Anda di halaman 1dari 121

Daftar Isi

_Contents

DAFTAR ISI
SELAMAT DATANG
DI LAPORAN KEBERLANJUTAN
KALTIM PRIMA COAL YANG KE-12.

WELCOME TO KPC 12TH


ANNUAL SUSTAINABILITY REPORT

CONTENTS
N

W E
IKHTISAR 2014
2014 HIGHLIGHTS S
------------------------------------ 6 MAJU BERSAMA LAPORAN
KESELAMATAN DAN
----- SEMANGAT MEMBARA TATA KELOLA YANG BAIK KESEHATAN KERJA MASYARAKAT GRI G4 CORE CHECK
KARTU LAPORAN 2014 MEMBARA SPIRIT GOOD GOVERNANCE OCCUPATIONAL MOVING FORWARD WITH GRI G4 CORE
2014 REPORT CARD PRACTICE SAFETY AND HEALTH THE COMMUNITIES CHECK STATEMENT
------------------------------------ 8 ------------------------------------
42 50 114 160 224
----- ------ ----------------------------
INDEKS REFERENSI
PENGHARGAAN DAN
SILANG GRI G4 - CORE
PENCAPAIAN
GRI G4 CORE CROSS
ACHIEVEMENTS &
REFERENCE INDEX
ACCOLADES
--------------------------------------
------------------------------------ 12 225
KEMITRAAN YANG ---
-----
PENINGKATAN KINERJA PELESTARIAN LINGKUNGAN BERKELANJUTAN
TENTANG LAPORAN INI INSAN KPC FORMULIR TANGGAPAN
PERFORMANCE ENVIRONMENT SUSTAINABLE
ABOUT THIS REPORT OUR PEOPLE PARTNERSHIP FEEDBACK FORM
IMPROVEMENT PRESERVATION
------------------------------------ 14 64 80 134 202 226
-----

KATA SAMBUTAN DARI


TOP MANAGEMENT KAMI
A VIEW FROM OUR
TOP MANAGEMENT
------------------------------------
28
-----

SEKILAS KPC
KPC AT A GLANCE
32
Ikhtisar 2014
_2014 Highlight

IKHTISAR 2014 2014 HIGHLIGHT

MITRA USAHA KEMASYARAKATAN INSAN KPC KESELAMATAN, LINGKUNGAN KINERJA


OUR PARTNER COMMUNITY OUR PEOPLE KESEHATAN DAN ENVIRONMENT OPERASIONAL
KEAMANAN OPERATIONAL

69,17 HA 4.944 SAFETY, HEALTH


AND SECURITY 1.191
AREA REKLAMASI /
HA
PERFORMANCE
10.832.145 liter
AREA REKLAMASI / KARYAWAN / EMPLOYEES RECLAMATION AREAS PENGHEMATAN BAHAN

84%
RECLAMATION AREAS
BAKAR/ FUEL SAVINGS

655.000 POHON
25 3.709
/ TREES &

6 TOTAL PEMBELIAN KE HA
VEGETATIONS

7
SUPPLIER NASIONAL / LAHAN BUDIDAYA TANAMAN/ KARYAWAN DARI SEKITAR
1.636.078kWh
TOTAL PROCUREMENT
TRANSACTION WITH
SEASONAL CROPS CULTIVATION SANGATTA / EMPLOYEES
FROM SANGATTA AREAS PENGHEMATAN LISTRIK/ 52,69 PRODUKSI BATUBARA/

117
juta ton COAL PRODUCTION


NATIONAL SUPPLIERS ELECTRICITY EFFICIENCY

PEMASOK OLSABARA/
25,83 $728.501.498 ZERO REJECT
BREACH
$1.188
SUPPLIERS OF OLSABARA

0,13
DANA PENGELOLAAN
STORE OUTLET
MILIAR JAM PELATIHAN PER TAHUN/ LINGKUNGAN/
AVERAGE TRAINING HOURS ENVIRONMENTAL

600-800
ANNUALLY INVESTMENT

31
NILAI LTIFR / LTIFR
SUPPLIER LOKAL

51EKOR
PERFORMANCE
80% $3.457
BINAAN/

$122,69 JUTA
WISATAWAN KAWASAN TBA/
REGISTERED
TOURISTS VISITED TELAGA

496
ASSISTED LOCAL
BATU ARANG AREA OLI BEKAS/ billion
SUPPLIERS DANA KESEJAHTERAAN OIL WASTE PENDAPATAN
ORANGUTAN DI AREA
KARYAWAN /EMPLOYEE USAHA/

$2,86
PASCATAMBANG/ (RE-USE)
6 area reklamasi seluas 69,17 WELFARE FUNDS OPERATING
hektar dimanfaatkan KPC menjadi KOORDINATOR ORANGUTAN IN POST
JUTA REVENUES
perkebunan sawit. K3 / OHS MINING AREAS
TOTAL PEMBELIAN/ Pengembangan budidaya tanaman COORDINATORS Penghematan bahan bakar
TOTAL TRANSACTION 4.944 orang karyawan mencapai 10.832.145 liter.
semusim seluas 25 hektar lahan luas area reklamasi mencapai 1.191
52,69 juta ton hasil produksi
109.795
di Sepaso Selatan dengan metode 3.709 orang karyawan KPC direkrut hektar yang telah ditanami lebih dari
System of Rice Intensification (SRI). batu bara
84% dari total nilai dari wilayah Sangatta, Bengalon, 655.000 pepohonan
dan sekitarnya. 53,15 juta ton penjualan
pembelian atau senilai 117 pemasok outlet Olsabara berhasil 1.636.078 KWh adalah jumlah total batu bara
JAM PELATIHAN
dengan USD 1,188 miliar mencapai rata-rata nilai penjualan 25,83 jam rata-rata durasi pelatihan penghematan energi listrik yang
K3 / HOURS OF ZERO Reject, ZERO Breach
adalah pembelian kepada sebesar Rp 75 juta/bulan. per tahun per karyawan dengan berhasil dicapai, dimana jumlah ini
nilai investasi USD 333.830 SHS TRAINING 80% limbah oli bekas
supplier nasional, lokal Jumlah rata-rata wisatawan yang setara dengan mencegah 728.840
digunakan kembali sebagai
Kalimantan Timur dan mengunjungi kawasan eco-tourism USD 122,69 juta total dana KgCO2e emisi karbon campuran bahan peledak
lokal Kutai Timur Telaga Batu Arang mencapai 600-800 kesejahteraan karyawan Nilai dana pengelolaan lingkungan untuk proses blasting
orang per bulan 7 serikat pekerja dengan jumlah Nilai LTIFR pada angka 0,13 mencapai USD 70.501.498 Pendapatan usaha
31 supplier lokal binaan
total nilai pembelian anggota 4.342 orang karyawan per 1 juta jam kerja 51 ekor Orangutan tinggal di area mencapai USD 3,457 billion
mencapai USD 2,86 juta. 496 koordinator K3 pascatambang
6 reclamation areas with a total area Fuel savings reached
of 69.17 hectares were rehabilitated for 109.795 jam pelatihan 10,832,145 liters.
4,944 employees terkait dengan program
84% of total procurement palm oil plantations. Reclamation area of 1,191 hectares 52.69 million tons of
3,709 employees were recruited Keselamatan, kesehatan dan coal production
with value amounted to Seasonal crops cultivation using Rice from Sangatta and Bengalon areas. keamanan which planted with more than 655.000
USD 1.188 billion was Intensification System was developed in trees and vegetations 53.15 million tons of
an area of 25 hectares in South Sepaso. 25.83 hours average duration of coal sales
transaction with national, 1,636,078 KWh is the total of electricity
training per year per employee with ZERO Reject, ZERO Breach
East Kalimantan and East 117 suppliers of Olsabara store outlet a total investment of USD 333,830 LTIFR performance of 0.13 efficiency that equals to preventing
Kutai suppliers reached an average sales revenue of per 1 million working hours 728,840 KgCO2e carbon emissions 80% used oil waste has
Rp 75 million/month. USD 122.69 million of employee been reused as a mixture
31 registered assisted welfare funds 496 OHS coordinators Environmental funding reached USD of explosives for blasting
local suppliers with a total An average of 600-800 tourists per 70,501,498 process
7 labor unions with a total 109,795 hours of training on
procurement value of USD month visited Telaga Batu Arang eco- 51 Orangutans called KPCs post Operating revenues reached
membership of 4,342 employees. Safety, Health and Security.
2.86 million. tourism area. mining areas as their home. USD 3.457 billion

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kartu Laporan 2014
_Report Card of 2014

KARTU LAPORAN 2014 REPORT CARD 2014

STATUS STATUS
PROGRESS PROGRESS
ACHIEVED / ACHIEVED /

2012 2013 2014 2012 2013 2014


KOMITMEN KAMI TUJUAN ON TRACK KOMITMEN KAMI TUJUAN ON TRACK
/ NEEDS / NEEDS
#.# OUR COMMITMENT #.# OBJECTIVES IMPROVEMENT #.# OUR COMMITMENT #.# OBJECTIVES IMPROVEMENT

1 Kinerja Penjualan & 1.1 Peningkatan Penjualan 7 Operasional 7.1 ENERGI:


Optimasi Produksi Sales Increase 40.94 juta ton 53,15 juta ton 52,70 juta ton Achieved Ramah Lingkungan Penghematan bahan
Sales Performance Green Operation bakar (Kilo Liter) 158.917 200.406 235.000 Achieved
& Production 1.2 Peningkatan Kuantitas ENERGY:
Optimization Produksi (siap jual) Fuel saving (Kilo Liter)
Increase in ready-to-sell 41.3 juta ton 49,77 juta ton 52,36 juta ton Achieved
7.3 EMISI:
product quantity
Emisi gas buang di semua
titik dibawah BML
2 Berkontribusi dalam 2.1 Nilai Pembelian Domestik 100% 100% 100% Achieved
Mengembangkan EMISSION:
Domestic Procurement 74% 86% 84% Achieved
Perekonomian All parameters comply
Value with standard quality
Daerah
2.2 Nilai pembelian kepada 7.4 LIMBAH:
Contribution to the
Pemasok Lokal Binaan Penggunaan Pelumas
local economy
Procurement Value for USD 2,94 juta USD 2,46 juta USD 2,86 juta Achieved Bekas untuk bahan
Assisted Local Suppliers pembantu peledakan
42% 43% 80% Achieved
WASTE:
3 Dukungan dan 3.1 Contract Performance Reusing used-oil waste as
62% <50% 80,02% On Track
Komunikasi dengan Evaluation (CPE) explosive material mixture
Kontraktor &
3.2 Supplier Communication
Supplier
Meeting Direncanakan 7.5 Pencapaian kategori
Contractor/Supplier PROPER Propinsi Emas Emas Hijau
pelaksanaan tahun 2014 1 kali pada bulan On Track
Support and 1 kali pada bulan April Achieved Gold Gold Green
September 2014 Regional PROPER
Communication Planned for 2014
7.6 Pencapaian kategori
PROPER Nasional Hijau Hijau Hijau
5 Manajemen 5.1 Nol insiden terkait On Track
Pemukiman Kembali relokasi warga National PROPER Green Green Green
Management Zero incident regarding 0 0 0 Achieved
of resettlement resettlement activities
8 Pengembangan 8.3 Pelaksanaan training
activities Sumber Daya per karyawan
Manusia (per tahun)
6 Pengelolaan Lahan 6.1 Luas area reklamasi 35.9 43.4 25,83 Achieved
Pascatambang Human Resources
Total reclamation area Empowerment Employee training hours
Post-mining Area 883.33 5377.2 5740 Achieved (per year)
Management 8.4 Karyawan yang menerima
evaluasi kompetensi tepat
6.2 Memastikan relokasi waktu 100% 100% 100% Achieved
orang utan yang terkena
dampak penambangan Prompt competencies
100% 100% 100% Achieved evaluation for employees
Orangutan relocation from
affected areas 8.5 Penurunan turn-over
karyawan yang bukan
6.3 Rehabilitasi karena pensiun Needs
Keanekaragaman Hayati 1.95% 1.98% 3.58%
Minimizing non-pension Improvement
1.3 1.3 1.24 On Track
Habitat and Biodiversity employee turnover ratio
Rehabilitation

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kartu Laporan 2014
_Report Card of 2014

STATUS STATUS
PROGRESS PROGRESS
ACHIEVED / ACHIEVED /

#.#
KOMITMEN KAMI
OUR COMMITMENT #.#
TUJUAN
OBJECTIVES
2012 2013 2014
ON TRACK
/ NEEDS
IMPROVEMENT #.#
KOMITMEN KAMI
OUR COMMITMENT #.#
TUJUAN
OBJECTIVES
2012 2013 2014 ON TRACK
/ NEEDS
IMPROVEMENT

9 Manajemen K3 9.1 Mempertahankan 10.5


Yang Efektif Sertifikasi OHSAS 18001 Jumlah program
kemitraan dalam
Effective OHSAS 18001 certified 100% 100% 100% Achieved bidang sosial baik
Occupational
Health & Safety dengan pemerintah 529%
Management atau pihak ketiga lainnya
(kali per tahun) 100% (90 programs) 594% (101 program) Achieved
10 Sosial 10.1 Pertemuan dengan Tiap 3 bulan, Tiap 3 bulan, Tiap 3 bulan,
Masyarakat pemangku kepentingan / minimal 1 kali minimal 1 kali minimal 1 kali Number of sosial
Social tokoh masyarakat Achieved related programs with
Once every Once every Once every
Community 3 months 3 months 3 months government or other
Engaging with local
community leaders related third party

10.2 Pertemuan dengan 10.6 Jumlah program


pemerintah daerah kemitraan dalam
untuk penyusunan bidang lingkungan baik
dan penyelerasan Minimal Minimal Minimal
program pemberdayaan dengan pemerintah atau
1 tahun 1 tahun 1 tahun 220%
masyarakat minimal 1 pihak ketiga lainnya
dua kali dua kali dua kali
tahun 2 kali (kali per tahun) 100% (11 program) 200% (10 program) Achieved
Achieved
Twice, Twice, Twice,
Engagement with local annually annually annually Number of environment
authorities regarding related programs with
local community
empowerment program government or other
planning and adjustment related third party
for at least twice per year
10.7 Realisasi anggaran
10.3 Pendampingan community development
Pembuatan Rencana per tahun sesuai
Kerja Pembangunan Tiap desa di lingkar Tiap desa di lingkar Tiap desa di lingkar komitmen 110.40% 94.60% 100,52% ACHIEVED
Desa (Tahunan) yang tambang didampingi tambang didampingi tambang didampingi
melibatkan Stakeholder Community
pada desa lingkar Development Fund
tambang sebanyak 1 Achieved
All villages were All villages were All villages were Disbursement
tahun, satu kali per desa
assisted assisted assisted
Assistance in developing 11 Penerapan 11.2 Sanksi moneter
Village Development Praktik Terbaik & dan non-moneter
Plan for once per year Kepatuhan yang diterima KPC
for each village Best Practice & oleh karena terbukti
Compliance melakukan pelanggaran
terhadap peraturan,
hukum dan perundang- 0 0 0 Achieved
undangan yang berlaku
Monetary and non-
monetary sanction due
to law and regulation
violation

11.3 Zero Breach, Zero Reject 100% 100% 100% Achieved

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Penghargaan dan Pencapaian 2014
_Awards and Achievements 2014

PENGHARGAAN
DAN PENCAPAIAN
2014 AWARDS AND
ACHIEVEMENTS 2014 SOSIAL Penghargaan Energi Nasional (PEEN) 2014 Penghargaan Gold untuk Program
kategori Manajemen Energi Di Industri dan Senyum dan Harapan dalam
SOCIAL Bangunan untuk Fuel Efficiency Project PART Indonesian CSR Award 2014
4 sebagai bagian dari implementasi budaya
LINGKUNGAN KESELAMATAN, KESEHATAN, Penghargaan Citra Abdi Kesehatan dari
kerja yang kompetitif dalam meningkatkan
Gold Award for Smile and
Hope Program in Indonesia
DAN KEAMANAN KERJA Gubernur Propinsi Kalimantan Timur kepada
ENVIRONMENT KPC sebagai Perusahaan Peduli Kesehatan sikap operator dan supervisor dalam CSR Award 2014
mendukung gerakan konservasi energi di KPC
OCCUPATIONAL SAFETY, HEALTH,
12 Peringkat Hijau Program Penilaian Peringkat Kinerja
Perusahaan (PROPER) dalam Pengelolaan Lingkungan AND SECURITY
Citra Abdi Kesehatan Award in the
framework of Health Caring Company from National Energy Award 2014 for category
Penghargaan Gold untuk Program
Pembangunan Rumah Sakit 13
Energy Management in Industry and
Hidup, diberikan oleh Gubernur Kalimantan Timur the Governor of East Kalimantan to KPC Umum Daerah Sangatta dalam
Kecelakan Nihil, diberikan oleh Bupati Kutai Timur Buildings for Fuel Efficiency Program
Green PROPER Ranking for Company Performance Indonesian CSR Award 2014
Zero Accident, awarded by Head of Kutai Timur Regency Penghargaan Tiga Terbaik Program PART 4 as a part of competitive working
Assessment Rating in Environment Management, Kemasyarakatan untuk Program Desa culture program implementation which Gold Award for Sangatta
awarded by Governor of East Kalimantan Kecelakaan Nihil, diberikan oleh Menteri Tenaga Mandiri dalam Annual Global CSR Summit and aims to improve operators and supervisors Regional General Hospital
Kerja dan Transmigrasi Award ke-6 - 2014 (3 April 2014) working attitude in order to support energy Development Program in
Indonesia Green Awards 2014 Untuk Kategori
Zero Accident, awarded by State Minister for Third Best Community Program Award for Desa conservation effort in KPC Indonesian CSR Award 2014
Mengembangkan dan Menggunakan Energi Baru
Terbarukan, diberikan oleh The La Tofi School Of CSR Manpower And Transmigration Mandiri Program in 6th Annual Global CSR Penghargaan Silver untuk Program
Penghargaan Platinum untuk Program
Kecelakan Nihil, diberikan oleh Gubernur Kalimantan Timur Summit and Awards 2014 (April 3rd, 2014) Konservasi Energi Dalam Rangka Mitigasi Pemanfaatan Lahan Pascatambang untuk
Indonesia Green Award 2014 in Developing and
Implementation of New and Renewable Energy Category, Perubahan Iklim dalam Indonesian CSR Wisata Alam dan Peternakan Sapi dalam
Zero Accident, given by Governor of East Kalimantan Perusahaan Baik dalam Program
awarded by The La Tofi School of CSR Award 2014 Indonesian CSR Award 2014
BUMDes (Badan Usaha Milik Desa) dalam
Perusahaan Dengan Kepesertaan Program BPJS Terbanyak, Indonesia Social Responsibility Award Platinum Award for Energy Conservation Silver Award for Post Mining Land
Indonesia Green Awards 2014 untuk Kategori diberikan oleh Gubernur Kalimantan Timur Utilization for Eco Tourism and Cattle
2014 LaThoffi School of CSR Program in the framework for Climate
Mengembangkan Keanekaragaman Hayati oleh Breeding Facility in Indonesian CSR
Company with The Most Membership in the BPJS (Badan A Good Company Award for BUMDes Change Mitigation Effort in Indonesia CSR
The La Tofi School Of CSR.
Penyelenggara Jaminan Sosial Social Security Agency) (Badan Usaha Milik Desa Village Award 2014 Award 2014
Indonesia Green Award 2014 in Developing Biodiversity Program, awarded by Governor of East Kalimantan Owned Enterprises) Program in Social Penghargaan Platinum untuk Program Penghargaan Silver untuk Program
Category, awarded by The La Tofi School of CSR.
Perhargaan Program Pencegahan dan Penanggulangan Responsibility Award 2014 LaTofi Pengembangan Batik Lokal Wakaroros Meretas Warna Meraih Asa dalam
Penghargaan Aditama Pengelolahan Lingkungan (P2-HIV & AIDS) di Tempat Kerja, diberikan oleh School of CSR dalam Indonesian CSR Award 2014 Indonesian CSR Award 2014
Pertambangan, diberikan oleh Menteri Energi Gubernur Kalimantan Timur Silver Award for Meretas Warna
Indonesia Green Award 2014 untuk Platinum Award for the Development of
Dan Sumber Daya Mineral Meraih Asa (Breaking Through
Award of HIV & AIDS Prevention Program (P2-HIV &AIDS) kategori: Penyelamatan Sumber Daya Local Wakaroros Batik Heritage
Aditama Award in Mining Environment Management, In Work Place, awarded By Governor of East Kalimantan Air, Mengembangkan dan Menggunakan Conservation Program in Indonesia CSR Colors Reaching Hope) Program in
awarded by The Ministry of Energy and Mineral Resources. Energi Baru dan Terbarukan, Melindungi Award 2014 Indonesian CSR Award 2014
Penghargaan Utama dalam Pengelolaan Keselamatan Keanekaragaman Hayati, dan
10 Tahun Sertifikasi Atas Dediksasi dan Komitmen Pertambangan Mineral dan Batubara, diberikan Penghargaan Platinum untuk Program Penghargaan Silver untuk Program
Mengembangkan Pengolahan
untuk Sistem Manajemen Lingkungan, diberikan oleh Menteri Energi Dan Sumber Daya Mineral Penguatan Badan Usaha Milik Desa Pelatihan Pra Purna Bhakti bagi
Sampah Terpadu.
oleh PT SGS Indonesia (BUMDes) dalam rangka Mengelola Usaha Karyawan KPC yang akan menjalani
First Award in Safety Management of Mineral and Indonesia Green Award 2014
Award Charter for 10 Years of Dedication and Coal Mining, awarded by State Minister of Energy Pelayanan Listrik Desa di Kecamatan Rantau Masa Persiapan Pensiun dalam
for category: Water Resources Pulung, Kutai Timur dalam Indonesian CSR Indonesian CSR Award 2014
Commitment Towards Environmental Management and Mineral Resource Conservation, Development and Award 2014
System Implementation, awarded by PT SGS Indonesia Silver Award for Pre Pension Training
Predikat Platinum Program Pencegahan dan implementation of New and Renewable
Platinum Award for Village Owned Program for KPC Employees in
Perhargaan Platinum Program Pengelolahan Lingkungan, Penanggulangan HIV & AIDS, diberikan oleh Energy, Protecting Biodiversity, and
Enterprises (BUMDes) Strengthening Indonesian CSR Award 2014
diberikan oleh Menteri Koordinator Bidang Pembangunan Menteri Tenaga Kerja dan Transmigrasi Development of Integrated Waste
Program in the framework of Electricity
Manusia dan Kebudayaan Management. Best Sustainability Report 2013
Platinum Predicate Award in HIV & AIDS Prevention Provision Services Management in Rantau
Platinum Award in Environment Management Program, Program, awarded by State Minister for Manpower and Kategori Mining dan Metal dalam
Penghargaan dari Bupati Kutai Timur atas Pulung District, East Kutai in Indonesia CSR
awarded by The Coordinating Ministry of Human Sustainability Reporting Award 2014
Transmigration Partisipasi dalam Program Pembangunan Award 2014
Development and Culture Rumah Layak Huni Best Sustainability Report 2013
Penghargaan Individu Pemeduli Haryadi Wardono dalam Penghargaan Gold untuk Program Rumah Category Mining and Metal in
Peringkat Hijau Program Penilaian Peringkat Kinerja Program Pencegahan Dan Penanggulangan HIV & AIDS, Award from the Head of East Kutai Kemas Olsabara dalam Indonesian CSR Sustainability Reporting Award 2014
Perusahaan (PROPER) 2013-2014, diberikan oleh Menteri diberikan oleh Menteri Tenaga Kerja dan Transmigrasi Regency for Participation in Habitable House Award 2014
Lingkungan Hidup dan Kehutanan Provision Program
Individual Award - Haryadi Wardono in HIV & AIDS Gold Award for Olsabara Packaging House
Green PROPER Ranking for Company Performance Prevention Program, awarded by State Minister for Program in Indonesia CSR Award 2014
Assessment Rating in Environment Management 2013-2014, Manpower and Transmigration
awarded by The Ministry of Environment and Forestry

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report

KPC berkomitmen untuk berperan dalam pemenuhan kebutuhan dunia akan energi

TENTANG
dengan cara yang bertanggung jawab. Ini berarti kami senantiasa berupaya untuk
menciptakan lingkungan kerja yang aman, meminimalisasi potensi dampak lingkungan dan
sosial dari aktivitas yang kami lakukan, serta memastikan setiap pemangku kepentingan,

LAPORAN INI
terutama masyarakat sekitar tambang dapat memperoleh manfaat positif dari operasional
KPC. Laporan ini merupakan perwujudan dari komitmen dan tanggung jawab kami kepada
seluruh pemangku kepentingan, serta partisipasi aktif KPC sebagai bagian dari upaya
global untuk menciptakan dunia yang lebih baik bagi generasi yang akan datang.

ABOUT THIS REPORT


KPC commits to participate in the effort of meeting the worlds energy demand in
responsible ways. We operate safely, reduce our impact on the environment and ensure that
all stakeholders, especially the local communities, can receive positive benefits from KPCs
operational activities.This report reflects our commitment and responsibility to all of our
stakeholder, as well as represents our active participation in the global effort to create a
14 better world for future generation.
15

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report

KPC menerbitkan Laporan Keberlanjutan sejak Since 2003, KPC has been publishing our Kami tidak melaksanakan verifikasi eksternal untuk This year we postponed external assurance for this
tahun 2003 satu tahun sekali. Tahun ini adalah Annual Sustainability Report through which laporan keberlanjutan tahun ini atas pertimbangan report due to efficiency considerations. However
tahun ke-12 dari Laporan Keberlanjutan KPC yang KPC transparently reports information related efisiensi. Namun, sebelum diterbitkan seluruh data prior to publication of this report, all data and
melaporkan secara terbuka setiap informasi yang to our corporate sustainability strategy dan informasi dalam laporan keberlanjutan ini telah information has been thoroughly reviewed and
berkaitan dengan strategi dan kinerja keberlanjutan dan performances. This reportis our 12th melalui proses tinjauan dan verifikasi internal yang verified by KPCs internal team of contributors
Perusahaan dan merupakan kelanjutan laporan Sustainability Report, providing a continuity from dilaksanakan oleh tim kontributor bersama-sama together with personnel in each department. In
keberlanjutan KPC pada periode sebelumnya yang previous sustainability report that was published dengan personel di masing-masing departemen addition to internal verification, the National Center
telah diterbitkan pada bulan Oktober 2014 [G4-29] in October 2014. [G4-29] di KPC. Selain verifikasi internal, laporan ini telah for Sustainability Reporting (NCSR) Indonesia
melalui proses verifikasi aplikasi GRI G4-CORE yang conducted a GRI G4-CORE application verification
Mengacu pada panduan pelaporan Global Reporting Using Global Reporting Initiatives GRI G4-CORE
dilaksanakan oleh National Center for Sustainability process for this report. [G4-33]
Inititives GRI G4-CORE, kami mencantumkan semua as our reporting guidelines, we have included
Reporting (NCSR) Indonesia.[G4-33]
kegiatan, aktivitas dan wilayah pernambangan yang related information on operation, activities and
material bagi pemangku kepentingan. site areas that are material to our stakeholder.
PEMBACA AUDIENCE
PRINSIP PELAPORAN REPORTING PRINCIPLES Laporan keberlanjutan kami tahun 2014 fokus pada Our Sustainability Report 2014 focuses on the
tantangan dan subjek keberlanjutan yang penting bagi sustainability challenges and subjects that matter
Sebagaimana laporan keberlanjutan periode-periode Similar to our previous reports, KPC holds
pemangku kepentingan yang tertarik pada aktivitas most to our stakeholders who have an interest
sebelumnya, KPC tetap menjunjung tinggi prinsip tothe principles of Accuracy, Completeness and
kami. Dengan laporan ini, kami berusaha untuk in our activities. With this report, we seek to be
Ketepatan, Kelengkapan, serta Reliabilitas dalam Realibility in developing this report.
bertanggung jawab kepada masyarakat atas kegiatan accountable to society for our actions, results
penyusunan laporan ini.
kami, hasil dan komitmen kami dalam aspek ekonomi, and commitments in the economic, social and
16 STANDAR PELAPORAN REPORTING STANDARD
sosial dan lingkungan pada tahun 2014. Para pembaca
dapat memperoleh informasi lebih lanjut mengenai
environmental aspects for 2014. Readers may
download the detailed information regarding our 17
Laporan Keberlanjutan tahun 2014 KPC disusun KPCs 12th Annual Sustainability Reportis developed seluruh komitmen kami pada KPC Report Card dan bab commitment in KPC Report Card and SEMANGAT
mengacu pada panduan pelaporan Global according to the Global Reporting Initiative (GRI) SEMANGAT MEMBARA dalam laporan ini. MEMBARA chapter in this report.
Reporting Initiatives GRI G4-CORE yang turut guidelines, specifically adopting GRI G4-CORE,
dilengkapi dengan indikator tambahan dari Mining with the presentation of indicators from the Mining STRUKTUR PELAPORAN REPORT STRUCTURE
and Metals Sector Supplement. Untuk memudahkan and Metals Sector Supplement. To help readers in
Tidak ada perubahan signifikan terkait struktur There were no significant changes in the structure
para pembaca menemukan informasi spesifik finding specific information about GRI indicators
pelaporan. Struktur pelaporan tahun ini tetap mengikuti of the report, compared to the previous year. This
terkait indikator-indikator GRI tertentu, indeks discussed in this report, a GRI G4-CORE cross
struktur pelaporan tahun sebelumnya, yakni mengikuti report consistently follows KPC Sustainable Business
referensi GRI G4-CORE dapat ditemukan pada reference index can be found on page 227 of
KPC Sustainable Business Principles yang terdiri dari: Principles which comprises of:
halaman 227. Selain itu, indeks ini juga kami this report. Additionally, this index is completed
lengkapi dengan referensi silang dengan standar with cross-reference with other international SEMANGAT MEMBARA SEMANGAT MEMBARA
keberlanjutan internasional lain, yaitu United sustainability standards, namely: United Nation
Nation Global Compact (UNCG) dan Corporate Social Global Compact (UNCG) and Corporate Social Tata Kelola Perusahaan yang Baik Good Corporate Governance
Responsibility Guildelines ISO 26000. [G4-32] Responsibility Guildelines ISO 26000. [G4-32]
Peningkatan Kinerja Performance Improvement
PERIODE PELAPORAN REPORTING PERIOD Pelestarian Lingkungan Environmental Preservation
Laporan keberlanjutan KPC diterbitkan setiap KPCs sustainability report is published annually. Keselamatan dan Kesehatan Kerja Occupational Safety and Health
tahun. Laporan ini berisi kinerja kami pada periode This particular reportcovers our performance
1 Januari 2014 sampai dengan 31 Desember 2014. period from January 1st, 2014 to December 31st,
Insan KPC Our People
Untuk memudahkan komparabilitas data dan melihat 2014. In order to enhance data comparability and Maju Bersama Masyarakat Moving Forward with the Communities
progress KPC dalam pencapaian target keberlanjutan to monitor progress towards our sustainability
kami, dalam laporan ini turut dicantumkan data targets, we present comparative data from Kemitraan yang Berkelanjutan Sustainable Partnership
historis dari 2 tahun terkahir untuk beberapa 2 consecutive years, especially for selected Kami juga tidak merubah prinsip pencatatan akuntansi There were also no significant changes regarding
indikator, khususnya indikator dengan data-data quantitative performance indicators. sepanjang periode pelaporan. Tanpa adanya perubahan- the Companys accounting principles throughout
kuantitatif. [G4-28][G4-30] [G4-28][G4-30] perubahan tersebut, tidak terdapat penyataan the reporting period. As there were no significant
ulang informasi dari laporan keberlanjutan periode changes, there were no restatement of information
MEMASTIKAN KREDIBILITAS LAPORAN ENSURING REPORT CREDIBILITY sebelumnya. [G4-22][G4-23] from the previous report. [G4-22][G4-23]
Laporan Keberlanjutan 2014 ini telah melalui This 2014 Sustainability Report has been
proses verifikasi internal dan eksternal. Tinjauan internally and externally verified. Internal review STANDAR PENGUKURAN DATA DATA MEASUREMENT STANDARD
dan verifikasi internal dilaksanakan oleh 49 orang and verification are conducted by 49 contributors Kami menggunakan metode pengukuran data yang Our method of data measurement is relevant to the
kontributor dari setiap divisi terkait, dimana 22 orang from various divisions in KPC. Out of all of relevan dengan masing-masing bidang yang dilaporkan related reporting aspects and principles, which are
dari kontributor tersebut telah memiliki sertifikasi these contributors, 22 of them are Certified dan sesuai dengan kaidah yang relevan, antara lain: including:
CSRS (Certified Sustainability Reporting Specialist), Sustainability Reporting Specialist (CSRS)
dan 4 diantaranya memiliki sertifikasi CSRA (Certified and 4 contributors are Certified Sustainability Pengukuran data lingkungan sesuai dengan Measurement of environmental data according
Sustainability Reporting Assuror). Tim ini diharapkan Reporting Assuror (CSRA). This team of ketentuan Kementrian Lingkungan Hidup dan to provisions of the Ministry of Environment
dapat mengawal reliabilitas dan kredibilitas dari contributors is expected to ensure the reability mengacu pada dokumen AMDAL and reference to EIA document,
data serta informasi yang kami sajikan di laporan and credibility of this sustainability report.
keberlanjutan ini.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report

Pengukuran kinerja keselamatan dan Measurement of occupational safety Empat tahapan proses yang telah dilaksanakan sesuai The four stages to defining report content and
kesehatan kerja yang mengacu pada and health performance, which refers to dengan GRI G4 dalam menentukan materialitas dan isi deciding their materiality as required by the GRI
ketentuan Kementerian Ketenagakerjaan dan provisions of the Ministry of Labour and laporan adalah: [G4-18] G4 are: [G4-18]
Standar Internasional OHSAS 18001, international OHSAS 18001 standard, STAGE 1
TAHAP 1
International Financial Reporting Standard International Financial Reporting Standard Mengidentifikasi aspek-aspek keberlanjutan Identifying relevant sustainability aspects
(IFRS) untuk pelaporan keuangan, serta (IFRS) for financial reporting, and yang relevan dan batasan dari setiap aspek, and aspect boundaries,
Konversi emisi karbon yang mengacu pada Conversion of carbon emissions according STAGE 2
TAHAP 2
standar konversi CarbonTrust UK. to CarbonTrust UK conversion factors. Prioritizing sustainability aspects and
Memprioritaskan aspek-aspek dan isu-isu
keberlanjutan untuk menentukan materialitas issues to determine materiality of every
CAKUPAN DAN BATASAN LAPORAN SCOPE AND BOUNDARY setiap aspek, information,
Laporan keberlanjutan kami tahun 2014 fokus pada Our 2014 Sustainability Report focuses on TAHAP 3 STAGE 3
tantangan dan subjek keberlanjutan yang penting bagi sustainability challenges and subjects that Melakukan validasi setiap aspek yang material, dan Validating every material aspect, and
pemangku kepentingan yang tertarik pada aktivitas matter most to our stakeholders, who have
kami. Dengan laporan ini, kami berusaha untuk vested interests in our activities. By publishing TAHAP 4 STAGE 4
this report, we are being accountable to the Mengkaji laporan yang terdahulu. Reviewing the previous report.
bertanggung jawab kepada masyarakat atas kegiatan,
pencapaian, tantangan dan komitmen kami dalam people for any actions, results, challenges
aspek ekonomi, sosial dan lingkungan sepanjang and commitments in the economic, social and
tahun 2014. environmental aspects performed during 2014.
KONTEKS
18 Kami telah mencantumkan informasi kualitatif dan We have included qualitative and quantitative
information from Sangatta and Bengalon, East
KEBERLANJUTAN
Sustainability Context 19
kuantitatif dari operasional KPC di Sangatta dan
Bengalon, Kalimantan Timur, juga kantor perwakilan Kalimantan, as well as our representative offices
kami di Jakarta, Samarinda dan Balikpapan. [G4-17] in Jakarta, Samarinda and Balikpapan. [G4-17]
Semua informasi keuangan yang terdapat pada All of financial information in this report is stated
laporan ini dinyatakan dalam Dollar Amerika Serikat in United States Dollar (USD), unless mentioned Tahap 1 / Stage 1
MATERIALITAS
(USD), kecuali dinyatakan lain. differently in the report. IDENTIFIKASI Materiality
Identification
Dalam laporan tahun ini kami juga menyertakan This report includes information on our engagement
informasi pelibatan dan interaksi serta kinerja para and interaction with, as well asperformance of, Tahap 4 / Stage 4 Tahap 2 / Stage 2
kontraktor dan supplier KPC.Namun, data-data contractors and suppliers. However, the data are KAJIAN PRIORITAS
tersebut terbatas pada aktivitas para mitra usaha limited on those partners located in the neighboring PELIBATAN Review Prioritization
di wilayah operasional penambangan KPC yang area of our mining site. The information are PEMANGKU
mencakup: [G4-17] including: [G4-17] KEPENTINGAN
Stakeholder Engagement Tahap 3/ Stage 3
Data produksi Production information VALIDASI
Data kinerja lingkungan Environmental performance information Validation

Data kinerja keselamatan dan kesehatan Occupational safety and health


kerja performance LENGKAP
Completeness
Praktik pengamanan (security) Security practice
Praktik ketenagakerjaan Employment practice
Penerapan prinsip-prinsip hak asasi manusia Implementation of human rights principles

PENGUNGKAPAN PENDEKATAN MANAJEMEN DISCLOSURE OF MANAGEMENT APPROACHES MASUKAN UNTUK PERBAIKAN FEEDBACK FOR FUTURE IMPROVEMENTS

Berdasarkan Panduan GRI G4, pengungkapan Based on Guide GRI G4, management approach KPC berkomitmen dalam meningkatkan kualitas KPC is committed to improving the quality of
pendekatan manajemen untuk setiap aspek yang disclosure in every material aspect is categorized laporan keberlanjutan kami. Kami menyambut our Sustainability Report. We welcome your
diidentifikasi sebagai aspek material dikategorikan and discussed in the relevant chapters or komentar, ide dan umpan balik dari para pembaca. comments, thoughts and remarks. If you
dan dibahas pada bab-bab atau bagian-bagian yang sections of this report. Silahkan menyampaikan komentar dan mengirimkan wish to comment and submit your feedback
relevan dalam laporan ini. kritik atau ide-ide untuk perbaikan laporan kami or ideas on how we can improve, please send
yang akan datang kepada: [G4-31] them to: [G4-31]
PROSES MENENTUKAN ISI LAPORAN PROCESS OF DEFINING REPORT CONTENT
Penetapan informasi dalam laporan ini disusun Information on this report is defined based
berdasarkan asas materialitas yang mempengaruhi on the principle of materiality that influences
stakeholders in decision-making and according to DIVISI EXTERNAL AFFAIRS & SUSTAINABLE DEVELOPMENT
pengambilan keputusan pemangku kepentingan dan
yang memiliki dampak penting dalam kinerja ekonomi, important impacts they have on economic, social PT. Kaltim Prima Coal, M2 Building, Mine Site
sosial dan lingkungan. [G4-18] and environmental performance. [G4-18] Sangatta, Kutai Timur, Kalimantan Timur - Indonesia
Telp. 62 549 52 1155 Fax. 62 549 52 1701

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report

SIAPA PEMANGKU KEPENTINGAN KAMI WHO ARE OUR STAKEHOLDERS

MELIBATKAN
Pada tingkat operasional, kami mengidentifikasi, At the operational level, we identify, prioritize
memprioritaskan dan terlibat langsung dengan and directly engage stakeholder groups that
kelompok pemangku kepentingan yang memiliki have potential impacts on our operation,

PEMANGKU
potensi untuk mempengaruhi kegiatan operasional, sustainability or financial performance. In
keberlanjutan atau kinerja keuangan kami. Dalam determining our key stakeholders, we also take
menentukan pemangku kepentingan utama kami, into consideration other aspects, namely their

KEPENTINGAN
kami juga mempertimbangkan aspek-aspek lain, involvement, influence, close-relationship and
yaitu keterlibatan, pengaruh, kedekatan, dan dependency on our business and operations.
ketergantungan pada bisnis dan operasi kami. Para Our stakeholders are including: employees,
pemangku kepentingan KPC meliputi karyawan, shareholders, business partners, government,
pemegang saham, mitra bisnis, pemerintah, LSM NGOs, academics, media, trade associations,
STAKEHOLDER ENGAGEMENT dan akademisi, media, asosiasi perdagangan, consumers and communities.
[G4-24]
konsumen dan masyarakat. [G4-24]

HOW WE ENGAGE

T O
METODE PELIBATAN PEMANGKU KEPENTINGAN
ujuan utama kami adalah untuk membangun ur primary objective as an organization
dan menjalankan tambang yang menguntungkan is to build and operate profitable mines Ketertarikan dan kepentingan bervariasi bagi Specific interests and concerns vary by
dengan cara yang konsisten dengan prinsip in a manner that is consistent with our masing-masing kelompok pemangku kepentingan, stakeholder groups, our approach to
pembangunan yang berkelanjutan sehingga sustainable development principles pendekatan kami dalam melibatkan kelompok engaging with our main stakeholder groups
kami dapat memastikan nilai yang positif bagi in order that we can create positive pemangku kepentingan utama kami untuk lebih to better understand their interests and
memahami kepentingan dan keprihatinan mereka concerns is consistent as illustrated in the
20 pemangku kepentingan kami. Kami menyadari bahwa
pemangku kepentingan memiliki minat lebih terhadap
valuesfor our stakeholders.We realize that
our stakeholders have growing interests in konsisten secara global seperti yang diilustrasikan following table. We are committed to ongoing
21
pendekatan dan kinerja kami dalam mengelola aspek- our approach and performance in managing pada tabel berikut. Kami berkomitmen untuk dialog and honest dialogue; transparent, timely
aspek sosial, lingkungan dan ekonomi dari usaha kami. the social, environmental and economic yang berkelanjutan dan jujur; transparan, tepat and fact-based communications; and the
Kegiatan KPC mendorong perubahan transisional dan aspects of our business. KPCs activities drive waktu dan berdasarkan fakta komunikasi; dan consideration of stakeholder views in our
perubahan ini melibatkan risiko yang lebih rendah jika transformational change; and these changes pertimbangan pandangan pemangku kepentingan decision making.[G4-26] [G4-26]
arah bisnis dan operasional kami dapat diintegrasikan involve less risk when they can be integrated dalam pengambilan keputusan kami. [G4-26]
dengan harapan dari pemangku kepentingan. [G4-25] with stakeholders expectations.
Keterlibatan pemangku kepentingan yang proaktif Proactive stakeholder engagement plays a
memainkan peranan penting dalam membantu kami vital role in helping us maintain sustainable KELOMPOK PEMANGKU
TOPIK UTAMA YANG PENDEKATAN
menjaga pembentukan nilai-nilai keberlanjutan dan value creation and identify material issues. MENJADI PERHATIAN PELIBATAN
KEPENTINGAN
mengindentifikasi isu-isu yang meterial. Mendapatkan As gaining support from our stakeholders is KEY TOPICS AND AREAS OUR APPROACH
STAKEHOLDER GROUP
OF INTEREST TO ENGAGEMENT
dukungan dari pemangku kepentingan kami crucial for our success,KPC always strives to [G4-24]
merupakan hal yang penting bagi kesuksesan kami. understand the expectations of stakeholders [G4-27] [G4-26]
KPC selalu berusaha untuk memahami harapan dari who have vested interests in our operation. Kualitas produk Audit implementasi
para pemangku kepentingan yang memiliki dampak PELANGGAN Ketepatan pengantaran prinsip sustainability
pada dan terdampak oleh kegiatan kami. [G4-25] Interaksi rutin dengan
CUSTOMERS Kepatuhan terhadap peraturan
Departemen Marketing
Semua aktivitas yang melibatkan para pemangku All of our stakeholder engagement activities Tanggungjawab produk Survei kepuasan pelanggan
kepentingan diinformasikan sesuai dengan prinsip- are presented according to the principles of:
Program-program keberlanjutan Kunjungan ke area
prinsip berikut:
tambang (mining tour)
INKLUSIVITAS INCLUSIVITY Lembar informasi kualitas produk
We consider our stakeholders as Quality products
Kami menilai bahwa pemangku kepentingan dan cadangan batubara
adalah mereka yang memiliki ketertarikan those who have a direct interest in our Delivery commitments Survei terkait kinerja keberlanjutan perusahaan
langsung terhadap usaha kami dan mereka business and those who are impacted Regulatory compliance Website perusahaan
yang mengalami dampak dari usaha dan by our business and operation. Product stewardship
kegiatan operasional kami.
Sustainability programs Site-level sustainability audits
MATERIALITAS MATERIALITY or data requests
The stakeholder engagement process Daily interactions with our
Proses pelibatan pemangku kepentingan
Marketing Department
membantu kami dalam mengidentifikasi dan helps us to identify and manage current
mengelola isu-isu yang sedang terjadi dan Customer satisfaction surveys
and emerging issues.
yang akan muncul. Mining tours
Deposit quality and product
RESPONSIVENESS RESPONSIVENESS information sheets
Kami terus memantau perubahan lingkungan We continually monitor changes in Supply chain sustainability surveys
dimana kami beroperasi untuk memastikan the environment where we operate to Website
bahwa kepentingan para pemangku ensure that stakeholder concerns are
kepentingan ditangkap dan dikelola secara recognizedand managed on a
terus menerus. continuous basis.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report

TOPIK UTAMA YANG PENDEKATAN TOPIK UTAMA YANG PENDEKATAN


KELOMPOK PEMANGKU KELOMPOK PEMANGKU
MENJADI PERHATIAN PELIBATAN MENJADI PERHATIAN PELIBATAN
KEPENTINGAN KEPENTINGAN
KEY TOPICS AND AREAS OUR APPROACH KEY TOPICS AND AREAS OUR APPROACH
STAKEHOLDER GROUP STAKEHOLDER GROUP
OF INTEREST TO ENGAGEMENT OF INTEREST TO ENGAGEMENT
[G4-24] [G4-24]
[G4-27] [G4-26] [G4-27] [G4-26]

Keselamatan dan kesehatan kerja Program-program K3 Laporan kinerja operasional Sesi rapat dan komunikasi personal
KARYAWAN Perubahan operasional Pemberitahuan/pengumuman berita terkait SUPPLIER & dan finansial Forum diskusi dengan para pemasok
operasional perusahaan secara rutin dan KONTRAKTOR Lingkungan kerja yang Kemitraan dengan pemasok lokal
EMPLOYEES Manajemen Sumber Daya Manusia tepat waktu aman dan sehat Kemitraan dalam berbagai
Kesetaraan dan kesejahteraan Komunikasi dua arah dengan supervisor SUPPLIERS AND Syarat dan prakondisi program sosial
Pelatihan dan pengembangan karir dan manajemen CONTRACTORS kontrak kerjasama Melibatkan pemasok dalam
Surat langsung Peluang bisnis / kemitraan program K3 dan proyek
Health and safety Employee Engagement Survey Praktik usaha yang
Intranet perusahaan bertanggung jawab
Operational change Meetings and personal communications,
Berbagai komunikasi dan forum diskusi Inovasi
Workforce management Supplier conferences,
dengan manajemen dan serikat pekerja Efisiensi operasional
Equal opportunity and welfare Local content partnerships,
Kemitraan yang berkelanjutan
Social responsibility partnerships,
Training and career development Health and safety programs and initiatives
Participation in contractor safety and health
Timely site-level dissemination of Financial and operating performance program and continuous improvement initiatives
Company news and events
22 Two-way communications with
Safe and healthy work environment
Contract terms and conditions 23
supervisors and management
Business opportunities
Direct home mailings
Responsible business practices
Employee Engagement Survey
Innovation
Company intranet
Operating efficiencies
Various communication and discussion
forums with management and labor union Strong partnerships

Akses pada sumber daya alam Interaksi dengan manajemen perusahaan Kemitraan formal
MASYARAKAT Pembangunan ekonomi Berbagai riset dan studi
PEMERINTAH Perlindungan lingkungan Proses perizinan terkait operasional
SETEMPAT, Pajak dan royalti Perwakilan pemerintah setempat dan/atau SETEMPAT, LSM, Pendidikan Pertanyaan dan permintaan akan informasi

PEMERINTAH PUSAT Pengembangan ekonomi daerah pemerintah pusat dalam forum bersama AKADEMISI Hak Asasi Manusia Proposal proyek
Pengembangan infrastruktur pemangku kepentingan Keselamatan dan kesehatan Partisipasi dalam forum konferensi
DAN REGULATOR LOCAL COMMUNITY,
Pengembangan SDM setempat Perlibatan melalui asosiasi industri Kinerja lingkungan
LOCAL AND CENTRAL nasional ataupun internasional NGOS, ACADEMICS
Kesempatan berkolaborasi dalam Tata kelola dan etika Formal partnerships
GOVERNMENT AND program CSR
Research and studies
REGULATORS Interaction with company management
Economic development Inquiries and requests for information
Resource access Regulatory processes and requirements
Education Project proposals
Environmental protection Governmental representation at stakeholder
Human rights Conference participation
engagement forums
Taxes and royalties Health and safety
Engagement via national and international
Economic development Environmental performance
trade associations
Infrastructure development Corporate governance and ethics
Workforce development
Opportunities for joint CSR program

Kinerja finansial Press release dan presentasi


PEMEGANG SAHAM Tata kelola perusahaan Presentasi untuk para investor
DAN INVESTOR Akses permodalan Interaksi Departemen External Relation and
Kinerja lingkungan Sustainable Development dengan para investor
SHAREHOLDERS K3 dan pemegang saham
AND INVESTORS Hak Asasi Manusia Pertemuan tahunan pemegang saham
Risiko usaha Laporan keberlanjutan

Public news releases and presentations


Financial performance
Corporate governance Public presentations to the investment community
Access to capital Communications between our External Relation
and Sustainable Development Department with the
Environmental performance
investing communities and shareholders
Health and safety
Annual meeting of shareholder
Human rights
Sustainability reporting
Business risk

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report

TOPIK UTAMA YANG PENDEKATAN MENENTUKAN MATERIALITAS DEFINING REPORT CONTENT


KELOMPOK PEMANGKU
MENJADI PERHATIAN PELIBATAN
KEPENTINGAN Laporan kami difokuskan pada berbagai isu dan Our report focuses on the
KEY TOPICS AND AREAS OUR APPROACH
STAKEHOLDER GROUP
OF INTEREST TO ENGAGEMENT pencapaian serta strategi KPC yang mencakup economical, environmental and social
[G4-24] aspek ekonomi, lingkungan dan sosial yang challenges that matter most to our
[G4-27] [G4-26]
penting bagi pemangku kepentingan utama kami. key stakeholders. We use a thorough
Kinerja finansial dan operasional Berbagai pertemuan Kami menggunakan proses yang menyeluruh process to define the content for
MEDIA Kinerja K3 Komunikasi melalui telepon dan email untuk menentukan isi dari laporan kami our reporting based on information
Kinerja sosial kemasyarakatan Interview berdasarkan pada informasi dari narasumber from internal and external sources.
MEDIA internal dan eksternal. Kamu mengidentifikasi We have identified relevant areas
Pelestarian lingkungan Website perusahaan
Kepatuhan akan perundangan, Press release beberapa area yang relevan dan menggunakan and have used a materiality matrix
peraturan dan perizinan matriks materialitas untuk memetakan isu-isu to map these issues and focused on
Dokumen perizinan
Merger, akusisi, dan divestasi tersebut dan fokus pada masing-masing area each area according to the following
Presentasi perusahaan
berdasarkan kriteria sebagai berikut: [G4-18] criteria: [G4-18]
Publikasi
Financial and operating performance Kunjungan ke area tambang, dan
Health and safety performance Media sosial
Community and social performance
Environmental stewardship Meetings,
Government regulations and permitt communications via phone and email,
Mergers, acquisitions and interviews,
24 divestments
Company website,
25
Press releases,
regulatory filings,
presentations,
Kami melaporkan isu-isu Isu-isu ini dilaporkan Isu-isu ini memiliki
publications,
yang paling relevan dan tetapi tidak memerlukan tingkat meterialitas
mine site visits and memiliki pengaruh yang indikator kuantitatif. yang rendah dan tidak
social media channels berpotensi tinggi bagi Beberapa isu hanya dilaporkan secara detail.
Operasional yang aman dan sehat Berbagai pertemuan dan usaha kami dan para memiliki sebagian
These issues are of low
ASOSIASI Praktik bisnis yang komunikasi personal pemangku kepentingan. pengaruh bagi usaha
materiality and are
bertanggung jawab Partisipasi aktif sebagai anggota kami dan para pemangku
INDUSTRI We report issues that are not reported in detail.
Perlindungan lingkungan Forum konferensi kepentingan.
most relevant and have
INDUSTRY Kolaborasi bersama melalui forum Pelibatan melalui asosiasi industri These issues are reported
high current or potential
ASSOCIATIONS industri untuk berbagai topik dan impacts on our business but not necessarily with
isu terkait dengan implementasi quantitative indicators.
Meetings and personal communications, and stakeholders.
keberlanjutan di industri
pertambangan, khususnya batubara Active participation as members Some issues have only
partial impacts on our
Forum diskusi dimana dapat Conferences,
berbagai pengetahuan, pengalaman
business and to the
Engagement through business
dan best practice di industri stakeholders.
bodies and industry
pertambangan.

