Anda di halaman 1dari 31

RENCANA ANGGARA BIAYA

Kegiatan
Pekerjaan
Lokasi
Tahun

: Pembangunan Insfrastruktur Ekonomi


: Pembangunan Pasar Desa
: Desa Air Bacang Kecamatan Maje
: 2014

No

Uraian Pekerjaan

Satuan

Perkiraan
Volume
4

Analisa Harga Satuan


( Rp. )
5

Jumlah Harga
( Rp. )
7

I PEKERJAAN PERSIAPAN
1
2
3
4
5

Pembersihan Lokasi
Pengadaan Air Kerja
Pek. Pasangan Bowplank
Sewa Gudang/Barak Kerja
Papan Nama Proyek

unit
unit
unit
unit
unit

1.00
1.00
1.00
1.00
1.00

Taksiran
Taksiran
Taksiran
Taksiran
Taksiran

250,000.00
500,000.00
900,000.00
1,000,000.00
300,000.00
Sub Total I

250,000.00
500,000.00
900,000.00
1,000,000.00
300,000.00
2,950,000.00

M
M
M
M
M

15.78
16.07
48.00
2.34
6.00

Tnh.1
Tnh.9
Taksiran
Psr.4
Psr.4

52,600.00
17,533.33
125,000.00
177,040.00
177,040.00
Sub Total II

830,028.00
281,830.80
6,000,000.00
414,273.60
1,062,240.00
8,588,372.40

M
M
M
M
M

4.80
3.20
3.51
2.97
1.76

Btn.1
Btn.1
Btn.2.2
Btn.2.3
Btn.2.8

909,161.30
909,161.30
5,696,797.00
8,833,427.00
7,691,466.67
Sub Total III

4,363,974.22
2,909,316.15
19,995,757.47
26,235,278.19
13,498,524.00
67,002,850.03

M
M
M
M
M
Bh
M

35.54
34.50
69.00
69.00
70.00
4.00
120.00

.Pond.3
Ddin.2
Pls.2
Taksiran
Taksiran
Taksiran
Lant.2

753,700.00
102,535.00
50,094.00
10,000.00
85,000.00
42,500.00
115,185.67
Sub Total IV

26,786,498.00
3,537,457.50
3,456,486.00
690,000.00
5,950,000.00
170,000.00
13,822,280.00
54,412,721.50

M
M
M'
M'

130.68
143.75
39.57
67.00

Bes.Al.1
At.Gnt.9
At.Gnt.4
Kyu.2.2

162,460.00
100,320.00
100,200.00
60,770.00
Sub Total V

21,230,272.80
14,420,799.36
3,964,914.00
4,071,590.00
43,687,576.16

II PEKERJAAN TANAH DAN PASIR


1
2
3
4
5

Pek. Galian Tanah Pondasi


Pek. Urugan Tanah Kembali
Pek. Urugan Tanah Bawah Lantai
Pek. Urugan Pasir Bawah Pondasi
Pek. Urugan Pasir Bawah Lantai

III PEKERJAAN BETON


1
2
3
4
5

Pek. Beton Bawah Lantai


Pek. Beton Rabat Keliling Bangunan
Pek. Beton Sloof 15/20
Pek. Beton Kolom Struktur 20/20
Pek. Ring Balok 10/15

IV PEKERJAAN PASANGAN
1
2
3
4

Pas Pondasi Batu Kali


Pek. Batu bata 1 : 4
Pek. Plesteran 1 : 4
Pek. Acian
Pek. Saluran Air Hujan Keliling Bangunan
Pek. Bak Kontrol Bangunan
Pas. Lantai Keramik 30x30 cm

V PEKERJAAN ATAP
1
2
3
4

Pek. Pas. Rangka Atap Baja Ringan


Pek. Pas. Atap Genteng Metal
Pek. Pas. Nok bulat (atas)
Pek. Pas. Listplank Kayu 3/20

No

Uraian Pekerjaan

Satuan

Perkiraan
Harga Satuan
Analisa
( Rp. )
Volume
4

Jumlah Harga
( Rp. )
7

VI PEKERJAAN PENGECATAN
1
2

Pek. Cat Tembok dan Kolom


Pek. Cat List Plank

M
M

128.40
20.10

unit
unit
unit

1.00
1.00
1.00

Cat.4.5
Cat.4.3

19,665.00
33,952.50
Sub Total VI

2,524,986.00
682,445.25
3,207,431.25

Taksiran
Taksiran
Taksiran

250,000.00
420,000.00
1,300,000.00
Sub Total VII

250,000.00
420,000.00
1,300,000.00
1,970,000.00

JUMLAH

181,818,951.34

VII PEKERJAAN LAIN-LAIN


1
2
3

Pembersihan Ahkir
Administrasi Dokumentasi
Pelaporan

Kegiatan
Lokasi
Tahun

: Pembangunan Insfrastruktur Ekonomi


: Desa Air Bacang Kecamatan Maje
: 2014

No
1
I
II
III
IV
V
VI
VII

Uraian Pekerjaan
2
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN PASIR
PEKERJAAN BETON
PEKERJAAN PASANGAN
PEKERJAAN ATAP
PEKERJAAN PENGECATAN
PEKERJAAN LAIN-LAIN
Jumlah
PPn 10%
Jumlah Total
Dibulatkan

Terbilang

Jumlah Harga
( Rp. )
3
2,950,000.00
8,588,372.40
67,002,850.03
54,412,721.50
43,687,576.16
3,207,431.25
1,970,000.00
181,818,951.34
18,181,895.13
200,000,846.47
200,000,000.00

Dua Ratus Juta Rupiah

Bintuhan,

2014

Diperiksa Oleh
KEPALA BIDANG PENANAMAN MODAL
BADAN PEMBANGUNAN PERENCANAAN DAERAH
KABUPATEN KAUR

Dibuat Oleh

NUZMANTO M. ADIL, ST
NIP. 19751106 200312 1 006

DADANG SUPRIYADI, ST
NIP. 19800731 201101 1 002

Disetujui Oleh :
KEPALA BADAN PERENCANAAN PEMBANGUNAN DAERAH
KABUPATEN KAUR

Ir. Drs. H. SUDOTO, M.Pd


NIP. 19600813 198502 1 005

RENCANA ANGGARAN BIAYA


Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran

NO

:
:
:
:

Pembangunan Insfrastruktur Ekonomi


Pembangunan Pasar Desa
Desa Air Bacang Kecamatan Nasal
2014

ANALISA

HSP
Tnh.1

Menggali 1 M tanah biasa sedalam 1 meter


0.7500
Oh Pekerja
0.0250
Oh Mandor

HSP.
Tnh.2

Menggali 1 M tanah biasa sedalaM meter


0.9000
Oh Pekerja
0.0450
Oh Mandor

HSP.
Tnh.3

Menggali 1 M tanah biasa sedalam 3 meter


1.0500
Oh Pekerja
0.0670
Oh Mandor
Jumlah

HSP.
Tnh.4

Menggali 1 M tanah keras sedalam 1 meter


1.0000
Oh Pekerja
0.0320
Oh Mandor

HSP.
Tnh.5

HSP.Tnh.5
Menggali 1 M tanah lumpur sedalam 1 meter
1.2000
Oh Pekerja
0.0450
Oh Mandor

HSP.
Tnh.6

Menggali 1 M Tanah cadas sedalam 1 meter


1.5000
Oh Pekerja
0.0600
Oh Mandor

HSP.
Tnh.7

Mengerjakan 1 M Stripping tebing setinggi 1 meter


0.0500
Oh Pekerja
0.0050
Oh Mandor

HSP.Tnh.8
Tnh.8

HSP.
Tnh.9

Membuang 1 M Tanah sejauh 15 meter


0.3300
Oh Pekerja
0.0100
Oh Mandor

Mengurug Kembali 1 M galian


0.2500
Oh Pekerja
0.0083
Oh Mandor

Analisa BG SNI-2008

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

67,000.00
94,000.00
Jumlah

50,250.00
2,350.00
52,600.00

67,000.00
94,000.00
Jumlah

60,300.00
4,230.00
64,530.00

67,000.00
94,000.00

70,350.00
6,298.00
76,648.00

67,000.00
94,000.00
Jumlah

67,000.00
3,008.00
70,008.00

67,000.00
94,000.00
Jumlah

80,400.00
4,230.00
84,630.00

67,000.00
94,000.00
Jumlah

100,500.00
5,640.00
106,140.00

67,000.00
94,000.00
Jumlah

3,350.00
470.00
3,820.00

67,000.00
94,000.00
Jumlah

22,110.00
940.00
23,050.00

67,000.00
94,000.00
Jumlah

16,750.00
783.33
17,533.33

Page 4

NO

HSP.
Tnh.10

ANALISA

Memadatkan 1 M tanah (per 20 cm)


0.5000
Oh Pekerja
0.0500
Oh Mandor

HSP.
Psr.1

Mengurug 1 M Pasir Urug


1.2000
M Pasir Timbunan
0.3000
Oh Pekerja
0.0100
Oh Mandor

HSP.
Psr.2

1 M Pek. Timbunan Sirtu


1.2000
M Sirtu
0.3000
Oh Pekerja
0.0100
Oh Mandor

HARGA
SATUAN
(Rp)

67,000.00
94,000.00
Jumlah

JUMLAH
(Rp)

33,500.00
4,700.00
38,200.00

130,000.00
67,000.00
94,000.00
Jumlah

156,000.00
20,100.00
940.00
177,040.000

130,000.00
67,000.00
94,000.00
Jumlah

156,000.00
20,100.00
940.00
177,040.00

HSP.
Psr.3

Mengurug 1 M sirtu padat untuk penginggian lantai bangunan


1.2000
M Sirtu
130,000.00
0.2500
Oh Pekerja
67,000.00
0.0250
Oh Mandor
94,000.00
Jumlah

156,000.00
16,750.00
2,350.00
175,100.00

HSP.
Psr.4

1 M Pek. Urugan Pasir Bawah Pondasi / Lantai


1.2000
M Pasir Urug
0.3000
Oh Pekerja
0.0100
Oh Mandor

HSP.
.Pond.1

Memasang 1 M batu kosong (anstamping)


1.2000
M Batu Kali (batu belah 15/20 cm
0.4320
M Pair Urug
0.7800
Oh Pekerja
0.3900
Oh Tukang Batu
0.0390
Oh Kepala Tukang
0.0390
Oh Mandor

