I PEKERJAAN PERSIAPAN
1
2
3
4
5
Pembersihan Lokasi
Pengadaan Air Kerja
Pek. Pasangan Bowplank
Sewa Gudang/Barak Kerja
Papan Nama Proyek
unit
unit
unit
unit
unit
1.00
1.00
1.00
1.00
1.00
Taksiran
Taksiran
Taksiran
Taksiran
Taksiran
250,000.00
500,000.00
900,000.00
1,000,000.00
300,000.00
Sub Total I
250,000.00
500,000.00
900,000.00
1,000,000.00
300,000.00
2,950,000.00
M
M
M
M
M
15.78
16.07
48.00
2.34
6.00
Tnh.1
Tnh.9
Taksiran
Psr.4
Psr.4
52,600.00
17,533.33
125,000.00
177,040.00
177,040.00
Sub Total II
830,028.00
281,830.80
6,000,000.00
414,273.60
1,062,240.00
8,588,372.40
M
M
M
M
M
4.80
3.20
3.51
2.97
1.76
Btn.1
Btn.1
Btn.2.2
Btn.2.3
Btn.2.8
909,161.30
909,161.30
5,696,797.00
8,833,427.00
7,691,466.67
Sub Total III
4,363,974.22
2,909,316.15
19,995,757.47
26,235,278.19
13,498,524.00
67,002,850.03
M
M
M
M
M
Bh
M
35.54
34.50
69.00
69.00
70.00
4.00
120.00
.Pond.3
Ddin.2
Pls.2
Taksiran
Taksiran
Taksiran
Lant.2
753,700.00
102,535.00
50,094.00
10,000.00
85,000.00
42,500.00
115,185.67
Sub Total IV
26,786,498.00
3,537,457.50
3,456,486.00
690,000.00
5,950,000.00
170,000.00
13,822,280.00
54,412,721.50
M
M
M'
M'
130.68
143.75
39.57
67.00
Bes.Al.1
At.Gnt.9
At.Gnt.4
Kyu.2.2
162,460.00
100,320.00
100,200.00
60,770.00
Sub Total V
21,230,272.80
14,420,799.36
3,964,914.00
4,071,590.00
43,687,576.16
IV PEKERJAAN PASANGAN
1
2
3
4
V PEKERJAAN ATAP
1
2
3
4
No
Uraian Pekerjaan
Satuan
Perkiraan
Harga Satuan
Analisa
( Rp. )
Volume
4
Jumlah Harga
( Rp. )
7
VI PEKERJAAN PENGECATAN
1
2
M
M
128.40
20.10
unit
unit
unit
1.00
1.00
1.00
Cat.4.5
Cat.4.3
19,665.00
33,952.50
Sub Total VI
2,524,986.00
682,445.25
3,207,431.25
Taksiran
Taksiran
Taksiran
250,000.00
420,000.00
1,300,000.00
Sub Total VII
250,000.00
420,000.00
1,300,000.00
1,970,000.00
JUMLAH
181,818,951.34
Pembersihan Ahkir
Administrasi Dokumentasi
Pelaporan
Kegiatan
Lokasi
Tahun
No
1
I
II
III
IV
V
VI
VII
Uraian Pekerjaan
2
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN PASIR
PEKERJAAN BETON
PEKERJAAN PASANGAN
PEKERJAAN ATAP
PEKERJAAN PENGECATAN
PEKERJAAN LAIN-LAIN
Jumlah
PPn 10%
Jumlah Total
Dibulatkan
Terbilang
Jumlah Harga
( Rp. )
3
2,950,000.00
8,588,372.40
67,002,850.03
54,412,721.50
43,687,576.16
3,207,431.25
1,970,000.00
181,818,951.34
18,181,895.13
200,000,846.47
200,000,000.00
Bintuhan,
2014
Diperiksa Oleh
KEPALA BIDANG PENANAMAN MODAL
BADAN PEMBANGUNAN PERENCANAAN DAERAH
KABUPATEN KAUR
Dibuat Oleh
NUZMANTO M. ADIL, ST
NIP. 19751106 200312 1 006
DADANG SUPRIYADI, ST
NIP. 19800731 201101 1 002
Disetujui Oleh :
KEPALA BADAN PERENCANAAN PEMBANGUNAN DAERAH
KABUPATEN KAUR
NO
:
:
:
:
ANALISA
HSP
Tnh.1
HSP.
Tnh.2
HSP.
Tnh.3
HSP.
Tnh.4
HSP.
Tnh.5
HSP.Tnh.5
Menggali 1 M tanah lumpur sedalam 1 meter
1.2000
Oh Pekerja
0.0450
Oh Mandor
HSP.
Tnh.6
HSP.
Tnh.7
HSP.Tnh.8
Tnh.8
HSP.
Tnh.9
Analisa BG SNI-2008
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
67,000.00
94,000.00
Jumlah
50,250.00
2,350.00
52,600.00
67,000.00
94,000.00
Jumlah
60,300.00
4,230.00
64,530.00
67,000.00
94,000.00
70,350.00
6,298.00
76,648.00
67,000.00
94,000.00
Jumlah
67,000.00
3,008.00
70,008.00
67,000.00
94,000.00
Jumlah
80,400.00
4,230.00
84,630.00
67,000.00
94,000.00
Jumlah
100,500.00
5,640.00
106,140.00
67,000.00
94,000.00
Jumlah
3,350.00
470.00
3,820.00
67,000.00
94,000.00
Jumlah
22,110.00
940.00
23,050.00
67,000.00
94,000.00
Jumlah
16,750.00
783.33
17,533.33
Page 4
NO
HSP.
