No
A
IV
1
2
3
V
A
1
B
2
C
3
D
4
E
5
F
6
VI
A
1
B
2
VII
A
1
XII
A
1
SPESIFIKASI MATERIAL
MATERIAL TIAP PEKERJAAN
B
Pekerjaan Struktur Beton
Beton
Pembesian
Bekisting
Pekerjaan Struktur Atap
Pekerjaan Rangka Kuda-Kuda
1.1. Kayu 6/15
1.2. Kayu 6/16
1.3. Kayu 6/12
1.4. Kayu 8/12
Pekerjaan Nok & Gording
2.1. Kayu 8/12
Pekerjaan Genteng Bubungan
3.1. Genteng Kodok Glasur (29.5 cm)
Pekerjaan Kaso dan Reng
4.1. Kayu Kaso 5/7 dan Reng 2/30
Pekerjaan Papan Listplank
5.1. Kayu 2/20
Pekerjaan Genteng
6.1. Genteng Keramik Jatiwangi
Pekerjaan Plafond
Pekerjaan Penutup Plafond
1.1. Gypsum
1.2. Tripleks
1.3. Rangka Besi Hold
Pekerjaan List Plafond
2.1. List Plafond
Pekerjaan Dinding & Lantai
Pekerjaan Dinding
1.1. Dinding Pasangan Batu Bata Merah
1.2. Plesteran 1 : 3
1.3. Acian 1 : 3
1.4. Keramik Dinding WC (20x20 cm)
Pekerjaan Mekanikal & Elektrikal
Pekerjaan Elektrikal
1.1. Lampu Chandellier (Gantung)
1.2. Upspot Light (Lampu Sorot)
1.3. Downlight (Lampu Pijar)
1.4. Stop Kontak
1.5. Saklar Tunggal
1.6. Saklar Ganda
1.7. Antena TV Outlet
1.8. Telepon Outlet
1.9. KWH Meter
SPEK
C
K 225 atau f'c 19,3
Polos U - 24
Kayu Meranti
Gypsum Board 9 mm
Cat 6 mm
4 x 4 cm & 2 x 4 cm
Gypsum Corniche 5x5 cm
Roman
Philips
Philips
Philips
1 Phase Digital
B
1
XIII
A
1
B
2
C
3
XIV
A
1
B
2
1.10. MCB/Panel
Pekerjaan Mekanikal
1.1. AC (Air Conditioner)
1.2. Penangkal Petir
Pekerjaan Plambing/Sanitasi
Instalasi Air Bersih
1.1. Pipa PVC 3/4"
1.2. Pipa PVC 1/2"
1.3. Kran Air Dia 3/4" - 1/2"
Instalasi Air Kotor
2.1. Pipa PVC 3"
2.2. Pipa PVC 4"
2.3. Bak Kontrol Terbuka
2.4. Bak Kontrol Grill
2.5. Bak Kontrol Tertutup
2.6. Floor Drain
2.7. Roof Drain
2.8. Septic Tank
2.9. Sumur Resapan
Alat Saniter
3.1. Closet Duduk
3.2. Closet Jongkok
3.3. Washtafel
3.5. Bak Mandi
3.6. Bath Tub
3.7. Pantry/ Kitchen Sink
Pekerjaan Taman
Pekerjaan Carport
1.1. Finishing Batu Alam
1.2. Finishing Batu Sikat
Pekerjaan Pagar Luar
2.1. Pagar Depan Pas. Bata, h = 2 meter
3 Phase 40A/18A
1 PK
3 AIP
TOTO
TOTO
TOTO
fiberglass
TOTO
stainless steel
OLEH :
GHINA FEBRIANI KHAIRUNNISA
MUHAMMAD FAUZI NOVRIZALDY
141144011
141144022
3-TPPG
No
A
IV
A
1
B
4
10
11
C
12
URAIAN PEKERJAAN
B
Pekerjaan Struktur Beton
Pekerjaan Sloof
1.1. Pekerjaan sloof beton ukuran 20/30
1.2. Pembesian tulangan utama 4 12
1.3. Pembesian tulangan sengkang 8-15
1.4. Pekerjaan Bekisting
2.1. Pekerjaan sloof beton ukuran 20/30
2.2. Pembesian tulangan utama 6 12
2.3. Pembesian tulangan sengkang 8-15
2.4. Pekerjaan Bekisting
3.1. Pekerjaan sloof beton ukuran 15/20
3.2. Pembesian tulangan utama 4 10
3.3. Pembesian tulangan sengkang 8 - 15
3.4. Pekerjaan Bekisting
Pekerjaan Kolom Lantai 1
4.1. Pekerjaan Kolom K1 (15/20)
4.2. Pembesian tulangan utama 4 12
4.3. Pembesian tulangan sengkang 8- 15
4.4. Pekerjaan Bekisting
5.1. Pekerjaan Kolom K2 (15/25)
5.2. Pembesian tulangan utama 4 16
5.3. Pembesian tulangan sengkang 8- 15
5.4. Pekerjaan Bekisting
6.1. Pekerjaan Kolom K3 (15/30)
6.2. Pembesian tulangan utama 6 16
6.3. Pembesian tulangan sengkang 8- 15
6.4. Pekerjaan Bekisting
7.1. Pekerjaan Kolom K4 (15/40)
7.2. Pembesian tulangan utama 8 16
7.3. Pembesian tulangan sengkang 8- 15
7.4. Pekerjaan Bekisting
8.1. Pekerjaan Kolom K5 (15/50)
8.2. Pembesian tulangan utama 10 16
8.3. Pembesian tulangan sengkang 8- 15
8.4. Pekerjaan Bekisting
9.1. Pekerjaan Kolom K25 (25/25)
9.2. Pembesian tulangan utama 4 16
9.3. Pembesian tulangan sengkang 8- 15
9.4. Pekerjaan Bekisting
10.1. Pekerjaan Kolom KP (15/15)
10.2. Pembesian tulangan utama 4 8
10.3. Pembesian tulangan sengkang 6- 15
10.4. Pekerjaan Bekisting
11.1. Pekerjaan Kolom K3L
11.2. Pembesian tulangan utama 8 16
11.3. Pembesian tulangan sengkang 8- 15
11.4. Pekerjaan Bekisting
Pekerjaan Kolom Lantai 2
12.1. Pekerjaan Kolom K1 (15/20)
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
Mutu
VOLUME
SAT
4.70
306.43
215.76
46.95
1.11
108.49
50.93
11.08
1.80
164.01
134.03
24.05
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
0.83
108.46
125.11
20.50
0.53
98.54
68.62
11.98
2.57
591.21
291.21
53.63
0.43
98.54
40.59
8.13
1.07
246.34
89.54
19.11
2.67
295.61
193.31
44.50
1.96
153.66
394.40
55.88
4.82
985.36
728.03
41.04
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
1.45
m3
13
14
15
16
17
D
18
19
20
21
22
23
E
24
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
166.54
192.11
30.19
0.63
99.25
69.12
11.42
0.38
74.44
36.67
6.39
0.25
49.63
20.44
3.88
1.03
73.84
189.51
26.11
0.23
49.63
36.67
3.67
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
0.73
167.86
54.17
13.85
0.39
56.99
16.78
5.06
1.09
208.45
73.64
18.59
7.01
1032.54
321.92
95.74
1.1
132.98
40.01
11.77
0.32
60.14
13.45
5.8
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
9.99
1314.87
524.83
165.60
m3
kg
kg
m2
E
25
F
26
G
27
V
A
1
B
2
C
3
D
4
E
5
F
6
VI
A
1
B
2
VII
A
1
f'c 19,3
U - 24
U - 24
12.50
814.00
250.80
125.04
m3
kg
kg
m2
f'c 19,3
U - 24
U - 24
1.36
11.09
124.89
5.67
0.41
52.88
4.20
4.39
0.18
54.57
10.00
3.04
0.82
50.79
96.92
8.86
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
62.36
m3
1.42
0.03
0.23
0.01
m3
m3
m3
m3
1.25
m3
54.45
m'
240.09
m2
88.35
m'
240.09
m2
236.62
74.55
311.17
m2
m2
m2
454.68
m'
612
1120.0
1120.0
104.5
m2
m2
m2
m2
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
f'c 19,3
U - 24
U - 24
Kayu Jati
Kayu Jati
Kodok Glasur
Kayu Meranti
Kayu Meranti
Jatiwangi
XII
A
1
B
1
XIII
A
1
B
2
C
3
XIV
A
1
B
2
XV
A
1 Phase Digital
3 Phase 40A/18A
1 PK
3 AIP
TOTO
TOTO
TOTO
fiberglass
TOTO
stainless steel
Pipa Stainless
1
2
39
14
16
5
6
9
1
1
buah
buah
buah
unit
buah
buah
titik
titik
buah
buah
5
1
unit
unit
84.46
31.22
7.00
m'
m'
buah
12.90
77.39
6
2
3
9
11
1
1
m'
m'
unit
unit
unit
bh
bh
unit
unit
3
2
3
2
2
1
bh
bh
bh
bh
bh
unit
17.58
17.82
m2
m2
7.50
m'
9.77
m2
keterangan
K
No.
1
IV.
1
Uraian Pekerjaan
Sat.
PEKERJAAN BETON
Beton K-225
Semen Portland 40 kg
Pasir beton
Batu pecah mesin 1/2
Air (biaya air tawar)
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
m3
zak
m3
m3
lt
OH
OH
OH
OH
JASA (10 %)
kg
kg
kg
OH
OH
OH
OH
JASA (10 %)
m2
m3
m3
kg
ltr
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
OH
OH
OH
OH
Bahan Begesting 2x pakai
Upah bgesting 2 x pakai
JASA (10 %)
m2
m3
kg
ltr
m3
lbr
btg
OH
OH
OH
Mandor
OH
Bahan Begesting 2x pakai
Upah bgesting 2 x pakai
JASA (10 %)
m2
m3
kg
ltr
m3
lbr
btg
OH
OH
OH
OH
m2
m3
kg
ltr
m3
lbr
btg
OH
OH
OH
OH
Bekisting Tangga
Kayu meranti usuk
Paku Usuk
Minyak Begesting
Balok Kayu Kamper 3/5
Multiplek tebal 9 mm
m2
m3
kg
ltr
m3
lbr
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
OH
OH
OH
OH
Bahan Begesting 2x pakai
Upah bgesting 2 x pakai
JASA (10 %)
14
Membongkar Cetakan
m3
Pekerja
OH
JASA (10 %)
V.
1
m3
m3
Besi Strip
Paku biasa 2"- 5"
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
kg
kg
OH
OH
OH
OH
JASA (10 %)
m3
m3
Besi Strip
Paku biasa 2"- 5"
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
kg
kg
OH
OH
OH
OH
JASA (10 %)
m2
m3
m3
kg
OH
OH
OH
OH
JASA (10 %)
m'
m3
kg
OH
OH
OH
OH
JASA (10 %)
m2
bh
OH
OH
OH
OH
JASA (10 %)
m'
bh
kg
Pasir Pasang
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
VI.
1
PEKERJAAN PLAFOND
Pas. Plafond Gypsumboard 9 mm Rangka Hollow
Besi Hollow 40/40 mm
Besi Hollow 20/40 mm
Gypsum Board Uk. 240x120x9 mm
Paku Asbes Skrup 4
Pekerja
Tukang Gypsum
Kepala Tukang Kayu
Mandor
m3
OH
OH
OH
OH
JASA (10 %)
m2
m
m
lbr
bh
OH
OH
OH
OH
JASA (10 %)
m1
Lis Gypsum
`
Sekrup Gypsum
Pekerja
Tukang Gypsum
Kepala Tukang Gypsum
m
bh
OH
OH
OH
Mandor
OH
JASA (10 %)
VII.
1
PEKERJAAN DINDING
Pasang Dinding Bata 1:3 1/2 Bata
Batu Bata Merah
Semen Portland 50 kg
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
m2
lbr
kg
OH
OH
OH
OH
JASA (10 %)
m2
bh
zak
m3
OH
OH
OH
OH
JASA (10 %)
m2
zak
m3
OH
OH
OH
OH
JASA (10 %)
Acian Beton
Semen Portland
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
m2
zak
OH
OH
OH
OH
JASA (10 %)
m2
XII.
