Invoice Rumah Dinas
Invoice Rumah Dinas
KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN : Pengawasan Pembangunan Rumah Dinas
NO
JABATAN
NAMA
PERIODE
LEMBAR
:
:
TANGGAL
1
APRIL 2010
LEMBAR 1 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
HARI
Koordinator Pengawas
.....................................
0.27
Inspector
.....................................
0.27
Operator Komputer
.....................................
0.27
Office Boy
.....................................
0.27
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
CV. KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN :
NO
PERIODE
LEMBAR
JABATAN
NAMA
TANGGAL
1
:
:
MEI 2010
LEMBAR 2 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
HARI
Koordinator Pengawas
.....................................
0.87
Inspector
.....................................
0.87
Operator Komputer
.....................................
0.87
Office Boy
.....................................
0.87
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
CV. KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN :
NO
PERIODE
LEMBAR
JABATAN
NAMA
TANGGAL
1
:
:
JUNI 2010
LEMBAR 3 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
HARI
Koordinator Pengawas
.....................................
0.87
Inspector
.....................................
0.87
Operator Komputer
.....................................
0.87
Office Boy
.....................................
0.87
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
CV. KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN :
NO
PERIODE
LEMBAR
JABATAN
NAMA
TANGGAL
1
:
:
JULI 2010
LEMBAR 4 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
HARI
Koordinator Pengawas
.....................................
0.87
Inspector
.....................................
Operator Komputer
.....................................
Office Boy
.....................................
0.87
0.87
0.87
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
CV. KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN :
NO
PERIODE
LEMBAR
JABATAN
NAMA
TANGGAL
1
:
:
AGUSTUS 2010
LEMBAR 5 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
HARI
Koordinator Pengawas
.....................................
0.87
Inspector
.....................................
Operator Komputer
.....................................
Office Boy
.....................................
0.87
0.87
0.87
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
CV. KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN :
NO
PERIODE
LEMBAR
JABATAN
NAMA
TANGGAL
1
:
:
SEPTEMBER 2010
LEMBAR 6 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
HARI
Koordinator Pengawas
.....................................
0.73
Inspector
.....................................
Operator Komputer
.....................................
Office Boy
.....................................
0.73
0.73
0.73
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
CV. KONSULTAN
TAHUN ANGGARAN
DINAS
TIME SHEET
KEGIATAN :
PEKERJAAN :
NO
PERIODE
LEMBAR
JABATAN
NAMA
TANGGAL
1
:
:
OKTOBER 2010
LEMBAR 7 - 7
TOTAL
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
HARI
Koordinator Pengawas
.....................................
0.63
Inspector
.....................................
Operator Komputer
.....................................
Office Boy
.....................................
0.63
0.63
0.63
KET
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 01
BULAN : APRIL 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
INVOICE
S/D BLN LALU
(Rp.)
5
Lembar 1 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
SISA
KONTRAK
(Rp.)
8=3-7
25,854,000.00
0.00
3,693,428.57
3,693,428.57 22,160,571.43
15,606,000.00
1,631,000.00
0.00
0.00
0.00
0.00
0.00 15,606,000.00
0.00
1,631,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
0.00
0.00
0.00
0.00
3,693,428.57
369,342.86
4,062,771.43
4,062,000.00
3,693,428.57 39,397,571.43
369,342.86
3,939,757.14
4,062,771.43 43,337,328.57
4,062,000.00 43,337,000.00
KETERANGAN
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
8.57
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 02
BULAN : MEI 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
TERBILANG
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
INVOICE
S/D BLN LALU
(Rp.)
5
Lembar 2 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
SISA
KONTRAK
(Rp.)
8=3-7
25,854,000.00
3,693,428.57
3,693,428.57
7,386,857.14 18,467,142.86
15,606,000.00
1,631,000.00
0.00
0.00
0.00
0.00
0.00 15,606,000.00
0.00
1,631,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
3,693,428.57
369,342.86
4,062,771.43
0.00
3,693,428.57
369,342.86
4,062,771.43
4,062,000.00
7,386,857.14 35,704,142.86
738,685.71
3,570,414.29
8,125,542.86 39,274,557.14
8,125,000.00 39,274,000.00
KETERANGAN
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
17.14
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 03
BULAN : JUNI 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
JUMLAH
PPN 10 %
TOTAL ( C+D )
PEMBULATAN
TERBILANG
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
INVOICE
S/D BLN LALU
(Rp.)