Tnh.10
ANALISA
HSP.
Psr.1
HSP.
Psr.2
HARGA
SATUAN
(Rp)
67,000.00
94,000.00
Jumlah
JUMLAH
(Rp)
33,500.00
4,700.00
38,200.00
130,000.00
67,000.00
94,000.00
Jumlah
156,000.00
20,100.00
940.00
177,040.000
130,000.00
67,000.00
94,000.00
Jumlah
156,000.00
20,100.00
940.00
177,040.00
HSP.
Psr.3
156,000.00
16,750.00
2,350.00
175,100.00
HSP.
Psr.4
HSP.
.Pond.1
130,000.00
67,000.00
94,000.00
156,000.00
20,100.00
940.00
177,040.00
185,000.00
130,000.00
67,000.00
87,000.00
90,000.00
94,000.00
Jumlah
222,000.00
56,160.00
52,260.00
33,930.00
3,510.00
3,666.00
371,526.00
HSP.
.Pond.2
222,000.00
323,200.00
84,875.00
65,250.00
6,750.00
100,500.00
7,050.00
809,625.00
HSP.
.Pond.3
222,000.00
260,800.00
91,350.00
65,250.00
6,750.00
100,500.00
7,050.00
753,700.00
Analisa BG SNI-2008
Page 5
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
.Pond.4
222,000.00
217,600.00
95,200.00
65,250.00
6,750.00
100,500.00
7,050.00
714,350.00
HSP.
.Pond.5
240,000.00
187,200.00
98,175.00
130,500.00
67,500.00
5,025.00
7,050.00
735,450.00
HSP.
Ddin.1
45,500.00
22,992.00
6,650.00
8,700.00
900.00
20,100.00
1,410.00
106,252.00
HSP.
Ddin.2
45,500.00
18,400.00
7,525.00
8,700.00
900.00
20,100.00
1,410.00
102,535.00
HSP.
Ddin.3
45,500.00
22,992.00
7,000.00
8,700.00
900.00
20,100.00
1,410.00
106,602.00
Analisa BG SNI-2008
Page 6
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Ddin.4
45,500.00
15,488.00
7,875.00
8,700.00
900.00
20,100.00
1,410.00
99,973.00
HSP.
Ddin.5
8,125.00
48,512.00
127,400.00
13,050.00
1,350.00
23,450.00
1,692.00
223,579.00
HSP.
Ddin.6
31,250.00
38,816.00
135,100.00
13,050.00
1,350.00
23,450.00
1,692.00
244,708.00
HSP.
Btn.1
Membuat 1 M lantai kerja beton mutu f'c =7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87
4.6000 Zak Semen 50 Kg
80,000.00
368,000.00
0.6379 M Pasir Beton / Kasar
175,000.00
111,625.00
0.7607 M Batu Pecah 2-3
400,000.00
304,296.30
200 Ltr Air
100.00
20,000.00
0.2000 Oh Tukang Batu
87,000.00
17,400.00
0.0200 Oh Kepala Tukang
90,000.00
1,800.00
1.2000 Oh Pekerja
67,000.00
80,400.00
0.0600 Oh Mandor
94,000.00
5,640.00
Jumlah
909,161.30
HSP.
Btn.2
Membuat 1 M beton mutu f'c =7,4 Mpa (K100) slump (12+-2) cm, w/c = 0,87
4.9400 Zak Semen 50 Kg
80,000.00
395,200.00
0.6207 M Pasir Beton / Kasar
175,000.00
108,625.00
0.7400 M Batu Pecah 2-3
400,000.00
296,000.00
200
Air
100.00
20,000.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
964,622.00
Analisa BG SNI-2008
Page 7
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Btn.3
Membuat 1 M beton mutu f'c =9,8 Mpa (K125) slump (12+-2) cm, w/c = 0,78
5.5200 Zak Semen 50 Kg
80,000.00
441,600.00
0.5914 M Pasir Beton / Kasar
175,000.00
103,500.00
0.7496 M Batu Pecah 2-3
400,000.00
299,851.85
200
Air
100.00
20,000.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,009,748.85
HSP.
Btn.4
Membuat 1 M beton mutu f'c =12,2 Mpa (K150) slump (12+-2) cm, w/c = 0,72
5.9800 Zak Semen 50 Kg
80,000.00
478,400.00
0.5707 M Pasir Beton / Kasar
175,000.00
99,875.00
0.7533 M Batu Pecah 2-3
400,000.00
301,333.33
200
Air
100.00
20,000.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,044,405.33
HSP.
Btn.5
Membuat 1 M beton mutu f'c =14,5 Mpa (K175) slump (12+-2) cm, w/c = 0,66
6.5200 Zak Semen 50 Kg
80,000.00
521,600.00
0.5429 M Pasir Beton / Kasar
175,000.00
95,000.00
0.7622 M Batu Pecah 2-3
400,000.00
304,888.89
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,087,785.89
HSP.
Btn.6
Membuat 1 M beton mutu f'c =16,9 Mpa (K200) slump (12+-2) cm, w/c = 0,61
7.0400 Zak Semen 50 Kg
80,000.00
563,200.00
0.5221 M Pasir Beton / Kasar
175,000.00
91,375.00
0.7637 M Batu Pecah 2-3
400,000.00
305,481.48
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,126,353.48
HSP.
