No.

Uraian Pekerjaan

(1)
1.0.0.0.0
1.1.0.0.0

(2)
PEKERJAAN PERSIAPAN
Pagar pengaman lokasi proyek
P = 18+25+16+2+6+19= 86 m

1.2.0.0.0

Pembersihan lokasi proyek

1.3.0.0.0

Pengukuran/pemasangan bowplank
(1,5 meter dari as bangunan)

1.4.0.0.0

Dimensi
l
(3)

25.00

16.00

Pembuatan barak kerja

4.50

3.00

2.0.0.0.0
2.1.0.0.0
2.1.1.0.0

PEKERJAAN TANAH
Galian Tanah
Galian Pondasi Tapak tipe P1

1.40

1.40

2.1.2.0.0

Galian Pondasi Tapak tipe P2

1.20

1.20

76.50

0.88

1.40

1.40

Total Galian pondasi tapak

2.1.3.0.0

Galian Pondasi Menerus


Total Galian pondasi menerus

2.2.0.0.0
2.2.1.0.0

Urugan Pasir Pondasi


Urugan Pasir Pondasi tapak P1

2.2.2.0.0

Urugan Pasir Pondasi tapak P2

1.20

1.20

2.2.3.0.0

Urugan Pasir Pondasi Menerus

76.50

0.75

2.3.0.0.0
2.3.1.0.0

Total Urugan Pasir


Urugan tanah kembali
Urugan kembali pondasi tapak P1

1.40

1.40

2.3.2.0.0

Urugan kembali pondasi tapak P2

1.20

1.20

2.3.3.0.0

Urugan kembali pondasi menerus

76.50

0.88

Total Urugan kembali


2.4.0.0.0

Urugan Pasir bawah lantai

205.50

2.5.0.0.0

Urugan Tanah bawah lantai

205.50

3.0.0.0.0

KONSTRUKSI LANTAI 1

3.1.0.0.0
3.1.1.0.0
3.1.1.1.0

Pekerjaan Struktur
Pondasi Tapak
Aanstamping Pondasi Tapak P1

76.50

0.75

3.1.1.2.0
3.1.1.2.1

Pondasi Tapak tipe P1


Beton
Lantai kerja

1.40

1.40

Badan Pondasi

1.20

1.20

Tiang Pondasi

2.0

0.3

3.1.1.2.2

Pembesian/Tulangan

3.1.1.2.3

Bekisting

No.

Uraian Pekerjaan

(1)

(2)

Dimensi
l
(3)

3.1.1.3.0

Aanstamping Pondasi Tapak P2

76.50

0.75

3.1.1.4.0
3.1.1.4.1

Pondasi Tapak tipe P2


Beton
Lantai kerja

1.20

1.20

Badan Pondasi

1.00

1.00

Tiang Pondasi

2.00

0.25

3.1.1.4.2

Pembesian/Tulangan

3.1.1.4.3

Bekisting

3.1.2.0.0
3.1.2.1.0

Pondasi Menerus batu gunung


Aanstamping batu kosong

76.50

0.75

3.1.2.2.0

Pasangan batu gunung

76.50

0.48

3.1.3.0.0
3.1.3.1.0
3.1.3.1.1

Sloof
Sloof (20/30)
Beton

131.46

0.20

3.1.3.1.2

Pembesian/Tulangan

3.1.3.1.3

Bekisting

3.1.4.0.0
3.1.4.1.0
3.1.4.1.1

Kolom
Kolom tipe K1 (25/35)
Beton

4.25

0.25

3.1.4.1.2

Pembesian/Tulangan

3.1.4.1.3

Bekisting

3.1.4.2.0
3.1.4.2.1

Kolom tipe K2 (D = 40)


Beton

4.25

0.40

3.1.4.2.2

Pembesian/Tulangan

3.1.4.2.3

Bekisting

3.1.4.3.0
3.1.4.3.1

Kolom tipe K3 (13/13)


Beton

3.1.4.3.2

Pembesian/Tulangan

3.1.4.3.3

Bekisting

3.1.5.0.0
3.1.5.1.0
3.1.5.1.1

Pekerjaan Tangga
Plat Tangga
Beton

3.1.5.1.2

Bekisting

3.1.5.2.0
3.1.5.2.1

Anak Tangga
Beton

3.1.5.2.2

Bekisting

3.2.0.0.0
3.2.1.0.0
3.2.1.1.0

Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5

3.2.1.2.0
3.2.1.2.1

Pemasangan keramik lantai


Keramik lantai 40x40

4.25

0.13

6.05

1.28

1.28

0.37

No.

Uraian Pekerjaan

(1)

(2)

(3)

3.2.1.2.2

Keramik lantai 20x20

3.2.1.3.0

Pasangan dinding keramik 20x20

60.00

3.2.1.4.0

Pemasangan keramik tangga


Anak tangga

1.28

3.2.2.0.0
3.2.2.1.0

Pekerjaan Dinding
Pasangan dinding 1 : 2
Luas kotor dinding 1 : 2
Luas bidang pintu P1
Luas bidang pintu P2
Luas bidang pintu P4
Kolom tipe K1

Dimensi
l

0.37

75.50
1.52
1.42
0.92
0.25
0.35

Luas bersih dinding 1 : 2


3.2.2.2.0

Pasangan dinding 1 : 4
Luas kotor dinding 1 : 4
Luas bidang pintu P1
Luas bidang pintu P2
Luas bidang pintu P4
Luas bidang jendela J1
Luas bidang jendela J2
Luas bidang jendela J3
Luas bidang jendela J4
Luas bidang jendela J5
Luas bidang jendela J6
Kolom tipe K1
Luas bersih dinding 1 : 4

3.2.2.3.0

Pasangan dinding 1 : 2 kamar mandi

75.50
1.42
0.92
0.67
0.85
0.70
1.28
1.28
3.11
0.25
0.35

Luas kotor dinding 1 : 2


Luas bidang pintu P5
Kolom tipe K1

3.2.2.4.0

Luas bersih dinding 1 : 2


Pasangan dinding 1 : 4 kamar mandi
Luas kotor dinding 1 : 4
Luas bidang pintu P5
Luas bidang ventilasi V1
Luas bidang ventilasi V2
Kolom tipe K1

27.50
0.82
0.25
0.35

27.5
0.82
0.67
1.28
0.25
0.35

Luas bersih dinding 1 : 2


Luas bersih dinding 1 : 4 kamar mandi
3.2.2.5.0

Plesteran 1 : 2
Total luas plesteran

3.2.2.6.0

Plesteran 1 : 4
Total luas plesteran

3.2.3.0.0
3.2.3.1.0

Plafond
Pemasangan plafond gypsum
Ruang 1
Ruang 2
L1 = 4 x 5.5 = 20
L2 = 10.5 x 2 = 21
Total :

2.45

4.00
10.50

Ruang 3
Ruang 4
Ruang 5
Ruang 6
L1 = 4 x 6 = 24
L2 = (2.8 + 1.4)/2 x 0.8 = 1.68
Total :
Ruang 7
Ruang 8
Ruang 9
Ruang 10
Total Volume :

5.50
2.00

4.50
2.00
2.00

4.00
2.80

6.00
1.40

5.00
2.00
3.00

No.

Uraian Pekerjaan

(1)

(2)

3.2.3.2.0

Pemasangan List Profil


Ruang 1
Ruang 2
Ruang 3
Ruang 4
Ruang 5
Ruang 6
Ruang 7
Ruang 8
Ruang 9
Ruang 10

Dimensi
l

(3)

13.00
36.00
17.00
12.00
9.00
20.60
20.00
9.00
11.60
16.00

Total Volume :

3.2.4.0.0
3.2.4.1.0
3.2.4.1.1

Pintu, Jendela dan Ventilasi


Pintu tipe P1
Kusen Pintu

3.2.4.1.2

Daun Pintu

3.2.4.1.3

Kaca

2.63
1.52
1.57

0.06
0.06
0.06
Total Volume Kuse
2.3
0.19
0.53

Total Volume Kaca


3.2.4.1.4

Engsel Pintu

3.2.4.1.5

Kunci Pintu

3.2.4.1.6

Pegangan Pintu

3.2.4.2.0
3.2.4.2.1

Pintu tipe P2
Kusen Pintu

3.2.4.2.2

Daun Pintu

3.2.4.2.3

Kaca

3.2.4.2.4

Engsel Pintu

3.2.4.2.5

Kunci Pintu

2.63
1.42
0.46

0.20

0.06
0.06
0.06
Total Volume Kuse
2.30
0.37
Total Volume Daun Pi
0.45

3.2.4.2.6

Pegangan Pintu

3.2.4.3.0
3.2.4.3.1

Pintu tipe P4
Kusen Pintu

3.2.4.3.2

Daun Pintu

3.2.4.3.3

Engsel Pintu

3.2.4.3.4

Kunci Pintu

3.2.4.3.5

Pegangan Pintu

3.2.4.4.0
3.2.4.4.1

Pintu tipe P5
Kusen Pintu

3.2.4.4.2

Daun Pintu

3.2.4.4.3

Engsel Pintu

3.2.4.4.4

Kunci Pintu

3.2.4.4.5

Pegangan Pintu

3.2.4.5.0
3.2.4.5.1

Jendela tipe J1
Kusen Jendela

3.2.4.5.2

Daun Jendela

3.2.4.5.3

Kaca

3.2.4.5.4

Engsel Jendela

3.2.4.5.5

Grendel Jendela

3.2.4.5.6

Hak Angin

2.02
0.92

0.06
0.06
Total Volume Kuse
2.30

2.02
0.82

0.06
0.06
Total Volume Kuse
2.10

2.36
0.67

0.06
0.06
Total Volume Kuse
0.37
1.85
Total Volume Daun jen
0.19
0.38
Total Volume Kaca

Volume Daun Jendela :

No.

Uraian Pekerjaan

(1)

(2)

3.2.4.6.0
3.2.4.6.1

Jendela tipe J2
Kusen Jendela

3.2.4.6.2

Daun Jendela

3.2.4.6.3

Kaca

3.2.4.6.4

Engsel Jendela

3.2.4.6.5

Grendel Jendela

3.2.4.6.6

Hak Angin

Dimensi
l
(3)

2.36
0.85

0.06
0.06
Total Volume Kuse
0.37
1.85
Total Volume Daun jen
0.19
0.38
Total Volume Kaca

Volume Daun Jendela :


3.2.4.7.0
3.2.4.7.1

Jendela tipe J3
Kusen Jendela

3.2.4.7.2

Daun Jendela

3.2.4.7.3

Kaca

3.2.4.7.4

Engsel Jendela

3.2.4.7.5

Grendel Jendela

3.2.4.7.6

Hak Angin

2.36
0.70

0.06
0.06
Total Volume Kuse
0.37
1.85
Total Volume Daun jen
0.19
0.38
Total Volume Kaca

Volume Daun Jendela :


3.2.4.8.0
3.2.4.8.1

Jendela tipe J4
Kusen Jendela

3.2.4.8.2

Daun Jendela

3.2.4.8.3

Kaca

3.2.4.8.4

Engsel Jendela

3.2.4.8.5

Grendel Jendela

2.36
1.28

0.06
0.06
Total Volume Kuse
0.37
1.85
Total Volume Daun jen
0.19
0.38
Total Volume Kaca

3.2.4.8.6

Hak Angin
Volume Daun Jendela :

3.2.4.9.0
3.2.4.9.1

Jendela tipe J5
Kusen Jendela

3.2.4.9.2

Daun Jendela

3.2.4.9.3

Kaca

3.2.4.9.4

Engsel Jendela

3.2.4.9.5

Grendel Jendela

3.2.4.9.6

Hak Angin

1.96
1.28

0.06
0.06
Total Volume Kuse
0.37
1.45
Total Volume Daun jen
0.19
0.42
Total Volume Kaca

Volume Daun Jendela :


3.2.4.10.0
3.2.4.10.1

Jendela tipe J6
Kusen Jendela

3.2.4.10.2

Daun Jendela

3.2.4.10.3

Kaca

3.2.4.10.4

Engsel Jendela

3.2.4.10.5

Grendel Jendela

3.2.4.10.6

Hak Angin

2.36
3.11

0.06
0.06
Total Volume Kuse
0.37
1.85
Total Volume Daun jen
0.19
0.38
Total Volume Kaca

Volume Daun Jendela :


3.2.4.11.0
3.2.4.11.1

Ventilasi tipe V1
Kusen Ventilasi

3.2.4.11.2

Kaca

3.2.4.12.0
3.2.4.12.1

Ventilasi tipe V2
Kusen Ventilasi

3.2.4.12.2

Kaca

0.47
0.67

0.06
0.06
Total Volume Kuse
0.20

0.47
1.28

0.06
0.06
Total Volume Kuse
0.20

No.

Uraian Pekerjaan

(1)

(2)

3.2.4.13.0
3.2.4.13.1

Ventilasi atas teras


Kusen Ventilasi

3.2.4.13.2

Kaca

Dimensi
l
(3)

0.8
1.22
1.02

0.06
0.06
0.06
Total Volume Kuse
0.31
0.32

0.65
Total Volume Kaca
3.3.0.0.0
3.3.1.0.0
3.3.1.1.0
3.3.1.2.0
3.3.1.3.0

Mechanical dan Electrical


Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put

3.3.2.0.0
3.3.2.1.0
3.3.2.2.0
3.3.2.3.0

Pekerjaan Instalasi Lampu


Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)

3.3.3.0.0
3.3.3.1.0
3.3.3.2.0

Pekerjaan Instalasi Stop Kontak


Saklar Tunggal
Saklar Ganda

3.4.0.0.0
3.4.1.0.0
3.4.1.1.0
3.4.1.2.0
3.4.1.3.0
3.4.1.4.0
3.4.1.5.0
3.4.1.6.0
3.4.1.7.0

Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Bak cuci piring
Wastafel

3.4.2.0.0
3.4.2.1.0
3.4.2.2.0

Instalasi Air Kotor


Pipa PVC ( 2,5")
Bak Kontrol

3.4.3.0.0
3.4.3.1.0
3.4.3.2.0

Instalasi Kotoran
Pipa PVC ( 4")
Septictank dan Peresapan

4.0.0.0.0

KONSTRUKSI LANTAI 2

4.1.0.0.0
4.1.1.0.0
4.1.1.1.0
4.1.1.1.1

Pekerjaan Struktur
Balok Lantai
Balok 25/40
Beton

4.1.1.1.2

Pembesian/Tulangan

4.1.1.1.3

Bekisting

4.1.1.2.0
4.1.1.2.1

Balok 25/50
Beton

4.1.1.2.2

Pembesian/Tulangan

4.1.1.2.3

Bekisting

4.1.1.3.0
4.1.1.3.1

Balok 13/18
Beton

4.1.1.3.2

Pembesian/Tulangan

4.1.1.3.3

Bekisting

4.1.2.0.0
4.1.2.1.0

Plat Lantai
Beton

4.1.2.2.0

Pembesian/Tulangan

4.1.2.3.0

Bekisting

4.1.3.0.0
4.1.3.1.0
4.1.3.1.1

Kolom
Kolom tipe K1 (25/35)
Beton

4.1.3.1.2

Pembesian/Tulangan

4.1.3.1.3

Bekisting

4.1.3.2.0
4.1.3.2.1

Kolom tipe K2 (d = 40)


Beton

4.1.3.2.2

Pembesian/Tulangan

4.1.3.2.3

Bekisting

4.1.3.3.0
4.1.3.3.1

Kolom tipe K3 (13/13)


Beton

4.1.3.3.2

Pembesian/Tulangan

4.1.3.3.3

Bekisting

133.00

0.25

17.50

0.25

6.80

0.13

159.99

4.00

0.25

4.00

0.40

4.00

0.13

4.1.4.0.0
4.1.4.1.0

Ringbalk
Beton

4.1.4.2.0

Pembesian/Tulangan

4.1.4.3.0

Bekisting

143.00

0.20

No.

Uraian Pekerjaan

(1)

(2)

4.2.0.0.0
4.2.1.0.0
4.2.1.1.0

Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5

4.2.1.2.0
4.2.1.2.1

Pemasangan Keramik lantai


Keramik lantai 40x40

4.2.1.2.2

Keramik Lantai 20x20

4.2.1.3.0

Pasangan dinding keramik 20x20

4.2.2.0.0
4.2.2.1.0

Dinding
Pasangan dinding 1 : 2
Luas kotor dinding 1 : 2
Luas bidang pintu P3
Luas bidang pintu P4
Kolom tipe K1

Dimensi
l
(3)

60.00

73.00
1.52
0.92
0.25
0.35

Luas bersih dinding 1 : 2


4.2.2.2.0

Pasangan dinding 1 : 4
Luas kotor dinding 1 : 4
Luas bidang pintu P3
Luas bidang pintu P4
Luas bidang jendela JA
Luas bidang jendela JB

73.00
0.92
0.67
0.85

0.70
1.28
1.89
0.70
3.11
0.25
0.35

Luas bidang jendela JC


Luas bidang jendela JD
Luas bidang jendela JE
Luas bidang jendela JF
Luas bidang jendela JG
Kolom tipe K1

Luas bersih dinding 1 : 2


Luas bersih dinding 1 : 4
4.2.2.3.0

Pasangan dinding 1 : 2 kamar mandi


Luas kotor dinding 1 : 2
Luas bidang pintu P5
Kolom tipe K1

30.00
0.82
0.25
0.35

Luas bersih dinding 1 : 2

4.2.2.4.0

Pasangan dinding 1 : 4 kamar mandi


Luas kotor dinding 1 : 4
Luas bidang pintu P5
Luas bidang ventilasi V1
Luas bidang ventilasi V2
Luas bidang ventilasi V3
Kolom tipe K1

30.00
0.82
0.67
1.28
0.37
0.25
0.35

Luas bersih dinding 1 : 2


Luas bersih dinding 1 : 4 kamar mandi
4.2.2.5.0

Plesteran 1 : 2
Total luas plesteran

4.2.2.6.0

Plesteran 1 : 4
Total luas plesteran

4.2.3.0.0
4.2.3.1.0

Plafond
Pemasangan plafond gypsum
Ruang 1
Ruang 2
L1 = 6.5 x 2 = 13
L2 = 2 x 13 = 26
Ruang 3
L1 = 2 x 2 =4
L2 = 4.5 x 6 = 27
Ruang 4
Ruang 5
Ruang 6
L1 = 2 x 1.5 = 3
L2 = 4 x 4 = 16

6.50
6.50
2.00
2.00
4.50
2.00
2.00
2.00
4.00

L3 = (2.8 + 1.4)/2 x 0.8 = 1.68


Ruang 7
Ruang 8
Ruang 9
Ruang 10
Total Volume Plafon :

2.80

1.40
5.00
2.00
3.00

No.

Uraian Pekerjaan

(1)

(2)

4.2.3.2.0

Pemasangan List Profil


Ruang 1
Ruang 2
Ruang 3
Ruang 4
Ruang 5
Ruang 6
Ruang 7
Ruang 8
Ruang 9
Ruang 10
Total Volume List Profil :

4.2.4.0.0
4.2.4.1.0
4.2.4.1.1

Pintu, Jendela dan Ventilasi


Pintu tipe P3
Kusen Pintu

4.2.4.1.2

Daun Pintu

4.2.4.1.3

Kaca

4.2.4.1.4

Engsel Pintu

4.2.4.1.5

Kunci Pintu

4.2.4.1.6

Pegangan Pintu

4.2.4.2.0
4.2.4.2.1

Pintu tipe P4
Kusen Pintu

4.2.4.2.2

Daun Pintu

4.2.4.2.3

Engsel Pintu

4.2.4.2.4

Kunci Pintu

4.2.4.2.5

Pegangan Pintu

4.2.4.3.0
4.2.4.3.1

Pintu tipe P5
Kusen Pintu

4.2.4.3.2

Daun Pintu

Dimensi
l
(3)

23.00
43.00
25.00
12.00
9.00
11.60
20.00
9.00
11.60
16.00

2.36
1.52
1.57

0.06
0.06
0.06
Total Volume Kuse
2.10
0.19
0.53

Total Volume Kaca

2.02
0.92

0.06
0.06
Total Volume Kuse
2.30

2.02
0.82

0.06
0.06
Total Volume Kuse
2.10

4.2.4.3.3

Engsel Pintu

4.2.4.3.4

Kunci Pintu

4.2.4.3.5

Pegangan Pintu

4.2.4.4.0
4.2.4.4.1

Jendela tipe JA
Kusen Jendela

4.2.4.4.2

Daun Jendela

4.2.4.4.3

Kaca

4.2.4.4.4

Engsel Jendela

4.2.4.4.5

Grendel Jendela

4.2.4.4.6

Hak Angin

2.26
0.67

0.06
0.06
Total Volume Kuse
0.37
1.75
Total Volume Daun jen
0.19
0.34
Total Volume Kaca

Volume Daun Jendela :


4.2.4.5.0
4.2.4.5.1

Jendela tipe JB
Kusen Jendela

4.2.4.5.2

Daun Jendela

4.2.4.5.3

Kaca

4.2.4.5.4

Engsel Jendela

4.2.4.5.5

Grendel Jendela

4.2.4.5.6

Hak Angin

2.26
0.85

0.06
0.06
Total Volume Kuse
0.37
1.75
Total Volume Daun jen
0.19
0.34
Total Volume Kaca

Volume Daun Jendela :

4.2.4.6.0
4.2.4.6.1

Jendela tipe JC
Kusen Jendela

4.2.4.6.2

Daun Jendela

4.2.4.6.3

Kaca

2.26
0.70

0.06
0.06
Total Volume Kuse
0.37
1.75
Total Volume Daun jen
0.19
0.34

Total Volume Kaca


4.2.4.6.4

Engsel Jendela

4.2.4.6.5

Grendel Jendela

4.2.4.6.6

Hak Angin
Volume Daun Jendela :

No.

Uraian Pekerjaan

(1)

(2)

4.2.4.7.0
4.2.4.7.1

Jendela tipe JD
Kusen Jendela

4.2.4.7.2

Daun Jendela

4.2.4.7.3

Kaca

4.2.4.7.4

Engsel Jendela

4.2.4.7.5

Grendel Jendela

4.2.4.7.6

Hak Angin

Dimensi
l
(3)

2.26
1.28

0.06
0.06
Total Volume Kuse
0.37
1.75
Total Volume Daun jen
0.19
0.34
Total Volume Kaca

Volume Daun Jendela :


4.2.4.8.0
4.2.4.8.1

Jendela tipe JE
Kusen Jendela

4.2.4.8.2

Daun Jendela

4.2.4.8.3

Kaca

4.2.4.8.4

Engsel Jendela

4.2.4.8.5

Grendel Jendela

4.2.4.8.6

Hak Angin

2.26
1.89

0.06
0.06
Total Volume Kuse
0.37
1.75
Total Volume Daun jen
0.19
0.34
Total Volume Kaca

Volume Daun Jendela :


4.2.4.9.0
4.2.4.9.1

Jendela tipe JF
Kusen Jendela

4.2.4.9.2

Daun Jendela

0.06
0.06
Total Volume Kuse
1.46

4.2.4.9.3

Kaca

0.38

4.2.4.9.4

Engsel Jendela

4.2.4.9.5

Grendel Jendela

4.2.4.9.6

Hak Angin

1.56
0.70

Volume Daun Jendela :

4.2.4.10.0
4.2.4.10.1

Jendela tipe JG
Kusen Jendela

4.2.4.10.2

Daun Jendela

4.2.4.10.3

Kaca

4.2.4.10.4

Engsel Jendela

4.2.4.10.5

Grendel Jendela

4.2.4.10.6

Hak Angin

1.56
3.11

0.06
0.06
Total Volume Kuse
1.05
0.02
Total Volume Daun jen
0.40

Volume Daun Jendela :


4.2.4.11.0
4.2.4.11.1

Ventilasi tipe V1
Kusen Ventilasi

4.2.4.11.2

Kaca

4.2.4.12.0
4.2.4.12.1

Ventilasi tipe V2
Kusen Ventilasi

4.2.4.12.2

Kaca

4.2.4.13.0
4.2.4.13.1

Ventilasi tipe V3
Kusen Ventilasi

4.2.4.13.2

Kaca

4.3.0.0.0
4.3.1.0.0
4.3.1.1.0
4.3.1.1.1
4.3.1.1.2

Mechanical dan Electrical


Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put

4.3.2.0.0
4.3.2.1.0
4.3.2.1.1
4.3.2.1.2

Pekerjaan Instalasi Lampu


Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)

0.47
0.67

0.06
0.06
Total Volume Kuse
0.20

0.47
1.28

0.06
0.06
Total Volume Kuse
0.20

0.51
0.37

0.06
0.06
Total Volume Kuse
0.41

No.

Uraian Pekerjaan

(1)

(2)

4.3.3.0.0
4.3.3.1.0
4.3.3.1.1

Pekerjaan Instalasi Stop Kontak


Saklar Tunggal
Saklar Ganda

4.4.0.0.0
4.4.1.0.0
4.4.1.1.0
4.4.1.2.0
4.4.1.3.0
4.4.1.4.0
4.4.1.5.0
4.4.1.6.0

Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Wastafel

4.4.2.0.0
4.4.2.1.0
4.4.2.2.0

Instalasi Air Kotor


Pipa PVC ( 2,5")
Bak Kontrol

Dimensi
l
(3)

5.0.0.0.0

KONSTRUKSI ATAP

5.1.0.0.0
5.1.1.0.0
5.1.1.1.0
5.1.1.2.0
5.1.1.3.0
5.1.1.4.0
5.1.1.5.0
5.1.1.6.0

Rangka Atap
Pemasangan Kuda - kuda K1
Balok tarik 6/12
Kaki kuda - kuda 6/12
Balok gapit 4/14
Skor 6/12
Tiang kuda - kuda 6/12
Sokong 6/12

13.00
4.34
5.39
3.46
4.07
5.18

0.06
0.06
0.04
0.06
0.06
0.06
Volume total kuda - kud

5.1.2.0.0
5.1.2.1.0
5.1.2.2.0
5.1.2.3.0
5.1.2.4.0
5.1.2.5.0
5.1.2.6.0

Pemasangan Kuda - kuda K2


Balok tarik 6/12
Kaki kuda - kuda 6/12
Balok gapit 4/14
Skor 6/12
Tiang kuda - kuda 6/12
Sokong 6/12

5.00
3.48
3.00
0.63
1.73
1.25

0.06
0.06
0.04
0.06
0.06
0.06
Volume total kuda - kud

5.1.3.0.0
5.1.3.1.0
5.1.3.2.0
5.1.3.3.0
5.1.3.4.0

Pemasangan Kuda - kuda K3


Balok tarik 6/12
Kaki kuda - kuda 6/12
Skor 6/12
Tiang kuda - kuda 6/12

4.00
3.30
0.90
1.40

0.06
0.06
0.06
0.06
Volume total kuda - kud

Volume Total seluruh kuda - kuda :


5.1.4.0.0
5.1.4.1.0

Pemasangan Penutup Atap


Gording 5/10

235.08

0.05

5.1.4.2.0
5.1.4.3.0
5.1.4.4.0
5.1.4.5.0

6.0.0.0.0
6.1.0.0.0
6.1.1.0.0
6.1.2.0.0
6.1.3.0.0
6.1.4.0.0
6.1.5.0.0
6.1.6.0.0

Pemasangan kasau + reng genteng


Pemasangan atap genteng metal
Rabung genteng keramik
Listplank 3/30

261.86
261.86
51.81
72.71

PEKERJAAN LANDSCAPE
Pekerjaan Pagar
Galian Tanah Pondasi Menerus
Urugan Pasir Bawah Pondasi
Urugan Tanah Kembali
Pemasangan Aanstamping
Pemasangan Pondasi Batu Gunung
Sloof 20/25

180.5
180.5

0.6
0.6

180.5
180.5
180.5

0.6
0.45
0.2

Bekisting

0.45

0.4

Kolom 23/23

0.23
0.23
0.23

0.23
0.23
0.23

Bekisting

0.46
0.46
0.46

4
4
4

6.1.8.0.0

Dinding Pagar

12.31
4.81
55.82

6.1.9.0.0

Plesteran

6.1.10.0.0

Ringbalk
Bekisting

6.2.0.0.0

Timbunan Tanah Halaman

6.3.0.0.0
6.3.1.0.0
6.3.2.0.0
6.3.3.0.0

Pekerjaan Tanaman
Ekor Tupai
Bougenville
Bunga Lily

6.1.7.0.0

64.5
0.28

0.13
4
0.8

Dimensi
t

Jumlah

(3)
86.00

Unit

Volume

Satuan

(4)

(5)

(6)

1.00

86.00

m1

1.00

200.00

m2

74.00

m1

74.00

13.50

1.00

13.50

m2

2.10

4.12

4.00

16.46

m3

2.10

3.02

15.00

45.36

m3

61.824

m3

30.29

m3

30.29

m3

0.39

m3

0.45

0.05

30.29

0.10

1.00

4.00

0.05

0.07

15.00

1.08

m3

0.05

2.87

1.00

2.87

m3

4.341

m3

2.10

4.12

4.00

4.12

m3

2.10

3.02

15.00

11.34

m3

0.45

30.29

1.00

7.57

m3

23.030

m3

0.50

102.75

1.00

102.75

m2

0.15

30.83

1.00

30.83

m2

0.10

5.74

1.00

5.74

m3

0.05

0.10

4.00

0.39

m3

0.30

0.43

4.00

1.73

m3

0.4

0.2

4.0

0.7
2.8

m3
m3

261.2

kg

9.6
5.8
15.4

m2
m2
m2

75

10

Dimensi
t

Jumlah

(3)

Unit

Volume

Satuan

(4)

(5)

(6)

0.10

5.74

1.00

5.74

m3

0.05

0.07

15.00

1.08

m3

0.30

0.30

15.00

4.50

m3

0.35

0.18

15.00

2.625
8.21

m3
m3

869.831

kg

36
18
54

m2
m2
m2

0.10

5.7375

1.00

5.7375

m3

0.60

22.032

1.00

22.032

m3

0.30

7.8876

1.00

7.8876

m3

1331.7906

kg

78.876

m2

8.925

m3

1068.7152

kg

122.4

m2

1.0676

m2

63.6218

kg

10.676

m2

0.35

0.3719

0.5338

24.00

2.00

0.13

0.15

0.0718

1.1616

23.00

1.00

1.652

m3

325.1924

kg

50.83

m2

1.1616

m3

7.744

m2

6.7429

5.3559

0.15

0.07104

26.00

m3

1.84704
0.00

9.984
0.754
10.738

m2
m2
m2

1.00

196.99

m2

1.00

180.73

m2

Dimensi

Unit

Volume

Satuan

(4)

(5)

(6)

1.00

14.91

m2

90.00

1.00

90.00

m2

0.4736

26.00

12.3136

m2

0.20
0.20
0.20
0.20
0.20
0.20

15.10
0.304
0.284
0.184
0.05
0.07

1.00
1.00
1.00
2.00
22.00
22.00

15.10
0.304
0.284
0.368
1.1
1.54
11.504

m2
m2
m2
m2
m2
m2
m2

4.25

320.875

2.76
2.15
2.36
2.36
2.36
2.36
2.05
2.36
4.25
4.25

3.92
1.98
1.58
2.01
1.65
3.02
2.62
7.34
1.06
1.49

1.00
1.00
1.00
2.00
4.00
2.00
4.00
2.00
2.00
1.00
22.00
22.00

320.875
5.86
3.9192
3.956
6.3248
4.012
6.608
6.0416
5.248
7.3396
23.375
32.725
203.9618

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Jumlah

(3)