5
Lembar 3 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
SISA
KONTRAK
(Rp.)
8=3-7
25,854,000.00
7,386,857.14
3,693,428.57
11,080,285.71 14,773,714.29
15,606,000.00
1,631,000.00
0.00
0.00
0.00
0.00
0.00 15,606,000.00
0.00
1,631,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
7,386,857.14
738,685.71
8,125,542.86
0.00
3,693,428.57
369,342.86
4,062,771.43
4,062,000.00
11,080,285.71 32,010,714.29
1,108,028.57
3,201,071.43
12,188,314.29 35,211,785.71
12,188,000.00 35,211,000.00
KETERANGAN
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
25.71
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 04
BULAN : JULI 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
JUMLAH
PPN 10 %
TOTAL ( C+D )
PEMBULATAN
TERBILANG
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
INVOICE
S/D BLN LALU
(Rp.)
5
Lembar 4 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
SISA
KONTRAK
(Rp.)
8=3-7
25,854,000.00
11,080,285.71
3,693,428.57
14,773,714.29 11,080,285.71
15,606,000.00
1,631,000.00
0.00
0.00
0.00
0.00
0.00 15,606,000.00
0.00
1,631,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
11,080,285.71
1,108,028.57
12,188,314.29
0.00
3,693,428.57
369,342.86
4,062,771.43
4,062,000.00
14,773,714.29 28,317,285.71
1,477,371.43
2,831,728.57
16,251,085.71 31,149,014.29
16,251,000.00 31,149,000.00
KETERANGAN
ENAM BELAS JUTA DUA RATUS LIMA PULUH SATU RIBU RUPIAH
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
34.28
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 05
BULAN : AGUSTUS 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
JUMLAH
PPN 10 %
TOTAL ( C+D )
PEMBULATAN
TERBILANG
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
INVOICE
S/D BLN LALU
(Rp.)
5
Lembar 5 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
18,467,142.86
SISA
KONTRAK
(Rp.)
8=3-7
25,854,000.00
14,773,714.29
3,693,428.57
15,606,000.00
1,631,000.00
0.00
0.00
0.00
0.00
0.00 15,606,000.00
0.00
1,631,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
14,773,714.29
1,477,371.43
16,251,085.71
0.00
3,693,428.57
369,342.86
4,062,771.43
4,062,000.00
18,467,142.86 24,623,857.14
1,846,714.29
2,462,385.71
20,313,857.14 27,086,242.86
20,313,000.00 27,086,000.00
KETERANGAN
9
7,386,857.14
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
42.85
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 06
BULAN : SEPTEMBER 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
JUMLAH
PPN 10 %
TOTAL ( C+D )
PEMBULATAN
TERBILANG
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
INVOICE
S/D BLN LALU
(Rp.)
5
Lembar 6 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
22,160,571.43
SISA
KONTRAK
(Rp.)
8=3-7
25,854,000.00
18,467,142.86
3,693,428.57
15,606,000.00
1,631,000.00
0.00
0.00
0.00
0.00
0.00 15,606,000.00
0.00
1,631,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
18,467,142.86
1,846,714.29
20,313,857.14
0.00
3,693,428.57
369,342.86
4,062,771.43
4,062,000.00
22,160,571.43 20,930,428.57
2,216,057.14
2,093,042.86
24,376,628.57 23,023,471.43
24,376,000.00 23,023,000.00
KETERANGAN
9
3,693,428.57
DUA PULUH EMPAT JUTA TIGA RATUS TUJUH PULUH ENAM RIBU RUPIAH
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
51.43
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
:
:
:
:
:
INVOICE NO : 07
BULAN : OKTOBER 2010
REKAPITULASI BIAYA
SERTIFIKAT PENAGIHAN / PEMBAYARAN (INVOICE)
NO
URAIAN
A
B
C
D
E
JUMLAH
PPN 10 %
TOTAL ( C+D )
PEMBULATAN
TERBILANG
NILAI KONTRAK
AWAL
AMANDEMEN
(Rp.)