Btn.7
Membuat 1 M beton mutu f'c =19,3 Mpa (K225) slump (12+-2) cm, w/c = 0,58
7.4200 Zak Semen 50 Kg
80,000.00
593,600.00
0.4986 M Pasir Beton / Kasar
175,000.00
87,250.00
0.7756 M Batu Pecah 2-3
400,000.00
310,222.22
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,157,369.22
Analisa BG SNI-2008
Page 8
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Btn.8
Membuat 1 M beton mutu f'c =21,7 Mpa (K250) slump (12+-2) cm, w/c = 0,56
7.6800 Zak Semen 50 Kg
80,000.00
614,400.00
0.4943 M Pasir Beton / Kasar
175,000.00
86,500.00
0.7696 M Batu Pecah 2-3
400,000.00
307,851.85
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
1,175,048.85
HSP.
Btn.9
Membuat 1 M beton mutu f'c =24 Mpa (K275) slump (12+-2) cm, w/c = 0,53
8.1200 Zak Semen 50 Kg
80,000.00
649,600.00
0.4886 M Pasir Beton / Kasar
175,000.00
85,500.00
0.7600 M Batu Pecah 2-3
400,000.00
304,000.00
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,205,397.00
HSP.
Btn.10
Membuat 1 M beton mutu f'c =26,4 Mpa (K300) slump (12+-2) cm, w/c = 0,52
8.2600 Zak Semen 50 Kg
80,000.00
660,800.00
0.4864 M Pasir Beton / Kasar
175,000.00
85,125.00
0.7563 M Batu Pecah 2-3
400,000.00
302,518.52
215
Air
100.00
21,500.00
0.2750 Oh Tukang Batu
87,000.00
23,925.00
0.0280 Oh Kepala Tukang
90,000.00
2,520.00
1.6500 Oh Pekerja
67,000.00
110,550.00
0.0830 Oh Mandor
94,000.00
7,802.00
Jumlah
1,214,740.52
HSP.
Btn.11
Membuat 1 M beton mutu f'c =28,8 Mpa (K325) slump (12+-2) cm, w/c = 0,49
8.7800 Zak Semen 50 Kg
80,000.00
702,400.00
0.4786 M Pasir Beton / Kasar
175,000.00
83,750.00
0.7452 M Batu Pecah 2-3
400,000.00
298,074.07
215
Air
100.00
21,500.00
0.3500 Oh Tukang Batu
87,000.00
30,450.00
0.0350 Oh Kepala Tukang
90,000.00
3,150.00
2.1000 Oh Pekerja
67,000.00
140,700.00
0.1050 Oh Mandor
94,000.00
9,870.00
Jumlah
1,289,894.07
- hal. 45 Membuat 1 M beton mutu f'c =31,2 Mpa (K350) slump (12+-2) cm, w/c = 0,52
8.9600 Zak Semen 50 Kg
80,000.00
716,800.00
0.4764 M Pasir Beton / Kasar
175,000.00
83,375.00
0.7407 M Batu Pecah 2-3
400,000.00
296,296.30
215
Air
100.00
21,500.00
0.3500 Oh Tukang Batu
87,000.00
30,450.00
0.0350 Oh Kepala Tukang
90,000.00
3,150.00
2.1000 Oh Pekerja
67,000.00
140,700.00
0.1050 Oh Mandor
94,000.00
9,870.00
Jumlah
1,302,141.30
TRIWULAN I (Pertama)
HSP.
Btn.12
Analisa BG SNI-2008
Page 9
NO
ANALISA
HSP.
Btn.13
HSP.
Bgst.1
HSP.
Bgst.2
HSP.
Bgst.3
HSP.
Bgst.4
Analisa BG SNI-2008
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
18,000.00
19,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
1 kg
189,000.00
2,850.00
6,090.00
630.00
4,690.00
376.00
203,636.00
20,363.60
1,750,000.00
20,000.00
12,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
70,000.00
6,000.00
1,200.00
22,620.00
2,340.00
34,840.00
2,444.00
139,444.00
1,750,000.00
20,000.00
12,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
78,750.00
6,000.00
1,200.00
22,620.00
2,340.00
34,840.00
2,444.00
148,194.00
1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
70,000.00
8,000.00
2,400.00
45,000.00
40,250.00
15,000.00
28,710.00
2,970.00
44,220.00
3,102.00
259,652.00
1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
70,000.00
8,000.00
2,400.00
54,000.00
40,250.00
15,000.00
28,710.00
2,970.00
44,220.00
3,102.00
268,652.00
Page 10
NO
ANALISA
HSP.
Bgst.5
HSP.
Bgst.6
HSP.
Bgst.7
HSP.
Bgst.8
Analisa BG SNI-2008
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
70,000.00
8,000.00
2,400.00
45,000.00
40,250.00
45,000.00
28,710.00
2,970.00
44,220.00
3,102.00
289,652.00
1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
52,500.00
8,000.00
2,400.00
60,000.00
40,250.00
22,500.00
28,710.00
2,970.00
44,220.00
3,102.00
264,652.00
1,750,000.00
20,000.00
12,000.00
3,000,000.00
115,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
52,500.00
8,000.00
1,800.00
45,000.00
40,250.00
15,000.00
28,710.00
2,970.00
44,220.00
3,102.00
241,552.00
1,750,000.00
20,000.00
12,000.00
7,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
46,200.00
12,000.00
1,800.00
3,750.00
4,350.00
450.00
10,050.00
752.00
79,352.00
Page 11
NO
HSP.
