Daftar Isi
Daftar Isi
PENDAHULUAN
1.1 Latar Belakang.............................................................................I-1
1.2 Rumusan Masalah........................................................................I-2
1.3 Tujuan...........................................................................................I-2
1.4 Manfaat.........................................................................................I-3
1.5 Batasan Masalah...........................................................................I-3
1.6 Sistematika Penulisan...................................................................I-4
BAB II
LANDASAN TEORI
2.1
2.2
2.3
2.4
2.5
2.6
Pengertian Kanban..............................................................II-9
2.7
Persiapan Prakanban............................................................II-10
2.8
Aturan Kanban....................................................................II-11
5i
2.8.1
2.9.1
Penyesuaian.........................................................................II-17
2.10.1
2.10.2
Kelonggaran........................................................................II-19
2.11.1
2.11.2
2.11.3
2.13
Assembly..............................................................................II-24
2.13.1
2.14
2.14.1
Peta-peta Kerja....................................................................II-25
II-31
6i
2.15
2.16
2.16.1
Metode RPW
II-38
2.16.2
Metode LCR
II-39
2.16.3
2.18.1
BABIII
2.17
2.18
3.6.8
Peta-Peta Kerja........................................................III-6
3.6.8.1 Peta Proses Operasi...................................III-6
3.6.8.2 Assembly Chart..........................................III-6
3.6.9
7i
Technique............................................III-7
Metode Largest Candidate
Rule (LCR).........................................III-7
3.6.9.3 Metode Region Appoach (RA)...........III-7
3.6.9.2
3.6.10
Quality Control...................................................III-8
Pengenalan Produk..............................................IV-1
4.1.2
Pengenalan Kelompok........................................IV-6
4.1.3
4.1.4
4.1.5
Uji Statistik.........................................IV-58
8i
ANALISA
5.1 Pengumpulan Data........................................................................V-1
5.2 Pengolahan Data...........................................................................V-1
5.2.1 Bill Of Material (BOM)............................................V-2
5.2.2 Standard Operational Procedure (SOP)....................V-2
5.2.3 Analisa Uji Statistik...................................................V-2
5.2.3.1 Perhitungan Uji Keseragaman Data.............V-2
5.2.3.2 Perhitungan Uji Kecukupan Data................V-3
5.2.4 Work Sampling dan Produktivitas..............................V-3
5.2.5 Waktu Normal............................................................V-5
5.2.5.1 Penyesuaian Pada Stasiun Pemotongan.......V-5
5.2.5.2 Penyesuaian Pada Stasiun Pelipatan............V-7
5.2.5.3 Penyesuaian Pada Stasiun Perakitan............V-7
5.2.5.4 Penyesuaian Pada Stasiun
Quality Control (QC)...................................V-8
5.2.6 Waktu Baku................................................................V-8
5.2.6.1 Kelonggaran Pada Stasiun Pemotongan......V-8
5.2.6.2 Kelonggaran Pada Stasiun Pelipatan...........V-9
5.2.6.3 Kelonggaran PadaStasiun Perakitan............V-10
5.2.7 Peta-peta Kerja...........................................................V-10
5.2.7.1 Peta Proses Operasi......................................V-10
5.2.7.2 Assembly Chart............................................V-11
5.2.7.3 Peta Aliran Proses........................................V-11
9i
PENUTUP
6.1 Kesimpulan..........................................................................VI-1
6.2 Saran....................................................................................VI-1
DAFTAR PUSTAKA
LAMPIRAN
10i