Safe and healthy operations


Responsible business practices
Survei materialitas dibagikan kepada para Materiality surveys were distributed
Environmental stewardship
pemangku kepentingan kami agar dapat to our stakeholders in order to help
Collaborating with peers, via membantu kami dalam menentukan isu-isu us define issues that matter for
industry forums on sustainability
issues and policy positions
yang penting bagi para pemangku kepentingan both our stakeholders and to our
kami dan pendekatan keberlanjutan kami. sustainability approach. We also used
General knowledge sharing on
lessons learned and best practices
Kami juga menggunakan survei ini untuk this survey to identify topics that our
menentukan topik yang ingin dibahas oleh para stakeholders want us to discuss in
pemangku kepentingan pada laporan tahun ini. this years report. After performing
Setelah melakukan survey, untuk mendapatkan the survey, in order to gain a more in-
pemahaman yang mendalam, kami juga depth insight, we conducted interview
melakukan sesi interview dengan responden sessions with selected respondents of
terpilih dari setiap kelompok pemangku each stakeholder group. Below is our
kepentingan. Di bawah ini adalah matriks interactive materiality matrix. Issues
materialitas interaktif kami. Pada matriks ini, are categorized according to their
isu-isu dikelompokkan berdasarkan pentingnya importance to the stakeholders and
bagi pemangku kepentingan dan pengaruh yang their current or potential impacts on the
potensial bagi perusahaan. [G4-18] company. [G4-18]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tentang Laporan Ini
_About This Report
Identifikasi Aspek Material & Cakupan Pelapotan
Material Aspect Identification& Report Boundary
[G4-17][G4-19][G4-20][G4-21]

1 CAKUPAN
BOUNDARY

2
BAB MATERIAL
INDIKATOR YANG Pemasok Eksternal
BAHASAN ASPEK G4
DILAPORKAN (Supplier & Kontraktor) di

3 4
UTAMA
GRI G4 Area Operasional KPC
REPORTED Internal KPC
MAIN MATERIAL
IMPORTANT TO STAKE HOLDERS
INDICATORS KPC Internal External Vendors
CHAPTER ASPECT
(Suppliers &
Subcontractors in KPC
Operational area)

5
SEMANGAT MEMBARA Etika Dan Integritas G4-DMA
Ethic And Integrity G4-56

6
MEMBARA SPIRIT
TATA KELOLA
YANG BAIK Anti Korupsi G4-SO3

7
N

W E
GOOD CORPORATE Anti Corruption G4-SO4
S GOVERNANCE
G4-EN5
Energi

8
G4-EN6
PENINGKATAN Energy
G4-EN7
KINERJA

10 9
PERFORMANCE Informasi Produk Dan Jasa
G4-PR4
Product & Service Labelling
26 IMPROVEMENT
Compliance G4-PR9
27
Energi G4-EN3

12 11
Energy G4-EN6
Air G4-EN8
Water G4-EN9
Keanekaragaman Hayati
G4-EN13
Biodiversity
G4-EN15
PELESTARIAN Emisi
G4-EN19
LINGKUNGAN Emission
G4-EN21
IMPORTANT TO KPC ENVIRONMENT
Pengelolaan Limbah G4-EN23
PROTECTION
Effluent & Waste G4-EN24
Produk Dan Jasa
G4-EN27
Product & Services
Kepatuhan
G4-EN29
Compliance

TIER TIER TIER Keseluruhan


Overall
G4-EN31

KESELAMATAN,

1 2 3
KESEHATAN DAN Kesehatan dan
Keselamatan Kerja G4-LA6
KEAMANAN KERJA G4-LA7
Occupational G4-LA8
OCCUPATIONAL Health & Safety
SAFETY AND HEALTH
Eksistensi Pasar
G4-EC5
Market Presence

RENCANA TUTUP TAMBANG PENGELOLAAN DAN KUALITAS PRODUK INSAN KPC Ketenagakerjaan G4-LA1
Employment G4-LA2
Closure Plan KINERJA LINGKUNGAN DAN PEMASARAN OUR PEOPLE
G4-LA9
Environmental Management Product Quality Pelatihan dan Pendidikan
KESELAMATAN DAN Training & Education
& Performance & Market G4-LA11
KESEHATAN KERJA
KEPATUHAN HUKUM DAN PROFITABILITAS
MAJU BERSAMA Dampak Ekonomi Tidak Langsung G4-EC7
Employee Safety MASYARAKAT Indirect Economic Impact G4-EC8
UPAYA ANTI-KORUPSI Profitability
and Health, MOVING FORWARD
Regulatory Compliance & WITH THE Sosial Kemasyarakatan
G4-SO1
PERLINDUNGAN Anti-Corruption Measures KONTRIBUSI COMMUNITIES Social Community

KEANEKARAGAMAN HAYATI TERHADAP


PERTUMBUHAN Praktik Pembelian
G4-EC9
Biodiversity Protection PERTUMBUHAN Procurement Practice
PEREKONOMIAN
SOCIAL EKONOMI Penilaian Kinerja Lingkungan Pemasok
PERLIBATAN Economic Development G4-EN33
Socio-Economic KEMITRAAN YANG Supplier Environmental Assessment
MASYARAKAT SEKITAR PRAKTIK KETENAGAKERJAAN, Contribution BERKELANJUTAN
Penilaian Kinerja Praktik
Local Community Engagement MENCAKUP PELATIHAN & SUSTAINABLE Ketenagakerjaan
PERLINDUNGAN HAM PARTNERSHIP G4-LA15
PENGEMBANGAN Supplier Labor
Human Rights Protection Practice Assessment
Labor Practice, Including Employee
Training and Development Penilaian Hak Asasi Pemasok
G4-HR11
Supplier Human Rights Assessment

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kata Sambutan dari Top Management Kami
_ A View from Our Top Management

HELLO
STAKEHOLDERS...
Para Pemangku Kepentingan Dear Valued
yang terhormat, Stakeholders,

S I
It is publicly known already
udah menjadi rahasia umum bahwa industri
that global coal industry is in a
[G4-1] batu bara di dunia sedang mengalami masa
yang tidak mudah, terutama karena harga
challenging period, especially due
to declining price of coal. China as
batu bara yang terus menurun. Tiongkok
one of major coal importers has
sebagai salah satu pengimpor utama batu
KATA SAMBUTAN DARI
decided to reduce its demand by around
bara telah mengurangi permintaannya sekitar
30 million tons, Australia and Russia
30 juta ton. Lalu Australia dan Rusia belakangan

TOP MANAGEMENT KAMI


has start producing more coal with
ini dapat meningkatkan produksi mereka dengan
lower production cost as their currency
biaya yang lebih rendah karena nilai mata uangnya
depreciated by 30% against the US
yang terdepresiasi 30% terhadap dolar Amerika
dollar, which leave us in Indonesia to
28 A VIEW FROM OUR TOP MANAGEMENT Serikat. Akhirnya kita di Indonesia harus berupaya
compete better in order to be stronger
lebih baik agar dapat menguatkan posisinya
di pasar global batu bara. Di dalam negeri ada
in the coal global market. Domestically 29
there is hope as the new government
harapan dengan inisiatif program pembangkit
put much attention to the 35,000 MW
listrik 35.000 MW yang menjadi salah satu pusat
power plants initiative, where most of
perhatian pemerintahan baru, yang mayoritas
them would be burning coal. However
SAPTARI HOEDAJA bahan bakarnya berbasis batu bara. Namun
this situation would only come into light
CHIEF EXECUTIVE OFFICER program tersebut baru akan menunjukkan hasil
in the next 3-5 years, considering the
setelah 3-5 tahun mengingat kompleksnya
complexity of building these plants.
berbagai aspek yang terkait dengan proses
pembangunan pembangkit listrik tersebut.
Pembahasan tentang pengelolaan kas The topic of cash reservation
perusahaan dan memastikan operasional and ensuring efficient operation,
yang efisien, termasuk soal keberlanjutan especially sustainability become
(sustainability) menjadi lebih penting lagi bagi more important for KPC. Since if
KPC. Sebab bila KPC tidak menghasilkan the company is not making profit,
keuntungan, maka kami tidak dapat we will not be able to improve our
meningkatkan sumbangsih kami kepada bangsa, contribution to the nation, to the
MUHAMMAD RUDY bumi, dan juga kehidupan orang-orang yang planet, and the people.
CHIEF OPERATION OFFICER kehidupannya terkait dengan perusahaan.
Guna menghadapi masa yang tidak mudah di In facing current and future
saat ini dan beberapa waktu ke depan, KPC challenging times, we at KPC revert
mengandalkan sesuatu yang menjadi salah satu to one of the basic human nature
sifat dasar manusia ketika sedang mengalami when facing difficulties, which is
kesulitan, yaitu KPC mengandalkan orang-orang we look to our closest ones. In this
terdekat kami. Dalam hal ini, yang terdekat case, KPC look to its employees. As
dengan KPC tentu adalah para karyawan kami. such the case of sustainability where
Sebab kehidupan mereka akan terpengaruh people is a key pillar, the challenges
secara signifikan dengan keberlanjutan this industry has to endure can affect
perusahaan yang salah satu pilarnya adalah the lives of many. Extending beyond
ASHOK MITRA manusia. Bukan hanya kehidupan mereka secara people who work in the coal mining
CHIEF FINANCIAL OFFICER individu, namun juga kehidupan keluarga mereka business to each of their families and
dan masyarakat sekitar. communities.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kata Sambutan dari Top Management Kami
_ A View from Our Top Management

Selayaknya manusia biasa, karyawan KPC dan As normal human being, our employees and their Untuk menjaga momentum dan semangat In order to maintain the momentum and
keluarganya tentu secara psikologis merasa families would surely be psychologically affected with inovasi dari para karyawan, kami akan innovative sprit of our employees, we are
khawatir terhadap masa depan mereka dengan all these news regarding the tough times the coal meningkatkan kualitas mekanisme komunikasi planning to improve internal communication
melihat berita tentang masa sulit industri batu industry is facing and also coal mines having to close internal antara manajemen dengan seluruh mechanism among the management and
bara dan begitu banyak tambang yang tutup down or cease operation. Many people in this industry, karyawan. KPC telah melakukan employee employees. KPC has conducted employee
atau menghentikan operasionalnya. Disini kami including our employees, are restless about their future, engagement survey yang hasilnya telah engagement survey, and the result have
melihat kesempatan untuk mengajak setiap their livelihood, and it is their right to be. Here we see disosialisasikan kepada seluruh karyawan. been socialized to all employees.
insan KPC untuk bahu-membahu menguatkan the opportunity, as KPC believe by working hand-in-
Selain itu dari survei tersebut, kami Also equally importance is that from the
keberlanjutan perusahaan ke depannya. Orang hand with all of our employees will our sustainability
mengidentifikasi bahwa KPC perlu meningkatkan previous survey we were able to identify
bilang perlu nekat kalau lagi kepepet, tapi be carried forward. Many say desperate time calls
kualitas komunikasi internalnya dengan that KPC need to improve its internal
kami katakan bahwa perlu inovasi kalau lagi for desperate measure, but we say desperate times
karyawan. Dari identifkasi tersebut lahirlah communication to our employees. Thus born
kepepet, atau dalam hal ini inovasi-lah yang akan call for innovative measure, or in this case through
konsep penempatan kotak saran karyawan the suggestion box scheme that has been
menghantarkan kami mencapai keberlanjutan. innovation we achieve sustainability.
yang telah ditempatkan di setiap departemen. implemented. Employee suggestion boxes
Untuk melaksanakan inovasi, kadang kita tidak To accomplish such innovation, one does Melalui inisiatif sederhana ini, kami mendorong have been placed in each department. With
perlu berpikir terlalu rumit. Kita cukup perlu not have to go through an overly complex para insan KPC untuk menyumbangkan ide such tool, we encourage our employees
mendengar dan berdiskusi dengan orang-orang system. One just need to talk and listen dan saran mereka tentang bagaimana KPC to come forward with their ideas and
yang penting bagi perusahaan. Dalam hal KPC, with those who matter most. In KPCs dapat meningkatkan efektifitas operasional dan suggestions how KPC can improve our
30 kami perlu meningkatkan kualitas interaksi
dengan para karyawan kami. Mereka perlu lebih
case, we need to get our employees more bisnisnya. Kami ingin semua karyawan tanpa operation and business. We want to
31
engaged with the company. Their future is terkecuali untuk menyuarakan ide-ide mereka, reach out to all employees, from the
merasakan kuatnya ikatan emosional dengan our future and our future is their future. As mulai dari petugas administrasi, para mekanik, administration behind the desk employees
KPC. Sebab masa depan mereka adalah masa simple as that. hingga petugas lapangan di tambang. Apa yang to the mechanics or field operators in the
depan perusahaan, dan masa depan perusahaan kami lakukan bukanlah hanya pencitraan. Untuk mines. All are encouraged to speak up and
adalah masa depan mereka. menjaga pelaksanaan kotak saran tersebut, provide ideas. What we do here is not a
sebuah komite khusus telah ditunjuk dan gimmick. A specially assigned committee
Maka itu KPC menggunakan pendekatan- To that end, KPC utilize simple approaches
bertugas untuk mengumpulkan semua ide dari will go through all the ideas and report to
pendekatan sederhana yang bertujuan untuk that aims to maintain a healthy working
kotak saran tersebut untuk dilaporkan kepada the top management, where then those
menjaga semangat kerja dan optimisme spirit and optimism and at the same time to
pihak manajemen setiap akhir bulan. Dari situ ideas that are relevant and impactful will
karyawan yang sekaligus mampu memupuk jiwa nurture the innovation we have in our people.
ide-ide yang relevan dan dinilai dapat membawa be implemented in the company. We have
inovasi para insan KPC ini.
dampak positif akan diterapkan oleh perusahaan. also equipped the scheme with incentive in
Mekanisme kotak suara telah kami lengkapi the form of reward for the best idea each
DI SINI KAMI MELIHAT KESEMPATAN UNTUK MENGAJAK SETIAP INSAN KPC UNTUK BAHU- dengan skema insentif melalui dalam bentuk month.
MEMBAHU MENGUATKAN KEBERLANJUTAN PERUSAHAAN KEDEPANNYA. ORANG BILANG PERLU penghargaan ide terbaik tiap bulannya.
NEKAT KALAU LAGI KEPEPET, TAPI KAMI KATAKAN BAHWA PERLU INOVASI KALAU LAGI KEPEPET, Di Indonesia dikenal istilah Gotong Royong, In Indonesia there is phrase called Gotong
ATAU DALAM HAL INI INOVASILAH YANG AKAN MENGHANTARKAN KAMI MENCAPAI KEBERLANJUTAN. yang intinya adalah orang-orang bahu membahu Royong, essentially meaning people
guna mencapai suatu tujuan. Dengan Gotong working together to obtain a goal or
HERE WE SEE THE OPPORTUNITY, AS KPC BELIEVE BY WORKING HAND-IN-HAND WITH ALL Royong bersama karyawan kami, KPC percaya objective. With Gotong Royong with our
OF OUR EMPLOYEES WILL OUR SUSTAINABILITY BE CARRIED FORWARD. MANY SAY DESPERATE keberlanjutaan perusahaan akan dapat employees, KPC believe this companys
TIME CALLS FOR DESPERATE MEASURE, BUT WE SAY DESPERATE TIMES CALL FOR melangkah maju dan membuat perusahaan sustainability will move forward and carry
INNOVATIVE MEASURE, OR IN THIS CASE THROUGH INNOVATION. lebih baik lagi ke depannya. the company forward.
Kami ingin mengucapkan terima kasih kepada We would like to thank all our employee,
para karyawan, mitra, dan investor kami partners, and investors for all their help
atas kepercayaannya pada KPC. Kami harap and confidence they have in KPCs. We hope
Tahun ini, dengan tujuan utama untuk This year, in order to further boost working
kerjasama yang kuat ini akan berlanjut terus di such strong bond will continue in the years
meningkatkan semangat kerja dan produktivitas spirit and enhance productivity from the
tahun-tahun mendatang. to come.
dari tim inti operasional kami, KPC meluncurkan very core of our operation, KPC launched
program Operator Top Gun. Pada program Top Gun Operator Competition. In this
ini, setiap tim mining operator akan saling program, each crew in mining operation Salam Membara!!! Salam Membara!!!
berkompetisi dengan kriteria penilaian will compete against other crews in
mencakup man-ready hours, efisiensi bahan terms of man-ready hours, fuel efficiency,
bakar, output produksi, kinerja K3, sampai productivity output, safety performance,
pada perilaku pribadi. Tim operator terbaik and personal behavior. The best crew will
akan dikirim untuk mewakili KPC pada ajang represent KPC in an international mining
kompetisi tim operator mining internasional yang operation crew competition that will be held
akan diadakan di Bali tahun depan. next year in Bali.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Sekilas KPC
_KPC in a Glance

SEKILAS KPC OPERASIONAL


OUR OPERATION
Kegiatan pertambangan batubara di KPC dioperasikan
KPC IN A GLANCE oleh KPC sendiri dalam hal ini Divisi Mining Operation
Division dan beberapa kontraktor pertambangan.
Beberapa lokasi pit yang dioperasikan langsung oleh
KPC di tahun 2014 adalah Pit Bendili, Pit J, South Pinang,
LOKASI Bendili Prima, Pit Inul K, Inul East, dan Inul Middle.
Sedangkan pit-pit yang dioperasikan oleh kontraktor
OUR LOCATION adalah Pit A, Pit B, dan Pit E Bengalon Area oleh PT.
Darma Henwa; Pit Pelikan, dan Pit Kangguru oleh PT.
Pama Persada; Pit Melawan, Pit Mustahil, dan Pit Peri

32 Kantor Pusat
Head Office:
oleh PT.Thiess. Dalam aktivitas operasional, KPC tidak
pernah bekerja sama dengan artisanal and small scale
33
mining (ASM).

SANGATTA Coal mining activities in KPC is operated by our own


Mining Operation Division Division and/or together with
EAST KALIMANTAN, our mining contractors. In 2014, our own Mining Operation
INDONESIA Division manages Pit Bendili, Pit J, South Pinang, Bendili
Prima, Pit Inul K, Inul East, dan Inul Middle. Our mining
M1 BUILDING MINE SITE,
contractors help manage and operate several other
SANGATTA, KUTAI TIMUR,
mining pit in. Pit A, Pit B, and Pit E Bengalon Area by PT.
KALIMANTAN TIMUR,
Darma Henwa; Pit Pelikan and Pit Kangguru by PT. Pama
INDONESIA [G4-5]
Persada; Pit Melawan, Mustahil, and Peri by PT.Thiess. We
Kantor Perwakilan never in cooperation with artisanal and small scale mining
Representative Offices: (ASM) mining contractors in our operation.
JAKARTA, SAMARINDA,
and BALIKPAPAN [G4-6]
90.938 HEKTAR area konsesi
pertambangan di Sangatta dan Bengalon,
1. KANTOR PERWAKILAN
PT. KALTIM PRIMA COAL Kalimantan Timur, Indonesia berdasarkan
BALIKPAPAN Perjanjian Karya Pengusahaan Pertambangan
PKP2B sampai tahun 2021
International Airport
Sultan Adji Mohammad (hectares of mining area in Sangatta and
Sulaiman Sepinggan Bengalon, East Kalimantan, Indonesia which
Jalan Marsma R. was based on Coal Exploration and Work
Iswahyudi 3, Sepinggan Agreement PKP2B) up to 2021 [G4-6] [G4-9]
Balikpapan, Kaltim

50.000.000+
2. KANTOR PERWAKILAN
PT. KALTIM PRIMA COAL
TON/TAHUN
SAMARINDA
kapasitas produksi
Jalan S. Parman No. 12
PT Kaltim Prima Coal (KPC) adalah perusahaan pertambangan batubara Samarinda, Kaltim
(tonnes/year production capacity and) [G4-9]
yang berlokasi di Sangatta, Kalimatan Timur, Indonesia. Kami mengelola Kode Pos 75117
salah satu open-pit mining terbesar di dunia dengan total jumlah resources
3. KPC JAKARTA
dan reserve batubara mencapai 9.275 milyar ton. [G4-3]
Jalan HR Rasuna Said,
9.275.000.000.000 TON
Epicentrum Gedung total sumber daya dan cadangan batubara
PT Kaltim Prima Coal (KPC) is a coal mining company located in Bakrie Tower Lt. 15 (tonnes of total coal resources and reserves)
the region Sangatta, East Kalimantan, Indonesia. We operate one of the Jakarta Selatan 12920 [G4-9]
largest open-pit mining in the world with coal resources and reserves DKI Jakarta
totalling to 9,275 billion tonnes. [G4-3]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Sekilas KPC
_KPC in a Glance

KPC PREMINING PHASE MINING PHASE POST MINING PHASE

Coal 1 2 3 1 2 3 1 2

Chain
[G4-12]

COAL MINING & COAL


EXPLORATION SOIL COMPOTITION ON-SITE INFRASTRUCTURE PROCESSING
STOCKPILING
SURVEY EXAMINATION CONSTRUCTION PLANT
BLASTING

POST-MINING AREA BIODIVERSITY


RECLAMATION & MONITORING AT
REHABILITATION RECLAMATION AREA
4 5 6 4 5 6

3
34 SECURING WILDLIFE LAND CLEARING & OVERLAND PORT LOADING &
POST-MINING
35
AREA UTILIZATION
VEGETATION SEEDS RELOCATION TOP SOIL REUSE FOR CONVEYOR STOCKPILES SHIPMENT TO
REHABILITATION CUSTOMERS

W E

SUMBER PRODUK PELANGGAN STRUKTUR NILAI EKONOMI


DAYA OUR PRODUCTS OUR CUSTOMERS KEPEMILIKAN TAHUN 2014
MANUSIA

3
SHAREHOLDER STRUCTURE 2014 ECONOMIC
OUR PEOPLE KPC memasarkan produk Terjadi perubahan susunan pemegang VALUE 2014 (USD) 2013 (USD)
batubara untuk pasar saham KPC di tahun 2014. Susunan NILAI EKONOMI DIHASILKAN

4.944
domestik maupun ekspor pemegang saham KPC per 31 Desember ECONOMIC VALUE GENERATED
yang digunakan oleh 2014 menjadi: Pendapatan/Penjualan
JENIS BATUBARA 3.501.220.343 4.038.992.305
SUB-BITUMINOUS
pelanggan kami dari berbagai In 2014, there was a change in KPCs
Revenue / Sales
ORANG KARYAWAN sektor industri, antara lain: shareholders composition. KPC
NILAI EKONOMI DIDISTRIBUSIKAN
(brand of high quality ECONOMIC VALUE DISTRIBUTED
(employees) pembangkit tenaga listrik, shareholders as of 31 December 2014:
sub-bituminous coal) Biaya Operasional
[G4-9] trading company, industri besi, [G4-7][G4-13] Operating Cost
3.226.114.767 3.548.226.300
[G4-4]
dan sektor industri lainnya.
Remunerasi &

26%
[G4-8] Tunjangan Karyawan
PT SITRADE COAL
PRIMA Employee wages 122.685.258 131.129.383

21.500+
KPC markets our products & benefits
BHIRA
PINANG
30%
both in domestic and export Deviden
INVESTMENTS Payments to providers 330.737.149 339.118.751
markets to customers from
MELAWAN LIMITED of capital / dividend
ORANG PERSONEL various industry sectors,
Pajak
KONTRAKTOR DAN namely: power generation,
25 %
PERUSAHAAN TERKAIT PT BUMI Payments to 43.179.802 52.974.041
trading company, steel mill, RESOURCES Government -Taxes
LAINNYA
and other general industries. Dana CSR
5.038.116 5.551.933

19%
(personnel from contractors Community Investment
[G4-8] MOUNTAIN
and associated companies) NILAI EKONOMI
NETHERLANDS DIPERTAHANKAN
[G4-9] 104.202.399 301.110.648
INVESTMENT BV
ECONOMIC VALUE RETAINED

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Sekilas KPC
_KPC in a Glance

Operasional dimulai pada

1992
bulan Januari 1992.
Commercial operation
began in January 1992.

1978
1982 Pemerintah Indonesia mengundang
tender dari perusahaan asing untuk
eksplorasi dan pengembangan
PT Kaltim Prima Coal (KPC) sumber daya batubara di
didirikan di Indonesia dengan Kalimantan timur dan selatan.
masing-masing BP dan CRA 50% A BP / CRA joint venture berhasil
Proses pembangunan
memegang saham. KPC lisensi penawaran untuk wilayah 7.900
selesai pada akhir 1991
untuk melakukan eksplorasi km persegi di dua blok memanjang

1991
dan pertambangan batubara 300 km di sepanjang pantai timur Construction completed
berdasarkan Kontrak Karya Kalimantan. by late 1991.
Batubara (Kontrak Karya) dengan
36 HPH seluas 90.706 ha. Negara
The Indonesian government invited
tenders from foreign companies
37
Indonesia Perusahaan Batubara for exploration and development
(PTBA) berhak menerima 13,5% of coal resources in the eastern
dari seluruh produksi. and southern Kalimantan. A BP
PT Kaltim Prima Coal (KPC) / CRA successful joint venture
was established in Indonesia to offer 7,900 sq km area in two

1990
with each BP and CRA 50% blocks extending 300 km along the
eastern coast of Kalimantan. Konstruksi tambang skala
stock holding. KPC license for besar dimulai pada bulan Juni.
exploration and mining of coal by
Coal Contract of Work (CoW) with Large-scale mining
the concession area of 90,706 ha. construction of began in June.

JEJAK LANGKAH
Indonesian State Coal Company
(PTBA) is entitled to received
13.5% of all production.

OUR HISTORY

KPC melanjutkan dengan pengembangan tambang ekspor dengan kapasitas


desain 7 juta ton per tahun (mtpa) setelah eksplorasi rinci dan studi kelayakan,

1988 1989
prospek dekat dengan Sangatta. Studi kelayakan tersebut menunjukan peluang
yang amat menjanjikan. Sangatta merupakan area yang memiliki jumlah besar
cadangan batubara berkualitas tinggi yang terletak dekat dengan garis pantai
dengan kedalaman laut yang mencukupi serta posisi strategis untuk melayani
pasar-pasar yang sedang berkembang.
Konstruksi dimulai pada bulan
KPC proceeds with the development of export mine with a design capacity of Januari. Anggaran untuk proyek
7 million tonnes per annum (mtpa) after detailed exploration and feasibility ini adalah US$570 juta.
study, prospects is located close to Sengatta. The prospect of having a large
Construction began in January.
number of high-quality coal reserves, close to the shoreline with deep water
The budget for this project is
and is strategically located in the growing market services.
US$ 570 million.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Sekilas KPC
_KPC in a Glance

KPC PHILOSOPHY:
Keunggulan Pemberdayaan
MORE THAN MINING
[G4-56]
EXCELLENCE
Mendorong pertanggungjawaban
semua karyawan, kontraktor, dan
EMPOWERMENT
Mengembangkan karyawan dan
masyarakat setempat dengan
pemasok untuk mencapai praktik mendorong mereka untuk
terbaik dalam segala hal. mengambil inisiatif, bertindak
inovatif, dan membangun
Holding all employees, contractors,
kemandirian.
and suppliers accountablefor
achieving best practices in Developing employees and the
7 NILAI everything we do. local community by encouraging
PERUSAHAAN them to take initiatives, be
innovative, and become self-
KPC 7 VALUES
[G4-56] Integritas reliant.

INTEGRITY
Kerjasama
S I
ungguh suatu kehormatan bagi KPC telah t is the greatest honour and privilege Mendapatkan kepercayaan dan
38 diberikan kepercayaan oleh Indonesia untuk
mengelola kekayaan sumber daya batubara
for KPC to be trusted by Indonesia
to manage the countrys vast coal
rasa hormat dengan bertindak
adil, jujur, dan bertanggung jawab.
TEAMWORK
39
negeri ini. Oleh karena itu, lebih dari sekedar resources. Therefore, more than Mencapai keunggulan melalui
Earning trust and respect by
menambang, apa yang kami kelola di mining, what we manage here must kerjasama antara manajemen,
behaving in a fair, honest, and
Sangatta harus mampu memberikan manfaat yang be able to provide sustainable benefits karyawan, dan segenap mitra.
responsible way.
berkelanjutan bagi seluruh pemangku kepentingan, to all stakeholders and contribute
Achieving excellence through
berkontribusi dalam pembangunan manusia to Indonesias society and national
cooperation between management,

Transparansi
Indonesia, dan pembangunan nasional Indonesia. development.
employees, and partners.

TRANSPARENCY
VISI Produsen batubara terkemuka Indonesia untuk
memenuhi kebutuhan dunia, yang memberikan nilai
Berupaya terus-menerus untuk
bersikap terbuka dan jujur dalam
Kepedulian
CARE
VISION optimal bagi semua pemangku kepentingan. semua tindakan.
[G4-56] Bersikap peduli terhadap
Striving to be open and honest in
Indonesias leading coal producer for global needs, our conduct.
kebutuhan-kebutuhan para
delivering optimum values to all stakeholders. pemangku kepentingan dan
memastikan pemenuhan

Kegesitan
kebutuhan dengan cara yang
mendukung kesinambungan.
AGILITY
MISI Memupuk budaya yang
mengutamakan keselamatan,
Fostering a culture that
considers health, safety and
Secara proaktif menyesuaikan
Paying attention to the needs
of stakeholders and ensuring
those needs are addressed in a
MISSION kesehatan, dan lingkungan environment in everything
diri dengan situasi yang dinamis sustainable manner.
[G4-56] dalam segala tindakan we do
dengan memanfaatkan gagasan-
Memelihara tatakelola Maintaining good corporate gagasan baru dan meraih peluang-
perusahaan yang baik dan governance and promoting peluang.
mempromosikan perusahaan good corporate citizenship
Proactively adapting to dynamic
sebagai warga yang baik
situations by embracing new ideas
Menyediakan lingkungan belajar Providing an environment for and seizing opportunities
untuk mencapai keunggulan dan learning to achieve excellence
meningkatkan kesejahteraan and improve livelihood
Mengoptimalkan nilai bagi Optimising value for all
semua pemangku kepentingan stakeholders
Menyelenggarakan praktik Carrying out best practice in
pengelolaan dan operasi terbaik management and operations
untuk menghasilkan produk dan to deliver consistent
kinerja berkualitas tinggi secara high quality product and
konsisten performance

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


C O A L
MEMBARA BERSAMA

O
_Together Burning Bright

T
alam. Kita tidak bisa menyalakan lampu, tidak dapat have no light, be unable to communicate with our
berkomunikasi dengan gadget canggih ataupun gadgets or computers or internet connection, halt
menggunakan komputer dan mengakses internet. our business , see that hospitals will find it very

or NOT
Bisnis akan berenti, rumah sakit akan mengalami difficult to help their patients, and many more.
kesulitan dalam menangani pasiennya, dan masih These shows that we rely heavily on coal as a
banyak lagi. Hal ini menunjukkan bahwa kita sangat source of energy to get the most of our present
bergantung listrik yang menopang aktivitas hidup dan lives.
batubara sebagai bahan baku listrik itu.

A L
Bila kita menengok ke masa lalu, batubara telah turut If we look at our past, coal has helped shaping

C O
berperan dalam membentuk sejarah peradaban dan the human history and civilization, led by James

O
perkembangan manusia. Diawali oleh sebuah penemuan Watts invention of the coal-powered steam engine

T
oleh James Watt, yakni mesin uap bertenaga batubara which was then used to run machines in factories
yang kemudian digunakan untuk menjalankan mesin throughout the United Kingdom; hence, starting the
mekanik di pabrik-pabrik di seluruh Inggris Raya yang Industrial Revolution. A number of important world
akhirnya memicu Revolusi Industri. Sejumlah tokoh figures, such as Fiedrich Engels, Karl Marx and
penting dunia seperti Fiefrich Engels, Karl Max, dan Francis Fukuyama, were inspired by this Industrial
Francis Fukuyama terinspirasi oleh Revolusi Industri Revolution, catalyzed by coal, seen in a variety of their
yang dikatalisasi oleh batubara dalam berbagai hasil works and the fruits of their thoughts. Since then, coal
40 ntang bagaimana
karya dan buah pemikiran mereka. Sejak saat itu has been a catalyst of various important milestones

Sebuah pe rtan ya an te
an
batubara telah menjadi katalis berbagai milestone in our history. Industrial mechanization, the then
41
kebutuhan kita ak
penting dalam kehidupan kita. Mekanisasi industri, domination of the United Kingdom as a superpower
menyeimbangkan yang
ber energi utama
dominasi Inggris Raya sebagai negara super power country, poor labor conditions, up to the development
ra se ba ga i su m pada saat itu, kondisi buruh yang kurang baik, sampai of two main ideologies that have shaped human
batuba
an g ke h id u pa n dan pertumbuhan pada berkembangnya dua ideologi utama yang telah history: Capitalism and Communism.
menop n masa
lestarian alam da
membentuk sejarah manusia, yakni Kapitalisme dan
om i de n ga n pe Komunisme.
ekon
sustainable.
depan yang lebih of
Tetapi kita tetap harus memberikan penghargaan atas But we need to give credit where it is due. Coal

balance our need


apa yang telah dihasilkannya. Batubara adalah sumber as the source of energy for electricity has also
ti on on h ow to
A ques r energi listrik yang juga menjadi katalis atas hal-hal become one of the catalysts for many good things.
pr od u ce th e en ergy to sustain ou positif. Batubara telah membantu dalam menciptakan It helps changes human and goods transportation
coal to nature
of lif e an d ec on omic growth with transportasi manusia dan barang yang lebih cepat to become faster and more efficient, which in turn
way ainable future. dan efisien, dimana menjadi dasar dalam peningkatan becoming a foundation for improving economic
an d a m ore su st
conservation
aktivitas ekonomi yang pada akhirnya meningkatkan activities that lead to improvement of human
tingkat kemakmuran kita semua. Internet dan prosperity. Internet and telecommunication, the
telekomunikasi yang saat ini telah menjadi kebutuhan buzz words in our current timeline, exists due to
pokok dari aktivitas kita saat ini, ada karena listrik. electricity. Cement and steel factories whose products

S C
aat ini, batubara merupakan sumber energi yang oal is the source of energy that now has Pabrik semen dan baja yang produknya kita gunakan we use to build our great cities and homes are able to
menjadi perdebatan dan dilema bagi dunia. Pada become the source of debate/discussion untuk membangun kota-kota dan rumah tidak dapat function due to coal.
satu sisi, batubara masih menjadi salah satu and dilemma for the world. Human activities berfungsi tanpa batubara.
sumber energi primer yang menopang aktivitas and worlds economic growth are dependent Now, the pressure is on coal as humans become more in-
Sekarang, tekanan pada batubara sejalan dengan isu
manusia dan geliat roda perekonomian global. The on coal. The International Energy Agency tune with sustainability. In other words more concern are
keberlanjutan, dalam kata lain kepedulian terhadap
International Energy Agency dan World Coal Association and World Coal Association stated that within placed on the future of our earth, with coal being the energy
masa depan bumi kita, dengan batubara sebagai
mengatakan bahwa dalam kurun waktu 2010 sampai the period of 2010 until 2014, more than 40% of fuel with the largest contribution to carbon emission. It
sumber energi yang mengeluarkan emisi karbon. Hal ini
2014, lebih dari 40% energi listrik dunia dihasilkan the worlds electricity was generated from coal seems we are put in the position of choosing between the
membuat kita harus memilih antara sekarang dan masa
dari batubara sebagai bahan baku dengan kapasitas with a total capacity of 200 Megawatt per day. present and the future. Although it shouldnt be that case.
depan. Walaupun ini tidak harus seperti ini.
pembangkitan mencapai 200 megawatt per hari. Di In Indonesia alone, coal generates 48% of the
Indonesia sendiri pembangkitan listrik berbahan baku countrys electricity. Kami percaya bahwa setiap orang akan setuju bahwa We believe everyone agrees on wanting a better future
batubara mencapai 48% listrik nasional. kita menginginkan masa depan yang lebih baik bagi for our children, which includes a sustainable nature.
anak-anak kita, yang diantaranya termasuk alam yang Eventually coal will need to be replaced. The question
Disisi lain, batubara adalah salah satu sumber energi In other hand, coal accounts for one of the most we need to ask now is that how fast this can be done.
berkelanjutan. Pada saatnya nanti, batubara pasti akan
dengan emisi karbon yang cukup signifikan yang carbon-intensive energy sources, which might And, while we are in the pursuit of coal replacement,
digantikan, permasalahannya adalah seberapa cepat
ditakutkan akan mengancam keberlanjutan alam yang threat our nature sustainability. People of this how can we continue to sustain our present lives? It
ini dapat terjadi? Dan disaat kita berusaha mencari
kita miliki. Masyarakat dunia menghadapi dilema yang world are now apparently stuck between a rock will take a collective effort from all of us to shape a
pengganti batubara, bagaimana kita bisa menjaga
besar dalam menyikapi dilema batubara ini. and a hard case when it comes to coal. sustainable future without having to set our current
keberlanjutan dari kehidupan kita saat ini? Hal ini
Dahulu, peradaban manusia bergantung pada alam, In the past, great human civilization relies on akan membutuhkan usaha kolektif dari setiap kita civilization back to a pre-coal era. It is not a
seperti perkebunan dan sungai. Sekarang peradaban nature, such as agriculture and rivers. However, untuk membentuk masa depan yang berkelanjutan question of sacrificing our current way of living, but
manusia modern sangat bergantung pada listrik. current modern human civilization relies heavily tanpa mengembalikan kehidupan kita seperti saat a question of taking action and improving our way
Jika listrik padam, kepanikan masyarakat tidak dapat on electricity. If a blackout occurs, the panic is era sebelum batubara. Ini bukan berarti kita harus of living in the present, for a better future.
dihindari, seperti halnya saat terjadinya bencana almost as if a natural disaster occurs. We will mengorbankan kehidupan kita saat ini, tetapi bagaimana
kita bertindak untuk memperbaiki cara hidup kita saat
ini untuk masa depan yang lebih baik.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


MEMBARA BERSAMA
_Together Burning Bright

MEMBARA
BERSAMA
TOGETHER
BURNING BRIGHT

B
atubara telah mengkatalisasi
42 banyak perubahan dalam
sejarah kehidupan manusia.
Pertanyaan yang perlu kita
43
jawab saat ini adalah bagaimana
kita dapat memaksimalkan manfaat
positif dari batubara dan pada saat
yang bersamaan meminimalisasi
dampak negatifnya, sehingga kita
dapat mempertahankan kehidupan
dan mengeksplorasi berbagai
sumber energi yang sustainable
untuk masa depan.
Untuk menjawab pertanyaan ini,
sebuah prinsip pertambangan yang
bertanggung jawab harus dijunjung
tinggi dan diimplementasikan oleh
seluruh perusahaan pertambangan
yang juga melibatkan seluruh
pemangku kepentingan di
keseluruhan coal chain.

C
oal has paved the way for many
improvements in our lives. So
now, the question is how to
maintain the positive impacts of
coal and coal mining and minimize
the negative impacts, so that we
can sustain our daily activities and
improve the pursuit for sustainable
energy sources to fuel human
civilization.
In order to answer this question,
a responsible mining principles
must be upheld and implemented
by all mining companies through
a collaborative effort with all
stakeholders in the entire coal
chain.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


MEMBARA BERSAMA
_Together Burning Bright

SEMANGAT PENAMBANGAN BATUBARA

MEMBARA YANG BERTANGGUNG JAWAB


HOW WE IMPLEMENT A RESPONSIBLE
COAL MINING OPERATION
MEMBARA SPIRIT [G4-DMA][G4-56]

S
ebagai salah satu perusahaan produsen batubara terkemuka untuk kebutuhan dunia,
KPC percaya bahwa apa yang kami lakukan disini adalah Lebih dari Menambang -
More than Mining. Kami yakin jika kegiatan penambangan batubara dikelola dengan
bertanggung jawab, batubara dapat memberikan keuntungan jangka panjang bagi
masyarakat, dan disaat yang bersamaan mampu meminimalisasi bahkan mengeliminasi
44 dampak negatifnya.
45
More T han Mining adalah filosofi perusahaan yang telah dikembangkan
lebih lanjut menjadi sebuah inisiatif, yakni: SEMANGAT MEMBARA sebagai sebuah
pendekatan yang fundamental dalam mencapai penambangan batubara yang lebih
berkelanjutan. Sejak diformulasikan, KPC memastikan SEMANGAT MEMBARA
menyentuh keseluruhan operasional dan coal chain kami yang mencakup:
manajemen, operasional, pelanggan, lingkungan, keselamatan dan kesehatan,
sumber daya manusia, masyarakat, dan supply chain.

A
s one of the leading coal producers for global needs, KPC believes that what we are
doing here is More Than Mining. We are confident that if coal mining operation
is managed responsibly, coal can provide lasting benefits to society and its negative
impacts can be minimized or even eliminated.

More T han Mining as our philosophy has led us to develop KPC a corporate
initiative, called SEMANGAT MEMBARA (burning spirit) as the fundamental approach
to achieve a more sustainable coal mining operation. Since its formulation, SEMANGAT
MEMBARA is to cover our entire coal chain, from the management, operation,
customer, environment, safety and health, human resources, community, and supply
chain.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


MEMBARA BERSAMA
GOOD MINING PRACTICE SEBAGAI _Together Burning Bright

PRINSIP OPERASIONAL DAN TEKNIS


DALAM KEGIATAN PENAMBANGAN
BATUBARA YANG BERTANGGUNG JAWAB
ASPEK DESKRIPSI
GOOD MINING PRACTICE AS OUR NO.
ASPECT DESCRIPTION

OPERATIONAL AND TECHNICAL PRINCIPLES Prioritas perhatian pada kompetensi


karyawan sejak pada proses rekrutmen yang
Attention to employees competence since
recruitment process, including on the
FOR RESPONSIBLE COAL MINING OPERATION antara lain mencakup aspek: following aspects:
[G4-DMA][G4-56] KOMPETENSI Pengetahuan dan pemahaman yang Knowledge and understanding of the
KARYAWAN memadai di bidangnya particular field
1 Keahlian dengan pengalaman minimal Expertise with experience of at least a
EMPLOYEES
COMPETENCE yang sudah ditentukan specified period

K W
Kualitas personal, yakni sikap dan etos Personal quality, which are attitude
ami selalu berusaha untuk mengidentifikasi e strive to identified and manage
kerja serta memiliki tanggung jawab moral and work ethic as well as moral
dan mengelola setiap resiko yang every single risk occurs to ensure terhadap tugas dan pekerjaannya responsibility to the assigned duties
muncul untuk memasukan bahwa kami that we are in the right track
berada di jalan yang benar dalam mencapai to achieve sustainability. Therefore, Pemenuhan seluruh kriteria proses Compliance to all process criteria in
keberlanjutan. Untuk itu, sejak tahun 1992, awal since 1992, which is the beginning of
46 kegiatan operasional KPC selalu dilaksanakan our operation, KPC always concerns
penentuan dan implementasi perencanaan
yang mencakup:
determining and implementing a plan
which include:
dengan memperhatikan segala aspek yang on every aspects in the coal chain. DESAIN DAN Perencanaan dan desain tambang yang Planning and feasible mine designing in 47
ada mulai dari hulu hingga hilir. Operasional KPCs mining operation should bring a PERENCANAAN feasible serta sesuai dengan sumber daya accordance with available resources
pertambangan KPC dalam hal ini harus sustainable benefit for all stakeholders. TAMBANG yang tersedia Safety factor and technical competence
2
memberikan manfaat yang berkelanjutan bagi To that end, in order to create a positif Faktor keamanan serta kemampuan teknis Risk assessment for projects within
seluruh pemangku kepentingan. Oleh karena benefit of every mining activity, also MINE DESIGN Kajian resiko (risk assessment) untuk proyek- medium to high risk category
itu, guna menciptakan dampak positif dari reduce or eliminate (if possible) the AND PLANNING proyek dengan skala kategori risiko menengah Preparation of framework and long-
setiap aktivitas pertambangan perusahaan, negative impacts that may occur, we ke atas term design plan
serta mengurangi atau bahkan menghilangkan have develop Good MInIng Practice Pembuatan kerangka dan rencana desain
dampak negatif yang mungkin ditimbulkan, Principle (GMP) in managing a jangka panjang
kami telah mengembangkan prinsip Good responsible mining operation. Pemilihan dan perawatan peralatan sesuai Selection and maintainance of equipments in
Mining Practice (GMP) dalam mengelola operasi PEMILIHAN ALAT dengan fungsi dan kondisi area tambang accordance with the function and condition of
penambangan yang bertanggung jawab. YANG TEPAT DAN dengan memperhatikan: the mine area by taking into account:
PERAWATANNYA Target dan kapasitas produksi Target and production capacity
GMP terdiri dari kerangka dan berbagai GMP contains of frames and various YANG BAIK
parameter kerja yang KPC kembangkan parameter that has been developed 3 Kesesuaian ukuran antara alat gali Compliance to proper distant between
berdasarkan pengalaman bertahun-tahun, by KPC based on years of experience, SELECTING THE dan alat muat excavator and loading tool
melalui penelitian internal, serta berbagai through internal research, and various APPROPRIATE Jenis pekerjaan yang dilakukan Type of work performed
masukan dari para ahli pertambangan. KPC input from mining specialist. KPC EQUIPMENTS AND Kondisi material di area tambang Material conditions in the mine area
merumuskan GMP menjadi 9 aspek yang has fomulated GMP into accountable GOOD MAINTENANCE
Menggunakan teknologi terkini Use of the latest technology
terukur dan sistematis dalam berbagai and systematic 9 aspects ini various
kegiatan operasional perusahaan. Kesembilan operational activity of the Company. The KESELAMATAN DAN Pembentukan dan penunjukan departemen Formation and appointment of a special
aspek tersebut dalam GMP selalu diterapkan 9 aspects in GMP is implemented by KESEHATAN KERJA khusus di KPC yang menangani keselamatan department that supervises KPCs
4 dan kesehatan kerja untuk memastikan occupational health and safety to
oleh seluruh departemen terkait di KPC. all related departments in KPC. The 9
OCCUPATIONAL bahwa ketaatan terhadap aspek ini benar- ensure strict adherence, execution and
Kesembilan aspek tersebut adalah: aspects is as follows: benar dijalankan dan ditaati. compliance.
HEALTH AND SAFETY
Perencanaan desain sampai pada tahap All processes, since early design planning
pengelolaan dampak operasional senantiasa phase up to the operational impact
DIMENSI DAN dilaksanakan dengan baik dan menyeluruh management phase, are to be constantly
KERANGKA WAKTU sejak tahap awal. Sehingga setiap resiko bisa performed in appropriate manner. Thus,
5 dikendalikan lebih awal, lebih cepat dan lebih it will help to control and mitgate risks
DIMENSION AND baik. KPC mengkategorikan kerangka waktu in a more effective and efficient way. The
TIME FRAME menjadi jangka pendek, jangka menengah, phases are categorized into short, medium
dan jangka panjang. and long term.

Implementasi berbagai pendekatan untuk Implementation of various approaches


BIAYA PRODUKSI meningkatkan efisiensi dan penghematan to improve efficiency and cost savings
YANG KOMPETITIF demi optimalisasi biaya dan output produksi. in order to optimize cost and production
6 Dengan demikian KPC dapat merencanakan output. Therefore, KPC can finance
COMPETITIVE pembiayaan program pengelolaan lingkungan appropriate environmental management
PRODUCTION COST serta peningkatkan kualitas kehidupan programs as well as enhance the quality of
masyarakat sekitar tambang. life of surrounding communities.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


MEMBARA BERSAMA
_Together Burning Bright

SUSTAINABILITY AT KPC
MEWUJUDKAN
PERTAMBANGAN BATUBARA
YANG BERTANGGUNG JAWAB
REALIZING A RESPONSIBLE
COAL MINING OPERATION
ASPEK DESKRIPSI [G4-DMA][G4-56]
NO.
ASPECT DESCRIPTION
Perencanaan, implementasi dan Continous implementation and
48 ASPEK LINGKUNGAN
pengembangan metode pengelolaan development of environmental

7
DAN EKOSISTEM
lingkungan serta kajian risiko serta tindakan
preventif atas setiap potensi dampak negatif
management approaches, which include
risk assessment and preventive measures More T han Mining 49
ENVIRONMENT AND terhadap lingkungan, termasuk pencemaran for any potential negative impacts on the PHILOSOPHY
ECOSYSTEM ASPECT yang mungkin terjadi pada keseluruhan environment, such as pollution in the whole
rantai operasional kami. chain of our operations.

Pengelolaan dampak sosial masyarakat sekitar Management of potential impacts on social


tambang. Beberapa faktor yang menjadi community around the mine. Several

sustainability
pertimbangan dalam pengelolaan sosial factors that are taken into consideration in
masyarakat tersebut antara lain adalah: the social community management are:
Lokasi area tambang yang direncanakan jauh Planned mining area will be located
dari area pemukiman penduduk sehingga away from residential areas to avoid the
menghindari potensi konflik sosial dan potential of social conflict and minimize
ASPEK SOSIAL meminimalisir dampak langsung. direct impacts. N

KEMASYARAKATAN Pengelolaan air keluaran tambang secara Integrated management of mine output W E

8 terintegrasi untuk menghasilkan sumber air water to provide drinking water for the S
SOCIAL COMMUNITY
minum bagi masyarakat. community.
ASPECT
Menghindari interaksi langsung proses Avoid direct interaction between process
ataupun dampak kegiatan tambang dengan and impact of mining practices with
aktivitas masyarakat community activities E
N C P
Malibatkan masyarakat untuk beberapa Involve communities in programs that A
kegiatan yang menunjang tambang misalnya support mine operation, for example V P O R
pengadaan barang dan kebutuhan dari goods procurement and fulfillment of I E M T
G R H M N
masyarakat lokal, dan lain-lain. local community needs, etc.
C P O S O U E
Pemenuhan dan kepatuhan penuh terhadap Compliance with the laws and regulation I N P N R
seluruh perizinan terkait operasional tambang, related to the operations of our mines, for
G E L S
M I H
antara lain mencakup: instance:
E E T I
Perizinan operasional tambang seperti : Mining operation permits, such as:
ASPEK PROSEDUR studi kelayakan, AMDAL, RKTTL dan feasibility studies, environmental impact
N Y P
DAN KETAATAN RKAB, UKL dan UPL assessments, RKAB and RKTTL, UKL T
HUKUM and UPL
9
LEGAL COMPLIANCE Perizinan pengelolaan limbah seperti : Waste management permits, such as:
AND PROCEDURAL Limbah B3, Limbah cair dan lain-lain B3 waste, liquid waste, etc.
ASPECT Perizinan lahan seperti: ijin pembukaan Land permits: land clearing permits and
lahan dan Ijin Pemanfaatan Kayu (IPK) Timber Utilization Permit (IPK) GOOD MINING PRACTICE OPERATIONAL & TECHNICAL PRINCIPLES
Pemenuhan biaya jaminan reklamasi Providing reclamation guarantee
(Jamrek), dan lain lain. (Jamrek) funds, etc.
SEMANGAT MEMBARA SUSTAINABILITY STRATEGY

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


N

W E

TATA KELOLA
YANG BAIK
GOOD GOVERNANCE
PRACTICE

P
rinsip tata kelola yang baik
tidak hanya menjadi panduan
bagi seluruh insan KPC
dalam menjalankan kegiatan
operasional, namun juga dalam
berinteraksi, baik dengan
sesama kolega maupun dengan
pihak eksternal dan seluruh
pemangku kepentingan.

T
he principles of Good
Corporate Government not
only serve as a guideline
in running the operations,
but also in interactions with
colleagues, external parties
andall stakeholders.
Tata Kelola yang Baik
_Good Governance Practice

TATA KELOLA
YANG BAIK MEKANISME PENGADUAN:
Speak Up System
GOOD CORPORATE
S
ebagai salah satu pendekatan untuk memastikan setiap
aktivitas operasional dan perilaku insan KPC selalu

GOVERNANCE menjunjung tinggi budaya perusahaan, pedoman perilaku,


etika bisnis dan demi menegakkan semangat anti-fraud/anti-
corruption, KPC menerapkan mekanisme pengaduan melalui
Speak Up System yang dikelola oleh pihak independen.
Mekanisme Speak Up System telah disosialisasikan secara
52 rutin kepada seluruh insan KPC dan pihak terkait, yang
dikoordinasikan oleh Komite Pedoman Perilaku. Selain itu, 53
strategi sosialisasi harian lain juga kami terapkan. Salah
satunya yaitu dengan memasang poster Speak Up System
di berbagai lokasi strategis yang mudah dibaca oleh setiap

BUDAYA PERUSAHAAN karyawan. Melalui Speak Up System, karyawan maupun


pihak eksternal diberikan kemudahan dan wadah untuk
melaporkan pelanggaran atau dugaan pelanggaran dengan
CORPORATE CULTURE cara terstruktur dan terjamin kerahasiaannya. Laporan yang
diterima melalui Speak Up System juga akan dievaluasi setiap
bulan oleh departemen Internal Audit, Direksi dan Dewan

M M
R SPIRIT, ikon budaya perusahaan KPC, terus R SPIRIT, the icon of KPC corporate culture, Komisaris melalui Komite Audit. Jika dugaan pelanggaran
mensosialisasikan nilai-nilai positif bagi constantly communicates positive values that KPC 7 VALUES terbukti, maka sanksi akan diberikan sesuai dengan
keberlangsungan dan peningkatan kinerja can help maintaining and improving employees [G4-56] peraturan perusahaan dan hukum yang berlaku.
karyawan, memberikan panduan perilaku dan performances and provides behavior and morale [G4-SO3][G4-SO4]
semangat kerja bagi setiap insan KPC sehingga guidelines to all KPC people, in order that our people Keunggulan
selalu bersemangat, menjaga profesionalisme, can in all circumstances always be enthusiastic,
EXCELLENCE

A
bertindak independen, bekerja dengan Rajin, professional, independent, diligent, upholding s an approach to ensure the consistency of KPCs
menjaga Integritas, dan Tanggung Jawab, tanpa integrity and responsible. [G4-56]. operational activities and peoples conduct according to the
kecuali dan dalam situasi apapun. [G4-56]. Integritas corporate culture, code of conduct, business ethics, as well
as to establish anti-fraud/anti-corruption spirit, KPC applies a
INTEGRITY whistleblowing mechanism through our Speak Up System that
is managed by an independent party.
KPC 7 VALUES SEBAGAI Transparansi
Coordinated by the Committee on Code of Conduct, Speak
TRANSPARENCY
PEDOMAN PERILAKU Up System is communicated regularly to all KPC people and
related parties. Other daily communication method employed
Kegesitan is including placing Speak Up System posters at various
KPC 7 VALUES AS CODE OF CONDUCT AGILITY strategic locations to be read by every employee. Through
Speak Up System, employees and external parties are given
Pemberdayaan
D K
alam menjalankan setiap kegiatan operasionalnya, PC 7 Values becomes the Companys Code of an easy access and a forum to report any proven or alleged
insan KPC selalu didasarkan pada KPC 7 Values Conduct that guides all KPC people in running violations in a structured and confidential way. Reports
EMPOWERMENT received through Speak Up System will also be evaluated
sebagai pedoman perilaku perusahaan. Kami the operations. We ensure that KPC 7 Values
senantiasa memastikan bahwa KPC 7 Values monthly by the Internal Audit department, the Board of
telah disosialisaikan kepada dan dipahami secara
continues to be communicated to and can be
thoroughly understood by all employees, business
Kerjasama Directors and the Board of Commissioners through the Audit
menyeluruh oleh setiap karyawan KPC, mitra usaha, partners, suppliers, and other stakeholders. For COOPERATION Committee. If the alleged violation is proven, then sanctions
supplier, dan pihak terkait lainnya. Untuk itu Komite this purpose, we establish a Committee on Code of will be given in accordance with the Company rules and
Pedoman Perilaku dibentuk untuk melakukan Conduct to ensure proper communication and oversee Kepedulian applicable law. [G4-SO3] [G4-SO4]
sosialisasi dan mengawasi implementasi KPC 7 the implementation of KPC 7 Values in all of our COOPERATION
Values di lingkungan operasional kami. operational areas.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tata Kelola yang Baik
STRUKTUR TATA _Good Governance Practice
KELOLA PERUSAHAAN
CORPORATE GOVERNANCE STRUCTURE

KOMITE EKSEKUTIF EXECUTIVE COMMITTEE


Komite Eksekutif terdiri atas Chief Executive The Executive Committee of KPC consists
Officer (CEO), Chief Operating Officer (COO), Chief of a Chief Executive Officer (CEO), a Chief
Financial Officer (CFO), dan seluruh General Operating Officer (COO), a Chief Financial
Manager. Tugas dan tanggung jawab Komite Officer (CFO) and General Managers.
Eksekutif terdiri dari pengawasan rutin terhadap Duties and responsibilities of the Executive
seluruh aspek yang terkait dengan kegiatan Committee consists of routine monitoring
operasional tambang, termasuk perencanaan, of all aspects related to mining operations,
identifikasi risiko-risiko operasional, status including planning, identification of operational
operasional harian, kebijakan serta hal-hal risks, daily operational status and policies,
penting lain yang ditujukan untuk pengambilan as well as other matters important for future

S K
truktur tata kelola KPC tidak mengalami perubahan PC governance structure did not change keputusan atau penentuan kebijakan di masa decision-making or policy-making. In addition,
yang signifikan sepanjang tahun 2014. Keputusan significantly during 2014. The highest decision- yang akan datang. Selain itu, komite eksekutif the Executive Committee also evaluates all
54 tertinggi KPC dipegang oleh Rapat Umum making body in KPC is the General Meeting of juga mengevaluasi seluruh kinerja perusahaan aspects of the Company's performance, i.e.
Pemegang Saham (RUPS). Dewan Komisaris dan
Direksi bertanggung jawab kepada RUPS. KPC tidak
Shareholders (GMS). The Board of Commissioners
and the Board of Directors are responsible to GMS.
dalam aspek ekonomi, lingkungan dan sosial,
serta meninjau kepatuhan terhadap aturan yang
economic, environmental and social, reviews
the Companys compliance to applicable
55
memperbolehkan adanya anggota Dewan Komisaris KPC does not allow any member of the Board of berlaku, menetapkan risiko yang harus segera rules and regulations, defines risks that
dan Direksi yang memiliki jabatan rangkap. KPC Commissioners and Board of Directors to assume ditangani dan memanfaatkan peluang yang must be managed and seizes any possible
juga tidak memiliki anggota komisaris independen. other position within the Company. KPC also does dapat diraih. [G4-14] opportunities. [G4-14]
Di samping itu, KPC memiliki sejumlah komite not have any independent board member. In addition,
untuk membantu tugas Dewan Komisaris dalam KPC establishes a number of committees to assist the
KOMITE AUDIT AUDIT COMMITTEE
menjalankan fungsi pengawasan terhadap kinerja Board of Commissioners in performing supervision of
perusahaan secara menyeluruh. [G4-34] the Company's overall performance. [G4-34] Komite Audit dibentuk sesuai dengan Keputusan The Company establishes an Audit Committee
Dewan Komisaris No. L.136/BOC-COM2.8/VI/10 following the Decision of the Board of
RAPAT UMUM PEMEGANG SAHAM GENERAL MEETING OF SHAREHOLDERS tertanggal 1 Juni 2010. Tugas dan tanggung Commissioners No. L.136/BOC-COM2.8 /
jawab utama Komite Audit adalah untuk VI/10 dated June 1st, 2010. The main duty and
KPC mengadakan RUPS satu kali dalam satu KPC holds GMS annually to report on memaksimalkan efektivitas fungsi pengawasan responsibility of Audit Committee is to ensure
tahun untuk mempertanggung jawabkan kinerja the Companys performance to all of our Dewan Komisaris dalam pengendalian internal, most effective supervision performed by the
perusahaan kepada seluruh pemegang saham. shareholders. GMS also determines the amount pengendalian risiko dan kepatuhan terhadap Board of Commissioners on the Companys
Dalam RUPS juga ditentukan besaran kompensasi of compensation that would be received by the ketentuan perundang-undangan yang berlaku. internal control, risk control and compliance to
yang diterima oleh Dewan Komisaris, Direksi Board of Commissioners, the Board of Directors Lingkup pekerjaan Komite Audit tercantum the laws and regulations. The scope of work of
dan seluruh karyawan. Besar nilai kompensasi and all employees, according to the Companys dalam piagam Komite Audit, antara lain untuk the Audit Committee is specified in the Audit
ditentukan oleh kinerja dan pencapaian pada performance and achievement throughout the meninjau risiko fraud/korupsi/pelanggaran Committee charter, including reviewing any risks
tahun tersebut. Kinerja dinilai berdasarkan year. The Companys performance is assessed yang mungkin terjadi di seluruh lingkungan of fraud/corruption/violation that may occur in
kriteria yang mencakup kinerja keuangan, according to various criterias that include perusahaan. Selain itu, dibentuknya Komite Audit the Company. In addition, the establishment
operasional, lingkungan dan sosial seperti yang financial, operational, environmental and social bertujuan untuk meningkatkan efektivitas dan of the Audit Committee aims to improve the
tercantum dalam KPC Report Card pada halaman performances, as listed in the KPC Report Card kualitas komunikasi dengan auditor internal dan effectiveness and quality of communication with
8-11 laporan ini. Disamping itu, para pemegang on page 8 to 11 of this report. During GMS, eksternal. [G4-14][G4-SO3] internal and external auditors. [G4-14] [G4-SO3]
saham juga berkesempatan untuk membahas dan shareholders also have the opportunity to discuss
mengambil keputusan mengenai risiko-risiko yang and make decisions regarding potential risks,
PENGAWASAN DAN PENGENDALIAN INTERNAL SUPERVISION AND INTERNAL CONTROL
mungkin dihadapi, peluang usaha dan penentuan business opportunities and the Companys future
arah strategis perusahaan. [G4-14] strategic direction. [G4-14] Pengawasan dan pengendalian internal Supervision and internal control functions
sebagai bagian dari implementasi prinsip- as parts of the implementation of corporate
DEWAN KOMISARIS BOARD OF COMMISSIONERS prinsip GCG dilaksanakan oleh departemen governance are carried out by Internal
DAN DIREKSI AND BOARD OF DIRECTORS Internal Audit. Departemen ini bertujuan untuk Audit department. This department is
memberikan penilaian yang independen dan established to provide an independent
Dewan Komisaris dan Direksi ditetapkan dalam Members of the Board of Commissioners and objektif guna membantu manajemen KPC dalam and objective assessment that can assist
RUPS. Dewan Komisaris dan Direksi dipilih the Board of Directors are appointed during GMS mencapai sasarannya melalui pendekatan KPCs management in achieving their
berdasarkan kualifikasi dan pengalaman yang according to their respective qualifications and yang sistematis dan terarah. KPC mengadopsi goals through systematic and focused
turut memperhatikan keragaman sudut pandang experiences as well the diversity of viewpoints and standar internasional untuk Praktik Profesional approaches. KPC adopts the International
dan keahlian. Dalam rangka meningkatkan expertise. In order to improve the competence Audit Internal (International Standard for the Standards for the Professional Practice of
kompetensi Dewan Komisaris dan Direksi, of the Board of Commissioners and the Board of Professional Practice of Internal Auditing) yang Internal Auditing published by the Institute
KPC memfasilitasi berbagai program pelatihan Directors, KPC has facilitated various training and diterbitkan oleh Institute of Internal Auditors (IIA), of Internal Auditors (IIA), including its
dan pengembangan yang relevan dengan development programs that are relevant to the termasuk juga didalamnya Kode Etik Auditor Code of Ethics for Internal Auditors.
praktik-praktik pertambangan yang baik dan Companys implementation of good and responsible Internal. [G4-14] [G4-14]
bertanggung jawab. mining practices.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


PENGENDALIAN RISIKO Tata Kelola yang Baik
_Good Governance Practice
RISK MANAGEMENT

P
ada tahun 2008, KPC telah mengembangkan sistem
manajemen risiko korporat. Sistem ini bertujuan
untuk mengidentifikasi dan mengelola risiko melalui INISIATIF ANTI-KORUPSI
sistem pengembangan dan pengelolaan risiko yang baik.
Pemahaman serta kesadaran mengenai pentingnya
ANTI-CORRUPTION INITIATIVE
manajemen risiko yang berkelanjutan merupakan
bentuk komitmen KPC untuk menerapkan tata kelola

P C
emberantasan korupsi di Indonesia ombating corruption in Indonesia is one of
perusahaan yang efektif dan efisien. Berdasarkan
merupakan salah satu prioritas dan tugas the priorities and tasks of our government.
analisa sistem manajemen risiko di tahun 2014, risiko-
negara. Sejalan dengan itu, KPC juga selalu In line with that, KPC commits to create a
risiko yang memiliki pengaruh signifikan terhadap
berkomitmen menciptakan praktik bisnis yang clean business practices that has no room for
kegiatan usaha KPC, antara lain adalah: [G4-14]
bersih dari korupsi. KPC selalu mengawal corruption. KPC oversees the implementation
1. Risiko dampak penurunan harga batubara pelaksanaan budaya anti-korupsi perusahaan of anti-corruption culture in the company
terhadap pendapatan perusahaan dengan sepenuhnya patuh serta taat kepada in compliance with the applicable anti-
2. Risiko naiknya biaya operasional perusahaan peraturan perundang-undangan anti-korupsi corruption laws and regulations. KPC is
mengikuti kenaikan harga minyak dunia yang berlaku. KPC juga selalu bersikap also always cooperative to respond to any
kooperatif dengan lembaga/institusi yang government-authorized agency/institution,
3. Risiko perubahan kebijakan pemerintah pusat
berwenang apabila memang diperlukan. when necessary.
mengenai kuota jumlah produksi batubara
56 Upaya berikut telah kami implementasikan We have implemented several mechanism
4. Risiko beban tambahan biaya operasional
akibat penyelesaian proyek yang tertunda sebagai mekanisme yang kami miliki untuk to oversee the implementation of the values 57
mengawal pelaksanaan nilai-nilai integritas that encourage behavioral integrity and
5. Risiko operasional dan sosial yang timbul dari
dan budaya anti-korupsi perusahaan: anti-corruption culture within the company:
proses pembebasan lahan
[G4-SO3][G4-SO4] [G4-SO3][G4-SO4]

BENTURAN
KEPENTINGAN WHISTLEBLOWING

I
n 2008, KPC has
Bertujuan untuk mendeteksi penyimpangan atau
developed a corporate CONFLICT OF INTEREST pelanggaran yang dicurigai, termasuk fraud yang melibatkan
risk management
system that aims to karyawan dan rekan bisnis termasuk konsultan, vendor,

K
identify and manage PC senantiasa memastikan tidak ada kontraktor, sub-kontraktor dan/atau pihak lain yang terlibat
risks through a proper karyawan, manajemen, direktur, komisaris, dalam aktivitas bisnis dan operasional KPC.
development and atau anggota keluarganya baik secara Aims to detect alleged breaches or violations. For instance,
risk management langsung maupun tidak langsung yang frauds that might involve employees and business associates,
system. Understanding menggunakan wewenang pengambil keputusan which include consultants, vendors, contractors, sub-
and awareness of untuk menerima keuntungan pribadi. KPC akan contractors and/or other parties involved in the business and
the importance memberi tindakan tegas sesuai dengan peraturan operational activities of KPC.
of establishing a perusahaan dan hukum yang berlaku bilamana
continuous risk management is a form of KPC's hal tersebut terjadi. Untuk mencegah adanya
commitment to implement effective and efficient benturan kepentingan tersebut, KPC antara lain FRAUD RISK ASSESSMENT
corporate governance. Based on an analysis of telah menerapkan kebijakan yang mengatur
aspirasi serta hubungan politik. Kebijakan Mencakup Cash Management, Procurement dan Supply
risk management system performed in 2014, risks
tersebut telah disusun dan disosialisasikan Chain. Penilaian resiko berkala dilakukan pada semua
that have significant impacts on KPCs business
kepada seluruh karyawan tanpa terkecuali. divisi, terutama divisi-divisi yang bertanggung jawab untuk
activities, are including: [G4-14]
RISK hubungan eksternal, pengelolaan/kompensasi lahan dan
1. Risk of the decline in coal prices pengembangan masyarakat.
that impacts corporate earnings

