Bahan

Satuan

Harga (Rp)

Dolken Kayu 8-10/400 cm

Btg

Rp

Semen Portland
Pasir Beton
Koral Beton

Kg
M
M
M
Kg
Lt
M
Kg
M
Roll
Bh
M
Bh
Lbr
M
M
Bh
M
M
M
M
M
M
M
M
M
Lt
Kg
Kg
M
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
M
Kg
Lbr
Kg
Kg
Kg
Ltr
Bh
Kg
Lbr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Kayu Kaso 5/7 Kamper Medan


Paku Biasa 2"-5"
Residu
Kayu Papan Albasia
Besi Strip
Pasir Pasang
Seng Plat
Jendela Nako 12 kaca/1m
Kaca Polos 3 mm
Kunci Tanam
Plywood 4 mm
Pasir Urug
Batu Belah 15/20 cm
Bata Merah 5 X 11 X 22 cm
Kapur Padam
Kayu jati, balok
Kayu Jati, papan
Kayu Bengkirai, balok
Kayu Borneo, balok
Kayu Borneo,Papan
Kayu balok kamper samarinda
Kayu papan Kamper Samarinda
Lem Kayu
Minyak Bekisting
Besi Beton polos
Kawat Beton
Kayu Albasiah
Plywood tebal 9 mm
Ubin Abu-Abu 20X20 cm
Plint Ubin 10x30 cm
Kunci Tanam Biasa
Engsel Pintu
Engsel Jendela
Door holder
Kaca Wireglass 5 mm
Cat Meni
Kertas Gosok kayu
Plamir
Cat dasar kayu
Cat penutup 2 kali
Minyak Cat
Kuas 3"
Plamir
Kertas gosok tembok

Stok di pasaran

28,000.00
1,406.00 50kg
255,400.00
211,100.00
3,356,800.00
23,400.00
8,100.00
2,071,700.00 4m
26,800.00
125,000.00
1,581,500.00
10
30,000.00
87,400.00
25,000.00
140,000.00
175,300.00
205,500.00
775.00
45,000.00
15,000,000.00
18,000,000.00
8,500,000.00
8,500,000.00
10,000,000.00
7,742,500.00
7,823,800.00
18,000.00
10,000.00
12,000.00
13,000.00
3,000,000.00
95,000.00
3,888.89 9bh
2,700.00
25,000.00
8,000.00
7,000.00
5,000.00
90,000.00
18,000.00
3,000.00
18,000.00
20,000.00
38,000.00
12,000.00
10,000.00
12,000.00
3,000.00

70,300.00

85,000.00

300000

35,000.00

48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Cat Dasar tembok


Cat Penutup 2x
Kloset Jongkok Porselen
Porselen (11x11) Cm
Semen Nat
Kran Air
Sealm Tape
Pipa PVC 1"
Pipa PVC 4"
Batu Kerikil
Besi Beton
Genteng Bubung Palentong
Genteng Beton
Kayu Profil
Paku plafon
Pelat Asbes tebal 6mm
Ubin Keramik 33X33 cm
Semen Warna
Ubin Keramik Artistik 10X20 cm
Septic tank + Resapan

URAIAN
Mandor
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Plitur
Tukang Taman
Tukang
Pembantu Tukang
Pekerja Biasa
Penjaga Malam
Sopir
Operator
Mekanik
Pembantu Sopir
Pembantu Operator
Pembantu Mekanik

Kg
Kg
Bh
Bh
Kg
bh
Kg
m
m
M3
Kg
Bh
Bh
M
Kg
M
Bh
Kg
Bh
Bh

SATUAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

35,000.00
60,000.00
90,000.00
2,500.00
13,000.00
15,000.00
6,250.00
21,250.00
125,000.00
10,000.00
7,500.00
5,500.00
3,333.33
10,000.00
32,000.00
4,000.00
13,000.00
4,444.44
2,500,000.00

UPAH (Rp.)
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

80,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
42,000.00
50,000.00
42,000.00
65,000.00
75,000.00
65,000.00
42,000.00
50,000.00
42,000.00

bh
4m
4m

1,000.00
25,000.00
85,000.00

3m

10,000.00

9bh

36,000.00

9bh

40,000.00

Stok di pasaran

NO

MATERIAL
SAT
AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA

A.

0.024
41.6666666667
3,541,666.67
30000

3,888.89

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Pasir Urug
Tanah Urug Pilihan
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok ( Apung )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K-225 )
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40
Bata Merah Bakar kelas I
Bata Merah Bakar kelas II
Bata Merah Oven ( Klingker )
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Canstin Paving Blok
Semen PC /50 kg

m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak

36
37
38
39
40
41
42
43
44
45

Semen Putih
Kanstin Jalan Ukuran Besar ( Bina Marga ) 1b
Readymix Beton K500, Tanpa Pompa ( Selang
Readymix Beton K400, Tanpa Pompa ( Selang
Readymix Beton K350, Tanpa Pompa ( Selang
Readymix Beton K300, Tanpa Pompa ( Selang
Readymix Beton K225, Tanpa Pompa ( Selang
Readymix Beton K175, Tanpa Pompa ( Selang
Kapur Pasang / Kapur Tembok
Kapur Sirih

zak
bh
m3
m3
m3
m3
m3
m3
m3
kg

46
47
48
49
50
51
52
6,250.00
21,250.00

4,000.00
4,444.44

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Semen Warna
Tanah liat
Air
Formite/spacer
Hollow/Con Blok 8 x 20 x 40
Hollow/Con Blok 8 x 15 x 40
Hollow/Con Blok 8 x 10 x 40

kg
m3
ltr
bh
bh
bh
bh

LABURAN,PENGISI DAN ALATNYA


Plamir Tembok
Cat Tembok ICI Eksterior ( Beton )
Cat Tembok ICI Interior ( Plafon Dan Dinding )
Cat Tembok Vinilex
Cat Dasar ICI untuk Interior ( 2 Pelapis )
Cat Tembok Sanlek
Cat Dasar
Cat Tahan Asam
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )
Cat Marka / Spotlight
Water Profing Emulsion
Water Profing Membrance
Rool Cat Tembok
Kape Tembok
Kape Kayu
Soligneum 1 Blek
Plincote
Penawetan Kayu
Pegopenan Kayu
Kwas 3"
Oker
Oyan
Oten ( Pewarna Plitur )
Spirtus
Bahan Pelitur Kripik ( Sirlak India )
Dempul Lilin
Dempul Plitur
Dempul Halus / Imfra ( Wood Filler )
Dempul Jadi
Politur
Politur Jadi
Terpentin
Tiner A
Tiner B
Kumpon
Melamik
Dempul Plastik
Dempul Duco
Ampelas
Dempul Kayu Cap Kucing
Meni Kayu / Besi
Sincromat
Cat Kayu Sieve

kg
lt
lt
kg
lt
kg
kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m3
m3
bh
bh
bks
bks
lt
kg
kg
kg
kg
lt
kg
lt
lt
kg
kg
kg
lbr
kg
kg
kg
lbr
kg
kg
kg
lt

44
45
46
47
48
49
50

Cat Besi
Cat Besi Duco Danaglos / ICI
Cat Bron
Karet lis
Minyak cat
Glass beet
Residu

lt
bh
kg
bh
kg
kg
lt

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu 5 s.d 7
Bambu 7 s.d 10
Bambu Gombong
Kayu Kamper Singkil / Kapur ( Kayu Samarinda
Kayu Balok Borneo Super
Kayu Papan Borneo Super
Kayu Balok Kamper Medan (Kruing )
Kayu Papan Kamper Medan (Kruing )
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Balok Rasamala
Kayu Jati Jatim Tua dia. 40 cm
Kayu Jati Jateng Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm kebawah
Kayu Hutan Kelas I ( Segeng,Mahoni, Laban )
Kayu Balok Albasia
Kayu Papan Albasia
Dolken 5 s/d 7
Dolken 7 s/d 10
List Profil Kamper 1 cm
List Profil Kamper 2 cm
List Profil Kamper 4 cm
List Profil Kamper 5 cm
List Profil Kamper 10 cm
Pegangan Tangga Profil Jati
Pegangan Tangga Profil Kamper
Kayu Kaso 4/6
Kayu Kaso 5/7 Kamper Medan
Kayu Reng 2/3 Borneo Super
Kayu Reng 2/3 Kamper Banjar
Kayu Reng 3/4 Kamper Medan
Kayu Papan Terentang
Kayu Balok Terentang
Batang Kelapa
Tali Ijuk
lapisan Ijuk tebal 10 cm
Venetion Blind
Vertikal Blind

bt
bt
bt
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m3
m3
m1
m1
m3
m3
m3
bt
kg
m2
m2
m2