1.50

1.50
1.50
1.50
1.50

41.25
1.23
0.375
0.525

1.00
3.00
3.00
3.00

41.25
3.69
1.125
1.575
34.86

m2
m2
m2
m2
m2

4.25
2.15
0.47
0.47
4.25
4.25

116.875
1.763
0.3149
0.6016
1.0625
1.4875

1.00
3.00
2.00
1.00
3.00
3.00

116.875
5.289
0.6298
0.6016
3.1875
4.4625
34.86
67.8446

m2
m2
m2
m2
m2
m2
m2
m2

46.364

m2

271.8064

m2
4.00
1

4.00

9.8

1.00

4.00
2.45

m2

9.80

3
6.50

1.00
1.00

5.50
2.00
2.00

4.00
4.00
2.50

18.00
8.00
5.00

1.00
1.00
1.00

4.00

Void

0.80

m42
m2
m2 5

22
21
43.00
18.00
8.00
9
5.00

m2
6
m2
m2
3.00

5.00
10.50

m24.00

2.50

DENAH PLAFOND LT. I

25.00
5.00

1.00
1.00

5.00

15.00

1.00

2.00

6.00

10

4.00

5.00
2.50

2.00

0.80
1.20

24.00
1.68

4.50

25.68

m2

25
5
20.68
15

m2
m2
m2
m2

175.16

m2

Dimensi

Unit

Volume

Satuan

(4)

(5)

(6)

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

13.00
36.00
17.00
12.00
9.00
20.60
20.00
9.00
11.60
16.00

m1
m1
m1
m1
m1
m1
m1
m1
m1
m1

164.20

m1

0.0379
0.0109
0.0113
0.0601
3.266

m3
m3
m3
m3
m2

1.00
1.00
1.00

0.053
0.148
0.1917
0.393

m2
m2
m2
m2

6.00

1.00

6.00

buah

1.00

1.00

1.00

buah

2.00

1.00

2.00

buah

0.12
2.00
0.12
2.00
0.12
1.00
Total Volume Kusen :
1.32
1.00
0.61
2.00
Total Volume Daun Pintu :

1.00
1.00
1.00

2.00

0.0379
0.0204
0.0033
0.0616
3.036
0.4514
3.4874
0.18

m3
m3
m3
m3
m2
m2
m2
m2

6.00

1.00

6.00

buah

1.00

1.00

1.00

buah

Jumlah

(3)

0.12
2.00
0.12
1.00
0.12
1.00
Total Volume Kusen :
1.42
3.266
0.14
0.14

2.00
2.00

1.00
1.00
1.00
1.00

Total Volume Kaca :

1.00
1.00

a:

2.00

1.00

2.00

buah

0.12
2.00
0.12
1.00
Total Volume Kusen :
1.42

2.00
2.00
2.00

0.058
0.013
0.071
6.532

m3
m3
m3
m2

3.00

2.00

6.00

buah

1.00

2.00

2.00

buah

1.00

2.00

2.00

buah

0.12
2.00
0.12
1.00
Total Volume Kusen :
0.72

3.00
3.00
3.00

0.087
0.018
0.105
4.536

m3
m3
m3
m2

2.00

3.00

6.00

buah

1.00

3.00

3.00

buah

1.00

3.00

3.00

buah

0.12
2.00
0.12
3.00
Total Volume Kusen :
0.57
1.00
0.57
1.00
Total Volume Daun jendela :
0.37
1.00
0.37
4.00
Total Volume Kaca :
2.00

4.00
4.00

4.00

0.136
0.058
0.194
0.844
4.218
5.062
0.281
2.250
2.531
8.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

2.00

4.00

8.00

buah

2.00

4.00

8.00
2.53

buah
m2

4.00
4.00
4.00
4.00

Dimensi

Unit

Volume

Satuan

(4)

(5)

(6)

0.12
2.00
0.12
3.00
Total Volume Kusen :
0.75
1.00
0.75
1.00
Total Volume Daun jendela :
0.57
1.00
0.57
4.00
Total Volume Kaca :
2.00

2.00
2.00

2.00

0.068
0.037
0.105
0.555
2.775
3.33
0.217
1.733
1.949
4.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

2.00

2.00

4.00

buah

2.00

2.00

4.00
1.38

buah
m2

0.12
2.00
0.12
3.00
Total Volume Kusen :
0.60
1.00
0.60
1.00
Total Volume Daun jendela :
0.42
1.00
0.42
4.00
Total Volume Kaca :
2.00

4.00
4.00

4.00

0.136
0.060
0.196
0.888
4.44
5.328
0.319
2.554
2.873
8.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

2.00

4.00

8.00

buah

2.00

4.00

8.00
2.46

buah
m2

0.12
3.00
0.12
3.00
Total Volume Kusen :
0.55
2.00
0.55
2.00
Total Volume Daun jendela :
0.39
2.00
0.39
8.00
Total Volume Kaca :
4.00

2.00
2.00

2.00

0.102
0.055
0.157
0.814
4.07
4.884
0.296
2.371
2.668
8.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

4.00

2.00

8.00

buah

Jumlah

(3)

2.00
2.00
2.00
2.00

a:

4.00
4.00
4.00
4.00

a:

2.00
2.00
2.00
2.00

4.00

2.00

8.00
2.22

buah
m2

0.12
3.00
0.12
3.00
Total Volume Kusen :
0.55
2.00
0.55
2.00
Total Volume Daun jendela :
0.39
2.00
0.39
6.00
Total Volume Kaca :
4.00

2.00
2.00

2.00

0.085
0.055
0.140
0.814
3.19
4.004
0.296
1.966
2.262
8.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

4.00

2.00

8.00

buah

4.00

2.00

8.00
1.74

buah
m2

0.12
6.00
0.12
3.00
Total Volume Kusen :
0.55
5.00
0.55
5.00
Total Volume Daun jendela :
0.39
5.00
0.39
20.00
Total Volume Kaca :
10.00

1.00
1.00

1.00

0.102
0.067
0.169
1.018
5.088
6.105
0.371
2.964
3.335
10.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

10.00

1.00

10.00

buah

10.00

1.00

10.00
2.77

buah
m2

0.12
2.00
0.12
2.00
Total Volume Kusen :
0.57
2.00

2.00
2.00

0.014
0.019
0.033
0.456

m3
m3
m3
m2

0.12
3.00
0.12
2.00
Total Volume Kusen :
0.57
4.00

1.00
1.00

0.010
0.018
0.029
0.912

m3
m3
m3
m2

a:

2.00
2.00
2.00
2.00

a:

1.00
1.00
1.00
1.00

a:

2.00

2.00

Dimensi

Unit

Volume

Satuan

(4)

(5)

(6)

0.12
2.00
0.12
1.00
0.12
1.00
Total Volume Kusen :
0.22
2.00
0.22
2.00

1.00
1.00
1.00

0.38
1.00
Total Volume Kaca :

1.00

0.012
0.009
0.007
0.028
0.1364
0.1408
0.0261
0.247
0.5503

m3
m3
m3
m3
m2
m2
m2
m2
m2

1.00
1.00
1.00

1.00
1.00
1.00

unit
m1
m1

8.00
5.00
6.00

8.00
5.00
6.00

titik
titik
titik

7.00
6.00

7.00
6.00

titik
titik

1.00
3.00
2.00
4.00
3.00
1.00
1.00

68.29
3.00
2.00
4.00
3.00
1.00
1.00

Jumlah

(3)

1.00
1.00

m1
buah
buah
buah
buah
buah
buah

Pipa Air Kotor 2,5"

Pipa Air Bersih 3/4"

Pipa Air Kotor 2,5"

Pipa Air Bersih 3/4"

Pipa Kotoran 4"


Pipa Air Bersih 3/ 4"

Pipa Kotoran 4"

Pipa Air Kotor 2,5"

1.00
3.00

Septictank

Pipa Buangan Air 4"

m1
buah

60.2
3.00

Septictank

Pipa Air Bersih 3/4"

Pipa Buangan Air 4"

Resapan

Resapan

DENAH SANI TASI


Ke Saluran

1.00
2.00

Skala 1 : 100

38.11
2.00

Dari PDAM
Ke Saluran

m1
unit

0.40

1.00

0.50

1.00

0.18

1.00

13.300

m3

1753.07

kg

107.730

m2

2.188

m3

237.849

kg

1.766

m2

0.159

m3

22.297

kg
m2

3.332
13.00
5.00

4.00

4.00

2.00

0.12

19.199

4.50

1.00

19.199

2.00

10 -15
10 -15

10 -15

10 -15
10 -15

Void

10 -15

m2

4.50

2.00

4.00

10 -15
10 -15

16.50

2.00

10 -15

247.104

10 -15

10 -15

10 -15

10 -15

10 -15
10 -15

10 -15

10 -15

10 -15

kg

2.00

6.00

4.00

0.80

10 -15

10 -15
10 -15

159.99

10 -15

10 -15

10 -15

10 -15
10 -15

10 -15
10 -15

10 -15

10 -15

1.20

4.00

5.00

4.00

13.00

0.35

0.35

20.00

2.00

0.13

0.068

23.00

7.00

m3

737.72

kg

96

m2

1.0048

m2

59.739

kg

10.048

m2

1.555

m3

303.37

kg

47.84

m2

14.50

0.30

8.58

1.00

8.58

m3

1126.125

kg

114.4

m2

Dimensi
t

Jumlah

(3)

1.50

0.20
0.20
0.20
0.20
0.20

4.00
2.15
2.26
2.26

90.00

Unit

Volume

Satuan

(4)

(5)

(6)

1.00

159.99

m2

1.00

143.73

m2

1.00

14.89

m2

1.00

90.00

m2

1.00
1.00
3.00
19.00
19.00

14.6
0.304
0.552
0.95
1.33

m2
m2
m2
m2
m2

11.464

m2

292
55.6
5.93
3.03
3.84

m2
m2
m2
m2
m2

1.00
1.00
3.00
2.00
2.00

2.26
2.26
2.26
1.56
1.56
4.00
4.00

1.50
1.50
1.50
1.50

4.00
3.00
1.00
1.00
1.00
19.00
19.00

6.33
8.68
4.27
1.09
4.85
19.00
26.60

m2
m2
m2
m2
m2
m2
m2

11.464
141.31

m2
m2

45
3.69
2.25
3.15

m2
m2
m2
m2

1.00
3.00
6.00
6.00

4.00 2
6.00 m

35.91 2.00
5.00

4.00
2.15
0.47
0.47
0.51
4.00
4.00

1.00
3.00
2.00
1.00
12.00
6.00
6.00

6.50

120
5.29
0.63
0.60
2.26
5
6.00
8.40
6

2.00

4.00

35.91
2.5060.91

0.80
1.20

4.00

47.374
94.748

4.50

m
2
4 m
m2
m2
m2
8
m2
2
9 m
2

m2
2.50
m2

10
5.00

2.00
2.00

6.00

3.00

4.00

m2
m2
m2
m2

202.22
404.43
13.00
5.00

5.00

1.00

2.00
13.00

1.00
1.00

1.50

4.00

4.00

32.50

m2

13.00
26.00

m2
m2

4.00
27.00
8.00
5.00

m2
m2
m2
m2

4.50

4.50

Void

2.00

4.00

18.00

2.00
6.00
4.00
2.50

1.00
1.00
1.00
1.00

2.00

4.00

0.80

1.50
4.00

1.00
1.00

1.20

3.00
16.00
4.00

5.00
13.00

m2
m2

4.00

2.00

6.00

14.50

0.80
5.00
2.50
5.00

1.00
1.00
1.00
1.00
1.00

1.68
25.00
5.00
1.68
15.00
182.86

m2
m2
m2
m2
m2
m2

Dimensi
t

Jumlah

(3)

0.12
2.00
0.12
1.00
0.12
1.00
Total Volume Kusen :
1.42
0.14
0.14

Unit

Volume

Satuan

(4)

(5)

(6)

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

23.00
43.00
25.00
12.00
9.00
11.60
20.00
9.00
11.60
16.00
180.20

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

1.00
1.00
1.00

0.034
0.011
0.011
0.056
2.982

m3
m3
m3
m3
m2
m2
m2
m2
m2
buah

1.00

2.00
2.00

1.00
1.00

Total Volume Kaca :


6.00

1.00

0.053
0.148
0.192
0.393
6.00

1.00

1.00

1.00

buah

2.00

1.00

2.00

buah

0.12
2.00
0.12
1.00
Total Volume Kusen :
1.42

3.00
3.00
3.00

0.087
0.020
0.107
9.798

m3
m3
m3
m2

3.00

3.00

9.00

buah

1.00

3.00

3.00

buah

1.00

3.00

3.00

buah

0.12
2.00
0.12
1.00
Total Volume Kusen :
0.72

3.00
3.00

0.087
0.018
0.105
4.536

m3
m3
m3
m2

3.00

2.00

3.00

6.00

buah

1.00

3.00

3.00

buah

1.00

3.00

3.00

buah

0.12
2.00
0.12
3.00
Total Volume Kusen :
0.57
1.00
0.57
1.00
Total Volume Daun jendela :
0.37
1.00
0.37
4.00
Total Volume Kaca :
2.00

2.00
2.00

2.00

0.065
0.029
0.094
0.422
1.995
2.417
0.141
1.006
1.147
4.00

m3 37
57
m3
37 3
m
37
m2
342
m
m2
2
175m
m2
m2
buah

2.00

2.00

4.00

buah

2.00

2.00

4.00
1.27

buah
m2

67

2.00
2.00
226

2.00
2.00

a:

0.12
2.00
0.12
3.00
Total Volume Kusen :
0.75
1.00
0.75
1.00
Total Volume Daun jendela :
0.57
1.00
0.57
4.00
Total Volume Kaca :
2.00

2.00
2.0037 19

0.065
57
75

3
m85
m3
m3
m2
m2
m2
m2
m2
m2
buah

2.00

0.037
0.102
57
0.555
2.625
3.180
0.217
1.550
1.767
4.00

2.00

2.00

4.00

buah

2.00

2.00

4.00
1.41

buah
m2

0.12
2.00
0.12
3.00
Total Volume Kusen :
0.60
1.00
0.60
1.00
Total Volume Daun jendela :
0.42
1.00
0.42
4.00

4.00
4.00

0.130
0.060
0.191
70
0.888
4.200
5.088
0.319
2.285

2.00
2.00
2.00
2.00

34

175

a:

4.00
4.00
4.00
4.00

226

226

m3
m3
42
3
m60
19 37 m2
2
m42
34 m2
m2
m2
175

19

a:

42
34
226

175 m2

Total Volume Kaca :


2.00

4.00

2.604
8.00

2.00

4.00

8.00

buah

2.00

4.00

8.00
2.48

buah
m2

buah

Dimensi

Unit

Volume

Satuan

(4)

(5)

(6)

0.12
3.00
0.12
3.00
Total Volume Kusen :
0.57
2.00
0.57
2.00
Total Volume Daun jendela :
0.37
2.00
0.37
8.00
Total Volume Kaca :
4.00

3.00
3.00

3.00

0.146
0.083
0.229
128
1.265
5.985
7.250
0.422
3.019
3.441
12.00

m3
m3
37
m3
57
m2
m2
37
m2
m2
m2
m2
buah

4.00

3.00

12.00

buah

4.00

3.00

12.00
3.81

buah
m2

0.12
4.00
0.12
3.00
Total Volume Kusen :
0.57
3.00
0.57
3.00
Total Volume Daun jendela :
0.37
3.00
0.37
12.00
Total Volume Kaca :
6.00

1.00
1.00

1.00

0.065
0.041
0.106
0.633
2.993
3.625
0.211
1.510
1.721
6.00

m3
m3
m3
m2
m2
m2
m2
m2
m2
buah

6.00

1.00

6.00

buah

6.00

1.00

6.00
1.90

buah
m2

0.12
2.00
0.12
2.00
Total Volume Kusen :
0.60
1.00

1.00
1.00
1.00

0.022
0.010
0.033
0.876

m3
m3
m3
m2

3.00

1.00

0.456

m2

2.00

1.00

2.00

buah

2.00

1.00

2.00

buah

2.00

1.00

2.00
0.42

buah
m2

Jumlah

(3)

3.00
3.00
3.00226
3.00

a:

1.00
1.00
1.00
1.00

a:

a:

0.40

19 37
34

175

1.00

0.067
0.067
0.135
2.993
0.280
3.273
1.480

m3
m3
m3
m2
m2
m2
m2

10.00

1.00

10.00

buah

10.00

1.00

10.00

buah

10.00

1.00

10.00
1.793

buah
m2

0.12
2.00
0.12
2.00
Total Volume Kusen :
0.57
2.00

2.00
2.00

0.014
0.019
0.033
0.912

m3
m3
m3
m2

0.12
3.00
0.12
2.00
Total Volume Kusen :
0.57
4.00

1.00
1.00

0.010
0.018
0.029
0.912

m3
m3
m3
m2

0.12
2.00
0.12
2.00
Total Volume Kusen :
0.27
1.00

12.00
12.00
12.00

0.088
0.064
0.152
1.3284

m3
m3
m3
m2

2.00
1.00
1.00

2.00
1.00
1.00

unit
m1
m1

18.00
9.00
11.00

18.00
9.00
11.00

titik
titik
titik

0.12
6.00
0.12
3.00
Total Volume Kusen :
0.57
5.00
0.56
25.00
Total Volume Daun jendela :
0.37
10.00

1.00
1.00
1.00
1.00

a:

4.00

2.00

Dimensi
t

Jumlah

(3)

Unit

Volume

Satuan

(4)

(5)

(6)

15.00
14.00

15.00
14.00

titik
titik
Pipa Air Kotor 2,5"

Pipa Air Bersih 3/4"

Pipa Air Kotor 2,5"

Pipa Air Bersih 3/4"

1.00
2.00
2.00
3.00
3.00
1.00

Pipa Air Bersih 3/4"

Pipa Air Kotor 2,5"

m
buah
buah
buah
buah
buah

68.29
2.00
2.00
3.00
3.00
1.00

Pipa Kotoran 4"

Pipa Kotoran 4"

Septictank

Septictank
Pipa Air Bersih 3/ 4"

Pipa Buangan Air 4"

1.00
3.00

Pipa Buangan Air 4"

Resapan

Ke Saluran

60.2
3.00

Resapan

DENAH SANI TASI


Skala 1 : 100

m1
buah

Ke Saluran

0.741
0.12
2.00
0.12
1.00
0.14
2.00
0.12
1.00
0.12
1.00
0.12
1.00
Volume total kuda - kuda K1 :

2
2.00
2.00
2.00
2.00
2.00
2.00

1.481312
0.374
0.062
0.121
0.050
0.059
0.075
0.741

m3
m3
m3
m3
m3
m3
m3
m3

0.313
0.12
2.00
0.12
1.00
0.14
2.00
0.12
1.00
0.12
1.00
0.12
1.00
Volume total kuda - kuda K2 :

2
2.00
2.00
2.00
2.00
2.00
2.00

0.626448
0.144
0.050
0.067
0.009
0.025
0.018
0.313

m3
m3
m3
m3
m3
m3
m3
m3

1.250
0.12
2.00
0.12
1.00
0.12
1.00
0.12
1.00
Volume total kuda - kuda K3 :

2
2.00
2.00
2.00
2.00

2.49944
0.115
0.048
0.013
0.020
0.196
1.250

m3
m3
m3
m3
m3
m3
m3

0.10

1.00

1.175

m3

1.00

Dari PDAM

1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00

261.86
261.86
51.81
72.71

m2
m2
m1
m1

0.1
0.45
0.25

64.98
5.415
45.125
10.83
36.55125
9.025

1
1
1
1
1
1

64.98
5.415
45.125
10.83
36.55125
9.025

m3
m3
m3
m3
m3
m3

180.5

32.49

32.49

m2

1.8
2.5
4

0.09522
0.13225
0.2116

4
2
16

0.38088
0.2645
3.3856

m3
m3
m3

1.8
2.5
4

3.312
4.6
7.36

4
2
16

0.8
2.3
3.8

9.848
11.063
212.116

1
1
1

13.248
9.2
117.76
140.208
9.848
11.063
212.116

m2
m2
m2
m2
m2
m2
m2

233.027

466.054

m2

0.15
64.5

1.25775
72.24

1
1

1.25775
72.24

m3
m2

200

160

160

m3

12
4
6

1
1
1

12
4
6

btg
btg
btg

0.6
0.05

Gambar Sket

18
6
2
25
19

16

16
1.5

17.5

210

Tanah dasar

140

210

Tanah dasar

120

0.00

45

100

75

140

120

75

2
0
0

3
0

Sloof 20/30

Tanah Urug

3
0

2 - 12
4 - 14
7 - 15

12 - 15
12 - 15
Lantai Cor 1 : 3 : 5
Pasir urug

Gambar Sket

2
0
0

3
0

Sloof 20/30

Tanah Urug

2 - 12
4 - 14
7 - 15

3
0

12 - 15
12 - 15
Lantai Cor 1 : 3 : 5
Pasir urug

45

60

0.00

30
65
75

100

30

20

35

25

40

35

25

13
13

13
13

Gambar Sket

1.28

0.19
0.18

4.00
2.45

4.50

2.00
5

2.00

6.00

3.00
4.00
2.50

Gambar Sket

4.00

4.00
2.45

3
5.50

6.50

Void

4.50

2
4

2.00

2.00
5

2.00

2.00

8
7

6.00

4.00

10

0.80
1.20

3.00
4.00

5.00

4.00

10.50

142

230
164
150
152

263

45
61 132

142
46

20 37

263

230

92

142

230

202

72

210

82

202

37
57

67

37
236

19
37

38

185

Gambar Sket

57
75
37

85

19
57

38
236

185

70

42 60
19
236

37
42
38

185

128

3955
37

19
39

38

185

236

128

39
55
19 37

196

39
42
145

311

236

39
55
37

19
39

38

185

57
20

67
47

57
128
47

20

57
20

Gambar Sket

130
113
102

80
22
31

110
R23
65

38

NO

NAMA
BOX PANEL

SAKLAR TUNGGAL

SAKLAR GANDA

4 STOP KONTAK

6 LP. SL 25 WATT

7 LP. SL 15 WATT (TANAM)

9 KABEL IN PUT

Pipa Air Bersih 3/4"

Pipa Air Kotor 2,5"

Pipa Air Bersih 3/4"

Pipa Kotoran 4"

Septictank

a Buangan Air 4"

Resapan

Dari PDAM
Ke Saluran

5 LP. SL 40 WATT

8 KABEL OUT PUT

Air Kotor 2,5"

SIMBOL BANYAKNYA

34 30
22

12
40
25

12
50

25

18

13

4.00

10 -15
10 -15

10 -15

4.50

2.00

10 -15

10 -15
2.00

10 -15

14.50

6.00

10 -15
10 -15

10 -15

4.00

35

25

40

35

25

13
13

13
13

30
20

Gambar Sket

4.00

4.50

2.00

2.00

6.00

4.00

14.50

Gambar Sket

5.00

2.00

4.00
6.00

3
6.50

4.50

2.00

2.00
2.00

8
7
6

4.00
0.80
1.20

10
2.50
4.00

6.00

5.00

2.50

3.00

4.00

164
150
152

142

210

236

128
3955
37

19
39

38

185

236

128

39
55
196

1937
39
42
145

128

39
55
196

145

37
57
19
37
34

175

39
42

37

1937

85

42
60
42

42

Gambar Sket

37
57
37

189

226

37
57
3719
37
34

175

40
60
70

156

38
146

311

156

37
57
40
105

56
2

57

67

20

47

57
128

20

47

37

4
1

51

27

NO

NAMA

SIMBOL BANYAKNYA

BOX PANEL

SAKLAR TUNGGAL

SAKLAR GANDA

4 STOP KONTAK

5 LP. SL 40 WATT

10

6 LP. SL 25 WATT

7 LP. SL 15 WATT (TANAM)

8 KABEL OUT PUT


9 KABEL IN PUT

Gambar Sket

or 2,5"

Pipa Air Bersih 3/4"

Pipa Air Kotor 2,5"

Pipa Air Bersih 3/4"

Pipa Kotoran 4"

eptictank

angan Air 4"

Resapan

Dari PDAM
Ke Saluran

Atap Genteng Metal


Rabung Genteng Keramik
Tiang Kuda-Kuda 6/12
Balo k Gapit 4/ 14
Sokong 6/12
Skor 6/12
Reng Genteng 3/4
Gording 5/10
Balok Tarik6/12
173

Kaki Kuda-kuda 6/12

50 0

20.0008

407

Atap Genteng Metal


Rabung Genteng Keramik
TiangKuda-Kuda 6/12
Sokong 6/12
Gapit 4/14
Reng Genteng
Kaki Kuda-kuda 6/12
Skor 6/12
Balok Kas au 5/ 7
Gording5/10
Sokong 6/12
Gapit 4/14

Lisplank Doubl e

100

130 0

100

AtapGenteng Metal
Rabung Gen ten g Keramik
Tiang K uda-Kuda 6/12
Kaki Kuda-kuda 6/12
Skor 6/12
Balok Tarik 6/ 12
K ayu Kasau 5/7

140

Gording 5/10

Lisplank

85

40 0

85

m2
m3

m1
m2
m3

Ukuran :
No

Deskripsi

Jumlah
Potongan

6 mm
Panjang

Jumlah
Pasangan

Ukuran :
Total (kg)

8 mm

Jumlah
Potongan

1 Pondasi Tapak
Pondasi Tapak P1

22

Pondasi Tapak P2

22

Panjang
1.02

1.020

Jumlah
Pasangan
4

15

2 Plat Lantai
(luas ruangan 4 x 4.5 m)

Jumlah besi/ 1m3 = 277.996/(4x4.5x1.2) = 12.87 kg/m3


Total besi plat lantai = 12.87 x 19.2 =
3 Sloof (20/30)
4 Lantai 1

658

0.840

Kolom tipe K1 (25/35)

22

1.020

24

Kolom tipe K2 (d = 40)

22

0.110

Kolom tipe K3 (13/13)

22

0.420

23

5 Lantai 2
Kolom tipe K1 (25/35)

20

0.420

20

Kolom tipe K2 (d = 40)

20

0.105

Kolom tipe K3 (13/13)

20

0.420

23

6 Balok
Balok 25/40

665

1.160

Balok 25/50

88

1.360

715

0.840

Balok 13/18

7 Ring balok 20/30

46

0.54

5.514

Ukuran :
Total (kg)

10 mm

Jumlah
Potongan

Panjang

Ukuran :

Jumlah
Pasangan

Total (kg)

Jumlah
Potongan

35.455

4
8
8
8

132.957

4
7
7
7

2
1
1
2
1
1

1.150
4.370
4.380
1.340
3.540
4.890

15
15
30
14
14
27

12 mm
Panjang
2.000
1.170
0.560
0.560

2.000
1.110
0.460
0.460

Ukuran :

Jumlah
Pasangan

Total (kg)

14

Jumlah
Potongan

Panjang

4
4
4
4

28.416
33.247
15.913
15.913
93.489

2.000

15
15
15
15

106.560
103.496
42.890
42.890
295.837

2.000

21.287
40.444
81.074
23.150
30.579
81.463
277.996

4.5x1.2) = 12.87 kg/m3


247.104 kg
218.324

131.460

212.731

4.250

24

362.304

4.250

4.250

4.000

4.000

304.703

133.000

47.274

17.500

1.912

83.945

4.250

23

241.247

66.360

4.000

20

284.160

1.659

76.314

237.237

4.000

6.800

23

227.056

16.782

143.000

888.888
TOTAL PEMBESIAN :

mm
Jumlah
Pasangan

Total (kg)

Total (kg)

38.720

261.152

15

145.200

869.831

247.104
1113.466

1331.791

24

493.680

1068.715

61.710

63.622

325.192

20

387.200

737.720

58.080

59.739

303.370

1448.370

1753.073

190.575

237.849

22.297

1126.125
:

8407.580

FAKTOR KONVERSI
Polos
P6
P8
P9
P 10
P 12
P 13
P 14
P 16
P 18
P 19
P 20
P 22
P 25
P 28
P 29

U
U
U
U
U
U
U
U
U
U
U
U
U
U
U

Ulir
6
8
9
10
12
13
14
16
18
19
20
22
25
28
29

(cm2)
0.288
0.503
0.636
0.758
1.131
1.327
1.540
2.011
2.545
2.835
3.142
3.801
4.909
6.157
6.605

(kg/m)
0.222
0.395
0.499
0.617
0.888
1.040
1.210
1.580
2.000
2.230
2.470
2.980
3.850
4.830
5.190

VOLUME BEKISTING :

No

Jenis Pekerjaan

Pondasi tapak
P1
P2

Dimensi

Panjang

Jumlah

25/35
120/120
25/25
100x100

4
4
15
15

Sloof

20/30

131.46

Kolom K1
Lantai I
Lantai II

25/35
25/35

4.25
4.00

24
20

Kolom K2
Lantai I
Lantai II

D=40
D=40

4.25
4.00

2
2

Kolom K3
Lantai I
Lantai II

13/13
13/13

4.25
4

23
23

Balok 25/40

25/40

133.00

Balok 25/50

25/50

17.5

Balok 13/18

13/18

6.80

Ring balok

20/30

143

10

Plat lantai (t=12)

159.99

11

Tangga
Plat tangga (T=15)

7.744

anak tangga

1.28x0.3
0.19x0.3

26
26

Perhitungan

Luas Unit

Luas total(m2)

2x(0.25+0.35)x2
4x1.2x0.3
2x(0.25+0.35)x2
4x1x0.3

2.4
1.44
2.4
1.2

9.6
5.76
36
18

2 x 0,30 x 131.46

78.876

[(2x0.35)+(2x0.25)] x 4.25
[(2x0.35)+(2x0.25)] x 4

5.10
4.80

122.4
96

Dx4.25
Dx4

5.338
5.024

10.676
10.048

4x0.13x4.25
4x0.13x4

2.21
2.08

50.83
47.84

[(0.28x2)+0.25]x133

107.73

[(0.38x2)+0.25]x17.5

1.766

[(0.18x2)+0.13]x6.8

3.332

[(0.3x2)+0.2]x143

114.4
159.99

7.744
0.384x26
[1/2x0.19x0.3]

TOTAL BEKISTING :

0.384
0.029
total

9.984
0.754
10.738
891.73

DAFTAR HARGA SATUAN


BAHAN BANGUNAN
DALAM
KOTA BANDA ACEH

LAMPIRAN - KEPUTUSAN GUBER


PROVINSI NANGGROE
ACEH DARUSSALAM
NOMOR : 028 /708 / 2012

NO.

