PEKERJAAN PERSIAPAN
1 m' Pagar Sementara dari Kayu tinggi 2 m
Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Residu
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 002

1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m


Bahan
Dolken Kayu 8 - 10/400 cm
Semen Portland
Pasir Beton
Koral Beton
Kaso 5 / 7 ( albasiah )
Paku Biasa 2" - 5"
Meni Besi
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 003

1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m


Bahan
Dolken Kayu 8 - 10/400 cm

Semen Portland
Kawat Duri
Pasir Beton
Koral Beton
Paku Biasa 2" - 5"
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
ANALISA 004

1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank


Bahan
Kayu Kaso 5 / 7 (borneo)
Paku Biasa 2" - 5"
Kayu Papan 3 / 20 borneo
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 005

1 m Pek. Kantor Direksi Keet , dengan lantai plesteran


Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo
Paku
Besi Strip
Semen Portland
Pasir Pasang
Pasir Beton
Koral Beton
Bata merah kelas I
Seng Plat
Jendela Nako
Kaca Polos
Kunci Tanam
Plywood 4 mm
Tenaga
Tukang Kayu
Tukang Batu

Perkerja
Kepala Tukang
Mandor
ANALISA 006

1 m Pembuatan Gudang Semen dan Alat - alat


Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo
Paku
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 007

1 m Pembuatan Rumah Jaga / Konstruksi Kayu


Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo
Paku
Seng Gelombang BJLS 32
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 008

Membersihkan Lapangan dan Perataan


Tenaga
Perkerja
Mandor

ANALISA 009

1 m Pembuatan Bedeng Buruh


Bahan
Dolken Kayu 8 - 10/400 cm
Kayu Balok Borneo
Paku

Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang BJLS 32
Plywood 4 mm
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor
ANALISA 010

1 m Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm


Bahan
Kayu Terentang
Paku
Kayu Kaso 5 / 7 (borneo)
Tenaga
Tukang Kayu
Mandor

ANALISA 011

1 m Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm


Bahan
Bambu 6 - 8 / 600 cm
Tali Ijuk
Tenaga
Tukang Kayu
Perkerja
Kepala Tukang
Mandor

ANALISA 012

1 m Pembuatan Jalan Sementara


Bahan
Batu Belah 5 / 20
Batu Belah 5 / 7
Pasir Pasang
Tenaga
Perkerja
Mandor

ANALISA 013

1 m Bongkaran Beton Bertulang


Tenaga

Perkerja
Mandor
ANALISA 014

1 m Bongkaran Dinding Tembok Bata Merah


Tenaga
Perkerja
Mandor

II
ANALISA 015

PEKERJAAN TANAH
1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m'
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 016

1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 017

1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 018

1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 019

1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali

Kepala Tukang
Mandor
ANALISA 020

1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m'


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 021

1 m Pek. Stripping 1 m
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 022

1 m Pembuangan Tanah sejauh 150 m


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 023

1 m3 Urugan Tanah Kembali


Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 024

1 m3 Pemadatan tanah
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

ANALISA 025

1 m3 Pek. Urugan Pasir


Bahan
Pasir Urug

Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor
ANALISA 026

1 m3 Pemasangan Lapisan ijuk


Bahan
Ijuk
Tenaga
Perkerja
Tukang Gali
Kepala Tukang
Mandor

III
ANALISA 027

PEKERJAAN PONDASI
1 m' Pembuatan Tiang Pancang ( 35 x 35 ) cm, Beton Bertulang
Bahan
Pasir Urug Darat
Pasir Beton
Koral Beton
Semen Portland
Besi Beton
Kawat Beton
Kayu Kaso 5 / 7 (borneo)
Paku
Minyak Bekisting
Plamuur Tembok
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 028

1 m3 Pasangan Batu kali 1 Pc : 3Ps


Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja

Tukang Batu
Kepala Tukang
Mandor
ANALISA 029

1 m3 Pasangan Batu kali 1 Pc : 5Ps


Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

IV
ANALISA 030

PEKERJAAN DINDING
1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 031

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 032

1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata


Bahan
Bata merah kelas I

Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 033

1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata


Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

V
ANALISA 032

PEKERJAAN PELESTERAN
1 m2 Plesteran Dinding 1Pc : 3Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 033

1 m2 Plesteran Dinding 1Pc : 5Ps


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 034

1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm

Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 035

1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm


Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 036

1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm


Bahan
Semen Portland
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 037

1 m2 Plesteran 1Kp : 1 Sm : 1Ps, tebal 15 mm


Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
ANALISA 038

1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm


Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 039

1 m2 Plesteran 1Pc : 2 Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 040

1 m2 Plesteran 1Pc : 3 Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 041

1 m2 Plesteran 1Pc : 4Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
ANALISA 042
7.29

1 m2 Plesteran 1Pc : 5Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 043

1 m2 Plesteran 1Pc : 6Ps, tebal 20 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 044

1 m2 Plesteran 1Kp : 1 Sm : 2Ps, tebal 15 mm


Bahan
Semen Merah
Kapur Padam
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 045

1 m2 Plesteran 1Pc : 2Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
ANALISA 046

1 m2 Plesteran 1Pc : 3Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 047

1 m2 Plesteran 1Pc : 4Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 048

1 m2 Plesteran 1Pc : 5Ps, tebal 25 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 049

1 m2 Plesteran 1Pc : 2Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 050

1 m2 Plesteran 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 051

1 m2 Plesteran 1Pc : 4Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 052

1 m2 Plesteran 1Pc : 5Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 053

1 m2 Berapen 1Pc : 3Ps, tebal 30 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 054

1 m2 Berapen 1Pc : 5Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 055

1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 056

1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 057

1 m2 Pelesteran Skoring 1Pc : 2Ps


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 058

1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm

Bahan
PC Warna
Batu Granito
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 059

1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm


Bahan
PC Warna
Batu Teraso
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 060

1 m2 Pelesteran Ciprat 1 Pc : 2 Ps
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 061

1 m2 Pelesteran Siar Adukan 1 Pc : 2 Ps


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

ANALISA 062

1 m2 Pelesteran Waterfroof Batacote 3 lapis


Bahan

Semen Portland
Batacote
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
ANALISA 063

1 m2 Plesteran Dinding 1 : 3 + ACIAN


Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m2 Plesteran Dinding 1 : 5 + ACIAN
Bahan
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

III

PEKERJAAN KAYU
1m Pasang Kusen Pintu dan Jendela Kayu Jati
Bahan
Kayu Balok Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kusen Pintu dan Jendela Kayu Borneo
Bahan

Kayu Balok Borneo


Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kusen Pintu dan Jendela Kayu Damar Laut
Bahan
Kayu Balok Damar Laut
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Klamp Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Klamp Kayu Borneo
Bahan
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Panel Kayu Jati
Bahan
Papan Kayu Jati
Tenaga
Perkerja

Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Panel Kayu Kamper
Bahan
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu dan Jendela Kaca Kayu Jati
Bahan
Papan Kayu Jati
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu dan Jendela Kaca Kayu Kamper
Bahan
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu dan Jendela Kaca Kayu Borneo
Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu dan Jendela Jalusi Kayu Borneo

Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu dan Jendela Jalusi Kayu Kamper
Bahan
Papan Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Plywood rangkap, rangka kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Plywood rangkap, rangka kayu Kamper
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m Pasang Jalusi Mati Kusen Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Jalusi Mati Kusen Kayu Kamper
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Plywood Rangkap, rangka Kayu Borneo
Bahan
Papan Kayu Borneo
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Teakwood Rangkap, rangka Kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu

Kepala Tukang
Mandor
1m Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Plywood & Formika, rangka Kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Plywood & Formika, rangka Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m Pasang Pintu Teakwood & Formika, rangka Kayu Jati


Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Teakwood & Formika, rangka Kayu Kamper ( divernis )
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Formika Double, rangka Kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Pintu Formika Double, rangka Kayu Kamper
Bahan

Papan Kayu Kamper


Paku Biasa " - 1"
Lem Kayu
Plywood 4 mm
Formika 4' x 3'
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m3 Pasang Konstruksi Kuda - kuda Kayu Jati
Bahan
Balok Kayu Jati
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper
Bahan
Balok Kayu Kamper
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo
Bahan
Balok Kayu Borneo
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu

Kepala Tukang
Mandor
1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing
Bahan
Balok Kayu Kruing
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kaso + Reng Genteng Kodok Kayu Kamper
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kaso + Reng Genteng Kodok Kayu Borneo
Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kaso + Reng Genteng Monier Kayu Jati
Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu

Kepala Tukang
Mandor
1m Pasang Kaso + Reng Genteng Monier Kayu Kamper
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kaso + Reng Genteng Beton Kayu Borneo
Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kaso + Reng Atap Sirap Kayu Kamper
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Kaso + Reng Atap Sirap Kayu Borneo
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang

Mandor
1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati
Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo
Bahan
Kayu Papan 3 / 20 borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati


Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper
Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo
Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati
Bahan
Balok Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper


Bahan
Balok Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo
Bahan
Balok Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 20 )cm Kayu Jati
Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 30 )cm Kayu Jati

Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank ( 3 x 30 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 3 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Kamper
Bahan
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Lisplank 2 x( 2 x 20 )cm Kayu Borneo
Bahan

Papan Kayu Borneo


Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Dinding Pemisah Kayu Kamper
Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Rangka Dinding Pemisah Kayu Borneo
Bahan
Balok Kayu Borneo
Papan Kayu Borneo
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper
Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper


Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper
Bahan
Balok Kayu Kamper
Papan Kayu Kamper
Paku Biasa 2" - 5"
Lem Kayu
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Dinding Lambriziring dari papan Kayu jati
Bahan
Papan Kayu Jati
Paku Biasa 2" - 5"
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Plywood tebal 4mm, untuk dinding
Bahan
Plywood 4 mm
Paku Biasa " - 1"
Tenaga
Perkerja

Tukang Kayu
Kepala Tukang
Mandor
1m Pasang List Plafond Kayu Profil
Bahan
Kayu Profil
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Tumbuk 1 Pc : 3 Ps : 6 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Tumbuk 1 Pc : 4 Ps : 6 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m Membuat Beton 1 Pc : 2 Ps : 3 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 4 Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr

Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 3Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 1 Ps : 2Kr
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
1 m Membuat Tiang Pancang Prestressed Beton
Bahan
Semen Portland
Pasir Beton
Koral Beton
Rapidrant
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 2Ps : 3 Splt
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 2Ps : 4 Splt
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 3 Splt
Bahan
Semen Portland
Pasir Beton
Koral Beton

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 1.5Ps : 2.5 Splt
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Bertulang 1 Pc : 1Ps : 1Splt
Bahan
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Membuat Beton Kedap Air dengan Strorox - 100
Bahan
Semen Portland
Pasir Beton
Koral Beton
Strorox - 100
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m' Memasang PVC Waterstop lebar 150 mm

Bahan
Waterstop lebar 150 mm
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m' Memasang PVC Waterstop lebar 200 mm
Bahan
Waterstop lebar 200 mm
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m' Memasang PVC Waterstop lebar 230 mm
Bahan
Waterstop lebar 230 mm
Tenaga
Perkerja
Tukang Batu
Mandor
1 m' Memasang PVC Waterstop lebar 250 mm
Bahan
Waterstop lebar 250 mm
Tenaga
Perkerja
Tukang Batu
Mandor
1 m' Memasang PVC Waterstop lebar 300 mm
Bahan
Waterstop lebar 300 mm
Tenaga
Perkerja
Tukang Batu
Mandor

1 m' Memasang PVC Waterstop lebar 320 mm


Bahan
Waterstop lebar 320 mm
Tenaga
Perkerja
Tukang Batu
Mandor
1 Kg Pembesian dengan Besi Polos atau Besi Ulir
Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 Kg Kabel Presstressed Polos / Strands
Bahan
Besi Beton ( Polos / Ulir )
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 Kg Jaring Kawat Baja
Bahan
Besi Jaring Kawat Baja
Kawat Beton
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 m2 Pasang Bekisting
Bahan
Kayu Terentang

Paku Biasa 2" - 5"


Minyak Bekisting
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasangan Stoot Werk
Bahan
Kayu Kaso 5 / 7 (borneo)
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Pondasi
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Sloof
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m2 Pasang Bekisting untuk Kolom


Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Balok
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Lantai
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
1 m2 Pasang Bekisting untuk Dinding
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Formtie / penjaga jarak bekisting
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m2 Pasang Bekisting untuk Tangga
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Balok Kayu Borneo
Plywood 9 mm
Dolken Kayu Galam 8 - 10 / 4m
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton

Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Sloof Beton Bertulang ( 200 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Kolom Beton Bertulang ( 300 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m
Tenaga
Perkerja

Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Balok Beton Bertulang ( 200 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Balok Beton Bertulang ( 150 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m
Tenaga

Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Dinding Beton Bertulang ( 150 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Tangga Beton Bertulang ( 200 Kg + bekisting )
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Kayu Balok Borneo
Plywood 9 mm
Dolken 8 / 4 m

Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
Bahan
Kayu Terentang
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1 m Membuat Ring Balok Beton Bertulang (10 x 15) cm
Bahan
Kayu Albasiah
Paku Biasa 2" - 5"
Besi Beton Polos
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton
Tenaga
Perkerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

PEKERJAAN PENTUP ATAP


1m Pasang Atap Genteng Palentong Kecil
Bahan
Genteng Palentong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Genteng Kodok / Glazzur
Bahan
Genteng Kodok
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Genteng Palentong Super / Besar
Bahan
Genteng Palentong Super
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Genteng Bubung Palentong
Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Genteng Bubung Kodok Glazzur

Bahan
Genteng Bubung Kodok
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Genteng Bubung Palentong Besar
Bahan
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Rooflight Fiberglass ( 180 x 90 ) cm
Bahan
Roof Light Fiberglass
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m' Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm

Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm
Bahan

Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm
Bahan
Asbes Gelombang

Paku Pancing 60 x 230


Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Bubung Stel Gelombang 0.92m
Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 0.92m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 1.05m
Bahan
Asbes Gelombang
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel Gelombang 1.08m
Bahan
Asbes Gelombang
Paku Skrup 3.5"

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 0.92m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 1.05m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Paten 1.08m
Bahan
Nok Paten
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel rata 0.92m
Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga

Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Stel rata 1.05m
Bahan
Nok Stel rata
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Genteng Beton
Bahan
Genteng Beton
Paku Biasa 2" - 5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Genteng Aspal
Bahan
Genteng Aspal
Plywood 4 mm
Paku Biasa 1/2" - 1"
Plastic Aerator
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Genteng Metal
Bahan
Genteng Metal
Paku Biasa 2" - 5"

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Sirap
Bahan
Genteng Sirap
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Genteng Beton
Bahan
Genteng Beton
Paku Biasa 2" - 5"
Semen abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Genteng Aspal
Bahan
Genteng Aspal
Paku Biasa " - 1"
Balok Kayu Borneo
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Genteng Metal

Bahan
Genteng Decra Bond
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Genteng Metal
Bahan
Genteng Decra Bond
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m' Pasang Nok Sirap
Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1"
Paku Biasa 2" - 5"
Papan Kayu Borneo tebal 3cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Seng Gelombang
Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1m Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Atap Alluminium
Bahan
Atap Alluminium Gelombang tebal 0.55
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Nok Alluminium
Bahan
Nok standar 40 cm 18, swg 22
Paku Hak Pnjang 15 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1m Pasang Alluminium Foil / Sisalation
Bahan
Sisalation / Alluminium Foil
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
VII

PEKERJAAN LANGIT - LANGIT


1 m2 Pas. Rangka Plapond Kayu Kls I (Hanya Rangka)

Bahan
Kayu Balok Borneo
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 5 mm
Bahan
Pelat Asbes tebal 5 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 4 mm
Bahan
Pelat Asbes tebal 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Asbes ( 1.00 x 1.00 )m tebal 3.5 mm
Bahan
Pelat Asbes tebal 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Akustik ( 30 x 30 )cm
Bahan

Akustik 30 x 30 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Akustik ( 30 x 60 )cm
Bahan
Akustik 30 x 60 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Akustik ( 60 x 120 )cm
Bahan
Akustik Arm Strong Ukuran 30 x 120 cm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 4 mm
Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Plywood ( 30 x 60 )cm, tebal 6 mm
Bahan
Plywood 4 mm

Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 4 mm
Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Plywood ( 60 x 120 )cm, tebal 6 mm
Bahan
Plywood 4 mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Teakwood ( 30 x 60 )cm, tebal 4 mm
Bahan
Teakwood 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Teakwood ( 60 x 120 )cm, tebal 4 mm
Bahan
Teakwood 4' x 8' x 4mm
Paku

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Gypsum
Bahan
Gypsum
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Kayu Jati
Bahan
Papan Kayu Jati
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Kayu Ramin
Bahan
Papan Kayu Ramin
Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Kayu Kamper
Bahan
Papan Kayu Kamper

Paku
Paku Sekrup
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Softboard
Bahan
Softboard 4' x 8' x 4mm
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Akustik 60 x 120 cm + rangka Alluminium
Bahan
Profil Alluminium " T "
Kawat seng polos
Ramset / Dinabolt
Akustik Armstrom 60 x 120cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m List Langit - langit Kayu Profil
Bahan
List Kayu Profil
Paku
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Plywood 4 mm + RangkaKayu Borneo

Bahan
Balok Kayu Borneo
Paku
Plywood 4 mm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Asbes ( 1.00 x 1.00 )m, tebal 3.2mm Rangka Borneo
Bahan
Balok Kayu Borneo
Paku
Asbes
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Akustik ( 30 x 60 )cm + Rangka Kayu Borneo
Bahan
Balok Kayu Borneo
Paku
Akustik 30 x 60 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Langit - langit Akustik ( 30 x 30 )cm + Rangka Kayu Borneo
Bahan
Balok Kayu Borneo
Paku
Akustik 30 x 30 cm
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang

Mandor
IX

PEKERJAAN SANITASI
Memasang 1 buah Kloset Duduk / Monoblok
Bahan
Kloset Duduk / Monoblok
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Porselen
Bahan
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Kloset Jongkok Teraso
Bahan
Kloset Jongkok Teraso
Bata merah kelas I
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Urinoir
Bahan
Urinoir
Perlengkapan
Semen Portland

Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Wastafel
Bahan
Urinoir
Perlengkapan
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Bak Mandi Teraso, volume 0.30 m
Bahan
Bak Teraso
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m
Bahan
Bak Fiberglass
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Bak Mandi Batu bata, volume 0.30 m

Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Porselen ( 11 x 11 ) cm
Semen Nat
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 buah Badkip Porselen
Bahan
Badkip
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 buah Bak Fiberglass volume 1 m air


Bahan
Bak Fiberglass
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 15 cm
Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja

Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Penyalur Air limbah jenis Pipa Tanah 20 cm
Bahan
Pipa Tanah
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Beton 5 cm - 20 cm
Bahan
Pipa Beton
Bata merah kelas I
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Beton 30 cm - 100 cm
Bahan
Pipa Beton
Bata merah kelas I
Semen Portland
Pasir Pasang
Pasir Urug
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Kerikil
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65cm
Bahan
Bata merah kelas I
Semen Portland
Pasir Pasang
Batu Koral
Besi Beton
Pasir Beton
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
Tukang Gali
Memasang 1 m' Pipa Galvanis "
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Galvanis "
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Galvanis 1"
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Galvanis 1"
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
Memasang 1 m' Pipa Galvanis 3"
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa Galvanis 4"
Bahan
Pipa Galvanis D 4"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW "
Bahan
Pipa PVC D 1/2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW "
Bahan
Pipa PVC tipe AW "
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW 1"


Bahan
Pipa PVC tipe AW 1"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW 1"
Bahan
Pipa PVC tipe AW 1"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW 2"
Bahan
Pipa PVC tipe AW 2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW 2"
Bahan
Pipa PVC tipe AW 2"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 m' Pipa PVC tipe AW 3"


Bahan
Pipa PVC tipe AW 3"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 m' Pipa PVC tipe AW 4"
Bahan
Pipa PVC tipe AW 4"
Perlengkapan
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 bh Bak Cuci Piring Stainles Steel
Bahan
Bak cuci Stainless steel
Water Drain + Asesories
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 bh Bak Cuci Piring Teraso
Bahan
Bak cuci Teraso
Water Drain + Asesories
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Memasang 1 bh Kran " atau "


Bahan
Kran Air
Seal tape
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
Memasang 1 bh Floor Drain
Bahan
Kran Air
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
VII

PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Pasang Rangka Atap Baja
Bahan
Besi Profil WF
Meni Besi
Tenaga
Perkerja
Tukang Besi
Kepala Tukang
Mandor
1 m Pasang Pintu Besi Baja
Bahan
Pintu Besi Baja
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Jendela Besi

Bahan
Jendela Besi
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Jendela Besi Tahan Api
Bahan
Jendela Besi Tahan Api
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Pintu gulung besi
Bahan
Pintu gulung besi
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Pintu Lipat
Bahan
Pintu Lipat
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Pintu Suncreen Allumunium
Bahan
Suncreen Allumunium
Tenaga
Perkerja
Tukang Besi Konstruksi

Kepala Tukang
Mandor
1 m Pasang Rolling Door
Bahan
Rolling Door
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Pintu Allumunium
Bahan
Pintu Allumunium
Tenaga
Perkerja
Tukang Besi Konstruksi
Kepala Tukang
Mandor
1 m Pasang Venetions Blinds
Bahan
Venetions Blinds
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Vertikals Blinds
Bahan
Venetions Blinds
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Terali Besi
Bahan

Terali Besi 2 x 3
Tenaga
Perkerja
Tukang Las
Kepala Tukang
Mandor
1 m Pasang Kawat Harmonika
Bahan
Kawat Harmonika
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Kawat Nyamuk
Bahan
Kawat Nyamuk
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m Pasang Kawat Kassa


Bahan
Kawat Kassa
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 m Pasang Kawat Burung


Bahan
Kawat Burung
Paku Biasa " - 1"
Papan Kayu Kamper
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Jendela Nako & Tralis
Bahan
Jendela Nako
Paku Biasa " - 1" atau Sekrup
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Talang Datar , Seng BJLS 28
Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup
Papan Kayu Borneo
Flincote / Meni Besi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Talang Miring , Seng BJLS 28
Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup
Papan Kayu Borneo
Flincote / Meni Besi
Tenaga

Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 28
Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1" atau Sekrup
Papan Kayu Borneo
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 m Pasang Talang Lingkaran 10 cm, Seng BJLS 24
Bahan
Seng Plat 3 x 6 BJLS 24
Paku Biasa " - 1" atau Sekrup
Papan Kayu Borneo
Besi Strip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
VI

PEKERJAAN KUNCI DAN KACA


1 Buah Pasang Kunsi Tanam Antik
Bahan
Kunsi Tanam Antik
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Biasa
Bahan

Kunsi Tanam Biasa


Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Tanam Kamar Mandi
Bahan
Kunsi Tanam Kamar Mandi
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunsi Silinder
Bahan
Kunsi Silinder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Pintu
Bahan
Engsel Pintu
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Engsel Jendela Kupu - kupu
Bahan
Engsel Jendela
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang

Mandor
1 Buah Pasang Engsel Angin
Bahan
Engsel Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Spring Knip
Bahan
Spring Knip
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kait angin
Bahan
Kait Angin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Closer
Bahan
Door Closer
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunci Selot
Bahan
Kunci Selot

Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Pegangan Pintu / Door Holder
Bahan
Door Holder
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Door Stop
Bahan
Door Stop
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Rel Pintu Dorong
Bahan
Rel Pintu Dorong
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kunci Lemari
Bahan
Kunci Lemari
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

1 Buah Pasang Kaca tebal 3 mm


Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 5 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca tebal 8 mm
Bahan
Kaca Polos
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Buram tebal 12 mm
Bahan
Kaca Buram
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 5 mm
Bahan
Kaca Cermin
Tenaga

Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 6 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Cermin tebal 8 mm
Bahan
Kaca Cermin
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Wireglass tebal 5 mm
Bahan
Kaca Wireglass
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
1 Buah Pasang Kaca Patri tebal 5 mm
Bahan
Kaca Patri
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor

VI

PEKERJAAN PENUTUP LANTAI DAN DINDING


1 m Pasang Lantai Ubin PC Abu - abu ukuran 40 x 40 cm
Bahan
Ubin Abu -abu 40 x40 cm
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin PC Abu - abu ukuran 30 x 30 cm
Bahan
Ubin Abu -abu 30 x 30 cm
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin PC Abu - abu ukuran 20 x 20 cm
Bahan
Ubin Abu -abu 20 x 20 cm
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Warna ukuran 40 x 40 cm
Bahan
Ubin Warna 40 x 40 cm
Semen Portland

Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Warna ukuran 30 x 30 cm
Bahan
Ubin Warna 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Warna ukuran 20 x 20 cm
Bahan
Ubin Warna 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teraso ukuran 40 x 40 cm
Bahan
Ubin Teraso 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teraso ukuran 30 x 30 cm
Bahan
Ubin Teraso 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Granito ukuran 40 x 40 cm
Bahan
Ubin Granito 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Granito ukuran 30 x 30 cm
Bahan
Ubin Granito 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga

Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teralux Kerang ukuran 40 x 40 cm
Bahan
Ubin Teralux Kerang 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teralux Kerang ukuran 30 x 30 cm
Bahan
Ubin Teralux Kerang 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teralux Marmer ukuran 60 x 60 cm
Bahan
Ubin Teralux Marmer 60 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu

Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teralux Marmer ukuran 40 x 40 cm
Bahan
Ubin Teralux Marmer 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Ubin Teralux Marmer ukuran 30 x 30 cm
Bahan
Ubin Teralux Marmer 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin PC Abu - abu ukuran 15 x 20 cm
Bahan
Plint Ubin PC Abu - abu 15 x 20 cm
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 30 cm


Bahan
Plint Ubin PC Abu -abu 10 x 30 cm
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin PC Abu - abu ukuran 10 x 40 cm
Bahan
Plint Ubin PC Abu - abu 10 x 40 cm
Semen Portland
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin PC Warna ukuran 10 x 20 cm
Bahan
Plint Ubin PC Warna 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin PC Warna ukuran 10 x 30 cm
Bahan
Plint Ubin PC Warna 10 x 30 cm
Semen Portland

Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin PC Warna ukuran 10 x 40 cm
Bahan
Plint Ubin PC Warna 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teraso ukuran 10 x 30 cm
Bahan
Plint Ubin Teraso 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teraso ukuran 10 x 40 cm
Bahan
Plint Ubin Teraso 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Granito ukuran 10 x 40 cm
Bahan
Plint Ubin Granito 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Granito ukuran 10 x 30 cm
Bahan
Plint Ubin Granito 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 40 cm
Bahan
Plint Ubin Teralux Kerang 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga

Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teralux Kerang ukuran 10 x 30 cm
Bahan
Plint Ubin Teralux Kerang 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 60 cm
Bahan
Plint Ubin Teralux Marmer 10 x 60 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 40 cm
Bahan
Plint Ubin Teralux Marmer 10 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu

Kepala Tukang
Mandor
1 m Pasang Plint Ubin Teralux Marmer ukuran 10 x 30 cm
Bahan
Plint Ubin Teralux Marmer 10 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Teraso Cor ditempat
Bahan
Bahan Teraso Cor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Teralux Cor ditempat, tebal 3 cm
Bahan
Bahan Teraso Cor
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Ubin Tahan Asam
Bahan
Ubin Tahan Asam
Semen Tanam Asam
Pasir Pasang

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik Artistik 10 x 20 cm
Bahan
Ubin Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m' Pasang Plint Keramik Artistik ukuran 10 x 20 cm
Bahan
Plint Keramik Artistik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m' Pasang Plint Keramik Artistik ukuran 10 x 10 cm
Bahan
Plint Keramik Artistik 10 x 10 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga

Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m' Pasang Plint Keramik Artistik ukuran 5 x 20 cm
Bahan
Plint Keramik Artistik 5 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m' Pasang Plint Vinyl tanpa adukan


Bahan
Lt. Vinyl Karet 30 x 30 kwl I
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik 10 x 20 cm
Bahan
Ubin Keramik 10 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor
1 m Pasang Lantai Keramik 15 x 15 cm
Bahan
Ubin Keramik 15 x 15 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik 20 x 20 cm
Bahan
Ubin Keramik 20 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik 25 x 25 cm
Bahan
Ubin Keramik 25 x 25 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m Pasang Lantai Keramik 15 x 20 cm


Bahan
Ubin Keramik 15 x 20 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik 33 x 33 cm
Bahan
Ubin Keramik 33 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik 33 x 33 cm anti slip
Bahan
Ubin Keramik 33 x 33 cm anti slip
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Keramik 10 x 33 cm
Bahan

Ubin Keramik 10 x 33 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Mozaik 30 x 30 cm, ex lokal
Bahan
Mozaik 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Marmer
Bahan
Marmer
Semen Portland
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Karpet 100% Wool
Bahan
Feltex 100% Wool - T - 21
Lem Vinyl

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Karpet 100% Wool, 20% Nylon
Bahan
Carpet 80% Wool, 20% Nylon
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Underlyer, tebal 6 mm
Bahan
Underlyer, tebal 6 mm / Rubber Corrugated
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Karpet
Bahan
Carpet
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Parquet Jati
Bahan

Parquet Jati
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m Pasang Dinding Porselen 11 x 11 cm, putih


Bahan
Porselen 11 x 11 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Porselen 11 x 11 cm, warna
Bahan
Porselen 11 x 11 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Porselen 15 x 15 cm, putih
Bahan
Porselen 15 x 15 cm putih
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga

Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Porselen 15 x 15 cm, warna
Bahan
Porselen 15 x 15 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Porselen 10 x 20 cm, warna
Bahan
Porselen 10 x 20 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Porselen 20 x 20 cm, warna
Bahan
Porselen 20 x 20 cm warna
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

1 m Pasang Dinding Keramik Artistik 10 x 20 cm, warna


Bahan
Keramik Artistik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Keramik Artistik 5 x 20 cm, warna
Bahan
Keramik Artistik 5 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Keramik 10 x 20 cm
Bahan
Keramik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Keramik 15 x 15 cm
Bahan
Keramik 15 x 15 cm
Semen Abu -abu
Pasir Pasang

Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Keramik 20 x 20 cm
Bahan
Keramik 20 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Keramik 10 x 20 cm
Bahan
Keramik 10 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Marmer
Bahan
Marmer
Semen Abu -abu
Pasir Pasang
Semen Warna
Tenaga
Perkerja
Tukang Batu
Kepala Tukang

Mandor

1 m Pasang Dinding Bata Klinker 5 x 5 x 24 cm


Bahan
Bata Pelapis Klinker
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Batu Paros
Bahan
Batu Paros
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Dinding Batu Tempel Hitam
Bahan
Batu Tempel Hitam
Semen Abu -abu
Pasir Pasang
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL I
Bahan
Vinyl Karet 30 x 30 cm KL I
Lem Vinyl
Tenaga

Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Vinyl Karet 30 x 30 cm KL II
Bahan
Vinyl Karet 30 x 30 cm KL II
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Vinyl Asbes 30 x 30 cm
Bahan
Vinyl Asbes 30 x 30 cm
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Lantai Vinyl Motif Kembang 30 x 30 cm
Bahan
Vinyl Motif Kembang ex DN
Lem Vinyl
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Pasang Wall Covering lebar 50 cm
Bahan
Vinyl Wall Covering lebar 50 cm
Lem
Tenaga
Perkerja

Tukang Batu
Kepala Tukang
Mandor
1 m Floor Hardener Ferrovax
Bahan
Floor Hardener Ferrovax
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Floor Hardener Mastercron
Bahan
Floor Hardener Ferrovax
Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor
1 m Plint Kayu 2 x 10 cm
Bahan
Papan Kayu Jati
Paku Skrup 3.5"
Tenaga
Perkerja
Tukang Kayu
Kepala Tukang
Mandor
VI

PEKERJAAN PENGECATAN
1 m Mengikis / Mengerok Permukaan Cat Tembok Lama
Bahan
Soda Api
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Mencuci Bidang Permukaan Tembok yang Pernah dicat


Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual
Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Menyabun Permukaan Tembok Lama
Bahan
Sabun
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingk
Bahan
Pasir Silika
BBM
Peralatan
Kompresor, Blasting Pot , Selang Dan Nozzle
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mendempul dan Menggosok Kayu

Bahan
Dempul Jadi
Minyak Cat
Batu Apung
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mengecatan Bidang Kayu Lama
Bahan
Plamir
Cat Dasar
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
Bahan
Cat Meni
Plamir
Cat Dasar
Cat Kayu glotek
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pelaburan Bidang Kayu dengan Teak Oil
Bahan
Teak Oil
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pelaburan Bidang Kayu dengan Pelitur
Bahan
Pelitur
Pelitur Jadi
Ampelas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pelaburan Bidang Kayu dengan Cat Residu dan Ter
Bahan

Residu atau Ter


Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pelaburan Bidang Kayu dengan Vernis
Bahan
Vernis
Dempul
Ampelas
Kuas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Melabur Tembok dengan Kapur Sirih
Bahan
Ampelas
Alang - alang
Perancah Kayu
Kapur Sirih
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan )


Bahan
Perancah Kayu
Kapur Sirih
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pemasangan Wall Paper
Bahan
Wall Paper
Perekat
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pengecatan Permukaan Baja dengan Meni Besi
Bahan
Meni Besi
Kuas
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor
1 m Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
Bahan
Meni Besi
Kuas
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Kon
Bahan
Meni ( Read Lead ) A
Meni ( Read Lead ) B
Alluminium C
Alluminium B
Pengencer
Perancah Kayu
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Muta
Bahan
Meni Besi
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Kon
Bahan
Cat Dasar
Cat Antara
Cat Penutup
Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

1 m Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn S
Bahan
Cat Dasar
Tenaga
Perkerja
Tukang Cat

Kepala Tukang
Mandor

KOEF

SAT

HARGA SAT matrial

HARGA SAT upah

JUMLAH matrial

G=(CXE)
0.00

1.250
2.500
0.005

btg
Kg
m3

Rp
Rp
Rp

Rp
Rp
Rp

0.009
0.072
0.060
0.400

m3
m3
Kg
Lt

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00
0.00

1.250
2.500
1.200
0.009
0.072
0.060
0.450

btg
Kg
m3
m3
m3
Kg
Lt

0.200
0.400
0.020
0.020

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp
Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00
0.00

1.000

btg

Rp

0.00

2.000
25.000
0.005
0.009
0.060

Kg
Kg
m3
m3
Kg

0.200
0.300
0.020
0.020

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
Rp
Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00
0.00

0.012
0.020
0.007

m3
Kg
m3

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Rp
Rp
Rp

0.00
0.00
0.00
Rp
Rp
Rp
Rp

65,734.00
55,798.00
75,671.00
85,607.00
0.00

1.250
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060

btg
m3
Kg
Kg
Kg
m3
m3
m3
bh
lbr
bh
m2
bh
lbr

2.000
1.000

Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp
Rp

2.000
0.300
0.050

Oh
Oh
Oh

Rp
Rp
Rp

0.00

1.700
0.210
0.300
10.500
0.030
0.050
1.500

btg
m3
Kg
Kg
m3
m3
lbr

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00
0.00
Rp
Rp
Rp
Rp

0.00

3.000
0.276
0.700
1.500

btg
m3
Kg
lbr

1.500
1.000
0.150
0.050

Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
Rp
Rp
Rp
Rp

0.00

0.100
0.050

Oh
Oh

27,500.00
55,000.00
547,485.00

1.250
0.186
0.300

btg
m3
Kg

8,800.00
1,815,000.00
34,100.00

11,000.00
337,590.00
10,230.00

18.000
0.030
0.050
1.500
1.350

Kg
m3
m3
lbr
lbr

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
60,500.00
42,900.00

19,800.00
6,450.00
13,750.00
90,750.00
57,915.00
38,500.00
27,500.00
44,000.00
55,000.00
2,331,670.00

0.186
0.300
1.000

m3
Kg
btg

2.000
0.050

Oh
Oh

1,540,000.00
34,100.00
2,035,000.00

286,440.00
10,230.00
2,035,000.00
38,500.00
55,000.00
17,600.00

1.000
0.250

btg
Kg

2.000
1.000
0.200
0.050

Oh
Oh
Oh
Oh

13,200.00
17,600.00

13,200.00
4,400.00
38,500.00
27,500.00
44,000.00
55,000.00
55,280.00

0.150
0.090
0.010

m3
m3
m3

1.000
0.050

Oh
Oh

209,000.00
242,000.00
215,000.00

31,350.00
21,780.00
2,150.00
27,500.00
55,000.00
0.00

6.667
0.333

Oh
Oh

27,500.00
55,000.00
0.00

6.667
0.033

Oh
Oh

27,500.00
55,000.00

0.00
0.400

0.040

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.525

0.052

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.735
0.073

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.625
0.062

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

1.250
-

Oh
Oh

27,500.00
33,000.00

0.125

Oh
Oh

44,000.00
55,000.00
0.00

0.823
0.083

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.050
0.005

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.192
0.050

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.192
0.019

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
0.00

0.500
0.050

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
105,600.00

1.200

m3

88,000.00

105,600.00

0.300
0.010

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
19,800.00

1.200

m3

0.150
0.015

Oh
Oh
Oh
Oh

16,500.00

19,800.00
27,500.00
33,000.00
44,000.00
55,000.00

1,231,009.50
0.016
0.080
0.125
49.000
34.500
0.700
0.270
0.120
0.090
0.200

m3
m3
m3
Kg
Kg
Kg
m3
Kg
lt
Kg

0.800
0.500
0.050
0.040

Oh
Oh
Oh
Oh

35,750.00
215,000.00
275,000.00
1,100.00
16,000.00
21,450.00
2,035,000.00
34,100.00
4,950.00
19,800.00

572.00
17,200.00
34,375.00
53,900.00
552,000.00
15,015.00
549,450.00
4,092.00
445.50
3,960.00
27,500.00
35,750.00
44,000.00
55,000.00
710,460.00

1.100
392.000
0.314

m3
Kg
m3

1.500

Oh

192,500.00
1,100.00
215,000.00

211,750.00
431,200.00
67,510.00
27,500.00

0.600
0.060
0.075

Oh
Oh
Oh

35,750.00
44,000.00
55,000.00
478,310.00

1.100
136.000
0.544

m3
Kg
m3

1.500
0.600
0.060
0.075

Oh
Oh
Oh
Oh

192,500.00
1,100.00
215,000.00

211,750.00
149,600.00
116,960.00
27,500.00
35,750.00
44,000.00
55,000.00

140,510.00
140.000
32.950
0.091

bh
Kg
m3

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00

84,700.00
36,245.00
19,565.00
27,500.00
35,750.00
44,000.00
55,000.00
131,050.00

140.000
22.200
0.102

bh
Kg
m3

0.650
0.200
0.020
0.030

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00

84,700.00
24,420.00
21,930.00
27,500.00
35,750.00
44,000.00
55,000.00
66,757.00

70.000

bh

605.00

42,350.00

14.370
0.040

Kg
m3

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

1,100.00
215,000.00

15,807.00
8,600.00
27,500.00
35,750.00
44,000.00
55,000.00
62,673.00

70.000
9.680
0.045

bh
Kg
m3

0.320
0.100
0.010
0.015

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00

42,350.00
10,648.00
9,675.00
27,500.00
35,750.00
44,000.00
55,000.00

11,213.00
6.480
0.019

Kg
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,100.00
215,000.00

7,128.00
4,085.00
27,500.00
35,750.00
44,000.00
55,000.00
9,482.00

4.320
0.022

Kg
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,100.00
215,000.00

4,752.00
4,730.00
27,500.00
35,750.00
44,000.00
55,000.00
8,075.00

4.320
0.003
0.013

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,100.00
176,000.00
215,000.00

4,752.00
528.00
2,795.00
27,500.00
35,750.00
44,000.00
55,000.00
6,090.00

1.840
0.006
0.014

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,100.00
176,000.00
215,000.00

2,024.00
1,056.00
3,010.00
27,500.00
35,750.00
44,000.00
55,000.00
8,265.00

3.000
0.005
0.019

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,100.00
176,000.00
215,000.00

3,300.00
880.00
4,085.00
27,500.00
35,750.00
44,000.00
55,000.00
3,529.89

0.009
0.009
0.009

Kg
m3
m3

0.200
0.150
0.015

Oh
Oh
Oh

1,210.00
176,000.00
215,000.00

10.89
1,584.00
1,935.00
27,500.00
35,750.00
44,000.00

0.010

Oh

55,000.00
4,465.47

0.007
0.007
0.015

Kg
m3
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

1,210.00
176,000.00
215,000.00

8.47
1,232.00
3,225.00
27,500.00
35,750.00
44,000.00
55,000.00
20,653.00

14.280
0.023

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00

15,708.00
4,945.00
27,500.00
35,750.00
44,000.00
55,000.00
17,470.00

10.800
0.026

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00

11,880.00
5,590.00
27,500.00
35,750.00
44,000.00
55,000.00
15,568.00

8.680
0.028

Kg
m3

0.250
0.200
0.020

Oh
Oh
Oh

1,100.00
215,000.00

9,548.00
6,020.00
27,500.00
35,750.00
44,000.00

0.0125

Oh

55,000.00
14,039.00

7.290
0.028

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00

8,019.00
6,020.00
27,500.00
35,750.00
44,000.00
55,000.00
13,314.00

6.240
0.030

Kg
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,100.00
215,000.00

6,864.00
6,450.00
27,500.00
35,750.00
44,000.00
55,000.00
5,464.89

0.009
0.009
0.018

Kg
m3
m3

0.250
0.200
0.020
0.0125

Oh
Oh
Oh
Oh

1,210.00
176,000.00
215,000.00

10.89
1,584.00
3,870.00
27,500.00
35,750.00
44,000.00
55,000.00
19,845.00

15.500
0.013

Kg
m3

0.300
0.200
0.020

Oh
Oh
Oh

1,100.00
215,000.00

17,050.00
2,795.00
27,500.00
35,750.00
44,000.00

0.013

Oh

55,000.00
20,450.00

11.750
0.035

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

12,925.00
7,525.00
27,500.00
35,750.00
44,000.00
55,000.00
18,598.00

9.480
0.038

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

10,428.00
8,170.00
27,500.00
35,750.00
44,000.00
55,000.00
17,119.00

7.940
0.039

Kg
m3

0.300
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

8,734.00
8,385.00
27,500.00
35,750.00
44,000.00
55,000.00
28,040.00

18.650
0.035

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

1,100.00
215,000.00

20,515.00
7,525.00
27,500.00
35,750.00
44,000.00
55,000.00

23,950.00
14.150
0.039

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

1,100.00
215,000.00

15,565.00
8,385.00
27,500.00
35,750.00
44,000.00
55,000.00
21,548.00

11.380
0.042

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

1,100.00
215,000.00

12,518.00
9,030.00
27,500.00
35,750.00
44,000.00
55,000.00
18,684.00

8.190
0.045

Kg
m3

0.320
0.250
0.025
0.015

Oh
Oh
Oh
Oh

1,100.00
215,000.00

9,009.00
9,675.00
27,500.00
35,750.00
44,000.00
55,000.00
12,292.00

7.070
0.021

Kg
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

1,100.00
215,000.00

7,777.00
4,515.00
27,500.00
35,750.00
44,000.00
55,000.00

11,182.00
5.670
0.023

Kg
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

1,100.00
215,000.00

6,237.00
4,945.00
27,500.00
35,750.00
44,000.00
55,000.00
14,100.00

9.300
0.018

Kg
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

10,230.00
3,870.00
27,500.00
35,750.00
44,000.00
55,000.00
12,292.00

7.070
0.021

Kg
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

1,100.00
215,000.00

7,777.00
4,515.00
27,500.00
35,750.00
44,000.00
55,000.00
980.00

0.500
0.002

Kg
m3

0.057
0.038
0.038
0.002

Oh
Oh
Oh
Oh

1,100.00
215,000.00

550.00
430.00
27,500.00
35,750.00
44,000.00
55,000.00
330,190.08

0.144
15.000

Kg
Kg

0.050
0.020
0.002
0.005

Oh
Oh
Oh
Oh

1,320.00
22,000.00

190.08
330,000.00
27,500.00
35,750.00
44,000.00
55,000.00
202,980.80

0.440
11.500

Kg
Kg

0.450
0.200
0.020
0.025

Oh
Oh
Oh
Oh

1,320.00
17,600.00

580.80
202,400.00
27,500.00
35,750.00
44,000.00
55,000.00
8,192.00

4.320
0.016

Kg
m3

0.250
0.100
0.010
0.015

Oh
Oh
Oh
Oh

1,100.00
215,000.00

4,752.00
3,440.00
27,500.00
35,750.00
44,000.00
55,000.00
8,192.00

4.320
0.016

Kg
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

1,100.00
215,000.00

4,752.00
3,440.00
27,500.00
35,750.00
44,000.00
55,000.00
59,260.00

0.500
2.900
0.006

Kg
Kg
m3

0.300
0.200
0.020
0.015

Oh
Oh
Oh
Oh

1,100.00
19,800.00
215,000.00

550.00
57,420.00
1,290.00
27,500.00
35,750.00
44,000.00
55,000.00
14,390.00

8.0000
0.0260

kg
m3

0.2250
0.1525
0.0100
0.0080

org
org
org
org

1,100.00
215,000.00

8,800.00
5,590.00
27,500.00
35,750.00
44,000.00
55,000.00
11,960.00

5.4000
0.0280

kg
m3

0.2250
0.1525
0.0100
0.0080

org
org
org
org

1,100.00
215,000.00

5,940.00
6,020.00
27,500.00
35,750.00
44,000.00
55,000.00

30,250,000.00
1.100

m3

6.000
20.000
2.000
0.300

Oh
Oh
Oh
Oh

27,500,000.00

30,250,000.00
27,500.00
38,500.00
44,000.00
55,000.00
2,178,000.00

1.200

m3

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

1,815,000.00

2,178,000.00
27,500.00
38,500.00
44,000.00
55,000.00
2,442,000.00

1.200

m3

6.000
18.000
2.000
0.300

Oh
Oh
Oh
Oh

2,035,000.00

2,442,000.00
27,500.00
38,500.00
44,000.00
55,000.00
74,965.00

0.036
0.050

m3
Kg

0.350
1.050
0.105
0.018

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

73,260.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
74,965.00

0.036
0.050

m3
Kg

0.350
1.050
0.105
0.018

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

73,260.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
1,375,000.00

0.050

m3

1.000

Oh

27,500,000.00

1,375,000.00
27,500.00

2.500
0.250
0.050

Oh
Oh
Oh

38,500.00
44,000.00
55,000.00
81,400.00

0.040

m3

1.000
2.500
0.250
0.050

Oh
Oh
Oh
Oh

2,035,000.00

81,400.00
27,500.00
38,500.00
44,000.00
55,000.00
962,500.00

0.035

m3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

27,500,000.00

962,500.00
27,500.00
38,500.00
44,000.00
55,000.00
71,225.00

0.035

m3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

2,035,000.00

71,225.00
27,500.00
38,500.00
44,000.00
55,000.00
71,225.00

0.035

m3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

2,035,000.00

71,225.00
27,500.00
38,500.00
44,000.00
55,000.00
130,240.00

0.064

m3

1.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

2,035,000.00

130,240.00
27,500.00
38,500.00
44,000.00
55,000.00
130,240.00

0.064

m3

1.000
3.000
0.300
0.500

Oh
Oh
Oh
Oh

2,035,000.00

130,240.00
27,500.00
38,500.00
44,000.00
55,000.00
585,893.00

0.0196
0.030
0.300
1.000

m3
Kg
Lt
Lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00

539,000.00
1,023.00
2,970.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
585,893.00