D
1
2
3
4
5

BAHAN PENUTUP RANGKA PLAFOND


Plafond Enternit 4 mm
Plafond hardpleks 5 mm 120 x 240
Plafond Asbes Semen 5 mm
Plafond Asbes Semen 3,5 mm
Gypsum 120 x 240 t= 9 mm ex DN

m2
lbr
m2
m2
lbr

6
7
8
9
10
11
12

Gypsum 120 x 240 t= 9 mm ex Luar


Tepung gypsum
Acustik Amstrong 60 x 120
Cotton Plester
GRC (120 x 240) cm, t = 4 mm
Cornice Coumpound
List gypsum

lbr
kg
lbr
bh
lbr
zak
m'

E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 4 mm ukuran Pintu
Triplek 6 mm 120 x 240
Triplek 9 mm 120 x 240
Jabar Wood 4 mm
Bilik Bambu ( tanpa kulit )
Bilik Bambu ( dengan kulit )
Bilik Bambu Hitam Variasi
Wall paper
MultiPlek 9 mm 120 x 240
MultiPlek 12 mm 120 x 240
MultiPlek 18 mm 120 x 240
Ply Wood 18 mm 120 x 240
Ply Wood 9 mm 120 x 240
Ply Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240
Teak Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240 ukuran Pintu
Teak Wood ukuran Pintu 4 mm
Tacon ( Tahan Bakar )
Supercon
Melamin 4 mm 120 x 240
Melamin TOK 4 mm
Formika 120 x 240
Formika ukuran Pintu
Formika Warna 4" x 8"

lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr

F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

BAHAN LANTAI DAN PELAPIS DINDING


Tegel PC 20 x 20
Plin Tegel PC 10 x 20
Tegel PC 30 x 30
Plin Tegel PC 15 x 30
Tegel Warna 20 x 20
Plin Tegel Warna 10 x 20
Tegel Warna 30 x 30
Plin Tegel Warna 15 x 30
Tegel Wafel PC 20 x 20
Tegel Wafel Warna 20 x 20
Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih /
Keramik 10 x 20 KW I DN Corak/Warna/Anti S
Keramik 20 x 20 (KM) KW I DN Corak/Warna /
Keramik 20 x 20 (KM) KW I DN Putih Polos M
Keramik 20 x 25 Dinding KM KW I DN Corak
Keramik 30 x 30 KWI DN Putih Polos Mulia

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2

20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

Keramik 30 x 30 KWI DN Warna/Corak (ANTI


Keramik 40 x 40 KWI DN Putih Polos Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI
Keramik 10 x 20 dan 20 x 20 KW I DN Putih /
Keramik 10 x 20 KW I DN Corak/Warna/Anti
Keramik 20 x 20 (KM) KW I DN Corak/Warna/
Keramik 20 x 20 (KM) KW I DN Putih Polos
Keramik 20 x 25 Dinding KM KW I DN Cora
Keramik 20 x 25 KW I DN Putih Polos Roman
Keramik 30 x 30 KW I DN Polos Roman
Keramik 30 x 30 KW I DN Warna/Corak (ANT
Keramik 40 x 40 KW I DN Polos Roman
Keramik 40 x 40 KW I DN Warna/Corak (ANT
Vinyl Lantai Standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Parquet Jati
Stairnosing Keramik 10/20
Stairnosing Fiber
Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 30 x 30
Granito Tile Essenza Ukuran 40 x 40 UnPolis
Marmer
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Granito Tile Essenza 60 x 60 Polis
Granito Tile Essenza 60 x 60 UnPolis
Batu Tempel Hitam
Bata Karawang
Campuran untuk Kedap Air ( AM )
Plint keramik 10 x 20
Plint keramik 10 x 25
Plint keramik 10 x 30
Plint keramik 10 x 40
Plint keramik 15 x 30
Plint keramik 15 x 40
Plint granito 10 x 30
Plint granito 10 x 40
Plint granito 15 x 30
Plint granito 15 x 40

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
ltr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

G
1
2
3
4
5
6

BAHAN SALURAN AIR KOTOR / BERSIH


Grafel U 20 cm'
Grafel U 30 cm'
Grafel U 40 cm'
Buis Beton 20 cm ( 1 M' )
Buis Beton 30 cm ( 1 M' )
Buis Beton 40 cm ( 1 M' )

m1
m1
m1
m1
m1
m1

7
8
9
10
11
12
13
14
15

Buis Beton 50 cm ( 1 M' )


Buis Beton 60 cm ( 1 M' )
Buis Beton 100 cm ( 0.50 M' )
Buis Beton 80 cm ( 0.50 M' )
BuisTanah 10 cm ( 0.50 M' )
BuisTanah 15 cm ( 0.50 M' )
BuisTanah 20 cm ( 0.50 M' )
BuisTanah 25 cm ( 0.50 M' )
Injuk

stk
stk
stk
stk
stk
stk
stk
stk
kg

H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata
Besi Beton U-39 / U-32 Rata-rata
Pagar BRC lengkap tiang ( Tanpa Pondasi )
Bondek
Besi WF Ex DN SII
Besi WF Ex Jepang
Besi Profil DN SII
Besi Profil Ex LN
Besi C Lip Chanel
Ongkos Galfanis Besi
Kawat Beton
Kawat Duri
Kawat Pengikat
Kawat Bronjong 4 mm
Kawat Tembaga
Ram Nyamuk Hijau
Ram Kawat 1 x 1 cm
Ram Ayam
Kawat Kasa 1 x 1 ( Putih )
Kawat Harmonika 4 cm
Kawat Harmonika 2 cm
Kawat Las Listrik
Wiremesh M8
Wiremesh M6
Timah
Timah Hitam
Ram nyamuk Alumunium
Plat Srip 2 x 30 mm ( 6 m1 )
Plat Srip 3 x 30 mm ( 6 m1 )
Plat Strip
Besi Strip
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t= 1,3 mm (
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4
Kusen Alumunium Natural 1.3 mm t= 1,3 mm (
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3
Daun Jendela Alumunium Natural ( tanpa kaca d
Daun Jendela Alumunium Warna ( tanpa kaca da
Daun Pintu Alumunium Natural ( tanpa kaca dan
Daun Pintu Alumunium Warna ( tanpa kaca dan
Handle Alumunium ( Tarikan Pintu Alumunium

kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
m1
kg
kg
m2
m2
m2
m2
m2
m2
kg
m2
m2
kg
kg
m2
bt
bt
bt
kg
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m2
m2
m2
m2
bh

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

Kait Angin Alumunium


Karet Asisoris Kusen / Pintu Alumunium
Jalusi Alluminium
Sunscreen Almunium
Seng Plat BJLS 30 60 cm ( 100 m1 )
Seng Plat BJLS 30 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mms/d 10 mm
Plat Besi 10 mm keatas
Kabel presstressed polos
Jaring Kawat Baja
Lem Kuning ( Aibond )
Lem Fox
Lem Vinyl
Besi Strip Kaca Nako
Profil alumunium "T"
Besi Hallow ( 2 x 4 x 4) cm (400cm)
Besi Hallow ( 4 x 4) cm (400 cm)
Besi Rail Pengamanan
Jendela Besi
Jendela Besi tahan api
Pintu gulung besi
Pintu Roliing Door
Jendela nako kaca ryben + tralis 6 klips
Jendela nako kaca ryben + tralis 7 klips
Jendela nako kaca ryben + tralis 8 klips
Jendela nako kaca ryben + tralis 10 klips
Jendela nako kaca bening + tralis 4 klips
Jendela nako kaca bening + tralis 5 klips
Jendela nako kaca bening + tralis 6 klips
Jendela nako kaca bening + tralis 7 klips
Jendela nako kaca bening + tralis 8 klips
Jendela nako kaca bening + tralis 10 klips

ps
m1
m'
m2
roll
roll
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m1
btg
btg
kg
m2
m2
m2
m2
set
set
set
set
set
set
set
set
set
set

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Polos 8 mm ( ASAHI )
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca cermin 8 mm
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri Ex Luar Negeri Terpasang
Kaca 6 mm Gravver
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Sealant
Jendela Nako

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
bh

J
1

BAHAN PAKU DAN MUR BAUT


Paku 1/2" s/d 2"

kg

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Paku 2" s/d 5"


Paku 8 cm s/d 15 cm
Paku Beton 2 cm s/d 5 cm
Paku Kait Lengkap
Paku Cacing
Besi Beugel Kuda - Kuda
Duk Angker
Angker Mur Baut dia. 19 / Panjang 60 cm
Mur Baut HTB dia. 19 s/d 16 ( 5 cm )
Mur Baut Biasa dia. 19 s/d 16 ( 5 cm )
Piser dia.12 s/d 20 cm
Paku skrup 3"
Ramset / Dinabolt
Baut Besar
Baut Kecil
Paku GRC
Paku gypsum
Sekrup fixer

kg
kg
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
kg
bh

K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP 1"
Besi Pipa Untuk Hydrant BSP 1.25"
Besi Pipa Untuk Hydrant BSP 1.5"
Besi Pipa Untuk Hydrant BSP 2"
Besi Pipa Untuk Hydrant BSP 2.5"
Besi Pipa Untuk Hydrant BSP 3"
Besi Pipa Untuk Hydrant BSP 4"
Besi Pipa Untuk Hydrant BSP 6"
Besi Pipa Hitam 1" t = 2 mm
Besi Pipa Hitam 2" t = 2 mm
Besi Pipa Hitam 3" t = 2mm
Besi Pipa Hitam 4" t = 2 mm
Besi Pipa Hitam 6" t = 2 mm
Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4" ( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )
Pipa GIP Medium A 4" ( 6 m1 )
Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"
Macam2 Sambungan GIP 1"
Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 1 1/2"
Macam2 Sambungan GIP 1 3/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 1"
Pipa PVC RUCIKA type AW 1 1/4"