NAMA JENIS BARANG

SATUAN

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

3
Lembar
Kg
Lembar
Lembar
Lembar
Kg
Kg
Lembar
Lembar
M2
Kg
Buah
Buah
Buah
Buah
Buah
Buah
Batang
Buah
M3
M3
M3
Buah
M3
M3
Btg
M2
M3
M3
M3
Buah
Liter
Kg
Kg
Buah
Kg
Buah
Buah

Acustic 30 x 60
Arang
Asbes Gelombang Besar
Asbes Gelombang kecil
Asbes Quality 1 x 1 m
Asphalt
Asphalt Semen Pen. 60/70 atau Pen 80/100
Atap Harflek
Atap Multroof / Elmiral
Atap Multroof / Elmiral
Baja Profil
Bak Cuci Piring Logam
Bak Cuci Tangan / Wastafel Keramik
Bak Kontrol + Instalasi
Bak Mandi Fibre
Bak Mandi Plastik
Bak Mandi Porselin
Bambu
Bataco
Batu ( >1000 ) Kg - Material Water Break
Batu ( 250 - 1000) Kg - Material Water Break
Batu (< 250) Kg - Material Water Break
Batu Bata
Batu Kali / Batu Belah (Sungai / Gunung)
Bed Matress (Terrafix)
Batang Kelapa
Bitumen Geomembran Type ES.1
Batu Pakhlag (Batu 5-7 cm)
Batu Pecah 2-3 cm
Batu Tempel
Baut Kap 1/2 - 8
Bensin (Industri)
Besi Beton Polos
Besi Beton Ulir
Besi Bout (Kuda-Kuda) 5/8 - 10
Besi Strip
Beton Rooster / Kerawang
Boks Panel + Instalasi

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

Bubungan Genteng
Bubbungan Seng
Buis Beton 10 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Tanah 10 cm
Buis Tanah 20 cm
Cat Kayu Dasar
Cat Kayu Mengkilat
Cat Marka Jalan (Non Thermoplast)
Cat Menie Besi
Cat Tembok
Dempul Kayu
Elektroda
Engsel Jendela
Engsel Pintu
Espagnolet
Floor Drain
Filler
Geosand Bag (2,4 m 1,45 m)

M'
M'
Buah
Buah
Buah
Buah
Buah
Kg
Kg
Kg
Kg
Kg
Kg
Buah
Pasang
Pasang
Buah
Buah
Kg
Bag

59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106

Geotube (P + 20 m, T + 1,5 m, L + 1,8 m)


Genteng Beton
Genteng Keramik
Glass Block
Glass Block
Gypsum Board tebal 9 mm
Gip Sum (120 x 240 cm) Tebal 1,2 cm
Grendel Jendela / Pintu
Gravel
Hak Angin
Ijuk
Kaca Bening Uk. 2 mm
Kaca Bening Uk. 3 mm
Kaca Bening Uk. 5 mm
Kaca Rayband Uk. 3 mm
Kaca Rayband Uk. 5 mm
Kapur Batu
Kapur Sirih
Karpus Asbes Gelombang Besar
Karpus Asbes Gelombang Kecil
Karpus Genteng Beton
Karpus Genteng Keramik
Kawat Beton
Kawat Bronjong 3 mm
Kawat Bronjong 4 mm
Kawat Bronjong 5 mm
Kawat Bronjong Pabrikan Uk. (1,5 x 1 x 1)
Kawat Bronjong Pabrikan Uk. (2 x 1 x 1)
Kawat Bronjong Pabrikan Uk. (3 x 1 x 0,5)
Kawat Bronjong Pabrikan Uk. (2 x 1 x 0,5)
Kawat Bronjong Pabrikan Uk. (4 x 1 x 0,5)
Kawat Bronjong Pabrikan Uk. (3 x 1,5 x 0,5)
Kawat Bronjong Pabrikan Uk. (3 x 1 x 1)
Kawat Bronjong Pabrikan Uk. (4 x 1 x 1)
Kawat Bronjong Pabrikan Uk. (4 x 2 x 0,5)
Kawat Bronjong Pabrikan Uk. (4 x 2 x 0,25)
Kawat Bronjong Pabrikan Uk. (3 x 1,5 x 1)
Kawat Duri
Kawat Harmonika
Kawat Nyamuk / Kasa Logam
Kawat Nyamuk / Kasa Plastik
Kayu Bakar
Kayu Bakau 10 cm
Kayu Kelas I (Seumantok / Ulin / dll)
Kayu Kelas II (Kamper / Kruing / dll)
Kayu Kelas III (Borneo / dll)
Papan Kayu Kelas III
Kayu kelas IV (Sengo / dll)

Tube
Keping
Keping
M2
Buah
Lbr
Lembar
Buah
M3
Buah
Kg
M2
M2
M2
M2
M2
Kg
Kg
M'
M'
M'
M'
Kg
Kg
Kg
Kg
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Lembar
Kg
M2
M2
M2
M2
Batang
M3
M3
M3
Lbr
M3

107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123

Keramik 20 X 20 cm
Keramik Dinding 20 X 25 cm
Keramik Sisi Kulit Jeruk 20 x 20
Keramik Uk. 30 x 30 cm
Keramik Uk. 40 x 40 cm
Keramik Uk. 60 x 60 cm
Kerosen/Minyak Tanah (Industri)
Kerosen/Minyak Tanah (Subsidi)
Kertas Amplas
Kloset Duduk keramik
Kloset Jongkok Keramik
Krawang Ventilasi
Krawang Ventilasi
Kran Standar
Kunci Putar
Lampu SL 25
Lampu SL 15 Watt

Bh
Bh
M2
M2
M2
M2
Liter
Liter
Lembar
Buah
Buah
Buah
M2
Buah
Buah
Buah
Buah

124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172

lampu TL 20 Watt
Lampu TL 40 Watt
Lampu DL 20 Watt
Lampu SL 40 Watt
Lem Aibon
Lem Kayu
Lempengan Rumput
List Eternit Kayu
Marmer
Minyak Cat
minyak Bekisting
Multipleks 3 mm
Multipleks 4 mm
Multipleks 6 mm
Multipleks 9 mm
N a c o (Kerangka + Daun)
Nok / Rabung Seng 0.35 Cat Pabrik
Nok / Rabung Seng 0.35 Tidak Dicat
Oksigen
Pagar besi
Paku Asbes
Paku Beton 8 inchi
Paku Kait
Paku Kayu
Paku Reng
Paku Seng
Paku Sumbat
Paku Ulir Primadek
Pasang Batu Alam
Pasir Batu (Sirtu) - Material Jalan
Pasir Beton / Kerikil
Pasir Pasang
Pasir Urug
Paving Block
Pelumas / Oil
Peresapan + Instalasi
Pintu Pagar Besi 450 x 155
Pipa Leiding 1" Galvanis Tebal 3,2 mm
Pipa Leiding " Galvanis Tebal 3,2 mm
Pipa Leiding 1" Galvanis Tebal 3,2 mm
Pipa Leiding 2" Galvanis Tebal 3,2 mm
Pipa Leiding 3" Galvanis Tebal 3,2 mm
Pipa Leiding 4" Galvanis Tebal 3,2 mm
Pipa Leiding 6" Galvanis Tebal 3,2 mm
Pipa PVC 1"
Pipa PVC " Kualitas A WE (United)
Pipa PVC 1"
Pipa PVC 2"
Pipa PVC 3"

Buah
Buah
Buah
Buah
Buah
Kg
M2
M'
M2
Liter
Liter
Lembar
Lembar
Lembar
Lembar
M2
Lembar
Lembar
M3
M'
Kg
Kotak
Buah
Kg
Kg
Kg
Buah
Buah
M2
M3
M3
M3
M3
M2
Liter
Unit
Unit
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Batang

173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220

Pipa PVC "


Pipa PVC 4"
Plamur Tembok
Plin Keramik 15 x 30
Plin Ubin Abu-Abu 15 x 20
Plin Ubin Berwarna 15 x 20
Plin Ubin Teraso 10 x 30
Porselin 10 x 15
Porselin 11 x 11
Porselin 15 x 15
Porselin 20 x 20
Profil Kusen Alumunium
Ramset
Relling Tannga
Residu
Rabung Seng
Reservoir Air 1 m3 Fibre
Reservoir Air 0,5 m3 Stainless Steel
Reservoir Air 1 m3 Stainless Steel
Schakelar merek Braco
Schakelar Ganda merek Braco
Semen @ 40 Kg
Semen @ 50 Kg
Semen Putih @ 50 Kg
Semen Warna 40 Kg
Seng BJLS 0,20
Seng BJLS 0,20 Cat Pabrik
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30 Cat Pabrik
Seng Plat BJLS 20
Seng Plat BJLS 30
Septicktank + Instalasi
Solar (Industri)
Stop Kontak + Instalasi
Stut Werk (Ska Folding)
Sumur + Pompa Tangan Terpasang
Tanah Timbun
Tanah Timbun Pilihan - Material Jalan
Teralis Besi
Titik Lampu + Instalasi
Ubin Abu-Abu 20 x 20
Ubin Berwarna 20 x 20
Ubin Teraso 20 x 20
Ubin Wafel 20 x 20
Urinoir Keramik
VInyl
Wayer Mess (Ulir) Dia 5.0
Wayer Mess (Ulir) Dia 6.0

Batang
Batang
Kg
Buah
Buah
Buah
Buah
M2
M2
M2
M2
m'
bh
M'
liter
Lembar
Buah
Buah
Buah
Buah
Buah
Zak
Zak
Zak
Zak
M2
M2
M2
M2
M2
M2
Unit
Liter
Titik
M3
Buah
M3
M3
M2
Titik
M2
M2
M2
M2
Buah
M2
M
M

221
222
223
224
225
226
227
228
229
230
231
232
233
234
235

Zakering (Kast Lokal 1 Zakering)


Zakering (Kast Lokal 2 Zakering)
Zakering (Kast Lokal 3 Zakering)
Geotekstil Non Woven
Ekor Tupai
Bunga Lily
Bunga Bugenvile
Gebalan Rumput
Palem
Air
Plywood tebal 9 mm
Kayu Dolken / Galam 8-10 cm / 4 m )
Besi Baut (Kuda-Kuda) 5/8 - 10 "
Kabel input
Kabel output

Buah
Buah
Buah
M2
Btg
Btg
Btg
m2
btg
Liter
Lbr
Btg
Buah
M
M

DAFTAR UPAH KERJA


DALAM DAERAH KOTA - BANDA ACEH
NO.
1

URAIAN TENAGA
Mandor

SATUAN
Orang

2
3
4
5
6
7
8
9
10
11
12

Kepala Tukang Kayu / Cat


Tukang Kayu / Cat
Laden Tukang Kayu / Cat
Kepala Tukang Batu / Besi
Tukang Batu / Besi
Laden Tukang Batu / Besi
Pekerja Galian Tanah
Penjaga Malam / Satpam
Penyelam
Supir
Operator

Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang

LAMPIRAN - KEPUTUSAN GUBERNUR


PROVINSI NANGGROE
ACEH DARUSSALAM
NOMOR : 028 /708 / 2012

HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(Rp.)
4.00
184,200.00
3,300.00
75,600.00
75,100.00
19,100.00
14,400.00
14,200.00
81,700.00
88,400.00
65,000.00
32,500.00
709,700.00
600,400.00
380,000.00
2,136,900.00
1,861,100.00
2,481,500.00
38,500.00
5,100.00
269,900.00
220,400.00
211,400.00
600.00
165,000.00
95,500.00
280,000.00
185,000.00
183,400.00
529,300.00
206,600.00
4,000.00
9,700.00
15,200.00
28,400.00
11,600.00
14,000.00
8,600.00
202,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

64,000.00
29,900.00
37,600.00
49,900.00
68,500.00
30,000.00
42,500.00
30,300.00
45,600.00
68,500.00
25,800.00
30,400.00
20,300.00
22,500.00
22,600.00
30,000.00
151,500.00
20,700.00
1,300.00
525,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

75,000,000.00
6,400.00
16,500.00
425,000.00
17,000.00
68,000.00
75,600.00
13,300.00
131,700.00
16,100.00
14,700.00
67,900.00
102,100.00
121,100.00
111,200.00
134,800.00
6,400.00
4,100.00
98,000.00
83,000.00
57,100.00
92,500.00
22,400.00
20,100.00
22,400.00
23,700.00
515,000.00
623,500.00
553,000.00
489,000.00
791,500.00
809,500.00
894,500.00
1,172,000.00
1,171,500.00
1,167,000.00
1,171,500.00
11,900.00
17,900.00
17,900.00
7,300.00
758,300.00
55,700.00
5,613,100.00
4,247,800.00
3,792,500.00
75,850.00
3,489,200.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,100.00
3,000.00
37,200.00
44,700.00
46,900.00
54,200.00
7,700.00
3,200.00
2,200.00
1,774,700.00
136,200.00
10,000.00
250,000.00
18,500.00
135,000.00
80,000.00
39,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

90,700.00
121,100.00
70,500.00
92,000.00
25,700.00
19,500.00
33,800.00
6,200.00
575,900.00
21,600.00
8,000.00
64,900.00
83,100.00
113,600.00
174,200.00
312,300.00
72,200.00
51,700.00
420,300.00
220,000.00
13,300.00
16,200.00
1,200.00
17,300.00
12,000.00
17,900.00
1,200.00
4,000.00
120,000.00
280,400.00
132,500.00
130,000.00
127,300.00
92,500.00
45,200.00
1,580,000.00
6,500,000.00
155,400.00
87,100.00
200,400.00
333,500.00
576,200.00
907,000.00
1,486,500.00
85,100.00
42,100.00
108,400.00
142,800.00
156,700.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

34,700.00
318,300.00
14,700.00
16,100.00
1,200.00
4,100.00
6,400.00
150,000.00
150,000.00
150,000.00
150,000.00
43,000.00
9,000.00
115,000.00
3,300.00
37,300.00
2,578,900.00
1,972,000.00
3,185,600.00
25,700.00
35,000.00
52,500.00
65,800.00
128,700.00
105,000.00
39,300.00
42,000.00
53,100.00
67,900.00
47,600.00
66,000.00
570,000.00
9,100.00
160,700.00
2,721,100.00
1,254,500.00
60,400.00
143,800.00
416,100.00
143,800.00
47,600.00
47,600.00
47,600.00
47,600.00
1,137,600.00
186,800.00
37,000.00
42,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA (Rp.)
Rp

145,900.00
186,800.00
271,500.00
48,900.00
25,000.00
30,000.00
25,000.00
12,000.00
30,000.00
100.00
98,000.00
12,000.00
11,600.00
20,000.00
20,000.00

75,800.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

101,200.00
84,200.00
56,900.00
107,200.00
84,200.00
56,900.00
53,100.00
47,800.00
129,700.00
86,800.00
129,700.00

NO

ANALISA

1.0.0.0.0 PEKERJAAN PERSIAPAN


1.1.0.0.0 Pagar Sementara
RSNI T-12-2002-B2

1.2.0.0.0

1.3.0.0.0

1.4.0.0.0

URAIAN

1m' Pagar sementara dari seng gelombang tinggi 2 m

Pembersihan Lapangan
RSNI T-12-2002-B8

1 M2 Membersihkan Lapangan dan Perataan

Pemasangan Bowplank
RSNI T-12-2002-B4

1 M' Pengukuran dan Pemasaangan Bowplank

Barak Kerja
RSNI T-12-2002-B9

1 m2 Barak Kerja

2.0.0.0.0 PEKERJAAN TANAH


2.1.0.0.0 Galian Tanah
2.1.1.0.0 Pondasi Tapak (120 x 120)
SNI 2835:2008-6.2

2.1.2.0.0

2.1.3.0.0

2.2.0.0.0
2.2.1.0.0

2.2.2.0.0

2.2.3.0.0

1 M3

Galian Tanah Biasa Sedalam 2 m

Pondasi Tapak (100 x 100)


SNI 2835:2008-6.2

1 M3

Galian Tanah Biasa Sedalam 2 m

Pondasi Menerus
SNI 2835:2008-6.1

1 M3

Urugan Pasir di Bawah Pondasi


Urugan Pasir Pondasi Tapak (120 x 120)
1 M3
SNI 2835:2008-6.11

Urungan Pasir di Bawah Pondasi

Urugan Pasir Pondasi Tapak (100 x 100)


1 M3
SNI 2835:2008-6.11

Urungan Pasir di Bawah Pondasi

Urugan Pasir Pondasi Menerus


SNI 2835:2008-6.11

Urungan Pasir di Bawah Pondasi

1 M3

2.3.0.0.0
2.3.1.0.0

Urugan Tanah Kembali


Urugan Kembali Pondasi Tapak (120x120)
1 M3
SNI 2835:2008 6.10.a

2.3.2.0.0

Urugan Kembali Pondasi Tapak (100x100)

2.3.3.0.0

2.4.0.0.0

2.5.0.0.0

SNI 2835:2008 6.10.a

1 M3

Urugan Kembali Pondasi Menerus


SNI 2835:2008 6.10.a

1 M3

Urugan Pasir Lantai


SNI 2835:2008-6.11

1 M3

Urungan Pasir di Bawah Pondasi

Urugan Tanah di Bawah Lantai


SNI 2835:2008 6.10.a

1 M3

Urugan Tanah

3.0.0.0.0
3.1.0.0.0
3.1.1.0.0
3.1.1.1.0

KONSTRUKSI LANTAI I
Pekerjaan Struktur
Pondasi Tapak
Anstamping Pondasi Tapak tipe 1 (120x120)
1 M3 Pasang Pondasi Batu Kosong (Aanstamping)
SNI 2836:2008-6.9

3.1.1.2.0
3.1.1.2.1

Pondasi Tapak P1 (120x120)


Beton
SNI 7394:2008-6.8

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

3.1.1.2.2

3.1.1.2.3

3.1.1.2.4

Pembesian / Tulangan
SNI 7394:2008-6.17.a

1 Kg Pembesian dengan Besi Polos

Bekisting
SNI 7394:2008-6.20

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Pasang Bekisting untuk Pondasi

3.1.1.3.0

Anstamping Pondasi Tapak tipe 2 (100x100)


1 M3 Pasang Pondasi Batu Kosong (Aanstamping)
SNI 2836:2008-6.9

3.1.1.4.0
3.1.1.4.1

Pondasi Tapak P2
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.a

1 Kg Pembesian dengan Besi Polos

3.1.1.4.2

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

3.1.1.4.3

3.1.1.4.4

3.1.2.0.0
3.1.2.1.0

3.1.2.2.0

3.1.3.0.0
3.1.3.1.0
3.1.3.1.1

Bekisting
SNI 7394:2008-6.20

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Pasang Bekisting untuk Pondasi

Pekerjaan pasangan pondasi batu gunung


Pemasangan Aanstamping
1 M3
SNI 2836:2008-6.9

Pasang Pondasi Batu Kosong (Aanstamping)

Pemasangan Batu Gunung


SNI 2836:2008-6.1

1 M3

Pasang Pondasi Batu Kali 1 Pc : 3 Pp

Sloof
Sloof 20/30
Beton
SNI 7394:2008-6.8

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

3.1.3.1.2

3.1.3.1.3

3.1.3.1.4

3.1.4.0.0
3.1.4.1.0
3.1.4.1.1

3.1.4.1.2

Pembesian / Tulangan
SNI 7394:2008-6.17.a

1 Kg Pembesian dengan Besi Polos

Bekisting
SNI 7394:2008-6.21

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Kolom
Kolom tipe K1
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Pasang Bekisting untuk Sloof

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

3.1.4.1.3

3.1.4.1.4

3.1.4.2.0
3.1.4.2.1

3.1.4.2.2

3.1.4.2.3

Bekisting
SNI 7394:2008-6.22

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Kolom tipe K2
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.22

1 M2

Pasang Bekisting untuk Kolom

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Pasang Bekisting untuk Kolom

3.1.4.2.4

3.1.4.3.0
3.1.4.3.1

3.1.4.3.2

3.1.4.3.3

3.1.4.3.4

3.1.5.0.0

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Kolom Tipe K3
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.22

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Pekerjaan Tangga

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Pasang Bekisting untuk Kolom

3.1.5.1.0
3.1.5.1.1

3.1.5.1.2

3.1.5.1.3

3.2.0.0.0
3.2.1.0.0
3.2.1.1.0

3.2.1.2.0
3.2.1.2.1

Plat Tangga
Beton
SNI 7394:2008-6.8

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Bekisting
SNI 7394:2008-6.23

1 M2

Pasang Bekisting untuk Balok

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Pekerjaan Arsitektur
Pekerjaan Lantai
Beton cor 1 : 3 : 5
SNI 2002 6.5

1 M3 Membuat Lantai Cor 1 : 3 : 5

Pemasangan keramik lantai


Lantai keramik 40/40
SNI 7395:2008-6.11

1 M2

Pasang Lantai Keramik 40 x 40 cm

3.2.1.2.2

3.2.1.3.0

3.2.1.4.0

3.2.2.0.0
3.2.2.1.0

Lantai Keramik 20/20


SNI 7395:2008-6.36

1 M2

Pasang Lantai Keramik 20 x 20 cm

Lantai Keramik Lantai kamar mandi 20/20


SNI 7395:2008-6.36
1 M2

Pasang Lantai Keramik 20 x 20 cm

Lantai Keramik Tangga 20/20


SNI 7395:2008-6.36

1 M2

Pasang Lantai Keramik 20 x 20 cm

Dinding
Pasangan bata 1:2
SNI 6897:2008-6.7

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x2

3.2.2.2.0

3.2.2.3.0

3.2.2.4.0

3.2.2.5.0

3.2.2.6.0

Pasangan Bata 1:4


SNI 6897:2008-6.9

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x2

Pasangan bata 1:2 kamar mandi


1 M2
SNI 6897:2008-6.7

Pasangan Dinding Bata Merah ukuran (5x11x2

Pasangan Bata 1:4 kamar mandi


SNI 6897:2008-6.9
1 M2

Pasangan Dinding Bata Merah ukuran (5x11x2

Plaster Dinding 1/2 Bata 1:2


SNI 2837:2008-6.2

1 M2

Plesteran 1 Pc : 2 Ps, Tebal 15 mm

Plaster Dinding 1/2 Bata 1:4


SNI 2837:2008-6.4

1 M2

Plesteran 1 Pc : 4 Ps, Tebal 15 mm

3.2.3.0.0
3.2.3.1.0

3.2.3.2.0

3.2.4.0.0
3.2.4.1.0
3.2.4.1.1

3.2.4.1.2

3.2.4.1.3
3.2.4.1.4
3.2.4.1.5
3.2.4.1.6

Plafond
Plafond Gypsum t=6 mm
SNI 2839:2008-6.8a

1 M2 Langit-langit Gypsum board + Rangka Alumun

List Profil
SNI 2839 : 2008 - 6.10

1 M1 list langit-langit kayu profil

Pintu dan Jendela


Pintu tipe P1
Kusen
SNI 3434:2008-6.2

1 M3

Daun Pintu
SNI 3434:2008-6.5

1 M Pekerjaan Daun Pintu Panel, Kayu Kelas I atau K

Kaca bening 5 mm
Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.2.0
3.2.4.2.1

3.2.4.2.2

3.2.4.2.3
3.2.4.2.4
3.2.4.2.5
3.2.4.2.6
3.2.4.4.0
3.2.4.4.1

3.2.4.4.2

3.2.4.4.3
3.2.4.4.4
3.2.4.4.5
3.2.4.5.0
3.2.4.5.1

Pintu tipe P2
Kusen
SNI 3434:2008-6.2

1 M3

Daun Pintu
SNI 3434:2008-6.5

1 M

Kaca bening 5 mm
Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)
Pintu tipe P4
Kusen
SNI 3434:2008-6.2

1 M3

Daun Pintu
SNI 3434:2008-6.5

1 M Pekerjaan Daun Pintu Panel, Kayu Kelas I atau K

Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)
Pintu tipe P5
Kusen

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

SNI 3434:2008-6.2

1 M3

Daun Pintu
SNI 3434:2008-6.5

1 M Pekerjaan Daun Pintu Panel, Kayu Kelas I atau K

3.2.4.5.3
3.2.4.5.4
3.2.4.5.5
3.2.4.5.0
3.2.4.5.1

Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)
Jendela tipe J1
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.5.4
3.2.4.5.5
3.2.4.5.6
3.2.4.6.0
3.2.4.6.1

Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J2
Kusen
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.6.4
3.2.4.6.5
3.2.4.6.6
3.2.4.7.0

Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe J3

3.2.4.5.2

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.7.1

SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.7.4
3.2.4.7.5
3.2.4.7.6
3.2.4.8.0
3.2.4.8.1

Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe J4
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.8.4
3.2.4.8.5
3.2.4.8.6
3.2.4.9.0
3.2.4.9.1

Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe J5
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.9.4
3.2.4.9.5
3.2.4.9.6
3.2.4.10.0
3.2.4.10.1

Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe J6
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.11.0
3.2.4.11.1

ventilasi tipe V1
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.12.0
3.2.4.12.1

ventilasi tipe V2
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.2.4.13.0
3.2.4.13.1

ventilasi atas teras


SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

3.3.0.0.0

Mechanical dan Electrical


Taksir

3.4.0.0.0

Pekerjaan Sanitasi
Taksir
KONSTRUKSI LANTAI 2
Pekerjaan Struktur
Balok Lantai
Balok (25/40)
Beton
SNI 7394:2008-6.8

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

4.0.0.0.0
4.1.0.0.0
4.1.1.0.0
4.1.1.1.0
4.1.1.1.1

4.1.1.1.2

4.1.1.1.3

4.1.1.1.4

4.1.1.2.0
4.1.1.2.1

4.1.1.2.2

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.23

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Balok lantai (25/50)


Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Pasang Bekisting untuk Balok

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

4.1.1.2.3

4.1.1.2.4

4.1.1.3.0
4.1.1.3.1

4.1.1.3.2

4.1.1.3.3

Bekisting
SNI 7394:2008-6.23

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Balok lantai (13/18)


Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.23

1 M2

Pasang Bekisting untuk Balok

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Pasang Bekisting untuk Balok

4.1.1.3.4

4.1.2.0.0
4.1.2.1.0

4.1.2.2.0

4.1.2.3.0

4.1.2.4.0

4.1.3.0.0
4.1.3.1.0

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Plat lantai
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.24

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Kolom
Kolom tipe K1

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Pasang Bekisting untuk Lantai

4.1.3.1.1

4.1.3.1.2

4.1.3.1.3

4.1.3.1.4

4.1.3.2.0
4.1.3.2.1

Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.22

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Kolom tipe K2
Beton
SNI 7394:2008-6.8

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Pasang Bekisting untuk Kolom

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

4.1.3.2.2

4.1.3.2.3

4.1.3.2.4

4.1.3.3.0
4.1.3.3.1

4.1.3.3.2

4.1.4.3.3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.22

1 M2

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Kolom tipe K3
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting

Pasang Bekisting untuk Kolom

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

4.1.4.3.4

4.1.4.0.0
4.1.4.1.1

4.1.4.1.2

4.1.4.1.3

SNI 7394:2008-6.22

1 M2

Pasang Bekisting untuk Kolom

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Ringbalk (20/30)
Beton
SNI 7394:2008-6.8

1 M3

Pembesian / Tulangan
SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir

Bekisting
SNI 7394:2008-6.23

1 M2

Beton mutu f'c = 21,7 Mpa (K-250), slump (12

Pasang Bekisting untuk Balok

4.1.4.1.4

4.2.0.0.0
4.2.1.0.0
4.2.1.1.0

4.2.1.2.0
4.2.1.2.1

4.2.1.2.2

4.2.1.3.0

Pemeliharaan
Analisa Beton

1 M2 Membongkar Cetakan dan Menyiram Beton

Pekerjaan Arsitektur
Lantai
Beton cor 1 : 3 : 5
SNI 2002 6.5

1 M3 Membuat Lantai Cor 1 : 3 : 5

Pemasangan keramik lantai


Lantai keramik 40/40
SNI 7395:2008-6.35

1 M2

Pasang Lantai Keramik 40 x 40 cm

Lantai Keramik 20/20


SNI 7395:2008-6.36

1 M2

Pasang Lantai Keramik 20 x 20 cm

Lantai Keramik Kamar Mandi 20/20


SNI 7395:2008-6.36
1 M2

Pasang Lantai Keramik 20 x 20 cm

4.2.2.0.0
4.2.2.1.0

4.2.2.2.0

4.2.2.3.0

4.2.2.4.0

4.2.2.5.0

Dinding
Pasangan bata 1:2
SNI 6897:2008-6.7

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x2

Pasangan Bata 1:4


SNI 6897:2008-6.9

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x2

Pasangan bata 1:2 kamar mandi


1 M2
SNI 6897:2008-6.7

Pasangan Dinding Bata Merah ukuran (5x11x2

Pasangan Bata 1:4 kamar mandi


1 M2
SNI 6897:2008-6.9

Pasangan Dinding Bata Merah ukuran (5x11x2

Plester Dinding 1/2 Bata 1:2


SNI 2837:2008-6.2

Plesteran 1 Pc : 2 Ps, Tebal 15 mm

1 M2

4.2.2.6.0

4.2.3.0.0
4.2.3.1.0

4.2.3.2.0

4.2.4.0.0
4.2.4.1.0
4.2.4.1.1

Plester Dinding 1/2 Bata 1:4


SNI 2837:2008-6.4

1 M2

Plafond
Plafond Gypsum t=6 mm
SNI 2839:2008-6.8a

1 M2 Langit-langit Gypsum board + Rangka Alumun

List Profil
SNI 2839 : 2008 - 6.10

1 M1 list langit-langit kayu profil

Pintu dan Jendela


Pintu tipe P3
Kusen
SNI 3434:2008-6.2

1 M3

Plesteran 1 Pc : 4 Ps, Tebal 15 mm

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.1.2

4.2.4.1.3
4.2.4.1.4
4.2.4.1.5
4.2.4.1.6
4.2.4.2.0
4.2.4.2.1

4.2.4.2.2

4.2.4.2.3
4.2.4.2.4
4.2.4.2.5
4.2.4.3.0
4.2.4.3.1

4.2.4.3.2

Daun Pintu
SNI 3434:2008-6.5

1 M

Kaca Bening 5 mm
Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)
Pintu tipe P4
Kusen
SNI 3434:2008-6.2

1 M3

Daun Pintu
SNI 3434:2008-6.5

1 M

Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)
Pintu tipe P5
Kusen
SNI 3434:2008-6.2

1 M3

Daun Pintu

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.3.3
4.2.4.3.4
4.2.4.3.5
4.2.4.4.0
4.2.4.4.1

SNI 3434:2008-6.5

1 M

Engsel Pintu
Kunci Pintu
Pegangan Pintu (Grendel)
Jendela tipe JA
Kusen
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.4.3
4.2.4.4.4
4.2.4.4.5
4.2.4.4.6
4.2.4.5.0
4.2.4.5.1

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe JB
Kusen
SNI 3434:2008-6.2

4.2.4.5.3
4.2.4.5.4
4.2.4.5.5
4.2.4.5.6
4.2.4.6.0
4.2.4.6.1

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe JC
Kusen
SNI 3434:2008-6.2

4.2.4.6.3
4.2.4.6.4
4.2.4.6.5
4.2.4.6.6
4.2.4.7.0
4.2.4.7.1

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe JD
Kusen
SNI 3434:2008-6.2

4.2.4.7.3
4.2.4.7.4
4.2.4.7.5
4.2.4.7.6
4.2.4.8.0
4.2.4.8.1

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin
jendela tipe JE
Kusen
SNI 3434:2008-6.2

4.2.4.8.3
4.2.4.8.4
4.2.4.8.5
4.2.4.8.6
4.2.4.9.0
4.2.4.9.1

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JF
Kusen
SNI 3434:2008-6.2

4.2.4.9.3
4.2.4.9.4
4.2.4.9.5
4.2.4.9.6

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.10.0
4.2.4.10.1

jendela tipe JG
Kusen
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.10.3
4.2.4.10.4
4.2.4.10.5
4.2.4.10.6
4.2.4.11.0
4.2.4.11.1

Kaca Bening 3 mm
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.12.0
4.2.4.12.1

Ventilasi tipe V2
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.2.4.13.0
4.2.4.13.1

Ventilasi tipe V3
SNI 3434:2008-6.2

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Ka

4.3.0.0.0

Mechanical dan Electrical


Taksir

4.4.0.0.0

Pekerjaan Sanitasi
Taksir

5.0.0.0.0
5.1.0.0.0
5.1.1.0.0

KONSTRUKSI ATAP
Rangka Atap
Pemasangan Kuda- Kuda Tipe K1
SNI 3434:2008-6.13

1 M Pekerjaan Konstruksi Kuda-kuda Konvensional,

Pemasangan Kuda Kuda Tipe K2


SNI 3434:2008-6.13

1 M Pekerjaan Konstruksi Kuda-kuda Konvensional,

Pemasangan Kuda Kuda Tipe K3


SNI 3434:2008-6.13

1 M Pekerjaan Konstruksi Kuda-kuda Konvensional,

Pemasangan Penutup Atap


Gording
SNI 3434:2008-6.15

1 M Pekerjaan Konstruksi Gordeng, Kayu Kelas II

5.1.2.0.0

5.1.3.0.0

5.1.4.0.0
5.1.4.1.0

5.1.4.2.0

Pemasangan kasau + reng genteng


SNI 3434:2008-6.16
1 M Rangka Atap Genteng Keramik, Kayu Kelas II

5.1.4.4.0

5.1.4.5.0

6.0.0.0.0
6.1.0.0.0
6.1.1.0.0

6.1.2.0.0

6.1.3.0.0

6.1.4.0.0

Rabung Atap
SNI 3434:2008-6-39

1M'

Lisplank
SNI 3434:2008-6.22

1 M Pekerjaan Lisplank (3 x 30) cm, Kayu Kelas I ata

Landscape
Pekerjaan Pagar
Galian Tanah Pondasi Menerus
I.SNI 2835:2008-6.1

1 M3

Galian Tanah Biasa Sedalam 1 m

Urugan Pasir di Bawah Pondasi


SNI 2835:2008-6.11

1 M3

Urungan Pasir di Bawah Pondasi

Urugan Tanah Kembali


SNI 2835:2008 6.10.a

1 M3 Urugan Kembali Pondasi Menerus

Pemasangan Anstamping
SNI 2836:2008-6.9

1 M3

Pasang Pondasi Batu Kosong (Aanstamping)

6.1.5.0.0

6.1.6.0.0

6.1.7.0.0

6.1.8.0.0

6.1.9.0.0

Pemasangan Batu Gunung


SNI 2836:2008-6.1

1 M3

Pasang Pondasi Batu Kali 1 Pc : 3 Pp

Sloof 20/25
Analisa Beton 11.1

1 M3

Mengerjakan Sloof (20 x 30 ) cm

Kolom 23/23
Analisa Beton 12.1

1 M3

Mengerjakan Kolom (13 x 13)

Dinding Pagar
SNI 6897:2008-6.9

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x2

Plesteran
SNI 2837:2008-6.4

1 M2

Plesteran 1 Pc : 4 Ps, Tebal 15 mm

6.1.10.0.0

6.2.0.0.0

6.3.0.0.0

Ringbalk
Analisa Beton 13.1

1 M3

Timbunan Tanah Halaman


SNI 2835:2008 6.10.a

1 M3 Timbunan Tanah

Pekerjaan Tanaman
Taksir

Mengerjakan Ring Balok ( 20 x 30 ) cm (1)

URAIAN

1m' Pagar sementara dari seng gelombang tinggi 2 meter


Dolken kayu galam, (8-10)-4 m
Semen portland
Seng gelombang 3"-5"
Pasir beton
Koral beton
Kayu 5/7
Paku seng
Meni besi
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

1 M2 Membersihkan Lapangan dan Perataan


Pekerja
Mandor

1 M' Pengukuran dan Pemasaangan Bowplank


Kayu Kelas III
Papan 3/20
Paku Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

1 m2 Barak Kerja
Dolken kayu galam, (8-10)-4 m
Kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang bjls 32
Plywood 9 mm
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

KOEF.