0.0196
0.030
0.300
1.000

m3
Kg
Lt
Lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00

539,000.00
1,023.00
2,970.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00

1,655,115.00
0.0600
0.150

m3
Kg

0.500
2.000
0.200
0.025

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

1,650,000.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
1,655,115.00

0.0600
0.150

m3
Kg

0.500
2.000
0.200
0.025

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

1,650,000.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
86,779.00

0.0196
0.030
0.300
1.000

m3
Kg
Lt
lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
9,900.00
42,900.00

39,886.00
1,023.00
2,970.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
595,100.00

0.0196
0.300
0.300
1.000

m3
Kg
Lt
lbr

0.600
2.000

Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00

539,000.00
10,230.00
2,970.00
42,900.00
27,500.00
38,500.00

0.200
0.030

Oh
Oh

44,000.00
55,000.00
595,100.00

0.0196
0.300
0.300
1.000

m3
Kg
Lt
lbr

0.600
2.000
0.200
0.030

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00

539,000.00
10,230.00
2,970.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
633,050.00

0.0196
0.300
0.800
1.000
0.500

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

539,000.00
10,230.00
7,920.00
42,900.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00
133,936.00

0.0196
0.300
0.800
1.000
0.500

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
9,900.00
42,900.00
66,000.00

39,886.00
10,230.00
7,920.00
42,900.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00

633,050.00
0.0196
0.300
0.800
1.000
0.500

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

539,000.00
10,230.00
7,920.00
42,900.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00
611,600.00

0.0196
0.300
0.800
0.500
0.500

m3
Kg
Lt
lbr
lbr

0.800
2.500
0.250
0.040

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

539,000.00
10,230.00
7,920.00
21,450.00
33,000.00
27,500.00
38,500.00
44,000.00
55,000.00
670,010.00

0.0196
0.300
1.200
1.000
1.000

m3
Kg
Lt
lbr
lbr

1.000
2.600
0.260
0.050

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
9,900.00
42,900.00
66,000.00

539,000.00
10,230.00
11,880.00
42,900.00
66,000.00
27,500.00
38,500.00
44,000.00
55,000.00
170,896.00

0.0196
0.300
1.200
1.000
1.000

m3
Kg
Lt
lbr
lbr

1.000
2.600
0.260
0.050

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00
9,900.00
42,900.00
66,000.00

39,886.00
10,230.00
11,880.00
42,900.00
66,000.00
27,500.00
38,500.00
44,000.00
55,000.00
30,450,530.00

1.100
15.000
0.800

m3

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

Kg

27,500,000.00
11,550.00
34,100.00

30,250,000.00
173,250.00
27,280.00
27,500.00
38,500.00
44,000.00
55,000.00
2,015,530.00

1.100
15.000
0.800

m3
Kg
Kg

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

1,650,000.00
11,550.00
34,100.00

1,815,000.00
173,250.00
27,280.00
27,500.00
38,500.00
44,000.00
55,000.00
1,960,530.00

1.100
15.000
0.800

m3
Kg
Kg

4.000
12.000

Oh
Oh

1,600,000.00
11,550.00
34,100.00

1,760,000.00
173,250.00
27,280.00
27,500.00
38,500.00

1.200
0.200

Oh
Oh

44,000.00
55,000.00
1,834,030.00

1.100
15.000
0.800

m3
Kg
Kg

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

1,485,000.00
11,550.00
34,100.00

1,633,500.00
173,250.00
27,280.00
27,500.00
38,500.00
44,000.00
55,000.00
24,915.00

0.012
0.150

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

19,800.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
24,315.00

0.012
0.150

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00

19,200.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
390,115.00

0.014
0.150

m3
Kg

0.100
0.100

Oh
Oh

27,500,000.00
34,100.00

385,000.00
5,115.00
27,500.00
38,500.00

0.010
0.005

Oh
Oh

44,000.00
55,000.00
28,215.00

0.014
0.150

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

23,100.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
27,515.00

0.014
0.150

m3
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00

22,400.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
279,070.00

0.165
0.200

m3
Kg

0.120
0.120
0.012
0.006

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

272,250.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00
279,070.00

0.165
0.200

m3
Kg

0.120
0.120
0.012

Oh
Oh
Oh

1,650,000.00
34,100.00

272,250.00
6,820.00
27,500.00
38,500.00
44,000.00

0.006

Oh

55,000.00
333,410.00

0.012
0.100

m3
Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

330,000.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
16,357.00

0.0072
0.050

m3
Kg

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

14,652.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
23,210.00

0.012
0.100

m3
Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

19,800.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
23,210.00

0.012
0.100

m3
Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

19,800.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00

637,615.00
0.023
0.150

m3
Kg

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

632,500.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
43,065.00

0.023
0.150

m3
Kg

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

37,950.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
41,915.00

0.023
0.150

m3
Kg

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00

36,800.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
749,320.00

0.027
0.200

m3
Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

742,500.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00

51,370.00
0.027
0.200

m3
Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

1,650,000.00
34,100.00

44,550.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00
50,020.00

0.027
0.200

m3
Kg

0.250
0.350
0.035
0.0125

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00

43,200.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00
199,705.00

0.0072
0.050

m3
Kg

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

198,000.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
16,357.00

0.0072
0.050

m3
Kg

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

14,652.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
304,205.00

0.0110
0.050

m3
Kg

0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

302,500.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
24,090.00

0.0110
0.050

m3
Kg

0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

22,385.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
31,553.50

0.0145
0.060

m3
Kg

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

29,507.50
2,046.00
27,500.00
38,500.00
44,000.00
55,000.00
19,547.00

0.0086
0.060

m3
Kg

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

17,501.00
2,046.00
27,500.00
38,500.00
44,000.00
55,000.00
19,954.00

0.0088
0.060

m3
Kg

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

2,035,000.00
34,100.00

17,908.00
2,046.00
27,500.00
38,500.00
44,000.00
55,000.00
49,830.00

0.0195
0.007
0.100

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00

32,175.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
48,855.00

0.0195
0.007
0.100

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

1,600,000.00
2,035,000.00
34,100.00

31,200.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
49,830.00

0.0195
0.007
0.100

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00

32,175.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00

49,830.00
0.0195
0.007
0.100

m3
m3
Kg

0.150
0.450
0.045
0.075

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00

32,175.00
14,245.00
3,410.00
27,500.00
38,500.00
44,000.00
55,000.00
98,274.00

0.0195
0.007
0.100
0.560
1.000

m3
m3
Kg
lt
lbr

0.200
0.600
0.060
0.010

Oh
Oh
Oh
Oh

1,650,000.00
2,035,000.00
34,100.00
9,900.00
42,900.00

32,175.00
14,245.00
3,410.00
5,544.00
42,900.00
27,500.00
38,500.00
44,000.00
55,000.00
201,025.00

0.007
0.100
0.150

m3
Kg
Kg

0.600
1.800
0.180
0.030

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
34,100.00

192,500.00
3,410.00
5,115.00
27,500.00
38,500.00
44,000.00
55,000.00
18,865.00

0.400
0.050

lbr
Kg

0.025

Oh

42,900.00
34,100.00

17,160.00
1,705.00
27,500.00

0.075
0.0075
0.0013

Oh
Oh
Oh

38,500.00
44,000.00
55,000.00
18,480.00

1.050

m'

0.021
0.021
0.0020
0.0010

Oh
Oh
Oh
Oh

17,600.00

18,480.00
27,500.00
38,500.00
44,000.00
55,000.00

28,690.00
10.000
0.026
0.044

Kg
m3
m3

1.150
0.020
0.002
0.006

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

11,000.00
5,590.00
12,100.00
27,500.00
35,750.00
44,000.00
55,000.00
590,850.00

218.000
0.520
0.870

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

239,800.00
111,800.00
239,250.00
27,500.00
35,750.00
44,000.00
55,000.00
576,250.00

197.000
0.470
0.940

Kg
m3
m3

1,100.00
215,000.00
275,000.00

216,700.00
101,050.00
258,500.00

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
552,100.00

173.000
0.570
0.870

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

190,300.00
122,550.00
239,250.00
27,500.00
35,750.00
44,000.00
55,000.00

581,500.00
232.000
0.520
0.780

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

255,200.00
111,800.00
214,500.00
27,500.00
35,750.00
44,000.00
55,000.00
652,250.00

280.000
0.450
0.900

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

308,000.00
96,750.00
247,500.00
27,500.00
35,750.00
44,000.00
55,000.00
700,100.00

352.000
0.560
0.700

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

387,200.00
120,400.00
192,500.00
27,500.00
35,750.00
44,000.00
55,000.00
631,500.00

357.000
0.420
0.540

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

392,700.00
90,300.00
148,500.00
27,500.00
35,750.00
44,000.00
55,000.00
740,150.00

386.000
0.470
0.780

Kg
m3
m3

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

424,600.00
101,050.00
214,500.00
27,500.00
35,750.00
44,000.00
55,000.00
809,950.00

479.000
0.370
0.740

Kg
m3
m3

1.650
0.250
0.025

Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

526,900.00
79,550.00
203,500.00
27,500.00
35,750.00
44,000.00

0.080

Oh

55,000.00
828,892.00

479.000
0.370
0.740
2.460

Kg
m3
m3
gln

1.650
0.250
0.025
0.080

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
7,700.00

526,900.00
79,550.00
203,500.00
18,942.00
27,500.00
35,750.00
44,000.00
55,000.00
708,450.00

336.000
0.540
0.810

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

369,600.00
116,100.00
222,750.00
27,500.00
35,750.00
44,000.00
55,000.00
676,900.00

291.000
0.470
0.930

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

320,100.00
101,050.00
255,750.00
27,500.00
35,750.00
44,000.00
55,000.00
740,300.00

367.000
0.440
0.880

Kg
m3
m3

1,100.00
215,000.00
275,000.00

403,700.00
94,600.00
242,000.00

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
763,200.00

400.000
0.480
0.800

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

440,000.00
103,200.00
220,000.00
27,500.00
35,750.00
44,000.00
55,000.00
931,300.00

615.000
0.520
0.520

Kg
m3
m3

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00

676,500.00
111,800.00
143,000.00
27,500.00
35,750.00
44,000.00
55,000.00
769,140.00

400.000
0.480
0.800
1.200

Kg
m3
m3
Kg

2.000
0.350
0.035
1.000

Oh
Oh
Oh
Oh

1,100.00
215,000.00
275,000.00
4,950.00

440,000.00
103,200.00
220,000.00
5,940.00
27,500.00
35,750.00
44,000.00
55,000.00
36,960.00

1.050

m'

0.050
0.030
0.003
0.002

Oh
Oh
Oh
Oh

35,200.00

36,960.00
27,500.00
35,750.00
44,000.00
55,000.00
40,425.00

1.050

m'

0.050
0.030
0.0035
0.002

Oh
Oh
Oh
Oh

38,500.00

40,425.00
27,500.00
35,750.00
44,000.00
55,000.00
42,735.00

1.050

m'

0.550
0.350
0.003

Oh
Oh
Oh

40,700.00

42,735.00
27,500.00
35,750.00
55,000.00
47,355.00

1.050

m'

0.550
0.350
0.003

Oh
Oh
Oh

45,100.00

47,355.00
27,500.00
35,750.00
55,000.00
53,130.00

1.050

m'

0.550
0.350
0.003

Oh
Oh
Oh

50,600.00

53,130.00
27,500.00
35,750.00
55,000.00

75,075.00
1.050

m'

0.550
0.350
0.003

Oh
Oh
Oh

71,500.00

75,075.00
27,500.00
35,750.00
55,000.00
17,646.75

1.050
0.015

Kg
Kg

0.007
0.007
0.0007
0.0003

Oh
Oh
Oh
Oh

16,500.00
21,450.00

17,325.00
321.75
27,500.00
35,750.00
44,000.00
55,000.00
17,539.50

1.050
0.010

Kg
Kg

0.005
0.005
0.0005
0.0003

Oh
Oh
Oh
Oh

16,500.00
21,450.00

17,325.00
214.50
27,500.00
35,750.00
44,000.00
55,000.00
39,707.25

1.020
0.805

Kg
Kg

0.025
0.025
0.0025
0.0015

Oh
Oh
Oh
Oh

22,000.00
21,450.00

22,440.00
17,267.25
27,500.00
35,750.00
44,000.00
55,000.00
108,955.00

0.040

m3

1,540,000.00

61,600.00

0.400
0.200
0.350
2.000

Kg
Lt
lbr
btg

0.300
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

34,100.00
4,950.00
49,500.00
7,700.00

13,640.00
990.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00
196,537.00

0.0882
0.5000

m3
kg

0.1500
0.2000
0.2000
0.0170

org
org
org
org

2,035,000.00
34,100.00

179,487.00
17,050.00
27,500.00
38,500.00
44,000.00
55,000.00
72,325.00

0.040
0.300
0.100

m3
Kg
Lt

0.300
0.260
0.0260
0.0050

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00

61,600.00
10,230.00
495.00
27,500.00
38,500.00
44,000.00
55,000.00
72,325.00

0.040
0.300
0.100

m3
Kg
Lt

0.300
0.260
0.0260
0.0050

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00

61,600.00
10,230.00
495.00
27,500.00
38,500.00
44,000.00
55,000.00

132,955.00
0.040
0.400
0.200
0.015
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

0.300
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

61,600.00
13,640.00
990.00
24,000.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00
137,755.00

0.040
0.400
0.200
0.018
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

0.320
0.330
0.0330
0.0060

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

61,600.00
13,640.00
990.00
28,800.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00
163,755.00

0.040
0.400
0.200
0.015
0.350
6.000

m3
Kg
Lt
m3
lbr
btg

0.320
0.330
0.033

Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

61,600.00
13,640.00
990.00
24,000.00
17,325.00
46,200.00
27,500.00
35,750.00
44,000.00

0.006

Oh

55,000.00
449,755.00

0.040
0.400
0.200
0.015
0.350
6.000
4.000

m3
Kg
Lt
m3
lbr
btg
bh

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00
71,500.00

61,600.00
13,640.00
990.00
24,000.00
17,325.00
46,200.00
286,000.00
27,500.00
38,500.00
44,000.00
55,000.00
117,307.50

0.030
0.400
0.150
0.015
0.350
2.000

m3
Kg
Lt
m3
lbr
btg

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
1,600,000.00
49,500.00
7,700.00

46,200.00
13,640.00
742.50
24,000.00
17,325.00
15,400.00
27,500.00
38,500.00
44,000.00
55,000.00
3,490,992.50

0.200
1.500
0.400
150.000
2.250
323.000
0.520
0.780

m3
Kg
Lt
Kg
Kg
Kg
m3
m3

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

308,000.00
51,150.00
1,980.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00

3.900
0.350
1.040
1.050
0.245
0.165

Oh
Oh
Oh
Oh
Oh
Oh

27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
4,432,920.00

0.270
2.000
0.600
200.000
3.000
323.000
0.520
0.780

m3
Kg
Lt
Kg
Kg
Kg
m3
m3

4.850
0.350
1.560
1.400
0.331
0.170

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

415,800.00
68,200.00
2,970.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
6,961,925.00

0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.150
3.500
20.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

7.300

Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

616,000.00
136,400.00
9,900.00
4,800,000.00
96,525.00
355,300.00
111,800.00
214,500.00
272,250.00
173,250.00
176,000.00
27,500.00

0.350
3.300
2.100
0.570
0.250

Oh
Oh
Oh
Oh
Oh

35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
5,089,290.00

0.320
3.200
1.600
200.000
3.000
323.000
0.520
0.780
0.140
2.800
16.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

5.960
0.350
2.800
1.400
0.455
0.208

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

492,800.00
109,120.00
7,920.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
254,100.00
138,600.00
140,800.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
4,377,702.50

0.320
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.120
2.800
32.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

492,800.00
109,120.00
7,920.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
217,800.00
138,600.00
281,600.00

5.800
0.350
2.800
1.050
0.420
0.185

Oh
Oh
Oh
Oh
Oh
Oh

27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
4,256,702.50

0.240
3.200
1.600
150.000
2.250
323.000
0.520
0.780
0.160
2.800
24.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

5.600
0.350
2.640
1.050
0.400
0.193

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

369,600.00
109,120.00
7,920.00
2,400,000.00
48,262.50
355,300.00
111,800.00
214,500.00
290,400.00
138,600.00
211,200.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
4,876,715.00

0.250
3.000
1.200
200.000
3.000
323.000
0.520
0.780
0.105
2.500
14.000

m3
Kg
Lt
Kg
Kg
Kg
m3
m3
m3
lbr
btg

1,540,000.00
34,100.00
4,950.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00
1,815,000.00
49,500.00
8,800.00

385,000.00
102,300.00
5,940.00
3,200,000.00
64,350.00
355,300.00
111,800.00
214,500.00
190,575.00
123,750.00
123,200.00

5.600
0.350
2.300
1.400
0.405
0.202

Oh
Oh
Oh
Oh
Oh
Oh

27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
69,238.50

0.002
0.010
3.000
0.450
4.000
0.006
0.009

m3
Kg
Kg
Kg
Kg
m3
m3

0.060
0.020
0.020
0.020
0.006
0.003

Oh
Oh
Oh
Oh
Oh
Oh

1,540,000.00
34,100.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

3,080.00
341.00
48,000.00
9,652.50
4,400.00
1,290.00
2,475.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00
79,087.50

0.003
0.200
3.600
0.050
5.500
0.009
0.015

m3
Kg
Kg
Kg
Kg
m3
m3

0.100
0.330
0.033
0.033
0.010
0.005

Oh
Oh
Oh
Oh
Oh
Oh

495,000.00
34,100.00
16,000.00
21,450.00
1,100.00
215,000.00
275,000.00

1,485.00
6,820.00
57,600.00
1,072.50
6,050.00
1,935.00
4,125.00
27,500.00
35,750.00
38,500.00
35,750.00
44,000.00
55,000.00

41,250.00
25.000

bh

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

1,650.00

41,250.00
27,500.00
38,500.00
44,000.00
55,000.00
126,500.00

25.000

bh

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

5,060.00

126,500.00
27,500.00
38,500.00
44,000.00
55,000.00
29,040.00

12.000

bh

0.150
0.060
0.006
0.008

Oh
Oh
Oh
Oh

2,420.00

29,040.00
27,500.00
38,500.00
44,000.00
55,000.00
40,430.00

5.000
8.000
0.032

bh
Kg
m3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

4,950.00
1,100.00
215,000.00

24,750.00
8,800.00
6,880.00
27,500.00
38,500.00
44,000.00
55,000.00
54,180.00

5.000
8.000
0.032

bh
Kg
m3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

7,700.00
1,100.00
215,000.00

38,500.00
8,800.00
6,880.00
27,500.00
38,500.00
44,000.00
55,000.00
35,480.00

4.000
8.000
0.032

bh
Kg
m3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

4,950.00
1,100.00
215,000.00

19,800.00
8,800.00
6,880.00
27,500.00
38,500.00
44,000.00
55,000.00
232,705.00

0.600
0.050

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

385,000.00
34,100.00

231,000.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
13,992.00

0.500
0.120

lbr
Kg

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

19,800.00
34,100.00

9,900.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00

15,972.00
0.600
0.120

lbr
Kg

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

19,800.00
34,100.00

11,880.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
15,972.00

0.600
0.120

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

11,880.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
18,942.00

0.750
0.120

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

14,850.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
11,022.00

0.350
0.120

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

6,930.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
12,408.00

0.420
0.120

lbr
Kg

0.140
0.070
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

8,316.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
12,804.00

0.440
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

8,712.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
14,190.00

0.510
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

10,098.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
19,932.00

0.800
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

15,840.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
11,418.00

0.370
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

7,326.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
11,616.00

0.380
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

7,524.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
13,200.00

0.460
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

9,108.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
13,794.00

0.490
0.120

lbr
Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

19,800.00
34,100.00

9,702.00
4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
15,378.00

0.570

lbr

19,800.00

11,286.00

0.120

Kg

0.140
0.067
0.007
0.007

Oh
Oh
Oh
Oh

34,100.00

4,092.00
27,500.00
38,500.00
44,000.00
55,000.00
252,120.00

2.400
6.000

lbr
Kg

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

19,800.00
34,100.00

47,520.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
252,120.00

2.400
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

19,800.00
34,100.00

47,520.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
246,180.00

2.100
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

19,800.00
34,100.00

41,580.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
245,190.00

2.050
6.000

lbr
bh

19,800.00
34,100.00

40,590.00
204,600.00

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
208,560.00

1.200
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

3,300.00
34,100.00

3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
208,560.00

1.200
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

3,300.00
34,100.00

3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
208,560.00

1.200
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

3,300.00
34,100.00

3,960.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
209,440.00

1.100
6.000

lbr
bh

4,400.00
34,100.00

4,840.00
204,600.00

0.100
0.150
0.013
0.004

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
209,440.00

1.100
6.000

lbr
bh

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

4,400.00
34,100.00

4,840.00
204,600.00
27,500.00
38,500.00
44,000.00
55,000.00
92,983.00

11.000
0.030

lbr
bh

0.200
0.100
0.010
0.010

Oh
Oh
Oh
Oh

8,360.00
34,100.00

91,960.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
92,378.00

6.900
0.350
0.030
0.500

lbr
lbr
Kg
Bh

0.200
0.300
0.003
0.010

Oh
Oh
Oh
Oh

11,000.00
42,900.00
34,100.00
880.00

75,900.00
15,015.00
1,023.00
440.00
27,500.00
38,500.00
44,000.00
55,000.00
51,475.60