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Pipa PVC RUCIKA type AW 1 1/2"


Pipa PVC RUCIKA type AW 2"
Pipa PVC RUCIKA type AW 2 1/2"
Pipa PVC RUCIKA type AW 3"
Pipa PVC RUCIKA type AW 4"
Pipa PVC RUCIKA type AW 6"
Pipa PVC RUCIKA type AW 8"
Pipa PVC MASPION ABU ( AW ) 1/2"
Pipa PVC MASPION ABU ( AW ) 3/4"
Pipa PVC MASPION ABU ( AW ) 1"
Pipa PVC MASPION ABU ( AW ) 1 1/4"
Pipa PVC MASPION ABU ( AW ) 1 1/2"
Pipa PVC MASPION ABU ( AW ) 2"
Pipa PVC MASPION ABU ( AW ) 2 1/2"
Pipa PVC MASPION ABU ( AW ) 3"
Pipa PVC MASPION ABU ( AW ) 4"
Macam2 Sambungan Paralon 1/2"
Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Sambungan Paralon 2 1/2"
Macam2 Sambungan Paralon 3"
Macam2 Sambungan Paralon 4"
Sambungan Pipa PVC Jenis AW 4" TY
Lem Paralon
Solatip Ledeng
Pipa PVC 4" Berlobang Jenis AW
PVC Waterstop lebar 150
PVC Waterstop lebar 200
PVC Waterstop lebar 230
PVC Waterstop lebar 250
PVC Waterstop lebar 300
PVC Waterstop lebar 320

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
gl
m1
m1
m1
m1
m1
m1
m1

L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

BAHAN SANITAIR
Stop Kran 3/4" KIT
Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate walve 1/2"
Saringan Air Lt. KM Stainless Steel
Apooer Bath Tube
Kran Stainless Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2"
Kran Tembok ITAP dia. 1/2"
Kran Bebek Sun Eui 1/2"
Kran Bebek ITAP 1/2"

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Kran Panas Dingin San Eui Standard


Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin Warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Le
Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard INA Lengkap
Urinoir Lengkap TOTO Warna Standard Lengk
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Luba
Kitchen Zink Stainless Non Standard Franke (
Kitchen Zink Stainless Non Standard Franke (
Talang PVC U - 15 cm

bh
unit
bh
unit
unit
unit
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh
btng

M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180
Atap Fiber Glass Tipis 80 x 180 ( Gelombang )
Atap Fiber Glass Tebal 80 x 180 ( Gelombang
Atap Alumunium Natural USR 26 ( JAINDO )
Atap Alumunium Warna USR 26 ( JAINDO )
Atap Asbes Gel. Kecil 80 x 180 x 4 mm
Atap Asbes Gel. Besar 80 x 180 x 5 mm
Atap Seng Gelombang 80 cm x 180 cm x 3 m
Atap Seng Gelombang 80 cm x 180 cm x 5 m
Atap Seng Gelombang 270 cm x 105 cm x 4m
Atap Seng Gelombang 240 cm x 105 cm x 4m
Atap Seng Gelombang 210 cm x 105 cm x 4m
Atap Seng Gelombang 150 cm x 105 cm x 4m
Atap Seng Gelombang 150 cm x 102 cm x 5m
Atap Seng Gelombang 180 cm x 102 cm x 5m
Atap Asbes Gelombang 300 cm x 105 cm x 4
Atap Tegola Kubota, lengkap
Atap Tegola Kwalitas Sedang
Alumunium Foile
Atap Genteng Plentong pres Bakar KW I
Atap Genteng Plentong pres Molen Oven KW
Atap Genteng Flam pres Molen Oven Jatiwangi
Bubung Genteng pres Bulat Ex Jatiwangi
Genteng Bubungan Ex Jatiwangi Segi Tiga
Genteng Bubungan Beton
Genteng Metal ( Rainbow Roof )
Genteng Metal Hana
Nok Atas Metal ( Rainbow Roof )
Nok Atas Metal Hana
Nok Pingir Metal ( Rainbow Roof )
Nok Pingir Metal Hana
Wall Flasing ( Rainbow Roof )
Wall Flasing Hana
Atap Genteng Beton Warna 14.5/m2
Genteng Beton Natural
Sirap Kelas I ( 80 / m2 )
Genteng Keramik Natural Intan 14.5 / m2
Genteng Keramik Glasur Standard 14.5 /m2

lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
m2
bh
m2
m2
m2

39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Genteng Keramik Glasur Special 14.5 /m2


Genteng Keramik Glasur Premium 14.5 /m2
Genteng Murando Natural 1m2 = 18 bh
Genteng Murando Glasur 1m2 = 18 bh
Bubung Murando Natural
Bubung Murando Glasur
Bubungan Genteng Keramik
Atap Genteng Kodok
Bubungan Genteng Kodok
Bubungan Genteng Plentong
Bubungan Stel Gelombang
Nok Stel Gelombang
Nok Atap Seng
Nok standar 40 cm 18, SWG 22
Pelat Asbes tebal 4 mm
Pelat Asbes tebal 3.5 mm
Trusses ZAM-75 t=0.8 Rangka Utama
Trusses ZAM-75 t=0.5 Rangka Utama
Reng 16-DB Roof Battens t=0.48 mm
Foot Plate t= 1.22 mm
PLD - Diafragma Plate
WIND Bracing
Tensioner ( Pengaku Tali angin )

m2
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m2
lbr
lbr
m1
m1
m1
m1
bh
m1
bh

N
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6
Electrical Pump kap. 750 gln/menit 120 m1 ( 9
Diesel Pump kap. 750 gln/menit 120 m1 ( 105
Presure Tank kap. 500 liter lengkap
Hydran Box dlm Gedung ( Lengkap )
Fire House 1.5 x 30 m + nose
Exhose Fan H 360 W 60 x 60 cm
Exhose Fan H 380 W CFM 55 x 55 cm
Exhose Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Un

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU

O
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' )

ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' )


Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' )
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm ( Kosong )
Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
MCB 1 PAS
MCB 3 PAS
Tahanan 50 A Merk Fuji
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase (Out Bow)
Stop Kontak Broko 3 Phase ( In Bow)
Stop Kontak Handle 3 Phase
Instalas Titik Lampu / Stop Kontak (Upah dan A
Lampu pijar 25 Watt s/d 100 Watt
Lampu Neon Phillips 20 Watt
Lampu Neon Phillips 40 Watt
Trapo TL 20 W (Phillips)
Trapo TL 40 W (Phillips)
Trapo TL 20 W (Sinar)
Trapo TL 40 W (sinar)
Stater Neon Phillips
Stater Neon Biasa
Rumah TL In Bow / Out Bow 2 x 20 W (koson
Down Light + SL 25 W
Lampu SL Philip 25 W
Lampu Sirkel TL 20 W Lengkap
Lampu Mercuri 80 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W Lengkap
Jarum Penangkal Petir 16
Kawat BC ( Tembaga )
Pentanahan Penangkal Petir
Pentanahan Panel

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk

P
1
2
3
4
5
6
7
8

BAHAN ALAT PENGANTUNG DAN KUNCI


Kunci Silinder ALFA untuk Pintu Alumunium
Tarikan Pintu Alumunium
Kunci 2 Slaag ROYAL
Rel Henderson Lengkap
Rel maraton I Pintu
Kunci 2 Slaag Silinder SEIS Asli type 210 s/d t
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO

bh
bh
bh
bh
unt
bh
bh
bh

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Kunci KM Bulat Kualitas Biasa


Kunci kM Bulat ALFA
Kunci 2 Slaag Silinder Utama Standard
Kunci Gembok Besar
Kunci 2 Slaag Kuda Terbang
Kunci Lemari
Espangolet
Grendel 15 cm
Grendel 5 cm
Hak Angin Kait Jendela Biasa
Hak Angin Jendela Antik
Hak Angin Sendok Stainless / Kuningan
Sloot Pintu Berikut Rantai
Sloot Jendela Tunggal
Engsel Pintu Unilon Standard
Engsel Jendela Unilon
Engsel Patrun
Engsel Harmonika
Door Closer Kelas Standard ( Kelas Sedang )
Door Closer Kelas Standard ( Kelas Baik )
Door Closer Kelas Rendah
Door Holder
Door Stoper
Tarikan Almari Rata-rata
Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' )
Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' )
Seng BJLS 30 / 3 x 0.3 mm
Seng Plat
Waterstop Lebar 200 mm

bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
bh
bh
ps
ps
ps
m1
unt
unt
unt
unt
unt
bh
m1
m1
lbr
lbr
m1