Btn.2.1
HARGA
SATUAN
(Rp)
ANALISA
(Rp)
537,600.00
94,500.00
149,850.00
23,925.00
23,580.00
355,100.00
24,910.00
1,209,465.00
Besi 150 kg
bahan
157.5000 kg
2.2500 kg
Upah
1.0500 Oh
18,000.00
19,000.00
2,835,000.00
42,750.00
Tukang Besi
87,000.00
91,350.00
2,969,100.00
Bekesting
bahan
0.2000
1.5000
0.4000
Upah
1.3000
M
kg
ltr
1,750,000.00
20,000.00
12,000.00
350,000.00
30,000.00
4,800.00
Oh
Tukang Kayu
87,000.00
113,100.00
497,900.00
Total
4,676,465.00
Jumlah
HSP.
Btn.2.2
JUMLAH
537,600.00
94,500.00
149,850.00
23,925.00
29,070.00
378,550.00
26,602.00
1,240,097.00
Besi 200 kg
bahan
210.0000 kg
3.0000 kg
Upah
1.4000 Oh
18,000.00
19,000.00
3,780,000.00
57,000.00
Tukang Besi
87,000.00
121,800.00
3,958,800.00
Bekesting
bahan
0.2000
1.5000
0.4000
Upah
1.3000
M
kg
ltr
1,750,000.00
20,000.00
12,000.00
350,000.00
30,000.00
4,800.00
Oh
Tukang Kayu
87,000.00
113,100.00
497,900.00
Total
5,696,797.00
Jumlah
Analisa BG SNI-2008
Page 12
NO
HSP.
Btn.2.3
HARGA
SATUAN
(Rp)
ANALISA
(Rp)
537,600.00
94,500.00
149,850.00
23,925.00
36,270.00
472,350.00
33,182.00
1,347,677.00
Besi 300 kg
bahan
315.0000 kg
4.5000 kg
Upah
2.1000 Oh
18,000.00
19,000.00
5,670,000.00
85,500.00
Tukang Besi
87,000.00
182,700.00
5,938,200.00
Bekesting
bahan
0.1500
0.4000
4.0000
2.0000
20.0000
Upah
1.6500
M
M
kg
ltr
bt
Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting
dolken 8-10 cm (klas III)
3,000,000.00
1,750,000.00
20,000.00
12,000.00
7,500.00
450,000.00
700,000.00
80,000.00
24,000.00
150,000.00
Oh
Tukang Kayu
87,000.00
143,550.00
1,547,550.00
8,833,427.00
Jumlah
HSP.
Btn.2.4
JUMLAH
Total
Bekesting
bahan
0.15
0.3000
4.0000
2.0000
Upah
1.6500
M
kg
ltr
Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting
Oh
Tukang Kayu
18,000.00
19,000.00
87,000.00
Tukang Besi
Jumlah
Analisa BG SNI-2008
537,600.00
94,500.00
149,850.00
23,925.00
29,970.00
425,450.00
29,892.00
1,291,187.00
3,780,000.00
57,000.00
121,800.00
3,958,800.00
3,000,000.00
1,750,000.00
20,000.00
12,000.00
450,000.00
525,000.00
80,000.00
24,000.00
87,000.00
143,550.00
1,222,550.00
6,472,537.00
Total
Page 13
NO
HSP.
Btn.2.5
HARGA
SATUAN
(Rp)
ANALISA
(Rp)
537,600.00
94,500.00
149,850.00
23,925.00
23,850.00
355,100.00
24,910.00
1,209,735.00
Besi 200 kg
bahan
157.5000 kg
2.2500 kg
Upah
1.0500 Oh
18,000.00
19,000.00
2,835,000.00
42,750.00
Tukang Besi
87,000.00
91,350.00
2,969,100.00
Bekesting
bahan
0.15
0.3000
4.0000
2.0000
Upah
1.6500
M
M
kg
ltr
Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting
3,000,000.00
1,750,000.00
20,000.00
12,000.00
450,000.00
525,000.00
80,000.00
24,000.00
Oh
Tukang Kayu
87,000.00
143,550.00
1,222,550.00
Total
5,401,385.00
Jumlah
HSP.
Btn.2.6
JUMLAH
537,600.00
94,500.00
149,850.00
23,925.00
23,580.00
355,100.00
24,910.00
1,209,465.00
Besi 200 kg
bahan
157.5000 kg
2.2500 kg
Upah
1.0500 Oh
18,000.00
19,000.00
2,835,000.00
42,750.00
Tukang Besi
87,000.00
91,350.00
2,969,100.00
Bekesting
bahan
0.16
0.2400
3.2000
1.6000
Upah
1.3000
M
kg
ltr
Kayu Klas II
Kayu Balok Kls III
Paku 5 cm- 12 cm
Minyak bekesting
480,000.00
420,000.00
64,000.00
19,200.00
Oh
Tukang Kayu
3,000,000.00
1,750,000.00
20,000.00
12,000.00
87,000.00
Jumlah
Analisa BG SNI-2008
Total
113,100.00
1,096,300.00
5,274,865.00
Page 14
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Btn.2.7
3,500.00
200.00
54,000.00
855.00
6,400.00
1,050.00
1,665.00
1,740.00
1,740.00
1,740.00
540.00
12,060.00
846.00
86,336.00
7,135,206.61
HSP.
Btn.2.8
5,250.00
400.00
64,800.00
950.00
8,800.00
1,575.00
2,775.00
2,871.00
2,871.00
2,871.00
900.00
19,899.00
1,410.00
115,372.00
7,691,466.67
HSP.
Pav.Block
HSP.
Pls.1
HSP.
