/m3
0.007
0.070
0.070
0.004
10.500 Kg
0.150 Kg

/m3
0.026
0.260
0.520
0.026
0.300 Kg
0.040 m3
0.100 ltr

Satuan
Rp.
Kerikil
Pasir pasang
Semen
Air Kerja
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Kerikil
Pasir pasang
Semen
Air Kerja
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Kepala Tukang
Tukang Besi
Pekerja
Mandor
Besi
Kawat Beton
untuk Tulangan 10 Kg
untuk Tulangan 1 Kg
Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Paku
Kayu Bekisting
Minyak bekisting

280,000.00
100,000.00
5,000.00
25.00
67,200.00
65,100.00
42,700.00
67,200.00

280,000.00
100,000.00
5,000.00
25.00
67,200.00
65,100.00
42,700.00
67,200.00

67,200.00
60,025.00
42,700.00
67,200.00
15,000.00
16,000.00

Upah
Rp.

213,422.22
54,285.71
1,630,000.00
5,375.00
1,881.60
17,902.50
70,455.00
5,577.60
95,816.70

1,344.00
13,020.00
51,240.00
4,032.00
69,636.00

/m3
0.026
0.260
0.520
0.026
0.300 Kg
0.045 m3
0.100 ltr

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Paku
Kayu Bekisting
Minyak bekisting

67,200.00
65,100.00
42,700.00
67,200.00
15,000.00
900,000.00
13,750.00

/m3
0.033
0.330
0.660
0.033
0.400
0.040
0.200
0.015
0.350
2.000

Kg
m3
ltr
m3
lbr
btg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Paku
Kayu Bekisting
Minyak bekisting
Balok bekisting
Plywood 9 mm
Galam dia. 8 - 4 m'

67,200.00
65,100.00
42,700.00
67,200.00
15,000.00
900,000.00
13,750.00
900,000.00
134,200.00
20,000.00

157,500.00
2,400.00
159,900.00
15,990.00

1,747.20
16,926.00
22,204.00
1,747.20
4,500.00
36,000.00
1,375.00
41,875.00

1,747.20
16,926.00
22,204.00
1,747.20

42,624.40
23 Pekerjaan Bekisting kolom

1,431,793.12

470.40
4,201.75
2,989.00
268.80

42,624.40
22 Pekerjaan Bekisting sloof

1,903,082.94
213,007.41
63,785.71
1,150,000.00
5,000.00

7,929.95
793.00
67,200.00
65,100.00
42,700.00
67,200.00
15,000.00
900,000.00
13,750.00

Bahan
Rp.

4,500.00
40,500.00
1,375.00
46,375.00

2,217.60
21,483.00
28,182.00
2,217.60
6,000.00
36,000.00
2,750.00
13,500.00
46,970.00
40,000.00

No.

Uraian Pekerjaan

Analisa / Satuan

Satuan
Rp.

Upah
Rp.
54,100.20

Bahan
Rp.
145,220.00

No.

Uraian Pekerjaan

24 Pekerjaan Bekisting balok

Analisa / Satuan
/m3
0.033
0.330
0.660
0.033
0.400
0.040
0.200
0.018
0.350
2.000

Kg
m3
ltr
m3
lbr
btg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Paku
Kayu Bekisting
Minyak bekisting
Balok bekisting
Plywood 9 mm
Galam dia. 8 - 4 m'

Satuan
Rp.

Upah
Rp.

67,200.00
65,100.00
42,700.00
67,200.00
15,000.00
900,000.00
13,750.00
900,000.00
134,200.00
20,000.00

2,217.60
21,483.00
28,182.00
2,217.60

54,100.20
25 Pek.Bekisting Plat Lantai

26 Pek.Bekisting Plat Tangga

27 Pekerjaan Plafond Gypsumboard


+ Rangka

/m3
0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033
/m3
0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033

m3
kg
lt
m3
lbr
btg

m3
kg
lt
m3
lbr
btg

/m2
0.040
0.400
0.270
0.0135
0.023 m3
0.375 Lbr
0.030 Kg

Kayu bekisting
Paku biasa 2"- 5"
Minyak bekisting
Balok Bekisting
Plywood 9 mm
Galam dia.8 - 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Kayu bekisting
Paku biasa 2"- 5"
Minyak bekisting
Balok Bekisting
Plywood 9 mm
Galam dia.8 - 4 m
Pekerja
Tukang kayu
Kepala tukang
Mandor

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Lanan
Gypsumboard
Paku

900,000.00
15,000.00
13,750.00
900,000.00
134,200.00
20,000.00
42,700.00
65,100.00
67,200.00
67,200.00

900,000.00
15,000.00
13,750.00
900,000.00
134,200.00
20,000.00
42,700.00
65,100.00
67,200.00
67,200.00

67,200.00
65,100.00
42,700.00
67,200.00
3,250,000.00
80,000.00
15,000.00

/m'
1.1000 m2
0.0100 kg
0.0050
0.0500
0.0500
0.0030

List gypsum
Paku
Kepala Tukang
Tukang Kayu
Pekerja
Mandor

44,000.00
15,000.00
67,200.00
65,100.00
42,700.00
67,200.00

6,000.00
36,000.00
2,750.00
16,200.00
46,970.00
40,000.00
147,920.00
36,000.00
6,000.00
2,750.00
13,500.00
46,970.00
120,000.00

28,182.000
21,483.000
2,217.600
2,217.600
54,100.200

225,220.000
27,000.00
6,000.00
2,062.50
13,500.00
46,970.00
40,000.00

28,182.000
21,483.000
2,217.600
2,217.600
54,100.200

135,532.500

2,688.00
26,040.00
11,529.00
907.20

41,164.20
28 Pasangan List plafond
(bahan gypsum)

Bahan
Rp.

74,750.00
30,000.00
450.00
105,200.00
48,400.00
150.00

336.00
3,255.00
2,135.00
201.60
5,927.60

48,550.00

No.

Uraian Pekerjaan

29 Pasangan Batu Kali


Campuran 1 : 4

30 Memasang kunci tanam


Setara solid

Analisa / Satuan
/m3
1.2000 m3
163.0000 kg
0.5200 m3
0.0750
0.7500
1.5000
0.0750
/ buah
0.010
0.500
0.010
0.005
1.000 buah

Satuan
Rp.
Batu kali
Semen
Pasir pasang
Kepala Tukang
Tukang Batu
Pekerja
Mandor

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kunci tanam

290,000.00
5,000.00
100,000.00
67,200.00
65,100.00
42,700.00
67,200.00

67,200.00
65,100.00
42,700.00
67,200.00
260,000.00

Upah
Rp.