Q
1
2
3
4
5
6

BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


Aspal Bitumen
kg
Aspal Emulsi
kg
Aspal Curah
kg
Aspal Concrete / Laston( AC -WC)
ton
Aspal Threated Base ( ATB )
ton
Lataston /Hot Rolls Sheet ( HRS )
ton

R
1
2
3
4
5
6
7
8
9
10
11

BAHAN PENGISAP AIR SUMUR DALAM


Pompa Kodok
Pompa Dragon Tegal
Pompa Dragon Asli
Mesin Pompa Air 100 W - Sanyo
Mesin Pompa Air 150 W - Sanyo
Pompa Zet Pump 250 W - Sanyo
Pompa Zet Pump 450 W - Sanyo
Pompa Submersible kap. 150 liter / menit 3 K
Gear Pump Kap. 60 liter / menit
Deep Well dengan kelengkapannya kap. 150 lite
Hand Oil Pump

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

S
1
2
3
4
5

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Excel )
Tangki Air Fiber Glass 1 m3 ( Excel )
Tangki Air Fiber Glass 2 m3 ( Excel )
Bak KM Fiber 60 x 60
Bak Taraso WC 40 x 40

bh
bh
bh
bh
bh

Bak KM Taraso 60 x 60

bh

T
1
2
3
4
5
6
7
8
9
10

ALAT TUKANG
Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Selang Plastik untuk Water Pas dia. 0.5 cm
Water Pas Alumunium 60 cm

bh
bh
bh
bh
bh
bh
bh
bh
m
bh

U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN BAKAR DAN PELUMAS


Minyak Tanah
Kayu Bakar dari Kayu Karet
Bahan Bakar Residu
Minyak Solar
Bensin Premium
Plus Oil
Oil Mesran 40 SAE
Elpiji / botol
Asitilin / Botol
Angin ( O2 ) / botol
Karbit
Minyak Bekisting
Rapidrant
Soda Api
Sabun
Arang Kayu
Kawat Las

V
1
2

BAHAN PAGAR
Panel Beton Pracetak
Kolom Beton Pracetak

B.
1
2
3
4
5
6
7
8
9
10

BIDANG PERTAMANAN
Aglonema
Bambu krisik/jepang
Furadan
Kompos/pupuk kandang
M atoa (2 m)
Palm (botol, ekor tupai, putri, dll) tinggi 2 m
Philo
Pohon pelindung (angsana, mahoni, kamboja dll
Pohon perdu (kaca piring, puring, mawar, melati
Rumput gajah mini

lt
m3
lt
lt
lt
lt
lt
15 kg
15.1 kg btl
btl
kg
ltr
Gln
kg
kg
kg
bh

lbr
btg

batang
batang
kg
karung
batang
batang
batang
batang
batang
m2

HARGA (Rp)

AN JADINYA
175,300.00
89,200.00
203,500.00
174,200.00
233,400.00
255,400.00
259,000.00
29,600.00
223,600.00
211,100.00
205,000.00
196,000.00
205,500.00
180,800.00
172,600.00
96,600.00
14,100.00
73,700.00
97,800.00
2,000.00
2,400.00
5,400.00
775.00
675.00
1,800.00
14,800.00
15,500.00
9,700.00
22,500.00
81,100.00
108,600.00
76,000.00
86,000.00
34,900.00
70,300.00
1,406.00
92,700.00
58,900.00
1,105,000.00
903,500.00
877,500.00
925,000.00
850,000.00
825,000.00
353,300.00
18,300.00

15,700.00
31,300.00
3.00
2,500.00
5,000.00
4,000.00
3,000.00

25,000.00
120,000.00
75,000.00
25,000.00
75,000.00
20,000.00
30,000.00
40,000.00
90,000.00
185,000.00
70,000.00
62,500.00
32,500.00
8,500.00
10,000.00
25,000.00
29,000.00
382,600.00
370,000.00
16,000.00
22,000.00
5,200.00
5,500.00
15,000.00
110,000.00
34,200.00
37,700.00
37,700.00
35,800.00
48,000.00
112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00
39,200.00
35,800.00
5,000.00
24,400.00
30,400.00
40,900.00
41,700.00

44,000.00
76,300.00
67,700.00
3,300.00
38,400.00
50,100.00
8,100.00

17,700.00
25,000.00
37,200.00
7,094,450.00
5,280,000.00
5,595,800.00
5,692,600.00
5,823,400.00
6,363,600.00
6,645,300.00
8,633,700.00
8,724,300.00
2,658,000.00
20,772,000.00
22,188,400.00
13,625,400.00
12,736,100.00
2,069,800.00
1,870,500.00
2,071,700.00
22,600.00
28,000.00
8,900.00
10,000.00
14,300.00
17,200.00
29,400.00
160,100.00
122,500.00
2,772,000.00
3,356,800.00
2,500.00
3,300.00
4,000.00
2,850,000.00
2,640,000.00
139,500.00
23,400.00
22,000.00
537,300.00
351,200.00

17,400.00
62,400.00
22,500.00
19,500.00
79,800.00

83,800.00
12,500.00
132,800.00
15,000.00
67,500.00
75,000.00
8,500.00

61,700.00
64,400.00
56,200.00
92,000.00
166,600.00
119,000.00
19,800.00
22,700.00
34,200.00
55,700.00
151,100.00
195,000.00
255,400.00
323,900.00
235,000.00
140,000.00
129,100.00
131,700.00
127,200.00
114,700.00
128,200.00
57,900.00
89,200.00
133,400.00
170,000.00
132,900.00
238,100.00

3,400.00
2,400.00
3,400.00
2,800.00
3,600.00
3,400.00
5,700.00
6,300.00
3,200.00
2,500.00
4,100.00
63,300.00
67,300.00
54,500.00
56,000.00
62,500.00
54,500.00
62,500.00
53,000.00

58,000.00
56,800.00
65,500.00
64,400.00
72,200.00
75,200.00
72,900.00
75,200.00
72,900.00
68,900.00
76,600.00
72,500.00
77,000.00
56,000.00
1,025,500.00
353,500.00
375,400.00
13,700.00
25,000.00
31,800.00
13,500.00
1,848,400.00
1,612,900.00
1,331,100.00
1,299,400.00
345,000.00
322,800.00
204,900.00
550,000.00
550,200.00
345,700.00
340,800.00
237,600.00
157,900.00
358,100.00
231,800.00
96,500.00
600.00
37,600.00
3,000.00
3,250.00
3,500.00
4,000.00
4,500.00
5,250.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

44,300.00
56,400.00
74,200.00
49,200.00
61,700.00
80,900.00

94,300.00
130,900.00
299,800.00
298,500.00
9,600.00
12,700.00
16,800.00
22,800.00
17,400.00

16,500.00
20,700.00
171,300.00
185,000.00
24,000.00
23,900.00
18,300.00
21,600.00
19,200.00
10,600.00
27,700.00
63,500.00
1,000.00
28,200.00
41,400.00
13,400.00
15,300.00
14,900.00
32,100.00
35,900.00
28,600.00
23,600.00
51,900.00
38,700.00
46,300.00
43,300.00
32,400.00
33,000.00
33,100.00
18,200.00
26,800.00
89,800.00
110,500.00
141,400.00
143,100.00
171,800.00
56,300.00
151,100.00
163,000.00
81,000.00
102,000.00
98,800.00
148,800.00
211,800.00
207,500.00
345,200.00

104,500.00
7,500.00
35,000.00
380,200.00
1,581,500.00
2,080,100.00
16,800.00
17,700.00
14,100.00
14,100.00
14,700.00
26,700.00
28,900.00
35,700.00
23,900.00
44,000.00
11,000.00
12,200.00
22,600.00
29,200.00
459,300.00
390,200.00
501,700.00
501,700.00
306,600.00
170,000.00
200,000.00
230,000.00
290,000.00
120,000.00
140,000.00
170,000.00
210,000.00
230,000.00
300,000.00

69,000.00
87,400.00
111,000.00
183,100.00
148,700.00
323,400.00
627,000.00
150,500.00
186,400.00
234,300.00
1,621,100.00
3,425,700.00
1,263,900.00
22,000.00
125,700.00
211,800.00
109,200.00

23,800.00

23,400.00
20,000.00
1,600.00
900.00
57,100.00
21,700.00
7,500.00
71,800.00
15,900.00
9,300.00
5,300.00
800.00
7,200.00
600.00
300.00
35,000.00
17,500.00
250.00

