SUMBER DATA :
D A E R A H :
A. UPAH KERJA
No JENIS BAHAN BANGUNAN SAT KODE
1 2 3 4
PASARAN BEBAS
KABUPATEN SAMBAS
120,000.00
165,000.00
135,000.00
135,000.00
135,000.00
135,000.00
135,000.00
135,000.00
135,000.00
180,000.00
170,000.00
140,000.00
170,000.00
170,000.00
135,000.00
135,000.00
135,000.00
115,000.00
DAFTAR HARGA BAHAN
SUMBER DATA :
D A E R A H :
B. HARGA BAHAN
No JENIS BAHAN BANGUNAN SAT KODE
1 2 3 4
I. BAHAN PENGISI
1 Tanah Timbunan Biasa / m3 M.17.b
2 Pasir Urug / m3 M.14.d
3 Pasir Beton / Pasang (Lokal) / m3 M.14.a
4 Tanah Pilihan/Kong (Hitam) / m3 M.17.b
5 Batu Kong / m3 M.06.b
6 Pasir Kuarsa/Batu Kerikil Tdk Tersaring / m3 M.14.b
7 Batu Belah Uk. 10/15 cm / m3 M.06.a
8 Batu Pecah Uk. 5/7 cm / m3 M.06.a
9 Batu Pecah Uk. 3/5 cm / m3 M.06.a
10 Batu Pecah Uk. 2/3 cm / m3 M.06.a
11 Batu Pecah Uk. 1/2 cm / m3 M.06.a
12 Batu Pecah Uk. 1/1 cm / m3 M.06.a
13 Batu Uk. 0,5/1 cm / m3 M.06.a
14 Stone Dust / m3 M.01
15 Aspal Drum / Kg T.18
16 Aspal Emulsi / Kg M.111
17 Semen / Zak M.15
18 Alat Bantu / Set
19 Minyak Tanah / Kerosine / Ltr M.130
20 Minyak Diesel/Solar (Subsidi) / Ltr M.137.a
21 Minyak Diesel/Solar (Non Subsidi) / Ltr M.137.b
22 Pertamax Plus / Ltr M.113.a
23 Minyak Premium/Bensin (Subsidi) / Ltr M.133.b
24 Minyak Pelumas / Ltr M.132.d
25 Olie Mesin / Kg M.132.a
26 Olie Hidroulic / Kg M.132.b
27 Olie Transmisi / Kg M.132.c
28 Carby/Griace / Kg
29 Air Cleaner / Pcs
30 Filter Solar / Pcs
31 Filter Olie / Pcs
32 Batako / Bh M.05.f
33 Bata Merah / Bh M.05.a
34 Rooster (Kerawang Beton Uk. 20 x20) / Bh
35 Buis Beton 1/2 Lingkaran Dia.3 cm / Bh M.10.l
36 Buis Beton Uk Dia. 120 cm / Bh M.10.l
37 Kermaik Lantai 20 x 20 cm Kotak
38 Kermaik Dinding 20 x 25 cm Kotak
39 Kermaik Lantai 30 x 30 cm Kotak
40 Kermaik Lantai 40 x 40 cm Kotak
41 Kermaik Lantai 60 x 60 cm (Biasa) Kotak
II. BAHAN KAYU
1 Ky Bel. tdk diktm15/15-20/20x4 m / m3
2 Ky Bel. tdk diktm 12/12x4 m / m3
3 Ky Bel. tdk diktm 10/10x4 m / m3
4 Ky Bel. diketam 6/6 x 4 m / m3
5 Ky Bel. diketam 7/7 x 4 m / m3
6 Ky Bel. diketam 8/8 x 4 m / m3
7 Ky Bel. diketam 9/9 x 4 m / m3
8 Ky Belian diketam 10/10x4 m / m3
9 Ky Belian diketam 12/12x4 m / m3
10 Papan belian 2/14-2.5/16x4 m / m3
11 Papan belian 3/14-4/16 x 4 m / m3
12 Ppn bel. tdk diktm 3/14 x 4 m / m3
13 Ppn bel. tdk diktm 1.2/14x4 m / m3
14 Papan Lat 1.5/15 cm x 4 m / m3
15 Ky Klas I :18/18-20/20cmx4m / m3 M.31.a
16 12/12-14/14cmx4m / m3 M.31.a
17 8/8-10/10cmx4 m / m3 M.31.a
18 Papan Klas I 1.8 cm / m3 M.31.b
19 Kayu Klas I: 2/18-5/18 cm x 4 m / m3 M.31.a
20 Kasau 4/6-5/7 cm x 4 m / m3
21 Reng seng 2/3-3/5cmx4m / m3
22 Kayu Kls II 8/12 cm x 4 m / m3 M.33.a
23 Kayu Kls II 4/6 cm x 4 m / m3 M.33.a
24 Kayu Kls II 3/5 cm x 4 m / m3 M.33.a
25 Papan Kls II 2/20 cm x 4 m / m3 M.33.a
26 Kayu Kls III / m3 M.33.d
27 Papan Kls III tebal 2 cm / m3 M.33.e
28 Kayu Kls IV tebal 1.6 cm / m3 M.33.f
29 Triplek 3 mm / Lbr m.42.a
30 Triplek 4 mm / Lbr M.42.b
31 Triplek 9 mm / Lbr M.42.d
32 Kayu Bakar / m3 M.31.b
33 Kayu Bulat Dia. 10/12 cm x 6 M / Btg M.34.1
34 Kayu Bulat Dia. 10/12 cm x 4 M / Btg M.34.b
35 Kayu Bulat Dia. 8/10 cm x 4 M / Btg M.34.c
36 Cerucuk Bentangor dia. 12/15 x 12 m / Btg M.35.e
37 GRC Lbr
38 Gyipsum Board 9 mm Lbr
39 Genteng Metal 0.25 Lbr
40 Genteng Metal 0.30 Lbr
41 Genteng Metal 0.35 Lbr
III. BAHAN BESI & ALUMINIUM
1 Tiang Pipa Baja o 16 tebal 6.35 mm / m' M.92.b
2 Tiang Pipa Baja o 16 tebal 9.00 mm / m' M.92.b
3 Tiang Pipa Baja o 16 tebal 9.52 mm / m' M.92.b
4 Tiang Pipa Baja o 60 cm tebal 12.00 mm, berat = 176,8 Kg/M' / m' M.93.d
5 Tiang Pancang Press Trees (Spoon Pile o 40 cm, berat=179 Kg/M') / m' M.93.d
6 Tiang Pancang Press Trees (Spoon Pile o 50 cm, berat=196 Kg/M') / m' M.93.d
Pot Bearing Tumpuan Jembatan Pelengkung
7 -. Type PN 6000, Horz 20% (berat = +/- 500 kg/bh) / Buah
8 -. Type PN 6000, Horz 10% (berat = +/- 500 kg/bh) / Buah
9 -. Type PN 10000, Horz 20% (berat = +/- 550 kg/bh) / Buah
