HARGA DASAR SATUAN UPAH

HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1. Pekerja (L01) Jam - /hari 7jam


2. Tukang (L02) Jam - /hari 7jam
3. Mandor (L03) Jam - /hari 7jam
4. Operator (L04) Jam - /hari 7jam
5. Pembantu Operator (L05) Jam - /hari 7jam
6. Sopir / Driver (L06) Jam - /hari 7jam
7. Pembantu Sopir / Driver (L07) Jam - /hari 7jam
8. Mekanik (L08) Jam - /hari 7jam
9. Pembantu Mekanik (L09) Jam - /hari 7jam
10. Kepala Tukang (L10) Jam - /hari 7jam

Buruh Tidak Terampil /hari -


Buruh Terampil/Pekerja /hari -
Tukang Kayu /hari -
Tukang Batu /hari -
Tukang Besi /hari -
Tukang Cat /hari -
Kepala Tukang /hari -
Mandor /hari -
Mekanik /hari -
Operator Terampil /hari -
Pembantu Operator /hari -
Sopir Terampil /hari -
Pembantu Sopir /hari -
X-4

X.3. HARGA BAHAN BANGUNAN

No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk

#### ###
X.3.1.1. Bahan Struktur
3
4 Batu Pecah 10 - 15 cm M - *
3
11 Kerikil Sungai M - *
3
13 Sirtu Royalti M - *

X.3.1.2. Bahan Pasangan


1 Batu Bata Uk. 10 x 10 x 20 cm Bh - *

X.3.2. Pasir
3
1 Pasir Beton ex Palu M - *
3
3 Pasir Putih/Pasangan M - *

X.3.4. Semen
1 Semen Abu-abu 1 zak = 50 kg Zak - Tonasa*
7 Semen Putih 1 zak = 40 kg Zak - *

X.3.5. Kayu
23 Kayu List Profil Ukuran 2 x 8 x 400 cm Btg -

X.3.6.2. Kawat
7 Kawat Bendrat Bendrat 1 Kg - *

X.3.6.3. Besi Beton


X.3.6.3.1. Besi Beton Polos (Full)
17 Besi Beton Polos Kg - *

X.3.6.6. Paku
8 Paku Sekrup 1 1/2" Bh -
17 Paku Beton 4,3 x 100" Kg -
18 Paku Seng 2" besar Kg -
28 Paku Biasa 3" Kg - begisting*

X.3.6.7. Baja
2
2 Pintu Besi M -

X.3.7.2. Jenis Cat


X.3.7.2.1. Cat Dasar
8 Plamir Ecoemulsion 5 liter Kg - *

X.3.7.2.2. Cat Tembok


1 Cat Type 364 Isi 5 Ltr Klg - Paragon*
35 Cat tembok Interior Isi 2.5 Ltr Klg - Vinilex*
37 Cat tembok Interior Isi 2.5 Ltr Klg - Mowilex*
16 Cat Kayu (Exterior) Ultran Lasur Natural Gloss, Natural Dof Isi 1 liter Klg - Propan

X.3.8. Multipleks
4 Triplek 6 mm Lbr -
5 Triplek 9 mm Lbr -
6 Triplek 12 mm Lbr -
8 Triplek 18 mm Lbr -
18 HPL Motif Taco Setara Lbr -

X.3.9. Bahan Pelapis Dinding


X.3.9.1. Kaca
2
4 Kaca Bening 8 mm M - Asahimas
21 Kaca Tempered 10 mm M2 -
2
24 Kaca Cermin M -

X.3.9.2. Gypsum
2
1 Gypsum Standard Board Ukuran 9 x 1200 x 2400 mm M - Knauf

X.3.9.3. GRC
2 GRC (External) Ukuran 9 x 1220 x 2440 mm Lbr -
6 GRC (External) Ukuran 9 x 100 x 2440 # mm Lbr -
12 GRC (Internal) Ukuran 10 x 1220 x 2440 mm Lbr -

X.3.10. Bahan Pelapis Lantai

Ket : Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku. Harga dpt berubah sewaktu-waktu sesuai harga pasar
X-5

No Nama Barang Ukuran/Tipe Sat. Harga (Rp) Merk

#### ###
X.3.10.1. Granito Tile
87 Granito Tile Marble Polished Ukuran 60 x 60 cm Box - Essenza

X.3.10.2. Keramik
12 Keramik Dinding Special Ukuran 25 x 40 cm Box - Kia
29 Keramik Lantai Rustic Ukuran 30 x 30 cm Box - Kia

X.3.10.3. Dan Lain-lain


3 Wallpaper 50 x 1500 cm Roll - Premium
8 Sealent tube - Dexson
9 Profil Alumunium Kusen Coklat 4" M1 - Alexindo
10 Rangka Pintu Alumunium M1 - Alexindo
11 Rangka Hollow 4 x 6 x 0,3 cm m' -
12 Rangka Hollow 8 x 6 x 0,3 cm m' -

X.3.11.6. Bahan Insulation


3
3 Glasswoll D. 16 Kg/M Tebal 25 mm x 1.2 mx 30 m Roll -

X.3.12. Penggantung & Pengunci


4 Engsel Kipas Bh -
9 Kunci Pintu Besar 693 LD Set - Mortise
25 Lever Handle HRE.65.03 Psg - Kend
35 Engsel Pintu Besi 497 US P Psg - Kend
52 Handle Pintu Psng - SES
53 Handle Bh - Belleza
54 Door Closer Bh - Yale
86 Kunci Pintu Digital YDR 4110 FingerPrint Max 20 Pin Code Max 12 Digit Pcs - Yale

X.3.13.2. Closet
9 Closet Duduk CW 824PJ Set - Toto

X.3.13.3. Kran Air


1 Kran Washtafel TOTO T 30 AR13V7N Bh - Toto
14 Floor Drain Stainless Steel Bh -
18 Jet Washer Bh -

X.3.13.4. Wastafel
6 Wastafel Type LW 592 J Putih Bh - Toto

X.3.13.5. Urinal
8 Urinal UW447JNM Moslem Type urinal (Top Inlet) Set - Toto

X.3.13.6. Kitchen Sink


1 Kitchen Sink Sink R -1 Ukuran 100 x 56 x 88 cm Bh - Standart

X.3.14. Pipa
X.3.14.2. Pipa PVC
2 Pipa PVC 3/4" Btg -

X.3.14.2.1. Pipa PVC Serie 12,5


18 Pipa PVC 2" Btg - Wavin
20 Pipa PVC 3" D Btg - Wavin
22 Pipa PVC 4" D Btg - Wavin

X.3.17. Bahan Bakar


2 Minyak Diessel/solar Liter -

Ket : Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku. Harga dpt berubah sewaktu-waktu sesuai harga pasar
REKAP ANALISA SNI
RJ YG DIPAKAI

N0 KODE PEKERJAAN SAT HARGA SATUAN KET

0 PEKERJAAN BONGKARAN
0.2 Pekerjaan Pembongkaran Dinding Partisi M2 -
0.3 Pekerjaan Pembongkaran Kusen Pintu Unit -
0.5 Pekerjaan Pembongkaran Wastafel Unit -
0.7 Bongkar 1 M2 Plafon M2 -
0.9 Pekerjaan Pembongkaran 1 M3 beton bertulang M3 -
0.10 Pekerjaan Pembongkaran kloset Unit -
0.11 Pekerjaan Pembongkaran Urinoir Unit -

1 PEKERJAAN TANAH
1.1 Penggalian 1 m3 tanah biasa sedalam 1 meter m3 -
1.2 Penggalian tanah biasa sedalam 2 meter m3 -
1.10 Mengurug kembali 1 m3 galian m3 -
1.17a Bongkaran Beton Bt. Gunung & Batu Bata m3 -

