5.BQ Analisa Rsud Tugurejo PDF
5.BQ Analisa Rsud Tugurejo PDF
NO
A.
1
SNI
ANALISA PEKERJAAN
KODE
PEKERJAAN TANAH
03-2835-2008
6.1
HARGA
SATUAN
(Rp.)
UPAH
PEKERJA
(Rp.)
HARGA
BAHAN
(Rp.)
03-2835-2008
6.2
03-2835-2008
6.9
03-2835-2008
6.11
1 M3 Urugan pasir
1.2000 m3
0.3000
oh
0.0100
oh
Jml Total
Jml Total
Pasir urug
Pekerja
Mandor
Jml Total
5
03-2835-2008
6.15
03-2835-2008
6.15
03-2835-2008
6.15
Jml Total
Jml Total
Jml Total
B.
1
C.
1
PEKERJAAN PONDASI
03-2836-2008
6.9
03-2836-2008
6.3
JUMLAH
(Rp.)
03-2837-2008
6.16
03-2837-2008
6.15
03-2837-2008
6.19
03-2837-2008
6,20
03-2837-2008
6,26
03-2837-2008
6,27
1 M2 Memasang acian
3.2500
kg Portland Cemen ( PC )
0.1500
oh Pekerja
0.1000
oh Tukang batu
0.0100
oh Kepala tukang
0.0080
oh Mandor
D.
1
PEKERJAAN LANTAI
03-7395-2008
6.9
03-7395-2008
6.9
03-7395-2008
6.9
03-7395-2008
6.9
03-7395-2008
6.9
03-7395-2008
6.35
03-7395-2008
6.35
03-7395-2008
6.54
03-7395-2008
6.36
0.6200
0.3500
0.0350
0.0300
10
03-7395-2008
11
03-7395-2008
13
03-7395-2008
14
03-7395-2008
Pekerja
Tukang batu
Kepala tukang
Mandor
12
E.
1
oh
oh
oh
oh
PEKERJAAN BETON
03-7394-2008
6.4
03-7394-2008
6.5
1 M3 Beton lantai kerja mutu fc = 7,4 Mpa ( K100) slum (3-6) cm w/c = 0,87
230.0000
kg Portland Cemen ( PC )
893.0000
kg Pasir beton
1,024.0000
kg Kerikil (maksimum 30 mm)
200.0000
ltr air
1.2000
oh Pekerja
0.2000
oh Tukang batu
0.0200
oh Kepala tukang
0.0060
oh Mandor
1 M3 Beton mutu fc = 9,8 Mpa ( K175) slum (122) cm w/c = 0,66
326.0000
kg Portland Cemen ( PC )
760.0000
kg Pasir beton
1,029.0000
kg Kerikil (maksimum 30 mm)
215.0000
1.6500
0.2500
0.0250
0.0800
ltr
oh
oh
oh
oh
air
Pekerja
Tukang batu
Kepala tukang
Mandor
03-7394-2008
6.7
03-7394-2008
6.9
03-7394-2008
6.9
03-7394-2008
6.17
03-7394-2008
6.21
03-7394-2008
6.22
03-7394-2008
6.23
0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330
m3
kg
ltr
m3
lbr
btg
oh
oh
oh
oh
10
03-7394-2008
6.24
11
03-7394-2008
6.26
12
Dihitung
13
Dihitung
14
Dihitung
15
Dihitung
16
Dihitung
17
Dihitung
18
Dihitung
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
177.6702
13.3336
kg
m2
Besi
Bekisting
Jml Total
19
Dihitung
20
Dihitung
21
Dihitung
21
Dihitung
22
Dihitung
23
Dihitung
24
Dihitung
25
Dihitung
26
Dihitung
27
Dihitung
28
Dihitung
29
Dihitung
30
Dihitung
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
(Asrama) :
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
31
Dihitung
32
Dihitung
33
Dihitung
Jml Total
Jml Total
Jml Total
33
Dihitung
34
Dihitung
35
Dihitung
36
Dihitung
37
Dihitung
38
Dihitung
39
Dihitung
40
Dihitung
41
Dihitung
42
Dihitung
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
1.0000
0.4000
0.1000
0.0500
0.2500
32.7972
0.8000
m3
m3
m3
m3
m3
kg
m2
Galian tanah
Urugan kembali
Urugan pasir
Beton K 100
Beton K 225
Besi
Bekisting
Jml Total
43
Dihitung
44
Dihitung
45
Dihitung
46
Dihitung
47
Dihitung
48
Dihitung
49
Dihitung
50
Dihitung
51
Dihitung
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
Jml Total
F.
1
1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200
m3
kg
kg
oh
oh
oh
oh
03-3434-2008
6,15a
03-3434-2008
6.16
03-3434-2008
6.22
3434-2008
G.
1
03-3436-2002
6.5
03-3436-2002
6.42
03-7393-2008
6.18
1.0500
0.0150
0.0190
0.2000
0.4000
0.0250
0.0100
H.