130,000.00
67,000.00
94,000.00

156,000.00
20,100.00
940.00
177,040.00

185,000.00
130,000.00
67,000.00
87,000.00
90,000.00
94,000.00
Jumlah

222,000.00
56,160.00
52,260.00
33,930.00
3,510.00
3,666.00
371,526.00

HSP.
.Pond.2

Memasang 1 M pondasi batu belah, campuran 1 PC : 3 PP


1.2000
M Batu Kali (batu belah 15/20 cm
185,000.00
4.0400
Zak Semen 50 Kg
80,000.00
0.4850
M Pasir Pasangan
175,000.00
0.7500
Oh Tukang Batu
87,000.00
0.0750
Oh Kepala Tukang
90,000.00
1.5000
Oh Pekerja
67,000.00
0.0750
Oh Mandor
94,000.00
Jumlah

222,000.00
323,200.00
84,875.00
65,250.00
6,750.00
100,500.00
7,050.00
809,625.00

HSP.
.Pond.3

Memasang 1 M pondasi batu belah, campuran 1 PC : 4 PP


1.2000
M Batu Kali (batu belah 15/20 cm
185,000.00
3.2600
Zak Semen 50 Kg
80,000.00
0.5220
M Pasir Pasangan
175,000.00
0.7500
Oh Tukang Batu
87,000.00
0.0750
Oh Kepala Tukang
90,000.00
1.5000
Oh Pekerja
67,000.00
0.0750
Oh Mandor
94,000.00
Jumlah

222,000.00
260,800.00
91,350.00
65,250.00
6,750.00
100,500.00
7,050.00
753,700.00

Analisa BG SNI-2008

Page 5

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
.Pond.4

Memasang 1 M Pondasi batu belah, campuran 1 PC : 5 PP


1.2000
M Batu Kali (batu belah 15/20 cm
185,000.00
2.7200
Zak Semen 50 Kg
80,000.00
0.5440
M Pasir Pasangan
175,000.00
0.7500
Oh Tukang Batu
87,000.00
0.0750
Oh Kepala Tukang
90,000.00
1.5000
Oh Pekerja
67,000.00
0.0750
Oh Mandor
94,000.00
Jumlah

222,000.00
217,600.00
95,200.00
65,250.00
6,750.00
100,500.00
7,050.00
714,350.00

HSP.
.Pond.5

Memasang 1 M Pondasi batu belah, campuran 1 PC : 8 PP


1.2000
M Batu Gunung
200,000.00
2.3400
zak Semen 50 Kg
80,000.00
0.5610
M Pasir Pasangan
175,000.00
1.5000
Oh Tukang Batu
87,000.00
0.7500
Oh Kepala Tukang
90,000.00
0.0750
Oh Pekerja
67,000.00
0.0750
Oh Mandor
94,000.00
Jumlah

240,000.00
187,200.00
98,175.00
130,500.00
67,500.00
5,025.00
7,050.00
735,450.00

HSP.
Ddin.1

Memasang 1 M dinding bata merah tebal 1/2 bata, spesi 1 PC : 2 PP


70.0000 Biji Batu Bata
650.00
0.3790 Zak Semen 50 Kg
80,000.00
0.0380 M Pasir Pasangan
175,000.00
0.1000 Oh Tukang Batu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.3000 Oh Pekerja
67,000.00
0.0150 Oh Mandor
94,000.00
Jumlah

45,500.00
22,992.00
6,650.00
8,700.00
900.00
20,100.00
1,410.00
106,252.00

HSP.
Ddin.2

Memasang 1 M dinding bata merah tebal 1/2 bata, spesi 1 PC : 4 PP


70.0000 Biji Batu Bata
650.00
0.2300 Zak Semen 50 Kg
80,000.00
0.0430 M Pasir Pasangan
175,000.00
0.1000 Oh Tukang Batu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.3000 Oh Pekerja
67,000.00
0.0150 Oh Mandor
94,000.00
Jumlah

45,500.00
18,400.00
7,525.00
8,700.00
900.00
20,100.00
1,410.00
102,535.00

HSP.
Ddin.3

Memasang 1 M dinding bata merah tebal 1/2 bata, spesi 1 PC : 3 PP


70.0000 Biji Batu Bata
650.00
0.2874 Zak Semen 50 Kg
80,000.00
0.0400 M Pasir Pasangan
175,000.00
0.1000 Oh Tukang Batu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.3000 Oh Pekerja
67,000.00
0.0150 Oh Mandor
94,000.00
Jumlah

45,500.00
22,992.00
7,000.00
8,700.00
900.00
20,100.00
1,410.00
106,602.00

Analisa BG SNI-2008

Page 6

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Ddin.4

Memasang 1 M dinding bata merah tebal 1/2 bata, spesi 1 PC : 5 PP


70.0000 Biji Batu Bata
650.00
0.1936 Zak Semen 50 Kg
80,000.00
0.0450 M Pasir Pasangan
175,000.00
0.1000 Oh Tukang Batu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.3000 Oh Pekerja
67,000.00
0.0150 Oh Mandor
94,000.00
Jumlah

45,500.00
15,488.00
7,875.00
8,700.00
900.00
20,100.00
1,410.00
99,973.00

HSP.
Ddin.5

Memasang 1 M dinding Concrete Block 20, Campuran 1 PC : 3 PP


12.5000 Biji Batu Batako
650.00
0.6064 Zak Semen 50 Kg
80,000.00
0.7280 M Pasir Pasangan
175,000.00
0.1500 Oh Tukang Batu
87,000.00
0.0150 Oh Kepala Tukang
90,000.00
0.3500 Oh Pekerja
67,000.00
0.0180 Oh Mandor
94,000.00
Jumlah

8,125.00
48,512.00
127,400.00
13,050.00
1,350.00
23,450.00
1,692.00
223,579.00

HSP.
Ddin.6

Memasang 1 M dinding Concrete Block 20, Campuran 1 PC : 4 PP


12.5000 Biji Batu Batako
2,500.00
0.4852 Zak Semen 50 Kg
80,000.00
0.7720 M Pasir Pasangan
175,000.00
0.1500 Oh Tukang Batu
87,000.00
0.0150 Oh Kepala Tukang
90,000.00
0.3500 Oh Pekerja
67,000.00
0.0180 Oh Mandor
94,000.00
Jumlah

31,250.00
38,816.00
135,100.00
13,050.00
1,350.00
23,450.00
1,692.00
244,708.00

HSP.
Btn.1

Membuat 1 M lantai kerja beton mutu f'c =7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87
4.6000 Zak Semen 50 Kg
80,000.00
368,000.00
0.6379 M Pasir Beton / Kasar
175,000.00
111,625.00
0.7607 M Batu Pecah 2-3
400,000.00
304,296.30
200 Ltr Air
100.00
20,000.00
0.2000 Oh Tukang Batu
87,000.00
17,400.00
0.0200 Oh Kepala Tukang
90,000.00
1,800.00
1.2000 Oh Pekerja
67,000.00
80,400.00
0.0600 Oh Mandor
94,000.00
5,640.00
Jumlah
909,161.30

HSP.
Btn.2

Membuat 1 M beton mutu f'c =7,4 Mpa (K100) slump (12+-2) cm, w/c = 0,87
4.9400 Zak Semen 50 Kg
80,000.00
395,200.00
0.6207 M Pasir Beton / Kasar
175,000.00
108,625.00
0.7400 M Batu Pecah 2-3
400,000.00
296,000.00
200
Air
100.00
20,000.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
964,622.00

Analisa BG SNI-2008

Page 7

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Btn.3

Membuat 1 M beton mutu f'c =9,8 Mpa (K125) slump (12+-2) cm, w/c = 0,78
5.5200 Zak Semen 50 Kg
80,000.00
441,600.00
0.5914 M Pasir Beton / Kasar
175,000.00
103,500.00
0.7496 M Batu Pecah 2-3
400,000.00
299,851.85
200
Air
100.00
20,000.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,009,748.85

HSP.
Btn.4

Membuat 1 M beton mutu f'c =12,2 Mpa (K150) slump (12+-2) cm, w/c = 0,72
5.9800 Zak Semen 50 Kg
80,000.00
478,400.00
0.5707 M Pasir Beton / Kasar
175,000.00
99,875.00
0.7533 M Batu Pecah 2-3
400,000.00
301,333.33
200
Air
100.00
20,000.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,044,405.33

HSP.
Btn.5

Membuat 1 M beton mutu f'c =14,5 Mpa (K175) slump (12+-2) cm, w/c = 0,66
6.5200 Zak Semen 50 Kg
80,000.00
521,600.00
0.5429 M Pasir Beton / Kasar
175,000.00
95,000.00
0.7622 M Batu Pecah 2-3
400,000.00
304,888.89
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,087,785.89

HSP.
Btn.6

Membuat 1 M beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
7.0400 Zak Semen 50 Kg
80,000.00
563,200.00
0.5221 M Pasir Beton / Kasar
175,000.00
91,375.00
0.7637 M Batu Pecah 2-3
400,000.00
305,481.48
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,126,353.48

HSP.
Btn.7

Membuat 1 M beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
7.4200 Zak Semen 50 Kg
80,000.00
593,600.00
0.4986 M Pasir Beton / Kasar
175,000.00
87,250.00
0.7756 M Batu Pecah 2-3
400,000.00
310,222.22
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,157,369.22

Analisa BG SNI-2008

Page 8

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Btn.8

Membuat 1 M beton mutu f'c =21,7 Mpa (K250) slump (12+-2) cm, w/c = 0,56
7.6800 Zak Semen 50 Kg
80,000.00
614,400.00
0.4943 M Pasir Beton / Kasar
175,000.00
86,500.00
0.7696 M Batu Pecah 2-3
400,000.00
307,851.85
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
1,175,048.85

HSP.
Btn.9

Membuat 1 M beton mutu f'c =24 Mpa (K275) slump (12+-2) cm, w/c = 0,53
8.1200 Zak Semen 50 Kg
80,000.00
649,600.00
0.4886 M Pasir Beton / Kasar
175,000.00
85,500.00
0.7600 M Batu Pecah 2-3
400,000.00
304,000.00
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,205,397.00

HSP.
Btn.10

Membuat 1 M beton mutu f'c =26,4 Mpa (K300) slump (12+-2) cm, w/c = 0,52
8.2600 Zak Semen 50 Kg
80,000.00
660,800.00
0.4864 M Pasir Beton / Kasar
175,000.00
85,125.00
0.7563 M Batu Pecah 2-3
400,000.00
302,518.52
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,214,740.52