166,700.00
210,200.00
298,000.00
351,800.00
439,300.00
595,000.00
869,600.00
1,423,400.00
172,300.00
227,900.00
365,800.00
573,100.00
772,400.00
109,100.00
159,400.00
181,500.00
259,300.00
280,500.00
326,400.00
467,400.00
672,100.00
849,900.00
920,300.00
6,300.00
8,600.00
16,700.00
19,800.00
20,700.00
22,700.00
51,200.00
60,400.00
75,900.00
118,600.00
40,100.00
52,200.00
63,200.00
79,900.00

105,900.00
110,700.00
167,100.00
205,100.00
347,900.00
640,000.00
818,300.00
22,500.00
27,800.00
40,500.00
58,500.00
60,200.00
75,800.00
126,300.00
145,700.00
256,800.00
4,400.00
4,700.00
4,900.00
7,200.00
9,500.00
13,500.00
15,800.00
26,400.00
29,700.00
34,000.00
89,900.00
10,100.00
4,200.00
36,700.00
53,500.00
57,900.00
65,700.00
74,700.00
83,600.00
92,500.00

103,900.00
124,200.00
208,000.00
267,900.00
713,200.00
830,300.00
86,400.00
32,400.00
40,200.00
55,500.00
66,600.00
267,800.00
46,100.00
221,000.00
134,800.00
86,900.00
40,900.00
144,600.00
51,500.00

228,400.00
2,098,700.00
46,300.00
1,012,700.00
699,900.00
205,600.00
188,200.00
2,032,900.00
1,724,700.00
910,800.00
1,272,100.00
1,773,400.00
495,900.00
397,800.00
1,272,300.00
1,650,200.00
60,000.00

33,100.00
47,100.00
100,000.00
140,600.00
164,700.00
77,200.00
111,100.00
62,900.00
83,100.00
73,300.00
65,900.00
58,500.00
42,300.00
78,500.00
97,200.00
80,000.00
487,100.00
283,600.00
19,600.00
1,900.00
2,700.00
2,300.00
7,500.00
4,800.00
10,500.00
203,100.00
172,700.00
138,500.00
80,900.00
105,300.00
100,800.00
83,900.00
88,700.00
96,700.00
8,500.00
26,400.00
112,400.00
142,200.00

139,300.00
145,100.00
2,700.00
4,000.00
7,500.00
10,700.00
10,000.00
3,000.00
4,500.00
6,000.00
7,500.00
38,100.00
37,500.00
75,000.00
21,000.00
16,400.00
34,500.00
22,000.00
11,000.00
7,200.00
2,200.00
1,700.00
7,200.00

71,396,400.00
216,358,900.00
591,647,100.00

36,997,300.00
6,854,400.00
4,866,100.00
6,862,900.00
5,491,100.00
1,092,600.00
30,791,800.00
21,926,500.00
5,174,100.00
4,200,000.00

102,700.00
151,700.00
6,600.00
7,600.00
4,900.00
10,900.00
7,600.00
6,300.00
15,400.00
20,700.00
11,800.00
13,700.00
18,600.00
17,600.00
119,700.00
26,500.00
29,700.00

12,000.00
19,300.00
23,800.00
14,500.00
19,200.00
18,500.00
20,400.00
25,800.00
35,500.00
41,900.00
841,900.00
2,182,600.00
153,500.00
204,800.00
222,600.00
468,800.00
55,100.00
106,000.00
521,100.00
23,800.00
26,300.00
23,800.00
87,700.00
144,900.00
87,800.00
179,600.00
61,200.00
29,700.00
35,200.00
41,800.00
37,900.00
40,600.00
41,300.00
8,300.00
6,500.00
144,000.00
306,900.00
306,900.00
67,900.00
147,400.00
307,600.00
221,700.00
738,000.00
101,500.00
65,100.00
423,700.00
296,100.00

410,900.00
408,600.00
126,500.00
864,300.00
193,100.00
335,900.00
165,300.00
207,300.00

54,400.00
102,700.00
586,600.00
85,200.00
94,500.00
46,800.00
51,600.00
49,800.00
5,500.00
7,100.00
29,000.00
32,200.00
31,500.00
33,000.00
21,000.00
15,000.00
13,700.00
9,100.00
420,000.00
597,500.00
200,000.00
205,400.00
255,500.00
19,500.00
43,500.00
53,500.00
86,900.00
50,100.00
57,900.00

12,459.00
12,459.00
10,890.00
1,348,300.00
1,200,200.00
1,666,900.00

172,600.00
243,800.00
718,500.00
1,100,200.00
1,890,700.00
4,961,500.00
7,878,000.00
27,151,200.00
15,702,700.00
172,052,500.00
5,195,300.00

1,172,500.00
1,316,400.00
1,954,200.00
255,300.00
118,500.00

161,100.00

39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
41,700.00
101,000.00
37,800.00
1,600.00
88,200.00

18,000.00
151,100.00
28,435.00
7,150.00
7,800.00
3,300.00
55,000.00
104,600.00
88,900.00
66,400.00
19,400.00
40,500.00
15,700.00
35,600.00
2,400.00
11,100.00
1,400.00

199,200.00
264,000.00

50,000.00
50,000.00
24,000.00
25,000.00
40,000.00
100,000.00
75,000.00
25,000.00
10,000.00
15,000.00

Analisa Harga Satuan Pekerjaan


Pekerjaan :
Lokasi :
Tahun :

SNI 3434:2008

Harga Satuan (Rp)


No

Jenis Pekerjaan

Sat

Indeks
Bahan

I
SNI 3434:2008

SNI 3434:2008

SNI 3434:2008

Upah

Pekerjaan Kusen, Pintu dan Jendela


A. Pemasangan Kusen Pintu dan Kusen Jendela
Bahan
Balok Kayu Kamper Samarinda
Paku 10 cm
Lem Kayu
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang Kayu
Mandor
Sub Total
B. Pemasangan Daun Pintu Panel Kayu Kamper
Bahan
Kayu Papan Kamper Samarinda
Paku Biasa 5-7 cm
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang Kayu
Mandor
Sub Total
C. Pemasangan Daun Jendela Kaca Kayu Kamper
Bahan
Kayu Papan Kamper Samarinda
Tenaga
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
Sub Total

Btg
Kg
Kg

1.200
1.250
1.000

Oh
Oh
Oh
Oh

18.000
6.000
1.800
0.300

M
Kg

0.040
0.050

Oh
Oh
Oh
Oh

1.050
0.350
0.105
0.018

0.035

Oh
Oh
Oh
Oh

2.000
0.200
0.800
0.040

7,742,500.00
23,400.00
18,000.00
65,000.00
50,000.00
75,000.00
80,000.00

7,823,800.00
23,400.00
65,000.00
50,000.00
75,000.00
80,000.00

7,823,800.00
65,000.00
75,000.00
50,000.00
80,000.00

Total Harga Satuan


(Rp)

9,291,000.00
29,250.00
18,000.00
1,170,000.00
300,000.00
135,000.00
24,000.00
10,967,250.00

312,952.00
1,170.00
68,250.00
17,500.00
7,875.00
1,440.00
409,187.00

273,833.00
130,000.00
15,000.00
40,000.00
3,200.00
462,033.00

Volume

III
6.6
SNI 03-2835-2002

IV
6.11
SNI 03-2835-2002

6.15
SNI 03-2835-2002

V
6.14
SNI 03-2835-2002

6.9
SNI 03-2835-2002

VI
6.1
SNI 03-2835-2002

6.7
SNI 03-2835-2002

ALS

6.35
SNI 03-2835-2002

6.53
SNI 03-2835-2002

6.40
SNI 03-2835-2002

VII
6.39
SNI 03-2835-2002

6.40
SNI 03-2835-2002

6.46
SNI 03-2835-2002

6.46
SNI 03-2835-2002

6.5
SNI 03-2835-2002

6.25
SNI 03-2835-2002

6.32
SNI 03-2835-2002

VIII
6.4
SNI 03-2835-2002

6.30
SNI 03-2835-2002

IX
6.19
SNI 03-2835-2002

6.1
SNI 03-2835-2002

X
Pek Tanah 6.11
SNI 03-2835-2002

6.47
SNI 03-2835-2002

6.42
SNI 03-2835-2002

6.3
SNI 03-2835-2002

6.17
SNI 03-2835-2002

XI
6.2
SNI 03-2835-2002

6.5

SNI 03-2835-2002

6.6
SNI 03-2835-2002

6.12
SNI 03-2835-2002

6.16
SNI 03-2835-2002

6.23
SNI 03-2835-2002

XII
ALS

ALS

XIII
ALS
ALS
ALS
ALS

ALS
ALS

uts
irvan
faisal

fikry
david

70
70
70
70

70
70
70
70

tugas besar

70

66

70
70
70

60
60

uts
40%
27.5
27.6
27
27

65

uas
30%
18
18
18
18

nilai
30%
18
18
18
18

100%
63.5
63.6
63
63

275
276
270
270

68.75
69
67.5
67.5

uas
60
60
60
60

60
60
60
60

PEKERJAAN PONDASI
D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m)
Bahan
Batu Belah 15/20 cm
M
1.100
Semen Portland
Kg
136.000
Pasir Pasang
M
0.544
Tenaga
Pekerja
Oh
1.500
Tukang Batu
Oh
0.600
Kepala Tukang
Oh
0.060
Mandor
Oh
0.075
Sub Total

PEKERJAAN DINDING
A. Pasangan Tembok Bata 1Pc:4Ps (Trasraam) (m)
Bahan

36,000.00
42,500.00
45,000.00
40,000.00

54,000.00
25,500.00
2,700.00
3,000.00
85,200.00

Bata Merah 5 X 11 X 22 cm
Bh
70.000
Semen Portland
Kg
11.500
Pasir Pasang
M
0.043
Tenaga
Pekerja
Oh
0.320
Tukang Batu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.015
Sub Total
B. Pasangan Tembok Bata 1Pc:3Kp:10Ps (m)
Bahan
Bata Merah 5 X 11 X 22 cm
Bh
70.000
Semen Portland
Kg
4.500
Pasir Pasang
M
0.050
Kapur Padam
M
0.015
Tenaga
Pekerja
Oh
0.320
Tukang Batu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.015
Sub Total

775.00
#REF!
#REF!