(Rp.)
3
4
25,854,000.00
INVOICE
S/D BLN LALU
(Rp.)
5
22,160,571.43
Lembar 7 dari 7
INVOICE
BLN INI
(Rp.)
6
INVOICE
S/D BLN INI
(Rp.)
7=5+6
SISA
KONTRAK
(Rp.)
8=3-7
3,693,428.57
25,854,000.00
0.00
15,606,000.00
1,631,000.00
0.00 15,606,000.00
0.00 1,631,000.00
15,606,000.00
1,631,000.00
0.00
0.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
22,160,571.43 20,930,428.57
2,216,057.14 2,093,042.86
24,376,628.57 23,023,471.43
0.00 23,023,000.00
43,091,000.00
4,309,100.00
47,400,100.00
47,400,000.00
0.00
0.00
0.00
0.00
KETERANGAN
DISETUJUI OLEH :
PENGGUNA ANGGARAN
DINAS PEKERJAAN UMUM
DIAJUKAN OLEH :
KONSULTAN PENGAWAS
CV. ...............CONSULTANT
......................
NIP.
..........................
Direktur
100.00
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
KETERANGAN
(MOB/DEMOB)
(Rupiah)
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
0.25
0.15
9=10% of 4
0.10
0.10
10=5+6+7+8+9
13
1.00
.....................................
Koordinator Pengawas
1,609,000.0
643,600
402,250
241,350
160,900
160,900
1,609,000
1,609,000
0.27
429,067
23 April 2010
.....................................
Inspector
1,100,000.0
440,000
275,000
165,000
110,000
110,000
1,100,000
1,100,000
0.27
293,333
23 April 2010
.....................................
Operator Komputer
1,100,000.0
440,000
275,000
165,000
110,000
110,000
1,100,000
1,100,000
0.27
293,333
23 April 2010
.....................................
Office Boy
500,000.0
200,000
125,000
75,000
50,000
50,000
500,000
500,000
0.27
133,333
23 April 2010
..........................
Direktur
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
.....................................
.....................................
.....................................
.....................................
Koordinator Pengawas
Inspector
Operator Komputer
Office Boy
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
(Rupiah)
4
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
1
2
3
4
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
1,609,000.0
1,100,000.0
1,100,000.0
500,000.0
643,600
440,000
440,000
200,000
0.25
402,250
275,000
275,000
125,000
0.15
241,350
165,000
165,000
75,000
9=10% of 4
0.10
160,900
110,000
110,000
50,000
0.10
160,900
110,000
110,000
50,000
10=5+6+7+8+9
KETERANGAN
(MOB/DEMOB)
13
1.00
1,609,000
1,100,000
1,100,000
500,000
1,609,000
1,100,000
1,100,000
500,000
0.87
0.87
0.87
0.87
1,401,387
958,065
958,065
435,484
..........................
Direktur
01 Mei 2010
01 Mei 2010
01 Mei 2010
01 Mei 2010
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
.....................................
.....................................
.....................................
.....................................
Koordinator Pengawas
Inspector
Operator Komputer
Office Boy
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
(Rupiah)
4
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
1
2
3
4
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
1,609,000.0
1,100,000.0
1,100,000.0
500,000.0
643,600
440,000
440,000
200,000
0.25
402,250
275,000
275,000
125,000
0.15
241,350
165,000
165,000
75,000
9=10% of 4
0.10
160,900
110,000
110,000
50,000
0.10
160,900
110,000
110,000
50,000
10=5+6+7+8+9
KETERANGAN
(MOB/DEMOB)
13
1.00
1,609,000
1,100,000
1,100,000
500,000
1,609,000
1,100,000
1,100,000
500,000
0.87
0.87
0.87
0.87
1,394,467
953,333
953,333
433,333
..........................
