Kebutuhan
Tenaga Kerja
Pekerja
Mandor
Satuan
org/hr
org/hr
Indeks
0.750
0.025
Kebutuhan
Tenaga Kerja
Pekerja
Mandor
Satuan
org/hr
org/hr
Indeks
0.900
0.045
Kebutuhan
Tenaga Kerja
Pekerja
Mandor
Satuan
org/hr
org/hr
Indeks
0.248
0.008
Kebutuhan
Tenaga Kerja
Pekerja
Mandor
Satuan
org/hr
org/hr
Indeks
0.500
0.005
Kebutuhan
Satuan
Indeks
Kebutuhan
Bahan
Tenaga Kerja
Pasir Urug
Tanah Timbunan
Pekerja
Mandor
Satuan
Indeks
M
M
1.200
1.200
org/hr
org/hr
0.300
0.010
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
M
org/hr
org/hr
org/hr
org/hr
Indeks
1.200
202.000
0.485
1.500
0.600
0.060
0.075
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
M
org/hr
org/hr
org/hr
org/hr
Indeks
1.200
163.000
0.520
1.500
0.600
0.060
0.075
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
M
org/hr
org/hr
org/hr
org/hr
Indeks
1.200
0.432
0.780
0.390
0.039
0.039
Kebutuhan
Satuan
Indeks
Bahan
Tenaga Kerja
Paving Block 6 cm
Paving Block 6 cm warna
Pasir Urug
Pekerja
Tukang batu
Kepala tukang
Mandor
M
M
M
org/hr
org/hr
org/hr
org/hr
50.000
50.000
0.200
0.720
0.135
0.014
0.036
Kebutuhan
Bahan
Tenaga Kerja
Paving Block 8 cm
Paving Block 8 cm warna
Pasir Urug
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
M
M
M
org/hr
org/hr
org/hr
org/hr
Indeks
50.000
50.000
0.200
0.720
0.135
0.014
0.036
PEK. BETON
Membuat 1 M beton mutu fc = 7,4 Mpa (K100) W/c = 0.87 (beton Rabat 1 Pc : 3 Ps : 5 Kr)
Kebutuhan
Bahan
Tenaga Kerja
Semen
Pasir beton
Kerikil (maks. 30 cm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
Kg
Kg
Kg
Ltr
org/hr
org/hr
org/hr
org/hr
Indeks
247.000
869.000
999.000
215.000
1.650
0.275
0.028
0.083
Kebutuhan
Bahan
Tenaga Kerja
Semen
Pasir beton
Kerikil (maks. 30 cm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
Kg
Kg
Kg
Ltr
org/hr
org/hr
org/hr
org/hr
Indeks
352.000
731.000
1,031.000
215.000
1.650
0.275
0.028
0.083
Kebutuhan
Bahan
Tenaga Kerja
Semen
Pasir beton
Kerikil (maks. 30 cm)
Air
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
Kg
Kg
Kg
Ltr
org/hr
org/hr
org/hr
org/hr
Indeks
371.000
698.000
1,047.000
215.000
1.650
0.275
0.028
0.083
Kebutuhan
Bahan
Tenaga Kerja
Satuan
Kg
Kg
org/hr
org/hr
org/hr
org/hr
Indeks
10.500
0.150
0.070
0.070
0.007
0.004
Jum
Kebutuhan
Bahan
Satuan
M
Kg
Indeks
0.040
0.300
Tenaga Kerja
Minyak bekesting
Pekerja
Tukang batu
Kepala tukang
Mandor
Ltr
org/hr
org/hr
org/hr
org/hr
0.100
0.520
0.260
0.026
0.026
Jumlah harga per -
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
Ltr
org/hr
org/hr
org/hr
org/hr
Indeks
0.045
0.300
0.100
0.520
0.260
0.026
0.026
Jumlah harga per -
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
Ltr
M
Lbr
Btg
org/hr
org/hr
org/hr
org/hr
Indeks
0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033
Jumlah harga per -
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
Ltr
M
Lbr
Btg
org/hr
org/hr
org/hr
org/hr
Indeks
0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033
Jumlah harga per -
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
Ltr
M
Lbr
Btg
org/hr
Indeks
0.040
0.400
0.200
0.015
0.350
6.000
0.660
Tukang batu
Kepala tukang
Mandor
org/hr
org/hr
org/hr
0.330
0.033
0.033
Jumlah harga per -
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
Ltr
M
Lbr
Btg
org/hr
org/hr
org/hr
org/hr
Indeks
0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033
0.033
Jumlah harga per -
Kebutuhan
Bahan
Tenaga Kerja
Bata merah
Semen
Pasir
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satuan
bh
kg
m
org/hr
org/hr
org/hr
org/hr
Indeks
70.000
11.500
0.043
0.300
0.100
0.010
0.015
Kebutuhan
Bahan
Tenaga Kerja
Semen
Pasir
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satuan
kg
m
org/hr
org/hr
org/hr
org/hr
Indeks
10.244
0.020
0.200
0.150
0.015
0.010
Kebutuhan
Bahan
Tenaga Kerja
Semen
Pasir
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satuan
kg
m
org/hr
org/hr
org/hr
org/hr
Indeks
7.776
0.023
0.200
0.150
0.015
0.010
Memasang 1 M Acian
Kebutuhan
Satuan
Indeks
Kebutuhan
Bahan
Tenaga Kerja
Semen
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Satuan
kg
org/hr
org/hr
org/hr
org/hr
Indeks
3.250
0.150
0.100
0.010
0.008
Kebutuhan
Bahan
Tenaga kerja
Loster beton
Semen
Pasir
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
bh
kg
m
org/hr
org/hr
org/hr
org/hr
Indeks
1.000
0.850
0.002
0.050
0.125
0.025
0.003
Kebutuhan
Bahan
Tenaga kerja
Plint keramik 10 x 40
Semen
Pasir
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
Buah
Kg
M
Kg
