Anda di halaman 1dari 45

PEMERINTAH KABUPATEN BANJAR

DINAS BINA MARGA DAN SUMBER DAYA AIR

KEGIATAN :
PELAKSANAAN NORMALISASI SUNGAI
DAN SALURAN IRIGASI

GAMBAR RENCANA
PEKERJAAN :
PERENCANAAN TEKNIS 2017 (PAKET 11) DIR JAMBU BURUNG

CV. TORNADO KONSULTAN


K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Peta Situasi
PETA KABUPATEN BANJAR DAN LOKASI PROYEK
Brunai
Darussalam

Malaysia
Kalimantan
Timur

Kalimantan
Barat
Kalimantan
Tengah
Lokbesar

Kalimantan
Selatan
KABUPATEN TAPIN G Hatalau

Lahanin

Hanani
Ba Angin

lokasi proyek
Belimbing G Riamdinding

Alalak Padang Sei. Pinang


Sunan Cintapuri

BANJARMASIN Simpang Empat

PROPINSI Pengaron
KALIMANTAN TENGAH Sei. Raya
Danau Salak Panyiuran G Hambulangan

PROPINSI
KALIMANTAN TIMUR Sei. Tabuk

TANJUNG Kertak Hanyar Astambul

AMUNTAI
Gambut MARTAPURA G. Batuhampakan
BARABAI

Karang Intan
KANDANGAN Aluh-Aluh Besar
S.Asam
Guntung Papuyu
RANTAU
MARABAHAN

KOTABARU

BANJARMASIN

MARTAPURA
BATULICIN
BANJARBARU WADUK RIAM KANAN
G. Mungguanau
BANJARBARU
PELAIHARI

UTARA
G. Pamaton U
1 : 3.200.000

G. Batukapur
G. Kahung

G. Panggilingan

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
PETA SITUASI ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 2000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Situasi Dan Potongan Memanjang


Sungai Saka Hitam
U
0+150

0+200

0+250

0+300

0+350
0+100

0+400

0+550
0+450
0+050

0+500
0+600

0+000

0+650

0+700

0+900
0+750

0+850
1+050

0+800
1+100

1+150
1+100

1+108

DAERAH ALIRAN SUNGAI SAKA HITAM

Skala 1 : 2.500

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI SAKA HITAM ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 2.500 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+050

U
0+000

STA: long section Datum: 0,000


3,925

4,032

Elevasi Tanah Asli


2.225

2,241

Elevasi Tanah Rencana


50,000
0,000

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI SAKA HITAM ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
U
0+150

0+200

0+250

0+300
0+100

0+350

0+400
0+050

STA: long section Datum: 0,000


4,032

3,868

4,058

4,067

4,126

3,989

3,967

3,812
Elevasi Tanah Asli
2,241

2,258

2,274

2,290

2,307

2,323

2,339

2,356
Elevasi Tanah Rencana
100,000

150,000

200,000

250,000

300,000

350,000

400,000
50,000

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI SAKA HITAM ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+350

0+400

0+450

0+550
0+500
0+600
U

0+650

STA: long section Datum: 0,000


3,989

3,967

3,812

3,789

3,851

3,868

3,895

4,164
Elevasi Tanah Asli
2,323

2,339

2,356

2,372

2,389

2,405

2,421

2,438
Elevasi Tanah Rencana
300,000

350,000

400,000

450,000

500,000

550,000

600,000

650,000
STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI SAKA HITAM ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
U
0+650

0+700

0+900
0+750

0+950

0+850
0+800
1+000

STA: long section Datum: 0,000


4,164

4,164

4,199

4,212

3,926

3,916

3,930

3,930

3,936

3,995

4,012

4,026

4,021
Elevasi Tanah Asli
2,438

3,454

2,470

2,477

2,487

2,503

2,519

2,526

2,536

2,552

2,568

3,585

3,587
Elevasi Tanah Rencana

1000,000

1050,000

1100,000

1108,000
650,000

700,000

750,000

770,000

800,000

850,000

900,000

920,000

950,000
STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI SAKA HITAM ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+950

U
1+000

1+050

1+100

1+108

STA: long section Datum: 0,000

3,936

3,995

4,012

4,026

4,021
Elevasi Tanah Asli

2,536

2,552

2,568

2,585

2,587
Elevasi Tanah Rencana

1000,000

1050,000

1100,000

1108,000
950,000
STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI SAKA HITAM ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Potongan Melintang
Sungai Saka Hitam
L = 10,206 m2 L = 9,805 m2