K
PC always ensures that there is no employee, Assessments on Cash Management, Procurement and Supply
2. Risk of rising operating costs following management, director, commissioner, or their Chain. Periodic risk assessments are carried out within all
the rise in the global oil prices family member, either directly or indirectly, divisions, especially divisions responsible for external relations,
3. Risk of changes in the government's policy using their authority in making decision for land management/compensation and community development.
regarding the amount of total coal production personal gain. KPC will take a strict action in
4. Risk of an additional operational costs accordance with company rules and laws if such
due to completion of any pending projects incident happens. Therefore, to prevent any
Sepanjang tahun 2014, tidak ada insiden Throughout 2014, there were no incidents
5. Operational and socialrisks arising from conflict of interest, KPC has implemented a policy
pelanggaran maupun indikasi praktik korupsi, of violation and indication of corruption,
land acquisition process that regulates personal aspiration and political
perilaku anti-persaingan, praktik anti-trust anti-competitive behavior, anti-trust practice
affiliations. The policy has been prepared and
dan monopoli, serta pelanggaran hukum yang and monopoly, as well as any violations of
communicated to all employees without exception.
menyebabkan KPC dikenakan denda ataupun the law that led to fines or non-monetary
sanksi non-moneter. sanctions to KPC.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tata Kelola yang Baik
_Good Governance Practice

BERKONTRIBUSI DALAM UPAYA


MEWUJUDKAN SUSTAINABLE
DEVELOPMENT

K W
ami menyadari bahwa kegiatan produksi KPC e realize that KPC production activities
CONTRIBUTING TO SUSTAINABLE berdampak pada perubahan struktur dan have caused changes on the structure
DEVELOPMENT EFFORTS bentang lingkungan alam sekitar. Namun di and landscape of the surrounding
sisi lain kegiatan pertambangan kami mampu environment. Yet, our mining activities provide
memberikan banyak manfaat kepada begitu banyak many benefits to various stakeholders,
pihak, termasuk masyarakat sekitar, masyarakat including local communities, the people of
Indonesia pada umumnya, dan pemerintah Indonesia Indonesia in general, and the Indonesian
melalui kontribusi kami terhadap pemasukan government through our contribution to the
negara melalui pajak dan royalti. Oleh karena itu, state revenue through taxes and royalties.
KPC terus berupaya untuk memastikan agar kami Therefore, KPC always strives to ensure that
dapat memaksimalkan dampak positif dari kegiatan we can maximize the positive impacts of our
operasional pertambangan yang kami geluti, dan pada mining operations, while at the same time
saat yang sama secara terus menerus memastikan continuously ensuring that impacts from
58 bahwa dampak pertambangan dapat diminimalisir, mining activities can be minimized, or even
atau bahkan dieliminasi. eliminated.
59
Khususnya bagi masyarakat Kutai Timur, Especially for people of East Kutai,
lokasi dimana pertambangan KPC where KPCs mine is located,
berada, kami terus berkomitmen we are committed to develop
untuk membangun dan and empower the local
memberdayakan masyarakat communities through
lokal melalui berbagai various community
program community development programs
development yang that are integrated
terintegrasi dengan with the
rencana strategis operational
operasional strategic
dan rencana plan and
tutup tambang. the mine
Sehingga, closure plan.
bilamana Therefore, when
saatnya tiba KPC the time comes
harus menutup for KPC to close our
tambang, keberlanjutan mine, the livelihood of
penghidupan masyarakat people, especially those
khususnya yang berada di residing near mine areas, will
sekitar operasional tambang akan sustainably progress towards
semakin menuju kemandirian, yakni independence, which means they
memiliki kemampuan yang lebih baik will have better capability to manage
dalam mengelola sumber daya di desa resources in their villages or district, that
atau wilayahnya sehingga mendukung pada eventually supports the welfare of the bigger
" BILAMANA SAATNYA TIBA KPC HARUS MENUTUP TAMBANG, kesejahteraan masyarakat secara lebih luas. community. Various continuous programs
MASYARAKAT AKAN LEBIH MUMPUNI MENGELOLA SUMBERDAYA Berbagai program berkelanjutan dan program and social programs have been held in order
DI DESA ATAU WILAYAHNYA DAN MENCIPTAKAN PELUANG USAHA sosial kemasyarakatan kami jalankan dalam rangka to support the achievement of eight targets of
YANG MAMPUN MENINGKATKAN KESEJAHTERAAN mendukung tercapainya delapan butir sasaran Millennium Development Goals (MDGs) or 12
SECARA BERKELANJUTAN. Millenium Development Goals (MDGs) atau 12 butir targets of SDGs (Sustainable Development Goals).
sasaran SDGs (Sustainable Development Goals). Therefore, KPC continues to actively participate as
"... WHEN THE TIME COMES FOR KPC TO CLOSE OUR MINE, Oleh karena itu, KPC terus aktif berperan sebagai a member of the United Nations Global Compact
anggota United Nation Global Compact (UNGC) dengan (UNGC) by supporting and implementing the
THE COMMUNITY WILL BE MORE INDEPENDENT IN MANAGING ITS
mendukung dan melaksanakan nilai inti UNGC, yaitu: UNGC principles, covering aspects of human
OWN RESOURCES IN THEIR VILLAGES OR AREAS AND CREATING
menghargai hak asasi manusia, memperhatikan rights, employment practices, environmental
BUSINESS OPPORTUNITIES THAT CAN IMPROVE THE WELLBEING OF praktik keternagakerjaan, melindungi lingkungan preservation and implementing environmentally-
THE COMMUNITY IN A SUSTAINABLE MANNER" dan melaksanakan operasional yang berwawasan friendly operations, and promoting a culture that
lingkungan, serta mendorong terciptanya budaya anti is against any kinds of corruptions, including
korupsi termasuk pemerasan dan penyuapan. [G4-15] extortion and bribery. [G4-15]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tata Kelola yang Baik
_Good Governance Practice

MENDORONG TERCAPAINYA PROGRAM PEMANFAATAN PROGRAM PENINGKATAN PROGRAM PENDIDIKAN PROGRAM KESEHATAN PENGEMBANGAN PROGRAM KONSERVASI
MILLENIUM DEVELOPMENT GOALS LAHAN PASCATAMBANG KAPASITAS MASYARAKAT DAN PELATIHAN
KPC terus memberikan
USAHA LOKAL ALAM DAN BUDAYA
UNTUK PETERNAKAN DAN PEMERINTAH DESA
(MDGS) DARI KUTAI TIMUR DAN WISATA
Sebanyak 105 orang telah dukungannya kepada Melalui pelatihan, Gerakan dalam
Sebanyak 35 unit mendapatkan bantuan Pemerintah dan pemberian insentif meningkatkan keperdulian
ENCOURAGING THE ACHIEVEMENT OF Kerjasama pengelolaan usaha yang dilakukan pendidikan dan beasiswa masyarakat dalam serta penyediaan outlet berbagai pihak dalam
THE MILLENNIUM DEVELOPMENT GOALS telah dilakukan antara oleh 18 BUMDesa di penuh di tahun 2014. merespon berbagai isu yang juga berfungsi pengelolaan sampah terus
KPC dan Yayasan 4 kecamatan telah Selain itu kerjasama seperti pengendalian sebagai rumah kemas dilakukan bersama dengan
(MDGS) FROM EAST KUTAI Sangatta Baru (YSB). berjalan, dimana bidang dengan pihak seperti penyakit menular, di OLSABARA, 117 Pemerintah Daerah
Sejumlah kegiatan di usahanya difokuskan sekolah dan Balai Latihan kesehatan ibu dan anak, pelaku usaha mikro serta berbagai pihak lain
kedua lokasi tersebut lebih kepada pelayanan Kerja Indonesia (BLKI) peningkatan kapasitas telah difasilitasi yang merupakan bagian

T
idak hanya menggeluti persoalan
telah melibatkan kepada masyarakat juga dilakukan dalam dan wawasan melalui dalam meningkatkan dari program Gerakan
pertambangan saja, KPC
pemerintah desa dan seperti penyediaan rangka meningkatkan pelatihan, studi banding, produktivitas Bersih Sehat dan Mandiri.
berupaya secara berkelanjutan
kelompok masyarakat, listrik, air bersih dan air kualitas lulusan serta dialog interaktif melalui usaha dan omzet Gerakan Jumat Bersih,
memberikan kontribusi positif dan
agar dapat memberikan minum, simpan pinjam, daya saing tenaga radio penyediaan penjualannya. pengelolaan bank sampah
nyata bagi Indonesia dan dunia
manfaat bagi semua penyediaan sarana kerja lokal. KPC juga air bersih serta dan rumah kompos
60 melalui dukungan kami terhadap
pihak yang terlibat, baik produksi pertanian dan memberikan dukungan pengadaan sarana dan terus dilakukan untuk
pencapaian agenda pembangunan Pemerintah
Daerah Kabupaten Kutai Timur dimana didalamnya
secara sosial, ekonomi lain-lain dalam peningkatan prasarana. meningkatkan keperdulian 61
dan lingkungan. sarana dan prasarana masyarakat dalam
berkaitan dengan pencapaian berbagai program
pendidikan. menjaga lingkungannya.
pembangunan di tingkat Nasional dan Internasional
seperti Millenium Development Goals (MDGs).
Dalam implementasinya, ketujuh bidang program
pemberdayaan tersebut diintegrasikan dalam
sebuah skenario yang mendukung kemandirian
desa serta pemanfaatan lahan pascatambang yang
diproyeksikan untuk menjadi sumber perekonomian
alternatif daerah di luar sektor tambang. KPC terus
membangun kolaborasi dengan berbagai pihak
serta meningkatkan akses pemerintah desa dan
masyarakat pada berbagai sumberdaya, untuk
memastikan kontinuitas dan keberlanjutan dari
setiap program yang dilaksanakan.

NATURE CONSERVATION
PROGRAM AND CULTURE

N
ot only focused on mining-
related issues, KPC seeks A movement to raise
EDUCATION AND the awareness of
to continuously contribute
COMMUNITY AND TRAINING PROGRAM HEALTH PROGRAM various parties in waste
positively and significantly to
UTILIZATION OF POST- VILLAGE GOVERNMENT management continues
Indonesia and the world through A total of 105 villagers KPC continues to
MINING LAND FOR CAPACITY BUILDING to be held in cooperation
our support for the achievement have received educational support the Government
ANIMAL HUSBANDRY PROGRAM with the Local
of the Local Government's development agenda assistance and full and the communities LOCAL BUSINESS
of East Kutai Regency, including achievements AND TOURISM scholarship in 2014. In Government and various
A total of 35 business through responding to DEVELOPMENT
of various development programs at national units have been addition, cooperation with various issues, including other stakeholders, a
This program is a joint
and international level, such as the Millennium established by 18 other parties, including infectious disease, Through trainings, part of KPCs Clean,
cooperation between KPC
Development Goals (MDGs). In its implementation, BUMDes (Village- schools and Training maternal and, child incentive, as well as an Healthy and Independent
and Yayasan Sangatta
seven areas of socio-economic and community owned Enterprises) in 4 Center Indonesia (BLKI), health, capacity and outlet that also serves Movement program.
Baru (YSB). Activities held
empowerment program are integrated in a scenario districts, with businesses is also conducted in knowledge building as a packaging facility Other programs,
at both locations involve
that supports village independency as well as the that are focused on order to improve the through trainings, in OLSABARA, a total of including Clean Friday
the local government
use of post-mining land as an alternative source of providing services to quality of graduates and comparative studies, 117 micro businesses Movement, waste bank
and community groups,
livelihood, outside the mining sector, for the village. the community, such competitiveness of local interactive dialogue have been given various management and
in order to provide
KPC continues to establish collaborations with as electricity, clean and labor. KPC also provides via radio programs, development programs house for composting,
socially, economically
various stakeholders and to improve access for the drinking water, savings support in improving the water supply and on increasing business continue to be carried
and environmentally
village government and public to various resources, and loans, agricultural quality of educational providing facilities and productivity and sales out to increase public
benefits to all involved
ensuring continuity and sustainability of each facilities, etc. facilities. infrastructure. turnover. awareness in protecting
stakeholders.
implemented program. the environment.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


KEANGGOTAAN DALAM ASOSIASI Tata Kelola yang Baik
_Good Governance Practice
MEMBERSHIP IN ASSOCIATION

S I
esuai dengan komitmen KPC untuk memberikan n accordance with KPC's commitment to provide
kontribusi positif bagi masyarakat Indonesia. Dalam a positive contribution to the people of Indonesia, operasional KPC telah diintegrasikan dengan area has been integrated with elements of
hal ini, KPC selalu berusaha untuk memberikan KPC always seeks to provide support during public elemen-elemen dalam Good Mining Practice the Good Mining Practice, which then has
dukungan dalam proses pembentukan kebijakan publik policy making processes through involvements yang kemudian diturunkan menjadi serangkaian been translated into a series of procedures
melalui berbagai organisasi dan asosiasi industri yang in various existing organizations and industry prosedur yang implementasinya wajib dilaksanakan that must be implemented by any of KPCs
ada, baik sebagai anggota dan/atau pengurus. Sampai associations, either as a member and/or an oleh setiap karyawan KPC, kontraktor, supplier, employees, contractors, suppliers, as well
dengan akhir 2014, KPC terdaftar sebagai anggota administrator. As of the end of 2014, KPC is listed as serta setiap orang yang berada di dalam wilayah as anyone who is within our operational
dan terus berpartisipasi aktif dalam asosiasi-asosiasi a member and continues to actively participate in the operasional kami. areas.
berikut: [G4-16] following associations: [G4-16]
Dalam mengelola kawasan, segenap insan In managing the mining areas, our people
Komite Olah Raga Nasional Indonesia (KONI) Komite Olah Raga Nasional Indonesia (KONI) KPC bekerjasama melaksanakan inisiatif works together in implementing various
Komite Nasional Pemuda Indonesia (KNPI) Komite Nasional Pemuda Indonesia (KNPI) pengamanan baik aset fisik maupun non fisik. security initiatives for both physical and non-
Kamar Dagang dan Industri (KADIN) Kamar Dagang dan Industri (KADIN) Kami juga mengikutsertakan masyarakat physical assets. We also include the community
sekitar daerah operasi untuk ikut serta around our operation area to support and
BUN (Bakrie Untuk Negeri) BUN (Bakrie Untuk Negeri) participate in the KPCs operational area
berpartisipasi dalam sistem manajemen
APINDO (Asosiasi Pengusaha Indonesia) APINDO (Asosiasi Pengusaha Indonesia) pengamanan wilayah operasional KPC. security management system.
Forum Multi Stakeholder for Corporate Social Forum Multi Stakeholder for Corporate Social
62 Responsibility (FMSH for CSR) Responsibility (FMSH for CSR)
Sistem manajemen pengamanan terpadu KPC KPCs integrated security management

Asosiasi Pertambangan Batubara Indonesia (APBI) Asosiasi Pertambangan Batubara Indonesia (APBI)
tersebut dikenal dengan nama Polisi Masyarakat
(Polmas) yang telah disahkan dengan Peraturan
system is known as the Community Police
(Polisi Masyarakat - Polmas), which has been 63
Asosiasi Pertambangan Indonesia/ Asosiasi Pertambangan Indonesia/ Indonesian Kepala Kepolisian Republik indonesia No. approved by the Regulation of the Chief of
Indonesian Mining Association (IMA) Mining Association (IMA) 24/2007 serta telah memperoleh sertifikasi the Indonesian National Police No. 24/2007,
Forum Reklamasi Hutan Lahan Forum Reklamasi Hutan sistem pengamanan dan direkomendasikan obtained a certification on security system
Bekas Tambang (FRHLBT) Lahan Bekas Tambang (FRHLBT) untuk diadopsi oleh perusahaan tambang and recommended for adoption by other
lainnya. Terdapat 3 tahapan besar yang menjadi mining companies. There are three major
Indonesia Global Compact Network (IGCN) Indonesia Global Compact Network (IGCN)
fokus utama dalam membangun Polmas, yaitu stages that have been the major focus in
United Nation Global Compact (UNGC) United Nation Global Compact (UNGC)
dimulai dari menimalisasi dan memitigasi resiko developing Community Police, which starts
PERHAPI (Perhimpunan Ahli PERHAPI (Perhimpunan Ahli terhadap area, melibatkan kelompok atau warga from minimizing and mitigating risk to the
Pertambangan Indonesia) Pertambangan Indonesia) masyarakat melalui program pemberdayaan area, involving community groups or the
Corporate Forum for Community Corporate Forum for dan pembinaan yang pada akhirnya akan citizens through empowerment and mentoring
Development (CFCD) Community Development (CFCD) menanamkan lalu meningkatkan rasa memiliki programs that will ultimately instill and
Forum Kabupaten Sehat Kabupaten Kutai Timur Forum Kabupaten Sehat Kabupaten Kutai Timur akan perusahaan dan dukungan terhadap enhance ownership spirit of the company and
keberlangsungan operasional kami. support the sustainability of our operations.
Dewan Pendidikan Kabupaten Kutai Timur Dewan Pendidikan Kabupaten Kutai Timur
Sistem Manajemen pengamanan tersebut The security management system is
berlaku pada tiga tempat wilayah pengamanan implemented in three areas where security is
MENJAGA OBJEK VITAL NASIONAL yang dilakukan oleh tiga Badan Usaha Jasa
Pengamanan (BUJP), yaitu Marga Sukses
carried out by three security services providers
(Badan Usaha Jasa Pengamanan - BUJP),
MELALUI SISTEM MANAJEMEN Sejahtera, Nawakara Perkasa Nusantara, dan namely Marga Sukses Sejahtera, Nawakara
PENGAMANAN TERPADU Global Arrow. Setiap anggota pengamanan wajib
untuk mengikuti Pendidikan Dasar (DIKSAR). Hal
Perkasa Nusantara, and Global Arrow. Every
security guard is required by the Security Unit
to follow Basic Education (DIKSAR) in order to
SAFEGUARDING THE NATIONS itu dilakukan setiap Satuan Pengamanan Untuk
possess a good quality of security qualification
memperoleh kualitas keamanan yang baik untuk
VITAL OBJECT THROUGH INTEGRATED menjaga wilayah operasional KPC yang menjadi in guarding KPCs operational area, which has
SECURITY MANAGEMENT SYSTEM Objek Vital Nasional. become the National Vital Objects.

Sampai akhir tahun 2014, total anggota yang Until the end of 2014, total security members

K K
PC telah diberikan kepercayaan yang besar oleh PC has given a great trust by the Indonesian
telah mengikuti DIKSAR Satuan Pengamanan who have participated in Security Units DIKSAR
Indonesia untuk mengelola sebaik-baiknya kekayaan government to well manage the country's
mencapai 498 orang. reached 498 people.
batubara negeri ini. Luas area konsesi pertambangan abundant coal resources. The area of mining
yang dipercayakan kepada kami adalah salah satu yang concession entrusted to us is one of the largest Pada tahun 2014, kami telah meraih pencapaian In 2014, we have achieved 100% status in
terluas di Indonesia dengan jumlah cadangan batubara in Indonesia with very abundant coal reserves. 100% dalam mengamankan seluruh area dan keeping the entire area and KPC's operations
yang amat melimpah, sehingga area operasional KPC Therefore, KPCs operational area has been operasional KPC sesuai dengan target awal yang secured in accordance with our initial goal,
telah ditetapkan sebagai salah satu Obyek Vital nasional established as one of the National Vital Objects kami rencanakan, sedangkan dalam meningkatkan while making 87.5% progress on improving
(Obvitnas) yang berperan strategis dalam mendorong (Obvitnas) which plays a strategic role in driving sistem manajemen pengamanan, kami telah the security management system because
pertumbuhan ekonomi nasional. national economic growth. mencapai progress sebesar 87,5% karena the application of visitors SOP, which is
penerapan SOP visitor yang didukung dengan supported by a computer-based database, is
Menjaga Obvitnas, dan terlebih lagi kepercayaan Keeping Obvitnas and more importantly the trust of
database berbasis komputer masih dalam tahap still in its early stage of implementation.
pemerintah dan seluruh masyarakat Indonesia telah the government and the entire people of Indonesia
awal implementasi.
menjadi bagian yang tidak terpisahkan dari tata have become an integral part of our corporate
kelola perusahaan. Aspek-aspek keamanan wilayah governance. Safety aspects in KPCs operational

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


PENINGKATAN
KINERJA
PERFORMANCE
IMPROVEMENT

B
agi KPC, kinerja yang baik
dan kesuksesan bukan
hanya menghasilkan
keuntungan. Kesuksesan
kami saat ini mendorong kami
untuk bisa mendapatkan dan
memberikan lebih bagi para
pemangku kepentingan kami
hari ini. Kesuksesan berarti
peningkatan kinerja dan
membuat perubahan.

f
or KPC, achieving high
performance and becoming
successful should not
only provide advantages
for the Company. Any present
success has to drive us to
achieve more and give more to
our stakeholders. It is about
continuous improvement and
making a difference.
PENINGKATAN
KINERJA
PERFORMANCE
IMPROVEMENTS

S T
66 epanjang tahun 2014, KPC masih dihadapkan
pada kondisi industri pertambangan yang
hroughout 2014, KPC still faced a difficult and
uncertain condition due to situation in the
sulit dan tidak menentu. Situasi ini menjadi mining industry. This situation became a major
tantangan utama bagi KPC untuk dapat challenge for KPC to overcome, for us to be
bertahan, terus mempertahankan prinsip able to continue implementing sustainable
operasional berkelanjutan yang telah dilaksanakan, operations that have been carried out and evenmore
dan bahkan meningkatkan profitabilitas perusahaan. to improve the profitability of the Company. Facing
Menghadapi tantangan tersebut, peningkatan kinerja these challenges, the Company's performance
perusahaan secara menyeluruh menjadi kunci bagi improvement in overall operations is the key to the
keberlanjutan KPC. Hari ini harus lebih baik dari sustainability of KPC. A tagline of Today should be
hari kemarin, inilah semangat yang mendasari better than yesterday has become the underlying
strategi keberlanjutan KPC. Produktivitas, efektivitas spirit of KPCs sustainability strategies. We continue
efisiensi, dan profitabilitas perusahaan ini terus maintaining productivity, efficiency, effectiveness
kami jaga sehingga KPC mampu terus melangkah, and profitability in order that KPC will be able to
bertumbuh, dan memberikan manfaat bagi seluruh keep moving, growing and providing benefits to all
pemangku kepentingan. [G4-EC8] stakeholders. [G4-EC8]
Peningkatan kinerja tentu berkorelasi erat dengan Performance improvement correlates closely with
bagaimana kami dapat mempertahankan semangat how we maintain passion and determination of all
dan daya juang seluruh insan KPC di tengah of our people when encountering difficulties. Such
kesulitan yang dihadapi. Semangat dan daya juang passion and determination shown by KPC people
setiap Insan KPC inilah yang menjadi motor dan have become the driving force and foundation of the
fondasi keberlanjutan perusahaan ini. [G4-EC8] Company's sustainability. [G4-EC8]

ALAT DAN TEKNOLOGI BISA "TOOLS AND TECHNOLOGY CAN


DIBELI. NAMUN LOYALITAS, BE BOUGHT. HOWEVER, LOYALTY,
KEPERCAYAAN, IDE, INOVASI TRUST, IDEAS, INNOVATION
DAN SEMANGAT DARI ORANG- AND PASSION OF THE PEOPLE
ORANG YANG MENDORONG WHO HAVE BEEN MAKING THE
DAN MENGGERAKAN KPC WAY AND DRIVING KPC TO MOVE
TIDAK DAPAT DINILAI ATAUPUN
ASHOK MITRA FORWARD ARE INVALUABLE
DIGANTIKAN DENGAN APAPUN. CHIEF FINANCIAL AND INDISPENSABLE. THIS IS
INILAH YANG HARUS TERUS OFFICER KPC SOMETHING THAT WE MUST
KAMI PUPUK DAN JAGA. CONTINUE TO MAINTAIN
SESUNGGUHNYA PARA INSAN AND PROTECT. IT IS INDEED
KPC-LAH YANG MEMBUAT OUR PEOPLE WHO ENABLE
PERUSAHAAN INI MAMPU THIS COMPANY TO SURVIVE
BERTAHAN DI TENGAH SEGALA AMIDST ALL SITUATIONS AND
SITUASI DAN TANTANGAN. CHALLENGES."

LAPORAN KEBERLANJUTAN 2014


Peningkatan Kinerja
_Performance Improvement

PERENCANAAN STRATEGIS,
DESAIN DAN OPERASIONAL
STRATEGIC PLANNING DESIGN AND OPERATION

B V
erbagai aspek di tahun ini memang arious aspects happening during
menyulitkan bagi industri batubara. Mulai the year, including low coal prices,
dari harga batubara yang masih rendah, relatively stagnant coal demands
permintaan akan batubara yang relatif and rising component of production
stagnan, dan komponen biaya produksi yang costs, have created problems in the coal
terus meningkat. Melihat kondisi tersebut, industry. Reflecting on those conditions,
tidak bisa tidak, peningkatan produktivitas, KPC inevitably sought to improve our
efektivitas dan efisiensi dalam setiap sendi productivity, effectiveness and efficiency in
operational KPC harus terus ditingkatkan. every operation.
Hal tersebut tentunya membutuhkan This certainly required a careful planning
perencanaan yang matang dan data yang and accurate data on the entire coal chain
akurat di seluruh coal chain KPC. Mulai sejak of KPC, starting from mine planning,
awal perencanaan tambang, kebutuhan infrastructure requirement, economic 67
infrastruktur, keekonomian pembukaan area impact of opening a new mining area,
penambangan baru, proses penambangan mining process, implementation of the
itu sendiri, implementasi teknologi terbaru, latest technology, tools maintenance, up to
perawatan alat-alat, sampai dengan hal-hal aspects related to human resources.
yang terkait dengan sumber daya manusia.

PERBAIKAN BERKESINAMBUNGAN
CONTINUOUS IMPROVEMENT

D B
ivisi Business Process Improvement usiness Process Improvement Division
(BPID) KPC terus memfasilitasi dan (BPID) of KPC continues to facilitate and
mengkoordinasikan berbagai proyek coordinate implementations of various
improvement di sejumlah divisi di KPC. improvement projects in a number of divisions
Tahun ini program improvement KPC telah in KPC. In 2014, improvement program of
memasuki cycle 8. Selain program-program KPC has entered the 8th cycle. In addition
improvement yang berkelanjutan dan terus to the established and closely monitored
di monitor dari cycle-cycle sebelumnya dalam continuous improvement programs from the
rangka meningkatkan efisiensi proses dan previous cycles that aim to improve efficiency
penggunaan bahan bakar serta material of various processes and the use of fuel and
lain, program-program improvement baru other materials, new improvement programs
sepanjang 2014 juga menitikberatkan have been implemented throughout 2014 that
pada perbaikan sikap dan budaya kerja focus on improving attitudes of our people and
insan KPC hingga ke level individu. Hal ini internalizing cooperate culture to the individual
dilakukan untuk meningkatkan kualitas dan level. This initiative is conducted to improve the
mengembangkan inovasi karyawan, serta employees expertise and develop innovation,
memberikan kemudahan dalam setiap as well as providing comfort and ease in their
kegiatan aktivitas pekerjaan mereka. working activities.
Di samping itu, BPID bersama dengan divisi In addition, BPID along with HR Division work
HR bekerja sama untuk merancang ulang together to redesign KPCs Performance
Sistem Manajemen Kinerja (SMK) dengan Management System (PMS) by including
memasukan komponen sikap kerja dan components of work attitude and productivity
produktivitas setiap karyawan menjadi salah of each employee into one of the points of PMS
satu poin penilaian dalam SMK. SMK yang assessment. The new PMS is targeted to be
baru ini direncanakan untuk mulai diterapkan implemented in 2015.
tahun 2015 mendatang.

2014 SUSTAINABILITY REPORT


Peningkatan Kinerja
_Performance Improvement

IMPROVEMENT IMPROVEMENT

80 %
IN ACTION IN ACTION
PENGGUNAAN ANSOL ANSOL USAGE
DALAM PROSES IN BLASTING LIMBAH OLI BEKAS DIGUNAKAN
BLASTING PROCESS KEMBALI SEBAGAI CAMPURAN BAHAN
PELEDAK UNTUK PROSES BLASTING
USED OIL IS REUSED AS ADDITIONAL

S O
alah satu proses dalam pertambangan batubara ne of the coal mining process that requires MIXTURE MATERIAL FOR EXPLOSIVES
yang memerlukan material dalam jumlah significant amounts of material is the blasting DURING BLASTING PROCESS
signifikan adalah proses blasting. Selain dalam hal process. Besides the amount of material used,
jumlah, proses blasting juga memiliki potensi polusi blasting process can also generate potential
akibat penggunaan bahan kimia yang dibutuhkan. pollutants due to the use of required chemicals.
68 Improvement terkait proses blasting ini telah menjadi Related improvements on how to perform
proyek yang secara berkesinambungan dilaksanakan blasting process has become an ongoing project 69
oleh KPC. Kami terus mencari cara agar proses of KPC. We continue looking for ways to have a PENGEMBANGAN UTORO TUNNEL
INFRASTRUKTUR
D
blasting ini dapat dilaksanakan dengan lebih efisien more efficient and safe blasting process. This i tahun 2014, KPC membangun terowongan dengan sistem
dan aman. Tahun ini, setelah melalui berbagai year, after going through various research, KPC microtunnelling yakni di Pit Inul East, Hatari. Teknologi microtunneling,
penelitian, KPC mulai mengimplementasikan
penggunaan Ammonium Nitrate Solution (ANSOL)
has started to use Ammonium Nitrate Solution
(ANSOL) to replace AN Prill material previously
DAN MANAJEMEN teknik pembangunan terowongan menggunakan mesin bor

untuk menggantikan AN Prill yang saat ini digunakan. used. OPERASIONAL Microtunnel Boring Machines (MTBM) ini dikombinasikan dengan teknik
jacking pipa, yakni pemasangan pipa bawah tanah. Teknologi ini lebih
KPC menjalin mitra dengan AEL (African Explosive KPC is in partnership with AEL (African Explosives efisien secara biaya dan lebih ramah lingkungan karena tidak perlu
Limited) yakni kerjasama dalam pengadaan ANSOL di Limited) for the procurement ANSOL for KPC. mengupas tanah 40-50 meter di atasnya. Terowongan microtunneling

P
erbaikan kinerja dan semangat KPC ini memiliki panjang 300 meter berdiameter 1,8 meter dan bagian
KPC. ANSOL yang memiliki kepanjangan Ammonium ANSOL or Ammonium Nitrate Solution was
improvement KPC juga tercermin luarnya 2,12 meter. Sementara kualitas material beton untuk pipa
Nitrate Solution secara resmi diimplementasikan officially used during the blasting process done
dalam berbagai pengembangan beton yang digunakan adalah beton K-700. Terowongan ini mampu
dengan peledakan pertama pada 24 Maret 2014. on March 24th, 2014. With the use of ANSOL, it
infrastruktur pendukung produksi mengalirkan debit air sebesar kurang lebih 54.87 m3/detik. Masa
hasil peledakan yang sangat baik ditunjukan dengan produced excellent blasting results seen from
dan manajemen operasional yang kontruksi menghabiskan waktu empat bulan di mulai pada tanggal 1
kecepatan detonasi/VoD (Velocity of Detonation) VoD (Velocity of Detonation) that exceeded the
diimplementasikan. Beberapa Agustus 2014 dan selesai pada tanggal 2 Desember 2014. Terowongan
melebih dari spesifikasi bahan peledak (VoD lebih required specifications of explosives (VoD over
pengembangan infrastruktur dan ini diberi nama Utoro Tunnel, sebagai bentuk apresiasi kami kepada Chief
dari 4500 meter/detik) Bahan peledak emulsi yang 4500 meter/sec). Blasting process with ANSOL
manajemen operasional yang Operation Officer KPC, Bapak R. Utoro.
dihasilkan ANSOL menunjukan hasil yang jauh emulsion showed much better explosion result
dilaksanakan sepanjang tahun 2014
lebih baik karena tidak membutuhkan bahan kimia because it does not require chemical additives. adalah sebagai berikut:
tambahan. Penggunaan ANSOL akan menghilangkan The use of ANSOL will also eliminate the risk
resiko terjadinya caking (menggumpal) yang biasanya of clot that usually occurs in blasting process
terjadi pada AN Prill. Konsistensi dan kualitas produk using AN Prill. The consistency and quality of
INFRASTRUCTURE UTORO TUNNEL
campuran yang dihasilkan akan lebih baik dengan the mixture output would be better with ANSOL

I
menggunakan ANSOL karena tidak terpengaruh because it is not affected by climate conditions DEVELOPMENT AND n 2014, KPC built a tunnel in
Pit Inul East, Hatari, using
terhadap kondisi iklim seperti temperatur atau such as temperature or humidity. The results
kelembaban. Bahan peledak emulsi yang dihasilkan from emulsion explosives produced by AEL will
OPERATIONAL Microtunneling technology, a
AEL akan memiliki kualitas yang lebih baik have a better quality because the raw material MANAGEMENT tunnel construction technique
karena bahan baku yang digunakan (ANSOL) tidak used (ANSOL) contains no additional chemical that uses Microtunnel Boring
mengandung bahan kimia tambahan. substances. Machines (MTBM) combined
with pipe jacking technique,

T
he passion for continuous
Peralihan ke ANSOL juga membuka peluang untuk Transitioning to using ANSOL also opens up the which is a technique to install underground pipes. This technology
improvements in KPC is reflected
pembuatan emulsi sehingga memungkinkan AEL opportunity for emulsion manufacturing that is more cost-efficient and more environmentally friendly because it
various implementations of
untuk meningkatkan oli bekas didalam emulsi secara allows AEL to significantly increase the use of does not need to remove 40-50 meters soil above the tunnel. This
infrastructure development to
signifikan. Penggunaan oli bekas yang sebelumnya used oil in emulsion. Previously, 55% of our used KPC tunnel is 300 meters in length and 1.8 meters of inside diameter
support production and of proper
sudah mencapai level 55% menggantikan solar, saat oil has been recycled and reused, replacing and 2.12 meters of outside diameter. The type of concrete material
operational management. Several
ini telah berhasil ditingkatkan hingga mencapai 80% diesel fuel, and currently has successfully scaled used for concrete pipe is K-700. This tunnel is able to carry an
initiatives of infrastructure
dan masih memungkinkan ditingkatkan kembali di up to 80% with potential for further increase of approximately 54.87 m3/sec amount of water. Construction period
development and operational
masa mendatang. use in the future. management performed during 2014 lasted for four months starting from August 1, 2014 until December
are as follows: 2, 2014. This tunnel is called as Utoro Tunnel, as a form of our
appreciation to the Chief Operation Officer of KPC, Mr. R.Utoro.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Peningkatan Kinerja
_Performance Improvement

LINEUP & FATIGUE


MANAGEMENT SYSTEM
LINEUP & FATIGUE
MANAGEMENT SYSTEM

D
i tahun 2014, KPC juga mulai menerapkan
teknologi Informasi Lineup & Fatigue
Management System di divisi MOD. Lineup
& Fatigue Management System ini merupakan
KAMERA PENGAWAS CCTV penggabungan dari sistem absensi fingerprint,
70 CCTV SURVEILLANCE CAMERAS
Fatigue Module dan Lineup Dispatch. Penggunaan
sidik jari dalam sistem ini juga memungkinkan 71
D
alam rangka mendukung kegiatan operasional, proses monitoring pengumpulan data menjadi
KPC mulai menerapkan sistem kamera lebih cepat dan akurat. Sistem pencatatan
CCTV di pit Bendili. Sistem kamera CCTV ini kehadiran ini terintegrasi dengan sistem
digunakan oleh Dispatcher untuk memantau manajemen keletihan (fatigue management)
aktivitas antrian truck di area loading point dan sistem antrian alat berat (line Up). Dengan
Panel 6 di Pit Bendili 24 jam, baik siang maupun demikian, semua kegiatan mulai dari awal
malam hari sebagai bagian dari program fuel samapi akhir shift dapat tercatat dan termonitor MEMBUDAYAKAN SEMANGAT
secara terpadu. Dengan implementasi sistem
efficiency dan peningkatan produktivitas yang
ini, efektifitas dan efisiensi proses shiftchange
IMPROVEMENT MELALUI
menjadi perhatian utama dalam kondisi saat ini.
Sistem ini menggunakan kamera outdoor yang dapat ditingkatkan. Setelah melakukan absensi, PROGRAM PENINGKATAN
memiliki teknologi nightvision dengan kekuatan operator langsung memperoleh informasi unit KINERJA DAN PERBAIKAN
yang akan dioperasikan, status dan tingkat
pembesaran (zoom) hingga lebih dari 1 kilometer
fatigue, lokasi shiftchange dan transport yang
BERKESINAMBUNGAN
dan kemampuan manuver putar 360 derajat
sesuai dengan kebutuhan. tertera pada printout tiket di jalur absensinya. DI BERBAGAI DIVISI DI KPC
Bekerja menjadi lebih efektif dan nyaman.

T IMPROVEMENT,
o support our operational activities, KPC

I
n 2014, KPC also began to implement
started to install CCTV cameras in Bendili
Lineup & Fatigue Management information
pit. The cameras are used by our Dispatcher
system in MOD division. Lineup & Fatigue

IMPROVEMENT,
to monitor queueing activity in Panel 6 truck
Management System is a combination of
loading point in Bendili Pit for 24 hours,
fingerprint attendance system, Fatigue Module
day and night, as a part fuel efficiency and
and Dispatch lineup. The use of fingerprints in
productivity increase programs which become the system enables in faster and more accurate

IMPROVEMENT!!
KPCs current main concerns. This system uses monitoring process of data collection. Therefore,
outdoor camera with nightvision technology and through this system, attendance management
zooming feature of more than 1 kilometer and is integrated with fatigue management and
360 degrees rotating function, as required. heavy equipment line up system. Accordingly,
all employees activities from the beginning
untill the end of the shift can be recorded
and monitored in an integrated system. By INSTILING THE SPIRIT OF
implementing this system, effectiveness and IMPROVEMENT THROUGH
efficiency of the shiftchange process can be
improved. After doing the attendance, an PERFORMANCE IMPROVEMENT
operator will immediately receives information PROGRAMME AND SUSTAINABLE
on unit to be operated, status and level of fatigue, IMPROVEMENTS IN VARIOUS
shiftchange location and transport, having
all of the information stated on the printout DIVISION OF KPC
attendance ticket. Therefore, work becomes
more effective and convenient.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Peningkatan Kinerja
_Performance Improvement
KPC CONTINUOUS IMPROVEMENT EXPONENTIAL
ACADEMY (KPC CIA) IMPROVEMENT TRAINING
LOMBA FUEL EFFICIENCY PROJECT

P P
rogram KPC CIA yang sudah dimulai sejak November ada tahun 2014, KPC mengadakan pelatihan

K
2013, terus kami galakkan demi meningkatkan exponential improvement yang bertujuan untuk IMPROVEMENT PC melakukan proyek penghematan bahan bakar sejak
potensi dan kualitas insan KPC. Melalui CIA, sejumlah memberikan pemahaman kepada para karyawan 2008. Projek tersebut dievaluasi secara bertahap untuk
kandidat karyawan yang memiliki potensi lebih untuk mengenai pentingnya konsep perbaikan bagi
MINING SUPPORT meningkatkan pencapaian keberhasilan. Update terakhir
dipromosikan ke jenjang yang lebih tinggi diberikan perusahaan. Pelatihan yang difasilitasi oleh BPID ini DIVISION proyek ini dilakukan pada tahun 2014 melalui Fuel Efficiency
Project Part 4.
kesempatan untuk menjalani program magang di divisi merupakan program singkat yang berisi pembekalan

D
Business Process Improvement (BPID) selama 6 bulan. kepada peserta kursus terkait kompetensi dasar alam mengembangkan inovasi
atau ide para karyawan, Pada tahun 2013, biaya bahan bakar merupakan biaya
Selama proses magang berlangsung, para personel dalam improvement, serta 7-langkah improvement terbesar dari total biaya operasional di Mining Operation
CIA ini diberikan bekal dan pengetahuan tentang cara yang berintikan pada konsep PDCA (Plan-Do-Check- MSD juga melakukan lomba
improvement yang bertujuan Division (MOD), yaitu sebesar 57%. Fuel Efficiency Project
menjalankan proyek improvement dengan metode yang Action) yang dikembangkan oleh KPC. Melalui Part-4 ditujukan untuk meninjau kembali praktek
efisien dan efektif. Program ini bertujuan agar budaya pelatihan ini, setiap karyawan nantinya diharapkan untuk memudahkan pekerjaan
di bengkel. Pemilihan pemenang pengoperasian alat-alat berat yang digunakan untuk
dan semangat improvement dapat ditanamkan pada diri dapat mengembangkan potensi yang dimiliki proses pemindahan overburden (OB). Target proyek adalah
setiap insan KPC. Sampai akhir tahun 2014, KPC telah untuk melakukan perbaikan secara optimal dan berdasarkan penghematan
waktu, biaya, aspek K3 dalam memperoleh rata-rata Fuel Ratio (FR) tahun 2014 sebesar
memiliki 14 personel CIA yang mampu menjalankan berkelanjutan bagi perusahaan. Pelatihan singkat 0,0420 (liter/bcm/menit), atau setara dengan penurunan 6%
program improvement di masing-masing divisinya secara yang diadakan selama delapan jam ini terdiri dari pekerjaan dan improvement
tools yang dihasilkan. Kegiatan terhadap baseline. Target perbaikan jangka panjang adalah
72 berkesinambungan. Sementara itu secara parallel BPID presentasi dan diskusi interaktif, games, simulasi,
ini sejalan dengan upaya KPC menciptakan budaya kerja karyawan peduli efisiensi bahan
juga rutin menyelenggarakan berbagai pelatihan terkait
business improvement untuk level supervisor keatas.
serta pemberian tugas-tugas individu kepada masing-
masing peserta. Pada 2014, sebanyak 63 peserta dari untuk melakukan efisiensi untuk bakar sehingga FR akan secara bertahap turun menuju
angka 0,0360 (liter/bcm/menit), atau setara penurunan
73
12 divisi mengikuti pelatihan exponential training ini. mengurangi biaya produksi.
Selain itu untuk meningkatkan sebesar 19% dari kondisi baseline. [G4-EN5][G4-EN7]

K
PC CIA program that has been started since kompetensi para mekanik, Fuel Efficiency Part 4 ini dirancang dengan memperbaiki

I
November 2013 continues to be conducted to n 2014, KPC conducted exponential improvement MSD menerjunkan langsung tiga (3) komponen objek utama yaitu mengelola Engine
improve the talent and quality of KPC people. training that aimed to give insights to employees on job trainer untuk memberikan Uprate (EUR) agar mencapai angka optimum, penurunan
Through CIA, a number of employees with high the importance of the improvement concept for the bimbingan di lapangan. MSD juga Fuel Burn Rate (FBR), dan monitoring akurasi Fuel Report
potential to be promoted for higher level of Company. The training that was facilitated by BPID melakukan close monitoring dan menggunakan teknologi Banlow System dan Dispatch.
responsibilities are given the opportunity to participate is a brief program that comprises a session on basic menempatkan mini warehouse Implementasi berbagai inisiatif dari projek ini akan
in an internship program in Business Process competencies in performing improvement, as well di pit sehingga mempersingkat menjadikan fuel efficiency sebagai budaya kerja yang
Improvement Division (BPID) for 6 months. During the as 7-step improvement program which takes root on waktu respon apabila terjadi kompetitif serta mendukung kebijakan konservasi
internship, CIA participants are given basic information PDCA (Plan-Do-Check-Action) program developed kerusakan/masalah pada energi di area operasional KPC. [G4-EN7]
and knowledge on how to run improvement projects by KPC. Through this training, every participant kendaraan operasional.
efficiently and effectively. This program aims that was expected to develop their potentials in order

K
the culture and passion for self-improvement can to perform optimal and sustainable improvements PC has conducted fuel savings project since 2008. This
be embedded in each of our people. Until the end of for the Company. The brief training which was held
MINING SUPPORT project is evaluated gradually to increase completion
2014, KPC has 14 CIA graduates who are able to run for eight hours consisted of presentations and DIVISIONS success rate. Last update of this project was carried out
improvement programs in each division on an ongoing interactive discussions, games, simulations, and IMPROVEMENT in 2014, that is, through Fuel Efficiency Project Part 4.
basis. Meanwhile, BPID also regularly organizes individual assignments to each participant. In 2014, COMPETITION In 2013, fuel became the biggest cost out of total operating
various trainings related to business improvement for a total of 63 participants from 12 divisions joined this costs in Mining Operations Division (MOD), which amounted

I
KPC people in supervisor level and above. exponential training. n developing employees
to 57%. Fuel Efficiency Project Part 4 was carried out to
innovation or ideas, MSD holds
review the operation of heavy equipment used during
an improvement competition
overburden (OB) removal process. The target of the project
that aims to facilitate any activity
is to obtain an average of Fuel Ratio (FR) in 2014 of 0.0420
at the workshop. Winners are
MSD CULTURE DAY selected based on aspects of
(liters/bcm/min), equivalent to a 6% decrease against the
baseline, while the long-term improvement target is to
time savings, cost and OSH in

M R
enyadari pentingnya peranan ecognizing the importance of create a culture of fuel efficiency by all employees in order
work and improvement tools
pelaksanaan perawatan dan performing maintenance and that FR will decrease gradually towards 0.0360 (liters/
produced. This competition is in
perbaikan alat-alat produksi repair for production equipment bcm/min), or the equivalent of a 19% decrease against the
line with KPC efforts to improve
bagi seluruh kegiatan di KPC, divisi to support KPC operations, baseline. [G4-EN5][G4-EN7]
efficiency to reduce production
Mining Support Division menjalankan Mining Support Division runs a costs. In addition, to improve Fuel Efficiency Part 4 was designed to improve three (3)
suatu program yang disebut MSD program called MSD Culture Day. mechanical competence, MSD main object components, which are to manage Engine
Culture Day. Program ini bertujuan The program aims to improve provides job trainer to give Uprate (EUR) in order to achieve optimum level, decline
untuk meningkatkan kedisiplinan disciplined work behavior of all on-the-job training. MSD also in Fuel Burn Rate (FBR) and monitor the accuracy of Fuel
para personel di divisi MSD. Melalui personnel of MSD. Through this conducts close monitoring and Report using Banlow System and Dispatch. Implementation
program ini pula, 7 nilai KPC program, 7 KPC values can also be sets up a mini warehouse at the of various initiatives of the project will enforce fuel efficiency
ditanamkan dan diimplementasikan instilled and implemented in every pit to shorten response time as a competitive work culture as well as to support the
di setiap aktivitas di MSD. MSD activity. in case of damage/problem on energy conservation policy in the operational area of PT.
operational vehicles. Kaltim Prima Coal. [G4-EN7]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Peningkatan Kinerja
_Performance Improvement
DALAM PERIODE DURING THE PERIOD
JANUARI-DESEMBER 2014, FROM JANUARY TO
FUEL EFFICIENCY PART DECEMBER 2014, FUEL TOP GUN OPERATOR operator dari empat departemen (Hatari, Bintang,
4 BERHASIL MENCAPAI EFFICIENCY PART 4 Jupiter, Coal Mining) memasuki simulator untuk

P
FUEL RATIO (FR) SEBESAR rogram Top Gun Operator diinisiasi oleh diberikan pelatihan tentang cara mengoperasikan
MANAGED TO ACHIEVE FUEL
BPID pada bulan Oktober 2014. Top Gun unit yang lebih efisien dan aman melalui minimalisasi
0.0429 LTR/BCM/MNT, ATAU RATIO (FR) OF 0.0429 LITERS/ Operator merupakan program kompetisi operational abuse. Untuk mencapai fuel eficiency,
PENGHEMATAN BAHAN BCM/MNT, OR 10,832,145 untuk mencari operator-operator terbaik. operational abuse juga terkait dengan keharusan
BAKAR 10.832.145 LITER. LITERS OF FUEL SAVINGS. KPC berkolaborasi dengan vendor operator untuk mematikan mesin pada saat delay yang
[G4-EN5][G4-EN6][G4-EN7] [G4-EN5][G4-EN6][G4-EN7] Simulator dalam pelaksanaan program tidak diperlukan. Kami saat ini dapat memonitor dan
ini. Tujuan utama dari program Top Gun mengetahui apakah mesin sedang berkerja, dalam
Operator adalah memperbaiki kinerja posisi yang sedang berjalan atau berhenti, dengan
operator, sekaligus mengurangi operational mamasang device yang menghubungkan status alat
abuse yang terjadi di lapangan yang ke dispatch yang ada. Pada prinsipnya, kami berusaha
menyebabkan unit kendaraan tambang
Beberapa penghargaan tingkat Nasional MAN-READY HOURS menjadi tidak efisien dan cepat rusak.
agar semua kinerja operator dapat diperbaiki melalui
dan Asia yang diraih KPC melalui program simulator training.

M
Fuel Efficiency Project Part 4 : an-ready hours adalah parameter yang
Para operator terbaik di KPC awalnya Setelah memasuki simulator, para operator ini
kami gunakan untuk mengukur waktu
1st Winner Specific Innovation for disaring melalui Sistem Manajemen diterjunkan ke lapangan yang kemudian akan diamati
kerja efektif operator. Pada dasarnya
74 Industry dalam National Energy Efficiency proyek improvement man-ready hours bertujuan
Kinerja (SMK). Operator terbaik dipilih dan diobservasi kinerjanya untuk memastikan apakah
Award 2014, Kementerian Energi
dan Sumber Daya Mineral Republik
untuk meningkatkan angka waktu kerja efektif
berdasarkan kedisiplinan, absensi, jam
kerja, kinerja safety dari masing-masing
mereka masih melakukan operational abuse atau
sebaliknya. Tim Penilai yang dipimpin oleh BPID
75
operator sehingga produktivitas turut terdorong
Indonesia, Jakarta 18 November 2014 individu. Dari penilaian tersebut, akan akan memberikan penilaian tiap 3 bulan satu kali,
naik. Proyek improvement untuk meningkatkan
diperoleh ranking operator terbaik dari dengan menyaring total 8 operator terbaik pada
Highly Commended Finalist of Opexcon man-ready hours ini dilaksanakan seiring
setiap departemen serta ditetapkan para empat departemen yang ada dalam kurun waktu 9
Award 2014 dalam Operational Excellence dengan program operator Top Gun dan
operator yang dapat mengikuti program bulan kedepan. 8 orang best-of-the-best operator ini
Conference & Award, Continuous pengembangan SMK. Pada implementasi
Top Gun. Berdasarkan penilaian SMK kemudian akan dikirim ke Bali pada bulan Agustus
Improvement Project Competition, Sistem Manajemen Kinerja (SMK) yang baru
tersebut, telah terpilih sebanyak 250 2015 mendatang untuk mewakili KPC dalam ajang
Jakarta 22 September 2014 di tahun 2015 mendatang, laporan SMK
operator dari total sekitar 3.000 operator kompetisi operator tambang tingkat nasional dan
setiap karyawan akan mencakup komponen
The Best Presentation dalam Asia User di KPC. Pada tahap berikutnya, ke 250 internasional.
penilaian seperti, absensi, safety, man-ready
Group Forum of Immersive Technologies,
hours, serta sikap kerja lain seperti kepatuhan
Denpasar 20-21 Agustus 2014
kepada atasan, dan lain-lain. Dalam tahap awal
Platinum Champion Indonesian CSR Award implementasi proyek man-ready hours di tahun
2014, telah tercatat peningkatan man-ready
2014, Jakarta Juli 2014
hours dibandingkan tahun sebelumnya, yakni
TOP GUN OPERATOR all 250 operators from four departments (Hatari,
Bintang, Jupiter and Coal Mining) enter simulator

T
menjadi sebesar 8.0 jam pada akhir tahun dari op Gun Operator program was program to be given training on how to operate
KPC managed to achieve various national 6.5 jam pada awal tahun initiated by BPID in October 2014. The units more efficiently and safely through reducing
and reagional accolades for our Fuel program is a competition held to find operational abuse. Including to achieve fuel eficiency,
Efficiency Project Part 4 program, namely: best operators. KPC collaborated with a reducing operational abuse is also associated with the
1st Winner Specific Innovation for
MAN-READY HOURS vendor, Simulator, in the implementation requirement for operators to turn off the engine during
unnecessary delays. We are now able to monitor and

M
Industry in the National Energy an-ready hours is a parameter that we of this program. The main objective of
Top Gun Operator program is to improve determine whether the machines are in use, moving
Efficiency Award 2014, the Ministry use to measure effective working time
operator performances, while reducing or stopped, by installing a device that provides the
of Energy and Mineral Resources of of our operators. It basically aims to
on-site operational abuse that produces machine status to existing dispatch. In principle, we
the Republic of Indonesia, Jakarta, increase the number of effective working
inefficiency and can easily damage our strive to have all the operators performance to be
November 18th, 2014 time in order that operators can also have
mining vehicles. improved through simulator training.
Highly Commended Finalist of higher productivity. This improvement
project is carried out in line with Top Gun KPCs best operators are initially screened After participating in the simulator program, the
Opexcon Award 2014 in the Operational
operator program and development of PMS. through Performance Management System operators will then be deployed to the site which for
Excellence Conference & Award,
Specifically in the implementation of the new (PMS) and selected according to discipline, further performance monitoring and observation to
Continuous Improvement Project
Performance Management System (PMS) in attendance, working hours and safety decide whether they still perform operational abuse
Competition, Jakarta, September 22nd,
2014 2015, every employee will get a PMS report performances of each individual. From the or not. Assessment Team led by BPID will hold an
that incorporates assessment components, assessments, we rank best operators from assessment once every three months within a period
The Best Presentation in Asia User including attendance, safety, man-ready each department to further be admitted for of the next 9 months, to get 8 best operators in the four
Group Forum of Immersive Technologies, hours, as well as other work attitudes, such Top Gun program. So far, we have selected existing departments. 8 best-of-the-best operators
Denpasar 20-21 August 2014 as obedience to superiors. In the early stage 250 operators from a total of approximately then will be sent to Bali in August 2015 to represent
of man-ready hours project implementation 3,000 operators in KPC. In the next stage, KPC in in the national and international level of mining
Champion Platinum Indonesian CSR in 2014, we recorded an increase in man- operator competitions.
Award 2014, Jakarta in July 2014 ready hours over the previous year, which was
8.0 hours at the end of the year compared to
6.5 hours at the beginning of the year.

2014 SUSTAINABILITY REPORT


Peningkatan Kinerja
_Performance Improvement
AVERAGE PHYSICAL FUEL IMPROVEMENT
AVAILABILITY EFFICIENCY PROJECT

PEMASARAN MARKETING
OB DIGGER
86,50% DAN HUBUNGAN
PELANGGAN
AND CUSTOMER
RELATIONSHIP
10.832.145
I
n any corporate sustainability strategy,
90,28%
D
alam strategi keberlanjutan perusahaan
OB TRUCK customer becomes the decisive component.
liter manapun, pelanggan menjadi komponen KPC is committed to provide best coal
penentu. Kami berkomitmen untuk
FUEL RATIO (FR) Cycle 8 memberikan produk batubara yang terbaik
products accompanied by superior customer
service. Zero Breach, Zero Contaminant
COAL DIGGER 86,85% 0,0429
disertai dengan pelayanan pelanggan yang
unggul. Zero Breach, Zero Contaminant & Zero
& Zero Reject is not just a motto for KPC,
but has become the main goal of excellent
Reject tidak hanya menjadi motto KPC, namun our products and services that we offer
ltr/bcm/mnt telah menjadi tujuan utama keunggulan produk
91,63%
to the customers. To that end, KPCs
COAL TRUCK dan pelayanan kami untuk pelanggan. Untuk Marketing division is in charge to build
[G4-EN5][G4-EN6][G4-EN7] itu, divisi Marketing KPC bertugas untuk relationships with our customers and
menjalin hubungan dengan para pelanggan bridge the communications regarding the
76 dan menjembatani kebutuhan jumlah dan amount and specifications of coals required
KINERJA PRODUKSI 2013 2014 2013 2014 spesifikasi batubara setiap pelanggan dengan
jumlah dan spefisikasi yang dapat KPC
by the customers and the amount and the
specification that KPC can provide.
77
TAHUN 2014 sediakan.
KPC has the advantage of possessing a
KPC didukung dengan lokasi tambang yang

T
otal pemindahan tanah penutup strategic mine location and is very close
strategis serta sangat dekat dengan pantai to the beach and the sea. Such excellent
(overburden removal - OB) di KPC dan laut dalam. Keunggulan lokasi dan jarak
sepanjang tahun 2014 adalah location and distance can benefit our
ini dapat menguntungkan pelanggan dari customers in terms of the quality of our
507.547 Kbcm yang berada di bawah segi kualitas batubara dan rendahnya risiko
rencana produksi yaitu 510.574 Kbcm. coal and the low risk of contamination. In
kontaminasi. Selain itu, KPC memiliki dan addition, KPC owns and operates our own
Target / Planned

Target / Planned

Target / Planned

Target / Planned
Ketidaktercapaian target pemindahan mengoperasikan terminal kami sendiri, yakni
Aktual/Actual

Aktual/Actual

Aktual/Actual

Aktual/Actual
tanah penutup di tahun 2014 terjadi terminal, which is the Tanjung Bara Coal
Tanjung Bara Coal Terminal, sehingga kami Terminal, enabling us to provide certainty
pada triwulan terkahir yang disebabkan mampu memberikan kepastian ketepatan
oleh perubahan sekuen penambangan. and accuracy of coal loading schedule to
jadwal loading batubara kepada setiap each of our customers.
Hal ini terjadi untuk mengimbangi laju pelanggan kami.
produksi pada periode sebelumnya
sehingga total pencapaian produksi
553.054 531.993 507.547 510.574 49,768 49,756 52,697 52,696
batubara di akhir 2014 sesuai dengan
target yang telah disetujui oleh OVERBURDEN REMOVAL BATUBARA TERTAMBANG KONSISTENSI MUTU
pemerintah yaitu 52,69 juta ton.
( kBCM) (juta ton) CONSISTECY IN QUALITY

2014 PRODUCTION
PERFORMANCE
BEBAS
FLEKSIBEL KONTAMINASI
T
otal overburden removal (OB)
performed by KPC throughout FLEXIBILITY ZERO
2014 was 507,547 Kbcm, below

5 SILA
CONTAMINANT
our production plan of 510,574 Kbcm.
Failure to meet overburden removal
2014

2014
2013

2013

target in 2014 happened during the


last quarter of the year due to changes MARKETING KPC
in mining sequence that was made
to keep pace with production in the
previous period, bringing the total of
coal production by the end of 2014 in 49,77 53,15 52,70 52,36
accordance with the target that had
been approved by the government, BATUBARA BATUBARA RESPONSIF KEHANDALAN
which was 52.69 million tonnes. TERTAMBANG TERJUAL RESPONSIVENESS PENGIRIMAN
(juta ton) (juta USD) RELIABLE DELIVERY

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


COAL TECHNOLOGY UNTUK COAL TECHNOLOGY FOR Peningkatan Kinerja
MEREALISASIKAN ZERO REALIZING ZERO BREACH, _Performance Improvement

BREACH, ZERO REJECT ZERO REJECT

K K
PC mengetahui bahwa pelanggan merupakan PC acknowledges that the customer is an
elemen penting dalam keberlanjutan. Reputasi essential element in our sustainability target.
KPC sebagai produsen batubara dibangun diatas KPCs reputation as a coal producer is also built
kepercayaan pelanggan-pelanggan kami. Untuk on the trust of our customers. To that end, KPC
itu, KPC berkomitmen untuk selalu memberikan is committed to always provide the best for every Nilai Penjualan* Kuantitas Penjualan
yang terbaik bagi setiap pelanggan, baik dari sisi customer, in terms of quality and specifications of Berdasarkan Sales Value Sales Quantity
kualitas dan spesifikasi produk, pelayanan pelangan, our product, customer service, technical assistance Jenis Industri
pendampingan teknis dan layanan purna jual lainnya. and other after-sales service.
Types of Industry Mata Uang Nominal (juta) Nominal (juta) Satuan
KPC membentuk Coal Technology Department KPC establishes Coal Technology Department that Currency Value (million) Value (million) Unit
[G4-8]
yang secara khusus bertugas untuk mengawal is specifically assigned to provide assurance on
Coal Quality, Quantity Management, dan Technical Coal Quality, Quantity Management, and Technical
Marketing. Coal Quality Management merupakan Marketing. In particular, Coal Quality Management GENERAL INDUSTRY USD 101 1.3 ton
bagian integral dari seluruh operasi KPC. Target becomes the integral part of the entire operation
telah ditetapkan untuk manajemen kualitas of KPC. Targets that have been set for coal quality POWER GENERATIONS USD 2.726 41,8 ton
batubara yang meliputi: management include:
Mengoptimalkan produksi dan Optimizing production and
78 jadwal permintaan delivery schedules,
STEEL MILL USD 90 1 ton

Memaksimalkan sumber daya, serta Maximizing resources, and 79


TRADING COMPANY USD 539 8,3 ton
Memastikan seluruh pengiriman kepada Ensuring all deliveries to customers
pelanggan sesuai dengan spesifikasi in accordance with the specifications
Sub Total USD 3.457 52,4 ton
KPC Coal Technology memberikan Technical KPC Coal Technology provides Technical Assistance
Assistance kepada End User Costomers untuk Coal to the End User Customers for Coal Handling
Handling and Combustion dan secara aktif terlibat and Combustion and actively engages with the BERDASARKAN NEGARA /
dengan pelanggan untuk memastikan bahwa kualitas customers to ensure that our coal quality meets BASED ON COUNTRY [G4-8]
batubara memenuhi persyaratan dan dalam waktu the requirements and in accordance with applicable
yang sama sesuai dengan Standard Operating Standard Operating Procedure and International Myanmar
Procedure and International Shipping Regulation Shipping Regulation. Throughout 2014, we managed China 5.903.441 Zealand 0,0%
0,1%
yang berlaku. Sepanjang tahun 2014, kami berhasil to achieve Zero Breach, Zero Reject. [G4-PR9] Taiwan
merealisasikan Zero Breach, Zero Reject. [G4-PR9] Hongkong 2.274.020 New Philippines 1,4% Thailand
Malaysia 4,2%
India 19.561.077 3,7% China
0,4%
11,3%
KINERJA SALES Indonesia 9.065.465 Korea
Hongkong
PENJUALAN PERFORMANCE
0,3%
4,3%
Italy 916.620

D I
i tahun 2014, seluruh hasil n 2014, the whole Japan
produksi batubara KPC Japan 9.260.316 17,7%
production of KPC coal
teserap oleh para pelanggan was absorbed by our
kami baik di dalam maupun both domestic and export Korea 179.334
di luar negeri. Selain itu, KPC customers. In addition,
turut serta dalam pemenuhan KPC participated to fulfill Malaysia 216.213
Domestic Market Obligation Domestic Market Obligation
(DMO) sebesar 17,3% dari total (DMO), therefore providing Myanmar 67.496
produksi kami untuk kebutuhan 17.3% of our total production Italy
batubara Indonesia. Sesuai for Indonesian coal needs. New Zealand 15.510 1,8%
dengan jenis batubara KPC, In accordance with the type
yakni batubara sub-bituminous, of KPC coal, namely sub- India
porsi terbesar penggunaan Philippines 2.214.750
bituminous coal, the largest 37,4%
batubara KPC adalah untuk portion of KPCs coal is used
pembangkitan energi listrik Taiwan 757.901
of for power generation, with
dengan 70% dari pelanggan 70% of our total customers Indonesia
kami adalah pelanggan dengan are long-term contracts
Thailand 1.927.178 17,3%
kontrak jangka panjang dengan customers with maturities
jangka waktu mulai dari 1 tahun, ranging from 1 year, 3 years, Grand Total 52.359.321
3 tahun, hingga 5 tahun. [G4-8] up to 5 years. [G4-8]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

PELESTARIAN
LINGKUNGAN
ENVIRONMENT
PRESERVATION

B
agi kami, pengelolaan dampak
80 lingkungan sejak tahap awal
operasional sampai dengan
pada tahap reklamasi area
81
pascatambang tidak hanya memiliki
kontribusi terhadap terciptanya
kerberlanjutan perusahaan dari
prespektif ekonomi, namun juga
sosial dan tentu saja lingkungan
di saat ini dan di masa yang akan
datang. Arti keberlanjutan bagi KPC
hanya akan benar-benar terwujud
apabila lingkungan sekitar kami
lestari.