3 PEKERJAAN BETON & BAJA


3.22 Membuat pondasi beton bertulang (150kg besi + bekisting) m3 688,518.60
3.29 Membuat kolom praktis beton bertulang (11 x 11) cm m1 6,885.19
3.31 Beton Tumbuk 1Pc : 3Psr : 5Kr m3 -

4 PEKERJAAN DINDING
4.10 Memasang 1 m2 dinding bata merah tebal 1/2 bata, m2 -
campuran 1 PC : 3 PP
4.18 Pekerjaan Pemasangan Dinding Partisi GRC Double Side m2 375,593.25
4.18a Pekerjaan Pemasangan Dinding Partisi GRC Single Side m2 375,593.25
4.19 Pekerjaan Pemasangan Dinding Partisi GRC Fin. HPL Double Side m2 548,530.64
4.20 Pekerjaan Dinding Partisi Multiplek Finish Dico-Cat Double Side m2 527,252.00

5. PEKERJAAN PLESTERAN
5.10 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2 -
5.20 Memasang acian m2 -

6. PEKERJAAN KAYU
6.50b Pekerjaan Lantai Plywood 12 mm Pada Rangka Modul 60/60 m2 71,905.89

7. PEKERJAAN PENUTUP LANTAI DAN DINDING


7.3 Memasang 1 m2 lantai keramik, uk (25 x 40) cm m2 -
7.4 Memasang 1 m2 lantai keramik, uk (30 x 30) cm m2 -
7.4a Memasang 1 m2 lantai granit, uk (60 x 60) cm m2 -
7.5 Pasang Plastik Cor m2 5,300.00

8. PEKERJAAN LANGIT-LANGIT
8.4 Memasang 1 m2 langit-langit Gypsum board, uk (120x240) cm, tebal 9 mm. Rangka Hollowm2
4/4 (60/60) 106,571.94
9 PEKERJAAN PENGECATAN
9.8 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat dasar, 2 Lapis Cat Penutup M2 -
9.9 Pengecatan Plafond Baru ( 1 Lapis cat dasar, 2 Lapis Cat Pebutup) M2 -
9.11 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Mowilex M2 -
Secara Manual Sistem 3 Lapis Cat Konvensional dengan tebal 200 um

10 PEKERJAAN SANITASI
10.7 Memasang Pipa PVC Type AW Diameter 3/4" M' -
10.7a Memasang Pipa PVC Type AW Diameter 3" M' -
10.7b Memasang Pipa PVC Type AW Diameter 4" M' -

11 PEKERJAAN ALUMINIUM DAN KACA


11.8 Memasang 1 m2 Wallpaper m2 117,000.00
11.10 Memasang 1 m2 Kaca Bening tebal 12 mm m2 -
11.11 Memasang 1 m2 Kaca Tempered tebal 10 mm m2 1,471,250.00

12 PEKERJAAN PEMASANGAN DAUN PINTU


12.1 Membuat dan memasang Kusen dan Daun Pintu type P1 Set 6,290,887.43
12.2 Membuat dan memasang Kusen dan Daun Pintu type P2 Set 3,186,768.00
12.3 Membuat dan memasang Kusen dan Daun Pintu type P3 Set 4,876,566.00
12.4 Membuat dan memasang Kusen dan Daun Pintu type P4 Set 3,073,791.67
12.5 Membuat dan memasang Kusen dan Daun Pintu type P5 Set 3,201,569.33
12.6 Membuat dan memasang Kusen dan Daun Pintu type P6 Set 3,120,328.00
12.7 Membuat dan memasang Kusen dan Daun Pintu type P7 Set 3,449,104.57
12.8 Membuat dan memasang Kusen dan Daun Pintu type P8 Set 2,643,099.00
12.9 Membuat dan memasang Kusen dan Daun Pintu type P10 Set 3,089,853.17
12.10 Membuat dan memasang Daun Pintu type P11 Set 2,907,018.15
12.11 Membuat dan memasang Daun Pintu Lipat (Insulasi) type P12 dan Cover Set 31,534,029.67
ANALISA SNI
KOTA BALIKPAPAN

Harga Jumlah Harga (Rp.)


No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
0 PEKERJAAN BONGKARAN

0.2 Pekerjaan Pembongkaran Dinding Partisi M2


0.333 Oh Pekerja Tidak terampil - - - -
0.033 Oh Mandor - - - -
- - -

0.3 Pekerjaan Pembongkaran Kusen Pintu Unit


0.333 Oh Pekerja Tidak terampil - - - -
0.033 Oh Mandor - - - -
- - -

0.5 Pekerjaan Pembongkaran Wastafel Unit


0.333 Oh Pekerja Tidak terampil - - - -
0.033 Oh Mandor - - - -
- - -

0.7 Bongkar 1 M2 Plafon M2


0.05 OH Pekerja Tidak terampil - - -
0.005 OH Mandor - - -
- -

0.8 Pekerjaan Pembongkaran Dinding Bata M3


1.250 Oh Pekerja Tidak terampil - - - -
0.125 Oh Mandor - - - -
- - -
0.9 Pekerjaan Pembongkaran 1 M3 beton bertulang M3
1.334 Oh Pekerja Tidak terampil - - - -
0.666 Oh Mandor - - - -
- - -
0.10 Pekerjaan Pembongkaran kloset Unit
0.333 Oh Pekerja Tidak terampil - - - -
0.033 Oh Mandor - - - -
- - -
0.11 Pekerjaan Pembongkaran Urinoir Unit
0.333 Oh Pekerja Tidak terampil - - - -
0.033 Oh Mandor - - - -
- - -
1 PEKERJAAN TANAH

1.1 Penggalian 1 m3 tanah biasa sedalam 1 meter m3


0.750 OH Pekerja Tidak terampil - - -
0.025 OH Mandor - - -
- -

1.2 Penggalian tanah biasa sedalam 2 meter m3


0.900 OH Pekerja Tidak terampil - - -
0.045 OH Mandor - - -
- -

1.5 Penggalian tanah cadas sedalam 1 meter m3


1.500 OH Pekerja Tidak terampil - - -
0.060 OH Mandor - - -
- -

1.7 Pengerjaan stripping tebing setinggi 1 meter m2


0.050 OH Pekerja Tidak terampil - - -
0.005 OH Mandor - - -
- -

1.9 Membuang tanah sejauh 150 meter m3


0.516 OH Pekerja Tidak terampil - - -
0.050 OH Mandor - - -
- -

1.10 Mengurug kembali 1 m3 galian m3


Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian -

1.17 Bongkaran Beton Bertulang m3


6.667 Oh Pekerja Tidak terampil - - -
0.333 Oh Mandor - - -
- -

1.17 a Bongkaran Beton Bt. Gunung & Batu Bata m3


Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
PEKERJAAN1.250
BONGKARAN
Oh Pekerja Tidak terampil - - -
0.125 Oh Mandor - - -
- -

- 1,147,628.74 1,147,628.74

3 PEKERJAAN BETON & BAJA

3.22 Membuat pondasi beton bertulang (150kg besi + bekisting) m3


0.200 m3 Kayu kelas III (meranti uk. 5/7) 3,442,593.00 688,518.60 688,518.60
1.500 kg Paku - - -
0.400 ltr Minyak bekisting (Solar) - - -
157.500 kg Besi beton polos - - -
2.250 kg Kawat beton - - -
336.000 kg Portland Cement - - -
0.540 m3 Pasir ex Palu - - -
0.810 m3 Kerikil - - -
5.300 OH Pekerja Tidak terampil - - -
0.275 OH Tukang batu - - -
1.300 OH Tukang kayu - - -
1.050 OH Tukang besi - - -
0.262 OH Kepala tukang - - -
0.265 OH Mandor - - -
- 688,518.60 688,518.60