1
Semen PC 40 kg
zak
kg
m3
m2
OH
OH
OH
OH
JASA (10 %)
bh
m
m
%
OH
OH
OH
OH
JASA (10 %)
bh
m
m
%
OH
OH
OH
OH
JASA (10 %)
bh
m
m
%
OH
OH
OH
OH
JASA (10 %)
bh
m
m
%
OH
OH
OH
OH
JASA (10 %)
bh
m
m
%
OH
OH
OH
OH
JASA (10 %)
bh
OH
%
JASA (10 %)
bh
Upah Pasang
OH
Perlengkapan Instalasi (5 %)
%
JASA (10 %)
XII.2. Mekanikal
Memasang 1 unit Penangkal Petir Konvensional (3 AIP)
Splitzen (Tombak Petir) 2 buah
1 Batang arde,copper rod
Kabel BC 2,5 mm, 15 meter
3 batang Pipa Paralon
Pengeboran max 8 meter
Test Magger
Biaya Instalasi
unit
OH
%
JASA (10 %)
unit
OH
%
JASA (10 %)
unit
unit
JASA (10 %)
unit
bh
JASA (10 %)
XIII.
1
bh
bh
x
OH
OH
OH
OH
JASA (10 %)
bh
bh
kg
m3
OH
OH
OH
OH
JASA (10 %)
Memasang Wastafel
Wastafel TOTO lengkap
Harga Perlengkapan Wastafel
PC
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
bh
bh
x
kg
m3
OH
OH
OH
OH
JASA (10 %)
bh
bh
x
OH
OH
OH
OH
JASA (10 %)
bh
bh
set
OH
OH
OH
OH
JASA (10 %)
bh
bh
OH
OH
OH
OH
JASA (10 %)
bh
bh
kg
m3
m3
kg
m3
OH
OH
OH
OH
OH
JASA (10 %)
m'
m'
Perlengkapan
Pekerja
Tukang Batu
Kepala Tukang
Mandor
x
OH
OH
OH
OH
JASA (10 %)
m'
m'
x
OH
OH
OH
OH
JASA (10 %)
10
bh
m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3
JASA (10 %)
11
bh
bh
bh
OH
OH
OH
OH
JASA (10 %)
12
bh
bh
13
m'
m'
x
OH
OH
OH
OH
JASA (10 %)
14
m'
m'
x
15
XIV.
1
Tukang Batu
OH
OH
OH
OH
JASA (10 %)
bh
bh
m2
m2
Tukang Plambing
Kepala Tukang
Pekerja
Mandor
OH
OH
OH
OH
JASA (10 %)
m2
Galian Tanah
m3
m2
m3
m'
m2
m2
JASA (10 %)
m2
m3
m2
m3
m'
m2
m2
JASA (10 %)
Pagar Dinding Tinggi 2 m bata hollow ekspos + kolom/ring balok di plester &
dicat
Pas. Bouwplank
Galian Tanah Pondasi 60 cm
Pemadatan Tanah Pondasi L 60 cm
m'
m'
m3
m2
m3
m3
m3
m3
m2
kg
kg
m3
m2
m'
m'
m2
m2
m'
m2
JASA (10 %)
Pagar Dinding Tinggi 2 m bata hollow ekspos + kolom/ring balok di plester &
dicat
m'
m'
JASA (10 %)
XV
1
m2
m2
Btg
Btg
Btg
OH
OH
OH
OH
JASA (10 %)
Koef.
Jumlah
(Rp)
6.
5.
1.000
9.275
0.436
0.551
215.000
1.650
0.275
0.028
0.083
JASA (10 %)
59,000.00
236,575.00
240,000.00
157.00
72,780.00
91,927.00
107,872.00
124,218.00
Jumlah
1.000
1.050
0.015
0.007
0.007
0.001
0.000
9,000.00
27,100.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
0.022
0.002
0.300
0.100
3,812,000.00
3,981,000.00
15,400.00
16,000.00
Jumlah bahan
0.520
0.260
0.026
0.026
72,780.00
91,927.00
107,872.00
124,218.00
Jumlah upah
0.500
1.000
98,046.00
67,780.96
JASA (10 %)
Jumlah begesting 2 x pakai
1.000
0.010
3,981,000.00
0.400
15,400.00
0.200
16,000.00
0.015
4,078,050.00
0.350
207,200.00
2.000
35,000.00
Jumlah bahan
0.660
72,780.00
0.330
91,927.00
0.033
107,872.00
547,225.00
103,217.67
132,264.00
33,755.00
120,087.00
25,279.93
3,020.42
10,310.09
97,515.91
1,072,675.02
9,450.00
406.50
509.46
643.49
75.51
49.69
1,113.46
12,248.11
83,864.00
7,962.00
4,620.00
1,600.00
98,046.00
37,845.60
23,901.02
2,804.67
3,229.67
67,780.96
49,023.00
67,780.96
28,263.09
145,067.05
39,810.00
6,160.00
3,200.00
61,170.75
72,520.00
70,000.00
252,860.75
48,034.80
30,335.91
3,559.78
0.033
124,218.00
Jumlah upah
0.500
1.000
JASA (10 %)
Jumlah begesting 2 x pakai
1.000
0.020
0.400
0.200
0.018
0.350
2.000
Jumlah bahan
0.660
0.330
0.033
0.033
Jumlah upah
0.500
1.000
JASA (10 %)
Jumlah begesting 2 x pakai
1.000
0.0238
0.4000
0.2000
0.0150
0.3500
6.0000
Jumlah bahan
0.660
0.330
0.033
0.033
Jumlah upah
0.500
1.000
JASA (10 %)
Jumlah begesting 2 x pakai
1.000
0.030
0.400
0.150
0.015
0.350
Jumlah bahan
0.660
0.330
0.033
0.033
Jumlah upah
0.500
1.000
JASA (10 %)
Jumlah begesting 2 x pakai
1.000
252,860.75
86,029.68
3,981,000.00
15,000.00
16,000.00
4,078,050.00
207,200.00
35,000.00
72,780.00
91,927.00
107,872.00
124,218.00
304,744.90
86,029.68
3,981,000.00
15,000.00
16,000.00
4,078,050.00
207,200.00
35,000.00
72,780.00
91,927.00
107,872.00
124,218.00
447,638.55
86,029.68
3,981,000.00
15,000.00
16,000.00
3,650,000.00
106,000.00
72,780.00
91,927.00
107,872.00
124,218.00
219,680.00
86,029.68
4,099.19
86,029.68
126,430.38
86,029.68
55,135.05
267,595.10
79,620.00
6,000.00
3,200.00
73,404.90
72,520.00
70,000.00
304,744.90
48,034.80
30,335.91
3,559.78
4,099.19
86,029.68
152,372.45
86,029.68
62,917.67
301,319.80
94,747.80
6,000.00
3,200.00
61,170.75
72,520.00
210,000.00
447,638.55
48,034.80
30,335.91
3,559.78
4,099.19
86,029.68
223,819.28
86,029.68
84,351.72
394,200.67
119,430.00
6,000.00
2,400.00
54,750.00
37,100.00
219,680.00
48,034.80
30,335.91
3,559.78
4,099.19
86,029.68
109,840.00
86,029.68
50,157.94
246,027.62
4.000
72,780.00
JASA (10 %)
291,120.00
29,112.00
320,232.00
Jumlah
1.000
1.100
18,231,825.00
20,055,007.50
15.000
0.400
0.330
0.033
0.660
0.033
13,500.00
15,400.00
91,927.00
107,872.00
72,780.00
124,218.00
202,500.00
6,160.00
30,335.91
3,559.78
48,034.80
4,099.19
2,034,969.72
22,384,666.90
JASA (10 %)
Jumlah
1.000
1.100
18,231,825.00
20,055,007.50
15.000
0.400
0.330
0.033
1.000
0.400
13,500.00
15,400.00
91,927.00
107,872.00
72,780.00
124,218.00
202,500.00
6,160.00
30,335.91
3,559.78
72,780.00
49,687.20
2,042,003.04
22,462,033.42
JASA (10 %)
Jumlah
1.000
0.012
0.012
0.150
0.100
0.010
0.100
0.003
3,981,000.00
3,999,000.00
15,400.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
0.043
0.030
0.050
0.005
0.050
0.025
3,812,000.00
15,400.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
14.000
0.060
0.006
0.150
0.008
7,000.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
4.000
8.000
2,300.00
1,477.00
47,772.00
47,988.00
2,310.00
9,192.70
1,078.72
7,278.00
310.55
11,593.00
127,522.96
163,916.00
462.00
4,596.35
539.36
3,639.00
3,105.45
17,625.82
193,883.98
98,000.00
5,515.62
647.23
10,917.00
993.74
11,607.36
127,680.96
9,200.00
11,816.00
0.032
0.400
0.200
0.020
0.002
185,400.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
0.750
2.000
0.382
4.000
0.150
0.250
0.025
0.075
48,000.00
40,000.00
73,966.00
300.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
5,932.80
29,112.00
18,385.40
2,157.44
248.44
7,685.21
84,537.28
36,000.00
80,000.00
28,247.62
1,200.00
10,917.00
22,981.75
2,696.80
9,316.35
19,135.95
210,495.47
1.000
1.050
4.000
0.050
0.050
0.005
12,000.00
1,000.00
72,780.00
91,927.00
107,872.00
12,600.00
4,000.00
3,639.00
4,596.35
539.36
0.003
124,218.00
372.65
JASA (10 %)
Jumlah
1.000
0.360
0.030
0.070
0.100
0.010
0.004
84,600.00
15,400.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
70.000
0.287
0.040
0.300
0.100
0.010
0.015
741.00
73,000.00
150,000.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
0.156
0.023
0.300
0.150
0.015
0.015
JASA (10 %)
73,000.00
150,000.00
72,780.00
91,927.00
107,872.00
124,218.00
2,574.74
25,747.36
30,456.00
462.00
5,094.60
9,192.70
1,078.72
434.76
4,671.88
51,390.66
51,870.00
20,980.20
6,000.00
21,834.00
9,192.70
1,078.72
1,863.27
11,281.89
124,100.78
11,351.50
3,450.00
21,834.00
13,789.05
1,618.08
1,863.27
5,390.59
Jumlah
1.000
0.065
0.200
0.100
0.010
0.010
59,296.49
73,000.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
4,745.00
14,556.00
9,192.70
1,078.72
1,242.18
3,081.46
33,896.06
1.000
0.233
59,000.00
13,747.00
1.940
0.018
1.060
0.900
0.450
0.045
0.045
8,500.00
150,000.00
46,250.00
72,780.00
91,927.00
107,872.00
124,218.00
16,490.00
2,700.00
49,025.00
65,502.00
41,367.15
4,854.24
5,589.81
19,927.52
219,202.72
JASA (10 %)
Jumlah
1.000
12.000
10.000
0.050
0.150
0.150
0.150
0.150
17,000.00
10,900.00
1,395.00
60,000.00
70,000.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
16.000
16.000
0.050
0.166
0.166
0.033
0.017
17,000.00
10,900.00
1,395.00
60,000.00
70,000.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
15.000
12.000
0.050
0.150
0.150
0.180
0.150
17,000.00
10,900.00
1,395.00
60,000.00
70,000.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
15.000
15.000
0.050
4,500.00
10,900.00
770.00
204,000.00
109,000.00
69.75
9,000.00
10,500.00
16,180.80
18,632.70
36,738.33
404,121.58
272,000.00
174,400.00
69.75
9,960.00
11,620.00
3,559.78
2,111.71
47,372.12
521,093.36
255,000.00
130,800.00
69.75
9,000.00
10,500.00
19,416.96
18,632.70
44,341.94
487,761.35
67,500.00
163,500.00
38.50
0.150
0.150
0.180
0.150
60,000.00
70,000.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
12.000
12.000
0.050
0.150
0.150
0.180
0.150
4,000.00
10,900.00
745.00
60,000.00
70,000.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
0.100
0.050
9,000.00
10,500.00
19,416.96
18,632.70
28,858.82
317,446.98
48,000.00
130,800.00
37.25
9,000.00
10,500.00
19,416.96
18,632.70
23,638.69
260,025.60
13,000.00
91,000.00
5,200.00
13,000.00
9,100.00
260.00
2,236.00
24,596.00
1.000
18,000.00
18,000.00
0.100
91,000.00
9,100.00
0.050
5,450.00
272.50
2,737.25
30,109.75
350,000.00
91,000.00
22,050.00
350,000.00
9,100.00
1,102.50
36,020.25
396,222.75
JASA (10 %)
Jumlah
JASA (10 %)
Jumlah
1.000
0.100
0.050
JASA (10 %)
Jumlah
1.000
0.100
0.050
300,000.00
91,000.00
19,550.00
JASA (10 %)