F
or KPC, managing
environmental impacts since
early operational stage up to
post-mining reclamation stage
is not only contributing to the
creation of corporate sustainability
from the economic perspective, but
also socially and environmentally,
at the present and in the future.
The real sustainability for KPC will
only be achieved if the environment
around us is sustainable.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

K W
ami menyadari, tanggung jawab e realize, responsibility of the future of post-
yang diemban pada lahan mining land depends on how KPC do a careful
pascatambang, tergantung planning. Mining activities will indeed change
pada bagaimana KPC dapat the composition of the earth and nature, so it
melakukan perencanaan yang is expected to have a concern for destruction
matang dengan apa yang akan of the environment. However, KPC has always believed
terjadi ke depan, setelah tambang. that mining activities should be carried out with full
Kegiatan pertambangan memang responsibility and shall generate added value for the
akan merubah bentuk komposisi environment in the future.
lingkungan, sehingga hal yang
For us, it starts from making a measurable planning. If
wajar apabila mucul kekhawatiran
it is not well-planned, then there will be no result. All of
akan adanya perusakan terhadap
our people always ensure that all post-mining activities
alam. Namun, KPC selalu meyakini,
will start with a long-term planning.
kegiatan pertambangan justru harus
dilaksanakan dengan penuh tanggung To that end, KPC always applies the principles of Good
jawab dan menghasilkan nilai tambah Mining Practice through operating in environmentally
bagi lingkungan ke depannya. friendly mechanism. Planning and implementing end-
82 to-end mining process is conducted with responsibility
Bagi kami, semua bermula dari sebuah
proses perencanaan yang terukur.
and aims to minimize the negative impacts on the 83

PENERAPAN
environment. Starting from pre-planning, production
Jika perencanaan tidak berjalan,
process, implementation of pollution control measures,
maka tidak akan ada yang dihasilkan.
monitoring the impact of mining, biodiversity
Seluruh insan KPC selalu memastikan,
management, reclamation and rehabilitation phase

GOOD MINING
bahwa semua kegiatan pascatambang
of post-mining areas, up to increasing environmental
berawal dari suatu perencanaan jangka
awareness. Not to forget, participation of KPC employees
panjang.
in environmental conservation programs. For us,

PRACTICE
Untuk itu, insan KPC selalu solidarity and cooperation of Our People help ensuring
menerapkan prinsip Good Mining that all environmental preservation processes are run as
Practice dalam beroperasi dengan expected.

PADA ASPEK
mekanisme yang ramah lingkungan.
KPC has built an integrated management system as the
Perencanaan dan pelaksanakan
foundation in maintaining environmental sustainability.
end-to-end mining process dikerjakan
The environmental management system consists of
dengan tanggungjawab dan bertujuan

LINGKUNGAN
environmental targets and programs that focus on:
untuk meminimalisir dampak negatif
terhadap lingkungan. Mulai dari
pra-perencanaan, proses produksi,
pelaksanaan tindakan pengendalian RESTORASI AREA
pencemaran, pemantauan dampak PASCATAMBANG
pertambangan, pengelolaan PENCEGAHAN KE DALAM KONDISI
IMPLEMENTATION OF keanekaragaman hayati, tahap
reklamasi dan rehabilitasi area paska
PENCEMARAN YANG PRODUKTIF,
STABIL, DAN AMAN

GOOD MINING PRACTICE ON


POLLUTION
tambang, hingga meningkatkan PREVENTION POST-MINING AREA
kesadaran lingkungan. Tidak
RESTORATION

ENVIRONMENTAL ASPECTS ketinggalan, peran serta karyawan


KPC dalam program-program v
INTO PRODUCTIVE,
STABLE AND SAFE
pelestarian lingkungan. Bagi kami, CONDITION
[G4-DMA] kebersamaan dan kerja sama dari
seluruh insan KPC lah yang dapat
memastikan semua proses pelestarian
lingkungan terlaksana seperti yang
diharapkan. KONSERVASI AIR
x
DAN EFISIENSI
KPC telah membangun sistem
SUMBER ENERGI w PEMELIHARAAN
manajemen terpadu yang menjadi KEANEKARAGAMAN
pondasi dalam mempertahankan WATER HAYATI
keberlanjutan lingkungan. Sistem CONSERVATION AND
BIODIVERSITY
manajemen lingkungan terdiri dari ENERGY SOURCES
CONSERVATION
target dan program lingkungan yang EFFICIENCY
berfokus pada:

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation
Setiap target dan program tersebut kami tuangkan Each target and program is defined in Objective,
ke dalam Objective, Target, Program (OTP) yang telah Target, Program (OTP) that complies with
sesuai dengan ERA (Environmental Risk Assesment), ERA (Environmental Risk Assessment),
peraturan dan perundangan yang berlaku, standar applicable rules and regulations, environmental
management standards, as well as the results
pengelolaan lingkungan, serta hasil pemantauan
internal dan audit eksternal. Di dalam pelaksanaan of internal monitoring and external audits. Upon MEWUJUDKAN OPERASIONAL
implementation and monitoring, OTP is integrated
dan pemantauannya, OTP diintegrasikan dengan
Sistem Manajemen Lingkungan (SML) Internasional with the international Environmental Management TAMBANG YANG RAMAH LINGKUNGAN
ISO 14000 yang diimplementasikan di KPC. Kami System (EMS) ISO 14000 which is implemented in
selalu melakukan pengujian sampel kualitas air, KPC. We always carry out sample testing of water
REALIZING AN ECO-FRIENDLY MINING OPERATION
kualitas udara, pencapaian target reklamasi, quality, air quality, reclamation target achievement [G4-DMA][MM11]
dan pengelolaan hidrokarbon dan limbah serta and hydrocarbons and waste management, as

K
parameter lingkungan lainnya di laboratorium yang well as other environmental parameters in the eseimbangan aspek lingkungan dan
telah terakreditasi ISO 17025 oleh Komite Akreditasi laboratory that is ISO 17025 accredited by the ekosistem akibat proses penambangan KONSERVASI SUMBER DAYA
Nasional (KAN) dan terdaftar di Kementerian National Accreditation Body of Indonesia (KAN) and harus terus kami jaga. Kami memastikan AIR SECARA SISTEMATIS YANG
Lingkungan Hidup. Sebab bagi kami, validitas data registered in the Ministry of Environment. For us, semua desain operasional yang dibuat harus BERDAPAK POSITIF PADA
yang menjadi acuan dalam pemantauan kinerja the validity of the data which is used in monitoring memenuhi aspek standar kelayakan desain KETERSEDIAAN AIR TANAH BAGI
lingkungan KPC merupakan aspek penting yang KPC environmental performance is an important dan ramah lingkungan. KPC senantiasa KEHIDUPAN MASYARAKAT
turut menjadi prioritas. aspect and also a priority. memastikan bahwa semua kegiatan dan
CONSERVATION of
operasional tambang juga harus memenuhi
84 aspek legalitas dan ketaatan terhadap
water resources will
aturan hukum yang berlaku, antara lain
systematically have a
positive impact on the 85
mencakup: Perizinan Operasional Tambang
availability of ground
(POT) seperti: Studi kelayakan, Amdal,
water for the society
RKTTL dan RKAB, UKL dan UPL; Perizinan

pengelolaan limbah seperti; dan Perizinan
lahan seperti: izin pembukaan lahan dan
izin pemanfaatan kayu, serta pemenuhan
biaya jaminan reklamasi. Berbagai upaya
EFISIENSI ENERGI DAN
MENGEMBANGKAN ENERGI BARU
KPC mewujudkan operasional tambang
DAN TERBARUKAN SEBAGAI
yang ramah lingkungan dan bermanfaat
UPAYA PENGGANTI ENERGI FOSIL
bagi kehidupan sosial masyarakat sekitar
di tahun 2014 telah memperoleh sejumlah EFFICIENCY of energy
penghargaan dan apresiasi baik dalam and development of new
skala nasional maupun internasional atas and renewable energy
berbagai program lingkungan kami yang as a substitute for fossil
mencakup berbagai: energy

PROTEKSI KEANEKARAGAMAN
T
Dapat kami laporkan bahwa sepanjang tahun 2014, We would like to report that during 2014 he balance in the aspects of environment
tidak terdapat sanksi admisnistratif maupun denda there is no administrative sanction and fine and ecosystem due to the mining process HAYATI
yang terkait dengan pelanggaran baku mutu atau associated with violation on quality standards or should be maintained. We ensure that
PROTECTION
pengelolaan lingkungan. [G4-EN29] environmental management. [G4-EN29] all operational design aspects are made to
of biodiversity
As a company, we are committed to always meet eligible standards and eco-friendly
Kami berkomitmen bahwa perusahaan selalu
provide sustainable benefits and added value design. KPC always ensures that all the
dapat memberikan manfaat yang berkelanjutan
economically, socially and environmentally, activities and operations of the mine must
dan memiliki nilai tambah baik secara ekonomis
also meet the legal aspect and compliance
maupun sosial dan lingkungan, antara lain dengan
memanfaatkan lahan pascatambang menjadi lahan
which are including utilizing the post-mining
land into farm land, plantation, fishery, as well with applicable laws, among others: Mine INOVASI DALAM PENGELOLAAN
as source of drinking water for the surrounding Operations Licenses, including feasibility LIMBAH TERPADU
peternakan, perkebunan, perikanan, termasuk
communities. Therefore, since 2004, KPC has studies, EIA, RKTTL and RKAB, UKL and
sumber air baku bagi masyarakat sekitar. Oleh INNOVATION in
made an integrated road map for post-mining UPL; Waste Management License and
karena itu, sejak tahun 2004, KPC telah membuat integrated waste
land, to conduct an in-depth research over Land Permit, including: Clearing Permit
roadmap terpadu lahan pascatambang, untuk management
the next five years from 2005 to 2010. Various and Wood Utilization Permit, as well as
melakukan riset mendalam selama lima tahun ke
stages of planning and implementation of land Costs Of Reclamation Guarantees. Various
depan, sejak 2005 sampai 2010. Berbagai tahapan
restoration have been implemented starting efforts to make KPC mine operations
perencanaan dan implementasi restorasi lahan
from conducting research, testing and a environmentally friendly and beneficial for
telah diimplementasikan mulai dari penelitian, uji
medium scale implementation. Going forward, the social life of the surrounding community
coba, hingga implementasi pada skala menengah.
we hope to get to the production phase for a in 2014 have resulted in a number of
Ke depan, kami berharap dapat sampai kepada fase
larger scale. [MM2] awards and appreciation both nationally and
produksi untuk skala yang lebih besar. [MM2]
internationally for various environmental
programs that include:

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

1. PENCEGAHAN PENCEMARAN
POLLUTION PREVENTION

K K
PC selalu berupaya untuk melaksanakan upaya-upaya PC strives to implement preventive measures 2. Sistem Pengelolaan 2. Mining Water
preventif serta pemantauan rutin demi meminimalisir and regular monitoring in order to minimize
potensi terjadinya pencemaran. Insan KPC terus potential contamination. Our People continues
Air Tambang [MM3] Management System [MM3]
memastikan program prosedur dan target pencegahan to ensure that the program, procedures and Sistem pengelolaan air tambang yang kami Our mining water management system
pencemaran lingkungan yang telah kami tetapkan targets of environmental pollution prevention that miliki bertujuan untuk menghindari dampak aims to avoid impacts of acidic rock
diterapkan dengan baik dan berkelanjutan. we have set are well implemented and sustained. air asam batuan terhadap kualitas badan water on the quality of nearby surface
air permukaan terdekat serta terhadap water bodies as well as on soil quality.
Pengelolaan Air Asam Tambang (AAT) [MM3] Mining Water Management [MM3] kualitas tanah. Air permukaan dari Surface water at various coal mining
berbagai lokasi kegiatan penambangan dan and processing locations is supplied to a
Aktivitas penambangan dan rehabilitasi lahan Mining activities and post-mining area pengolahan batubara dialirkan ke sistem controller system in the form of terraced
pascatambang akan berakibat pada terjadinya perubahan rehabilitation will result in changes in the structure pengendali berupa kolam pengendap sedimentation ponds to be processed and
struktur batuan serta kualitas tanah dan air di sekitarnya. of rock, soil and water quality around the mining bertingkat untuk diproses dan dipantau monitored before then released to public
Material sisa penambangan yang akan menghasilkan area. Mining waste materials that create acid sebelum dialirkan ke badan air umum. water bodies.
Air Asam Tambang (AAT) dengan pH rendah akan mining water with low pH which can contaminate Proses perawatan, pengolahan, dan We perform routine maintenance,
mengakibatkan tercemarnya air tanah dan berkurangnya ground water and reduce soil fertility. To that end,
86 kesuburan tanah. Untuk itu, kami telah melaksanakan we have implemented preventive measures in
rehabilitasi kami terapkan secara rutin
pada kolam-kolam pengendapan yang
treatment, and rehabilitation processes
to each existing deposition ponds. Adding
upaya preventif dalam mengelola batuan asam melalui
klasifikasi dan pemisahan batuan penutup dan desain
managing acidic rocks through the classification ada. Penambahkan kapur pada kolam- lime to the ponds to raise the pH of the 87
and separation of overburden and the design in kolam pengendapan yang bertujuan water or regular ponds maintenance by
pengelolaan air asam tambang. acidimine drainage management. untuk meningkatkan nilai pH air, using dredges are some of the methods
ataupun perawatan kolam rutin dengan that we also apply.
1. Pemisahan Batuan Penutup 1. Separation of Overburden menggunakan kapal keruk, merupakan
Acid mine drainage management starts beberapa metode yang selama ini kami
Proses penanganan air asam tambang diawali
with preventing the formation of acid terapkan.
melalui proses pencegahan pembentukan AAT
dengan cara menutup material yang berpotensi mine water by covering materials that Pemantauan baku mutu air kami lakukan Monitoring of water quality is done by
membentuk AAT. Kegiatan utama dalam proses potentially form acid mine water. Main dengan mengambil sample harian. Sample taking daily samples. The sample will
ini adalah melakukan analisa Net Acid Generation activity in this process is to conduct Net tersebut nantinya akan kami analisa guna be analyzed in order to ensure that
(NAG) untuk mengindentikasi dan memisahkan Acid Generation (NAG) analysis to identify memastikan baku mutu air pada kolam- water quality in deposition ponds is in
batuan yang bersifat asam (Potential Acid Forming and separate rocks that are Potential kolam pengendapan sudah sesuai dengan compliance with the Decree of the Minister
PAF) dari batuan yang tidak bersifat asam Acid Forming (PAF) from those that Keputusan Menteri Lingkungan Hidup No. of Environment No. 113/2003 and East
(Non Acid Forming - NAF), baik dalam kegiatan are Non Acid Forming (NAF), including 113/2003 dan Peraturan Daerah Provinsi Kalimantan Provincial Regulation No.
penggalian, penempatan dan penimbunan batuan during excavation, placement and Kalimantan Timur No. 02/2011. Jika baku 02/2011. If the water quality has already
penutup tersebut. stockpiling of overburden. mutu air yang ada sudah memenuhi standar met the regulation, then will be released to
In 2014, we have conducted Net Acid yang ditetapkan, barulah kemudian kami public water bodies.
Di tahun 2014, kami telah melakukan analisa alirkan ke badan air umum
Net Acid Generation (NAG) terhadap 50.954 Generation (NAG) analysis to 50.954 rock
sampel batuan yang berasal dari areal eksplorasi samples derived from the exploration
(diamond core atau geology drill chips), lubang area (diamond core or geology drill Pengelolaan Air Limbah Wastewater Management
peledakan (blast holes) dan area penimbunan chips), blast holes and the final dump Sebelum terjadinya proses pengaliran air limbah Before waste water is released by KPC to public
akhir (final dump) sebelum reklamasi. Dari before reclamation. From this analysis, KPC ke badan air umum seperti sungai atau laut, water bodies, such as rivers or the sea, we
analisa tersebut dapat diketahui bahwa sampel the result shows that the rock samples kami memastikan bahwa keluaran air limbah ensure that the waste water output has met
batuan terdiri dari 75% batuan NAF dan 25% are 75% NAF rocks and 25% PAF yang dihasilkan telah memenuhi baku mutu yang the quality standards set by the Government.
batuan PAF. Hasil analisa NAG selanjutnya rocks. Furthermore, the result from ditetapkan Pemerintah. Seluruh lokasi titik penataan All points of waste water disposal location have
digunakan sebagai acuan untuk membuat NAG analysis is used as a reference for pembuangan air limbah telah memperoleh izin obtained an approval through the Decree of the
pemodelan batuan, yang bertujuan untuk rock modelling, which aims to guide melalui Keputusan Bupati Kutai Timur dan Keputusan Regent of East Kutai and The Decree of East
menjadi pedoman dalam melakukan penempatan in separating between NAF and PAF Gubernur Kalimantan Timur. Kalimantan Governor.
OB yang terpisah antara NAF dan PAF di daerah OB at the overburden dumping site.
Rock modelling designs that have been
penimbunan batuan penutup. Pemodelan batuan
published in 2014 are: South Pinang 0314,
Pengelolaan Limbah Bahan Management of Hazardous
yang telah diterbitkan selama tahun 2014 adalah:
South Pinang 0314, Melawan North 0214, Melawan Melawan North 0214, Melawan South Rev. Berbahaya dan Beracun (B3) and Toxic Waste Materials
South Rev 0314, Pit Jupiter 0514, Bengalon 0514, 0314, Jupiter Pit 0514, Bengalon 0514, and Limbah B3 yang dikelola termasuk pelumas bekas, Hazardous and toxic waste that we manage are
dan Melawan North 1014. Melawan North 1014. barang terkontaminasi hidrokarbon, filter beroli, hose including used oil, hydrocarbon-contaminated goods,
beroli, limbah medis, limbah hidrogen peroksida, used oil filter, used oil hose, medical waste, hydrogen
grease bekas, baterai/aki bekas, toner bekas, limbah peroxide waste, used grease, batteries / used
kimia, abu insinerator, baterai kering bekas, lampu TL, batteries, used toner, chemical waste, incinerator
wadah terkontaminasi B3, abu batubara, dan tanah ash, used dry batteries, fluorescent lamp, hazardous-
terkontaminasi hidrokarbon. [G4-EN23] and-toxic contaminated container, coal ash and
hydrocarbon-contaminated soil. [G4-EN23]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Limbah B3 dari kegiatan operasional KPC dikelola Hazardous and toxic waste from KPCs operations are Pelestarian Lingkungan
dengan mengikuti peraturan pemerintah dan managed in compliance to government regulations _Environment Preservation
izin pengelolaan limbah B3 yang diperoleh KPC, and hazardous and toxic waste management permit
mulai dari penyimpanan sementara, pemanfaatan, obtained by KPC, starting from temporary storage,
pengolahan internal, sampai dengan dikirim ke recycling, internal processing, until delivery to a
Pengolahan limbah padat terkontaminasi hidrokarbon Treatment on hydrocarbon-contaminated solid
pihak ketiga berizin untuk dikelola lebih lanjut. licensed third party for further processs. The third
dilakukan dengan dua cara, yaitu sebagian diolah dengan waste is done in two ways, which incineration of
Pihak ketiga berizin yang dimaksud adalah party should be a service provider in hazardous and
cara dibakar (insinerasi) dan sebagian lagi dikirim ke some of the waste and sending the rest to the
pengelola limbah B3 yang berada di Indonesia toxic waste management located in Indonesia and has
pengelola berizin. Pengolahan secara insinerasi dilakukan licensed processors. Incineration is done using
dan telah memiliki izin dari KLH untuk melakukan permission from the Ministry of Environment to conduct
dengan menggunakan insinerator yang terletak di Sangatta the incinerator that is located in the Sangatta
pengelolaan sebagian atau semua jenis limbah B3 management of some or all types of hazardous and
North Dump, sesuai dengan izin yang diperoleh berdasarkan North Dump, compliant to the permit obtained
dari penghasil limbah B3. KPC tidak melakukan toxic waste from hazardous and toxic waste producers.
Keputusan Menteri Negara Lingkungan Hidup No. 276 tahun based on the Ministry of the Environment No. 276
pengiriman limbah B3 ke luar negeri. KPC does not send hazardous and toxic waste abroad.
2010 tertanggal 25 Oktober 2010. Berdasarkan keputusan year 2010 dated 25 October 2010. Based on the
tersebut, limbah B3 yang diizinkan untuk diinsinerasi decree, hazardous and toxic waste that is allowed
adalah limbah filter dan majun terkontaminasi hidrokarbon, to be incinerated is filter waste and hydrocarbon-
Jumlah Limbah B3 yang Dikelola Tahun 2014 serta limbah medis yang berasal dari klinik KPC. Proses contaminated rags, as well as medical waste
Total Amount of Hazardous and Toxic Waste 2014 [G4-EN23] pembakaran ini akan menghasilkan abu insinerasi, yang originating from KPC clinic. The combustion
kemudian dikirim ke pengelola berizin. [G4-EN23] process will generate incineration ash, which is
Jenis Limbah Satuan Jumlah Pengolahan then sent to a licensed waste processor. [G4-EN23]
Pelumas bekas (used lubricant) yang ditimbulkan dari
Type of Waste Unit Amount Process kegiatan operasional KPC dan para kontraktor di area Used lubricants from operational activities of KPC
dimanfaatkan untuk ANFO-Emulsi Sangatta kecuali Thiess, dimanfaatkan untuk bahan bakar and our contractors in Sangatta area, except Thiess,
88 Pelumas Bekas + dikirim ke pihak III pembantu peledakan (ANFO-Emulsi), sesuai dengan are used as explosive mixture (ANFO-emulsion),
Used Grease
Ton 10.851,94
Used for ANFO-Emulsion izin pemanfaatan pelumas bekas yang diperoleh melalui
Keputusan Menteri Negara Lingkungan Hidup No.185
in accordance with the permit to recycle used
lubricant that is obtained through the Decree of
89
+ send to 3rd party
tahun 2010 tertanggal 11 Agustus 2010. Berdasarkan izin Minister of the Environment No. 185 2010 dated 11
Majun Terkontaminasi insinerasi + dikirim pihak III
Ton 740,82 yang diperoleh bahwa komposisi pemanfaatan pelumas August 2010. Based on the permit, the composition
Contaminated Used Catton Incineration + send to 3rd party
bekas dan solar baru adalah 80:20. Selama tahun 2014, of used lubricant and new diesel is 80:20.
Filter Terkontaminasi insinerasi + dikirim pihak III jumlah pelumas bekas yang dihasilkan oleh kegiatan Throughout 2014, the amount of used oil both from
Ton 549,73
Contaminated Filter Incineration + send to 3rd party operasi KPC dan para kontraktor kami, baik yang berlokasi operating activities of KPC and our contractors in
Hose Terkontaminasi insinerasi + dikirim pihak III di Sangatta maupun Bengalon mencapai 10,85 juta liter. Sangatta and Bengalon reached 10.85 million liters.
Ton 503,37 Dari jumlah tersebut, sebanyak 4,57 juta liter atau sebesar As much as 4.57 million liters or 42% of them were
Contaminated Hose Incineration + send to 3rd party
42% digunakan sebagai campuran bahan peledak, dan 58% recycled as explosive mixture, and the remaining
Limbah Medis Insinerasi 58%, as much as 6.28 million liters, were shipped to
Ton 3,51 sisanya yaitu sebanyak 6,28 juta liter dikirim ke pengelola
Medical Waste Incineration
berizin. [G4-EN23] a licensed waste processor. [G4-EN23]
Limbah Hidrogen Peroksida dikirim ke pihak III
Ton 8,71
Hydrogen Peroxide Waste send to 3rd party Pemanfaatan Fly Ash dan Bottom Ash Recycling of Fly Ash and Bottom Ash
Grease Bekas dikirim ke pihak III Sesuai dengan izin yang diperoleh, yaitu Keputusan In accordance with the permit obtained
Ton 56,19
Used Grease send to 3rd party Bupati Kutai Timur No.658.31/K.33/2010 tertanggal 25 through the Decree of the Regent of East Kutai
Baterai Bekas dikirim ke pihak III Januari 2010, abu batubara (fly ash dan bottom ash) yang No.658.31/K.33/2010 dated January 25, 2010, coal
Ton 161,72
Waste Battery send to 3rd party berasal dari sisa pembakaran PLTU dikumpulkan di ash (fly ash and bottom ash) generated from our
Toner Bekas dikirim ke pihak III areal penyimpanan Tanjung Bara Coal Ash Stockpile. Abu combustion plant is to be piled at Tanjung Bara
Ton 0,43 batubara ini kemudian akan dimanfaatkan di wilayah Coal Ash Stockpile. The coal ash will then be used
Used Toner send to 3rd party
operasional KPC sesuai dengan izin pemanfaatan abu in KPC operational area in accordance with the
Limbah Kimia dikirim ke pihak III batubara yaitu Keputusan Menteri Negara Lingkungan permit on coal ash utilization, namely the Decree
Ton 71,54
Chemical Waste send to 3rd party Hidup No.185 tahun 2011 tertanggal 6 September 2011 of Minister of the Environment No. 185 year 2011
Abu Insinerator dikirim ke pihak III yang berlaku selama 5 tahun. dated 6 September 2011, which is valid for 5 years.
Ton 13
Insinerator Ash send to 3rd party
Selama tahun 2014, KPC telah memanfaatkan bottom Throughout 2014, KPC used bottom ash as road
Baterai Kering Bekas dikirim ke pihak III ash sebagai pelapis dasar jalan (road base) sebesar 53,16 base up to 53.16 tons, with 1.3 tons for construction
Ton 0,65
Dry Battery Waste send to 3rd party ton, masing-masing 1,3 ton di lokasi jalan menuju Power of road to Tanjung Bara Power Station; 38.86 tons
Lampu TL dikirim ke pihak III Station Tanjung Bara; 38,86 ton di lokasi jalan menuju for the road to ISP Warehouse / Golf Area, P10
Ton 0,92 ISP Warehouse/ Golf Area, kantor P10 dan Power Plant; and Power Plant office; and 13 tons for the road to
Lamp Bulb Waste send to 3rd party
serta 13 ton di lokasi jalan menuju Marine. Marine.
Wadah Terkontaminasi dikirim ke pihak III
Ton 6,25
Contaminated Containers send to 3rd party Selain itu, KPC juga memiliki izin pemanfaatan abu In addition, KPC also has a permit to use fly ash
batubara (fly ash) dari proses pembakaran batubara from the coal combustion process to be mixed with
dimanfaatkan untuk road base,
campuran beton/semen, untuk campur dengan reject coal menjadi batubara low reject coal to become low grade coal, in accordance
Abu Batu Bara paving block grade dan telah memperoleh ijin melalui Keputusan with a permit obtained through the Minister of
Ton 6.556,60
Coal Ash Menteri Negara Lingkungan Hidup No. 459 tahun 2013 Environment No. 459 year 2013 dated 24 December
Reused for road base, concrete / tertanggal 24 Desember 2013 yang berlaku selama 5 2013, which is valid for 5 years. In 2014, a total of
cement mix, paving block 3,697 tons of fly ash were mixed with reject coal to
tahun. Di tahun 2014, sebanyak 3.697 ton fly ash telah di
Tanah Terkontanimasi Bioremediasi campur dengan reject coal menjadi batubara low grade. become low grade coal.
m3 312,19
Contaminated Land Bioremediation

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

Pemanfaatan Abu Batubara (Fly Ash dan Bottom Ash) Tahun 2014 PEMANFAATAN BOTTOM ASH DI LOKASI OPERASIONAL KPC
Utilization of (Fly Ash dan Bottom Ash) in 2014 [G4-EN23] Reusing Bottom Ash in KPC Operational Area [G4-EN23]

Jenis Abu
Batubara Jenis Lokasi Jumlah
Periode
Pemanfaatan Pemanfaatan Pemanfaatan
Period Coal Ash Utilization Location Total Amount
Category
Jalan menuju
Power Station
BOTTOM Tanjung Bara
ASH
Road base (perawatan jalan) 1,3 ton
Road to Tanjung

Triwulan II
Bara Power Plant
Pencampuran
Quarter II
2014
di-blending
dengan reject Tes Kelembaban Material
90 coal menjadi HUMIDITY TEST
MATERIAL MIX
FLY ASH
batubara low
grade - 2.069 ton 91
blend with
reject coal to be
low grade coal
Jalan menuju
ISP Warehouse/
Golf Area, kantor
P10 serta jalan
menuju Power
BOTTOM Plant
ASH
Road base 38,86 ton
Road to ISP
Warehouse/golf
Triwulan III Area, P10 office
Quarter III and road to power
2014 plant
di-blending
dengan reject
coal menjadi
batubara low
FLY ASH grade - 1.628 ton
blend with
Uji Kepadatan dan
reject coal to be Priming Aspal
low grade coal
Triwulan IV Jalan menuju
Pengisian dan Pemadatan DENSITY TEST AND
ASPHALT PRIMING
BOTTOM FILLING AND COMPACTING
Quarter IV
ASH
Road base Marine 13 ton
2014 Road to Marine

Total Pemanfaatan
3.750,16 ton
Total Utilization

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


PEMANFAATAN BOTTOM ASH Pelestarian Lingkungan
DI LOKASI JALAN MENUJU MARINE _Environment Preservation
UTILIZATION OF BOTTOM ASH FOR
CONSTRUCTION OF ROAD TO MARINE
Pengelolaan Limbah Non B3 Non Toxic Waste Management
Limbah non-B3 yang kami hasilkan meliputi Non-toxic waste that we produce includes
sampah umum, limbah kertas, ban bekas, plastik, general waste, paper waste, used tires,
dan kardus bekas. Sampah umum yang dikelola plastic and used cardboards. General waste
oleh KPC adalah limbah umum yang berasal managed by KPC are ones that are from
Pemanfaatan dari areal perumahan karyawan KPC dan areal KPC employees housing and industrial
Bottom Ash di Lokasi
industri KPC. Sampah umum ini dibuang ke Tempat areas. They are sent to the landfill at Hatari
Jalan menuju ISP
Warehouse/ Golf Area, Pembuangan Akhir atau TPA di area dumping Hatari East dumping area. Throughout 2014, total
Kantor P10, dan Power Plant East. Selama tahun 2014, volume sampah umum volume of general waste sent to the landfill
Utilization of Bottom Ash for
yang dibuang ke TPA tersebut mencapai 18.375,60
m3 atau sekitar 7.350,24 ton (dengan asumsi 1 m3
reached 18,375.60 m3 or approximately
7,350.24 tons (assuming 1m3 equivalent to
Construction of Road to ISP
Warehouse/Gold Area, P10 setara dengan 400 kg). 400 kg).
Office, and Power Limbah kertas yang berasal dari perkantoran akan Waste paper from offices will be collected
Plant
dikumpulkan dan dimanfaatkan untuk kegiatan and recycled during reclamation activities,
reklamasi, yaitu sebagai mulsa (mulch) yang as mulch which will be mixed with other
kemudian dicampur dengan bahan lain seperti ingredients, such as seeds, fertilizers and
92 biji, pupuk dan perekat. Bahan-bahan yang sudah adhesives. The ingredients that are mixed with
dicampur dengan mulsa ini kemudian akan
disemprotkan ke lereng areal reklamasi dengan
mulch will then be sprayed on the slopes of
the reclamation area by using Hydroseeder.
93
Jalan menggunakan alat Hydroseeder. Limbah kertas dari Waste paper from offices is also used as
menuju ISP perkantoran juga dimanfaatkan sebagai bahan baku composting material for composting activities
Warehouse/ kompos dan kegiatan pengomposan ini dilakukan di that are carried out in the nursery of KPCs
Golf Area nursery Departemen Lingkungan KPC. Environment Department.
Road to ISP Selain kertas, sampah basah yang berasal In addition to paper, wet waste from kitchen
Warehouse/ dari kegiatan dapur mess karyawan KPC juga activities at KPC employee housing is also
Golf Area
ditambahkan sebagai bahan untuk membuat reutilized as composting material. The
kompos. Kompos yang dihasilkan digunakan compost mix is used for planting, either
sebagai campuran media tanam, baik penanaman di planting in pots or for planting in the
dalam pot maupun penanaman di areal reklamasi. reclamation area.

Pemanfaatan
Kembali Limbah
Non-B3 Tahun 2014
Jalan menuju Recycling of
Kantor P10 Jumlah
Road to
Non-toxic Waste
[G4-EN23]
Jenis Limbah
Type of Waste
Satuan
Unit
Pemanfaatan
Pemanfaatan
Utilization
P10 Office Amount

Kardus Koperasi daur ulang


m3 138,50
Cardboard Recycling Cooperative

Plastik Koperasi daur ulang


m3 34,00
Plastic Recycling Cooperative

Jalan menuju Kertas Pupuk Kompos


ton 72,49
Kantor P10 Paper Compost
Road to
P10 Office Drop Structure
Ban Bekas Reklamasi
each 978
Used Tires Drop Structure for
Reclamation

Karung Bekas Koperasi daur ulang


m3 291,50
Used sack Recycling Cooperative

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

Limbah kardus, plastik dan karung dikumpulkan di Cardboard, plastic and sacks waste are
Koperasi Binaan Divisi ESD. Limbah kardus, plastik collected at Cooperative Mentored by ESD Emisi CO2 Dari Konsumsi Energi dan Pembukaan Lahan
dan karung yang sudah dikumpulkan kemudian Division to be sent to the recycler of cardboard, CO2 Emission From Energy Consumption and Land Clearing [G4-EN15]
dikirim ke perusahaan pendaur ulang limbah kardus, plastic and sacks waste in Balikpapan and
plastik dan karung di Balikpapan dan Surabaya. Surabaya.
Ekuivalen CO2
Ban bekas dari alat berat (truk) dimanfaatkan untuk Used tires from heavy equipment (trucks) are Sumber Emisi Satuan Jumlah
CO2 Equivalent
pembuatan sistem drainage (drop structure) di used for the construction of drainage system (drop Emission Source Unit Amount
areal reklamasi. Selama tahun 2014, sejumlah 978 structure) at the reclamation area. In 2014, a total (kg CO2e)
ban bekas telah dimanfaatkan di areal reklamasi of 978 units of used tires have been recycled in BENSIN
Sariwang Pond (Stage 1 dan 2), Inul East, Murung, the reclamation areas of Sariwang Pond (Stage 1 FUEL
liter 894.481 2.074.666,21
Melawai, Pit J (Stage 1 dan 2), Kedapat (Stage 1 dan and 2), East Inul, Murung, Melawai, Pit J (Stage 1
2), Lock Pond Pit J (Stage 1 dan 2), Keong Repair dan and 2), Kedapat (Stage 1 and 2), Lock Pond Pit J SOLAR
Kedasih. (Stage 1 and 2), Keong Repair and Kedasih. DIESEL
liter 669.020.693 1.804.480.017,54

Penanganan Tumpahan Spill Handling BATUBARA


ton 42.952 71.995.223,12
COAL
Tingginya penggunaan bahan bakar solar dan oli High use of diesel fuel and lubricants in

94 di KPC, menimbulkan potensi bahaya dan dampak KPC can potentially cause hazards and BIODIESEL
liter 34.875.691 87.064.561,84
lingkungan yang disebabkan oleh tumpahan. Oleh
karena itu, kami memiliki prosedur penanganan
environmental impacts, caused by the spill.
Therefore, we have procedures to deal with
BIODIESEL
95
tumpahan dan membentuk Oil Spill Response Team spill handling and form Oil Spill Response PEMBUKAAN LAHAN
agar tumpahan yang terjadi ditangani dengan Team in order to have a quick response when LAND CLEARING
Ha 1.634,4 161.805,60
sesegera mungkin. Selain itu, KPC memastikan any spill occurs. In addition, KPC ensures
oil spill kit selalu tersedia di setiap maintenance that oil spill kits are always available in every TOTAL (Kg CO2e) 1.965.776.294,31
workshop. maintenance workshop.
Selama tahun 2014, terjadi 2 kali tumpahan There were 2 hydrocarbon spills around mine
TOTAL (Ton CO2e) 1.965.776,29
hidrokarbon di beberapa area tambang dan and hydrocarbon storage areas in 2014 with
penyimpanan hidrokarbon. Total volume tumpahan total volume of spills of 16,275 liters. We
GLOBAL WARMING POTENTIAL (GWP) 1.00
tahun 2014 mencapai 16.275 liter. Kami berhasil managed to isolate and clean all spills, so
mengisolasi dan membersihkan seluruh volumen they did not reach outside of mine area.
TOTAL (Ton CO2e) 1.965.776,29
tumpahan tersebut, sehingga tidak ada tumpahan [G4-EN24]
yang keluar dari area tambang. [G4-EN24] (*) Dihitung menggunakan Faktor Konversi Environmental Protection Agency (EPA) versi Juni 2014
(*) Calculated based on Environmental Protection Agency (EPA) version June 2014 Coversion Factor
Selain itu, tanah yang telah terkontaminasi minyak Soil that has been contaminated by oil from
dari seluruh maintenance workshop, khususnya all maintenance workshops, particularly
yang berasal dari fasilitas interceptor, diolah secara from interceptor facilities, is processed with
bioremediasi menggunakan bakteri petrophylic. bioremediation treatment using Petrophylic Dalam rangka pengurangan terhadap dampak In reducing the impacts of emission caused
Pengolahan tanah terkontaminasi minyak ini bacteria. The process for oil-contaminated yang ditimbulkan dari emisi gas pada peralatan by our operational equipments and vehicles,
dilakukan di area Biological Treatment Unit (BTU) soil is conducted in Biological Treatment Unit operasional maupun kendaraan operasional, we always perform regular maintenance on
yang terletak di Sangatta North Dump, sesuai dengan (BTU) area at Sangatta North Dump, according kami selalu melakukan perawatan berkala untuk the equipments and vehicales to keep the
izin yang diperoleh melalui Keputusan Menteri to the permit obtained through the Minister of menjaga efektifitas proses pembakaran. Dalam effectiveness of their combustion process. In the
Negara Lingkungan Hidup No.184 Tahun 2010 the Environment No. 184 Year of 2010 dated 11 pengadaan peralatan baru seperti truk dan alat procurement of new equipment, such as trucks
tertanggal 11 Agustus 2010. August 2010. berat lainnya, KPC mengacu pada standar emisi and other heavy equipment, KPC refers to the
Environmental Protection Agency (EPA) Tier-1, emission standards of Environmental Protection
Tier-2 dan Tier-3. Sehingga kami memastikan Agency (EPA) Tier-1, Tier-2 and Tier-3. Therefore,
Pemantauan dan Pengendalian Emisi Monitoring and Control of Emissions
bahwa setiap kendaraan yang masuk dan we ensure that every vehicle entering and
Penggunaan bahan bakar fosil menjadi sumber utama A major source of carbon emissions in KPCs beroperasional di area KPC sesuai dengan operating in the area of KPC is in accordance with
emisi karbon dari kegiatan operasional KPC, yang operations is from the use of fossil fuels, standar dan layak pakai. [G4-EN19] the standards and in good condition. [G4-EN19]
bertujuan untuk menunjang aktivitas penambangan, which aims to support mining activities, among
Pada proses perbaikan lingkungan serta In the process of improving the environment
antara lain: penggunaan bahan bakar untuk boiler dan others: use of fuels for boilers, generators; use
pengurangan jumlah emisi gas karbondioksida condition as well as reducing the amount of
genset, penggunaan bahan bakar untuk kendaraan of fuels for operational vehicle; use of coal in
pada areal tambang, kami melakukan carbon dioxide emissions in the mining area,
operasional, penggunaan batubara untuk PLTU, serta power plant; as well as during land clearing for
reklamasi yang dilanjutkan dengan revegetasi. we perform reclamation activities, followed by
landclearing dalam rangka pembukaan lahan untuk mining operations.
Vegetasi yang terpelihara dapat menghasilkan revegetation. Protected vegetation can result in
pertambangan.
terciptanya kondisi yang stabil, pencegahan stable land, prevention of erosion and certainly
erosi dan tentunya perbaikan kondisi lahan improving conditions of the mined lands
bekas tambang secara menyeluruh. thoroughly.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


1.191
SELAMA TAHUN 2014, LUAS AREA Pelestarian Lingkungan
REKLAMASI MENCAPAI 1.191 HEKTAR _Environment Preservation
YANG TELAH DITANAMI LEBIH DARI
655.000 PEPOHONAN DAN TUMBUHAN
DARI BERAGAM JENIS DENGAN DAYA HEKTAR (HA) (2014)
Hasil Pengukuran Cerobong Insinerator
SERAP CO2 TINGGI. DENGAN DEMIKIAN
Incinerator Emissions Measurement Result [G4-EN21]
TOTAL LAHAN YANG TELAH DIREKLAMASI

5.740
SEJAK AWAL OPERASIONAL SAMPAI
BML Kep. Limbah Filter Limbah Medis
AKHIR TAHUN 2014 MENCAPAI 5.740 Ka. Bapedal
HEKTAR [MM1] Parameter Satuan Filter Waste Medical Waste
03/1995
Parameter Unit
THROUGHOUT 2014, 1,191 HECTARES OF Standard of
H E K TA R ( H A ) Min Max Min Max
Reference
RECLAMATION AREA HAVE BEEN PLANTED
WITH MORE THAN 655,000 TREES AND Partikel
(mg/m3) 50 10 33 4 39
DIFFERENT TYPES OF PLANTS WITH HIGH Particle

655.000
CO2 ABSORPTION. THUS, TOTAL LAND
SO2 (mg/m3) 250 <1 17 2 27
THAT HAS BEEN RECLAIMED SINCE THE
BEGINNING OF OUR OPERATION UNTIL THE NO2 (mg/m3) 300 0 99 1 114
END OF 2014 IS 5,740 HECTARES [MM1] POHON (TREES)
HF (mg/m3) 10 2 4 1 4
96
CO (mg/m3) 100 <1 12 5 8 97
Pemantauan Kualitas Udara Air Quality Monitoring
KPC selalu melakukan pemantauan terhadap KPC always monitord the ambient air quality, HCl (mg/m3) 70 <3 21 <3 16
kualitas udara ambien, terutama debu di area especially the dust of mining area and
pertambangan dan keluaran pembakaran PLTU, ashes from power plant, generators, and CH4 (mg/m3) 35 <1 29 0 29
genset serta insinerator. PLTU dan genset kami incinerators combustion. We use our power
gunakan sebagai penghasil energi yang mendukung plant and generators as energy producers that As (mg/m3) 1 <0,001 <0,001 <0,001 <0,001
seluruh kegiatan perusahaan. Sementara support all activities of the Company, while
insinerator kami gunakan untuk memusnahkan we use incinerators to destroy hydrocarbon- Cd (mg/m3) 0,2 <0,001 <0,005 <0,001 0,01
limbah terkontaminasi hidrokarbon (filter dan contaminated waste (filter and rags) and
majun) serta limbah medis dari klinik. medical waste from the clinic. Cr (mg/m3) 1 <0,005 <0,03 <0,005 <0,03
Berdasarkan pengukuran dan pemantauan emisi Based on the measurement and monitoring of
Pb (mg/m3) 5 <0,01 0,08 <0,01 0,38
udara pada cerobong PLTU, genset dan insinerator air emissions at the power plant, generators
sepanjang tahun 2014, menunjukan bahwa seluruh and incinerators chimneys throughout 2014,
Hg (mg/m3) 0,2 <0,0005 <0,001 <0,0005 <0,001
parameter baku mutu emisi telah memenuhi the result shows that all the parameters have
baku mutu yang ditetapkan oleh Kementerian met the emission quality standards set by the
Lingkungan Hidup. Ministry of Environment. Tl (mg/m3) 0,2 <0,02 <0,02 <0,02 <0,02

Opasitas
(%) 10 5 7,5 2,5 5
Data Pemantauan Emisi Udara pada Cerobong PLTU Tahun 2014 Opacity
Monitoring Data on Power Plant Emissions 2014 [G4-EN21] Efisiensi
(%) - 99,99 100 99,99 99,99
Efficiency
Tanggal Sulfur Dioksida Nitrogen Oksida (NOx) Total Opasitas Velositas Gas
Date (SO2) sebagai NO2 Partikulat Opacity m/sec - 5,64 30,48 7,19 24,46
Lokasi Kode Gas Velocity
Location Code Unit (Mg/m ) 3
(Mg/m ) 3
(Mg/m ) 3
(%)
CO2 % - 1,2 8,3 5,4 9,4
Baku Mutu*) 750 850 150 20
Cerobong PLTU 1 Boiler Temperature Gas
JUN-14 192,00 627,00 56,10 11,80 oC - 111 234 121 241
(Boiler 1 - FL01) T/A 101 Gas Temperature

Cerobong PLTU 2 Boiler Tekanan Udara


JUN-14 637,00 699,00 62,70 12,40 mmHg - 748 766 758 781
(Boiler 2 - FL02) T/A 102 Air Pressure

Cerobong PLTU 1 Boiler


DES-14 344,00 603,00 <0.10 10,00
(Boiler 1 - FL01) T/A 101
Cerobong PLTU 2 Boiler
DES-14 23,00 628,00 <0.10 10,00
(Boiler 2 - FL02) T/A 102

*) Standar Baku Mutu merujuk pada Peraturan Kementrian Lingkungan No. 21/2008 tentang Standar Mutu Tetap Sumber Emisi
untuk Industri dan Aktivitas Pembangkit Listrik - Lampiran I A. Baku Mutu Tetap Sumber Emisi Pembangkit Tenaga Listrik
*) Quality Standard refers to Regulation of the Minister of Environment no. 21/2008 on Quality Standards Fixed Emission Sources,
for businesses and / or activities Thermal Power Plant - Annex I A. Quality Standards Fixed Source Emissions Power Plant.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan

2.
_Environment Preservation
RESTORASI
EKOSISTEM AREA
PASCATAMBANG ZONA LINDUNG digunakan untuk pemanfaatan air, PROTECTION ZONE is used for water
seperti pengadaan sumber air. Sementara restorasi reservation, for example as water source.
ECOSYSTEM habitat dan keanekaragaman hayati menjadi fokus Meanwhile, restoration of habitats and
RESTORATION utama pada ZONA KONSERVASI keanekaragaman biodiversity become the main focus at the
OF THE POST hayati, dimana kami mengembangkan spesies biodiversity CONSERVATION ZONE, where we
lokal sesuai dengan kondisi awal (rona awal) dan grow local species following the initial condition
MINING AREA spesies baru yang sesuai dengan ekosistem sekitar. (baseline) and new species in accordance with
Pada tahun 2014, eks Pit Jupiter yang telah selesai the surrounding ecosystem. In 2014, ex-pit
ditambang pada tahun ini, juga akan dipersiapkan Jupiter that has closed its mining activities
secara terintegrasi dari berbagai aspek untuk this year will also be integratedly prepared for
memberikan hasil yang berkelanjutan bagi area various aspects to support sustainability of the
pascatambang. post-mining area.
Selanjutnya, ZONA PENYANGGA merupakan zona BUFFER ZONE is a zone that is adjacent to the

S K
udah menjadi tujuan utama KPC untuk PC has a priority to restore the conditions
yang berbatasan langsung dengan Taman Nasional Kutai National Park, designed to support the
mengembalikan kondisi lingkungan, habitat flora of the earth and nature, flora and fauna, as
Kutai. Zona ini dirancang untuk menunjang aktivitas activities of rehabilitation and management of
dan fauna, serta produktivitas area pascatambang well as the productivity of post-mining land
rehabilitasi dan pengelolaan area bekas tambang KPC post-mining area. In addition to utilization
98 seperti sediakala. Oleh sebab itu, upaya pelaksanaan to their initial conditions. Therefore, restoration
KPC. Selain pemanfaatan dan pengembalian and restoration of biodiversity, we are also
kegiatan restorasi di KPC telah melalui perencanaan
yang matang dan terukur berdasarkan dokumen
projects in the KPC have to go through careful
and measurable planning based on KPCs
keanekaragaman hayati, kami juga mengembangan
lahan pascatambang sebagai ZONA ECO-WISATA,
developing post-mining areas as an ECO-
TOURISM ZONE, including Telaga Batu Arang.
99
Desain Restorasi Ekosistem Lahan Bekas Tambang Ecosystem Restoration Design for Post Coal
salah satunya adalah Telaga Batu Arang.
Batubara KPC yang dirumuskan pada tahun 2009. Mining Area that was formulated in 2009. The
Dokumen ini telah dikembangkan melalui Pusat document has been developed by the Research Kami percaya bilamana direstorasi dan dikelola We believe if restored and managed properly, post-
Penelitian dan Pengembangan Hutan dan Konservasi and Development Center for Forest and Nature dengan baik, lahan pascatambang dapat memberikan mining area can provide added value and great
Alam yang berkolaborasi dengan Kementerian Conservation in collaboration with the Ministry nilai tambah dan potensi yang begitu besar bagi potential for the sustainability of communities.
Kehutanan. Berdasarkan desain yang ada, restorasi of Forestry. Based on the design, post-mining keberlanjutan masyarakat. Saat ini, beberapa area Currently, some of the post-mining areas, such
area pascatambang dapat dibagi menjadi 5 zona, restoration area can be divided into five zones pascatambang, seperti Peternakan Sapi Terpadu as Integrated Cattle Farming (PESAT) or Telaga
yaitu: [MM2] namely: [MM2] (PESAT) atau Telaga Batu Arang (TBA), tidak Batu Arang (TBA), do not only become tourist
hanya merupakan daerah kunjungan wisata untuk destinations for the surrounding communities, but
masyarakat sekitar, namun juga menjadi sarana bagi also a place to learn, providing a great educational
murid untuk belajar, memberikan nilai edukasi yang value for students. To that end, the UTILIZATION
besar. Untuk itu pada ZONA PEMANFAATAN, yang ZONE, which covers 45% of the total post-mining
luasnya mencapai 45% dari total area pascatambang areas of KPC, has been developed and utilized
KPC, dikembangkan dan dimanfaatkan menjadi for local agribusiness activities, including cattle
berbagai aktivitas agrobisnis lokal seperti peternakan breeding, freshwater fish farming, as well as to
sapi, budidaya ikan air tawar, penanaman rumput plant elephant grass and elephant cassava. In
gajah, dan penanaman singkong gajah. Pada tahun 2014, ex-pit Jupiter that has closed its mining
2014, Pit Jupiter yang telah selesai ditambang pada activities this year will also be integratedly
tahun ini, juga akan dipersiapkan secara terintegrasi prepared to provide sustainable benefits for the
dari berbagai aspek untuk memberikan manfaat yang society and the environment.
berkelanjutan bagi masyarakat dan lingkungan.

zona 1: zona 2: zona 3:


KONSERVASI Pemantauan Indeks Pemantauan Pemantauan
LINDUNG PENYANGGA Keanekaragaman Hayati Lokasi Ronal Awal
CONSERVATION Monitoring Monitoring
PROTECTED BUFFER Biodiversity Index Location Initial Index
2013 2014
Monitoring [G4-EN13]
AB Far North 1,22 1,26 1,24

Kutu Kambing 1,43 1,30 1,19

Melawan 1,53 1,18 1,27

Pelikan 1,47 1,32 1,28


zona 4: zona 5: Pit J 1,36 1,31 1,23
WISATA PEMANFAATAN
Rata-rata
TOURISM UTILIZATION 1,43 1,27 1,24
Average

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

Pengembangan Kerjasama
Budidaya Ikan di KPC dan IPB
Area Pascatambang Untuk PESAT
Telaga Batu Arang Cooperation
Fish Farming of KPC and
Development in IPB in PESAT
Post-Mining Area of [G4-EN13]
Telaga Batu Arang
100 [G4-EN13]
101

P T P P
engembangan keramba ikan mulai he development of fish farming ESAT merupakan cikal bakal ESAT becomes the pilot project for
dilakukan pada September 2013. activities began in September 2013 permodelan pemanfaatan lahan utilization of KPC post-mining area,
Terdapat empat jenis ikan, yaitu nila, with four types of fish, including pascatambang KPC yang secara specifically related to self-provision
lele, patin dan ikan mas. Total ikan yang tilapia nilotica, catfish, iridescent shark khusus mengacu pada swasembada in meat supply. To maximize the
ditebar di TBA sebanyak 12 ribu ekor and carp. Total fishes grown at TBA are daging. Untuk memaksimalkan results and impacts of utilization of
dengan jumlah 14 keramba. Sebanyak 11 12 thousand fishes spread inside a total hasil dan dampak pemanfaatan post-mining areas, KPC has resumed
keramba telah dikembangkan langsung of 14 cages. A total of 11 cages have lahan pascatambang tersebut, KPC the cooperation with the Bogor
oleh KPC melalui Mining Operation been developed directly by KPC through melanjutkan kembali kerjasama Agricultural University (IPB) to support
Division, Mining Support Division dan Mining Operation Division, Mining dengan Institut Pertanian Bogor untuk economic development of what was
Health Safety Environment and Security. Support Division and Health Safety mendukung pembangunan ekonomi yang a mine area into an agricultural
Sementara tiga keramba lainnya Environment and Security Division, while pada awalnya kawasan tambang menjadi economic area. In the future, we will
disumbangkan oleh tiga kontraktor three other cages are donated by three kawasan ekonomi di bidang pertanian. massively develop cattle farming
KPC, yaitu PT United Tractors, PT Pama contractors of KPC, namely PT United Ke depannya, proyek peternakan akan project in order that it can become
Persada Nusantara dan PT Thiess Tractors, PT Pama Persada Nusantara dikembangkan secara masif, sehingga a source of economic income for the
Contractor Indonesia. and PT Thiess Contractor Indonesia. dapat menjadi salah satu sumber development of the region, as well as
ekonomi pembangunan daerah serta becoming a model for modern and
Pada April 2014, KPC melakukan On April 2014, KPC held an event in
menjadi model peternakan yang modern profitable cattle farming.
acara panen dan makan bersama yang which we harvested fishes from the
dan menguntungkan.
dihasilkan dari budidaya ikan. Ikan farms and ate them together. Fishes As for sustainability of post-mining
keramba dari kolam pascatambang from the post-mining fish farms are Sedangkan untuk berkelanjutan area areas, a team of experts from IPB
sendiri merupakan ikan yang aman safe for consumption; therefore, fish pascatambang, tim ahli IPB dengan KPC works together with KPC to prepare
untuk dikonsumsi, sehingga budidaya farming could be developed in post- mempersiapkan lahan pascatambang post-mining area of Pit A for the
ikan layak dikembangkan di area mining areas. Going forward, KPC plans Pit J sebagai lokasi pengembangan dan development and cultivation of maize,
pascatambang. Kedepannya, KPC to coordinate with the government of kegiatan budidaya jagung, singkong dan cassava and soybeans, to be used
berencana akan berkoordinasi dengan East Kutai Regency to establish ponds kedelai sebagai bahan baku konsentrat as concentrates for cattle fattening.
pemerintah Kabupaten Kutai Timur in the post-mining areas. In developing untuk penggemukan sapi. Saat ini, lahan Currently, a total six acres of land of
untuk mengembangkan Kolam di areal the fish farming project, KPC is in enam hektar bekas lahan tambang post-mining area has been planted
pascatambang. Dalam mengembangkan collaboration with Mulawarman telah ditanami bibit rumput gajah yang with grass seed to feed the cows
budidaya ikan ini, KPC berkerjasama University (UNMUL), specifically on nantinya akan menyuplai makanan sapi di in PESAT, as well as a source of
dengan Universitas Mulawarman post-mining pond. KPC and UNMUL PESAT, serta sumber rumput gajah bagi elephant grass for the communities
(UNMUL) di kolam pascatambang. Telah have cooperated in monitoring the masyarakat sekitar tambang. around the mine.
menjadi bagian kerja sama KPC dan water biodiversity in the mining area.
UNMUL untuk memantau Biota Perairan
di kawasan tambang perusahaan.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


3. PEMELIHARAAN
B
agi KPC, pemeliharaan
keanekaragaman hayati tidak
KEANEKARAGAMAN hanya penting bagi keseimbangan Pelestarian Lingkungan
ekosistem dan kesuksesan aktivitas _Environment Preservation
HAYATI restorasi di area kami, akan tetapi
lebih dari itu, keanekaragaman
MAINTAINING hayati yang terpelihara dengan
baik merupakan warisan yang tidak
BIODIVERSITY ternilai bagi generasi mendatang. Berdasarkan data hasil pengamatan yang diperoleh Independent third party survey result data showed
dari hasil survei oleh pihak ketiga, kami menemukan that more and more Orangutan come and live in KPC
semakin banyak Orangutan yang berdatangan di area post mining reclamation area, some of them has build

F
or KPC, maintenance of reklamasi pascatambang KPC, bahkan beberapa telah their family and nurture a new communities in the
biodiversity is not only important membentuk keluarga dan komunitas baru. reclamation area.
for the balance of the ecosystem
and the success of restoration
program in our area. More than
that, well-maintained biodiversity
is a valuable heritage for future
generations.