54,250.00
#REF!
#REF!
36,000.00
42,500.00
45,000.00
40,000.00

775.00
#REF!
#REF!
45,000.00

11,520.00
4,250.00
450.00
600.00
#REF!

54,250.00
#REF!
#REF!
675.00
36,000.00
42,500.00
45,000.00
40,000.00

11,520.00
4,250.00
450.00
600.00
#REF!

PEKERJAAN PLESTERAN DINDING


A. Plesteran Dinding 1Pc:3Ps (m) tebal 20 mm
Bahan
Semen Portland
Kg
10.800
#REF!
Pasir Pasang
M
0.026
#REF!
Tenaga
Pekerja
Oh
0.250
Tukang Batu
Oh
0.200
Kepala Tukang
Oh
0.020
Mandor
Oh
0.013
Sub Total
B. Plesteran Dinding 1Pc:3Kp:10Ps (m) tebal 15 mm
Bahan
Semen Portland
Kg
1.840
#REF!
Kapur Padam
M
0.006
45,000.00
M
Pasir Pasang
0.014
#REF!
Tenaga
Pekerja
Oh
0.200
Tukang Batu
Oh
0.150

#REF!
#REF!
36,000.00
42,500.00
45,000.00
40,000.00

9,000.00
8,500.00
900.00
500.00
#REF!

#REF!
270.00
#REF!
36,000.00
42,500.00

7,200.00
6,375.00

Kepala Tukang
Mandor
Sub Total

Oh
Oh

0.015
0.010

45,000.00
40,000.00

675.00
400.00
#REF!

PEKERJAAN KAYU
A. Pasang Kusen Pintu dan Jendela Kayu Jati (m)
Bahan
Kayu jati, balok
M
1.100
###
Tenaga
Pekerja
Oh
6.000
Tukang Kayu
Oh
20.000
Kepala Tukang
Oh
2.000
Mandor
Oh
0.300
Sub Total
B. Pasang Pintu Panel Kayu Jati (m)
Bahan
M
Kayu Jati, papan
0.040
###
Tenaga
Pekerja
Oh
1.000
Tukang Kayu
Oh
2.500
Kepala Tukang
Oh
0.250
Mandor
Oh
0.050
Sub Total
C. Pasang Nook, Gording, Murplat, Nook Kayu Bengkirai (m)
Bahan
M
1.100
###
Kayu Bengkirai, balok
Tenaga
Pekerja
Oh
2.000
Tukang Kayu
Oh
8.000
Kepala Tukang
Oh
1.200
Mandor
Oh
0.200
Sub Total
D. Pasang Kaso+Reng Genteng Beton Kayu Borneo (m)
Bahan
M
0.014
###
Kayu Borneo, balok
Kg
0.150
23,400.00
Paku Biasa 2"-5"
Tenaga
Pekerja
Oh
0.100
Tukang Kayu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005

16,500,000.00
36,000.00
47,500.00
45,000.00
40,000.00

216,000.00
950,000.00
90,000.00
12,000.00
17,768,000.00

720,000.00
36,000.00
47,500.00
45,000.00
40,000.00

36,000.00
118,750.00
11,250.00
2,000.00
888,000.00

9,350,000.00
36,000.00
47,500.00
45,000.00
40,000.00

72,000.00
380,000.00
54,000.00
8,000.00
9,864,000.00

119,000.00
3,510.00
36,000.00
47,500.00
45,000.00
40,000.00

3,600.00
4,750.00
450.00
200.00

Sub Total
E. Pasang Listplank, Reuter 2X (2X20) cm, kayu borneo (m)
Bahan
M
0.009
###
Kayu Borneo,Papan
Kg
0.060
23,400.00
Paku Biasa 2"-5"
Tenaga
Pekerja
Oh
0.100
Tukang Kayu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.050
Sub Total
F. Pasang Rangka Langit-langit 1X1 m Kayu Borneo (m)
Bahan
Kayu borneo, balok
M
0.012
###
Paku biasa 2"-5"
Kg
0.100
23,400.00
Tenaga
Pekerja
Oh
0.150
Tukang Kayu
Oh
0.250
Kepala Tukang
Oh
0.025
Mandor
Oh
0.075
Sub Total

131,510.00

88,000.00
1,404.00
36,000.00
47,500.00
45,000.00
40,000.00

3,600.00
4,750.00
450.00
2,000.00
100,204.00

102,000.00
2,340.00
36,000.00
47,500.00
45,000.00
40,000.00

5,400.00
11,875.00
1,125.00
3,000.00
125,740.00

PEKERJAAN BETON
A. Membuat sloof Beton Bertulang (200Kg besi+bekisting) (m)
Bahan
Kayu Terentang
M
0.270
###
Paku Biasa 2"-5"
Kg
2.000
23,400.00
Minyak Bekisting
Lt
0.600
10,000.00
Besi Beton polos
Kg
200.000
12,000.00
Kawat Beton
Kg
3.000
13,000.00
Semen Portland
Kg
323.000
1,406.00
Pasir Beton
M
0.520
###
Koral Beton
M
0.780
###
Tenaga
Pekerja
Oh
4.850
Tukang Batu
Oh
0.350
Tukang Kayu
Oh
1.560
Tukang Besi
Oh
1.400
Kepala Tukang
Oh
0.331
Mandor
Oh
0.170
Sub Total

2,112,426.00
46,800.00
6,000.00
2,400,000.00
39,000.00
454,138.00
132,808.00
164,658.00
36,000.00
42,500.00
47,500.00
45,000.00
45,000.00
40,000.00

174,600.00
14,875.00
74,100.00
63,000.00
14,895.00
6,800.00
5,704,100.00

B. Membuat Kolom Beton Bertulang (300Kg besi+bekisting) (m)


Bahan
Kayu Terentang
M
0.400
###
Paku Biasa 2"-5"
Kg
4.000
23,400.00
Minyak Bekisting
Lt
2.000
10,000.00
Besi Beton polos
Kg
300.000
12,000.00
Kawat Beton
Kg
4.500
13,000.00
Semen Portland
Kg
323.000
1,406.00
Pasir Beton
M
0.520
###
Koral Beton
M
0.780
###
Kayu Borneo Balok
M
0.150
###
Plywood 9 mm
Lbr
3.500
95,000.00
Dolken Kayu 8-10/400 cm
Btg
20.000
28,000.00
Tenaga
Pekerja
Oh
7.300
Tukang Batu
Oh
0.350
Tukang Kayu
Oh
3.300
Tukang Besi
Oh
2.100
Kepala Tukang
Oh
0.570
Mandor
Oh
0.250
Sub Total
C. Membuat Ring Balok Beton Bertulang (10X15cm) (m)
Bahan
Kayu Albasiah
M
0.003
###
Paku Biasa 2"-5"
Kg
0.020
23,400.00
Besi Beton polos
Kg
3.600
13,000.00
Kawat Beton
Kg
0.050
13,000.00
Semen Portland
Kg
5.500
1,406.00
Pasir Beton
M
0.009
###
Koral Beton
M
0.015
###
Tenaga
Pekerja
Oh
0.100
Tukang Batu
Oh
0.033
Tukang Kayu
Oh
0.033
Tukang Besi
Oh
0.033
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Sub Total
D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m)
Bahan
Kayu Albasiah
M
0.003
###

3,129,520.00
93,600.00
20,000.00
3,600,000.00
58,500.00
454,138.00
132,808.00
164,658.00
1,275,000.00
332,500.00
560,000.00
36,000.00
42,500.00
47,500.00
45,000.00
45,000.00
40,000.00