1.020
0.200

lbr
Kg

43,780.00
34,100.00

44,655.60
6,820.00

0.200
0.100
0.010
0.001

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
34,320.00

60.000
0.200

lbr
Kg

0.166
0.250
0.025
0.008

Oh
Oh
Oh
Oh

458.33
34,100.00

27,500.00
6,820.00
27,500.00
38,500.00
44,000.00
55,000.00
51,045.00

3.500
0.050
10.800
0.032
1.000

lbr
Kg
Kg
m3
Kg

0.400
0.200
0.020
0.020

Oh
Oh
Oh
Oh

8,360.00
34,100.00
1,100.00
215,000.00
1,320.00

29,260.00
1,705.00
11,880.00
6,880.00
1,320.00
27,500.00
38,500.00
44,000.00
55,000.00
29,305.00

2.000
0.050
0.0035

lbr
Kg
Kg

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

11,000.00
34,100.00
1,600,000.00

22,000.00
1,705.00
5,600.00
27,500.00
38,500.00
44,000.00
55,000.00
44,055.00

1.100
0.050

lbr
Kg

0.250
0.150
0.015
0.013

Oh
Oh
Oh
Oh

38,500.00
34,100.00

42,350.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
44,055.00

1.100
0.050

lbr
Kg

0.250
0.150
0.015
0.013

Oh
Oh
Oh
Oh

38,500.00
34,100.00

42,350.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
27,291.00

0.400
0.060
0.050
0.004

Lbr
Kg
Kg
m3

0.125
0.250
0.025
0.006

Oh
Oh
Oh
Oh

38,500.00
34,100.00
34,100.00
2,035,000.00

15,400.00
2,046.00
1,705.00
8,140.00
27,500.00
38,500.00
44,000.00
55,000.00
35,332.00

0.700
0.020

Lbr
Kg

0.120
0.060
0.006
0.006

Oh
Oh
Oh
Oh

49,500.00
34,100.00

34,650.00
682.00
27,500.00
38,500.00
44,000.00
55,000.00

12,914.00
0.300
0.040

Lbr
Kg

0.015
0.070
0.008
0.006

Oh
Oh
Oh
Oh

38,500.00
34,100.00

11,550.00
1,364.00
27,500.00
38,500.00
44,000.00
55,000.00
46,882.00

1.050
0.020

m2
Kg

0.015
0.075
0.008
0.006

Oh
Oh
Oh
Oh

44,000.00
34,100.00

46,200.00
682.00
27,500.00
38,500.00
44,000.00
55,000.00
9,284.00

1.200
0.040

m2
Kg

0.100
1.000
0.010
0.010

Oh
Oh
Oh
Oh

6,600.00
34,100.00

7,920.00
1,364.00
27,500.00
38,500.00
44,000.00
55,000.00
4,042.50

1.050

m2

0.150
0.050
0.005
0.008

Oh
Oh
Oh
Oh

3,850.00

4,042.50
27,500.00
38,500.00
44,000.00
55,000.00

45,617.00

0.0210
0.2200

m3
kg

0.1875
0.2250
0.0375
0.0105

org
org
org
org

1,815,000.00
34,100.00

38,115.00
7,502.00
27,500.00
38,500.00
44,000.00
55,000.00
48,741.00

1.100
0.010

lbr
Kg

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

44,000.00
34,100.00

48,400.00
341.00
27,500.00
38,500.00
44,000.00
55,000.00
42,691.00

1.100
0.010

lbr
Kg

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

38,500.00
34,100.00

42,350.00
341.00
27,500.00
38,500.00
44,000.00
55,000.00
42,691.00

1.100
0.010

lbr
Kg

0.030
0.070
0.007
0.0015

Oh
Oh
Oh
Oh

38,500.00
34,100.00

42,350.00
341.00
27,500.00
38,500.00
44,000.00
55,000.00
570,955.00

11.500
0.050

lbr
Kg

0.060
0.120
0.012
0.0030

Oh
Oh
Oh
Oh

49,500.00
34,100.00

569,250.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
314,325.00

5.800
0.050

lbr
Kg

0.060
0.100
0.010
0.0030

Oh
Oh
Oh
Oh

53,900.00
34,100.00

312,620.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
100,705.00

1.500
0.050

lbr
Kg

0.060
0.100
0.010
0.0030

Oh
Oh
Oh
Oh

66,000.00
34,100.00

99,000.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
16,467.00

0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

42,900.00
34,100.00

15,444.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
16,467.00

0.360

lbr

42,900.00

15,444.00

0.030

Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

34,100.00

1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
16,467.00

0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

42,900.00
34,100.00

15,444.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
16,467.00

0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

42,900.00
34,100.00

15,444.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
30,723.00

0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

82,500.00
34,100.00

29,700.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
30,723.00

0.360
0.030

lbr
Kg

82,500.00
34,100.00

29,700.00
1,023.00

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
28,023.00

0.360
0.030

lbr
Kg

0.070
0.100
0.010
0.0035

Oh
Oh
Oh
Oh

75,000.00
34,100.00

27,000.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
662,046.00

0.024
0.010
0.050

m3
Kg
Kg

0.200
0.600
0.060
0.0100

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00
34,100.00

660,000.00
341.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
3,804.24

0.024
0.010
0.050

lbr
Kg
Kg

0.200
0.600
0.060
0.0100

Oh
Oh
Oh
Oh

73,260.00
34,100.00
34,100.00

1,758.24
341.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
50,886.00

0.024

lbr

2,035,000.00

48,840.00

0.010
0.050

Kg
Kg

0.200
0.600
0.060
0.0100

Oh
Oh
Oh
Oh

34,100.00
34,100.00

341.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00
33,748.00

0.350
0.030

lbr
Kg

0.600
0.100
0.010
0.0030

Oh
Oh
Oh
Oh

93,500.00
34,100.00

32,725.00
1,023.00
27,500.00
38,500.00
44,000.00
55,000.00
379,885.00

3.600
0.150
1.000
1.500

m'
Kg
bh
lbr

0.150
0.500
0.050
0.0075

Oh
Oh
Oh
Oh

71,500.00
20,900.00
12,100.00
71,500.00

257,400.00
3,135.00
12,100.00
107,250.00
27,500.00
38,500.00
44,000.00
55,000.00
16,071.00

1.100
0.010

m'
Kg

0.050
0.050
0.005
0.0030

Oh
Oh
Oh
Oh

14,300.00
34,100.00

15,730.00
341.00
27,500.00
38,500.00
44,000.00
55,000.00
55,577.00

0.023
0.060
0.390

m3
Kg
lbr

0.270
0.400
0.040
0.0135

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
42,900.00

36,800.00
2,046.00
16,731.00
27,500.00
38,500.00
44,000.00
55,000.00
43,026.00

Rangka Borneo
0.012
0.060
1.100

m3
Kg
lbr

0.180
0.320
0.032
0.0090

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
19,800.00

19,200.00
2,046.00
21,780.00
27,500.00
38,500.00
44,000.00
55,000.00
351,466.00

0.023
0.060
5.800

m3
Kg
lbr

0.260
0.400
0.040
0.0130

Oh
Oh
Oh
Oh

1,600,000.00
34,100.00
53,900.00

36,800.00
2,046.00
312,620.00
27,500.00
38,500.00
44,000.00
55,000.00
614,496.00

0.027
0.060
11.500

m3
Kg
lbr

0.310
0.470
0.047

Oh
Oh
Oh

1,600,000.00
34,100.00
49,500.00

43,200.00
2,046.00
569,250.00
27,500.00
38,500.00
44,000.00

0.0155

Oh

55,000.00

1,859,000.00
1.000
30% Dari bahan

bh

3.300
1.100
0.001
0.1600

Oh
Oh
Oh
Oh

1,430,000.00
429,000.00

1,430,000.00
429,000.00
27,500.00
35,750.00
44,000.00
55,000.00
173,750.00

1.000
6.000
0.010

bh
Kg
m3

1.000
1.500
1.500
0.1600

Oh
Oh
Oh
Oh

165,000.00
1,100.00
215,000.00

165,000.00
6,600.00
2,150.00
27,500.00
35,750.00
44,000.00
55,000.00
117,485.00

1.000
7.000
6.000
0.010

bh
bh
Kg
m3

1.000
1.500
0.300
0.1100

Oh
Oh
Oh
Oh

104,500.00
605.00
1,100.00
215,000.00

104,500.00
4,235.00
6,600.00
2,150.00
27,500.00
35,750.00
44,000.00
55,000.00
652,250.00

1.000
bh
30% Harga Urinoir
6.000
Kg

495,000.00
148,500.00
1,100.00

495,000.00
148,500.00
6,600.00

0.010

m3

1.000
1.000
0.100
0.1000

Oh
Oh
Oh
Oh

215,000.00

2,150.00
27,500.00
35,750.00
44,000.00
55,000.00
563,150.00

1.000
bh
12% Harga Urinoir
6.000
Kg
0.010
m3
1.000
1.450
0.150
0.1000

495,000.00
59,400.00
1,100.00
215,000.00

Oh
Oh
Oh
Oh

495,000.00
59,400.00
6,600.00
2,150.00
27,500.00
35,750.00
44,000.00
55,000.00
140,750.00

1.000
6.000
0.010

bh
Kg
m3

2.100
0.750
0.070
0.1100

Oh
Oh
Oh
Oh

132,000.00
1,100.00
215,000.00

132,000.00
6,600.00
2,150.00
27,500.00
35,750.00
44,000.00
55,000.00
233,640.00

1.000
bh
18% Harga Bak
1.800
2.700
0.540
0.1100

Oh
Oh
Oh
Oh

198,000.00
35,640.00

198,000.00
35,640.00
27,500.00
35,750.00
44,000.00
55,000.00
420,284.00

0.400
120.000
0.300
360.000
6.000

m3
Kg
m3
bh
Kg

6.000
3.000
0.300
0.3000

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00
598.95
1,320.00

242.00
132,000.00
64,500.00
215,622.00
7,920.00
27,500.00
35,750.00
44,000.00
55,000.00
858,000.00

1.000
bh
20% harga Badkip
0.075
0.750
0.2500

715,000.00
143,000.00

Oh
Oh
Oh
Oh

715,000.00
143,000.00
27,500.00
35,750.00
44,000.00
55,000.00

221,760.00
1.000
bh
12% Harga Bak
3.000
4.500
0.900
0.9000

198,000.00

Oh
Oh
Oh
Oh

198,000.00
23,760.00
27,500.00
35,750.00
44,000.00
55,000.00
154,111.00

1.600
0.680
0.013
0.011

bh
Kg
m3
m3

0.060

Oh

93,500.00
1,100.00
215,000.00
88,000.00

149,600.00
748.00
2,795.00
968.00
27,500.00

0.030
0.003
0.0025

Oh
Oh
Oh

35,750.00
44,000.00
55,000.00
154,799.00

1.600
0.870
0.014
0.014

bh
Kg
m3
m3

0.080
0.040
0.004
0.0070

Oh
Oh
Oh
Oh

93,500.00
1,100.00
215,000.00
88,000.00

149,600.00
957.00
3,010.00
1,232.00
27,500.00
35,750.00
44,000.00
55,000.00
115,427.35

1.100
0.270
3.920
0.056
0.024

bh
m3
Kg
m3
m3

0.140
0.070
0.007
0.0070

Oh
Oh
Oh
Oh

88,000.00
605.00
1,100.00
215,000.00
88,000.00

96,800.00
163.35
4,312.00
12,040.00
2,112.00
27,500.00
35,750.00
44,000.00
55,000.00
127,649.75

1.100
0.550
10.300
0.061
0.069

bh
m3
Kg
m3
m3

0.380
0.190
0.019
0.0190

Oh
Oh
Oh
Oh

88,000.00
605.00
1,100.00
215,000.00
88,000.00

96,800.00
332.75
11,330.00
13,115.00
6,072.00
27,500.00
35,750.00
44,000.00
55,000.00

30 )cm, t = 35cm

121,287.73
0.145
44.000
0.070
0.070
1.600
0.060

m3
Kg
m3
m3
Kg
m3

3.200
1.015
0.0015
0.0160

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00

87.73
48,400.00
15,050.00
19,250.00
25,600.00
12,900.00
27,500.00
35,750.00
44,000.00
55,000.00

45 )cm, t = 50cm

179,251.25
0.250
77.000
0.130
0.020
2.600
0.090

m3
Kg
m3
m3
Kg
m3

1.420
0.473
0.0470
0.0710

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00

151.25
84,700.00
27,950.00
5,500.00
41,600.00
19,350.00
27,500.00
35,750.00
44,000.00
55,000.00

60 )cm, t = 65cm

277,659.46
0.371
114.000
0.184
0.033
4.850
0.120

m3
Kg
m3
m3
Kg
m3

2.160
0.720
0.0720

Oh
Oh
Oh

605.00
1,100.00
215,000.00
275,000.00
16,000.00
215,000.00

224.46
125,400.00
39,560.00
9,075.00
77,600.00
25,800.00
27,500.00
35,750.00
44,000.00

0.1080
0.1000

Oh
Oh

55,000.00
33,000.00
201,500.00

1.200
m'
35% Harga Pipa
0.054
0.090
0.0090
0.0270

130,000.00
45,500.00

Oh
Oh
Oh
Oh

156,000.00
45,500.00
27,500.00
35,750.00
44,000.00
55,000.00
201,500.00

1.200
m'
35% Harga Pipa
0.054
0.090
0.0090
0.0270

130,000.00
45,500.00

Oh
Oh
Oh
Oh

156,000.00
45,500.00
27,500.00
35,750.00
44,000.00
55,000.00
201,500.00

1.200
m'
35% Harga Pipa
0.054
0.090
0.0090
0.0270

130,000.00
45,500.00

Oh
Oh
Oh
Oh

156,000.00
45,500.00
27,500.00
35,750.00
44,000.00
55,000.00
201,500.00

1.200
m'
35% Harga Pipa
0.108
0.180
0.0180

Oh
Oh
Oh

130,000.00
45,500.00

156,000.00
45,500.00
27,500.00
35,750.00
44,000.00

0.0054

Oh

55,000.00
156,000.00

1.200
m'
35% Harga Pipa
0.108
0.180
0.0180
0.0054

130,000.00
45,500.00

Oh
Oh
Oh
Oh

156,000.00

27,500.00
35,750.00
44,000.00
55,000.00
28,416.67

1.200
m'
35% Harga Pipa
0.135
0.225
0.0225
0.0068

18,333.33
6,416.67

Oh
Oh
Oh
Oh

22,000.00
6,416.67
27,500.00
35,750.00
44,000.00
55,000.00
3,912.98

1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018

2,524.50
883.58

Oh
Oh
Oh
Oh

3,029.40
883.58
27,500.00
35,750.00
44,000.00
55,000.00
6,146.53

1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018

Oh
Oh
Oh
Oh

3,965.50
1,387.93

4,758.60
1,387.93
27,500.00
35,750.00
44,000.00
55,000.00

8,439.75
1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018

5,445.00
1,905.75

Oh
Oh
Oh
Oh

6,534.00
1,905.75
27,500.00
35,750.00
44,000.00
55,000.00
28,626.95

1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018

18,469.00
6,464.15

Oh
Oh
Oh
Oh

22,162.80
6,464.15
27,500.00
35,750.00
44,000.00
55,000.00
31,073.63

1.200
m'
35% Harga Pipa
0.054
0.090
0.0090
0.0027

20,047.50
7,016.63

Oh
Oh
Oh
Oh

24,057.00
7,016.63
27,500.00
35,750.00
44,000.00
55,000.00
51,150.00

1.200
m'
35% Harga Pipa
0.036
0.060
0.0060
0.0018

Oh
Oh
Oh
Oh

33,000.00
11,550.00

39,600.00
11,550.00
27,500.00
35,750.00
44,000.00
55,000.00

61,763.63
1.200
m'
35% Harga Pipa
0.081
0.135
0.0135
0.0041

39,847.50
13,946.63

Oh
Oh
Oh
Oh

47,817.00
13,946.63
27,500.00
35,750.00
44,000.00
55,000.00
90,365.00

1.200
m'
35% Harga Pipa
0.081
0.135
0.0135
0.0041

58,300.00
20,405.00

Oh
Oh
Oh
Oh

69,960.00
20,405.00
27,500.00
35,750.00
44,000.00
55,000.00
566,500.00

1.000
1.000

bh
set

0.030
0.300
0.0300
0.0015

Oh
Oh
Oh
Oh

495,000.00
71,500.00

495,000.00
71,500.00
27,500.00
35,750.00
44,000.00
55,000.00
489,250.00

1.000
1.000
20.000
0.050

bh
set
Kg
m3

0.050
0.500
0.0500
0.0025

Oh
Oh
Oh
Oh

385,000.00
71,500.00
1,100.00
215,000.00

385,000.00
71,500.00
22,000.00
10,750.00
27,500.00
35,750.00
44,000.00
55,000.00

33,123.75
1.000
0.025

bh
bh

0.010
0.100
0.0100
0.0050

Oh
Oh
Oh
Oh

33,000.00
4,950.00

33,000.00
123.75
27,500.00
35,750.00
44,000.00
55,000.00
33,000.00

1.000

bh

0.010
0.100
0.0100
0.0050

Oh
Oh
Oh
Oh

33,000.00

33,000.00
27,500.00
35,750.00
44,000.00
55,000.00

23,100.00
1.100
0.080

Kg
Kg

0.006
0.060
0.0060
0.0003

Oh
Oh
Oh
Oh

19,800.00
16,500.00

21,780.00
1,320.00
27,500.00
35,750.00
44,000.00
55,000.00
495,000.00

1.000

m2

0.650
0.650
0.0650
0.0320

Oh
Oh
Oh
Oh

495,000.00

495,000.00
27,500.00
38,500.00
44,000.00
55,000.00
495,000.00

1.000

m2

1.050
1.050
0.1050
0.00525

Oh
Oh
Oh
Oh

495,000.00

495,000.00
27,500.00
38,500.00
44,000.00
55,000.00
715,000.00

1.000

m2

1.022
1.200
0.1200
0.0060

Oh
Oh
Oh
Oh

715,000.00

715,000.00
27,500.00
38,500.00
44,000.00
55,000.00
495,000.00

1.000

m2

1.200
1.200
0.1200
0.0060

Oh
Oh
Oh
Oh

495,000.00

495,000.00
27,500.00
38,500.00
44,000.00
55,000.00
715,000.00

1.000

m2

1.050
1.050
0.1050
0.0052

Oh
Oh
Oh
Oh

715,000.00

715,000.00
27,500.00
38,500.00
44,000.00
55,000.00
385,000.00

1.000

m2

0.080
0.800

Oh
Oh

385,000.00

385,000.00
27,500.00
38,500.00

0.080
0.004

Oh
Oh

44,000.00
55,000.00
715,000.00

1.000

m2

1.050
1.500
0.105
0.0052

Oh
Oh
Oh
Oh

715,000.00

715,000.00
27,500.00
38,500.00
44,000.00
55,000.00
385,000.00

1.000

m2

1.050
1.050
0.105
0.0052

Oh
Oh
Oh
Oh

385,000.00

385,000.00
27,500.00
38,500.00
44,000.00
55,000.00
143,000.00

1.000

m2

0.350
0.350
0.035
0.00175

Oh
Oh
Oh
Oh

143,000.00

143,000.00
27,500.00
38,500.00
44,000.00
55,000.00
143,000.00

1.000

m2

0.350
0.350
0.035
0.00175

Oh
Oh
Oh
Oh

143,000.00

143,000.00
27,500.00
38,500.00
44,000.00
55,000.00
202,400.00

11.500

m'

1.200
1.200
0.012
0.0006

Oh
Oh
Oh
Oh

17,600.00

202,400.00
27,500.00
38,500.00
44,000.00
55,000.00
197,945.00

1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

176,000.00
34,100.00
2,035,000.00

193,600.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00
52,745.00

1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

44,000.00
34,100.00
2,035,000.00

48,400.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00

76,945.00
1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

66,000.00
34,100.00
2,035,000.00

72,600.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00

46,695.00
1.100
0.020
0.0018

m2
Kg
m3

0.100
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

38,500.00
34,100.00
2,035,000.00

42,350.00
682.00
3,663.00
27,500.00
38,500.00
44,000.00
55,000.00
11,860.75

1.100
0.020
0.0250

m2
Kg
m2

0.200
0.200
0.020
0.0010

Oh
Oh
Oh
Oh

9,900.00
34,100.00
11,550.00

10,890.00
682.00
288.75
27,500.00
38,500.00
44,000.00
55,000.00
46,447.50

0.500
0.015
0.0096
0.2500

Lbr
Kg
m3
Kg

0.150
0.400
0.025
0.00125

Oh
Oh
Oh
Oh

38,500.00
34,100.00
2,035,000.00
28,600.00

19,250.00
511.50
19,536.00
7,150.00
27,500.00
38,500.00
44,000.00
55,000.00
67,006.50

0.500
0.015
0.0190
0.3000

Lbr
Kg
m3
Kg

38,500.00
34,100.00
2,035,000.00
28,600.00

19,250.00
511.50
38,665.00
8,580.00

0.040
0.400
0.025
0.00125

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
62,700.00

0.300
0.100
0.0190
0.5000

Lbr
Kg
m3
Kg

0.150
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

49,500.00
34,100.00
2,035,000.00
11,550.00

14,850.00
3,410.00
38,665.00
5,775.00
27,500.00
38,500.00
44,000.00
55,000.00
57,750.00