STA: 0+000 Datum: 0,000 STA: 0+050 Datum: 0,000


5,159

5,158

5,221

5,253

5,215

4,256

4,040

3,925

4,217

4,703

5,257

5,353

5,345

5,085

5,044

5,014

5,278

5,257

5,299

4,227

4,011

4,032

3,994

4,102

5,066

5,098

5,120

5,141
Elevasi Asli Elevasi Asli
5,159

5,158

5,221

5,253

5,215

4,256

4,040

2,225

2,225

4,703

5,257

5,353

5,345

5,085

5,044

5,014

5,278

5,257

5,299

4,227

4,011

2,241

2,241

4,102

5,066

5,098

5,120

5,141
Elevasi Rencana Elevasi Rencana
-13,300

-12,300

-11,300

-12,100

-11,100

-10,100
10,800

11,800

10,100
-9,300

-7,800

-7,300

-3,650

-8,100

-6,100

-5,600

-2,800
0,000

3,650

7,300

7,800

9,800

0,000

2,800

5,600

6,100

8,100

9,100
Jarak Jarak

CROSS SECTION STA 0 + 000 CROSS SECTION STA 0 + 050

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 8,959 m2
L = 10,406 m2

STA: 0+100 Datum: 0,000 STA: 0+150 Datum: 1,000

5,120

5,054

5,033

5,110

5,098

4,054

3,898

3,868

3,869

4,054

5,058

5,192

5,166

5,144

5,271

5,384

5,428

5,349

5,255

4,514

4,068

4,058

4,054

4,514
5,208

5,208

5,305

5,282
Elevasi Asli Elevasi Asli

5,120

5,054

5,033

5,110

5,098

4,054

3,278

2,258

2,258

4,054

5,058

5,192

5,166

5,144

5,271

5,384

5,428

5,349

5,255

4,514

2,274

2,274

2,274

4,514
5,208

5,208

5,305

5,282
Elevasi Rencana Elevasi Rencana

-9,400

-8,400

-7,400

-6,400

-5,200

-4,300

-2,100

-8,300

-7,300

-6,300

-5,300

-4,300

-3,300

-1,650
0,000

2,100

4,300

4,800

6,800

7,800

8,800

0,000

1,650

3,300
3,800

4,800

5,800

6,800
Jarak Jarak

CROSS SECTION STA 0 + 100 CROSS SECTION STA 0 + 150

L = 10,096 m2 L = 11,461 m2

STA: 0+200 Datum: 1,000 STA: 0+250 Datum: 1,000


5,251

5,340
5,407

5,445

5,353

4,263

4,110

4,067

4,095

4,167
5,165

5,287

5,252

5,299

5,158

5,239

5,293

5,287

5,300

4,776

4,268

4,126

4,361

4,749
5,421

5,393

5,401

5,393
Elevasi Asli Elevasi Asli
5,251

5,340
5,407

5,445

5,353

4,263

2,290

2,290

2,290

4,167
5,165

5,287

5,252

5,299

5,158

5,239

5,293

5,287

5,300

4,776

2,307

2,307

2,307

4,749
5,421

5,393

5,401

5,393
Elevasi Rencana Elevasi Rencana
-8,750

-7,750
-6,950

-5,850

-4,750

-3,350

-1,675

-9,990

-8,990

-7,990

-6,990

-5,390

-3,390

-1,695
0,000

1,675

3,350
3,850

4,850

5,750

6,750

0,000

1,695

3,390
3,990

4,990

5,990

6,990
Jarak Jarak

CROSS SECTION STA 0 + 200 CROSS SECTION STA 0 + 250

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 10,158 m2 L = 9,703 m2

STA: 0+300 Datum: 0,000 STA: 0+350 Datum: 0,000

5,299
5,226

5,349

5,308

5,317

4,355

4,032

3,989

4,046

4,346
5,270

5,252

5,251

4,855

5,299

5,251

5,370

5,329

5,338

4,376

4,012

3,967

4,023

4,331
5,232

5,213

4,872

4,825
Elevasi Asli Elevasi Asli

5,299
5,226

5,349

5,308

5,317

3,275

2,323

2,323

2,323

3,275
5,270

5,252

5,251

4,855

5,299

5,251

5,370

5,329

5,338

4,005

2,339

2,339

2,339

4,005
5,232

5,213

4,872

4,825
Elevasi Rencana Elevasi Rencana

-7,980
-7,480

-6,480

-5,480

-4,280

-2,780

-1,390

-9,090

-8,090

-7,090

-5,590

-4,090

-2,990

-1,495
0,000

1,390

2,780
3,380

4,880

5,880

6,880

0,000

1,495

2,990
3,590

5,590

6,590

7,590
Jarak Jarak

CROSS SECTION STA 0 + 300 CROSS SECTION STA 0 + 350

L = 8,731 m2 L = 8,910 m2

STA: 0+400 Datum: 0,000 STA: 0+450 Datum: 0,000


4,989

5,000

5,105

5,105

5,062

4,388

3,857

3,812

3,868

4,140
5,055

5,050

5,011

5,040

4,989

5,000

5,105

5,105

5,062

4,388

3,857

3,789

3,868

4,140
5,055

5,050

5,011

5,040
Elevasi Asli Elevasi Asli
4,989

5,000

5,105

5,105

5,062

4,056

2,356

2,356

2,356

4,124
5,055

5,050

5,011

5,040

4,989

5,000

5,105

5,105

5,062

3,222

2,372

2,372

2,372

3,222
5,055

5,050

5,011

5,040
Elevasi Rencana Elevasi Rencana
-8,000

-7,000

-6,000

-5,000

-4,000

-3,000

-1,500

-8,250

-7,250

-6,250

-5,250

-3,750

-2,750

-1,375
0,000

1,520

3,020
3,520

4,520

5,520

6,520

0,000

1,375

2,750
3,350

4,350

5,350

6,350
Jarak Jarak

CROSS SECTION STA 0 + 400 CROSS SECTION STA 0 + 450

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 8,447 m2 L = 8,295 m2

STA: 0+500 Datum: 0,000 STA: 0+550 Datum: 0,000

4,989

5,000

5,053

4,985

5,051

4,388

3,857

3,851

3,868

4,140
5,037

5,050

5,011

5,040

5,006

5,017

5,070

5,002

5,024

4,305

3,874

3,868

3,885

4,157
4,990

5,067