348,000.00
815,000.00
52,000.00
5,040.00
48,825.00
64,050.00
5,040.00
122,955.00

/ buah
0.010
0.500
0.010
0.005
1.000 buah

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kunci tanam

67,200.00
65,100.00
42,700.00
67,200.00
220,000.00

/ pasang
0.050
0.500
0.050
0.0025
1.000 buah

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Pegangan pintu

67,200.00
65,100.00
42,700.00
67,200.00
310,000.00

/ buah
0.015
0.150
0.015
0.00075
1.000 buah

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Engsel pintu

67,200.00
65,100.00
42,700.00
67,200.00
42,000.00

/ buah
0.010
0.100
0.010
0.00050
1.000 buah

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Engsel jendela

67,200.00
65,100.00
42,700.00
67,200.00
15,000.00

/ pasang
0.010
0.100
0.010
0.00050
1.000 buah

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Grendel jendela

67,200.00
65,100.00
42,700.00
67,200.00
10,000.00

42,000.00
42,000.00

672.00
6,510.00
427.00
33.60
7,642.60

35 Memasang grendel jendela

310,000.00
310,000.00

1,008.00
9,765.00
640.50
50.40
11,463.90

34 Memasang engsel jendela

220,000.00
220,000.00

3,360.00
32,550.00
2,135.00
168.00
38,213.00

33 Memasang engsel pintu


setara Solid

260,000.00
260,000.00

672.00
32,550.00
427.00
336.00
33,985.00

32 Memasang pegangan pintu

1,215,000.00

672.00
32,550.00
427.00
336.00
33,985.00

31 Memasang kunci tanam


Setara Seis

Bahan
Rp.

15,000.00
15,000.00

672.00
6,510.00
427.00
33.60
7,642.60

10,000.00
10,000.00

No.

Uraian Pekerjaan

36 Memasang kaca bening t. 5 mm

Analisa / Satuan
/ m2
0.015
0.150
0.015
0.00075
1.100 m2

Satuan
Rp.
Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kaca bening

67,200.00
65,100.00
42,700.00
67,200.00
165,000.00

Upah
Rp.
1,008.00
9,765.00
640.50
50.40
11,463.90

37 Memasang kaca rayband t. 5 mm

/ m2
0.015
0.150
0.015
0.00075
1.100 m2

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kaca rayband

67,200.00
65,100.00
42,700.00
67,200.00
165,000.00

Memasang dinding pemisah


Kalsiboard rangkap , rangka kayu klas II

/ m2
0.060
0.600
0.200
0.01000
0.028
0.150
0.560
1.000

m3
kg
kg
lbr

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Balok kayu meranti
Paku
Lem kayu
Kalsiboard

67,200.00
65,100.00
42,700.00
67,200.00
3,250,000.00
15,000.00
12,000.00
92,000.00

40 Pengecatan bidang kayu baru


(1 lapis plamir , 1lapis cat dasar ,
2 lapis cat penutup)

/m2
0.0063
Kepala Tukang
0.0630
Tukang Cat
0.0200
Pekerja
0.0025
Mandor
0.10 kg Plamir
0.10 kg Cat dasar
0.26 kg Cat penutup 2 x
UNTUK 1 CAT DASAR + 2 X CAT PENUTUP
/m2
0.0060
Kepala Tukang
0.0090
Tukang Cat
0.0700
Pekerja
0.0025
Mandor
0.2000 kg Cat menie
0.1500 kg Plamir
0.1700 kg Cat dasar
0.2600 kg Cat penutup 2x
UNTUK 1 CAT DASAR + 2 X CAT PENUTUP

67,200.00
65,100.00
42,700.00
67,200.00
14,800.00
45,000.00
53,750.00

91,000.00
2,250.00
6,720.00
92,000.00
191,970.00

423.36
4,101.30
854.00
168.00

5,546.66
67,200.00
65,100.00
42,700.00
67,200.00
15,000.00
14,800.00
45,000.00
70,400.00

181,500.00
181,500.00

4,032.00
39,060.00
8,540.00
672.00

52,304.00
39 Pengecatan cat tembok baru Interior
(1 lapis plamir , 1 lapis cat dasar ,
2 lapis cat penutup)

181,500.00
181,500.00

1,008.00
9,765.00
640.50
50.40
11,463.90

38

Bahan
Rp.

1,480.00
4,500.00
13,975.00
19,955.00

403.20
585.90
2,989.00
168.00

4,146.10

3,000.00
2,220.00
7,650.00
18,304.00
31,174.00

No.

Uraian Pekerjaan

41 Pengecatan cat tembok baru Exterior


(1 lapis alkali , 1 lapis cat dasar ,
2 lapis cat penutup)

42 Pekerjaan memasang list plank kayu


uk 3/30

Analisa / Satuan

Satuan
Rp.

/m2
0.0063
Kepala Tukang
67,200.00
0.0630
Tukang Cat
65,100.00
0.0200
Pekerja
42,700.00
0.0025
Mandor
67,200.00
0.10 kg Alkali
49,000.00
0.10 kg Cat dasar
45,000.00
0.26 kg Cat penutup 2 x
107,500.00
UNTUK 1 CAT DASAR + 2 X CAT PENUTUP
/m'
0.0200
Kepala Tukang
67,200.00
0.2000
Tukang Kayu
65,100.00
0.1000
Pekerja
42,700.00
0.0500
Mandor
67,200.00
0.0110 m3 Papan ky ulin
8,000,000.00
0.2500 Kg P a k u
15,000.00

Upah
Rp.
423.36
4,101.30
854.00
168.00

5,546.66

/m3
2.0000
20.0000
6.0000
0.3000
1.1000 m3
1.2500 Kg
1.0000 kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kayu ulin
P a k u/angker
Lem kayu

67,200.00
65,100.00
42,700.00
67,200.00
8,000,000.00
15,000.00
0.00

/m2
0.2500
2.5000
1.0000
0.0500
0.0400 m3
0.5000 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Papan ulin
Lem kayu

67,200.00
65,100.00
42,700.00
67,200.00
8,000,000.00
12,000.00

/m2
0.1050
1.0500
0.3500
0.0180
0.0400 m3
0.0500 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Papan ulin
P a k u ulin