Jumlah
300,000.00
9,100.00
977.50
31,007.75
341,085.25
1.000
1.000
2,500,000.00
JASA (10 %)
Jumlah
1.000
1.000
3,640,000.00
JASA (10 %)
Jumlah
2,500,000.000
250,000.00
2,750,000.00
3,640,000.000
364,000.00
4,004,000.00
1.000
1.000
0.060
1.100
0.001
3.300
1.600
2,379,000.00
142,740.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
1.000
6.000
0.010
1.500
1.500
1.000
0.160
434,100.00
1,477.00
185,400.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
1.000
0.120
6.000
0.010
1.450
0.150
1.200
0.100
1,517,000.00
182,040.00
1,477.00
185,400.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
1.000
0.180
2.700
0.540
1.800
0.110
450,550.00
81,099.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
2,379,000.00
8,564.40
101,119.70
107.87
240,174.00
198,748.80
292,771.48
3,220,486.25
434,100.00
8,862.00
1,854.00
137,890.50
161,808.00
72,780.00
19,874.88
83,716.94
920,886.32
1,517,000.00
21,844.80
8,862.00
1,854.00
133,294.15
16,180.80
87,336.00
12,421.80
179,879.36
1,978,672.91
450,550.00
14,597.82
248,202.90
58,250.88
131,004.00
13,663.98
91,626.96
1,007,896.54
1.000
1.000
1.000
0.300
0.030
0.030
0.002
214,000.00
110,000.00
91,927.00
107,872.00
72,780.00
124,218.00
JASA (10 %)
Jumlah
1.000
1.000
0.100
0.010
0.010
0.005
JASA (10 %)
42,000.00
91,927.00
107,872.00
72,780.00
124,218.00
214,000.00
110,000.00
27,578.10
3,236.16
2,183.40
186.33
35,718.40
392,902.39
42,000.00
9,192.70
1,078.72
727.80
621.09
5,362.03
Jumlah
1.000
222
114
0.184
0.033
4.850
0.120
2.160
0.720
0.072
0.108
0.100
58,982.34
637.00
1,477.00
185,400.00
260,600.00
13,100.00
236,575.00
72,780.00
91,927.00
107,872.00
124,218.00
91,927.00
JASA (10 %)
Jumlah
141,414.00
168,378.00
34,113.60
8,599.80
63,535.00
28,389.00
157,204.80
66,187.44
7,766.78
13,415.54
9,192.70
69,819.67
768,016.33
1.000
1.200
26,825.00
32,190.00
0.350
0.081
0.135
0.014
0.004
9,388.75
72,780.00
91,927.00
107,872.00
124,218.00
3,286.06
5,895.18
12,410.15
1,456.27
509.29
5,574.70
61,321.65
JASA (10 %)
Jumlah
1.000
1.200
0.350
0.081
0.135
0.014
0.004
44,825.00
15,688.75
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
1.000
4.5
0.214
2.250
15.000
0.300
15.000
5.400
5.000
3.375
5.400
1.050
9.000
1.125
26,252.00
136,675.00
716,798.00
110,790.00
6,438,864.00
46,950.00
44,825.00
27,900.00
20,000.00
9,650.00
205,000.00
23,375.00
35,000.00
JASA (10 %)
Jumlah
1.000
1.200
0.025
0.100
0.010
0.010
0.005
46,000.00
3,000.00
91,927.00
107,872.00
72,780.00
124,218.00
53,790.00
5,491.06
5,895.18
12,410.15
1,456.27
509.29
7,955.20
87,507.15
118,134.00
29,248.45
1,612,795.50
1,661,850.00
1,931,659.20
704,250.00
242,055.00
139,500.00
67,500.00
52,110.00
215,250.00
210,375.00
39,375.00
702,410.22
7,726,512.37
55,200.00
75.00
9,192.70
1,078.72
727.80
621.09
JASA (10 %)
6,689.53
73,584.84
Jumlah
1.000
1.000
1.000
1.200
0.350
0.060
0.006
0.036
0.002
146,620.00
Jumlah
146,620.00
146,620.00
3,575.00
1,251.25
91,927.00
107,872.00
72,780.00
124,218.00
4,290.00
437.94
5,515.62
647.23
2,620.08
223.59
1,373.45
15,107.91
JASA (10 %)
Jumlah
1.000
1.200
0.350
30,300.00
10,605.00
36,360.00
3,711.75
0.060
91,927.00
5,515.62
0.006
0.036
0.002
107,872.00
72,780.00
124,218.00
647.23
2,620.08
223.59
4,907.83
53,986.10
JASA (10 %)
Jumlah
1.000
1.000
4.000
7,200,000.00
110,790.00
7,200,000.00
443,160.00
3.000
110,790.00
332,370.00
3.000
0.750
3.000
0.250
91,927.00
107,872.00
72,780.00
124,218.00
275,781.00
80,904.00
218,340.00
31,054.50
858,160.95
9,439,770.45
JASA (10 %)
Jumlah
1.000
0.250
57,690.00
14,422.50
1.000
0.200
3.000
1.000
1.000
2,554.67
224,070.00
8,500.00
117,830.00
110,000.00
2,554.67
44,814.00
25,500.00
117,830.00
110,000.00
31,512.12
346,633.29
JASA (10 %)
Jumlah
1.000
0.250
1.000
0.200
3.000
1.000
1.000
57,690.00
2,554.67
224,070.00
8,500.00
117,830.00
100,000.00
JASA (10 %)
Jumlah
14,422.50
2,554.67
44,814.00
25,500.00
117,830.00
100,000.00
30,512.12
335,633.29
1.000
0.330
0.360
0.600
53,460.00
57,690.00
2,554.67
17,641.80
20,768.40
1,532.80
0.060
187,080.00
11,224.80
0.175
694,600.00
0.030
0.400
3.907
1.659
0.595
2.000
0.667
1.000
4.700
4.700
2.000
4.700
709,427.78
42,090.17
13,100.00
13,100.00
19,220.00
108,470.00
88,130.00
106,240.00
44,870.00
26,980.00
11,726.00
23,566.67
121,555.00
21,282.83
16,836.07
51,181.70
21,732.90
11,435.90
216,940.00
58,782.71
106,240.00
210,889.00
126,806.00
23,452.00
110,763.35
114,906.53
1,263,971.79
JASA (10 %)
Jumlah
1.000
1.000
979,530.00
JASA (10 %)
Jumlah
1.000
1.000
0.080
0.080
0.080
0.060
0.060
0.006
0.003
28,900.00
240,000.00
320,000.00
400,000.00
72,780.00
91,927.00
107,872.00
124,218.00
JASA (10 %)
Jumlah
979,530.000
97,953.00
1,077,483.00
28,900.00
19,200.00
25,600.00
32,000.00
4,366.80
5,515.62
647.23
372.65
11,660.23
128,262.54
URAIAN
B
PEKERJAAN PEMBETONAN & PEMBESIAN
Beton Struktur K-225 (1Pc : 2Ps : 3Kr)
Pembesian Dengan Besi Polos U-24
sat
HSP (Rp)
C
1,072,675.02
12,248.11
m
kg
m2
267,595.10
301,319.80
394,200.67
Bekisting Tangga
246,027.62
Membongkar Cetakan
PEKERJAAN STRUKTUR & PENUTUP ATAP
Konstruksi kuda - kuda Kayu Jati
Pasang Nook,Gording Kayu Jati
320,232.00
m
m
m2
m'
m2
m'
22,384,666.90
22,462,033.42
m2
m'
m2
210,495.47
25,747.36
m2
124,100.78
8
V
1
2
3
4
5
6
VI
1
2
3
VII
1
2
2
2
2
145,067.05
127,522.96
193,883.98
127,680.96
84,537.28
51,390.66
59,296.49
Acian Beton
33,896.06
219,202.72
4
XII
1
2
3
4
5
6
7
8
9
10
11
XIII
1
2
3
4
5
6
7
8
9
10
11
2
2
2
titik
titik
titik
titik
titik
set
set
set
set
unit
unit
404,121.58
521,093.36
487,761.35
317,446.98
260,025.60
24,596.00
30,109.75
396,222.75
341,085.25
2,750,000.00
4,004,000.00
bh
bh
bh
bh
bh
bh
unit
m'
m'
unit
bh
3,220,486.25
920,886.32
1,978,672.91
1,007,896.54
1,007,896.54
58,982.34
768,016.33
61,321.65
87,507.15
7,726,512.37
73,584.84
12
13
14
15
XIV
1
2
bh
m'
m'
bh
146,620.00
15,107.91
53,986.10
9,439,770.45
m2
346,633.29
m2
m'
m2
335,633.29
1,263,971.79
128,262.54
No
A
IV
A
1
B
4
10
11
URAIAN PEKERJAAN
VOLUM
E
SAT
HSP
B
Pekerjaan Struktur Beton
Pekerjaan Sloof
1.1. Pekerjaan sloof beton ukuran 20/30
1.2. Pembesian tulangan utama 4 12
1.3. Pembesian tulangan sengkang 8-15
1.4. Pekerjaan Bekisting
2.1. Pekerjaan sloof beton ukuran 20/30
2.2. Pembesian tulangan utama 6 12
2.3. Pembesian tulangan sengkang 8-15
2.4. Pekerjaan Bekisting
3.1. Pekerjaan sloof beton ukuran 15/20
3.2. Pembesian tulangan utama 4 10
3.3. Pembesian tulangan sengkang 8 - 15
3.4. Pekerjaan Bekisting
4.70
306.43
215.76
46.95
1.11
108.49
50.93
11.08
1.80
164.01
134.03
24.05
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
145,067
1,072,675
12,248
12,248
145,067
1,072,675
12,248
12,248
145,067
SUB TOTAL
0.83
108.46
125.11
20.50
0.53
98.54
68.62
11.98
2.57
591.21
291.21
53.63
0.43
98.54
40.59
8.13
1.07
246.34
89.54
19.11
2.67
295.61
193.31
44.50
1.96
153.66
394.40
55.88
4.82
985.36
728.03
41.04
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
145,067
1,072,675
12,248
12,248
267,595
SUB TOTAL
C
12
13
14
15
16
17
D
18
19
20
21
22
23
1.45
166.54
192.11
30.19
0.63
99.25
69.12
11.42
0.38
74.44
36.67
6.39
0.25
49.63
20.44
3.88
1.03
73.84
189.51
26.11
0.23
49.63
36.67
3.67
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
267,595
1,072,675
12,248
12,248
145,067
1,072,675
12,248
12,248
267,595
SUB TOTAL
0.73
167.86
54.17
13.85
0.39
56.99
16.78
5.06
1.09
208.45
73.64
18.59
7.01
1032.54
321.92
95.74
1.1
132.98
40.01
11.77
0.32
60.14
13.45
5.8
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
301,320
1,072,675
12,248
12,248
301,320
1,072,675
12,248
12,248
301,320
1,072,675
12,248
12,248
301,320
1,072,675
12,248
12,248
301,320
1,072,675
12,248
12,248
301,320
SUB TOTAL
24
9.99
1314.87
524.83
165.60
m3
kg
kg
m2
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
145,067
SUB TOTAL
12.50
814.00
250.80
125.04
m3
kg
kg
m2
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
394,201
SUB TOTAL
1.36
11.09
124.89
5.67
0.41
82.72
4.20
4.39
0.18
54.57
10.00
3.04
0.82
50.79
97.20
8.86
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
m3
kg
kg
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,072,675
12,248
12,248
246,028
1,072,675
12,248
12,248
246,028
1,072,675
12,248
12,248
246,028
1,072,675
12,248
12,248
246,028
SUB TOTAL
m3 Rp
320,232
SUB TOTAL
m3
m3
m3
m3
Rp
Rp
Rp
Rp
22,384,667
22,384,667
22,384,667
22,384,667
SUB TOTAL
1.25
m3 Rp
22,462,033
SUB TOTAL
54.45
m' Rp
84,537
SUB TOTAL
240.09
m2 Rp
127,523
SUB TOTAL
88.35
m' Rp
193,884
SUB TOTAL
E
25
F
26
G
27
V
A
1
Membongkar Cetakan
26.1. Pekerjaan Anak Tangga
Pekerjaan Genteng
62.36
VI
A
1
B
2
VII
A
1
XII
A
1
B
1
XIII
A
1
B
2
240.09
m2 Rp
127,681
SUB TOTAL
m2 Rp
m2 Rp
210,495
51,391
SUB TOTAL
m' Rp
25,747
SUB TOTAL
454.68
m2
m2
m2
m2
Rp
Rp
Rp
Rp
124,101
59,296
33,896
219,203
SUB TOTAL
buah
buah
buah
unit
buah
buah
titik
titik
buah
buah
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