5,028

5,057
Elevasi Asli Elevasi Asli

4,989

5,000

5,053

4,985

5,051

4,388

2,389

2,389

2,389

4,140
5,037

5,050

5,011

5,040

5,006

5,017

5,070

5,002

5,024

4,305

2,405

2,405

2,405

4,157
4,990

5,067

5,028

5,057
Elevasi Rencana Elevasi Rencana

-8,750

-7,750

-6,750

-5,750

-4,250

-3,250

-1,625

-8,950

-7,950

-6,950

-5,950

-4,450

-3,450

-1,725
0,000

1,625

3,250
3,850

4,850

5,850

6,850

0,000

1,725

3,450
4,050

5,050

6,050

7,050
Jarak Jarak

CROSS SECTION STA 0 + 500 CROSS SECTION STA 0 + 550

L = 8,330 m2
L = 11,803 m2

STA: 0+600 Datum: 0,000 STA: 0+650 Datum: 1,000


5,033

5,005

5,097

5,029

5,021

4,232

3,901

3,895

3,912

4,184
4,995

5,094

5,055

5,084

4,864

4,875

4,923

4,898

4,890

4,501
4,170
4,164
4,181
4,453
4,864

4,963

4,950

4,953
Elevasi Asli Elevasi Asli
5,033

5,005

5,097

5,029

5,021

4,232

2,421

2,421

2,421

4,184
4,995

5,094

5,055

5,084

4,864

4,875

4,923

4,898

2,438

2,438
2,438
2,438
2,438
2,438
2,438

4,478

4,950

4,953
Elevasi Rencana Elevasi Rencana
-8,950

-7,950

-6,950

-5,950

-4,450

-3,450

-1,725

-7,000

-6,000

-5,000

-4,000

-2,500

-1,500
-0,750
0,000

1,725

3,450
4,050

5,050

6,050

7,050

0,000
0,750
1,500
2,100

3,100

4,100

5,100
Jarak Jarak

CROSS SECTION STA 0 + 600 CROSS SECTION STA 0 + 650

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 11,969 m2 L = 11,392 m2

STA: 0+700 Datum: 1,000 STA: 0+750 Datum: 1,000

4,864

4,875

4,897

4,898

4,890

4,501
4,170
4,164
4,181
4,453
4,864

4,963

4,950

4,953

4,899

4,910

4,932

4,933

4,905

4,536
4,205
4,199
4,216
4,488
4,899

4,998

4,985

4,988
Elevasi Asli Elevasi Asli

4,864

4,875

4,897

4,898

2,454

2,454
2,454
2,454
2,454
2,454
2,454

3,814

4,950

4,953

4,899

4,910

4,932

4,933

2,470

2,470
2,470
2,470
2,470
2,470
2,470

4,170

4,985

4,988
Elevasi Rencana Elevasi Rencana

-6,800

-5,800

-4,800

-3,800

-2,300

-1,300
-0,650

-6,900

-5,900

-4,900

-3,900

-2,400

-1,400
-0,700
0,000
0,650
1,300
1,900

2,900

3,900

4,900

0,000
0,700
1,400
2,000

3,000

4,000

5,000
Jarak Jarak

CROSS SECTION STA 0 + 700 CROSS SECTION STA 0 + 750

L = 9,211 m2
L = 11,706 m2

STA: 0+770 a Datum: 1,000 STA: 0+800 Datum: 0,000


4,912

4,923

4,945

4,946

4,918

4,549
4,218
4,212
4,229
4,501
4,912

5,011

4,998

5,001

5,064

5,036

5,028

5,060

5,052

4,263

3,932

3,926

3,943

4,215
5,026

5,125

5,086

5,115
Elevasi Asli Elevasi Asli
4,912

4,923

4,945

4,946

2,817

2,477
2,477
2,477
2,477
2,477
2,477

4,857

4,998

5,001

5,064

5,036

5,028

5,060

5,052

2,487

2,487

2,487

2,487

2,487
4,017

5,125

5,086

5,115
Elevasi Rencana Elevasi Rencana
-7,100

-6,100

-5,100

-4,100

-2,600

-1,600
-0,800

-7,850

-6,850

-5,850

-4,850

-3,350

-2,350

-1,175
0,000
0,800
1,600
2,200

3,200

4,200

5,200

0,000

1,175

2,350
2,950

3,950

4,950

5,950
Jarak Jarak

CROSS SECTION STA 0 + 770 CROSS SECTION STA 0 + 800

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 9,046 m2 L = 8,933 m2

STA: 0+850 Datum: 0,000 STA: 0+900 Datum: 0,000

5,046

5,029

5,018

5,050

5,022

4,253

3,922

3,916

3,933

4,205
5,027

5,216

5,085

5,206

5,060

5,043

5,032

5,064

5,036

4,267

3,936

3,930

3,947

4,219
5,041

5,185

5,099

5,040
Elevasi Asli Elevasi Asli

5,046

5,029

5,018

5,050

5,022

2,503

2,503

2,503

2,503

2,503
4,033

5,216

5,085

5,206

5,060

5,043

5,032

5,064

5,036

2,519

2,519

2,519

2,519

2,519
4,219

5,185

5,099

5,040
Elevasi Rencana Elevasi Rencana

-7,850

-6,850

-5,850

-4,850

-3,350

-2,350

-1,175

-7,900

-6,900

-5,900

-4,900

-3,400

-2,400

-1,200
0,000

1,175

2,350
2,950

3,950

4,950

5,950

0,000

1,200

2,400
3,000

4,000

5,000

6,000
Jarak Jarak

CROSS SECTION STA 0 + 850 CROSS SECTION STA 0 + 900

L = 10,594 m2 L = 10,784 m2

STA: 0+920 Datum: 0,000 STA: 0+950 Datum: 0,000


5,060

5,043

5,032

5,064

5,036

4,267
3,936
3,930
3,947
4,219
5,041

5,185

5,099

5,040

4,966

5,049

5,038

5,070

5,042

4,273
3,942
3,936
3,953
4,225
5,047

5,191

5,105

5,046
Elevasi Asli Elevasi Asli
5,060

5,043

5,032

5,064

2,866

2,526
2,526
2,526
2,526
2,526
2,526

4,906

5,099

5,040

4,966

5,049

5,038

5,070

2,536

2,536
2,536
2,536
2,536
2,536
2,536

4,576

5,105

5,046
Elevasi Rencana Elevasi Rencana
-7,100

-6,100

-5,100

-4,100

-2,600

-1,600
-0,800

-7,000

-6,000

-5,000

-4,000