3.29 Membuat kolom praktis beton bertulang (11 x 11) cm m1


0.002 m3 Kayu kelas III (meranti uk. 5/7) 3,442,593.00 6,885.19 6,885.19
0.010 kg Paku - - -
1.200 ltr Minyak bekisting (Solar) - - -
3.000 kg Besi beton polos - - -
0.450 kg Kawat beton - - -
4.000 kg Portland Cement - - -
0.006 m3 Pasir ex Palu - - -
0.009 m3 Kerikil - - -
0.180 OH Pekerja Tidak terampil - - -
0.020 OH Tukang batu - - -
0.020 OH Tukang kayu - - -
0.020 OH Tukang besi - - -
0.006 OH Kepala tukang - - -
0.009 OH Mandor - - -
- 6,885.19 6,885.19

3.31 Beton Tumbuk 1Pc : 3Psr : 5Kr m3


1.650 Oh Pekerja Tidak terampil - - -
0.250 Oh Tukang batu - - -
0.025 Oh Kepala tukang - - -
0.080 Oh Mandor - - -
0.520 M3 Pasir ex Palu - - -
0.870 M3 Koral Beton/Batu Pecah - - -
218.000 Kg Portland Cement - - -
- - -

4 PEKERJAAN DINDING

4.10 Memasang 1 m2 dinding bata merah tebal 1/2 bata, m2


campuran 1 PC : 3 PP
78.000 buah Bata Merah - - -
14.370 kg Portland Cement - - -
0.040 m3 Pasir pasang - - -
0.320 OH Pekerja Tidak terampil - - -
0.100 OH Tukang batu - - -
0.010 OH Kepala tukang - - -
0.015 OH Mandor - - -
- - -

4.18 Pekerjaan Pemasangan Dinding Partisi GRC Double Side m2


0.0700 Oh Pekerja - - - -
0.1000 Oh Tukang Kayu - - - -
0.0100 Oh Kepala Tukang - - - -
0.0035 Oh Mandor - - - -
3.6045 m Baja Ringan Canal C 104,200.00 375,593.25 375,593.25
0.6719 Lbr GRC 9 mm - - - -
0.0300 Kg Paku sekrup - - - -
Jumlah - 375,593.25 375,593.25

4.18a Pekerjaan Pemasangan Dinding Partisi GRC Single Side m2


0.0700 Oh Pekerja - - - -
0.1000 Oh Tukang Kayu - - - -
0.0100 Oh Kepala Tukang - - - -
0.0035 Oh Mandor - - - -
3.6045 m Baja Ringan Canal C 104,200.00 375,593.25 375,593.25
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
PEKERJAAN BONGKARAN
0.3359 Lbr GRC 9 mm - - - -
0.0300 Kg Paku sekrup - - - -
Jumlah - 375,593.25 375,593.25

4.19 Pekerjaan Pemasangan Dinding Partisi GRC Fin. HPL Double Side m2
0.0700 Oh Pekerja - - - -
0.1000 Oh Tukang Kayu - - - -
0.0100 Oh Kepala Tukang - - - -
0.0035 Oh Mandor - - - -
3.6045 m2 Baja Ringan Canal C 104,200.00 375,593.25 375,593.25
0.6719 Lbr GRC 9 mm - - - -
0.0300 Kg Paku sekrup - - - -
2.2000 m2 HPL 78,607.90 172,937.38 172,937.38
Jumlah - 548,530.64 548,530.64

4.20 Pekerjaan Dinding Partisi Multiplek Finish Dico-Cat Double Side m2


0.0700 Oh Pekerja - - - -
0.1000 Oh Tukang Kayu - - - -
0.0100 Oh Kepala Tukang - - - -
0.0035 Oh Mandor - - - -
4.4000 m Baja Ringan Canal C 104,200.00 458,480.00 458,480.00
0.6719 Lbr Multipleks - - - -
0.0300 Kg Paku sekrup - - - -
Finishing (15% Biaya) 68,772.00
Jumlah - 527,252.00 527,252.00

5. PEKERJAAN PLESTERAN

5.10 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2


10.368 kg Portland Cement - - -
0.031 m3 Pasir pasang - - -
0.260 OH Pekerja Tidak terampil - - -
0.200 OH Tukang batu - - -
0.020 OH Kepala tukang - - -
0.013 OH Mandor - - -
- - -

5.20 Memasang acian m2


3.250 kg Portland Cement - - -
0.150 OH Pekerja Tidak terampil - - -
0.100 OH Tukang batu - - -
0.010 OH Kepala tukang - - -
0.008 OH Mandor - - -
- - -

6. PEKERJAAN KAYU

6.50b Pekerjaan Lantai Plywood 12 mm Pada Rangka Modul 60/60 m2


0.150 Oh Pekerja - - -
0.300 Oh Tukang Kayu - - -
0.030 Oh Kepala Tukang - - -
0.005 Oh Mandor - - -
1.000 m2 Plywood 12 mm 61,105.89 61,105.89 61,105.89
12.000 Bj Paku Klam 900.00 10,800.00 10,800.00
71,905.89 - 71,905.89

7. PEKERJAAN PENUTUP LANTAI DAN DINDING

7.3 Memasang 1 m2 lantai keramik, uk (25 x 40) cm m2


10.000 bh Ubin keramik 25/40 - - -
11.380 kg Portland Cement - - -
0.042 m3 Pasir pasang - - -
1.500 kg Semen warna - - -
0.620 OH Pekerja Tidak terampil - - -
0.350 OH Tukang batu - - -
0.035 OH Kepala tukang - - -
0.030 OH Mandor - - -
- - -

7.4 Memasang 1 m2 lantai keramik, uk (30 x 30) cm m2


9.000 bh Ubin keramik 30/30 - - -
11.380 kg Portland Cement - - -
0.042 m3 Pasir pasang - - -
1.500 kg Semen warna - - -
0.620 OH Pekerja Tidak terampil - - -
0.350 OH Tukang batu - - -
0.035 OH Kepala tukang - - -
0.030 OH Mandor - - -
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
PEKERJAAN BONGKARAN - - -
7.4a Memasang 1 m2 lantai granit, uk (60 x 60) cm m2
1.667 bh Granito 60/60 - - -
11.380 kg Portland Cement - - -
0.042 m3 Pasir pasang - - -
1.500 kg Semen warna - - -
0.620 OH Pekerja Tidak terampil - - -
0.350 OH Tukang batu - - -
0.035 OH Kepala tukang - - -
0.030 OH Mandor - - -
- - -
7.5 Pasang Plastik Cor m2
0.015 OH Pekerja tidak terampil - - -
0.003 OH Mandor - - -
1.200 m2 Plastik Cor 4,000.00 4,800.00 4,800.00
1.000 Ls Alat Bantu 500.00 500.00 500.00
- 5,300.00 5,300.00

8. PEKERJAAN LANGIT-LANGIT

8.4 Memasang 1 m2 langit-langit Gypsum board, uk (120x240) cm, tebal 9 mm.


m2
Rangka Hollow 4/4 (60/60)
1.000 m2 Gypsum Standard Board - - -
4.361 m Baja Ringan Hollow 4/4 24,437.50 106,571.94 106,571.94
0.030 kg Paku Sekrup - - -
0.070 OH Pekerja Tidak terampil - - -
0.100 OH Tukang kayu - - -
0.010 OH Kepala tukang - - -
0.004 OH Mandor - - -
- 106,571.94 106,571.94

9 PEKERJAAN PENGECATAN
.

9.8 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat dasar, 2 Lapis Cat PenutupM2
0.020 Oh Pekerja Tidak terampil - - -
0.063 Oh Tukang Cat - - -
0.006 Oh Kepala tukang - - -
0.003 Oh Mandor - - -
0.100 Kg Plamir - - -
0.110 Ltr Cat Dasar - - -
0.260 Klg Cat Penutup 2 x - - -
Jumlah - - -
9.9 Pengecatan Plafond Baru ( 1 Lapis cat dasar, 2 Lapis Cat Pebutup) M2
0.020 Oh Pekerja Tidak terampil - - -
0.063 Oh Tukang Cat - - -
0.006 Oh Kepala tukang - - -
0.003 Oh Mandor - - -
0.110 Ltr Cat Dasar - - -
0.260 Klg Cat Penutup 2 x - - -
Jumlah - - -