404,122
521,093
404,122
487,761
24,596
30,110
317,447
260,026
341,085
396,223
SUB TOTAL
5
1
unit Rp
unit Rp
4,004,000
2,750,000
SUB TOTAL
TOTAL PEKERJAAN ME
Pekerjaan Plambing/Sanitasi
Instalasi Air Bersih
1.1. Pipa PVC 3/4"
84.46
1.2. Pipa PVC 1/2"
31.22
1.3. Kran Air Dia 3/4" - 1/2"
7.00
m' Rp
m' Rp
buah Rp
53,986
15,108
73,585
SUB TOTAL
12.90
77.39
6
2
3
9
11
1
m'
m'
unit
unit
unit
bh
bh
unit
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
61,322
87,507
768,016
768,016
768,016
58,982
146,620
7,726,512
SUB TOTAL
C
3
XIV
A
1
Alat Saniter
3.1. Closet Duduk
3.2. Closet Jongkok
3.3. Washtafel
3.5. Bak Mandi
3.6. Bath Tub
3.7. Pantry/ Kitchen Sink
3
2
3
2
2
1
bh
bh
bh
bh
bh
unit
Rp
Rp
Rp
Rp
Rp
Rp
Pekerjaan Railing
Railing Tangga Utama
1.1. Railing
2.48
3,220,486
920,886
1,978,673
1,007,897
9,439,770
1,007,897
SUB TOTAL
346,633
335,633
SUB TOTAL
m' Rp
1,263,972
SUB TOTAL
m2 Rp
128,263
SUB TOTAL
9.77
TOTAL PEKERJAAN RAILING
Total Sementara
Bulat
JUMLAH
E
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,036,209
3,753,152
2,642,669
6,810,898
1,188,738
1,328,832
623,771
1,607,633
1,934,677
2,008,780
1,641,584
3,488,572
32,065,516
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
890,320
1,328,400
1,532,386
5,485,700
568,518
1,206,876
840,457
3,205,789
2,756,775
7,241,258
3,566,819
14,351,125
461,250
1,206,876
497,100
2,175,548
1,147,762
3,017,191
1,096,694
5,113,742
2,864,042
3,620,629
2,367,630
11,907,982
2,102,443
1,882,070
4,830,647
8,106,347
5,170,294
12,068,764
8,917,048
10,982,103
132,510,589
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,555,379
2,039,796
2,353,023
8,079,231
675,785
1,215,676
846,585
3,057,006
407,617
911,757
449,103
1,710,468
268,169
607,838
250,362
1,037,199
1,104,855
904,346
2,321,154
3,787,991
246,715
607,838
449,103
982,609
35,869,605
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
783,053
2,056,022
663,514
4,173,279
418,343
698,032
205,507
1,524,678
1,169,216
2,553,105
901,989
5,601,535
7,519,452
12,646,628
3,942,896
28,848,358
1,179,943
1,628,742
490,055
3,546,534
343,256
736,565
164,711
1,747,655
83,543,067
Rp
Rp
Rp
Rp
Rp
10,719,081
16,104,658
6,428,186
24,022,495
57,274,420
Rp
Rp
Rp
Rp
Rp
13,408,438
9,969,963
3,071,826
49,290,852
75,741,079
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,458,838
135,807
1,529,667
1,394,977
439,797
1,013,204
51,395
1,080,061
193,082
668,419
122,528
747,924
879,594
622,126
1,190,549
2,179,805
13,707,771
Rp
Rp
Rp
19,969,555
19,969,555
450,681,602
Rp
Rp
Rp
Rp
Rp
31,786,227
707,803
5,081,355
330,845
37,906,231
Rp
Rp
28,077,542
28,077,542
Rp
Rp
4,603,055
4,603,055
Rp
Rp
30,616,988
30,616,988
Rp
Rp
17,129,649
17,129,649
Rp
Rp
Rp
30,654,920.63
30,654,921
148,988,385
Rp
Rp
Rp
49,807,437.39
3,831,173.80
53,638,611
Rp
Rp
Rp
11,706,811
11,706,811
65,345,423
Rp
Rp
Rp
Rp
Rp
Rp
75,949,676.75
66,412,068.80
37,963,587.20
22,906,684.24
203,232,017
203,232,017
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
404,121.58
1,042,186.71
15,760,741.43
6,828,658.91
393,536.00
150,548.75
1,904,681.86
2,340,230.41
341,085.25
396,222.75
29,562,014
Rp
Rp
Rp
Rp
20,020,000
2,750,000
22,770,000
52,332,014
Rp
Rp
Rp
Rp
4,559,558
471,639
515,094
5,546,291
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
791,233
6,771,741
4,608,098
1,536,033
2,304,049
530,841
1,612,820
7,726,512
Rp
25,881,327
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
9,661,458.75
1,841,772.64
5,936,018.72
2,015,793.08
18,879,540.90
1,007,896.54
39,342,481
70,770,098
Rp
Rp
Rp
6,093,813
5,980,985
12,074,798
Rp
Rp
Rp
3,134,650
3,134,650
15,209,448
Rp
Rp
Rp
Rp
Rp
1,253,125
1,253,125
1,253,125
1,007,812,113
1,008,000,000
DAFTAR HARGA SATUAN DASAR BAHAN, PERALATAN DAN UPAH TENAGA (BASIC
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
WILAYAH BANDUNG th 2016
NO.
URAIAN
SAT
RATA-RATA
HARGA DASAR
2016
JURNAL HRG
MINIMAL
JURNAL
HRG
MAKSIMAL
I.
URAIAN BAHAN
1.
Pasir pasang
185,400.00
161,600
2.
Pasir beton
236,575.00
222,200
3.
Pasir urug
136,675.00
153,800.00
172,700.00
4.
Sirtu
168,975.00
175,200.00
195,300.00
5.
Tanah merah
68,000.00
6.
Abu batu
148,366.00
168,300.00
202,000.00
7.
Batu kali
174,625.00
175,200.00
188,700.00
8.
177,300.00
9.
195,300
242,600
221,150.00
202,000.00
215,500.00
10.
218,500.00
215,500.00
235,700.00
11.
236,675.00
222,200.00
249,200.00
12.
240,825.00
242,600.00
269,300.00
13.
275,000.00
14.
Koral beton
200,025.00
134,700
163,800
14.
bh
637.00
650.00
800.00
15.
bh
741.00
750.00
900.00
16.
Batako
bh
1,550.00
1,100.00
1,200.00
17.
bh
2,300.00
2,200.00
2,400.00
18.
bh
7,233.00
19.
bh
10,600.00
20.
bh
8,050.00
21.
bh
9,600.00
22.
bh
7,200.00
3,000.00
3,200.00
23.
Roster beton 20 x 20 x 7
bh
10,200.00
4,800.00
5,400.00
24.
Roster beton 30 x 30 x 7
bh
10,100.00
9,400.00
10,800.00
25.
bh
5,350.00
26.
Glass block 20 x 20 x 10
bh
25,050.00
27.
134,850.00
28.
174,600.00
29.
Grassblock
154,200.00
30.
Kanstin abu-abu 15 x 25 x 40
bh
26,900.00
20,300.00
24,200.00
31.
bh
47,125.00
34,900.00
37,100.00
32.
Batu palimanan
135,350.00
33.
Batu paras
157,450.00
34.
Semen portland
kg
1,477.00
1,416.00
1,462.00
35.
kg
3,021.00
2,050.00
2,162.50
36.
Semen warna
kg
10,523.00
9,100.00
10,100.00
37.
kg
3,150.00
2,500.00
4,100.00
38.
kg
1,525.00
1,300.00
1,600.00
39.
kg
1,375.00
1,100.00
1,600.00
40.
kg
3,125.00
3,000.00
3,500.00
41.
3,400.00
5,700.00
42.
kg
4,566.00
5,900.00
3,900.00
43.
Limestone
69,900.00
44.
277,800.00
45.
297,700.00
46.
260,600.00
47.
271,200.00
BAHAN KAYU
1.
24,901,150.00
24,684,000
27,275,600
2.
18,231,825.00
18,513,000
19,253,300
3.
26,305,000.00
4.
16,522,000.00
5.
11,634,233.00
11,107,800
11,724,900
6.
10,811,433.00
9,873,600
10,490,700
7.
7,890,000.00
8.
8,284,000.00
9.
12,210,000.00
10.
12,821,000.00
11.
4,208,000.00
12.
7,494,000.00
13.
13,310,000.00
14.
10,838,033.00
15.
11,931,900.00
16.
11,319,420.00
11,107,800
12,034,000
17.
11,468,225.00
11,724,900
12,650,000
18.
10,183,000.00
19.
10,345,000.00
20.
8,470,000.00
21.
8,894,000.00
22.
8,385,000.00
23.
8,418,000.00
24.
6,193,250.00
25.
6,353,000.00
26.
6,588,000.00
27.
6,014,000.00
28.
4,078,050.00
29.
3,812,000.00
30.
3,981,000.00
31.
3,999,000.00
32.
4,380,550.00
33.
4,447,000.00
34.
4,208,000.00
35.
4,235,500.00
36.
4,078,050.00
37.
3,812,000.00
38.
3,594,000.00
39.
3,608,000.00
40.
4,189,925.00
4,572,000
4,936,800
41.
4,455,350.00
4,690,000
5,245,900
42.
3,950,000.00
43.
3,608,000.00
44.
3,025,000.00
45.
2,995,000.00
46.
3,321,700.00
3,085,500
3,702,600
47.
1,503,533.00
925,700
1,604,900
48.
2,420,000.00
47.
btg
29,900.00
23,700
29,700
48.
btg
30,200.00
31,400
37,400
49.
m'
25,600.00
50.
Bambu dia. 5 - 7 cm
btg
24,850.00
51.
Bambu dia. 7 - 10 cm
btg
41,000.00
52.
Bambu Gombong
btg
67,000.00
1.
Teakwood 3x7 ft 3 mm
Lbr
132,000.00
2.
Teakwood 4x8 ft 3 mm
Lbr
176,000.00
3.
Triplek 4x8 ft 4 mm
Lbr
67,400.00
4.
Triplek 4x8 ft 6 mm
Lbr
84,600.00
5.
Triplek 4x8 ft 9 mm
Lbr
140,900.00
6.
Triplek 3x7 ft 12 mm
Lbr
195,000.00
7.
Triplek 4x8 ft 12 mm
Lbr
207,200.00
8.
Formika 3x7 ft
Lbr
210,000.00
9.
Formika 4x8 ft
Lbr
257,000.00
10.
Lbr
20,625.00
11.
Lbr
25,375.00
12.
Gypsumboard 120x240 cm 9 mm
Lbr
73,966.00
13.
Gypsumboard 120x240 cm 12 mm
Lbr
110,000.00
14.
GRC-board 120x240 cm 4 mm
Lbr
65,500.00
15.
GRC-board 120x240 cm 6 mm
Lbr
73,000.00
16.
Calsiboard 120x240 cm 4 mm
Lbr
97,000.00
17.
Akustik 60 x 60 cm
Lbr
84,000.00
18.
Akustik 60 x 120 cm
Lbr
105,000.00
19.
m'
12,000.00
20.
m'
17,450.00
21.
m'
18,800.00
BAHAN BESI
1.
kg
13,100.00
2.
kg
13,700.00
3.
Kawat beton
kg
27,100.00
4.
Kawat diameter 4 mm
kg
14,000.00
5.
kg
7,750.00
6.
35,750.00
7.
Kawat nyamuk
26,950.00
8.
kg
43,200.00
9.
36,200.00
10.
kg
14,050.00
11.
kg
14,200.00
12.
Besi profil
kg
14,700.00
13.
Besi baja WF
kg
14,250.00
14.
Besi Siku
kg
13,850.00
15.
Baja Canal
kg
13,650.00
16.
Baja CNP
kg
13,650.00
17.
kg
13,700.00
18.
Besi rangka
kg
14,100.00
19.
Plat Bordes
kg
13,850.00
20.
37,000.00
21.
40,000.00
22.
47,000.00
1.
btg
40,000.00
2.
btg
32,000.00
3.
btg
48,000.00
4.
btg
40,000.00
5.
btg
68,000.00
6.
btg
53,000.00
7.
m'
23,000.00
8.
m'
21,000.00
9.
m'
17,000.00
10.
m'
146,000.00
11.
m'
165,000.00
12.
m'
113,000.00
13.
m'
129,000.00
14.
bh
3,000.00
15.
Paku rivet
btg
440.00
16.
Sekrup 6x1-1,5
bh
2,000.00
17.
Sekrup gypsum
bh
1,000.00
18.
Skrup fixer
19.
Sealant
20.
21.
22.
Textile tape
23.
24.
bh
2,000.00
tube
61,000.00
Compound gypsum
20kg/zak
81,000.00
Compound GRC
20kg/zak
99,000.00
50m/rol
21,000.00
Alkasit
kg
28,000.00
Wall angle
m'
11,000.00
BAHAN BESI
1.
Ubin pc abu-abu 40 x 40
bh
2.
Ubin pc abu-abu 30 x 30
bh
3.
Ubin pc abu-abu 20 x 20
bh
4.
Ubin pc warna 40 x 40
bh
5.
Ubin pc warna 30 x 30
bh
6.
Ubin pc warna 20 x 20
bh
7.
Plint ubin pc 10 x 40
bh
8.
Plint ubin pc 10 x 30
bh
9.
Plint ubin pc 15 x 20
bh
10.
bh
11.
bh
12.
bh
1.