10 -. Type PN 10000, Horz 10% (berat = +/- 550 kg/bh) / Buah
11 Expantion Joint Type Strip Seal SMM 100 (berat =+/- 50 kg/m) / m'
12 Metal Deck untuk Lantai Jembatan (berat =+/- 20 kg/m) / m2
13 Balok Gelegar I (Uk. Pj. 13,6 M, tinggi 90 CM) / m'
14 Balok Gelegar I (Uk. Pj. 16,6 M, tinggi 90 CM) / m'
15 Balok Gelegar I (Uk. Pj. 19,6 M, tinggi 90 CM) / m'
16 Balok Gelegar I (Uk. Pj. 22,6 M, tinggi 125 CM) / m'
17 Balok Gelegar I (Uk. Pj. 25,6 M, tinggi 125 CM) / m'
18 Balok Gelegar I (Uk. Pj. 28,6 M, tinggi 160 CM) / m'
19 Balok Gelegar I (Uk. Pj. 31,6 M, tinggi 160 CM) / m'
20 Tegofilm tebal 15 mm untuk Bekisting /Lbr
21 Rangka Baja Besi Siku untuk Perancah / Kg
22 Pengaku Inf 220 x 100 mm / Kg
23 Kawat ikat beton / Kg M.67
24 Kawat Duri 10 Kg / Kg M.67
25 Kawat Duri 30 Kg / Kg M.67
26 Kawat Harmonika / m2 M.67
27 Kawat Nyamuk / Besi / Roll M.70
28 Kawat plastik / m2 M.71
29 Kawat Semen / Kg M.72
30 Kawat anyam / Roll M.68
31 Saringan Pasir Uk.55 ( 30 m ) / Roll M.70
32 Baut Baja / Kg M.57
33 Baut o 5/8 -25 cm / Bt M.57.d
34 Baut o 5/8 -30 cm / Bt M.57.e
35 B e u g e l / Bt M.55.c
36 Baja Tulangan U 24 / Kg M.55.d
37 Baja Tulangan U32 / Kg M.55.e
38 Besi Siku Rata-Rata / Kg M.54.g
39 Besi Plat Rata - rata 1 s/d 5 mm / Kg M.53.c
40 Besi Plat Rata - rata 6 s/d 10 mm / Kg M.53.e
41 Besi Plat Rata - rata 11 s/d 16 mm / Kg M.53.g
42 Baja konstruksi / profil / Kg M.54.a
43 Paku Jembatan / Kg M.71.h
44 Paku seng R R T / Kg M.71.g
45 Paku ulir aluminium / Kg M.71.g
46 Paku campuran / Kg M.71.c
47 Wire Mesh D-5 mm / m2 M.95.a
48 Wire Mesh D-6 mm / m2 M.95.a
49 Plastik Beton / m2
50 Geotextile Non Woven
a. 150 gr/m2 / m2 M.122.a
b. 200 gr/m2 / m2 M.122.a
c. 250 gr/m2 / m2 M.122.a
d. 300 gr/m2 / m2 M.122.a
e. 350 gr/m2 / m2 M.122.b
f. 400 gr/m2 / m2 M.122.b
g. 450 gr/m2 / m2 M.122.b
h. 500 gr/m2 / m2 M.122.b
i. 550 gr/m2 / m2 M.122.c
j. 600 gr/m2 / m2 M.122.c
k. 650 gr/m2 / m2 M.122.c
IV. BAHAN FINISHING / CAT
1 Amplas Kayu / Lbr T.20
2 Amplas Besi / Lbr T.20
3 Oker / Kg
4 Dempul / Kg
5 Cat Dasar / Kg M.115.d
6 Thiner ( Pengencer ) / Kg
7 Cat Kilat / Ltr
8 Plamur / Kg
9 Cat Tembok Weatershiled / Kg M.115.d
10 Cat Tembok / Kg M.115.d
11 Teer / Kg
V. BAHAN LAIN-LAIN
1 Pipa GIV Medium size 1" /m M.104.c
2 Pipa GIV Medium size 2" / btg M.104.f
3 Pipa GIV Medium size 3" / btg M.104.g
4 Pipa PVC size 3/4" D ex Wavin /m M.107.a
5 Pipa Gip Medium Ø 1" /m M.106.c
6 Pipa Gip Medium Ø 2" /m M.106.e
7 Pipa Gip Medium Ø 3" /m M.106.g
8 Pipa Gip Medium Ø 4" /m M.106.h
9 Pipa Gip Medium Ø 5" /m M.106.i
10 Pipa Gip Medium Ø 6" /m M.106.j
11 Pipa PVC SNI Ø 1" /m M.107.b
12 Pipa PVC SNI Ø 2" /m M.107.e
13 Pipa PVC SNI Ø 3" /m M.107.g
14 Pipa PVC SNI Ø 4" /m M.107.i
15 Pipa PVC SNI Ø 5" /m M.107.j
16 Pipa PVC SNI Ø 6" /m M.107.k
17 Pipa PVC SNI Ø 8" /m M.107.l
18 Pipa HDPE Ø 1" /m M.105.a
19 Pipa HDPE Ø 2" /m M.105.a
20 Pipa HDPE Ø 3" /m M.105.a
21 Pipa HDPE Ø 4" /m M.105.a
22 Pipa HDPE Ø 6" /m M.105.a
23 U-ditch 0,6x0,7x1,2 buah M.190
24 Geotekstil m2 M.122.c
25 Jendela Naco buah M.191.b
26 Kaca Polos m2 M.191.a
27 Kunci Tanam buah M.192
28 Paving Block tebal 6cm m2 M.193
29 Air liter M.02
VI. PINTU AIR
1 Pintu Air Kecil Daun M.81.1
2 Pintu Air Sedang Daun M.81.2
3 Pintu Air Besar Daun M.81.3
N
PASARAN BEBAS
KABUPATEN SAMBAS
177,100.00
179,200.00
185,200.00
183,400.00
234,000.00
291,800.00
497,880.00
538,300.00
592,750.00
695,700.00
749,400.00
765,300.00
749,400.00
658,680.00
18,490.00
17,010.00
94,900.00
175,000.00
17,100.00
7,400.00
12,900.00
12,200.00
8,500.00
26,500.00
38,600.00
41,200.00
44,300.00
56,100.00
222,800.00
171,600.00
198,600.00
3,000.00
1,500.00
7,500.00
63,300.00
665,200.00
72,500.00
78,700.00
82,300.00
84,700.00
325,000.00
18,173,610.00
16,020,868.50
14,785,407.00
14,008,585.50
13,938,928.50
15,447,568.50
15,791,548.50
16,250,188.50
16,938,148.50
15,400,156.80
15,506,872.50
15,480,622.50
14,661,816.00
13,108,000.00
5,157,810.00
5,372,220.00
4,924,500.00
4,735,500.00
4,658,010.00