Direktur
01 Juni 2010
01 Juni 2010
01 Juni 2010
01 Juni 2010
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
.....................................
.....................................
.....................................
.....................................
Koordinator Pengawas
Inspector
Operator Komputer
Office Boy
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
(Rupiah)
4
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
1
2
3
4
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
1,609,000.0
1,100,000.0
1,100,000.0
500,000.0
643,600
440,000
440,000
200,000
0.25
402,250
275,000
275,000
125,000
0.15
241,350
165,000
165,000
75,000
9=10% of 4
0.10
160,900
110,000
110,000
50,000
0.10
160,900
110,000
110,000
50,000
10=5+6+7+8+9
KETERANGAN
(MOB/DEMOB)
13
1.00
1,609,000
1,100,000
1,100,000
500,000
1,609,000
1,100,000
1,100,000
500,000
0.87
0.87
0.87
0.87
1,401,387
958,065
958,065
435,484
..........................
Direktur
01 Juli 2010
01 Juli 2010
01 Juli 2010
01 Juli 2010
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
.....................................
.....................................
.....................................
.....................................
Koordinator Pengawas
Inspector
Operator Komputer
Office Boy
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
(Rupiah)
4
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
1
2
3
4
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
1,609,000.0
1,100,000.0
1,100,000.0
500,000.0
643,600
440,000
440,000
200,000
0.25
402,250
275,000
275,000
125,000
0.15
241,350
165,000
165,000
75,000
9=10% of 4
0.10
160,900
110,000
110,000
50,000
0.10
160,900
110,000
110,000
50,000
10=5+6+7+8+9
KETERANGAN
(MOB/DEMOB)
13
1.00
1,609,000
1,100,000
1,100,000
500,000
1,609,000
1,100,000
1,100,000
500,000
0.87
0.87
0.87
0.87
1,401,387
958,065
958,065
435,484
..........................
Direktur
01 Agustus 2010
01 Agustus 2010
01 Agustus 2010
01 Agustus 2010
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
.....................................
.....................................
.....................................
.....................................
Koordinator Pengawas
Inspector
Operator Komputer
Office Boy
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
(Rupiah)
4
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
1
2
3
4
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
1,609,000.0
1,100,000.0
1,100,000.0
500,000.0
643,600
440,000
440,000
200,000
0.25
402,250
275,000
275,000
125,000
0.15
241,350
165,000
165,000
75,000
9=10% of 4
0.10
160,900
110,000
110,000
50,000
0.10
160,900
110,000
110,000
50,000
10=5+6+7+8+9
KETERANGAN
(MOB/DEMOB)
13
1.00
1,609,000
1,100,000
1,100,000
500,000
1,609,000
1,100,000
1,100,000
500,000
0.73
0.73
0.73
0.73
1,179,933
806,667
806,667
366,667
..........................
Direktur
01 September 2010
01 September 2010
01 September 2010
01 September 2010
PEKERJAAN
I.
URAIAN
No.
NAMA
JABATAN
.....................................
.....................................
.....................................
.....................................
Koordinator Pengawas
Inspector
Operator Komputer
Office Boy
Beban Biaya
Gj per
Bulan
Lain-lain
Beban
Biaya/Bulan
(dibulatkan)
Jumlah
Hari
Bertugas
Dibayarkan
10
11=9+10
12
13 = (5+6+7+8+9)x12
(Rupiah)
4
40 % of 4
25 % of 4
15 % of 4
10 % of 4
0.4
1
2
3
4
Beban Biaya
Tunjangan
Biaya Umum
Keuntungan
Sosial
Penugasan
1,609,000.0
1,100,000.0
1,100,000.0
500,000.0
643,600
440,000
440,000
200,000
0.25
402,250
275,000
275,000
125,000
0.15
241,350
165,000
165,000
75,000
9=10% of 4
0.10
160,900
110,000
110,000
50,000
0.10
160,900
110,000
110,000
50,000
10=5+6+7+8+9
KETERANGAN
(MOB/DEMOB)
13
1.00
1,609,000
1,100,000
1,100,000
500,000
1,609,000
1,100,000
1,100,000
500,000
0.63
0.63
0.63
0.63
1,019,033
696,667
696,667
316,667
..........................