Marmer
412,000.00
2.
bh
70,800.00
3.
bh
58,000.00
4.
bh
48,700.00
5.
bh
47,200.00
6.
bh
13,000.00
7.
bh
21,300.00
8.
bh
7,800.00
9.
bh
165,200.00
10.
bh
20,500.00
11.
bh
10,300.00
12.
bh
4,525.00
13.
bh
5,107.00
14.
bh
1,200.00
15.
bh
10,300.00
16.
bh
6,786.00
17.
bh
3,346.00
18.
bh
3,746.00
19.
bh
800.00
20.
bh
3,300.00
21.
bh
2,900.00
22.
bh
2,500.00
23.
bh
31,700.00
24.
Stepnosing
bh
16,200.00
25.
Vinyl karet 30 x 30 cm kl 1
bh
7,700.00
26.
Vinyl karet 30 x 30 cm kl 2
bh
6,500.00
27.
Parquet
300,100.00
1.
Lbr
48,100.00
2.
Lbr
64,250.00
3.
Lbr
64,200.00
4.
Lbr
125,100.00
5.
Lbr
40,900.00
6.
Lbr
47,300.00
7.
Lbr
53,200.00
8.
bh
1,400.00
9.
bh
2,000.00
10.
bh
2,500.00
11.
bh
3,500.00
12.
bh
1,700.00
13.
bh
2,300.00
14.
bh
10,600.00
15.
bh
11,100.00
16.
bh
7,900.00
17.
Genteng metal
206,500.00
18.
Spandek
69,800.00
19.
Atap Fibreglass
85,800.00
20.
125,100.00
21.
bh
3,450.00
22.
bh
5,700.00
23.
bh
5,500.00
24.
bh
5,200.00
25.
bh
23,300.00
26.
bh
25,300.00
27.
bh
6,500.00
28.
m'
41,300.00
29.
Nok asbes
bh
34,400.00
30.
Genteng sirap
bh
72,900.00
31.
Lbr
96,500.00
32.
Lbr
85,800.00
33.
Lbr
79,500.00
34.
Lbr
73,500.00
35.
Lbr
57,600.00
36.
Flashing
m'
59,900.00
37.
m'
82,000.00
38.
Nok paten
Lbr
48,100.00
39.
Lbr
41,800.00
40.
Allumunium foil
22,600.00
41.
m2
6,600.00
42.
m2
9,700.00
43.
m2
30,300.00
44.
Glasswool BG 50
m2
33,200.00
45.
Glasswool IB 3250
m2
31,400.00
46.
m2
156,300.00
47.
Policarbonat
m2
85,800.00
48.
14,600.00
1.
Dempul kayu
kg
20,300.00
2.
Dempul Duco
kg
28,150.00
3.
Plamir kayu
kg
23,400.00
4.
Plamir tembok
kg
10,400.00
5.
kg
39,100.00
6.
kg
47,200.00
7.
kg
47,200.00
8.
Cat zinchromate
kg
22,300.00
9.
kg
43,800.00
10.
kg
43,800.00
11.
kg
50,050.00
12.
kg
50,900.00
13.
kg
45,150.00
14.
kg
19,650.00
15.
kg
20,850.00
16.
kg
16,500.00
17.
kg
19,700.00
18.
kg
17,400.00
19.
kg
18,800.00
20.
kg
37,500.00
21.
kg
53,100.00
22.
kg
73,700.00
23.
kg
45,100.00
24.
kg
56,200.00
25.
Cat genteng KW 2
kg
32,500.00
26.
kg
49,600.00
27.
Plamur duco
kg
41,800.00
28.
Meni duco
kg
47,800.00
29.
Ltr
17,800.00
30.
Ltr
22,300.00
31.
Politur
Ltr
40,000.00
32.
Politur jadi
Ltr
31,100.00
33.
Politur Ultran
kg
43,400.00
34.
kg
27,900.00
35.
kg
57,500.00
36.
kg
46,100.00
37.
Melamic Impra
kg
24,900.00
38.
Vernis
Ltr
40,000.00
39.
Residu
Ltr
1,100.00
40.
Minyak bekisting
Ltr
2,700.00
41.
Amplas
Lbr
2,700.00
42.
Kuas
bh
11,600.00
43.
Kuas Roll
bh
24,000.00
44.
Ijuk
7,900.00
45.
Ijuk ikatan
kg
9,650.00
46.
Lem kayu
Ltr
46,800.00
47.
Lem Vinyl
kg
33,200.00
48.
Lem perekat
kg
16,900.00
49.
kg
52,800.00
50.
Aquaproof Waterproofing
kg
44,000.00
51.
Wallpaper
m2
72,900.00
52.
Grout
kg
11,500.00
53.
kg
40,000.00
54.
glassbead
kg
29,300.00
PAKU
1.
kg
15,400.00
2.
kg
23,700.00
3.
bh
2,400.00
4.
Paku sekrup
kg
35,600.00
5.
Paku beton
kg
21,900.00
6.
Paku asbes
bh
300.00
7.
Paku seng
kg
29,050.00
8.
Baut 16
bh
11,000.00
9.
Baut 12
bh
11,000.00
10.
Angkur 19
bh
75,500.00
11.
bh
39,600.00
BAHAN PIPA
1.
m'
23,400.00
2.
m'
30,300.00
3.
m'
24,616.00
4.
m'
27,900.00
5.
m'
27,900.00
6.
m'
36,100.00
7.
m'
43,300.00
8.
m'
49,216.00
9.
m'
57,416.00
10.
m'
73,816.00
11.
m'
3,575.00
12.
m'
4,950.00
13.
m'
6,875.00
14.
m'
8,950.00
15.
m'
7,400.00
16.
m'
11,000.00
17.
m'
7,150.00
18.
m'
12,225.00
19.
m'
8,625.00
20.
m'
18,350.00
21.
m'
11,075.00
22.
m'
26,825.00
23.
m'
16,000.00
24.
m'
44,825.00
25.
m'
23,375.00
26.
m'
132,200.00
27.
m'
59,800.00
26.
bh
268,600.00
27.
bh
229,500.00
28.
bh
291,200.00
29.
bh
240,700.00
30.
bh
126,200.00
31.
bh
85,600.00
32.
bh
61,400.00
33.
bh
160,900.00
34.
bh
109,900.00
35.
bh
67,700.00
36.
bh
44,900.00
37.
bh
33,750.00
38.
bh
1,733,800.00
39.
bh
2,661,600.00
40.
bh
3,678,300.00
41.
bh
5,385,300.00
42.
m'
845,900.00
43.
m'
707,000.00
BAHAN KACA
1.
daun
14,000.00
2.
daun
27,000.00
3.
Kaca 3 mm
86,500.00
4.
Kaca 5 mm
95,650.00
5.
Kaca 8 mm
259,000.00
6.
Kaca 10 mm
287,000.00
7.
Kaca rayben 5 mm
106,400.00
8.
Kaca rayben 8 mm
426,000.00
9.
Kaca rayben 10 mm
613,000.00
10.
Kaca rayben 12 mm
693,000.00
11.
Kaca es 3 mm
102,650.00
12.
Kaca es 5 mm
126,500.00
13.
297,000.00
14.
485,000.00
15.
584,000.00
16.
683,000.00
17.
218,000.00
18.
1,319,000.00
BAHAN SANITASI
1.
bh
694,000.00
2.
bh
2,006,800.00
3.
bh
2,379,000.00
4.
bh
167,600.00
5.
bh
307,650.00
6.
bh
434,100.00
7.
bh
2,463,700.00
8.
bh
977,650.00
9.
bh
1,517,000.00
10.
bh
450,550.00
11.
bh
214,000.00
12.
set
110,000.00
13.
bh
246,000.00
14.
bh
46,000.00
15.
bh
212,000.00
16.
bh
216,000.00
17.
bh
494,000.00
18.
bh
356,000.00
19.
bh
380,000.00
20.
bh
1,230,000.00
21.
bh
135,000.00
22.
Seal tape
bh
3,000.00
23.
bh
42,000.00
24.
bh
370,000.00
25.
bh
104,500.00
26.
bh
72,000.00
27.
bh
67,000.00
28.
Gantungan baju
bh
31,000.00
29.
bh
1,198,150.00
30.
bh
2,927,000.00
31.
bh
6,786,000.00
1.
bh
108,500.00
2.
bh
189,050.00
3.
bh
397,000.00
4.
Kunci tanam KM
bh
172,850.00
5.
bh
158,400.00
6.
Kunci lemari
bh
86,900.00
7.
Kunci gembok
bh
72,500.00
8.
bh
16,775.00
9.
bh
23,825.00
10.
bh
34,200.00
11.
bh
25,700.00
12.
Engsel jendela
bh
22,100.00
13.
Engsel angin
bh
21,600.00
14.
bh
137,300.00
15.
bh
17,850.00
16.
bh
114,100.00
17.
Window Casement
bh
87,500.00
18.
Rambuncis
bh
68,000.00
19.
Floor hinges
ps
2,051,300.00
20.
Pull handle
ps
1,872,800.00
21.
bh
317,300.00
22.
bh
404,500.00
23.
bh
521,700.00
24.
Kunci selot
bh
34,600.00
25.
Grendel
bh
35,250.00
26.
Roll door
356,400.00
27.
Pintu aluminium
533,100.00
28.
Door holder
bh
217,100.00
29.
bh
107,600.00
30.
bh
62,700.00
31.
bh
785,400.00
1.
m'
34,000.00
2.
m'
17,000.00
3.
m'
15,900.00
4.
m'
11,300.00
5.
m'
31,700.00
6.
m'
68,000.00
7.
m'
17,000.00
8.
Kabel NYA 1 x 70 mm
m'
79,300.00
6.
Kabel antena TV
m'
4,500.00
7.
Kabel telepon
m'
4,000.00
8.
Kabel BC 10 mm
m'
12,500.00
9.
Kabel BC 50 mm
m'
51,800.00
10.
bh
28,300.00
11.
MCB 10 A
bh
68,000.00
12.
MCB 6 A
bh
68,000.00
13.
bh
99,800.00
14.
m'
10,900.00
15.
Tee dos
bh
2,800.00
16.
Inbow doos
bh
2,600.00
17.
Sock
bh
1,200.00
18.
Klem conduit
bh
1,200.00
19.
bh
5,500.00
20.
Lastdop
bh
800.00
21.
Flexible pipe
m'
900.00
22.
Elbow
bh
5,400.00
23.
bh
13,000.00
24.
bh
29,000.00
25.
Saklar tunggal MK
bh
20,000.00
26.
bh
18,000.00
27.
bh
40,000.00
28.
Saklar seri MK
bh
23,000.00
29.
bh
29,000.00
30.
bh
63,000.00
31.
bh
34,000.00
32.
Saklar triple MK
bh
40,000.00
33.
bh
18,000.00
34.
bh
48,000.00
35.
Stop kontak MK
bh
23,000.00
36.
Stop kontak AC
bh
68,000.00
37.
bh
137,000.00
38.
bh
177,000.00
39.
Lampu PL 8 watt
bh
59,000.00
40.
bh
112,000.00
41.
bh
168,000.00
42.
bh
573,000.00
43.
Lampu SL 20 watt
bh
59,000.00
44.
bh
241,000.00
45.
bh
281,000.00
46.
bh
365,000.00
47.
bh
119,000.00
48.
bh
141,000.00
49.
bh
167,000.00
50.
bh
204,000.00
51.
bh
204,000.00
52.
bh
8,000.00
53.
Lampu taman
bh
1,105,000.00
54.
Exhaust Fan
bh
520,000.00
55.
bh
122,800.00
56.
Grounding Sistem
bh
1,635,000.00
57.
bh
178,000.00
58.
Klem BC 50 mm2
bh
4,000.00
59.
AC standing 4 PK
bh
23,625,000.00
60.
AC standing 10 PK
bh
63,762,000.00
61.
bh
8,412,000.00
62.
bh
4,641,000.00
63.
AC split wall 1 Pk
bh
3,544,000.00
64.
AC cassete 4 PK
bh
25,641,000.00
65.
bh
35,000.00
66.
Connector BC
bh
55,000.00
67.
bh
374,000.00
68.
bh
955,000.00
69.
bh
712,000.00
LAIN-LAIN
1.
Lbr
81,400.00
2.
btg
185,500.00
3.
btg
212,500.00
4.
Pintu lipat
512,100.00
5.
m'
221,700.00
6.
m'
171,900.00
7.
bh
147,600.00
8.
bh
103,400.00
9.
Bensin
Ltr
7,550.00
10.
Solar
Ltr
6,950.00
11.
Minyak tanah
Ltr
7,000.00
12.
Pelumas
Ltr
34,500.00
13.
kg
11,100.00
14.
kg
11,900.00
15.
kg
13,100.00
16.
kg
14,650.00
17.
kg
14,850.00
18.
17,400.00
19.
