PERMASALAHAN
DAN KONSEP
PENANGANAN
Design Cek perhitungan Q
Cek Q
Q B H A P
No Ruas saluran m k I (m3/det Control Q
(m3/det) (m) (m) (m2) (m)
)
1 2 3 4 5 6 7 8 9 10 13
1 BKKi 1E - BKKi 1F 30,140 14,00 1,41 1,5 60 0,00028 25,308 19,589 30,140 OK 0,000
2 BKKi.1F - BKKi.1G 30,140 14,00 1,41 1,5 60 0,00028 25,308 19,589 30,140 OK 0,000
3 BKKi.1G - BKKi.1H 30,140 14,00 1,41 1,5 60 0,00028 25,308 19,589 30,140 OK 0,000
4 BKKi.1H - BKKi.1I 30,140 14,00 1,41 1,5 60 0,00028 25,308 19,589 30,140 OK 0,000
5 BKKi.1I - BKKi.1J 30,140 14,00 1,46 1,5 60 0,00035 23,553 19,248 30,140 OK 0,000
6 BKKi.1J - BKKi.1K 30,140 14,00 1,46 1,5 60 0,00035 23,553 19,248 30,140 OK 0,000
7 BKKi.1K - BKKi.1L 30,140 14,00 1,46 1,5 60 0,00035 23,553 19,248 30,140 OK 0,000
8 BKKi.1L - BKKi.1M 30,140 14,00 1,46 1,5 60 0,00035 23,553 19,248 30,140 OK 0,000
9 BKKi.1M - BKKi.1N 30,140 14,00 1,77 1,5 60 0,00018 29,549 20,395 30,140 OK 0,000
10 BKKi.1N - BKKi.1O 30,140 14,00 1,77 1,5 60 0,00018 29,549 20,395 30,140 OK 0,000
11 BKKi.1O - BKKi.1P 30,140 14,00 1,77 1,5 60 0,00018 29,549 20,395 30,140 OK 0,000
12 BKKi.1P- BKKi.1Q 30,140 14,00 1,77 1,5 60 0,00018 29,549 20,395 30,140 OK 0,000
13 BKKi.1Q - BKKi.1R 30,140 14,00 1,77 1,5 60 0,00018 29,549 20,395 30,140 OK 0,000
14 BKKi.1R - BKKi.1 30,140 14,00 1,77 1,5 60 0,00018 29,549 20,395 30,140 OK 0,000
PENANGANAN TANGGUL
DENGAN GEOTEKSTIL
KONSEP PENANGANAN SALURAN INDUK BKKi 1e- BKKi 1f
PENANGANAN TANGGUL
DENGAN GEOTEKSTIL
KONSEP PENANGANAN SALURAN INDUK BKKi 1f- BKKi 1l
KONSEP PENANGANAN SALURAN INDUK BKKi 1l- BKKi 1m
PENANGANAN TANGGUL
DENGAN GEOTEKSTIL
KONSEP PENANGANAN SALURAN INDUK BKKi 1m- BKKi 1
KONSEP PENANGANAN SALURAN INDUK BKKi 2- BKKi 15
Tabel Dimensi Perhitungan Hidrolis Saluran
Induk Klambu Kiri
Design Cek perhitungan Q
Cek Q
Q B H A P
No Ruas saluran m k I (m3/det Control Q
(m3/det) (m) (m) (m2) (m)
)
1 2 3 4 5 6 7 8 9 10 13
1 BKKi.1 - BKKi.2 19.703 11.60 1.72 1.5 60 0.0001 24.378 17.799 19.703 OK 0.000
2 BKKi.2 - BKKi.3 19.602 11.60 1.58 1.5 60 0.0002 21.992 17.279 19.602 OK 0.000
3 BKKi.3 - BKKi.4 19.443 11.60 1.57 1.5 60 0.0002 21.871 17.252 19.443 OK 0.000
4 BKKi.4 - BKKi.5 19.367 11.60 1.56 1.5 60 0.0002 21.813 17.239 19.367 OK 0.000
5 BKKi.5 - BKKi.6 19.108 11.60 1.55 1.5 60 0.0002 21.616 17.196 19.108 OK 0.000
6 BKKi.6 - BKKi.7 18.582 11.60 1.53 1.5 60 0.0002 21.212 17.106 18.582 OK 0.000
7 BKKi.7 - BKKi.8 18.233 11.40 1.94 1.3 60 0.0001 27.321 18.302 18.233 OK 0.000
8 BKKi.8 - BKKi.9 17.490 11.40 2.32 1.2 60 0.0000 33.578 19.579 17.490 OK 0.000
9 BKKi.9 - BKKi.10 17.180 10.84 1.39 1.5 60 0.0002 17.966 15.852 17.180 OK 0.000
10 BKKi.10 - BKKi.11 17.164 10.84 1.62 1.5 60 0.0001 21.432 16.666 17.164 OK 0.000
11 BKKi.11 - BKKi.12 17.003 10.84 1.61 1.5 60 0.0001 21.295 16.634 17.003 OK 0.000
12 BKKi.12 - BKKi.13 16.833 10.84 1.62 1.5 60 0.0001 21.428 16.665 16.833 OK 0.000