9.11 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Mowilex M2
0.028 Oh Pekerja Tidak terampil - - -
0.042 Oh Tukang Cat - - -
0.004 Oh Kepala tukang - - -
0.003 Oh Mandor - - -
0.120 Ltr Cat Dasar - - -
0.180 Kg Cat Penutup 2 x - - -
Jumlah - - -

10 PEKERJAAN SANITASI

10.7 Memasang Pipa PVC Type AW Diameter 3/4" M'


0.036 Oh Pekerja Tidak terampil - - -
0.002 Oh Tukang batu - - -
0.060 Oh Kepala tukang - - -
0.006 Oh Mandor - - -
1.200 M' Pipa PVC - - -
1.000 Ls Perlengkapan (35% Harga Pipa) - - -
Jumlah - - -
10.7a Memasang Pipa PVC Type AW Diameter 3" M'
0.081 Oh Pekerja Tidak terampil - - -
0.135 Oh Tukang batu - - -
0.014 Oh Kepala tukang - - -
0.004 Oh Mandor - - -
1.200 M' Pipa PVC - - -
1.000 Ls Perlengkapan (35% Harga Pipa) - - -
Jumlah - - -
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
PEKERJAAN BONGKARAN
10.7b Memasang Pipa PVC Type AW Diameter 4" M'
0.081 Oh Pekerja Tidak terampil - - -
0.135 Oh Tukang batu - - -
0.014 Oh Kepala tukang - - -
0.004 Oh Mandor - - -
1.200 M' Pipa PVC - - -
1.000 Ls Perlengkapan (35% Harga Pipa) - - -
Jumlah - - -

11 PEKERJAAN ALUMINIUM DAN KACA

11.8 Memasang 1 m2 Wallpaper m2


0.350 Oh Pekerja terampil - - -
0.002 Oh Mandor - - -
0.175 Oh Tukang - - -
0.017 Oh Kepala tukang - - -
1.000 m2 Wallpaper 117,000.00 117,000.00 117,000.00
0.250 Kg Lem 138,297.50 34,574.38 34,574.38
Jumlah - 117,000.00 117,000.00

11.10 Memasang 1 m2 Kaca Bening tebal 12 mm m2


0.025 Oh Pekerja terampil - - -
0.250 Oh Tukang - - -
0.025 Oh Kepala Tukang - - -
0.001 Oh Mandor - - -
1.100 m2 Kaca Bening - - -
0.070 Kg Sealant 46,300.00 3,241.00 3,241.00
Jumlah - - -
11.11 Memasang 1 m2 Kaca Tempered tebal 10 mm m2
0.070 Oh Pekerja terampil - - -
0.100 Oh Tukang - - -
0.010 Oh Kepala Tukang - - -
0.004 Oh Mandor - - -
1.100 m2 Kaca Tempered 10 mm 1,337,500.00 1,471,250.00 1,471,250.00
0.070 Tube Sealant 46,300.00 3,241.00 3,241.00
Jumlah - 1,471,250.00 1,471,250.00

12 PEKERJAAN PEMASANGAN DAUN PINTU

12.1 Membuat dan memasang Kusen dan Daun Pintu type P1 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
11.200 m Rangka Pintu Alumunium 227,800.00 2,551,360.00 2,551,360.00
4.800 m2 Plywood 6 mm 30,536.15 146,573.50 146,573.50
4.800 m2 Lapis HPL 78,607.90 377,317.93 377,317.93
12.300 m Profil Alumunium 117,700.00 1,447,710.00 1,447,710.00
0.725 m2 Kaca Bening 8 mm 401,200.00 290,870.00 290,870.00
2.000 Psg Handle Pintu 224,700.00 449,400.00 449,400.00
3.000 Psg Engsel 61,100.00 183,300.00 183,300.00
0.120 tube sealant 46,300.00 5,556.00 5,556.00
2.000 Set Door Closer 419,400.00 838,800.00 838,800.00
Jumlah - 6,290,887.43 6,290,887.43

12.2 Membuat dan memasang Kusen dan Daun Pintu type P2 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.200 m Rangka Pintu Alumunium 227,800.00 1,184,560.00 1,184,560.00
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
5.100 m Profil Alumunium 117,700.00 600,270.00 600,270.00
1.050 m2 Kaca Bening 8 mm 401,200.00 421,260.00 421,260.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
1.000 Psg Engsel 61,100.00 61,100.00 61,100.00
1.000 Set Door Closer 419,400.00 419,400.00 419,400.00
0.060 tube sealant 46,300.00 2,778.00 2,778.00
Jumlah - 3,186,768.00 3,186,768.00

12.3 Membuat dan memasang Kusen dan Daun Pintu type P3 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
9.200 m Rangka Pintu Alumunium 227,800.00 2,095,760.00 2,095,760.00
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
5.700 m Profil Alumunium 117,700.00 670,890.00 670,890.00
1.050 m2 Kaca Bening 8 mm 401,200.00 421,260.00 421,260.00
2.000 Psg Handle Pintu 224,700.00 449,400.00 449,400.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
2.000 Set Door Closer 419,400.00 838,800.00 838,800.00
0.120 tube sealant 46,300.00 5,556.00 5,556.00
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
PEKERJAAN BONGKARAN Jumlah - 4,876,566.00 4,876,566.00

12.4 Membuat dan memasang Kusen dan Daun Pintu type P4 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.920 m Rangka Pintu Alumunium 227,800.00 1,348,576.00 1,348,576.00
3.200 m2 Plywood 6 mm 30,536.15 97,715.67 97,715.67
3.200 m2 Lapis HPL - - -
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
5.000 m Profil Alumunium 117,700.00 588,500.00 588,500.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
1.000 Set Door Closer 419,400.00 419,400.00 419,400.00
Jumlah - 3,073,791.67 3,073,791.67

12.5 Membuat dan memasang Kusen dan Daun Pintu type P5 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.620 m Rangka Pintu Alumunium 227,800.00 1,280,236.00 1,280,236.00
2.800 m2 Plywood 6 mm 30,536.15 85,501.21 85,501.21
2.800 m2 Lapis HPL 78,607.90 220,102.12 220,102.12
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
4.900 m Profil Alumunium 117,700.00 576,730.00 576,730.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
1.000 Set Door Closer 419,400.00 419,400.00 419,400.00
Jumlah - 3,201,569.33 3,201,569.33

12.6 Membuat dan memasang Kusen dan Daun Pintu type P6 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.000 m Rangka Pintu Alumunium 227,800.00 1,139,000.00 1,139,000.00
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
5.000 m Profil Alumunium 117,700.00 588,500.00 588,500.00
0.875 m2 Kaca Bening 8 mm 401,200.00 351,050.00 351,050.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
1.000 Set Door Closer 419,400.00 419,400.00 419,400.00
0.060 tube sealant 46,300.00 2,778.00 2,778.00
Jumlah - 3,120,328.00 3,120,328.00

12.7 Membuat dan memasang Kusen dan Daun Pintu type P7 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
6.220 m Rangka Pintu Alumunium 227,800.00 1,416,916.00 1,416,916.00
3.600 m2 Plywood 6 mm 30,536.15 109,930.13 109,930.13
3.600 m2 Lapis HPL 78,607.90 282,988.44 282,988.44
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
5.100 m Profil Alumunium 117,700.00 600,270.00 600,270.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
1.000 Set Door Closer 419,400.00 419,400.00 419,400.00
Jumlah - 3,449,104.57 3,449,104.57