3,549,000.00
3,990,000.00
3,202,500.00
2,624,800.00
4,174,500.00
3,412,500.00
1,893,150.00
2,131,500.00
1,618,050.00
76,230.00
97,020.00
185,700.00
165,500.00
15,675.00
16,000.00
13,920.00
127,050.00
90,100.00
101,500.00
62,500.00
75,500.00
81,650.00
2,257,520
3,073,800
3,369,520
4,212,840
828,755
1,634,760
101,857,500
115,357,500
209,857,500
243,607,500
9,603,447
171,450
44,926,471
43,072,289
39,795,918
39,977,876
39,609,375
51,818,182
51,835,443
366,865
23,625
53,220
23,200
72,250
160,250
42,490
327,110
23,160
22,100
431,150
547,970
21,840
10,500
12,600
42,000
14,000
17,800
21,780
21,120
21,120
21,120
53,085
44,867
26,000
73,430
21,190
26,800
61,900
4,250
8,700
10,320
11,940
13,695
15,450
17,205
19,500
21,660
23,820
26,250
28,410
2,530.00
4,840.00
19,800.00
30,360.00
28,755.00
53,900.00
62,500.00
19,470.00
132,800.00
47,700.00
15,900.00
90,800.00
188,000.00
309,700.00
8,923.00
90,800.00
188,000.00
309,700.00
448,600.00
603,500.00
718,500.00
18,100.00
55,400.00
113,900.00
170,100.00
280,000.00
360,500.00
565,400.00
23,500.00
87,500.00
174,700.00
262,300.00
549,600.00
775,000.00
47,500.00
41,500.00
100,000.00
85,000.00
85,000.00
30.00
4,725,000.00
5,350,000.00
5,975,000.00
DAFTAR HARGA SATUAN PEKERJAAN
SUMBER DATA :
D A E R A H :
12 Pasang Pondasi Siklop, 60% Beton Campuran 1PC : 2PB : 3KR & 40% m3 B.12.a
Batu Belah
13 Membuat Beton mutu f'c=31,2 MPa (K400), slum (12±2)cm, w/c = 0,48 m3 B.13.a
14 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 B.12.a
PASARAN BEBAS
KABUPATEN SAMBAS
39,300,000.00
17,120,000.00
2,138,732.97
1,769,336.80
104,526.73
5,000,000.00
157,633.55
105,741.05
300,551.05
274,081.50
67,036.54
3,916,003.96
2,348,444.70
2,011,228.76
46,134.00
281,817.80
3,656,821.45
228,712.00
65,900.45
696,437.50
250,603.99
67,647.04
67,036.54
Breakdown Pekerjaan Persatuan Volume
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN
Koefisien
No Uraian Volume
Jam
A. Total
B. Grand Total
I Persiapan RK3K
1
1 Set
Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja
II Sosialsasi dan Promosi K3
1 Pengarahan K3 : Pertemuan Keselamatan ( Safety Talk dan 20 Org
/ atau Tool Box Meeting), dan Simulasi K3
III Pekerjaan Mobilisasi dan demobilisasi
1 Topi Pelindung (Safety Helmet) 20 Bh
2 Pelindung Pernafasan dan Mulut (Masker) 34 Dus
3 Sepatu Keselamatan (Safety Shoes/Boot)/ 20 Psg
4 Rompi Keselamatan (Safety Vest) 20 Bh
IV Pekerjaan Mobilisasi dan demobilisasi
V Personil K3
1 Petugas K3 4 Org/Bln
VI Fasilitas Sarana Kesehatan
1 Peralatan P3K ( Kotak P3K), Obat Luka 1 Bh
VII Rambu - Rambu
1 Rambu Peringatan 2 Bh
A. Total
B. Grand Total
Koefisien
No Uraian Volume
Jam
I Pekerjaan Dokumentasi
1 Set foto dokumentasi menggunakan kamera 1 1
A. Total
B. Grand Total
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 0.9
2 Mandor L.04 OH 0.045
Jumlah Harga Tena
B Bahan
Jumlah Harg
C Peralatan
1 Excavator E.11.c jam 0.03722
Jumlah Harga P
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 10%) 10%
F Harga Satuan Pekerjaan
1 2 3 4 5
A Tenaga Kerja
A.3.2.1.10. Pasang Pondasi Siklop, 60% Beton Campuran 1PC : 2PB : 3KR & 40% Batu Belah (m3)
B.13.a Membuat Beton mutu f'c=31,2 MPa (K400), slum (12±2)cm, w/c = 0,48 (m3)
Jenis Pekerjaan : Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0
Satuan :-
Beton K250
No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 1.65
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tena
B Bahan
1 Portland Semen Kg 384
2 Pasir Beton Kg 692
3 Kerikil (maksimum 30 mm) Kg 1039
4 Air ltr 215
Jumlah Harg
C Peralatan
Jumlah Harga P
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 10%) 10%
F Harga Satuan Pekerjaan album dokumentasi
Jenis Pekerjaan : Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,8
Satuan :-
Beton K100
No Uraian Kode Satuan Koefisien
1 2 3 4 5
A Tenaga Kerja
1 Pekerja L.01 OH 1.65
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tena
B Bahan
1 Portland Semen Kg 247
2 Pasir Beton Kg 869