1.250
2.500
1.200
0.005
0.009
0.072
0.060
0.450
0.020
0.020
0.400
0.200
0.640

Sat

btg
kg
lbr
m3
m3
m3
kg
kg
Oh
Oh
Oh
Oh

0.100 Oh
0.050 Oh
0.150

0.012
0.007
0.020
0.100
0.100
0.010
0.005
0.215

M3
M3
Kg
Oh
Oh
Oh
Oh

1.250
0.186
0.300
18.000
0.030
0.050
1.500
1.350
0.050
0.200
2.000
1.000
3.250

btg
m3
kg
kg
m3
m3
lbr
lbr
Oh
Oh
Oh
Oh

1 M3

Galian Tanah Biasa Sedalam 2 m


Pekerja
Mandor

Indeks
0.900
0.045
0.945

Satuan
Oh
Oh

1 M3

Galian Tanah Biasa Sedalam 2 m


Pekerja
Mandor

Indeks
0.900
0.045

Satuan
Oh
Oh

Galian Tanah Biasa Sedalam 1 m


Pekerja
Mandor

1 M3

1 M3

1 M3

0.750
0.025
0.775

Oh
Oh

1.200
0.300
0.010
0.310

M3
Oh
Oh

Urungan Pasir di Bawah Pondasi


Pasir Urug
Pekerja
Mandor

1.200
0.300
0.010

M3
Oh
Oh

Urungan Pasir di Bawah Pondasi


Pasir Urug
Pekerja
Mandor

1.200
0.300
0.010

M3
Oh
Oh

1.200
0.500
0.050
0.550

M3
Oh
Oh

Urungan Pasir di Bawah Pondasi


Pasir Urug
Pekerja
Mandor

Urugan Kembali Pondasi Tapak (120x120)


Tanah Urug
Pekerja
Mandor

Urugan Kembali Pondasi Tapak (100x100)


Tanah Urug
Pekerja
Mandor

Urugan Kembali Pondasi Menerus


Tanah Urug
Pekerja
Mandor

1 M3

1 M3

Urungan Pasir di Bawah Pondasi


Pasir Urug
Pekerja
Mandor

Urugan Tanah
Tanah Urug
Pekerja
Mandor

(120x120)
1 M3 Pasang Pondasi Batu Kosong (Aanstamping)
Batu Kali 15 cm / 20 cm
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3

1.200
0.500
0.050
0.550

M3
Oh
Oh

1.200
0.500
0.050
0.550

M3
Oh
Oh

1.200
0.300
0.010
0.310

M3
Oh
Oh

1.200
0.500
0.050
0.550

M3
Oh
Oh

1.200
0.432
0.780
0.390
0.039
0.039
1.248

M3
M3
Oh
Oh
Oh
Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
2.036

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1 Kg Pembesian dengan Besi Polos


Besi Beton Polos
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

Pasang Bekisting untuk Pondasi


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

(100x100)
1 M3 Pasang Pondasi Batu Kosong (Aanstamping)
Batu Kali 15 cm / 20 cm
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3

1.050
0.015
0.007
0.007
0.001
0.000
0.015

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.300
0.100
0.520
0.260
0.026
0.026
0.832

M3
Kg
Liter
Oh
Oh
Oh
Oh

0.320

Oh

1.200
0.432
0.780
0.390
0.039
0.039
1.248

M3
M3
Oh
Oh
Oh
Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
2.036

1 Kg Pembesian dengan Besi Polos


Besi Beton Polos

1.050

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

Kg

Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

Pasang Bekisting untuk Pondasi


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

1 M3

1 M3

Pasang Pondasi Batu Kosong (Aanstamping)


Batu Kali 15 cm / 20 cm
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Pasang Pondasi Batu Kali 1 Pc : 3 Pp


Batu Kali (15 cm / 20 cm)
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.015
0.007
0.007
0.001
0.000
0.015

Kg
Oh
Oh
Oh
Oh

0.040
0.300
0.100
0.520
0.260
0.026
0.026
0.832

M3
Kg
Liter
Oh
Oh
Oh
Oh

0.320

Oh

1.200
0.432
0.780
0.390
0.039
0.039
1.248

M3
M3
Oh
Oh
Oh
Oh

1.200
202.000
0.480
1.500
0.750
0.075
0.075
2.400

M3
Kg
M3
Oh
Oh
Oh
Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000

Kg
Kg
Kg
Liter

Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 Kg Pembesian dengan Besi Polos


Besi Beton Polos
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

Pasang Bekisting untuk Sloof


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

1.650
0.275
0.028
0.083
2.036

Oh
Oh
Oh
Oh

1.050
0.015
0.007
0.007
0.001
0.000
0.015

Kg
Kg
Oh
Oh
Oh
Oh

0.045
0.300
0.100
0.520
0.260
0.026
0.026
0.832

M3
Kg
Liter
Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
2.036

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang

1.050
0.015
0.007
0.007
0.001

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

Kg
Kg
Oh
Oh
Oh

Mandor

1 M2

Pasang Bekisting untuk Kolom


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

Oh

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033
1.056

M3
Kg
Liter
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
2.036

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

0.000
0.015

Pasang Bekisting untuk Kolom


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1.050
0.015
0.007
0.007
0.001
0.000
0.015

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.015
0.350
2.000

M3
Kg
Liter
M3
Lbr
Btg

Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
2.036

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

0.660
0.330
0.033
0.033
1.056

Pasang Bekisting untuk Kolom


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1.050
0.015
0.007
0.007
0.001
0.000
0.015

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033
1.056

M3
Kg
Liter
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.320

Oh

1 M3

1 M2

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
2.036

Pasang Bekisting untuk Balok


Kayu KLs III
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3 Membuat Lantai Cor 1 : 3 : 5


Semen portland
Pasir beton
Koral beton
Mandor
Kepala Tukang
Tukang batu
Pekerja

1 M2

Pasang Lantai Keramik 40 x 40 cm


Keramik 40 x 40 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033
1.056

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

0.320

Oh

10.000
0.026
0.044
0.006
0.002
0.020
1.150
1.178

kg
m3
m3
Oh
Oh
Oh
Oh

6.630
0.045
1.300
9.800
0.250

Bh
M3
Kg
Kg
Oh

Tukang
Kepala Tukang
Mandor

1 M2

Pasang Lantai Keramik 20 x 20 cm


Keramik 20 x 20 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

0.125
0.013
0.013
0.151

Oh
Oh
Oh

26.500
0.045
10.400
1.620
0.700
0.350
0.035
0.035

Bh
M3
Kg
Kg
Oh
Oh
Oh
Oh

0.420

1 M2

1 M2

1 M2

Pasang Lantai Keramik 20 x 20 cm


Keramik 20 x 20 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

Pasang Lantai Keramik 20 x 20 cm


Keramik 20 x 20 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

26.500
0.045
10.400
1.620
0.700
0.350
0.035
0.035
0.420

Bh
M3
Kg
Kg
Oh
Oh
Oh
Oh

26.500
0.045
10.400
1.620
0.700
0.350
0.035
0.035
0.420

Bh
M3
Kg
Kg
Oh
Oh
Oh
Oh

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 2 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.038
M3
Semen portland
18.950
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 4 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.043
M3
Semen portland
11.500
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 2 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.038
M3
Semen portland
18.950
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 4 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.043
M3
Semen portland
11.500
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh

1 M2

Plesteran 1 Pc : 2 Ps, Tebal 15 mm


Pasir pasang
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

0.020
10.224
0.300
0.150
0.015
0.015

M3
Kg
Oh
Oh
Oh
Oh

Plesteran 1 Pc : 4 Ps, Tebal 15 mm


Pasir pasang
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

0.024
6.240
0.300
0.150
0.015
0.015

M3
Kg
Oh
Oh
Oh
Oh

1 M2

1 M2 Langit-langit Gypsum board + Rangka Alumunium


Profil Alumunium T
Kawat Diameter 4 mm
Ramset
Gypsum Board
Pekerja
Tukang
Kepala Tukang
Mandor

1 M1 list langit-langit kayu profil


List kayu profil
Paku
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M3

3.600
0.150
1.050
0.350
0.060
0.060
0.006
0.003
0.129

M3
Kg
Bh
Lbr
Oh
Oh
Oh
Oh

1.050
0.010
0.050
0.050
0.005
0.003
0.108

M1
Kg
Oh
Oh
Oh
Oh

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

1 M Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

M3
Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.500
1.000
3.000
0.300
0.050
4.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

1 M3

M3
Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.500
1.000
3.000
0.300
0.050
4.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1 M Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

0.040
0.500
1.000
3.000
0.300
0.050
4.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000

Ls
Ls
Ls

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

1 M Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

1 M3

1 M3

M3
Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.500
1.000
3.000
0.300
0.050
4.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000

Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100
1.000
1.000
1.000

M3
Kg
Kg
Oh
Oh
Oh
Oh

Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000

Ls
Ls
Ls

1 M3

1 M3

1 M3

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000

Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000

Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000

Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1 M3

1 M3

1 M3

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
26.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000

Ls

1.000

Ls

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

0.386

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

Pasang Bekisting untuk Balok


Kayu KLs III
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

1.05
0.015
0.007
0.007
0.0007
0.0004
0.008

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033
0.396

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

0.32

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
0.386

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1.050
0.015
0.007
0.007
0.001
0.000
0.008

Oh

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

Kg
Kg
Oh
Oh
Oh
Oh

1 M2

Pasang Bekisting untuk Balok


Kayu KLs III
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
0.386

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033
0.396

Pasang Bekisting untuk Balok


Kayu KLs III
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1.050
0.015
0.007
0.007
0.001
0.000
0.008

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh

Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
Kepala Tukang
Mandor

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

0.033
0.033

Pasang Bekisting untuk Lantai


Kayu KLs III
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

Kg
Kg
Kg
Liter
Oh

0.275
0.028
0.083

Oh
Oh
Oh

1.05 Kg
0.015 Kg
0.007 Oh
0.007 Oh
0.0007 Oh
0.0004 Oh

0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

0.320

Oh

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
0.386

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

Pasang Bekisting untuk Kolom


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1.050
0.015
0.007
0.007
0.001
0.000
0.008

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033
0.396

M3
Kg
Liter
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
0.386

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

Pasang Bekisting untuk Kolom


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

1.050
0.015
0.007
0.007
0.001
0.000

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
0.386

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1.050
0.015
0.007
0.007
0.001
0.000

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

Kg
Kg
Oh
Oh
Oh
Oh

1 M2

Pasang Bekisting untuk Kolom


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3

M3
Kg
Liter
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.320

Oh

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm, w/c = 0,56
Pasir Beton
692.000
Kerikil (Maximum 30 mm)
1,039.000
Semen Portland
384.000
Air
215.000
Pekerja
1.650
Tukang Batu
0.275
Kepala Tukang
0.028
Mandor
0.083
0.386

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

1 M2

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033

Pasang Bekisting untuk Balok


Kayu KLs III
Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

1.050
0.015
0.007
0.007
0.001
0.000
0.008

Kg
Kg
Oh
Oh
Oh
Oh

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

1 M2 Membongkar Cetakan dan Menyiram Beton


Pekerja

1 M3 Membuat Lantai Cor 1 : 3 : 5


Semen portland
Pasir beton
Koral beton
Mandor
Kepala Tukang
Tukang batu
Pekerja

1 M2

1 M2

Pasang Lantai Keramik 40 x 40 cm


Keramik 40 x 40 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

Pasang Lantai Keramik 20 x 20 cm


Keramik 20 x 20 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

0.320

Oh

10.000
0.026
0.044
0.006
0.002
0.020
1.150
1.178

kg
m3
m3
Oh
Oh
Oh
Oh

6.630
0.045
1.300
9.800
0.700
0.350
0.035
0.035
0.420

Bh
M3
Kg
Kg
Oh
Oh
Oh
Oh

26.500
0.045
10.400
1.620
0.700
0.350
0.035
0.035

Bh
M3
Kg
Kg
Oh
Oh
Oh
Oh

0.420

1 M2

Pasang Lantai Keramik 20 x 20 cm


Keramik 20 x 20 cm
Pasir Pasang
Semen Warna
Semen portland
Pekerja
Tukang
Kepala Tukang

26.500
0.045
10.400
1.620
0.700
0.350
0.035

Bh
M3
Kg
Kg
Oh
Oh
Oh

Mandor

0.035
0.420

Oh

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 2 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.038
M3
Semen portland
18.950
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 4 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.043
M3
Semen portland
11.500
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 2 Ps)
Batu Bata

70.000

Buah

Pasir pasang
Semen portland
Pekerja
Tukang batu
Kepala Tukang
Mandor

0.038
18.950
0.300
0.100
0.010
0.015
0.125

M3
Kg
Oh
Oh
Oh
Oh

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 4 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.043
M3
Semen portland
11.500
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Plesteran 1 Pc : 2 Ps, Tebal 15 mm


Pasir pasang
Semen portland

0.020
10.224

M3
Kg

Pekerja
Tukang
Kepala Tukang
Mandor

1 M2

Plesteran 1 Pc : 4 Ps, Tebal 15 mm


Pasir pasang
Semen portland
Pekerja
Tukang
Kepala Tukang
Mandor

1 M2 Langit-langit Gypsum board + Rangka Alumunium


Profil Alumunium T
Kawat Diameter 4 mm
Ramset
Gypsum Board
Pekerja
Tukang
Kepala Tukang
Mandor

1 M1 list langit-langit kayu profil


List kayu profil
Paku
Pekerja
Tukang kayu
Kepala tukang
Mandor

1 M3

0.300
0.150
0.015
0.015
0.180

Oh
Oh
Oh
Oh

0.024
6.240
0.300
0.150
0.015
0.015
0.180

M3
Kg
Oh
Oh
Oh
Oh

3.600
0.150
1.050
0.350
0.060
0.060
0.006
0.003
0.069

M3
Kg
Bh
Lbr
Oh
Oh
Oh
Oh

1.050
0.010
0.050
0.050
0.005
0.003
0.058

M1
Kg
Oh
Oh
Oh
Oh

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

1 M3

0.040
0.500
1.000
3.000
0.300
0.050
3.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

1 M3

0.040
0.500
1.000
3.000
0.300
0.050
3.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000

Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Daun Pintu Panel, Kayu Kelas I atau Kelas II


Papan Kayu Kelas I
Lem Kayu
Pekerja
Tukang
Kepala Tukang
Mandor

1 M3

1 M3

1 M3

0.040
0.500
1.000
3.000
0.300
0.050
3.350

M
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000

Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300

M3
Kg
Kg
Oh
Oh
Oh
Oh

20.100

1 M3

1 M3

1 M3

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

1 M3

1 M3

1 M3

1 M3

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000
1.000
1.000
1.000

Ls
Ls
Ls
Ls

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300
20.100

M3
Kg
Kg
Oh
Oh
Oh
Oh

Pekerjaan Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau Kelas III
Balok Kayu Kelas II
1.200
Paku 2" - 5"
1.250
Lem Kayu
1.000
Pekerja
6.000
Tukang
18.000
Kepala Tukang
1.800
Mandor
0.300

M3
Kg
Kg
Oh
Oh
Oh
Oh

1.000

Ls

1.000

Ls

1 M Pekerjaan Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III


Balok Kayu Kelas II
1.100
Besi Strip tebal 5 mm
15.000
Paku 2" - 5"
5.600
Pekerja
4.000
Tukang
12.000
Kepala Tukang
1.200
Mandor
0.200
13.400

M
Kg
Kg
Oh
Oh
Oh
Oh

1 M Pekerjaan Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III


Balok Kayu Kelas II
1.100
Besi Strip tebal 5 mm
15.000
Paku 2" - 5"
5.600
Pekerja
4.000
Tukang
12.000
Kepala Tukang
1.200
Mandor
0.200
13.400

M
Kg
Kg
Oh
Oh
Oh
Oh

1 M Pekerjaan Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III


Balok Kayu Kelas II
1.100
Besi Strip tebal 5 mm
15.000
Paku 2" - 5"
5.600
Pekerja
4.000
Tukang
12.000
Kepala Tukang
1.200
Mandor
0.200

M
Kg
Kg
Oh
Oh
Oh
Oh

1 M Pekerjaan Konstruksi Gordeng, Kayu Kelas II


Balok Kayu Kelas II
Besi Strip tebal 5 mm
Paku 2" - 5"
Pekerja
Tukang
Kepala Tukang
Mandor

M
Kg
Kg
Oh
Oh
Oh
Oh

1 M Rangka Atap Genteng Keramik, Kayu Kelas II

1.100
15.000
3.000
2.400
7.200
0.120
0.120
7.440

Kaso 5x7 cm
Paku 5 - 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pemasangan Rabung Atap


Perabung Atap multiroof
Paku kayu
Pekerja
Tukang kayu
Kepala tukang
mandor

1 M Pekerjaan Lisplank (3 x 30) cm, Kayu Kelas I atau II


Papan Kayu Kelas I
Paku 2" - 5"
Pekerja
Tukang
Kepala Tukang
Mandor

1 M3

1 M3

Galian Tanah Biasa Sedalam 1 m


Pekerja
Mandor

Urungan Pasir di Bawah Pondasi


Pasir Urug
Pekerja
Mandor

1 M3 Urugan Kembali Pondasi Menerus


Tanah Urug
Pekerja
Mandor

1 M3

Pasang Pondasi Batu Kosong (Aanstamping)

0.014
0.250
0.100
0.100
0.010
0.005
0.115

M
Kg
Oh
Oh
Oh
Oh

1.100
0.050
0.250
0.150
0.015
0.013
0.178

Lb
Kg
Oh
Oh
Oh
Oh

0.011
0.050
0.100
0.200
0.020
0.005
0.225

M
Kg
Oh
Oh
Oh
Oh

0.750
0.025
0.775

Oh
Oh

1.200
0.300
0.010
0.310

M3
Oh
Oh

1.200
0.500
0.050
0.550

M3
Oh
Oh

Batu Kali 15 cm / 20 cm
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3

1 M3

1 M3

Pasang Pondasi Batu Kali 1 Pc : 3 Pp


Batu Kali (15 cm / 20 cm)
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Mengerjakan Sloof (20 x 30 ) cm


Beton K-250 (SNI 7394:2008-6.8)
Besi Beton Polos (SNI 7394:2008-6.17)
Bekisting untuk Sloof (SNI 7394:2008-6.21)
Membongkar Cetakan dan Menyiram Beton

Mengerjakan Kolom (13 x 13)


Beton K-250 (SNI 7394:2008-6.8)
Besi Beton Polos (SNI 7394:2008-6.17)
Bekisting untuk Kolom (SNI 7394:2008-6.22)
Membongkar Cetakan dan Menyiram Beton

1.200
0.432
0.780
0.390
0.039
0.039
0.468

M3
M3
Oh
Oh
Oh
Oh

1.200
202.000
0.480
1.500
0.750
0.075
0.075
0.900

M3
Kg
M3
Oh
Oh
Oh
Oh

1.000
45.750
2.229
2.229
51.207

M3
Kg
M2
M2

1.000
44.480
6.667
6.667

M3
Kg
M2
M2

1 M2

Pasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1/2 Bata (1 Pc : 4 Ps)
Batu Bata
70.000
Buah
Pasir pasang
0.043
M3
Semen portland
11.500
Kg
Pekerja
0.300
Oh
Tukang batu
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor
0.015
Oh
0.125

1 M2

Plesteran 1 Pc : 4 Ps, Tebal 15 mm


Pasir pasang
Semen portland
Pekerja
Tukang

0.024
6.240
0.300
0.150

M3
Kg
Oh
Oh

Kepala Tukang
Mandor

1 M3

Mengerjakan Ring Balok ( 20 x 30 ) cm (1)


Beton K-250 (SNI 7394:2008-6.8)
Besi Beton Polos (SNI 7394:2008-6.17)
Bekisting untuk Balok (SNI 7394:2008-6.23)
Membongkar Cetakan dan Menyiram Beton

1 M3 Timbunan Tanah
Tanah Urug
Pekerja
Mandor

0.015
0.015
0.015

Oh
Oh

1.000
53.100
8.333
8.333

M3
Kg
M2
M2

1.200
0.500
0.050
0.550

M3
Oh
Oh

Harga Satuan

Jumlah Harga

12,000.00
1,316.00
53,100.00
132,500.00
132,500.00
3,489,200.00
17,900.00
25,800.00
75,800.00
101,200.00
84,200.00
53,100.00
Jumlah
Dibulatkan

15,000.00
3,290.00
63,720.00
662.50
1,192.50
251,222.40
1,074.00
11,610.00
1,516.00
2,024.00
33,680.00
10,620.00
395,611.40
395,600.00

53,100.00
75,800.00
Jumlah
Dibulatkan

5,310.00
3,790.00
9,100.00
9,100.00

3,792,500.00
3,792,500.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

45,510.00
26,547.50
346.00
5,310.00
8,420.00
1,012.00
379.00
87,524.50
87,500.00

12,000.00
3,792,500.00
17,300.00
1,316.00
132,500.00
132,500.00
67,900.00
98,000.00
75,800.00
101,200.00
84,200.00
53,100.00
Jumlah

15,000.00
705,405.00
5,190.00
23,688.00
3,975.00
6,625.00
101,850.00
132,300.00
3,790.00
20,240.00
168,400.00
53,100.00
1,239,563.00

Dibulatkan

1,239,500.00

53,100.00
75,800.00
Jumlah
Dibulatkan

47,790.00
3,411.00
51,201.00
51,200.00

53,100.00
75,800.00
Jumlah
Dibulatkan

47,790.00
3,411.00
51,201.00
51,200.00

53,100.00
75,800.00
Jumlah
Dibulatkan

39,825.00
1,895.00
41,720.00
41,700.00

127,300.00
53,100.00
75,800.00
Jumlah
Dibulatkan

152,760.00
15,930.00
758.00
169,448.00
169,400.00

127,300.00
53,100.00
75,800.00
Jumlah
Dibulatkan

152,760.00
15,930.00
758.00
169,448.00
169,400.00

127,300.00
53,100.00
75,800.00
Jumlah
Dibulatkan

152,760.00
15,930.00
758.00
169,448.00
169,400.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
26,550.00
3,790.00
102,820.00
102,800.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
26,550.00
3,790.00
102,820.00
102,800.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
26,550.00
3,790.00
102,820.00
102,800.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
15,930.00
758.00
89,168.00
89,100.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
26,550.00
3,790.00
102,820.00
102,800.00

165,000.00
130,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

198,000.00
56,160.00
41,418.00
32,838.00
4,180.80
2,956.20
335,553.00
335,500.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79

Dibulatkan

810,700.00

15,200.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

15,960.00
336.00
371.70
589.40
75.04
30.32
17,362.46
17,300.00

3,792,500.00
17,300.00
8,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
5,190.00
800.00
27,612.00
21,892.00
2,787.20
1,970.80
211,952.00
211,900.00

53,100.00
Jumlah

16,992.00
16,992.00

165,000.00
130,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

198,000.00
56,160.00
41,418.00
32,838.00
4,180.80
2,956.20
6,920.00
6,900.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

15,200.00

15,960.00

22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

336.00
371.70
589.40
75.04
30.32
17,362.46
17,300.00

3,792,500.00
17,300.00
8,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
5,190.00
800.00
27,612.00
21,892.00
2,787.20
1,970.80
60,252.00
60,200.00

53,100.00
Jumlah

16,992.00
16,992.00

165,000.00
130,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

198,000.00
56,160.00
41,418.00
32,838.00
4,180.80
2,956.20
335,553.00
335,500.00

165,000.00
1,316.00
130,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

198,000.00
265,832.00
62,400.00
79,650.00
63,150.00
8,040.00
5,685.00
682,757.00
682,700.00

94.64
94.64
1,316.00
100.00

65,492.86
98,333.93
505,344.00
21,500.00

53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

15,200.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

15,960.00
336.00
371.70
589.40
75.04
30.32
17,362.46
17,300.00

3,792,500.00
17,300.00
8,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

170,662.50
5,190.00
800.00
27,612.00
21,892.00
2,787.20
1,970.80
230,914.50
230,900.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00

29,820.00
336.00
371.70
589.40
75.04

75,800.00
Jumlah
Dibulatkan

30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
351,108.00
351,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
24,000.00

53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

35,046.00
27,786.00
3,537.60
2,501.40
351,108.00
351,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
351,108.00
351,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
76,460.40
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
363,851.40
363,800.00

53,100.00
Jumlah

16,992.00
16,992.00

1,316.00
132,500.00
132,500.00
75,800.00
107,200.00
84,200.00
53,100.00
Jumlah
Dibulatkan

13,160.00
3,445.00
5,830.00
454.80
214.40
1,684.00
61,065.00
85,853.20
85,800.00

19,512.00
130,000.00
2,625.00
1,316.00
53,100.00

129,364.56
5,850.00
3,412.50
12,896.80
13,275.00

84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

10,525.00
1,393.60
985.40
177,702.86
177,700.00

2,100.00
130,000.00
2,625.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

55,650.00
5,850.00
27,300.00
2,131.92
37,170.00
29,470.00
3,752.00
2,653.00
163,976.92
163,900.00

2,100.00
130,000.00
2,625.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

55,650.00
5,850.00
27,300.00
2,131.92
37,170.00
29,470.00
3,752.00
2,653.00
163,976.92
163,900.00

2,100.00
130,000.00
2,625.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

55,650.00
5,850.00
27,300.00
2,131.92
37,170.00
29,470.00
3,752.00
2,653.00
163,976.92
163,900.00

600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah

42,000.00
4,940.00
24,938.20
15,930.00
8,420.00
1,072.00
1,137.00
98,437.20

: 2 Ps)

Dibulatkan

98,400.00

600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

42,000.00
5,590.00
15,134.00
15,930.00
8,420.00
1,072.00
1,137.00
89,283.00
89,200.00

600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00

42,000.00
4,940.00
24,938.20
15,930.00
8,420.00
1,072.00
1,137.00
98,437.20
98,400.00

: 4 Ps)

: 2 Ps)

Jumlah
Dibulatkan

: 4 Ps)
600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

42,000.00
5,590.00
15,134.00
15,930.00
8,420.00
1,072.00
1,137.00
89,283.00
89,200.00

130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

2,600.00
13,454.78
15,930.00
12,630.00
1,608.00
1,137.00
47,359.78
47,300.00

130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00

3,120.00
8,211.84
15,930.00
12,630.00
1,608.00
1,137.00

Jumlah
Dibulatkan

42,636.84
42,600.00

43,000.00
22,400.00
9,000.00
68,000.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

154,800.00
3,360.00
9,450.00
23,800.00
3,186.00
5,052.00
607.20
227.40
200,482.60
200,400.00

6,200.00
17,300.00
9,000.00
68,000.00
53,100.00
84,200.00
Jumlah
Dibulatkan

6,510.00
173.00
450.00
3,400.00
265.50
252.60
11,051.10
11,000.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Dibulatkan
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40

Jumlah
Dibulatkan

810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
76,460.40
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
363,851.40
363,800.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46

Dibulatkan

31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
76,460.40
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
363,851.40
363,800.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00

151,700.00
6,920.00
1,600.00
76,460.40
34,300.00
24,000.00
35,046.00
27,786.00

107,200.00
75,800.00
Jumlah
Dibulatkan

3,537.60
2,501.40
363,851.40
363,800.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00

84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
72,000.00
35,046.00
27,786.00
3,537.60
2,501.40
399,108.00
399,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
351,108.00
351,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
351,108.00
351,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

151,700.00
6,920.00
1,600.00
63,717.00
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40
351,108.00
351,100.00

53,100.00
Jumlah

16,992.00
16,992.00

94.64
94.64
1,316.00
100.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

65,492.86
98,333.93
505,344.00
21,500.00
87,615.00
23,155.00
3,001.60
6,291.40
810,733.79
810,700.00

28,400.00
22,400.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

29,820.00
336.00
371.70
589.40
75.04
30.32
31,222.46
31,200.00

3,792,500.00
17,300.00
8,000.00
4,247,800.00
98,000.00
12,000.00
53,100.00
84,200.00
107,200.00
75,800.00

151,700.00
6,920.00
1,600.00
76,460.40
34,300.00
24,000.00
35,046.00
27,786.00
3,537.60
2,501.40