12.8 Membuat dan memasang Kusen dan Daun Pintu type P8 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.400 m Rangka Pintu Alumunium 227,800.00 1,230,120.00 1,230,120.00
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
1.080 m2 Kaca Bening 8 mm 401,200.00 433,296.00 433,296.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.250 m Rel Pintu Geser 61,100.00 137,475.00 137,475.00
1.080 m2 Sticker kaca Blur 247,250.00 267,030.00 267,030.00
1.000 Ls Sticker Papan Nama Ruangan Solid Colour 75,000.00 75,000.00
0.060 tube sealant 46,300.00 2,778.00 2,778.00
Jumlah - 2,643,099.00 2,643,099.00

12.9 Membuat dan memasang Kusen dan Daun Pintu type P10 Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.300 m Rangka Pintu Alumunium 227,800.00 1,207,340.00 1,207,340.00
Harga Jumlah Harga (Rp.)
No. Rincian Pekerjaan Satuan
Rp. Upah Bahan Jumlah
PEKERJAAN2.660
BONGKARAN
m2 Plywood 6 mm 30,536.15 81,226.15 81,226.15
2.660 m2 Lapis HPL 78,607.90 209,097.02 209,097.02
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
4.700 m Profil Alumunium 117,700.00 553,190.00 553,190.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
1.000 Set Door Closer 419,400.00 419,400.00 419,400.00
Jumlah - 3,089,853.17 3,089,853.17

12.10 Membuat dan memasang Daun Pintu type P11 Set


0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
5.000 m Rangka Pintu Alumunium 227,800.00 1,139,000.00 1,139,000.00
2.660 m2 Plywood 6 mm 30,536.15 81,226.15 81,226.15
2.660 m2 Lapis HPL 401,200.00 1,067,192.00 1,067,192.00
1.000 Set Kunci Tanam 272,700.00 272,700.00 272,700.00
1.000 Psg Handle Pintu 224,700.00 224,700.00 224,700.00
2.000 Psg Engsel 61,100.00 122,200.00 122,200.00
Jumlah - 2,907,018.15 2,907,018.15

12.11 Membuat dan memasang Daun Pintu Lipat (Insulasi) type P12 dan Cover Set
0.025 Oh Pekerja terampil - - -
0.050 Oh Mandor - - -
0.025 Oh Tukang - - -
0.100 Oh Kepala tukang - - -
33.312 m Hollow Baja Ringan 78,500.00 2,614,992.00 2,614,992.00
2.916 m2 GRC 9 mm 54,700.00 159,505.20 159,505.20
9.500 m Profil Alumunium 117,700.00 1,118,150.00 1,118,150.00
69.960 m Rangka Pintu Alumunium 227,800.00 15,936,888.00 15,936,888.00
23.302 m2 Plywood 9 mm 44,914.00 1,046,600.44 1,046,600.44
22.005 m2 Glasswoll 7,316.67 161,003.25 161,003.25
20.000 Psg Ensel Stainless 42,800.00 856,000.00 856,000.00
2.000 Psg Handle Pintu Geser 146,000.00 292,000.00 292,000.00
23.302 m2 Lapis HPL 401,200.00 9,348,890.78 9,348,890.78
Jumlah - 31,534,029.67 31,534,029.67
HARGA PERKIRAAN SENDIRI (BQ)
Kegiatan : Peningkatan Gedung Pemerintah
Pekerjaan : Penyusunan DED Interior Kantor BAPPEDA
Lokasi : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016

No. Uraian Pekerjaan Volume Sat. Kode SNI Harga Satuan Jumlah Harga

A PEKERJAAN LANTAI 01
I PEKERJAAN BONGKARAN
I.1 Pekerjaan Persiapan dan Mobilisasi 1 Ls - - Rp -
I.2 Pekerjaan Bongkaran Pintu Dan Jendela 24 Set 0.2 - Rp -
I.3 Pekerjaan Bongkaran Dinding Bata 38.80 m3 1.17 a - Rp -
I.4 Bongkaran Dinding Partisi 226.36 m2 0.2 - Rp -
I.5 Bongkaran Plafond 389.20 m2 0.7 - Rp -
I.6 Bongkaran Beton Bertulang 0.59 m3 0.9 - Rp -
I.7 Bongkaran Railing Tangga 1 Ls - - Rp -
I.8 Bongkaran Lantai Keramik, t:2 cm 13.69 m3 0.9 - Rp -
I.9 Bongkaran Keramik Dinding 2.43 m3 0.9 - Rp -
I.10 Bongkaran Closet 3 Buah 0.10 - Rp -
I.11 Bongkaran Wastafel 2 Buah 0.5 - Rp -
I.12 Bongkaran Urinoir 3 Buah 0.11 - Rp -

Sub - Total I : Rp -
II PEKERJAAN KONSTRUKSI
1 PEKERJAAN DINDING
1.1 Pekerjaan Pas. Dinding Bata, Camp. 1 : 3 68.87 m2 4.10 - Rp -
1.2 Pek. Beton Kolom Praktis 42.00 m1 3.29 - Rp -
1.3 Pek. Ringbalk 15/15 0.52 m3 3.22 - Rp -
1.4 Pekerjaan Plesteran Camp. 1 : 3 137.74 m2 5.10 - Rp -
1.5 Pekerjaan Acian 137.74 m2 5.20 - Rp -
1.6 Pekerjaan Pengecatan Tembok Baru 137.74 m2 9.8 - Rp -
1.7 Pek. Wallpaper R. Kepala BAPPEDA 12.00 m2 11.8 - Rp -
1.8 Pek. Wallpaper R. Sekretaris BAPPEDA 12.69 m2 11.8 - Rp -
Jumlah : Rp -
2 PEKERJAAN LANTAI
2.1 Pekerjaan Lapis Lantai Granit 60/60 353.57 m2 7.4a - Rp -
2.2 Pekerjaan Lapis Lantai Keramik 30/30 Toilet 24.54 m2 7.4 - Rp -
2.3 Pekerjaan Lapis Lantai Granit 60/60 Tangga 21.67 m2 7.4 - Rp -
2.4 Pekerjaan Lapis Keramik Dinding 25/40 127.70 m2 7.3 - Rp -
2.5 Pek. Lapis Karpet R. Kepala dan Sekretaris BAPPEDA 54.94 m2 HPL - Rp -
2.6 Pekerjaan Plint GRC 100/9 mm 145.57 m x.3.9.3.6 - Rp -
Jumlah : Rp -
3 PEKERJAAN PLAFOND
3.1 Pekerjaan Plafond Gypsum 9 mm Rangka Hollow 368.47 m2 8.4 - Rp -
3.2 Pekerjaan Pengecatan Plafond Baru 368.47 m2 9.9 - Rp -
3.3 Pek. Profil Plafond Plywood Lapis HPL R. Lobby Fix LED 12.13 m2 HPL - Rp -
3.4 Pek. Profil Plafond Plywood Lapis HPL R. Rapat I & II 11.22 m2 HPL - Rp -
Jumlah : Rp -
4 PEKERJAAN PARTISI
4.1 Pek. Dinding Partisi P1 1.00 Ls HPL - Rp -
4.2 Pek. Dinding Partisi P2
a. GRC Rangka Canal C Double Side 71.14 m2 4.18 - Rp -
b. Pengecatan Dinding Partisi 71.14 m2 9.9 - Rp -
4.3 Pek. Dinding Partisi P3
a. Plywood Rangka Canal C fin. Dico Cat Double Side 4.48 m2 4.20 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 14.48 m 11.10 - Rp -
c. Kaca Tempered 10 mm clear 3.36 m2 11.11 - Rp -
d. Pek. Lapis Stiker Kaca Blur 0.45 m2 HPL - Rp -
e. GRC Rangka Canal C Double Side 1.40 m2 4.18 - Rp -
f. Pengecatan Dinding Partisi 2.80 m2 9.9 - Rp -
4.4 Pek. Dinding Partisi P4
a. Plywood Rangka Canal C fin. Dico Cat Double Side 7.07 m2 4.20 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 34.00 m 11.10 - Rp -
c. Kaca Tempered 10 mm clear 7.98 m2 11.11 - Rp -
d. Lapis Stiker Kaca Blur 1.09 m2 HPL - Rp -
4.5 Pek. Dinding Partisi P5
a. Plywood Rangka Canal C fin. Dico Cat Double Side 2.53 m2 4.20 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 5.04 m 11.10 - Rp -
c. Kaca Tempered 10 mm clear 0.75 m2 11.11 - Rp -
d. Lapis Stiker Kaca Blur 0.37 m2 HPL - Rp -
e. List Kayu Tepi Partisi ( Profil Kayu 2/10 cm) 3.68 m1 x.3.5.19 - Rp -
f. Sticker Nama Ruangan Solid Colour 1 Ls HPL - Rp -
4.6 Pek. Dinding Partisi P6
a. GRC Rangka Canal C Double Side 17.03 m2 4.18 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 39.18 m 11.10 - Rp -
c. Kaca Tempered 10 mm clear 8.95 m2 11.11 - Rp -
d. Kaca Bening 8 mm 4.44 m2 11.3 - Rp -
e. Lapis Stiker Kaca Blur 21.68 m2 HPL - Rp -
f. Pengecatan Dinding Partisi 34.06 m2 9.9 - Rp -
4.7 Pek. Dinding Partisi P7
a. Plywood Rangka Canal C fin. Dico Cat Double Side 5.68 m2 4.20 - Rp -
Jumlah : Rp -
HARGA PERKIRAAN SENDIRI (BQ)
Kegiatan : Peningkatan Gedung Pemerintah
Pekerjaan : Penyusunan DED Interior Kantor BAPPEDA
Lokasi : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016