0.300
0.100
0.0190
0.5000

Lbr
Kg
m3
Kg

0.150
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

33,000.00
34,100.00
2,035,000.00
11,550.00

9,900.00
3,410.00
38,665.00
5,775.00
27,500.00
38,500.00
44,000.00
55,000.00

220,000.00
1.000

Bh

0.060
0.600
0.060
0.003

Oh
Oh
Oh
Oh

220,000.00

220,000.00
27,500.00
38,500.00
44,000.00
55,000.00
99,000.00

1.000

Bh

0.010
0.500
0.010
0.005

Oh
Oh
Oh
Oh

99,000.00

99,000.00
27,500.00
38,500.00
44,000.00
55,000.00
132,000.00

1.000

Bh

0.005
0.500
0.005
0.0025

Oh
Oh
Oh
Oh

132,000.00

132,000.00
27,500.00
38,500.00
44,000.00
55,000.00
165,000.00

1.000

Bh

0.005
0.500
0.005
0.00025

Oh
Oh
Oh
Oh

165,000.00

165,000.00
27,500.00
38,500.00
44,000.00
55,000.00
30,250.00

1.000

Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

30,250.00

30,250.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00

1.000

Bh

0.010
0.100
0.010

Oh
Oh
Oh

27,500.00

27,500.00
27,500.00
38,500.00
44,000.00

0.00050

Oh

55,000.00
33,000.00

1.000

Bh

0.020
0.200
0.020
0.01000

Oh
Oh
Oh
Oh

33,000.00

33,000.00
27,500.00
38,500.00
44,000.00
55,000.00
3,850.00

1.000

Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

3,850.00

3,850.00
27,500.00
38,500.00
44,000.00
55,000.00
38,500.00

1.000

Bh

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

38,500.00

38,500.00
27,500.00
38,500.00
44,000.00
55,000.00
165,000.00

1.000

Bh

0.050
0.500
0.050
0.00250

Oh
Oh
Oh
Oh

165,000.00

165,000.00
27,500.00
38,500.00
44,000.00
55,000.00
22,000.00

1.000

Bh

22,000.00

22,000.00

0.020
0.200
0.020
0.001

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
231,000.00

1.000

Bh

0.050
0.500
0.050
0.0025

Oh
Oh
Oh
Oh

231,000.00

231,000.00
27,500.00
38,500.00
44,000.00
55,000.00
165,000.00

1.000

Bh

0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

165,000.00

165,000.00
27,500.00
38,500.00
44,000.00
55,000.00
275,000.00

1.000

Bh

0.060
0.600
0.060
0.0030

Oh
Oh
Oh
Oh

275,000.00

275,000.00
27,500.00
38,500.00
44,000.00
55,000.00
27,500.00

1.000

Bh

0.025
0.250
0.025
0.00125

Oh
Oh
Oh
Oh

27,500.00

27,500.00
27,500.00
38,500.00
44,000.00
55,000.00

78,650.00
1.100

m2

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

71,500.00

78,650.00
27,500.00
38,500.00
44,000.00
55,000.00
78,650.00

1.100

m2

0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

71,500.00

78,650.00
27,500.00
38,500.00
44,000.00
55,000.00
78,650.00

1.100

m2

0.0165
0.165
0.0165
0.00080

Oh
Oh
Oh
Oh

71,500.00

78,650.00
27,500.00
38,500.00
44,000.00
55,000.00
102,850.00

1.100

m2

0.0250
0.250
0.0250
0.00125

Oh
Oh
Oh
Oh

93,500.00

102,850.00
27,500.00
38,500.00
44,000.00
55,000.00
96,800.00

1.100

m2

88,000.00

96,800.00

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

27,500.00
38,500.00
44,000.00
55,000.00
96,800.00

1.100

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

88,000.00

96,800.00
27,500.00
38,500.00
44,000.00
55,000.00
96,800.00

1.100

m2

0.0165
0.165
0.0165
0.00080

Oh
Oh
Oh
Oh

88,000.00

96,800.00
27,500.00
38,500.00
44,000.00
55,000.00
145,200.00

1.100

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

132,000.00

145,200.00
27,500.00
38,500.00
44,000.00
55,000.00
423,500.00

1.100

m2

0.0150
0.150
0.0150
0.00075

Oh
Oh
Oh
Oh

385,000.00

423,500.00
27,500.00
38,500.00
44,000.00
55,000.00

56,243.30
6.630
9.800
0.0215

bh
Kg
m3

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

6,160.00
1,100.00
215,000.00

40,840.80
10,780.00
4,622.50

27,500.00
35,750.00
44,000.00
55,000.00
56,752.05

11.870
10.000
0.0215

bh
Kg
m3

0.2600
0.125
0.0125
0.0130

Oh
Oh
Oh
Oh

3,465.00
1,100.00
215,000.00

41,129.55
11,000.00
4,622.50

27,500.00
35,750.00
44,000.00
55,000.00
55,152.50

26.500
10.400
0.0135

bh
Kg
m3

0.2700
0.130
0.0130
0.0135

Oh
Oh
Oh
Oh

1,540.00
1,100.00
215,000.00

40,810.00
11,440.00
2,902.50

27,500.00
35,750.00
44,000.00
55,000.00
55,949.80

6.630
8.160

bh
Kg

6,160.00
1,100.00

40,840.80
8,976.00

0.0230
0.9000

m3
Kg

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

215,000.00
1,320.00

4,945.00
1,188.00

27,500.00
35,750.00
44,000.00
55,000.00
56,458.55

11.870
8.360
0.0230
0.9000

bh
Kg
m3
Kg

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

3,465.00
1,100.00
215,000.00
1,320.00

41,129.55
9,196.00
4,945.00
1,188.00

27,500.00
35,750.00
44,000.00
55,000.00
56,579.00

26.500
8.760
0.0230
0.9000

bh
Kg
m3
Kg

0.2700
0.130
0.0130
0.0135

Oh
Oh
Oh
Oh

1,540.00
1,100.00
215,000.00
1,320.00

40,810.00
9,636.00
4,945.00
1,188.00

27,500.00
35,750.00
44,000.00
55,000.00
48,490.50

6.250
8.800
0.0215
0.9000

bh
Kg
m3
Kg

5,280.00
1,100.00
215,000.00
1,320.00

33,000.00
9,680.00
4,622.50
1,188.00

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
23,209.20

1.870
10.000
0.0215
1.5400

bh
Kg
m3
Kg

0.2600
0.125
0.0125
0.0130

Oh
Oh
Oh
Oh

2,970.00
1,100.00
215,000.00
1,320.00

5,553.90
11,000.00
4,622.50
2,032.80

27,500.00
35,750.00
44,000.00
55,000.00
224,464.10

6.930
9.800
0.0215
1.3000

bh
Kg
m3
Kg

0.2500
0.120
0.0125
0.0125

Oh
Oh
Oh
Oh

29,920.00
1,100.00
215,000.00
1,320.00

207,345.60
10,780.00
4,622.50
1,716.00

27,500.00
35,750.00
44,000.00
55,000.00
217,374.60

11.870
10.000
0.0215
1.5000

bh
Kg
m3
Kg

16,830.00
1,100.00
215,000.00
1,320.00

199,772.10
11,000.00
4,622.50
1,980.00

0.2600
0.125
0.0125
0.0130

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
98,518.50

6.250
8.800
0.0215
1.3000

bh
Kg
m3
Kg

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

13,200.00
1,100.00
215,000.00
1,320.00

82,500.00
9,680.00
4,622.50
1,716.00

27,500.00
35,750.00
44,000.00
55,000.00
104,774.48

11.807
10.000
0.0215
1.1250

bh
Kg
m3
Kg

0.2500
0.120
0.0120
0.0125

Oh
Oh
Oh
Oh

7,425.00
1,100.00
215,000.00
1,320.00

87,666.98
11,000.00
4,622.50
1,485.00

27,500.00
35,750.00
44,000.00
55,000.00
286,116.00

5.600
8.190
0.0450
1.0000

bh
Kg
m3
Kg

0.2500
0.120

Oh
Oh

47,520.00
1,100.00
215,000.00
1,320.00

266,112.00
9,009.00
9,675.00
1,320.00

27,500.00
35,750.00

0.0120
0.0125

Oh
Oh

44,000.00
55,000.00
148,018.50

6.250
8.800
0.0215
1.3000

bh
Kg
m3
Kg

0.6720
0.224
0.0220
0.0340

Oh
Oh
Oh
Oh

21,120.00
1,100.00
215,000.00
1,320.00

132,000.00
9,680.00
4,622.50
1,716.00

27,500.00
35,750.00
44,000.00
55,000.00
158,618.10

11.870
10.000
0.0215
1.5000

bh
Kg
m3
Kg

0.7000
0.340
0.0340
0.0350

Oh
Oh
Oh
Oh

11,880.00
1,100.00
215,000.00
1,320.00

141,015.60
11,000.00
4,622.50
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
8,697.50

5.300
1.560
0.0040

bh
Kg
m3

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,155.00
1,100.00
215,000.00

6,121.50
1,716.00
860.00

27,500.00
35,750.00
44,000.00
55,000.00

6,438.15
3.530
1.560
0.0030

bh
Kg
m3

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,155.00
1,100.00
215,000.00

4,077.15
1,716.00
645.00

27,500.00
35,750.00
44,000.00
55,000.00
5,859.00

2.650
1.560
0.0030

bh
Kg
m3

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

1,320.00
1,100.00
215,000.00

3,498.00
1,716.00
645.00

27,500.00
35,750.00
44,000.00
55,000.00
6,879.80

5.300
1.200
0.0030
0.1900

bh
Kg
m3
Kg

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

880.00
1,100.00
215,000.00
1,320.00

4,664.00
1,320.00
645.00
250.80

27,500.00
35,750.00
44,000.00
55,000.00
7,030.60

3.330
1.650

bh
Kg

1,320.00
1,100.00

4,395.60
1,815.00

0.0032
0.1000

m3
Kg

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

215,000.00
1,320.00

688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
6,761.00

2.650
1.200
0.0030
0.1000

bh
Kg
m3
Kg

0.0800
0.040
0.0040
0.0040

Oh
Oh
Oh
Oh

1,760.00
1,100.00
215,000.00
1,320.00

4,664.00
1,320.00
645.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
6,688.95

3.530
1.560
0.0030
0.1900

bh
Kg
m3
Kg

0.0800
0.040
0.0040
0.0040

Oh
Oh
Oh
Oh

1,155.00
1,100.00
215,000.00
1,320.00

4,077.15
1,716.00
645.00
250.80

27,500.00
35,750.00
44,000.00
55,000.00
6,178.00

2.650
1.200
0.0030
0.1000

bh
Kg
m3
Kg

1,540.00
1,100.00
215,000.00
1,320.00

4,081.00
1,320.00
645.00
132.00

0.0800
0.040
0.0040
0.0040

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
21,919.00

2.650
1.200
0.0030
0.1000

bh
Kg
m3
Kg

0.0600
0.030
0.0030
0.0030

Oh
Oh
Oh
Oh

7,480.00
1,100.00
215,000.00
1,320.00

19,822.00
1,320.00
645.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
21,316.30

3.330
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

5,610.00
1,100.00
215,000.00
1,320.00

18,681.30
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
10,885.00

2.500
1.650
0.0032
0.1000

bh
Kg
m3
Kg

3,300.00
1,100.00
215,000.00
1,320.00

8,250.00
1,815.00
688.00
132.00

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
10,876.75

3.330
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

2,475.00
1,100.00
215,000.00
1,320.00

8,241.75
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
16,099.00

1.700
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

7,920.00
1,100.00
215,000.00
1,320.00

13,464.00
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
15,835.00

2.500
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.9000
0.090

Oh
Oh

5,280.00
1,100.00
215,000.00
1,320.00

13,200.00
1,815.00
688.00
132.00

27,500.00
35,750.00

0.0090
0.0045

Oh
Oh

44,000.00
55,000.00
15,821.80

3.330
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

3,960.00
1,100.00
215,000.00
1,320.00

13,186.80
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
118.80

0.0036

m3

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

33,000.00

118.80

27,500.00
35,750.00
44,000.00
55,000.00
118.80

0.0036

m3

0.9000
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

33,000.00

118.80

27,500.00
35,750.00
44,000.00
55,000.00
178,970.20

1.0500
14.1400
0.0400

m2
Kg
m3

143,000.00
1,430.00
215,000.00

150,150.00
20,220.20
8,600.00

0.2700
0.150
0.0150
0.0135

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
32,108.00

5.0000
11.3800
0.0420
1.5000

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,716.00
1,100.00
215,000.00
1,320.00

8,580.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
9,235.00

5.000
1.650
0.0032
0.1000

bh
Kg
m3
Kg

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

1,320.00
1,100.00
215,000.00
1,320.00

6,600.00
1,815.00
688.00
132.00

27,500.00
35,750.00
44,000.00
55,000.00
35,661.40

5.000
1.650
0.0032
0.1200

bh
Kg
m3
Kg

6,600.00
1,100.00
215,000.00
1,320.00

33,000.00
1,815.00
688.00
158.40

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
4,813.60

5.000
0.850
0.0022
0.0800

bh
Kg
m3
Kg

0.0900
0.090
0.0090
0.0045

Oh
Oh
Oh
Oh

660.00
1,100.00
215,000.00
1,320.00

3,300.00
935.00
473.00
105.60

27,500.00
35,750.00
44,000.00
55,000.00

15,620.00
3.500
0.080

bh
Kg

0.0800
0.080
0.0080
0.0040

Oh
Oh
Oh
Oh

2,200.00
99,000.00

7,700.00
7,920.00

27,500.00
35,750.00
44,000.00
55,000.00
62,028.00

50.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350

Oh
Oh
Oh

770.00
1,100.00
215,000.00
1,320.00

38,500.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00

0.0300

Oh

55,000.00
72,533.00

44.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,113.75
1,100.00
215,000.00
1,320.00

49,005.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
73,028.00

25.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,980.00
1,100.00
215,000.00
1,320.00

49,500.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
73,028.00

16.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

3,093.75
1,100.00
215,000.00
1,320.00

49,500.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00

75,503.00
35.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,485.00
1,100.00
215,000.00
1,320.00

51,975.00
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
77,433.50

10.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

5,390.55
1,100.00
215,000.00
1,320.00

53,905.50
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
89,412.50

10.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

6,588.45
1,100.00
215,000.00
1,320.00

65,884.50
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
77,433.50

33.000
11.380
0.042
1.500

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,633.50
1,100.00
215,000.00
1,320.00

53,905.50
12,518.00
9,030.00
1,980.00

27,500.00
35,750.00
44,000.00
55,000.00
92,590.00

12.000
14.150
0.039
2.000

bh
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

5,500.00
1,100.00
215,000.00
1,320.00

66,000.00
15,565.00
8,385.00
2,640.00

27,500.00
35,750.00
44,000.00
55,000.00
177,026.00

1.052
14.150
0.039
2.000

M2
Kg
m3
Kg

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

143,000.00
1,100.00
215,000.00
1,320.00

150,436.00
15,565.00
8,385.00
2,640.00

27,500.00
35,750.00
44,000.00
55,000.00
219,450.00

1.050
0.350

m2
Kg

176,000.00
99,000.00

184,800.00
34,650.00

0.1700
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
127,050.00

1.050
0.350

m2
Kg

0.1700
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

88,000.00
99,000.00

92,400.00
34,650.00

27,500.00
35,750.00
44,000.00
55,000.00
99,330.00

1.050

m2

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

94,600.00

99,330.00

27,500.00
35,750.00
44,000.00
55,000.00
63,525.00

1.050
0.350

m2
Kg

0.1700
0.170
0.0170
0.0085

Oh
Oh
Oh
Oh

27,500.00
99,000.00

28,875.00
34,650.00

27,500.00
35,750.00
44,000.00
55,000.00
244,200.00

1.050
0.600

m2
Kg

0.6500
0.350
0.0350
0.0325

Oh
Oh
Oh
Oh

176,000.00
99,000.00

184,800.00
59,400.00

27,500.00
35,750.00
44,000.00
55,000.00

57,165.00
83.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6200
0.500
0.0500
0.0300

Oh
Oh
Oh
Oh

495.00
1,100.00
215,000.00
1,320.00

41,085.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
66,295.00

83.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6200
0.500
0.0500
0.0300

Oh
Oh
Oh
Oh

605.00
1,100.00
215,000.00
1,320.00

50,215.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
66,198.75

45.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

1,113.75
1,100.00
215,000.00
1,320.00

50,118.75
10,230.00
3,870.00
1,980.00

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
77,336.25

45.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

1,361.25
1,100.00
215,000.00
1,320.00

61,256.25
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
76,580.00

50.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

1,210.00
1,100.00
215,000.00
1,320.00

60,500.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
76,580.00

25.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

2,420.00
1,100.00
215,000.00
1,320.00

60,500.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00

786,080.00
100.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

7,700.00
1,100.00
215,000.00
1,320.00

770,000.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
731,080.00

100.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

7,150.00
1,100.00
215,000.00
1,320.00

715,000.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
208,580.00

50.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

3,850.00
1,100.00
215,000.00
1,320.00

192,500.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
189,330.00

45.000
9.300
0.018

Bh
Kg
m3

3,850.00
1,100.00
215,000.00

173,250.00
10,230.00
3,870.00

1.500

Kg

0.6000
0.450
0.0450
0.0300

Oh
Oh
Oh
Oh

1,320.00

1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
112,330.00

25.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.100
0.0450
0.0300

Oh
Oh
Oh
Oh

3,850.00
1,100.00
215,000.00
1,320.00

96,250.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
208,580.00

50.000
9.300
0.018
1.500

Bh
Kg
m3
Kg

0.6000
0.125
0.0125
0.0300

Oh
Oh
Oh
Oh

3,850.00
1,100.00
215,000.00
1,320.00

192,500.00
10,230.00
3,870.00
1,980.00
27,500.00
35,750.00
44,000.00
55,000.00
166,899.00

1.020
12.440
0.025
1.500

M2
Kg
m3
Kg

0.7200
0.650
0.0650

Oh
Oh
Oh

143,000.00
1,100.00
215,000.00
1,320.00

145,860.00
13,684.00
5,375.00
1,980.00
27,500.00
35,750.00
44,000.00

0.0350

Oh

55,000.00

107,059.00
80.000
12.440
0.025

Bh
Kg
m3

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

1,100.00
1,100.00
215,000.00

88,000.00
13,684.00
5,375.00
27,500.00
35,750.00
44,000.00
55,000.00
309,200.00

1.050
11.750
0.035

Bh
Kg
m3

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

275,000.00
1,100.00
215,000.00

288,750.00
12,925.00
7,525.00
27,500.00
35,750.00
44,000.00
55,000.00
112,850.00

1.050
11.750
0.035

Bh
Kg
m3

0.6200
0.350
0.0350
0.0300

Oh
Oh
Oh
Oh

88,000.00
1,100.00
215,000.00

92,400.00
12,925.00
7,525.00
27,500.00
35,750.00
44,000.00
55,000.00
144,045.00

11.050
0.350

Bh
Kg

9,900.00
99,000.00

109,395.00
34,650.00

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

27,500.00
35,750.00
44,000.00
55,000.00
131,890.00

11.050
0.350

Bh
Kg

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

8,800.00
99,000.00

97,240.00
34,650.00
27,500.00
35,750.00
44,000.00
55,000.00
107,580.00

11.050
0.350

Bh
Kg

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

6,600.00
99,000.00

72,930.00
34,650.00
27,500.00
35,750.00
44,000.00
55,000.00
125,812.50

11.050
0.350

Bh
Kg

0.1500
0.150
0.0150
0.0075

Oh
Oh
Oh
Oh

8,250.00
99,000.00

91,162.50
34,650.00
27,500.00
35,750.00
44,000.00
55,000.00
23,188.00

1.100
0.250

m2
Kg

0.7500

Oh

19,580.00
6,600.00

21,538.00
1,650.00
27,500.00

0.170
0.0170
0.0085

Oh
Oh
Oh

35,750.00
44,000.00
55,000.00
92,400.00

3.000

Kg

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

30,800.00

92,400.00
27,500.00
35,750.00
44,000.00
55,000.00
154,000.00

5.000

Kg

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

30,800.00

154,000.00
27,500.00
35,750.00
44,000.00
55,000.00
67,705.00

0.002
0.050

m3
Kg

0.1200
0.120
0.0120
0.0060

Oh
Oh
Oh
Oh

27,500,000.00
34,100.00

66,000.00
1,705.00
27,500.00
38,500.00
44,000.00
55,000.00

357.50
0.050

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

7,150.00

357.50
27,500.00
33,000.00
44,000.00
55,000.00

192.50
0.050

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

3,850.00

192.50
27,500.00
33,000.00
44,000.00
55,000.00
192.50

0.050

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

3,850.00

192.50
27,500.00
33,000.00
44,000.00
55,000.00
192.50

0.050

Kg

0.1500
0.0025

Oh
Oh
Oh
Oh

3,850.00

192.50
27,500.00
33,000.00
44,000.00
55,000.00

asir ( Sanblasting ) dgn Tingkat Kebersihan Sa 2.


40.000
10.000

Kg
Ltr

577,500.00
13,200.00
4,950.00

528,000.00
49,500.00

sewa / Hr
1.6000
1.600
0.8000
0.5000

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00
2,464.00

0.080
0.020
0.010

Kg
Kg
Kg

0.0400
0.040
0.0040
0.0025

Oh
Oh
Oh
Oh

23,100.00
27,500.00
6,600.00

1,848.00
550.00
66.00
27,500.00
33,000.00
44,000.00
55,000.00
7,084.00

0.150
0.170
0.170

Kg
Kg
Kg

0.0700
0.075
0.0075
0.0025

Oh
Oh
Oh
Oh

19,800.00
11,000.00
13,200.00

2,970.00
1,870.00
2,244.00
27,500.00
33,000.00
44,000.00
55,000.00

Dasar, 2 Lapis Cat Penutup

15,290.00

0.200
0.150
0.170
0.260

Kg
Kg
Kg
Kg

0.0700
0.009
0.0060
0.0025

Oh
Oh
Oh
Oh

16,500.00
19,800.00
11,000.00
27,500.00

27,500.00
33,000.00
44,000.00
55,000.00

Dasar, 3 Lapis Cat Penutup


0.200
0.150
0.170
0.350

3,300.00
2,970.00
1,870.00
7,150.00

17,765.00
Kg
Kg
Kg
Kg

16,500.00
19,800.00
11,000.00
27,500.00

3,300.00
2,970.00
1,870.00
9,625.00

0.0700
0.105
0.0040
0.0025

Oh
Oh
Oh
Oh

27,500.00
33,000.00
44,000.00
55,000.00

Dasar, 3 Lapis Cat Penutup

17,765.00

0.200
0.150
0.170
0.350

Kg
Kg
Kg
Kg

0.0700
0.105
0.0040
0.0025

Oh
Oh
Oh
Oh

16,500.00
19,800.00
11,000.00
27,500.00

3,300.00
2,970.00
1,870.00
9,625.00

27,500.00
33,000.00
44,000.00
55,000.00
7,920.00

0.360

Ltr

0.0400
0.063
0.0630
0.0025

Oh
Oh
Oh
Oh

22,000.00

7,920.00
27,500.00
33,000.00
44,000.00
55,000.00
49,511.00

0.150
0.372
2.000

Ltr
Ltr
Lbr

0.0400
0.063
0.0630
0.0025

Oh
Oh
Oh
Oh

38,500.00
88,000.00
5,500.00

5,775.00
32,736.00
11,000.00
27,500.00
33,000.00
44,000.00
55,000.00
5,390.00

0.350

Ltr

0.1000
0.0060

Oh
Oh
Oh
Oh

15,400.00

5,390.00
27,500.00
33,000.00
44,000.00
55,000.00
6,897.00

0.150
0.050
0.100
0.010

Ltr
Kg
Lbr
Bh

0.1600
0.160
0.0160
0.0025

Oh
Oh
Oh
Oh

34,100.00
23,100.00
5,500.00
7,700.00

5,115.00
1,155.00
550.00
77.00
27,500.00
33,000.00
44,000.00
55,000.00

Cat Penutup )