102
Tipe dan Jumlah Flora-Fauna yang Ditemukan di Area Reklamasi KPC 103
The Types and Amount of Flora and Fauna Found in KPC Reclamation Area

153
Spesies Tumbuhan Balangeran
Species of Vegetation (Shorea Balangeran)
6 Red Balau
Spesies Asli Red Meranti
Kalimantan (Shorea Johorensis)
Species Endemic Light Red Meranti
to East Kalimantan Kapur
3 (Dryobalanops Aromatica)
Spesies Dilindungi Borneo Camphor
Protected Species

23
Spesies Mamalia
Species of Mammals Bornean Orangutan
(Pongo Pygmaeus Morio)
2
Proboscis Monkey
Spesies Asli (Narsalis Larvatus)
Kalimantan
Proboscis Monkey
Species Endemic
to East Kalimantan Long-tailed Macaques
(Macaca Fascicularis)
2 Long-tailed Monkey
Spesies Dilindungi
Protected Species

7 Rice Green Frog


Spesies Amfibi (Rana erythraea)
Species of Amphibians Green Paddy Frog

Punai Land
26
(Chalcophaps Indica)
Spesies Burung Emerald Dove
Species of Birds

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
Melestarikan Populasi Orangutan Preserving Orangutan Populations _Environment Preservation
di Area Reklamasi [G4-EN13] in Reclamation Area [G4-EN13]
Orangutan merupakan salah satu spesies fauna yang Orangutan is one of the protected and endemic fauna

4.
dilindungi dan endemik bagi negeri kita Indonesia. in our country, Indonesia. The island of Kalimantan,
Pulau Kalimantan, khususnya Kalimantan Timur especially East Kalimantan, where KPCs KONSERVASI AIR DAN
lokasi operasional KPC adalah salah satu habitat alami operations is located, is one of the natural habitat of EFISIENSI ENERGI
Orangutan. Untuk itu, salah satu tujuan utama reklamasi Orangutans. To that end, one of the main objectives
dan program pelestarian keanekaragaman hayati of reclamation and biodiversity conservation program
KPC adalah untuk melestarikan habitat dan populasi KPC is to preserve the habitat and population of
WATER CONSERVATION
Orangutan di area reklamasi kami. Orangutans in our reclamation area. AND ENERGY EFFICIENCY
Berdasarkan data hasil pengamatan yang diperoleh Based on observation data obtained from a
dari hasil survei oleh pihak ketiga, kami menemukan survey held by a third party, we find that more
semakin banyak Orangutan yang berdatangan di area and more Orangutans come to KPCs post-mining
reklamasi pascatambang KPC, bahkan beberapa reclamation area, some of them have even formed
telah membentuk keluarga dan komunitas baru. Hal new families and communities. This shows
ini menunjukan reproduksi Orangutan telah terjadi di Orangutan reproduction occurs at that location.
lokasi tersebut. Sejak bulan November 2013 hingga Since November 2013 until August, 2014 we have
Agustus 2014 telah dijumpai sebanyak 39 individu encountered a total of 39 different Orangutans of
berbeda dari berbagai segmen usia. Areal Taman different ages. Taman Payau area is an area with
104 Payau merupakan lokasi dengan populasi Orangutan the largest Orangutan population compared to
terbesar dibandingkan lokasi lainnya, yaitu sebanyak
13 individu. Berdasarkan frekuensi perjumpaan yang
other locations, with 13 Orangutans. Based on the
frequency of encounters, most of Orangutans that 105
kami lakukan, diperkirakan sebagian besar dari we have encountered in Taman Payau are from
individu yang kami jumpai di Taman Payau merupakan the same Orangutan population. It means, there
populasi Orangutan yang sama. Artinya, Orangutan are indeed Orangutans that use the area as their
yang ada memang tinggal dan menetap di wilayah habitat. Based on observations for the past years
tersebut. Berdasarkan pengamatan dari tahun-tahun until now, total Orangutan population in post-
sebelumnya, maka hingga saat ini, populasi Orangutan mining areas of KPC is 51 Orangutan.
di areal pascatambang KPC berjumlah 51 individu.

P T
Mengamati Perilaku Orangutan Observation of Orangutans Behavior emerintah Indonesia mulai menata sistem he Indonesian government has begun to
manajemen energi pada tahun 2010. Hal ini organize an energy management system in
Pada tahun 2014, kami juga mulai melakukan In 2014, we also began to make observations on kemudian ditindaklanjuti KPC dengan memegang 2010. KPC has responded to the initiative
pengamatan terhadap perilaku Orangutan di sekitar areal Orangutan behavior around the rehabilitation teguh komitmen terhadap konservasi energi yang through holding an unwavering commitment
rehab. Pengamatan melalui metode focal animal sampling area. Observations are performed through focal tercantum di dalam dokumen kebijakan K3L dan PB to the conservation of energy, which is
dilakukan mulai sejak Orangutan keluar dari sarangnya animal sampling method start when Orangutans (Kebijakan, Keselamatan, Kesehatan, Lingkungan, translated in a Policy of Occupational Safety,
di pagi hari, hingga mereka kembali membuat sarangnya travel from their nests in the morning until they Keamanan dan Pembangunan Berkesinambungan). Health and Environment, and Sustainable
untuk tidur di sore hari. Jumlah Orangutan yang kami re-create a nest to sleep in the evening. The Kebijakan ini diharapkan bisa mengurangi serta Development. This policy is expected to
amati sebanyak 7 individu di dua lokasi berbeda, yaitu number of Orangutans that we observe is seven mengontrol beban pemakain energi fosil yang reduce and control the usage of fossil energy,
areal Gajah Hitam dan Taman Payau. Ketujuh Orangutan Orangutans at two different locations, namely hingga saat ini masih sering digunakan. KPC sebagai which until now is still in practice. KPC, as
tersebut adalah Albaret, Mentari, dan Hatari yang berada Gajah Hitam and Taman Payau areas. The names salah satu perusahaan pertambangan di Indonesia, one of the mining companies in Indonesia,
di Gajah Hitam, serta Chiko, Cassia, Clotalaria, dan of the Orangutans are Albaret, Mentari, and berupaya untuk turut serta dalam pengembangan participates in the development and
Meremia yang berada di Taman Payau. Hatari, which are located in the Gajah Hitam; and dan pemanfaatan sumber daya energi yang utilization of renewable energy resources in
Sejumlah Orangutan yang kami amati di kedua lokasi Chiko, Cassia, Clotalaria, and Meremia, which are terbarukan di lingkungan KPC. KPC operational area.
tersebut mengalokasikan sebagian besar waktu mereka located in Taman Payau.
Kami senantiasa aktif dalam mengadakan kegiatan- We are also constantly active in organizing
untuk makan (50,44%) dan istirahat (34,18%). Sementara A number of Orangutans that we observed in both kegiatan yang ramah lingkungan. KPC, dalam hal ini, activities that are environmentally friendly. In this
itu, aktivitas lain yang juga biasa mereka lakukan adalah locations spend most of their time to eat (50.44%) selalu mengadakan berbagai upaya untuk menjaga case, KPC has made various efforts to protect
bergerak, berpindah-pindah (13,39%), bersarang (1,41%), and rest (34.18%). Meanwhile, other activities that serta mengelola air dan energi dengan baik melalui and manage water and energy through water
dan sosial (0,05%). Berdasarkan hasil dari pengamatan are also commonly done are travelling, (13.39%), konservasi air dan efisiensi sumber energi. conservation and efficient energy initiatives.
kami terhadap 4 individu Orangutan, di areal taman nesting (1.41%) and socializing (0.05%). Based on
Payau setidaknya terdapat 30 jenis tumbuhan dan 2 jenis the results of our observations of four Orangutans,
serangga yang mereka konsumsi. Sedangkan pada areal
Penggunaan Material Utilization of Materials
in Taman Payau area, they consume at least
Gajah Hitam, setidaknya ada 26 jenis tumbuhan yang 30 different species of plants and two different Untuk Operasi Penambangan for Mining Operations
mereka makan. species of insects. In Gajah Hitam area, they eat at Operasional penambangan di KPC dibagi menjadi KPCs mining operations are divided into two
least 26 different species of plants. 2 bagian besar, yaitu proses produksi atau proses major parts, namely production, or the process
penambangan dan proses pencucian batubara kotor. of mining, and dirty coal washing process.
Material utama yang kami gunakan dalam proses The main material we use in the process of
produksi batubara adalah bahan peledak. Sedangkan coal production is explosives, while the main
material utama dalam proses pencucian batubara materials in the process of dirty coal washing
kotor adalah magnetite, flocculants, dan lime. are magnetite, flocculants, and lime.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Jumlah
Jenis Material Penggunaan Satuan Pelestarian Lingkungan
Amount _Environment Preservation
Material Purpose of Use Unit
2011 2012 2013 2014
Amonium Bahan peledak Jumlah Konsumsi Air Bersih dan Air Minum
Ton 133.758 136.352 143.638 81.809
Nitrate Explosive material Consumption of Clean Water and Drinking Water [G4-EN8]
Pencucian batubara
Magnetite Ton 1.278 840 780 920 Keterangan Volume (m3)
Coal Washing
Description 2012 2013 2014
Pencucian batubara
Flocculant Ton 39,4 46,2 25 16,9 Pengambilan Air Permukaan & Air Tanah (air baku)
Coal Washing
Intake of Surface Water & Groundwater (raw water)
Pencucian batubara
Lime Ton 135 40 35 181 Air Sungai Sangatta (diambil di Papa Charlie)
Coal Washing 2.669.865 2.718.900 2.527.350
Sangatta River Water (intake in Papa Charlie)
Pengapuran air asam
Lime Ton 1.418 855 736 1.732 Air Permukaaan dan Sumur Bor Tanjung Bara
Acid Water Treatment 758.961 775.509 916.144
Surface Water and Drilling Well in Tanjung Bara
Pelumas
Lubricating Oil Kilo Liter 1.418 1,24 1,24 1,24 Total Pengambilan Air Baku
Lubricants 3.428.826 3.494.409 3.443.494
Total of Raw Water Intake
Total Air Baku Diolah (Pre Treatment)
2.669.865 2.718.900 2.583.450
106 Menggunakan Air Dengan Bijak Wise Water Consumption Total Pre treatment Water

Pada operasi penambangan kami, kami menggunakan At our mining operations, we use water to wash Pengolahan Air Minum (WTP) 107
air untuk mencuci batubara. Air yang kami gunakan the coal. The water we use is rainwater, water Water Treatment Plant (WTP)
diperoleh dari air hujan, air dari area pascatambang, from post-mining area, and the recycled water WTP Swarga Bara 2.012.982 1.840.699 1.802.613
dan air daur ulang dari pencucian batubara itu sendiri. from the washing of the coal process itself.
Hal ini merupakan langkah kongkrit yang kami This is a concrete step that we take to ensure WTP Tanjung Bara 513.677 609.269 534.738
lakukan untuk memastikan pasokan air bersih bagi ongoing supply of clean water for the surrounding
Total Produksi Air Minum
masyarakat sekitar. communities. 2.526.659 2.449.968 2.337.351
Total Production of Drinking Water
KPC tidak menggunakan sumber air baru untuk KPC does not take new water sources in carrying
melakukan aktivitas-aktivitas yang berkaitan dengan out activities related to coal production activities. Total Konsumsi Air Minum
2.551.226 2.438.297 2.327.772
operasional batubara. Dapat kami laporkan, hingga We can report that by the end of 2014, we received Total Drinking Water Consumption
akhir tahun 2014, tidak ada keluhan dari masyarakat no complaints from the public related to the
sekitar mengenai penurunan kuantitas air sungai decrease in the quantity of river water or ground
atau air tanah akibat konsumsi air KPC. Selain water due to KPCs water consumption. In addition Konsumsi & Konservasi Energi
penggunaan air untuk pencucian batubara, kami to the use of water for washing coal, we consume
juga mengkonsumsi air bersih dan air minum untuk clean water and drinking water for personal Energi kami butuhkan untuk menjalankan seluruh aktivitas
Realisasi Penggunaan
keperluan karyawan KPC. [G4-EN9] purposes of KPC employees. [G4-EN9] operasional. Menyadari besarnya kebutuhan kami akan energi,
Bahan Bakar Tahun 2014
program konservasi energi dan pemanfaatan sumber energi
terbarukan menjadi salah satu prioritas KPC. Realization of
Energy Sources in 2014
Sumber energi yang kami gunakan adalah batubara dan bahan
[G4-EN3]
bakar minyak, yaitu solar dan bensin. Batubara digunakan untuk
menghasilkan listrik melalui 2 unit Pembangkit Listrik Tenaga Uap
(PLTU) sebagai sumber energi utama, sedangkan untuk sumber
energi cadangan, kami menggunakan solar untuk menghasilkan
SOLAR
DIESEL 669.020.693
LITER
listrik melalui genset (diesel generator). Selain itu, bahan bakar
minyak kami butuhkan untuk menggerakan peralatan, seperti alat
berat tambang, bus karyawan, mobil operasional, dan lain-lain.
BIODIESEL
BIODIESEL 34.875.691
LITER
Energy Consumption & Conservation
Energy is required for us to run the entire operational activities.
Realizing the magnitude scale of our needs for energy, the initiative
BENSIN
GASOLINE 894.481
LITER
for energy conservation and utilization of renewable energy sources
become one priority of KPC.
BATUBARA
Sources of energy that we use are from coal and oil, specifically
diesel and gasoline. Coal is used to generate electricity through
UTK PLTU
COAL FOR
42.952
our two units of Steam Power Plant as the primary energy TON
POWER PLANT
source. For backup energy source, we use diesel fuel to generate
electricity through diesel generators. In addition, the oil is needed
in operating of the equipment, such as mining heavy equipment,
employees bus, operational vehicles, and others.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

Upaya Efisiensi Energi & An Effort for Energy Efficiency and


2. Penghematan Bahan Bakar 2. Fuel Saving
Penggunaan Energi Alternatif Usage of Environmentally-Friendly
Sejak 2008, kami telah menginisiasi program We have initiated a fuel efficiency
Ramah Lingkungan Alternative Energy penghematan bahan bakar. KPC menugaskan program since 2008. KPC assigned
[G4-EN6] [G4-EN6] sebuah tim khusus yang bertugas untuk a dedicated team in identifying the
mengidentifikasi penyebab keborosan cause of inefficient fuel consumption
secara terus-menerus, serta pada akhirnya and implement various improvements
menerapkan sistem perbaikan, seperti: in areas, namely:
[G4-EN6][G4-EN19] [G4-EN6][G4-EN19]
Melakukan sosialisasi SOP untuk Providing information on
mematikan mesin pada kondisi tidak procedures (SOP) to turn off the
produktif dan SOP untuk menjaga match engine in unproductive condition
factor (keseimbangan) truck-shovel pada and to keep the match factor
operasional yang optimum; (balance) of truck-shovel during
Melakukan peninjauan ulang terhadap optimum operations;
range match factor optimal terhadap Reviewing the optimal range of
pilihan untuk mematikan shovel saat tidak match factor against the option to
digunakan atau mematikan truk saat turn off shovel when not in use or
108 sedang berhenti untuk waktu yang turn off the truck when stopping
Saat ini, sebagian besar sumber energi yang kita Currently, most of the sources of the energy that cukup lama; for a long time; 109
gunakan berasal dari bahan bakar fosil. Kami we use come from fossil fuels. As we realize Melakukan Pemasangan lampu khusus Installing special lamps in trucks to
menyadari bahwa sumber daya ini pada akhirnya that the resources can eventually run out, we di truk untuk memantau apakah operator monitor whether the operator has
dapat habis. Oleh sebab itu, kami selalu melakukan always carry out energy conservation efforts benar-benar mematikan mesin pada saat completely shut down the engine
upaya konservasi energi yang tidak hanya bertujuan to reduce operating costs and also to preserve kondisi truk standby. when the truck in standby position.
untuk menekan biaya operasional tapi juga untuk non-renewable energy sources.
melestarikan sumber energi tidak terbarukan tersebut.

1. Penghematan Listrik 1. Power Savings


Sejak tahun 2010, kami memiliki program Since 2010, we have initiated a power
penghematan listrik yang bertujuan untuk saving program aimed at reducing the
mengurangi penggunaan listrik berlebih yang unnecessary use of electricity. This program
sebenarnya tidak perlu digunakan. Program ini has made a very positive impact related
telah memberikan dampak yang sangat positif to energy savings. The activities we do to
terkait penghematan energi. Kegiatan-kegiatan achieve energy savings include:
yang kami lakukan untuk mencapai penghematan
energi tersebut antara lain:
Pemasangan KWH meter Installation of KWH meters
di kantor dan pabrik in offices and factories
Installation of switches with light 3. Penggunaan Overland Conveyor (OLC) 3. Use of Overland Conveyor (OLC) as
Pemasangan saklar yang dilengkapi sensor sebagai Alternatif Transportasi Batubara Coal Transportation Alternatives
cahaya di lokasi pabrik yang memperoleh sensor at the plant sites that receive
cahaya berlebih pada siang hari more sunlight during the day Kami juga berkomitmen di dalam We are also committed in enhancing
Installation of air conditioning timer in offices peningkatkan efisiensi transportasi the efficiency of coal transportation.
Pemasangan timer AC di perkantoran batubara. KPC telah membangun Over Land KPC has installed Over Land Conveyor
Implementasi SOP untuk mematikan semua Implementation of SOP to turn off all
Conveyor (OLC) guna menggantikan dump (OLC) to replace dump trucks that
peralatan listrik bila tidak digunakan electrical appliances when not in use
truck yang mengkonsumsi bahan bakar consume relatively more fuel, due
Penggunaan lampu hemat energi The use of energy saving lamps relatif lebih banyak, dikarenakan harus to back-and-forth coal transport
Reduction in the amount of mengangkut sebagian jumlah batubara activities . The first OLC installation
Pengurangan jumlah lampu berlebih
unnecessary light in the parking area ke tempat tujuan serta kembali ke tempat connects Melawan Pit and crusher
di area parkir
Incorporate save energy program awal untuk mengangkut batubara lainnya. area, while the second OLC connects
Memasukkan hemat energi OLC pertama menghubungkan Pit Melawan crusher area and Tanjung Bara Coal
sebagai kriteria perancangan as the design criteria in KPC
equipment procurement dan area crusher. Sementara OLC kedua Terminal. OLC TBCT has currently
peralatan di KPC menghubungkan crusher dan terminal been completed with track that spans
Revisi Program Perbaikan Lingkungan Revision of KPC Environmental
batubara Tanjung Bara (Tanjung Bara Coal along 13 km. OLC also plays an
KPC untuk menyertakan program Improvement Program to include
Terminal TBCT). Sementara itu, OLC TBCT important role in helping us to save
hemat energi the energy-saving program
telah selesai dengan jalur sepanjang 13 km. the consumption of diesel fuel during
Mengganti AC Window dengan Replace Window Air Conditioners OLC turut berperan penting dalam membantu the transportation of coal.
AC Split with Split system kami menghemat konsumsi bahan bakar
solar untuk transportasi batubara.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
_Environment Preservation

Mewujudkan komitmen KPC dalam


bidang konservasi energi, kami Mengeksplorasi Tidak berhenti pada pemanfaatan
mengembangkan energi terbarukan
berupa Pembangkit Listrik Tenaga
Sumber Energi mikro hidro, KPC juga mengeksplorasi

Mikro Hidro (PLTMH) atau juga dikenal Baru Terbarukan berbagai kemungkinan pemanfaatan
energi ramah lingkungan lainnya seperti
dengan Mikro Hidro seperti yang
telah kami rencanakan dalam strategi
Lainnya penggunaan solar cell di pondokan yang
berada di tambang, serta pemakaian 10
konservasi energi dan penggunaan energi persen bio diesel untuk pencampuran
baru terbarukan. KPC telah menjalin solar. Selain itu, terdapat program
kerjasama dengan ikatan alumni ujicoba penggunaan Bio Ethanol dengan
Institut Tekonologi Sepuluh November menanam lahan singkong gajah di area
(ITS) Surabaya, di Sangatta untuk bekas lahan tambang, pemanfaatan
mengembangkan pemanfaatan PLTMH oli bekas untuk blasting, pemanfaatan
sebagai sumber energi terbarukan di biomassa (kayu dan ranting) untuk
area operasional KPC dan ke depannya memenuhi kebutuhan PLTU pengganti
untuk sumber energi bagi masyarakat batu bara dan pemanfaatan kincir angin
sekitar tambang. yang rencananya akan dibangun di kolam

110 Mikro Hidro merupakan pembangkit listrik pascatambang Telaga Batu Arang.
skala kecil yang menggunakan tenaga
air sebagai tenaga penggeraknya. Sejak
111
Pengembangan Mikro
Oktober 2013, KPC telah mengindentifikasi
berbagai potensi air ditambang KPC
Hidro Sebagai Sumber untuk pemanfaatan Mikro Hidro. Dari lima
lokasi potensial memiliki potensi daya
Energi Alternatif 1100 watt, sudah ada satu unit yang telah
berjalan dan menghasilkan energi listrik
Ramah Lingkungan 300 watt yang telah dimanfaatkan untuk
[G4-EN27] penerangan jalan.

Development of Micro Hydro as KPCs commitments towards energy


conservation is realized through the
Environmentally-Friendly Sources development of renewable energy such
of Energy Alternative as micro-hydro power plant (MHP) or
[G4-EN27] known as Micro Hydro according to the
plan of energy construction strategy
and the use of new renewable energy.
KPC has established a cooperation
with the Alumni Association of Sepuluh
Nopember Institute of Technology
(ITS) Surabaya, in Sangatta to develop
Micro Hydro as a source of renewable
energy in the operational area of KPC Exploration of Not only focusing on the utilization of Micro
and the future source of energy for the Hydro, KPC also explore possible uses of
communities around the mining area. Other Renewable environmentally friendly energy, such as
Micro Hydro is a small-scale power Energy Sources installation of solar cell in Pondo at the mining
area and mixing 10 percent bio-diesel with
plant that use hydropower as its source
diesel fuel. In addition, there are also a pilot
of energy. Since October 2013, KPC has
program to use Bio Ethanol from elephant
identified potential water sources in KPC
cassava plant at the post mining area,
mine area for Micro Hydro. From the five
utilization of used oil for blasting process,
potential areas with 1100 watt potential
utilization of biomass (wood and twigs) to as a
power, one unit has been running and
subtitute of coal for power plants generation,
generating 300 watts of electricity that
and the use of wind turbines which will be built
has been used for street lighting.
at Telaga Batu Arang post-mining area.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pelestarian Lingkungan
1.636.078.000
MELALUI BERBAGAI PROGRAM
PENGHEMATAN ENERGI LISTRIK, _Environment Preservation
SEPANJANG TAHUN 2014 KPC K W h (2014)
BERHASIL MENGHEMAT 1.636.078
KWh ATAU SETARA DENGAN
MENCEGAH EMISI 728.840 KgCO2e. OLIMPIADE Sebagai salah satu bagian dari Olimpiade Lingkungan
2014, lomba Green Office berhasil menjaring peserta
[G4-EN6][G4-EN19] LINGKUNGAN 2014 sebanyak 23 kantor perwakilan divisi dan kontraktor.
Penilaian dilakukan dengan mekanisme audit selama
RAISE YOU VOICE,
728.840
kurang lebih dua minggu ke masing-masing kantor
OUR VARIOUS ENERGY SAVING
INITIATIVES THROUGHOUT 2014 HAS NOT SEA LEVEL" perwakilan divisi dan kontraktor. Aspek yang dinilai
mencakup: Pengelolaan limbah; Kebersihan dan
SUCCESSFULLY HELPED KPC TO SAVE [G4-EN27] kerapian; Perilaku manusia; Keanekaragaman hayati
1,636,078 KWh OR EQUAL TO PREVENT KgCO 2 e (2014) dan; Program peduli lingkungan. Berdasarkan kriteria

S
THE EMISSION OF 728,840 KgCO2e. eperti tahun-tahun sebelumnya, bahwa penilaian External Affairs & Sustainable Dev S22 Office,
[G4-EN6][G4-EN19] salah satu kegiatan yang diadakan Human Resources Learning Development J22 Office,
oleh KPC untuk memperingati Hari dan 3C Office dinyatakan sebagai pemenang Green
Lingkungan Hidup Sedunia adalah Olimpiade Office 2014 kategori Kantor Administrasi. Supply
Lingkungan, yaitu kegiatan perlombaan Chain Warehouse Office, Mining Operation Hatari, dan
dengan target peserta karyawan KPC dan para Hexindo dinyatakan sebagai pemenang Green Office
MELALUI PROGRAM PENGHEMATAN kontraktor. Kegiatan dibagi menjadi beberapa 2014 kategori Kantor Operasional.

235.000.000
BAHAN BAKAR YANG KAMI INISIASI DI rangkaian perlombaan, diantaranya : Dayung
112 TAHUN 2008 SAMPAI DENGAN AKHIR Perahu, Enviro Race, Foto Lingkungan, Green Kegiatan Olimpiade Lingkungan 2014 kemudian ditutup
TAHUN 2014, KPC TELAH BERHASIL
L I T E R (2014)
Office, Kampanye Lingkungan, Desain, Poster, dengan kegiatan acara Penutupan Olimpiade dan
Kadarigat Award yang diadakan di pantai Gedung
113
MENGHEMAT LEBIH DARI 235,000,000 serta Video Iklan Lingkungan.
Olahraga Swarga Bara, Sangatta pada tanggal 14
LITER BAHAN BAKAR ATAU SENILAI Tahun 2014 Olimpiade Lingkungan KPC September 2014. Dihadiri oleh kurang lebih 800 orang
DENGAN MENGHEMAT LEBIH DARI USD 58 dilaksanakan bertepatan dengan Hari peserta yang terdiri dari semua peserta olimpiade,
JUTA BIAYA OPERASIONAL. [G4-EN6] Lingkungan Hidup Sedunia 2014 yang

58 juta
pihak managemen KPC, perwakilan instansi setempat
mengusung tema Raise Your Voice, Not (BLH, Distamben, Dishut). Dalam acara ini kami
HROUGH THE FUEL SAVING PROGRAM
T Sea Level. Berbagai kegiatan bertemakan memberikan penghargaan kepada para tim terbaik yang
WHICH WAS INITIATED SINCE 2008, UP TO pelestarian lingkungan seperti penanaman telah mengikuti kegiatan olimpiade lingkungan dan juga
pohon dan lomba diadakan dalam rangka
THE END OF 2014, KPC MANAGED TO SAVE
MORE THAN235,000,000 LITER OF FUEL
(million) Olimpiade Lingkungan tahunan ini.
Kadarigat Award kepada setiap kantor yang memiliki
komitmen untuk menjaga lingkungan dengan baik.
OR EQUAL TO SAVE MORE THANUSD 58 USD (2014)
MILLION OF OPERATIONAL COST. [G4-EN6]
As part of Environmental Olympics 2014, Green Office
received participations from 23 representatives from
ENVIRONMENT office divisions and from contractors. Assessment
Realisasi Biaya
Pengelolaan dan Uraian Biaya Pengelolaan dan Pemantauan Lingkungan
Jumlah OLYMPICS 2014 was carried out through audit for approximately two
Total weeks to each division representatives and contractors
Pemantauan Environmental Management and Monitoring Expenditure Description
(USD) RAISE YOU VOICE, offices. Assessment criteria were including Waste
Lingkungan Management; Cleanliness and tidiness; Human
Biaya Pengelolaan Lingkungan NOT SEA LEVEL behavior; Biodiversity; and Environmental care
Realization of Cost 68.993.686
Environment Management Cost [G4-EN27] program. Based on the assessment, External Affairs
Management and
Environmental Biaya Pemantauan Lingkungan & Sustainable Dev S22 Office, Human Resources -

A
810.418 s in the previous years, KPC held an event Learning Development Office J22 and 3C Office were
Monitoring Environment Monitoring Cost
to celebrate World Environment Day, declared as the winners of Green Office 2014 in the
[G4-EN31] Konsultan Lingkungan dan Pelatihan which was Environmental Olympics, category of Administrative Office. Meanwhile, Supply
470.711
Environment-related Third Party Consultant and Trainings a competition that invited participation Chain Warehouse Office, Mining Operation - Hatari and
from KPC employees and contractors. Hexindo were declared the winners of Green Office 2014
Peringatan Hari Bumi, Hari Lingkungan Hidup The event was divided into several race in the category of Operational Office.
serta Hari Pertambangan dan Energi series, including: Paddle Boat, Enviro
30.428 Environment Olympic 2014 was closed with the main
Environment-related Events: Earth Day, Environment Day, Race, Environment Photo, Green Office,
and Mining and Energy Day activity, which was Closing Ceremony and Kadarigat
Environmental Campaign, Design, Poster and
Award Presentation, which was held at Swarga Bara
Environment Video Advertising.
Biaya Subkontraktor Sports Hall, Sangatta, on September 14, 2014. Attended
154.295
Subcontractor Cost KPCs 2014 Environmental Olympic was held by approximately 800 participants, including, employees,
during the World Environment Day 2014 with contractors, KPC management and representatives of
Audit eksternal ISO 14001 a theme Raise Your Voice, Not Sea Level. local authorities (BLH, Distamben, DFS). We presented
41.959
ISO 14001 External Audit Various activities that had environmental the awards to the best teams that have participated
conservation theme, such as tree planting in the Environmental Olympic 2014, as well as also
Total Biaya Pengelolaan Dan Pemantauan Lingkungan
2.012.982 and various competitions, were held as part Kadarigat Award to each office who has been committed
Total Environmental Management and Monitoring Expenditure
of the annual Environmental Olympic. in protecting the environment.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja
_Occupational Safety and Health

KESELAMATAN, KESEHATAN
& KEAMANAN KERJA

OCCUPATIONAL
SAFETY & HEALTH

L
114 ingkungan kerja yang aman,
selamat, dan sehat adalah 115
tujuan utama dari seluruh
program Keselamatan dan
Kesehatan Kerja (K3) di KPC. Untuk
itu, K3 harus menjadi budaya, gaya
hidup, dan keseharian setiap insan
KPC serta setiap orang yang bekerja
di wilayah operasional kami.

T
o create a safe and healthy
working environment is the
main goal of Occupational
Safety and Health (OHS)
program at KPC. To that end, OHS
should become a culture and daily
lifestyle of KPC people and everyone
who works within our operational
areas.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja

KESELAMATAN
_Occupational Safety and Health

PRIMA NIRBHAYA:

DAN KESEHATAN SISTEM MANAJEMEN


KESELAMATAN,
MEWUJUDKAN
ACHIEVING

KERJA OCCUPATIONAL
SAFETY AND HEALTH
KESEHATAN KERJA
DAN LINGKUNGAN
PRIMA NIRBHAYA:
zero fatality
SAFETY, HEALTH
AND ENVIRONMENT
MANAGEMENT SYSTEM zero hazard
116
K
PC menerapkan K3L Prima Nirbhaya untuk

zero accident 117


mengelola aspek-aspek keselamatan,
kesehatan kerja dan lingkungan. Sistem
yang kami laksanakan merupakan penerapan
yang berbasis pada pendekatan prinsip-
prinsip perencanaan, pelaksanaan dan
tinjauan berkala, serta tindak lanjut (Plan, Do,
Check, Action/ PDCA). Prima Nirbhaya KPC MELALUI
turut mengadopsi berbagai standar nasional THROUGH
dan internasional bidang lingkungan dan K3,
yakni Ketentuan Menteri Ketenagakerjaan
dan Transmigrasi Republik Indonesia, ISO
14001 dan OHSAS 18001. Demi memastikan
efektivitas implementasi sistem.

PRIMA
K
PC implements SHE Prima Nirbhaya in

NIRBHAYA
effort to manage aspects of safety, health
and environment. The implemented system
takes an approach that is based on Plan,

S A
Do, Check, Action (PDCA) principles. KPCs
ebagai perusahaan tambang, Keselamatan s a mining company, Occupational Safety Prima Nirbhaya also adopts various national
dan Kesehatan Kerja (K3) merupakan sebuah and Health (OHS) in KPC is truly an essential and international standards on Occupational DESAIN PERENCANAAN
keharusan bagi KPC. Namun lebih dari hanya aspect. More than just being compliant to the Safety, Health and Environment, including the
sekedar mengikuti peraturan, berbagai program applicable regulations, various implemented TAMBANG YANG AMAN
provisions of the Minister of Manpower and
K3 menjadi amat penting bagi kami karena OHS programs are very important to KPC Transmigration of the Republic of Indonesia, SAFE MINING DESIGN
program ini melindungi aset KPC yang paling because they protect our most valuable asset, the ISO 14001 and OHSAS 18001. To ensure AND PLANNING
berharga, yakni karyawan kami. Oleh karena itu K3 employees. Therefore, OHS has become a part of effective implementation of Prima Nirbhaya
telah menjadi salah satu pilar keberlanjutan serta our sustainability pillars and one of the nine aspects system, we carry out periodic reviews and PENGOPERASIAN
salah satu aspek dari sembilan Good Mining Practice of Good Mining Practice that we have implemented audits by both internal and external parties,
yang telah diimplementasikan sejak awal KPC since the beginning of KPC operation, in addition to
TAMBANG YANG AMAN
covering the whole program and targets as
beroperasi serta menjadi aspek wajib dalam proses becoming a mandatory aspect in the mining design well as its implementations. SAFE MINING OPERATION
desain tambang. process.
Tujuan utama program K3 di KPC adalah untuk The main objective of OHS program in KPC is to SISTEM IDENTIFIKASI,
menciptakan sebuah lingkungan kerja yang dapat create a working environment that can guarantee PENGENDALIAN DAN MONITORING
menjamin keamanan, keselamatan dan kesehatan security, safety and health aspects of everyone who BAHAYA SERTA RISIKO
dari setiap personel yang bekerja di dalamnya, baik is within the area, whether they are our employees,
HAZARD AND RISK IDENTIFICATION,
itu karyawan kami, para kontraktor dan supplier, serta contractors and suppliers, or people from the
CONTROL, AND MONITORING
masyarakat sekitar dan para pengunjung. surrounding communities and visitors.

PELATIHAN DAN PENDIDIKAN K3


OHS TRAINING AND EDUCATION

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja
_Occupational Safety and Health

GOLDEN RULES
KESELAMATAN DAN
KESEHATAN KERJA KPC
Golden Rules
KESELAMATAN DAN
GOLDEN RULES OF KPCS
OCCUPATIONAL SAFETY KESEHATAN KPC
AND HEALTH (OHS) KPC GOLDEN RULES OF
S A F E T Y A N D H E A LT H

G
olden Rules menjadi aturan baku standar keselamatan
dan kesehatan kerja di KPC yang membantu kami
untuk merealisasikan zero accident dan menanamkan Semua Jenis Pekerjaan: Pekerja harus All Types of Job: Workers must be
budaya K3 pada diri setiap insan KPC. Terdapat 11 tipe 1 mampu mengidentifikasi potensi bahaya dan able to identify potential hazards and

118 pekerjaan dengan potensi insiden/bahaya yang diatur mengendalikan bahaya tersebut. control hazards
dalam Golden Rules tersebut yang kemudian diturunkan Pengawasan Pekerjaan: Setiap pengawas Supervision of Works: Each supervisor is 119
ke tahap implementasi menjadi standar kerja, petunjuk
pelaksanaan, kriteria audit serta materi pelatihan. Golden
2 berkewajiban untuk memastikan bahwa
aturan baku telah dilaksanakan.
obliged to ensure that the standard rules
have been well implemented.
Rules juga mengikat setiap penggunaan kendaraan milik
Keselamatan Kendaraan dan Alat Bergerak: Moving Vehicle and Equipment Safety:
KPC, kendaraan kontrak sewa atau kendaraan sewa yang
setiap saat berada di dalam batas wilayah kontrak KPC, 3 Pekerja dilarang untuk mengoperasikan atau
mengendarai semua kendaraan atau alat
Workers are forbidden to operate or drive
any damaged vehicle or equipment.
atau kegiatan yang berhubungan dengan penambangan yang rusak.
dan/atau produksi batu bara. [G4-DMA][G4-LA7][G4-LA8]
Keselamatan di Jalan dan Lalu Lintas: Road Safety and Traffic:
4 Setiap karyawan wajib untuk memahami Every employee is required to

K
PC Golden Rules has become the official standard for aturan lalu lintas KPC. understand KPC traffic rules.
occupational safety and health implementation in our Isolasi dan Lockout: Jika bekerja dengan alat Isolation and Lockout: When working
company to help us to achieve zero accident and instill
OHS culture in all of our people. There are 11 types of
5 yang dapat menimbulkan cedera, setiap pekerja
harus memastikan bahwa alat tersebut telah
with a tool that can lead to injury, every
worker should ensure that the tool has
jobs with potential incidents/hazards set out in the Golden diisolasi atau di-locked. been isolated or locked.
Rules which, as an implementation, are then translated Keselamatan untuk Pekerjaan dan Listrik: Electrical Safety: Before using electrical
into working standards, guidelines, audit criteria and Sebelum menggunakan peralatan listrik, equipment, workers shall ensure that the
training materials. Golden Rules also controls any use of 6 pekerja wajib memastikan bahwa peralatan equipment is in a safe condition.
KPCs vehicles, rented-with-contract vehicles or leased tersebut dalam kondisi aman.
vehicles at any time within the limits of the contract Bekerja di Ketinggian: Pekerja harus selalu Working at Height: Workers should always
area of KPC, or any activities related to mining and/or
production of coal. [G4-DMA] [G4-LA7] [G4-LA8] 7 melindungi diri dari kemungkinan terjatuh
saat bekerja di ketinggian.
protect themselves from the possibility of
falling while working at height.
Ruang Terbatas: Dilarang memasuki ruang Restricted Area: Prohibited from entering
8 terbatas tanpa surat izin masuk ruang terbatas. the restricted area without a permit.
Alat Pengangkat/Penyangga: Pekerja dilarang Lifter / Buffer: Workers are prohibited
9 mengoperasikan alat pengangkat atau penyangga
bila hal tersebut tidak aman untuk dilakukan.
to operate a crane or a buffer when it is
not unsafe.
Bekerja di Dekat Dinding Galian Working Near the Excavation Wall
10 yang Mudah Longsor. with high potential of landslide
Bekerja di Dekat Area Peledakan: Working in around Blasting Area:
Pekerja yang tidak berwenang dilarang Unauthorized workers are forbidden to
11 untuk memasuki area yang sedang atau enter the area that is being or has been
sudah diisi dengan bahan peledak. filled with explosives.
Bekerja di Dekat Air: Pekerja harus Working Near Water: Workers should
12 melindungi diri dari jatuh atau tenggelam
saat bekerja di tempat dengan kedalaman
protect themselves from falling or
drowning while working at a depth of
lebih dari 1 meter. more than 1 meter.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


M
Keselamatan, Kesehatan
PENERAPAN GOOD engacu pada Good Mining Practice, aspek K3
menjadi komponen yang terintegrasi dengan dan Keamanan Kerja
MINING PRACTICE PADA setiap aktivitas dalam Coal Chain KPC. Aspek
K3 telah diperhitungkan dengan seksama secara
_Occupational Safety and Health

ASPEK KESELAMATAN komprehensif sejak kami mendesain tambang,


DAN KESEHATAN KERJA merencanakan pembukaan tambang baru,
operasional sehari-hari, pemberian sosialisasi dan
pelatihan, pemilihan peralatan, sampai pada tahap
IMPLEMENTATION OF GOOD
MINING PRACTICE ON THE
reklamasi dan penutupan tambang. [G4-DMA] LOST TIME INJURY
ASPECT OF OCCUPATIONAL Selain itu untuk menciptakan lingkungan kerja yang
aman, Divisi HSES , BPID serta berbagai divisi terkait
FREQUENCY RATE
SAFETY AND HEALTH lainnya melakukan pengawasan dan berbagai program
improvement untuk meminimalisasi potensi bahaya PRIMA NIRBHAYA/NOSA
45 Implementation 3.50
di tempat kerja seperti kebisingan, kadar debu, LTIFR Threshold 2014: 0.18
penerangan, ventilasi, tekanan panas, kandungan gas 39
beracun, serta getaran di alat berat. [G4-LA8]
36 35 35
Tidak kalah pentingnya, kesehatan jasmani dan FPE & NEW

LTIFR (per 1.000.000 manhours


35 2.86
rohani setiap karyawan kami turut menjadi bagian GOLDEN RULES 32
Implementation 31 2.50
dari program K3 di KPC, antara lain sosialisasi 2.59
rutin mengenai pola hidup sehat, pengawasan serta 2.43

120

No. of LTI
sosialiasi nutrisi dan makanan, dan program olah 2.31
25
raga rutin. [G4-LA8]
25 23 22 22
20
121
19
18 17 1.50

F
ollowing the Good Mining Practice, OHS aspect 1.51 15 14
15 1.36 14
becomes an integrated component of any activities 12
performed within KPCs Coal Chain. Comprehensive 1.11 10
aspect OHS has been carefully taken into account since 0.93
the process of designing the mine, planning on opening 0.76 0.60
0.34 0.50
of new mines, day-to-day operational, information 5 0.26
0.50 0.56 0.20 0.18
0.13
dissemination and training, equipment selection, up to 0.32 0.23
reclamation and mine closure. [G4-DMA]

1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012

2013

2014
In addition to creating a safe working environment,
HSES Division, BPID as well as other related divisions
perform monitoring and improvement programs
to reduce potential hazards in our workplaces,
including noise, dust level, lighting, ventilation, heat
pressure, toxic gases, as well as vibration from heavy
equipment. [G4-LA8]

S
emenjak tahun 1996 sampai dengan
The physical and spiritual health of each of our akhir tahun 2014, KPC berhasil
employees are also no less important and become a mencatatkan kinerja K3 yang terus
part of OHS programs at KPC, which include regular meningkat dari tahun ke tahun. Tahun
dissemination about healthy lifestyle, supervision ini KPC berhasil menekan angka tingkat
and dissemination on nutrition and diet, and regular kekerapan kecelakaan yang menyebabkan
exercise program. [G4-LA8] kehilangan jam kerja (LTIFR) dari 0,18
per 1 juta jam kerja di tahun 2013 dengan
14 LTI menjadi 0,13 per 1 juta jam kerja
KINERJA KESELAMATAN
U
ntuk mengetahui efektifnya kinerja keselamatan dengan 10 LTI di tahun 2014. [G4-LA6]
dan kesehatan kerja bagi setiap insan KPC, kami
DAN KESEHATAN KERJA melakukan evaluasi terhadap kinerja K3 setiap

S
tahunnya. Evaluasi yang kami lakukan yaitu dengan
TAHUN 2014 melakukan pemantauan terhadap nilai kekerapan
ince 1996 until the end of 2014, KPC
managed to record continuous increase
terjadinya kecelakaan yang menyebabkan kehilangan of OHS performance from year to year.
OCCUPATIONAL SAFETY AND jam kerja (Lost Time Injury Frequency Rate LTIFR) This year, KPC successfully reduced the
HEALTH PERFORMANCE 2014 dan Lost Time Injury (LTI). number of LTIFR from 0.18 per 1 million
work hours and 14 LTI in 2013 to 0.13 per

T
o determine the effective performance of safety 1 million work hours and 10 LTI in 2014.
and health of each KPC people, we evaluate their [G4 -LA6]
OHS performance annually. Our evaluation is made
through monitoring the Lost Time Injury Frequency
Rate (LTIFR) and Lost Time Injury (LTI).

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


K K
Keselamatan, Kesehatan
MENGAWAL PC melaksanakan berbagai PC carries out various
dan Keamanan Kerja
aktivitas audit keselamatan safety audits and Prinasa
IMPLEMENTASI kerja dan observasi behavioral observations _Occupational Safety and Health
SISTEM K3 DI KPC perilaku Prinasa dilaksanakan on an ongoing basis to
secara berkesinambungan ensure the effectiveness of
CONVEY THE untuk memastikan efektivitas OHS management system.
IMPLEMENTATION OF sistem manajemen K3. Selain In addition, a number of
OHS SYSTEM IN KPC itu, sejumlah personel auditor auditors and operation
UJI
dan pengawasan operasional supervisors are assigned to 270 ORANG KARYAWAN KPC DAN
[G4-DMA]
ditugaskan untuk mengawal oversee the implementation KOMPETENSI KONTRAKTOR KAMI TELAH BERHASIL
implementasi program K3 di of OHS program throughout & SERTIFIKASI MENGIKUTI UJI KOMPETENSI DAN
seluruh Coal Chain KPC. KPC Coal Chain. SERTIFIKASI. PENGAWAS OPERASIONAL
POP & POM KAMI TELAH MENGIKUTI SERTIFIKASI POP
COMPETENCY (PENGAWAS OPERASIONAL PRATAMA)
DAN POM (PENGAWASAN OPERASIONAL
TEST AND

496
AUDIT K3 SECARA BERKALA POP & POM
MADYA) YANG DISELEGGARAKAN OLEH
PEMERINTAH. DIMANA UJI KOMPETENSI
PERIODIC OHS AUDIT CERTIFICATION POP DIIKUTI 211 PESERTA, TERDIRI DARI

151
171 KARYAWAN KPC DAN 40 KARYAWAN
151 KALI AUDIT INTERNAL
KO O R D I N ATO R PERUSAHAAN KONTRAKTOR. SEDANGKAN
TELAH DILAKSANAKAN UNTUK UJI KOMPETENSI POM DIIKUTI 59 PESERTA,

270
COORDINATORS MENGUKUR TINGKAT KEPATUHAN TERDIRI DARI 49 KARYAWAN KPC DAN 10
122 ELEMEN PENCEGAHAN INTERNAL AUDIT PESERTA PERUSAHAAN KONTRAKTOR
KECELAKAAN FATAL (FATALITY
PREVENTION ELEMENT / FPE) DI INTERNAL AUDITS
270 EMPLOYEES OF KPC AND OUR
123
BERBAGAI DEPARTEMEN DI KPC
ORANG CONTRACTORS HAVE SUCCESSFULLY
TERMASUK KONTRAKTOR KAMI. EMPLOYEES PARTICIPATED IN THE COMPETENCY TEST
AND CERTIFICATION OF POP (PENGAWAS
151 INTERNAL AUDITS OPERASIONAL PRATAMA OR PRIMARY
HAVE BEEN CONDUCTED TO OPERATIONS SUPERVISOR) AND POM
ASSESS THE LEVEL OF COMPLIANCE (PENGAWAS OPERASIONAL MADYA OR
SAAT INI KPC MEMILIKI MIDDLE OPERATIONAL SUPERVISION)
496 KOORDINATOR K3 DAN TO FATALITY PREVENTION ELEMENT
WHICH ARE CONDUCTED BY THE
PETUGAS K3 YANG DIDUKUNG (FPE) EFFORRTS IN VARIOUS
GOVERNMENT. POP COMPETENCY TEST WAS
DEPARTMENTS OF KPC,
OLEH 164 ORANG KARYAWAN TAKEN BY 211 PARTICIPANTS, CONSISTING
INCLUDING OUR CONTRACTOR.
KPC SEBAGAI PERWAKILAN OF 171 OPERATIONAL SUPERVISORS OF
KPC AND 40 CONTRACTORS EMPLOYEES.
KESELAMATAN DAN MEANWHILE, POM COMPETENCY TEST WAS
KESEHATAN KERJA. TAKEN BY 59 PARTICIPANTS, CONSISTING OF
PROGRAM SELAMA 4-6 BULAN PARA CALON 49 OPERATIONAL SUPERVISORS OF KPC AND
MAGANG AUDITOR K3 KPC DIGEMBLENG UNTUK 10 CONTRACTORS EMPLOYEES.
496 COORDINATORS AND
K3 UNTUK MENGENAL DOKUMEN K3, TEKNIK
OFFICERS OF OHS SUPPORTED
PARA CALON AUDIT DAN PRAKTIK AUDIT K3 BAIK
BY 164 KPC EMPLOYEES THAT DESK AUDIT DAN AUDIT LAPANGAN.
ACT AS SAFETY AND HEALTH AUDITOR PARA CALON AUDITOR KEMUDIAN
DITANTANG UNTUK MELAKSANAKAN

109.795
REPRESENTATIVES IN EACH INTERNSHIP
AUDIT DI AREA KERJANYA DAN
DEPARTMENT OF KPC. PROGRAM FOR MENUNJUKKAN 3 PELUANG PERBAIKAN
PROSPECTIVE YANG DAPAT DILAKUKAN YANG AKAN
OHS AUDITOR DIPRESENTASIKAN KEPADA GENERAL
MANAGER DIVISI YANG BERSANGKUTAN JA M
DAN GENERAL MANAGER SHE PADA
HOURS

4-6
AKHIR PERIODE MAGANG.

FOR 4-6 MONTHS KPCS OHS PROSPECTIVE


AUDITORS ARE TRAINED TO UNDERSTAND
BULAN OHS DOCUMENTS AND OHS AUDIT
109.795 JAM 109,795 HOURS
TECHNIQUES AND IMPLEMENTATIONS,
MONTHS INCLUDING HOW TO PERFORM DESK AUDIT PELATIHAN TERKAIT OF TRAINING RELATED
AND FIELD AUDIT. THE PROSPECTIVE DENGAN PROGRAM TO OCCUPATIONAL
AUDITORS ARE THEN CHALLENGED TO KESELAMATAN KERJA SAFETY AND HEALTH
CONDUCT AN AUDIT IN THEIR WORK DAN KESEHATAN KERJA PROGRAM HAVE BEEN
AREA AND FIND 3 OPPORTUNITIES FOR SELAMA PERIODE IMPLEMENTED AND
IMPROVEMENT THAT CAN BE REALIZED
TAHUN 2014 TELAH PARTICIPATED BY
AND TO BE PRESENTED TO THE GENERAL
MANAGER OF THE RELEVANT DIVISION DILAKSANAKAN DAN KPCS EMPLOYEES
AND GENERAL MANAGER OF SHE AT THE DIKUTI OLEH KARYAWAN AND CONTRACTORS
END OF THE INTERNSHIP PERIOD. DAN KONTRAKTOR KPC. THROUGHOUT 2014.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


TIM K3 KPC TELAH TERLATIH DAN TERSERTIFIKASI UNTUK BERBAGAI KEAHLIAN Keselamatan, Kesehatan
YANG MEMBANTU KAMI UNTUK MENCIPTAKAN LINGKUNGAN KERJA YANG dan Keamanan Kerja
_Occupational Safety and Health
AMAN DAN SEHAT, BEBERAPA DIANTARANYA ADALAH:

KPCS OHS TEAM HAS BEEN EQUIPPED WITH A WIDE RANGE OF TRAININGS AND
CERTIFICATIONS THAT HELP US TO CREATE A WORKING ENVIRONMENT THAT IS
SAFE AND HEALTHY. SOME OF THE PROGRAMS ARE: [G4-DMA]

Pemadam Pemeliharaan Menjalankan Memadamkan


Kebakaran Dasar & Inspeksi mesin pump Kebakaran
Kebakaran Mobil Pemadam
Basic Fire
Extinguisher Fire Inspection
Kebakaran
Fire Fighting
PROGRAM OBSERVASI
& Maintenance Pump the PERILAKU (PRINASA)
Fire Truck
BEHAVIORAL OBSERVATION
Penyelamatan Penyelamatan Kecelakaan Kecelakaan PROGRAM (PRINASA)
pada posisi pada posisi pada Alat Berat kendaraan
yang tinggi yang rendah bermotor
Heavy
124
U T
ntuk menunjang kelancaran dan efektivitas o support effective implementation of OHS,
High Angle Low Angle or Equipment Motor Vehicle
Rescue Slope Rescue Accident Accident
pengimplementasian K3, kami juga memiliki
Program Observasi Perilaku. Observasi Perilaku
KPC also conducts Behavioral Observation 125
Program called Prinasa that becomes a part
merupakan bagian dari upaya kami untuk mencegah of our efforts to prevent fatal accidents (Fatality
kecelakaan yang bersifat fatal (Fatality Prevention Prevention Element - FPE). This program
Penggunaan peralatan Penyelematan Penyelamatan Penyelamatan Elements FPE). Program ini dilaksanakan oleh jajaran is implemented by the management and
dan perlengkapan di Air Terbuka pada ruang di Hutan manajemen dan praktisi K3. Program ini diharapkan practitioners of OHS and is expected to reduce
mekanisme tertutup (navigasi dapat mengurangi jumlah kecelakaan dan frekuensi the number of fatalities and the frequency of
Open Water
keselamatan, termasuk: dan peta) kecelakaan yang menyebabkan kehilangan jam kerja. accidents causing loss of working hours.
Rescue Confined Space [G4-LA8]
Hinged Ladder System, [G4-LA8]
Rescue Jungle Rescue
rangka keselamatan Program PRINASA mempunyai 5 tahapan yang bertujuan Prinasa program consists of 5 stages that
(Navigation
Larkin, Tripod, Pompa untuk mengurangi atau bahkan menghilangkan potensi aim to reduce or even eliminate any potential
and Map)
hidraulik, Spreader, insiden atau cedera. 5 tahap tersebut terdiri dari: incident or injury. The 5 stages are:
Cutter, Air Bag Unit.
1. Mengamati orang yang sedang bekerja 1. Observing people who are working
Operating safety dengan fokus terhadap tindakan atau in their workplaces, with the focus
mechanism equipment perilaku orang di tempat kerja, pada saat on their specific actions or behavior
and tools, including: mereka melakukan pekerjaan normal when they perform normal work
Hinged Ladder System, dengan menggunakan seluruh indera. using all the five senses.
Larkin Rescue Frame, 2. Membantu menegaskan kembali atau 2. Helping to reaffirm or improve work
Tripod, Hydraulic Pump, memperbaiki standar kerja. standards.
Spreader, Cutter, 3. Perbincangan dengan karyawan, yaitu 3. Having conversation with employees,
Airbag unit dengan hanya menggunakan pertanyaan simply through asking questions.
saja. Dari hal tersebut para pekerja dapat Therefore, workers can be open
terbuka dalam mengenali dan mengoreksi to identify and solve any safety
Pertolongan CPR & AED Penggunaan Peralatan masalah keselamatan kerja. problems.
Pertama terapi oksigen pernafasan 4. Kesepakatan dan pemberian pujian 4. Giving affirmation and appraisal to the
CPR & AED
(Airline, SCBA) kepada karyawan. Tahap ini berguna untuk employees. This stage accommodates
First Aid Administering
karyawan dalam menyalurkan ide-ide dalam employees to channel their ideas in
Oxygen Therapy Breathing
melakukan pekerjaan secara aman. performing their jobs safely.
Apparatus
(Airline, SCBA) 5. Tahap terakhir dari program ini adalah: 5. The last stage of this program is:
jangan ada hukuman. Sikap yang terbuka, no punishment. Being open, not
tidak mengancam atau menghukum, serta threatening or punishing, as well as
sikap menghargai dari audit dan atasan showing mutual respect become the
Penanganan Tumpahan Hidrokarbon (di Darat & Air) adalah dasar dari sebuah kegiatan Prinasa foundation of a successful Prinasa
termasuk Penggunaan peralatan untuk tumpahan hidrokarbon yang sukses. activities.

Hydrocarbon Spill Response (Land & Water)


Including Operating Hydrocarbon Spill Kit

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja
AMAN, AMAN, AMAN _Occupational Safety and Health

Kap anp un,


S
istem demerit point adalah Setiap jenis pelanggaran lalu lintas yang
sebuah sistem dimana tercantum dalam formulir TOR memiliki

Dimanapun,
otoritas perizinan atau poin hukuman tertentu. Poin hukuman
kepolisian mengeluarkan akan terakumulasi selama pengemudi
poin kumulatif kepada masih melakukan pelanggaran dan berlaku

SIapapun
pengemudi atas pelanggaran selama 12 bulan sejak tanggal pelanggaran.
lalu lintas yang dilakukannya. Poin kemudian akan dikembalikan setelah
Dalam wilayah hukum yang satu tahun dari tanggal pelanggaran. Jika
menggunakan sistem demerit pengemudi mengumpulkan 9 poin hukuman,
point, polisi atau otoritas maka KIMPER-nya nya akan dicabut dan
perizinan (sebagaimana hanya akan diterbitkan kembali setelah poin
Safety, Safety, Safety ditentukan oleh hukum) pengemudi tersebut kurang dari 9 poin.
Everytime, Everywhere, menyimpan catatan skor Pengemudi yang melakukan pelanggaran
untuk setiap pengemudi. akan dikonseling oleh atasannya.
Everybody Masing-masing pelanggaran Konseling ini nantinya diharapkan dapat

126 lalu-lintas seperti ngebut meningkatkan kesadaran akan keselamatan

Sampai pada akhir tahun 2014,


atau tidak mematuhi
rambu lalu-lintas diberikan
oleh pengemudi bersangkutan dan dapat
mengubah perilaku mengemudinya. 127
Prinasa berhasil mencapai angka sejumlah poin. Ketika
34.072 Prinasa, dimana 24.836 pengemudi dinyatakan
Prinasa atau 73% dari total Prinasa bersalah atas pelanggaran
yang dilakukan berfokus pada Prinasa tertentu, poin yang sesuai
yang berhubungan dengan Elemen akan ditambahkan ke SISTEM DEMERIT POINT
Pencegahan Kecelakaan Fatal. skor total pengemudi.
Sistem demerit point ini UNTUK KESELAMATAN
Until the end of 2014, we recorded a
total number of 34,072 Prinasa, in which
terintegrasi dengan Program
Pengendalian Lalu Lintas
BERKENDARA DI KPC
24,836 or 73% of them were focusing on KPC yang dimaksudkan untuk DEMERIT POINT SYSTEM
Fatal Accident Prevention Element. mengukur tingkat kepatuhan
semua pemegang KIMPER FOR SAFETY DRIVING IN KPC
(SIM KPC) terhadap Aturan
Lalu Lintas Umum dan Aturan
OPERATIONAL AREA
Lalu Lintas Tambang KPC.