13 BKKi.13 - BKKi.14 16.781 10.84 1.50 1.9 60 0.0001 20.096 16.356 16.781 OK 0.000
14 BKKi.14 - BKKi.15a 16.733 10.84 1.38 1.5 60 0.0002 17.804 15.813 16.733 OK 0.000
15 BKKi.15b - BKKi.15 16.733 10.84 1.14 1.5 60 0.0004 14.254 14.937 16.733 OK 0.000
16 BKKi.15 BKKi.16 14,600 10,70 1,47 1.5 60 0,00013 19,025 16,013 14,600 OK 0.000
17 BKKi.16 BKKi.17 8,0300 9,00 1,24 1.5 60 0,0001 13,412 13,455 8,0300 OK 0.000
18 BKKi.17 BKKi.18 8,0100 7,50 1,40 1.5 60 0,00009 13,441 12,548 8,0100 OK 0.000
19 BKKi.18 BKKi.19 7,6500 7,50 1,36 1.5 60 0,00009 13,021 12,418 7,6500 OK 0.000
20 BKKi.19 BKKi.20 7,3700 6,00 1,60 1.5 60 0,00007 13,438 11,768 7,3700 OK 0.000
21 BKKi.20 BKKi.21 7,1080 6,00 1,57 1.5 60 0,00007 13,099 11,654 7,1080 OK 0.000
22 BKKi.21 BKKi.22 6,9690 6,00 1,55 1.5 60 0,00007 12,917 11,593 6,9690 OK 0.000
23 BKKi.22 BKKi.23 6,8780 6,00 1,54 1.5 60 0,00007 12,798 11,553 6,8780 OK 0.000
24 BKKi.23 BKKi.24 6,4980 6,00 1,49 1.5 60 0,00007 12,295 11,381 6,4980 OK 0.000
25 BKKi.24 BKKi.25 6,4180 6,00 1,48 1.5 60 0,00007 12,188 11,344 6,4180 OK 0.000
KONSEP PENANGANAN SALURAN INDUK BKKi 2- BKKi 3
DETAIL PENULANGAN SALURAN INDUK BKKi 2- BKKi 3
KONSEP PENANGANAN SALURAN SEKUNDER W
1-W2
Tabel Dimensi Saluran Sekunder W2
Design Cek perhitungan Q
Q V Cek Q
b H A P R
No Ruas saluran (m3/ m k I (m/det (m3/de
(m) (m) (m2) (m) (m)
det) ) t)
1 2 3 4 5 6 7 8 9 10 11 12 13
BKKi.25 - 2.00 1.50 60 4.297 0.438 0.518 0.975
1
BW.2.1 0.980 0.64 0.00022 1.883
2 BW.2.1 - BW.2.2 0.840 2.00 0.62 1.50 60 0.00018 1.826 4.244 0.430 0.460 0.840
3 BW.2.2 - BW.2.3 0.810 2.00 0.60 1.50 60 0.00019 1.749 4.172 0.419 0.463 0.810
4 BW.2.3 - BW.2.4 0.760 1.95 0.63 1.50 60 0.00015 1.813 4.211 0.431 0.419 0.760
5 BW.2.4 - BW.2.5 0.680 1.60 0.61 1.50 60 0.00018 1.544 3.810 0.405 0.440 0.679
6 BW.2.5 - BW.2.6 0.600 1.10 0.64 1.50 60 0.00021 1.305 3.391 0.385 0.460 0.600
7 BW.2.6 - BW.2.7 0.570 1.10 0.64 1.50 60 0.00019 1.316 3.405 0.386 0.433 0.570
8 BW.2.7 - BW.2.8 0.500 1.10 0.62 1.50 60 0.00016 1.272 3.351 0.380 0.393 0.500
9 BW.2.8 - BW.2.9 0.440 1.10 0.71 1.50 60 0.00007 1.521 3.642 0.418 0.289 0.440
BW.2.9 - 1.50 60 2.957 0.403 0.327 0.390
10
BW.2.10 0.390 0.8 0.76 0.00010 1.191
BW.2.10 - 1.00 60 2.673 0.362 0.289 0.280
11
BW.2.11 0.280 0.8 0.66 0.00009 0.968
BW.2.11 - 1.00 60 2.545 0.343 0.263 0.230
12
BW.2.12 0.230 0.8 0.62 0.00008 0.874
PROGRESS PELAKSANAAN TA.
BANGUNAN AIR
Panjang
Realisasi
Saluran Lebar (b) Debit (Q) Areal Realisasi
No. SALURAN
m m Ha
Review
Justek (%)
RENCANA
Design (%)
m s/d
Saluran Induk Klambu
1 Kiri 18,277.13 14.85 19.70 14,038 100% 85%
AKHIR
Saluran Sekunder DESEMBE
2 Wedung
PanjangSaluranW1 29,735.62 4.90 4.29 100% 25%
R 2016
PanjangSaluranW2 14,498.18 4.90 4.29
PanjangSaluranW3 25,247.19 5.90 5.79
PanjangSaluranW4 19,252.44 2.30 2.45 REVIEW