Hotmix
ton
1,114,600.00
20.
kg
21.
unit
22.
957,000.00
23.
1,013,000.00
24.
1,030,000.00
25.
1,069,000.00
26.
1,092,000.00
27.
1,137,000.00
2,600.00
6,231,500.00
AlAT BANTU
1.
Sewa Scafolding
bh
27,000.00
2.
Blencong
bh
84,000.00
3.
Ember Aduk
bh
4.
Mesin Bor
unit
715,000.00
5.
Mesin Gurinda
unit
436,000.00
6.
Pacul Aduk
bh
67,000.00
7.
Pahat Besi
bh
46,000.00
8.
Pengki
bh
14,000.00
9.
Sekop
bh
70,000.00
10.
Sendok semen
bh
11.
Travo Las
12.
Mata gerinda
bh
13.
Mata bor
bh
26,000.00
14.
Material Bantu
lot
525,000.00
15.
garuk aspal
bh
127,000.00
16.
sapu lidi
bh
13,000.00
17.
sikat
bh
6,000.00
18.
rambu
bh
127,000.00
19.
kereta sorong
bh
351,000.00
20.
bh
140,000.00
21.
maal tripleks
bh
30,000.00
22.
karung
bh
2,000.00
23.
cerek aspal
bh
102,000.00
24.
kaleng aspal
bh
64,000.00
TAMBAHAN
1.
m3
124,000.00
2.
lbr
2,000.00
3.
CD
bh
19,000.00
unit
6,000.00
12,000.00
2,452,000.00
13,000.00
4.
Jilid
bh
34,000.00
5.
Gebalan rumput
m2
21,000.00
6.
Lbr
121,000.00
7.
Btg
243,000.00
8.
m'
27,000.00
9.
bh
3,000.00
10.
bh
9,000.00
11.
bh
33,000.00
II.
1.
unit
###
2.
ASPHALT FINISHER
unit
###
3.
ASPHALT SPRAYER
unit
###
4.
BULLDOZER 140 HP
unit
###
5.
AIR COMPRESSOR
unit
###
6.
unit
###
7.
unit
###
8.
unit
###
9.
unit
###
10.
unit
###
11.
unit
12.
unit
###
13.
unit
###
14.
unit
###
15.
unit
###
16.
unit
###
17.
unit
18.
CONCRETE VIBRATOR
unit
19.
unit
###
20.
unit
###
21.
PEDESTERIAN ROLLER
unit
###
22.
unit
52,276,000.00
23.
PLATE COMPACTOR
unit
12,108,000.00
III.
SEWA ALAT BESAR SESUAI BUKU PATOKAN HARGA SATUAN BAHAN & UPAH DKI
1.
Asphalt Finisher
jam
1,483,000.00
2.
jam
576,000.00
3.
jam
116,000.00
4.
jam
659,000.00
5.
jam
103,000.00
6.
jam
289,000.00
7.
jam
576,000.00
8.
jam
420,000.00
9.
371,000.00
8,720,000.00
###
49,201,000.00
jam
10.
jam
330,000.00
11.
unit
1,566,000.00
12.
bln
49,424,000.00
13.
bln
65,898,000.00
14.
jam
906,000.00
15.
jam
289,000.00
16.
jam
1,566,000.00
17.
Gondola Standar
bln
9,539,000.00
18.
bln
14,324,000.00
19.
m3
41,000.00
20.
m3
45,000.00
21.
Sewa kompresor
jam
7,000.00
IV.
1.
87,000.00
2.
145,000.00
V.
1.
m'
221,000.00
2.
m'
229,000.00
3.
m'
247,000.00
4.
m'
281,000.00
5.
m'
312,000.00
6.
m'
351,000.00
7.
m'
415,000.00
1.
m'
176,000.00
2.
m'
298,000.00
3.
m'
436,000.00
1.
Ukuran 25x25 cm
set
1,345,000.00
2.
Ukuran 30x30 cm
set
1,347,000.00
1.
Ukuran 25x25 cm
sbg
282,000.00
2.
Ukuran 30x30 cm
sbg
425,000.00
1.
86,967,000.00
Crane service
VI.
UPAH TENAGA
1.
Pekerja
Oh
72,780.00
90,000.00
2.
Tukang gali
Oh
91,927.00
113,000.00
3.
Tukang kayu
Oh
91,927.00
113,000.00
4.
Tukang batu
Oh
91,927.00
113,000.00
5.
Tukang besi
Oh
91,927.00
113,000.00
6.
Oh
91,927.00
113,000.00
7.
Kepala tukang
Oh
107,872.00
136,000.00
8.
Tukang las
Oh
91,927.00
113,000.00
9.
Tukang cat
Oh
91,927.00
113,000.00
10.
Oh
91,927.00
113,000.00
11.
Oh
107,872.00
136,000.00
12.
Oh
91,927.00
113,000.00
13.
Tukang aspal
Oh
91,927.00
113,000.00
14.
Tukang gypsum
Oh
91,927.00
113,000.00
15.
Tukang alumunium
Oh
91,927.00
113,000.00
16.
Instalator
Oh
97,927.00
113,000.00
17.
Oh
125,818.00
159,000.00
18.
Oh
88,127.00
90,000.00
19.
Mandor
Oh
124,218.00
159,000.00
20.
Operator Genset
Oh
91,927.00
113,000.00
Keterangan:
1.
Data harga bahan dan upah diperoleh dari survei pasar, Journal Harga Bahan dan Harga Satuan Bahan & Upah Pemda.
2.
Data yang diperoleh dari survei pasar dimasukkan dalam kolom 6 s/d 11.
3.
Data yang diperoleh dari Journal Harga Bahan dimasukkan dalam kolom 5.
4.
Ltr = liter
5.
Singkatan:
kg = kilogram
bh = buah
m = meter persegi
Lbr = lembar
m = meter kubik
zak = karung
dia. = diameter
Oh = orang hari
btg = batang
DATA
SURVEI
pergub
jabar 2016
DATA
SURVEI
2
DATA
SURVEI
3
KET.
203,500.00
181,200.00
249,600.00
###
290,800.00
190,700.00
249,600.00
###
115,300.00
104,900.00
115,200.00
191,900.00
113,500.00
68,000.00
74,800.00
199,400.00
192,500.00
142,100.00
220,800.00
###
192,500.00
162,100.00
220,800.00
###
275,000.00
192,100.00
230,400.00
###
275,000.00
147,800.00
249,600.00
###
275,000.00
200,300.00
249,600.00
###
275,000.00
176,400.00
249,600.00
###
249,600.00
###
275,000.00
211,200.00
290,400.00
600.00
500.00
700.00
1,000.00
500.00
600.00
700.00
2,100.00
1,900.00
2,300.00
proses mesin
6,300.00
6,900.00
8,500.00
leibel
8,200.00
12,300.00
11,300.00
leibel
8,900.00
7,200.00
csk
13,700.00
5,500.00
csk
3,700.00
csk
18,900.00
15,000.00
15,600.00
5,300.00
5,400.00
28,000.00
144,500.00
125,200.00
197,100.00
152,100.00
31,500.00
31,600.00
52,600.00
63,900.00
22,100.00
###
155,000.00
###
160,900.00
###
1,480.00
5,500.00
2,375.00
11,000.00
11,893.20
1,900.00
4,100.00
1,600.00
1,550.00
Tiga Roda
Perekat Hebel
###
Plesteran
1,200.00
1,600.00
Render
2,500.00
3,500.00
Acian
2,300.00
-
3,900.00
###
###
###
###
###
###
###
###
###
###
###
###
###
-
7,890,000.00
###
-
###
###
9,052,100.00
###
9,957,300.00
4,208,000.00
7,494,000.00
###
###
###
###
###
###
###
###
###
###
###
###
8,470,000.00
8,894,000.00
8,385,000.00
8,418,000.00
6,050,000.00
###
6,353,000.00
###
5,990,000.00
###
6,014,000.00
3,630,000.00
###
3,812,000.00
###
3,594,000.00
###
3,608,000.00
6,336,500.00
4,526,100.00
4,526,100.00
4,235,000.00
###
4,447,000.00
###
4,193,000.00
###
4,210,000.00
4,526,100.00
3,630,000.00
3,812,000.00
###
3,812,000.00
3,594,000.00
###
3,594,000.00
3,608,000.00
###
3,608,000.00
3,620,900.00
3,630,000.00
4,073,500.00
3,812,000.00
4,306,000.00
3,594,000.00
3,608,000.00
###
3,608,000.00
3,025,000.00
2,995,000.00
3,177,000.00
1,980,000.00
###
27,200.00
39,000.00
18,200.00
31,000.00
33,000.00
24,800.00
24,000.00
28,000.00
23,000.00
22,000.00
22,400.00
32,000.00
###
###
###
###
57,800.00
77,000.00
79,200.00
90,000.00
110,700.00
167,000.00
###
###
216,600.00
207,000.00
###
###
0.03 mm
###
0.03 mm
21,250.00
20,000.00
26,750.00
24,000.00
67,900.00
78,000.00
Flat Harflex
Jabesmen
76,000.00
Jayaboard
### Jayaboard
73,000.00
58,000.00
###
###
###
Daikin, Armstrong
###
###
15,900.00
19,000.00
13,600.00
24,000.00
12,800.00
13,400.00
12,800.00
14,600.00
29,700.00
24,500.00
10kg/rol
###
6,000.00
9,500.00
30,900.00
40,600.00
17,900.00
36,000.00
###
###
12,800.00
15,300.00
12,800.00
15,600.00
12,800.00
16,600.00
12,800.00
15,700.00
12,800.00
14,900.00
12,800.00
14,500.00
12,800.00
14,500.00
12,800.00
14,600.00
12,800.00
15,400.00
12,800.00
14,900.00
###
0.4 mm
###
0.35 mm
###
0.5 mm
###
0.5 mm
###
0.6 mm
###
0.6 mm
###
Jayaboard
###
Jayaboard
###
###
###
###
###
###
###
###
###
###
###
### Jayaboard
###
###
###
###
###
###
###
###
###
###
Lokal
###
###
###
###
9,500.00
11,100.00
4,550.00
4,500.00
5,115.00
5,100.00
###
###
ex.Mulia / Ikad
8,272.73
5,300.00
4,092.00
2,600.00
ex.Mulia / Ikad
4,092.00
3,400.00
###
###
ex.Roman
###
###
###
###
ex.Roman
###
Maxwell
###
###
###
73,400.00
55,100.00
###
###
###
###
###
1,400.00
tidak Glazzur
2,000.00
Glazzur
2,500.00
tidak Glazzur
3,500.00
Glazzur
1,700.00
tidak Glazzur
2,300.00
Glazzur
###
ex.Kanmuri Natural
###
7,400.00
8,400.00
###
###
###
###
3,000.00
3,900.00
4,900.00
6,100.00
###
###
###
ex.Kanmuri
###
6,500.00
###
###
###
###
###
###
###
Jabesmen
###
###
###
###
Zinclume 0.35 mm
###
### standar 1 sided
### 1250mm x 60 m
### 1250mm x 60 m
### 90 m2
###
(20x1.2x0.05)m ex.malaysia
###
(10x1.2x0.025)m ex.malaysia
###
(2.3x1.2x0.025)m ex.malaysia
###
###
17,800.00
22,800.00
24,900.00
31,400.00
###
###
###
47,200.00
47,200.00
22,300.00
47,200.00
40,400.00
47,200.00
40,400.00
50,000.00
50,100.00
50,000.00
51,800.00
50,000.00
40,300.00
22,300.00
17,000.00
22,300.00
19,400.00
###
###
###
###
###
###
71,100.00
76,300.00
###
###
Nippe 2000
###
###
###
###
17,800.00
22,300.00
40,000.00
31,100.00
###
###
###
###
24,900.00
40,000.00
Ultran
###
###
2,700.00
Niken
11,600.00
4"
24,000.00
###
10,000.00
9,300.00
46,800.00
33,200.00
16,900.00
###
###
###
###
###
###
15,400.00
23,700.00
2,400.00
35,600.00
###
###
29,700.00
28,400.00
###
###
###
###
###
###
24,616.67
27,900.00
27,900.00
36,100.00
###
49,216.67
57,416.67
73,816.67
3,575.00
4,950.00
6,875.00
8,950.00
###
11,000.00
7,150.00
12,225.00
8,625.00
18,350.00
11,075.00
26,825.00
16,000.00
44,825.00
23,375.00
###
###
### Tanpa tulangan
###
###
###
###
###
###
###
###
###
44,300.00
45,500.00
34,500.00
33,000.00
###
###
###
###
###
###
Asahimas
###
###
88,000.00
85,000.00
96,300.00
95,000.00
###
###
68,800.00
144,000.00
###
###
###
96,300.00
109,000.00
104,000.00
149,000.00
###
###
###
###
###
###
###
2,006,800.00
###
257,200.00
78,000.00
382,300.00
233,000.00
431,200.00
437,000.00
Toto CW 420 J
Toto CE 6
2,508,400.00
2,419,000.00
Toto U 57M
836,300.00
1,119,000.00
Toto A 100
###
703,100.00
198,000.00
###
1 lubang
###
###
###
###
Toto T 23 B13V7N
###
Toto T 23 B13
###
Toto TX 603 KM
###
Toto T 30 AR 13V7N
###
Toto TX 402 S
###
Toto TB 18 R / TX 422 SC
###
Toto T4A
###
###
###
104,000.00
105,000.00
###
###
Toto S 156 N
###
993,300.00
1,403,000.00
Penguin
###
###
109,400.00
107,600.00
185,000.00
193,100.00
###
210,400.00
135,300.00
###
###
###
10,550.00
23,000.00
3 x 4"
14,750.00
32,900.00
ES BRASS (elmes)
###
ES BRASS (elmes)
###
3 x 4"
###
###
###
16,900.00
DB018 BR
18,800.00
10-20 cm
###
DK SS/SB-SS
###
20"
###
###
###
###
DKS HO-NA/BA
###
###
11,800.00
57,400.00
21,000.00
49,500.00
Cisa 60410-02
RRT
###
###
###
###
###
DKS 887
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Eterna, Suprame
###
###
###
###
###
###
###
###
###
###
###
Lokal
###
Italia
###
England
###
Lokal
###
Italia
###
England
###
Italia
###
Italia
###
Jepang
###
England
###
###
###
###
Panasonic
###
Philips
###
Philips
###
Philips
###
Philips
###
###
###
Philips
###
Philips
###
Philips
###
Philips
###
Philips
###
Philips
###
Philips
###
Philips
###
### Philips
### IDGL 18w
###
Maspion
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
8,500.00
6,600.00
7,500.00
6,400.00
7,000.00
###
###
###
###
18,500.00
10,800.00
CRS-1
18,500.00
11,200.00
CRS-2
###
###
###
### Pompa Semi Deep
###
###
###
###
###
###
###
1 SET
###
###
###
###
Bosch
###
###
###
###
###
###
NLG
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
9,000.00
### ex.Kanmuri
###
33,000.00
### ex.Kanmuri
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
200x65x100 cm
###
600x65x100 cm
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
60,000.00
90,900.00
65,000.00
58,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
72,000.00
136,364.51
100,000.00
95,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
72,000.00
136,364.51
100,000.00
95,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
85,000.00
80,000.00
68,000.00
113,636.80
100,000.00
95,000.00
76,000.00
159,090.47
120,000.00
72,000.00
113,636.80
85,000.00
68,000.00
159,090.47
120,000.00
68,000.00
113,636.80
85,000.00
###
80,000.00
###
80,000.00
URAIAN
PEKERJAAN PENDAHULUAN
1.