67,200.00
65,100.00
42,700.00
67,200.00
8,000,000.00
15,000.00

/m2
0.3000
3.0000
1.0000
0.0500
0.0640 m3
0.5000 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Papan ulin
Lem kayu

67,200.00
65,100.00
42,700.00
67,200.00
8,000,000.00
12,000.00

320,000.00
6,000.00
326,000.00

7,056.00
68,355.00
14,945.00
1,209.60

91,565.60
46 Pek. Membuat / memasang daun pintu
/ jendela Jalusi kayu ulin

8,800,000.00
18,750.00
0.00
8,818,750.00

16,800.00
162,750.00
42,700.00
3,360.00

225,610.00
45 Pek. Membuat / memasang daun pintu
Klamp kayu ulin

0.00
3,750.00
3,750.00

134,400.00
1,302,000.00
256,200.00
20,160.00

1,712,760.00
44 Pek. Membuat / memasang daun pintu
panel kayu ulin

4,900.00
4,500.00
27,950.00
37,350.00

1,344.00
13,020.00
4,270.00
3,360.00

21,994.00
43 Pekerjaan Kusen dari Kayu Ulin

Bahan
Rp.

320,000.00
750.00
320,750.00

20,160.00
195,300.00
42,700.00
3,360.00

261,520.00

512,000.00
6,000.00
518,000.00

No.

Uraian Pekerjaan

Analisa / Satuan

47 Pek. Memasang rangka langit-2


50x100 cm kayu lanan KW1

/m2
0.0250
0.2500
0.1500
0.0750
0.0154 m3
0.5000 Kg

Satuan
Rp.
Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kasau 5x7
Paku

67,200.00
65,100.00
42,700.00
67,200.00
3,250,000.00
15,000.00

Upah
Rp.
1,680.00
16,275.00
6,405.00
5,040.00

29,400.00
48 Pek. memasang langit-2 lambriziring
papan lanan KW 1 1x20

/m2
0.0800
0.8000
0.6000
0.0300
0.0150 m3
0.5000 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Papan lanan KW 1
Paku

67,200.00
65,100.00
42,700.00
67,200.00
3,500,000.00
15,000.00

/m
0.0050
0.0500
0.0500
0.0030
1.0500 m'
0.0100 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
List profil
Paku

67,200.00
65,100.00
42,700.00
67,200.00
6,000.00
15,000.00

50,050.00
7,500.00
57,550.00

5,376.00
52,080.00
25,620.00
2,016.00

85,092.00
49 Pek. memasang list langit - 2 profil

Bahan
Rp.

52,500.00
7,500.00
60,000.00

336.00
3,255.00
2,135.00
201.60

5,927.60

6,300.00
150.00
6,450.00

50 Pekerjaan Pasangan paving


0.009
Kepala Tukang
0.090
Tukang Batu
0.270
Pekerja
0.014
Mandor
43.000 buah Paving Block
0.003 m3 Pasir urug
51 Pek. Membuat / memasang daun pintu
/ jendela Jalusi dan panel kayu ulin
Daun pintu / jendela jalusi
Daun pintu / jendela panel
untuk pekerjaan / m2

67,200.00
65,100.00
42,700.00
67,200.00
3,500.00
100,000.00

604.80
5,859.00
11,529.00
940.80

18,933.60

150,500.00
300.00
150,800.00

225,610.00
261,520.00
487,130.00
243,565.00

326,000.00
518,000.00
844,000.00
422,000.00

/m2
1.0000 m2
1.0000 m2
x

ANALISA HARGA SATUAN


Jumlah
Rp.

29,188.00

33,705.00

11,235.00

133,482.00

156,710.00

131,800.00

168,550.00

Jumlah
Rp.

77,711.00

58,191.00

235,947.00

235,947.00

249,247.00

Jumlah
Rp.

196,473.00

239,629.00

319,629.00

31,892.80

2,223,204.40

Jumlah
Rp.

1,998,899.64

1,501,429.12

16,783.00

84,499.40

88,999.40

Jumlah
Rp.
199,320.20

Jumlah
Rp.

202,020.20

279,320.200

189,632.700

146,364.20

54,477.60

Jumlah
Rp.

1,337,955.00

293,985.00

253,985.00

348,213.00

53,463.90

22,642.60

17,642.60

Jumlah
Rp.

192,963.90

192,963.90

244,274.00

25,501.66

35,320.10

Jumlah
Rp.

42,896.66

25,744.00

10,531,510.00

551,610.00

412,315.60

779,520.00

Jumlah
Rp.

86,950.00

145,092.00

12,377.60

169,733.60

665,565.00

DAF TAR UPAH DAN BAHAN


Lokasi : kab. Tabalong
No.
Uraian

I.

Satuan

Harga Satuan
(Rp)

Upah
1
2
3
4
5
6
7
8
9

II.

Pekerja
Mandor
Tukang Kayu
Tukang Batu
Tukang Cat
Tukang Besi
Tukang Dempul
Tukang Plitur
Kepala Tukang

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

42,700.00
67,200.00
65,100.00
65,100.00
65,100.00
60,025.00
65,100.00
65,450.00
67,200.00

Bahan
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Tanah Urug Pilihan


Pasir Urug
Pasir Pasang
Semen PC
Semen warna
Kerikil cor beton
Batu Bata KW I
Keramik 50 x 50 (warna)
Keramik 60 x 60 (warna)
Keramik 33,3 x 33,3 (warna) setara Roman
Keramik 20 x 40 (warna)
Plint keramik
Batu candi 30 x 30
Batu alam
Besi Beton
Kawat Beton
Kayu Bekisting
Balok Bekisting
Paku
Balok Ulin (klas I)
Papan Ulin (klas I)
Balok Ulin (klas I) untuk kusen
Balok lanan KW 1
Papan lanan KW 1
Gypsum 9 mm
Kalsiboard 6 mm
Genteng metal setara Multiroof
Nok / pemuung type C
Minyak bekisting
Galam dia.8/10 - 4 m
Plywood 9 mm (untuk bekisting)
Batu kali
Besi strip / Besi siku
Air Kerja
Kunci tanam setara solid
Kunci tanam setara SES
Pegangan pintu setara Ecostile

m3
m3
m3
kg
kg
m3
Buah
m2
m2
m2
m2
m'
m2
m2
Kg
Kg
m3
m3
kg
m3
m3
m3
m3
m3
Lembar
Lembar
m2
m'
ltr
btg
Lembar
m3
kg
ltr
buah
buah
psng