3 Kerikil (maksimum 30 mm) Kg 999
4 Air ltr 215
Jumlah Harg
C Peralatan
Jumlah Harga P
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 10%) 10%
F Harga Satuan Pekerjaan album dokumentasi
B.22.a Bekisting Set Plat Baja Untuk Kubus Beton (set = /kg untuk setiap vol beton sebesar 1,536 m3)
Jumlah Harg
C Peralatan
1 Alat Bantu Ls 1
Jumlah Harga P
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 10%) 10%
F Harga Satuan Pekerjaan
Jumlah Harg
C Peralatan
1 Excavator 0.0449
2 Dum truck 0.10625
Jumlah Harga P
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit (Contoh 10%) 10%
F Harga Satuan Pekerjaan album dokumentasi
Persatuan Volume
ATUAN PEKERJAAN
Rp 660,000 19,800,000.00
Rp 600,000 -
Rp 80,000 8,000,000.00
Rp 115,000 11,500,000.00
39,300,000.00
39,300,000.00
200,000.00
Rp 200,000 200,000.00
200,000.00
Rp 10,000 200,000.00
6,770,000.00
Rp 75,000 1,500,000.00
Rp 55,000 1,870,000.00
Rp 150,000 3,000,000.00
Rp 20,000 400,000.00
-
9,600,000.00
Rp 2,400,000 9,600,000.00
100,000.00
Rp 100,000 100,000.00
200,000.00
Rp 100,000 200,000.00
Rp - -
50,000.00
Rp 50,000 50,000.00
Rp - -
17,120,000.00
17,120,000.00
120,000.00 240,000.00
135,000.00 270,000.00
135,000.00 135,000.00
180,000.00 54,000.00
165,000.00 8,250.00
Jumlah Harga Tenaga Kerja 707,250.00
120,000.00 120,000.00
135,000.00 270,000.00
180,000.00 36,000.00
165,000.00 8,250.00
Jumlah Harga Tenaga Kerja 434,250.00
39,396.00 49,245.00
4,735,500.00 880,803.00
21,190.00 6,357.00
2,372.50 42,705.00
185,200.00 5,556.00
538,300.00 26,915.00
21,120.00 31,680.00
97,020.00 130,977.00
Jumlah Harga Bahan 1,174,238.00
120,000.00 12,000.00
135,000.00 13,500.00
180,000.00 1,800.00
165,000.00 825.00
Jumlah Harga Tenaga Kerja 28,125.00
3,549,000.00 42,588.00
21,190.00 423.80
3,412,500.00 23,887.50
Jumlah Harga Bahan 66,899.30
Rp 5,000,000 5,000,000.00
5,000,000.00
5,000,000.00
6 7
120,000.00 108,000.00
165,000.00 7,425.00
Jumlah Harga Tenaga Kerja 115,425.00
749,012.00 27,878.23
Jumlah Harga Peralatan 27,878.23
143,303.23
xD 14,330.32
157,633.55
120,000.00 60,000.00
165,000.00 8,250.00
Jumlah Harga Tenaga Kerja 68,250.00
177,100.00 177,100.00
Jumlah Harga Bahan
749,012.00 27,878.23
Jumlah Harga Peralatan 27,878.23
96,128.23
xD 9,612.82
105,741.05
177,100.00 177,100.00
Jumlah Harga Bahan 177,100.00
749,012.00 27,878.23
Jumlah Harga Peralatan 27,878.23
273,228.23
xD 27,322.82
300,551.05
120,000.00 30,000.00
165,000.00 4,125.00
Jumlah Harga Tenaga Kerja 34,125.00
179,200.00 215,040.00
Jumlah Harga Bahan 215,040.00
6 7
749,012.00 41,879.81
Jumlah Harga Peralatan 41,879.81
60,942.31
xD 6,094.23
67,036.54
120,000.00 102,000.00
135,000.00 114,750.00
180,000.00 15,300.00
165,000.00 24,750.00
Jumlah Harga Tenaga Kerja 256,800.00
497,880.00 238,982.40
2,372.50 460,265.00
185,200.00 57,782.40
17,800.00 2,242,800.00
23,200.00 41,760.00
538,300.00 261,613.80
Jumlah Harga Bahan 3,303,203.60
120,000.00 276,000.00
135,000.00 51,300.00
180,000.00 6,840.00
165,000.00 18,975.00
Jumlah Harga Tenaga Kerja 353,115.00
2,372.50 1,186,250.00
132.29 72,757.14
516.83 516,827.59
30.00 6,000.00
Jumlah Harga Bahan 1,781,834.73
120,000.00 252,000.00
135,000.00 47,250.00
180,000.00 6,300.00 Harga : Kubus 0.8 x 0.8 x 0.8
165,000.00 17,325.00
Jumlah Harga Tenaga Kerja 322,875.00 Harga : Kubus 0.75 x 0.75 x 0.75
2,372.50 949,000.00
132.29 59,528.57
516.83 490,986.21
30.00 6,000.00
Jumlah Harga Bahan 1,505,514.78
Rp 120,000.00 198,000.00
Rp 135,000.00 37,125.00
Rp 180,000.00 5,040.00
Rp 165,000.00 13,695.00
Jumlah Harga Tenaga Kerja 253,860.00
2,372.50 911,040.00
132.29 91,541.71
516.83 536,983.86
30.00 6,450.00
Jumlah Harga Bahan 1,546,015.58
Rp 120,000.00 198,000.00
Rp 135,000.00 37,125.00
Rp 180,000.00 5,040.00
Rp 165,000.00 13,695.00
Jumlah Harga Tenaga Kerja 253,860.00
2,372.50 586,007.50
132.29 114,956.29
516.83 516,310.76
30.00 6,450.00
Jumlah Harga Bahan 1,223,724.54
120,000.00 8,400.00
135,000.00 9,450.00
180,000.00 1,260.00