No. Uraian Pekerjaan Volume Sat. Kode SNI Harga Satuan Jumlah Harga

5 PEKERJAAN KUSEN DAN DAUN PINTU


5.1 Pek. Pemasangan Kusen dan Daun Pintu P1 2.00 Set 12.1 - Rp -
5.2 Pek. Pemasangan Kusen dan Daun Pintu P2 2.00 Set 12.2 - Rp -
5.3 Pek. Pemasangan Kusen dan Daun Pintu P3 4.00 Set 12.3 - Rp -
5.4 Pek. Pemasangan Kusen dan Daun Pintu P4 5.00 Set 12.4 - Rp -
5.5 Pek. Pemasangan Kusen dan Daun Pintu P5 3.00 Set 12.5 - Rp -
5.6 Pek. Pemasangan Kusen dan Daun Pintu P6 1.00 Set 12.6 - Rp -
5.7 Pek. Pemasangan Kusen dan Daun Pintu P7 3.00 Set 12.7 - Rp -
5.8 Pek. Pemasangan Kusen dan Daun Pintu P10 1.00 Set 12.9 - Rp -
5.9 Pek. Pemasangan Kusen dan Daun Pintu P11 3.00 Set 12.10 - Rp -
5.10 Pek. Pemasangan Kusen dan Daun Pintu P12 1.00 Set 12.11 - Rp -
5.11 Pek. Pemasangan Kusen dan Daun Pintu Geser (P8) 1.00 Set 12.8 - Rp -
5.12 Pek. Cover Pintu Slide GRC 9 mm Rangka Hollow 2.25 m2 4.18a - Rp -
5.13 Pengecatan Dinding GRC Cover Pintu Slide 2.25 m2 9.9 - Rp -
5.14 Pemasangan Pintu Besi P9 2.56 m2 x.3.6.7.2 - Rp -
Engsel Pintu Besi 3.00 Psg x.3.12.35 - Rp -
Kunci Pintu Besi 1.00 Bh x.3.12.9 - Rp -
Handle Pintu 1.00 Psg x.3.12.25 - Rp -
5.15 Pek. Kusen Pintu Besi P9 5.42 m HPL - Rp -
5.15 Pek. Instalasi Fingerprint Automatic Lock 2.00 Set x.3.12.86 - Rp -
Jumlah : Rp -
6 PEKERJAAN SANITARI DAN LAINNYA
6.1 Pek. Bongkaran Beton Lantai 1.05 m3 0.9 - Rp -
6.2 Pek. Galian Tanah 28.63 m3 1.2 - Rp -
6.3 Pek. Septic Tank Biofill RC - 12 1.00 Set HPL - Rp -
6.4 Pek. Septic Tank Biofill BT - 06 1.00 Set HPL - Rp -
6.5 Pek. Urugan Tanah kembali 0.21 m3 1.10 - Rp -
6.6 Instalasi Pipa Limbah Padat 4" 15.70 m 10.7 - Rp -
6.7 Instalasi Pipa Limbah Cair 2" 11.61 m 10.7a - Rp -
6.8 Instalasi Pipa Air Bersih 3/4" 21.37 m 10.7b - Rp -
6.9 Pek. Rabat Beton Cam. 1:3:5, t:12 cm 2.40 m3 3.31 - Rp -
6.10 Pemasangan Closet Duduk 5.00 Set x.3.13.2.9 - Rp -
6.11 Pemasangan Wastafel 5.00 Set x.3.13.4.6 - Rp -
6.12 Pemasangan Urinal 1.00 Set x.3.13.5.8 - Rp -
6.13 Pemasangan Kran Washtafel 6.00 Set x.3.13.3.1 - Rp -
6.14 Pemasangan Floor Drain 8.00 Set x.3.13.3.14 - Rp -
6.15 Pemasangan Kitchen Sink 1.00 Set x.3.13.6.1 - Rp -
6.16 Pemasangan Jet Washer 5.00 Set x.3.13.3.18 - Rp -
6.17 Pemasangan Kaca Cermin 6mm 3.50 m2 x.3.9.1.24 - Rp -
6.18 Pekerjaan Railing Tangga 5.65 m2 HPL - Rp -
6.19 Pengecatan Dinding Lama 418.84 m2 9.11 - Rp -
Jumlah : Rp -

Sub - Total II : Rp -
III PEKERJAAN ELEKTRIKAL
1 PEKERJAAN ARUS LISRIK
1.1 Instalasi Kabel Tray 400 x 100 x 1.2 mm 39.73 m HPL - Rp -
.1a Cross-Cabel Tray 400 x 400 x 100 x 1.2 mm 7 Bh HPL - Rp -
.1b Jointing 400 x 100 x 1.2 mm 17 Bh HPL - Rp -
1.2 Instalasi Kabel Tray 200 x 100 x 1.2 mm 92.41 m HPL - Rp -
.2a Tee-Cabel Tray 200 x 200 x 100 x 1.2 mm 10 Bh HPL - Rp -
.2b Elbow-Cabel Tray 200 x 200 x 100 x 1.2 mm 1 Bh HPL - Rp -
.2c Jointing 200 x 100 x 1.2 mm 39 Bh HPL - Rp -
1.3 Instalasi Stop Kontak AC 18 Titik HPL - Rp -
1.4 Instalasi Stop Kontak 38 Titik HPL - Rp -
1.5 Instalasi Box Panel 3 Set HPL - Rp -
1.6 Instalasi MCB 10A 3 Set HPL - Rp -
Jumlah : Rp -
2 PEKERJAAN LAMPU DAN ARMATUR
2.1 Instalasi Titik Lampu TL 2 X 20 Watt 37 Titik HPL - Rp -
2.2 Instalasi Titik Lampu TS 12 Watt 7 Titik HPL - Rp -
2.3 Instalasi Titik Lampu TS 20 Watt 86 Titik HPL - Rp -
2.4 Instalasi Titik Lampu TS 25 Watt 7 Titik HPL - Rp -
2.5 Instalasi Saklar Ganda 7 Titik HPL - Rp -
2.6 Instalasi Saklar Tunggal 18 Titik HPL - Rp -
2.7 Instalasi Armatur Downlight 100 Buah HPL - Rp -
2.8 Instalasi Armatur Lampu Raster 37 Buah HPL - Rp -
Jumlah : Rp -
3 PEKERJAAN LISTRIK LAINNYA
3.1 Instalasi Exhaust Fan 7 Unit HPL - Rp -
Jumlah : Rp -