110,000.00
100,000.00
100,000.00
5,000.00
10,000.00
280,000.00
700.00
110,000.00
110,000.00
119,520.00
55,000.00
15,000.00
120,000.00
200,000.00
15,000.00
16,000.00
900,000.00
900,000.00
15,000.00
7,250,000.00
8,000,000.00
8,000,000.00
3,250,000.00
3,500,000.00
80,000.00
92,000.00
83,700.00
60,000.00
13,750.00
20,000.00
134,200.00
290,000.00
15,000.00
25.00
260,000.00
220,000.00
310,000.00

DAF TAR UPAH DAN BAHAN


Lokasi : kab. Tabalong
No.
Uraian
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

Engsel pintu setara solid


Engsel jendela
Kait angin
Pegangan jendela
Grendel jendela
Kaca bening 5 mm
Kaca rayband 5 mm
Kaca rayband 10 mm
Kaca rayband 12 mm
Lem kayu
Sekrup fixer
Sealant
Kusen alumunium
Profil aluminium pintu / jendela
Kloset duduk setara TOTO
Kran air setara San-ei
Seal tape
Floor drain
Cat dasar (setara jotashiler-07)
Cat kilap (setara Gardex)
Cat tembok interior (setara majestic )
Cat tembok exterior(setara Jotashield)
Plamir
Cat menie
List gypsum
List kayu profil
Alkali cat exterior setara Danapaint
Paku ulin / angker
Paku ulin sekrup
Paku metal
64 Paving block k- 250

Satuan
buah
buah
buah
buah
buah
m2
m2
m3
m4
kg
buah
tube
m'
m'
buah
buah
buah
buah
kg
kg
kg
kg
kg
kg
m'
m'
kg
kg
kg
kg
buah

Harga Satuan
(Rp)
42,000.00
15,000.00
8,000.00
10,000.00
10,000.00
165,000.00
165,000.00
600,000.00
700,000.00
12,000.00
400.00
40,000.00
231,250.00
312,500.00
2,262,700.00
126,864.00
3,000.00
15,000.00
45,000.00
70,400.00
53,750.00
107,500.00
14,800.00
15,000.00
44,000.00
6,000.00
49,000.00
15,000.00
20,000.00
24,000.00
3,500.00

DAFTAR ANALISA HARGA SATUAN


Lokasi : kab. Tabalong
No.
Uraian Pekerjaan

Analisa / Satuan

Satuan

Sub jumlah
Rp.

Jumlah
Rp.

BANGUNAN
52 Beton Bertulang Poer
17
20
21

1.00 m3
125.00 kg
6.00 m2

2,223,204.40
16,783.00
84,499.40

2,223,204.40
2,097,874.38
506,996.40
4,828,075.17

17
20
22

1.00 m3
170.00 kg
6.00 m2

2,223,204.40
16,783.00
88,999.40

2,223,204.40
2,853,109.15
533,996.40
5,610,309.95

17
20
23

1.00 m3
175.00 kg
10.00 m2

2,223,204.40
16,783.00
199,320.20

2,223,204.40
2,937,024.13
1,993,202.00
7,153,430.52

17
20
24

1.00 m3
175.00 kg
8.00 m2

2,223,204.40
16,783.00
202,020.20

2,223,204.40
2,937,024.13
1,616,161.60
6,776,390.12

17
20
24

1.00 m3
175.00 kg
8.00 m2

2,223,204.40
16,783.00
202,020.20

2,223,204.40
2,937,024.13
1,616,161.60
6,776,390.12

17
20
25

1.00 m3
125.00 kg
7.00 m2

2,223,204.40
16,783.00
279,320.20

2,223,204.40
2,097,874.38
1,955,241.40
6,276,320.17

17
20
26

1.00 m3
130.00 kg
7.00 m2

2,223,204.40
16,783.00
189,632.70

2,223,204.40
2,181,789.35
1,327,428.90
5,732,422.65

53 Beton Bertulang Sloof

54 Beton Bertulang Kolom

55 Beton Bertulang Balok Lantai

56 Beton Bertulang Ringbalk

57 Beton Bertulang Plat Lantai

58 Beton Bertulang Plat Tangga , anak tangga


& bordes

PEMERINTAH PROVINSI KALIMANTAN SELATAN

REKAPITULASI

BIAYA ( Alternatif 2 )

Program : Peningkatan Sarana & Prasarana Aparatur


Kegiatan : Penataan Tapal Batas Provinsi Kalimantan Selatan
Pekerjaan : Perencanaan Penataan Tapal Batas Provinsi Kalimantan Selatan di desa Pasar Panas Kab. Tabalong
Lokasi : Kabupaten Tabalong
URAIAN PEKERJAAN
I
II
III
IV
V
VI
VII
VIII

JUM
#REF!

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PEKERJAAN TANAH / PASIR


PEKERJAAN PONDASI / BETON BERTULANG
PEKERJAAN LANTAI / DINDING
PEKERJAAN RANGKA KAP / ATAP / PLAFOND
PEKERJAAN PINTU / JENDELA & PERLENGKAPAN
#REF!
PEKERJAAN CAT - CATAN

IX

#REF!

Rp.

Jumlah a
PPN 10 %
Jumlah b
Asumsi kenaikan harga 2013 - ( 10%)
Jumlah c
Dibulatkan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Terbilang :

Catatan :
Jumlah harga di atas sudah termasuk biaya persiapan,mobilisasi,demobilisasi,keuntungan, pajak-pajak, PPN

dan biaya pungutan resmi lainnya.

Banjarmasin ,
PT. MATRA ESTETIKA REK

H. S U P A R , ST
Direktur Utama

TAH PROVINSI KALIMANTAN SELATAN

PITULASI

BIAYA ( Alternatif 2 )

mantan Selatan di desa Pasar Panas Kab. Tabalong

JUMLAH HARGA
#REF!
13,759,134.33
#REF!
90,940,365.63
72,034,586.40
37,290,682.60
#REF!
77,983,115.23
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Banjarmasin ,
2012
PT. MATRA ESTETIKA REKAYASA

H. S U P A R , ST
Direktur Utama

PEMERINTAH PROVINSI KALIMANTAN SELATAN

RENCANA ANGGARAN

BIAYA ( Alternatif 2 )

Program : Peningkatan Sarana & Prasarana Aparatur


Kegiatan : Penataan Tapal Batas Provinsi Kalimantan Selatan
Pekerjaan : Perencanaan Penataan Tapal Batas Provinsi Kalimantan Selatan di desa Pasar Panas Kab. Tabalong
Lokasi : Kabupaten Tabalong
No.