Pls.2
Analisa BG SNI-2008
1,500.00
175,000.00
87,000.00
67,000.00
Jumlah
75,000.00
17,500.00
13,050.00
40,200.00
145,750.00
80,000.00
175,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
12,441.60
4,025.00
13,050.00
1,350.00
20,100.00
1,410.00
52,376.60
80,000.00
175,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
9,984.00
4,200.00
13,050.00
1,350.00
20,100.00
1,410.00
50,094.00
Page 15
NO
HSP.
Pls.3
ANALISA
Memasang 1 M plesteran 1 PC : 5 PP, tebal 15 mm
0.1168 Zak Semen Pc. 50 Kg
0.0260 M Pasir Pasangan
0.1500 Oh Tukang Batu
0.0150 Oh Kepala Tukang
0.3000 Oh Pekerja
0.0150 Oh Mandor
1 M Pek. Menaruh Pasir Alas Jalan
1.2000 M Pasir Urug
0.3750 Oh Pekerja
0.0190 Oh Mandor
Biaya Gilas
Untuk 1 Mesin Gilas Tiap Bulan Diperlukan
1.0000 Oh Masinis
1.0000 Oh Pembantu Masinis
30.0000 Oh Penjaga Api
150.0000 Oh Pekerja
1.0000
Bahan Bakar dll
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
80,000.00
175,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
9,344.00
4,550.00
13,050.00
1,350.00
20,100.00
1,410.00
49,804.00
130,000.00
67,000.00
94,000.00
Jumlah
156,000.00
25,125.00
1,786.00
182,911.00
950,000.00
800,000.00
30,000.00
67,000.00
1,800,000.00
Jumlah
950,000.00
800,000.00
900,000.00
10,050,000.00
1,800,000.00
14,500,000.00
400,000.00
67,000.00
94,000.00
8,575,000.00
Jumlah
3,200,000.00
502,500.00
599,250.00
231,525.00
4,533,275.00
400,000.00
67,000.00
94,000.00
8,575,000.00
Jumlah
3,200,000.00
502,500.00
599,250.00
231,525.00
4,533,275.00
3,200,000.00
502,500.00
599,250.00
391,500.00
4,693,250.00
Analisa BG SNI-2008
Page 16
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
35,000.00
67,000.00
94,000.00
Jumlah
17,500.00
670,000.00
47,000.00
734,500.00
100,000.00
67,000.00
94,000.00
Jumlah
120,000.00
670,000.00
47,000.00
837,000.00
HSP.
Pls.Siar.2.1
4,972.80
6,525.00
720.00
10,050.00
752.00
23,019.80
HSP.
Pls.Siar.2.2
2,560.00
3,045.00
360.00
4,690.00
376.00
11,031.00
HSP.
Pls.Siar.2.3
10,144.00
2,100.00
13,050.00
1,350.00
20,100.00
1,410.00
48,154.00
HSP.
Aci.1
Memasang 1M acian
0.0650 Zak Semen 50 kg
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.2000 Oh Pekerja
0.0100 Oh Mandor
HSP.
Lant.1
Analisa BG SNI-2008
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
5,200.00
8,700.00
900.00
13,400.00
940.00
29,140.00
12,500.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
78,125.00
7,875.00
16,000.00
30,450.00
3,150.00
46,900.00
3,290.00
185,790.00
Page 17
NO
ANALISA
HSP.
Lant.2
HSP.
Lant.3
HSP.
Dind.2.1
HSP.
Dind.2.2
HSP.
Cat.1
HSP.
Cat.2
Analisa BG SNI-2008
HARGA
SATUAN
(Rp)
JUMLAH
12,500.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
10,416.67
7,875.00
13,104.00
30,450.00
3,150.00
46,900.00
3,290.00
115,185.67
25,000.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
55,208.33
7,875.00
16,640.00
30,450.00
3,150.00
46,900.00
3,290.00
163,513.33
25,000.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
110,416.67
3,150.00
14,880.00
39,150.00
4,050.00
60,300.00
4,230.00
236,176.67
3,000.00
175,000.00
80,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
75,000.00
3,150.00
14,880.00
39,150.00
4,050.00
60,300.00
4,230.00
200,760.00
41,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
5,187.50
6,525.00
6,750.00
3,350.00
235.00
22,047.50
25,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
3,125.00
6,525.00
6,750.00
3,350.00
235.00
19,985.00
(Rp)
Page 18
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Kyu.1
Membuat dan Memasang 1 M Kusen Pintu dan kusen jendela kayu klas I
1.1000 M Kayu Bayam
3,500,000.00
3,850,000.00
1.2500 kg pAku 10 cm
20,000.00
25,000.00
1.0000 kg Lem Kayu
25,000.00
25,000.00
21.0000 Oh Tukang Kayu
87,000.00
1,827,000.00
2.1000 Oh Kepala Tukang
90,000.00
189,000.00
7.0000 Oh Pekerja
67,000.00
469,000.00
0.3500 Oh Mandor
94,000.00
32,900.00
Jumlah
6,417,900.00
HSP.
Kyu.2
Membuat dan Memasang 1 M Kusen Pintu dan kusen jendela kayu klas II
1.2000 M Kayu klas II
3,000,000.00
3,600,000.00
1.2500 kg pAku 10 cm
20,000.00
25,000.00
1.0000 kg Lem Kayu
25,000.00
25,000.00
18.0000 Oh Tukang Kayu
87,000.00
1,566,000.00
1.8000 Oh Kepala Tukang
90,000.00
162,000.00
6.0000 Oh Pekerja
67,000.00
402,000.00
0.3000 Oh Mandor
94,000.00
28,200.00
Jumlah
5,808,200.00
HSP.