Sub - Total III : Rp -


IV PENGADAAN DAN PABRIKASI
1 PEKERJAAN PENGADAAN
HARGA PERKIRAAN SENDIRI (BQ)
Kegiatan : Peningkatan Gedung Pemerintah
Pekerjaan : Penyusunan DED Interior Kantor BAPPEDA
Lokasi : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016

No. Uraian Pekerjaan Volume Sat. Kode SNI Harga Satuan Jumlah Harga

1.1 Kursi Staff INF-Staff Class ZOFF (Blue) X078193 9 Unit HPL - Rp -
1.2 Kursi Kepala INF-Director Class King C51(Black) X104264 1 Unit HPL - Rp -
1.3 Kursi Sekretaris INF-Director Class President931 (Black) X146955 1 Unit HPL - Rp -
1.4 Kursi Kasie INF-Managerial Class Soul (Blue) X135108 6 Unit HPL - Rp -
1.5 Kursi Hadap Kasie INF-Staff Class Zappelin (Black) X115821 10 Unit HPL - Rp -
1.6 Sofa Tamu R. Sekretaris INF-Office Sofa Prada X083618 3 Unit HPL - Rp -
1.7 Sofa Lobby IKEA-Tullsta 6 Unit HPL - Rp -
1.8 Sofa Laktasi IKEA-Ekaenas 1 Unit HPL - Rp -
1.9 Meja TV Ruang Kepala IKEA-Besta NA:291.239.39 1 Set HPL - Rp -
1.10 Meja TV Ruang Sekretaris IKEA-Besta NA:191.197.11 1 Set HPL - Rp -
1.11 Lemari Berkas "A" Mobile File MF-10-22 (40 CPTS) 2 Set HPL - Rp -
1.12 Lemari Berkas "B" IKEA-Brusali 10 Unit HPL - Rp -
1.13 Lemari Berkas "C" IKEA-Besta NA:491.247.68 2 Unit HPL - Rp -
1.14 Pengadaan & Pemasangan TV LCD 40" LC-40M550 1 Unit HPL - Rp -
Jumlah : Rp -
2 PEKERJAAN PABRIKASI
2.1 Pabrikasi Meja Penerima "A" 1 Unit HPL - Rp -
2.2 Pabrikasi Meja R. Kepala 1 Unit HPL - Rp -
2.3 Pabrikasi Meja R. Sekretaris 1 Unit HPL - Rp -
2.4 Pabrikasi Meja Kabid, Kasubid, dan Kasubag 21 Unit HPL - Rp -
2.5 Pabrikasi meja Staff 38 Set HPL - Rp -
Jumlah : Rp -

Sub - Total V : Rp -

B PEKERJAAN LANTAI 02
I PEKERJAAN BONGKARAN
1.1 Bongkaran Pintu dan Jendela 21 Set 0.2 - Rp -
1.2 Bongkaran Dinding Bata 12.44 m3 1.17 a - Rp -
1.3 Bongkaran Dinding Partisi 280.99 m2 0.2 - Rp -
1.4 Bongkaran Plafond 561.65 m2 0.7 - Rp -
1.5 Bongkaran Beton Bertulang 0.18 m3 0.9 - Rp -
1.6 Bongkaran Lantai Keramik 10.93 m3 0.9 - Rp -
1.7 Bongkaran Keramik Dinding 0.69 m3 0.9 - Rp -

Sub - Total I : Rp -
II PEKERJAAN KONSTRUKSI
1 PEKERJAAN DINDING
1.1 Pek. Pas. Bata, Camp. 1 : 3 41.74 m2 4.10 - Rp -
1.2 Pek. Beton Kolom Sederhana 14 m 3.29 - Rp -
1.3 Pek. Ring Balok 15/15 0.30 m2 3.22 - Rp -
1.4 Pek. Plesteran, Camp. 1:3 83.47 m2 5.10 - Rp -
1.5 Pek. Acian 36.52 m2 5.20 - Rp -
1.6 Pek. Pengecatan Tembok Baru 36.52 m2 9.8 - Rp -
1.7 Pek. Pengecatan Dinding Lama 962.54 m2 9.11 - Rp -
Jumlah : Rp -
2 PEKERJAAN LANTAI
2.1 Pekerjaan Lapis Lantai Granit 60/60 590.21 m2 7.4a - Rp -
2.2 Pekerjaan Lapis Lantai Keramik 30/30 24.79 m2 7.4 - Rp -
2.3 Pekerjaan Lapis Keramik Dinding 25/40 76.80 m2 7.3 - Rp -
2.4 Pekerjaan Plint GRC 100/9 mm 209.87 m x.3.9.3.6 - Rp -
2.5 Pek. Floor Deck Rangka Besi Hollow 4/4 Modul 60/60 40.48 m2 HPL - Rp -
2.6 Pek. Lantai Plywood 12 mm Floor deck 40.48 m2 6.50b - Rp -
2.7 Pek. Lapis Layer Plastik 40.48 m2 7.5 - Rp -
2.8 Pek. Rabat Beton Lantai, t: 10 cm 4.05 m3 3.31 - Rp -
Jumlah : Rp -
3 PEKERJAAN PLAFOND
3.1 Pek. Plafond Gypsum 9 mm Rangka Hollow 561.65 m2 8.4 - Rp -
3.2 Pek. Pengecatan Plafond Baru 561.65 m2 9.9 - Rp -
3.3 Profil Plafond Plywood Lapis HPL R. Tunggu & R. Rapat Besar + LED 27.24 m2 HPL - Rp -
Jumlah : Rp -
4 PEKERJAAN PARTISI
4.1 Pek. Dinding Partisi P2
a. GRC Rangka Canal C Double Side 18.84 m2 4.18 - Rp -
b. Pengecatan Dinding Partisi 18.84 m2 9.9 - Rp -
4.2 Pek. Dinding Partisi P3
a. GRC Rangka Canal C Double Side 14.94 m2 4.18 - Rp -
b. Plywood Rangka Canal C fin. Dico Cat Double Side 34.06 m2 4.20 - Rp -
c. Frame Kaca Tempered Profil Alumunium Coklat 119.52 m 11.10 - Rp -
d. Kaca Tempered 10 mm clear 217.14 m2 11.11 - Rp -
e. Pek. Lapis Stiker Kaca Blur 5.08 m2 HPL - Rp -
f. Pengecatan Dinding Partisi 29.88 m2 9.9 - Rp -
4.3 Pek. Dinding Partisi P4
a. Plywood Rangka Canal C fin. Dico Cat Double Side 14.26 m2 4.20 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 78.69 m 11.10 - Rp -
HARGA PERKIRAAN SENDIRI (BQ)
Kegiatan : Peningkatan Gedung Pemerintah
Pekerjaan : Penyusunan DED Interior Kantor BAPPEDA
Lokasi : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016