D
emerit point is a system in Each type of traffic violation
which the licensing authority listed in TOR form has certain
or the police issues cumulative penalty points. Penalty points
points to drivers that conduct any will be accumulated if the
traffic violations. In jurisdictions driver still commits traffic
that use demerit point system, the offenses and are valid for 12
police or the licensing authority (as months from the date of the
determined by law) keeps a record violation. Points will then
score for each driver. Each of traffic be reset after one year from
offenses, such as speeding or the date of the violation. If a
disobeying traffic signs, is given a driver collects a maximum 9
number of points. If a driver is found penalty points, his KIMPER
guilty of a particular offense, the will be revoked and will only
corresponding points will be added be reissued after the driver
to the total score of the driver. In has less than 9 penalty points.
KPC, the demerit point system is Drivers who commit traffic
integrated with KPC Traffic Control violations will be counseled by
Program, which is intended to his superiors. This counseling
measure the level of compliance of is expected to increase
all KIMPER (SIM KPC) holders to the awareness for safety of that
General Road Rules and Traffic Laws particular driver and could
and KPCs Mining Traffic Rules. change his driving behavior.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja
_Occupational Safety and Health
Did You
T AHU KAH Know?
AN DA
PENYULUHAN HIV/AIDS
PROVIDING INFORMATION
M
ENURUT WORLD HEALTH
ORGANIZATION (WHO) SETIAP 6,5
ON HIV / AIDS
NO SMOKING DETIK SATU ORANG MENINGGAL KARENA

SENSATION: ROKOK. RISET MEMPERKIRAKAN

S A
ebagai salah satu bentuk kepedulian kami nother way to show our care for our
BAHWA ORANG YANG MULAI MEROKOK
MENUJU KPC PADA USIA REMAJA (+ 70%) DAN TERUS
terhadap kesehatan para karyawan KPC, kami
juga telah melakukan sosialisasi awareness
employees health, we conducted
Awareness program and hold special
BEBAS ROKOK MEROKOK SELAMA DUA DEKADE ATAU
LEBIH AKAN MENINGGAL 20-25 TAHUN
dan kelas khusus pencegahan HIV/AIDS di
tempat kerja kepada lebih dari 6.200 karyawan
classes on Prevention of HIV/AIDS in
our workplaces to more than 6,200

128 2015 LEBIH AWAL DARIPADA ORANG YANG KPC dan kontraktor kami. employees and KPCs contractors .
TIDAK PERNAH MENGHISAP ROKOK."
NO SMOKING According to a research done by the
Penyuluhan HIV/AIDS yang diberikan, antara lain
mencakup pengetahuan komprehensif tentang
Various education programs on HIV/
AIDS are focusing on comprehensive
129
SENSATION: World Health Organisation (WHO), every HIV/AIDS, informasi dasar, cara penularan, knowledge, basic information, mode
TOWARDS A SMOKE- 6.5 seconds one person dies because of efek yang ditimbulkan, cara pencegahan dan of transmission, impacts, ways of
smoking. The research estimates that penerapan pola hidup bebas dari risiko HIV/ prevention, and free of HIV/AIDS
FREE KPC 2015 people start smoking during their teens AIDS. Kami juga mengajak kontraktor yang lifestyle. We also invite our contractors
(+70%) and continue smoking for two bekerjasama dengan kami untuk menggalakkan to work together in promoting
decades or will die 20-25 years earlier than program penyuluhan HIV/ AIDS. Tahun 2014, ini educational programs on HIV/AIDS. In
they who do not and never smoke. kami meningkatkan penyuluhan dalam sistem 2014, we conducted more programs
visit (voluntary consulting and testing). Selain through visitation (voluntary consulting
itu, kami juga mengadakan check up, survey and testing). In addition, we also
tentang HIV/AIDS, dan visit secara bersama- conducted a check-up, a survey, and

S O
alah satu fakta kesehatan yang begitu dekat ne health condition that is so prevalent, sama. Dengan demikian sejak September a group visit. Thus, since September
dengan masyarakat, khususnya di Indonesia especially in Indonesia, is smoking 2010 sampai dengan akhir tahun 2014, KPC 2010 until the end of 2014, KPC had
adalah kebiasaan merokok yang tidak dapat habit, which can not be denied having telah menyelenggarakan sebanyak 28.264 jam conducted a total 28,264 hours of HIV/
dipungkiri memiliki dampak negatif terhadap negative impacts on a persons health. awareness HIV/AIDS di tempat kerja dengan AIDS awareness programs at our
kesehatan. Untuk itu, sejak tahun 2014 KPC To that end, KPC began educating all 4.128 jam awareness dari total durasi tersebut workplace. A total of 4,128 hours was
memulai sosialisasi bahaya merokok kepada employees and their families on the danger dilaksanakan sepanjang tahun 2014. conducted in 2014 only.
seluruh karyawan dan keluarganya. of smoking since 2014.
Program ini mulai dilaksanakan dengan The comprehensive program on smoking
memberikan pengetahuan dasar tentang starts with providing basic knowledge KAMPANYE K3 MELALUI SIARAN RADIO
rokok, bahaya merokok dan dampak sosial about smoking, the dangers of smoking
serta finansial dari kebiasan merokok. and social and financial impacts of having OHS CAMPAIGN THROUGH RADIO BROADCAST
Disamping itu, sebanyak 20 konselor a smoking habit. In addition, as many as
ditugaskan untuk melakukan pendekatan 20 counselors are assigned to conduct a

K K
PC telah menggandeng Radio Gema Wana PC has been including
yang lebih personal kepada karyawan KPC more personal approach to KPC employees
Prima (GWP) FM untuk mengkampanyekan Gema Wana Prima (GWP)
yang merokok untuk memberikan tips dan trik who smoke, to give tips and tricks as well
pentingnya keselamatan dan kesehatan FM Radio in the campaign to
serta dukungan untuk mengurangi konsumsi as to support the efforts to reduce or stop
kerja. Radio yang pertama kali didirikan raise awareness on the importance of
rokok atau berhenti sama sekali. Program tobacco consumption. This program has
oleh salah satu karyawan KPC ini telah occupational health and safety. The radio
ini telah memperoleh sambutan baik dari received good responses from the East
membantu kami dalam mensosialisasikan station that was first founded by one
Gubernur Kutai Timur dan tokoh masyarakat Kutai Governor and community leaders
dan mengkomunikasikan pentingnya perilaku of KPCs employees has helped us in
sekitar operasi kami. around our operations.
aman. Radio GWP juga memberikan tips-tips communicating the importance of safe
Seiring dengan sosialisasi intensif tersebut, pada Along with intensive dissemination mengenai gaya hidup sehat yang dikemas behavior. GWP RM Radio also gives tips on
tahun 2014 larangan merokok telah diberlakukan programs, smoking ban has been imposed dengan sangat menarik. Melalui media radio healthy lifestyles through interesting radio
di sejumlah wilayah operasional kami dan KPC in some areas of our operations in 2014 and GWP FM, KPC mengharapkan sosialisasi programs. Through GWP FM Radio, KPC
akan memberlakukan larangan merokok di KPC will impose a ban on smoking in all K3 mampu menjangkau setiap karyawan, expects that OHS socialization can reach
seluruh area operasional kami seluas lebih dari areas of our operations, covering more than kontraktor, hingga masyarakat sekitar secara every employee, contractor, up to the people
90.000 hektar di tahun 2015 mendatang. 90,000 hectares, in 2015. menyeluruh. in the surrounding communities.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja
PENANGANAN _Occupational Safety and Health

KECELAKAAN KERJA
HANDLING OF
WORK ACCIDENTS
IMPROVEMENT IN ACTION:
3 MENIT EMERGENCY
T
anggap darurat di KPC bertujuan
RESPONSE AIRPORT agar seluruh insan KPC selalu

TANJUNG BARA sigap dalam menyelesaikan segala


permasalahan yang berkenaan dengan
K3 di wilayah operasi KPC. Kami telah
melakukan beberapa improvement
pada tahun 2014 mengenai tanggap
darurat di KPC. Salah satunya dengan
meningkatkan keterampilan Tim
Emergency KPC, jika sewaktu-waktu
130 terjadi kecelakaan kerja/keadaan
darurat, untuk mengevakuasi korban
melalui Bandara Tanjung Bara,
131
Sangatta. Kami mendapatkan hasil
yang positif dari improvement ini. Hal
tersebut terungkap dari hasil evaluasi
latihan penanggulangan keadaan
darurat (emergency drill).
Pada emergency drill tersebut,
waktu respon terbaik yang berhasil
IMPROVEMENT IN ACTION:

D I
alam menangani kecelakaan yang terjadi n handling accidents that occur in dicatatkan adalah 3 menit. Truk
di tempat kerja, KPC telah membentuk our workplaces, KPC has established pemadam kebakaran, ambulance,
sistem dan prosedur bagi seluruh pihak systems and procedures to be followed 3 MINUTES EMERGENCY tim medis, water truck, dan tim
yang terlibat. Hal ini bertujuan agar kecelakaan by all related parties. This is to ensure RESPONSE OF TANJUNG pengamanan berhasil tiba di TKP
dapat ditangani dengan secepatnya, korban that accidents can be managed as dalam waktu 3 menit tersebut. Latihan
mendapatkan penanganan terbaik, dan soon as possible, victims get the best
BARA AIRPORT ini melibatkan unit kerja yang terkait
mencegah berulangnya kejadian serupa di treatment, and prevent the recurrence dengan operasional Bandara Tanjung
kemudian hari. of similar incidents in the future. Bara, yakni Departemen Logistic and
Transport, Airborn, Rescue, International
Ketika terjadi insiden kecelakaan kerja, When an accident happens in the
SOS dan tim pengamanan.
hal pertama yang harus dilakukan adalah workplace, the first thing to do is to
melaporkan kecelakan tersebut kepada atasan report the accident to each persons
masing-masing. Pimpinan juga berkewajiban superior. Leaders are obliged to report
untuk melaporkan setiap kejadian yang terjadi any incident that occurs in their area
di area yang merupakan cakupan tanggung of responsibility. In addition, OHS
jawabnya. Di samping itu, petugas K3 memiliki officers have an obligation to assist in
kewajiban untuk membantu pengumpulan data the collection of information so that

K
the benefit section officer may file a PC emergency response effort aims At the emergency drill that we
sehingga petugas dari benefit section dapat
report to the Office of Manpower, PT for all of our people to always be ready performed in 2014, we recorded
menyusun laporan kepada Kantor Tenaga Kerja,
Jamsostek, and insurance company in to solve any problem that is related the best response time of 3
PT JAMSOSTEK, dan perusahaan asuransi
less than 48 hours. OHS in KPC operations. In 2014, we made minutes. Fire trucks, ambulances,
dalam waktu kurang dari 48 jam.
several improvements on KPCs emergency medical teams, water truck,
Jika kategori kecelakaan termasuk If the accident is in the category of response. One improvement has been and security team arrived at the
dalam kategori fatality, kami akan segera fatality, we will immediately stop our carried out by KPC Emergency Team in scene within 3 minutes. This drill
menghentikan operasi sementara pada area operation temporarily in the area so that any time occupational accident/ involved the related working units
tempat terjadi fatality untuk melakukan kajian to conduct a study and thorough emergency happens, evacuation effort will of Tanjung Bara airport operations,
dan investigasi secara menyeluruh untuk investigation to find out the main cause be done through Tanjung Bara Airport, namely the Department of
mencari tahu penyebab utama terjadinya fatality of the fatality. Results of the study and Sangatta. From this improvement effort, Logistics and Transport, Airborn,
investigation will be used to make an Rescue, International SOS and
tersebut. Hasil dari kajian serta investigasi we get positive results that was revealed
action plan so that similar incidents can security team.
tersebut akan digunakan untuk merencanakan from the evaluation of emergency drill.
be avoided in the future.
action plan sehingga kejadian serupa dapat
dihindari di kemudian hari.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Keselamatan, Kesehatan
dan Keamanan Kerja
FORUM K3 OHS FORUM _Occupational Safety and Health

F O
orum K3 yang kami laksanakan HS Forum that we establish
merupakan kerjasama dari beberapa is a result of cooperation with
pihak, baik pihak internal maupun several parties, both internal
kontraktor. Forum ini dilaksanakan untuk and contractors, to evaluate
mengevaluasi dan meningkatkan kualitas and improve the quality of OHS
program. The forum is open for
K3 APA KATA MEREKA
program K3. Program ini dilakukan
dengan mengadakan forum diskusi bagi all divisions of KPC to prepare CHALLENGE TENTANG K3 CHALLENGE:
seluruh divisi KPC untuk menyiapkan topik
topics and materials that can be
communicated, so that everyone MAKING WHAT THEY SAY ABOUT
SAFETY FUN
dan materi yang dapat disosialisasikan,
can have an opportunity to speak
sehingga semua mempunyai kesempatan OHS CHALLENGE:
their opinion.
untuk menyalurkan opininya.
FOR ALL
OHS CHALLENGE
MARDIANSYAH MARDIANSYAH
MAKING SAFETY Seninor Engineer Seninor Engineer
FUN FOR ALL Mining CMD PAMA Mining CMD PAMA
K3 Challenge 2014 lumayan seru. "2014 OHS Challenge was pretty
132
K
3 Challenge Kami menikmati berjalan di alam exciting. We enjoyed walking in
merupakan bagian
walau lebih ringan dibanding ketika
tahun 2013, sedikit saran jangan
the nature though the challenge
was a little bi easier than in 2013. 133
dari serangkai acara terlalu seperti rescue banget My suggestion is not to make
yang diselenggarakan namun lebih ke arah bagaimana it more like a rescue but more
selama Bulan K3 Nasional penanganan korban ketika dalam toward how to handle victims
keadaan urgent. when it is urgent. "
yang merupakan sebuah
kegiatan yang bertujuan ANDI NUGROHO ANDI NUGROHO
untuk meningkatkan Coordinator Safety
Coordinator Safety
rasa kebersamaan antar CMD PAMA
CMD PAMA
karyawan dan kontraktor
"2014 OHS Challenge was
dengan menggabungkan K3 Challenge 2014 seru dan
menantang buat Team Work. exciting and challenging for Team
berbagai kegiatan outdoor Work. It was great. "
Pokoe Mantap..
dengan aspek-aspek
K3. Di tahun 2014, K3 AGUSTIA RIZAL ALHAFIEDZ AGUSTIA RIZAL ALHAFIEDZ
Challenge dilaksanakan Graduate Supply Graduate Supply
pada tanggal 8 Maret 2014 "OHS Challenge held in 2014

PERTEMUAN SAFETY
K3 Challenge yang diadakan
SAFETY CONTRACTORS di Telaga batu Arang yang not only taught about the
di tahun 2014 tidak hanya
diikuti oleh 55 tim dari value of safety, but also it was

CONTRACTORS MEETING karyawan KPC dan para


mengajarkan nilai nilai safety,
tapi juga hiburan bagi pekerja
entertaining for the workers in

W
Sangatta, who actually in need of
kontraktor kami. -pekerja tambang di kota

K
e also hold a meeting with the some entertainment. 2014 OHS
ami juga melibatkan kontraktor dengan Sangatta, yang notabene miskin
Challenge was very interesting
mengadakan Pertemuan Safcon (Safety contractor through Safcon (Safety akan hiburan. K3 Challenge 2014

O
for office workers, who everyday
Contractor). Dalam pertemuan ini, Contractor) meeting. In this HS Challenge is part of sangat menarik bagi pekerja
just sit and rarely move or sweat.
event series held during kantor, yang sehari-hari hanya
General Manager, manajer, dan praktisi meeting, we invited the General Managers, It's not only becoming a safety
duduk dan jarang sekali bergerak
K3L KPC serta manajer dan praktisi K3L managers, and SHE practitioners of OHS National Month, atau berkeringat. Ini tidak hanya
campaign event but also an
KPC, as well as managers and SHE an activity that aims to event for fun sports. "
kontraktor dilibatkan untuk memastikan ajang kampanye safety tetapi
setiap jajaran manajemen dan praktisi K3L practitioners of contractors, to ensure that increase the sense of unity juga merupakan ajang untuk
the management and practitioners of SHE among employees and berkeringat dengan gembira.
serta mitra kontraktor kami memperoleh
informasi penting yang berkaitan and our contractor partners can receie contractors by combining a PUTRA ADI MULYA
PUTRA ADI MULYA
dengan Keselamatan, Kesehatan Kerja, important information on Safety, Health, variety of outdoor activities Supv PC Support
Supv PC Support
Lingkungan. Sepanjang tahun 2014, kami and Environment. Throughout 2014, we with the aspects of OHS.
"2014 OHS Challenge is a
telah mengadakan 3 kali Safcon. held Safcon three times . In 2014, OHS Challenge K3 Challenge 2014 adalah acara
very complete and interesting
yang sangat menarik dan sangat
was held on March 8, 2014 lengkap, karena membutuhkan event, because it requires
in Telaga Batu Arang, persiapan fisik, keterampilan, physical preparation, skill,
participated by 55 teams kekompakan dan pengetahuan teamwork and knowledge
in every game challenge.
from KPC employees and didalam setiap tantangan
permainannya. Harapannya kegiatan Hopefully the event could be
contractors. held annually with additional
ini bisa diadakan setiap tahunnya
dengan jenis permainan dan games and challenges."
tantangan yang lebih banyak lagi.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Insan KPC
_Our People

INSAN KPC
OUR PEOPLE

K
arena Insan KPC, kami
mampu bertahan menghadapi
dinamika yang terjadi di industri
134 batubara selama lebih dari
20 tahun. Bersama mereka, KPC
terus berupaya mengatasi segala 135
rintangan dan tantangan. Tanpa
mereka, cita-cita keberlanjutan
kami tidak mungkin dapat
direalisasikan. Untuk itu, we invest
in people, para pria dan wanita
yang menjadi tulang punggung dan
motor keberlanjutan KPC.

o
ur people is the strength that
enable us to withstand the
dynamics of the coal industry
for more than 20 years.
Together, KPC strives to overcome
all obstacles and challenges. Our
sustainability goals may not be
achieved without them. To that
end, we invest in our people, men
and women who have become the
backbone and the motor of KPCs
sustainability.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Insan KPC
_Our People

M. RUDY - COO KPC WAHYUDIONO, - SUPERINTENDENT


PRODUCTION SHIFT CREW BRAVO HATARI

,,D unia tambang


batubara saat ini
memang belum
membaik seperti tahun - tahun ,,K erjasama tim sangat
dibutuhkan di tengah
sebelumnya. Tentu banyak tantangan kondisi harga batubara
ke depannya. Namun kita tetap yang belum stabil, serta banyaknya

INSAN KPC
mampu membuktikan prestasi yang alat berat yang terparkir. Bagaikan
membanggakan. Di samping itu, roda yang berputar kadang di bawah
136 KPC selalu berkomitmen untuk tetap kadang di atas, Industri yang lesu
menjunjung tinggi prinsip-prinsip pasti akan bangkit lagi. Untuk itu kita 137
OUR PEOPLE operasional yang bertanggung jawab
melalui Good Mining Practice."
jangan lengah dan tidak perlu ikut
lesu, kita harus tetap semangat, tetap
memberikan yang terbaik."
The condition of the world coal

t K
etap semangat!, kata sederhana yang selalu eep up the spirit! is a simple tagline industry nowadays has not been as A good teamwork becomes a
kami pegang teguh kapanpun dan dimanapun that we always hold on to whenever and good as in the previous years, so this foundational aspect in facing a
kami bekerja. Ditengah kondisi industri wherever we work. Amid uncertain coal might present many challenges in the condition with unstable coal prices and
batubara yang tidak menentu, semangat setiap industry conditions, the spirit of every future. However, we can be proud that the number of heavy equipment that
insan KPC harus tetap membara melalui member of KPC must keep burning to give we still make notable achievements. are parked. Like a wheel, going up and
unjuk kerja terbaik. Hanya melalui semangat dan the best performance. Only through keeping In addition, KPC continues to be down, a flagging industry will surely
etos kerja yang tetap membara inilah keberlanjutan up the burning spirit and work ethic, KPCs committed in upholding the principles rise again. Therefore, we must remain
KPC dapat diwujudkan dan kami sebagai salah satu sustainability goal can be realized and we as of responsible operations through alert and not be hopeless, but need to
perusahaan batubara terbesar di Indonesia tetap one of the largest coal company in Indonesia Good Mining Practice. keep up the spirit and do our best.
dapat memberikan manfaat dan kontribusi positif can still generate positive benefits and
kepada masyarakat dan negeri ini. contributions to the society and the country.
Sepanjang tahun 2014, KPC terus memberikan Throughout 2014, KPC continued to provide
berbagai pelatihan-pelatihan dan pembekalan- various training and mentoring activities
pembekalan yang mereka perlukan untuk needed in facing all the challenges both
SHANE BENNET - GENERAL MANAGEMENT MINING DESIGN DIVISION
menghadapi segala tantangan yang ada baik disaat nowadays and in the future. Moreover, we

,,K
ini dan di masa yang akan datang. Lebih dari itu, continuously instilled a safety, happy, healthy
kami selalu menanamkan budaya dan etos kerja and environmentally friendly corporate
aman, selamat, sehat, dan ramah lingkungan culture and work ethic as a guidance for our PC, walaupun di tengah kondisi Amidst uncertain market conditions, KPC
sebagai pedoman aktivitas dan kegiatan para employees in performing any activities. yang tidak menentu masih berhasil still manages to meet our production
karyawan. [G4-DMA] [G4-DMA] memenuhi target produksi. Lebih targets. Moreover, with many mining
dari itu, walaupun peralatan tambang kita banyak equipment that are parked, there
Melalui Human Resources Division, berbagai program Through the Human Resources Division, has been no lay offs. This is possible
pengembangan karyawan diluncurkan. Kami juga various employee development programs yang terparkir, tidak ada karyawan yang di-PHK.
Pencapaian ini karena setiap karyawan tetap because every employee continues to
membangun berbagai fasilitas penunjang sumber have been launched. We also build various give their supports to our company. We
daya manusia yang terbaik untuk Insan KPC. human resource facilities for best development mendukung perusahaan ini. Tetep semangat kerja,
keep working passionately, united and
Kami berkomitmen, agar setiap karyawan merasa of Our People. We are committed to make tetap kompak, tetap semangat melakukan efisiensi
focused on our efficiency targets. In good
kerasan menjadi bagian dari keluarga besar KPC every employee feels like being part of a bersama-sama. Di saat kondisi baik, kita senang condition, we are happy together. During
sehingga mereka dapat memaksimalkan talenta, family of KPC so that they can maximize their bersama. Di saat kondisi sulit, kita pikul bersama." difficult times, we endure together.
kinerja, dan performa terbaiknya. Disamping talents and performances. In addition, human
itu, kebijakan sumber daya manusia KPC telah resource policies of KPC have been developed
dikembangkan sesuai dengan peraturan dan in accordance with the rules and regulations
perundang-undangan yang berlaku dan menjunjung that apply and uphold the principles of human
tinggi prinsip-prinsip hak asasi manusia. [G4-DMA] rights. [G4-DMA]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Insan KPC
_Our People
PENERAPAN GOOD MINING
PRACTICE PADA ASPEK
KETENAGAKERJAAN MELINDUNGI
GOOD MINING PRACTICE
HAK-HAK KARYAWAN

D
i dalam mengelola maupun berinteraksi dengan para karyawan KPC, kami selalu
ON EMPLOYMENT menjujung tinggi nilai-nilai hak asasi manusia, keadilan, serta kesetaraan. Dalam
hal ini, KPC tidak pernah membeda-bedakan agama, suku, ras dan jenis kelamin.
Dapat kami laporkan, hingga akhir tahun 2014, tidak ada laporan ataupun terjadi

K
aryawan merupakan aset dan kunci insiden yang terkait dengan diskriminasi. Kami juga menjamin setiap karyawan
kesuksesan perusahaan. Tanpa adanya tanpa terkecuali, mendapatkan hak mereka dalam hal keselamatan, kesehatan
kinerja yang maksimal dari karyawan, dan lingkungan, peluang karir, pelatihan dan pengembangan, rotasi dan mutasi,
maka sulit bagi perusahaan untuk dapat terus menduduki jabatan tertentu, serta perolehan tunjangan.
maju dan berkembang. Kami mewujudkannya Dalam memberikan tugas kepada masing-masing karyawan, kami selalu
melalui berbagai pengelolaan SDM yang mempertimbangkan keselamatan dan kesehatan kerja. Karyawan memiliki hak
sesuai dengan prinsip Good Mining Practice. untuk menolak perintah atasan jika melanggar prosedur atau membahayakan
Sumber daya manusia yang kompeten keselamatan jiwa mereka. Kami mewajibkan setiap kontraktor dan pemasok yang
138 di industri pertambangan akan selalu bermitra dengan KPC agar selalu mematuhi peraturan ketenagakerjaan dan standar
dibutuhkan demi menciptakan perusahaan keselamatan, kesehatan dan lingkungan yang berlaku di KPC. Di samping itu, kami
dengan tegas menolak adanya pemaksaan kerja dalam bentuk apapun terhadap
139
yang berkelanjutan. Bagi kami, penting
untuk terus mencari, mempertahankan dan tenaga kerja di bawah umur.
mengembangkan sumber daya manusia yang Bagi para karyawan yang ingin melalukan konsultasi mengenai masalah yang
terbaik di bidangnya untuk bergabung dan sedang dihadapi dalam pekerjaan mereka, kami juga memiliki jasa konseling.
tumbuh berkembang dengan kami. Jasa konseling kami sediakan untuk membantu karyawan memecahkan masalah
Prinsip-prinsip ketenagakerjaan GMP selalu tersebut. Program konseling dikelola oleh divisi Human Resources dan bekerja sama
kami wujudkan melalui proses rekrutmen dengan Serikat Pekerja atau Serikat Buruh.
berdasarkan kompetensi dan keahlian, Bersama-sama, program ini memiliki garis besar untuk mendukung kesetaraan
program-program pengembangan dan gender dan anti diskriminasi dalam lingkungan KPC. Dapat dilaporkan bahwa selama
pelatihan karyawan, evaluasi kinerja berkala, tahun 2014 tidak terjadi pemogokan kerja di lingkungan KPC, baik yang dilakukan
jenjang karir, serta paket remunerasi yang oleh karyawan kami ataupun oleh karyawan kontraktor KPC yang berdampak pada
adil sekaligus menarik. [G4-DMA] aktivitas operasional perusahaan.

E
mployees are assets and the key to our
companys success. Without maximum PROTECTING EMPLOYEES RIGHTS

I
performance given by our employees, it n managing and interacting with our people, we always uphold the principles
is difficult for the Company to keep growing of human rights, justice and equality. In this case, KPC never discriminates our
and expanding through implementing human employees on religion, ethnicity, race and gender. We reported that by the end of
resources management that is in accordance 2014 there were no reports or incidents related to employee discrimination. We also
with the principles of Good Mining Practice. ensured that all employees, without exception, get their rights in terms of safety,
Having competent human resources in the health and environment; career opportunities; training and development; rotation
mining industry is always required in any and transfer; job positions; as well as allowances.
effort to create a sustainable company. For In assigning tasks to each employee, we always consider safety and health aspects.
us, it is important to continue to recruit, retain Employees have the right to decline any assignment from their superiors if it violates
and develop best human resources in their any procedures or endanger their safety. We require our partners, including all
respective fields to join and grow with us. contractors and suppliers, to always comply with any labor regulations and standards
Implementations of GMP principles on of safety, health and environment applicable in KPC. In addition, we strictly apposed
employment are realized through the any kinds of forced labor and employment of underage workers.
process of recruitment that is based on KPC also have counseling services for employees who wish to consult on their problems
competence and expertise, providing at work, to help them to solve the problems. This counseling program is administered by
employee development and training the Human Resources Division and in cooperation with the Labor Union.
programs, conducting periodic performance
evaluation, establishing career paths, as well Together, all these programs reflect an overarching purpose to support gender
as providing fair and attractive remuneration equality and anti-discrimination within KPC. Throughout 2014, there were no labor
packages. [G4-DMA] strike took place in KPC workplaces, whether done by our employees or employees of
KPCs contractors, that have an impact on the operational activities of the Company.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


PROFIL DAN Insan KPC
DISTRIBUSI TOTAL JUMLAH
_Our People

KARYAWAN
EMPLOYEES
4.944
ORANG
KARYAWAN
PER 31 DEC 2014
IND EXP
TOTAL EMPLOYEES
PROFILE AND AS OF DEC 31ST, 2014
LOKASI
DISTRIBUTION SANGATTA 4.873 4
LOCATION
[G4-10] SAMARINDA 4 -
BALIKPAPAN 4 -
IND EXP JAKARTA 24 -
JENIS KONTRAK
4.861 4 0 -
SEPARI
PERMANEN
(PERMANEN/ PERMANENT
FIX TERM)
LEMBAK 0 -
TYPE OF CONTRACT
JANGKA WAKTU
TERTENTU 79 - BENGALON 35 -
140 (PERMANENT/FIX TERM)
FIX TERM
141
IND EXP
IND EXP
JABATAN
4.589 3
MANAGEMENT/
PRIA ROLE PROF 623 4
JENIS KELAMIN MALE (MANAGEMENT, TECHNICAL, SKILL)
484 -
351 1
GENDER TECH/SUPV
WANITA
FEMALE
CLERICAL 484 -

SKILLED 484 -
IND EXP
UNSKILLED
484 -
KELOMPOK UMUR <30 975 975
(<30 ; 30-50 ; >50)
AGE GROUPS
30-50 351 351 IND EXP
(<30 ; 30-50 ; >50)
>50 123 123 A 17 17

B 3332 3332

C 484 484

D 652 652

E 235 235

GRADE
GRADE
F 130 130

G 19 19

H 39 39

I 20 20

J 12 12

TOTAL 4940 4940

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


REASON TOTA L GRADE TOTA L Insan KPC
_Our People
SELESAI KONTRAK KERJA
END OF WORK CONTRACT 35 A 1

B 79
MENGUNDURKAN DIRI
RESIGNATION 44
C 27
KESEMPATAN BEKERJA BAGI
PENSIUN D 39
MASYARAKAT SETEMPAT
Sementara itu, tingkat
turnover karyawan pada RETIREMENT 70 WORK OPPORTUNITIES
E 8
tahun 2014 tercatat sebesar
LAIN-LAIN FOR LOCAL COMMUNITIES
3,58%. Beberapa hal yang
melatarbelakangi tingkat OTHERS
37 F 15

turnover di KPC adalah G 2

S O
alah satu komitmen kami untuk untuk ne of KPC commitment is to contribute
karyawan telah mencapai GRAND TOTAL 179 H 4 turut serta memberdayakan dan in the empowering and developing the
usia pensiun normal, berakhir
masa kontrak, diberhentikan, J 3 mengembangkan potensi daerah di potential of local communities around
mengundurkan diri hingga area pertambangan KPC, yang berada di KPC mining areas, including the region of
K 1 wilayah Sangatta, Kutai Timur, Kalimantan Sangatta district, East Kutai regency, East
alasan kesehatan dan yang Meanwhile, employee turnover rate in 2014 was
lainnya. Sesuai dengan UU recorded at 3.58%, which represents the number Timur, yaitu dengan membuka kesempatan Kalimantan province, which is through
GRAND 179 berkerja bagi masyarakat setempat. providing work opportunities for local people.
142 Ketenagakerjaan No. 13 dan retired employee, the end of employment contract,
TOTAL
PKB yang berlaku, maka
surat pengunduran diri
termination, resignation, as well as health related
resignation and other reasons. In accordance with
Kami melakukan perekrutan dengan
memberikan prioritas pada para calon
We give priority to prospective employees
who live in the area around the point of
143
atau pemberhentian harus the Labor Law No.13 and applicable Collective karyawan yang berdomisili di area sekitar hire, i.e. Sangatta and surrounding area.
disampaikan kepada karyawan Bargaining Agreement, any letter of resignation or point of hire, yaitu Sangatta dan wilayah In 2014, there were 3,709 KPC employees
terkait paling lambat 1 bulan termination shall be communicated to employees sekitarnya. Pada tahun 2014, tercatat who are recruited from Sangatta,
sebelumnya. [G4-LA1] at least 1 month prior. [G4-LA1] sebanyak 3.709 orang karyawan KPC Bengalon, and surrounding areas.
adalah karyawan yang direkrut dari wilayah
Sangatta, Bengalon, dan sekitarnya.
Harus kami akui, salah satu faktor yang We must admit that one of the factors
REKRUTMEN menjadi tantangan bagi KPC dalam proses that become a challenge for KPC in the
YANG ADIL DAN rekrutmen karyawan dari masyarakat
lokal adalah kompetensi yang tidak sesuai
recruitment of local communities is the
level of competency, which is different
BERKUALITAS dengan apa yang perusahaan butuhkan.
Terbatasnya lembaga dan sumber
with our requirement. Lack of educational
institutions and resources in Sangatta is
FAIR AND QUALITY daya pendidikan di Sangatta menjadi the cause of the lack of competency of local
penyebabnya. Maka, agar masyarakat people. Therefore, to provide opportunity for
RECRUITMENT setempat memiliki kesempatan untuk local communities to join KPC or to other
bergabung bersama KPC atau perusahaan similar companies, we have developed
lain sejenis, kami telah mengembangkan a program that combines community

K K
PC bekerja sama dengan berbagai media massa, PC cooperates with various mass media, program community development yang development training, development and
pusat karir di berbagai perguruan tinggi, dan career centers at various universities, mengkombinasikan program pelatihan, education with a special recruitment
head hunter untuk merekrut kandidat karyawan and head hunters in recruiting potential pengembangan, dan pendidikan dengan process for local people of East Kutai and
potensial. Kebijakan rekrutmen dan peraturan employee candidates. Recruitment policies proses rekrutmen khusus bagi putera East Kalimantan, among others: operator
perusahaan KPC memang mensyaratkan jika usia and regulations of KPC require the minimum daerah Kutai Timur dan Kalimatan Timur, and mechanic training program.
minimal calon karyawan yang dapat diterima adalah age of acceptable candidates to be 18 years. antara lain: program pelatihan operator dan
18 tahun. mekanik.
To recruit potential candidates, we also open POINT
Untuk menjaring kandidat yang potensial, kami up the opportunity for students from various IND EXP
OF HIRE
membuka kesempatan bagi mahasiswa dari berbagai majors that are in line with the industry and
jurusan yang relevan dengan industri dan proses business process of KPC to perform their OVERSEAS - 4
bisnis KPC untuk melaksanakan Kerja Praktik (KP), internships, finish their Final Assignment,
Tugas Akhir (TA), ataupun bergabung dalam Program or participate in the Companys Internship JAKARTA 532 -
Magang perusahaan. Pada akhir program, setiap Program. At the end of the Internship
mahasiswa diberikan kesempatan untuk bergabung Program, each student is usually given the SAMARINDA 223 -
dengan KPC. Ketentuan untuk bergabung juga harus opportunity to join KPC. Provisions to join
dipastikan sesuai dengan kriteria umur yang tidak KPC must also be in accordance with the age BALIKPAPAN 344 -
boleh di bawah dari 18 tahun. work criteria of minimum 18 years old.
SANGATTA 3709 -
Pada tahun 2014, sebanyak 72 karyawan baru In 2014, there were 72 new employees joined
bergabung dengan KPC pada berbagai posisi dan KPC in various positions and divisions. [G4- OTHER IND 132 -
divisi. [G4-LA1] LA1]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Insan KPC
PERENCANAAN JENJANG KARIR _Our People

CAREER PATH PLANNING SISTEM


MANAJEMEN
K K KINERJA
PC selalu memberikan apresiasi yang sepadan PC always gives appreciation to our employees
bagi karyawan kami yang memiliki tingkat kinerja who have made a good performance and
baik dan turut berkontribusi bagi perusahaan. contribution to the Company. Through making PERFORMANCE
Melalui evaluasi kinerja secara berkala, kami regular performance evaluations, we ensure
memastikan adanya pengembangan karir karyawan. career development of all our employees. MANAGEMENT
KPC telah mengembangkan program Dual Career KPC has developed a program called Dual Career
SYSTEM
Ladder, yang berguna untuk pengembangkan Ladder, which is useful for functional career
jalur karir fungsional. Berbagai program telah path development. Various programs have been
kami rencanakan dan susun, mulai dari pelatihan planned and arranged in this program, ranging
kepemimpinan dasar, pelatihan tindak disiplin, hingga from basic leadership training, discipline training,
pelatihan HR untuk profesional non-HR. up to HR training for non-HR professionals.

144
145

S A
ebagai bagian dari perbaikan sistem s a part of improvement on KPCs
manajemen kinerja (performance integrated performance management
management system) terintegrasi di KPC, system, KPC has been implemented
sejak tahun 2013 KPC telah menjalankan the Performance Management System
proyek implementasi Sistem Manajemen (Sistem Manajemen Kinerja SMK) project
Kinerja (SMK) untuk operator Mining to operators in Mining Operation Division
Operation Division (MOD) dan mekanik (MOD) and mechanics in Mining Support
Mining Support Division (MSD). Proyek Division (MSD) since 2013. This project
ini mencakup penetapan KPI dan target includes the setting up of KPI and individual
individu, pengukuran data kinerja, dan targets, measurement of performance data
pemberian umpan balik peningkatan and providing feedback on performance
kinerja. Penerapan SMK memungkinkan improvement. Implementation of SMK allows
PROGRAM PERSIAPAN PENSIUN peninjauan kinerja individu karyawan employees individual performance review to
dilakukan berdasarkan data obyektif dan be carried out based on objective data and
RETIREMENT PREPARATION PROGRAM dalam tingkat kekerapan lebih tinggi, yaitu higher frequency, i.e. up to once a month.
hingga sekali setiap bulan. Sebelum SMK Before implementation of SMK, employees
diterapkan, peninjauan kinerja karyawan performance review was carried out annually

K K
PC tidak hanya memberikan perhatian kepada PC does not only pay attention to our active dilakukan hanya sekali setiap tahun dan and based on subjective observation of their
karyawannya yang masih aktif, namun juga employees but also retiring ones. KPC didasarkan pada hasil pengamatan atasan superiors.
kepada insan KPC yang telah memasuki masa has a training program for employees yang relatif bersifat subyektif.
pensiun. KPC memiliki program pelatihan bagi who enter retirement period, which is the
karyawan yang akan memasuki masa pensiun, Retirement Preparation Program. This Laporan kinerja individu karyawan Individual performance report is based on
yaitu Program Masa Persiapan Pensiun (MPP). program is inteded to provide employees mencakup pencapaian key performance the core processes in the key performance
Program yang kami berikan berfungsi bagi calon who are entering retirement period and their indicator (KPI) proses inti serta perilaku indicators (KPI) and employee behavior.
pensiunan perusahaan dan keluarganya untuk families with physical and mental preparation karyawan. Contoh KPI proses inti yang Examples of KPI core processes that are
mempersiapkan fisik serta mental ketika pensiun. upon retirement period. We provide resources, diterapkan adalah man ready hours untuk applied are including man ready hours for
Terdapat pembekalan-pembekalan yang kami such as skills and knowledge in maintaining operator MOD, yang mencerminkan durasi MOD operators, which show the period in
berikan seperti keterampilan maupun pengetahuan health and nutrition, implement harmonious operator berada dalam keadaan siap which the operator is in a ready state to
dalam mengelola kesehatan dan gizi, menerapkan family relations, financial management, as mengoperasikan alat. Semenjak SMK operate the equipment. Since implementation
hubungan keluarga yang harmonis, mengelola well as psychological counseling. diterapkan, data man ready hours operator of SMK, data of man ready hours has been
keuangan, serta konsultasi psikologi. dikumpulkan, dipantau serta dianalisa collected, monitored and analyzed on a regular
secara rutin, dan inisiatif-inisiatif perbaikan basis, in order that improvement initiatives
Kami juga memberikan program pembekalan We also provide an introduction to bisa dijalankan dengan lebih efektif. could be implemented more effectively.
mengenai kewirausahaan. Program tersebut entrepreneurship. The program is
disertai dengan kunjungan lapangan untuk berbagi accompanied by a field visit to get sharing SMK akan terus dikembangkan dan SMK will gradually continue to be developed
pengalaman dengan para pensiunan yang telah sessions from the retirees who have managed diterapkan di semua divisi secara bertahap. and implemented in all divisions.
berhasil menjadi seorang wiraswastawan. to become successful entrepreneurs.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


NYAMAN DAN KERASAN Insan KPC
BEKERJA DI TAMBANG 31 TAHUN BERSAMA KPC _Our People

31 YEARS WITH KPC


COMFORTABLE AND
B
apak Syarifudin, karyawan yang berprofesi sebagai
CONTENT WORKING IN A MINE operator drill ini telah bekerja dan mengabdi selama KEGIATAN
31 tahun di KPC. Pria kelahiran Toraja, tahun 1963 KEBERSAMAAN KARYAWAN

K
ami berkomitmen agar karyawan dan para
ini memang sudah cukup tua dari segi usia. Akan tetapi,
kontraktor serta keluarga mereka dapat selalu
semangatnya tidak pernah luntur dan hilang. Hingga MUTUAL EMPLOYEES ACTIVITIES
merasa kerasan bekerja dan tinggal di Sangatta.

K
tahun 2014, semangat kerja kerasnya telah menjadi PC memiliki kegiatan bersama
Area operasional KPC di Sangatta merupakan area
contoh, panutan, serta motivasi bagi karyawan lain untuk karyawan di luar dari aktivitas
tambang yang terletak di kota, ibukota Kabupaten
selalu memberikan yang terbaik. pekerjaan perusahaan. Salah satu
Kutai Timur. 31 tahun yang lalu, pada awal
Atas dedikasi tersebut, di tahun 2014 KPC memberikan kegiatan tersebut adalah dengan
beroperasinya perusahaan, Sangatta belum menjadi
penghormatan khusus kepada Bapak Syarifudin. Pada mengadakan gathering party. Setiap
ibukota Kabupaten. Akan tetapi, seiring dengan
acara syukuran HUT KPC ke 32, CEO Endang Ruchijat divisi di KPC mengadakan kegiatan
pertumbuhan operasional KPC, wilayah Sangatta
menyerahkan secara langsung potongan tumpeng ini satu tahun sekali. Setiap karyawan
berkembang dari sebuah desa dengan penduduk 4.000
kepadanya, sebagai bentuk apresiasi atas pengabdian mendapatkan kesempatan untuk
orang menjadi ibukota Kabupaten Kutai Timur dengan
dan loyalitas yang diberikan kepada KPC selama ini. Bagi berkumpul dan melakukan kegiatan
jumlah penduduk lebih dari 125.000 orang. Sebanyak
Syarifudin, hal tersebut merupakan bentuk penghargaan guna memupuk dan mempererat rasa
65% dari penduduk Sangatta adalah karyawan KPC,
dan kebanggaan. Kepada generasi muda, Syarifudin kebersamaan.
para kontraktor kami dan keluarganya.

146 Selain lokasi operasional tambang KPC yang


selalu menanamkan nilai-nilai mulia agar menjadi insan Di samping itu, kegiatan-kegiatan
amat dekat dengan ibukota Kabupaten, KPC juga
yang senantiasa bersyukur dan bersabar. outbound juga kami adakan. Kami
menyelenggarakan kegiatan outbond 147
menyediakan berbagai fasilitas untuk karyawan baik
dengan memanfaatkan fasilitas sendiri
di dalam area pertambangan ataupun di kota Sangatta

M
r. Syarifudin, a drill operator, has worked and served in untuk meningkatkan tingkat kekompakan
dan Bengalon seperti kompleks perumahan, sekolah,
KPC for 31 years. Born in Toraja in 1963, his passion dan rasa solidaritas antarkaryawan.
berbagai fasilitas olahraga dan gedung pertemuan,
has never faded and lost even when he gets old. For a Telaga Batu Arang juga tidak ketinggalan
fasilitas pelayanan kesehatan, dan lain-lain.
long time, his passion to continue working hard has become
WORK HARD,
kami gunakan sebagai tempat acara
KPC juga rutin menggelar berbagai acara a model, as well as motivation, for other employees to keluarga. Sepanjang tahun 2014,
kebersamaan agar para karyawan dapat melepas always give their best. WORK HARD, sejumlah aktivitas kebersamaan telah
rutinitas dan kejenuhan mereka sejenak, serta
menjalin kekerabatan yang lebih erat. Semuanya ini
For such dedication, KPC held a special tribute to Mr.
Syarifudin in 2014. At KPC 32nd anniversary celebration
PLAY HARD PLAY HARD ...
diselenggarakan, antara lain:

TOGETHER!
ACARA YEAR END PARTY 2014
demi merubah anggapan bahwa memiliki pekerjaan
event, Mr. Endang Ruchijat, CEO of KPC, gave the top of TOGETHER! UNTUK MASING-MASING DIVISI.
di area tambang merupakan hal yang sulit, dan tidak
tumpeng to Mr. Syarifudin, as a symbol of appreciation
nyaman, jauh dari peradaban, jauh dari keluarga. PERAYAAN HUT KPC KE-32
for his devotion and loyalty to KPC. For Mr. Syarifudin, it
becomes a form of recognition and achievement. To the PERINGATAN BULAN K3
younger generation, Syarifudin always shares noble virtues OLIMPIADE LINGKUNGAN

W
e are committed to make our employees,
in becoming a person who is always grateful and patience.
contractors and their families to feel content
working and living in Sangatta. KPC operational area

K
PC conducts programs for employees
in Sangatta is a mining area located in East Kutai regency.
to do non-work-related activities. One
At the beginning of our operation 31 years ago, Sangatta PAK SYARIFUDIN (Mr. Syarifudin): of these activities is a gathering party.
was not the capital city of the regency yet. However, in line
Each division in KPC holds this event
with operational growth of KPC, Sangatta region evolved SAYA SENANG DAPAT KERJA DI KPC. DARI once a year. All employees get a chance
from a village with a population of 4,000 people into PENGALAMAN SELAMA INI, ATASAN-ATASAN to gather and do activities to foster and
the capital city of East Kutai regency with a population SAYA SELALU MEMPERHATIKAN ANAK BUAHNYA. strengthen the sense of unity.
of more than 125,000 people. As many as 65% of the SAYA JUGA BERSYUKUR BEKERJA DI SINI DAN
population in Sangatta has become KPC employees, our GAJI SELALU TEPAT WAKTU. SAYA AKAN TETAP In addition, we also hold outbound
contractors and their families. BEKERJA DENGAN RAJIN DAN MENGERJAKAN activities by utilizing our own facilities to
SEMUA PEKERJAAN SELAMA TENAGA SAYA MASIH improve the level of unity and solidarity
In addition to the location of KPC mine that is very close
MAMPU. PESAN SAYA UNTUK YANG MASIH MUDA, among employees, including holding
to the capital city of the regency, KPC also provides
BERSYUKUR DAN BERSABARLAH AGAR BISA a family event in Telaga Batu Arang.
various facilities for the employees whether within the
MENJALANI PEKERJAAN DENGAN IKHLAS." Throughout 2014, a number of employee
mining area or in the cities of Sangatta and Bengalon,
gathering activities have been organized,
such as housing complexes, schools, various sports
among others:
facilities and convention hall, health care facilities, etc. I am happy to be able to work in KPC. From my
experience, my superiors always pay attention to his
KPC also regularly holds various gatherings in order YEAR END PARTY 2014
subordinates. I am also grateful to work here and the
that the employees can briefly forget about the routines EVENT FOR EACH DIVISION.
salary payments are always on time. I will continue
and tiredness and establish a closer relationship CELEBRATION OF THE
to work diligently and do all the work while Im still
with each other. The aim is to change the notion that 32nd ANNIVERSARY OF KPC
capable. My message to the young generation is to be
working in the mine area is difficult, uncomfortable, far
grateful and patience so we can work happily. OSH MONTH
from civilization, and far from family.
ENVIRONMENTAL OLYMPICS

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


K W
Insan KPC
FASILITAS ami selalu menginginkan agar setiap
karyawan KPC dapat bekerja dengan
e always want all employees
to work comfortably within the _Our People
UNTUK nyaman di lingkungan perusahaan.
Maka dari itu, KPC memberikan
Companys operational areas.
Therefore, KPC provides various
KARYAWAN berbagai fasilitas yang memadai untuk facilities to help establish passion in
mewujudkan rasa semangat bagi setiap working for each employee. Some PEMBANGUNAN CLUSTER SURYA:
EMPLOYEES karyawan dalam bekerja. Beberapa of the facilities that we provide are
PERUMAHAN BAGI KARYAWAN KPC
fasilitas yang kami berikan tersebut employees housing and 3 meals a
FACILITIES adalah tempat tinggal dan makan 3 kali day. Around employees housing, we SURYA CLUSTER DEVELOPMENT:
sehari. Disekitar mess karyawan, kami also provide a variety of recreational
juga menyediakan berbagai fasilitas and sports facilities, such as golf HOUSING FOR KPCS EMPLOYEES
rekreasi dan olah raga seperti golf, course, football field, basketball
lapangan bola, lapangan basket, kolam court, swimming pool, and much
renang, dan lainnya. Fasilitas-fasilitas ini more. The facilities are for all
kami berikan kepada seluruh karyawan. employees.

H U
KPC juga menyediakan bus antar- KPC also provides employee shuttle ingga tahun 2014, jumlah karyawan ntil 2014, the number of
jemput karyawan dari dan ke tempat bus to and from the workplace. In KPC yang belum memiliki hunian employees in KPC who do not yet
kerja. Di samping itu, kami menyediakan addition, we provide a shuttle to and mencapai 2.370 orang. Oleh karena have a house are approximately
jemputan dari dan ke sekolah Perusahaan from school for the children of the itu, untuk memenuhi kebutuhan 2,370 employees. Therefore, to meet
bagi anak-anak karyawan. Hal ini Companys employees. This service perumahan karyawan yang cukup tinggi, the relatively high housing needs for
kami berkomitmen agar dapat terus our employees, we are committed to
148 dimaksudkan untuk menjaga keamanan is intended to maintain security and
menyediakan perumahan bagi karyawan continue to allow house ownership
dan juga efisiensi bahan bakar. also for fuel efficiency.
dengan memberikan bantuan pinjaman to our employees by providing them 149
keuangan. with financial loans.
Saat ini KPC, melalui Yayasan Sangatta KPC, through Yayasan Sangatta
Baru (YSB) tengah mengembangkan Baru (YSB), currently is developing
kawasan perumahan di sekitar a residential cluster around the

SANGAT T A, RUMAH KITA


perusahaan. Untuk meningkatkan Companys operational area. To
fasilitas dan memenuhi kebutuhan improve the facilities and meet the
perumahan bagi karyawan tersebut, YSB housing needs of the employees,
berkerjasama dengan PT Rayyan Prima YSB collaborates with PT Rayyan
S A N GAT TA H O M E S W E E T H O M E Persada tengah membangun Cluster Prima Persada developing Surya
Surya dengan jumlah mencapai 270 unit. Cluster with total 270 unit of houses.
Kedepannya, Cluster Surya ini diharapkan In the future, Surya Cluster is
akan menjadi kawasan hunian yang expected to be a residential area
nyaman dan aman bagi karyawan KPC, that is comfortable and safe for the
serta menjadi kawasan percontohan employees of KPC, as well as a pilot
pengelolaan lingkungan. area of environmental management.

BERBAGAI FASILITAS UNTUK KARYAWAN KPC


SEHINGGA MEREKA MERASA NYAMAN DAN KERASAN UNTUK
MENJADIKAN SANGATTA RUMAH TEMPAT TINGGAL MEREKA.
VARIOUS FACILITIES FOR KPCS EMPLOYEES
ARE AIMED TO MAKE THEM FEEL COMFORTABLE AND
FEEL CONTENT TO CALL SANGATTA AS THEIR HOME.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Insan KPC

Wisma _Our People

FASILITAS DAN
KELENGKAPAN CLUSTER
Rayah INFRASTRUKTUR DAN FASILITAS
CAMP KARYAWAN DAN
PENGINAPAN TAMU KPC
UMUM SEKITAR KOMPLEK PERUMAHAN
KARYAWAN DAN AREA TAMBANG KPC
Olahraga
SPORTS
FACILITIES AT EMPLOYEES
CLUSTER HOUSING AND LAPANGAN
Wisma INFRASTRUCTURE AND PUBLIC FACILITIES
AROUND EMPLOYEES HOUSING CLUSTERS KOLAM RENANG SWARGA BARA

Prima AND KPCS MINE AREAS Swarga Bara swimming pool


LODGING FOR KPC GUESTS BASKET
Basketball court LAPANGAN VOLLEY SWARGA BARA
Swarga Bara volleyball court
Pendidikan Tempat Ibadah LAPANGAN TENNIS SWARGA BARA
Swarga Bara tennis court
EDUCATION PLACES OF WORSHIP
LAPANGAN BOLA SWARGA BARA
Swarga Bara soccer field
LAPANGAN LAPANGAN JOGGING TRACK
VOLLEY BASKET jogging track
150 Field Volleyball Basketball court
LAPANGAN BASKET INDOOR
Tanjung Bara TK ISLAM TERPADU
DARUSSALAM
MASJID DARUSSALAM
Darussalam Mosque
Indoor basketball court 151
Darussalam Intergrated MASJID BAITURRAHMAN

LAPANGAN
Islamic Kindergarten
Darussalam
Baiturrahman Mosque taman rekreasi
dan hutan kota
LAPANGAN MASJID AL-IKHLAS
BADMINTON VOLLEY SD ISLAM TERPADU Al-Ikhlas Mosque
KOLAM RENANG Field Badminton Field Volleyball DARUSSALAM
MASJID ANNUR RECREATIONAL, PARKS
Swimming pool LAPANGAN Darussalam Integrated
AnNur Mosque
SEPAK BOLA Islamic Elementary School AND CITY FOREST
DAN RUGBY MASJID AL-FALLAH
SMP ISLAM TERPADU
Al-Fallah Moqque TAMAN BERMAIN
Football and DARUSSALAM
MASJID AL-KAUTSAR Playground
Rugby Field Darussalam Integrated
LAPANGAN Islamic Junior High School Al-Khautsar Mosque SISI DANAU G. HOUSE
FITNESS
BADMINTON MUSHOLLA BUKIT Side of the Lake
LAPANGAN CENTER TK KRISTEN KEFAS
Badminton BATUBARA of G. House
BASKET Fitness Center KEFAS Christian
Kindergarten Musalla Bukit Batubara TAMAN SENTRA
Basketball court
GEREJA OIKUMENE NIAGA TOWNHALL
PAUD GRIYA ANANDA
Oikumene Church Sentra Niaga Town
LAPANGAN GOLF Griya Ananda Preschool Hall Park
TANJUNG BARA TK YPPSB GEREJA KATOLIK ST.
Tanjung Bara Golf THERESIA ARBORETUM
BILLIARD YPPSB Kindergarten Arboretum
BILLIARD St. Theresia Catholic
Billiard Billiard SD YPPSB
Church
LAPANGAN YPPSB Elementary School

fasilitas Komersial
PURA
TENIS SD YPPSB 2
Temple
Tennis court YPPSB Elementary School 2
SD YPPSB 3 COMMERCIAL FACILITIES
YPPSB Elementary School 3
Kesehatan
MESS HALL MESS HALL
MESS HALL
FOOD CENTER FOOD CENTER SMP YPPSB
FOOD CENTER
Lodging Hall - Lodging Hall - YPPSB Junior High School
Food Court
Lodging Hall - HEALTH
Food Court Food Court
LAPANGAN
SQUASH PASAR BASAH GRIYA GEMINI
Squash Wet Market Griya gemini

189 260 159 KLINIK SOS


FOODCOURT
Food Court
MINI MARKET
Minimarket
unit / units unit / units unit / units SOS clinic KIOS KOPERASI K3PC
Stand K3PC Cooperation

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


PENGEMBANGAN RATA-RATA DURASI PELATIHAN
Insan KPC
_Our People
DAN PELATIHAN MENCAPAI 25,83 JAM PER

KARYAWAN KARYAWAN PER TAHUN


ABSENTEEISM PROJECT
TOTAL TRAININGS PARTICIPANTS
EMPLOYEE DEVELOPMENT WAS 25,83 HOURS EMPLOYEES ABSENTEEISM PROJECT
AND TRAINING

P
engembangan dan pelatihan karyawan PESERTA PELATIHAN

A A
bsenteeism Project adalah salah satu pelatihan bsenteeism Project is one of the
secara berkelanjutan terus kami MENCAPAI 26,120 ORANG trainings that we provide to instill
yang kami berikan untuk menanamkan perilaku
laksankan untuk mengembangkan PESERTA KARYAWAN KPC discipline in daily lives of Our People.
disiplin dalam setiap insan KPC. Kami berharap,
potensi karyawan. Pada 2014, KPC telah With the training, we hope that employee
TOTAL TRAINING PARTICIPATION dengan adanya program ini, kehadiran karyawan
menyelenggarakan 127.688 jam pelatihan attendance will gradually increased,
secara berangsur dapat meningkat, yang tentunya
untuk karyawan dengan jumlah peserta FROM 26,120 EMPLOYEES
akan memberikan nilai yang positif bagi produktivitas which would give a positive value for the
26.120 orang karyawan KPC. [G4-LA9] productivity of the company.
perusahaan.
INVESTASI UNTUK Proyek yang sudah dimulai sejak awal 2013 ini diawali The project which was started since early

D
evelopment and training of our PELATIHAN KARYAWAN dengan pemberian sosialisasi kepada supervisor di 2013 provides a seminar to all of the Company
employees is continuously carried out MENCAPAI USD 333,830 semua departemen perusahaan mengenai cara-cara supervisors in all departments on discipline
to develop their potential. In 2014, KPC
untuk menegakkan kedisiplinan. Jika terdapat karyawan enforcement. If there is an employee who
organized 127,688 hours of employees TOTAL INVESTMENT FOR
yang absen, hal tersebut berarti karyawan bersangkutan is absent, it means that the employee has
152 training with total participation from EMPLOYEES TRAINING WAS
telah melanggar peraturan dan akan diberikan sanksi. violated the rules and will get sanctions.
26,120 employees. [G4-LA9] USD 333,830
Tujuan absenteeism project ini sendiri lebih diarahkan The Absenteeism project is directed towards
153
kepada supervisor agar dapat tegas dalam the supervisor to be firm in enforcing the
menegakkan sanksi tersebut. Jika sanksi ditegakkan, sanctions. If sanctions are enforced, then
JUMLAH RATA-RATA DURASI maka kedisiplinan dapat meningkat dan sebaliknya, discipline can be improved and absenteeism
JUMLAH JAM JUMLAH
PESERTA PELATIHAN KARYAWAN ketidakhadiran dapat menurun sehingga etos kerja dan can be decreased so that work ethic and
GRADE PELATIHAN KARYAWAN
Total PER TAHUN produktivitas dapat ditingkatkan. productivity can be improved.
Grade Total Training Total No. of
Participants Hours Employee Average Training Duration
per Employee per year
A 29 68 17 4,00
B 19.386 74.658 3.332 22,41
C 1.947 11.089 484 22,91
D 3.125 27.254 652 41,80
E 1.121 11.501 235 48,94
F 332 1.929 130 14,84
G 73 535 19 28,16
H 48 400 39 10,26
I 40 137 20 6,85
J 15 79 12 6,58
LV4 1 4 2 2,00
LV5 3 34 2 17,00
JUMLAH
26.120 127.688 4.944 25,83
Total

Di tahun 2014, absenteeism project KPC


JUMLAH RATA-RATA DURASI telah berhasil menurunkan angka absen
JUMLAH JAM JUMLAH
PESERTA PELATIHAN KARYAWAN karyawan sebesar lebih dari 30% menjadi
Gender PELATIHAN KARYAWAN
Total PER TAHUN total 12.747 ketidakhadiran dibandingkan total
Gender Total Training Total No. of
Participants Hours Employee Average Training Duration ketidakhadiran tahun 2013 yang mencapai
per Employee per year 19.548 ketidakhadiran. [G4-LA6]
LAKI-LAKI In 2014, KPC absenteeism project has
67.704 232.735 4.592 50,68
Male successfully reduce more than 30%
PEREMPUAN absenteeism frequency to 12,747 from the
1.803 10.088 352 28,66
Female previous total absenteeism frequency of
19,548. [G4-LA6]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


SERIKAT PEKERJA / Insan KPC
SERIKAT BURUH _Our People

LABOR UNION
PERJANJIAN KERJA
BERSAMA (PKB)
K K
PC memberikan kesempatan bagi seluruh PC provides an opportunity for all
karyawan untuk memperoleh pengalaman dalam employees to gain experience in
berorganisasi, mengutarakan pendapat, dan participating in organization, expressing COLLECTIVE LABOUR
menyampaikan aspirasi melalui Serikat Pekerja dan their opinions, and expressing their aspirations AGREEMENT (CLA)
Serikat Buruh. KPC percaya bahwa kebersamaan through the Labor Union. KPC believes
yang dibangun dengan baik merupakan salah satu that well maintained harmony is one key to
kunci kekompakan dan produktivitas pekerja. workers solidarity and productivity.