Jumlah
Dibulatkan

363,851.40
363,800.00

53,100.00
Jumlah

16,992.00
16,992.00

1,316.00
132,500.00
132,500.00
75,800.00
107,200.00
84,200.00
53,100.00
Jumlah
Dibulatkan

13,160.00
3,445.00
5,830.00
454.80
214.40
1,684.00
61,065.00
85,853.20
85,800.00

2,100.00
130,000.00
2,625.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

13,923.00
5,850.00
3,412.50
12,896.80
37,170.00
29,470.00
3,752.00
2,653.00
109,127.30
109,100.00

2,100.00
130,000.00
2,625.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

55,650.00
5,850.00
27,300.00
2,131.92
37,170.00
29,470.00
3,752.00
2,653.00
163,976.92
163,900.00

2,100.00
130,000.00
2,625.00
1,316.00
53,100.00
84,200.00
107,200.00

55,650.00
5,850.00
27,300.00
2,131.92
37,170.00
29,470.00
3,752.00

75,800.00
Jumlah
Dibulatkan

2,653.00
163,976.92
163,900.00

600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

42,000.00
4,940.00
24,938.20
15,930.00
8,420.00
1,072.00
1,137.00
98,437.20
98,400.00

600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

42,000.00
5,590.00
15,134.00
15,930.00
8,420.00
1,072.00
1,137.00
89,283.00
89,200.00

600.00

42,000.00

130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00

4,940.00
24,938.20
15,930.00
8,420.00
1,072.00
1,137.00
98,437.20
98,400.00

: 2 Ps)

: 4 Ps)

: 2 Ps)

Jumlah
Dibulatkan

: 4 Ps)
600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

42,000.00
5,590.00
15,134.00
15,930.00
8,420.00
1,072.00
1,137.00
89,283.00
89,200.00

130,000.00
1,316.00

2,600.00
13,454.78

53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

15,930.00
12,630.00
1,608.00
1,137.00
47,359.78
47,300.00

130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

3,120.00
8,211.84
15,930.00
12,630.00
1,608.00
1,137.00
42,636.84
42,600.00

43,000.00
22,400.00
9,000.00
68,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

154,800.00
3,360.00
9,450.00
23,800.00
3,186.00
5,052.00
643.20
227.40
200,518.60
200,500.00

6,200.00
17,300.00
9,000.00
68,000.00
53,100.00
84,200.00
Jumlah
Dibulatkan

6,510.00
173.00
450.00
3,400.00
265.50
252.60
11,051.10
11,000.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

5,613,100.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

224,524.00
9,750.00
53,100.00
252,600.00
30,360.00
3,790.00
574,124.00
574,100.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00

Jumlah
Dibulatkan

7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
17,300.00
19,500.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

5,097,360.00
21,625.00
19,500.00
318,600.00
1,515,600.00
182,160.00
22,740.00
7,177,585.00
7,177,500.00

4,247,800.00
14,000.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

4,672,580.00
210,000.00
96,880.00
212,400.00
1,010,400.00
121,440.00
15,160.00
6,338,860.00
6,338,800.00

4,247,800.00
14,000.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

4,672,580.00
210,000.00
96,880.00
212,400.00
1,010,400.00
121,440.00
15,160.00
6,338,860.00
6,338,800.00

4,247,800.00
14,000.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

4,672,580.00
210,000.00
96,880.00
212,400.00
1,010,400.00
121,440.00
15,160.00
6,338,860.00
6,338,800.00

4,247,800.00
14,000.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

4,672,580.00
210,000.00
51,900.00
127,440.00
606,240.00
12,144.00
9,096.00
5,689,400.00
5,689,400.00

4,247,800.00
12,000.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

59,469.20
3,000.00
5,310.00
8,420.00
1,012.00
379.00
77,590.20
77,500.00

37,300.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

41,030.00
865.00
13,275.00
12,630.00
1,518.00
985.40
70,303.40
70,300.00

5,613,100.00
17,300.00
53,100.00
84,200.00
101,200.00
75,800.00
Jumlah
Dibulatkan

61,744.10
865.00
5,310.00
16,840.00
2,024.00
379.00
87,162.10
87,100.00

53,100.00
75,800.00
Jumlah
Dibulatkan

39,825.00
1,895.00
41,720.00
41,700.00

127,300.00
53,100.00
75,800.00
Jumlah
Dibulatkan

152,760.00
15,930.00
758.00
169,448.00
169,400.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
26,550.00
3,790.00
102,820.00
102,800.00

165,000.00
130,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

198,000.00
56,160.00
41,418.00
32,838.00
4,180.80
2,956.20
335,553.00
335,500.00

165,000.00
1,316.00
130,000.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

198,000.00
265,832.00
62,400.00
79,650.00
63,150.00
8,040.00
5,685.00
682,757.00
682,700.00

810,700.00
17,300.00
230,900.00
16,992.00
Jumlah
Dibulatkan

810,700.00
791,475.00
514,583.74
37,868.37
2,154,627.11
2,154,600.00

810,700.00
17,300.00
230,900.00
16,992.00
Jumlah
Dibulatkan

810,700.00
769,504.00
1,539,341.03
113,280.57
3,232,825.60
3,232,800.00

600.00
130,000.00
1,316.00
53,100.00
84,200.00
107,200.00
75,800.00
Jumlah
Dibulatkan

42,000.00
5,590.00
15,134.00
15,930.00
8,420.00
1,072.00
1,137.00
89,283.00
89,200.00

130,000.00
1,316.00
53,100.00
84,200.00

3,120.00
8,211.84
15,930.00
12,630.00

: 4 Ps)

107,200.00
75,800.00
Jumlah
Dibulatkan

1,608.00
1,137.00
42,636.84
42,600.00

810,700.00
17,300.00
230,900.00
16,992.00
Jumlah
Dibulatkan

810,700.00
918,630.00
1,924,158.97
141,599.43
3,795,088.40
3,795,000.00

60,400.00
53,100.00
75,800.00
Jumlah
Dibulatkan

72,480.00
26,550.00
3,790.00
102,820.00
102,800.00

ANALISA

URAIAN

PEKERJAAN BETON
SNI 7394:2008-6.1

1 M3

Beton mutu f'c = 7,4 Mpa (K-100), slump (12 2) cm, w


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.2

1 M3

Beton mutu f'c = 9,8 Mpa (K-125), slump (12 2) cm, w


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.3

1 M3

Beton mutu f'c = 12,2 Mpa (K-150), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.4

1 M3

Lantai Kerja Beton mutu f'c = 7,4 Mpa (K-100), slump (

Pasir Beton
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.5

1 M3

Beton mutu f'c = 14,5 Mpa (K-175), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air

Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.6

1 M3

Beton mutu f'c = 16,9 Mpa (K-200), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.7

1 M3

Beton mutu f'c = 19,3 Mpa (K-225), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.8

1 M3

Beton mutu f'c = 21,7 Mpa (K-250), slump (12 2) cm,

Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.9

1 M3

Beton mutu f'c = 24,0 Mpa (K-275), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air

Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.10

1 M3

Beton mutu f'c = 26,4 Mpa (K-300), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.11

1 M3

Beton mutu f'c = 28,8 Mpa (K-325), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.12

1 M3

Beton mutu f'c = 31,2 Mpa (K-350), slump (12 2) cm,


Pasir Beton
Kerikil (Maximum 30 mm)
Semen Portland
Air
Pekerja
Tukang Batu
Kepala Tukang
Mandor

SNI 7394:2008-6.17.a

1 Kg Pembesian dengan Besi Polos


Besi Beton Polos
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

SNI 7394:2008-6.17.b

1 Kg Pembesian dengan Besi Ulir


Besi Beton Ulir
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

SNI 7394:2008-6.18

1 Kg Pasang Kabel Presstressed Polos/Strands


Besi Beton (Polos/Ulir)
Kawat Beton
Pekerja
Tukang Batu/pipa
Kepala Tukang
Mandor

SNI 7394:2008-6.20

1 M2

SNI 7394:2008-6.21

1 M2

Pasang Bekisting untuk Pondasi


Kayu KLs III
Paku 2" - 5"
Minyak Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

Pasang Bekisting untuk Sloof

Kayu KLs III


Paku 2" - 5"
Minyak Bekisting
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.22

1 M2

Pasang Bekisting untuk Kolom

Kayu KLs III


Paku 2" - 5"
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.23

1 M2

Pasang Bekisting untuk Balok

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.24

1 M2

Pasang Bekisting untuk Lantai

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.25

1 M2

Pasang Bekisting untuk Dinding

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.26

1 M2

Pasang Bekisting untuk Tangga

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.27

1 M2

Pasang Jembatan untuk Pengecoran Beton

Kayu KLs III


Paku 5 cm - 12 cm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.28

1 M3

Pondasi Beton Bertulang (150 kg besi + bekisting)

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.29

1 M3

Sloof Beton Bertulang (200 kg besi + bekisting)

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.30

1 M3

Kolom Beton Bertulang (300 kg besi + bekisting)

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Balok Kayu Kls II
Plywood 9 mm

Dolken Kayu galam (8-10) cm


Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.31

1 M3

Lantai Beton Bertulang (150 kg besi + bekisting)

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.32

1 M3

Lantai Beton Bertulang (150 kg besi + bekisting)

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.33

1 M3

Dinding Beton Bertulang (150 kg besi + bekisting)

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland

Balok Kayu Kls II


Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.34

1 M3

Dinding Beton Bertulang (200 kg besi + bekisting

Kayu KLs III


Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Balok Kayu Kls II
Plywood 9 mm
Dolken Kayu galam (8-10) cm
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.35

1 M1

Kolom Praktis Beton Bertulang (11 x 11) cm

Kayu KLs III


Paku 5 cm - 12 cm
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Pekerja
Tukang
Kepala Tukang
Mandor

SNI 7394:2008-6.36

1 M1

Ring Balok Beton Bertulang (10 x 15) cm

Kayu KLs III


Paku 5 cm - 12 cm
Besi Beton Polos
Kawat Beton
Pasir Beton
Kerikil Beton
Semen Portland
Pekerja
Tukang
Kepala Tukang

Mandor

Analisa Beton

1 M2

Membongkar Cetakan dan Menyiram Beton

Pekerja

KOEF.

Sat

Harga Satuan

Jumlah Harga

(K-100), slump (12 2) cm, w/c = 0,87

869.000
999.000
247.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

82,244.643
94,548.214
325,052.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
643,407.857
643,400.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

78,364.286
95,778.571
363,216.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
678,921.857
678,900.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

75,619.643
96,251.786
393,484.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
706,918.429
706,900.000

(K-125), slump (12 2) cm, w/c = 0,78

828.000
1,012.000
276.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

a (K-150), slump (12 2) cm, w/c = 0,72

799.000
1,017.000
299.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

f'c = 7,4 Mpa (K-100), slump (3-6) cm, w/c = 0,87

893.000
230.000
200.000
1.200
0.200
0.020
0.060

Kg
Kg
Liter
Oh
Oh
Oh
Oh

94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

84,516.071
302,680.000
20,000.000
63,720.000
16,840.000
2,144.000
4,548.000
494,448.071
494,400.000

94.643
94.643
1,316.000
100.000

71,928.571
97,387.500
429,016.000
21,500.000

a (K-175), slump (12 2) cm, w/c = 0,66

760.000
1,029.000
326.000
215.000

Kg
Kg
Kg
Liter

1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

87,615.000
23,155.000
3,001.600
6,291.400
739,895.071
739,800.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

69,183.929
97,576.786
463,232.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
771,555.714
771,500.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

66,060.714
99,091.071
488,236.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
794,950.786
794,900.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

65,492.857
98,333.929
505,344.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
810,733.786
810,700.000

94.643
94.643
1,316.000
100.000

64,735.714
97,103.571
534,296.000
21,500.000

a (K-200), slump (12 2) cm, w/c = 0,61

731.000
1,031.000
352.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

a (K-225), slump (12 2) cm, w/c = 0,58

698.000
1,047.000
371.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

a (K-250), slump (12 2) cm, w/c = 0,56

692.000
1,039.000
384.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

a (K-275), slump (12 2) cm, w/c = 0,53

684.000
1,026.000
406.000
215.000

Kg
Kg
Kg
Liter

1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

87,615.000
23,155.000
3,001.600
6,291.400
837,698.286
837,600.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

64,451.786
96,630.357
543,508.000
21,500.000
87,615.000
23,155.000
3,001.600
6,291.400
846,153.143
846,100.000

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

63,410.714
95,210.714
577,724.000
21,500.000
111,510.000
29,470.000
3,752.000
7,959.000
910,536.429
910,500.000

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

94.643
94.643
1,316.000
100.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

63,126.786
94,642.857
589,568.000
21,500.000
111,510.000
29,470.000
3,752.000
7,959.000
921,528.643
921,500.000

Kg
Kg
Oh
Oh
Oh
Oh

15,200.000
22,400.000
53,100.000
84,200.000
107,200.000
75,800.000

15,960.000
336.000
371.700
589.400
75.040
30.320

a (K-300), slump (12 2) cm, w/c = 0,52

681.000
1,021.000
413.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

a (K-325), slump (12 2) cm, w/c = 0,49

670.000
1,006.000
439.000
215.000
2.100
0.350
0.035
0.105

Kg
Kg
Kg
Liter
Oh
Oh
Oh
Oh

a (K-350), slump (12 2) cm, w/c = 0,48

667.000
1,000.000
448.000
215.000
2.100
0.350
0.035
0.105

1.050
0.015
0.007
0.007
0.001
0.000

Jumlah
Dibulatkan

17,362.460
17,300.000

1.050
0.015
0.007
0.007
0.001
0.000

Kg
Kg
Oh
Oh
Oh
Oh

28,400.000
22,400.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

29,820.000
336.000
371.700
589.400
75.040
30.320
31,222.460
31,200.000

1.050
0.015
0.007
0.007
0.001
0.000

Kg
Kg
Oh
Oh
Oh
Oh

28,400.000
22,400.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

29,820.000
336.000
371.700
589.400
75.040
22.740
31,214.880
31,200.000

0.040
0.300
0.100
0.520
0.260
0.026
0.026

M3
Kg
Liter
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

151,700.000
5,190.000
800.000
27,612.000
21,892.000
2,787.200
1,970.800
211,952.000
211,900.000

0.045
0.300
0.100
0.520
0.260
0.026
0.026

M3
Kg
Liter
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

170,662.500
5,190.000
800.000
27,612.000
21,892.000
2,787.200
1,970.800
230,914.500
230,900.000

0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Btg
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
4,247,800.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah

151,700.000
6,920.000
1,600.000
63,717.000
34,300.000
24,000.000
35,046.000
27,786.000
3,537.600
2,501.400
351,108.000

d Polos/Strands

Dibulatkan

351,100.000

0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
4,247,800.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

151,700.000
6,920.000
1,600.000
76,460.400
34,300.000
24,000.000
35,046.000
27,786.000
3,537.600
2,501.400
363,851.400
363,800.000

0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
4,247,800.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

151,700.000
6,920.000
1,600.000
63,717.000
34,300.000
72,000.000
35,046.000
27,786.000
3,537.600
2,501.400
399,108.000
399,100.000

0.030
0.400
0.200
0.020
0.350
6.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
4,247,800.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

113,775.000
6,920.000
1,600.000
84,956.000
34,300.000
72,000.000
35,046.000
27,786.000
3,537.600
2,501.400
382,422.000
382,400.000

0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033

M3
Kg
Liter
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
4,247,800.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah

113,775.000
6,920.000
1,200.000
63,717.000
34,300.000
24,000.000
35,046.000
27,786.000
3,537.600
2,501.400
312,783.000

Dibulatkan

312,700.000

M3
Kg
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

100,122.000
10,380.000
6,000.000
7,965.000
4,210.000
536.000
606.400
129,819.400
129,800.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

758,500.000
25,950.000
3,200.000
2,394,000.000
50,400.000
71,550.000
107,325.000
442,176.000
281,430.000
221,025.000
28,086.400
20,087.000
4,403,729.400
4,403,700.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

1,023,975.000
34,600.000
4,800.000
3,192,000.000
67,200.000
71,550.000
107,325.000
442,176.000
300,015.000
272,387.000
34,625.600
21,451.400
5,572,105.000
5,572,100.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg
M3
Lbr

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
4,200,000.000
98,000.000

1,517,000.000
69,200.000
16,000.000
4,788,000.000
100,800.000
71,550.000
107,325.000
442,176.000
630,000.000
343,000.000

engecoran Beton

0.026
0.600
0.500
0.150
0.050
0.005
0.008

(150 kg besi + bekisting)

0.200
1.500
0.400
157.500
2.250
0.540
0.810
336.000
5.300
2.625
0.262
0.265

00 kg besi + bekisting)

0.270
2.000
0.600
210.000
3.000
0.540
0.810
336.000
5.650
3.235
0.323
0.283

00 kg besi + bekisting)

0.400
4.000
2.000
315.000
4.500
0.540
0.810
336.000
0.150
3.500

20.000
7.050
4.025
0.403
0.353

Batang
Oh
Oh
Oh
Oh

12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

240,000.000
374,355.000
338,905.000
43,201.600
26,757.400
9,108,270.000
9,108,200.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
4,200,000.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

1,213,600.000
55,360.000
12,800.000
3,192,000.000
67,200.000
71,550.000
107,325.000
442,176.000
588,000.000
274,400.000
192,000.000
337,185.000
279,965.000
35,697.600
24,104.400
6,893,363.000
6,893,300.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
4,200,000.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

1,213,600.000
55,360.000
12,800.000
2,394,000.000
50,400.000
71,550.000
107,325.000
442,176.000
504,000.000
274,400.000
384,000.000
281,430.000
220,604.000
28,408.000
20,087.000
6,060,140.000
6,060,100.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000

910,200.000
55,360.000
12,800.000
2,394,000.000
50,400.000
71,550.000
107,325.000
442,176.000

50 kg besi + bekisting)

0.320
3.200
1.600
210.000
3.000
0.540
0.810
336.000
0.140
2.800
16.000
6.350
3.325
0.333
0.318

50 kg besi + bekisting)

0.320
3.200
1.600
157.500
2.250
0.540
0.810
336.000
0.120
2.800
32.000
5.300
2.620
0.265
0.265

(150 kg besi + bekisting)

0.240
3.200
1.600
157.500
2.250
0.540
0.810
336.000

0.160
2.800
24.000
5.300
2.620
0.265
0.265

M3
Lbr
Batang
Oh
Oh
Oh
Oh

4,200,000.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

672,000.000
274,400.000
288,000.000
281,430.000
220,604.000
28,408.000
20,087.000
5,828,740.000
5,828,700.000

M3
Kg
Liter
Kg
Kg
Kg
Kg
Kg
M3
Lbr
Batang
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
8,000.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
4,200,000.000
98,000.000
12,000.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

948,125.000
51,900.000
9,600.000
3,192,000.000
67,200.000
71,550.000
107,325.000
442,176.000
441,000.000
245,000.000
168,000.000
300,015.000
272,387.000
34,625.600
21,451.400
6,372,355.000
6,372,300.000

0.002
0.010
3.000
0.045
0.006
0.009
4.000
0.180
0.060
0.006
0.006

M3
Kg
Kg
Kg
Kg
Kg
Kg
Oh
Oh
Oh
Oh

3,792,500.000
17,300.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
53,100.000
84,200.000
107,200.000
75,800.000
Jumlah
Dibulatkan

7,585.000
173.000
45,600.000
1,008.000
795.000
1,192.500
5,264.000
9,558.000
5,052.000
643.200
454.800
77,325.500
77,300.000

0.003
0.020
3.600
0.050
0.009
0.015
5.500
0.297
0.099
0.010

M3
Kg
Kg
Kg
Kg
Kg
Kg
Oh
Oh
Oh

3,792,500.000
17,300.000
15,200.000
22,400.000
132,500.000
132,500.000
1,316.000
53,100.000
84,200.000
107,200.000

11,377.500
346.000
54,720.000
1,120.000
1,192.500
1,987.500
7,238.000
15,770.700
8,335.800
1,072.000

(200 kg besi + bekisting

0.250
3.000
1.200
210.000
3.000
0.540
0.810
336.000
0.105
2.500
14.000
5.650
3.235
0.323
0.283

ulang (11 x 11) cm

ng (10 x 15) cm

0.015

Oh

75,800.000
Jumlah
Dibulatkan

1,137.000
104,297.000
104,200.000

0.320

OH

53,100.000

16,992.000

Jumlah

16,992.000

n Menyiram Beton

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

3.1.4.3.0

Kolom Teras 3.1.4.3.0

Kolom Teras

RENCANA ANGGARAN B
PEKERJAAN
LOKASI

NO

: PEMBANGUNAN RUMAH TING


: LHONG RAYA - BANDA ACEH

JENIS PEKERJAAN

1.0.0.0.0
1.1.0.0.0
1.2.0.0.0
1.3.0.0.0
1.4.0.0.0

PEKERJAAN PERSIAPAN
Pagar pengaman lokasi proyek
Pembersihan lokasi proyek
Pengukuran/pemasangan bowplank
Pembuatan barak kerja

2.0.0.0.0
2.1.0.0.0
2.1.1.0.0
2.1.2.0.0
2.1.3.0.0
2.2.0.0.0
2.2.1.0.0
2.2.2.0.0
2.2.3.0.0
2.3.0.0.0
2.3.1.0.0
2.3.2.0.0
2.3.3.0.0
2.4.0.0.0
2.5.0.0.0

PEKERJAAN TANAH
Galian Tanah
Galian Pondasi Tapak tipe P1
Galian Pondasi Tapak tipe P2
Galian Pondasi Menerus
Urugan Pasir Pondasi
Urugan Pasir Pondasi tapak P1
Urugan Pasir Pondasi tapak P2
Urugan Pasir Pondasi Menerus
Urugan tanah kembali
Urugan kembali pondasi tapak P1
Urugan kembali pondasi tapak P2
Urugan kembali pondasi menerus
Urugan Pasir bawah lantai
Urugan Tanah bawah lantai

3.0.0.0.0
3.1.0.0.0
3.1.1.0.0
3.1.1.1.0
3.1.1.2.0
3.1.1.2.1
3.1.1.2.2
3.1.1.2.3
3.1.1.2.4
3.1.1.3.0
3.1.1.4.0
3.1.1.4.1

KONSTRUKSI LANTAI 1
Pekerjaan Struktur
Pondasi Tapak
Aanstamping Pondasi Tapak P1
Pondasi Tapak tipe P1
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Aanstamping Pondasi Tapak P2
Pondasi Tapak tipe P2
Beton

VOLUME

86.00
200.00
74.00
13.50

16.46
45.36
30.29
0.39
1.08
2.87
4.12
11.34
7.57
102.75
30.83

5.74
2.82
261.15248
15.36
1.00
5.74
8.21

3.1.1.4.2
3.1.1.4.3
3.1.1.4.4
3.1.2.0.0
3.1.2.1.0
3.1.2.2.0
3.1.3.0.0
3.1.3.1.0
3.1.3.1.1
3.1.3.1.2
3.1.3.1.3
3.1.3.1.4
3.1.4.0.0
3.1.4.1.0
3.1.4.1.1
3.1.4.1.2
3.1.4.1.3
3.1.4.1.4
3.1.4.2.0
3.1.4.2.1
3.1.4.2.2
3.1.4.2.3
3.1.4.2.4
3.1.4.3.0
3.1.4.3.1
3.1.4.3.2
3.1.4.3.3
3.1.4.3.4
3.1.5.0.0
3.1.5.1.0
3.1.5.1.1
3.1.5.1.2
3.1.5.1.3
3.1.5.2.0
3.1.5.2.1
3.1.5.2.2
3.1.5.2.3
3.2.0.0.0
3.2.1.0.0
3.2.1.1.0
3.2.1.2.0
3.2.1.2.1
3.2.1.2.2
3.2.1.3.0
3.2.1.4.0

Pembesian/Tulangan
Bekisting
Pemeliharaan
Pondasi Menerus batu gunung
Aanstamping batu kosong
Pasangan batu gunung
Sloof
Sloof (20/30)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (D = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Tangga
Plat Tangga
Beton
Bekisting
Pemeliharaan
Anak Tangga
Beton
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan keramik lantai
Keramik lantai 40x40
Keramik lantai 20x20
Pasangan dinding keramik 20x20
Pemasangan keramik tangga

869.8314
54
1
5.7375
22.032

7.8876
1331.7906
78.876
1

8.925
1068.7152
122.4
1
1.0676
63.6218
10.676
1
1.651975
325.1924
50.83
1

1.1616
7.744
1
1.84704
10.738
1

196.99
180.73
14.91
90.00
12.3136

3.2.2.0.0
3.2.2.1.0
3.2.2.2.0
3.2.2.3.0
3.2.2.4.0
3.2.2.5.0
3.2.2.6.0
3.2.3.0.0
3.2.3.1.0
3.2.3.2.0
3.2.4.0.0
3.2.4.1.0
3.2.4.1.1
3.2.4.1.2
3.2.4.1.3
3.2.4.1.4
3.2.4.1.5
3.2.4.1.6
3.2.4.2.0
3.2.4.2.1
3.2.4.2.2
3.2.4.2.3
3.2.4.2.4
3.2.4.2.5
3.2.4.2.6
3.2.4.3.0
3.2.4.3.1
3.2.4.3.2
3.2.4.3.3
3.2.4.3.4
3.2.4.3.5
3.2.4.4.0
3.2.4.4.1
3.2.4.4.2
3.2.4.4.3
3.2.4.4.4
3.2.4.4.5
3.2.4.5.0
3.2.4.5.1
3.2.4.5.2
3.2.4.5.3
3.2.4.5.4
3.2.4.5.5
3.2.4.5.6
3.2.4.6.0

Pekerjaan Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P1
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P2
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe J1
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J2

11.504
203.9618
34.86
67.8446
46.364
271.8064
175.16
164.20

0.06012
3.266
0.3933
6.00
1.00
2.00
0.061632
3.4874
0.18
6.00
1.00
2.00
0.071424
6.532
6.00
2.00
2.00
0.104976
4.536
6.00
3.00
3.00
0.193824
2.53
2.5308
8.00
8.00
8.00

3.2.4.6.1
3.2.4.6.2
3.2.4.6.3
3.2.4.6.4
3.2.4.6.5
3.2.4.6.6
3.2.4.7.0
3.2.4.7.1
3.2.4.7.2
3.2.4.7.3
3.2.4.7.4
3.2.4.7.5
3.2.4.7.6
3.2.4.8.0
3.2.4.8.1
3.2.4.8.2
3.2.4.8.3
3.2.4.8.4
3.2.4.8.5
3.2.4.8.6
3.2.4.9.0
3.2.4.9.1
3.2.4.9.2
3.2.4.9.3
3.2.4.9.4
3.2.4.9.5
3.2.4.9.6
3.2.4.10.0
3.2.4.10.1
3.2.4.10.2
3.2.4.10.3
3.2.4.10.4
3.2.4.10.5
3.2.4.10.6
3.2.4.11.0
3.2.4.11.1
3.2.4.11.2
3.2.4.12.0
3.2.4.12.1
3.2.4.12.2
3.2.4.13.0
3.2.4.13.1
3.2.4.13.2
3.3.0.0.0
3.3.1.0.0

Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J3
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J4
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J5
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J6
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
Kusen Ventilasi
Kaca
Ventilasi tipe V2
Kusen Ventilasi
Kaca
Ventilasi atas teras
Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel

0.104688
1.38
1.9494
4.00
4.00
4.00
0.196416
2.46
2.8728
8.00
8.00
8.00
0.157248
2.22
2.6676
8.00
8.00
8.00
0.139968
1.74
2.262
8.00
8.00
8.00
0.169128
2.77
3.3345
10.00
10.00
10.00
0.032832
0.456
0.028584
0.912
0.027648
0.5503

3.3.1.1.0
3.3.1.2.0
3.3.1.3.0
3.3.2.0.0
3.3.2.1.0
3.3.2.2.0
3.3.2.3.0
3.3.3.0.0
3.3.3.1.0
3.3.3.2.0
3.4.0.0.0
3.4.1.0.0
3.4.1.1.0
3.4.1.2.0
3.4.1.3.0
3.4.1.4.0
3.4.1.5.0
3.4.1.6.0
3.4.1.7.0
3.4.2.0.0
3.4.2.1.0
3.4.2.2.0
3.4.3.0.0
3.4.3.1.0
3.4.3.2.0

Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Bak cuci piring
Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Bak Kontrol
Instalasi Kotoran
Pipa PVC ( 4")
Septictank dan Peresapan

4.0.0.0.0
4.1.0.0.0
4.1.1.0.0
4.1.1.1.0
4.1.1.1.1
4.1.1.1.2
4.1.1.1.3
4.1.1.1.4
4.1.1.2.0
4.1.1.2.1
4.1.1.2.2
4.1.1.2.3
4.1.1.2.4
4.1.1.3.0
4.1.1.3.1
4.1.1.3.2
4.1.1.3.3
4.1.1.3.4
4.1.2.0.0

KONSTRUKSI LANTAI 2
Pekerjaan Struktur
Balok Lantai
Balok 25/40
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 25/50
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 13/18
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Plat Lantai

1.00
1.00
1.00
8.00
5.00
6.00
7.00
6.00

68.29
3.00
2.00
4.00
3.00
1.00
1.00
60.2
3.00
38.11
2.00

13.3
1753.07
107.73
1
2.1875
237.8486
1.766
1
0.15912
22.29688
3.332
1

4.1.2.1.0
4.1.2.2.0
4.1.2.3.0
4.1.2.4.0
4.1.3.0.0
4.1.3.1.0
4.1.3.1.1
4.1.3.1.2
4.1.3.1.3
4.1.3.1.4
4.1.3.2.0
4.1.3.2.1
4.1.3.2.2
4.1.3.2.3
4.1.3.2.4
4.1.3.3.0
4.1.3.3.1
4.1.3.3.2
4.1.3.3.3
4.1.3.3.4
4.1.4.0.0
4.1.4.1.0
4.1.4.2.0
4.1.4.3.0
4.1.4.4.0
4.2.0.0.0
4.2.1.0.0
4.2.1.1.0
4.2.1.2.0
4.2.1.2.1
4.2.1.2.2
4.2.1.3.0
4.2.2.0.0
4.2.2.1.0
4.2.2.2.0
4.2.2.3.0
4.2.2.4.0
4.2.2.5.0
4.2.2.6.0
4.2.3.0.0
4.2.3.1.0
4.2.3.2.0
4.2.4.0.0
4.2.4.1.0
4.2.4.1.1

Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (d = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Ringbalk
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan Keramik lantai
Keramik lantai 40x40
Keramik Lantai 20x20
Pasangan dinding keramik 20x20
Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P3
Kusen Pintu

19.1988
247.104
159.99
1

7.00
737.72
96
1
1.0048
59.739
10.048
1
1.5548
303.37
47.84
1
8.58
1126.125
114.4
1

159.99
143.73
14.89
90.00
11.464
141.31
35.91
60.91
94.748
404.43
182.86
180.20

0.056232

4.2.4.1.2
4.2.4.1.3
4.2.4.1.4
4.2.4.1.5
4.2.4.1.6
4.2.4.2.0
4.2.4.2.1
4.2.4.2.2
4.2.4.2.3
4.2.4.2.4
4.2.4.2.5
4.2.4.3.0
4.2.4.3.1
4.2.4.3.2
4.2.4.3.3
4.2.4.3.4
4.2.4.3.5
4.2.4.4.0
4.2.4.4.1
4.2.4.4.2
4.2.4.4.3
4.2.4.4.4
4.2.4.4.5
4.2.4.4.6
4.2.4.5.0
4.2.4.5.1
4.2.4.5.2
4.2.4.5.3
4.2.4.5.4
4.2.4.5.5
4.2.4.5.6
4.2.4.6.0
4.2.4.6.1
4.2.4.6.2
4.2.4.6.3
4.2.4.6.4
4.2.4.6.5
4.2.4.6.6
4.2.4.7.0
4.2.4.7.1
4.2.4.7.2
4.2.4.7.3
4.2.4.7.4
4.2.4.7.5
4.2.4.7.6

Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe JA
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JB
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JC
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JD
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin

2.982
0.3933
6.00
1.00
2.00
0.107136
9.798
9.00
3.00
3.00
0.104976
4.536
6.00
3.00
3.00
0.094032
1.27
1.147
4.00
4.00
4.00
0.101808
1.41
1.767
4.00
4.00
4.00
0.190656
2.48
2.604
8.00
8.00
8.00
0.229392
3.81
3.441
12.00
12.00
12.00

4.2.4.8.0
4.2.4.8.1
4.2.4.8.2
4.2.4.8.3
4.2.4.8.4
4.2.4.8.5
4.2.4.8.6
4.2.4.9.0
4.2.4.9.1
4.2.4.9.2
4.2.4.9.3
4.2.4.9.4
4.2.4.9.5
4.2.4.9.6
4.2.4.10.0
4.2.4.10.1
4.2.4.10.2
4.2.4.10.3
4.2.4.10.4
4.2.4.10.5
4.2.4.10.6
4.2.4.11.0
4.2.4.11.1
4.2.4.11.2
4.2.4.12.0
4.2.4.12.1
4.2.4.12.2
4.2.4.13.0
4.2.4.13.1
4.2.4.13.2
4.3.0.0.0
4.3.1.0.0
4.3.1.1.0
4.3.1.1.1
4.3.1.1.2
4.3.2.0.0
4.3.2.1.0
4.3.2.1.1
4.3.2.1.2
4.3.3.0.0
4.3.3.1.0
4.3.3.1.1
4.4.0.0.0
4.4.1.0.0
4.4.1.1.0

Jendela tipe JE
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JF
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JG
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
Kusen Ventilasi
Kaca
Ventilasi tipe V2
Kusen Ventilasi
Kaca
Ventilasi tipe V3
Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")

0.105912
1.90
1.7205
6.00
6.00
6.00
0.032544
0.42
0.456
2.00
2.00
2.00
0.134568
1.7925
1.48
10.00
10.00
10.00
0.032832
0.912
0.028584
0.912
0.152064
1.3284

2.00
1.00
1.00
18.00
9.00
11.00
15.00
14.00

68.29

4.4.1.2.0
4.4.1.3.0
4.4.1.4.0
4.4.1.5.0
4.4.1.6.0
4.4.2.0.0
4.4.2.1.0
4.4.2.2.0

Kloset Duduk Keramik


Bak mandi fibre
Kran air
Floor drain
Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Bak Kontrol

5.0.0.0.0
5.1.1.0.0
5.1.2.0.0
5.1.3.0.0
5.1.4.0.0
5.1.4.1.0
5.1.4.2.0
5.1.4.3.0
5.1.4.4.0
5.1.4.5.0

KONSTRUKSI ATAP
Pemasangan Kuda - kuda K1
Pemasangan Kuda - kuda K2
Pemasangan Kuda - kuda K3
Pemasangan Penutup Atap
Gording 5/10
Pemasangan kasau + reng genteng
Pemasangan atap genteng metal
Rabung genteng keramik
Listplank 3/30

6.0.0.0.0
6.1.0.0.0
6.1.1.0.0
6.1.2.0.0
6.1.3.0.0
6.1.4.0.0
6.1.5.0.0
6.1.6.0.0
6.1.7.0.0
6.1.8.0.0
6.1.9.0.0
6.1.10.0.0
6.1.11.0.0
6.1.12.0.0
6.2.0.0.0
6.3.0.0.0
6.3.1.0.0
6.3.2.0.0
6.3.3.0.0

PEKERJAAN LANDSCAPE
Pekerjaan Pagar
Galian Tanah Pondasi Menerus
Urugan Pasir Bawah Pondasi
Urugan Tanah Kembali
Pemasangan Aanstamping
Pemasangan Pondasi Batu Gunung
Sloof 20/25
Kolom 23/23
Dinding Pagar
Plesteran
Ringbalk
Pasang Pagar Besi
Pintu Pagar Besi 450x155
Timbunan Tanah Halaman
Pekerjaan Tanaman
Ekor Tupai
Bougenville
Bunga Lily

2.00
2.00
3.00
3.00
1.00
60.20
3.00

1.481312
0.626448
2.49944
1.1754
261.86
261.86
51.81
72.71

64.98
5.415
45.125
10.83
36.55125
9.025
4.03098
233.027
466.054
1.25775
615.00
1.00
160.00
12.00
4.00
6.00

ANA ANGGARAN BIAYA (RAB)

EMBANGUNAN RUMAH TINGGAL 2 LANTAI TIPE 380


HONG RAYA - BANDA ACEH

SATUAN

ANALISA

m1
m2
m2
m2

RSNI
RSNI
RSNI
RSNI

m3
m3
m3

SNI 2835:2008-6.2
SNI 2835:2008-6.2
SNI 2835:2008-6.1

m3
m3
m3

SNI 2835:2008-6.11
SNI 2835:2008-6.11
SNI 2835:2008-6.11

m3
m3
m3
m2
m2

T-12-2002-B2
T-12-2002-B8
T-12-2002-B4
T-12-2002-B9
TOTAL

SNI 2835:2008 6.10.a


SNI 2835:2008 6.10.a
SNI 2835:2008 6.10.a
SNI 2835:2008-6.11
SNI 2835:2008 6.10.a
TOTAL

HARGA SATUAN

TOTAL

Jumlah

395,600.00
9,100.00
87,500.00
1,239,500.00

34,021,600.00
1,820,000.00
6,475,000.00
16,733,250.00
59,049,850.00

51,200.00
51,200.00
41,700.00

842,956.80
2,322,432.00
1,263,259.80

169,400.00
169,400.00
169,400.00

66,404.80
182,952.00
485,966.25

102,800.00
102,800.00
102,800.00
89,100.00
102,800.00

423,124.80
1,165,752.00
778,555.80
9,155,025.00
3,168,810.00
19,855,239.25

m3

SNI 2836:2008-6.9

335,500.00

1,924,931.25

m3

m3

SNI 7394:2008-6.8
SNI 7394:2008-6.17.a
SNI 7394:2008-6.20
Taksiran
SNI 2836:2008-6.9

810,700.00
17,300.00
211,900.00
16,992.00
335,500.00

2,286,174.00
4,517,937.90
3,254,784.00
16,992.00
1,924,931.25

m3

SNI 7394:2008-6.8

810,700.00

6,651,793.50

kg
m2

kg
m2

SNI 7394:2008-6.17.a
SNI 7394:2008-6.20
Taksiran

17,300.00
211,900.00
16,992.00

15,048,083.22
11,442,600.00
16,992.00

m3
m3

SNI 2836:2008-6.9
SNI 2836:2008-6.1

335,500.00
682,700.00

1,924,931.25
15,041,246.40

m3

SNI 7394:2008-6.8
SNI 7394:2008-6.17.a
SNI 7394:2008-6.21
Taksiran

810,700.00
17,300.00
211,900.00
16,992.00

6,394,477.32
23,039,977.38
16,713,824.40
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.a
SNI 7394:2008-6.21
Taksiran

810,700.00
17,300.00
211,900.00
16,992.00

7,235,497.50
18,488,772.96
25,936,560.00
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.a
SNI 7394:2008-6.21
Taksiran

810,700.00
17,300.00
211,900.00
16,992.00

865,503.32
1,100,657.14
2,262,244.40
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.a
SNI 7394:2008-6.21
Taksiran

810,700.00
17,300.00
211,900.00
16,992.00

1,339,256.13
5,625,828.52
10,770,877.00
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.23
Taksiran

810,700.00
363,800.00
16,992.00

941,709.12
2,817,267.20
16,992.00

kg

SNI 7394:2008-6.8
SNI 7394:2008-6.23
Taksiran

810,700.00
363,800.00
16,992.00

1,497,395.33
3,906,484.40
16,992.00

m2

SNI 2002 6.5

85,800.00

16,901,742.00

177,700.00
163,900.00
163,900.00
163,900.00

32,115,721.00
2,443,749.00
14,751,000.00
2,018,199.04

kg
m2

m3
kg
m2

m3
kg
m2

m3
kg
m2

m3
kg

m3

m2
m2
m2
m2

SNI
SNI
SNI
SNI

7395:2008-6.11
7395:2008-6.36
7395:2008-6.36
7395:2008-6.36

m2
m2
m2
m2
m2
m2

SNI
SNI
SNI
SNI
SNI
SNI

6897:2008-6.7
6897:2008-6.9
6897:2008-6.7
6897:2008-6.9
6897:2008-6.7
6897:2008-6.9

98,400.00
89,200.00
98,400.00
89,200.00
47,300.00
42,600.00

1,131,993.60
18,193,392.56
3,430,224.00
6,051,738.32
2,193,017.20
11,578,952.64

200,400.00
11,000.00

35,102,064.00
1,806,200.00

m1
m1

SNI 2839:2008-6.8a
SNI 2839 : 2008 - 6.10

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
574,100.00
121,100.00
30,000.00
135,000.00
13,300.00

431,511.30
1,875,010.60
47,628.63
180,000.00
135,000.00
26,600.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
574,100.00
121,100.00
30,000.00
135,000.00
13,300.00

442,363.68
2,002,116.34
21,798.00
180,000.00
135,000.00
26,600.00

m3
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran

7,177,500.00
574,100.00
30,000.00
135,000.00
13,300.00

512,645.76
3,750,021.20
180,000.00
270,000.00
26,600.00

m3
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran

7,177,500.00
574,100.00
30,000.00
135,000.00
13,300.00

753,465.24
2,604,117.60
180,000.00
405,000.00
39,900.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,391,171.76
18,164,817.00
258,394.68
180,800.00
106,400.00
128,800.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

751,398.12
9,909,256.50
199,033.74
90,400.00
53,200.00
64,400.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,409,775.84
17,622,198.00
293,312.88
180,800.00
106,400.00
128,800.00

m3
m
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,128,647.52
15,908,211.00
272,361.96
180,800.00
106,400.00
128,800.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,004,620.32
12,503,205.00
230,950.20
180,800.00
106,400.00
128,800.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,213,916.22
19,885,263.75
340,452.45
226,000.00
133,000.00
161,000.00

m3
m2

SNI 3434:2008-6.2
Taksiran

7,177,500.00
102,100.00

235,651.68
46,557.60

m3
m2

SNI 3434:2008-6.2
Taksiran

7,177,500.00
102,100.00

205,161.66
93,115.20

m3
m2

SNI 3434:2008-6.2
Taksiran

7,177,500.00
102,100.00

198,443.52
56,185.63

unit
m1
m1

Taksiran
Taksiran
Taksiran

202,000.00
20,000.00
20,000.00

202,000.00
20,000.00
20,000.00

titik
titik
titik

Taksiran
Taksiran
Taksiran

92,000.00
80,000.00
39,000.00

736,000.00
400,000.00
234,000.00

titik
titik

Taksiran
Taksiran

25,700.00
35,000.00

179,900.00
210,000.00

m1
buah
buah
buah
buah
buah
buah

Taksiran
Taksiran
Taksiran
Taksiran
Taksiran
Taksiran
Taksiran

34,700.00
1,774,700.00
2,136,900.00
18,500.00
20,700.00
709,700.00
600,400.00

2,369,663.00
5,324,100.00
4,273,800.00
74,000.00
62,100.00
709,700.00
600,400.00

m1
buah

Taksiran
Taksiran

142,800.00
380,000.00

8,596,560.00
1,140,000.00

m1
unit

Taksiran
Taksiran

318,300.00
570,000.00

12,130,413.00
1,140,000.00
499,169,790.83

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.23
Taksiran

810,700.00
31,200.00
363,800.00
16,992.00

10,782,310.00
54,695,877.60
39,192,174.00
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.23
Taksiran

810,700.00
31,200.00
363,800.00
16,992.00

1,773,406.25
7,420,876.32
642,470.80
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.23
Taksiran

810,700.00
31,200.00
363,800.00
16,992.00

128,998.58
695,662.66
1,212,181.60
16,992.00

TOTAL

m3
kg
m2

m3
kg
m2

m3
kg
m2

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.24
Taksiran

810,700.00
31,200.00
399,100.00
16,992.00

15,564,467.16
7,709,644.80
63,852,009.00
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.22
Taksiran

810,700.00
31,200.00
351,100.00
16,992.00

5,674,900.00
23,016,864.00
33,705,600.00
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.22
Taksiran

810,700.00
31,200.00
351,100.00
16,992.00

814,591.36
1,863,856.80
3,527,852.80
16,992.00

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.22
Taksiran

810,700.00
31,200.00
351,100.00
16,992.00

1,260,476.36
9,465,144.00
16,796,624.00
16,992.00

kg
m2

SNI 7394:2008-6.8
SNI 7394:2008-6.17.b
SNI 7394:2008-6.23
Taksiran

810,700.00
31,200.00
363,800.00
16,992.00

6,955,806.00
35,135,100.00
41,618,720.00
16,992.00

m2

SNI 2002 6.5

85,800.00

13,727,142.00

m2
m2
m2

SNI 7395:2008-6.35
SNI 7395:2008-6.36
SNI 7395:2008-6.36

109,100.00
163,900.00
163,900.00

15,680,943.00
2,440,471.00
14,751,000.00

98,400.00
89,200.00
98,400.00
89,200.00
47,300.00
42,600.00

1,128,057.60
12,604,869.84
3,533,544.00
5,432,743.84
4,481,580.40
17,228,752.08

200,500.00
11,000.00

36,663,430.00
1,982,200.00

7,177,500.00

403,605.18

m3
kg
m2

m3
kg
m2

m3
kg
m2

m3
kg
m2

m3

m2
m2
m2
m2
m2
m2

SNI
SNI
SNI
SNI
SNI
SNI

6897:2008-6.7
6897:2008-6.9
6897:2008-6.7
6897:2008-6.9
6897:2008-6.7
6897:2008-6.9

m1
m1

SNI 2839:2008-6.8a
SNI 2839 : 2008 - 6.10

m3

SNI 3434:2008-6.2

m2
m2
buah
buah
buah

SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran
Taksiran

574,100.00
121,100.00
30,000.00
135,000.00
13,300.00

1,711,966.20
47,628.63
180,000.00
135,000.00
26,600.00

m3
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran

7,177,500.00
574,100.00
30,000.00
135,000.00
13,300.00

768,968.64
5,625,031.80
270,000.00
405,000.00
39,900.00

m3
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.5
Taksiran
Taksiran
Taksiran

7,177,500.00
574,100.00
30,000.00
135,000.00
13,300.00

753,465.24
2,604,117.60
180,000.00
405,000.00
39,900.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

674,914.68
9,113,989.50
117,108.70
90,400.00
53,200.00
64,400.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

730,726.92
10,141,807.50
180,410.70
90,400.00
53,200.00
64,400.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,368,433.44
17,828,910.00
265,868.40
180,800.00
106,400.00
128,800.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

1,646,461.08
27,341,968.50
351,326.10
271,200.00
159,600.00
193,200.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

760,183.38
13,670,984.25
175,663.05
135,600.00
79,800.00
96,600.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

233,584.56
3,014,550.00
46,557.60
45,200.00
26,600.00
32,200.00

m3
m2
m2
buah
buah
buah

SNI 3434:2008-6.2
SNI 3434:2008-6.2
Taksiran
Taksiran
Taksiran
Taksiran

7,177,500.00
7,177,500.00
102,100.00
22,600.00
13,300.00
16,100.00

965,861.82
12,865,668.75
151,108.00
226,000.00
133,000.00
161,000.00

m3
m2

SNI 3434:2008-6.2
Taksiran

7,177,500.00
102,100.00

235,651.68
93,115.20

m3
m2

SNI 3434:2008-6.2
Taksiran

7,177,500.00
102,100.00

205,161.66
93,115.20

m3
m2

SNI 3434:2008-6.2
Taksiran

7,177,500.00
102,100.00

1,091,439.36
135,629.64

unit
m1
m1

Taksiran
Taksiran
Taksiran

202,000.00
20,000.00
20,000.00

404,000.00
20,000.00
20,000.00

titik
titik
titik

Taksiran
Taksiran
Taksiran

92,000.00
80,000.00
39,000.00

1,656,000.00
720,000.00
429,000.00

titik
titik

Taksiran
Taksiran

25,700.00
35,000.00

385,500.00
490,000.00

m1

Taksiran

34,700.00

2,369,663.00

buah
buah
buah
buah
buah

Taksiran
Taksiran
Taksiran
Taksiran
Taksiran

1,774,700.00
2,136,900.00
18,500.00
20,700.00
600,400.00

3,549,400.00
4,273,800.00
55,500.00
62,100.00
600,400.00

m1

Taksiran
Taksiran

142,800.00
380,000.00

8,596,560.00
1,140,000.00
646,774,279.81

buah

TOTAL
m3
m3
m3

SNI 3434:2008-6.13
SNI 3434:2008-6.13
SNI 3434:2008-6.13

6,338,800.00
6,338,800.00
6,338,800.00

9,389,740.51
3,970,928.58
15,843,450.27

m3

SNI 3434:2008-6.15
SNI 3434:2008-6.16
Taksiran
SNI 3434:2008-6-39
SNI 3434:2008-6.22
TOTAL

5,689,400.00
77,500.00
65,000.00
70,300.00
87,100.00

6,687,320.76
20,294,150.00
17,020,900.00
3,642,243.00
6,333,041.00
83,181,774.12

41,700.00
169,400.00
102,800.00
335,500.00
682,700.00
2,154,600.00
3,232,800.00
89,200.00
42,600.00
3,795,000.00
220,000.00
6,500,000.00
102,800.00

2,709,666.00
917,301.00
4,638,850.00
3,633,465.00
24,953,538.38
19,445,265.00
13,031,352.14
20,786,008.40
19,853,900.40
4,773,161.25
135,300,000.00
6,500,000.00
16,448,000.00

25,000.00
25,000.00
30,000.00

300,000.00
100,000.00
180,000.00
273,570,507.57

m
m2
m1
m1
2

m3

I.SNI 2835:2008-6.1
SNI 2835:2008-6.11
SNI 2835:2008 6.10.a
SNI 2836:2008-6.9
SNI 2836:2008-6.1
Analisa Beton 11.1
Analisa Beton 12.1
SNI 6897:2008-6.9
SNI 2837:2008-6.4
Analisa Beton 13.1
Taksiran
Taksiran
SNI 2835:2008 6.10.a

btg
btg
btg

Taksiran
Taksiran
Taksiran

m3
m2
m1
m3
m3
m3
m3
m2
m2
m3
m1

unit

TOTAL

REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA
PEKERJAAN
LOKASI

: Pembangunan Rumah Tinggal Dua Lantai Tipe 38


: Lhong Raya - Banda Aceh

No.

Uraian Pekerjaan

PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH

III

KONSTRUKSI LANTAI 1

IV

KONSTRUKSI LANTAI 2

KONSTRUKSI ATAP

VI

PEKERJAAN LANDSCAPE

TERBILANG :

JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
Satu Milyar Tujuh Ratus Tiga Puluh Sembilan Tujuh Ratus Enam P

TAL
N BIAYA

mah Tinggal Dua Lantai Tipe 380

Jumlah Harga
c
59,049,850.00
19,855,239.25
499,169,790.83
646,774,279.81
83,181,774.12
273,570,507.57

1,581,601,441.58
158,160,144.16
1,739,761,585.74
1,739,760,000.00
luh Sembilan Tujuh Ratus Enam Puluh Ribu

Tabel 4.1 Durasi Pekerjaan


No.

Uraian Pekerjaan

1.0.0.0.0
1.1.0.0.0
1.2.0.0.0
1.3.0.0.0
1.4.0.0.0

PEKERJAAN PERSIAPAN
Pagar pengaman lokasi proyek
Pembersihan lokasi proyek
Pengukuran/pemasangan bowplank
Pembuatan barak kerja

2.0.0.0.0
2.1.0.0.0
2.1.1.0.0
2.1.2.0.0
2.1.3.0.0
2.2.0.0.0
2.2.1.0.0
2.2.2.0.0
2.2.3.0.0
2.3.0.0.0
2.3.1.0.0
2.3.2.0.0
2.3.3.0.0
2.4.0.0.0
2.5.0.0.0

PEKERJAAN TANAH
Galian Tanah
Galian Pondasi Tapak tipe P1
Galian Pondasi Tapak tipe P2
Galian Pondasi Menerus
Urugan Pasir Pondasi
Urugan Pasir Pondasi tapak P1
Urugan Pasir Pondasi tapak P2
Urugan Pasir Pondasi Menerus
Urugan tanah kembali
Urugan kembali pondasi tapak P1
Urugan kembali pondasi tapak P2
Urugan kembali pondasi menerus
Urugan Pasir bawah lantai
Urugan Tanah bawah lantai

3.0.0.0.0
3.1.0.0.0
3.1.1.0.0
3.1.1.1.0
3.1.1.2.0
3.1.1.2.1
3.1.1.2.2
3.1.1.2.3
3.1.1.2.4
3.1.1.3.0
3.1.1.4.0
3.1.1.4.1
3.1.1.4.2
3.1.1.4.3
3.1.1.4.4
3.1.2.0.0
3.1.2.1.0
3.1.2.2.0
3.1.3.0.0
3.1.3.1.0
3.1.3.1.1

KONSTRUKSI LANTAI 1
Pekerjaan Struktur
Pondasi Tapak
Aanstamping Pondasi Tapak P1
Pondasi Tapak tipe P1
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Aanstamping Pondasi Tapak P2
Pondasi Tapak tipe P2
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pondasi Menerus batu gunung
Aanstamping batu kosong
Pasangan batu gunung
Sloof
Sloof (20/30)
Beton

Satuan

Faktor
tenaga
kerja

86.00
200.00
74.00
13.50

m'
m3
m3
m3

0.64
0.15
0.22
3.25

16.46
45.36
30.29

m3
m3
m3

0.95
0.95
0.78

0.39
1.08
2.87

m3
m3
m3

0.31
0.31
0.31

4.12
11.34
7.57
102.75
30.83

m3
m3
m3
m2
m2

0.55
0.55
0.55
0.31
0.55

5.74

m3

1.25

2.82
261.15248
15.36
1
5.7375

m3
Kg
m2

2.04
0.0151
0.83
0.32
1.25

8.205
869.8314
54
1

m3
Kg
m2

2.04
0.02
0.83
0.32

5.7375
22.032

m3
m3

1.25
2.40

7.8876

m3

2.04

m3

3.1.3.1.2
3.1.3.1.3
3.1.3.1.4
3.1.4.0.0
3.1.4.1.0
3.1.4.1.1
3.1.4.1.2
3.1.4.1.3
3.1.4.1.4
3.1.4.2.0
3.1.4.2.1
3.1.4.2.2
3.1.4.2.3
3.1.4.2.4
3.1.4.3.0
3.1.4.3.1
3.1.4.3.2
3.1.4.3.3
3.1.4.3.4
No.
3.1.5.0.0
3.1.5.1.0
3.1.5.1.1
3.1.5.1.2
3.1.5.1.3
3.1.5.2.0
3.1.5.2.1
3.1.5.2.2
3.1.5.2.3
3.2.0.0.0
3.2.1.0.0
3.2.1.1.0
3.2.1.2.0
3.2.1.2.1
3.2.1.2.2
3.2.1.3.0
3.2.1.4.0
3.2.2.0.0
3.2.2.1.0
3.2.2.2.0
3.2.2.3.0
3.2.2.4.0
3.2.2.5.0
3.2.2.6.0
3.2.3.0.0
3.2.3.1.0

Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (D = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Uraian Pekerjaan
Pekerjaan Tangga
Plat Tangga
Beton
Bekisting
Pemeliharaan
Anak Tangga
Beton
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan keramik lantai
Keramik lantai 40x40
Keramik lantai 20x20
Pasangan dinding keramik 20x20
Pemasangan keramik tangga
Pekerjaan Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum

1331.7906
78.876
1

Kg
m2

0.02
0.83
0.32

8.925
1068.7152
122.4
1

m3
Kg
m2

2.04
0.02
1.06
0.32

1.0676
63.6218
10.676
1

m3
Kg
m2

2.04
0.02
1.06
0.32

1.651975
325.1924
50.83
1

m3
Kg
m2

2.04
0.02
1.06
0.32

Satuan

1.1616
7.744
1

m3
m2

2.04
1.06
0.32

1.84704
10.738
1

m3
m2

1.65
1.06
0.32

196.99

m2

1.18

180.73
14.91
90
12.3136

m2
m2
m2
m2

0.15
0.42
0.42
0.42

11.504
203.9618
34.86
67.8446
46.364
271.8064

m2
m2
m2
m2
m2
m2

0.13
0.13
0.13
0.13
0.13
0.13

175.16

m2

0.13

Faktor
tenaga
kerja

3.2.3.2.0
3.2.4.0.0
3.2.4.1.0
3.2.4.1.1
3.2.4.1.2
3.2.4.1.3
3.2.4.1.4
3.2.4.1.5
3.2.4.1.6
3.2.4.2.0
3.2.4.2.1
3.2.4.2.2
3.2.4.2.3
3.2.4.2.4
3.2.4.2.5
3.2.4.2.6
3.2.4.3.0
3.2.4.3.1
3.2.4.3.2
3.2.4.3.3
3.2.4.3.4
3.2.4.3.5
3.2.4.4.0
3.2.4.4.1
3.2.4.4.2
3.2.4.4.3
3.2.4.4.4
3.2.4.4.5
3.2.4.5.0
3.2.4.5.1
3.2.4.5.2
3.2.4.5.3
3.2.4.5.4
3.2.4.5.5
3.2.4.5.6
3.2.4.6.0
3.2.4.6.1
3.2.4.6.2
No.
3.2.4.6.3
3.2.4.6.4
3.2.4.6.5
3.2.4.6.6
3.2.4.7.0
3.2.4.7.1
3.2.4.7.2

Pemasangan List Profil


Pintu, Jendela dan Ventilasi
Pintu tipe P1
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P2
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe J1
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J2
Kusen Jendela
Daun Jendela
Uraian Pekerjaan
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J3
Kusen Jendela
Daun Jendela

164.2

m2

0.11

0.06012
3.266
0.3933
6
1
2

m3
m2
m2
buah
buah
buah

26.10
4.35
1.00

0.061632
3.4874
0.18
6
1
2

m3
m2
m2
buah
buah
buah

26.10
4.35

0.071424
6.532
6
2
2

m3
m2
buah
buah
buah

26.10
4.35

0.104976
4.536
6
3
3

m3
m2
buah
buah
buah

26.10
4.35

0.193824
2.5308
2.5308
8
8
8

m3
m2
m2
buah
buah
buah

26.10
4.35

0.104688
1.3806

m3
m2

26.10
4.35

Satuan

Faktor
tenaga
kerja

1.9494
4
4
4

m2
buah
buah
buah

0.196416
2.4552

m3
m2

26.10
26.10

3.2.4.7.3
3.2.4.7.4
3.2.4.7.5
3.2.4.7.6
3.2.4.8.0
3.2.4.8.1
3.2.4.8.2
3.2.4.8.3
3.2.4.8.4
3.2.4.8.5
3.2.4.8.6
3.2.4.9.0
3.2.4.9.1
3.2.4.9.2
3.2.4.9.3
3.2.4.9.4
3.2.4.9.5
3.2.4.9.6
3.2.4.10.0
3.2.4.10.1
3.2.4.10.2
3.2.4.10.3
3.2.4.10.4
3.2.4.10.5
3.2.4.10.6
3.2.4.11.0
3.2.4.11.1
3.2.4.11.2
3.2.4.12.0
3.2.4.12.1
3.2.4.12.2
3.2.4.13.0
3.2.4.13.1
3.2.4.13.2
3.3.0.0.0
3.3.1.0.0
3.3.1.1.0
3.3.1.2.0
3.3.1.3.0
3.3.2.0.0
3.3.2.1.0
3.3.2.2.0
3.3.2.3.0
3.3.3.0.0
3.3.3.1.0
3.3.3.2.0
3.4.0.0.0
3.4.1.0.0

Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J4
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J5
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J6
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
Kusen Ventilasi
Kaca
Ventilasi tipe V2
Kusen Ventilasi
Kaca
Ventilasi atas teras
Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih

2.8728
8
8
8

m2
buah
buah
buah

0.157248
2.2164
2.6676
8
8
8

m3
m2
m2
buah
buah
buah

26.10
26.10

0.139968
1.742
2.262
8
8
8

m3
m2
m2
buah
buah
buah

26.10
26.10

0.169128
2.7705
3.3345
10
10
10

m3
m2
m2
buah
buah
buah

26.10
26.10

0.032832
0.456

m3
m2

26.10

0.028584
0.912

m3
m2

26.10

0.027648
0.5503

m3
m2

26.10

1
1
1

unit
m'
m'

8
5
6

titik
titik
titik

7
6

titik
titik

3.4.1.1.0
3.4.1.2.0
3.4.1.3.0
3.4.1.4.0
3.4.1.5.0
3.4.1.6.0
3.4.1.7.0
3.4.2.0.0
3.4.2.1.0
NO.