2.
Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m'
3.
Pagar perimeter dari kawat duri tinggi 1,5 meter tiap 1 m'
4.
5.
6.
Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m
7.
8.
9.
10. Pekerjaan Pengukuran dan Pasang bouwplank kayu Albasia tiap 1 m'
11. Pasang bouwplank kayu terentang tiap 1 m'
12. Pasang bouwplank kayu meranti tiap 1 m'
13. Membersihkan puing-puing tiap 1 m2
B
PEKERJAAN TANAH
1.
2.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
PEKERJAAN DINDING
1.
2.
3.
4.
5.
6.
7.
8.
9.
PEKERJAAN PLESTERAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
Pasang kusen pintu dan jendela Kayu Kamper Samarinda Oven tiap 1m
3.
4.
5.
6.
7.
8.
9.
14. Pasang pintu dan jendela kaca Kayu Meranti Sampit tiap 1m
15. Pasang pintu dan jendela kaca Kayu Borneo tiap 1m
16. Pasang pintu dan jendela jalusi Kayu Jati tiap 1m
17. Pasang pintu dan jendela jalusi Kayu Kamper Samarinda Oven tiap 1m
18. Pasang pintu dan jendela jalusi Kayu Kamper Singkil tiap 1m
19. Pasang pintu dan jendela jalusi Kayu Kamper Medan/Kruing tiap 1m
20. Pasang pintu dan jendela jalusi Kayu Meranti Sampit tiap 1m
21. Pasang pintu dan jendela jalusi Kayu Borneo tiap 1m
22. Pasang jalusi mati Kayu Jati tiap 1m
23. Pasang jalusi mati Kayu Kamper Samarinda oven tiap 1m
24. Pasang jalusi mati Kayu Kamper Medan/Kruing tiap 1m
25. Pasang pintu teakwood rangkap, rangka Kayu Kamper Samarinda oven tiap 1m
26. Pasang pintu teakwood rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m
27. Pasang pintu teakwood rangkap, rangka Kayu Meranti Palembang tiap 1m
28. Pasang pintu triplek rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m
29. Pasang pintu triplek rangkap, rangka Kayu Meranti Palembang tiap 1m
30. Pasang pintu teakwood dan formika, rangka Kayu Kamper Samarinda oven tiap 1m
31. Pasang pintu teakwood dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m
32. Pasang pintu teakwood dan formika, rangka Kayu Meranti Palembang tiap 1m
33. Pasang pintu triplek dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m
34. Pasang pintu triplek dan formika, rangka Kayu Meranti Palembang tiap 1m
35. Pasang pintu triplek dan double formika, rangka Kayu Meranti Palembang tiap 1m
36. Pasang kawat harmonika tiap 1 m
37. Pasang kawat nyamuk tiap 1 m
38. Pasang kawat kasa tiap 1 m
G
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. Pasang kaso + reng genteng beton Kayu Meranti Jambi tiap 1m
11. Pasang kaso + reng atap sirap kayu kamper tiap 1m
12. Pasang lisplank (3 x 20) cm Kayu Kamper Samarinda tiap 1m'
13. Pasang lisplank (3 x 20) cm Kayu Kamper Medan/Kruing tiap 1m'
14. Pasang lisplank (3 x 20) cm Kayu Meranti Palembang tiap 1m'
15. Pasang lisplank (3 x 30) cm Kayu Kamper Samarinda tiap 1m'
16. Pasang lisplank (3 x 30) cm Kayu Kamper Medan/Kruing tiap 1m'
17. Pasang lisplank (3 x 30) cm Kayu Meranti Palembang tiap 1m'
18. Pasang lisplank 2 x (2 x 20) cm Kayu Kamper Samarinda tiap 1m'
19. Pasang lisplank 2 x (2 x 20) cm Kayu Kamper Medan/Kruing tiap 1m'
20. Pasang lisplank 2 x (2 x 20) cm Kayu Meranti Palembang tiap 1m'
21. Membuat listplank asbes plat ram kayu tiap 1 m2
22. Pasang kaso hollow 40x40 + reng baja ringan tiap 1m
H
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. Pasang rangka plafon (60 x 60) cm Kayu Kamper Samarinda tiap 1m
11. Pasang rangka plafon (60 x 60) cm Kayu Kamper Medan/Kruing tiap 1m
12. Pasang rangka plafon (60 x 60) cm Kayu Meranti Palembang tiap 1m
13. Pasang rangka plafon (30 x 60) cm Kayu Kamper Samarinda tiap 1m
14. Pasang rangka plafon (30 x 60) cm Kayu Kamper Medan/Kruing tiap 1m
15. Pasang rangka plafon (30 x 60) cm Kayu Meranti Palembang tiap 1m
16. List Plafon kayu profil tiap 1m'
17. List plafon bahan Kayu Kamper Samarinda papan 1x5 cm tiap 1 m'
18. List plafon bahan triplek 0,3x5 cm tiap 1 m'
19. Pasang list profil cornice gypsum lebar sampai 5 cm tiap 1 m'
20. Pasang list profil cornice gypsum lebar sampai 5-10 cm tiap 1 m'
21. Pasang list profil cornice gypsum lebar lebih dari 10 cm tiap 1 m'
22. Pasang list profil cornice wall aluminium tiap 1 m'
23. Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm tiap 1m
24. Penutup plafon akustik (60 x 120) cm tiap 1m
25. Penutup plafon teakwood (60 x 120) cm tebal 3 mm tiap 1m
26. Penutup plafon gypsum board 9 mm tiap 1m
27. Penutup plafon GRC-board 4 mm tiap 1m
28. Penutup plafon Calsiboard 4 mm tiap 1m
29. Penutup plafon triplek 4 mm tiap 1m
30. Penutup plafon triplek 6 mm tiap 1m
31. Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm lengkap rangka Kamper Medan/Kruing tiap 1m
32. Penutup plafon triplek 4 mm (60 x 120) cm lengkap rangka Kamper Medan/Kruing tiap 1m
33. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap (6mx6m) = 36 m
34. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.3 mm / tiap 1 m
35. Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
36. Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
37. Penutup plafon Calsiboard 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
37. Penutup plafon Akustik ukuran 60x120 cm + rangka alumunium / tiap 1 m
38. Plafond Papan (Lambriziring) 10 cm, tebal 1 cm + Rangka Kayu Borneo Super tiap 1 m2
39. Perapihan langit-langit beton exposed
I
1.
2.
3.
Pasang dinding pemisah teakwood rangkap rangka Kayu Kamper Medan/Kruing tiap 1m
4.
Pasang dinding pemisah teakwood rangkap rangka Kayu Meranti Palembang tiap 1m
5.
6.
7.
8.
9.
PEKERJAAN BETON
1.
Beton Non Struktur 1Pc : 3Ps : 5Kr - untuk rabatan/ beton tumbuk tiap 1m
2.
Lantai Kerja Beton 1Pc : 3Ps : 5Kr - untuk beton tumbuk tebal 5 cm
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
PEKERJAAN SANITASI
1.
2.
3.
4.
5.
6.
7.
8.
9.
45
1.
2.
3.
4.
5.
3.
4.
Pasang pintu besi plat baja tebal 2 mm rangkap, rangka baja siku / tiap m
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
4.
5.
6.
7.
8.
9.
PEKERJAAN PENGECATAN
1.
2.
3.
4.
5.
6.
Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 2 lps penutup Mowilex
7.
8.
Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 3 lps penutup Mowilex
9.
PEKERJAAN BONGKARAN
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
Pasang instalasi lampu dg NYM 3x2,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
2.
Pasang instalasi lampu dg NYM 2x2,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
3.
Pasang instalasi lampu dg NYM 2x1,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
4.
Pasang instalasi lampu untuk gedung pertemuan & gudang tiap 1 titik (tidak termasuk fitting, sakelar
5.
6.
7.
8.
9.
10. Pasang instalasi stop kontak tiap 1 titik (tidak termasuk stop kontak)
11. Pasang instalasi stop kontak lebih dari 500 watt tiap 1 titik (tidak termasuk stop kontak)
12. Pasang instalasi listrik + outlet AC tiap 1 titik (tidak termasuk AC)
13. Pasang instalasi + tiang antena TV tiap 1 titik (tidak termasuk socket & antena)
14. Pasang instalasi penangkal petir
15. Pasang instalasi telepon tiap 1 titik (tidak termasuk outlet, pesawat telepon & sambungan Telkom)
16. Pasang instalasi telepon paralel/extension line tiap 1 titik (tidak termasuk outlet, pesawat telepon)
17. Pasang Panel Pembagi Daya 1300 VA / 6 A (3 grup @ 6 A) tiap 1 unit
18. Pasang Panel Pembagi Daya 2200 VA / 10 A (3 grup @ 10 A) tiap 1 unit
19. Pasang pentanahan (grounding) tiap 1 titik
20. Pasang pentanahan (grounding) panel tiap 1 titik
21. Pasang 1 buah lampu SL
22
23
24
25
26
27
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.
2.
3.
Membuat pagar dinding tinggi 2 m bata merah + plesteran + cat tembok tiap 1 m'
4.
Membuat pagar dinding tinggi 3 m bata merah + plesteran + cat tembok tiap 1 m'
5.
Membuat pagar dinding tinggi 2 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'
6.
Membuat pagar dinding tinggi 1,5 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'
7.
Membuat pagar BRC 1,2 m tinggi jadi 1,5 m (pondasi batu kali + sloof 15/20 + bata 30 cm + plester
8.
Membuat pagar BRC 0,9 m tinggi jadi 1,2 m (pondasi batu kali + sloof 15/20 + bata 30 cm + plester
1.
2.
3.
4.
5.
6.
Lapis Pondasi Bawah (LPB / Subbase Course) Kelas C Sirtu tebal 10 cm tiap 1m
7.
Lapis Pondasi Jalan Tanpa Penutup Aspal jenis Waterbound Macadam tiap 1m
8.
9.