6,512.00
0.100
0.100
0.260

Kg
Kg
Kg

0.0200
0.063
0.0063
0.0025

Oh
Oh
Oh
Oh

19,800.00
11,000.00
13,200.00

1,980.00
1,100.00
3,432.00
27,500.00
33,000.00
44,000.00
55,000.00
5,302.00

0.100
0.250
0.002
0.150

Lbr
ikat
m3
Kg

0.1500
0.001
0.0001
0.0025

Oh
Oh
Oh
Oh

5,500.00
6,600.00
1,485,000.00
880.00

550.00
1,650.00
2,970.00
132.00
27,500.00
33,000.00
44,000.00
55,000.00

3,234.00
0.002
0.300

m3
Kg

0.0400
0.005
0.0005
0.0025

Oh
Oh
Oh
Oh

1,485,000.00
880.00

2,970.00
264.00
27,500.00
33,000.00
44,000.00
55,000.00
47,960.00

1.200
0.200

m3
Kg

0.0200
0.200
0.0020
0.0025

Oh
Oh
Oh
Oh

38,500.00
8,800.00

46,200.00
1,760.00
27,500.00
33,000.00
44,000.00
55,000.00
1,727.00

0.100
0.010

Kg
Bh

0.0200
0.200
0.0200
0.0100

Oh
Oh
Oh
Oh

16,500.00
7,700.00

1,650.00
77.00
27,500.00
33,000.00
44,000.00
55,000.00
4,697.00

0.100
0.010
0.002

Kg
Bh
m3

0.2500
0.225
0.0225
0.0075

Oh
Oh
Oh
Oh

16,500.00
7,700.00
1,485,000.00

1,650.00
77.00
2,970.00
27,500.00
33,000.00
44,000.00
55,000.00

nual Sistem 4 Lapis Cat Konvensional, tebal 200 um


0.100
0.100
0.040
0.040
0.010
0.002

Kg
Kg
Kg
Kg
Ltr
m3

0.0060
0.006
0.0225
0.0075

Oh
Oh
Oh
Oh

7,524.00
9,900.00
12,100.00
27,500.00
29,700.00
6,600.00
1,485,000.00

990.00
1,210.00
1,100.00
1,188.00
66.00
2,970.00
27,500.00
33,000.00
44,000.00
55,000.00

nual Sistem 1 Lapis Cat Mutakhir, tebal 200 um


0.300

Kg

0.0060
0.060
0.0120
0.0060

Oh
Oh
Oh
Oh

4,950.00
16,500.00

4,950.00
27,500.00
33,000.00
44,000.00
55,000.00

nual Sistem 3 Lapis Cat Konvensional, tebal 200 um


0.110
0.170
0.080

Kg
Kg
Kg

0.5000
0.800
0.3000
0.2000

Oh
Oh
Oh
Oh

4,136.00
11,000.00
11,000.00
13,200.00

1,210.00
1,870.00
1,056.00
27,500.00
33,000.00
44,000.00
55,000.00

mprot ( Airless Spray ) dgn Sistem 1 Lapis Cat Mutakhir, tebal 200 um
0.300

Kg

0.4000
0.700

Oh
Oh

3,300.00

11,000.00

3,300.00
27,500.00
33,000.00

0.2000
0.2000

Oh
Oh

44,000.00
55,000.00

JUMLAH upah

TOTAL harga

H = (C X F )

I=(G+H)

38,691.56

Rp
Rp
Rp
Rp

13,146.80
22,319.20
1,513.42
1,712.14
38,691.56

Rp
Rp
Rp
Rp

38,691.56

38,691.56

13,146.80
22,319.20
1,513.42
1,712.14
33,111.76

33,111.76

13,147
16,739
1,513
1,712
13,337.95

13,337.95

6,573
5,580
757
428
0.00

0.00

0.00

0.00

0.00

0.00

5,500.00

5,500.00

2,750
2,750
116,050.00

663,535.00

77,000
27,500
8,800
2,750
79,750.00

2,411,420.00

77,000
2,750
116,050.00

133,650.00

77,000
27,500
8,800
2,750
30,250.00

85,530.00

27,500
2,750
201,657.50

201,657.50

183,343
18,315
185,157.50

185,157.50

183,343
1,815

13,200.00

13,200.00

11,000
2,200
17,297.50

17,297.50

14,438
2,860
24,227.50

24,227.50

20,213

4,015
20,597.50

20,597.50

17,188

3,410
41,250.00
34,375

41,250.00

6,875
27,197.50

27,197.50

22,633

4,565
1,650.00

1,650.00

1,375

275
8,030.00

8,030.00

5,280

2,750
6,325.00

6,325.00

5,280

1,045
16,500.00

16,500.00

13,750

2,750
8,800.00

114,400.00

8,250

550
4,950.00

24,750.00

4,125

825

44,275.00

1,275,284.50

22,000
17,875
2,200
2,200
69,465.00

41,250

779,925.00

21,450
2,640
4,125
69,465.00

547,775.00

41,250
21,450
2,640
4,125

27,555.00

168,065.00

17,875
7,150
880
1,650
27,555.00

158,605.00

17,875
7,150
880
1,650
13,640.00

80,397.00

8,800
3,575
440
825
13,640.00

76,313.00

8,800
3,575
440
825

12,072.50

23,285.50

5,500
5,363
660
550
12,072.50

21,554.50

5,500
5,363
660
550
12,072.50

20,147.50

5,500
5,363
660
550
12,072.50

18,162.50

5,500
5,363
660
550
12,072.50

20,337.50

5,500
5,363
660
550
12,072.50

5,500
5,363
660

15,602.39

550
12,072.50

16,537.97

5,500
5,363
660
550
15,592.50

36,245.50

6,875
7,150
880
688
15,592.50

33,062.50

6,875
7,150
880
688
15,592.50

6,875
7,150
880

31,160.50

688
15,592.50

29,631.50

6,875
7,150
880
688
15,592.50

28,906.50

6,875
7,150
880
688
15,592.50

21,057.39

6,875
7,150
880
688
16,995.00

8,250
7,150
880

36,840.00

715
16,995.00

37,445.00

8,250
7,150
880
715
16,995.00

35,593.00

8,250
7,150
880
715
16,995.00

34,114.00

8,250
7,150
880
715
19,662.50

8,800
8,938
1,100
825

47,702.50

19,662.50

43,612.50

8,800
8,938
1,100
825
19,662.50

41,210.50

8,800
8,938
1,100
825
19,662.50

38,346.50

8,800
8,938
1,100
825
7,375.50

4,125
2,503
308
440

19,667.50

7,375.50

18,557.50

4,125
2,503
308
440
15,895.00

29,995.00

7,150
7,150
880
715
15,895.00

28,187.00

7,150
7,150
880
715
4,708.00

5,688.00

1,568
1,359
1,672
110
2,453.00

332,643.08

1,375
715
88
275
21,780.00

224,760.80

12,375
7,150
880
1,375
11,715.00

19,907.00

6,875
3,575
440
825
7,375.50

15,567.50

4,125
2,503
308
440
17,105.00

76,365.00

8,250
7,150
880
825
12,519.38

26,909.38

6,188
5,452
440
440

0.00
0.00
0.00
0.00

12,519.38

24,479.38

6,188
5,452
440
440

0.00
0.00
0.00
0.00

1,039,500.00

31,289,500.00

165,000
770,000
88,000
16,500
962,500.00

3,140,500.00

165,000
693,000
88,000
16,500
962,500.00

3,404,500.00

165,000
693,000
88,000
16,500
55,660.00

130,625.00

9,625
40,425
4,620
990
55,660.00

130,625.00

9,625
40,425
4,620
990
137,500.00

27,500

1,512,500.00

96,250
11,000
2,750
137,500.00

218,900.00

27,500
96,250
11,000
2,750
110,000.00

1,072,500.00

22,000
77,000
8,800
2,200
110,000.00

181,225.00

22,000
77,000
8,800
2,200
110,000.00

181,225.00

22,000
77,000
8,800
2,200
172,700.00

302,940.00

27,500
115,500
13,200
16,500
183,700.00

313,940.00

27,500
115,500
13,200
27,500
103,950.00

689,843.00

16,500
77,000
8,800
1,650
103,950.00

16,500
77,000
8,800
1,650

689,843.00

100,925.00

1,756,040.00

13,750
77,000
8,800
1,375
100,925.00

1,756,040.00

13,750
77,000
8,800
1,375
103,950.00

190,729.00

16,500
77,000
8,800
1,650
103,950.00

16,500
77,000

699,050.00

8,800
1,650
103,950.00

699,050.00

16,500
77,000
8,800
1,650
131,450.00

764,500.00

22,000
96,250
11,000
2,200
131,450.00

22,000
96,250
11,000
2,200

265,386.00

131,450.00

764,500.00

22,000
96,250
11,000
2,200
131,450.00

743,050.00

22,000
96,250
11,000
2,200
141,790.00

811,800.00

27,500
100,100
11,440
2,750
141,790.00

312,686.00

27,500
100,100
11,440
2,750
635,800.00

31,086,330.00

110,000
462,000
52,800
11,000
635,800.00

2,651,330.00

110,000
462,000
52,800
11,000
635,800.00

110,000
462,000

2,596,330.00

52,800
11,000
635,800.00

2,469,830.00

110,000
462,000
52,800
11,000
7,315.00

32,230.00

2,750
3,850
440
275
7,315.00

31,630.00

2,750
3,850
440
275
7,315.00

2,750
3,850

397,430.00

440
275
7,315.00

35,530.00

2,750
3,850
440
275
7,315.00

34,830.00

2,750
3,850
440
275
8,778.00

287,848.00

3,300
4,620
528
330
8,778.00

3,300
4,620
528

287,848.00

330
18,975.00

352,385.00

4,125
9,625
1,100
4,125
11,825.00

28,182.00

2,750
7,700
1,100
275
18,975.00

42,185.00

4,125
9,625
1,100
4,125
18,975.00

4,125
9,625
1,100
4,125

42,185.00

18,920.00

656,535.00

5,500
11,550
1,320
550
18,920.00

61,985.00

5,500
11,550
1,320
550
18,920.00

60,835.00

5,500
11,550
1,320
550
22,577.50

6,875
13,475
1,540
688

771,897.50

22,577.50

73,947.50

6,875
13,475
1,540
688
22,577.50

72,597.50

6,875
13,475
1,540
688
11,825.00

211,530.00

2,750
7,700
1,100
275
11,825.00

28,182.00

2,750
7,700
1,100
275
12,738.00

316,943.00

3,025
8,470
968
275
12,738.00

36,828.00

3,025
8,470
968
275
18,975.00

50,528.50

4,125
9,625
1,100
4,125
9,790.00

29,337.00

2,750
3,850
440
2,750
9,790.00

29,744.00

2,750
3,850
440
2,750
27,555.00

77,385.00

4,125
17,325
1,980
4,125
27,555.00

76,410.00

4,125
17,325
1,980
4,125
27,555.00

4,125
17,325
1,980
4,125

77,385.00

27,555.00

77,385.00

4,125
17,325
1,980
4,125
31,790.00

130,064.00

5,500
23,100
2,640
550
95,370.00

296,395.00

16,500
69,300
7,920
1,650
3,976.50

688

22,841.50

2,888
330
72
1,529.00

20,009.00

578
809
88
55

32,758.00

61,448.00

31,625
715
88
330
59,812.50

650,662.50

45,375
8,938
1,100
4,400
59,812.50

636,062.50

45,375
8,938
1,100
4,400
59,812.50

611,912.50

45,375
8,938
1,100
4,400

59,812.50

641,312.50

45,375
8,938
1,100
4,400
59,812.50

712,062.50

45,375
8,938
1,100
4,400
59,812.50

759,912.50

45,375
8,938
1,100
4,400
59,812.50

691,312.50

45,375
8,938
1,100
4,400
59,812.50

799,962.50

45,375
8,938
1,100
4,400
59,812.50

45,375
8,938
1,100

869,762.50

4,400
59,812.50

888,704.50

45,375
8,938
1,100
4,400
124,052.50

832,502.50

55,000
12,513
1,540
55,000
124,052.50

800,952.50

55,000
12,513
1,540
55,000
124,052.50

864,352.50

55,000
12,513
1,540
55,000
124,052.50

887,252.50

55,000
12,513
1,540
55,000
124,052.50

1,055,352.50

55,000
12,513
1,540
55,000
124,052.50

893,192.50

55,000
12,513
1,540
55,000
2,689.50

39,649.50

1,375
1,073
132
110
2,711.50

43,136.50

1,375
1,073
154
110
27,802.50

70,537.50

15,125
12,513
165
27,802.50

75,157.50

15,125
12,513
165
27,802.50

15,125
12,513
165

80,932.50

27,802.50

102,877.50

15,125
12,513
165
490.05

18,136.80

193
250
31
17
354.75

17,894.25

138
179
22
17
1,773.75

41,481.00

688
894
110
83
22,737.00

131,692.00

8,250
12,705
1,452
330
21,560.00

218,097.00

4,125
7,700
8,800
935
19,679.00

92,004.00

8,250
10,010
1,144
275
19,679.00

8,250
10,010
1,144
275

92,004.00

22,737.00

155,692.00

8,250
12,705
1,452
330
23,287.00

161,042.00

8,800
12,705
1,452
330
22,379.50

8,800
11,798
1,452

186,134.50

330
23,287.00

473,042.00

8,800
12,705
1,452
330
23,287.00

140,594.50

8,800
12,705
1,452
330
217,195.00

3,708,187.50

107,250
12,513
40,040
37,538
10,780
9,075
279,911.50

4,712,831.50

133,375
12,513
60,060
50,050
14,564
9,350
454,217.50

200,750

7,416,142.50

12,513
127,050
75,075
25,080
13,750
365,722.50

5,455,012.50

163,900
12,513
107,800
50,050
20,020
11,440
346,005.00

4,723,707.50

159,500
12,513
107,800
37,538
18,480
10,175
333,905.00

4,590,607.50

154,000
12,513
101,640
37,538
17,600
10,615
334,042.50

5,210,757.50

154,000
12,513
88,550
50,050
17,820
11,110
4,279.00

73,517.50

1,650
715
770
715
264
165
17,712.75

2,750
11,798
1,271
1,180
440
275

96,800.25

7,804.50

49,054.50

4,125
2,888
352
440
7,804.50

134,304.50

4,125
2,888
352
440
7,139.00

36,179.00

4,125
2,310
264
440
19,690.00

60,120.00

11,000
7,700
880
110
19,690.00

73,870.00

11,000
7,700
880
110
19,690.00

55,170.00

11,000
7,700
880
110
7,122.50

239,827.50

3,850
2,580
308
385
7,529.50

3,850
2,888
352
440

21,521.50

7,529.50

23,501.50

3,850
2,888
352
440
7,238.00

23,210.00

3,850
2,695
308
385
7,238.00

26,180.00

3,850
2,695
308
385
7,238.00

18,260.00

3,850
2,695
308
385
7,238.00

19,646.00

3,850
2,695
308
385
7,122.50

19,926.50

3,850
2,580
308
385
7,122.50

21,312.50

3,850
2,580
308
385
7,122.50

27,054.50

3,850
2,580
308
385
7,122.50

18,540.50

3,850
2,580
308
385
7,122.50

18,738.50

3,850
2,580
308
385
7,122.50

20,322.50

3,850
2,580
308
385
7,122.50

20,916.50

3,850
2,580
308
385
7,122.50

22,500.50

3,850
2,580
308
385
7,914.50

260,034.50

2,310
4,813
572
220
7,914.50

260,034.50

2,310
4,813
572
220
7,914.50

254,094.50

2,310
4,813
572
220
7,914.50

253,104.50

2,310
4,813
572
220
7,914.50

216,474.50

2,310
4,813
572
220
7,914.50

216,474.50

2,310
4,813
572
220
7,914.50

216,474.50

2,310
4,813
572
220
9,317.00

218,757.00

2,750
5,775
572
220
7,914.50

217,354.50

2,310
4,813
572
220
10,340.00

103,323.00

5,500
3,850
440
550
17,732.00

110,110.00

5,500
11,550
132
550
9,845.00

61,320.60

5,500
3,850
440
55
15,730.00

50,050.00

4,565
9,625
1,100
440
20,680.00

71,725.00

11,000
7,700
880
1,100
14,492.50

43,797.50

3,438
9,625
1,100
330
14,025.00

58,080.00

6,875
5,775
660
715
14,025.00

58,080.00

6,875
5,775
660
715
14,492.50

41,783.50

3,438
9,625
1,100
330
6,204.00

3,300
2,310
264
330

41,536.00

3,789.50

16,703.50

413
2,695
352
330
3,982.00

50,864.00

413
2,888
352
330
42,240.00

51,524.00

2,750
38,500
440
550
6,710.00

10,752.50

4,125
1,925
220
440

16,046.25

61,663.25

5,156
8,663
1,650
578

0.00
0.00
0.00
0.00

3,910.50

52,651.50

825
2,695
308
83
3,910.50

46,601.50

825
2,695
308
83
3,910.50

46,601.50

825
2,695
308
83
6,963.00

577,918.00

1,650
4,620
528
165
6,105.00

320,430.00

1,650
3,850
440
165
6,105.00

106,810.00

1,650
3,850
440
165
6,407.50

22,874.50

1,925
3,850
440
193
6,407.50

22,874.50

1,925
3,850
440
193
6,407.50

22,874.50

1,925
3,850
440
193
6,407.50

22,874.50

1,925
3,850
440
193
6,407.50

37,130.50

1,925
3,850
440
193
6,407.50

37,130.50

1,925
3,850
440
193
6,407.50

34,430.50

1,925
3,850
440
193
31,790.00

693,836.00

5,500
23,100
2,640
550
31,790.00

35,594.24

5,500
23,100
2,640
550
31,790.00

82,676.00

5,500
23,100
2,640
550
20,955.00

54,703.00

16,500
3,850
440
165
25,987.50

405,872.50

4,125
19,250
2,200
413
3,685.00

19,756.00

1,375
1,925
220
165
25,327.50

80,904.50

7,425
15,400
1,760
743
19,173.00

62,199.00

4,950
12,320
1,408
495
25,025.00

376,491.00

7,150
15,400
1,760
715
29,540.50

8,525
18,095
2,068

644,036.50

853

138,919.00

1,997,919.00

90,750
39,325
44
8,800
155,925.00

329,675.00

27,500
53,625
66,000
8,800
100,375.00

217,860.00

27,500
53,625
13,200
6,050
73,150.00

725,400.00

27,500
35,750
4,400
5,500
91,437.50

654,587.50

27,500
51,838
6,600
5,500
93,692.50

234,442.50

57,750
26,813
3,080
6,050
175,835.00

409,475.00

49,500
96,525
23,760
6,050
301,950.00

722,234.00

165,000
107,250
13,200
16,500
#VALUE!

#VALUE!