Uraian Pekerjaan

II. PEKERJAAN TANAH / PASIR


1 Galian tanah
2 Urugan tanah kembali
3 Pasir urug bawah pondasi
4 Tanah urug bawah lantai

Analis

2
3
4
5

Volume

194.95
64.98
13.16
30.00

Harga Satuan
Rp.
m3
m3
m3
m3

Jumlah
Rp.

33,705.00
11,235.00
133,482.00
156,710.00

6,570,789.75
730,087.75
1,756,956.83
4,701,300.00
13,759,134.33

jumlah
III.
1
2
3
4
5
6
7

PEKERJAAN PONDASI / BETON BERTULANG


Lantai kerja beton (K-100)
Poer beton
Sloof beton
Kolom
Balok lantai
Ringbalk
Plat lantai

19
52
53
54
55
56
57

6.09
18.28
#REF!
16.92
9.28
6.33
12.48

m3
m3
m3
m3
m3
m3
m3

1,501,429.12
4,828,075.17
5,610,309.95
7,153,430.52
6,776,390.12
6,776,390.12
6,276,320.17
jumlah

9,149,333.71
88,263,249.26
#REF!
121,027,102.67
62,851,018.39
42,860,667.53
78,328,475.76
#REF!

IV.
1
2
3
4
5

PEKERJAAN LANTAI / DINDING


Lantai keramik 50 x 50 setara Roman
Dinding pas. batu bata camp. 1:4 tb 1/2 bt
Plesteran camp. 1:4
Pekerjaan Acian dinding
Dinding Partisi kalsiboard + rangka lanan kw 1 - finish anti rayap

10
6
9
38

103.01
220.27
440.54
440.54
14.73

m2
m2
m2
m2
m2

235,947.00
131,800.00
58,191.00
19,000.00
244,274.00

24,304,900.47
29,031,586.00
25,635,463.14
8,370,260.00
3,598,156.02
90,940,365.63

jumlah
V. PEKERJAAN RANGKA KAP / ATAP / PLAFOND
1 Kuda- kuda + rangka atap baja ringan
2 Penutup atap setara Tegola :
Pas. Plywood 9 mm + aluminium foil +
lembaran atap Tegola ( terpasang + aksesoris )
3 Papan reuter , Nok + pemuung atap setara atap
4 Papan tampuk seng plat sambungan dengan dinding
/ patahan atap
5 Plafond lambriziring Pas. Papan. + rangka kayu lanan KW1 ,
dengan pengawet / anti rayap , diter
6 List tepi plafond profil papan ulin 1/4

54.05 m2

250,000.00

13,512,500.00

54.05 m2
5.50 m'

500,000.00
350,000.00

27,025,000.00
1,925,000.00

22.00 m'

200,000.00

4,400,000.00

47+48
49

104.00 m2
84.00 m'

232,042.00
12,377.60

24,132,368.00
1,039,718.40
72,034,586.40

jumlah

No.

Uraian Pekerjaan

VI. PEKERJAAN PINTU / JENDELA & PERLENGKAPAN


Pengadaan dan pemasangan daun pintu /jendela
1 Kusen kayu ulin 5/10 uk. Jadi + angker ( terpasang )
2 Daun pintu decoratif ( panil ulin + krepyak ulin )
Ukuran . 60 x 240
Ukuran . 50 x 200
Ukuran . 80 x 200
3 Daun jendela decoratif ( panil ulin + krepyak ulin )
Ukuran . 65x 100
Ukuran . 50x 100
4 Angin-2 panil ulin ukiran banjar
Ukuran . 65x 40
Ukuran . 50x 40
Ukuran . 100x 40
Ukuran .80x 40
5 Perlengkapan pintu:
Kunci tanam setara Solid
Espanollte tanam
Handle pintu setara solid
Engsel pintu
6 Perlengkapan jendela :
Grendel jendela
Engsel jendela
Kait angin jendela
Pegangan jendela

Analis

43

Volume

Harga Satuan
Rp.

0.80 m3

10,531,510.00

8,425,208.00

4.00 daun
4.00 daun
1.00 daun

958,413.60
665,565.00
1,064,904.00

3,833,654.40
2,662,260.00
1,064,904.00

2.00 daun
20.00 daun

432,617.25
332,782.50

865,234.50
6,655,650.00

2.00
20.00
2.00
1.00

daun
daun
daun
daun

143,000.00
110,000.00
220,000.00
176,000.00

286,000.00
2,200,000.00
440,000.00
176,000.00

5.00
4.00
9.00
31.00

set
psg
psg
bh

293,985.00
200,000.00
348,213.00
53,463.90

1,469,925.00
800,000.00
3,133,917.00
1,657,380.90

44.00
44.00
44.00
22.00

bh
bh
bh
bh

17,642.60
22,642.60
32,000.00
20,000.00

776,274.40
996,274.40
1,408,000.00
440,000.00
37,290,682.60

jumlah
VIII. PEKERJAAN CAT - CATAN
1 Cat tembok interior plafond dan dinding partisi , dinding dalam
2 Cat kilap KAYU ULIN
kusen, list plank , pintu / jendela , angin2,
papan penutup sloof , pagar , riliing tangga , atau semua bahan
kayu yg terlihat.
3 Cat tembok luar ( cat TeknikMarbling / wose type serat kayu )
( dinding tampak luar , kolom bwh bangunan )

Jumlah
Rp.

39
40

353.73 m2
208.34 m2

25,501.66
35,320.10

9,020,702.19
7,358,413.03

308.02 m2

200,000.00

61,604,000.00

jumlah

77,983,115.23

PEMERINTAH PROVINSI KALIMANTAN SELATAN

Program : Peningkatan Sarana & Prasarana Aparatur


Kegiatan : Penataan Tapal Batas Provinsi Kalimantan Selatan
Pekerjaan : Perencanaan Penataan Tapal Batas Provinsi Kalimantan Selatan di desa Pasar Panas Kab. Tabalong
Lokasi : Kabupaten Tabalong
FINISHING SITE DEVELOPMENT
Uraian Pekerjaan

No.
I.

PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan semak

II.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
III.

IV.

