Anda di halaman 1dari 7

REKAPITULASI

LAPORAN KEMAJUAN FISIK BULANAN


PEKERJAAN INTERIOR
GEDUNG PUSAT PROMOSI PRODUK KUKM
CELEBES CONVENTION CENTRE (CCC)
Sumber Dana : APBN
Tahun : Anggaran 2007 NOVEMBER S.D DESEMBER
2007
VOLUME KEMAJUAN PEKERJAAN
VOLUME KOMULATIF TERTIMBANG
NO U R A I A N P E K E R J A A N % %
I PEKERJAAN PERSIAPAN 0.17 100.00 0.17

II PEKERJAAN INTERIOR LANTAI - I


1 RUANG EXHIBITION 82.71 100.00 82.71

III PEKERJAAN INTERIOR LANTAI - II


1 RUANG PENGELOLA 10.73 100.00 10.73
2 RUANG PRESENTASE KECIL 6.26 100.00 6.26
3 PEKERJAAN LAIN-LAIN 0.13 100.00 0.13

JUMLAH/TOTAL BOBOT 100.00 100.00


PRESTASI FISIK SAMPAI MINGGU INI
INDIKASI PELAKSANAAN
MENDAHULUI (%)
TERLAMBAT (%) BOBOT REALISASI 100.00

Makassar, 12 Desember 2007


Diperiksa Oleh Kontraktor Pelaksana
Konsultan Pengawas PT HAKA UTAMA
CV. MALLOMO ENGINEERING

Ir. BADARUDDIN Ir A.M KILAT KARAKA


Site Engineering Direktur Utama

Mengetahui Mengetahui/Menyetujui
An. Kepala Dinas Koperasi dan UKM Pejabat Pembuat Komitmen Deputi
Prop Sul-Sel Pemasaran dan jaringan Usaha
Kasubdin UKM,

AHMAD ZABADI, SH.MM


Ir. MANSSYUR TITTONG, MM NIP 700 006 223
NIP 070 009 772
RENCANA ANGGARAN BIAYA
PEKERJAAN INTERIOR
GEDUNG PUSAT PROMOSI PRODUK KUKM
CELEBES CONVENTION CENTRE (CCC)

UNIT : PEKERJAAN PERSIAPAN

simber Dana : APBN

Tahun : Anggaran 2007

NO URAIAN PEKERJAAN VOLUME SAT HARGA SAT.

I PEKERJAAN PERSIAPAN

1 Pek. Administrasi dan Dokumentasi 1.000 Ls 1,770,000.00

2 Pek. Papan Proyek 1.000 Ls 350,000.00

Real Cost Rp.

RENCANA ANGGARAN BIAYA


PEKERJAAN INTERIOR
GEDUNG PUSAT PROMOSI PRODUK KUKM
CELEBES CONVENTION CENTRE (CCC)

UNIT : INTERIOR LANTAI - I

simber Dana : APBN

Tahun : Anggaran 2007

NO URAIAN PEKERJAAN VOLUME SAT HARGA SAT.

I RUANG EXHIBITION

1 Karpet Lantai 3,574.000 M2 310,000.00

2 Pengadaan Kursi Resepsi 276.000 Bh 292,500.00

3 Meja Resepsi 46.000 Bh 910,000.00


Real Cost Rp.
JML. HARGA

1,770,000.00

350,000.00

2,120,000.00

2,120,000.00

JML. HARGA

1,107,940,000.00

80,730,000.00

41,860,000.00
1,230,530,000.00

1,230,530,000.00
RENCANA ANGGARAN BIAYA
PEKERJAAN INTERIOR
GEDUNG PUSAT PROMOSI PRODUK KUKM
CELEBES CONVENTION CENTRE (CCC)

UNIT : INTERIOR LANTAI - I

simber Dana : APBN

Tahun : Anggaran 2007

NO URAIAN PEKERJAAN VOLUME SAT

I RUANG PENGELOLA
1 Kursi Sofa 3 Seat 1.000 Bh
2 Kursi Sofa 2 Seat 1.000 Bh
Meja Tamu 1.000 Bh
Meja Receptionist 1.000 Unit
Kursi Receptionist 2.000 Bh
Gradenza A (P = 230 cm L = 60 cm T = 75 cm) 1.000 Bh
Lemari Rak 2 Muka 2.000 Bh
Lemari Rak 1 Muka 2.000 Bh
Meja 1/2 Biro 5.000 Bh
Kursi Putar 10.000 Bh
Dinding Partisi Lapis Sungkal ( 2 sisi ) (P = 11.25 T = 3.5 cm) 1.000 Unit
Dinding Partisi Lapis Sungkal ( 1 sisi ) (P = 6 T = 3.5 cm) 2.000 Unit
Meja Rapat ( p = 150 cm L = 60 cm T = 70 cm) 2.000 Bh
Kursi Rapat 9.000 Bh
Karpet Lantai 72.000 M2

II RUANG PRESENTASE KECIL


1 Gradenza ( P = 190 cm L = 60 cm T = 75 ) 3.000 Bh
Meja Rapat ( P = 450 cm L = 140 cm T = 75 cm ) 1.000 Bh
Kursi Rapat 12.000 Bh
Dinding Lapis Sungkal 1 Sisi Type A ( P = 9 m T = 3.5 m ) 1.000 Unit
Dinding Lapis Sungkal 1 Sisi Type B ( P = 9 m T = 3.5 m ) 1.000 Unit
Karpet Lantai 36.000 M2

Untuk

III PEKERJAAN LAIN-LAIN


1 Pekerjaan Pembersihan Ls

Real Cost
HARGA SAT. JML. HARGA

2,000,000.00 2,000,000.00
1,500,000.00 1,500,000.00
750,000.00 750,000.00
10,401,914.00 10,401,914.00
1,500,000.00 3,000,000.00
7,619,516.67 7,619,516.67
5,275,970.50 10,551,941.00
4,552,645.50 9,105,291.00
2,620,891.67 13,104,458.33
1,500,000.00 15,000,000.00
32,940,546.67 32,940,546.67
11,557,925.00 23,115,850.00
1,989,332.50 3,978,665.00
1,500,000.00 13,500,000.00
310,000.00 22,320,000.00
168,888,182.67

6,852,219.00 20,556,657.00
10,624,915.83 10,624,915.83
1,500,000.00 18,000,000.00
17,842,191.25 17,842,191.25
20,764,307.92 20,764,307.92
310,000.00 11,160,000.00
98,948,072.00

750,000.00 750,000.00
750,000.00

268,586,254.67

Anda mungkin juga menyukai