28. Pembuatan jalan aspal beton t=5 cm lebar 3 m' tiap 1 m'
29. Pembuatan jalan aspal beton t=5 cm lebar 4 m' tiap 1 m'
30. Pembuatan jalan aspal beton t=5 cm lebar 5 m' tiap 1 m'
31. Pembuatan jalan aspal beton t=5 cm lebar 6 m' tiap 1 m'
32. Pembuatan jalan aspal beton t=5 cm lebar 8 m' tiap 1 m'
33. Pekerjaan paving parkir kendaraan (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 20 cm + urugan pa
34. Pekerjaan paving jalan setapak (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 10 cm + urugan pasir
35. Pekerjaan kanstin tiap 1 m'
36. Pasang grassblock tebal 10 cm tiap 1 1m
37. Gebalan rumput tiap 1m
V
1.
Foto Dokumentasi
2.
3.
4.
5.
6.
7.
8.
9.
10
11
12
13
14
CE)
NA
HSP (Rp)
463,030.00
101,320.00
118,140.00
145,920.00
1,404,300.00
684,410.00
1,282,460.00
127,340.00
149,780.00
53,460.00
77,670.00
92,930.00
14,550.00
13,480.00
4,260.00
57,690.00
71,090.00
84,740.00
76,750.00
116,620.00
92,920.00
43,760.00
19,220.00
104,670.00
25,250.00
19,430.00
42,600.00
8,520.00
16,124.00
3,229.00
26,873.00
5,375.00
2,332.00
491.00
224,070.00
187,080.00
104,670.00
245,550.00
25,130.00
24,960.00
70,680.00
866,390.00
781,140.00
730,030.00
694,600.00
373,470.00
1,845,530.00
747,710.00
250,750.00
228,130.00
120,870.00
110,790.00
108,470.00
1,110,820.00
1,019,320.00
95,020.00
108,140.00
139,280.00
25,410.00
58,800.00
193,980.00
202,100.00
152,740.00
221,070.00
291,040.00
641,680.00
50,010.00
46,950.00
44,870.00
237,970.00
66,220.00
62,140.00
59,300.00
69,290.00
67,830.00
65,030.00
69,120.00
33,430.00
31,570.00
15,260.00
37,570.00
49,660.00
26,980.00
#N/A
29,985,540.00
15,416,060.00
9,842,320.00
7,304,080.00
7,438,330.00
1,411,370.00
836,450.00
613,290.00
537,390.00
537,050.00
913,980.00
569,020.00
435,130.00
389,380.00
389,580.00
2,094,050.00
1,174,170.00
979,740.00
817,120.00
695,140.00
695,670.00
1,826,770.00
964,390.00
629,650.00
751,230.00
611,750.00
548,230.00
503,150.00
439,630.00
943,820.00
804,350.00
740,820.00
695,750.00
632,220.00
782,010.00
68,840.00
59,160.00
69,340.00
6,454,440.00
8,658,090.00
15,830,850.00
7,998,640.00
135,900.00
85,320.00
135,900.00
85,320.00
148,530.00
92,900.00
1,705,070.00
111,780.00
74,950.00
56,650.00
158,140.00
101,870.00
73,920.00
120,010.00
75,000.00
52,640.00
410,360.00
92,720.00
174,900.00
113,380.00
88,000.00
214,920.00
135,980.00
103,400.00
188,030.00
121,390.00
93,890.00
234,960.00
151,410.00
116,930.00
309,260.00
191,360.00
142,710.00
36,260.00
22,970.00
18,530.00
#REF!
35,700.00
38,180.00
25,200.00
32,540.00
173,690.00
82,510.00
46,260.00
43,540.00
55,010.00
41,840.00
48,290.00
146,700.00
161,210.00
#REF!
#REF!
186,140.00
183,410.00
194,880.00
287,150.00
360,540.00
52,550.00
233,850.00
174,620.00
430,710.00
371,490.00
81,260.00
37,820.00
44,700.00
54,860.00
#REF!
330,150.00
335,420.00
#REF!
806,610.00
117,830.00
812,930.00
897,670.00
997,680.00
1,039,100.00
1,080,530.00
1,118,160.00
1,154,370.00
1,017,360.00
15,430.00
16,060.00
205,530.00
222,140.00
211,830.00
367,010.00
395,040.00
502,410.00
492,850.00
352,730.00
291,120.00
2,401,460.00
1,398,520.00
4,257,350.00
5,275,780.00
9,203,460.00
7,082,700.00
6,549,460.00
6,172,380.00
6,339,380.00
950,180.00
136,850.00
203,310.00
466,920.00
88,130.00
105,000.00
177,240.00
758,630.00
106,240.00
781,710.00
704,400.00
233,800.00
1,136,420.00
703,310.00
1,013,780.00
54,660.00
42,070.00
62,160.00
145,270.00
184,570.00
113,430.00
238,660.00
76,790.00
80,020.00
75,540.00
82,970.00
61,090.00
266,030.00
201,450.00
70,490.00
40,770.00
51,900.00
84,900.00
94,000.00
152,750.00
172,400.00
105,830.00
81,830.00
89,690.00
172,140.00
91,620.00
83,340.00
34,090.00
59,140.00
110,740.00
86,430.00
298,440.00
1,096,910.00
2,488,480.00
2,883,010.00
425,040.00
565,090.00
691,540.00
3,401,440.00
1,469,570.00
1,958,980.00
982,770.00
1,755,150.00
771,140.00
51,410.00
62,590.00
53,380.00
58,700.00
72,210.00
85,500.00
106,740.00
120,030.00
153,360.00
14,790.00
17,020.00
20,140.00
23,500.00
20,990.00
26,820.00
20,580.00
33,310.00
27,480.00
38,530.00
26,740.00
63,720.00
46,190.00
92,880.00
58,130.00
234,430.00
117,140.00
357,180.00
57,690.00
223,690.00
505,690.00
367,690.00
391,690.00
106,690.00
78,620.00
42,620.00
53,620.00
381,620.00
146,620.00
116,120.00
83,620.00
9,133,870.00
1,699,340.00
3,056,130.00
1,629,110.00
300,350.00
3,265,020.00
7,270,880.00
27,800.00
27,280.00
30,690.00
30,210.00
#N/A
3,870.00
849,990.00
124,110.00
328,900.00
592,050.00
567,730.00
176,060.00
139,760.00
#REF!
480,480.00
208,020.00
214,720.00
204,350.00
76,460.00
15,140.00
15,140.00
83,790.00
371,700.00
463,360.00
156,330.00
236,880.00
219,740.00
205,290.00
114,550.00
100,150.00
33,360.00
40,410.00
50,790.00
43,720.00
2,106,600.00
1,894,920.00
153,890.00
34,440.00
372,600.00
56,720.00
57,370.00
104,090.00
51,190.00
272,400.00
73,760.00
851,760.00
129,500.00
121,800.00
155,740.00
133,630.00
303,140.00
333,940.00
486,840.00
692,540.00
789,950.00
778,950.00
670,050.00
561,150.00
256,390.00
1,467,490.00
381,560.00
204,540.00
136,920.00
325,150.00
288,890.00
245,950.00
204,240.00
245,460.00
214,220.00
173,920.00
165,970.00
548,790.00
422,310.00
130,330.00
#N/A
578,400.00
251,010.00
219,770.00
239,370.00
210,510.00
315,370.00
257,520.00
140,060.00
173,400.00
191,610.00
54,150.00
47,240.00
28,450.00
29,940.00
32,160.00
71,750.00
24,030.00
21,910.00
73,490.00
44,140.00
102,490.00
11,220.00
9,580.00
37,000.00
39,270.00
51,590.00
54,500.00
58,480.00
62,030.00
31,100.00
73,040.00
120,490.00
61,900.00
8,980.00
35,790.00
17,830.00
17,070.00
30,870.00
39,840.00
13,940.00
13,300.00
21,890.00
18,450.00
19,930.00
28,030.00
54,200.00
24,220.00
42,200.00
45,110.00
208,510.00
50,150.00
35,290.00
220,950.00
54,020.00
18,180.00
44,490.00
526,580.00
52,640.00
5,760.00
63,190.00
118,480.00
236,970.00
4,260.00
4,260.00
3,940.00
2,690.00
4,040.00
5,930.00
10,460.00
7,890.00
621,400.00
410,850.00
7,890.00
3,080.00
365,950.00
354,950.00
308,950.00
422,510.00
90,330.00
42,730.00
352,500.00
715,500.00
205,500.00
365,050.00
696,340.00
464,850.00
448,950.00
4,394,330.00
360,150.00
239,030.00
1,818,320.00
1,818,320.00
130,970.00
740,550.00
73,020.00
126,550.00
183,110.00
592,160.00
391,170.00
977,980.00
732,550.00
259,520.00
299,920.00
384,760.00
136,300.00
158,520.00
184,780.00
222,150.00
226,180.00
21,510.00
1,163,060.00
60,140.00
65,190.00
65,190.00
572,210.00
82,360.00
117,090.00
407,870.00
452,530.00
578,480.00
634,030.00
795,660.00
877,770.00
426,870.00
462,370.00
710,120.00
156,190.00
235,280.00
409,410.00
602,360.00
871,700.00
1,130,610.00
1,882,390.00
2,810,190.00
3,826,890.00
5,533,890.00
1,412,620.00
1,210,640.00
295,430.00
466,770.00
1,049,810.00
1,333,930.00
979,530.00
745,000.00
711,370.00
637,040.00
UPACARA/APEL
101,320.00
98,900.00
107,380.00
5,030.00
232,820.00
24,080.00
317,300.00
328,790.00
13,630.00
15,750.00
15,910.00
97,090.00
102,830.00
160,280.00
191,970.00
575,910.00
767,880.00
959,850.00
1,151,820.00
1,535,760.00
208,630.00
625,890.00
834,520.00
1,043,150.00
1,251,780.00
1,669,040.00
266,080.00
798,240.00
1,064,320.00
1,330,400.00
1,596,480.00
2,128,640.00
238,600.00
209,450.00
102,660.00
226,200.00
32,710.00
127,000.00
2,352,830.00
6,138,290.00
7,836,660.00
9,993,270.00
8,557,120.00
3,640,440.00
25,958,410.00
64,460,620.00
1,590,130.00
1,563,680.00
1,518,830.00
1,499,280.00
1,434,880.00
196,570.00
URAIAN PEKERJAAN
VOLUME
SAT
Pekerjaan Persiapan
1 Pembersihan Lokasi
m2
2 Pekerjaan Pengukuran
m2
m2
4 Air kerja
ls
5 Listrik Kerja
ls
m2
Sub Total
II
Pekerjaan Tanah
1 Galian Tanah
m3
m3
m3
m3
Sub Total
III
m3
Adukan 1PC:5 PS
m3
m3
Sub Total
IV
f'c
m3
Fy
kg
Fy
kg
c Pekerjaan Bekisting
2
m2
f'c
m3
Fy
kg
Fy
kg
c Pekerjaan Bekisting
3
m2
f'c
m3
Fy
kg
Fy
kg
c Pekerjaan Bekisting
4
m2
f'c
m3
Fy
kg
Fy
kg
c Pekerjaan Bekisting
5
m2
f'c
m3
Fy
kg
Fy
kg
c Pekerjaan Bekisting
6
m2
f'c
m3
Fy
kg
Fy
kg
c Pekerjaan Bekisting
m2
Sub Total
m3/m2
m3
m1
4 Pekerjaan Lisplank
m1
5 Pasang Genteng
m2
6 Pasang bubungan
m1
Sub Total
VI
Pekerjaan PLAFOND
1 Pekerjaan Rangka Plafond
m2
m2
m1
Sub Total
VII
Pekerjaan Dinding
1 Pekerjaan Pasangan Dinding
m2
m2
3 Pekerjaan acian
m2
m2
Sub Total
VIII
Pekerjaan Kusen
1 Kusen Pintu jendela
m3
2 Daun pintu
m2
3 Daun Jendela
m
Sub Total
IX
m2
2 Engsel
buah
3 Kunci
buah
Sub Total
Pekerjaan Lantai
1 Urukan pasir di bawah lantai
m3
m2
Sub Total
XI
m2
m2
3 listplang
m2
m2
5 Plafon asbes 1 x 1 m
m2
Sub Total
XII
buah
4 Closet jongkok
buah
5 Keran air
buah
Sub Total
XIII
Elektrikal
1 Pasang Box KWH dan Meter
unit
buah
ttk
ttk
Sub Total
HARGA
SATUAN
(Rp)
E
Pekerjaan Persiapan
Pekerjaan Tanah
JUMLAH
TOTAL
(Rp)
F = (CxE)
0
bata merah/batako/bata ringan
Pekerjaan Dinding
0
kayu/alumunium/wpc
kayu/alumunium/wpc
kayu/alumunium/wpc
Pekerjaan Kusen
Pekerjaan Lantai
Mekanikal/plumbing
Elektrikal