262,800.00
14,875.00
156,750.00
94,500.00
25,650.00
10,000.00
10,385,299.00

9,000.00
468.00
46,800.00
650.00
7,733.00
2,298.60
3,166.50
36,000.00
42,500.00
47,500.00
45,000.00
45,000.00
40,000.00

3,600.00
1,402.50
1,567.50
1,485.00
450.00
200.00
78,821.10

9,000.00

Paku Biasa 2"-5"


Kg
0.020
Besi Beton polos
Lt
3.600
Kawat Beton
Kg
0.050
Semen Portland
Kg
5.500
Pasir Beton
Kg
0.009
Koral Beton
M
0.015
Tenaga
Pekerja
Oh
0.100
Tukang Batu
Oh
0.033
Tukang Kayu
Oh
0.033
Tukang Besi
Oh
0.033
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005
Sub Total
E. Membuat Plat Beton 1Pc:2Ps:3Kr (m)
Bahan
Semen Portland
Kg
232.000
Pasir Beton
M
0.520
Koral Beton
M
0.780
Tenaga
Pekerja
Oh
1.650
Tukang Batu
Oh
0.250
Kepala Tukang
Oh
0.025
Mandor
Oh
0.080
Sub Total
F. Pembesian Besi Polos dan Ulir plat beton(Kg)
Bahan
Besi Beton (Polos/Ulir)
Kg
1.050
Kawat Beton
Kg
0.015
Tenaga
Pekerja
Oh
0.007
Tukang Besi
Oh
0.007
Kepala Tukang
Oh
0.001
Mandor
Oh
0.000
Sub Total
G. Pasang Bekisting untuk Plat Beton (m)
Bahan
Kayu Terentang
M
0.040
Paku Biasa 2"-5"
Kg
0.400
Minyak Bekisting
Lt
0.200
Balok Kayu borneo
M
0.015

23,400.00
13,000.00
13,000.00
1,406.00
###
###

468.00
46,800.00
650.00
7,733.00
2,298.60
3,166.50
36,000.00
42,500.00
47,500.00
45,000.00
45,000.00
40,000.00

1,406.00
###
###

326,192.00
132,808.00
164,658.00
36,000.00
42,500.00
45,000.00
40,000.00

12,000.00
13,000.00

59,400.00
10,625.00
1,125.00
3,200.00
698,008.00

12,600.00
195.00
36,000.00
45,000.00
45,000.00
40,000.00

###
23,400.00
10,000.00
###

3,600.00
1,402.50
1,567.50
1,485.00
450.00
200.00
78,821.10

252.00
315.00
31.50
12.00
13,405.50

312,952.00
9,360.00
2,000.00
127,500.00

Plywood tebal 9 mm
Dolken Kayu galam 8-10/4
Tenaga
Pekerja
Tukang kayu
Kepala Tukang
Mandor
Sub Total

Lbr
Btg

0.350
6.000

Oh
Oh
Oh
Oh

0.320
0.330
0.033
0.006

95,000.00
28,000.00

33,250.00
168,000.00
36,000.00
47,500.00
45,000.00
40,000.00

11,520.00
15,675.00
1,485.00
240.00
681,982.00

PEKERJAAN PENUTUP ATAP


A. Pasang Genteng Bubung Palentong (m)
Bahan
Genteng Bubung Palentong
Bh
5.000
Semen Portland
Kg
8.000
3
Pasir Pasang
0.032
M
Tenaga
Pekerja
Oh
0.400
Tukang Kayu
Oh
0.200
Kepala Tukang
Oh
0.020
Mandor
Oh
0.002
Sub Total
B. Pasang Atap Genteng Beton (m)
Bahan
Genteng Beton
Bh
11.000
Paku Biasa 2" - 5"
Kg
0.030
Tenaga
Pekerja
Oh
0.200
Tukang Kayu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.010
Sub Total

7,500.00
1,406.00
###

37,500.00
11,248.00
4,000.00
36,000.00
47,500.00
45,000.00
40,000.00

5,500.00
23,400.00

14,400.00
9,500.00
900.00
80.00
77,628.00

60,500.00
702.00
36,000.00
47,500.00
45,000.00
40,000.00

7,200.00
4,750.00
450.00
400.00
74,002.00

PEKERJAAN PLAFON
A. Pasang List Langit-langit Kayu Profil (m)
Bahan
M
Kayu Profil
1.100
Paku plafon
Kg
0.010
Tenaga
Pekerja
Oh
0.050
Tukang Kayu
Oh
0.050

3,333.33
10,000.00

3,666.67

36,000.00
47,500.00

1,800.00
2,375.00

Kepala Tukang
Mandor
Sub Total
B. Langit-langit Asbes (m)
Bahan
Pelat Asbes tebal 6mm
Paku plafon
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Sub Total

Oh
Oh

0.005
0.003

M
Kg

1.100
0.010

Oh
Oh
Oh
Oh

0.030
0.070
0.007
0.002

45,000.00
40,000.00

32,000.00
10,000.00

225.00
120.00
8,186.67

35,200.00

36,000.00
47,500.00
45,000.00
40,000.00

1,080.00
3,325.00
315.00
60.00
39,980.00

PEKERJAAN PENUTUP LANTAI DAN DINDING


A. Pekerjaan Urug Pasir Bawah Lantai (m)
Bahan
Pasir Urug
M
1.200
Tenaga
Pekerja
Oh
0.300
Tukang Gali
Oh
0.000
Kepala Tukang
Oh
0.000
Mandor
Oh
0.010
Sub Total
B. Pasang Lantai Keramik 33X33 cm (m)
Bahan
Ubin Keramik 33X33 cm
Bh
10.000
Semen Portland
Kg
11.380
Pasir Pasang
M
0.042
Semen Warna
Kg
1.500
Tenaga
Pekerja
Oh
0.620
Tukang Batu
Oh
0.350
Kepala Tukang
Oh
0.035
Mandor
Oh
0.030
Sub Total
C. Pasang Lantai Keramik 10X20 cm (m)
Bahan
Ubin Keramik Artistik 10X20 c
Bh
50.000
Semen Portland
Kg
11.380
Pasir Pasang
M
0.042

###

210,360.00
36,000.00
42,500.00
45,000.00
40,000.00

4,000.00
1,406.00
###
13,000.00

40,000.00
16,000.28
5,250.00
19,500.00
36,000.00
42,500.00
45,000.00
40,000.00

4,444.44
1,406.00
###

10,800.00
400.00
221,560.00

22,320.00
14,875.00
1,575.00
1,200.00
120,720.28

222,222.22
16,000.28
5,250.00

Semen Warna
Kg
1.500
13,000.00
Tenaga
Pekerja
Oh
0.620
Tukang Batu
Oh
0.350
Kepala Tukang
Oh
0.035
Mandor
Oh
0.030
Sub Total
D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m)
Bahan
Ubin Abu-Abu 20X20 cm
Bh
26.500
3,888.89
Semen Portland
Kg
10.400
1,406.00
Pasir Pasang
M
0.014
###
Tenaga
Pekerja
Oh
0.270
Tukang Batu
Oh
0.130
Kepala Tukang
Oh
0.013
Mandor
Oh
0.014
Sub Total
E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m)
Bahan
Plint Ubin 10x30 cm
Bh
3.530
2,700.00
Semen Portland
Kg
1.560
1,406.00
Pasir Pasang
M
0.003
###
Tenaga
Pekerja
Oh
0.060
Tukang Batu
Oh
0.030
Kepala Tukang
Oh
0.003
Mandor
Oh
0.003
Sub Total

19,500.00
36,000.00
42,500.00
45,000.00
40,000.00

22,320.00
14,875.00
1,575.00
1,200.00
302,942.50

103,055.56
14,622.40
1,687.50
36,000.00
42,500.00
45,000.00
40,000.00

9,720.00
5,525.00
585.00
540.00
135,735.46

9,531.00
2,193.36
375.00
36,000.00
42,500.00
45,000.00
40,000.00

2,160.00
1,275.00
135.00
120.00
15,789.36

PEKERJAAN KUNCI DAN KACA


A. Pasang Kunci Tanam Biasa (Bh)
Bahan
Kunci Tanam Biasa
Bh
Tenaga
Pekerja
Oh
Tukang Kayu
Oh
Kepala Tukang
Oh
Mandor
Oh
Sub Total
B. Pasang Engsel pintu (Bh)