-2,500

-1,500
-0,750
0,000
0,800
1,600
2,200

3,200

4,200

5,200

0,000
0,750
1,500
2,100

3,100

4,100

5,100
Jarak Jarak

CROSS SECTION STA 0 + 920 CROSS SECTION STA 0 + 950

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 10,713 m2
L = 10,608 m2

STA: 1+000 Datum: 0,000 STA: 1+050 Datum: 1,000

5,025

5,108

5,097

5,129

5,001

4,332
4,001
3,995
4,012
4,284
5,106

5,190

5,164

5,205

5,042

5,125

5,114

5,146

5,118

4,349

4,018

4,012

4,029

4,301
5,123

5,207

5,181

5,222
Elevasi Asli Elevasi Asli

5,025

5,108

5,097

5,129

2,892

2,552
2,552
2,552
2,552
2,552
2,552

4,932

5,164

5,205

5,042

5,125

5,114

5,146

3,248

2,568

2,568

2,568

2,568

2,568
2,568

5,207

5,181

5,222
Elevasi Rencana Elevasi Rencana

-7,100

-6,100

-5,100

-4,100

-2,600

-1,600
-0,800

-7,200

-6,200

-5,200

-4,200

-2,700

-1,700

-0,850
0,000
0,800
1,600
2,200

3,200

4,200

5,200

0,000

0,850

1,700
2,300

3,300

4,300

5,300
Jarak Jarak

CROSS SECTION STA 1 + 000 CROSS SECTION STA 1 + 050

L = 10,694 m2 L = 10,327 m2

STA: 1+100 Datum: 1,000 STA: 1+108 Datum: 1,000


5,056

5,139

5,128

5,160

5,132

4,363
4,032
4,026
4,043
4,315
5,137

5,221

5,195

5,236

5,051

5,134

5,123

5,155

5,127

4,358

4,027

4,021

4,038

4,310
5,132

5,216

5,190

5,231
Elevasi Asli Elevasi Asli
5,056

5,139

5,128

5,160

3,095

2,585
2,585
2,585
2,585
2,585
2,585

5,135

5,195

5,236

5,051

5,134

5,123

5,155

3,607

2,587

2,587

2,587

2,587

2,587
2,587

5,216

5,190

5,231
Elevasi Rencana Elevasi Rencana
-7,150

-6,150

-5,150

-4,150

-2,650

-1,650
-0,825

-7,300

-6,300

-5,300

-4,300

-2,800

-1,800

-0,900
0,000
0,825
1,650
2,250

3,250

4,250

5,250

0,000

0,900

1,800
2,400

3,400

4,400

5,400
Jarak Jarak

CROSS SECTION STA 1 + 100 CROSS SECTION STA 1 + 108

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
Lebar Atas Saluran

CATATAN :

01. Panjang Saluran = 1.108 m Kedalaman Saluran

Galian
02. Lebar Atas Saluran = 6,00 m

03. Lebar Bawah Saluran = 5,00 m


Lebar Bawah Saluran
04. Dalam Saluran Rata-rata = 3,00 m

05. Volume Galian = ....... m3

Bidang Persamaan 0.00

0.000

0.000

0.000
Elevasi Asli

-3.000
Elevasi Rencana

6.000
Jarak

POTONGAN MELINTANG RENCANA SALURAN


Skala 1 : 100

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI POTONGAN MELINTANG Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI RENCANA SALURAN SUNGAI SAKA HITAM

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 100 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Situasi Dan Potongan Memanjang


Sungai Keliling
0+550

0+600
U
0+500
0+650

0+450
0+700

0+400
0+350

0+750

0+800

0+850
0+300

0+894
0+250
0+000

0+200
0+050

0+150
0+100

DAERAH ALIRAN SUNGAI KELILING


Skala 1 : 2.000

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI KELILING ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 2.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+250

0+000
0+200

0+050

0+150
0+100

U
STA: long section Datum: 0,000
4,255

4,236

4,365

4,289

4,359

Elevasi Tanah Asli 4,395


2,455

2,467

100,000 2,479

150,000 2,491

200,000 2,503

250,000 2,515

Elevasi Tanah Rencana


50,000
0,000

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI KELILING ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+450
0+400
0+350

0+300

U
0+250

STA: long section Datum: 0,000


4,395

4,412

4,457

4,395

Elevasi Tanah Asli 4,354


250,000 2,515

300,000 2,527

350,000 2,539

400,000 2,551

450,000 2,563

Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI KELILING ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+550

0+600
0+500

0+650

0+450
0+700
0+400

U
0+750
STA: long section Datum: 0,000
4,395

4,354

4,319

4,284

4,347

4,158

3,958

4,153
Elevasi Tanah Asli
400,000 2,551

450,000 2,563

500,000 2,575

550,000 2,587

600,000 4,347

650,000 2,611

700,000 2,623

750,000 2,635
Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI KELILING ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+700

0+750

0+800

0+850

0+894

U
STA: long section Datum: 0,000

3,958

4,153

4,021

4,021

3,945
Elevasi Tanah Asli

700,000 2,623

750,000 2,635

800,000 2,647

850,000 2,659

894,000 2,670
Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI KELILING ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Potongan Melintang
Sungai Keliling
L = 8,361 m2 L = 8,365 m2