Kyu.3
140,000.00
12,500.00
261,000.00
27,000.00
67,000.00
4,700.00
512,200.00
HSP.
Kyu.4
120,000.00
12,500.00
261,000.00
27,000.00
67,000.00
4,700.00
492,200.00
HSP.
Kyu.5
3,300,000.00
375,000.00
112,000.00
1,044,000.00
108,000.00
268,000.00
18,800.00
5,225,800.00
HSP.
Kyu.6
4,200,000.00
375,000.00
112,000.00
1,748,700.00
180,900.00
448,900.00
31,490.00
7,096,990.00
Analisa BG SNI-2008
Page 19
NO
ANALISA
HSP.
Kyu.7
HSP.
Bes.Al.1
HARGA
SATUAN
(Rp)
3,000,000.00
25,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
HSP.
At.Sg.2
HSP.
At.Sg.3
HSP.
At.Gnt.1
Analisa BG SNI-2008
(Rp)
3,300,000.00
375,000.00
60,000.00
626,400.00
64,800.00
160,800.00
11,280.00
4,598,280.00
20,000.00
40,000.00
150,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
99,000.00
40,000.00
1,500.00
6,960.00
3,600.00
6,700.00
4,700.00
162,460.00
- hal. 54 -
7,500.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
45,000.00
1,200.00
17,400.00
1,800.00
6,700.00
4,700.00
76,800.00
7,500.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
45,000.00
1,200.00
17,400.00
1,800.00
6,700.00
4,700.00
76,800.00
50,000.00
30,000.00
87,000.00
67,000.00
94,000.00
Jumlah
15,000.00
600.00
2,175.00
1,675.00
235.00
19,685.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
8,700.00
900.00
13,400.00
940.00
23,940.00
TRIWULAN I (Pertama)
HSP.
At.Sg.1
JUMLAH
Page 20
NO
ANALISA
HSP.
At.Gnt.2
HSP.
At.Gnt.3
HSP.
At.Gnt.4
HARGA
SATUAN
(Rp)
HSP.
At.Gnt.6
HSP.
At.Gnt.7
Analisa BG SNI-2008
(Rp)
25,000.00
87,000.00
67,000.00
94,000.00
Jumlah
75,000.00
870.00
1,340.00
1,880.00
79,090.00
75,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
120,000.00
1,200.00
21,750.00
2,250.00
10,050.00
7,050.00
162,300.00
45,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
58,500.00
600.00
21,750.00
2,250.00
10,050.00
7,050.00
100,200.00
- hal. 55 -
TRIWULAN I (Pertama)
HSP.
At.Gnt.5
JUMLAH
75,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
120,000.00
1,200.00
21,750.00
2,250.00
10,050.00
7,050.00
162,300.00
45,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
58,500.00
600.00
21,750.00
2,250.00
10,050.00
7,050.00
100,200.00
75,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
120,000.00
1,200.00
21,750.00
2,250.00
10,050.00
7,050.00
162,300.00
Page 21
NO
ANALISA
HSP.
At.Gnt.8
HSP.
At.Gnt.9
HSP.
At.Gnt.10
HSP.
At.Gnt.11
HSP.
At.Poly.1
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
45,000.00
30,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
58,500.00
600.00
21,750.00
2,250.00
10,050.00
7,050.00
100,200.00
75,000.00
1,500.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
75,000.00
9,000.00
8,700.00
450.00
6,700.00
470.00
100,320.00
10,000.00
87,000.00
67,000.00
Jumlah
10,000.00
8,700.00
6,700.00
25,400.00
45,000.00
15,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
45,000.00
90,000.00
6,090.00
720.00
10,050.00
564.00
152,424.00
48,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
48,000.00
600.00
6,960.00
900.00
10,050.00
940.00
67,450.00
HSP.
Kyu.2.1
32,400.00
2,000.00
17,400.00
1,800.00
6,700.00
470.00
60,770.00
HSP.
Kyu.2.2
32,400.00
2,000.00
17,400.00
1,800.00
6,700.00
470.00
60,770.00
Analisa BG SNI-2008
Page 22
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Kyu.2.3
HSP.
Kyu.2.4
Memasang 1 M rangka Plafond (50x100) cm, kayu klas III - kaso-kaso (5x7) cm
0.0154 M Kaso-kaso (5x7) cm
3,000,000.00
46,200.00
0.2000 Kg Paku
20,000.00
4,000.00
0.3000 Oh Tukang Kayu
87,000.00
26,100.00
0.0300 Oh Kepala Tukang
90,000.00
2,700.00
0.1500 Oh Pekerja
67,000.00
10,050.00
0.0750 Oh Mandor
94,000.00
7,050.00
Jumlah
96,100.00
HSP.
Langit.1
HSP.
Langit.2
HSP.
Langit.3
HSP.
Langit.4
Analisa BG SNI-2008
40,500.00
1,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
5,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
48,900.00
5,000.00
26,100.00
2,700.00
13,400.00
940.00
97,040.00
44,550.00
15,000.00
3,480.00
360.00
33,500.00
1,880.00
98,770.00
5,250.00
200.00
4,350.00
450.00
3,350.00
282.00
13,882.00
Page 23
NO
HARGA
SATUAN
(Rp)
ANALISA
JUMLAH
(Rp)
HSP.
Langit.5
HSP.
