Kebutuhan Tulangan Core Wall Zona A
Kebutuhan Tulangan Core Wall Zona A
Rekap total
Tulangan
Zona
Shear
wall
Core wall
Zona A
Zona B
Zona C
Zona A
Zona B
Zona C
Total
Pembulatan
10
(m)
(lonjor)
71.58
5.96
71.58
5.96
66.70
5.56
101.38
8.45
101.38
8.45
412.62 34.39
35
D16
(m)
(lonjor)
420.69
35.06
170.19
14.18
420.69
35.06
717.93
59.83
543.75
45.31
543.75
45.31
2817.00 234.75
235
Beton
(m3)
4.463
1.642
4.463
5.69
5.47
5.50
27.23
28