STA: 0+000 Datum: 1,000 STA: 0+050 Datum: 1,000

5,368

5,357

5,389

5,361

4,492

4,261

4,255

4,272

4,544
5,366

5,450

5,424

5,465

5,349

5,338

5,370

5,332

4,373

4,242

4,236

4,253

4,525
5,347

5,431

5,405

5,446
Elevasi Asli Elevasi Asli

5,368

5,357

5,389

5,361

4,492

2,455

2,455

2,455

4,544
5,366

5,450

5,424

5,465

5,349

5,338

5,370

5,332

2,467

2,467

2,467

2,467

3,827
5,167

5,431

5,405

5,446
Elevasi Rencana Elevasi Rencana

-7,600

-6,600

-5,600

-4,100

-3,100

-1,550

-6,700

-5,700

-4,700

-3,200

-2,200

-1,100
0,000

1,550

3,100
3,700

4,700

5,700

6,700

0,000

1,100

2,200
2,800

3,800

4,800

5,800
Jarak Jarak

CROSS SECTION STA 0 + 000 CROSS SECTION STA 0 + 050

L = 9,195 m2 L = 8,612 m2

STA: 0+100 Datum: 1,000 STA: 0+150 Datum: 1,000


5,465

5,467

5,499

5,461

4,502

4,371

4,365

4,382

4,654
5,376

5,560

5,534

5,575

5,389

5,391

5,423

5,199

4,426

4,295

4,289

4,306

4,578
5,198

5,484

5,458

5,499
Elevasi Asli Elevasi Asli
5,465

5,467

5,499

5,461

2,819

2,479

2,479

2,479

3,839
5,179

5,560

5,534

5,575

5,389

5,391

5,423

5,199

3,001

2,491

2,491

2,491

4,021
5,198

5,484

5,458

5,499
Elevasi Rencana Elevasi Rencana
-6,750

-5,750

-4,750

-3,250

-2,250

-1,125

-6,800

-5,800

-4,800

-3,300

-2,300

-1,150
0,000

1,125

2,250
2,850

3,850

4,850

5,850

0,000

1,150

2,300
2,900

3,900

4,900

5,900
Jarak Jarak

CROSS SECTION STA 0 + 100 CROSS SECTION STA 0 + 150

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI KELILING

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 9,143 m2 L = 9,554 m2

STA: 0+200 Datum: 1,000 STA: 0+250 Datum: 1,000

5,459

5,461

5,493

5,269

4,496

4,365

4,359

4,376

4,648
5,445

5,554

5,528

5,569

5,495

5,497

5,529

5,491

4,532

4,401

4,395

4,412

4,684
5,481

5,590

5,564

5,605
Elevasi Asli Elevasi Asli

5,459

5,461

5,493

5,203

2,503

2,503

2,503

2,503

3,523
4,863

5,554

5,528

5,569

5,495

5,497

5,529

5,491

2,685

2,515

2,515

2,515

2,685
4,725

5,590

5,564

5,605
Elevasi Rencana Elevasi Rencana

-6,650

-5,650

-4,650

-3,150

-2,150

-1,075

-6,550

-5,550

-4,550

-3,050

-2,050

-1,025
0,000

1,075

2,150
2,750

3,750

4,750

5,750

0,000

1,025

2,050
2,650

3,650

4,650

5,650
Jarak Jarak

CROSS SECTION STA 0 + 200 CROSS SECTION STA 0 + 250

L = 9,495 m2 L = 9,286 m2

STA: 0+300 Datum: 1,000 STA: 0+350 Datum: 1,000


5,512

5,514

5,546

5,508

4,549

4,418

4,412

4,429

4,701
5,321

5,607

5,581

5,622

5,557

5,559

5,591

5,553

4,594

4,463

4,457

4,474

4,746
5,266

5,652

5,626

5,667
Elevasi Asli Elevasi Asli
5,512

5,514

5,546

5,397

2,697

2,527

2,527

2,527

2,697
4,737

5,607

5,581

5,622

5,557

5,559

5,591

5,553

3,559

2,539

2,539

2,539

3,559
4,899

5,652

5,626

5,667
Elevasi Rencana Elevasi Rencana
-6,550

-5,550

-4,550

-3,050

-2,050

-1,025

-6,800

-5,800

-4,800

-3,300

-2,300

-1,150
0,000

1,025

2,050
2,650

3,650

4,650

5,650

0,000

1,150

2,300
2,900

3,900

4,900

5,900
Jarak Jarak

CROSS SECTION STA 0 + 300 CROSS SECTION STA 0 + 350

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI KELILING

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 8,789 m2 L = 8,794 m2

STA: 0+400 Datum: 1,000 STA: 0+450 Datum: 1,000

5,495

5,497

5,529

5,305

4,532

4,401

4,395

4,412

4,684
5,304

5,590

5,564

5,605

5,454

5,456

5,488

5,450

4,491

4,360

4,354

4,371

4,643
5,440

5,549

5,523

5,564
Elevasi Asli Elevasi Asli

5,495

5,497

5,529

5,305

3,911

2,551

2,551

2,551

3,911
5,251

5,590

5,564

5,605

5,454

5,456

5,488

5,450

3,243

2,563

2,563

2,563

3,243
5,283

5,549

5,523

5,564
Elevasi Rencana Elevasi Rencana

-6,900

-5,900

-4,900

-3,400

-2,400

-1,200

-6,700

-5,700

-4,700

-3,200

-2,200

-1,100
0,000

1,200

2,400
3,000

4,000

5,000

6,000

0,000

1,100

2,200
2,800

3,800

4,800

5,800
Jarak Jarak

CROSS SECTION STA 0 + 400 CROSS SECTION STA 0 + 450

L = 8,155 m2 L = 8,091 m2

STA: 0+500 Datum: 1,000 STA: 0+550 Datum: 1,000


5,419

5,421

5,453

5,229

4,456

4,325

4,319

4,336

4,608
5,128

5,514

5,488

5,529

5,384

5,386

5,418

5,380

4,421

4,290

4,284

4,301

4,573
5,093

5,479

5,453

5,494
Elevasi Asli Elevasi Asli
5,419

5,421

5,453

5,229

4,456

2,575

2,575

2,575

4,608
5,128

5,514

5,488

5,529

5,384

5,386

5,418

5,380

3,607

2,587

2,587

2,587

3,607
5,093

5,479

5,453

5,494
Elevasi Rencana Elevasi Rencana
-7,100

-6,100

-5,100

-3,600

-2,600

-1,300

-6,800

-5,800

-4,800

-3,300

-2,300

-1,150
0,000

1,300

2,600
3,200

4,200

5,200

6,200

0,000

1,150

2,300
2,900

3,900

4,900

5,900
Jarak Jarak

CROSS SECTION STA 0 + 500 CROSS SECTION STA 0 + 550

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI KELILING

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 8,249 m2 L = 7,237 m2

STA: 0+600 Datum: 1,000 STA: 0+650 Datum: 1,000

5,447

5,449

5,481

5,443

4,484

4,353

4,347

4,364

4,636