Langit.6
Memasang 1 m list plafond Gypsum board ukuran ( 120 x 240 x 9 ) mm, tebal 9 mm
0.3640 lbr Gypsum board
55,152.00
20,075.33
0.1100 Kg Paku skrup
500.00
55.00
0.0500 Oh Tukang Kayu
87,000.00
4,350.00
0.0050 Oh Kepala Tukang
90,000.00
450.00
0.1000 Oh Pekerja
67,000.00
6,700.00
0.0050 Oh Mandor
94,000.00
470.00
Jumlah
32,100.33
HSP.
Kyu.3.1
42,000.00
10,800.00
5,000.00
8,700.00
900.00
6,700.00
470.00
74,570.00
HSP.
Kyu.3.2
42,000.00
21,600.00
5,000.00
8,700.00
900.00
6,700.00
470.00
85,370.00
HSP.
Kyu.3.3
495,000.00
4,000.00
10,440.00
1,080.00
8,040.00
564.00
519,124.00
HSP.
Kaca.1
HSP.
Cat.2.1
1 M Residu
1.0000 Kg
0.1000 Oh
0.0050 Oh
Cat Residu
Pekerja
Mandor
Jumlah
Analisa BG SNI-2008
15,000.00
20,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
15,750.00
200.00
4,350.00
450.00
3,350.00
282.00
24,382.00
130,000.00
20,000.00
5,000.00
87,000.00
94,000.00
Jumlah
130,000.00
600.00
20,000.00
43,500.00
2,350.00
196,450.00
5,000.00
50,000.00
70,000.00
5,000.00
5,000.00
350.00
10,350.00
Page 24
NO
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Kyu.4.1
HSP.
Kaca.2.1
HSP.
Kyu.5.1
84,000.00
3,000.00
74,820.00
14,000.00
52,200.00
5,400.00
13,400.00
940.00
247,760.00
HSP.
Kyu.5.2
24,500.00
2,000.00
3,750.00
156,600.00
16,200.00
40,200.00
2,820.00
246,070.00
HSP.
Langit.2.1
27,300.00
3,300.00
4,350.00
450.00
6,700.00
470.00
42,570.00
HSP.
Langit.2.2
45,000.00
300.00
69,600.00
7,200.00
53,600.00
3,760.00
179,460.00
Analisa BG SNI-2008
130,000.00
20,000.00
25,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
84,000.00
3,000.00
39,150.00
4,050.00
10,050.00
752.00
141,002.00
143,000.00
200,000.00
175,000.00
17,400.00
1,800.00
13,400.00
94.00
550,694.00
Page 25
NO
HSP.
Langit.2.3
HSP.
Kaca.2.
HSP.
Bes.Al.2.1
ANALISA
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
HSP.
Kyu.6.1
HSP.
Cat.4.1
1 M Cat Meni
0.3000 Kg
0.0250 Oh
0.0013 Oh
HSP.
Cat.4.2
Cat Meni
Pekerja
Mandor
Analisa BG SNI-2008
19,875.00
750.00
8,700.00
900.00
6,700.00
470.00
37,395.00
3,000,000.00
130,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
34,200.00
98,397.00
522,000.00
54,000.00
134,000.00
9,400.00
851,997.00
76,500.00
2,000.00
15,400.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
84,150.00
4,000.00
924.00
3,741.00
387.00
2,881.00
197.40
95,000.00
3,500,000.00
87,000.00
90,000.00
67,000.00
94,000.00
Jumlah
3,850,000.00
2,088,000.00
216,000.00
536,000.00
37,600.00
6,727,600.00
25,000.00
67,000.00
94,000.00
Jumlah
7,500.00
1,675.00
122.20
9,297.20
41,500.00
87,000.00
67,000.00
94,000.00
Jumlah
6,225.00
6,525.00
3,350.00
235.00
16,335.00
Page 26
NO
ANALISA
HSP.
Cat.4.3
HSP.
Cat.4.4
HSP.
Cat.4.5
HSP.
Cat.4.6
HSP
Bgstk.2.1
HSP.
Listr.1
Analisa BG SNI-2008
HARGA
SATUAN
(Rp)
JUMLAH
(Rp)
41,500.00
41,500.00
10,000.00
41,500.00
3,500.00
87,000.00
94,000.00
67,000.00
94,000.00
Jumlah
12,450.00
6,225.00
1,000.00
3,112.50
350.00
6,525.00
705.00
3,350.00
235.00
33,952.50
25,000.00
87,000.00
94,000.00
67,000.00
94,000.00
Jumlah
7,500.00
6,525.00
705.00
3,350.00
235.00
18,315.00
25,000.00
10,000.00
3,500.00
87,000.00
94,000.00
67,000.00
94,000.00
Jumlah
7,500.00
1,000.00
350.00
6,525.00
705.00
3,350.00
235.00
19,665.00
87,000.00
94,000.00
94,000.00
Jumlah
870.00
1,410.00
6,204.00
8,484.00
87,000.00
94,000.00
67,000.00
94,000.00
20,000.00
1,750,000.00
Jumlah
43,500.00
4,700.00
26,800.00
940.00
8,000.00
70,000.00
153,940.00
10,000.00
2,500.00
2,500.00
2,500.00
100.00
2,000.00
Jumlah
90,000.00
20,000.00
5,000.00
5,000.00
800.00
2,000.00
122,800.00
Page 27
NO
ANALISA
HSP.
San.1
HSP.
San.2
HSP.
Plumb.1
HSP.