Direktur
01 Oktober 2010
01 Oktober 2010
01 Oktober 2010
01 Oktober 2010
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
7 hari
f.
Absen
a. Gaji Pokok
429,067
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c. Tunjangan Umum
c. Lain - Lain
d. Lembur
429,067
429,067
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
7 hari
f.
Absen
a. Gaji Pokok
293,333
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
293,333
293,333
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
7 hari
f.
Absen
a. Gaji Pokok
293,333
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
293,333
293,333
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
7 hari
f.
Absen
a. Gaji Pokok
133,333
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
133,333
133,333
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
b. Tunjangan Tetap
c. Tunjangan Umum
d. Lembur
1,401,387
a. Potongan Tetap
b. Potongan Gaji
c. Lain - Lain
1,401,387
1,401,387
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
958,065
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
958,065
958,065
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
958,065
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
958,065
958,065
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
435,484
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
435,484
435,484
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
26 hari
f.
Absen
a. Gaji Pokok
b. Tunjangan Tetap
c. Tunjangan Umum
d. Lembur
1,394,467
a. Potongan Tetap
b. Potongan Gaji
c. Lain - Lain
1,394,467
1,394,467
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
26 hari
f.
Absen
a. Gaji Pokok
953,333
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
953,333
953,333
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
26 hari
f.
Absen
a. Gaji Pokok
953,333
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
953,333
953,333
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
26 hari
f.
Absen
a. Gaji Pokok
433,333
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
433,333
433,333
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
b. Tunjangan Tetap
c. Tunjangan Umum
d. Lembur
1,401,387
a. Potongan Tetap
b. Potongan Gaji
c. Lain - Lain
1,401,387
1,401,387
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
958,065
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
958,065
958,065
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
958,065
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
958,065
958,065
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
435,484
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
435,484
435,484
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
b. Tunjangan Tetap
c. Tunjangan Umum
d. Lembur
1,401,387
a. Potongan Tetap
b. Potongan Gaji
c. Lain - Lain
1,401,387
1,401,387
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
958,065
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
958,065
958,065
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
958,065
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
958,065
958,065
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
27 hari
f.
Absen
a. Gaji Pokok
435,484
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
435,484
435,484
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
b. Tunjangan Tetap
c. Tunjangan Umum
d. Lembur
1,179,933
a. Potongan Tetap
b. Potongan Gaji
c. Lain - Lain
1,179,933
1,179,933
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
806,667
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
806,667
806,667
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
806,667
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
806,667
806,667
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
366,667
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
366,667
366,667
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
a. Nama Pegawai
AMIRUDIN
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
378,571
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
378,571
378,571
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
AMIRUDIN
Direktur
Operator Komputer
a. Nama Pegawai
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
D III
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
378,571
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
378,571
378,571
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
Direktur
Operator Komputer
a. Nama Pegawai
KASMAN
b. Jabatan
Surveyor
c.
Penugasan
d. Pendidikan
STM
e. Hari Kerja
22 hari
f.
Absen
a. Gaji Pokok
378,571
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
378,571
378,571
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
KASMAN
Direktur
Surveyor
a. Nama Pegawai
.....................................
b. Jabatan
Koordinator Pengawas
c. Penugasan
d. Pendidikan
S1
e. Hari Kerja
19 hari
f.
Absen
a. Gaji Pokok
b. Tunjangan Tetap
c. Tunjangan Umum
d. Lembur
1,019,033
a. Potongan Tetap
b. Potongan Gaji
c. Lain - Lain
1,019,033
1,019,033
Yang Menyerahkan,
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
a. Nama Pegawai
.....................................
b. Jabatan
Inspector
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
19 hari
f.
Absen
a. Gaji Pokok
696,667
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
696,667
696,667
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Inspector
a. Nama Pegawai
.....................................
b. Jabatan
Operator Komputer
c.