Saluran Sekunder
DESIGN
3 Ngaloran 8,429.74 2.00 0.96 723 100% 25% SELESAI

4 Saluran Sekunder Turi 13,447.90 2.60 1.70 1,276 0% 0%
100%

5 Saluran Sekunder Jebor 12,787.40 2.30 1.35 1,019 0% 0% JUSTEK
MENGIKUTI
Saluran Sekunder
PROGRES
6 Tempuran 9,107.67 3.80 3.02 2,268 100% 30%
KONTRAKTOR

Saluran Sekunder
7 Weding 8,187.37 2.35 1.40 1,051 100% 0%

8 Saluran Sekunder Ruwit 2,380.48 0.95 0.36 268 100% 0%

Saluran Sekunder Gajah
MONITORING PELAKSANAAN SUPERVISI
DI.KLAMBU KIRI
REALISASI 2016 RENCANAI 2017
DESIG DESIG
DESIGN/R DESIGN/ DESIGN/RE
JUMLAH N/REVI Progr DESIGN/R N/REV Progr
N PANJANG EVIEW Progre REVIEW Progress VIEW Progress Progress
NAMA SALURAN BANG EW ess EVIEW IEW ess
O SAL (m) HIDROLIS ss (%) SALURA (%) HIDROLIS (%) (%)
(BH) BANGU (%) SALURAN BANG (%)
SALURAN N SALURAN
NAN UNAN
1 INDUK KIRI 1e-1 13.403,0 3.751,0
14,00
0 3.751,00 30 0 30 0 0 8.751,00 70 8.751,00 70 0 0
6.950,0
2 8.688,00 15,00
INDUK KIRI 1-15 6.950,00 80 0 80 13 80 1.738,00 20 1.738,00 20 2 20
1 INDUK KIRI 15-25 4.815,0
9.630,00 10,00
4.815,00 50 0 50 6 60 4.815,00 50 4.815,00 50 4 40
22.210,6 8.884,0 13.326,0
3 41,00
SEKUNDER W1 2 8.884,00 40 0 40 0 0 13.326,00 60 0 60 0 0
11.598,0 11.598,
4 14,50 43,00
SEKUNDER W2 0 80 00 80 0 0 2.900,00 20 2.900,00 20 0 0
3.372,0 13.490,0
5 16,86 28,00
SEKUNDER W3 3.372,00 20 0 20 0 0 13.490,00 80 0 80 0 0
3.423,0 13.690,0
6 17,11 31,00
SEKUNDER W4 3.423,00 20 0 20 0 0 13.690,00 80 0 80 0 0
0 0 0 0
SEKUNDER GAJAH
7 1,80 4,00
LOR 835,00 40 835,00 40 0 0 1.252,00 60 1.252,00 60 0 0
SEKUNDER 6.743,0
8 8,43 21,00
NGALURAN 6.743,00 80 0 80 0 0 1.686,00 20 1.686,00 20 0 0
5.399,0
9 9,84 24,00
SEKUNDER TURI 5.399,00 40 0 40 0 0 8.098,00 60 8.098,00 60 0 0
1 5.115,0
12,06 21,00
0 SEKUNDER JEBOR 5.115,00 40 0 40 0 0 7.672,00 60 7.672,00 60 0 0
1 SEKUNDER 7.286,0
9,11 17,00
1 TEMPURAN 7.286,00 80 0 80 0 0 1.821,00 20 1.821,00 20 0 0
1 SEKUNDER 4.912,0
8,25 15,00
2 WEDING 4.912,00 60 0 60 0 0 3.275,00 40 3.275,00 40 0 0
1 1.428,0
1,75 9,00
3 SEKUNDER RUWIT 1.428,00 60 0 60 0 0 952,00 40 952,00 40 0 0
PHOTO PELAKSANAAN JOINT
INSPECTION
PHOTO PELAKSANAAN
PEMASANGAN SSP
PHOTO PELAKSANAAN JOINT
INSPECTION DAN PELAKSANAAAN
PEKERJAAN
PHOTO PELAKSANAAN JOINT
INSPECTION DAN PELAKSANAAAN
PEKERJAAN

4,5
m
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION
JOINT
INSPEKTION

Anda mungkin juga menyukai