PEKERJAAN PAGAR
Pembersihan lokasi
Pengukuran & pasang bouwplank
Galian tanah pondasi
Urugan tanah kembali
Urugan tanah
Pasir urug
Lantai kerja
Pas. batu kali camp.1:4
Pekerjaan Beton Bertulang :
Poer
Sloof
Kolom
Ringbalk
Dinding pas. batu bata camp. 1:2 tb 1/2 bt
Plesteran camp. 1:2
Rollag bata camp camp. 1:2
Pasir urug dibawah rollag bata
Pagar besi hollow (4/4 , 2/2)
Pasangan batu alam pada pagar
Cat tembok kolom dan pagar
Plesteran mata sapi untuk pas. Batu kali bag. Luar
Urugan tanah subur
Pengadaan tanaman
Sutera bombay (Portulaca Grandiflora)
Airis (Iris SP)

PEKERJAAN PASANGAN CONBLOCK


1 Urugan tanah
2 Hamparan kerikil putih
3 Pas. Conblock 60 x 60
PEKERJAAN SALURAN
1 Pembuatan saluran air hujan sepanjang siring &
saluran penghubung ke bangunan
- galian tanah
- urugan tanah kembali
- pasir urug bawah saluran
- pas.batu bata camp.1:2
- plesteran camp.1:2 (untuk bagian yang terlihat)
- pasangan grill atas saluran penghubung
- penutup beton cor t. 5 cm
- bak kontrol
2 Pembuatan saluran pas. Batu kali sepanjang pagar depan
- galian tanah
- urugan tanah kembali
- pasir urug bawah saluran
- pasangan batu kali camp.1:4
- plesteran camp.1:2

Analis

Volume

Harga Satuan
Rp.

1.00 ls

Jumlah
Rp.

2,500,000.00
JUMLAH I

2,500,000.00
2,500,000.00

1
2
3
5
4
19
29

2.00
3.00
144.70
72.03
4.49
14.49
4.07
275.84

Ls
m'
m3
m3
m3
m3
m3
m3

200,000.00
29,188.00
33,705.00
11,235.00
156,710.00
133,482.00
1,501,429.12
1,337,955.00

400,000.00
87,564.00
4,877,194.39
809,222.22
703,314.48
1,934,220.92
6,114,570.10
369,062,845.16

#REF!
#REF!
#REF!
#REF!
7
8
7
4
14
41
-

8.22
5.51
36.33
3.21
284.45
568.90
19.73
1.97
30.51
170.31
359.39
28.22
2.86

m3
m3
m3
m3
m2
m2
m2
m3
m'
m2
m2
m2
m3

4,828,075.17
5,610,309.95
7,153,430.52
6,776,390.12
168,550.00
77,711.00
168,550.00
133,482.00
250,000.00
319,629.00
42,896.66
30,000.00
200,000.00

39,695,830.57
30,890,366.58
259,916,321.35
21,769,492.09
47,944,216.05
44,209,943.32
3,325,154.40
263,333.29
7,627,500.00
54,434,736.47
15,416,416.15
846,720.00
571,200.00

30.00 polybag
40.00 polybag

10,000.00
10,000.00
JUMLAH II

300,000.00
400,000.00
911,600,161.54

5
-

1.00 m3
2.00 m2
37.00 buah

156,710.00
150,000.00
96,000.00
JUMLAH III

156,710.00
300,000.00
3,552,000.00
4,008,710.00

m3
m3
m3
m2
m2
m2
m3
buah

33,705.00
11,235.00
133,482.00
168,550.00
77,711.00
225,000.00
1,501,429.12
200,000.00

638,797.38
42,855.91
562,493.15
20,889,092.56
12,438,764.59
384,750.00
1,295,733.33
1,200,000.00

m3
m3
m3
m3
m2

33,705.00
11,235.00
133,482.00
1,337,955.00
77,711.00

668,046.58
29,512.10
286,879.51
13,738,657.12
3,117,640.98

2
3
4
7
8
19
-

18.95
3.81
4.21
123.93
160.06
1.71
0.86
6.00

2
3
4
29
8

19.82
2.63
2.15
10.27
40.12

- pasangan grill atas saluran penghubung

1.50 m2

225,000.00
JUMLAH IV

337,500.00
55,630,723.21

No.
V.

VI.

Uraian Pekerjaan
PEKERJAAN TAMAN
1 Bak bunga pas. Batu bata
- galian tanah
- pasir urug
- tanah urug
- pas.batu bata camp.1:2
- plesteran camp.1:2
- ringbalok
- plesteran t. 5 cm
2 Bak bunga pas. Kansteen
- pas. Kansteen sekeliling taman
3 Urugan tanah subur
PEKERJAAN HALAMAN
1 Pembuatan taman
Pembuatan kolam
2 Perkerasan halaman & areal parkir :
- pasir urug bawah paving
- pasangan paving K-250

VII. PEMBUATAN GAZEBO


1 Galian tanah pondasi
2 Urugan tanah kembali
3 Pasir urug bawah lantai kerja pondasi
4 Pondasi batu kali camp.1:4
5 Tiang Ulin 10/10
6 Ringbalk 5/10
7 Rangka atap / pergola ulin 1,5/20
8 Rangka badan ulin (1,5/5, 1,5/10, 4/6, 5/10)
9 Atap polycarbonat
10 Pasir urug dibawah paving
11 Pas. Paving

Analis

2
4
5
7
8
#REF!
-

Volume

Jumlah
Rp.

m3
m3
m3
m2
m2
m3
m3

33,705.00
133,482.00
156,710.00
168,550.00
77,711.00
6,776,390.12
142,000.00

63,442.92
122,037.25
371,788.21
5,598,185.99
5,162,155.22
2,156,247.34
54,094.90

45.75 m'
11.39 m3

60,000.00
200,000.00
JUMLAH V

2,745,000.00
2,277,852.00
18,550,803.83

30.75 m2
5.48 m2

750,000.00
2,000,000.00

23,062,500.00
10,960,000.00

4
50

27.44 m3
274.44 m2

133,482.00
169,733.60
JUMLAH VI

3,663,280.01
46,581,689.18
84,267,469.19

33,705.00
11,235.00
133,482.00
1,337,955.00
10,373,680.00
10,373,680.00
10,373,680.00
10,373,680.00
600,000.00
133,482.00
169,733.60
JUMLAH VII

14,560.56
1,797.60
8,542.85
235,480.08
1,182,599.52
383,826.16
1,285,298.95
524,700.73
7,245,000.00
89,019.15
1,257,725.98
12,228,551.58

2
3
4
29
54
54
54
54
54
4
50

1.88
0.91
2.37
33.21
66.43
0.32
0.38

Harga Satuan
Rp.