HSP.
Btn.11

Membuat 1 M beton mutu f'c =28,8 Mpa (K325) slump (12+-2) cm, w/c = 0,49
8.7800 Zak Semen 50 Kg
80,000.00
702,400.00
0.4786 M Pasir Beton / Kasar
175,000.00
83,750.00
0.7452 M Batu Pecah 2-3
400,000.00
298,074.07
215
Air
100.00
21,500.00
0.3500 Oh Tukang Batu
87,000.00
30,450.00
0.0350 Oh Kepala Tukang
90,000.00
3,150.00
2.1000 Oh Pekerja
67,000.00
140,700.00
0.1050 Oh Mandor
94,000.00
9,870.00
Jumlah
1,289,894.07
- hal. 45 Membuat 1 M beton mutu f'c =31,2 Mpa (K350) slump (12+-2) cm, w/c = 0,52
8.9600 Zak Semen 50 Kg
80,000.00
716,800.00
0.4764 M Pasir Beton / Kasar
175,000.00
83,375.00
0.7407 M Batu Pecah 2-3
400,000.00
296,296.30
215
Air
100.00
21,500.00
0.3500 Oh Tukang Batu
87,000.00
30,450.00
0.0350 Oh Kepala Tukang
90,000.00
3,150.00
2.1000 Oh Pekerja
67,000.00
140,700.00
0.1050 Oh Mandor
94,000.00
9,870.00
Jumlah
1,302,141.30

TRIWULAN I (Pertama)

HSP.
Btn.12

Analisa BG SNI-2008

Page 9

NO

ANALISA

HSP.
Btn.13

Pembesian 10 kg dengan besi polos atau besi ulir


10.5000 Kg Besi Beton
0.1500 Kg Kawat Beton
0.0700 Oh Tukang Besi
0.0070 Oh Kepala Tukang
0.0700 Oh Pekerja
0.0040 Oh Mandor

HSP.
Bgst.1

Bahan Bekesting (Cetakan) ( C )


Memasang 1 M bekesting untuk pondasi
0.0400 M Kayu Balok Kls IV
0.3000 kg Paku 5 cm- 10 cm
0.1000 ltr Minyak bekesting
0.2600 Oh Tukang Kayu
0.0260 Oh Kepala Tukang
0.5200 Oh Pekerja
0.0260 Oh Mandor

HSP.
Bgst.2

Memasang 1 M bekesting untuk Sloof


0.0450 M Kayu Balok Kls III
0.3000 kg Paku 5 cm- 10 cm
0.1000 ltr Minyak bekesting
0.2600 Oh Tukang Kayu
0.0260 Oh Kepala Tukang
0.5200 Oh Pekerja
0.0260 Oh Mandor

HSP.
Bgst.3

Memasang 1 M bekesting untuk Kolom


0.0400 M Kayu Balok Kls III
0.4000 kg Paku 5 cm- 12 cm
0.2000 ltr Minyak bekesting
0.0150 M Balok Kayu Kals II
0.3500 lbr Plywood tebal 9 mm
2.0000 Btg dolken 8-10cm/4m (KlasIII)
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.6600 Oh Pekerja
0.0330 Oh Mandor

HSP.
Bgst.4

Memasang 1 M bekesting untuk Balok


0.0400 M Kayu Balok Kls IV
0.4000 kg Paku 5 cm- 12 cm
0.2000 ltr Minyak bekesting
0.0180 M Balok Kayu Kals II
0.3500 lbr Plywood tebal 9 mm
2.0000 Btg dolken 8-10cm/4m (KlasIII)
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.6600 Oh Pekerja
0.0330 Oh Mandor

Analisa BG SNI-2008

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

18,000.00
19,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
1 kg

189,000.00
2,850.00
6,090.00
630.00
4,690.00
376.00
203,636.00
20,363.60

1,750,000.00
20,000.00
12,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

70,000.00
6,000.00
1,200.00
22,620.00
2,340.00
34,840.00
2,444.00
139,444.00

1,750,000.00
20,000.00
12,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

78,750.00
6,000.00
1,200.00
22,620.00
2,340.00
34,840.00
2,444.00
148,194.00

1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

70,000.00
8,000.00
2,400.00
45,000.00
40,250.00
15,000.00
28,710.00
2,970.00
44,220.00
3,102.00
259,652.00

1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

70,000.00
8,000.00
2,400.00
54,000.00
40,250.00
15,000.00
28,710.00
2,970.00
44,220.00
3,102.00
268,652.00

Page 10

NO

ANALISA

HSP.
Bgst.5

Memasang 1 M bekesting untuk plat lantai


0.0400 M Kayu Balok Kls III
0.4000 kg Paku 5 cm- 12 cm
0.2000 ltr Minyak bekesting
0.0150 M Balok Kayu Kals II
0.3500 lbr Plywood tebal 9 mm
6.0000 Btg dolken 8-10cm/4m (KlasIII)
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.6600 Oh Pekerja
0.0330 Oh Mandor

HSP.
Bgst.6

Memasang 1 M bekesting untuk dinding


0.0300 M Kayu Balok Kls III
0.4000 kg Paku 5 cm- 12 cm
0.2000 ltr Minyak bekesting
0.0200 M Balok Kayu Kals II
0.3500 lbr Plywood tebal 9 mm
3.0000 Btg dolken 8-10cm/4m (KlasIII)
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.6600 Oh Pekerja
0.0330 Oh Mandor
Jumlah

HSP.
Bgst.7

Memasang 1 M bekesting untuk tangga


0.0300 M Kayu Balok Kls III
0.4000 kg Paku 5 cm- 12 cm
0.1500 ltr Minyak bekesting
0.0150 M Balok Kayu Kals II
0.3500 lbr Plywood tebal 9 mm
2.0000 Btg dolken 8-10cm/4m (KlasIII)
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.6600 Oh Pekerja
0.0330 Oh Mandor

HSP.
Bgst.8

Memasang 1 M Jembatan untuk Pengecoran beton


0.0264 M Kayu Balok Kls III
0.6000 kg Paku 5 cm- 12 cm
0.1500 ltr Minyak bekesting
0.5000 Btg dolken 8-10cm/4m (KlasIII)
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0080 Oh Mandor

Analisa BG SNI-2008

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

70,000.00
8,000.00
2,400.00
45,000.00
40,250.00
45,000.00
28,710.00
2,970.00
44,220.00
3,102.00
289,652.00

1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00

52,500.00
8,000.00
2,400.00
60,000.00
40,250.00
22,500.00
28,710.00
2,970.00
44,220.00
3,102.00
264,652.00

1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

52,500.00
8,000.00
1,800.00
45,000.00
40,250.00
15,000.00
28,710.00
2,970.00
44,220.00
3,102.00
241,552.00

1,750,000.00
20,000.00
12,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

46,200.00
12,000.00
1,800.00
3,750.00
4,350.00
450.00
10,050.00
752.00
79,352.00

Page 11

NO

HSP.
Btn.2.1

HARGA
SATUAN
(Rp)

ANALISA

Membuat 1 M pondasi beton bertulang (150 kg besi+bekesting)


Beton
bahan
6.7200 zak Semen 50 Kg
80,000.00
0.5400 M Pasir beton'
175,000.00
0.8100 M kerikil
185,000.00
upah
0.2750 Oh Tukang Batu
87,000.00
0.2620 Oh Kepala Tukang
90,000.00
5.3000 Oh Pekerja
67,000.00
0.2650 Oh Mandor
94,000.00

(Rp)

537,600.00
94,500.00
149,850.00
23,925.00
23,580.00
355,100.00
24,910.00
1,209,465.00

Besi 150 kg
bahan
157.5000 kg
2.2500 kg
Upah
1.0500 Oh

Besi beton polos


kawat beton

18,000.00
19,000.00

2,835,000.00
42,750.00

Tukang Besi

87,000.00

91,350.00
2,969,100.00

Bekesting
bahan
0.2000
1.5000
0.4000
Upah
1.3000

M
kg
ltr

Kayu Balok Kls III


Paku 5 cm- 12 cm
Minyak bekesting

1,750,000.00
20,000.00
12,000.00

350,000.00
30,000.00
4,800.00

Oh

Tukang Kayu

87,000.00

113,100.00
497,900.00

Total

4,676,465.00

Jumlah
HSP.
Btn.2.2

JUMLAH

Membuat 1 M sloof beton bertulang (200 kg besi+bekesting)


Beton
bahan
6.7200 zak Semen 50 Kg
80,000.00
0.5400 M Pasir beton'
175,000.00
0.8100 M kerikil
185,000.00
upah
0.2750 Oh Tukang Batu
87,000.00
0.3230 Oh Kepala Tukang
90,000.00
5.6500 Oh Pekerja
67,000.00
0.2830 Oh Mandor
94,000.00

537,600.00
94,500.00
149,850.00
23,925.00
29,070.00
378,550.00
26,602.00
1,240,097.00

Besi 200 kg
bahan
210.0000 kg
3.0000 kg
Upah
1.4000 Oh

Besi beton polos


kawat beton

18,000.00
19,000.00

3,780,000.00
57,000.00

Tukang Besi

87,000.00

121,800.00
3,958,800.00

Bekesting
bahan
0.2000
1.5000
0.4000
Upah
1.3000

M
kg
ltr

Kayu Balok Kls III


Paku 5 cm- 12 cm
Minyak bekesting

1,750,000.00
20,000.00
12,000.00

350,000.00
30,000.00
4,800.00

Oh

Tukang Kayu

87,000.00

113,100.00
497,900.00

Total

5,696,797.00

Jumlah

Analisa BG SNI-2008

Page 12

NO

HSP.
Btn.2.3

HARGA
SATUAN
(Rp)

ANALISA

Membuat 1 M Kolom beton bertulang (300 kg besi+bekesting)


Beton
bahan
6.7200 zak Semen 50 Kg
80,000.00
0.5400 M Pasir beton'
175,000.00
0.8100 M kerikil
185,000.00
upah
0.2750 Oh Tukang Batu
87,000.00
0.4030 Oh Kepala Tukang
90,000.00
7.0500 Oh Pekerja
67,000.00
0.3530 Oh Mandor
94,000.00

(Rp)

537,600.00
94,500.00
149,850.00
23,925.00
36,270.00
472,350.00
33,182.00
1,347,677.00

Besi 300 kg
bahan
315.0000 kg
4.5000 kg
Upah
2.1000 Oh

Besi beton polos


kawat beton

18,000.00
19,000.00

5,670,000.00
85,500.00

Tukang Besi

87,000.00

182,700.00
5,938,200.00

Bekesting
bahan
0.1500
0.4000
4.0000
2.0000
20.0000
Upah
1.6500

M
M
kg
ltr
bt

Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting
dolken 8-10 cm (klas III)