1
03-2839-2008
6.7
Hitung
03-2839-2008
6.9
I.
1
J.
1
PEKERJAAN BESI
03-7393-2008
6.2
Seng plat
Paku biasa 1"-2,5"
Papan kelas II
Pekerja
Tukang kayu
Kepala tukang
Mandor
PEKERJAAN LANGIT-LANGIT
03-2839-2008
6.7
1 M2 Plafond gypsum board (120x240) tebal 9 mm:
lbr Gypsum Board 9 mm
0.3640
1.0250 btg Rangka hollow 2x4 cm t = 0,35 mm
bh Stifenner
3.0000
kg Paku keling/sekrup
0.1100
bh Penggantung dan Ramzet
4.0000
0.1000
oh Pekerja
0.0500
oh Tukang kayu
0.0050
oh Kepala tukang
0.0050
oh Mandor
lbr
kg
m3
oh
oh
oh
oh
03-7393-2008
6.2
Semen gypsum
Amplas
Pekerja
Tukang batu
Kepala tukang
Mandor
0.0300
0.0300
0.0030
0.0015
K.
1
oh
oh
oh
oh
Pekerja
Tukang besi
Kepala tukang
Mandor
03-7393-2008
6.11
03-7393-2008
6.11
03-7393-2008
6.11
m'
6.480
m'
4.480
m'
Frame daun bv
9.680
m'
Tube sealant
4.840
28.000
m'
Silicon gel
bh
Sekrup fixer
1.000
5
03-7393-2008
6.11
unit Upah
m'
184.600
m'
Tube sealant
92.300
76.000
m'
Silicon gel
bh
Sekrup fixer
1.000
unit Upah
03-7393-2008
6.11
03-7393-2008
6.11
03-7393-2008
6.11
8.270
2.540
2.240
1.120
14.000
1.000
m'
m'
m'
m'
bh
unit
03-7393-2008
6.11
10
03-7393-2008
6.11
11
03-7393-2008
6.11
12
03-7393-2008
6.11
13
03-7393-2008
6.11
14
03-7393-2008
6.11
15
03-7393-2008
6.11
16
03-7393-2008
6.11
3.720
1.860
16.000
1.000
m'
m'
bh
unit
Tube sealant
Silicon gel
Sekrup fixer
Upah
17
03-7393-2008
6.11
18
03-7393-2008
6.11
19
03-7393-2008
6.11
20
03-7393-2008
6.11
21
03-7393-2008
6.11
22
03-7393-2008
6.11
23
03-7393-2008
6.11
L.
1
PEKERJAAN CAT
03-24
03-24
6.1
6.8
1 M2 Pengecatan kayu baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.2000
0.1500
0.1700
0.2600
0.0700
0.0090
0.0060
0.0025
kg
kg
kg
kg
oh
oh
oh
oh
Cat meni
Plamur
Cat dasar
Cat penutup 2 kali
Pekerja
Tukang cat
Kepala tukang
Mandor
03-24
6.14
1 M2 Pengecatan tembok baru ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.1000
kg Plamur
0.1000
kg Cat dasar
0.2600
kg Cat penutup 2 kali
0.2600
lbr Amplas
0.0200
oh Pekerja
0.0630
oh Tukang cat
0.0063
oh Kepala tukang
0.0025
oh Mandor
03-24
6.15
1 M2 Pengecatan tembok lama ( 1 lap. Plamir ) 1 lap. Cat dasar & 2 lap cat penutup :
0.1000
kg Cat dasar
0.1800
kg Cat penutup 2 kali
0.2600
lbr Amplas
0.0280
oh Pekerja
0.0420
oh Tukang cat
0.0042
oh Kepala tukang
0.0025
oh Mandor
M.
1
N.
1
PEKERJAAN KACA
6.17
6,17a
PEKERJAAN SANITASI
6.25
6.25
6.29
6.31
6.1
10
6.5
1 Bh Memasang Wastafel :
1.0000
bh Wastafel meja oval
0.3000
ls Perlengkapan 30 % harga pipa
6.0000
kg Portland cement
0.0100 m3 Pasir pasang
1.2000
oh Pekerja
0.1450
oh Tukang
0.1500
oh Kepala tukang
0.1000
oh Mandor
11
6.5
0.1000
oh
Mandor
12
6.36
13
6.35
14
15
16
1 M' Saluran U 30 :
0.4000 m2
0.2400 m2
0.0100 m3
0.0400 m3
1.0000
m'
17
18
1 BH Bak kontrol U 30 :
0.3600 m2 m2
0.0100 m3 m3
0.0045 m3 m3
0.5040 m3 m2
0.0429 m3 m3
1 M' Saluran O 30 :
0.4000 m2
0.0100 m3
0.0400 m3
1.0000
m'
19
20
21
22
m3
bh