OH
OH
OH
OH
Indeks
2.650
4.560
0.012
0.200
0.090
0.090
0.009
0.005
Kebutuhan
Bahan
Tenaga kerja
Satuan
bh
kg
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
6.630
9.800
0.022
1.600
0.620
0.350
0.035
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
bh
kg
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
11.870
10.000
0.045
1.500
0.620
0.350
0.035
0.030
Kebutuhan
Bahan
Tenaga kerja
Satuan
bh
kg
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
26.500
10.400
0.045
1.620
0.620
0.350
0.035
0.030
Kebutuhan
Bahan
Tenaga kerja
Keramik 20 x 25 cm
Semen
Pasir
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
bh
kg
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
21.500
9.300
0.018
1.940
0.600
0.450
0.045
0.030
Kebutuhan
Bahan
Tenaga kerja
Kuku Keramik
Semen
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
m'
Kg
Kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.1000
0.5000
0.1000
0.0150
0.0700
0.0070
0.0007
Jumlah harga per -
Kebutuhan
Tenaga kerja
Pekerja
Mandor
Satuan
OH
OH
Indeks
0.355
0.004
Kebutuhan
Bahan
Tenaga Kerja
Satuan
m
kg
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.100
1.250
1.000
6.000
20.000
2.000
0.300
Kebutuhan
Bahan
Tenaga Kerja
Satuan
m
kg
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.100
1.250
1.000
6.000
20.000
2.000
0.300
Kebutuhan
Bahan
Tenaga Kerja
Satuan
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
0.040
0.500
1.000
2.500
0.250
0.050
Kebutuhan
Bahan
Tenaga Kerja
Satuan
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
0.040
0.500
1.000
2.500
0.250
0.050
Kebutuhan
Bahan
Tenaga kerja
Kaca Bening 5 mm
Kaca Buram 5 mm
Kaca Rayben 5 mm
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
m
m
m
org/hr
org/hr
org/hr
org/hr
Indeks
1.100
1.100
1.100
0.015
0.150
0.015
0.00075
Kebutuhan
Satuan
Indeks
Kebutuhan
Bahan / Material
Pengecatan
Upah kerja
Satuan
ls
ls
ls
Indeks
1.000
1.000
1.000
Kebutuhan
Bahan
Tenaga kerja
Satuan
bh
bh
org/hr
org/hr
org/hr
org/hr
Indeks
1.000
1.000
0.010
0.500
0.010
0.005
Kebutuhan
Bahan
Tenaga kerja
Grandel
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
bh
org/hr
org/hr
org/hr
org/hr
Indeks
1.000
0.015
0.150
0.015
0.00075
Kebutuhan
Bahan
Tenaga kerja
Engsel pintu
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
bh
org/hr
org/hr
org/hr
org/hr
Indeks
1.000
0.015
0.150
0.015
0.0008
Kebutuhan
Bahan
Tenaga kerja
Engsel jendela
Pekerja
Tukang kayu
Kepala tukang
Satuan
bh
org/hr
org/hr
org/hr
Indeks
1.000
0.010
0.100
0.010
Mandor
org/hr
0.0005
Kebutuhan
Bahan
Tenaga kerja
Hak angin
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
Indeks
set
org/hr
org/hr
org/hr
org/hr
1.000
0.015
0.150
0.015
0.00075
Kebutuhan
Bahan
Tenaga
Satuan
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.100
5.600
12.000
1.200
4.000
0.200
Jumlah harga per
Kebutuhan
Bahan
Tenaga Kerja
Satuan
m
m
bh
bh
bh
org/hr
org/hr
org/hr
org/hr
Indeks
3.000
5.000
9.000
11.000
0.600
0.090
0.500
0.230
0.025
Kebutuhan
Bahan
Tenaga Kerja
Genteng metal
Screw Pen Fast Besar
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
lbr
bh
org/hr
org/hr
org/hr
org/hr
Indeks
1.623
6.000
0.200
0.100
0.010
0.001
Kebutuhan
Bahan
Tenaga Kerja
Atap spandeks
Paku secrup
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.050
0.020
0.150
0.075
0.008
0.006
Bahan
Tenaga Kerja
Kebutuhan
Satuan
bh
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.250
0.050
0.250
0.150
0.015
0.013
Kebutuhan
Bahan
Tenaga Kerja
Seng plat
Paku secrup
Pekerja
Tukang besi konstruksi
Satuan
M'
Kg
org/hr
org/hr
Indeks
1.050
0.010
0.150
0.300
Kepala tukang
Mandor
org/hr
org/hr
0.030
0.007
Kebutuhan
Bahan
Tenaga Kerja
Wood Plank
Paku Sekrup
Pekerja
Tukang Kayu
Kepala tukang
Mandor
Satuan
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.050
0.100
0.100
0.200
0.025
0.005
PEK. PLAFOND
Memasang 1 m Rangka Plafond Besi Hollow + Plafond Gypsumboard
Kebutuhan
Bahan
Tenaga
Satuan
m'
m'
lbr
kg
set
org/hr
org/hr
org/hr
org/hr
Indeks
3.300
0.700
0.382
0.200
0.250
0.500
0.050
0.150
0.008
Jumlah harga per
Kebutuhan
Bahan
Tenaga
Satuan
m'
m'
lbr
kg
set
org/hr
org/hr
org/hr
org/hr
Indeks
3.300
0.700
0.382
0.200
0.250
0.500
0.050
0.150
0.008
Jumlah harga per
Kebutuhan
Bahan
Tenaga
Satuan
m'
m'
lbr
kg
set
org/hr
org/hr
Indeks
3.300
0.700
0.382
0.200
0.250
0.500
0.050
Pekerja
Mandor
org/hr
org/hr
0.150
0.008
Jumlah harga per
Kebutuhan
Bahan
Tenaga
Satuan
m'
m'
lbr
kg
set
org/hr
org/hr
org/hr