0.43
0.16
0.06
0.18
0.11
0.04
0.12
0.05
12.08
0.67
7.41

m3
m3
m3
m3
m3
m3
m3
m3
m2
m3
m2

REKAPITULASI BIAYA
Program : Peningkatan Sarana & Prasarana Aparatur
Kegiatan : Penataan Tapal Batas Provinsi Kalimantan Selatan
Pekerjaan : Perencanaan Penataan Tapal Batas Provinsi Kalimantan Selatan di desa Pasar Panas Kab. Tabalong
Lokasi : Kabupaten Tabalong

FINISHING SITE DEVELOPMENT


URAIAN PEKERJAAN

I.
II.
III.
IV.
V.
VI.
VII.

JUMLAH HARGA

PEKERJAAN PERSIAPAN
PEKERJAAN PAGAR
PEKERJAAN PASANGAN CONBLOCK
PEKERJAAN SALURAN
PEKERJAAN TAMAN
PEKERJAAN HALAMAN
PEMBUATAN GAZEBO

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah Dana Konstruksi

2,500,000.00
911,600,161.54
4,008,710.00
55,630,723.21
18,550,803.83
84,267,469.19
12,228,551.58

Rp.

1,088,786,419.36

29 Penutup atap genteng metal

/m2
0.010
0.100
0.200
0.001
1.02 m2
0.20 kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
genteng metal
Paku anti karat

67,200.00
65,100.00
42,700.00
67,200.00
83,700.00
24,000.00

30 Pemasangan nok genteng


metal

/m'
1.1000
0.0500
0.2500
0.0130
0.1500
0.0150

Nok Genteng Metal


Paku anti karat
Pekerja
Mandor
Tukang Kayu
Kepala Tukang

60,000.00
24,000.00
42,700.00
67,200.00
65,100.00
67,200.00

40 Memasang kaca rayband t. 10 mm

/ m2
0.015
0.150
0.015
0.00075
1.100 m2

43 Pemasangan Kusen Aluminium

44 Pemasangan Jendela Kaca


rangka aluminium

M'
Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kaca rayband

67,200.00
65,100.00
42,700.00
67,200.00
600,000.00

/m'
0.0043
0.043
0.043
0.0021
1.10 m'
2.00 buah
0.06 tube

Kepala Tukang
Tukang besi
Pekerja
Mandor
Kusen aluminium
Sekrup fixer
Sealant

67,200.00
60,025.00
42,700.00
67,200.00
231,250.00
400.00
40,000.00

/m2
0.004
0.043
0.043
0.002
4.400 m'

Kepala Tukang
Tukang besi
Pekerja
Mandor
Profil aluminium

67,200.00
60,025.00
42,700.00
67,200.00
312,500.00

1.100 m2
0.270 tube

Kaca rayband 5 mm
Sealant

165,000.00
40,000.00

45 Pemasangan Jendela Kaca


rangka aluminium

/m2
0.004
0.043
0.043
0.002
4.400 m'
1.100 m2
0.270 tube

Kepala Tukang
Tukang besi
Pekerja
Mandor
Profil aluminium
Kaca bening 5 mm
Sealant

67,200.00
60,025.00
42,700.00
67,200.00
312,500.00
165,000.00
40,000.00

46 Pemasangan Pintu kaca 12 mm


rangka aluminium

/m2
0.004
0.043
0.043
0.002
4.400 m'
1.100 m2
0.270 tube

Kepala Tukang
Tukang besi
Pekerja
Mandor
Profil aluminium
Kaca rayband 12 mm
Sealant

67,200.00
60,025.00
42,700.00
67,200.00
312,500.00
700,000.00
40,000.00

48 Memasang kloset duduk / monoblo

/bh
1.0000 buah
0.0600

49 Memasang kran

50 Memasang Floor Drain

2,262,700.00
2,262,700.00

0.0010
1.1000
3.3000
0.1600

Kloset duduk
Perlengkapan
(harga kloset)
Kepala Tukang
Tukang Batu
Pekerja
Mandor

/bh
1.0000 buah
0.0250 buah
0.0100
0.1000
0.0100
0.0050

Kran air
Seal tape
Kepala Tukang
Tukang Batu
Pekerja
Mandor

126,864.00
3,000.00
67,200.00
65,100.00
42,700.00
67,200.00

/bh
1.0000 buah
0.0100

Floor drain
Kepala Tukang

15,000.00
67,200.00

67,200.00
65,100.00
42,700.00
67,200.00

0.1000
0.0100
0.0050
PEKERJAAN KAYU
54 Pekerjaan Rangka Badan dari Kayu

/m3
3.6000
36.0000
12.0000
0.6000
1.1000 m3
3.0000 Kg

Tukang Batu
Pekerja
Mandor

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kayu ulin
P a k u/angker

65,100.00
42,700.00
67,200.00

67,200.00
65,100.00
42,700.00
67,200.00
7,250,000.00
15,000.00

3/4 Upah
Pekerjaan kuda2 dari Kayu Ulin
bentang 6 M

/m3
1.2000
12.0000
4.0000
0.2000
1.1000 m3
15.0000 Kg
5.6000 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kayu ulin
Besi strip tebal 5mm
P a k u/angker

67,200.00
65,100.00
42,700.00
67,200.00
7,250,000.00
15,000.00
15,000.00

Pekerjaan gording dari Kayu Ulin

/m3
0.7200
7.2000
2.4000
0.1200
1.1000 m3
15.0000 Kg
3.0000 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kayu ulin
Besi strip tebal 5mm
P a k u/angker

67,200.00
65,100.00
42,700.00
67,200.00
7,250,000.00
10,000.00
15,000.00

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Kasau 5x7
Reng 3x4
Paku

67,200.00
65,100.00
42,700.00
67,200.00
3,250,000.00
3,250,000.00
15,000.00

Pekerjaan rangka atap Kayu lana

/m2
0.0100
0.1000
0.1000
0.0050
0.0140 m3
0.0570 m3
0.2500 Kg

Pekerjaan memasang dinding


Lambriziring papan ulin 1,5x20

/m2
0.1800
1.8000
0.6000
0.0300
0.0070 m3
0.1000 Kg
0.1500 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Papan ky ulin
P a k u 5cm & 10 cm
P a k u sekrup 10 cm