Pipa leiding ( 3/4")


Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Bak cuci piring
Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Uraian Pekerjaan

3.4.2.2.0
3.4.3.0.0
3.4.3.1.0
3.4.3.2.0

Bak Kontrol
Instalasi Kotoran
Pipa PVC ( 4")
Septictank dan Peresapan

4.0.0.0.0
4.1.0.0.0
4.1.1.0.0
4.1.1.1.0
4.1.1.1.1
4.1.1.1.2
4.1.1.1.3
4.1.1.1.4
4.1.1.2.0
4.1.1.2.1
4.1.1.2.2
4.1.1.2.3
4.1.1.2.4
4.1.1.3.0
4.1.1.3.1
4.1.1.3.2
4.1.1.3.3
4.1.1.3.4
4.1.2.0.0
4.1.2.1.0
4.1.2.2.0
4.1.2.3.0
4.1.2.4.0
4.1.3.0.0
4.1.3.1.0
4.1.3.1.1
4.1.3.1.2
4.1.3.1.3
4.1.3.1.4
4.1.3.2.0
4.1.3.2.1

KONSTRUKSI LANTAI 2
Pekerjaan Struktur
Balok Lantai
Balok 25/40
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 25/50
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 13/18
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Plat Lantai
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (d = 40)
Beton

68.29
3
2
4
3
1
1

m'
buah
buah
buah
buah
buah
buah

60.2

m'

Satuan

buah

38.11

m'
unit

13.3
1753.073
107.73
1

m3
kg
m2

0.39
0.01
0.40
0.32

2.1875
237.8486
1.766
1

m3
kg
m2

0.39
0.01
0.40
0.32

0.15912
22.29688
3.332
1

m3
kg
m2

0.39
0.01
0.40
0.32

19.1988
247.104
159.99
1

m3
kg
m2

0.39
0.01
0.40
0.32

7
737.72
96
1

m3
kg
m2

0.39
0.01
0.40
0.32

1.0048

m3

0.39

Faktor
tenaga
kerja

4.1.3.2.2
4.1.3.2.3
4.1.3.2.4
4.1.3.3.0
4.1.3.3.1
4.1.3.3.2
4.1.3.3.3
4.1.3.3.4
4.1.4.0.0
4.1.4.1.0
4.1.4.2.0
4.1.4.3.0
4.1.4.4.0
4.2.0.0.0
4.2.1.0.0
4.2.1.1.0
4.2.1.2.0
4.2.1.2.1
4.2.1.2.2
4.2.1.3.0
4.2.2.0.0
4.2.2.1.0
4.2.2.2.0
4.2.2.3.0
4.2.2.4.0
4.2.2.5.0
4.2.2.6.0

NO.
4.2.3.0.0
4.2.3.1.0
4.2.3.2.0
4.2.4.0.0
4.2.4.1.0
4.2.4.1.1
4.2.4.1.2
4.2.4.1.3
4.2.4.1.4
4.2.4.1.5
4.2.4.1.6
4.2.4.2.0
4.2.4.2.1
4.2.4.2.2
4.2.4.2.3
4.2.4.2.4
4.2.4.2.5

Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Ringbalk
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan Keramik lantai
Keramik lantai 40x40
Keramik Lantai 20x20
Pasangan dinding keramik 20x20
Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4

Uraian Pekerjaan
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P3
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu

59.739
10.048
1

kg
m2

0.01
0.40
0.32

1.5548
303.37
47.84
1

m3
kg
m2

0.39
0.01
0.40
0.32

8.58
1126.125
114.4
1

m3
kg
m2

0.39
0.01
0.40
0.32

159.99

m2

0.02

143.73
14.89
90

m2
m2
m2

0.42
0.42
0.42

11.464
141.3102
35.91
60.9052
94.748
404.4308

m2
m2
m2
m2
m2
m2

0.13
0.13
0.13
0.13
0.18
0.18

Satuan

Faktor
tenaga
kerja

182.86
180.2

m2
m2

0.07
0.06

0.056232
2.982
0.3933
6
1
2

m3
m2
m2
buah
buah
buah

20.10
3.35

0.107136
9.798
9
3
3

m3
m2
buah
buah
buah

20.10
3.35

4.2.4.3.0
4.2.4.3.1
4.2.4.3.2
4.2.4.3.3
4.2.4.3.4
4.2.4.3.5
4.2.4.4.0
4.2.4.4.1
4.2.4.4.2
4.2.4.4.3
4.2.4.4.4
4.2.4.4.5
4.2.4.4.6
4.2.4.5.0
4.2.4.5.1
4.2.4.5.2
4.2.4.5.3
4.2.4.5.4
4.2.4.5.5
4.2.4.5.6
4.2.4.6.0
4.2.4.6.1
4.2.4.6.2
4.2.4.6.3
4.2.4.6.4
4.2.4.6.5
4.2.4.6.6
4.2.4.7.0
4.2.4.7.1
4.2.4.7.2
4.2.4.7.3
4.2.4.7.4
4.2.4.7.5
4.2.4.7.6
4.2.4.8.0
4.2.4.8.1
4.2.4.8.2
4.2.4.8.3
4.2.4.8.4
4.2.4.8.5
4.2.4.8.6
4.2.4.9.0
4.2.4.9.1
4.2.4.9.2
4.2.4.9.3

Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe JA
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JB
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JC
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JD
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JE
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JF
Kusen Jendela
Daun Jendela
Kaca

4.2.4.9.4

Engsel Jendela

NO.

Uraian Pekerjaan

0.104976
4.536
6
3
3

m3
m2
buah
buah
buah

20.10
3.35

0.094032
1.2698
1.147
4
4
4

m3
m2
m2
buah
buah
buah

20.10
20.10

0.101808
1.413
1.767
4
4
4

m3
m2
m2
buah
buah
buah

20.10
20.10

0.190656
2.484
2.604
8
8
8

m3
m2
m2
buah
buah
buah

20.10
20.10

0.229392
3.8094
3.441
12
12
12

m3
m2
m2
buah
buah
buah

20.10
20.10

0.105912
1.9047
1.7205
6
6
6

m3
m2
m2
buah
buah
buah

20.10
20.10

0.032544
0.42
0.456

m3
m2
m2

20.10
20.10

buah

Satuan

Faktor
tenaga
kerja

NO.
4.2.4.9.6
4.2.4.10.0
4.2.4.10.1
4.2.4.10.2
4.2.4.10.3
4.2.4.10.4
4.2.4.10.5
4.2.4.10.6
4.2.4.11.0
4.2.4.11.1
4.2.4.11.2
4.2.4.12.0
4.2.4.12.1
4.2.4.12.2
4.2.4.13.0
4.2.4.13.1
4.2.4.13.2
4.3.0.0.0
4.3.1.0.0
4.3.1.1.0
4.3.1.1.1
4.3.1.1.2
4.3.2.0.0
4.3.2.1.0
4.3.2.1.1
4.3.2.1.2
4.3.3.0.0
4.3.3.1.0
4.3.3.1.1
4.4.0.0.0
4.4.1.0.0
4.4.1.1.0
4.4.1.2.0
4.4.1.3.0
4.4.1.4.0
4.4.1.5.0
4.4.1.6.0
4.4.2.0.0
4.4.2.1.0
4.4.2.2.0
5.0.0.0.0
5.1.1.0.0
5.1.2.0.0
5.1.3.0.0
5.1.4.0.0
5.1.4.1.0

Uraian Pekerjaan
Hak Angin
Jendela tipe JG
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
Kusen Ventilasi
Kaca
Ventilasi tipe V2
Kusen Ventilasi
Kaca
Ventilasi tipe V3
Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Bak Kontrol
KONSTRUKSI ATAP
Pemasangan Kuda - kuda K1
Pemasangan Kuda - kuda K2
Pemasangan Kuda - kuda K3
Pemasangan Penutup Atap
Gording 5/10

Faktor
tenaga
kerja

Satuan

buah

0.134568
1.7925
1.48
10
10
10

m3
m2
m2
buah
buah
buah

20.10
20.10

0.032832
0.912

m3
m2

20.10

0.028584
0.912

m3
m2

20.10

0.152064
1.3284

m3
m2

20.10

2
1
1

unit
m'
m'

18
9
11

titik
titik
titik

15
14

titik
titik

68.29
2
2
3
3
1

m'
buah
buah
buah
buah
buah

60.2
3

m''
buah

1.481312
0.626448
2.49944

m3
m3
m3

13.40
13.40
13.40

1.1754

m3

7.44

5.1.4.2.0
5.1.4.3.0
5.1.4.4.0
5.1.4.5.0
6.0.0.0.0
6.1.0.0.0
6.1.1.0.0
6.1.2.0.0
6.1.3.0.0
6.1.4.0.0
6.1.5.0.0
6.1.6.0.0
6.1.7.0.0
6.1.8.0.0
6.1.9.0.0
6.1.10.0.0
6.1.11.0.0
6.1.12.0.0
NO.
6.2.0.0.0
6.3.0.0.0
6.3.1.0.0
6.3.2.0.0
6.3.3.0.0

Pemasangan kasau + reng genteng


Pemasangan atap genteng metal
Rabung genteng keramik
Listplank 3/30
PEKERJAAN LANDSCAPE
Pekerjaan Pagar
Galian Tanah Pondasi Menerus
Urugan Pasir Bawah Pondasi
Urugan Tanah Kembali
Pemasangan Aanstamping
Pemasangan Pondasi Batu Gunung
Sloof 20/25
Kolom 23/23
Dinding Pagar
Plesteran
Ringbalk
Pasang Pagar Besi
Pintu Pagar Besi 450x155
Uraian Pekerjaan
Timbunan Tanah Halaman
Pekerjaan Tanaman
Ekor Tupai
Bougenville
Bunga Lily

261.86
261.86
51.81
72.71

m2
m2
m'
m'

64.98
5.415
45.125
10.83
36.55125
9.025
4.03098
233.027
466.054
1.25775
615.00
1.00

m3
m3
m3
m3
m3
m3
m3
m2
m2
m3

Satuan

Faktor
tenaga
kerja

160.00

m3

0.55

12.00
4.00
6.00

0.12
0.178
0.225

0.78
0.31
0.55
0.47
0.90

0.13
0.02

(org)

Kapasitas Tenaga
Kerja
m3/hari/0rang

6
6
5
5

1.56
6.67
4.65
0.31

9.173
5.000
3.182
8.775

10.00
5.00
4.00
9.00

7
7
8

1.06
1.06
1.29

2.223
6.124
2.935

3.00
7.00
3.00

2
2
3

3.23
3.23
3.23

0.061
0.167
0.296

1.00
1.00
1.00

3
3
5
4
4

1.82
1.82
1.82
3.23
1.82

0.755
2.079
0.833
7.963
4.238

1.00
3.00
1.00
8.00
5.00

0.80

2.387

3.00

3
4
6
2
3

0.49
66.23
1.20
3.13
0.80

1.914
0.986
2.130
0.160
2.387

2.00
1.00
3.00
1.00
3.00

3
4
6
2

0.49
66.23
1.20
3.13

5.57
3.28
7.49
0.16

6.00
4.00
8.00
1.00

4
7

0.80
0.42

1.790
7.554

2.00
8.00

0.49

8.030

9.00

T.kerja

Jam Kerja

Pembulatan

(hari)

(hari)

4
6
5

66.23
1.20
3.13

5.028
10.937
0.064

6.00
11.00
1.00

2
4
6
1

0.49
66.23
0.95
3.13

9.086
4.034
21.542
0.320

10.00
5.00
22.00
1.00

1
2
2
1

0.49
66.23
0.95
3.13

2.174
0.480
5.637
0.320

3.00
1.00
6.00
1.00

1
2
2
1

0.49
66.23
0.95
3.13

3.363
2.455
26.838
0.320

4.00
3.00
27.00
1.00

T.kerja

Kapasitas Tenaga
Kerja

Jam Kerja

Pembulatan

(org)

m3/hari/0rang

(hari)

(hari)

1
2
1

0.49
0.95
3.13

2.365
4.089
0.320

3.00
5.00
1.00

1
1
1

0.61
0.95
3.13

3.048
11.339
0.320

4.00
12.00
1.00

0.85

25.78

26.00

3
1
4
1

6.62
2.38
2.38
2.38

9.097
6.262
9.450
5.172

10.00
7.00
10.00
6.00

4
4
4
4
5
5

8
8
8
8
8
8

0.360
6.374
1.089
2.120
1.159
6.795

1.00
7.00
2.00
3.00
2.00
7.00

7.75

7.532

8.00

9.26

3.547

4.00

1
2
3

0.04
0.23
1.00

1.569
7.104
0.131

2.00
8.00
1.00

1
2

0.04
0.23

1.609
7.585

2.00
8.00

1
2

0.04
0.23

1.864
14.207

2.00
15.00

1
2

0.04
0.23

2.740
9.866

3.00
10.00

1
3

0.04
0.23

5.059
3.670

6.00
4.00

1
2

0.04
0.23

2.732
3.003

3.00
4.00

T.kerja

Kapasitas Tenaga
Kerja

Jam Kerja

Pembulatan

(org)

m3/hari/0rang

(hari)

(hari)

1
3

0.04
0.04

5.126
21.360

6.00
22.00

1
3

0.04
0.04

4.104
19.283

5.00
20.00

1
3

0.04
0.04

3.653
15.155

4.00
16.00

1
3

0.04
0.04

4.414
24.103

5.00
25.00

0.04

0.857

1.00

0.04

0.746

1.00

0.04

0.722

1.00

T.kerja

Kapasitas Tenaga
Kerja

Jam Kerja

Pembulatan

(org)

m3/hari/0rang

(hari)

(hari)

3
4
6
1

2.59
123.46
2.53
3.13

1.711
3.550
7.110
0.320

2.00
4.00
8.00
1.00

2
4
3
1

2.59
123.46
2.53
3.13

0.422
0.482
0.233
0.320

1.00
1.00
1.00
1.00

2
2
1
1

2.59
123.46
2.53
3.13

0.031
0.090
1.319
0.320

1.00
1.00
2.00
1.00

3
2
6
1

2.59
123.46
2.53
3.13

2.470
1.001
10.559
0.320

3.00
2.00
11.00
1.00

2
3
5
1

2.59
123.46
2.53
3.13

1.351
1.992
7.603
0.320

2.00
2.00
8.00
1.00

2.59

0.194

1.00

2
2
1

123.46
2.53
3.13

0.242
1.990
0.320

1.00
2.00
1.00

2
3
3
1

2.59
123.46
2.53
3.13

0.300
0.819
6.315
0.320

1.00
1.00
7.00
1.00

2
4
4
1

2.59
123.46
2.53
3.13

1.66
2.28
11.33
0.32

2.00
3.00
12.00
1.00

50.00

0.640

1.00

6
3
5

2.38
2.38
2.38

10.061
2.085
7.560

11.00
3.00
8.00

2
3
2
4
4
6

8
8
8
8
5.56
5.56

0.717
5.888
2.244
1.903
4.264
12.133

1.00
6.00
3.00
2.00
5.00
13.00

T.kerja

Kapasitas Tenaga
Kerja

Jam Kerja

Pembulatan

(org)

m3/hari/0rang

(hari)

(hari)

3
3

14.49
17.24

4.206
3.484

5.00
4.00

2
3

0.05
0.30

0.565
3.330

1.00
4.00

1
5

0.05
0.30

2.153
6.565

3.00
7.00

2
5

0.05
0.30

1.055
3.039

2.00
4.00

2
4

0.05
0.05

0.945
6.381

1.00
7.00

1
5

0.05
0.05

2.046
5.680

3.00
6.00

2
5

0.05
0.05

1.916
9.986

2.00
10.00

3
6

0.05
0.05

1.537
12.761

2.00
13.00

3
5

0.05
0.05

0.710
7.657

1.00
8.00

3
4

0.05
0.05

0.218
2.111

1.00
3.00

T.kerja

Kapasitas Tenaga
Kerja

Jam Kerja

Pembulatan

T.kerja

Kapasitas Tenaga
Kerja

Jam Kerja

Pembulatan

(org)

m3/hari/0rang

(hari)

(hari)

2
5

0.05
0.05

1.352
7.206

2.00
8.00

0.05

0.330

1.00

0.05

0.287

1.00

0.05

1.528

2.00

5
4
6

0.07
0.07
0.07

3.970
2.099
5.582

4.00
3.00
6.00

0.13

2.915

3.00

8.70

6.023

7.00

3
4

5.62
4.44

3.074
4.090

4.00
5.00

8
2
4
2
5
4
2
2
8
2

1.29
3.23
1.82
2.14
1.11
0.28
0.03
8.00
66.67
0.28

6.295
0.839
6.205
2.534
6.579
0.632
0.060
14.564
0.874
0.176

7.00
1.00
7.00
3.00
7.00
1.00
1.00
15.00
1.00
1.00

Jam Kerja

Pembulatan

(hari)
8.800

(hari)
9.00

T.kerja
(org)
10

Kapasitas Tenaga
Kerja
m3/hari/0rang
1.82

No.

Uraian Pekerjaan

1.0.0.0.0
1.1.0.0.0
1.2.0.0.0
1.3.0.0.0
1.4.0.0.0

PEKERJAAN PERSIAPAN
Pagar pengaman lokasi proyek
Pembersihan lokasi proyek
Pengukuran/pemasangan bowplank
Pembuatan barak kerja

2.0.0.0.0
2.1.0.0.0
2.1.1.0.0
2.1.2.0.0
2.1.3.0.0
2.2.0.0.0
2.2.1.0.0
2.2.2.0.0
2.2.3.0.0
2.3.0.0.0
2.3.1.0.0
2.3.2.0.0
2.3.3.0.0
2.4.0.0.0
2.5.0.0.0

PEKERJAAN TANAH
Galian Tanah
Galian Pondasi Tapak tipe P1
Galian Pondasi Tapak tipe P2
Galian Pondasi Menerus
Urugan Pasir Pondasi
Urugan Pasir Pondasi tapak P1
Urugan Pasir Pondasi tapak P2
Urugan Pasir Pondasi Menerus
Urugan tanah kembali
Urugan kembali pondasi tapak P1
Urugan kembali pondasi tapak P2
Urugan kembali pondasi menerus
Urugan Pasir bawah lantai
Urugan Tanah bawah lantai

3.0.0.0.0
3.1.0.0.0
3.1.1.0.0
3.1.1.1.0
3.1.1.2.0
3.1.1.2.1
3.1.1.2.2
3.1.1.2.3
3.1.1.2.4
3.1.1.3.0
3.1.1.4.0
3.1.1.4.1
3.1.1.4.2
3.1.1.4.3
3.1.1.4.4
3.1.2.0.0
3.1.2.1.0
3.1.2.2.0
3.1.3.0.0
3.1.3.1.0
3.1.3.1.1

KONSTRUKSI LANTAI 1
Pekerjaan Struktur
Pondasi Tapak
Aanstamping Pondasi Tapak P1
Pondasi Tapak tipe P1
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Aanstamping Pondasi Tapak P2
Pondasi Tapak tipe P2
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pondasi Menerus batu gunung
Aanstamping batu kosong
Pasangan batu gunung
Sloof
Sloof (20/30)
Beton

Durasi (hari)

10.00
5.00
4.00
9.00

0.00
3.00
7.00
3.00
1.00
1.00
1.00
1.00
3.00
1.00
8.00
5.00

3.00
2.00
1.00
3.00
1.00
3.00
6.00
4.00
8.00
1.00
2.00
8.00

9.00

3.1.3.1.2
3.1.3.1.3
3.1.3.1.4
3.1.4.0.0
3.1.4.1.0
3.1.4.1.1
3.1.4.1.2
3.1.4.1.3
3.1.4.1.4
3.1.4.2.0
3.1.4.2.1
3.1.4.2.2
3.1.4.2.3
3.1.4.2.4
3.1.4.3.0
3.1.4.3.1
3.1.4.3.2
3.1.4.3.3
3.1.4.3.4
3.1.5.0.0
3.1.5.1.0
3.1.5.1.1
3.1.5.1.2
3.1.5.1.3
3.1.5.2.0
3.1.5.2.1
3.1.5.2.2
3.1.5.2.3
3.2.0.0.0
3.2.1.0.0
3.2.1.1.0
3.2.1.2.0
3.2.1.2.1
3.2.1.2.2
3.2.1.3.0
3.2.1.4.0
3.2.2.0.0
3.2.2.1.0
3.2.2.2.0
3.2.2.3.0
3.2.2.4.0
3.2.2.5.0
3.2.2.6.0
3.2.3.0.0
3.2.3.1.0
3.2.3.2.0
3.2.4.0.0
3.2.4.1.0

Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (D = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Tangga
Plat Tangga
Beton
Bekisting
Pemeliharaan
Anak Tangga
Beton
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan keramik lantai
Keramik lantai 40x40
Keramik lantai 20x20
Pasangan dinding keramik 20x20
Pemasangan keramik tangga
Pekerjaan Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P1

6.00
11.00
1.00

10.00
5.00
22.00
1.00
3.00
1.00
6.00
1.00
4.00
3.00
27.00
1.00

3.00
5.00
1.00
4.00
12.00
1.00

26.00
10.00
7.00
10.00
6.00
1.00
7.00
2.00
3.00
2.00
7.00
8.00
4.00

3.2.4.1.1
3.2.4.1.2
3.2.4.1.3
3.2.4.1.4
3.2.4.1.5
3.2.4.1.6
3.2.4.2.0
3.2.4.2.1
3.2.4.2.2
3.2.4.2.3
3.2.4.2.4
3.2.4.2.5
3.2.4.2.6
3.2.4.3.0
3.2.4.3.1
3.2.4.3.2
3.2.4.3.3
3.2.4.3.4
3.2.4.3.5
3.2.4.4.0
3.2.4.4.1
3.2.4.4.2
3.2.4.4.3
3.2.4.4.4
3.2.4.4.5
3.2.4.5.0
3.2.4.5.1
3.2.4.5.2
3.2.4.5.3
3.2.4.5.4
3.2.4.5.5
3.2.4.5.6
3.2.4.6.0
3.2.4.6.1
3.2.4.6.2
3.2.4.6.3
3.2.4.6.4
3.2.4.6.5
3.2.4.6.6
3.2.4.7.0
3.2.4.7.1
3.2.4.7.2
3.2.4.7.3
3.2.4.7.4
3.2.4.7.5
3.2.4.7.6
3.2.4.8.0
3.2.4.8.1

Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P2
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe J1
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J2
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J3
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J4
Kusen Jendela

2.00
8.00

2.00
8.00

2.00
15.00

3.00
10.00

6.00
4.00

3.00
4.00

6.00
22.00

5.00

3.2.4.8.2
3.2.4.8.3
3.2.4.8.4
3.2.4.8.5
3.2.4.8.6
3.2.4.9.0
3.2.4.9.1
3.2.4.9.2
3.2.4.9.3
3.2.4.9.4
3.2.4.9.5
3.2.4.9.6
3.2.4.10.0
3.2.4.10.1
3.2.4.10.2
3.2.4.10.3
3.2.4.10.4
3.2.4.10.5
3.2.4.10.6
3.2.4.11.0
3.2.4.11.1
3.2.4.11.2
3.2.4.12.0
3.2.4.12.1
3.2.4.12.2
3.2.4.13.0
3.2.4.13.1
3.2.4.13.2
3.3.0.0.0
3.3.1.0.0
3.3.1.1.0
3.3.1.2.0
3.3.1.3.0
3.3.2.0.0
3.3.2.1.0
3.3.2.2.0
3.3.2.3.0
3.3.3.0.0
3.3.3.1.0
3.3.3.2.0
3.4.0.0.0
3.4.1.0.0
3.4.1.1.0
3.4.1.2.0
3.4.1.3.0
3.4.1.4.0
3.4.1.5.0
3.4.1.6.0

Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J5
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J6
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
Kusen Ventilasi
Kaca
Ventilasi tipe V2
Kusen Ventilasi
Kaca
Ventilasi atas teras
Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Bak cuci piring

20.00

4.00
16.00

5.00
25.00

1.00

1.00

1.00

2.00

5.00

3.4.1.7.0
3.4.2.0.0
3.4.2.1.0
3.4.2.2.0
3.4.3.0.0
3.4.3.1.0
3.4.3.2.0

Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Bak Kontrol
Instalasi Kotoran
Pipa PVC ( 4")
Septictank dan Peresapan

4.0.0.0.0
4.1.0.0.0
4.1.1.0.0
4.1.1.1.0
4.1.1.1.1
4.1.1.1.2
4.1.1.1.3
4.1.1.1.4
4.1.1.2.0
4.1.1.2.1
4.1.1.2.2
4.1.1.2.3
4.1.1.2.4
4.1.1.3.0
4.1.1.3.1
4.1.1.3.2
4.1.1.3.3
4.1.1.3.4
4.1.2.0.0
4.1.2.1.0
4.1.2.2.0
4.1.2.3.0
4.1.2.4.0
4.1.3.0.0
4.1.3.1.0
4.1.3.1.1
4.1.3.1.2
4.1.3.1.3
4.1.3.1.4
4.1.3.2.0
4.1.3.2.1
4.1.3.2.2
4.1.3.2.3
4.1.3.2.4
4.1.3.3.0
4.1.3.3.1
4.1.3.3.2
4.1.3.3.3
4.1.3.3.4
4.1.4.0.0

KONSTRUKSI LANTAI 2
Pekerjaan Struktur
Balok Lantai
Balok 25/40
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 25/50
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 13/18
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Plat Lantai
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (d = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Ringbalk

5.00

2.00
4.00
8.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
2.00
11.00
1.00

2.00
2.00
8.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
7.00
1.00

4.1.4.1.0
4.1.4.2.0
4.1.4.3.0
4.1.4.4.0
4.2.0.0.0
4.2.1.0.0
4.2.1.1.0
4.2.1.2.0
4.2.1.2.1
4.2.1.2.2
4.2.1.3.0
4.2.2.0.0
4.2.2.1.0
4.2.2.2.0
4.2.2.3.0
4.2.2.4.0
4.2.2.5.0
4.2.2.6.0
4.2.3.0.0
4.2.3.1.0
4.2.3.2.0
4.2.4.0.0
4.2.4.1.0
4.2.4.1.1
4.2.4.1.2
4.2.4.1.3
4.2.4.1.4
4.2.4.1.5
4.2.4.1.6
4.2.4.2.0
4.2.4.2.1
4.2.4.2.2
4.2.4.2.3
4.2.4.2.4
4.2.4.2.5
4.2.4.3.0
4.2.4.3.1
4.2.4.3.2
4.2.4.3.3
4.2.4.3.4
4.2.4.3.5
4.2.4.4.0
4.2.4.4.1
4.2.4.4.2
4.2.4.4.3
4.2.4.4.4
4.2.4.4.5
4.2.4.4.6

Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan Keramik lantai
Keramik lantai 40x40
Keramik Lantai 20x20
Pasangan dinding keramik 20x20
Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P3
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe JA
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin

2.00
3.00
12.00
1.00

1.00
11.00
3.00
8.00
1.00
6.00
3.00
2.00
5.00
13.00
5.00
4.00

1.00
4.00

3.00
7.00

2.00
4.00

1.00
7.00

4.2.4.5.0
4.2.4.5.1
4.2.4.5.2
4.2.4.5.3
4.2.4.5.4
4.2.4.5.5
4.2.4.5.6
4.2.4.6.0
4.2.4.6.1
4.2.4.6.2
4.2.4.6.3
4.2.4.6.4
4.2.4.6.5
4.2.4.6.6
4.2.4.7.0
4.2.4.7.1
4.2.4.7.2
4.2.4.7.3
4.2.4.7.4
4.2.4.7.5
4.2.4.7.6
4.2.4.8.0
4.2.4.8.1
4.2.4.8.2
4.2.4.8.3
4.2.4.8.4
4.2.4.8.5
4.2.4.8.6
4.2.4.9.0
4.2.4.9.1
4.2.4.9.2
4.2.4.9.3
4.2.4.9.4
4.2.4.9.5
4.2.4.9.6
4.2.4.10.0
4.2.4.10.1
4.2.4.10.2
4.2.4.10.3
4.2.4.10.4
4.2.4.10.5
4.2.4.10.6
4.2.4.11.0
4.2.4.11.1
4.2.4.11.2
4.2.4.12.0
4.2.4.12.1
4.2.4.12.2

Jendela tipe JB
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JC
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JD
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JE
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JF
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JG
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Ventilasi tipe V1
Kusen Ventilasi
Kaca
Ventilasi tipe V2
Kusen Ventilasi
Kaca

3.00
6.00

2.00
10.00

2.00
13.00

1.00
8.00

1.00
3.00

2.00
8.00

1.00

1.00

4.2.4.13.0
4.2.4.13.1
4.2.4.13.2
4.3.0.0.0
4.3.1.0.0
4.3.1.1.0
4.3.1.1.1
4.3.1.1.2
4.3.2.0.0
4.3.2.1.0
4.3.2.1.1
4.3.2.1.2
4.3.3.0.0
4.3.3.1.0
4.3.3.1.1
4.4.0.0.0
4.4.1.0.0
4.4.1.1.0
4.4.1.2.0
4.4.1.3.0
4.4.1.4.0
4.4.1.5.0
4.4.1.6.0
4.4.2.0.0
4.4.2.1.0
4.4.2.2.0
5.0.0.0.0
5.1.1.0.0
5.1.2.0.0
5.1.3.0.0
5.1.4.0.0
5.1.4.1.0
5.1.4.2.0
5.1.4.3.0
5.1.4.4.0
5.1.4.5.0
6.0.0.0.0
6.1.0.0.0
6.1.1.0.0
6.1.2.0.0
6.1.3.0.0
6.1.4.0.0
6.1.5.0.0
6.1.6.0.0
6.1.7.0.0
6.1.8.0.0
6.1.9.0.0
6.1.10.0.0

Ventilasi tipe V3
Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Bak Kontrol
KONSTRUKSI ATAP
Pemasangan Kuda - kuda K1
Pemasangan Kuda - kuda K2
Pemasangan Kuda - kuda K3
Pemasangan Penutup Atap
Gording 5/10
Pemasangan kasau + reng genteng
Pemasangan atap genteng metal
Rabung genteng keramik
Listplank 3/30
PEKERJAAN LANDSCAPE
Pekerjaan Pagar
Galian Tanah Pondasi Menerus
Urugan Pasir Bawah Pondasi
Urugan Tanah Kembali
Pemasangan Aanstamping
Pemasangan Pondasi Batu Gunung
Sloof 20/25
Kolom 23/23
Dinding Pagar
Plesteran
Ringbalk

2.00

2.00

4.00

4.00
3.00
6.00
3.00
7.00
4.00
5.00

7.00
1.00
7.00
3.00
7.00
1.00
1.00
15.00
1.00
1.00

6.1.11.0.0
6.1.12.0.0
6.2.0.0.0
6.3.0.0.0
6.3.1.0.0
6.3.2.0.0

Pasang Pagar Besi


Pintu Pagar Besi 450x155
Timbunan Tanah Halaman
Pekerjaan Tanaman
Ekor Tupai
Bougenville

6.3.3.0.0

Bunga Lily

9.00

4.00

Kegiatan Sebelum

1.4.0.0.0
1.2.0.0.0
1.1.0.0.0

1.3.0.0.0
2.1.1.0.0
2.1.2.0.0
2.1.3.0.0
2.1.3.0.0
2.1.3.0.0
3.1.1.2.4
3.1.1.4.4
3.1.2.2.0
5.1.4.5.0
5.1.4.5.0

2.2.1.0.0
3.1.1.2.3
3.1.1.1.0
3.1.1.2.2
3.1.1.2.1
2.2.2.0.0
3.1.1.4.3
3.1.1.3.0
3.1.1.4.2
3.1.1.4.1
2.2.3.0.0
3.1.2.1.0

3.1.3.1.3

2.3.1.0.0 ; 2.3.2.0.0 ;2.3.3.0.0


3.1.3.1.2
3.1.3.1.1

3.1.4.1.4
3.1.3.1.4
3.1.4.1.2
3.1.4.1.1
3.1.4.2.3
3.1.4.1.4
3.1.4.2.2
3.1.4.2.1
3.1.4.3.3
3.1.4.1.4
3.1.4.3.2
3.1.4.3.1

3.1.5.1.2
4.1.2.4.0
3.1.5.1.1
3.1.5.2.2
3.1.5.1.3
3.1.5.2.1

2.4.0.0.0
2.4.0.0.0
3.1.5.1.3
2.4.0.0.0
3.1.5.2.3
3.1.4.1.4
3.2.2.1.0
3.2.2.1.0
3.2.2.1.0
3.2.4.0.0
3.2.4.0.0
5.1.4.5.0
5.1.4.5.0
3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

3.2.2.2.0

4.2.3.1.0 ; 4.2.3.2.0

4.2.3.1.0 ; 4.2.3.2.0

4.2.3.1.0 ; 4.2.3.2.0

3.3.1.0.0 ; 3.3.2.0.0 ; 3.3.3.0.0

3.3.1.0.0 ; 3.3.2.0.0 ; 3.3.3.0.0

3.4.1.0.0

4.1.1.1.3
3.2.2.5.0 ; 3.2.2.6.0
4.1.1.1.2
4.1.1.1.1
4.1.1.2.3
3.2.2.5.0 ; 3.2.2.6.0
4.1.1.2.2
4.1.1.2.1
4.1.1.3.3
3.2.2.5.0 ; 3.2.2.6.0
4.1.1.3.2
4.1.1.3.1
4.1.2.3.0
4.1.1.1.4 ; 4.1.1.2.4 ; 4.1.1.3.4
4.1.2.2.0
4.1.2.1.0

4.1.3.1.3
4.1.2.4.0
4.1.3.1.2
4.1.3.1.1
4.1.3.2.3
4.1.3.1.4
4.1.3.2.2
4.1.3.2.1
4.1.3.3.3
4.1.3.3.4
4.1.3.3.2
4.1.3.3.4

4.1.4.3.0
4.1.3.1.4
4.1.4.2.0
4.1.4.1.0

2.4.0.0.0
4.2.1.1.0
4.2.1.2.1
4.2.1.3.0
4.1.3.1.4
4.2.2.1.0
4.1.3.1.4
4.2.2.1.0
4.2.2.2.0
4.2.2.2.0
3.2.3.2.0
3.2.3.2.0
4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.2.2.0

4.2.3.2.0 ; 4.2.3.1.0

4.3.1.0.0 ; 4.3.2.0.0 ; 4.3.3.0.0

4.4.1.0.0

4.1.4.0.0
4.1.4.0.0
4.1.4.0.0
5.1.1.0.0 ; 5.1.2.0.0 ; 5.1.3.0.0
5.1.4.1.0
5.1.4.2.0
5.1.4.4.0

4.2.1.2.2
6.1.1.0.0
6.1.5.0.0
6.1.2.0.0
6.1.4.0.0
6.1.3.0.0
6.1.6.0.0
6.1.7.0.0
6.1.8.0.0
6.1.9.0.0

6.1.10.0.0
6.1.10.0.0
6.1.12.0.0

6.2.0.0.0

No.