org/hr
Indeks
3.300
0.700
0.382
0.150
0.250
0.500
0.050
0.150
0.008
Jumlah harga per
Kebutuhan
Bahan
Tenaga Kerja
Satuan
M
Kg
org/hr
org/hr
org/hr
org/hr
Indeks
0.016
0.250
0.200
0.300
0.030
0.010
Kebutuhan
Bahan
Tenaga kerja
Satuan
m
kg
org/hr
org/hr
org/hr
org/hr
Indeks
1.050
0.010
0.050
0.050
0.005
0.003
Jumlah harga per
Kebutuhan
Satuan
Indeks
Bahan
Tenaga kerja
m
kg
org/hr
org/hr
org/hr
org/hr
1.050
0.010
0.050
0.050
0.005
0.003
Jumlah harga per
PEK. PENGECETAN
Pengecetan 1 m tembok lama, 1 lapis cat dasar, 1 lapis cat penutup
Kebutuhan
Bahan
Tenaga
Satuan
Plamir
Indeks
kg
Cat dasar
Cat penutup 1 x
Amplas halus
Kuas
Pekerja
Tukang cat
Kepala tukang
Mandor
kg
ltr
bh
bh
org/hr
org/hr
org/hr
org/hr
0.100
0.130
0.010
0.028
0.063
0.0063
0.0025
Pengecetan 1 m tembok baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Kebutuhan
Bahan
Tenaga
Plamir
Cat dasar
Cat penutup 2 x
Amplas halus
Kuas
Pekerja
Tukang cat
Kepala tukang
Mandor
Satuan
Indeks
kg
0.120
kg
ltr
bh
bh
org/hr
org/hr
org/hr
org/hr
0.100
0.260
0.050
0.010
0.028
0.063
0.0063
0.0025
Pengecetan 1 m bidang kayu lama, 1 lapis cat dasar, 1 lapis cat penutup
Kebutuhan
Bahan
Tenaga
Cat meni
Dampul
Cat dasar
Cat penutup 1 kali (Mowileks)
Pekerja
Tukang cat
Kepala tukang
Mandor
Satuan
Indeks
kg
kg
0.200
-
kg
kg
org/hr
org/hr
org/hr
org/hr
0.170
0.130
0.070
0.009
0.006
0.0025
Pengecetan 1 m bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Kebutuhan
Bahan
Tenaga
Cat meni
Dampul
Cat dasar
Cat penutup 2 kali (Mowileks)
Pekerja
Tukang cat
Kepala tukang
Mandor
Satuan
Indeks
kg
kg
0.200
0.150
kg
kg
org/hr
org/hr
org/hr
org/hr
0.170
0.260
0.070
0.009
0.006
0.0025
Kebutuhan
Bahan
Tenaga
Vernis
Dampul
Amlas
Kuas
Pekerja
Tukang cat
Kepala tukang
Mandor
Satuan
Indeks
kg
kg
0.150
0.050
kg
kg
org/hr
org/hr
org/hr
org/hr
0.100
0.010
0.160
0.160
0.020
0.0020
Kebutuhan
Bahan
Tenaga
Plamir
Satuan
Indeks
kg
Cat dasar
Cat penutup 1 x
Amplas halus
Kuas
Pekerja
Tukang cat
Kepala tukang
Mandor
kg
ltr
bh
bh
org/hr
org/hr
org/hr
org/hr
0.100
0.130
0.010
0.028
0.063
0.0063
0.0025
Kebutuhan
Bahan
Tenaga
Meni besi
Cat penutup (AGA)
Kuas
Pekerja
Tukang cat
Kepala tukang
Mandor
Satuan
Indeks
Kg
Kg
bh
org/hr
org/hr
org/hr
org/hr
0.100
0.180
0.010
0.020
0.200
0.020
0.01
Kebutuhan
Bahan
Tenaga
Satuan
m
m
org/hr
org/hr
Indeks
10.0000
1.0000
0.0065
0.0650
Kebutuhan
Bahan
Tenaga
Satuan
m
m
org/hr
org/hr
Indeks
7.0000
2.5000
0.0600
0.6000
Pemasangan 1 bh Saklar
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Saklar ganda
Saklar Tunggal
Alat bantu
Jasa Pemasangan
bh
bh
ls
ls
1.0000
1.0000
1.0000
1.0000
Jumlah harga per - satuan pekerj
Pemasangan 1 bh Fitting
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Fitting Tanam
Fitting Duduk
Alat bantu
Jasa Pemasangan
bh
bh
ls
ls
1.0000
1.0000
1.0000
1.0000
Jumlah harga per - satuan pekerj
Kebutuhan
Satuan
Indeks
Bahan + Pemasangan
Stop kontak komplit
Alat bantu
Jasa Pemasangan
bh
ls
ls
1.0000
1.0000
1.0000
Jumlah harga per -
Pemasangan 1 bh Lampu
Kebutuhan
Satuan
Lampu TL 1 x 20 Watt
Lampu TL 1 x 40 Watt
Lampu Sumpit 5 Watt Pilips
bh
bh
bh
Indeks
Bahan + Pemasangan
1.0000
1.0000
1.0000
Alat bantu
Jasa Pemasangan
ls
1.0000
ls
1.0000
Jumlah harga per - satuan pekerjaan Lam
Jumlah harga per - satuan pekerjaan Lam
PEK. SANITASI
Pasang 1 m kaca cermin tebal 3 mm
Kebutuhan
Bahan
Tenaga kerja
Cermin
Pekerja
Tukang kayu
Kepala tukang
Mandor
Satuan
m
org/hr
org/hr
org/hr
org/hr
Indeks
1.10000
0.01500
0.15000
0.01500
0.00075
Kebutuhan
Bahan
Tenaga kerja
Sataun
m
ls
org/hr
org/hr
org/hr
org/hr
Indeks
1.2000
1.0000
0.0540
0.0900
0.0090
0.0270
Kebutuhan
Bahan
Tenaga kerja
Sataun
m
ls
org/hr
org/hr
org/hr
org/hr
Indeks
1.2000
1.0000
0.0540
0.0900
0.0090
0.0027
Kebutuhan
Bahan
Sataun
m
ls
Indeks
1.2000
1.0000
Tenaga kerja
Pekerja
Tukang batu
Kepala tukang
Mandor
org/hr
org/hr
org/hr
org/hr
0.0810
0.1350
0.0135
0.0041
Kebutuhan
Bahan
Tenaga kerja
Wastafel
Perlengkapan (15% dari harga bahan)
Semen
Pasir
Pekerja
Tukang batu
Kepala tukang
Mandor
Satuan
set
ls
kg
m
org/hr
org/hr
org/hr
org/hr
Indeks
1.000
0.15
6.000
0.010
1.200
1.450
0.150
0.100
Kebutuhan
Bahan
Tenaga kerja
Sataun
bh
bh
org/hr
org/hr
org/hr
org/hr
Indeks
1.000
0.025
0.010
0.100
0.010
0.005
Kebutuhan
Bahan
Tenaga kerja
Sataun
m
ls
org/hr
org/hr
org/hr
org/hr
Indeks
1.2000
1.0000
0.0810
0.1350
0.0135
0.0041
Memasang 1 M' saluran air dari 1/2 bata, campuran spesi 1 PC: 4 PP (Tinggi 10 cm)
Kebutuhan