67,200.00
65,100.00
42,700.00
67,200.00
8,000,000.00
15,000.00
20,000.00

Pekerjaan memasang Lantai


papan ulin 2 x 20 cm

/m2
0.0800
0.8000
0.2800
0.0100
0.0233 m3
0.2000 Kg

Kepala Tukang
Tukang Kayu
Pekerja
Mandor
Papan ky ulin
P a k u ulin

67,200.00
65,100.00
42,700.00
67,200.00
8,000,000.00
15,000.00

672.00
6,510.00
8,540.00
67.20

15,789.20

85,374.00
4,800.00
90,174.00

105,963.20

10,675.00
873.60
9,765.00
1,008.00
22,321.60

89,521.60

660,000.00
660,000.00

671,463.90

254,375.00
800.00
2,400.00
257,575.00

262,422.26

66,000.00
1,200.00

67,200.00
1,008.00
9,765.00
640.50
50.40
11,463.90
288.96
2,581.08
1,836.10
141.12

4,847.26
288.96
2,581.08
1,836.10
141.12

1,375,000.00

4,847.26

181,500.00
10,800.00
1,567,300.00

1,572,147.26

1,375,000.00
181,500.00
10,800.00
1,567,300.00

1,572,147.26

1,375,000.00
770,000.00
10,800.00
2,155,800.00

2,160,647.26

288.96
2,581.08
1,836.10
141.12

4,847.26
288.96
2,581.08
1,836.10
141.12

4,847.26

2,262,700.00
135,762.00
67.20
71,610.00
140,910.00
10,752.00
223,339.20

2,398,462.00

2,621,801.20

126,864.00
75.00
672.00
6,510.00
427.00
336.00
7,945.00

126,939.00
15,000.00

672.00

134,884.00

6,510.00
427.00
336.00
7,945.00

15,000.00

22,945.00

7,975,000.00
45,000.00
8,020,000.00
8,020,000.00

10,373,680.00

7,975,000.00
225,000.00
84,000.00
8,284,000.00

9,330,080.00

7,975,000.00
150,000.00
45,000.00
8,170,000.00

8,797,648.00

45,500.00
185,250.00
3,750.00
234,500.00

246,288.00

241,920.00
2,343,600.00
512,400.00
40,320.00

3,138,240.00
2,353,680.00
80,640.00
781,200.00
170,800.00
13,440.00

1,046,080.00
48,384.00
468,720.00
102,480.00
8,064.00

627,648.00
672.00
6,510.00
4,270.00
336.00

11,788.00

12,096.00
117,180.00
25,620.00
2,016.00

156,912.00

56,000.00
1,500.00
3,000.00
60,500.00

217,412.00

186,666.67
3,000.00
189,666.67

259,750.67

5,376.00
52,080.00
11,956.00
672.00

70,084.00

6
7
8
9
10
11
12
13
14

No.

Closet duduk terpasang


48
Washlet
Paper holder
Wastafel+kran+cermin+meja wastafel (terpasang lengkap
Bak air pas.bata berlapis keramik
Pengadaan & pemasangan shower box + aksesoris
Pengadaan & pemasangan shower + aksesoris
Pembatas kain (terpasang lengkap)
Septictank + peresapan :
Septictank uk.130 x 130 (1 unit)
- galian tanah
2
- urugan tanah kembali
3
- pasir urug bawah lantai cor
4
- lantai kerja beton cor
19
- sloof beton
#REF!
- plat beton bawah,atas
75
- dinding pas.batu bata camp.1:2
7
- plesteran camp.1:2
8
- pipa hawa galvanis dia. 1"
- tutup lubang kontrol
- instalasi pemipaan
-

Uraian Pekerjaan
Septictank uk.130 x 180 (2 unit)
- galian tanah
- urugan tanah kembali
- pasir urug bawah lantai cor
- lantai kerja beton cor
- sloof beton
- plat beton bawah,atas dan dinding
- dinding pas.batu bata camp.1:2
- plesteran camp.1:2
- pipa hawa galvanis dia. 1"
- tutup lubang kontrol
- instalasi pemipaan
Peresapan (3 unit)
- galian tanah
- tanah urug atas lapisan pasir
- pasir urug

Analis

16.00
16.00
13.00
9.00
3.00
3.00
13.00
3.00

buah
buah
buah
buah
buah
buah
buah
buah

3.71
0.91
0.17
0.09
0.16
0.34
6.76
13.52
0.75
1.00
1.00

m3
m3
m3
m3
m3
m3
m2
m2
m'
buah
ls

Volume

2
3
4
19
74
75
7
8
-

9.41
1.77
0.47
0.23
0.37
2.35
16.12
64.48
1.50
2.00
1.00

m3
m3
m3
m3
m3
m3
m2
m2
m'
buah
ls

2
3
4

28.08 m3
2.08 m3
17.81 m3

- lapisan kerikil
- lapisan ijuk t.15 cm
- pas.batu bata camp.1:4
- pas.batu bata camp.1:4 t.20 cm
- tutup plat beton
- instalasi pemipaan

6
76
-

3.63
15.51
18.72
11.23
0.29
1.00

m3
m2
m2
m2
m3
ls

2,621,801.20
350,000.00
350,000.00
6,600,000.00
400,000.00
3,000,000.00
1,500,000.00
200,000.00

41,948,819.20
5,600,000.00
4,550,000.00
59,400,000.00
1,200,000.00
9,000,000.00
19,500,000.00
600,000.00

33,705.00
11,235.00
133,482.00
1,501,429.12
5,976,319.06
5,084,829.01
168,550.00
77,711.00
55,000.00
150,000.00
500,000.00

124,877.03
10,223.85
22,558.46
136,630.05
932,305.77
1,718,672.20
1,139,398.00
1,050,652.72
41,250.00
150,000.00
500,000.00
hal-2

Harga Satuan
Rp.

Jumlah
Rp.

33,705.00
11,235.00
133,482.00
1,501,429.12
5,976,319.06
5,084,829.01
168,550.00
77,711.00
55,000.00
300,000.00
1,000,000.00

317,231.46
19,863.48
62,469.58
351,334.41
2,223,190.69
11,959,517.82
2,717,026.00
5,010,805.28
82,500.00
600,000.00
1,000,000.00

33,705.00
11,235.00
133,482.00

946,436.40
23,391.27
2,377,447.90

131,250.00
78,750.00
131,800.00
100,000.00
5,061,198.55
1,500,000.00
JUMLAH VIII

476,437.50
1,221,412.50
2,467,296.00
1,123,200.00
1,469,772.06
1,500,000.00
183,574,719.64