P C
erjanjian Kerja Bersama (PKB) merupakan perjanjian ollective Labour Agreement (CLA) is a binding
Serikat pekerja / serikat buruh (SP/SB) dibentuk dari, Labor Union is formed of, by, and for labors, yang mengikat antara KPC dan para karyawan agreement between KPC and our employees.
oleh, dan untuk pekerja/buruh, baik di dalam KPC both within and outside KPCs operational kami. Melalui perjanjian ini, setiap karyawan akan Through this agreement, each employee will
maupun di luar KPC, yang bersifat bebas, terbuka, area, which is free, open, independent, mendapatkan perlindungan yang sama terkait hak dan receive the same protection regarding the rights
mandiri, demokratis, dan bertanggung jawab dalam democratic and accountable in fighting, kewajibannya sesuai dengan hubungan kerja masing- and obligations according to the employment
memperjuangkan, membela, serta melindungi hak defending and protecting the rights and masing karyawan. Perjanjian ini merupakan wujud dari relationship of each employee. This agreement is
dan kepentingan pekerja/buruh serta meningkatkan interests of labors and improve the welfare musyawarah untuk mufakat antara Serikat Pekerja (SP) a form of deliberation between Labor Unions and
kesejahteraan pekerja/buruh dan keluarganya. of labors and their families. As of 2014, the /Serikat Buruh (SB) dan Perusahaan. the Company.
Jumlah karyawan KPC yang terdaftar sebagai total number of KPC employees registered
154 anggota Serikat Pekerja/Serikat Buruh ini mencapai as member of Labour Union was 4,342
Perjanjian Kerja Bersama dibuat berdasarkan asas Collective Labor Agreement (CLA) is based on the
4.342 karyawan. [G4-11] employees. [G4-11]
itikad baik dan saling menghargai. Kami selalu
membangun hubungan industrial yang harmonis dan
principles of good faith and mutual respect as KPC
always builds a harmonious industrial relations and 155
Setiap karyawan KPC memiliki hak untuk Each employee has the right to propose beretika kepada seluruh insan KPC tanpa terkecuali. ethics to all Our People without exception.
mengajukan usulan perbaikan atau usulan improvements or suggestions to the
Pada tahun 2013, PKB mengalami pembaharuan In 2013, CLA was renewed with some changes
program kepada Manajemen dalam pertemuan- Management in regular meetings program
dengan beberapa perubahan di tahun 2013 lalu yang and has been in force since July 1, 2013 - June
pertemuan rutin yang diadakan melalui Serikat held by Labor Union or Human Resource
berlaku sejak 1 Juli 2013 30 Juni 2015. Perubahan- 30, 2015. The changes of CLA for the period
Pekerja atau Human Resource Division tanpa harus Division without having to be a member of
perubahan yang terdapat pada PKB periode tersebut include the increase in meal allowance, rent
menjadi anggota Serikat. the Union.
antara lain meliputi kenaikan tunjangan uang makan, assistance for employees, value of PPFP , fixed
Lembaga Kerja Sama (LKS) Bipartit telah dibentuk Bipartite Cooperation Institution (Lembaga bantuan sewa rumah bagi karyawan, besaran PPFP, pension plan, calculation of bonus based on
sejak 31 Januari 2005 dengan anggota yang terdiri Kerja Sama - LKS) has been established since program pensiun iuran pasti, perhitungan bonus employment period, reduction of delay in salary
atas 10 orang perwakilan manajemen dan 10 orang January 31, 2005 with members, including 10 masa kerja, pengurangan masa penundaan kenaikan increase for employees imposed by disciplinary
perwakilan SP/SB. Untuk periode 2013-2015 kami Management Representatives and 10 Labor gaji pokok bagi karyawan yang terkena sanksi, dan sanctions, and the provisions of resignation.
membina 6 Serikat Pekerja/Buruh, yaitu: [G4-11] Union representatives. For the period 2013- ketentuan pengunduran diri. [G4-11] [G4-11]
2015, we have 6 Labor Unions, namely: [G4-11]
Berdasarkan ketentuan yang ditetapkan pada PKB, Under the conditions set out in CLA, Article
Pasal 13.2 mengatur prosedur perubahan operasional 13.2 specifically regulates the procedure for
perusahaan. Pasal ini mencantumkan ketentuan any changes in the Company's operations. This
jika setiap rencana perubahan yang berhubungan article includes the provision that any change
SERIKAT PEKERJA/SERIKAT BURUH JUMLAH ANGGOTA
dengan operasi secara signifikan, didahului dengan plan significantly related to operations is to
Labour Unions Total Member pemberitahuan kepada seluruh karyawan minimal be preceded by notification to all employees
tujuh hari sebelumnya. Sementara itu, pada pasal 75 at least seven days in advance. Meanwhile,
KORPS PEGAWAI PERTAMBANGAN
1.209 PKB, hal-hal yang terkait dengan pemberhentian atau in article 75 of CLA, dismissal or reduction
BATU BARA (KORPPRA)
pengurangan tenaga kerja tercantum, yang meliputi in listed work force will include discussions
SERIKAT PEKERJA KIMIA ENERGI pembahasan dan kesepakatan menyangkut pesangon and agreements on severance, that will be
928
& PERTAMBANGAN (SP KEP) dilakukan 3 bulan sebelumnya. [G4-11] conducted 3 months earlier. [G4-11]
FEDERASI PERTAMBANGAN Hal-hal lain yang berkaitan dengan SDM diatur dalam Other matters related to human resources
490 Kebijakan Sumber Daya Manusia (KSDM), Buku policy is set in Human Resources Policy
& ENERGI SERIKAT BURUH (FPE-SBSI)
Panduan Staf, Kode Etik, Tata Kelola Perusahaan, dan (KSDM), Staff Handbook , the Code of Ethics,
PERSAUDARAAN PEKERJA prosedur operasional lainnya. Disamping itu, hal-hal Corporate Governance, and other operational
739
MUSLIM INDONESIA (PPMI) yang berhubungan dengan perubahan dalam Perjanjian procedures. In addition, related to changes in
Kerja Bersama, senantiasa kami komunikasikan the Collective Labor Agreement, we always
SERIKAT PEKERJA KEADILAN (SPK) 523 dan sosialisasikan terlebih dahulu kepada seluruh communicate and inform them to all employees
karyawan. [G4-11] in advance. [G4-11]
FEDERASI SERIKAT PEKERJA KIMIA,
ENERGI, & PERTAMBANGAN SERIKAT
453
PEKERJA SELURUH INDONESIA
(FSP-KEP SPSI)

JUMLAH
4.342
Total

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Insan KPC
_Our People

REMUNERASI YANG ADIL DAN MENARIK


FAIR AND ATTRACTIVE REMUNERATION

K K
PC selalu memberikan apresiasi yang tinggi kepada PC always gives the highest appreciation to
karyawan atas usaha dan kerja keras mereka our employees for their hard work and efforts
dalam mencapai setiap target yang ditetapkan. in achieving their targets. With the Companys
Dengan apresiasi yang kami berikan, karyawan appreciation, employees become more motivated
juga semakin terpacu untuk melakukan pekerjaan to give their best performance for the sake of the
terbaiknya demi keberlanjutan perusahaan. sustainability of the company.
Bentuk apresiasi dan penghargaan yang kami berikan Forms of appreciation and recognition that
kepada karyawan antara lain mencakup gaji dan we provide to employees includes salary and
tunjangan karyawan, program pensiun, bonus masa employee benefits, pension plan, bonus based
kerja, program beasiswa bagi anak karyawan serta on employment period, scholarship program for
156 berbagai fasilitas lainnya. Setiap karyawan KPC employees' children and various other facilities.
menerima remunerasi dan tunjangan dalam bentuk
gaji karyawan, bonus, cuti, uang makan, tunjangan
Each KPC employee receives remuneration and
benefits in the form of salary, bonus, leave, meal
157
hari raya (THR) keagamaan, pengobatan, akomodasi, allowance, religious holiday allowance (THR),
perumahan, tunjangan kerja bergilir, jaminan hari medical, accommodation, housing, rotating
tua, pensiun, dan berbagai tunjangan lainnya sesuai employment benefits, pension fund, retirement,
dengan PKB. Remunerasi dan tunjangan karyawan and various other benefits in accordance with CBA.
yang kami berikan ditinjau berdasarkan kinerja Remuneration and allowances of the employees are
karyawan, kinerja perusahaan, dan survei penggajian reviewed based on the employee's performance, the
melalui salary survey dan berbagai survei sejenis performance of the Company, and each year payroll
lainnya setiap tahunnya. Di samping itu, kami juga survey through salary surveys and other similar
selalu mengacu pada standar upah minimum yang surveys. In addition, we also refer to the applicable
berlaku di area operasional kami. minimum wage standards in our operational area.
HRCR FORUM Kami memberikan Tunjangan Hari Raya Keagamaan We provide religious holiday allowance (THRK)

DAN HR NETWORK (THRK) sebesar 150% dari gaji pokok, ditambah uang
senilai PPFP dan uang sebesar Rp 1,5 juta yang
of 150% of basic salary, in addition to allowance
equal to PPFP and fund amounting to Rp 1.5
akan dibayarkan minimal lima belas hari sebelum million to be paid a minimum of fifteen days before
HRCR FORUM AND HR NETWORK Hari Raya Idul Fitri. Setiap insan KPC memiliki hak Ied al Fitr. Every KPC People has the right to take
cuti tahunan sebanyak 16 hari kalender dengan hak annual leaves as many as 16 calendar days with
uang cuti tahunan sebesar 225% dari upah pokok, annual leave allowance equal to 225% of basic

H
RCR Forum dan HR Network adalah media
ditambah uang sebesar Rp 750 ribu. Tunjangan salary, including allowance amounting to Rp 750
bagi KPC, bersama dengan subkontraktor,
transportasi cuti diberikan kepada karyawan tetap thousand. Leave transportation allowance is given
untuk mengkoordinasikan isu-isu terkait
dan tanggungannya yang sah. Untuk karyawan to employees and legal dependents. For contract
ketenagakerjaan, hubungan industrial, dan
kontrak, tunjangan tersebut hanya diberikan kepada employees, these benefits are only given to the
pengembangan masyarakat setempat. Forum
yang bersangkutan saja. employees, excluding the dependents.
ini diadakan setiap dua bulan satu kali. Pada
forum ini, topik yang akan dibahas senantiasa Tunjangan yang lain yaitu manfaat pensiun yang Another benefit is the pension benefit provided to
disesuaikan dengan kesepakatan peserta rapat. diberikan kepada karyawan. Tunjangan manfaat employees. Pension benefit is only provided for
Pada tahun 2014, topik-topik yang diangkat antara pensiun hanya dialokasikan bagi karyawan tetap permanent employees of KPC. We provide tenure
lain BPJS Kesehatan, BPJS Ketenagakerjaan, dan KPC. Kami menyediakan bonus masa kerja, bantuan bonus, transportation assistance to a place of
BPJS Pensiun. transportasi ke tempat penerimaan atau maksimal acceptance or a maximum of transportation cost
biaya transportasi ke Jakarta dengan kapal laut to Jakarta by ship with their spouse for employees
beserta pasangan bagi karyawan yang tempat with place of acceptance in Sangatta, as well as

H
RCR Forum and HR Network are the media for
penerimaannya Sangatta (lokal), serta uang pisah severance pay for employees who have reached
KPC and subcontractors to coordinate issues
pensiun bagi karyawan yang telah mencapai usia normal retirement age. Soft loans for vehicles
related to employment, industrial relations, and
pensiun normal. Kredit lunak program kepemilikan and house ownership programs are also offered
the development of local communities. The forum
kendaraan dan rumah juga ditawarkan bagi karyawan to employees who have fulfilled the requirements.
is held once every two months. In this forum, topics
yang telah memenuhi persyaratan. Santunan Death benefit and burial benefit is a total of Rp 4
are always adjusted to the meeting participants
kematian dan tunjangan penguburan diberikan million if any employee, dependent, parent, or in-
agreement. In 2014, the topics raised were including
sebesar Rp 4 juta jika karyawan, tanggungannya, law dies.
BPJS Health, BPJS Employment and BPJS Pension.
orang tua, atau mertua meninggal dunia.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


KARYAWAN KARYAWAN
TUNJANGAN UNTUK KARYAWAN
TETAP KONTRAK
EMPLOYEE BENEFIT
PERMANENT CONTRACT
[G4-LA2]
EMPLOYEE EMPLOYEE

GAJI
Salary

TUNJANGAN
Allowance/Amenities

ASURANSI KECACATAN DAN KECELAKAAN KERJA


Occupational Disability and Accidents Insurance
ASURANSI MENINGGAL DUNIA KARENA PEKERJAAN
Life Insurance (Occupational Fatality)
ASURANSI KECACATAN DAN KECELAKAAN
DILUAR KECELAKAAN KERJA
Disability and Non-Occupational Accidents Insurance
158 ASURANSI MENINGGAL DUNIA BUKAN KARENA PEKERJAAN
Life Insurance (Non-Occupational Fatality)
JAMINAN KESEHATAN BAGI PEKERJA
Health Insurance for Workers
JAMINAN KESEHATAN BAGI PASANGAN PEKERJA
Health Insurance for Worker Spouse
JAMINAN KESEHATAN BAGI ANAK PEKERJA
Health Insurance for Worker Children
CUTI
Leave
BANTUAN TRANSPORTASI ISTIRAHAT TAHUNAN
(CUTI TAHUNAN)
Transportation Allowance on Annual Leave
IJIN MELAHIRKAN
Maternity Leave
IJIN HAID
Menstrual Leave
IJIN HAJI ATAU ZIARAH KEAGAMAAN
Hajj or Religious Pilgrimage Leave
TUNJANGAN HARI RAYA KEAGAMAAN
Religious Holiday Allowance
DANA PENSIUN
Pension Fund NO
PESANGON
Severance Fund
TUNJANGAN PROGRAM PINJAMAN PEMBANGUNAN RUMAH
Housing Development Loan Program NO
NO
BONUS MASA KERJA
Years of Service Bonus

NO
TUNJANGAN BANTUAN PENDIDIKAN ANAK KARYAWAN
Education Allowance for Workers Children

LAPORAN KEBERLANJUTAN 2014


Insan KPC
_Our People

UPAH MINIMUM DI KPC


ADALAH RP 2,36 JUTA. UPAH
MINIMUM KPC INI 20,6% LEBIH
TINGGI DIBANDINGKAN DENGAN
UPAH MINIMUM KABUPATEN KUTAI
TIMUR (UMK) DAN 12% LEBIH
TINGGI DIBANDINGKAN DENGAN

12%
UPAH MINIMUM PERTAMBANGAN

20,6%
KABUPATEN KUTAI TIMUR
(UMSK) [G4-EC5]
MINIMUM WAGE IN KPC WAS RP 2,36
> U PA H M I N I M U M
MILLION. KPCS MINIMUM WAGE WAS
> U PA H M I N I M U M P E R TA M B A N GA N
K A B U PAT E N K U TA I K A B U PAT E N K U TA I
20.6% HIGHER THAN MINIMUM WAGE
(UMK) OF THE EAST KUTAI REGENCY > HIGHER THAN > HIGHER THAN
AND 12% HIGHER THAN THE M I N I M U M WA G E O F T H E M I N I M U M WA G E O F T H E
MINIMUM MINING WAGE OF EAST E A S T K U TA I R E G E N C Y M I N I N G WA G E O F E A S T
KUTAI REGENCY (UMSK) [G4-EC5]
K U TA I R E G E N C Y
159

71
PA K E T
B E A S I S WA
SCHOLARSHIPS

PADA TAHUN 2014, TOTAL PAKET BEASISWA


ANAK KARYAWAN YANG DIDISTRIBUSIKAN
ADALAH 71 PAKET BEASISWA,
IN 2014, A TOTAL 71 SCHOLARSHIPS WERE
DISTRIBUTED TO EMPLOYEES CHILDREN

TOTAL REMUNERASI DAN


TUNJANGAN KARYAWAN KPC YANG
DIDISTRIBUSIKAN PADA TAHUN
$122,69
2014 MENCAPAI USD 122,69 JUTA juta (million)
TOTAL REMUNERATION AND
REMUNASI &
EMPLOYEE BENEFITS OF KPC
T U N JA N GA N
DISTRIBUTED IN 2014 WAS USD
122.69 MILLION R E M U N E R AT I O N &
BENEFITS

2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities

MAJU BERSAMA
MASYARAKAT
MOVING FORWARD
WITH THE COMMUNITIES

d
160 ukungan masyarakat
Kutai Timur senantiasa
memperkuat semangat
161
kami untuk terus melangkah
menuju keberlanjutan. Batubara
yang kami kelola adalah
perwujudan dari kepercayaan
masyarakat dan pemerintah
Indonesia kepada KPC.
Oleh karena itu, kami harus
mengelola kekayaan alam negeri
ini sebaik-baiknya sehingga
mampu memberikan manfaat
yang optimal bagi masyarakat
dan pemangku kepentingan.

t
he support of East Kutai
community has encouraged
us to continue moving
towards sustainability.
Coal that we manage is the
embodiment of trust that the
public and the Indonesian
government have in KPC.
Therefore, we must well manage
the country's natural resources
so we can provide optimum
benefit to the community and
stakeholders.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat

MAJU BERSAMA
_Moving Forward with the
Communities
MOVING FORWARD
MASYARAKAT WITH THE COMMUNITIES

162
163

Harga batubara yang masih belum


membaik di tahun 2014, tidak serta
merta membuat KPC mengurangi
atau bahkan mengabaikan program
tanggung jawab sosialnya. KPC
terus berupaya untuk melakukan
berbagai efisiensi dalam kegiatan
operasionalnya, tanpa meninggalkan
tanggung jawab sosial perusahaan.

The fact that there was no


improvement in coal prices in
2014 did not necessarily make
KPC reducing or even ignoring
its social responsibility program.
KPC continued to conduct
various efficiency programs in its
operations, without ignoring our
corporate social responsibility.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities

STUDI ZONASI "Meres t orasi L ahan Pascatambang


PERENCANAAN Menjadi Area Yang Bermanfaat
PASCATAMBANG YANG
BERMANFAAT BAGI Bagi Masyarakat"
MASYARAKAT DAN
LINGKUNGAN [MM10] RESTORATION OF POST-MINING SITE
TO BECOME A USEFUL AND ARABLE LAND
ZONING STUDY FOR POST-MINING FOR THE COMMUNITY
PLANNING THAT CAN BE USEFUL
164 FOR THE COMMUNITY AND THE Lahan pascatambang KPC telah KPC has proven post-mining
ENVIRONMENT [MM10] terbukti dapat dikembalikan site can be restored into 165
menjadi lahan produktif setelah productive land after undergoing
proses reklamasi yang kami reclamation process. Followings
lakukan. Berikut ini berbagai are the achievements of our
pencapaian reklamasi kami: reclamation:

M T
eskipun Surat Keputusan Kementerian he Decree of the Ministry of Forestry
Kehutanan nomor 79/2001 tanggal 15 Maret No. 79/2001 dated March 15, 2001 on [MM10][G4-EC7][G4-EC8][G4-SO1]
2001 tentang Penunjukan Kawasan Hutan Designation of Forest Areas and Water
dan Perairan di Wilayah Provinsi Kalimantan in the East Kalimantan Province has
Timur menetapkan bahwa sebagian besar set most of KPC operational area as
kawasan operasional KPC sebagai Areal Penggunaan for Other Land Uses (Areal Penggunaan
Lain (APL), KPC tetap mengedepankan aspek Lain-APL), KPC still prioritized the aspects of
Berkerjasama dengan Fakultas Pertanian
pengelolaan konservasi dalam penyusunan rencana conservation management in the preparation
Universitas Mulawarman Samarinda, kajian
pascatambang kami. of our post-mining planning.
penanaman sawit di area pascatambang
Untuk itu pada tahun 2009, KPC bekerja sama In 2009, KPC worked together with the Forest KPC dimulai pada tahun 2003. Berdasarkan
dengan Pusat Penelitian dan Pengembangan Hutan and Nature Conservation Research and kajian tersebut, sejak tahun 2005 KPC mulai
dan Konservasi Alam Departemen Kehutanan untuk Development Center of the Ministry of Forestry menanam sawit di enam area reklamasi
menyusun kajian Desain Restorasi Ekosistem Lahan to prepare a study of "Ecosystem Restoration dengan total luas 69 hektar. Perawatan kebun
Bekas Tambang Batubara PT Kaltim Prima Coal. Design of Post Coal Mining Site of PT Kaltim sawit seluas 4 Ha di Telaga Batu Arang telah
Hasil dari kajian tersebut menghasilkan model
restorasi areal bekas tambang PT KPC yang dibuat
Prima Coal." The study has resulted in a model
for PT KPCs post mining to be divided in zones
PERKEBUNAN dikolaborasikan dengan BUMDesa Desa
Swarga Bara dan telah memberikan tambahan
dalam zona-zona dengan fungsi dan manfaat serta with different functions and benefits as well KELAPA SAWIT Pendapatan Asli Desa (PADes).
pengelolaan tersendiri dengan mempertimbangkan as management by considering the various
berbagai aspek teknis, lingkungan dan ekonomi, technical, environmental and economical PALM OIL
untuk menjamin kesinambungan pembangunan di
Kabupaten Kutai Timur pascaoperasi KPC. Zona-
aspects, to ensure sustainable development of PLANTATION In collaboration with the Faculty of Agriculture
KPCs postmining era in East Kutai. The zones of Mulawarman University, Samarinda, we
zona tersebut terbagi menjadi Zona Lindung, Zona was divided into protected zone, Conservation conducted agriculture studies at KPC post-
Konservasi dan Keanekaragaman hayati, Zona and Biodiversity Zone, Kutai National Park mining areas in 2003. Based on these studies,
Penyangga Taman Nasional Kutai, Zona Wisata, dan Buffer Zone, Tourism Zone and Functional since 2005 KPC has started oil palm plantation
Zona Pemanfaatan. Zone. in six reclamation area with a total area of
69 hectares. Cultivation of 4 Ha of palm oil
Dalam perjalanannya, sejumlah penelitian dan uji Along the way, a number of studies and
plantations in Telaga Batu Arang was in
coba dilakukan di berbagai zona, berkolaborasi trials have been conducted in various zones,
collaboration with BUMDesa Swarga Bara
dengan berbagai pihak seperti Puslitbanghut, collaborating with various parties such as
village and has generated additional revenue
UNMUL, dan IPB, untuk memastikan kelayakan Puslitbanghut, UNMUL, and IPB, to ensure
for the village (PADes).
berbagai model pemanfaatan yang dapat proper utilization of the various models that
mendukung percepatan pembangunan Kutai can support the accelerated development of
Timur. East Kutai.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities

T
elaga Batu Arang merupakan nama baru untuk

HUTAN BUDIDAYA kawasan pascatambang yang bernama North


Sangatta yang masuk dalam Zona Penyangga
ARBORETUM IKAN AIR TAWAR Taman Nasional Kutai. Lokasi ini disiapkan untuk
tempat wisata yang dapat memberikan manfaat
bagi masyarakat baik sebagai pengguna maupun
ARBORETUM FRESHWATER sebagai mitra pengelola. Sejak tahun 2009, berbagai
FOREST FISH FARMING sarana dan prasarana secara bertahap telah
TELAGA dibangun untuk menunjang berbagai kegiatan

BATU ARANG seperti areal perkemahan, kandang rusa dan sapi


perah, dermaga, sejumlah pondok sebagai viewing

A B
rboretum adalah area pascatambang eberapa kolam di area pascatambang deck, kantor, dan penginapan karyawan. Pembuatan
seluas 22,34 hektar yang telah di KPC telah direklamasi menjadi kolam TELAGA master plan kawasan telah mulai dilakukan sejak
166 reklamasi menjadi zona konservasi untuk budidaya ikan air tawar. Penelitian
BATU ARANG tahun 2013 yang disusun dengan berdasarkan
keanekaragaman hayati (Kehati).
Berbagai vegetasi endemik Kalimatan
budidaya ikan air tawar yang diujicoba di kolam
bekas tambang DS2 menunjukan hasil yang
berbagai persyaratan yang tertera dalam dokumen
Penutupan Tambang KPC sebagai zona penyangga
167
Timur dapat ditemukan di area ini, baik. Menggunakan wadah karamba, kami Taman Nasional Kutai. Pengayaan keanekaragaman
antara lain tanaman pioneer dari family memelihara berbagai jenis ikan air tawar di hayati terus dilakukan untuk melestarikan berbagai
Leguminosae, family Dypterocarpaceae, kolam mini, antara lain ikan Repang (Barbodes plasma nutfah dengan melibatkan banyak pihak.
serta berbagai jenis endemik dan flora Chwanenfeldii), Puyau (Ostheicilus Sp.), Pepuyu
langka lainnya. Selain sebagai zona (Anabas Testudineus), ikan Mas (Cyprimus Carpio), Sampai dengan tahun 2014, kami terus melanjutkan
konservasi, Aboretum ini menjadi dan udang Galah (Macrobrachium Rosenbergii). dan mengembangkan bekerjasama dengan
pusat informasi dimana kami dapat Hasil pengamatan kami menunjukkan dalam komunitas pencinta alam lokal serta berbagai
mempelajari karakteristik pertumbuhan kurun waktu 4 bulan bobot tubuh ikan dan udang pihak lain dalam memanfaatkan Telaga Batu Arang
jenis-jenis endemik di area reklamasi. mengalami peningkatan yang cukup signifikan sebagai sebuah tempat wisata yang berwawasan
Program kami selanjutnya adalah sehingga dapat disimpulkan habitat kolam bekas lingkungan bermitra dengan Yayasan Sangatta Baru
memperkaya jenis vegetasi, pembuatan tambang KPC mampu mendukung aktivitas sebagai pengelola kawasan.
track untuk mempermudah kami budidaya ikan air tawar. Lebih dari itu, penelitian
melakukan perawatan dan pemantauan dari pihak independen terhadap ikan dan udang

T
area reklamasi tambang. hasil budidaya di kolam bekas tambang KPC elaga Batu Arang is a new name for the post-
menunjukan bahwa ikan dan udang ini aman mining region called North Sangatta , which is
untuk konsumsi manusia. part of Kutai National Park Buffer Zone. The

K
PC Arboretum forest is 22.34 location is intended for tourist attractions that can
hectares of post-mining area that has provide benefits to the community both as users and

S
been reclaimed into a biodiversity everal ponds in KPC post-mining area have as management partner. Since 2009, various facilities
conservation area. Various East been reclaimed into ponds for freshwater fish and infrastructure has gradually been built to
Kalimantan endemic plants can be found farming. A study on freshwater fish farming support a range of activities such as camping ground,
in this area, including pioneer plants of at a post-mining area of DS2 showed good deer cages and dairy cattle, dock, some cottage as a
Legumes, family Dipterocarpaceae, as results. Using fish cages, we grew various types viewing deck, offices and employee accommodation.
well as a variety of endemic species and of freshwater fish in the mini ponds, including Master plan design for the area has been done
other rare flora. Aside from becoming Repang fish (Barbodes chwanenfeldii), Puyau since 2013 which have been prepared based on
a conservation zone, the Arboretum fish (Ostheicilus sp.), Pepuyu fish (Anabas various requirements listed in the KPC Post Mining
becomes an information center where testudineus), Ikan Mas (Cyprinus carpio), and documents as a buffer zone Kutai National Tamana.
we can study the growth characteristics Galah shrimp (Macrobrachium rosenbergii ). Enrichment of biodiversity continues to be done to
of endemic species in the reclamation From our observations, within a period of 4 preserve the germplasm by involving many parties.
area. Our next program is to enrich the months weight of fish and shrimp have increased Up to 2014, we continue and develop cooperation with
types of vegetation, building a track to significantly. We concluded that KPC post-mining the local community of environmentalist and various
facilitate us in performing maintenance ponds was a good habitat to support freshwater other parties in exploiting Telaga Batu Arang as an
and monitoring of mining reclamation fish farming activities. Moreover, a research done environmentally friendly tourist spot in partnership
areas. by an independent party on fishes and shrimps with New Sengata Foundation as area manager.
farmed in KPC post-mining ponds showed that
those fishes and shrimps are safe for human
consumption.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


168

EAST KUTAI
BAGI KPC, BERBAGAI

KUTAI TIMUR MANDIRI

LAPORAN KEBERLANJUTAN 2014


ACHIEVE A SELF-SUSTAIN
PADA AGRIBISNIS MENUJU
PASCATAMBANG YANG KAMI

POST-MINING LAND HAS BEEN


UPAYA PEMANFAATAN LAHAN

A PREDETERMINED ZONE WITH


LAKSANAKAN SESUAI DENGAN

ONE MAIN PURPOSE, NAMELY TO


FOR US, ALL EFFORTS TO UTILIZE
MEMILIKI SATU TUJUAN UTAMA,
ZONA YANG TELAH DITENTUKAN

YAKNI MEMBERIKAN ALTERNATIF

THAT IS BUILT ON AGRIBUSINESS TO


PEREKONOMIAN YANG BERTUMPU

CARRIED OUT IN ACCORDANCE WITH

PROVIDE AN ALTERNATIVE ECONOMY

SKENARIO CSR KPC DALAM RENCANA PENUTUPAN TAMBANG


CSR KPC Scenario In Mine Closure Plan
[G4-EC7][G4-EC8][G4-SO1][MM10]

PENINGKATAN KAPITAL PENGUATAN KAPITAL


SOSIAL DAN POLITIK SOSIAL DAN POLITIK
Peningkatan Kapasitas Desa Penguatan Kemandirian Desa
Berkembangnya agen-agen
perubahan yang mandiri DESA MANDIRI
Perekonomian non-tambang
yang kuat dan multi-sektor
PROGRAM PROGRAM DESA MANDIRI Berkembangnya agen-agen
PEMERINTAH perubahan yang mandiri }
PENINGKATAN KAPITAL MANUSIA, PENINGKATAN KAPITAL MANUSIA,
FISIK, FINANSIAL & BUDAYA FISIK, FINANSIAL & BUDAYA
PROGRAM
CSR KPC Peningkatan Kualitas Hidup Masyarakat Pembangunan Manusia Secara Terintegrasi
MELALUI KEHIDUPAN
FORUM MSH Peningkatan Kualitas Hidup Masyarakat
MASYARAKAT YANG
Penguatan Ekonomi Keluarga & Lokal
CSR KUTIM (Tambang dan Non-Tambang)
BERKELANJUTAN
Wilayah di luar lahan pasca tambang

Penguatan Ekonomi Keluarga & Lokal


Penguatan Kapasitas Masyarakat (Non-tambang) & MANDIRI
( 4 kecamatan terdekat dengan operasi KPC)

PROGRAM (Tambang dan Non-Tambang)


CSR DIKELOLA Penguatan Kapasitas Masyarakat
KPC Pengentasan Kemiskinan (Non-tambang)

Pemenuhan Kebutuhan Dasar Pengentasan Kemiskinan

PENGINTEGRASIAN KAPITAL PENGUATAN INTEGRASI KAPITAL


PEMILIHAN EKOLOGIS (NATURAL) DENGAN EKOLOGIS (NATURAL) DENGAN
KAPITAL LAINNYA KAPITAL LAINNYA Skala operasional integrasi
EKOLOGIS, dengan aspek sosial, ekonomi,
HIDROLOGIS pertanian, dan konservasi pada
DAN TATA Skala uji coba integrasi dengan aspek Skala operasional integrasi dengan aspek
sosial, ekonomi, pertanian, dan sosial, ekonomi, pertanian, dan lahan pasca tambang
GUNA LAHAN konservasi pada lahan pasca tambang konservasi pada lahan pasca tambang
PASCA
Lahan pasca tambang

TAMBANG
2014 SUSTAINABILITY REPORT

PILOT: PEMANFAATAN LAHAN PEMANFAATAN LAHAN PASCA PELEPASAN LAHAN


PASCA TAMBANG TERINTEGRASI TAMBANG TERINTEGRASI PASCA TAMBANG

PENGUATAN PRODUK UNGGULAN DAN


SINERGISASI DENGAN RTRW DAN RENSTRA DAERAH
PENINGKATAN DAYA SAING DAERAH
Communities

Pembentukan, peningkatan dan penguatan Pengintegrasian dan pemandirian YAYASAN pengelola dana
kapasitas YAYASAN CSR KPC YAYASAN dalam pengelolaan CSR KPC secara mandiri
program CSR

MONITORING MONITORING
_Moving Forward with the

[EVALUASI PRA PASCA TAMBANG] [EVALUASI PASCA TAMBANG]


Maju Bersama Masyarakat

169
Maju Bersama Masyarakat
SKENARIO CSR KPC DALAM _Moving Forward with the
Communities
RENCANA PENUTUPAN TAMBANG
OUR CSR ROADMAP IN
MINING CLOSURE PLAN VISI, MISI & BIDANG PROGRAM
[G4-EC7][G4-EC8][G4-SO1][MM10]
PENGEMBANGAN MASYARAKAT
VISION, MISSION & COMMUNITY

M R
engacu pada Skenario CSR KPC dalam eferring to the KPCs CSR scenario for
Rencana Penutupan Tambang sebagaimana the Mine Closure Plan, as illustrated in
DEVELOPMENT PROGRAM
tergambarkan dalam skema diatas, maka the above scheme, the entire community
seluruh program pemberdayaan masyarakat empowerment program conducted by KPC
yang dilakukan oleh KPC ditujukan untuk is intended to support the acceleration of VISI
mendukung percepatan kemandirian masyarakat community independence by strengthening MENJADI MITRA DALAM PEMBANGUNAN BERKELANJUTAN
melalui penguatan pemerintah desa agar village governments so that the productivity DAN MENINGKATKAN KUALITAS HIDUP MASYARAKAT
produktivitas seluruh komponen masyarakat of the entire community can be optimized in
dapat dioptimalkan dalam membangun desa. village development. This is in accordance VISION
Hal ini sesuai dengan UU No. 6 tahun 2014 with Law No. 6 of 2014 regarding Villages. To become a Partner in Sustainable Development
170 Tentang Desa. and Life Quality Improvement of the Community
Kegiatan pemanfaatan lahan pascatambang yang Activities of Post-mining land utilization 171
sebelumnya didahului dengan berbagai ujicoba which are preceded by various trials have
telah mulai berinteraksi dengan masyarakat
baik melalui Pemerintah Desa maupun
begun to interact with the community
through the village government and the
MISI 1 MISI 2 MISI 3
dengan berbagai komunitas dengan maksud various communities that aim to support the MENJALIN MENDORONG MENJAGA
mendukung percepatan produktivitas desa dan productivity acceleration of the village and HUBUNGAN YANG PERTUMBUHAN TATANAN
masyarakatnya. its people. HARMONIS DENGAN PEREKONOMIAN MASYARAKAT
PEMANGKU LOKAL YANG SALING DENGAN
Keterlibatan Yayasan Sangatta Baru (YSB) yang Sangatta Baru Foundation (YSB) has
KEPENTINGAN MENGUNTUNGKAN MEMELIHARA
sejak tahun 2014 telah menjadi mitra KPC dalam involsed since 2014 as a partner of KPC in
BERDASARKAN UNTUK MENUJU KELESTARIAN
melakukan pengelolaan pemanfaatan lahan managing the post-mining land in PESAT
PRINSIP SALING MASYARAKAT YANG ALAM DAN
pascatambang di PESAT dan Telaga Batu Arang, and Telaga Batu Arang, allowing a wide
PERCAYA DAN SALING MANDIRI DAN BUDAYA
memungkinkan berbagai kerjasama tersebut range of cooperation mentioned above can
MENGHORMATI SEJAHTERA
diatas dapat dilakukan untuk memberikan be benefits both parties.
keuntungan pada kedua belah pihak.
Mengambil peran sebagai katalisator As a catalyst of development, KPC in all our MISSION 1 MISSION 2 MISSION 3
pembangunan, KPC dalam dalam segala activities always refers to the development Harmonious Encourage the growth Maintaining social order
kegiatannya selalu mengacu pada agenda agenda of the Government of East relationships with of local economies that of the communities
pembangunan Pemerintah Daerah Kutai Regency. Cooperation and multi- stakeholders based on are mutually beneficial through nature and
Kabupaten Kutai Timur. Kerjasama dan stakeholder collaboration is the spirit that is mutual trust and respect towards empowered and culture conservation
kolaborasi multipihak merupakan semangat always carried out in the implementation of prosperous society
yang selalu diusung dalam pelaksanaan community development programs that we
program pemberdayaan masyarakat yang conducted.
kami laksanakan. PENGEMBANGAN PENINGKATAN PENINGKATAN
Melalui Divisi External Relation and Sustainable Through the Division of External Relations AGRIBISNIS SANITASI DAN KESEHATAN PENDIDIKAN DAN
MASYARAKAT PELATIHAN
Development (ESD), KPC terus melanjutkan and Sustainable Development (ESD), KPC Agribusiness
pelaksanaan berbagai program pemberdayaan continued the implementation of various Development Sanitation and Public Improvements on
masyarakat dengan memperhatikan berbagai isu community development programs by Health Improvement Education and Training
strategis yang menjadi perhatian baik di tingkat considering various strategic issues concern
daerah, nasional maupun internasional. Untuk locally, nationally and internationally. To PENGEMBANGAN PENINGKATAN PELESTARIAN PENINGKATAN
memaksimalkan peran dan fungsi ESD, maka maximize the role and function of ESD, the USAHA MIKRO, KECIL INFRASTRUKTUR ALAM DAN BUDAYA KAPASITAS
Visi, Misi dan tujuh bidang program berikut telah Vision, Mission and seven field following DAN MENENGAH KELEMBAGAAN
menjadi acuan dalam bertindak sejak tahun program has become a reference in the act PEMERINTAH DESA
Development of Micro, Infrastructure Nature and Culture DAN MASYARAKAT
2003 sampai dengan saat ini, yang kemudian since 2003 until today, which is expressed
Small and Medium Improvement Conservation
diturunkan dalam dokumen Rencana Strategis in the Strategic Plan that is continuously Enterprises
yang terus diperbaharui untuk merespon updated to respond to the dynamics of Capacity Building
of Village Governance
berbagai dinamika sosial, ekonomi, dan social, economic, and environmental that
and Community
lingkungan yang terus berubah. constantly changing.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Sebagai katalisator dan mitra pembangunan, As a catalyst and development partners, the
ketujuh bidang program tersebut di atas dalam seven programs mentioned above in the Maju Bersama Masyarakat
pelaksanaanya ditujukan untuk meningkatkan implementation aimed to improve the quality _Moving Forward with the
kualitas hidup masyarakat khususnya yang of life especially those around the operational Communities
berada di sekitar wilayah operasional KPC. Dalam areas of KPC. In practice, the Medium Term of
pelaksanaannya, Rencana Pembangunan Jangka Development Plan, which is part of the Rural
Menengah Desa yang merupakan bagian dari Development Plan for the District continue
Rencana Pembangunan Kabupaten terus didorong to be encouraged in order to become a "AGRICULTURE IS OUT WISEST PURSUIT,
agar menjadi acuan bersama dalam pelaksanaannya. common reference the implementation. With BECAUSE IT WILL IN THE END CONTRIBUTE MOST TO REAL WEALTH,
Dengan mengacu pada perencanaan yang sama, reference to the similar plan, so the harmony, GOOD MORALS, AND HAPPINESS "
maka keselarasan, percepatan dan efisiensi acceleration and efficiency of various sources
sumberdaya dari berbagai sumber dapat can be optimized for better results. THOMAS JEFFERSON, UNITED STATE FOUNDING FATHER, PRINCIPLE AUTHOR
dioptimalkan dengan hasil capaian yang lebih baik. OF THE DECLARATION OF INDEPENDENCE, THE 3RD US PRESIDENT
[G4-EC7][G4-EC8][G4-SO1]

"ORGANIZATION
IS NOT BETTER THAN THE TEAM YOU PUT IN IT.
Gerakan Daerah Pembangunan Selaras dengan agenda agar semua kegiatan
IT ALL COMES DOWN TO THE QUALITY OF THE PEOPLE."
Agribisnis (GERDABANGAGRI) pemerintah, pemanfaatan yang dilakukan selaras
JOHN MACKEY, ERNST & YOUNG ENTERPRENEUR OF THE YEAR 2003, merupakan tonggak lahan pascatambang dengan visi, yakni: Menjadi
CEO OF WHOLE FOODS MARKET [G4-EC7][G4-EC8][G4-SO1] Pembangunan Kabupaten KPC diarahkan untuk percontohan pemanfaatan
Kutai Timur yang diperkuat mendukung agenda lahan pascatambang melalui
172 melalui Perda No. 04 tahun 2010 pembangunan daerah. Uji Peternakan Sapi Terpadu
Bidang program Peningkatan Dinas Pekerjaan Umum, antara lain : pengelolaan listrik
tentang Rencana Pembangunan coba pemanfaatan lahan (PESAT) untuk pembangunan 173
Jangka Panjang Daerah (RPJPD) pascatambang yang berada berkelanjutan. Kegiatan
Kapasitas Kelembagaan Badan Pemberdayaan desa, penjualan air bersih,
Kabupaten Kutai Timur 2006- di zona pemanfaatan, seluas utama yang dilaksanakan
Pemerintahan Desa dan Perempuan, Dinas air minum, penyedian Sarana
2025 dan juga Perda No.15 tahun 22 Ha untuk peternakan antara lain pengembangan
Masyarakat memfokuskan Pariwisata, Direktorat UEP Produksi Pertanian, simpan
2008 tentang RPJPD Kalimantan sapi telah mulai dilakukan budidaya sapi untuk
kegiatannya dalam meningkatan Kementrian Dalam Negeri, pinjam, rumah kompos,
Timur 2005-2025. Fokus bidang sejak tahun 2008 sebagai pembibitan sapi Bali,
produktivitas Kelembagaan Balai Taman Nasional Kutai ekowisata, dan pengelolaan
program agribinis bertujuan tindak lanjut dari hasil penggemukan sapi,
Desa dalam menjalankan (BTNK), Pertamina, PNPM kebun sawit. Seluruh
untuk mendukung percepatan penelitian yang dilakukan sapi perah, peningkatan
peran dan fungsinya. Dalam Mandiri dan APMD-STPMD keuntungan hasil usaha akan
pembangunan daerah yang oleh mahasiswa S3 IPB pada kapasitas masyarakat serta
pelaksanaannya, secara Yogyakarta. menjadi Pendapatan Asli Desa
bertumpu pada agribisnis menuju tahun 2007. Sejak tahun percontohan pemanfaatan
khusus kami berkoordinasi (PADes) yang dapat digunakan
Secara sosial ekonomi, Kutai Timur Mandiri. 2014, KPC bersama-sama energi alternatif.
dengan Badan Pemberdayaan desa untuk membiayai
jumlah BUMDesa yang dengan YSB telah bekerja
Masyarakat dan Pemerintah pembangunannya.
terus berkembang dari sama untuk memastikan
Desa (BPMPD), Pemerintah Desa
14 BUMDesa di tahun Usaha-usaha yang dilakukan
terkait serta pihak-pihak lain
2013 menjadi 18 BUMDesa oleh BUMDesa secara umum
seperti Pemerintah Kecamatan,
di tahun 2014. Total unit diutamakan untuk memenuhi "FOKUS BIDANG PROGRAM AGRIBINIS DITUJUKAN DALAM MENDUKUNGAN
Badan Pemberdayaan
usaha yang ada di bawah kebutuhan dasar masyarakat GERAKAN PEMBANGUNAN DIMAKSUD UNTUK MENDUKUNG PERCEPATAN PEMBANGUNAN
Masyarakat dan Pemerintahan DAERAH YANG BERTUMPU PADA AGRIBISNIS MENUJU KUTAI TIMUR MANDIRI.
pengelolaan 18 BUMDesa yang secara langsung dapat
Desa (BPMPD), Bappeda, Dinas
tersebut sebanyak 35 unit meningkatkan kualitas hidup THE FOCUS AREAS OF AGRIBUSINESS PROGRAM IS INTENDED TO SUPPORT
Pertanian/Peternakan, Dinas
usaha dimana jenis usahanya dan kesejahteraannya. THE ACCELERATION OF REGIONAL DEVELOPMENT, WHICH IS BASED ON AGRIBUSINESS
Perikanan, Dinas Kesehatan, IN ORDER TO SUPPORT AND HELP ACTUALIZE A SELF-SUSTAIN EAST KUTAI."

Institutional Capacity Building of Department of Public type of business include:


Village Government and Society Works, Bureau of Women's management of rural electricity, Local Movement of Agribusiness In line with the government's are carried out in line with
program focuses its activities Empowerment, Department clean water sales, drinking Development (Gerdabangagri) is agenda, our post-mining land its vision: "Being a pilot
in improving the productivity of Tourism, the Ministry of water, provision of Agricultural a milestone in the development utilization is also directed project of post-mining land
of Institutional Village in Internal Affairs Directorate Production Equipment, savings of East Kutai Regency that is to support the regional utilization through Integrated
performing its role and function. UEP, the Kutai National Park and loans, home composting, strengthened through Regulation development plan. Pilot Cattle Farming (PESAT) for
In doing so, we specifically (BTNK), Pertamina, PNPM eco-tourism, and management No. 04 of 2010 on Regional Long project of post-mining land sustainable development". The
coordinated with the Community Mandiri and APMD-STPMD of oil palm plantations. All Term Development Plan (RPJPD) utilization in the utilization main activities that have been
Empowerment Board and Village Yogyakarta. profits of Villages Operations of East Kutai District from 2006 to zone, covering an area of 22 carried out are the cultivation
Government (BPMPD), the Village Revenue (Pades) can be used to 2025 and also Regulation no. 15 of Ha for dairy farms has been of cattle for Bali cattle
Socioeconomically, the 2008 on East Kalimantan RPJPD started since 2008 as a follow breeding, breeding of dairy
Government concerned as well finance rural development.
BUMDesa growth was 14 2005-2025. The focus areas of up of the results of research cows, community capacity
as other parties such as the
BUMDesa in 2013 to 18 Efforts was undertaken by agribusiness program is intended conducted by Phd students building and pilot project
District Government, Agency for
BUMDesa in 2014. Total BUMDesa generally preferred to support the acceleration of of IPB in 2007. Since 2014, related with exploration of
Community Empowerment, and
business units that are to meet the basic needs of regional development, which is KPC in collaboration with alternative energy.
Village Government (BPMPD),
under the management of society which can directly based on agribusiness in order to YSB has started the program
Bappeda, Department of
the BUMDesa was 18 of 35 improve the quality of life and support and help actualize a self- to ensure that all activities
Agriculture / Animal Husbandry,
business units where the well-being. sustainable East Kutai.
Fisheries, Department of Health,

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat

W i sa t a A la m T ela g a
_Moving Forward with the
Communities

B a t u A r a n g (T B A )
TELAGA BATU ARANG (TBA)
NATURE TOURISM
Pengembangan budidaya
tanaman semusim
ANNUAL PLANTATION DEVELOPMENT
Merupakan sebuah areal bekas Is a former mining area of approximately 200 hectares
tambang seluas kurang lebih 200 ha located in Kutai National Park buffer zone. Since 2011,
yang berada dalam zona Penyangga we have carried out pilot project for the utilization of a Untuk meningkatkan produktivitas padi sawah The cultivation of annual crops In order to increase
Taman Nasional Kutai. Sejak tahun 2011, variety of community-based nature tourism facilities and di Desa Sepaso Selatan, kami melanjutkan the productivity of rice paddy in the village of South
telah dilakukan uji coba pemanfaatannya infrastructure activities that has been gradually built in pendampingan penerapan metode SRI atau System Sepaso, we continued assisting in the implementation
untuk tempat wisata alam berbasis cooperation with various parties including camp activities, of Rice Intensification di lahan padi sawah seluas of SRI or Rice Intensification System in rice paddy
komunitas. Berbagai sarana dan outbound, rowing race, tracking and others, which 25 ha. Selain itu, KPC juga memberikan perhatian field area of 25 ha. In addition, KPC also pays a lot
prasarana penunjang kegiatan secara involving various communities in its implementation. pada pengembangan dan pelestarian budidaya of attention to the development and preservation of
bertahap terus dibangun bekerjasama padi gunung, dengan memberikan bantuan benih mountain rice cultivation, by providing assistance
174 dengan berbagai pihak termasuk
Permit to captive deer from the Natural Resources
kepada dua kelompok tani (Harapan Jaya dan to the two seed farmer groups (Harapan Jaya and
kegiatan perkemahan, outbound, lomba
Conservation Agency of East Kalimantan province was
granted in 2014, which is part of the effort to preserve Sepakat Bersama), di Desa Muara Bengalon Sepakat Bersama), in the village of Muara Bengalon 175
dayung, tracking dan lain lain, yang sebanyak 550Kg benih untuk ditanam di lahan with total of 550 Kg of seed to be planted in the area
plasma nuftah that is part of the buffer zone of the
melibatkan berbagai komunitas dalam seluas kurang lebih 15 hektar. Pendampingan of approximately 15 hectares. Technical assistance
national park Kutai.
pelaksanaannya. teknis serta bantuan berupa sarana panen untuk as well as aids in the form of harvest equipment for
Collaboration between YSB with Swarga Mitra Mandiri padi ladang seluas 18,5 Ha diberikan kepada paddy fields covering an area of 18.5 ha was given to
Perizinan penangkaran rusa dari Badan
BUMDesa in Swarga Bara village for managing of 4 ha Kampung Budaya-Desa Keraitan. the Cultural Village - Keraitan Village.
Konservasi Sumber Daya Alam Propinsi
of palm oil plantations in the TBA with profit sharing of
Kalimantan Timur diberikan pada tahun PENGEMBANGAN TANAMAN TAHUNAN ANNUAL PLANTATION DEVELOPMENT
20% for YSB and 80% for BUMDesa. Collaboration with
2014, yang merupakan bagian dari upaya KPC turut membantu pembukaan lahan untuk KPC helped to open up land for rubber plantation in
a group of nature lovers was carried out in organizing
pelestarian plasma nuftah yang mejadi perkebunan karet di Desa Keraitan dengan seluas the Keraitan village in an area of 42 hectares, which
various activities in the TBA as well as in other areas
bagian dari zona penyangga Taman 42 Ha, yang merupakan program pengembangan is a rubber development program of the Department
in order to develop tourism in East Kutai. The average
Nasional Kutai. karet dari Dinas Perkebunan Kutim yang telah of Plantation Kutim who have been providing as
number of visits per month in the pilot project (TBA,
Kolaborasi juga dilakukan antara Kampung Pinang, Prima Agri and PESAT) recorded menyediakan bibit karet sebanyak 23.000 bibit bagi much as 23,000 rubber seedlings seeds for residents
YSB dengan BUMDesa Swarga Mitra approximately 800-1000 people. warga Keraitan. Selain itu, kami juga memberikan of Keraitan. In addition, we also provide an annual
Mandiri di Desa Swarga Bara untuk bibit tanaman tahunan berupa bibit durian, crop seeds such as seeds of durian, rambutan and
In addition to the development of animal husbandry in rambutan, dan buah naga kepada tiga kelompok dragon fruit to the three groups of farmers in the
pemeliharaan kebun sawit seluas 4
order to support GERDABANGAGRI in post-mining land, tani di Desa Muara Bengalon, Tebangan Lembak village of Muara Bengalon, Tebangan Lembak and
Ha di TBA dengan sistem bagi hasil,
villages agribusiness assistance was also conducted dan Keraitan serta kurang lebih 10 ton pupuk Keraitan and approximately 10 tons of fertilizer in the
sebesar 20% untuk YSB dan 80% untuk
in cooperation with the village government and farmer berupa UREA, NPK dan TSP. form of UREA, NPK and TSP.
BUMDesa. Kolaborasi dengan sejumlah
groups. Various agricultural commodities, agriculture,
kelompok pencinta alam juga telah PENGEMBANGAN USAHA PERIKANAN DAN BUSINESS DEVELOPMENT OF FISHERIES
livestock and fisheries that have already developed and
dilakukan dalam menyelenggarakan TAMBAK DI MASYARAKAT PESISIR AND POND FOR COASTAL COMMUNITY
newly developed by the community was also the focus of
berbagai kegiatan di TBA maupun di Kami melakukan rehabilitasi tambak yang dimiliki We rehabilitated ponds that was owned by 35
our assistance.
wilayah lain yang dilakukan dalam usaha oleh 35 anggota kelompok Api-api Kuning di members of the Api-api kuning group in the village
pengembangan wisata di Kutai Timur. Desa Muara Bengalon dimana masing-masing of Muara Bengalon which each have an area of
Rata-rata jumlah kunjungan per bulan memiliki area seluas 137m. Rehabilitasi ini 137m. Rehabilitation was aimed to optimize the
di pilot project (TBA, Kampung Pinang, bertujuan untuk mengoptimalkan daya tampung capacity for business improvement. Inlet and
Prima Agri, dan PESAT) tercatat sekitar agar usaha dapat ditingkatkan. Perbaikan inlet- outlet repair of water and irrigation channels in
800-1000 orang. outlet air serta saluran irigasi juga dilakukan order to support the irrigation system of ponds.
Selain pengembangan peternakan untuk menunjang sistem pengairan tambak. Di In the village of Sekerat, assistance is given to the
dalam rangka mendukung desa Sekerat, pendampingan diberikan untuk seed spawning development of catfish by using a
GERDABANGAGRI di lahan pembudayaan bibit ikan lele dengan menggunakan pool tarp. A number of stimulants in the form of
pascatambang, pendampingan di bidang kolam terpal. Sejumlah stimulan berupa sarana production facilities and 20 tail catfish broodstock
agribisnis juga dilakukan di desa-desa produksi dan 20 ekor indukan ikan lele diberikan, were given, in order to meet the needs of seed
bekerjasama dengan pemerintah desa agar produksinya dapat memenuhi kebutuhan bibit production for enlargement and local consumption.
dan kelompok tani. Berbagai komoditas untuk pembesaran dan konsumsi lokal. Selain itu, Besides, we also provide technical assistance and
pertanian, perkebunan, peternakan kami juga memberikan pendampingan teknis dan stimulants in the form of procurement of fish feed
dan perikanan yang telah dan baru stimulan berupa pengadaan pakan ikan dan 2 unit and 2 buildings in the location of fishing in the
dikembangkan oleh masyarakat juga bangunan di lokasi pemancingan di Desa Keraitan, Keraitan Village, this fishing effort is expected to
menjadi fokus pendampingan kami. yang diharapkan usaha pemancingan ini dapat increase productivity of the village.
meningkatkan produktivitas desa.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat

Pengembangan
_Moving Forward with the
Communities

budidaya ternak I REALLY BELIEVE THE


DEVELOPMENT OF LIVESTOCK FARM
MICRO AND SME
SECTORARE IS THE MOST POWERFULL CHANGE PLAYERS
ELKE BARBARA BACHLER, AUTHOR OF THE EVOLUTION OF INNOVATION
[G4-EC7][G4-EC8][G4-SO1]

176
177

"
Untuk terus mendukung pertumbuhan usaha Usaha peternakan ayam kampung dampingan
peternakan unggas, dua kali pelatihan budidaya kami, berkembang dengan baik di Desa Sepaso
peternakan ayam kampung telah dilakukan dengan Barat, Sepaso Timur, Sepaso Induk, Keraitan,
total peserta sebanyak 70 peternak. Penyediaan Day dan Tepian Langsat dengan dukungan teknis
Old Chick (DOC) sebanyak 20.500 untuk kelompok dari Dinas Peternakan Kutai Timur. HIMPULI
peternak di lima desa serta 100 ekor anakan itik (Himpunan Peternak Unggas Lokal Indonesia) mulai
kepada 10 peternak di Desa Tebangan Lembak. berperan aktif dalam mendukung pertumbuhan
usaha peternakan unggas di Kecamatan Bengalon.
Budidaya ternak kambing di desa Tepian Indah
Kelompok Manuai Bakti dari Desa Sepaso Barat
juga berkembang dengan baik dalam kurun waktu
mewakili Kabupaten Kutai Timur untuk mengikuti
tiga tahun terakhir. Di awal tahun 2014 populasi
lomba kelompok tani tingkat provinsi di tahun 2014
kambing hasil program pemberdayaan KPC di di
dan berhasil mendapatkan juara pertama."
Desa Tepian Indah mencapai 97 ekor dari 57 ekor di
tahun 2013. Bantuan tambahan sebanyak 43 ekor
kambing kepada 13 kelompok ternak Desa Tepian
Indah. Pengembangan ternak kambing juga menjadi
prioritas pembangunan Desa Tepian Indah, sehingga
dalam 2 3 tahun ke depan Tepian Indah menjadi Pengembangan Usaha Mikro Kecil dan Development of Micro, Small and
sentra ternak kambing di Kecamatan Bengalon. Menengah (UMKM) juga merupakan Medium Enterprise (SME) sector
sektor yang menjadi perhatian kami. is also a concern to us. SMEs have
UMKM memiliki peranan penting dalam an important role in supporting the
In order to continue our support for the growth of mendukung perekonomian daerah karena regional economy because it creates
poultry business, two trainings of livestock farming dapat menciptakan lapangan pekerjaan jobs for local communities and resilient
for free range chickens have been conducted with untuk masyarakat lokal dan tangguh dalam in facing of the global economic crisis,
total participant of 70 farmers. Provision of Day Old menghadapi krisis ekonomi global, karena because the source of raw materials is

"
Chick (DOC) as much as 20,500 to groups of farmers sumber bahan baku sebagian besar lokal mostly local and is not dependent on
in five villages and 100 duckling to 10 farmers in the Our assisted Chicken farm was well dan tidak tergantung pada teknologi tinggi. high technology.
village of Tebangan Lembak. developed in West Sepaso, East Sepaso,
Sepaso Parent, Keraitan, and Tepian Langsat Pendampingan yang kami lakukan Our mentoring program is focused
Raising livestock in the village of Tepian Indah difokuskan pada pengembangan dan on the development and expansion
also well developed within the last three years. Village with technical support from the
Animal Husbandry Department of East Kutai. perluasan jaringan rantai usaha dalam of business chain network in order to
In early 2014 the results of the goat population in rangka meningkatkan produktivitas increase the productivity of the area
the KPC's empowerment program in Tepian Indah HIMPULI (Indonesian Local Poultry Farmers
Association) started to play an active role in daerah di luar sektor tambang. Bentuk outside the mining sector. Form of
Village reached 97 goats while in 2013 reached 57 pendampingan tidak hanya terkait dengan assistance is not only related to the
goats. Additional support as many as 43 goats was supporting the growth of the poultry farm in
Bengalon. The "Menuai Bakti" from the village of kualitas dan kuantitas produk namun juga quality and quantity of the product but
dedicated to 13 livestock groups in Tepian Indah memfasilitasi pelaku UMKM untuk mendapat also facilitated SMEs to get PIRT from
Villages. The development of goats farm is also a West Sepaso representing the East Kutai Regency
to follow the race of farmer groups in provincial PIRT ke pihak-pihak terkait, manajemen relevant parties, business management,
priority Tepian Indah Village development, so that in usaha, permodalan dan perluasan pasar. capital and market expansion.
2-3 years ahead Tepian Indah Village will became the level in 2014 and managed to get the first prize."
center of goats farm in Bengalon.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
Rumah Kemas OLSABARA yang
Rumah Kemas
_Moving Forward with the
diluncurkan pada tahun 2013 merupakan Communities
wadah yang dikelola untuk membantu
motif
OLSABARA pemasaran berbagai produk-produk
olahan lokal, pangan, dan non pangan.
Setelah lebih dari setahun berjalan, jumlah wakaroros
OLSABARA pemasok produk meningkat dari 88 Motif Wakaroros merupakan salah satu
diawal berdirinya Olsabara menjadi 117 WAKAROROS MOTIF motif ukiran kayu milik Dayak Basap yang
PACKING HOUSE pemasok per Desember 2014. Rata-rata pada tahun 2006 telah menjadi inspirasi
nilai penjualan perbulanan nya sebesar Rp. untuk pengembangan produk khas lokal
75 juta/bulan. Olsabara juga telah terdaftar Kutai Timur. Dalam perjalanannya produk
sebagai vendor KPC, sehingga kerjasama yang terus bertahan dan berkembangan
dalam penyediaan berbagai produk lokal adalah pada teknik kerajinan membatik.
yang diperlukan oleh KPC untuk berbagai Sampai saat ini, Sanggar Batik Masriah di
kepentingan dapat dipenuhi dengan mudah. Kecamatan Rantau Pulung, Kutai Timur
Berbagai tantangan dalam proses yang sejak awal sudah memiliki ketrampilan
mengembangkan UMKM ini antara lain membatik terus berproduksi. Permintaan
kualitas produk, ketersediaan bahan belum dapat dipenuhi, karena kurangnya
baku, kontinuitas pasokan, manajemen pengrajin yang dapat membatik dengan baik.
usaha, dan pendampingan rutin lainnya Total produk pada tahun 2014 sebanyak 531
178 seperti fasilitasi untuk mendapatkan PIRT, lembar meningkat sedikit jika dibandingkan
pengemasan, penyediaan bahan baku, pada tahun sebelumnya sebanyak 505
lembar. Teknis pewarnaan masih didominasi
179
dan pembangunan jaringan antara pelaku.
Sejumlah pelatihan telah dilakukan antara pewarnaan sintetis sebanyak 495 lembar
lain Pelatihan Pengembangan Kompetensi atau 93%, sementara sisanya memakai
Kewirausahaan, Pelatihan Perencanaan pewarnaan alami.
Bisnis dan Keuangan UMKM, Pengolahan
Produk Berbahan Baku Susu serta Teknik Wakaroros motif is one pattern of wood
Produksi. carvings belonging to Dayak Basap which
in 2006 has become the inspiration for the
development of East Kutai local products. In
OLSABARA Packing house which was the journey of the products which continue
launched in 2013 is a place that managed to survive and develop is the technique of
to help the marketing of a variety of locally batik craft. Until now, Masriah Batik Studio
processed products, food and non-food. in District Rantau Pulung, East Kutai which
After more than a year, the number of PELATIHAN DAN LOMBA MEMBATIK YANG from the beginning has already the have skills
product suppliers increased from 88 at the DISELENGGARAKAN DI KECAMATAN RANTAU continue to produce batik. The demand can
beginning of the establishment of Olsabara PULUNG DILAKUKAN UNTUK MEMPERKENALKAN not be met, because of the lack of craftsmen
to 117 suppliers as of December 2014. TEKNIK MEMBANTIK DAN JUGA MENINGKATKAN who can make batik well. Total products in
The average value of its monthly sales JUMLAH PELAKU SERTA MELESTARIKAN 2014 as many as 531 sheets increased slightly
was amounting to Rp. 75 million / month. KEBUDAYAAN LOKAL compared to the previous year as many as 505
Olsabara has also been listed as a vendor of Training and competitions that were held in the batik sheets. Synthetic coloring technique is still