Satuan
Indeks
Pekerjaan
1/2 bata 1 : 4
Plesteran 1 :3
Acian semen
m
m
m
0.090
0.650
0.650
Harga/ Satuan
Bahan/ Upah (Rp)
50,750.00
90,000.00
Jumlah harga per-satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
50,750.00
90,000.00
Jumlah harga per-satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
50,750.00
90,000.00
Jumlah harga per-satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
50,750.00
90,000.00
Jumlah harga per-satuan pekerjaan
Harga/ Satuan
Jumlah (Rp)
38,062.50
2,250.00
40,312.50
Jumlah (Rp)
45,675.00
4,050.00
49,725.00
Jumlah (Rp)
12,560.63
742.50
13,303.13
Jumlah (Rp)
25,375.00
450.00
25,825.00
Jumlah (Rp)
Jumlah (Rp)
106,800.000
45,600.000
15,225.00
900.00
122,925.00
61,725.00
Harga Satuan
Bahan/ Upah (Rp)
127,000.00
1,383.00
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per satuan pekerjaan
Harga Satuan
Bahan/ Upah (Rp)
127,000.00
1,383.00
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per satuan pekerjaan
Harga Satuan
Bahan/ Upah (Rp)
127,000.00
89,000.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per satuan pekerjaan
Harga Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
152,400.00
279,366.00
45,468.75
76,125.00
45,000.00
5,100.00
6,750.00
610,209.75
Jumlah (Rp)
152,400.00
225,429.00
48,750.00
76,125.00
45,000.00
5,100.00
6,750.00
559,554.00
Jumlah (Rp)
152,400.00
38,448.00
39,585.00
29,250.00
3,315.00
3,510.00
266,508.00
Jumlah (Rp)
1,250.00
1,650.00
89,000.00
50,750.00
75,000.00
85,000.00
90,000.00
62,500.00
82,500.00
17,800.00
36,540.00
10,125.00
1,147.50
3,240.00
131,352.50
151,352.50
Harga Satuan
Bahan/ Upah (Rp)
1,500.00
1,875.00
89,000.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah (Rp)
75,000.00
93,750.00
17,800.00
36,540.00
10,125.00
1,147.50
3,240.00
143,852.50
162,602.50
PEK. BETON
Harga / Satuan
Bahan/ Upah (Rp)
1,383.00
66.96
162.04
110.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan/ Upah (Rp)
1,383.00
66.96
162.04
110.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
341,601.00
58,191.96
161,875.00
23,650.00
83,737.50
20,625.00
2,380.00
7,470.00
699,530.46
Jumlah (Rp)
486,816.00
48,950.89
167,060.19
23,650.00
83,737.50
20,625.00
2,380.00
7,470.00
840,689.58
Harga / Satuan
Bahan/ Upah (Rp)
1,383.00
66.96
162.04
110.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan/ Upah (Rp)
15,100.00
21,250.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah (Rp)
513,093.00
46,741.07
169,652.78
23,650.00
83,737.50
20,625.00
2,380.00
7,470.00
867,349.35
Jumlah (Rp)
158,550.00
3,187.50
3,552.50
5,250.00
595.00
360.00
171,495.00
17,149.50
Harga / Satuan
Bahan/ Upah (Rp)
2,750,000.00
18,750.00
Jumlah (Rp)
110,000.00
5,625.00
3,450.00
50,750.00
75,000.00
85,000.00
90,000.00
345.00
26,390.00
19,500.00
2,210.00
2,340.00
166,410.00
Harga / Satuan
Bahan/ Upah (Rp)
2,750,000.00
18,750.00
3,450.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
123,750.00
5,625.00
345.00
26,390.00
19,500.00
2,210.00
2,340.00
180,160.00
Harga / Satuan
Bahan/ Upah (Rp)
2,625,000.00
18,750.00
3,450.00
6,250,000.00
143,000.00
31,250.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan/ Upah (Rp)
2,625,000.00
18,750.00
3,450.00
6,250,000.00
143,000.00
31,250.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan/ Upah (Rp)
2,625,000.00
18,750.00
3,450.00
6,250,000.00
143,000.00
31,250.00
50,750.00
Jumlah (Rp)
105,000.00
7,500.00
690.00
93,750.00
50,050.00
62,500.00
33,495.00
24,750.00
2,805.00
2,970.00
383,510.00
Jumlah (Rp)
105,000.00
7,500.00
690.00
112,500.00
50,050.00
62,500.00
33,495.00
24,750.00
2,805.00
2,970.00
402,260.00
Jumlah (Rp)
105,000.00
7,500.00
690.00
93,750.00
50,050.00
187,500.00
33,495.00
75,000.00
85,000.00
90,000.00
24,750.00
2,805.00
2,970.00
508,510.00
Harga / Satuan
Bahan/ Upah (Rp)
2,625,000.00
18,750.00
3,450.00
6,250,000.00
143,000.00
31,250.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
78,750.00
7,500.00
517.50
93,750.00
50,050.00
62,500.00
33,495.00
24,750.00
2,805.00
2,970.00
357,087.50
Harga/ Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
625.00
1,383.00
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
43,750.00
15,904.50
4,031.25
15,225.00
7,500.00
850.00
1,350.00
88,610.75
Harga/ Satuan
Bahan/ Upah (Rp)
1,383.00
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
1,383.00
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/ Satuan
Jumlah (Rp)
14,167.45
1,875.00
10,150.00
11,250.00
1,275.00