3,000,000.00
1,750,000.00
20,000.00
12,000.00
7,500.00

450,000.00
700,000.00
80,000.00
24,000.00
150,000.00

Oh

Tukang Kayu

87,000.00

143,550.00
1,547,550.00
8,833,427.00

Jumlah
HSP.
Btn.2.4

JUMLAH

Total

Membuat 1 M balok beton bertulang (200 kg besi+bekesting)


Beton
bahan
6.7200 zak Semen 50 Kg
80,000.00
0.5400 M Pasir beton'
175,000.00
0.8100 M kerikil
185,000.00
upah
0.2750 Oh Tukang Batu
87,000.00
0.3330 Oh Kepala Tukang
90,000.00
6.3500 Oh Pekerja
67,000.00
0.3180 Oh Mandor
94,000.00
Besi 200 kg
bahan
210.0000 kg
3.0000 kg
Upah
1.4000 Oh

Besi beton polos


kawat beton

Bekesting
bahan
0.15
0.3000
4.0000
2.0000
Upah
1.6500

M
kg
ltr

Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting

Oh

Tukang Kayu

18,000.00
19,000.00
87,000.00

Tukang Besi

Jumlah

Analisa BG SNI-2008

537,600.00
94,500.00
149,850.00
23,925.00
29,970.00
425,450.00
29,892.00
1,291,187.00

3,780,000.00
57,000.00
121,800.00
3,958,800.00

3,000,000.00
1,750,000.00
20,000.00
12,000.00

450,000.00
525,000.00
80,000.00
24,000.00

87,000.00

143,550.00
1,222,550.00
6,472,537.00

Total

Page 13

NO

HSP.
Btn.2.5

HARGA
SATUAN
(Rp)

ANALISA

Membuat 1 M Plat beton bertulang (150 kg besi+bekesting)


Beton
bahan
6.7200 zak Semen 50 Kg
80,000.00
0.5400 M Pasir beton'
175,000.00
0.8100 M kerikil
185,000.00
upah
0.2750 Oh Tukang Batu
87,000.00
0.2650 Oh Kepala Tukang
90,000.00
5.3000 Oh Pekerja
67,000.00
0.2650 Oh Mandor
94,000.00

(Rp)

537,600.00
94,500.00
149,850.00
23,925.00
23,850.00
355,100.00
24,910.00
1,209,735.00

Besi 200 kg
bahan
157.5000 kg
2.2500 kg
Upah
1.0500 Oh

Besi beton polos


kawat beton

18,000.00
19,000.00

2,835,000.00
42,750.00

Tukang Besi

87,000.00

91,350.00
2,969,100.00

Bekesting
bahan
0.15
0.3000
4.0000
2.0000
Upah
1.6500

M
M
kg
ltr

Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting

3,000,000.00
1,750,000.00
20,000.00
12,000.00

450,000.00
525,000.00
80,000.00
24,000.00

Oh

Tukang Kayu

87,000.00

143,550.00
1,222,550.00

Total

5,401,385.00

Jumlah
HSP.
Btn.2.6

JUMLAH

Membuat 1 M Dinding beton bertulang (150 kg besi+bekesting)


Beton
bahan
6.7200 zak Semen 50 Kg
80,000.00
0.5400 M Pasir beton'
175,000.00
0.8100 M kerikil
185,000.00
upah
0.2750 Oh Tukang Batu
87,000.00
0.2620 Oh Kepala Tukang
90,000.00
5.3000 Oh Pekerja
67,000.00
0.2650 Oh Mandor
94,000.00

537,600.00
94,500.00
149,850.00
23,925.00
23,580.00
355,100.00
24,910.00
1,209,465.00

Besi 200 kg
bahan
157.5000 kg
2.2500 kg
Upah
1.0500 Oh

Besi beton polos


kawat beton

18,000.00
19,000.00

2,835,000.00
42,750.00

Tukang Besi

87,000.00

91,350.00
2,969,100.00

Bekesting
bahan
0.16
0.2400
3.2000
1.6000
Upah
1.3000

M
kg
ltr

Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting

480,000.00
420,000.00
64,000.00
19,200.00

Oh

Tukang Kayu

3,000,000.00
1,750,000.00
20,000.00
12,000.00
87,000.00
Jumlah

Analisa BG SNI-2008

Total

113,100.00
1,096,300.00
5,274,865.00

Page 14

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Btn.2.7

Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm


0.0020 M Kayu Balok Kls III
1,750,000.00
0.0100 kg Paku 5 cm- 12 cm
20,000.00
3.0000 kg Besi beton polos
18,000.00
0.0450 kg kawat beton
19,000.00
0.0800 zak Semen 50 Kg
80,000.00
0.0060 M Pasir beton'
175,000.00
0.0090 M kerikil
185,000.00
0.0200 Oh Tukang Batu
87,000.00
0.0200 Oh Tukang Kayu
87,000.00
0.0200 Oh Tukang Besi
87,000.00
0.0060 Oh Kepala Tukang
90,000.00
0.1800 Oh Pekerja
67,000.00
0.0090 Oh Mandor
94,000.00
Jumlah
Jumlah untuk 1 M

3,500.00
200.00
54,000.00
855.00
6,400.00
1,050.00
1,665.00
1,740.00
1,740.00
1,740.00
540.00
12,060.00
846.00
86,336.00
7,135,206.61

HSP.
Btn.2.8

Membuat 1 M' Ring balok beton bertulang (10 x 15) cm


0.0030 M Kayu Balok Kls III
1,750,000.00
0.0200 kg Paku 5 cm- 12 cm
20,000.00
3.6000 kg Besi beton polos
18,000.00
0.0500 kg kawat beton
19,000.00
0.1100 zak Semen 50 Kg
80,000.00
0.0090 M Pasir beton'
175,000.00
0.0150 M kerikil
185,000.00
0.0330 Oh Tukang Batu
87,000.00
0.0330 Oh Tukang Kayu
87,000.00
0.0330 Oh Tukang Besi
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.2970 Oh Pekerja
67,000.00
0.0150 Oh Mandor
94,000.00
Jumlah
Jumlah untuk 1 M

5,250.00
400.00
64,800.00
950.00
8,800.00
1,575.00
2,775.00
2,871.00
2,871.00
2,871.00
900.00
19,899.00
1,410.00
115,372.00
7,691,466.67

HSP.
Pav.Block

1 M Pek. Paving Block


50.0000 Bh Paving Block 8 cm
0.1000 M Pasir Pasangan
0.1500 Oh Tukang Batu
0.6000 Oh Pekerja

HSP.
Pls.1

Memasang 1 M plesteran 1 PC : 3 PP, tebal 15 mm


0.1555 Zak Semen Pc 50 Kg
0.0230 M Pasir Pasangan
0.1500 Oh Tukang Batu
0.0150 Oh Kepala Tukang
0.3000 Oh Pekerja
0.0150 Oh Mandor

HSP.
Pls.2

Memasang 1 M plesteran 1 PC : 4 PP, tebal 15 mm


0.1248 Zak Semen Pc. 50 Kg
0.0240 M Pasir Pasangan
0.1500 Oh Tukang Batu
0.0150 Oh Kepala tukang
0.3000 Oh Pekerja
0.0150 Oh Mandor

Analisa BG SNI-2008

1,500.00
175,000.00
87,000.00
67,000.00
Jumlah

75,000.00
17,500.00
13,050.00
40,200.00
145,750.00

80,000.00
175,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

12,441.60
4,025.00
13,050.00
1,350.00
20,100.00
1,410.00
52,376.60

80,000.00
175,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

9,984.00
4,200.00
13,050.00
1,350.00
20,100.00
1,410.00
50,094.00

Page 15

NO
HSP.
Pls.3

ANALISA
Memasang 1 M plesteran 1 PC : 5 PP, tebal 15 mm
0.1168 Zak Semen Pc. 50 Kg
0.0260 M Pasir Pasangan
0.1500 Oh Tukang Batu
0.0150 Oh Kepala Tukang
0.3000 Oh Pekerja
0.0150 Oh Mandor
1 M Pek. Menaruh Pasir Alas Jalan
1.2000 M Pasir Urug
0.3750 Oh Pekerja
0.0190 Oh Mandor

Biaya Gilas
Untuk 1 Mesin Gilas Tiap Bulan Diperlukan
1.0000 Oh Masinis
1.0000 Oh Pembantu Masinis
30.0000 Oh Penjaga Api
150.0000 Oh Pekerja
1.0000
Bahan Bakar dll

100 M Pek. Pasangan Batu Pecah 5/7 cm


8.0000 M Batu Pecah 5/7 cm
7.5000 Oh Pekerja
6.3750 Oh Mandor
0.0270 Oh Biaya Gilas W.4 : 2/75

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

80,000.00
175,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

9,344.00
4,550.00
13,050.00
1,350.00
20,100.00
1,410.00
49,804.00

130,000.00
67,000.00
94,000.00
Jumlah

156,000.00
25,125.00
1,786.00
182,911.00

950,000.00
800,000.00
30,000.00
67,000.00
1,800,000.00
Jumlah

950,000.00
800,000.00
900,000.00
10,050,000.00
1,800,000.00
14,500,000.00

400,000.00
67,000.00
94,000.00
8,575,000.00
Jumlah

3,200,000.00
502,500.00
599,250.00
231,525.00
4,533,275.00

100 M Pek. Pasangan Batu Gunung/ Batu Pecah 10/15 cm ( Onderlag ).


8.0000 M Batu Pecah 10/15
400,000.00
3,200,000.00
7.5000 Oh Pekerja
67,000.00
502,500.00
6.3750 Oh Mandor
94,000.00
599,250.00
0.0270 Oh Biaya Gilas W.4 : 2/75
14,500,000.00
391,500.00
Jumlah
4,693,250.00
100 M Pek. Pasangan Batu Pecah 3/5 cm
8.0000 M Batu Pecah 3/5
7.5000 Oh Pekerja
6.3750 Oh Mandor
0.0270 Oh Biaya Gilas W.4 : 2/75

400,000.00
67,000.00
94,000.00
8,575,000.00
Jumlah

3,200,000.00
502,500.00
599,250.00
231,525.00
4,533,275.00

100 M Pek. Pasangan Batu Pecah 2/3 cm dan 1/2 cm


8.0000 M Batu Pecah
400,000.00
7.5000 Oh Pekerja
67,000.00
6.3750 Oh Mandor
94,000.00
0.0270 Oh Biaya Gilas W.4 : 2/75
14,500,000.00
Jumlah