5,333

5,542

5,516

5,557

5,258

5,260

5,292

5,254

4,295

4,164

4,158

4,175

4,447
5,144

5,144

5,327

5,368
Elevasi Asli Elevasi Asli

5,447

5,449

5,481

5,443

4,129

2,599

2,599

2,599

4,129
5,333

5,542

5,516

5,557

5,258

5,260

5,292

5,254

3,971

2,611

2,611

2,611

3,971
5,144

5,144

5,327

5,368
Elevasi Rencana Elevasi Rencana

-6,950

-5,950

-4,950

-3,450

-2,450

-1,225

-6,900

-5,900

-4,900

-3,400

-2,400

-1,200
0,000

1,225

2,450
3,050

4,050

5,050

6,050

0,000

1,200

2,400
3,000

4,000

5,000

6,000
Jarak Jarak

CROSS SECTION STA 0 + 600 CROSS SECTION STA 0 + 650

L = 6,145 m2 L = 7,110 m2

STA: 0+700 Datum: 0,000 STA: 0+750 Datum: 1,000


5,058

5,060

5,092

5,054

4,095

3,964

3,958

3,975

4,247
5,044

5,153

5,127

5,168

5,253

5,255

5,287

5,249

4,290

4,159

4,153

4,170

4,442
4,862

5,348

5,322

5,363
Elevasi Asli Elevasi Asli
5,058

5,060

5,092

5,054

4,095

2,623

2,623

2,623

4,153
5,044

5,153

5,127

5,168

5,253

5,255

5,287

5,249

3,825

2,635

2,635

2,635

3,825
4,862

5,348

5,322

5,363
Elevasi Rencana Elevasi Rencana
-6,950

-5,950

-4,950

-3,450

-2,450

-1,225

-6,850

-5,850

-4,850

-3,350

-2,350

-1,175
0,000

1,225

2,450
3,050

4,050

5,050

6,050

0,000

1,175

2,350
2,950

3,950

4,950

5,950
Jarak Jarak

CROSS SECTION STA 0 + 700 CROSS SECTION STA 0 + 750

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI KELILING

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 6,159 m2 L = 6,049 m2

STA: 0+800 Datum: 1,000 STA: 0+850 Datum: 1,000

5,121

5,123

5,155

5,117

4,158

4,027

4,021

4,038

4,310
5,107

5,216

5,190

5,231

5,121

5,123

5,155

5,117

4,158

4,027

4,021

4,038

4,310
5,107

5,216

5,190

5,231
Elevasi Asli Elevasi Asli

5,121

5,123

5,155

5,117

4,158

2,647

2,647

4,038

4,310
5,107

5,216

5,190

5,231

5,121

5,123

5,155

5,117

4,158

2,659

2,659

4,038

4,310
5,107

5,216

5,190

5,231
Elevasi Rencana Elevasi Rencana

-8,250

-7,250

-6,250

-4,750

-3,750

-1,875

-9,100

-8,100

-7,100

-5,600

-4,600

-2,300
0,000

1,875

3,750
4,350

5,350

6,350

7,350

0,000

2,300

4,600
5,200

6,200

7,200

8,200
Jarak Jarak

CROSS SECTION STA 0 + 800 CROSS SECTION STA 0 + 850

L = 5,624 m2

STA: 0+894 Datum: 0,000


5,045

5,047

5,079

5,041

4,082

3,951

3,945

3,962

4,234
5,031

5,140

5,114

5,155
Elevasi Asli
5,045

5,047

5,079

5,041

4,082

2,670

2,670

3,962

4,234
5,031

5,140

5,114

Elevasi Rencana 5,155


-9,300

-8,300

-7,300

-5,800

-4,800

-2,400

0,000

2,400

4,800
5,400

6,400

7,400

8,400

Jarak

CROSS SECTION STA 0 + 894

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI KELILING

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Situasi Dan Potongan Memanjang


Sungai Handil Malintang 2
U

0+750

0+800
0+700
0+650
0+600

0+850
0+550
0+500
0+450

0+900
0+400

0+926
0+350
0+300
0+250
0+200
0+150
0+100
0+000

0+050

DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2


Skala 1 : 4.000

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2 ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 4.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
U
DAERAH ALIRAN SUNGAI HANDIL MELINTANG 2
Skala 1 : 1.000

STA: long section Datum: 1,000

Elevasi Tanah Asli

Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2 ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+200
0+150
U

0+100
0+000

0+050
STA: long section Datum: 1,000
4,156

4,258

4,298

4,298

4,369

Elevasi Tanah Asli


2,356

2,363

100,000 2,370

150,000 2,377

200,000 2,384

Elevasi Tanah Rencana


50,000
0,000

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2 ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+500
0+450
0+400
0+350
0+300
0+250
0+200

U
STA: long section Datum: 1,000
4,369

4,510

4,369

4,298

4,156

4,315

4,596
Elevasi Tanah Asli
200,000 2,384

250,000 2,390

300,000 2,399

350,000 2,406

400,000 2,413

450,000 2,420

500,000 2,427
Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2 ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+750

0+800
0+700
0+650
0+600

0+850
0+550
0+500

U
STA: long section Datum: 1,000
4,596

4,596

4,526

4,354

4,298

4,185

4,210

4,125
Elevasi Tanah Asli
500,000 2,427

550,000 2,434

600,000 2,441

650,000 2,448

700,000 2,455

750,000 2,462

800,000 2,470

850,000 2,477
Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2 ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
0+750

0+800
0+700
0+650

0+850

0+900

0+926

U
STA: long section Datum: 1,000

4,354

4,298

4,185

4,210

4,125

4,102

4,052
Elevasi Tanah Asli 650,000 2,448

700,000 2,455

750,000 2,462

800,000 2,470

850,000 2,477

900,000 2,484

926,000 2,487
Elevasi Tanah Rencana

STA

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI Pengelola Teknis Kegiatan .
DAERAH ALIRAN SUNGAI HANDIL MALINTANG 2 ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 1.000 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
K