900.00
39,617.45
Jumlah (Rp)
10,754.21
2,156.25
10,150.00
11,250.00
1,275.00
900.00
36,485.46
Jumlah (Rp)
Harga / Satuan
Bahan / Upah (Rp)
12,500.00
1,383.00
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
4,494.75
7,612.50
7,500.00
850.00
720.00
21,177.25
Jumlah (Rp)
12,500.00
1,175.55
187.50
2,537.50
9,375.00
2,125.00
225.00
28,125.55
Harga / Satuan
Bahan / Upah (Rp)
3,250.00
1,383.00
93,750.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan / Upah (Rp)
14,000.00
1,383.00
93,750.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan / Upah (Rp)
7,050.00
1,383.00
93,750.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
8,612.50
6,306.48
1,125.00
390.63
4,567.50
6,750.00
765.00
450.00
28,967.11
Jumlah (Rp)
92,820.00
13,553.40
2,015.63
3,125.00
31,465.00
26,250.00
2,975.00
2,700.00
174,904.03
Jumlah (Rp)
83,683.50
13,830.00
4,218.75
2,929.69
31,465.00
26,250.00
2,975.00
2,700.00
168,051.94
Harga / Satuan
Bahan / Upah (Rp)
2,875.00
1,383.00
93,750.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan / Upah (Rp)
5,769.23
1,383.00
93,750.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga / Satuan
Bahan / Upah (Rp)
6,500.00
1,383.00
1,953.13
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
76,187.50
14,383.20
4,218.75
3,164.06
31,465.00
26,250.00
2,975.00
2,700.00
161,343.51
Jumlah (Rp)
124,038.46
12,861.90
1,687.50
3,789.06
30,450.00
33,750.00
3,825.00
2,700.00
213,101.92
Jumlah (Rp)
7,150.00
691.50
195.31
761.25
5,250.00
595.00
63.00
14,706.06
Harga/Satuan
Bahan / Upah (Rp)
50,750.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
18,016.250
319.500
18,335.750
Harga/ Satuan
Bahan/ Upah (Rp)
11,458,300.00
18,750.00
40,950.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
6,250,000.00
18,750.00
40,950.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
12,604,130.00
23,437.50
40,950.00
304,500.00
1,500,000.00
170,000.00
27,000.00
14,670,017.50
Jumlah (Rp)
6,875,000.00
23,437.50
40,950.00
304,500.00
1,500,000.00
170,000.00
27,000.00
8,940,887.50
Harga/ Satuan
Bahan/ Upah (Rp)
12,983,300.00
40,950.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan Kls I
Harga/ Satuan
Bahan/ Upah (Rp)
6,250,000.00
40,950.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan Kls I
Harga/Satuan
Bahan/Upah (Rp)
116,650.00
265,625.00
133,300.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah (Rp)
519,332.00
20,475.00
50,750.00
187,500.00
21,250.00
4,500.00
803,807.00
Jumlah (Rp)
250,000.00
20,475.00
50,750.00
187,500.00
21,250.00
4,500.00
534,475.00
Jumlah (Rp)
128,315.00
292,187.50
146,630.00
761.25
11,250.00
1,275.00
67.50
141,668.75
305,541.25
159,983.75
Harga/Satuan
Jumlah (Rp)
Bahan/Upah (Rp)
90,000.00
10,500.00
40,000.00
Jumlah harga per- satuan pekerjaan
Jumlah (Rp)
90,000.00
10,500.00
40,000.00
140,500.00
Harga/Satuan
Bahan/Upah (Rp)
110,500.00
46,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah (Rp)
110,500.00
46,500.00
507.50
37,500.00
850.00
450.00
149,807.50
85,807.50
Harga/Satuan
Bahan/Upah (Rp)
13,000.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/Upah (Rp)
18,000.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/Upah (Rp)
18,000.00
50,750.00
75,000.00
85,000.00
Jumlah (Rp)
13,000.00
761.25
11,250.00
1,275.00
67.50
26,353.75
Jumlah (Rp)
18,000.00
761.25
11,250.00
1,275.00
67.50
31,353.75
Jumlah (Rp)
18,000.00
507.50
7,500.00
850.00
90,000.00
45.00
26,902.50
Harga/Satuan
Bahan/Upah (Rp)
19,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Jumlah (Rp)
19,500.00
761.25
11,250.00
1,275.00
67.50
32,853.75
Harga/Satuan
Bahan/ Upah (Rp)
11,458,300.00
18,750.00
75,000.00
85,000.00
50,750.00
90,000.00
Jumlah harga per -satuan pekerjaan
Harga/Satuan
Bahan/Upah (Rp)
17,708.33
11,458.33
600.00
480.00
4,375.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Jumlah (Rp)
12,604,130.000
105,000.000
900,000.000
102,000.000
203,000.000
18,000.000
13,932,130.000
Jumlah (Rp)
53,125.00
57,291.67
5,400.00
5,280.00
2,625.00
4,567.50
37,500.00
19,550.00
2,250.00
187,589.17
Harga/Satuan
Bahan/Upah (Rp)
37,500.00
600.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/Upah (Rp)
62,500.00
45,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/Upah (Rp)
37,500.00
45,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga / Satuan
Bahan/ Upah (Rp)
34,722.22
45,500.00
50,750.00
75,000.00
Jumlah (Rp)
60,862.50
3,600.00
10,150.00
7,500.00
850.00
90.00
83,052.50
Jumlah (Rp)
65,625.00