3,200,000.00
502,500.00
599,250.00
391,500.00
4,693,250.00

Analisa BG SNI-2008

Page 16

NO

ANALISA

100 M Pek. Pasangan Dengan Aspal Panas


500.0000 Kg Aspal Panas
0.5000
Alat Siram Aspal
0.7500 M Kayu Bakar
10.0000 Oh Pekerja
0.5000 Oh Mandor

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

35,000.00
67,000.00
94,000.00
Jumlah

17,500.00
670,000.00
47,000.00
734,500.00

100,000.00
67,000.00
94,000.00
Jumlah

120,000.00
670,000.00
47,000.00
837,000.00

HSP.
Pls.Siar.2.1

Memasang 1 M finishing siar pasangan dinding batu bata (=20 M')


0.0622 Zak Semen Pc. 50 Kg
80,000.00
0.0750 Oh Tukang Batu
87,000.00
0.0080 Oh Kepala Tukang
90,000.00
0.1500 Oh Pekerja
67,000.00
0.0080 Oh Mandor
94,000.00
Jumlah

4,972.80
6,525.00
720.00
10,050.00
752.00
23,019.80

HSP.
Pls.Siar.2.2

Memasang 1 M finishing siar Pasangan dinding conblock expose (=8M')


0.0320 Zak Semen Pc. 50 Kg
80,000.00
0.0350 Oh Tukang Batu
87,000.00
0.0040 Oh Kepala Tukang
90,000.00
0.0700 Oh Pekerja
67,000.00
0.0040 Oh Mandor
94,000.00
Jumlah

2,560.00
3,045.00
360.00
4,690.00
376.00
11,031.00

HSP.
Pls.Siar.2.3

Memasang 1 M finishing siar pasangan batu kali adukan 1 PC:2 PP


0.1268 Zak Semen Pc. 50 Kg
80,000.00
0.0120 M Pasir Pasangan
175,000.00
0.1500 Oh Tukang Batu
87,000.00
0.0150 Oh Kepala Tukang
90,000.00
0.3000 Oh Pekerja
67,000.00
0.0150 Oh Mandor
94,000.00
Jumlah

10,144.00
2,100.00
13,050.00
1,350.00
20,100.00
1,410.00
48,154.00

100 M Pek. Hamparan Pasir Kasar / Abu Batu


1.2000 M Pasir Kasar / Abu Batu
10.0000 Oh Pekerja
0.5000 Oh Mandor

HSP.
Aci.1

Memasang 1M acian
0.0650 Zak Semen 50 kg
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.2000 Oh Pekerja
0.0100 Oh Mandor

HSP.
Lant.1

Memasang 1 M Lantai keramik ukuran (40x40) cm


6.2500 Bh Ubin keramik
0.0450 M Pasir Pasangan
0.2000 Zak Semen 50 kg
0.3500 Oh Tukang Batu
0.0350 Oh Kepala Tukang
0.7000 Oh Pekerja
0.0350 Oh Mandor

Analisa BG SNI-2008

80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

5,200.00
8,700.00
900.00
13,400.00
940.00
29,140.00

12,500.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

78,125.00
7,875.00
16,000.00
30,450.00
3,150.00
46,900.00
3,290.00
185,790.00

Page 17

NO

ANALISA

HSP.
Lant.2

Memasang 1 M Lantai keramik ukuran (30x30) cm


0.8333 Dos Ubin keramik
0.0450 M Pasir Pasangan
0.1638 Zak Semen 50 kg
0.3500 Oh Tukang Batu
0.0350 Oh Kepala Tukang
0.7000 Oh Pekerja
0.0350 Oh Mandor

HSP.
Lant.3

Memasang 1 M Lantai keramik ukuran (20x20) cm


2.2083 Dos Tegel 20 x 20
0.0450 M Pasir Pasangan
0.2080 Zak Semen 50 kg
0.3500 Oh Tukang Batu
0.0350 Oh Kepala Tukang
0.7000 Oh Pekerja
0.0350 Oh Mandor

HSP.
Dind.2.1

Memasang 1 M dinding porselin ukuran (10x20) cm


4.4167 Dos porselin
0.0180 M Pasir Pasangan
0.1860 Zak Semen 50 kg
0.4500 Oh Tukang Batu
0.0450 Oh Kepala Tukang
0.9000 Oh Pekerja
0.0450 Oh Mandor

HSP.
Dind.2.2

Memasang 1 M dinding keramik ukuran (20x20) cm


25.0000 Bh Keramikmik 20 x 20
0.0180 M Pasir Pasangan
0.1860 Zak Semen 50 kg
0.4500 Oh Tukang Batu
0.0450 Oh Kepala Tukang
0.9000 Oh Pekerja
0.0450 Oh Mandor

HSP.
Cat.1

1 M Pek. Cat Atap Genteng


0.1250 Kg Cat Genteng
0.0750 Oh Tukang Cat
0.0750 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0025 Oh Mandor

HSP.
Cat.2

1 MPek. Cat Atap Seng


0.1250 Kg Cat Meni
0.0750 Oh Tukang Cat
0.0750 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0025 Oh Mandor

Analisa BG SNI-2008

HARGA
SATUAN
(Rp)

JUMLAH

12,500.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

10,416.67
7,875.00
13,104.00
30,450.00
3,150.00
46,900.00
3,290.00
115,185.67

25,000.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

55,208.33
7,875.00
16,640.00
30,450.00
3,150.00
46,900.00
3,290.00
163,513.33

25,000.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

110,416.67
3,150.00
14,880.00
39,150.00
4,050.00
60,300.00
4,230.00
236,176.67

3,000.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

75,000.00
3,150.00
14,880.00
39,150.00
4,050.00
60,300.00
4,230.00
200,760.00

41,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

5,187.50
6,525.00
6,750.00
3,350.00
235.00
22,047.50

25,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

3,125.00
6,525.00
6,750.00
3,350.00
235.00
19,985.00

(Rp)

Page 18

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Kyu.1

Membuat dan Memasang 1 M Kusen Pintu dan kusen jendela kayu klas I
1.1000 M Kayu Bayam
3,500,000.00
3,850,000.00
1.2500 kg pAku 10 cm
20,000.00
25,000.00
1.0000 kg Lem Kayu
25,000.00
25,000.00
21.0000 Oh Tukang Kayu
87,000.00
1,827,000.00
2.1000 Oh Kepala Tukang
90,000.00
189,000.00
7.0000 Oh Pekerja
67,000.00
469,000.00
0.3500 Oh Mandor
94,000.00
32,900.00
Jumlah
6,417,900.00

HSP.
Kyu.2

Membuat dan Memasang 1 M Kusen Pintu dan kusen jendela kayu klas II
1.2000 M Kayu klas II
3,000,000.00
3,600,000.00
1.2500 kg pAku 10 cm
20,000.00
25,000.00
1.0000 kg Lem Kayu
25,000.00
25,000.00
18.0000 Oh Tukang Kayu
87,000.00
1,566,000.00
1.8000 Oh Kepala Tukang
90,000.00
162,000.00
6.0000 Oh Pekerja
67,000.00
402,000.00
0.3000 Oh Mandor
94,000.00
28,200.00
Jumlah
5,808,200.00

HSP.
Kyu.3

Membuat dan Memasang 1 M Daun Pintu Panel, Kayu Klas I


0.0400 M Papan kayu Klas I
3,500,000.00
0.5000 kg Lem Kayu
25,000.00
3.0000 Oh Tukang Kayu
87,000.00
0.3000 Oh Kepala Tukang
90,000.00
1.0000 Oh Pekerja
67,000.00
0.0500 Oh Mandor
94,000.00
Jumlah

140,000.00
12,500.00
261,000.00
27,000.00
67,000.00
4,700.00
512,200.00

HSP.
Kyu.4

Membuat dan Memasang 1 M Daun Pintu Panel, Kayu Klas II


0.0400 M Papan kayu Klas II
3,000,000.00
0.5000 kg Lem Kayu
25,000.00
3.0000 Oh Tukang Kayu
87,000.00
0.3000 Oh Kepala Tukang
90,000.00
1.0000 Oh Pekerja
67,000.00
0.0500 Oh Mandor
94,000.00
Jumlah

120,000.00
12,500.00
261,000.00
27,000.00
67,000.00
4,700.00
492,200.00

HSP.
Kyu.5

Memasang 1 M Konstruksi kuda2 konvensional, kayu klas II


1.1000 M Balok klas II
3,000,000.00
15.0000 kg Besi srip tebal 5 mm
25,000.00
5.6000 kg Paku 12 cm
20,000.00
12.0000 Oh Tukang Kayu
87,000.00
1.2000 Oh Kepala Tukang
90,000.00
4.0000 Oh Pekerja
67,000.00
0.2000 Oh Mandor
94,000.00
Jumlah

3,300,000.00
375,000.00
112,000.00
1,044,000.00
108,000.00
268,000.00
18,800.00
5,225,800.00

HSP.
Kyu.6

Memasang 1 M Konstruksi kuda2 konvensional, kayu klas I


1.2000 M Kayu Kls I
3,500,000.00
15.0000 kg Besi srip tebal 5 mm
25,000.00
5.6000 kg Paku 12 cm
20,000.00
20.1000 Oh Tukang Kayu
87,000.00
2.0100 Oh Kepala Tukang
90,000.00
6.7000 Oh Pekerja
67,000.00
0.3350 Oh Mandor
94,000.00
Jumlah

4,200,000.00
375,000.00
112,000.00
1,748,700.00
180,900.00
448,900.00
31,490.00
7,096,990.00

Analisa BG SNI-2008

Page 19

NO

ANALISA

HSP.
Kyu.7

Memasang 1 M Konstruksi Gording , kayu klas II


1.1000 M Kayu Kls II
15.0000 kg Besi srip tebal 5 mm
3.0000 kg Paku 12 cm
7.2000 Oh Tukang Kayu
0.7200 Oh Kepala Tukang
2.4000 Oh Pekerja
0.1200 Oh Mandor

HSP.
Bes.Al.1

1 M Pek. Pasangan Rangka Atap ( Baja Ringan )


4.9500 kg Baja Zincalum
1.0000 Ls Paku Klem
0.0100 M Plat Sambungan
0.0800 Oh Tukang
0.0400 Oh Kepala Tukang
0.1000 Oh Pekerja
0.0500 Oh Mandor

HARGA
SATUAN
(Rp)

3,000,000.00
25,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

1 M Pek. Atap Seng BJLS 20


6.0000 Kk Seng BJLS 20 (6kk)
0.0400 Kg Paku Seng
0.2000 Oh Tukang Kayu
0.0200 Oh Kepala Tukang
0.1000 Oh Pekerja
0.0500 Oh Mandor

HSP.
At.Sg.2

1 M Pek. Atap Seng BJLS 0,35


6.0000 Kk Seng BJLS 0,35
0.0400 Kg Paku Seng
0.2000 Oh Tukang Kayu
0.0200 Oh Kepala Tukang
0.1000 Oh Pekerja
0.0500 Oh Mandor