PEMERINTAH KABUPATEN BANJAR


DINAS BINA MARGA DAN SUMBER DAYA AIR

Potongan Melintang
Sungai Handil Malintang 2
L = 15,758 m2 L = 16,843 m2

STA: 0+000 Datum: 1,000 STA: 0+050 Datum: 1,000

5,269

5,258

5,290

5,262

4,793

4,162

4,156

4,173

4,545

5,167

5,351

5,325

5,366

5,371

5,360

5,292

5,064

4,895

4,264

4,258

4,275

4,647

5,169

5,453

5,427

5,468
Elevasi Asli Elevasi Asli

5,269

5,258

5,290

5,262

4,793

4,162

2,356

2,356

4,545

5,167

5,351

5,325

5,366

5,371

5,360

5,292

5,064

4,895

2,363

2,363

2,363

4,647

5,169

5,453

5,427

5,468
Elevasi Rencana Elevasi Rencana
-11,600

-10,600

10,600

11,600
-9,600

-8,600

-7,600

-3,800

-9,600

-8,600

-7,600

-6,600

-5,600

-2,800
0,000

3,800

7,600

8,600

9,600

0,000

2,800

5,600

6,600

7,600

8,600

9,600
Jarak Jarak

CROSS SECTION STA 0 + 000 CROSS SECTION STA 0 + 050

L = 17,130 m2 L = 16,847 m2

STA: 0+100 Datum: 1,000 STA: 0+150 Datum: 1,000


5,411

5,400

5,332

5,104

4,935

4,304

4,298

4,315

4,687

5,209

5,293

5,467

5,508

5,411

5,400

5,332

5,204

4,935

4,304

4,298

4,315

4,687

5,309

5,493

5,467

5,508
Elevasi Asli Elevasi Asli
5,411

5,400

5,332

5,104

4,935

2,370

2,370

2,370

4,687

5,209

5,293

5,467

5,508

5,411

5,400

5,332

5,204

4,935

2,377

2,377

2,377

4,687

5,309

5,493

5,467

5,508
Elevasi Rencana Elevasi Rencana

-10,400

10,400
-9,650

-8,650

-7,650

-6,650

-5,650

-2,825

-9,400

-8,400

-7,400

-6,400

-3,200
0,000

2,825

5,650

6,650

7,650

8,650

9,650

0,000

3,200

6,400

7,400

8,400

9,400
Jarak Jarak

CROSS SECTION STA 0 + 100 CROSS SECTION STA 0 + 150

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI HANDIL MALINTANG 2

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 17,319 m2 L = 18,709 m2

STA: 0+200 Datum: 1,000 STA: 0+250 Datum: 1,000

5,482

5,471

5,403

5,330

4,906

4,375

4,369

4,386

4,758

5,280

5,464

5,538

5,579

5,623

5,612

5,544

5,371

5,047

4,516

4,510

4,527

4,899

5,421

5,605

5,679

5,701
Elevasi Asli Elevasi Asli

5,482

5,471

5,403

5,330

4,906

4,375

2,384

2,384

4,758

5,280

5,464

5,538

5,579

5,623

5,612

5,544

5,371

5,047

2,391

2,391

2,391

4,899

5,421

5,605

5,679

5,701
Elevasi Rencana -11,400 Elevasi Rencana
-10,400

-10,300
10,400

11,400

10,300
-9,400

-8,400

-7,400

-3,700

-9,300

-8,300

-7,300

-6,300

-3,150
0,000

3,700

7,400

8,400

9,400

0,000

3,150

6,300

7,300

8,300

9,300
Jarak Jarak

CROSS SECTION STA 0 + 200 CROSS SECTION STA 0 + 250

L = 17,224 m2 L = 16,609 m2

STA: 0+300 Datum: 1,000 STA: 0+350 Datum: 1,000


5,482

5,471

5,272

5,230

4,906

4,375

4,369

4,386

4,758

5,280

5,464

5,538

5,560

5,411

5,400

5,323

5,059

4,835

4,304

4,298

4,315

4,687

5,209

5,297

5,467

5,489
Elevasi Asli Elevasi Asli
5,482

5,471

5,272

5,230

4,906

4,375

2,399

2,399

4,758

5,280

5,464

5,538

5,560

5,411

5,400

5,323

5,059

4,835

2,406

2,406

2,406

4,687

5,209

5,297

5,467

5,489
Elevasi Rencana Elevasi Rencana
-11,100

-10,100

-10,150
10,100

11,100

10,150
-9,100

-8,100

-7,100

-3,550

-9,150

-8,150

-7,150

-6,150

-3,075
0,000

3,550

7,100

8,100

9,100

0,000

3,075

6,150

7,150

8,150

9,150
Jarak Jarak

CROSS SECTION STA 0 + 300 CROSS SECTION STA 0 + 350

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI HANDIL MALINTANG 2

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 15,238 m2 L = 17,618 m2

STA: 0+400 Datum: 1,000 STA: 0+450 Datum: 1,000

5,269

5,258

5,051

4,917

4,693

4,162

4,156

4,173

4,545

5,067

5,315

5,325

5,347

5,428

5,417

5,340

4,976

4,852

4,321

4,315

4,332

4,704

5,226

5,314

5,484

5,506
Elevasi Asli Elevasi Asli

5,269

5,258

5,051

4,917

4,693

2,413

2,413

2,413

4,545

5,067

5,315

5,325

5,347

5,428

5,417

5,340

4,976

3,440

2,420

2,420

2,420

3,440

5,226

5,314

5,484

5,506
Elevasi Rencana Elevasi Rencana

-10,150

10,150
-9,150

-8,150

-7,150

-6,150

-3,075

-8,300

-7,300

-6,300

-5,300

-4,300

-2,150
0,000

3,075

6,150

7,150

8,150

9,150

0,000

2,150

4,300

5,300

6,300

7,300

8,300
Jarak Jarak

CROSS SECTION STA 0 + 400 CROSS SECTION STA 0 + 450

L = 19,457 m2 L = 20,176 m2

STA: 0+500 Datum: 1,000 STA: 0+550 Datum: 1,000


5,709

5,698

5,621

5,257

5,133

4,602

4,596

4,613

4,985

5,507

5,595

5,765

5,787

5,709

5,698

5,630

5,402

5,233

4,602

4,596

4,613

4,985

5,507

5,591

5,765

5,806
Elevasi Asli Elevasi Asli
5,709

5,698

5,621

5,257

5,133

2,427

2,427

2,427

4,985

5,507

5,595

5,765

5,787

5,709

5,698

5,630

5,402

3,964

2,434

2,434

2,434

3,964

5,507

5,591

5,765

5,806
Elevasi Rencana Elevasi Rencana
-9,400

-8,400

-7,400

-6,400

-5,400

-2,700

-8,450

-7,450

-6,450

-5,450

-4,450

-2,225
0,000

2,700

5,400

6,400

7,400

8,400

9,400