Uraian Kegiatan

1.0.0.0.0
1.1.0.0.0
1.2.0.0.0
1.3.0.0.0
1.4.0.0.0

PEKERJAAN PERSIAPAN
Pagar pengaman lokasi proyek
Pembersihan lokasi proyek
Pengukuran/pemasangan bowplank
Pembuatan barak kerja

2.0.0.0.0
2.1.0.0.0
2.1.1.0.0
2.1.2.0.0
2.1.3.0.0
2.2.0.0.0
2.2.1.0.0
2.2.2.0.0
2.2.3.0.0
2.3.0.0.0
2.3.1.0.0
2.3.2.0.0
2.3.3.0.0
2.4.0.0.0
2.5.0.0.0

PEKERJAAN TANAH
Galian Tanah
Galian Pondasi Tapak tipe P1
Galian Pondasi Tapak tipe P2
Galian Pondasi Menerus
Urugan Pasir Pondasi
Urugan Pasir Pondasi tapak P1
Urugan Pasir Pondasi tapak P2
Urugan Pasir Pondasi Menerus
Urugan tanah kembali
Urugan kembali pondasi tapak P1
Urugan kembali pondasi tapak P2
Urugan kembali pondasi menerus
Urugan Pasir bawah lantai
Urugan Tanah bawah lantai

3.0.0.0.0
3.1.0.0.0
3.1.1.0.0
3.1.1.1.0
3.1.1.2.0
3.1.1.2.1
3.1.1.2.2
3.1.1.2.3
3.1.1.2.4
3.1.1.3.0
3.1.1.4.0
3.1.1.4.1
3.1.1.4.2
3.1.1.4.3
3.1.1.4.4
3.1.2.0.0
3.1.2.1.0
3.1.2.2.0
3.1.3.0.0
3.1.3.1.0
3.1.3.1.1

KONSTRUKSI LANTAI 1
Pekerjaan Struktur
Pondasi Tapak
Aanstamping Pondasi Tapak P1
Pondasi Tapak tipe P1
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Aanstamping Pondasi Tapak P2
Pondasi Tapak tipe P2
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pondasi Menerus batu gunung
Aanstamping batu kosong
Pasangan batu gunung
Sloof
Sloof (20/30)
Beton

Jumlah Harga Bobot Pek. Durasi

34021600.000
1820000.000
6475000.000
16733250.000

2.137
0.114
0.407
1.051

842956.800
2322432.000
1263259.800

0.053
0.146
0.079

66404.800
182952.000
485966.250

0.004
0.011
0.031

423124.800
1165752.000
778555.800
9155025.000
3168810.000

0.027
0.073
0.049
0.575
0.199

1924931.250

0.121

2286174.000
4517937.904
3254784.000
16992.000
1924931.250

0.144
0.284
0.204
0.001
0.121

6651793.500
15048083.220
11442600.000
16992.000

0.418
0.945
0.719
0.001

1924931.250
15041246.400

0.121
0.945

6394477.320

0.402

3.1.3.1.2
3.1.3.1.3
3.1.3.1.4
3.1.4.0.0
3.1.4.1.0
3.1.4.1.1
3.1.4.1.2
3.1.4.1.3
3.1.4.1.4
3.1.4.2.0
3.1.4.2.1
3.1.4.2.2
3.1.4.2.3
3.1.4.2.4
3.1.4.3.0
3.1.4.3.1
3.1.4.3.2
3.1.4.3.3
3.1.4.3.4
3.1.5.0.0
3.1.5.1.0
3.1.5.1.1
3.1.5.1.2
3.1.5.1.3
3.1.5.2.0
3.1.5.2.1
3.1.5.2.2
3.1.5.2.3
3.2.0.0.0
3.2.1.0.0
3.2.1.1.0
3.2.1.2.0
3.2.1.2.1
3.2.1.2.2
3.2.1.3.0
3.2.1.4.0
3.2.2.0.0
3.2.2.1.0
3.2.2.2.0
3.2.2.3.0
3.2.2.4.0
3.2.2.5.0
3.2.2.6.0
3.2.3.0.0
3.2.3.1.0
3.2.3.2.0
3.2.4.0.0
3.2.4.1.0

Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (D = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Tangga
Plat Tangga
Beton
Bekisting
Pemeliharaan
Anak Tangga
Beton
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan keramik lantai
Keramik lantai 40x40
Keramik lantai 20x20
Pasangan dinding keramik 20x20
Pemasangan keramik tangga
Pekerjaan Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P1

23039977.380
16713824.400
16992.000

1.447
1.050
0.001

7235497.500
18488772.960
25936560.000
16992.000

0.454
1.161
1.629
0.001

865503.320
1100657.140
2262244.400
16992.000

0.054
0.069
0.142
0.001

1339256.133
5625828.520
10770877.000
16992.000

0.084
0.353
0.676
0.001

941709.120
2817267.200
16992.000

0.059
0.177
0.001

1497395.328
3906484.400
16992.000

0.094
0.245
0.001

16901742.000

1.061

32115721.000
2443749.000
14751000.000
2018199.040

2.017
0.153
0.926
0.127

1131993.600
18193392.560
3430224.000
6051738.320
2193017.200
11578952.640

0.071
1.143
0.215
0.380
0.138
0.727

35102064.000
1806200.000

2.204
0.113

3.2.4.1.1
3.2.4.1.2
3.2.4.1.3
3.2.4.1.4
3.2.4.1.5
3.2.4.1.6
3.2.4.2.0
3.2.4.2.1
3.2.4.2.2
3.2.4.2.3
3.2.4.2.4
3.2.4.2.5
3.2.4.2.6
3.2.4.3.0
3.2.4.3.1
3.2.4.3.2
3.2.4.3.3
3.2.4.3.4
3.2.4.3.5
3.2.4.4.0
3.2.4.4.1
3.2.4.4.2
3.2.4.4.3
3.2.4.4.4
3.2.4.4.5
3.2.4.5.0
3.2.4.5.1
3.2.4.5.2
3.2.4.5.3
3.2.4.5.4
3.2.4.5.5
3.2.4.5.6
3.2.4.6.0
3.2.4.6.1
3.2.4.6.2
3.2.4.6.3
3.2.4.6.4
3.2.4.6.5
3.2.4.6.6
3.2.4.7.0
3.2.4.7.1
3.2.4.7.2
3.2.4.7.3
3.2.4.7.4
3.2.4.7.5
3.2.4.7.6
3.2.4.8.0
3.2.4.8.1

Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P2
Kusen Pintu
Daun Pintu
Kaca
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe J1
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J2
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J3
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe J4
Kusen Jendela

431511.300
1875010.600
47628.630
180000.000
135000.000
26600.000

0.027
0.118
0.003
0.011
0.008
0.002

442363.680
2002116.340
21798.000
180000.000
135000.000
26600.000

0.028
0.126
0.001
0.011
0.008
0.002

512645.760
3750021.200
180000.000
270000.000
26600.000

0.032
0.235
0.011
0.017
0.002

753465.240
2604117.600
180000.000
405000.000
39900.000

0.047
0.164
0.011
0.025
0.003

1391171.760
18164817.000
258394.680
180800.000
106400.000
128800.000

0.087
1.141
0.016
0.011
0.007
0.008

751398.120
9909256.500
199033.740
90400.000
53200.000
64400.000

0.047
0.622
0.012
0.006
0.003
0.004

1409775.840
17622198.000
293312.880
180800.000
106400.000
128800.000

0.089
1.107
0.018
0.011
0.007
0.008

1128647.520

0.071

3.2.4.8.2 Daun Jendela


3.2.4.8.3 Kaca
3.2.4.8.4 Engsel Jendela
3.2.4.8.5 Grendel Jendela
3.2.4.8.6 Hak Angin
3.2.4.9.0 Jendela tipe J5
3.2.4.9.1 Kusen Jendela
3.2.4.9.2 Daun Jendela
3.2.4.9.3 Kaca
3.2.4.9.4 Engsel Jendela
3.2.4.9.5 Grendel Jendela
3.2.4.9.6 Hak Angin
3.2.4.10.0Jendela tipe J6
3.2.4.10.1 Kusen Jendela
3.2.4.10.2 Daun Jendela
3.2.4.10.3 Kaca
3.2.4.10.4 Engsel Jendela
3.2.4.10.5 Grendel Jendela
3.2.4.10.6 Hak Angin
3.2.4.11.0Ventilasi tipe V1
3.2.4.11.1 Kusen Ventilasi
3.2.4.11.2 Kaca
3.2.4.12.0Ventilasi tipe V2
3.2.4.12.1 Kusen Ventilasi
3.2.4.12.2 Kaca
3.2.4.13.0Ventilasi atas teras

15908211.000
272361.960
180800.000
106400.000
128800.000

0.999
0.017
0.011
0.007
0.008

1004620.320
12503205.000
230950.200
180800.000
106400.000
128800.000

0.063
0.785
0.015
0.011
0.007
0.008

1213916.220
19885263.750
340452.450
226000.000
133000.000
161000.000

0.076
1.249
0.021
0.014
0.008
0.010

235651.680
46557.600

0.015
0.003

205161.660
93115.200

0.013
0.006

3.2.4.13.1
3.2.4.13.2
3.3.0.0.0
3.3.1.0.0
3.3.1.1.0
3.3.1.2.0
3.3.1.3.0
3.3.2.0.0
3.3.2.1.0
3.3.2.2.0
3.3.2.3.0
3.3.3.0.0
3.3.3.1.0
3.3.3.2.0
3.4.0.0.0
3.4.1.0.0
3.4.1.1.0
3.4.1.2.0
3.4.1.3.0
3.4.1.4.0
3.4.1.5.0
3.4.1.6.0
3.4.1.7.0
3.4.2.0.0
3.4.2.1.0
3.4.2.2.0
3.4.3.0.0
3.4.3.1.0
3.4.3.2.0

Kusen Ventilasi
Kaca
Mechanical dan Electrical
Pekerjaan Instalasi Panel
Box Panel
Kabel out put
Kabel in put
Pekerjaan Instalasi Lampu
Lampu SL 40 Watt
Lampu SL 25 Watt
Lampu SL 15 Watt (tanam)
Pekerjaan Instalasi Stop Kontak
Saklar Tunggal
Saklar Ganda
Pekerjaan Sanitasi
Instalasi Air Bersih
Pipa leiding ( 3/4")
Kloset Duduk Keramik
Bak mandi fibre
Kran air
Floor drain
Bak cuci piring
Wastafel
Instalasi Air Kotor
Pipa PVC ( 2,5")
Bak Kontrol
Instalasi Kotoran
Pipa PVC ( 4")
Septictank dan Peresapan

4.0.0.0.0
4.1.0.0.0
4.1.1.0.0
4.1.1.1.0
4.1.1.1.1
4.1.1.1.2
4.1.1.1.3
4.1.1.1.4
4.1.1.2.0
4.1.1.2.1
4.1.1.2.2
4.1.1.2.3
4.1.1.2.4
4.1.1.3.0
4.1.1.3.1
4.1.1.3.2
4.1.1.3.3
4.1.1.3.4

KONSTRUKSI LANTAI 2
Pekerjaan Struktur
Balok Lantai
Balok 25/40
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 25/50
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Balok 13/18
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan

198443.520
56185.630

0.012
0.004

202000.000
20000.000
20000.000

0.013
0.001
0.001

736000.000
400000.000
234000.000

0.046
0.025
0.015

179900.000
210000.000

0.011
0.013

2369663.000
5324100.000
4273800.000
74000.000
62100.000
709700.000
600400.000

0.149
0.334
0.268
0.005
0.004
0.045
0.038

8596560.000
1140000.000

0.540
0.072

12130413.000
1140000.000

0.762
0.072

10782310.000
54695877.600
39192174.000
16992.000

0.677
3.435
2.461
0.001

1773406.250
7420876.320
642470.800
16992.000

0.111
0.466
0.040
0.001

128998.584
695662.656
1212181.600
16992.000

0.008
0.044
0.076
0.001

4.1.2.0.0
4.1.2.1.0
4.1.2.2.0
4.1.2.3.0
4.1.2.4.0
4.1.3.0.0
4.1.3.1.0
4.1.3.1.1
4.1.3.1.2
4.1.3.1.3
4.1.3.1.4
4.1.3.2.0
4.1.3.2.1
4.1.3.2.2
4.1.3.2.3
4.1.3.2.4
4.1.3.3.0
4.1.3.3.1
4.1.3.3.2
4.1.3.3.3
4.1.3.3.4
4.1.4.0.0
4.1.4.1.0
4.1.4.2.0
4.1.4.3.0
4.1.4.4.0
4.2.0.0.0
4.2.1.0.0
4.2.1.1.0
4.2.1.2.0
4.2.1.2.1
4.2.1.2.2
4.2.1.3.0
4.2.2.0.0
4.2.2.1.0
4.2.2.2.0
4.2.2.3.0
4.2.2.4.0
4.2.2.5.0
4.2.2.6.0
4.2.3.0.0
4.2.3.1.0
4.2.3.2.0
4.2.4.0.0
4.2.4.1.0
4.2.4.1.1
4.2.4.1.2
4.2.4.1.3

Plat Lantai
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom
Kolom tipe K1 (25/35)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K2 (d = 40)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Kolom tipe K3 (13/13)
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Ringbalk
Beton
Pembesian/Tulangan
Bekisting
Pemeliharaan
Pekerjaan Arsitektur
Pekerjaan Lantai
Balok Tumbuk 1 : 3 : 5
Pemasangan Keramik lantai
Keramik lantai 40x40
Keramik Lantai 20x20
Pasangan dinding keramik 20x20
Dinding
Pasangan dinding 1 : 2
Pasangan dinding 1 : 4
Pasangan dinding 1 : 2 kamar mandi
Pasangan dinding 1 : 4 kamar mandi
Plesteran 1 : 2
Plesteran 1 : 4
Plafond
Pemasangan plafond gypsum
Pemasangan List Profil
Pintu, Jendela dan Ventilasi
Pintu tipe P3
Kusen Pintu
Daun Pintu
Kaca

15564467.160
7709644.800
63852009.000
16992.000

0.977
0.484
4.010
0.001

5674900.000
23016864.000
33705600.000
16992.000

0.356
1.445
2.117
0.001

814591.360
1863856.800
3527852.800
16992.000

0.051
0.117
0.222
0.001

1260476.360
9465144.000
16796624.000
16992.000

0.079
0.594
1.055
0.001

6955806.000
35135100.000
41618720.000
16992.000

0.437
2.206
2.614
0.001

13727142.000

0.862

15680943.000
2440471.000
14751000.000

0.985
0.153
0.926

1128057.600
12604869.840
3533544.000
5432743.840
4481580.400
17228752.080

0.071
0.792
0.222
0.341
0.281
1.082

36663430.000
1982200.000

2.302
0.124

403605.180
1711966.200
47628.630

0.157
0.025
0.108
0.003

4.2.4.1.4
4.2.4.1.5
4.2.4.1.6
4.2.4.2.0
4.2.4.2.1
4.2.4.2.2
4.2.4.2.3
4.2.4.2.4
4.2.4.2.5
4.2.4.3.0
4.2.4.3.1
4.2.4.3.2
4.2.4.3.3
4.2.4.3.4
4.2.4.3.5
4.2.4.4.0
4.2.4.4.1
4.2.4.4.2
4.2.4.4.3
4.2.4.4.4
4.2.4.4.5
4.2.4.4.6
4.2.4.5.0
4.2.4.5.1
4.2.4.5.2
4.2.4.5.3
4.2.4.5.4
4.2.4.5.5
4.2.4.5.6
4.2.4.6.0
4.2.4.6.1
4.2.4.6.2
4.2.4.6.3
4.2.4.6.4
4.2.4.6.5
4.2.4.6.6
4.2.4.7.0
4.2.4.7.1
4.2.4.7.2
4.2.4.7.3
4.2.4.7.4
4.2.4.7.5
4.2.4.7.6
4.2.4.8.0
4.2.4.8.1
4.2.4.8.2
4.2.4.8.3
4.2.4.8.4

Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P4
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Pintu tipe P5
Kusen Pintu
Daun Pintu
Engsel Pintu
Kunci Pintu
Pegangan Pintu
Jendela tipe JA
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JB
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JC
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JD
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela
Grendel Jendela
Hak Angin
Jendela tipe JE
Kusen Jendela
Daun Jendela
Kaca
Engsel Jendela

180000.000
135000.000
26600.000

0.011
0.008
0.002

768968.640
5625031.800
270000.000
405000.000
39900.000

0.048
0.353
0.017
0.025
0.003

753465.240
2604117.600
180000.000
405000.000
39900.000

0.047
0.164
0.011
0.025
0.003

674914.680
9113989.500
117108.700
90400.000
53200.000
64400.000

0.042
0.572
0.007
0.006
0.003
0.004

730726.920
10141807.500
180410.700
90400.000
53200.000
64400.000

0.046
0.637
0.011
0.006
0.003
0.004

1368433.440
17828910.000
265868.400
180800.000
106400.000
128800.000

0.086
1.120
0.017
0.011
0.007
0.008

1646461.080
27341968.500
351326.100
271200.000
159600.000
193200.000

0.103
1.717
0.022
0.017
0.010
0.012

760183.380
13670984.250
175663.050
135600.000

0.048
0.859
0.011
0.009

4.2.4.8.5 Grendel Jendela


4.2.4.8.6 Hak Angin
4.2.4.9.0 Jendela tipe JF
4.2.4.9.1 Kusen Jendela
4.2.4.9.2 Daun Jendela
4.2.4.9.3 Kaca
4.2.4.9.4 Engsel Jendela
4.2.4.9.5 Grendel Jendela
4.2.4.9.6 Hak Angin
4.2.4.10.0Jendela tipe JG
4.2.4.10.1 Kusen Jendela
4.2.4.10.2 Daun Jendela
4.2.4.10.3 Kaca
4.2.4.10.4 Engsel Jendela
4.2.4.10.5 Grendel Jendela
4.2.4.10.6 Hak Angin
4.2.4.11.0Ventilasi tipe V1
4.2.4.11.1 Kusen Ventilasi
4.2.4.11.2 Kaca
4.2.4.12.0Ventilasi tipe V2
4.2.4.12.1 Kusen Ventilasi
4.2.4.12.2 Kaca
4.2.4.13.0Ventilasi tipe V3
4.2.4.13.1 Kusen Ventilasi
4.2.4.13.2 Kaca
4.3.0.0.0 Mechanical dan Electrical
4.3.1.0.0 Pekerjaan Instalasi Panel
4.3.1.1.0 Box Panel
4.3.1.1.1 Kabel out put
4.3.1.1.2 Kabel in put
4.3.2.0.0 Pekerjaan Instalasi Lampu
4.3.2.1.0 Lampu SL 40 Watt
4.3.2.1.1 Lampu SL 25 Watt
4.3.2.1.2 Lampu SL 15 Watt (tanam)
4.3.3.0.0 Pekerjaan Instalasi Stop Kontak
4.3.3.1.0 Saklar Tunggal
4.3.3.1.1 Saklar Ganda
4.4.0.0.0 Pekerjaan Sanitasi
4.4.1.0.0 Instalasi Air Bersih
4.4.1.1.0 Pipa leiding ( 3/4")
4.4.1.2.0 Kloset Duduk Keramik
4.4.1.3.0 Bak mandi fibre
4.4.1.4.0 Kran air
4.4.1.5.0 Floor drain
4.4.1.6.0 Wastafel
4.4.2.0.0 Instalasi Air Kotor
4.4.2.1.0 Pipa PVC ( 2,5")
4.4.2.2.0 Bak Kontrol

79800.000
96600.000

0.005
0.006

233584.560
3014550.000
46557.600
45200.000
26600.000
32200.000

0.015
0.189
0.003
0.003
0.002
0.002

965861.820
12865668.750
151108.000
226000.000
133000.000
161000.000

0.061
0.808
0.009
0.014
0.008
0.010

235651.680
93115.200

0.015
0.006

205161.660
93115.200

0.013
0.006

1091439.360
135629.640

0.069
0.009

404000.000
20000.000
20000.000

0.025
0.001
0.001

1656000.000
720000.000
429000.000

0.104
0.045
0.027

385500.000
490000.000

0.024
0.031

2369663.000
3549400.000
4273800.000
55500.000
62100.000
600400.000

0.149
0.223
0.268
0.003
0.004
0.038

8596560.000
1140000.000

0.540
0.072

5.0.0.0.0
5.1.1.0.0
5.1.2.0.0
5.1.3.0.0
5.1.4.0.0
5.1.4.1.0
5.1.4.2.0
5.1.4.3.0
5.1.4.4.0
5.1.4.5.0
6.0.0.0.0
6.1.0.0.0
6.1.1.0.0
6.1.2.0.0
6.1.3.0.0
6.1.4.0.0
6.1.5.0.0
6.1.6.0.0
6.1.7.0.0
6.1.8.0.0
6.1.9.0.0
6.1.10.0.0
6.1.11.0.0
6.1.12.0.0
6.2.0.0.0
6.3.0.0.0
6.3.1.0.0
6.3.2.0.0
6.3.3.0.0

KONSTRUKSI ATAP
Pemasangan Kuda - kuda K1
Pemasangan Kuda - kuda K2
Pemasangan Kuda - kuda K3
Pemasangan Penutup Atap
Gording 5/10
Pemasangan kasau + reng genteng
Pemasangan atap genteng metal
Rabung genteng keramik
Listplank 3/30
PEKERJAAN LANDSCAPE
Pekerjaan Pagar
Galian Tanah Pondasi Menerus
Urugan Pasir Bawah Pondasi
Urugan Tanah Kembali
Pemasangan Aanstamping
Pemasangan Pondasi Batu Gunung
Sloof 20/25
Kolom 23/23
Dinding Pagar
Plesteran
Ringbalk
Pasang Pagar Besi
Pintu Pagar Besi 450x155
Timbunan Tanah Halaman
Pekerjaan Tanaman
Ekor Tupai
Bougenville
Bunga Lily

Jumlah Harga
Jumlah Bobot Pekerjaan
Rencana Kemajuan Pekerjaan Mingguan
Rencana Kemajuan Pekerjaan Kumulatif

9389740.506
3970928.582
15843450.272

0.590
0.249
0.995

6687320.760
20294150.000
17020900.000
3642243.000
6333041.000

2709666.000
917301.000
4638850.000
3633465.000
24953538.375
19445265.000
13031352.144
20786008.400
19853900.400
4773161.250
###
6500000.000
16448000.000

0.420
1.274
1.069
0.229
0.398
0.000
0.000
0.170
0.058
0.291
0.228
1.567
1.221
0.818
1.305
1.247
0.300
8.497
0.408
1.033

300000.000
100000.000
180000.000

0.019
0.006
0.011

1592383751.6
100

10

11

12

13

14

0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214

0.117 0.117 0.117 0.117

0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.214 0.117 0.117 0.117 0.117
0.214 0.427 0.641 0.855 1.068 1.282 1.496 1.709 1.923 2.137 2.253 2.370 2.487 2.604

15

16

17

0.117 0.117 0.117

0.117 0.117 0.117


2.720 2.837 2.954

Lampiran L-2

0
0

1.1.0.0.0

10.00
10
1
10

1.4.0.0.0

9.00
19.00
2
19.00

5.00
24.00
3
24.00

1.2.0.0.0

4
1.3.0.0.0

28.00
28.00

2.1.1.0.0

3.00
31.00
5
31.00

2.1.2.0.0

2.2.1.0.0

7.00
38.00
6
38.00

2.1.3.0.0

3.00
41.00
7
41.00

2.2.2.0.0

2.2.3.0.0

1.00
42.00
8
42.00
1.00
42.00
9
42.00
1.00
42.00
10
42.00

3.1.1.1.0

3.1.1.3.0

3.1.2.1.0

3.00
45.00
11
45
3.00
45.00
12
45.00
3.00
45.00
13
45.00

3.1.1.2.2

3.1.1.4.2

3.1.2.2.0

1.00
46.00
14
46.00
4.00
49.00
15
49.00
8.00
53.00
16
53.00

3.1.1.2.3

3.1.1.4.3

2.3.3.0.0

3.00
49.00
17
49.00
8.00
57.00
13
57.00
1.00
54.00
24
54.00

3.1.1.2.1

3.1.1.4.1

2.00
51.00
18
51.00
6.00
63.00
21
63.00

3.1.1.2.4

3.1.1.4.4

1.00
52.00
19
52.00
1.00
64.00
22
64.00

2.3.1.0.0

2.3.2.0.0

1.00
53.00
20
53.00
3.00
67.00
23
67.00

3.1.3.1.2

6.00
73.00
25
73.00

3.1.3.1.3

11.00
84.00
26
84.00

1
3.1.3.1.1

27

85.00
85.00

3.1.3.1.4

1
69
69

33

3.1.4.2.3

3.1.4.2.2

1.00
86.00
28
86.00

3.1.4.1.2

5.00
91.00
29
91.00

1
3.1.4.1.3

30

65
65

3.1.4.1.1

31

1
66
66

3.1.4.1.4

32

2
67
67

3.1.4.3.2

34

69
69

3.1.4.3.3

3.2.2.1.0

1
47

69
69

2
73
73

35

3.1.4.2.1

37

17

3.1.4.2.4

3.1.4.3.1

38

1
76
76

39

5
86
86

36

1
75
75

3.1.4.3.3

41

1
91
91

3.1.4.3.4

3.1.4.3.1

3.1.4.2.3

3.1.4.3.4

3.1.4.2.1

1
98
98

44

79
79

45

2
96
96

42

1
78
78

43

4
92
92

40

1
77
77

3.1.4.2.4

99
99

46

21
96
96

51
21

96
96

52
21

96
96

53

3.2.4.1.0

21
1

3.2.4.2.0

70
70

48

3.2.4.4.0

6
3.2.2.2.0

21

3.2.4.3.0

3.2.2.3.0

21
3.2.4.6.0

2
50

71

3.2.4.8.0

3.2.2.5.0

21
57

4
97
97

62

4.1.1.1.2

96
96

56

3.2.4.7.0
3.2.2.4.0

96
96

55

3.2.4.5.0

75
75

49

96
96

54

101
101

64

1
63

4.1.1.2.2

97
97

4.1.1.1.1

4.1.1.2.3

1
102
102

69
2

110
110

66

1
101
101

68

2
108
108

65

4
3.2.2.6.0

96
96

6
4.1.1.1.3

4.1.1.2.1

103
103

70
1

50

71

21

3.2.4.10.0
3.2.4.9.0

4.1.1.3.2

96
96

58
21

3.2.4.11.0

21

3.2.4.12.0

3.2.4.13.0

96
96

59

96
96

60
21

3.2.4.14.0

96
96

61
21

96
96

121
21

96
96

122
21
123

96
96

72

101
101

4.1.1.3.3

73

103
103

4.1.1.3.1

74

104
104

3
127
127

96

3.1.5.1.2

1
4.1.1.1.4

111
111

67
1

4.1.1.2.4

8
104
104

71
1

4.1.2.2.0

76

9
112
112

4.1.2.3.0

77

2
121
121

4.1.2.1.0

78

1
123
123

4.1.2.4.0

79

3
124
124

4.1.3.1.2

80

127
127

4.1.1.3.4

75

105
105

2
3.1.5.1.3

1
129
129

97

3.1.5.1.1

8
130
130

98

3.1.5.2.2

4
138
138

99

3.1.5.2.1

1
142
142

100

3.1.5.2.3

2
141
141

84

143
143

101

4.1.3.2.3

1
143
143

85

4.1.3.2.1

144
144

86

4.1.3.2.2

7
4.1.3.1.3

81

1
134
134

4.1.3.1.1

82

5
135
135

4.1.3.1.4

83

1
140
140

4.1.3.3.2

6
141
141

88

4.1.3.3.3

1
147
147

89

4.1.3.3.1

148
148

90

4.1.4.2.0

10

92

141
141

4.1.4.3.0

93

151
151

4.1.4.1.0

94

153
153

14
159
159

105
14

4.2.2.1.0
4.2.4.1.0

5
102

5
140
140

4.2.2.2.0

103

159
159

106
14

145
145

4.2.4.2.0

159
159

107
14

4.2.4.3.0

4.2.4.4.0

159
159

108
14

4.2.4.5.0

4.2.4.6.0

159
159

109
14

4.2.4.7.0

159
159

110
14

4.2.4.8.0

159
159

111
14

4.2.4.9.0

159
159

112
14
4.2.4.10.0

159
159

113
14

159
159

124
14

159
159

125
14
126

159
159

4.2.2.6.0

104

1
4.1.3.2.4

145
145

87
1

4.1.3.3.4

5
149
149

91

159
159

114
5.1.1.0.0

4.1.4.4.0

95

154
154

5.1.2.0.0

5.1.3.0.0

116

7
166
166

4.2.2.2.0

159
159

115

159
159

5.1.4.2.0

117

165
165

5.1.4.1.0

118

169
169

5.1.4.4.0

119

174
174

5.1.4.3.0

120

181
181

2
191
191

142
8
2.4.0.0.0

2.00
193
143
193

3
6.1.1.0.0

1
196
196

144

6.1.2.0.0.0

3
197
197

145

4.2.1.1.0

189
189

127

4.2.1.2.2

2
3.2.1.1.0

138

8
191
191

3.2.1.2.1

139

6
199
199

3.2.1.2.2

140

8
205
205

3.2.1.3.0

141

213
213

6.1.4.0.0.0

146

200
200

3.2.3.1.0

189
189

128
8

3.2.3.2.0

129

2
189
189

131

4
191
191

4.2.3.1.0

195
195

132
4

4.2.3.2.0

133

2
195
195

4.3.0.0.0

4
197
197

134

4.4.0.0.0

3.3.0.0.0

136

201
201

135
4

197
197

3.4.0.0.0

137

201
201

6
6.1.5.0.0.0

147

6
206
206

6.1.3.0.0.0

148

1
212
212

6.1.6.0.0

149

1
213
213

6.1.7.0.0

156

12
214
214

6.1.8.0.0

157

9
226
226

6.1.9.0.0

158

235
235

1
237
237

160
1
6.1.10.0.0

159

6.1.11.0.0

236
236

6.1.12.0.0

161

4
238
238

6.2.0.0.0

162

4
241
241

6.3.0.0.0

163

245
245