HSP.
At.Sg.3

1 M' Pek. Bubungan Seng


0.3000 Lbr Seng Plat BJLS 20
0.0200 Kg Paku Seng
0.0250 Oh Tukang Kayu
0.0250 Oh Pekerja
0.0025 Oh Mandor

HSP.
At.Gnt.1

1 M Pek. Atap Genteng Beton


9.0000 Bh Genteng Beton
0.1000 Oh Tukang Kayu
0.0100 Oh Kepala Tukang
0.2000 Oh Pekerja
0.0100 Oh Mandor

Analisa BG SNI-2008

(Rp)

3,300,000.00
375,000.00
60,000.00
626,400.00
64,800.00
160,800.00
11,280.00
4,598,280.00

20,000.00
40,000.00
150,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

99,000.00
40,000.00
1,500.00
6,960.00
3,600.00
6,700.00
4,700.00
162,460.00
- hal. 54 -

7,500.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

45,000.00
1,200.00
17,400.00
1,800.00
6,700.00
4,700.00
76,800.00

7,500.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

45,000.00
1,200.00
17,400.00
1,800.00
6,700.00
4,700.00
76,800.00

50,000.00
30,000.00
87,000.00
67,000.00
94,000.00
Jumlah

15,000.00
600.00
2,175.00
1,675.00
235.00
19,685.00

87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

8,700.00
900.00
13,400.00
940.00
23,940.00

TRIWULAN I (Pertama)

HSP.
At.Sg.1

JUMLAH

Page 20

NO

ANALISA

HSP.
At.Gnt.2

1 M' Pek. Bubungan Genteng Beton


3.0000 Bh Bubungan Genteng Beton
0.0100 Oh Tukang Kayu
0.0200 Oh Pekerja
0.0200 Oh Mandor

HSP.
At.Gnt.3

1 M Pek. Atap Metal Sakura Roof


1.6000 m Atap Metal Sakura Roof
0.0400 Kg Paku Seng
0.2500 Oh Tukang Kayu
0.0250 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0750 Oh Mandor

HSP.
At.Gnt.4

1 M' Pek. Bubungan Metal Sakura Roof


1.3000 m Bubungan Metal Sakura Roof
0.0200 Kg Paku Seng
0.2500 Oh Tukang Kayu
0.0250 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0750 Oh Mandor

HARGA
SATUAN
(Rp)

1 M Pek. Atap Multi Roof


1.6000 Lbr Atap Multi Roof
0.0400 Kg Paku Seng
0.2500 Oh Tukang Kayu
0.0250 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0750 Oh Mandor

HSP.
At.Gnt.6

1 M' Pek. Bubungan Multi Roof


1.3000 m Bumbungan Multi Roof
0.0200 Kg Paku Seng
0.2500 Oh Tukang Kayu
0.0250 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0750 Oh Mandor

HSP.
At.Gnt.7

1 M Pek. Atap Surya Roof


1.6000 Lbr Atap Surya Roof
0.0400 Kg Paku Seng
0.2500 Oh Tukang Kayu
0.0250 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0750 Oh Mandor

Analisa BG SNI-2008

(Rp)

25,000.00
87,000.00
67,000.00
94,000.00
Jumlah

75,000.00
870.00
1,340.00
1,880.00
79,090.00

75,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

120,000.00
1,200.00
21,750.00
2,250.00
10,050.00
7,050.00
162,300.00

45,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

58,500.00
600.00
21,750.00
2,250.00
10,050.00
7,050.00
100,200.00
- hal. 55 -

TRIWULAN I (Pertama)

HSP.
At.Gnt.5

JUMLAH

75,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

120,000.00
1,200.00
21,750.00
2,250.00
10,050.00
7,050.00
162,300.00

45,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

58,500.00
600.00
21,750.00
2,250.00
10,050.00
7,050.00
100,200.00

75,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

120,000.00
1,200.00
21,750.00
2,250.00
10,050.00
7,050.00
162,300.00

Page 21

NO

ANALISA

HSP.
At.Gnt.8

1 M' Pek. Bubungan Surya Roof


1.3000 m Bumbungan Surya Roof
0.0200 Kg Paku Seng
0.2500 Oh Tukang Kayu
0.0250 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0750 Oh Mandor

HSP.
At.Gnt.9

1 M Pek. Pasangan Atap Genteng Metal.


1.0000 Lbr Genteng Metal
6.0000 Biji Baut Drill
0.1000 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.1000 Oh Pekerja
0.0050 Oh Mandor

HSP.
At.Gnt.10

1 M Pek. Pasangan Karet Pelapis.


1.0000 m Karet Pelapis.
0.1000 Oh Tukang Kayu
0.1000 Oh Pekerja

HSP.
At.Gnt.11

1 M' Pek. Nok Atap Genteng Metal.


1.0000 m Nok Genteng Metal
6.0000 Bh Baut Drill
0.0700 Oh Tukang Kayu
0.0080 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0060 Oh Mandor

HSP.
At.Poly.1

1 M Pek. Pasangan Atap Policarbonat.


1.0000 m Atap Policarbonat
0.0300 Kg Paku biasa.
0.0800 Oh Tukang Kayu
0.0100 Oh Kepala Tukang
0.1500 Oh Pekerja
0.0100 Oh Mandor

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

45,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

58,500.00
600.00
21,750.00
2,250.00
10,050.00
7,050.00
100,200.00

75,000.00
1,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

75,000.00
9,000.00
8,700.00
450.00
6,700.00
470.00
100,320.00

10,000.00
87,000.00
67,000.00
Jumlah

10,000.00
8,700.00
6,700.00
25,400.00

45,000.00
15,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

45,000.00
90,000.00
6,090.00
720.00
10,050.00
564.00
152,424.00

48,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

48,000.00
600.00
6,960.00
900.00
10,050.00
940.00
67,450.00

HSP.
Kyu.2.1

Memasang 1 M' lisplank ukuran (3x20) cm. Kayu klas I


0.0108 M Papan Bayam
3,000,000.00
0.1000 Kg Paku
20,000.00
0.2000 Oh Tukang Kayu
87,000.00
0.0200 Oh Kepala Tukang
90,000.00
0.1000 Oh Pekerja
67,000.00
0.0050 Oh Mandor
94,000.00
Jumlah

32,400.00
2,000.00
17,400.00
1,800.00
6,700.00
470.00
60,770.00

HSP.
Kyu.2.2

Memasang 1 M' lisplank ukuran (3x20) cm. Kayu klas II


0.0108 M Papan Samarinda
3,000,000.00
0.1000 Kg Paku
20,000.00
0.2000 Oh Tukang Kayu
87,000.00
0.0200 Oh Kepala Tukang
90,000.00
0.1000 Oh Pekerja
67,000.00
0.0050 Oh Mandor
94,000.00
Jumlah

32,400.00
2,000.00
17,400.00
1,800.00
6,700.00
470.00
60,770.00

Analisa BG SNI-2008

Page 22

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Kyu.2.3

Memasang 1 M rangka Plafond (50x100) cm, kayu klas II - kaso-kaso (5x7) cm


0.0154 M Kaso-kaso (5x7) cm
3,000,000.00
46,200.00
0.2000 Kg Paku
20,000.00
4,000.00
0.3000 Oh Tukang Kayu
87,000.00
26,100.00
0.0300 Oh Kepala Tukang
90,000.00
2,700.00
0.1500 Oh Pekerja
67,000.00
10,050.00
0.0750 Oh Mandor
94,000.00
7,050.00
Jumlah
96,100.00

HSP.
Kyu.2.4

Memasang 1 M rangka Plafond (50x100) cm, kayu klas III - kaso-kaso (5x7) cm
0.0154 M Kaso-kaso (5x7) cm
3,000,000.00
46,200.00
0.2000 Kg Paku
20,000.00
4,000.00
0.3000 Oh Tukang Kayu
87,000.00
26,100.00
0.0300 Oh Kepala Tukang
90,000.00
2,700.00
0.1500 Oh Pekerja
67,000.00
10,050.00
0.0750 Oh Mandor
94,000.00
7,050.00
Jumlah
96,100.00

HSP.
Langit.1

Memasang 1 M rangka Plafond (60x60) cm, kayu klas II


0.0163 M Kaso-kaso (5x7) cm
3,000,000.00
0.2500 Kg Paku
20,000.00
0.3000 Oh Tukang Kayu
87,000.00
0.0300 Oh Kepala Tukang
90,000.00
0.2000 Oh Pekerja
67,000.00
0.0100 Oh Mandor
94,000.00
Jumlah

HSP.
Langit.2

Memasang 1 M Rangka Hollow Galvanised


1.1000 M Hollow Galvanised
15.0000 Kg Paku/sekrup
0.0400 Oh Tukang Besi/las
0.0040 Oh Kepala Tukang
0.5000 Oh Pekerja
0.0200 Oh Mandor

HSP.
Langit.3

Memasang 1 M Plafond Calsiboard ukuran (120 x 240 x 5)mm, tebal 5 mm


0.3640 lbr Calsi board
62,000.00
22,568.00
0.1100 Kg Paku/sekrup
500.00
55.00
0.0500 Oh Tukang Kayu
87,000.00
4,350.00
0.0050 Oh Kepala Tukang
90,000.00
450.00
0.1000 Oh Pekerja
67,000.00
6,700.00
0.0050 Oh Mandor
94,000.00
470.00
Jumlah
34,593.00

HSP.
Langit.4

Memasang 1 m list Plafond Kayu Profil


1.0500 m list Kayu profil
0.0100 Kg Paku
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0030 Oh Mandor

Analisa BG SNI-2008

40,500.00
1,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

5,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

48,900.00
5,000.00
26,100.00
2,700.00
13,400.00
940.00
97,040.00

44,550.00
15,000.00
3,480.00
360.00
33,500.00
1,880.00
98,770.00

5,250.00
200.00
4,350.00
450.00
3,350.00
282.00
13,882.00

Page 23

NO

HARGA
SATUAN
(Rp)

ANALISA

JUMLAH
(Rp)

HSP.
Langit.5

Memasang 1 m list Plafond Gypsum Profil


1.0500 m Gypsum Profil
0.0100 Kg Paku
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0030 Oh Mandor

HSP.
Langit.6

Memasang 1 m list plafond Gypsum board ukuran ( 120 x 240 x 9 ) mm, tebal 9 mm
0.3640 lbr Gypsum board
55,152.00
20,075.33
0.1100 Kg Paku skrup
500.00
55.00
0.0500 Oh Tukang Kayu
87,000.00
4,350.00
0.0050 Oh Kepala Tukang
90,000.00
450.00
0.1000 Oh Pekerja
67,000.00
6,700.00
0.0050 Oh Mandor
94,000.00
470.00
Jumlah
32,100.33