165,000.00 660.00
Jumlah Harga Tenaga Kerja 19,770.00
17,800.00 18,690.00
23,200.00 3,480.00
Jumlah Harga Bahan 22,170.00
120,000.00 62,400.00
135,000.00 35,100.00
180,000.00 4,680.00
165,000.00 4,290.00
Jumlah Harga Tenaga Kerja 106,470.00
1,893,150.00 75,726.00
21,190.00 6,357.00
26,500.00 2,650.00
185,700.00 64,995.00
Jumlah Harga Bahan 149,728.00
Harga Satuan (Rp) Jumlah Harga (Rp) TAMPAK ATAS BEGISTING 0.8x0.8x0.8
SKALA 1 : 20
6 7
POTONGAN A
SKALA 1 : 20
120,000.00 554,400.00
135,000.00 311,850.00
180,000.00 415,800.00
170,000.00 392,700.00 TAMPAK DEPAN BEGISTING 0.8x0.8x0.8
SKALA 1 : 20
TAMPAK SAMPING BEGISTING 0.8x0.8x0.8
SKALA 1 : 20
DETAIL SEKAT BEGISTING 0.8x0.8
SKALA 1 : 20
120000.00 30,000.00
135000.00 67,500.00
180000.00 9,000.00
165,000 165.00
Jumlah Harga Tenaga Kerja 106,665.00
85,000.00 85,850.00
185,200.00 9,260.00
Jumlah Harga Bahan 95,110.00
61,450.00 6,145.00
Jumlah Harga Peralatan 6,145.00
207,920.00
xD 20,792.00
228,712.00
120,000.00 5,328.00
165,000.00 1,831.50
Jumlah Harga Tenaga Kerja 7,159.50
47,500.00 52,250.00
500.00 500.00
Jumlah Harga Peralatan 500.00
59,909.50
xD 5,990.95
65,900.45
120000.00 18,000.00
135000.00 54,000.00
180000.00 7,200.00
165,000.00 165.00
Jumlah Harga Tenaga Kerja 79,365.00
775,000.00 542,500.00
185,200.00 9,260.00
Jumlah Harga Bahan 551,760.00
20,000.00 2,000.00
Jumlah Harga Peralatan 2,000.00
633,125.00
xD 63,312.50
696,437.50
120,000.00 43,200.00
135,000.00 24,300.00
180,000.00 3,240.00
165,000.00 2,970.00
Jumlah Harga Tenaga Kerja 73,710.00
749,012.00 41,879.81
Jumlah Harga Peralatan -
227,821.81
xD 22,782.18
250,603.99
120,000.00 2,400.00
135,000.00 2,700.00
180,000.00 3,600.00
165,000.00 330.00
Jumlah Harga Tenaga Kerja 9,030.00
10,587.50 10,587.50
Jumlah Harga Bahan 10,587.50
749,012.00 41,879.81
Jumlah Harga Peralatan -
61,497.31
xD 6,149.73
67,647.04
Harga Satuan (Rp) Jumlah Harga (Rp)
6 7
120,000.00 144,000.00
165,000.00 7,425.00
Jumlah Harga Tenaga Kerja 151,425.00
660,000.00 29,634.00
115,000.00 12,218.75
Jumlah Harga Peralatan 41,852.75
193,277.75
xD 19,327.78
212,605.53
ITEM PEMBAYARAN NO. :
JENIS PEKERJAAN : Pengerukan Area dan atau pemasan
SATUAN PEMBAYARAN : M3
No. URAIAN
I. ASUMSI
1 Jam kerja efektif per-hari
ukan waktu 30 menit = 0.5 jam jam kerja 2 Faktor pengembangan tanah
sien kerja utk memasang = 0.0625 3 Faktor pengembangan tanah lepas
4 Jarak angkut
5 URUTAN KERJA
a. Lebar area pengerukan diperkirakan 1-3 km
b. Excavator 1+Ponton mengeruk/menggali tanah d
c. Ponton 2 mengangkut tanah hasil pengerukan ke
d. Excavator 2 menurunkan tanah hasil pengerukan
dump truck
e. Dump truck mengangkut tanah hasil pengerukan
f. Bulldozer menghampar, meratakan, dan merapika
II. ALAT
Waktu siklus
-Menggali, swing, dan memuat ke ponton 2
- Swing kembali dan lain-lain
Waktu siklus = T1 x Fv
Kap. Prod.V x Fb x Fa x 60 x Fk
Ts1
Koefisien = 1/Q1
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu tem= ( L/v1) x 60
- Waktu te = ( L/v2) x 60
- Muat = ( V/Q1) x 60
-Lain-lain
Kap. Prod. V x Fa x 60
Ts2 x Fk
Koefisien = 1/Q2
Waktu siklus
-Menggali, swing, dan memuat ke dump truck
-Swing kembali dan lain-lain
Waktu siklus = T1 x Fv
Kap. Prod.V x Fb x Fa x 60 x Fk
Ts1
Koefisien = 1/Q3
d. Dump Truck
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu tem = ( L/v1) x 60
- Waktu te = ( L/v2) x 60
- Muat = ( V/Q1) x 60
- Lain-lain
Kapasitas Produksi / V x Fa x 60
D x Ts1
Koefisien = 1/Q4
1,005,614.38
e. Bulldozer 100-150 HP
0.75 x 0.75 402,245.75 Jarak gusur
Lebar Blade
Tinggi Blade
Faktor Blade
Faktor Efisiensi Alat
Waktu Ganti Persneling
Faktor Kemiringan Blade
Jarak Pengupasan
Jumlah Jalur Lintasan
Jumlah Lintasan Pengupasan
Lebar Overlap
Kecepatan Maju
Kecepatan Mundur
Kapasitas = Tb^2 x Lb x Fb
Produksi m (q x 60 x E x Fk1)
Ts5
Produksi m (q x 60 x E x Fk1)
2Ts5
Koefisien = 1/Q5
3. Tenaga
a. Di Excavator 2 di darat menurunkan hasil gali
area venue
Produksi yang menentukan = 3 buah Ponton 2