910.00
7,612.50
5,625.00
680.00
540.00
80,992.50
Jumlah (Rp)
46,875.00
2,275.00
12,687.50
11,250.00
1,275.00
1,170.00
75,532.50
85,000.00
90,000.00
2,550.00
630.00
70,205.83
Harga/ Satuan
Bahan/ Upah (Rp)
17,708.33
45,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
18,593.75
4,550.00
5,075.00
15,000.00
2,125.00
450.00
45,793.75
PEK. PLAFOND
Harga/Satuan
Bahan/ Upah (Rp)
6,250.00
7,812.50
70,000.00
45,500.00
86,250.00
75,000.00
85,000.00
50,750.00
90,000.00
Jumlah harga per -satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
6,250.00
7,812.50
75,000.00
45,500.00
86,250.00
75,000.00
85,000.00
50,750.00
90,000.00
Jumlah harga per -satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
6,250.00
7,812.50
78,000.00
45,500.00
86,250.00
75,000.00
85,000.00
Jumlah (Rp)
20,625.000
5,468.750
26,740.000
9,100.000
21,562.500
37,500.000
4,250.000
7,612.500
720.000
133,578.750
Jumlah (Rp)
20,625.000
5,468.750
28,650.000
9,100.000
21,562.500
37,500.000
4,250.000
7,612.500
720.000
135,488.750
Jumlah (Rp)
20,625.000
5,468.750
29,796.000
9,100.000
21,562.500
37,500.000
4,250.000
50,750.00
90,000.00
7,612.500
720.000
136,634.750
Harga/Satuan
Bahan/ Upah (Rp)
6,250.00
7,812.50
97,500.00
45,500.00
86,250.00
75,000.00
85,000.00
50,750.00
90,000.00
Jumlah harga per -satuan pekerjaan
Harga/ Satuan
Bahan/ Upah (Rp)
6,250,000.00
18,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
8,666.667
45,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per -satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
Jumlah (Rp)
20,625.000
5,468.750
37,245.000
6,825.000
21,562.500
37,500.000
4,250.000
7,612.500
720.000
141,808.750
Jumlah (Rp)
101,875.00
4,687.50
10,150.00
22,500.00
2,550.00
900.00
142,662.50
Jumlah (Rp)
9,100.000
455.000
2,537.500
3,750.000
425.000
270.000
16,537.500
Jumlah (Rp)
4,766.667
45,500.00
50,750.00
75,000.00
85,000.00
90,000.00
5,005.000
455.000
2,537.500
3,750.000
425.000
270.000
12,442.500
PEK. PENGECETAN
Harga/Satuan
Bahan/Upah (Rp)
9,750.00
11,700.00
92,500.00
3,900.00
19,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
1,170.00
12,025.00
195.00
1,421.00
4,725.00
535.50
225.00
20,296.50
Harga/Satuan
Bahan/Upah (Rp)
9,750.00
11,700.00
92,500.00
3,900.00
19,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
Jumlah (Rp)
1,170.00
1,170.00
24,050.00
195.00
195.00
1,421.00
4,725.00
535.50
225.00
33,686.50
Harga/Satuan
Bahan/Upah (Rp)
19,500.00
32,500.00
19,500.00
87,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
3,900.00
3,315.00
11,375.00
3,552.50
675.00
510.00
225.00
23,552.50
Harga/Satuan
Bahan/Upah (Rp)
19,500.00
32,500.00
19,500.00
87,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
3,900.00
4,875.00
3,315.00
22,750.00
3,552.50
675.00
510.00
225.00
39,802.50
Harga/Satuan
Bahan/Upah (Rp)
31,850.00
32,500.00
3,900.00
19,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
Jumlah (Rp)
4,777.50
1,625.00
390.00
195.00
8,120.00
12,000.00
1,700.00
180.00
28,987.50
Harga/Satuan
Bahan/Upah (Rp)
9,750.00
11,700.00
92,500.00
3,900.00
19,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
1,170.00
12,025.00
195.00
1,421.00
4,725.00
535.50
225.00
20,296.50
Harga/Satuan
Bahan/Upah (Rp)
19,500.00
39,000.00
19,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
1,950.00
7,020.00
195.00
1,015.00
15,000.00
1,700.00
900.00
27,780.00
Harga/Satuan
Bahan/Upah (Rp)
10,620.00
78,000.00
90,000.00
75,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
106,200.00
78,000.00
585.00
4,875.00
189,660.00
Harga/Satuan
Bahan/Upah (Rp)
10,620.00
1,812.50
90,000.00
75,000.00
Jumlah harga per - satuan pekerjaan
Jumlah (Rp)
74,340.00
4,531.25
5,400.00
45,000.00
129,271.25
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
17,050.00
13,750.00
1,540.00
5,500.00
Jumlah harga per - satuan pekerjaan Saklar Ganda
17,050.000
13,750.000
1,540.000
5,500.000
24,090.000
20,790.000
Harga/Satuan
Bahan/Upah (Rp)
Jumlah (Rp)
32,500.00
10,625.00
2,156.25
5,500.00
Jumlah harga per - satuan pekerjaan Fitting Tanam
32,500.00
10,625.00
2,156.25
5,500.00
40,156.25
18,281.25
Harga/Satuan
Bahan/Upah (Rp)
13,750.00
1,375.00
5,500.00
Jumlah harga per - satuan pekerjaan
Harga/Satuan
Bahan/Upah (Rp)
112,500.00
113,300.00
32,500.00
Jumlah (Rp)
13,750.000
1,375.000
5,500.000
20,625.00
Jumlah (Rp)
112,500.000
113,300.000
32,500.000
8,610.00
10,000.00
Jumlah harga per - satuan pekerjaan Lampu TL 1 x 20 Watt
Jumlah harga per - satuan pekerjaan Lampu TL 1 x 40 Watt