0,000

2,225

4,450

5,450

6,450

7,450

8,450
Jarak Jarak

CROSS SECTION STA 0 + 500 CROSS SECTION STA 0 + 550

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI HANDIL MALINTANG 2

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 20,072 m2
L = 17,371 m2

STA: 0+600 Datum: 1,000 STA: 0+650 Datum: 1,000

5,639

5,628

5,560

5,432

5,163

4,532

4,526

4,543

4,915

5,437

5,421

5,695

5,736

5,467

5,456

5,388

5,339

4,991

4,360

4,354

4,371

4,743

5,265

5,354

5,523

5,564
Elevasi Asli Elevasi Asli

5,639

5,628

5,560

5,432

2,441

2,441

2,441

2,441

2,441

5,437

5,421

5,695

5,736

5,467

5,456

5,388

5,339

4,991

2,448

2,448

2,448

4,743

5,265

5,354

5,523

5,564
Elevasi Rencana Elevasi Rencana

-7,950

-6,950

-5,950

-4,950

-3,950

-1,975

-8,900

-7,900

-6,900

-5,900

-4,900

-2,450
0,000

1,975

3,950

4,950

5,950

6,950

7,950

0,000

2,450

4,900

5,900

6,900

7,900

8,900
Jarak Jarak

CROSS SECTION STA 0 + 600 CROSS SECTION STA 0 + 650

L = 16,874 m2 L = 16,099 m2

STA: 0+700 Datum: 1,000 STA: 0+750 Datum: 1,000


5,411

5,400

5,323

5,059

4,835

4,304

4,298

4,315

4,687

5,209

5,297

5,467

5,489

5,298

5,287

5,219

4,991

4,822

4,191

4,185

4,202

4,574

5,096

5,180

5,354

5,395
Elevasi Asli Elevasi Asli
5,411

5,400

5,323

5,059

4,495

2,455

2,455

2,455

4,495

5,209

5,297

5,467

5,489

5,298

5,287

5,219

4,991

3,652

2,462

2,462

2,462

3,652

5,096

5,180

5,354

5,395
Elevasi Rencana Elevasi Rencana
-8,600

-7,600

-6,600

-5,600

-4,600

-2,300

-8,350

-7,350

-6,350

-5,350

-4,350

-2,175
0,000

2,300

4,600

5,600

6,600

7,600

8,600

0,000

2,175

4,350

5,350

6,350

7,350

8,350
Jarak Jarak

CROSS SECTION STA 0 + 700 CROSS SECTION STA 0 + 750

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI HANDIL MALINTANG 2

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
L = 17,006 m2 L = 16,895 m2

STA: 0+800 Datum: 1,000 STA: 0+850 Datum: 1,000

5,323

5,312

5,244

5,191

4,847

4,216

4,210

4,227

4,599

5,121

5,405

5,379

5,420

5,238

5,227

5,159

5,223

4,762

4,131

4,125

4,142

4,514

5,036

5,320

5,294

5,335
Elevasi Asli Elevasi Asli

5,323

5,312

5,244

5,191

2,470

2,470

2,470

2,470

2,470

5,121

5,405

5,379

5,420

5,238

5,227

5,159

3,837

2,477

2,477

2,477

2,477

2,477

3,837

5,320

5,294

5,335
Elevasi Rencana Elevasi Rencana

-7,800

-6,800

-5,800

-4,800

-3,800

-1,900

-7,400

-6,400

-5,400

-4,400

-3,400

-1,700
0,000

1,900

3,800

4,800

5,800

6,800

7,800

0,000

1,700

3,400

4,400

5,400

6,400

7,400
Jarak Jarak

CROSS SECTION STA 0 + 800 CROSS SECTION STA 0 + 850

L = 16,270 m2
L = 13,586 m2

STA: 0+900 Datum: 1,000 STA: 0+926 Datum: 1,000


5,215

5,204

5,092

5,063

4,639

4,108

4,102

4,119

4,491

5,013

5,261

5,271

5,293

5,165

5,154

5,086

5,013

4,589

4,058

4,052

4,069

4,441

4,963

5,147

5,221

5,262
Elevasi Asli Elevasi Asli
5,215

5,204

5,092

4,014

2,484

2,484

2,484

2,484

2,484

4,014

5,261

5,271

5,293

5,165

5,154

5,086

5,013

4,589

4,058

2,487

2,487

4,441

4,963

5,147

5,221

5,262
Elevasi Rencana Elevasi Rencana

-11,400

-10,400

10,400

11,400
-7,450

-6,450

-5,450

-4,450

-3,450

-1,725

-9,400

-8,400

-7,400

-3,700
0,000

1,725

3,450

4,450

5,450

6,450

7,450

0,000

3,700

7,400

8,400

9,400
Jarak Jarak

CROSS SECTION STA 0 + 900 CROSS SECTION STA 0 + 926

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI CROSS SECTION Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI SUNGAI HANDIL MALINTANG 2

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
... BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007
Lebar Atas Saluran

CATATAN :

01. Panjang Saluran = 926 m

02. Lebar Atas Saluran = 9,00 m Kedalaman Saluran


Galian
03. Lebar Bawah Saluran = 8,00 m

04. Dalam Saluran Rata-rata = 3,00 m

05. Volume Galian = ....... m3 Lebar Bawah Saluran

Bidang Persamaan 0.00

0.000

0.000

0.000
Elevasi Asli

-3.000
Elevasi Rencana

9.000
Jarak

POTONGAN MELINTANG RENCANA SALURAN


Skala 1 : 100

KEGIATAN JUDUL GAMBAR DIGAMBAR OLEH YANG BERTANGGUNGJAWAB DIPERIKSA OLEH: MENGETAHUI/ MENYETUJUI

CV. TORNADO KONSULTAN Pejabat Pembuat Komitmen


PELAKSANAAN NORMALISASI SUNGAI POTONGAN MELINTANG Pengelola Teknis Kegiatan .
ARCHITECS - ENGINERS - SUPERVISIONS (PPK)
DAN SALURAN IRIGASI RENCANA SALURAN SUGAI HANDIL MALINTANG 2

PEKERJAAN SKALA
PEMERINTAH KABUPATEN BANJAR
DINAS BINA MARGA
DAN SUMBER DAYA AIR PERENCANAAN TEKNIS 2017
Jl. Pangeran Hidayatullah No. 05 Telp. (0511) 4723054 Martapura 70611
1 : 100 BAGUS KURNIAWAN, ST H. RONAULI SARAGI, SE ANDRI YUNAN PRATAMA, ST IWAN TAUFIK, ST. MT
(PAKET 11) DIR JAMBU BURUNG
Kabupaten Banjar - Kalimantan Selatan Direktur NIP. 19840618 200904 1 004 NIP. 19690212 198903 1 007

Anda mungkin juga menyukai