HSP.
Kyu.3.1

Memasang 1 M rangka rangka atap genteng keramik, kayu klas II


0.0140 M Kaso-kaso (5x7) cm
3,000,000.00
0.0036 M Reng (2x3) cm
3,000,000.00
0.2500 Kg Paku
20,000.00
0.1000 Oh Tukang Kayu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.1000 Oh Pekerja
67,000.00
0.0050 Oh Mandor
94,000.00
Jumlah

42,000.00
10,800.00
5,000.00
8,700.00
900.00
6,700.00
470.00
74,570.00

HSP.
Kyu.3.2

Memasang 1 M rangka rangka atap genteng beton, kayu klas II


0.0140 M Kaso-kaso (5x7) cm
3,000,000.00
0.0072 M Reng (2x3) cm
3,000,000.00
0.2500 Kg Paku
20,000.00
0.1000 Oh Tukang Kayu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.1000 Oh Pekerja
67,000.00
0.0050 Oh Mandor
94,000.00
Jumlah

42,000.00
21,600.00
5,000.00
8,700.00
900.00
6,700.00
470.00
85,370.00

HSP.
Kyu.3.3

Memasang 1 M rangka rangka atap sirap, kayu klas II


0.1650 M Kayu klas II
3,000,000.00
0.2000 Kg Paku 5 ~ 10 CM
20,000.00
0.1200 Oh Tukang Kayu
87,000.00
0.0120 Oh Kepala Tukang
90,000.00
0.1200 Oh Pekerja
67,000.00
0.0060 Oh Mandor
94,000.00
Jumlah

495,000.00
4,000.00
10,440.00
1,080.00
8,040.00
564.00
519,124.00

HSP.
Kaca.1

1 M Pek. Kaca Mati 5 mm


1.0000 M Kaca Mati
0.0300 Kg Paku
4.0000 M Kayu Les
0.5000 Oh Tukang kayu
0.0250 Oh Kepala Tukang

HSP.
Cat.2.1

1 M Residu
1.0000 Kg
0.1000 Oh
0.0050 Oh

Cat Residu
Pekerja
Mandor
Jumlah

Analisa BG SNI-2008

15,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

15,750.00
200.00
4,350.00
450.00
3,350.00
282.00
24,382.00

130,000.00
20,000.00
5,000.00
87,000.00
94,000.00
Jumlah

130,000.00
600.00
20,000.00
43,500.00
2,350.00
196,450.00

5,000.00
50,000.00
70,000.00

5,000.00
5,000.00
350.00
10,350.00

Page 24

NO

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

HSP.
Kyu.4.1

Memasang 1 M rangka dinding pemisah (60 x 120) cm kayu klas II


0.0280 M Balok Kayu
3,000,000.00
0.1500 Kg Paku
20,000.00
0.4500 Oh Tukang Kayu
87,000.00
0.0450 Oh Kepala Tukang
90,000.00
0.1500 Oh Pekerja
67,000.00
0.0080 Oh Mandor
94,000.00
Jumlah

HSP.
Kaca.2.1

memasang 1 M jendela nako & trails


1.1000 M Kaca 5 mm+ rangka
10.0000 Daun paku skrup
7.0000 Oh Besi strip
0.2000 Oh Tukang Kayu
0.0200 Oh Kepala Tukang
0.2000 Oh Pekerja
0.0010 Oh Mandor

HSP.
Kyu.5.1

Memasang 1 M dinding pemisah Plywood rangkap, rangka kayu klas II


0.0280 Lbr balok kayu (6x12)cm
3,000,000.00
0.1500 kg Paku 5 cm dan 10 cm
20,000.00
0.8600 lbr Teakwood tebal 4 mm (120x240)
87,000.00
0.5600 Kg Lem Kayu
25,000.00
0.6000 Oh Tukang Kayu
87,000.00
0.0600 Oh Kepala Tukang
90,000.00
0.2000 Oh Pekerja
67,000.00
0.0100 Oh Mandor
94,000.00
Jumlah

84,000.00
3,000.00
74,820.00
14,000.00
52,200.00
5,400.00
13,400.00
940.00
247,760.00

HSP.
Kyu.5.2

Memasang 1 M dinding lambriziring dari papan klas I


0.0070 Lbr Papan kayu
3,500,000.00
0.1000 kg Paku 5 cm dan 10 cm
20,000.00
0.1500 lbr Paku Skrup 10 cm
25,000.00
1.8000 Oh Tukang Kayu
87,000.00
0.1800 Oh Kepala Tukang
90,000.00
0.6000 Oh Pekerja
67,000.00
0.0300 Oh Mandor
94,000.00
Jumlah

24,500.00
2,000.00
3,750.00
156,600.00
16,200.00
40,200.00
2,820.00
246,070.00

HSP.
Langit.2.1

Memasang 1 M Plafond gypsum board ukuran (1200x2400x9) mm


0.3640 Lbr Gypsum board
75,000.00
0.1100 Kg Paku Skrup
30,000.00
0.0500 Oh Tukang Kayu
87,000.00
0.0050 Oh Kepala Tukang
90,000.00
0.1000 Oh Pekerja
67,000.00
0.0050 Oh Mandor
94,000.00
Jumlah

27,300.00
3,300.00
4,350.00
450.00
6,700.00
470.00
42,570.00

HSP.
Langit.2.2

Memasang 1 M Plafond lambriziring kayu , tebal 9 mm


0.0150 Lbr Kayu papan
3,000,000.00
0.0100 Kg paku tripleks
30,000.00
0.8000 Oh Tukang Kayu
87,000.00
0.0800 Oh Kepala Tukang
90,000.00
0.8000 Oh Pekerja
67,000.00
0.0400 Oh Mandor
94,000.00
Jumlah

45,000.00
300.00
69,600.00
7,200.00
53,600.00
3,760.00
179,460.00

Analisa BG SNI-2008

130,000.00
20,000.00
25,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

84,000.00
3,000.00
39,150.00
4,050.00
10,050.00
752.00
141,002.00

143,000.00
200,000.00
175,000.00
17,400.00
1,800.00
13,400.00
94.00
550,694.00

Page 25

NO

HSP.
Langit.2.3

HSP.
Kaca.2.

HSP.
Bes.Al.2.1

ANALISA

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

Memasang 1 M langit2 tripleks ukuran (120x240) cm , tebal 3 mm , 4 mm


0.3750 Lbr Tripleks 3 mm
53,000.00
0.0300 Kg Paku tripleks
25,000.00
0.1000 Oh Tukang Kayu
87,000.00
0.0100 Oh Kepala Tukang
90,000.00
0.1000 Oh Pekerja
67,000.00
0.0050 Oh Mandor
94,000.00
Jumlah
1 M Pek. Jendela Bingkai Kaca
0.0114 M Papan Bayam Kls I
0.7569 M Kaca Polos 5 mm
6.0000 Oh Tukang Kayu
0.6000 Oh Kepala Tukang
2.0000 Oh Pekerja
0.1000 Oh Mandor

Memasang 1 m kusen Pintu / Jendela Aluminium


1.1000 M Profil Aluminium
2.0000 bh skrup fixer
0.0600 Tube sealant
0.0430 Oh Tukang Kayu
0.0043 Oh Kepala Tukang
0.0430 Oh Pekerja
0.0021 Oh Mandor

HSP.
Kyu.6.1

1 M Pek. Tiang Penyangga / Pemikul Kelas I


1.1000 M Kayu Bayam Kls I
24.0000 Oh Tukang Kayu
2.4000 Oh Kepala Tukang
8.0000 Oh Pekerja
0.4000 Oh Mandor

HSP.
Cat.4.1

1 M Cat Meni
0.3000 Kg
0.0250 Oh
0.0013 Oh

HSP.
Cat.4.2

1 M Pengecatan Atap Dengan Cat Mengkilap


0.1500 Kg Cat Mengkilap
0.0750 Oh Tukang Cat
0.0500 Oh Pekerja
0.0025 Oh Mandor

Cat Meni
Pekerja
Mandor

Analisa BG SNI-2008

19,875.00
750.00
8,700.00
900.00
6,700.00
470.00
37,395.00

3,000,000.00
130,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

34,200.00
98,397.00
522,000.00
54,000.00
134,000.00
9,400.00
851,997.00

76,500.00
2,000.00
15,400.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

84,150.00
4,000.00
924.00
3,741.00
387.00
2,881.00
197.40
95,000.00

3,500,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah

3,850,000.00
2,088,000.00
216,000.00
536,000.00
37,600.00
6,727,600.00

25,000.00
67,000.00
94,000.00
Jumlah

7,500.00
1,675.00
122.20
9,297.20

41,500.00
87,000.00
67,000.00
94,000.00
Jumlah

6,225.00
6,525.00
3,350.00
235.00
16,335.00

Page 26

NO

ANALISA

HSP.
Cat.4.3

1 M Pengecatan Dengan Cat Mengkilap 3 x


0.3000 Kg Cat Mengkilap
0.1500 Kg Cat Dasar
0.1000 Kg Plamur
0.0750 Ltr Minyak Cat
0.1000 Lbr Kertas Gosok
0.0750 Oh Tukang Cat
0.0075 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0025 Oh Mandor

HSP.
Cat.4.4

1 M Pengecatan Plafon Eternit


0.3000 Kg Cat Tembok
0.0750 Oh Tukang Cat
0.0075 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0025 Oh Mandor

HSP.
Cat.4.5

1 M Pengecatan Dinding Tembok


0.3000 Kg Cat Tembok
0.1000 Kg Plamur
0.1000 Lbr Kertas Gosok
0.0750 Oh Tukang Cat
0.0075 Oh Kepala Tukang
0.0500 Oh Pekerja
0.0025 Oh Mandor

HSP.
Cat.4.6

1 M Pek. Pengapuran Dinding Tembok 3 x


0.0011 M Kapur
0.0100 Oh Tukang Cat
0.0150 Oh Kepala Tukang
0.0660 Oh Pekerja

HSP
Bgstk.2.1

1 M Bekesting Biasa Untuk Accessoris


0.5000 Oh Tukang Kayu
0.0500 Oh Kepala Tukang
0.4000 Oh Pekerja
0.0100 Oh Mandor
0.4000 Kg
Paku 5 cm
0.0400 M
Kayu Klas III