8,610.000
10,000.000
131,110.000
131,910.000
51,110.000
PEK. SANITASI
Harga/Satuan
Bahan/Upah (Rp)
262,500.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
5,341.67
1,869.58
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
16,145.83
5,651.04
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
22,916.67
8,020.83
Jumlah (Rp)
288,750.00
761.25
11,250.00
1,275.00
67.50
302,103.75
Jumlah (Rp)
6,410.00
1,869.58
2,740.50
6,750.00
765.00
2,430.00
20,965.08
Jumlah (Rp)
19,375.00
5,651.04
2,740.50
6,750.00
765.00
243.00
35,524.54
Jumlah (Rp)
27,500.00
8,020.83
50,750.00
75,000.00
85,000.00
90,000.00
4,110.75
10,125.00
1,147.50
369.00
51,273.08
Harga/Satuan
Bahan/Upah (Rp)
600,000.00
90,000.00
1,343.75
93,750.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per - satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
31,250.00
13,000.00
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/Satuan
Bahan/ Upah (Rp)
22,916.67
8,020.83
50,750.00
75,000.00
85,000.00
90,000.00
Jumlah harga per- satuan pekerjaan
Harga/ Satuan
Bahan / Upah (Rp)
Jumlah (Rp)
600,000.00
13,500.00
8,062.50
937.50
60,900.00
108,750.00
12,750.00
9,000.00
813,900.00
Jumlah (Rp)
31,250.00
325.00
507.50
7,500.00
850.00
450.00
40,882.50
Jumlah (Rp)
27,500.00
8,020.83
4,110.75
10,125.00
1,147.50
369.00
51,273.08
Jumlah (Rp)
88,610.75
39,617.45
21,177.25
8,002.66
25,751.34
13,765.21
47,519.21
Parepare,
Dibuat oleh ;
2014
DIL
NO
SATUAN
I
1
2
3
4
UPAH / GAJI
Pekerja
Tukang
Kepala tukang
Mandor
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Timbunan Pilihan
Batu Kali / Batu Gunung
Batu Gunung Belah 15 - 20 cm
Kerikil Sungai Royalti
Sirtu
Batu pecah 1 - 2 cm
Paving Block 6 cm
Paving Block 8 cm
Paving Block Warna 6 cm
Paving Block Warna 8 cm
Batu merah
III
1
Semen PC tonasa @ 50 kg
Semen PC bosowa @ 40 kg
Semen PC bosowa @ 50 kg
3
4
5
6
7
org/hr
org/hr
org/hr
org/hr
m
m
m
m
m
m
m
m
m
m
m
m
m
m
bh
zak
kg
zak
kg
zak
kg
zak
kg
zak
kg
kg
btg
kg
kg
kg
NO
SATUAN
8
9
10
11
12
13
14
15
16
17
Paku biasa
Paku sekrup 3.5 inchi
Paku sekrup 4.0 inchi
Paku Seng (Payung)
Paku Beton
Paku Digalfano
Genteng metal 2 x 5
Atap spandeks
Nok genteng metal
Seng plat BJLS 30mm 40 x 180 cm
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Kaca bening 5 mm
Kaca buram 5 mm
Kaca rayben 5 mm
Cermin 3 mm
Kayu klas I papan swamil
Kayu klas II papan swamil
Kayu klas III papan swamil
Kayu klas III balok
Kayu klas I balok bayam swamil
Kayu klas II balok meranti
List profil
45
List kayu 1 x 4 cm
kg
kg
kg
kg
kg
Biji
lbr
m
bh
m
m
lbr
lbr
m
bh
bh
bh
bh
bh
m
lbr
lbr
btg
lbr
m
lbr
lbr
m
lbr
m
m
m
m
m
m
m
m
m
m
m
btg
m
btg
NO
SATUAN
46
47
48
49
50
51
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
52
###
###
#
#
69
70
71
72
Screw 12-14x20
Screw 12-16x16
Dyna Bolt 10.80
Reng U Type 0.45
m
bh
biji
bh
bh
bh
set
set
bh
bh
bh
btg
m
btg
m
btg
m
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
btg
m
roll
m
roll
m
roll
m
lbr
m
lbr
m
bh
bh
bh
lbr
NO
SATUAN
73
74
75
76
77
m
ltr
kg
kg
kg
kg
3 ltr
ltr
2,5 ltr
ltr
5 kg
kg
5 Kg
kg
5 kg
Air
Cat warna (glotex)
Cat kayu avian
Cat Kayu dasar
Cat kayu Mowileks
Cat tembok metrolite
Cat tembok Mowileks
78
79
80
81
82
83
84
85
86
87
88
Dempul
Amplas halus
Kuas 4 "
Minyak aspal / begistink
Alat bantu
Kg
Botol
20 Kg
kg
kg
bh
bh
ltr
Set
Parepare,
2014
Dibuat oleh ;
Team Perencana Teknis
AL DAN UPAH
PEMERINTAH KOTA PAREPARE
DILINGKUNGAN
HARGA (Rp)
4
50,750.00
75,000.00
85,000.00
90,000.00
93,750.00
93,750.00
89,000.00
38,000.00
50,000.00
121,875.00
127,000.00
130,000.00
77,300.00
218,750.00
1,250.00
1,500.00
1,650.00
1,875.00
625.00
57,900.00
1,447.50
78,125.00
1,953.13
69,150.00
1,383.00
53,750.00
1,343.75
66,250.00
1,325.00
15,100.00
56,250.00
81,250.00
119,500.00
21,250.00
HARGA (Rp)
4
18,750.00
37,500.00
45,500.00
35,400.00
18,750.00
840.00
37,500.00
62,500.00
37,500.00
62,500.00
34,722.22
97,500.00
53,125.00
17,708.33
2,875.00
5,769.23
7,050.00
14,000.00
3,250.00
6,500.00
78,000.00
143,000.00
31,250.00
70,000.00
24,050.00
75,000.00
25,000.00
6,250.00
31,250.00
7,812.50
116,650.00
265,625.00
133,300.00
262,500.00
12,983,300.00
6,250,000.00
2,750,000.00
2,625,000.00
11,458,300.00
6,250,000.00
26,000.00
8,666.67
14,300.00
HARGA (Rp)
4
4,766.67
110,500.00
12,500.00
18,000.00
13,000.00
19,500.00
600,000.00
625,000.00
31,250.00
43,750.00
13,000.00
137,500.00
22,916.67
96,875.00
16,145.83
32,050.00
5,341.67
78,000.00