Produuksi/h= Tk x Q.1
Kebutuhan Tenaga Kerja
- Pekerja
- Mandor
Koefisien Tenaga / m3
- Pekerja = (Tk x P)/Q1'
- Mandor = (Tk x M)/Q1'
Koefisien Tenaga / m3
- Pekerja = (Tk x P)/Q2'
- Mandor = (Tk x M)/Q2'
POTONGAN A
SKALA 1 : 20
us utk 3 buah
n samping kiri
0.251 kg/m
0.6 mm
71.06614 kg 0.06 cm
0.0006 m
cm x 10 batang
0
ukan Area dan atau pemasangan
URAIAN ANALISA HARGA SATUAN
Tk 7.00 Jam
Fk 1.20 -
an tanah lepas Fk1 1.00 -
L 1.00 km Jarak rata-rata
Ts1 menit
n memuat ke ponton 2 T1 0.83 menit
T2 0.50 menit
Ts1 1.33 menit
Q1 15.65 M3/Jam
0.0639 Jam
V 10.00 M3
Fa 0.75 - Kondisi Baik
Ts.2 menit
T.1 0.00 menit
T.2 #REF! menit
T.3 38.34 menit
T.4 5.00 menit
Ts.2 #REF! menit
Q2 #REF! M3/Jam
#REF! Jam
V 0.60 M3
Fb 0.70 -
Fa 0.69
Ts3 menit
n memuat ke dump truck T1 0.67 menit
T2 0.50 menit
Ts3 1.17 menit
Q3 17.88 M3/Jam
0.0559 Jam
V 4.00 M3
Fa 0.75 - Baik
v1 20.00 KM/Jam
v2 30.00 KM/Jam
Ts4 menit
T1 0.00 menit
T2 0.00 menit
T3 5.00 menit
T4 15.34 menit
Ts4 20.34 menit
V x Fa x 60 Q4 8.85 M3 / Jam
0.1130 Jam
D 50.00 m
Lb 3.18 m
Tb 1.30 m
Fb 0.80 Sedang
E 0.75 Baik
Z 0.05 menit
Fm 1.00
l 30.00 m
n 3.00 lajur
N 1.00 lintasan
Lo 0.30 m
F 46.67 m/menit
R 116.17 m/menit
q 4.29 m3
T1 38.57 menit
T2 15.49 menit
T3 10.00 menit
Ts.5 1.55 menit
Q5 124.48 m3
Q5 62.24 m3
0.0161 Jam
P 3.00 OH
M 0.30 OH
#REF! jam
#REF! jam
P 5.00 OH
M 0.50 OH
#DIV/0! jam
#DIV/0! jam
REKAPITULASI OWNER ESTIMATE (OE)
BALAI : BALAI WILAYAH SUNGAI KALIMANTAN 1
Pekerjaan : REVIEW DESAIN PEMBANGUNAN PENGAMAN PANTAI KABUPATEN
Lokasi Pekerjaan : KABUPATEN SAMBAS
Tahun Anggaran : 2021
Jumlah A+B+C+D+E
Pajak (PPN) 10 % x Jumlah (A+B)
Total
ASI OWNER ESTIMATE (OE)
KALIMANTAN 1
GUNAN PENGAMAN PANTAI KABUPATEN SAMBAS
JUMLAH HARGA
PANJANG BANGUNAN
(Rp.)
631.30 Rp 64,360,100,000.00
1846.51 Rp 103,956,500,000.00
364.00 Rp 34,504,800,000.00
1050.00 Rp 73,240,800,000.00
850.00 Rp 41,502,300,000.00
B+C+D+E 317,564,500,000.00
Jumlah (A+B) 31,756,450,000.00
349,320,950,000.00
101,948,518.93
56,298,909.84
94,793,406.59
69,753,142.86
48,826,235.29
DAFTAR KUANTITAS DAN HAR
Balai : BALAI WILAYAH SUNGAI KALIMANTAN 1
Pekerjaan : REVIEW DESAIN PEMBANGUNAN PENGAMAN PANTAI KA
Lokasi Pekerjaan : KABUPATEN SAMBAS
Tahun Anggaran : 2021
1 2 3
I. PEKERJAAN PERSIAPAN Ls
1 Galian Tanah M3
2 Kayu Cerucuk 3 m bh
3 Kayu Cerucuk Untuk Matras M2
4 Geotektile M2
5 Bekisting Plat Baja Kubus Beton 3 set Set
6 Kubus Beton 0,8x0,8x0,8 K350 M3
7 Pemasangan Kubus Beton M3
8 Timbunan Tanah Kembali M3
9 Bekisting Concrate Cap Beton M2
10 Pembesian Beton Kg
11 Beton K-350 Seawall M3
12 Paving M2
TOTAL TAHAP 1
DIBULATKAN
1 2 3
I. PEKERJAAN PERSIAPAN Ls
1 Galian Tanah M3
2 Kayu Cerucuk 3 m bh
3 Kayu Cerucuk Untuk Matras M2
4 Geotektile M2
5 Bekisting Plat Baja Kubus Beton Set
6 Kubus Beton 0,8x0,8x0,8 K350 M3
7 Pemasangan Kubus Beton M3
8 Timbunan Tanah Hasil Galian M3
9 Bekisting Kayu Concrate Cap Beton M2
10 Pembesian Beton Kg
11 Beton K-350 Seawall M3
1 2 3
I. PEKERJAAN PERSIAPAN Ls
1 Galian Tanah M3
2 Kayu Cerucuk 2 m bh
3 Kayu Cerucuk Untuk Matras M2
4 Geotektile M2
5 Bekisting Plat Baja Kubus Beton Set
6 Kubus Beton 0,8x0,8x0,8 K350 M3
7 Pemasangan Kubus Beton M3
8 Timbunan Tanah Kembali Hasil Galian M3
9 Bekisting Kayu Concrate Cap Beton M2
10 Pembesian Beton Kg
11 Beton K-350 Seawall M3
13 Bekisting Beton Cyclop M2
12 Beton Cyclop M3
14 U-ditch 0,6x0,7x1,2 buah
TOTAL
DIBULATKAN
1 2 3
I. PEKERJAAN PERSIAPAN Ls
1 Galian Tanah M3
2 Cerucuk Kayu Cerucuk 2 m bh
3 Cerucuk Untuk Matras M2
4 Geotektile M2
5 Bekisting Plat Baja Kubus Beton Set
6 Kubus Beton 0,8x0,8x0,8 K350 M3
7 Pemasangan Kubus Beton M3
8 Timbunan Pasir Didatangkan M3
9 Bekisting Kayu Concrate Cap Beton M2
10 Pembesian Beton Kg
11 Beton K-350 Seawall M3
12 Bekisting Beton Cyclop M2
13 Beton Cyclop M3
14 U-ditch 0,6x0,7x1,2 buah
TOTAL
DIBULATKAN
1 2 3
I. PEKERJAAN PERSIAPAN Ls
1 Mobilisasi & Demobilisasi Ls
2 Kebutuhan lain-lain ( Keselamatan dan Kesehatan Kerja ) Ls