Penugasan
d. Pendidikan
S1
e. Hari Kerja
19 hari
f.
Absen
a. Gaji Pokok
696,667
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
696,667
696,667
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Operator Komputer
a. Nama Pegawai
.....................................
b. Jabatan
Office Boy
c.
Penugasan
d. Pendidikan
SMA
e. Hari Kerja
19 hari
f.
Absen
a. Gaji Pokok
316,667
a. Potongan Tetap
b. Tunjangan Tetap
b. Potongan Gaji
c.
c.
316,667
316,667
Tunjangan Umumm
d. Lembur
Yang Menyerahkan
CV. ...............CONSULTANT
Lain - Lain
..........................
.....................................
Direktur
Office Boy
NO.
URAIAN PERALATAN
SATUAN VOLUME
JUMLAH HARGA
(Rp.)
KETERANGAN
Komputer
Unit
1.00
6.00
500,000.00
3,000,000.00
Sewa
Printer
Unit
1.00
6.00
200,000.00
1,200,000.00
Sewa
Peralatan Ukur
Unit
1.00
6.00
200,000.00
1,200,000.00
Sewa
Transportasi
Unit
1.00
6.00
300,000.00
1,800,000.00
Sewa
Peralatan Gambar
Unit
1.00
6.00
150,000.00
900,000.00
Sewa
Perlengkapan Kantor
Unit
1.00
6.00
1,000,000.00
6,000,000.00
Sewa
Alat Komunikasi
Unit
1.00
6.00
251,000.00
1,506,000.00
Sewa
15,606,000.00
Pemilik Alat
CV. ...............CONSULTANT
..........................
Direktur
.....................................
Koordinator Pengawas
KW ITAN S I
BANYAKNYA UANG
Y A I T U
TERBILANG
###
Yang Menerima,
Penyewa Alat,
CV. ...............CONSULTANT
.....................................
Koordinator Pengawas
..........................
Direktur
4. Cara Pembayaran
Pembayaran dilaksanakan pada saat Pihak Kedua telah menyelesaikan pekerjaan tersebut diatas.
Demikian Perjanjian Sewa Kendaraan Roda 2 (Dua) ini dibuat dengan penuh tanggung jawab, apabila terjadi perselisihan kedua
belah pihak sepakat akan menyelesaikan melalui musyawarah mufakat, apabila musyawarah mufakat tidak tercapai kedua belah
pihak sepakat menyelesaikan
PIHAK KEDUA
CV . ICHSAN CONSULTANT
PIHAK PERTAMA
Penyewa
NUSRAWATY, NS
Pimpinan Perwakilan
.....................................
Team Leader
KW ITAN S I
BANYAKNYA UANG
Y A I T U
TERBILANG
Rp 1,500,000.00
Yang Menerima,
Penyewa Alat,
CV. ...............CONSULTANT
.....................................
Koordinator Pengawas
..........................
Direktur
KWITANSI
BANYAKNYA UANG
Y A I T U
TERBILANG
Rp
1,631,000.00
CV. ...............CONSULTANT
..........................
Direktur
Yang Menerima,
CORE
Studio
.........................
Pimpinan
Kepada Yth :
Direktur
CV. ...............CONSULTANT
diBuol
NO
JENIS BARANG
Jilid
Jilid
Jilid
VOLUME
HARGA
SATUAN (Rp)
JUMLAH
HARGA (Rp)
### Lbr
Rp
250.00 Rp
456,500.00
15 Bh
Rp
3,000.00 Rp
45,000.00
### Lbr
Rp
250.00 Rp
731,500.00
15 Bh
Rp
3,000.00 Rp
45,000.00
### Lbr
Rp
250.00 Rp
308,000.00
15 Bh
Rp
3,000.00 Rp
45,000.00
Rp1,631,000.00
hormat kami,
CORE
Studio
.........................
Pimpinan
NILAI KONTRAK
47,400,000.00
KEGIATAN
0
PEKERJAAN
Pengawasan Pembangunan Rumah Dinas
TAHUN ANGGARAN
2010
KONSULTAN SUPERVISI