Plumb.2
Analisa BG SNI-2008
HARGA
SATUAN
(Rp)
JUMLAH
125,000.00
10,416.67
67,000.00
87,000.00
94,000.00
94,000.00
Jumlah
125,000.00
10,416.67
221,100.00
95,700.00
94.00
15,040.00
467,350.67
1,250,000.00
104,166.67
1,600.00
185,000.00
67,000.00
87,000.00
94,000.00
94,000.00
Jumlah
1,250,000.00
104,166.67
9,600.00
1,850.00
80,400.00
126,150.00
14,100.00
9,400.00
1,595,666.67
(Rp)
35,000.00
1,600.00
67,000.00
87,000.00
94,000.00
94,000.00
6 M'
1 M'
42,000.00
1,600.00
2,412.00
5,220.00
564.00
169.20
51,965.20
8,660.87
35,000.00
2,916.67
67,000.00
87,000.00
94,000.00
94,000.00
6 M'
1 M'
42,000.00
2,916.67
5,427.00
11,745.00
1,269.00
385.40
63,743.07
10,623.84
Page 28
NO
SATUAN
HARGA SATUAN
( Rp )
I
1
2
3
4
UPAH
Tukang
Kepala Tukang
Pekerja
Mandor
Hari
Hari
Hari
Hari
87,000.00
90,000.00
67,000.00
94,000.00
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
BAHAN
Amplas
Air
Batako
Batu Bata
Batu Catur
Batu Kali
Batu Alam
Besi Beton
Besi Strip
Bak Stainlles Steel
Box Skering
Cat Kayu Warna
Cat Meny Kayu
Cat Tembok
Closet Jongkok
Engsel Jendela Nylon
Engsel Pintu Nylon
Filter Air Kotor
Fiting Lampu
Genteng Metal Berpasir 0.3 mm
Genteng Metal
Grendel Jendela
Grendel Pintu
Hak Angin Jendela
Kaca 3 mm
Kaca 5 mm
Kawat Beton
Kayu Dolken
Kayu Klas II
Keramik 20 x 20
Keramik 20 x 25
Keramik 30 X 30 cm
Keramik 40 X 40 cm
Koral Biasa
Batu Pecah
Kran Air Putar Stainless
Kran Air Putar Biasa
Lbr
Liter
Bh
Bh
Bh
M
M
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
M
M
Bh
Bh
Bh
M
M
Kg
Btg
M
Bh
Bh
Bh
Bh
M
M
Bh
Bh
3,500.00
100.00
2,500.00
650.00
22,800.00
185,000.00
200,000.00
18,000.00
25,000.00
370,000.00
125,000.00
50,000.00
25,000.00
25,000.00
125,000.00
15,000.00
25,000.00
15,000.00
12,000.00
140,000.00
75,000.00
12,500.00
15,000.00
11,500.00
115,000.00
130,000.00
19,000.00
7,500.00
3,000,000.00
3,000.00
3,800.00
6,800.00
12,500.00
185,000.00
400,000.00
50,000.00
30,000.00
KETERANGAN
Meranti Sejenis
Setara Roman
Setara Roman
Setara Roman
Setara Roman
Split
NO
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
SATUAN
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Bh
Bh
Kg
Kg
M'
M'
M'
M'
Kg
Kg
Kg
Kg
Kg
Lembar
M
M
M
M
M
Kg
Set
Btg
Btg
Bh
Lbr
Lbr
M'
M'
Bh
Bh
Zak
Kg
Kg
Kg
Bh
HARGA SATUAN
( Rp )
15,500.00
80,000.00
170,000.00
190,000.00
170,000.00
10,000.00
65,000.00
140,000.00
215,000.00
108,000.00
25,000.00
12,000.00
50,000.00
35,000.00
45,000.00
45,000.00
20,000.00
45,000.00
45,000.00
25,000.00
30,000.00
75,000.00
3,000,000.00
1,750,000.00
175,000.00
130,000.00
54,000.00
10,000.00
250,000.00
35,000.00
40,000.00
450,000.00
85,000.00
115,000.00
7,500.00
15,000.00
12,500.00
10,000.00
90,000.00
1,600.00
1,600.00
21,000.00
15,000.00
KETERANGAN
Setara Primeru
Setara Belkin
Setara Belkin
Setara Dop
Standar PLN/SNI
Standar PLN/SNI
Standar PLN/SNI
Standar PLN/SNI
Meranti Sejenis
Durian Sejenis
Pasir Sungai
Meranti Sejenis
Setara Broco
Setara Broco
Setara Broco
NO
81
82
83
84
85
86
87
88
89
SATUAN
Tanah Urug
Tarikan Jendela
Teakwood
Thinner
Wastafel komplit
Box Panel 30 x 40 cm
Water Drain + Asesories
Wall Flashing Berpasir ( Penutup Dinding )
Wall Flashing Colour 0.3 ( Penutup Dinding )
HARGA SATUAN
( Rp )
M
Bh
Lbr
Ltr
Bh
Set
Bh
M'
M'
KETERANGAN
85,000.00
13,000.00
175,000.00
37,000.00
1,250,000.00
1,500,000.00
12,500.00
55,000.00
45,000.00
Bintuhan,
2014
Diperiksa Oleh
KEPALA BIDANG PENANAMAN MODAL
BADAN PEMBANGUNAN PERENCANAAN DAERAH
KABUPATEN KAUR
Dibuat Oleh
NUZMANTO M. ADIL, ST
NIP. 19751106 200312 1 006
DADANG SUPRIYADI, ST
NIP. 19800731 201101 1 002
Disetujui Oleh :
KEPALA BADAN PERENCANAAN PEMBANGUNAN DAERAH
KABUPATEN KAUR