3 Direksi Keet M2
4 Bedheng Pekerja M2
5 Pengukuran m
6 Dokumentasi Set
1 Galian Tanah M3
2 Geotektile M2
3 Bekisting Plat Baja Kubus Beton Set
4 Kubus Beton 0,8x0,8x0,8 K350 M3
5 Pemasangan Kubus Beton M3
6 Timbunan Pasir didatangkan M3
7 Bekisting Kayu Concrate Cap Beton M2
8 Pembesian Beton Kg
9 Beton K-350 Seawall M3
10 Bekisting Beton Cyclop M2
11 Beton Cyclop M3
12 U-ditch 0,6x0,7x1,2 buah
TOTAL
DIBULATKAN
TITAS DAN HARGA
63,830,536,727.08
64,360,113,484.28
64,360,100,000.00
103,295,265,349.99
103,956,545,786.99
103,956,500,000.00
34,010,830,218.08
34,504,867,887.08
34,504,800,000.00
72,673,606,481.22
73,240,812,861.22
73,240,800,000.00
40,956,048,746.97
41,502,349,780.97
41,502,300,000.00
1 cros = 49 bb
vol = 25.088 m3/m panjang
panjang 631.3
vol total = 15838.05
vcap 0.9974
629.65862
2020.446
2525.563
6.41 12.73
4040.9
432.85
364 78,574,171.69
4,000,000,000.00
50.9073136085759
381.942686391424
613.3333
Pembagi vol : 0.88239
panjang sewall baru = 364
404.4444
383.3333
1050 96,898,141.97
-43.7656778013241 175 m
Panjang Seawall = 925 m
pengali = 1.3
671.6933
1083.333
419.8083 12,459,536,683.76
dana 69,000,000,000
galian ditimbun sekitar di belakang seawall
410.2267
341.8556
645.8333
BREAKDOWN PERHITUNGAN VOLUME PEKERJAAN
ITEM PEKERJAAN SEAWALL PANTAI SINAM
No. Petunjuk Gambar Perhitungan Volume
Item
A -1 Pekerjaan Seawall
Keterangan
Tulangan besi D = 10 mm Jumlah Besi Panjang (m) Total (m) Gama besi 7.850 kg/m3
Tulangan besi sengkang D = 10-200 Tulangan Besi
56.00 657.00 36792.000
Total Berat Besi
V= 2.888 m3
Sengkang 39170.19 kg
3285.00 8.15 26772.750
V= 2.102 m3
Page 9
P0 - P1 57 38.065 2174.65
P1 - P2 50 39.045 1952.25
P2 - P3 50 40.145 2007.25
P3 - P4 50 43.270 2163.50
P4 - P5 49 40.340 1980.84
P5 - P6 104 34.845 3639.56
P6 - P7 51 33.930 1719.83
P7 - P8 50 33.295 1664.75
P8 - P9 89 34.780 3098.20
P9 - P10 50 37.820 1891.00
P10 - P11 55 36.440 2004.20
Jumlah luas Geotekstil = 24296.04
e Pekerjaan Paving
Kebutuhan luasan paving
Lebar (m) Panjang (m) Volume m2
33.82 655.45 22167.32
f Pekerjaan Geotekstil
Daerah potongan
Profil Lebar (m) Panjang (m) Luas m2
P0 - P1 18.35 57.13 1048.34
P1 - P2 18.35 50.00 917.50
P2 - P3 18.35 50.00 917.50
P3 - P4 18.35 50.00 917.50
P4 - P5 18.35 49.10 901.05
P5 - P6 18.35 104.45 1916.66
P6 - P7 18.35 50.69 930.12
P7 - P8 18.35 50.00 917.50
P8 - P9 18.35 89.08 1634.62
P9 - P10 18.35 50.00 917.50
P10 - P11 18.35 55.00 1009.25
12027.53
g Pekerjaan Matras Cerucuk
Page 9
BREAKDOWN PERHITUNGAN VOLUME PEKERJAAN
ITEM PEKERJAAN SEAWALL PANTAI PENJAJAP
No. Petunjuk Gambar Perhitungan Volume
Item
A -1 Pekerjaan Seawall
Keterangan
Tulangan besi D = 10 mm Jumlah Besi Panjang (m) Total (m) Gama besi 7.850 kg/m3
Tulangan besi sengkang D = 10-200 Tulangan Besi
56.00 2013.00 112728.000
Total Berat Besi
V= 8.849 m3
Sengkang 120014.59 kg
10065.00 8.15 82029.750
V= 6.439 m3
Page 9
P16 - P17 50.00 7.980 399.00
P17 - P18 50.00 8.830 441.50
P18 - P19 50.00 9.120 456.00
P19 - P20 51.61 11.050 570.29
P20 - P21 50.00 9.960 498.00
P21 - P22 50.00 8.930 446.50
P22 - P23 50.00 7.880 394.00
P23 - P24 50.00 10.710 535.50
P24 - P25 50.00 11.600 580.00
P25 - P26 51.28 11.940 612.28
P26 - P27 50.00 10.430 521.50
P27 - P28 50.00 9.030 451.50
Page 9
P28 - P29 50.00 10.390 519.50
P29 - P30 50.00 9.760 488.00
P30 - P31 50.00 9.730 486.50
P31 - P32 50.00 11.450 572.50
P32 - P33 50.00 11.750 587.50
P33 - P34 100.00 10.140 1014.00
P34 - P35 50.00 9.890 494.50
P35 - P36 248.01 7.770 1927.04
Jumlah Volume Galian = 19889.82
e Pekerjaan Geotekstil
Daerah potongan
Profil Lebar Panjang Luas (m2)
P1 - P2 12.76 48.320 616.56
P2 - P3 12.76 53.200 678.83
P3 - P4 12.76 50.000 638.00
P4 - P5 12.76 50.000 638.00
P5 - P6 12.76 67.670 863.47
P6 - P7 12.76 45.980 586.70
P7 - P8 12.76 42.510 542.43
P8 - P9 12.76 55.190 704.22
P9 - P10 12.76 57.110 728.72
P10 - P11 12.76 36.850 470.21
P11 - P12 12.76 27.040 345.03
P12 - P13 12.76 85.960 1096.85
P13 - P14 12.76 40.250 513.59