1.000
0.010
0.500
0.010
0.005

25,000.00

25,000.00
36,000.00
47,500.00
45,000.00
40,000.00

360.00
23,750.00
450.00
200.00
49,760.00

Bahan
Engsel Pintu
Bh
1.000
Tenaga
Pekerja
Oh
0.005
Tukang Kayu
Oh
0.500
Kepala Tukang
Oh
0.005
Mandor
Oh
0.000
Sub Total
C. Pasang Engsel Jendela Kupu-kupu (Bh)
Bahan
Engsel Jendela
Bh
1.000
Tenaga
Pekerja
Oh
0.010
Tukang Kayu
Oh
0.100
Kepala Tukang
Oh
0.010
Mandor
Oh
0.001
Sub Total
D. Pasang Pegangan Pintu/Door holder (Bh)
Bahan
Door holder
Bh
1.000
Tenaga
Pekerja
Oh
0.050
Tukang Kayu
Oh
0.500
Kepala Tukang
Oh
0.050
Mandor
Oh
0.003
Sub Total
E. Pasang Kaca tebal 3 mm (m)
Bahan
Kaca tebal 3 mm
M
1.100
Tenaga
Pekerja
Oh
0.015
Tukang Kayu
Oh
0.150
Kepala Tukang
Oh
0.015
Mandor
Oh
0.001
Sub Total
F. Pasang Kaca wireglass tebal 5 mm (m)
Bahan
Kaca Wireglass 5 mm
M
1.100
Tenaga
Pekerja
Oh
0.015
Tukang Kayu
Oh
0.150

8,000.00

8,000.00
36,000.00
47,500.00
45,000.00
40,000.00

7,000.00

180.00
23,750.00
225.00
10.00
32,165.00

7,000.00
36,000.00
47,500.00
45,000.00
40,000.00

5,000.00

360.00
4,750.00
450.00
20.00
12,580.00

5,000.00
36,000.00
47,500.00
45,000.00
40,000.00

87,400.00

1,800.00
23,750.00
2,250.00
100.00
32,900.00

96,140.00
36,000.00
47,500.00
45,000.00
40,000.00

90,000.00

96,140.00

99,000.00
36,000.00
47,500.00

540.00
7,125.00

Kepala Tukang
Mandor
Sub Total

Oh
Oh

0.015
0.001

45,000.00
40,000.00

675.00
30.00
107,370.00

PEKERJAAN PENGECATAN
A. Pengecatan Kayu (m)
Bahan
Cat Meni
Kg
Kertas Gosok
Lbr
Plamir
Kg
Cat dasar
Kg
Cat penutup 2 kali
Kg
Minyak Cat
Ltr
Kuas 3"
Bh
Tenaga
Pekerja
Oh
Tukang Cat
Oh
Kepala Tukang
Oh
Mandor
Oh
Sub Total
B. Pengecatan Tembok Baru (m)
Bahan
Plamir
Kg
Kertas gosok
LBR
Cat Dasar
Kg
Cat Penutup 2x
Kg
Tenaga
Pekerja
Oh
Tukang Cat
Oh
Kepala Tukang
Oh
Mandor
Oh
Sub Total

0.200
0.400
0.150
0.170
0.260
0.150
0.050

36,000.00
42,500.00
45,000.00
40,000.00

0.070
0.009
0.006
0.003

0.100
1.000
0.100
0.260

3,600.00
1,200.00
2,700.00
3,400.00
9,880.00
1,800.00
500.00

18,000.00
3,000.00
18,000.00
20,000.00
38,000.00
12,000.00
10,000.00

12,000.00
3,000.00
35,000.00
60,000.00

1,200.00
3,000.00
3,500.00
15,600.00
36,000.00
42,500.00
45,000.00
40,000.00

0.020
0.063
0.006
0.003

2,520.00
382.50
270.00
100.00
26,352.50

720.00
2,677.50
270.00
100.00
27,067.50

PEKERJAAN INSTALASI LISTRIK


A. Penyambungan Listrik PLN 2400 watt (LS)
Penyambungan PLN
LS
1.000
B. Pemasangan Lampu SL 25 Watt (Bh)
Lampu SL 25 Watt
Bh
1.000
C. Pemasangan Sekering Group (Bh)
Sekering Group
Bh
1.000
D. Pemasangan Stop Kontak (Bh)

###

2,000,000.00

30,000.00

30,000.00

17,500.00

17,500.00

Stop kontak
Bh
E. Pemasangan Sakelar Tunggal (Bh)
Sakelar Tunggal
Bh
F. Pemasangan Sakelar Ganda (Bh)
Sakelar Ganda
Bh

1.000

12,500.00

12,500.00

1.000

17,500.00

17,500.00

1.000

12,500.00

12,500.00

Anda mungkin juga menyukai

  • Tugas PBPAB
    Tugas PBPAB
    Dokumen3 halaman
    Tugas PBPAB
    David Jonathan
    Belum ada peringkat
  • Free 5x5 Risk Matrix
    Free 5x5 Risk Matrix
    Dokumen2 halaman
    Free 5x5 Risk Matrix
    David Jonathan
    Belum ada peringkat
  • Menejemen MKLH
    Menejemen MKLH
    Dokumen18 halaman
    Menejemen MKLH
    David Jonathan
    Belum ada peringkat
  • Jadwal Kuliah Semester 9
    Jadwal Kuliah Semester 9
    Dokumen1 halaman
    Jadwal Kuliah Semester 9
    David Jonathan
    Belum ada peringkat
  • Outline Ta
    Outline Ta
    Dokumen1 halaman
    Outline Ta
    David Jonathan
    Belum ada peringkat
  • 1
    1
    Dokumen1 halaman
    1
    David Jonathan
    Belum ada peringkat
  • Atmos Fer
    Atmos Fer
    Dokumen7 halaman
    Atmos Fer
    David Jonathan
    Belum ada peringkat
  • Ta 1
    Ta 1
    Dokumen3 halaman
    Ta 1
    David Jonathan
    Belum ada peringkat
  • Plambing Cutit
    Plambing Cutit
    Dokumen55 halaman
    Plambing Cutit
    David Jonathan
    Belum ada peringkat
  • Atmos Fer
    Atmos Fer
    Dokumen7 halaman
    Atmos Fer
    David Jonathan
    Belum ada peringkat
  • Tugas PBPAB
    Tugas PBPAB
    Dokumen3 halaman
    Tugas PBPAB
    David Jonathan
    Belum ada peringkat
  • 1275 2406 1 PB
    1275 2406 1 PB
    Dokumen8 halaman
    1275 2406 1 PB
    David Jonathan
    Belum ada peringkat
  • No
    No
    Dokumen1 halaman
    No
    David Jonathan
    Belum ada peringkat
  • Cara Menghitung Emisi
    Cara Menghitung Emisi
    Dokumen2 halaman
    Cara Menghitung Emisi
    David Jonathan
    Belum ada peringkat
  • 1001 Soal Solusi Uts Kalkulus II
    1001 Soal Solusi Uts Kalkulus II
    Dokumen43 halaman
    1001 Soal Solusi Uts Kalkulus II
    Muhammad Afif
    100% (1)
  • 16 Lamp Iran
    16 Lamp Iran
    Dokumen12 halaman
    16 Lamp Iran
    David Jonathan
    Belum ada peringkat
  • Outline PKP
    Outline PKP
    Dokumen2 halaman
    Outline PKP
    David Jonathan
    Belum ada peringkat
  • Menejemen MKLH
    Menejemen MKLH
    Dokumen16 halaman
    Menejemen MKLH
    David Jonathan
    Belum ada peringkat
  • Tugas
    Tugas
    Dokumen22 halaman
    Tugas
    Uswatun Hasanah
    Belum ada peringkat
  • Artikel Organizational Culture
    Artikel Organizational Culture
    Dokumen13 halaman
    Artikel Organizational Culture
    Heru Prabowo Hadi
    Belum ada peringkat
  • Sampah Cutit2
    Sampah Cutit2
    Dokumen37 halaman
    Sampah Cutit2
    David Jonathan
    Belum ada peringkat
  • 23 Artikel6 PDF
    23 Artikel6 PDF
    Dokumen6 halaman
    23 Artikel6 PDF
    Muhammad Noble Hidayatullah
    Belum ada peringkat
  • Klasifikasi Plta
    Klasifikasi Plta
    Dokumen27 halaman
    Klasifikasi Plta
    Cortney Johnson
    100% (3)
  • 00 Pdriau 007
    00 Pdriau 007
    Dokumen11 halaman
    00 Pdriau 007
    Erin Febrian
    Belum ada peringkat
  • Unit Aerasi
    Unit Aerasi
    Dokumen17 halaman
    Unit Aerasi
    Meey R. Ahmad
    Belum ada peringkat
  • JURNAL Putu
    JURNAL Putu
    Dokumen9 halaman
    JURNAL Putu
    David Jonathan
    Belum ada peringkat
  • Digital 125038 R210833 Analisa Perbandingan Lampiran
    Digital 125038 R210833 Analisa Perbandingan Lampiran
    Dokumen6 halaman
    Digital 125038 R210833 Analisa Perbandingan Lampiran
    Nadia Amelia
    Belum ada peringkat
  • Kata Pengantar Spam Cubit
    Kata Pengantar Spam Cubit
    Dokumen3 halaman
    Kata Pengantar Spam Cubit
    David Jonathan
    Belum ada peringkat
  • Chapter I
    Chapter I
    Dokumen7 halaman
    Chapter I
    David Jonathan
    Belum ada peringkat