112,500.00
113,300.00
32,500.00
13,750.00
14,375.00
32,500.00
10,625.00
13,750.00
17,050.00
7,250.00
1,812.50
357,500.00
3,575.00
1,062,000.00
10,620.00
1,393,750.00
13,937.50
100,000.00
16,666.67
106,250.00
17,708.33
600.00
480.00
4,375.00
68,750.00
HARGA (Rp)
4
11,458.33
110.00
56,550.00
65,000.00
19,500.00
87,500.00
110,500.00
36,833.33
231,250.00
92,500.00
58,500.00
11,700.00
159,250.00
31,850.00
195,000.00
39,000.00
19,500.00
40,950.00
195,000.00
9,750.00
32,500.00
3,900.00
19,500.00
3,450.00
86,250.00
Parepare,
2014
DAFTAR HARG
TA
NO
1
PEKERJAAN TANAH
1
2
3
4
5
6
PEKERJAAN PONDASI
1
2
3
4
5
PEKERJAAN DINDING & LANTAI
1
2
3
4
5
6
7
8
9
10
11
12
PEK. PINTU & JENDELA
1
2
3
4
5
6
7
8
9
10
11
12
13
PEKERJAAN BETON
1
2
3
4
5
6
7
8
9
10
ERJAAN TANAH
Menggali 1 m tanah biasa sedalam 1 meter
Menggali 1 m tanah biasa sedalam 2 meter
Mengurung kembali bekas galian 1 m
Memadatkan Tanah 1 m (20 cm)
Mengurung 1 m Pasir/Tanah urug
Tanah Timbunan
ERJAAN PONDASI
Memasang 1 M Pondasi Batu Belah, Campuran 1 PC : 3 PP
Memasang 1 M Pondasi Batu Belah, Campuran 1 PC : 4 PP
Memasang 1 M Batu Kosong (Aantamping)
Memasang 1 M2 Paving Block 6 cm
Memasang 1 M2 Paving Block 8 cm
ERJAAN DINDING & LANTAI
Memasang 1 M dinding tebal 1/2 bata, campuran spesi 1 PC: 4 PP
Memasang 1 M Plesteran 1PC : 2 PP tebal 15 mm
Memasang 1 M Plesteran 1PC : 3 PP tebal 15 mm
Memasang 1 M Acian
Memasang 1 bh Loster Beton
Memasang 1 m' Plint keramik ukuran (10 x 40 ) cm
Memasang 1 m lantai keramik ukuran (40 x 40 ) cm
Memasang 1 m lantai keramik ukuran (30 x 30 ) cm
Memasang 1 m lantai keramik ukuran (20 x 20 ) cm
Memasang 1 m dinding Keramik ukuran (20 x 25) cm
Memasang 1 m' Kuku Keramik
Pengupasan 1 m plesteran dinding tembok
. PINTU & JENDELA
Membuat dan memasang 1 M Kusen Pintu dan Jendela, Kayu Kls I
Membuat dan memasang 1 M Kusen Pintu dan Jendela, Kayu Kls II
Membuat dan memasang 1 M Daun Pintu Panel, Kayu Kls I
Membuat dan memasang 1 M Daun Pintu Panel, Kayu Kls II
Kaca Bening 5 mm
Kaca Buram 5 mm
Kaca Rayben 5 mm
Pasang 1 buah teralis pengaman jendela
Kunci tanam 2 x Slag
Pasang 1 buah grandel
Pasang 1 buah engsel pintu
Pasang 1 buah engsel jendela kupu - kupu
Pasang 1 buah kait angin
ERJAAN BETON
Membuat 1 M beton mutu fc = 7,4 Mpa (K100) W/c = 0.87 (beton Rabat 1 Pc : 3 Ps : 5 Kr)
Membuat 1 M Beton mutu fc = 19,3 Mpa (K200) W/c= 0,61 (1 Pc : 2 Ps : 3 Kr)
Membuat 1 M Beton mutu fc = 19,3 Mpa (K225) W/c= 0,58 (1 Pc : 2 Ps : 3 Kr)
Membuat, Merangaki & Memasang 1 Kg dengan besi beton polos / ulir
Memasang 1 m bekisting untuk pondasi
Memasang 1 m bekisting untuk sloof
Memasang 1 m bekisting untuk kolom
Memasang 1 m bekisting untuk balok
Memasang 1 m bekisting untuk plat lantai
Memasang 1 m bekisting untuk tangga
A BIAYA KONSTRUKSI
GARAN 2014
HARGA (Rp)
3
Rp
Rp
Rp
Rp
Rp
Rp
40,312.50
49,725.00
13,303.13
25,825.00
122,925.00
61,725.00
Rp
Rp
Rp
Rp
Rp
610,209.75
559,554.00
266,508.00
131,352.50
143,852.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
88,610.75
39,617.45
36,485.46
21,177.25
28,125.55
28,967.11
174,904.03
168,051.94
161,343.51
213,101.92
14,706.06
18,335.75
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
14,670,017.50
8,940,887.50
803,807.00
534,475.00
141,668.75
305,541.25
159,983.75
140,500.00
149,807.50
26,353.75
31,353.75
26,902.50
32,853.75
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
699,530.46
840,689.58
867,349.35
17,149.50
166,410.00
180,160.00
383,510.00
402,260.00
508,510.00
357,087.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
13,932,130.00
187,589.17
83,052.50
80,992.50
75,532.50
70,205.83
45,793.75
Rp
Rp
Rp
Rp
Rp
Rp
Rp
133,578.75
135,488.75
136,634.75
141,808.75
142,662.50
16,537.50
12,442.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
20,296.50
33,686.50
23,552.50
39,802.50
28,987.50
20,296.50
27,780.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
189,660.00
129,271.25
24,090.00
20,790.00
40,156.25
18,281.25
20,625.00
131,110.00
131,910.00
51,110.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
302,103.75
20,965.08
35,524.54
51,273.08
813,900.00
40,882.50
51,273.08
47,519.21
DINAS PENDIDIKAN
Kegiatan
Rehabilitasi Ruang Kelas SMA / SMK (DAK)
Pembangunan Laboratorium SMA / SMK (DAK)
Pembangunan Perpustakaan SMA / SMK (DAK)
Lokasi Pekerjaan
Kota Parepare
S PENDIDIKAN
Kegiatan
ang Kelas SMA / SMK (DAK)
aboratorium SMA / SMK (DAK)
rpustakaan SMA / SMK (DAK)
okasi Pekerjaan
Kota Parepare