P14 - P15 12.76 50.480 644.12
P15 - P16 12.76 50.000 638.00
P16 - P17 12.76 50.000 638.00
P17 - P18 12.76 50.000 638.00
P18 - P19 12.76 50.000 638.00
P19 - P20 12.76 51.610 658.54
P20 - P21 12.76 50.000 638.00
P21 - P22 12.76 50.000 638.00
P22 - P23 12.76 50.000 638.00
Page 9
P23 - P24 12.76 50.000 638.00
P24 - P25 12.76 50.000 638.00
P25 - P26 12.76 51.280 654.33
P26 - P27 12.76 50.000 638.00
P27 - P28 12.76 50.000 638.00
P28 - P29 12.76 50.000 638.00
P29 - P30 12.76 50.000 638.00
P30 - P31 12.76 50.000 638.00
P31 - P32 12.76 50.000 638.00
P32 - P33 12.76 50.000 638.00
P33 - P34 12.76 100.000 1276.00
P34 - P35 12.76 50.000 638.00
P35 - P36 12.76 248.010 3164.61
Jumlah luas Geotekstil = 25666.23
Page 9
BREAKDOWN PERHITUNGAN VOLUME PEKERJAAN
ITEM PEKERJAAN SEAWALL PANTAI RAMAYADI
No. Petunjuk Gambar Perhitungan Volume
Item
A -1 Pekerjaan Seawall
Page 9
P5 - P6 50.00 17.860 893.00
P6 - P7 50.00 17.475 873.75
P7 - P8 116.60 17.005 1982.78
e Pekerjaan Geotekstil
Daerah potongan
Profil Lebar Panjang Luas (m2)
P0 - P1 14.68 38.000 557.84
P1 - P2 14.68 49.690 729.45
P2 - P3 14.68 112.210 1647.24
P3 - P4 14.68 49.260 723.14
P4 - P5 14.68 51.390 754.41
P5 - P6 14.68 50.000 734.00
P6 - P7 14.68 50.000 734.00
P7 - P8 14.68 116.600 1711.69
Page 9
e Pekerjaan Cyclop
Daerah potongan
Kebutuhan tiap beton cyclop
Luas (m2) Tinggi (m) Volume m3
0.50 0.45 0.23
h Pekerjaan U-ditch
Page 9
BREAKDOWN PERHITUNGAN VOLUME PEKERJAAN
ITEM PEKERJAAN SEAWALL PANTAI ARUNG PARAK
No. Petunjuk Gambar Perhitungan Volume
Item
A -1 Pekerjaan Seawall
Page 9
TIMBUNAN Perhitungan Volume Timbunan
Crossection Panjang Luas Volume (m3)
P1 - P2 51.26 19.290 988.81
P2 - P3 50.77 20.645 1048.15
P3 - P4 49.81 27.595 1374.51
P4 - P5 52.32 41.490 2170.76
P5 - P6 48.26 33.850 1633.60
P6 - P7 50.26 26.000 1306.76
P7 - P8 50.67 41.160 2085.58
P8 - P9 50.67 57.780 2927.71
P9 - P10 50.67 60.130 3046.79
P10 - P11 50.67 73.750 3736.91
P11 - P12 50.45 87.440 4411.35
P12 - P13 50.44 95.880 4836.19
P13 - P14 50.44 97.860 4936.06
P14 - P15 50.44 104.540 5273.00
P15 - P16 51.40 112.110 5762.45
Jumlah Volume Timbunan = 45538.61
Page 9
e Pekerjaan Geotekstil
Daerah potongan
Profil Lebar Panjang Luas (m2)
P1 - P2 14.74 51.260 755.57
P2 - P3 14.74 50.770 748.35
P3 - P4 14.74 49.810 734.20
P4 - P5 14.74 52.320 771.20
P5 - P6 14.74 48.260 711.35
P6 - P7 14.74 50.260 740.83
P7 - P8 14.74 50.670 746.88
P8 - P9 14.74 50.670 746.88
P9 - P10 14.74 50.670 746.88
P10 - P11 14.74 50.670 746.88
P11 - P12 14.74 50.450 743.63
P12 - P13 14.74 50.440 743.49
P13 - P14 14.74 50.440 743.49
P14 - P15 14.74 50.440 743.49
P15 - P16 14.74 51.400 757.64
Jumlah Luas Geotekstil = 11180.73
e Pekerjaan Cyclop
Daerah potongan
Kebutuhan tiap beton cyclop
Luas (m2) Tinggi (m) Volume m3
0.50 0.45 0.23
h Pekerjaan U-ditch
Page 9
BREAKDOWN PERHITUNGAN VOLUME PEKERJAAN
ITEM PEKERJAAN SEAWALL PANTAI CAMAR BULAN
No. Petunjuk Gambar Perhitungan Volume
Item
A -1 Pekerjaan Seawall
Page 9
TIMBUNAN Perhitungan Volume Timbunan
Crossection Panjang La Lb Luas Volume (m3)
P1 - P2 58.88 24.19 23.85 24.019 1414.24
P2 - P3 25.19 23.85 23.66 23.755 598.39
P3 - P4 27.11 23.66 23.56 23.610 640.07
P4 - P5 25.40 23.56 23.45 23.505 597.03
P5 - P6 25.03 23.45 23.52 23.485 587.83
P6 - P7 28.37 23.52 23.44 23.480 666.13
P7 - P8 26.09 23.44 23.52 23.480 612.59
P8 - P9 26.09 23.52 23.33 23.425 611.16
P9 - P10 41.00 23.33 23.47 23.400 959.40
Jumlah Volume Timbunan = 6686.83
Page 9
e Pekerjaan Geotekstil
Daerah potongan
Profil Lebar Panjang Luas (m2)
P1 - P2 14.78 58.880 870.25
P2 - P3 14.78 25.190 372.31
P3 - P4 14.78 27.110 400.69
P4 - P5 14.78 25.400 375.41
P5 - P6 14.78 25.030 369.94
P6 - P7 14.78 28.370 419.31
P7 - P8 14.78 26.090 385.61
P8 - P9 14.78 26.090 385.61
P9 - P10 14.78 41.000 605.98
Jumlah Luas Geotekstil = 4185.10
e Pekerjaan Cyclop
Daerah potongan
Kebutuhan tiap beton cyclop
Luas (m2) Tinggi (m) Volume m3
0.50 0.45 0.23
h Pekerjaan U-ditch
Page 9