No. Uraian Pekerjaan Volume Sat. Kode SNI Harga Satuan Jumlah Harga

c. Kaca Tempered 10 mm clear 39.44 m2 11.11 - Rp -


d. Lapis Stiker Kaca Blur 2.20 m2 HPL - Rp -
4.4 Pek. Dinding Partisi P5
a. Plywood Rangka Canal C fin. Dico Cat Double Side 12.17 m2 4.20 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 21.80 m 11.10 - Rp -
c. Kaca Tempered 10 mm clear 3.71 m2 11.11 - Rp -
d. Lapis Stiker Kaca Blur 10.90 m2 HPL - Rp -
e. List Kayu Tepi Partisi ( Profil Kayu 2/10 cm) 22.42 m1 x.3.5.19 - Rp -
f. Sticker Nama Ruangan Solid Colour 8 Ls HPL - Rp -
4.5 Pek. Dinding Partisi P6
a. GRC Rangka Canal C Double Side 1.94 m2 4.18 - Rp -
b. Frame Kaca Tempered Profil Alumunium Coklat 12.67 m 11.10 - Rp -
c. Kaca Tempered 10 mm clear 8.15 m2 11.11 - Rp -
d. Kaca Bening 8 mm 1.32 m2 11.3 - Rp -
e. Lapis Stiker Kaca Blur 6.44 m2 HPL - Rp -
f. Pengecatan Dinding Partisi 3.88 m2 9.9 - Rp -
4.6 Pek. Dinding Partisi P7
a. Plywood Rangka Canal C fin. Dico Cat Double Side 5.68 m2 4.20 - Rp -
Jumlah : Rp -
5 PEKERJAAN KUSEN DAN DAUN PINTU
5.1 Pek. Pemasangan Kusen dan Daun Pintu P1 1.00 Set 12.1 - Rp -
5.2 Pek. Pemasangan Kusen dan Daun Pintu P3 6.00 Set 12.3 - Rp -
5.3 Pek. Pemasangan Kusen dan Daun Pintu P4 1.00 Set 12.4 - Rp -
5.4 Pek. Pemasangan Kusen dan Daun Pintu P5 1.00 Set 12.5 - Rp -
5.5 Pek. Pemasangan Kusen dan Daun Pintu P6 4.00 Set 12.6 - Rp -
5.6 Pek. Pemasangan Kusen dan Daun Pintu P7 6.00 Set 12.7 - Rp -
5.7 Pek. Pemasangan Kusen dan Daun Pintu P10 1.00 Set 12.9 - Rp -
5.8 Pek. Instalasi Fingerprint Automatic Lock 1.00 Set x.3.12.86 - Rp -
Jumlah : Rp -
HARGA PERKIRAAN SENDIRI (BQ)
Kegiatan : Peningkatan Gedung Pemerintah
Pekerjaan : Penyusunan DED Interior Kantor BAPPEDA
Lokasi : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016

No. Uraian Pekerjaan Volume Sat. Kode SNI Harga Satuan Jumlah Harga

6 PEKERJAAN SANITARI DAN LAINNYA


6.1 Instalasi Pipa Limbah Padat 4" 23.07 m 10.7 - Rp -
6.2 Instalasi Pipa Limbah Cair 2" 22.63 m 10.7a - Rp -
6.3 Instalasi Pipa Air Bersih 3/4" 23.82 m 10.7b - Rp -
Jumlah : Rp -

Sub - Total II : Rp -
III PEKERJAAN ELEKTRIKAL
1 PEKERJAAN ARUS LISRIK
1.1 Instalasi Kabel Tray 154.85 m HPL - Rp -
.1a Cross-Cabel Tray 400 x 400 x 100 x 1.2 mm 4 Bh HPL - Rp -
.1b Tee-Cabel Tray 400 x 400 x 100 x 1.2 mm 14 Bh HPL - Rp -
.1c Jointing 400 x 100 x 1.2 mm 65 Bh HPL - Rp -
1.2 Instalasi Kabel Tray 200 x 100 x 1.2 mm 182.92 m HPL - Rp -
.2a Tee-Cabel Tray 200 x 200 x 100 x 1.2 mm 30 Bh HPL - Rp -
.2b Jointing 200 x 100 x 1.2 mm 76 Bh HPL - Rp -
1.3 Instalasi Box Panel 3 Set HPL - Rp -
1.4 Instalasi Stop Kontak AC 27 Titik HPL - Rp -
1.5 Instalasi Stop Kontak 58 Titik HPL - Rp -
Jumlah : Rp -
2 PEKERJAAN LAMPU DAN ARMATUR
2.1 Instalasi Titik Lampu TL 2 X 20 Watt 58 Titik HPL - Rp -
2.2 Instalasi Titik Lampu TS 12 Watt 6 Titik HPL - Rp -
2.3 Instalasi Titik Lampu TS 20 Watt 131 Titik HPL - Rp -
2.4 Instalasi Armatur Downlight 137 Buah HPL - Rp -
2.5 Instalasi Armatur Lampu Raster 58 Buah HPL - Rp -
2.6 Instalasi Saklar Ganda 6 Titik HPL - Rp -
2.7 Instalasi Saklar Tunggal 24 Titik HPL - Rp -
Jumlah : Rp -
3 PEKERJAAN LISTRIK LAINNYA
3.1 Instalasi Exhaust Fan 6 Unit HPL - Rp -
Jumlah : Rp -

Sub - Total III : Rp -


IV PENGADAAN DAN PABRIKASI
1 PEKERJAAN PENGADAAN
1.1 Kursi Staff INF-Staff Class ZOFF (Blue) X078193 30 Unit HPL - Rp -
1.2 Kursi Kasie INF-Managerial Class Soul (Blue) X135108 15 Unit HPL - Rp -
1.3 Mini Sofa INF-Office Sofa Qubic (Cream) X176542 1 Unit HPL - Rp -
1.4 Kursi Rapat INF-Staff Class London (Orange) X084843 80 Unit HPL - Rp -
1.5 Kursi Kepala Rapat 3 Unit HPL - Rp -
1.15 Pengadaan + Pemasangan Projector Screen Motorized 300" 1 Unit HPL - Rp -
1.16 Pengadaan + Pemasangan Projector PT-RZ370 EA 1 Unit HPL - Rp -
1.17 Pengadaan & Pemasangan Projector Ceiling Bracket TLFT-200 1 Unit HPL - Rp -
Jumlah : Rp -
2 PEKERJAAN PABRIKASI
2.1 Pabrikasi Meja Rapat Besar 1 1 Set HPL - Rp -
2.2 Pabrikasi Meja Rapat Besar 2 14 Set HPL - Rp -
Jumlah : Rp -

Sub - Total V : Rp -
REKAPITULASI MINOR BQ
Kegiatan : Peningkatan Gedung Pemerintah
Lokasi : Penyusunan DED Interior Kantor BAPPEDA
Tahun Anggaran : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016
PEKERJAAN LANTAI 1
No. Uraian Pekerjaan Jumlah Harga

I PEKERJAAN BONGKARAN Rp -
II PEKERJAAN KONSTRUKSI Rp -
III PEKERJAAN ELEKTRIKAL Rp -
IV PENGADAAN DAN PABRIKASI Rp -
Sub-Total : Rp -

PEKERJAAN LANTAI 2
No. Uraian Pekerjaan Jumlah Harga

I PEKERJAAN BONGKARAN Rp -
II PEKERJAAN KONSTRUKSI Rp -
III PEKERJAAN ELEKTRIKAL Rp -
IV PENGADAAN DAN PABRIKASI Rp -
Sub-Total : Rp -
REKAPITULASI MAJOR BQ

Kegiatan : Peningkatan Gedung Pemerintah


Pekerjaan : Penyusunan DED Interior Kantor BAPPEDA
Lokasi : Kota Balikpapan
Sumber Dana : DPA BAPPEDA
Tahun Anggaran : 2016

No. Uraian Pekerjaan Jumlah Harga

I Pekerjaan Lantai 01 Rp -
II Pekerjaan Lantai 02 Rp -

Sub-Total Biaya : Rp -
PPn 10 % : Rp -
Total Biaya : Rp -
Pembulatan : Rp -
Terbilang : -

Dibuat Oleh :
PT/CV. ..

..