RENCANA ANGGARAN BIAYA

RENOVASI RUMAH TINGGAL DASWA

NO URAIAN PEKERJAAN VOLUME

A PEKERJAAN PERSIAPAN
1 Pengukuran & Bowplank 100.88
2 Mobilisasi & Demobilisasi 1.00

B PEKERJAAN BONGKARAN
1 Bongkar Dinding Eksisting 43.20
2 Bongkar Kusen Pintu Eksisting 2.00

C PEKERJAAN GALIAN & PONDASI


1 Galian Pondasi dan Sloof 16.52
2 Lantai Kerja (Lean Concreete) 31.26
3 Pondasi Foot Plat 2.02
4 Pasang Sloof 15x20 K225 + Pembesian + Bekisting 2.79
5 Urugan Tanah Kembali 11.72

D PEKERJAAN STRUKTUR
1 Kolom 30x30 K225 + Pembesian + Bekisting 4.32
2 Kolom Praktis 30x30 K225 + Pembesian + Bekisting 0.18
3 Ring Balk 15x25 K225 + Pembesian + Bekisting 2.98
4 Plat Lantai Beton 15x25 K225 + Wire Mesh + Bekisting 15.57
5 Pasang Water Proofing untuk Plat Lantai Beton 103.78
6 Screening Plat Lantai Beton 103.78

E PEKERJAAN ARSITEKTUR
E.1 Pekerjaan Dinding
1 Pasang Dinding Bata Merah Spasi 1PC:4PSR 95.49
2 Plesteran & Acian 190.98

E.2 Pekerjaan Plafond


1 Pasang Plafond Gypsum Rangka Hollow 103.78
2 Pasang List Plafond Gypsum L 8cm 75.97

E.3 Pekerjaan Pengecatan


1 Pengecatan Dinding 190.98
2 Pengecatan plafond 103.78

E.4 Pekerjaan Kusen, Pintu & Jendela


1 Pasang Kusen & Pintu Double + finishing + Acc. 1.00
2 Pasang Kusen & Pintu Single + finishing + Acc. 1.00
3 Pasang Kusen & Jendela Double + finishing + Acc. 1.00
NO URAIAN PEKERJAAN VOLUME
4 Pasang Kusen & Jendela Single + finishing + Acc. 1.00
5 Pasang Kusen & Pintu PVC Kamar Mandi 1.00

E.5 Pekerjaan Keramik Lantai & Dinding


1 Pas. Keramik Lantai Homogenous 40x40 106.88
2 Pas. Keramik Lantai Kamar Mandi 20x20 2.66
3 Pas. Keramik Dinding Kamar Mandi 20x25 9.60

E.6 Pekerjaan Atap


1 Pas. Atap Asbes + Rangka Kaso Penutup Void 3.20

F PEKERJAAN MEKANIKAL & ELEKTRIKAL


1 Pipa Air Hujan 4" PVC AW 4.32
2 Roof Drain 1.00
3 Instalasi Lampu + Kabel NYM 3 x 2,5 mm 7.00
4 Instalasi Saklar + Kabel NYM 3 x 2,5 mm 7.00
5 Instalasi Stop Kontak + Kabel NYM 3 x 2,5 mm 7.00

G PEKERJAAN LAIN-LAIN
1 Perapihan & Pembersihan 1.00

Terbilang :

Dua Ratus Tujuh Belas Juta Lima Puluh Enam Ribu Seratus Lima Puluh Em
SATUAN HARGA SATUAN JUMLAH HARGA

m2 8,000.00 807,040.00
lot 2,000,000.00 2,000,000.00
Sub Total 2,807,040.00

m2 45,000.00 1,944,000.00
bh 25,000.00 50,000.00
Sub Total 1,994,000.00

m3 65,000.00 1,074,060.00
m2 35,000.00 1,093,960.00
m3 3,550,000.00 7,156,800.00
m3 3,750,000.00 10,451,250.00
m3 15,000.00 175,815.00
Sub Total 19,951,885.00

m3 3,850,000.00 16,632,000.00
m3 3,550,000.00 639,000.00
m3 3,750,000.00 11,173,125.00
m3 3,750,000.00 58,376,250.00
m3 65,000.00 6,745,700.00
m3 35,000.00 3,632,300.00
Sub Total 97,198,375.00

m2 125,000.00 11,936,000.00
m2 72,500.00 13,845,760.00
Jumlah E.1 25,781,760.00

m2 90,000.00 9,340,200.00
m' 15,000.00 1,139,550.00
Jumlah E.2 10,479,750.00

m2 36,500.00 6,970,624.00
m2 29,000.00 3,009,620.00
Jumlah E.3 9,980,244.00

bh 3,850,000.00 3,850,000.00
bh 2,250,000.00 2,250,000.00
bh 1,800,000.00 1,800,000.00
SATUAN HARGA SATUAN JUMLAH HARGA
bh 1,150,000.00 1,150,000.00
bh 850,000.00 850,000.00
Jumlah E.4 9,900,000.00

m2 145,000.00 15,497,600.00
m2 75,000.00 199,500.00
m2 85,000.00 816,000.00
Jumlah E.5 16,513,100.00

m2 165,000.00 528,000.00
Jumlah E.6 528,000.00
Sub Total 73,182,854.00

m' 3,850,000.00 16,632,000.00


bh 65,000.00 65,000.00
titik 225,000.00 1,575,000.00
titik 215,000.00 1,505,000.00
titik 235,000.00 1,645,000.00
Sub Total 21,422,000.00

lot 500,000.00 500,000.00


Sub Total 500,000.00
BIAYA TOTAL 217,056,154.00