#VALUE!
2,681
33,000
13,750

332,475.00

554,235.00

82,500
160,875
39,600
49,500
2,992.00

1,650

157,103.00

1,073
132
138
4,191.00

158,990.00

2,200
1,430
176
385
7,045.50

122,472.85

3,850
2,503
308
385
19,123.50

10,450
6,793
836
1,045

146,773.25

125,232.25

246,519.98

88,000
36,286
66
880
61,932.75

241,184.00

39,050
16,910
2,068
3,905
97,548.00

59,400
25,740
3,168

375,207.46

5,940
3,300
6,583.50

208,083.50

1,485
3,218
396
1,485
6,583.50

208,083.50

1,485
3,218
396
1,485
6,583.50

208,083.50

1,485
3,218
396
1,485
10,494.00

2,970
6,435
792

211,994.00

297
10,494.00

166,494.00

2,970
6,435
792
297
13,120.25

41,536.92

3,713
8,044
990
374
3,498.00

7,410.98

990
2,145
264
99
3,498.00

990
2,145
264
99

9,644.53

3,498.00

11,937.75

990
2,145
264
99
3,498.00

32,124.95

990
2,145
264
99
5,247.00

36,320.63

1,485
3,218
396
149
3,498.00

990
2,145
264
99

54,648.00

7,873.25

69,636.88

2,228
4,826
594
226
7,873.25

98,238.25

2,228
4,826
594
226
12,952.50

579,452.50

825
10,725
1,320
83
21,587.50

1,375
17,875
2,200
138

510,837.50

4,565.00

37,688.75

275
3,575
440
275
4,565.00

37,565.00

275
3,575
440
275

2,590.50

25,690.50

165
2,145
264
17
47,520.00

542,520.00

17,875
25,025
2,860
1,760
74,208.75

569,208.75

28,875
40,425
4,620
289
79,915.00

794,915.00

28,105
46,200
5,280
330
84,810.00

579,810.00

33,000
46,200
5,280
330
74,206.00

789,206.00

28,875
40,425
4,620
286
36,740.00

2,200
30,800

421,740.00

3,520
220
91,531.00

806,531.00

28,875
57,750
4,620
286
74,206.00

459,206.00

28,875
40,425
4,620
286
24,736.25

167,736.25

9,625
13,475
1,540
96
24,736.25

167,736.25

9,625
13,475
1,540
96
79,761.00

282,161.00

33,000
46,200
528
33
7,067.50

205,012.50

2,750
3,850
440
28
7,067.50

59,812.50

2,750
3,850
440
28

7,067.50

2,750
3,850
440
28

84,012.50

7,067.50

53,762.50

2,750
3,850
440
28
14,135.00

25,995.75

5,500
7,700
880
55
20,693.75

67,141.25

4,125
15,400
1,100
69
17,668.75

84,675.25

1,100
15,400
1,100
69
14,918.75

77,618.75

4,125
9,625
1,100
69
14,918.75

72,668.75

4,125
9,625
1,100
69

27,555.00

247,555.00

1,650
23,100
2,640
165
20,240.00

119,240.00

275
19,250
440
275
19,745.00

151,745.00

138
19,250
220
138
19,621.25

184,621.25

138
19,250
220
14
6,888.75

37,138.75

413
5,775
660
41
4,592.50

275
3,850
440

32,092.50

28
9,680.00

42,680.00

550
7,700
880
550
6,888.75

10,738.75

413
5,775
660
41
6,888.75

45,388.75

413
5,775
660
41
22,962.50

187,962.50

1,375
19,250
2,200
138
9,185.00

31,185.00

550
7,700
880
55
22,962.50

253,962.50

1,375
19,250
2,200
138
4,592.50

169,592.50

275
3,850
440
28
27,555.00

302,555.00

1,650
23,100
2,640
165
11,481.25

688
9,625
1,100
69

38,981.25

6,888.75

85,538.75

413
5,775
660
41
6,888.75

85,538.75

413
5,775
660
41
7,576.25

86,226.25

454
6,353
726
44
11,481.25

114,331.25

688
9,625
1,100
69
6,888.75

103,688.75

413
5,775
660
41
6,888.75

103,688.75

413
5,775
660
41
7,576.25

104,376.25

454
6,353
726
44
6,888.75

152,088.75

413
5,775
660
41
6,888.75

413
5,775
660
41

430,388.75

12,380.50

68,623.80

6,875
4,290
528
688
12,883.75

69,635.80

7,150
4,469
550
715
13,387.00

68,539.50

7,425
4,648
572
743
12,380.50

68,330.30

6,875
4,290
528
688
12,380.50

68,839.05

6,875
4,290
528
688
13,387.00

69,966.00

7,425
4,648
572
743
12,380.50

60,871.00

6,875
4,290
528
688
12,883.75

36,092.95

7,150
4,469
550
715
12,402.50

236,866.60

6,875
4,290
550
688
12,883.75

230,258.35

7,150
4,469
550
715
12,380.50

110,899.00

6,875
4,290
528
688
12,380.50

117,154.98

6,875
4,290
528
688
12,380.50

6,875
4,290

298,496.50

528
688
29,326.00

177,344.50

18,480
8,008
968
1,870
34,826.00

193,444.10

19,250
12,155
1,496
1,925
3,019.50

1,650
1,073
132
165

11,717.00

3,019.50

9,457.65

1,650
1,073
132
165
3,019.50

8,878.50

1,650
1,073
132
165
3,019.50

9,899.30

1,650
1,073
132
165
3,019.50

10,050.10

1,650
1,073
132
165
4,026.00

10,787.00

2,200
1,430
176
220
4,026.00

10,714.95

2,200
1,430
176
220
4,026.00

10,204.00

2,200
1,430
176
220
3,019.50

24,938.50

1,650
1,073
132
165
28,611.00

49,927.30

24,750
3,218
396
248
28,611.00

39,496.00

24,750
3,218
396
248
28,611.00

39,487.75

24,750
3,218
396
248
28,611.00

44,710.00

24,750
3,218
396
248
28,611.00

24,750
3,218

44,446.00

396
248
28,611.00

44,432.80

24,750
3,218
396
248
28,611.00

28,729.80

24,750
3,218
396
248
28,611.00

28,729.80

24,750
3,218
396
248
14,190.00

193,160.20

7,425
5,363
660
743
32,752.50

64,860.50

17,050
12,513
1,540
1,650
6,336.00

15,571.00

2,475
3,218
396
248
6,336.00

41,997.40

2,475
3,218
396
248
6,336.00

11,149.60

2,475
3,218
396
248

5,632.00

21,252.00

2,200
2,860
352
220
32,752.50

17,050
12,513
1,540

94,780.50

1,650
32,752.50

105,285.50

17,050
12,513
1,540
1,650
32,752.50

105,780.50

17,050
12,513
1,540
1,650
32,752.50

17,050
12,513
1,540
1,650

105,780.50

32,752.50

108,255.50

17,050
12,513
1,540
1,650
32,752.50

110,186.00

17,050
12,513
1,540
1,650
32,752.50

122,165.00

17,050
12,513
1,540
1,650
32,752.50

110,186.00

17,050
12,513
1,540
1,650
32,752.50

125,342.50

17,050
12,513
1,540
1,650
32,752.50

209,778.50

17,050
12,513
1,540
1,650
11,968.00

231,418.00

4,675
6,078
748
468
11,968.00

139,018.00

4,675
6,078
748
468
8,448.00

107,778.00

3,300
4,290
528
330
11,968.00

75,493.00

4,675
6,078
748
468
33,715.00

277,915.00

17,875
12,513
1,540
1,788

38,775.00

95,940.00

17,050
17,875
2,200
1,650
38,775.00

105,070.00

17,050
17,875
2,200
1,650
36,217.50

102,416.25

16,500
16,088
1,980
1,650
36,217.50

113,553.75

16,500
16,088
1,980
1,650
36,217.50

112,797.50

16,500
16,088
1,980
1,650
36,217.50

16,500
16,088
1,980
1,650

112,797.50

36,217.50

822,297.50

16,500
16,088
1,980
1,650
36,217.50

767,297.50

16,500
16,088
1,980
1,650
36,217.50

244,797.50

16,500
16,088
1,980
1,650
36,217.50

225,547.50

16,500
16,088
1,980
1,650
23,705.00

136,035.00

16,500
3,575
1,980
1,650
23,168.75

231,748.75

16,500
4,469
550
1,650
47,822.50

19,800
23,238
2,860

214,721.50

1,925

32,752.50

139,811.50

17,050
12,513
1,540
1,650
32,752.50

341,952.50

17,050
12,513
1,540
1,650
32,752.50

145,602.50

17,050
12,513
1,540
1,650
10,560.00

154,605.00

4,125
5,363
660
413
10,560.00

142,450.00

4,125
5,363
660
413
10,560.00

118,140.00

4,125
5,363
660
413
10,560.00

136,372.50

4,125
5,363
660
413
27,918.00

20,625

51,106.00

6,078
748
468
8,448.00

100,848.00

3,300
4,290
528
330
8,448.00

162,448.00

3,300
4,290
528
330
8,778.00

76,483.00

3,300
4,620
528
330

4,262.50

4,125

138

4,620.00

4,262.50

4,455.00

4,125

138
4,262.50

4,455.00

4,125

138
4,262.50

4,455.00

4,125

138
159,500.00

737,000.00

44,000
52,800
35,200
27,500
2,733.50

5,197.50

1,100
1,320
176
138
4,867.50

11,951.50

1,925
2,475
330
138
2,623.50

17,913.50

1,925
297
264
138
5,703.50

23,468.50

1,925
3,465
176
138
5,703.50

23,468.50

1,925
3,465
176
138
6,088.50

14,008.50

1,100
2,079
2,772
138
6,088.50

55,599.50

1,100
2,079
2,772
138
3,080.00

8,470.00

2,750

330
10,521.50

17,418.50

4,400
5,280
704
138
3,043.70

9,555.70

550
2,079
277
138
4,299.90

4,125
33
4
138

9,601.90

1,424.50

4,658.50

1,100
165
22
138
7,375.50

55,335.50

550
6,600
88
138
8,580.00

10,307.00

550
6,600
880
550
15,702.50

6,875
7,425
990
413

20,399.50

1,765.50

9,289.50

165
198
990
413
3,003.00

7,953.00

165
1,980
528
330
64,350.00

68,486.00

13,750
26,400
13,200
11,000
53,900.00

11,000
23,100

57,200.00

8,800
11,000

DAFTAR BESI (BAJA) POLOS BETON


Diameter
(mm)
4.5
5
5.5
6
6.5
6.8
7
8
8.5
9
10
12
13
14
15
16
18
19
20
22
25
26
28
30
32

Luas Tampang
(cm2)
0.16
0.20
0.24
0.28
0.33
0.36
0.38
0.50
0.57
0.64
0.79
1.13
1.33
1.54
1.77
2.01
2.54
2.83
3.14
3.80
4.91
5.31
6.15
7.07
8.04

Berat
(kg/m')
0.125
0.154
0.186
0.222
0.260
0.285
0.302
0.394
0.445
0.499
0.616
0.887
1.041
1.208
1.387
1.578
1.997
2.225
2.465
2.983
3.851
4.166
4.831
5.546
6.310

Diameter
(mm)
34
35
36
38
40
42
44
46
48
48.5
50
55
60
65
70
75
80
85
90
95
100
110
120
130
140

Luas Tampang
(cm2)
9.07
9.62
10.17
11.34
12.56
13.85
15.20
16.61
18.09
18.47
19.63
23.75
28.26
33.17
38.47
44.16
50.24
56.72
63.59
70.85
78.50
94.99
113.04
132.67
153.86

Berat
(kg/m')
7.124
7.549
7.986
8.898
9.860
10.870
11.930
13.039
14.198
14.495
15.406
18.641
22.184
26.036
30.195
34.663
39.438
44.522
49.914
55.614
61.623
74.563
88.736
104.142
120.780

7850 43.4253758

VOLUME PEKERJAAN STRUKTUR


1 PONDASI
Panjang

35.5 M

Lantai keramik 40 x 40

II

20

Galian Tanah
0.8
x
Timbunan Pasir Alas Pondasi
0.8
x

Dinding 1/2 Bata

Slope 15/20

Pas. Batu Kosong


0.8
x

Pondasi Batu Kali


0.5
+

13

Urugan Tanah
40
Pondasi Patu Kali

Pasangan Batu Kosong

10
10

Timbunan Pasir Alas Pondasi

20
50
65
80

2 SLOPE
Panjang

Tombunan Tanah Kembali

35.5 M
1 Slope
Pek. Beton Slop
0.15
x

15

20

3 KOLOM
Tinggi
Jumlah

4M
20 Bh

15
15

Pek. Beton Kolom


0.15
x

15

4 TIMBUNAN TANAH BAWAH LANTAI


Tebal
0.4 M
1 Pek. Timbunan Tanah Teras
Panjang
Lebar

600
300

150

150

150
300

325
800

500
325

228

145

228

5 RABAT ALAS LANTAI


Tebal
0.05 M
1 Pek. Rabat Teras
Panjang
Lebar

600
300

150

150

150
300

325
800

500
325

228

145

228

6 PASANGAN KERAMIL LANTAI 40x40


Tebal
0M
1 Pek. Keramik Teras
Panjang
Lebar

600
300

150

150

150
300

325
800

600
300

150

150

150
300

325
800

500
325

228

145

228

6 PASANGAN DINDING
1 Pek. Pasangan Batu bata
Kantor dan Kamar Mandi
Panjang
Tinggi

Lantai keramik 40 x 40

Dinding 1/2 Bata

Slope 15/20
20

13

Urugan Tanah
40
Pondasi Patu Kali

10
10

2 Luas Pasangan Jendela


jendela jungkit
Jendela Teralis
Pintu 1 daun
Pintu 2 daun
pintu wc

Pasangan Batu Kosong

Luas Pintu 1 Daun


20
Tinggi
=
50
65
Lebar
=
80
=
Luas Pintu 2 Daun
Tinggi
=
Lebar
=
=
Luas Pintu Wc
Tinggi
=
Lebar
=
=

6 BETON RING BALOK

Timbunan Pasir Alas Pondasi

2.2
0.9
1.98

M
M
M^2

2.2
1.3
2.86

M
M
M^2

2.2
0.7
3.08

M
M
M^2

Luas Jendela Jungkit


Tinggi
Lebar
Luas Jendela Teralis
Tinggi
Lebar

Total Luas Jendela dan Pintu


Total Luasan Dinding

1 Pek. Ring Balok


Panjang
Tinggi
Lebar

10
15

7 ATAP

Tiang bubungan 5/12


Balok Nok 5/12
Balok Skoor 2 x 5/10
Balok Tarik 5/20

93

431
80

Ring balok 10/15

190

Atap seng
Balok reng 5/10

80

Balok Tarik

129

80

132

Les Plank

83
21

98

1 Pek. Kuda-kuda blk 5/10


Batang Tarik
Skor Angin miring
skor Angin Tegak
Tiang Bubungan
skor angin tiang bubungan
Kuda-kuda
Jumlah

66

Dibulatkan
720

Rangka Plafond 4/6


Plafond gipsun
963
823
675
533
388
240

190

2 Pek. Balok Reng 5/10


Balok Tampak Sam. Kanan
Balok Tampak Sam. Kiri
Balok Tampak Depan
Balok Tampak Belakang
Blk Saluran dan Bubungan
Jumlah

Dibulatkan
Rangka Plafond 4/6
Plafond gipsun

190

Rangka Plafond 4/6


Plafond gipsun

2 Luas Atap
Tam. Sam Kanan kiri
Tam. Sam depan belakang
Jumlah

7 PINTU DAN JENDELA

1 Pek. Kusen Pintu dan Daun Pintu 2 d


Daun Pintu Utama
Kusen Pintu Utama
Pek. Kusen Pintu dan Daun Pintu
2 Daun Pintu Kantor
Kusen Pintu Kantor
3 Pek. Kusen Jendela Jungkit
Daun Jendela Kaca
Kusen Jendela 2 mata
4 Pek. Kusen Jendela Teralis
Teralis Jendela
Kusen Jendela 2 mata

135
5

60

60

65

5
5
8

65

120

215

210

8
5
5

44

90
80

44

8 5

5
5

70
60

5
5

135
5

60

60

5
5

210

5 Pek. Kusen Pintu dan Daun Pintu Km


Teralis Jendela
Kusen Jendela 2 mata

210

110 120

PEMBESIAN
1 PEMBESIAN SLOPE
Panjang
35.5 M

10

15

Besi tulangan Utama D 12


Tulangan Pokok

Tulangan Sengkang D 8
Panjang/Sengkang
Panjang Total

Tul. Pokok 4 - 12
Sengkang 8 - 15

20

15
2 PEMBESIAN KOLOM
Jumlah
15 Buah
Tinggi
4M

Tul. Pokok 4 - 12
Sengkang 8 - 15

15

3 PEMBESIAN Ring Balok


Panjang
35.5 M

2.5

Besi tulangan Utama D 12


Tulangan Pokok

Tulangan Sengkang D 8
Panjang/Sengkang
Panjang Total

Besi tulangan Utama D 12


Tulangan Pokok

Tulangan Sengkang D 8
Panjang/Sengkang
Panjang Total

2.5
Tul. Pokok 4 - 12

15

Sengkang 8 - 15

10

PEKERJAAN PLAFON
Balok 4/6
1 Luas Plafon
Panjang
Lebar

600
300

150

150

150
300

325
800

500
325

228

145

228

2 Kebutuhan Rangka
Jarak Rangka
Melintang

325
800

500
325

228

145

228

Jarak Rangka
Memanjang

Total Plafon Gipsun


Ukuran
P
L

Total Balok Rangka Plafon

0.4 =
0.32
= 11.36 M^3
bunan Pasir Alas Pondasi
0.1 =
0.08
=
2.84 M^3
Batu Kosong
0.1 =
0.08
=
2.84 M^3

dasi Batu Kali


0.2
2

=
=
bunan Tanah Kembali
=

0.4
0.29
10.295 M^3
2.84

M^3

Beton Slop
0.2 =
=

0.03
1.065 M^3

0.2 =
=

0.0225
1.8 M^3

Beton Kolom

mbunan Tanah Teras


=
=
=

6.0 M
8.0 M
19.2 M^3

bat Teras
=
=
=

6.0 M
8.0 M
2.4 M^3

=
=
=

6.0 M
8.0 M
48
M^2

amik Teras

angan Batu bata


dan Kamar Mandi
=
35.5 M
=
3.5 M
= 124.25 M^2

angan Jendela
=
=
=
=
=

7
0
1
1
2

Bh
Bh
Bh
Bh
Bh

dela Jungkit
=
=
=

1.2 M
1.35 M
11.34 M^2

dela Teralis

endela dan Pintu

=
=
=

=
=

1.2
1.35
0

M
M
M^2

19.26 M^2
104.99 M^2

=
=
=
=

da-kuda blk 5/10

n tiang bubungan

=
=
=
=
=
=
=
=
=

2.00 Buah
7.20 M
3.28 M
9.00 M
1.90 M
2.58 M
8.62 M
32.58 M
0.16 M3
8.15 Batang
9
Batang

=
=
=
=
=
=
=
=
=

36.2 M
36.2 M
24.33 M
24.33 M
17.24 M
138.3 M
0.6917 M^3
34.585 Batang
35
Batang

Dibulatkan

ok Reng 5/10
mpak Sam. Kanan
mpak Sam. Kiri
mpak Depan
mpak Belakang
an dan Bubungan

Dibulatkan

35.50 M
0.15 M
0.10 m
0.53 M^3

m Kanan kiri
m depan belakang

=
=

51.72 M^2
31.032 M^2
82.752 M^2

n Pintu dan Daun Pintu 2 daun


=
2
tu Utama
=
1
n Pintu dan Daun Pintu
=
1
tu Kantor
=
1
n Jendela Jungkit
dela Kaca
=
14
dela 2 mata
=
7
n Jendela Teralis
=
0
dela 2 mata
=
0

n Pintu dan Daun Pintu KmM


=
2
dela 2 mata
=
2

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Bh
Bh

ngan Utama D 12

Sengkang D 8

4
142
11.833
31

Bh
M
Batang
Batang

=
=
=
=

236.67
0.55
130.17
10.847
11

Buah
M
M
Batang
Batang

ngan Utama D 12

Sengkang D 8

4
16
240
20
27
400
0.45
180
15

Bh
M
M
Batang
Batang
Buah
Buah
M
Batang

4
142
11.833
12

Bh
M
Batang
Batang

=
=
=
=

236.67
0.35
82.833
6.9028
7

Buah
M
M
Batang
Batang

=
=
=

6
8
48

M
M
M^2

=
=

1
8

M
Buah

=
=
=
=

ngan Utama D 12

Sengkang D 8

n Rangka

=
=

48
12

M
Batang

=
=
=
=

1
6
48
12

M
Buah
M
Batang

=
=
=
=
=
=

1.22
2.44
2.9768
16.125
17
24

M
M
M
Lembar
Lembar

on Gipsun

k Rangka Plafon

1 Pekerjaan Persiapan
Pembuatan dan Pemasangan Papan Proyek
Dokumentasi
2 Pekerjaan Tanah
Galian Tanah Pondasi
Timbunan Tanah Kembali
Timnunan tanah alas lantai

1
2

11.36
2.84
19.2

3 Pekerjaan Pondasi
Pas. Batu Kosong
Pondasi Batu Kali

2.84
10.295

4 Pekerjaan Dinding
Pasangan 1/2 Bata

104.99

5 Pekerjaan Plesteran dan Acian


Plesteran Dinding
Acian Dinding

209.98
209.98

6 Pekerjaan Kayu
Pasangan Pintu Dan jendela
Pintu 2 Daun
Pintu 1 Daun
Pintu Km
Jendela Jungkit 2 Daun
Jendela Teralis

1
3
1
2
0

7 Pekerjaan Beton
Slope
Kolom
Ring Balk

1.065
1.8
0.53

8 Pekerjaan Penutup
Pasangan Atap

82.752

9 Pekerjaan Langit Langit


Plafon
10 Pekerjaan Sanitasi
Memasang Kloset
11 Perjaan kaca dan kunci

48.00

12 Pasangan Penutup Lantai dan Dinding


Lantai Keramik
Dinding Keramik
13 Pekerjaan Pengecetan
Pengecatan dinding
Pengecatan bidang kayu

48
7.56

209.98

No
BAHAN
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
20
21
22

ALAT
1
2
3

Jenis

Satuan

Timbunan pilihan
Sirtu
Batu gunung
Kerikil
Batu Pecah 2-3 cm
Pasir Pasang
Pasir urug
Kayu/Papan Kls III
Besi 8 sigma
Besi 10 sigma
Besi 12 sigma
Besi 14 sigma
Besi ulir 16 sigma
Besi ulir 19 sigma
Besi ulir sigma
Besi ulir sigma
Pipa galvanis ~ 6 m
Semen PCc 50 kg
Semen Warna
Paku
Kawat Beton
Batu Merah
Seng Gelombang
Balok 4/6
Balok 5/10
Tripleks 3 mm
Besi Strip
Kloset Jingkok
Tegel/keramik
Plamir
Cat Dasar
Cat Pinilek

m3
m3
m3
m3
m3
m3
m3
m3
batang
batang
batang
batang
batang
batang
batang
batang
batang
zak
Kg
Kg
Kg
Kg

Concrete Mixer
Gerobak
Ember cor

LS
Buah
Buah

M^3
M^3
Kg
bh
Dos
Zak
Kg

Harga
Standar
Kabupaten

4
5
6
UPAH
1
2
3
4

Sekop
cangkul
sendok semen

Buah
Buah
Buah

Pekerja
Tukang
Kepala Tukang
Mandor

OH
OH

Harga Survey TPK


100,000
150,000
170,000
450,000
450,000
175,000
80,000
2,100,000
54,000
69,000
100,000
165,000
179,000
253,600
338,700
439,900
234,000
77,000
1,500
30,000
30,000
400
9,000
2,000,000
2,500,000
69,000
3,000
300,000
85,000
65,000
30,000
38,000

200,000
400,000
12,000

63000
0.0096 104.1667
0.02
50

2600
950000

19,200
50,000

75,000
75,000
35,000
70,000
90,000
100,000
100,000

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

Pekerjaan Persiapan
Sinjai
Sinjai Barat
2016

No

Uraian Pekerjaan

(a)

(b)
1 Pekerjaan Persiapan
a
Bahan
Papan Nama Kegiatan
Administrasi Dan Dokumentasi

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

1.00 Ls
1.00 Ls

I-a
I-a

0.00 Oh
0.00 Oh
0.00 Oh
0.00 Oh

III-a
III-a
III-a
III-a

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

Pekerjaan Tanah (Galian Tanah Pondasi)


Sinjai
Sinjai Barat
2016

No

Uraian Pekerjaan

(a)
(b)
1. Pek. Galian Tanah
a
Bahan
Batu Belah/Koral Beton
Pasir
Semen 50 Kg
b

Tenaga
Pekerja
Tukang

Volume
Total
(c)

Satuan
(d)

0.00 M^3
0.00 M^3
0.00 Zak

4.54 Oh
0.00 Oh

Kategori
Biaya
(e)

I-a
I-a
I-b

III-a
III-a

Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

0.00 Oh
0.45 Oh

III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

No

Pekerjaan Tanah (Timbunan Tanah Kembali)


Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Timbunan Kembali
a
Bahan
Batu Belah/Koral Beton
Pasir
Semen 50 Kg
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Volume
Total
(c)

Satuan
(d)

0.00 M^3
0.00 M^3
0.00 Zak

0.55 Oh
0.00 Oh
0.00 Oh
0.05 Oh

Kategori
Biaya
(e)

I-a
I-a
I-b

III-a
III-a
III-a
III-a

Mengetahui
Kepala Desa

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA
No

:
:
:
:
:

Pekerjaan Tanah (Timbunan Tanah Alas Lantai)


Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Timbunan Tanah Alas Lantai
a
Bahan
Batu Belah/Koral Beton
Pasir
Semen 50 Kg

Volume
Total
(c)

Satuan
(d)

0.00 M^3
0.00 M^3
0.00 Zak

Kategori
Biaya
(e)

I-a
I-a
I-b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

3.69 Oh
0.00 Oh
0.00 Oh
0.36 Oh

III-a
III-a
III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

No

Pekerjaan Pondasi
Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Pasangan Batu Kosong
a
Bahan
Batu Belah/Koral Beton
Pasir Urug
Semen 50 Kg
b

Volume
Total
(c)

Satuan
(d)

0.00 M^3
1.23 M^3
0.00 Zak

Kategori
Biaya
(e)

I-a
I-a
I-b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2.22 Oh
1.11 Oh
0.11 Oh
0.11 Oh

III-a
III-a
III-a
III-a

2 Pek. Pondasi Batu Kali 1 Pc : 5 Ps


a
Bahan
Batu Belah 15 / 20
Semen Portland
Pasir Pasang

11.32 M^3
28.00 Zak
5.60 M^3

I-a
I-a
I-b

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

15.44 Oh
6.18 Oh
0.62 Oh
0.77 Oh

III-a
III-a
III-a
III-a

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA
No

:
:
:
:
:

Pekerjaan Dinding
Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Pasangan Bata Merah 1Pc : 5Ps
a
Bahan
Bata merah kelas I

Volume
Total
(c)

Satuan

7349.30 Bh

(d)

Kategori
Biaya
(e)

I-a

Semen Portland
Pasir Pasang

30.17 Zak
4.20 M^3

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

33.60 Oh
10.50 Oh
1.05 Oh
1.57 Oh

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

I-a
I-b

III-a
III-a
III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

No

Pekerjaan Plesteran dan Acian Dinding


Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Plesteran Dinding 1Pc : 5Ps
a
Bahan
Semen Portland
Pasir Pasang
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2 Pek. Acian Dinding


a
Bahan
Semen Portlan
b

Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor

Volume
Total
(c)

Satuan
(d)

18.14 Zak
4.62 M^3

Kategori
Biaya
(e)

I-b
I-a

42.00 Oh
31.50 Oh
3.15 Oh
2.10 Oh

III-a
III-a
III-a
III-a

13.65 Zak

I-b

42.00 Oh
21.00 Oh
2.10 Oh
2.10 Oh

III-a
III-a
III-a
III-a

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

Pekerjaan Pintu dan Jendela


Sinjai
Sinjai Barat
2016

No

Uraian Pekerjaan

(a)

(b)

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

1.