HSP.
Listr.1

memasang 1 bh instalasi titik lampu


9.0000 m Kabel NYY 2x2,5 mm
8.0000 Oh Pipa Konduit (5/8")
2.0000 Oh T.Doss
2.0000 Oh Socket
8.0000 Kg
Klem sevice plastik
1.0000 M
Material bantu

Analisa BG SNI-2008

HARGA
SATUAN
(Rp)

JUMLAH
(Rp)

41,500.00
41,500.00
10,000.00
41,500.00
3,500.00
87,000.00
94,000.00
67,000.00
94,000.00
Jumlah

12,450.00
6,225.00
1,000.00
3,112.50
350.00
6,525.00
705.00
3,350.00
235.00
33,952.50

25,000.00
87,000.00
94,000.00
67,000.00
94,000.00
Jumlah

7,500.00
6,525.00
705.00
3,350.00
235.00
18,315.00

25,000.00
10,000.00
3,500.00
87,000.00
94,000.00
67,000.00
94,000.00
Jumlah

7,500.00
1,000.00
350.00
6,525.00
705.00
3,350.00
235.00
19,665.00

87,000.00
94,000.00
94,000.00
Jumlah

870.00
1,410.00
6,204.00
8,484.00

87,000.00
94,000.00
67,000.00
94,000.00
20,000.00
1,750,000.00
Jumlah

43,500.00
4,700.00
26,800.00
940.00
8,000.00
70,000.00
153,940.00

10,000.00
2,500.00
2,500.00
2,500.00
100.00
2,000.00
Jumlah

90,000.00
20,000.00
5,000.00
5,000.00
800.00
2,000.00
122,800.00

Page 27

NO

ANALISA

HSP.
San.1

Memasang 1 bh Kloset Jongkok


1.0000 bh Kloset Jongkok
1.0000
- Perlengkapan
3.3000 Oh Pekerja
1.1000 Oh Tukang batu
0.0010 Oh Kepala tukang
0.1600 Oh Mandor

HSP.
San.2

Memasang 1 Buah Westafel


1.0000 bh Wastafel
1.0000
Perlengkapan
6.0000 kg Semen Abu -abu
0.0100 M Pasir Pasang
1.2000 Oh Pekerja
1.4500 Oh Tukang Batu
0.1500 Oh Kepala tukang
0.1000 Oh Mandor

HSP.
Plumb.1

HSP.
Plumb.2

Memasang 1 m" pipa PVC tipe AW diameter 1/2"


1.2000 m Pipa PVC
1.0000
Perlengkapan
0.0360 Oh pekerja
0.0600 Oh tukang batu
0.0060 Oh kepala tukang
0.0018 Oh Mandor
Jumlah
Jumlah
Memasang 1 m" pipa PVC tipe AW diameter 3/4"
1.2000 m Pipa PVC
1.0000
Perlengkapan
0.0810 Oh pekerja
0.1350 Oh tukang batu
0.0135 Oh kepala tukang
0.0041 Oh Mandor
Jumlah
Jumlah

Analisa BG SNI-2008

HARGA
SATUAN
(Rp)

JUMLAH

125,000.00
10,416.67
67,000.00
87,000.00
94,000.00
94,000.00
Jumlah

125,000.00
10,416.67
221,100.00
95,700.00
94.00
15,040.00
467,350.67

1,250,000.00
104,166.67
1,600.00
185,000.00
67,000.00
87,000.00
94,000.00
94,000.00
Jumlah

1,250,000.00
104,166.67
9,600.00
1,850.00
80,400.00
126,150.00
14,100.00
9,400.00
1,595,666.67

(Rp)

35,000.00
1,600.00
67,000.00
87,000.00
94,000.00
94,000.00
6 M'
1 M'

42,000.00
1,600.00
2,412.00
5,220.00
564.00
169.20
51,965.20
8,660.87

35,000.00
2,916.67
67,000.00
87,000.00
94,000.00
94,000.00
6 M'
1 M'

42,000.00
2,916.67
5,427.00
11,745.00
1,269.00
385.40
63,743.07
10,623.84

Page 28

HARGA SATUAN BAHAN & UPAH


Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran

NO

: Pembangunan Insfrastruktur Ekonomi


: Pembangunan Pasar Desa
: Desa Air Bacang Kecamatan Maje
: 2014
URAIAN HARGA SATUAN

SATUAN

HARGA SATUAN
( Rp )

I
1
2
3
4

UPAH
Tukang
Kepala Tukang
Pekerja
Mandor

Hari
Hari
Hari
Hari

87,000.00
90,000.00
67,000.00
94,000.00

II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

BAHAN
Amplas
Air
Batako
Batu Bata
Batu Catur
Batu Kali
Batu Alam
Besi Beton
Besi Strip
Bak Stainlles Steel
Box Skering
Cat Kayu Warna
Cat Meny Kayu
Cat Tembok
Closet Jongkok
Engsel Jendela Nylon
Engsel Pintu Nylon
Filter Air Kotor
Fiting Lampu
Genteng Metal Berpasir 0.3 mm
Genteng Metal
Grendel Jendela
Grendel Pintu
Hak Angin Jendela
Kaca 3 mm
Kaca 5 mm
Kawat Beton
Kayu Dolken
Kayu Klas II
Keramik 20 x 20
Keramik 20 x 25
Keramik 30 X 30 cm
Keramik 40 X 40 cm
Koral Biasa
Batu Pecah
Kran Air Putar Stainless
Kran Air Putar Biasa

Lbr
Liter
Bh
Bh
Bh
M
M
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
M
M
Bh
Bh
Bh
M
M
Kg
Btg
M
Bh
Bh
Bh
Bh
M
M
Bh
Bh

3,500.00
100.00
2,500.00
650.00
22,800.00
185,000.00
200,000.00
18,000.00
25,000.00
370,000.00
125,000.00
50,000.00
25,000.00
25,000.00
125,000.00
15,000.00
25,000.00
15,000.00
12,000.00
140,000.00
75,000.00
12,500.00
15,000.00
11,500.00
115,000.00
130,000.00
19,000.00
7,500.00
3,000,000.00
3,000.00
3,800.00
6,800.00
12,500.00
185,000.00
400,000.00
50,000.00
30,000.00

KETERANGAN

Setara Krakatau Steel (KS)


Standar PLN/SNI
Setara PRESTO
Setara Bee Brand
Setara Metrolit
Setara KIA
Setara Cheti
Setara CARMEN
Stanlies Stell
Setara Sinar Harapan
Setara Sinar Harapan

Meranti Sejenis
Setara Roman
Setara Roman
Setara Roman
Setara Roman
Split

NO
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

URAIAN HARGA SATUAN


Kuas Cat 4 ''
Kunci Pintu Biasa
Kunci Tanam 2 Slaag Besar
Kunci Cilinder
Lampu Bareta 60 Watt
Lampu Pijar
Lampu SL 18 Waat
Lampu Down Light
Lampu TL 2x20 Waat (TKI)
Lampu TL 1x20 Waat (TKO)
Lem Kayu
Minyak Begisting
Nok Atas ( Bubungan ) Berpasir 0.35 mm
Nok Pinggir ( Bola-bola Atap ) Berpasir 0.35 mm
Nok Atas ( Bubungan ) Colour 0.2 mm
Nok Pinggir ( Bola-bola Atap ) Colour 0.2 mm
Paku Campur
Paku Genteng Metal
Paku Beton
Paku Halus
Paku Seng
Papan Gipsum
Papan Kayu Klas II
Papan Kayu Klas IV
Pasir Pasang
Pasir Urug
Paving Block
Plamir
Pegangan Pintu
Pipa PVC 1/2 "
Pipa PVC 3/4 "
Pintu PVC
Plywood 4 mm
Plywood 9 mm
Profil List Plafond kayu
Profil List Plafond Gipsum
Saklar Ganda Broco
Saklar Tunggal Broco
Semen Putih
Semen Type I
Semen Type M
Semen Warna
Stop Kontak Broco

SATUAN
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Bh
Bh
Kg
Kg
M'
M'
M'
M'
Kg
Kg
Kg
Kg
Kg
Lembar
M
M
M
M
M
Kg
Set
Btg
Btg
Bh
Lbr
Lbr
M'
M'
Bh
Bh
Zak
Kg
Kg
Kg
Bh

HARGA SATUAN
( Rp )
15,500.00
80,000.00
170,000.00
190,000.00
170,000.00
10,000.00
65,000.00
140,000.00
215,000.00
108,000.00
25,000.00
12,000.00
50,000.00
35,000.00
45,000.00
45,000.00
20,000.00
45,000.00
45,000.00
25,000.00
30,000.00
75,000.00
3,000,000.00
1,750,000.00
175,000.00
130,000.00
54,000.00
10,000.00
250,000.00
35,000.00
40,000.00
450,000.00
85,000.00
115,000.00
7,500.00
15,000.00
12,500.00
10,000.00
90,000.00
1,600.00
1,600.00
21,000.00
15,000.00

KETERANGAN

Setara Primeru
Setara Belkin
Setara Belkin
Setara Dop
Standar PLN/SNI
Standar PLN/SNI
Standar PLN/SNI
Standar PLN/SNI

Setara Sinar Harapan


Setara Sinar Harapan
Setara Sinar Harapan
Setara Sinar Harapan

Meranti Sejenis
Durian Sejenis
Pasir Sungai

Meranti Sejenis
Setara Broco
Setara Broco

Setara Broco

NO
81
82
83
84
85
86
87
88
89

URAIAN HARGA SATUAN

SATUAN

Tanah Urug
Tarikan Jendela
Teakwood
Thinner
Wastafel komplit
Box Panel 30 x 40 cm
Water Drain + Asesories
Wall Flashing Berpasir ( Penutup Dinding )
Wall Flashing Colour 0.3 ( Penutup Dinding )

HARGA SATUAN
( Rp )

M
Bh
Lbr
Ltr
Bh
Set
Bh
M'
M'

KETERANGAN

85,000.00
13,000.00
175,000.00
37,000.00
1,250,000.00
1,500,000.00
12,500.00
55,000.00
45,000.00

Bintuhan,

2014

Diperiksa Oleh
KEPALA BIDANG PENANAMAN MODAL
BADAN PEMBANGUNAN PERENCANAAN DAERAH
KABUPATEN KAUR

Dibuat Oleh

NUZMANTO M. ADIL, ST
NIP. 19751106 200312 1 006

DADANG SUPRIYADI, ST
NIP. 19800731 201101 1 002

Disetujui Oleh :
KEPALA BADAN PERENCANAAN PEMBANGUNAN DAERAH
KABUPATEN KAUR

Ir. Drs. H. SUDOTO, M.Pd


NIP. 19600813 198502 1 005