Pek. Pintu
a
Bahan
Pintu 2 Daun
Pintu 1 Daun
Pintu Kamar Mandi
2 Pek. Jendela
a
Bahan
Jendela Jungkit 2 Daun
Jendela Teralis 2 Mata

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

1.00 Bh
3.00 Bh
1.00 Bh

I-a
I-a
I-a

2 Bh
0 Bh

I-a
I-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

Pekerjaan Beton
Sinjai
Sinjai Barat
2016

No

Uraian Pekerjaan

(a)
1. Pek. Slope
a
Bahan
Semen Portland
Pasir Beton
Koral Beton
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2 Pek. Kolom
a
Bahan
Semen Portland
Pasir Beton
Koral Beton
b

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

3 Pek. Ring Balok


a
Bahan
Semen Portland
Pasir Beton
Koral Beton
b

Tenaga
Perkerja

(b)

Volume
Total
(c)

Satuan
(d)

4.94 Zak
0.55 M^3
0.83 M^3

1.76 Oh
0.27 Oh
0.03 Oh
0.09 Oh

8.35 Zak
0.94 M^3
1.40 M^3

2.97 Oh
0.45 Oh
0.05 Oh
0.14 Oh

2.47 Zak
0.28 M^3
0.42 M^3

0.88 Oh

Kategori
Biaya
(e)

I-b
I-a
I-a

III-a
III-a
III-a
III-a

I-a
I-a
I-b

III-a
III-a
III-a
III-a

I-a
I-a
I-b

III-a

Tukang Batu
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan
Mengetahui
Kepala Desa

( ..)

0.13 Oh
0.01 Oh
0.04 Oh

III-a
III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

No

Atap dan Rangka Atap


Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Penutup (Atap)
a
Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa " - 1"
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2 Pek. Memasang Kuda-kuda


a
Bahan
Kayu bangkirei, balok
Paku biasa 2" - 5"
Besi strip
b

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3 Pek. Gording
a
Bahan
Kayu bangkirei, balok
Paku biasa 2" - 5"
Besi strip
b

Tenaga
Pekerja
Tukang Kayu

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

57.93 Lbr
1.66 Kg

I-b
I-b

9.93 Oh
4.97 Oh
0.50 Oh
0.50 Oh

III-a
III-a
III-a
III-a

9.90 Batang
1.11 Kg
2.97 Kg

I-a
I-b
I-b

0.79 Oh
2.38 Oh
0.24 Oh
0.04 Oh

III-a
III-a
III-a
III-a

38.50 Btg
2.31 Kg
11.55 Kg

I-a
I-b
I-b

1.85 Oh
5.54 Oh

III-a
III-a

Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

0.55 Oh
0.09 Oh

III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

No

Rangka Plafond Dan Plafond


Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(a)
(b)
1. Pek. Rangka Plafond
a
Bahan
Kayu meranti, balok
Paku biasa 2" - 5"
b

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

2 Pek. Plafond Tripleks 3 mm


a
Bahan
Tripleks
Paku kecil
b

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri

Volume
Total
(c)

Satuan
(d)

24.00 Batang
2.88 Kg

7.20 Oh
12.00 Oh
1.20 Oh
3.60 Oh

Kategori
Biaya
(e)

I-a
I-b

III-a
III-a
III-a
III-a

18 Lbr
1.44 Kg

I-b
I-b

4.80 Oh
4.80 Oh
0.48 Oh
0.24 Oh

III-a
III-a
III-a
III-a

II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

Sanitasi
Sinjai
Sinjai Barat
2016

No

Uraian Pekerjaan

(a)
(b)
1. Pek. Pemasangan Kloset Jongkok
a
Bahan
Kloset Jongkok Porselen
Semen Portland
Pasir Pasang
b

Tenaga

Volume
Total
(c)

Satuan

2.00 Bh
12.00 Bh
0.02 Bh

(d)

Kategori
Biaya
(e)

I-b
I-b
I-a

Perkerja
Tukang Batu
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

2 Oh
3 Oh
3 Oh
0.32 Oh

III-a
III-a
III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

No
(a)

Pemasangan Penutup Lantai Dan Dinding


Sinjai
Sinjai Barat
2016
Uraian Pekerjaan

(b)
1 Pek. Pasangan Lantai Keramik 40 x 40 cm
a
Bahan
Ubin Warna 40 x 40 cm
Semen Portland
Pasir Pasang
Semen Warna
b

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

2 Pek. Dinding Keramik 20 x 20 cm Warna


a
Bahan
Keramik 20 x 20 cm
Semen Abu -abu
Pasir Pasang
Semen Warna
b

Catatan :

Tenaga
Perkerja
Tukang Batu
Kepala Tukang
Mandor

Volume
Total
(c)

Satuan
(d)

50.92 Dos
7.83 Zak
1.10 M^3
43.20 Kg

12.00 Oh
5.76 Oh
0.58 Oh
0.60 Oh

Kategori
Biaya
(e)

I-b
I-b
I-a
I-b

III-a
III-a
III-a
III-a

15.12 Dos
5.62 Zak
0.27 M^3
22.68 Kg

I-b
I-b
I-a
I-b

9.07 Oh
1.51 Oh
0.68 Oh
0.45 Oh

III-a
III-a
III-a
III-a

I-a
I-b

Kategori Biaya
Pembelian bahan hasil tenaga manusia
Pembelian bahan hasil industri

II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa

Pembesian
:
:
:

No
1.

Uraian Pekerjaan

(a)
(b)
1. Pek. Pembesian Slope, Kolom Dan Balok
a
Bahan
Besi dia. 25 - 12
Besi dia. 12 - 12
Besi dia. 8 - 12
Kawat Beton
b

Tenaga

Volume
Total
(c)

Satuan
(d)

0.00 Btg
65.22 Btg
13.67 Btg
14.20 Kg

Kategori
Biaya
(e)

I-b
I-b
I-b
I-b

Pekerja
Tukang Besi
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui
Kepala Desa

( ..)

6.63 Oh
6.63 Oh
0.66 Oh
0.28 Oh

III-a
III-a
III-a
III-a

RENCANA ANGGARAN BIAYA (RAB)


Pekerjaan
Kabupaten
Kecamatan
Desa
TA

:
:
:
:
:

Pengecetan
Sinjai
Sinjai Barat
2016

No
(a)

Uraian Pekerjaan
(b)
1 Pek.Pengecetan Dinding Baru
a
Bahan
Plamir
Cat Dasar
Cat Tembok vinilex
b

Tenaga
Perkerja
Tukang Cat
Kepala Tukang
Mandor

Catatan :
Kategori Biaya
I-a
Pembelian bahan hasil tenaga manusia
I-b
Pembelian bahan hasil industri
II-a
II-b

Pembelian alat tangan


Pembelian / penyewaan alat mesin

III-a
III-b

Pembayaran tenaga kerja untuk konstruksi


Pembayaran tenaga untuk pengumpulan bahan

Mengetahui

Volume
Total
(c)

Satuan
(d)

Kategori
Biaya
(e)

0.84 Zak
21.00 Kg
54.59 Kg

I-b
I-b
I-b

4.20 Oh
13.23 Oh
1.32 Oh
0.52 Oh

III-a
III-a
III-a
III-a

Kepala Desa

( ..)

Rp
Rp

Harga Satuan

Jumlah Harga

(f)

(g)

350,000.00
1,650,000.00

Rp
Rp

350,000.00
1,650,000.00

Jumlah

Rp

2,000,000.00

Jumlah

Rp
Rp
Rp
Rp
Rp
Rp

2,000,000.00

Rp
Rp
Rp
Rp
Jumlah a + b

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume

11.36

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp

Jumlah

Rp
Rp
Rp
Rp

Rp
Rp

70,000.00
90,000.00

Rp
Rp

318,080.00
-

Rp
Rp

100,000.00
100,000.00
Jumlah

Jumlah a + b

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Rp
Rp
Rp
Rp

45,440.00
363,520.00
363,520.00

Volume

2.84

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp

Jumlah

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah

Rp
Rp
Rp
Rp
Rp
Rp

Jumlah a + b

Sinjai April 2016

38,169.60
5,396.00
43,565.60
43,565.60

Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume

Rp
Rp
Rp

19.20

Harga Satuan

Jumlah Harga

(f)

(g)

Jumlah

Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah

Jumlah a + b

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Rp
Rp
Rp
Rp
Rp
Rp

258,048.00
36,480.00
294,528.00
294,528.00

Volume :

1
2

2.84
10.30

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp

80,000.00
77,000.00
Jumlah

Rp
Rp
Rp
Rp

98,150.40
98,150.40

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1

Rp
Rp
Rp
Rp
Rp
Rp

155,064.00
99,684.00
11,076.00
11,076.00
276,900.00
375,050.40

Rp
Rp
Rp

170,000.00
77,000.00
175,000.00
Jumlah

Rp
Rp
Rp
Rp

1,925,165.00
2,156,184.80
980,084.00
5,061,433.80

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah

Rp
Rp
Rp
Rp
Rp

1,080,975.00
555,930.00
61,770.00
77,212.50
1,775,887.50

Jumlah 2
Jumlah 1 + 2

Rp
Rp

6,837,321.30
7,212,371.70

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume :

Rp

104.99

Harga Satuan

Jumlah Harga

(f)

(g)

400.00

Rp

2,939,720.00

Rp
Rp

77,000.00
175,000.00
Jumlah

Rp
Rp
Rp

2,323,407.70
734,930.00
5,998,057.70

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Rp
Rp
Rp
Rp
Rp
Rp

2,351,776.00
944,910.00
104,990.00
157,485.00
3,559,161.00
9,557,218.70

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume :

1
2

209.98
209.98

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp

77,000.00
175,000.00
Jumlah

Rp
Rp
Rp

1,396,954.94
808,423.00
2,205,377.94

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1

Rp
Rp
Rp
Rp
Rp
Rp

2,939,720.00
2,834,730.00
314,970.00
209,980.00
6,299,400.00
8,504,777.94

Rp

77,000.00
Jumlah

Rp
Rp

1,050,949.90
1,050,949.90

70,000.00
90,000.00
100,000.00
100,000.00

Rp
Rp
Rp
Rp
Rp

2,939,720.00
1,889,820.00
209,980.00
209,980.00
5,249,500.00

Rp
Rp
Rp
Rp
Jumlah

Jumlah 2
Jumlah 1 + 2

Rp
Rp

6,300,449.90
14,805,227.84

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume :

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp

2,000,000.00
1,500,000.00
800,000.00
Jumlah 1

Rp
Rp
Rp
Rp

2,000,000.00
4,500,000.00
800,000.00
7,300,000.00

Rp
Rp

1,000,000.00
1,200,000.00
Jumlah 2
Jumlah 1 + 2

Rp
Rp
Rp
Rp

2,000,000.00
2,000,000.00
9,300,000.00

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume :

1.
2.
3.

1.07
1.80
0.53

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp

77,000.00
175,000.00
450,000.00
Jumlah

Rp
Rp
Rp
Rp

380,503.20
96,915.00
373,815.00
851,233.20

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1

Rp
Rp
Rp
Rp
Rp
Rp

123,007.50
23,962.50
2,662.50
8,520.00
158,152.50
1,009,385.70

Rp
Rp
Rp

77,000.00
175,000.00
450,000.00
Jumlah

Rp
Rp
Rp
Rp

643,104.00
163,800.00
631,800.00
1,438,704.00

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 2

Rp
Rp
Rp
Rp
Rp
Rp

207,900.00
40,500.00
4,500.00
14,400.00
267,300.00
1,706,004.00

Rp
Rp
Rp

77,000.00
175,000.00
450,000.00
Jumlah

Rp
Rp
Rp
Rp

190,251.60
48,457.50
186,907.50
425,616.60

Rp

70,000.00

Rp

61,503.75

Rp
Rp
Rp

90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 3
Jumlah 1 + 2 + 3

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Rp
Rp
Rp
Rp
Rp
Rp

11,981.25
1,331.25
4,260.00
79,076.25
504,692.85
3,220,082.55

Volume :

1.
2.
3.

82.75
9.00
35.00

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp

63,000.00
30,000.00
Jumlah

Rp
Rp
Rp

3,649,363.20
49,651.20
3,699,014.40

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1

Rp
Rp
Rp
Rp
Rp
Rp

695,116.80
446,860.80
49,651.20
49,651.20
1,241,280.00
4,940,294.40

Rp
Rp
Rp

50,000.00
30,000.00
3,000.00
Jumlah

Rp
Rp
Rp
Rp

495,000.00
33,264.00
8,910.00
537,174.00

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 2

Rp
Rp
Rp
Rp
Rp
Rp

55,440.00
213,840.00
23,760.00
3,960.00
297,000.00
834,174.00

Rp
Rp
Rp

50,000.00
30,000.00
3,000.00
Jumlah

Rp
Rp
Rp
Rp

1,925,000.00
69,300.00
34,650.00
2,028,950.00

Rp
Rp

70,000.00
90,000.00

Rp
Rp

129,360.00
498,960.00

Rp
Rp

100,000.00
100,000.00
Jumlah
Jumlah 3
Jumlah 1 + 2 + 3

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Rp
Rp
Rp
Rp
Rp

55,440.00
9,240.00
693,000.00
2,721,950.00
8,496,418.40

Volume :

1
2

24.00
48.00

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp

Rp
Rp
Rp
Rp
Jumlah

Rp
Rp

Rp
Rp
Rp
Rp
Jumlah

19,200.00
30,000.00
Jumlah

Rp
Rp
Rp

460,800.00
86,400.00
547,200.00

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah 1

Rp
Rp
Rp
Rp
Rp
Rp

504,000.00
1,080,000.00
120,000.00
360,000.00
2,064,000.00
2,611,200.00

69,000.00
30,000.00
Jumlah

Rp
Rp
Rp

1,242,000.00
43,200.00
1,285,200.00

70,000.00
90,000.00
100,000.00
100,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

336,000.00
432,000.00
48,000.00
24,000.00
840,000.00
2,125,200.00
4,736,400.00

Jumlah 2
Jumlah 1 + 2

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Volume :

Rp
Rp
Rp

2.00

Harga Satuan

Jumlah Harga

(f)

(g)

300,000.00
77,000.00
175,000.00
Jumlah a

Rp
Rp
Rp
Rp

600,000.00
924,000.00
3,500.00
1,527,500.00

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah b
Jumlah 1 + 2

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Rp
Rp
Rp
Rp
Rp
Rp

140,000.00
270,000.00
300,000.00
32,000.00
742,000.00
2,269,500.00

Volume :

1.
2.
3.

48.00
15.12
0.00

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp
Rp

85,000.00
77,000.00
175,000.00
1,500.00
Jumlah

Rp
Rp
Rp
Rp
Rp

4,328,064.00
603,187.20
193,200.00
64,800.00
5,189,251.20

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 1

Rp
Rp
Rp
Rp
Rp
Rp

840,000.00
518,400.00
57,600.00
60,000.00
1,476,000.00
6,665,251.20

Rp
Rp
Rp
Rp

85,000.00
77,000.00
175,000.00
1,500.00
Jumlah

Rp
Rp
Rp
Rp
Rp

1,285,200.00
433,097.28
47,628.00
34,020.00
1,799,945.28

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah 2
Jumlah 1 + 2

Rp
Rp
Rp
Rp
Rp
Rp
Rp

635,040.00
136,080.00
68,040.00
45,360.00
884,520.00
2,684,465.28
9,349,716.48

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Jenis Kegiatan
Jumlah

:
Dia 12mm :
Dia 8 mm :

Rp
Rp
Rp
Rp

Penulangan
70
33

Harga Satuan

Jumlah Harga

(f)

(g)

100,000.00
54,000.00
30,000.00
Jumlah

Rp
Rp
Rp
Rp
Rp

6,522,125.40
737,931.90
425,987.96
7,686,045.26

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Sinjai April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

Rp
Rp
Rp
Rp
Rp
Rp

463,853.56
596,383.15
66,264.79
28,399.20
1,154,900.70
8,840,945.96

Volume :

1.

209.98

Harga Satuan

Jumlah Harga

(f)

(g)

Rp
Rp
Rp

65,000.00
30,000.00
38,000.00
Jumlah

Rp
Rp
Rp
Rp

54,594.80
629,940.00
2,074,602.40
2,759,137.20

Rp
Rp
Rp
Rp

70,000.00
90,000.00
100,000.00
100,000.00
Jumlah
Jumlah a + b

Rp
Rp
Rp
Rp
Rp
Rp

293,972.00
1,190,586.60
132,287.40
52,495.00
1,669,341.00
4,428,478.20

Sinjai April 2016


Dibuat Oleh

Tim Penyusun RKP

( ..)

REKAPITULASI ANGGARAN BIAYA


Pekerjaan
Kabupaten
Kecamatan
Desa
Tahun Anggaran
No
(a)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

:
:
:
:
:

RUANG KELAS PENDIDIKAN ANAK USIA DINI (PAUD)


Sinjai
Sinjai Barat
2016
Jenis Pekerjaan
(b)

Pekerjaan Persiapan
Pekerjaan Tanah (Galian Tanah Pondasi)
Pekerjaan Tanah (Timbunan Tanah Kembali)
Pekerjaan Tanah (Timbunan Tanah Alas Lantai)
Pekerjaan Pondasi
Pekerjaan Dinding
Pekerjaan Plesteran dan Acian Dinding
Pekerjaan Pintu dan Jendela
Pekerjaan Beton
Atap dan Rangka Atap
Rangka Plafond Dan Plafond
Sanitasi
Pemasangan Penutup Lantai Dan Dinding
Pembesian
Pengecetan
Jumlah
PPn 10%
Total Cost
Dibulatkan

Terbilang :

Mengetahui
Kepala Desa

( ..)

Harga (Rp)
(c)
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Sinjai . April 2016


Dibuat Oleh
Tim Penyusun RKP

( ..)

2,000,000.00
363,520.00
43,565.60
294,528.00
7,212,371.70
9,557,218.70
14,805,227.84
9,300,000.00
3,220,082.55
8,496,418.40
4,736,400.00
2,269,500.00
9,349,716.48
8,840,945.96
4,428,478.20
84,917,973.44
8,491,797.34
93,409,770.78
-

Anda mungkin juga menyukai

  • 3 Hitungic
    3 Hitungic
    Dokumen6 halaman
    3 Hitungic
    Muhammad Agusalim
    Belum ada peringkat
  • 3 Hitungic
    3 Hitungic
    Dokumen6 halaman
    3 Hitungic
    Muhammad Agusalim
    Belum ada peringkat
  • PERJANJIAN
    PERJANJIAN
    Dokumen4 halaman
    PERJANJIAN
    Muhammad Agusalim
    Belum ada peringkat
  • Makalah Pendidikan Karakter
    Makalah Pendidikan Karakter
    Dokumen13 halaman
    Makalah Pendidikan Karakter
    Muhammad Agusalim
    Belum ada peringkat
  • Jurnal Fix Nani
    Jurnal Fix Nani
    Dokumen11 halaman
    Jurnal Fix Nani
    Muhammad Agusalim
    Belum ada peringkat
  • Surat Tugas Adhoc Kemahasiswaan
    Surat Tugas Adhoc Kemahasiswaan
    Dokumen2 halaman
    Surat Tugas Adhoc Kemahasiswaan
    Muhammad Agusalim
    Belum ada peringkat
  • RPP Ku
    RPP Ku
    Dokumen20 halaman
    RPP Ku
    Muhammad Agusalim
    Belum ada peringkat
  • RAB SNI-ANALISA Jembatan 12 M
    RAB SNI-ANALISA Jembatan 12 M
    Dokumen102 halaman
    RAB SNI-ANALISA Jembatan 12 M
    Muhammad Agusalim
    0% (1)
  • Rab Paud
    Rab Paud
    Dokumen415 halaman
    Rab Paud
    Muhammad Agusalim
    Belum ada peringkat
  • Kalender Akademik
    Kalender Akademik
    Dokumen1 halaman
    Kalender Akademik
    Muhammad Agusalim
    Belum ada peringkat
  • RAB SNI-ANALISA Jembatan 12 M
    RAB SNI-ANALISA Jembatan 12 M
    Dokumen102 halaman
    RAB SNI-ANALISA Jembatan 12 M
    Muhammad Agusalim
    0% (1)
  • Rab Paud
    Rab Paud
    Dokumen415 halaman
    Rab Paud
    Muhammad Agusalim
    Belum ada peringkat
  • Rab Paud
    Rab Paud
    Dokumen415 halaman
    Rab Paud
    Muhammad Agusalim
    Belum ada peringkat
  • Kalender Akademik
    Kalender Akademik
    Dokumen1 halaman
    Kalender Akademik
    Muhammad Agusalim
    Belum ada peringkat
  • Volume Boq
    Volume Boq
    Dokumen4 halaman
    Volume Boq
    Muhammad Agusalim
    Belum ada peringkat
  • RAB Bolangi
    RAB Bolangi
    Dokumen85 halaman
    RAB Bolangi
    Muhammad Agusalim
    Belum ada peringkat
  • Bab I Pendahuluan
    Bab I Pendahuluan
    Dokumen25 halaman
    Bab I Pendahuluan
    Abdyaz
    Belum ada peringkat
  • Belanja IKA
    Belanja IKA
    Dokumen2 halaman
    Belanja IKA
    Muhammad Agusalim
    Belum ada peringkat
  • Hitungan Gerbang Kiri Dan Kanan
    Hitungan Gerbang Kiri Dan Kanan
    Dokumen6 halaman
    Hitungan Gerbang Kiri Dan Kanan
    BioData
    Belum ada peringkat
  • Swot Edit
    Swot Edit
    Dokumen15 halaman
    Swot Edit
    BioData
    Belum ada peringkat
  • 3 Hitungic
    3 Hitungic
    Dokumen6 halaman
    3 Hitungic
    Muhammad Agusalim
    Belum ada peringkat
  • Balroom Luas Kaca Dan ACP
    Balroom Luas Kaca Dan ACP
    Dokumen4 halaman
    Balroom Luas Kaca Dan ACP
    Muhammad Agusalim
    Belum ada peringkat
  • Template Profil Penelitian1 2014 Mahmuddin
    Template Profil Penelitian1 2014 Mahmuddin
    Dokumen4 halaman
    Template Profil Penelitian1 2014 Mahmuddin
    Muhammad Agusalim
    Belum ada peringkat
  • Swot Edit
    Swot Edit
    Dokumen15 halaman
    Swot Edit
    BioData
    Belum ada peringkat
  • Saluran 2
    Saluran 2
    Dokumen1 halaman
    Saluran 2
    Muhammad Agusalim
    Belum ada peringkat
  • Saluranl
    Saluranl
    Dokumen1 halaman
    Saluranl
    Muhammad Agusalim
    Belum ada peringkat
  • Data Wisuda Fai
    Data Wisuda Fai
    Dokumen94 halaman
    Data Wisuda Fai
    Muhammad Agusalim
    Belum ada peringkat
  • Hitungan Reling
    Hitungan Reling
    Dokumen4 halaman
    Hitungan Reling
    Muhammad Agusalim
    Belum ada peringkat
  • Abse
    Abse
    Dokumen2 halaman
    Abse
    Muhammad Agusalim
    Belum ada peringkat