64 40
KPC, so that cooperation in the provision of district of Rantau Pulung was aim to introduce batik dominated by 93%or as many as 495 sheets,
ORANG ORANG various local products required by KPC for techniques and also increase the number of producers while the rest use the natural coloring.
(Participants) (Participants) as well as preserve local culture
various purposes can be met easily.
Various challenges occured in the process
JUMLAH PESERTA JUMLAH PESERTA of SMEs development, among others,
PELATIHAN PELATIHAN the quality of products, availability of raw
PERENCANAAN BISNIS PENGEMBANGAN KPC juga terus meningkatkan kerjasamanya dengan KPC also continues to increase our cooperation
materials, continuity of supply, business
DAN KEUANGAN UMKM KOMPETENSI vendor (kontraktor dan pemasok) lokal untuk with local vendors (contractors and suppliers)
management, and other routine such as
DI BENGALON DAN KEWIRAUSAHAAN BAGI meningkatkan jumlah transaksi sekaligus meningkatkan to increase the number of transactions while
the assistance to get PIRT facilitation,
RANTAU PULUNG PENGUSAHA ATAU kemanfaatannya secara ekonomi. Pada tahun 2014, enhancing economic usefulness. In 2014, 30
packaging, supply of raw materials, and the
KELOMPOK UMKM 30 vendor lokal dilibatkan sebagai pemasok dan local vendors involved as suppliers and various
The number of development of networks between parties.
DI SANGATTA berbagai proyek antara lain proyek infrastruktur dan projects such as infrastructure projects and non-
participants who A number of training has been carried
non-infrastruktur seperti perbaikan jalan lingkungan infrastructure such as road repair in environmental
followed Business The number of out, among others, Entrepreneurship
area Swarga Bara, pembuatan kandang sapi di area area of Swarga Bara, building of cowhouse in the
Planning and Finance participants who followed Competency Development Training,
Peternakan Sapi Terpadu (PESAT), pemagaran di Road Cattle Integrated Area (PESAT), fencing at Road 1
for SMEs Training in Entrepreneurship Business Planning Training and Finance
1 dan area Over Land Conveyor (OLC), pemasok dalam and Over Land Conveyor (OLC) of the area, supply
Bengalon and Rantau Competency Development for SMEs, Dairy Products Processing and
penyediaan kompos, bibit tanaman, peralatan kantor, of compost, seeds, office stationery, employee
Pulung Training for Entrepreneurs Production Techniques.
seragam karyawan, pencetakan formulir, dan lain-lain. uniforms, printing forms, and others.
or Group of SMES in

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
"I BELIEVE THAT THE GREATEST GIFT Communities
YOU CAN GIVE YOUR FAMILY AND THE WORLD

IS A HEALTHY YOU"
JOYCE MEYER, NEW YORK TIMES AUTHOR
[G4-EC7][G4-EC8][G4-SO1]

Kesehatan dan sanitasi merupakan isu Health and sanitation is an important issue which
penting yang juga menjadi fokus kegiatan is also the focus of our activities. In practice,
kami. Dalam pelaksanaannya, kerjasama cooperation with the village government and
dengan pemerintah desa dan lembaga terkait relevant institutions such as neighborhood health
seperti posyandu, puskesmas, LSM lokal center, health center, local NGOs are always
selalu dilakukan berkoordinasi dengan Dinas conducted in coordination with the Department of
Kesehatan serta lembaga terkait lainnya. Health and other relevant agencies.
Penanggulangan Penyakit Menular seperti Combating Infectious Diseases such as
180 Tuberkulosis (TB), HIV AIDS dan penyakit Tuberculosis (TB), HIV Aids and diseases caused
akibat nyamuk telah menjadi kegiatan
bersama sejak tahun 2004 yang dilakukan
by mosquitoes has become the joint activities
undertaken since 2004 with the government and 181
bersama pemerintah dan masyarakat dengan society in the form of of socialization, provision
cara penyuluhan, penyediaan brosur, dan of brochures, and provide various equipment
memberikan berbagai kelengkapan yang required by health centers for the treatment of
diperlukan oleh Puskesmas untuk penanganan infectious diseases.
penyakit menular ini.
Di sepanjang tahun 2014, KPC bersama Throughout 2014, KPC, together with the
FOTO BERSAMA PEMENANG
dengan Dinas Kesehatan dan Perkumpulan Department of Health and Society for the
LOMBA POSTER HIV/AIDS
Pemberantasan Tuberkulosis Indonesia (PPTI) Eradication of Tubekulosis Indonesia (PPTI) BERSAMA DENGAN JURI
Kutai Timur telah melakukan penyuluhan Kutim have conducted 16 counseling in North DAN PANITIA
sebanyak 16 kali di Kecamatan Sangatta Utara, Sangatta, South Sangatta and Bengalon District
Sangatta Selatan dan Bengalon dengan total with total participants as many as 761 people. Photo with the winner of the HIV /
AIDS poster contest together with
peserta sebanyak 761 orang. Kepada para kader For TB cadres, in order to improve motivation the jury and committee
TB, untuk meningkatkan motivasi dan kinerja and their performance, as many as 118 people
mereka, sebanyak 118 orang telah mengikuti have participated in trainings that we held SALAH SATU SESI
pelatihan yang kami selenggarakan bersama together with the Department of Health and SOSIALISASI DAN DISKUSI HIV/
dengan Dinas Kesehatan dan Puskesmas terkait. related health centers. AIDS KEPADA KONTRAKTOR DAN
KARYAWANNYA
Penyakit menular lain yang menjadi perhatian Other infectious diseases of KPCs concern
One session of dissemination
KPC adalah HIV/AIDS. Bekerjasama dengan is HIV / AIDS. In collaboration with the Health and discussion of HIV / AIDS to
Dinas Kesehatan baik di tingkat Kabupaten Department at both the district and East contractors and employees
maupun di tingkat Provinsi Kalimantan Kalimantan Provinsi level, KPC conducted
Timur, KPC melakukan berbagai kegiatan various activities to prevent the transmission
pencegahan penularan dan pengobatan dari and treatment of high-risk groups, the general
kelompok berisiko tinggi, masyarakat umum public, including the KPC company employees
termasuk kepada karyawan perusahaan KPC and subcontractors supported the government's
dan subkontraktornya untuk mendukung agenda. In addition to counseling and
agenda pemerintah. Selain penyuluhan dan socialization, along with KPADs Kutim and NGO
sosialisasi, bersama dengan KPAD KUTIM OASIS, we conduct training for health cadres
dan LSM OASE, kami melakukan pelatihan / PMO; examination and STI services in STI
untuk kader Posyandu/PMO; pemeriksaan clinics; improvement of physical infrastructure to
dan pelayanan IMS di klinik IMS; peningkatan support the program; assisting people living with
sarana dan prasarana fisik penunjang HIV, as well as participate in the formation of the
program; pendampingan ODHA, serta turut Association Structure of HIV VCT counselors East
berpartisipasi dalam pembentukan Struktur Kutai Regency coordinated by the Department of
Perhimpunan Konselor VCT HIV Kabupaten Health East Kutai.
Kutai Timur yang dikoordinir oleh Dinas
Kesehatan Kutai Timur.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Pengendalian Penyakit Maju Bersama Masyarakat
_Moving Forward with the

Operasi Katarak
Communities
Akibat Nyamuk
MOSQUITOES CAUSED DISEASE MONITOR CATARACT SURGERY
Bekerjasama dengan Balai Kesehatan Mata dan Olahraga Masyarakat (BKOM) Samarinda
serta Dinas Kesehatan Kabupaten Kutai Timur KPC kembali menyelenggarakan operasi
KPC terus melanjutkan kerjasama dengan Dinas KPC continued to collaboration with the katarak. Tahun 2014 kegiatan ini mengambil tempat di Puskesmas Sepaso Kecamatan
Kesehatan Kutai Timur yang dimulai pada tahun Health Department of East Kutai that Bengalon. Sebanyak 35 orang berhasil dioperasi dari 40 orang yang terdaftar, lima lainnya
2013 berupa Program Pemberantasan Sarang began in 2013 in the form of mosquito nest tidak bisa dioperasi karena kondisi kesehatan.
Nyamuk (PSN) sebagai tindak lanjut terhadap kasus eradication program (PSN) as a follow-up In cooperation with the Center for Eye Health and Sports Society (BKOM) of Samarinda and
demam berdarah yang terjadi pada tahun 2012 of cases of dengue fever that occurred in Kutai Timur Regency Health Office, KPC held the cataract surgery. In 2014 these activities take
di beberapa desa di Kecamatan Bengalon. Kasus 2012 in several villages in the district of place in Sepaso Puskesmas of Bengalon sub-district. A total of 35 people were successfully
demam berdarah di tahun 2013 dan 2014 mengalami Bengalon. Dengue cases in 2013 and 2014 operated from 40 people registered, the other five were inoperable due to health conditions.
penurunan yang cukup signifikan, dari 51 kasus di has decreased significantly, from 51 cases in
tahun 2012 turun menjadi 30 kasus di tahun 2013, 2012 dropped to 30 cases in 2013, and was
dan berhasil ditekan menjadi 19 di tahun 2014.
Kesehatan Ibu dan Anak memegang peranan
reduced to 19 in 2014.
Maternal and Child Health plays an important
Peningkatan Sarana
182 penting terhadap produktivitas bangsa, dimasa
sekarang dan akan datang. KPC juga memberikan
role on the productivity of the nation, in the
present and future. KPC also give special dan Prasarana Kesehatan 183
perhatian tersendiri terkait isu ini melalui melalui attention on this issue through the PERGIZI
PERGIZI atau Program Edukasi dan Rehabilitasi or Education and Nutrition Rehabilitation HEALTH FACILITIES AND INFRASTRUCTURE IMPROVEMENT
Gizi, klinik gizi dan Kelompok Peminat Kesehatan Program, clinical nutrition and Group Interest
Ibu dan Anak (KPKIA). PERGIZI bertujuan untuk in Maternal and Child Health (KPKIA) .PERGIZI Kualitas pelayanan kesehatan akan dapat The quality of health care will be improved
menangani anak balita gizi kurang dan gizi buruk aims to address stunting and malnutrition that ditingkatkan apabila sarana dan prasarana if the health facilities and infrastructure
yang dilaksanakan dengan memadukan kegiatan were carried out by combining educational kesehatan tersedia. Untuk itu, KPC pada tahun available. For that end, KPC in 2014 along
edukasi dengan rehabilitasi. Sementara itu, activities with rehabilitation. Meanwhile, KPKIA 2014 bersama dengan pemerintah desa dan with the village government and people
KPKIA merupakan program yang bertujuan untuk is a program that aims to increase knowledge masyarakat telah melakukan: have done:
meningkatkan pengetahuan mengenai perilaku about healthy behavior and the improvement Pembangunan empat Posyandu, yaitu Construction of four Posyandu namely
hidup sehat serta peningkatan status gizi dan of the nutritional status and health of pregnant Flamboyan dan NKKBS di Kecamatan Sangatta Flamboyan and NKKBS in the District of
kesehatan ibu hamil. Program ini dilaksanakan di women. The program is implemented in 10 Selatan, Mawar Kecamatan Rantau Pulung, South Sangatta,Mawar in District of Rantau
10 Posyandu, melibatkan 54 ibu hamil. Posyandu, involving 54 pregnant women. Bina Sehat di Kecamatan Sangatta Utara Pulung, Bina Sehat in the District of North
Tingkat kesadaran masyarakat terhadap isu The level of public awareness of health issues sertaPuskesmas Pembantu di Desa Muara Sangatta as well as Supporting Puskesmas
kesehatan juga memegang peranan penting dalam also play an important role in controlling and Bengalon. in Muara Bengalon.
mengendalikan serta menanggulangi berbagai resolving a wide range of health problems. Pemberian kantong darah dan peralatan Blood and laboratory equipment donation
masalah kesehatan. Berbagai kegiatan yang Various activities were conducted in collective laboratorium PMI Kutai Timur, biaya to East Kutai PMI, the operational costs of
dilakukan antara lain melalui penyuluhan kolektif education such as workshops and seminars, operasional Komisi Penanggulangan AIDS the East Kutai National AIDS Commission,
melalu workshop dan seminar, dialog interaktif interactive dialogue "Consultation" in GWP Kutai Timur, peningkatan sarana dan prasarana improvement of health infrastructure
Konsultasi Dokter di radio GWP dengan tujuan radio which aimed in improving public access kesehatan PKM Kecamatan Bengalon, dan for PKM Bengalon, and distributed 2,500
meningkatkan akses masyarakat terhadap berbagai to a variety of health information. This activity is membagikan 2.500 masker kepada masyarakat masks to communities affected by the
informasi kesehatan. Kegiatan ini dilakukan carried out in collaboration with IDI East Kutai, yang terkena dampak asap kebakaran hutan forest fire smoke
bekerjasama dengan IDI Kutai Timur, Klinik ISOS, ISOS Clinic, and various other sources.
dan berbagai narasumber lainnya. Instalasi pipa dari Telaga Kenyamukan yang Installation of Kenyamukan Ponds pipeline
berkapasitas 12 juta m3 untuk mendukung with a capacity of 12 million litters to
pasokan bahan baku air ke PDAM sebesar 100 support the supply of pottable water to

326 321 254


liter/detik. PDAM with total capacity of 100 liters / sec.
ORANG ORANG ORANG
(Participants) (Participants) (Participants)
Dukungan kepada Pemkab Kutim (PU dan PDAM) berupa air
PENYULUHAN TENTANG PENYULUHAN TENTANG KAMPANYE STOP baku air minum dengan alokasi debit 100 LPS dari Telaga
KANKER PAYUDARA DI KANKER SERVIKS DI BENGALON, MEROKOK DI SANGATTA Kenyamukan, danau yang terbentuk oleh kegiatan penambangan
BENGALON, RANTAU PULUNG, RANTAU PULUNG, DAN DENGAN JUMLAH di Pit Jupiter berkapasitas 12 juta m3 dan memiliki potensi
DAN SANGATTA DENGAN JUMLAH SANGATTA DENGAN JUMLAH PESERTA MENCAPAI pasokan bahan baku air minum yang mencapai 100 liter/detik.
PESERTA MENCAPAI 326 ORANG. PESERTA MENCAPAI 321 ORANG. 254 ORANG.
Supporting East Kutai regency (PU and PDAM) in the form of raw
Counseling on breast cancer Counseling of cervical cancer Stop Smoking Campaign water for drinking water with discharge allocation of 100 LPS from
in Bengalon, Rantau Pulung, in Bengalon, Rantau Pulung, in Sangatta with total Telaga Kenyamukan, the lake formed by the mining activities in
and Sangatta with total and Sangatta with total 254 participants. Pit Jupiter with a capacity of 12 million m3, has the potential raw
326 participants. 321 participants. material supply for drinking water of 100 liters/sec.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities
"EDUCATION IS THE MOST POWERFUL
WEAPON WHICH YOU CAN USE TO CHANGE THE WORLD."
NELSON MANDELA,
PRESIDENT OF SOUTH AFRICA FROM 1994 TO 1999
Prestasi Junior
Indonesia
Salah satu Investasi penting untuk masa depan An important investment for the future INDONESIAN JUNIOR
adalah memberikan kesempatan pendidikan is providing educational opportunities to ACHIEVEMENT
kepada semua anak bangsa. Berkoordinasi all children of the nation. In coordination
dengan pemerintah, kami setiap tahunnya with the government, we annually provide
menyediakan alokasi dana untuk kurang lebih allocation of funds for approximately 100 Indonesian Junior Achievement is an
100 beasiswa dan bantuan pendidikan, kepada scholarships and educational aid, to the extracurricular school programs in the
masyarakat Kutai Timur yang berprestasi namun East Kutai people who excel, but have field of entrepreneurship that has been
mempunyai kendala dalam pembiayaan. difficulties in financing. running since 2002. The main objective of
this program is to give students experience
in entrepreneurship for high school level,
184 aimed to encourage interest so that they
can create new businesses outside the 185
mining sector as well as creating jobs. The
program was conducted in five schools in
the district Bengalon, Rantau Pulung and
Meretas Warna North Sangatta.
As part of the sustainability scenario, two
Meraih Asa Prestasi Junior Indonesia merupakan
program ekstrakurikuler sekolah di bidang
alumni of the program has been assisted
to provide guidance in BUMDesa of South
kewirausahaan yang sudah berjalan sejak
Sepaso Village, Keraitan village, and
MERETAS WARNA tahun 2002. Tujuan utama program ini yaitu
Swarga Bara Village. Assistance is focused
MERAIH ASA memberikan pengalaman berwirausaha untuk
on improving the management BUMDesa,
pelajar tingkat SMA, dengan harapan dapat
improving productivity and Pades to
mendorong minat sehingga nantinya dapat
encourage the independence of the village.
menciptakan berbagai usaha baru di luar
Meretas Warna Meraih Asa sektor tambang sekaligus membuka lapangan To improve the quality of students and
adalah nama program kami pekerjaan. Program dilakukan di lima sekolah schools, we are also involved in the Student
yang menyediakan beasiswa dan di Kecamatan Bengalon, Rantau Pulung dan Skills Competition (LKS) and Vocational
bantuan pendidikan dimaksud. Pada Sangatta Utara. Student Competency Test. LKS is a
bulan November 2014, KPC telah government program that aims to prepare
menyerahkan bantuan tersebut Sebagai bagian dari skenario keberlanjutan,
students capability to meet the needs of
kepada 105 pelajar/mahasiswa dua orang alumni program telah melakukan
the world of work or industry, while Skills
untuk tingkat SMP, SMA, D3/S1/ pendampingan di BUMDesa Desa Sepaso
Competency Test is part of the National
S2, dan S3 yang telah lolos seleksi, Selatan, Desa Keraitan, dan Desa Swarga Bara.
Examination to be conducted by the
untuk turut serta mendukung Pendampingan difokuskan pada pembenahan
Vocational Education.
program pendidikan pemerintah Meretas Warna Meraih Asa is the name manajemen BUMDesa, untuk meningkatkan
daerah Kutim CEMERLANG (Cerdas of our program that provides scholarships and produktivitas dan PADes untuk mendorong
Merata dan Gemilang). educational assistance. In November 2014, KPC has kemandirian desa.
delivered fund to 105 students for junior high school,
Seiring dengan berjalannya waktu, Untuk meningkatkan kualitas siswa dan sekolah,
high school, College / Undergraduate / Postgraduate,
telah banyak alumni penerima kami juga terlibat dalam Lomba Keterampilan
and Phd which has passed selection, to participate and
bantuan pendidikan dan beasiswa Siswa (LKS) dan Uji Kompetensi Siswa SMK. LKS
support the educational programs of local governments
yang telah kembali dan sebagian merupakan program pemerintah yang bertujuan
Kutim, CEMERLANG (Cerdas Merata dan gemilang).
telah berperan dalam pembangunan mempersiapkan siswa mampu memenuhi
daerah. Pada bulan September Over time, many alumni of educational and scholarship kebutuhan dunia kerja atau industri, sementara
2014, telah terbentuk IKATAN recipients who have returned and some have been Uji Kompetensi Keahlian merupakan bagian dari
ALUMNI PENERIMA BEASISWA KPC supporting in the development of the region. In Ujian Nasional yang harus dilaksanakan oleh
(IAPBKPC) sebagai wadah berbagi September 2014, they has been formed IKATAN pihak Sekolah Menengah Kejuruan.
informasi dalam membangun ALUMNI PENERIMA BEASISWA KPC (IAPBKPC) as a
kerjasama di berbagai bidang. networking forum towards developing partnership.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities

Dalam pelaksanaan uji kompetensi, kami melibatkan In the implementation of the competency test,
9 staf dari berbagai divisi untuk membantu empat we involve 9 staff from various divisions to help
SMK di Sangatta Utara dan Bengalon yaitu SMK the four vocational schools in North Sangatta
Muhammadiyah, SMK Persada, SMK Hasanuddin, and Bengalon namely SMK Muhammadiyah, SMK
dan SMK Al-Kautsar melibatkan 301 siswa/ Persada, SMK Hasanuddin, and SMK Al-Kawthar
siswi. Untuk LKS, kami melibatkan 9 staf untuk involving 301 studens. For LKS, we involved 9 staffs
menjadi tim penilai mengacu kepada pada standar to be a reference as the assessment team with
keterampilan dan kompetensi nasional dan nationally and internationally skill and competency
internasional. KPC terlibat dalam 6 bidang dari 12 standards. KPC is involved in six fields of the 12
bidang yang dilombakan. fields that are contested.
Selain bekerjasama dengan sekolah, KPC juga In addition the partnership, KPC is also working
bekerjasama dengan Balai Latihan Kerja Industri with the Center for Industrial Work exercises KANTIN SDN 003 KABO,
(BLKI) melalui Program Pemagangan Mekanik (BLKI) through Internship Program for Mechanics SWARGA BARA
(Apprentice Mechanic). Kerjasama ini dilakukan (Apprentice Mechanic). This cooperation is
dalam rangka meningkatkan daya saing Sumber Canteen SDN 003 Kabo,
conducted in order to improve the competitiveness
Swarga Bara
Daya Manusia (SDM) lokal dalam bentuk pelatihan of Human Resources (HR) locally in the form
dan memagangkan calon mekanik alat berat untuk of training and heavy equipment mechanics for MENARA AIR SDN 010
186 menjadi mekanik yang handal dan bersertifikat. apprentice candidate to be a reliable and certified SANGATTA UTARA
Sampai dengan tahun 2014, kami telah memfasilitasi
sebanyak 11 angkatan, dengan total jumlah peserta
mechanic. Up to 2014, we have been facilitating
as much as 11 batches, with the total number of
Water Tower SDN 010
Sangatta Utara 187
sebanyak 363 orang. participants as much as 363 students. RENOVASI TK AL FURQON,
SANGATTA UTARA
Celoteh Pendidikan merupakan sebuah dialog Celoteh Pendidikan is an interactive dialogue on
Refurbishment of TK Al Furqon,
interaktif di radio yang bertujuan meningkatkan the radio which aimed to increase knowledge and Sangatta Utara
pengetahuan dan kepedulian masyarakat terhadap public awareness of the issues on education. In
berbagai isu seputar dunia pendidikan. Dalam our implementation involves practitioners and BANTUAN PENGURUKAN
pelaksanaannya kami melibatkan praktisi dan TANAH UNTUK PEMBANGUNAN
observers of education as a lecturer, teacher,
PERPUSTAKAAN SDN 012
pemerhati pendidikan seperti dosen, guru, siswa/ student, government agencies, companies, and KENYAMUKAN
siswi, instansi pemerintah, perusahaan, maupun LSM. NGOs. A total of 41 dialogues as been conducted in
Landfill aids for construction
Sebanyak 41 dialog dilakukan di tahun 2014, dengan 2014, with the theme of Communication in Children of SDN 012 Kenyamukan library
tema Komunikasi pada Anak Berkebutuhan Khusus, with Special Needs, Hypnoparenting, implementation
Hypnoparenting, Implementasi Kurikulum 2013 di SD, of Curriculum 2013 in primary schools, Healthy
Sekolah Sehat dan Berkarakter, Mengenali Minat dan Schools and Character, Recognizing Interests and
Bakat Anak Sejak Dini, dan lainnya. Talents of Early Childhood, and others.

Infrastruktur
Pendidikan
INFRASTRUCTURE EDUCATION

Sebagai sebuah kabupaten yang relatif baru dan For a county that is relatively new and
terus berkembang, sarana dan prasarana pendidikan continues to evolve, the educational
di Kutai Timur masih terus ditingkatkan dengan facilities in East Kutai still continue to be
cara kolaborasi dengan pihak sekolah. Di sepanjang enhanced by collaboration with the school.
tahun 2014, kami menyediakan dukungan maksimal Throughout 2014, we provide support with
sebesar 90% dari nilai total setiap kerjasama dan maximum of 90% of the total value of each
sekolah menanggung minimal atau setara dengan partnership and schools bear minimum of
10% dari nilai tersebut. 10% of that value.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat

WADITRA PRIMA sangatta _Moving Forward with the


Communities

KEMBALI UKIR PRESTASI MENCIPTAKAN GENERASI


ANOTHER ACCOMPLISHMENT CERDAS DAN BERPRESTASI
FROM WADITRA PRIMA KPC NURTURING A SMART AND
HIGH PERFORMANCE GENERATION
Indonesian students have been successfully dominated
a series of Sport Memory in various countries. This
journey was started in East Kutai gone global ever since.
It was Yudi Lesmana, KPCs employee who is one of the
154 World Memory Grand Master, tries to disseminate
the sport memory virus in Indonesia.
His efforts was not went in vain, with our support, East
Kutais first ever team with 5 members was awarded as the
Grand Champion in Japan Open Memory Championship
in May 2014. In June 2014, 7 people from East Kutai and
188 Jakarta was sent to represent Indonesia in Philippines
Tim Marching Band Waditra Prima Sangatta
(MB WPS) PT. KPC berhasil meraih posisi
KPCs Marching Bank team, Waditra Prima
Sangatta (MB WPS) has accomplished to be the
International Open Memory Championship. And as the 189
outcome, 11 years old M. Dzakiendra from East Kutai has
runner-up di ajang Grand Prix Marching runner up champion in National Marching Band successfully reach the top by becoming the Children Grand
Band Nasional (GPMB). Didukung oleh 102 Grand Prix (GPMB). Supported by 102 personnel Champion in this competition and the Indonesia delegate
personil dan 37 official, WPS berlaga dengan and 37 officials, WPS carried out Good Mining Pelajar Indonesia berhasil mendominasi ajang managed to brought home 31 medallions.
mengusung tema Good Mining Practice. Practice as their performance theme. Memory Sport di berbagai negara. Perjuangan
ini bermula dari Kutai Timur yang kemudian As time goes by, the team is getting even stronger, 10
GPMB tahun 2014 ini, diikuti 18 grup MB This years GPMP in 2014 was participated by people was sent to represent Indonesia in Hongkong
meraih prestasi di tingkat internasional. Adalah
dari seluruh Indonesia. Setelah melalui 18 marching band groups from across Indonesia. International Open Memory Championship in September
Yudi Lesmana, karyawan KPC yang juga salah
persaingan yang sangat ketat, MB WPS KPC After a fierce competition, MB WPS KPC managed 2014. The sons and daughters of Indonesia has set a
satu dari 154 Grand Master Memory di dunia, mencoba
berhasil masuk ke divisi utama beserta 10 to get into the primary division with 10 other remarkable accomplishment by sweeping all the 1st,
menularkan virus memory sport di Indonesia.
grup lainnya dan memperoleh posisi runner- groups and successfully awarded as the runner 2nd, and the 3rd position and managed to break children
up. Keberhasilan ini tidak lepas dari proses up position. The success of a long journey various Perjuangan kerasnya tidak sia-sia, dengan dukungan memory sport world records which previously held by
panjang dalam mengikuti berbagai event di national events has helped actualized this KPC, tim pertama yang beranggotakan 5 orang dari China and Germany.
tingkat nasional. accomplishment. Kutai Timur berhasil menjadi Juara Umum Japan Open
Memory Championship pada Mei 2014. Pada Juni 2014, 7 On November 1st 2014, together with KPC and Kompas
Tahun 2007, WPS KPC berlaga di Darunnajah In 2017, WPS KPC competed in Darunnajah Gramedia, Indonesia Sport Memory Association held
orang asal Kutai Timur dan Jakarta, mewakili Indonesia
Marching Competition (DMC) di Istora Marching Competition (DMC) at Istora Jakarta and National Memory Sport Championship in Jakarta which
dalam ajang Philippine International Open Memory
Jakarta dan berhasil meraih posisi managed to win the runner up position. was supported by the World Memory Sport Council
Championship. Hasilnya, M. Dzakiendra, 11 tahun, asal
runner-up. Kesuksesan berlanjut Another success story from WPS was and joined by 42 participants from Jakarta, Bogor,
Kutai Timur menjadi Juara Umum Anak pada kompetisi
ketika WPS berhasil meraih juara when the group successfully awarded Bali and East Kalimantan. The champion of this event
ini dan tim Indonesia membawa pulang 31 medali ke
umum di Langgam, Denpasar Bali, as the Overall Champion of GPMB 2012 will represent Indonesia in the 23rd World Memory
Tanah Air.
GPMB 2012. Saat ini WPS berhasil which was held in Langgam, Denpasar, Championship in Hainan, China on December 11-13,
menduduki posisi runner-up dan Bali. Now WPS successfully awarded Seiring dengan waktu, tim bertambah kuat, 10 orang 2014. This also has been a succesfull journey, where for
memboyong piala bergilir Menteri as the runner up and brought home the berangkat mewakili Indonesia dalam Hongkong the first time in history, Indonesia ranked number 6 out
Pariwisata. Ministry of Tourism trophy. International Open Memory Championship pada September of 19 countries (169 participants) who participated in this
2014. Hasil yang sangat membanggakan ditorehkan event with 2 gold medals, 1 silver, and 1 bronze medal.
oleh anak-anak Indonesia dengan menyapu bersih juara
1, 2, dan 3 serta memecahkan rekor dunia anak yang
sebelumnya dipegang oleh China dan Jerman.
Pada tanggal 1 November 2014, bersama dengan
KPC dan Kompas Gramedia, Asosiasi Memory Sport
Indonesia menggelar Kejuaraan Nasional Daya Ingat
di Jakarta yang dilegitimasi oleh World Memory Sport
Council dan diikuti 42 peserta dari Jakarta, Bogor, Bali,
dan Kaltim. Juara dari ajang ini menjadi wakil Indonesia
dalam 23rd World Memory Championship di Hainan,
China pada 11-13 Desember 2014. Hasil perjuangan
ini pun tidak sia-sia, untuk pertama kalinya dalam
sejarah, Indonesia berada di peringkat 6 dunia dari 19
negara (169 peserta) yang mengikuti ajang ini dengan
perolehan 2 medali emas, 1 perak, dan 1 perunggu.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


"THE ENVIRONMENT IS IN US, NOT OUTSIDE OF US. Maju Bersama Masyarakat
THE TREES ARE OUR LUNGS, THE RIVERS OUR BLOODSTREAM. _Moving Forward with the
WE ARE ALL INTERCONNECTED, AND WHAT YOU DO TO THE Communities
ENVIRONMENT, ULTIMATELY YOU DO TO YOURSELF."
IAN SOMERHALDER, INTERNATIONAL ACTOR AND DIRECTOR
[G4-EC7][G4-EC8][G4-SO1]

KAMPUNG PINANG
program Pelestarian KAMPUNG PINANG

Alam dan Budaya Through Conservation of Nature and


CONSERVATION OF NATURAL Culture Program, we pay attention
to the issue of waste management Kampung Pinang adalah sebuah
AND CULTURE PROGRAM
190 and the development of community- fasilitas yang dibangun KPC pada tahun
based nature tourism as an entry
point. Development of nature tourism
1998 untuk pelatihan dan percontohan 191
usaha tani yang berwawasan
Melalui bidang Program Pelestarian Alam dan in Telaga Batu Arang as part of the lingkungan. Pada tahun 2014, fasilitas
Budaya, kami memperhatikan isu penanganan utilization of post-mining land can not yang berada dalam wilayah TNK ini
sampah dan pengembangan wisata alam be separated from the conservation telah diserahterimakan ke BTNK,
berbasis komunitas sebagai pintu masuk. agenda of Kutai National Park (KNP), dengan tujuan agar BTNK dapat terus
Pengembangan wisata alam di Telaga Batu Protected Forest Wehea, Karst and meningkatkan kepedulian masyarakat
Arang sebagai bagian dari pemanfaaatan in the wealth of coastal areas is a pada isu pelestarian alam melalui
potential invaluable. Kampung Pinang is a KPC
lahan pascatambang tidak lepas dari agenda berbagai kegiatan-kegiatan yang facilities that were built in 1998
pelestarian Taman Nasional Kutai (TNK), As a member of TNK Partners since selama ini dilakukan oleh KPC. for training and pilot project of
Hutan Lindung Wehea, Kawasan Karst maupun 1995 along with a number of other Sepanjang tahun 2014 tercatat kurang environmental friendly farming.
di kekayaan wilayah pesisir yang merupakan companies in the area around KNP, lebih 4.500 orang yang berkunjung, In 2014, the facilities in TNK
potensi yang tak ternilai. our participation was not only in the terdiri dari pelajar dari berbagai region has been handed over to
Sebagai anggota Mitra TNK sejak tahun form of funds, but active participation sekolah, perusahaan, lembaga BTNK, so BTNK might continue to
1995 bersama dengan sejumlah perusahaan in activities that can improve the pemerintah, komunitas pecinta alam, raise public awareness on nature
lain di sekitar wilayah TNK, partisipasi kami awareness of various parties to the dan pihak lainnya. conservation issues through a
tidak hanya berupa dana, namun secara aktif preservation of TNK. variety of activities that have been
melakukan kegiatan yang dapat turut serta Kami juga telah memfasilitasi kegiatan carried out by KPC.
Ecotourism development in Kabojaya penelitian keragaman burung enggang
meningkatkan kepedulian berbagai pihak untuk Village which is located side by side yang ada di TNK yang dilakukan oleh Throughout the year of 2014 it
kelestarian TNK. with TNK region has been done since tim Institut Teknologi Bandung dan is recorded approximately 4,500
Pengembangan ekowisata di Dusun Kabojaya 2009. Ecotourism has become part juga kegiatan sosial yang dilakukan visitors were students from
yang bersisian dengan wilayah TNK yang telah of the rural development agenda oleh Ikatan Alumni Universitas Gadjah different schools, companies,
dilakukan sejak tahun 2009 merupakan bagian and has become one of the business Mada berupa kejar pake A-C, pelatihan government agencies, community
dimaksud. Usaha ekowisata ini telah menjadi units of Swarga Bara BUMDesa. A penerjemah oleh Balai Taman Nasional of nature lovers, and others.
bagian dari agenda pembangunan desa dan lot of improvement should be done, Kutai, dan pelatihan kewirausahaan
however, in 2014, the manager of We also have facilitated the
telah menjadi salah satu unit usaha BUMDesa dalam mengembangan usaha wisata
the ecotourism has managed to win research activities of hornbills
Swarga Bara. Masih banyak perbaikan yang alam.
6th position in the competition of the diversity in TNK conducted by
harus dilakukan, namun demikian pada tahun
National Tourism Awareness in Tana a team of Bandung Institute
2014, pengelola ekowisata ini telah berhasil

4.500
Toraja representing East Kalimantan of Technology and also the
menjadi juara ke-6 dalam kompetisi Sadar
Province. We continue to facilitate the ORANG social activities carried out
Wisata Nasional di Tana Toraja mewakili Provinsi
fulfillment of various requirements (Visitors) by the Alumni Association of
Kalimantan Timur. Kami terus memfasilitasi
that must be owned by village the University of Gadjah Mada
pemenuhan berbagai persyaratan yang harus
BUMDesa and government, including JUMLAH PENGUNJUNG in the form of pursuing A- C
dimiliki oleh BUMDesa bersama pemerintah
the safety and comfort of tourists. SELAMA TAHUN 2014 package, the translator training
desa, termasuk keselamatan dan kenyamanan
Benchmarking to the National Park by the Kutai National Park, and
wisatawan yang datang. Studi banding ke Taman VISITORS RECORDED
Pangrango, West Java also carried entrepreneurship training in
Nasional Pangrango, Jawa Barat juga dilakukan THROUGHOUT 2014
out in conjunction with the Kutai development ecotourism business.
bersama dengan Balai Taman Nasional Kutai
(BTNK). National Park (BTNK).

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities

GERAKAN KOMUNITAS BERSIH SEHAT GERAKAN KOMUNITAS BERSIH SEHAT DAN


DAN MANDIRI - PROGRAM PENGELOLAAN MANDIRI IS A COMMUNITY-BASED WASTE
SAMPAH BERBASIS KOMUNITAS YANG MANAGEMENT PROGRAM INITIATED SINCE
DIINISIASI SEJAK TAHUN 2009 INI MASIH 2009 IN VARIOUS FORMS OF ACTIVITY OR
TERUS BERLANGSUNG DALAM BERBAGAI MOVEMENT. THE ULTIMATE GOAL IS TO BE
BENTUK KEGIATAN ATAU GERAKAN. MORE RESPONSIBLE IN THE COMMUNITY
TUJUAN UTAMANYA ADALAH MELAKUKAN LEVEL AND TO PARTICIPATE ACTIVELY IN WASTE

GERAK GERAKAN DITINGKAT KOMUNITAS


UNTUK LEBIH BERTANGGUNGJAWAB
MANAGEMENT BY APPLYING THE PRINCIPLES
OF THE 3RS (REDUCE, REUSE, RECYCLE).

BERSEMI DAN TURUT SERTA SECARA AKTIF


MELAKUKAN PENGELOLAAN SAMPAH
DENGAN MENERAPKAN PRINSIP 3R
GERAK BERSEMI
(REDUCE, REUSE, RECYCLE) ATAU DALAM
192 BAHASA INDONESIANYA MENGURANGI,
MENGGUNAKAN KEMBALI, DAN Partnership with communities for improvement
of the movement has continued and has been
193
MENDAUR ULANG. part of the business activities include:

COMPOSTING TRAINING CENTER which was


inaugurated in 2010 and is currently managed
COMPOSTING TRAINING CENTER yang by the Creative Environmental Concern
KEGIATAN KEMITRAAN Youngsters (RKPL). RKPL return to be in
diresmikan pada tahun 2010 dan saat ini dikelola
BERSAMA DENGAN partnership with YSB to manage compost
Remaja Kreatif Peduli Lingkungan (RKPL).
BERBAGAI KOMUNITAS house in Swarga Bara Market and manage
RKPL kembali menjadi mitra kerja YSB untuk
UNTUK TERUS waste in Panorama, one residential area in
mengelola rumah kompos di Pasar Swarga Bara
MENINGKATKAN Swarga Bara
dan mengelola sampah di Panorama salah satu
GERAKAN TERUS
sektor pemukiman di Swarga Bara CRAFT RECYCLING has participated in
BERLANGSUNG DAN
TELAH MENJADI KERAJINAN DAUR ULANG yang telah ikut reducing the volume of waste dumped in
KEGIATAN USAHA berpartisipasi dalam mengurangi volume sampah Final Disposal (TPA), as well as providing
ANTARA LAIN : yang dibuang di Tempat Pembuangan Akhir (TPA), added value socially, economically and
sekaligus memberikan nilai tambah secara sosial, environmentally. Three types of raw materials
ekonomi, dan lingkungan kepada pelakunya. Tiga used included a variety of plastic waste, paper,
jenis bahan baku yang dimanfaatkan antara lain and other materials in accordance with the
berbagai sampah plastik, koran, dan bahan lain principals of creativity. The amount of paper
sesuai dengan kreatifitas pelaku. Jumlah sampah and plastic bins are managed approximately
koran dan plastik yang terkelola kurang lebih 1000 kg, produces 914 unit products worth
1000 kg, menghasilkan 914 unit produk senilai Rp IDR 48.5 million
48.5 juta SECOND HAND HOUSE (PONKAS) which has
PONDOK BEKAS (PONKAS) yang telah ada existed since 2010, throughout 2014 it has
sejak tahun 2010, sepanjang tahun 2014 telah facilitated the sales of used goods as many as
memfasilitasi penjualan barang bekas sebanyak 627 units with a value of IDR 55 million.
627 unit dengan nilai 55 juta rupiah. WASTE BANK has been running in Desa Teluk
BANK SAMPAH telah berjalan di Desa Teluk Lingga, Swarga Bara, Singa Gembara and
Lingga, Swarga Bara, Singa Gembara dan Bengalon, with total customer at the end of
Bengalon, dengan total nasabah pada akhir 2014 was as many as 335 customers.
tahun 2014 sebanyak 335 nasabah. CLEAN FRIDAY MOVEMENT is a mutual
GERAKAN JUMAT BERSIH Gerakan Gotong- cooperation organized by the government
Royong yang diorganisir oleh pemerintah dari
RT ke RT.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


"YOU AND I COME BY RAIL OR ROAD, Maju Bersama Masyarakat
BUT THE ECONOMY TRAVEL ON INFRASTRUCTURE." _Moving Forward with the
Communities
MARGARET THATCHER, THE PRIME MINISTER OF
THE UNITED KINGDOM 1979 - 1990

Ketersediaan berbagai infrastruktur yang The availability of adequate infrastructure


Segading Reset t l ement
memadai akan membantu percepatan will accelerate the development growth and SEGADING RESETTLEMENT
pertumbuhan pembangunan dan secara directly affect the welfare and improvement
langsung berpengaruh terhadap peningkatan of society living standards, in term of
kesejahteraan dan taraf hidup masyarakat economal, social, and environmental. In
baik secara ekonomi, sosial, dan lingkungan. practice, KPC continues to encourage
Dalam pelaksanaannya, KPC terus mendorong the involvement of multi-stakeholders
keterlibatan multipihak dan diharapkan and is expected that through the process,
dalam proses tersebut masyarakat mampu society would be able to continue building
terus membangun jaringan kerjasama dalam partneship in improving the access to
meningkatkan aksesnya pada berbagai various resources, in accordance with the
sumber daya yang ada, sesuai dengan rencana government's development plans from
194 pembangunan pemerintah dari tingkat desa the village level up to the district. The
sampai dengan kabupaten. Infrastruktur yang
telah kami lakukan di tahun 2014, antara lain:
infrastructure program that we have carried
out in 2014, among others:
195

PEMBANGUNAN KANTOR DESA SEKERAT


CONSTRUCTION OF SEKERAT VILLAGE OFFICE
PROGRAM SEGADING RESETTLEMENT masih SEGADING RESETTLEMENT PROGRAM
PEMASANGAN TRAFFIC LIGHT terus berjalan di tahun 2014, berbagai kegiatan was continued in 2014, various activities was
BANTUAN LANJUTAN
yang dilakukan antara lain peningkatan undertaken including the improvement of
SIMPANG TIGA WILAYAH PEMBANGUNAN GEDUNG SERBA
infrastruktur, peningkatan kapasitas infrastructure, community capacity building,
SWARGA BARA GUNA DESA SANGATTA SELATAN
masyarakat, pemberdayaan ekonomi, dan economic empowerment, and improving the
Additional Aid for the Construction peningkatan kualitas pendidikan dan kesehatan. quality of education and health. Activities
Traffic Light Installation in 3-way
of the Multipurpose Building in Kegiatan pekerjaan infrastruktur yang of infrastructure work carried out in 2014
Junction of Swarga Bara Area
South Sangatta village dilaksanakan di tahun 2014 antara lain adalah include the village office, BPD office, health
kantor desa, kantor BPD, bangunan Puskesmas center buildings, Balai Adat, and places of
PERBAIKAN JALAN LINGKUNGAN AREA SWARGA BARA Pembantu, Balai Adat, dan tempat ibadah di Desa worship in the village Keraitan. For water
Keraitan. Untuk penyediaan air bersih dan listrik, supply and electricity, KPC still provide
ROAD REFURBISHMENT IN SWARGA BARA AREA
KPC masih memberikan bantuan operasional operational support for both technical and
baik teknis dan finansial. Bantuan ini diberikan financial. This assistance is provided through
SEMENISASI JALAN RAMBUTAN SEMENISASI JALAN PERMAI
melalui BUMDesa Putra Keraitan yang mengelola BUMDesa of Putra Keraitan that manages
DESA SEPASO BARAT DESA SEPASO BARAT
generator listrik dan WTP (Water Treatment Plant). the electricity generator and WTP (Water
Concrete construction for Rambutan Road in Concrete construction for Permai Treatment Plant).
Di bidang pendidikan, bantuan yang diberikan
West Sepaso Village Traffic Light Installation Road in West Sepaso Village
adalah insentif guru, perlengkapan dan In education, the assistance given is
in 3-way Junction of Swarga Bara Area
peralatan sekolah, pemeliharaan sekolah, for teachers incentive, equipment and
serta pengembangan sekolah budaya. Pada school supplies, school maintenance, and
RENOVASI LAPANGAN
aspek peningkatan akses dan kualitas development of school culture. In the aspect
PENYELESAIAN GEDUNG SERBA SEPAKBOLA BENGALON kesehatan masyarakat, KPC mendukung of improving access and quality of public
GUNA SEPASO TIMUR Refurbishment of Football dengan menyediakan prasarana air bersih bagi health, KPC supported by providing clean
Completion of Multi Purpose Field in Bengalon kawasan Segading Resettlement, prasarana water facilities for the region Segading
Building in East Sepaso sanitasi rumah berteknologikan biofilter, Resettlement, sanitary infrastructure
memberikan penyuluhan berkala kepada home with biofilter technology, providing
warga dengan mengundang tenaga medis information periodically to the citizens by
KPC turut berpartisipasi dalam program KPC participated on East Kutai sebagai pembicara demi meningkatkan inviting medical personnel as a speaker in
Pemerintah Daerah Kutai Timur yaitu Government program of Houses kesadaran hidup sehat, kunjungan rutin order to raise awareness of healthy living,
Pembangunan Rumah Layak Huni Development. KPC donated 30 houses tenaga medis puskemas, dan pembangunan regular visits of medical personnel health
(PRLH). KPC mendonasikan 30 rumah which consist of 5 houses in Rantau puskesmas pembantu sebagai prasarana centers, and construction of health centers
pendukung kegiatan pendampingan di bidang as a support in mentoring activities in the
dengan rincian 5 di Rantau Pulung, 12 di Pulung, 12 houses in Bengalon, 7
kesehatan. field of health.
Bengalon, 7 di Sangatta Utara, dan 6 di houses in North Sangatta, and 6
Sangatta Selatan Houses in South Sangatta.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities
PENGUATAN FORUM MSH CSR Berdasarkan panduan program tersebut, di tahun
SEBAGAI BAGIAN DARI PENGUATAN 2014 PT KPC telah merealisasikan beberapa program
yang menjadi fokus dalam harmonisasi pembangunan
KAPASITAS KELEMBAGAAN diantaranya adalah pembangunan Rumah Layak
Huni (PRLH) sebanyak 30 unit rumah yang tersebar
di empat kecamatan yakni Kecamatan Sangatta
STRENGTHENING MSH-CSR FORUM AS PART Utara (7 unit), Kecamatan Sangatta Selatan (6 unit),
OF INSTITUTIONAL CAPACITY BUILDING Kecamatan Bengalon (12 unit), dan Kecamatan
Rantau Pulung (5 unit); dukungan program Kota
Sangatta Bersih bersama Dinas UPTD, dukungan

M R
engacu pada skenario RPT, salah eferring to the scenario of RPT, kebutuhan sarana dan prasarana pendidikan,
satu bagian penting dari penguatan one important part of institutional dukungan dalam rangka sosialisasi penanggulangan
kelembagaan yang dilaksanakan capacity Building conducted by KPC penyebaran penyakit menular HIV/ AIDS serta
oleh PT KPC adalah dengan menguatkan is to strengthen the functions of the dukungan kepada Palang Merah Indonesia (PMI).
fungsi lembaga Forum MSH-CSR Kutai MSH-CSR Forum of East Kutai (Multi Based on the guidelines of the program, in 2014
Timur (Forum Multi Stakeholder for Stakeholder Forum for Corporate Menyadari pentingnya peran aktif desa dalam rangka
mendukung Program Desa Mandiri, maka BUMDesa KPC has realized several programs that become
Corporate Social Responsibilty). Social Responsibility). the focus in the harmonization of development
sebagai salah satu fokus pengembangan yang
196 Sejak terbentuknya di tahun 2006, dan Since established in 2006, and through ditargetkan untuk dapat membangkitkan Pendapatan including the construction of Livable House
melalui tahap evaluasi kinerja di tahun
2011 yang dilakukan oleh lembaga
the performance evaluation stage in
2011 conducted by the C-Force agency,
Asli Desa (PADes). BUMDesa di wilayah Kecamatan
Rantau Pulung ditingkatkan kemampuannya untuk
(PRLH) were 30 housing units spread over four
districts namely District of North Sangatta (7 197
C-Force, Forum MSH CSR didorong untuk MSH CSR Forum is driven to perform dapat mengembangkan berbagai usaha yang units), District of South Sangatta ( 6 units), District
melaksanakan fungsi koordinasi dan the functions of coordination and memberikan penghasilan kepada desa, setelah of Bengalon (12 units), dan District of Rantau
fasilitasi antar korporasi yang menjadi facilitation among corporations and sebelumnya dari unit Pengelolaan Listrik Desa sudah Pulung (5 units). Support for Sengatta Clean
anggotanya dengan pemerintahan the members of local government. dikelola dengan baik dan mendapatkan penghargaan Cities program with the UPTD Office, support
daerah. Kegiatan koordinasi Forum Coordination activity with MSH-CSR Platinum pada ajang Indonesian CSR Award (ICA) the needs of educational facilities, support in
MSH-CSR dilakukan tidak hanya dalam Forum is not only in the context of a 2014 dengan kategori Program Investasi Sosial- the socialization of spread of infectious diseases
rangka rapat koordinasi di awal atau coordination meeting at the beginning Kelembagaan Sosial Ekonomi. prevention of HIV / AIDS and support to the
akhir tahun program saja, akan tetapi or end of the program, but on every Indonesian Red Cross.
dalam setiap kesempatan baik dalam occasion including the coffee morning Pengembangan unit BUMDesa diantaranya adalah
bantuan 1 unit pengolahan air minum di Desa Tanjung Realizing the importance of an active role in
acara coffee morning secara bergiliran event in turns and on the occasion of supporting the Independent Village Program,
maupun dalam kesempatan pembahasan the discussion of a regional program Labu, pengadaan 20 ribu bibit kelapa sawit BUMDesa
Tepian Makmur, bantuan 1 unit digital printing dan BUMDesa is targeted on development to raise
sebuah program daerah yang melibatkan that involves a third party. As a result of Revenue of the Villages (Pades). BUMDesa in
pihak ketiga. Sebagai salah satu hasil coordination MSH-CSR Forum and local mesin fotocopy untuk BUMDesa Mukti Jaya, bantuan
pengadaan 1 unit mesin kemasan air minum dan the District of Rantau Pulung improved its ability
koordinasi Forum MSH-CSR dan government is a planning guidance to develop a variety of businesses that provide
pemerintah daerah adalah sebuah of CSR program that was recorded kelengkapannya untuk BUMDesa Rama Mandiri Desa
Rantau Makmur. income to the village, after previously has been
panduan perencanaan program CSR yang with the title "Harmonization of Stake well managed from Village Electricity Producers
dibukukan dengan judul Harmonisasi Holder for Sustainable Development". Perencanaan program dilaksanakan oleh Forum MSH and awarded Platinum in the event the Indonesian
Stake Holder untuk Pembangunan CSR bersama KPC dan pihak lain di desa maupun CSR Award (ICA) 2014, with category of Socio-
Berkelanjutan. korporasi untuk program kemandirian desa dimana Institutional Social Economy Investment Program.
In manual planning of the program, keterlibatan dimulai sejak penyusunan Rencana
Dalam buku panduan perencanaan The development of BUMDesa included assistance
the focus of CSR targets aimed at: Pembangunan Desa dan Musrenbang di tingkat
program tersebut, fokus sasaran CSR of 1 unit drinking water treatment in the village
supporting poverty reduction and kecamatan hingga di tingkat kabupaten. Pembagian
ditujukan pada: mendukung pengentasan of Tanjung Labu, procurement of 20 thousand
achievement of the MDG's where one peran dan bentuk koordinasi dalam merealisasikan
kemiskinan dan pencapaian MDGs seedlings of palm oil for Tepian Makmur
of the program is the construction of program diupayakan terbagi sejak awal.
dimana salah satu programnya adalah BUMDesa, procurement of 1 unit digital printing
Livable housing (PRLH); education by
pembangunan Perumahan Layak Huni and copying machines for Mukti Jaya BUMDesa,
education facilities and infrastructure
(PRLH); pendidikan dengan program procurement of 1 unit of water packaging machine
program; health by maternal health
penyediaan sarana dan prasarana and equipment for Rama Mandiri BUMDesa in
programs, newborn babies and toddlers
pendidikan; kesehatan dengan program Rantau Makmur village.
program as well as prevention of HIV
kesehatan ibu, bayi baru lahir, dan anak
AIDS infectious diseases; environment Planning program was implemented by MSH-
balita serta penanggulangan penyebaran
by prevention of waste problems CSR Forum together with KPC and other parties
penyakit menular HIV AIDS; lingkungan
program. in the community or corporation for which the
dengan program penanggulangan
permasalahan sampah. involvement started from creating the Village
Development Plan and Musrenbang at the sub-
district level to district level. The allocation of roles
and forms of coordination in the realization of
program was carried out from the beginning.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
_Moving Forward with the
Communities

NILAI INVESTASI SOSIAL


SOCIAL INVESTMENT VALUE

P I
ada tahun 2014,besaran nilai investasi n 2014, the amount of the value of
sosial melalui program pengembangan social investment through community
masyarakat mencapai USD 5,030 juta. development programs reached
Manfaat yang diberikan meliputi ketujuh USD 5.030 million. Benefits provided
Bidang Program Pemberdayaan Masyarakat. through seven Divisions Community
Terhitung sejak tahun 2004 sampai dengan Empowerment Program. As from 2004
tahun 2014, total realisasi dana CSR kami until 2014, the total realization of our CSR
telah mencapai USD 69,11 juta. fund has reached USD 69.11 million.

198
Untuk mendukung pencapaian program RPT
199
maka KPC terus berupaya melakukan penguatan 80.000.000
kelembagaan forum agar dapat meningkatkan
fungsi koordinasi dan sinergi dengan berbagai 70.000.000
GRAFIK NILAI INVESTASI SOSIAL 2004 2014
pemangku kepentingan khususnya di wilayah Ring
Graph of Social Investment Value 2004-2014
1 dan Ring 2. Kerjasama dengan Forum MSH CSR 60.000.000
Supporting RPT program, KPC continues to
dilaksanakan mulai dari tahapan perencanaan,
make Forum institutional capacity building in
monitoring, dan evaluasi pelaksanaan program 50.000.000
order to improve the function of coordination
sebagaimana tertuang dalam Perbub no 27 tahun
and synergies with various stakeholders,
2011 tentang pengelolaan CSR di Kabupaten Kutai 40.000.000
especially in the area of Ring 1 and Ring
Timur. Pada tahun 2014, peran Forum MSH-CSR

10.327.791
11.314.020
2. Cooperation with MSH-CSR Forum was

9.233.231

7.180.707

6.795.227
menjadi kunci utama keberhasilan program PRLH, 30.000.000

5.025.930
started from the stage of planning, monitoring

5.030.836
4.594.968
2.829.636

4.597.526
dimana Forum MSH-CSR berperan aktif bersama

2.183.137
and evaluation of program implementation
pemerintah dan TNI serta korporasi dalam 20.000.000
as stated in Regional Regulation No. 27 of
merealisasikan Pembangunan Rumah Layak Huni
2011 on the management of CSR in East
sesuai dengan porsinya masing-masing. Selain 10.000.000
Kutai. In 2014, the role of MSH-CSR Forum
itu, Forum MSH-CSR bersama Bappeda menggali
was the key success factor of PRLH program,
potensi ekowisata yang ada khususnya di wilayah
which the MSH-CSR Forum plays an active
pesisir Kutai Timur sebagai potensi peningkatan

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014
role with the government and the military
Pendapatan Asli Daerah dan melepaskan
as well as corporations in realizing Livable
ketergantungan dari pertambangan. Selain itu,
Housing Development in accordance with
bidang pemberdayaan masyarakat lainnya dan
each portion. In addition, MSH-CSR Forum
peningkatan infrastruktur masyarakat serta
and Bappeda explored the potential for
pertanian juga menjadi perhatian lainnya.
ecotourism especially in the coastal areas of
East Kutai as a potential

$5,03 $69.112.999
increase in local revenue
and to be independent juta
of the mining industry. (million)
Besides, other community
empowerment, community TOTAL REALISASI TOTAL REALISASI DANA
infrastructure improvement DANA CSR 2014 CSR 2008 2014
and agriculture are also our
concern. TOTAL REALIZATION TOTAL REALIZATION OF
OF CSR FUND IN 2014 CSR FUND 2004- 2014

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Maju Bersama Masyarakat
COMMUNITY FEEDBACK SYSTEM: _Moving Forward with the
Communities
MENDENGARKAN UMPAN
BALIK MASYARAKAT
COMMUNITY FEEDBACK SYSTEM:
LISTENING TO COMMUNITY FEEDBACK

200
201

K C
eluhan dan teguran dari masyarakat omplaints and warning from the
terkait dengan dampak operasional public related to the impact of
KPC dikelola dalam sebuah sistem KPC's operations are managed in a Sebagai tindak lanjut keluhan-keluhan tersebut, As we respond to these complaints, water
pengelolaan bernama Community management system called Community pengelolaan air dan konflik sosial menjadi management and social conflict became a
Feedback System-CFS (Umpan Balik Feedback System. CFS always ensures perhatian utama pada tahun 2014 ini. Penurunan major concern in 2014. Critical complaints
Masyarakat). CFS selalu memastikan that all complaints and warnings from the keluhan kritikal terus kami upayakan dengan continue to decline as we are trying to focus
semua keluhan dan teguran yang berasal community are managed and resolved in memfokuskan pada peningkatan efektifitas on improving the effectiveness of water
dari masyarakat terkelola dengan baik accordance with the procedure. pengelolaan air dan isu-isu (lingkungan, sosial, management and issues (environmental,
dan diselesaikan sesuai dengan prosedur. ekonomi) yang berpotensi melahirkan konflik social, economical) that could potentially
sosial. Dengan demikian, KPC merumuskan action create social conflict. Thus, KPC formulate
Selama tahun 2014, telah terjadi 14 During 2014, there have been 14
plan untuk periode selanjutnya, yaitu: an action plan for the next period, namely:
keluhan yang berasal dari 2 wilayah complaints received from two KPC
operasional KPC, yaitu Bengalon dan operational areas, namely Bengalon and 1. Melakukan monitoring sosial dan lingkungan 1. Performing social and environmental
Sangatta. Kontribusi keluhan terbanyak Sangatta, with complaints mostly came secara sistematis pada lokasi-lokasi yang monitoring systematically in the
berasal dari Bengalon sebanyak 9 kasus from Bengalon with 9 cases and remaining memang memiliki potensi dampak yang locations with high potential impact so
dan sisanya 5 keluhan berasal dari 5 complaints came from Sangatta. tinggi, agar permasalahan di lapangan dapat that problems on field can be anticipated
Sangatta. terantisipasi secara dini early.
Di tahun ini, kriteria keluhan didominasi During this year, the types of complaints 2. Secara terus-menerus melakukan kegiatan 2. Continually conducting coordination
oleh keluhan terkait air dan konflik sosial. are dominated by complaints related to koordinasi dan pertemuan dengan tokoh and meetings with community leaders
Terdapat juga satu keluhan mengenai water and social conflict. There is also a masyarakat dan pemerintah (desa, and the government (village, district,
blasting di Sangatta, dan satu keluhan complaint regarding a blasting in Sangatta kecamatan, kabupaten) regency).
mengenai udara di Bengalon. Seluruh and one complaint about the air in Bengalon.
3. Meningkatkan pemahaman masyarakat 3. Increasing public awareness of
kasus keluhan kritikal tersebut telah All critical complaints cases have been
terhadap sistem pengelolaan lingkungan environmental management system to
berhasil kami kelola dan selesaikan. successfully managed and completed.
dengan membangun komunikasi yang baik establish good communication with the
dengan masyarakat community
Pengaruh Bencana Konflik
Udara Air Kebisingan Blasting Alam Sosial 4. Masyarakat perlu menyampaikan keluhan 4. Community need to make complaints
berdasarkan fakta dan data, sehingga based on facts and data, in order that
Air Water Noise Blasting Natural Social
Pollution Disaster Conflict hal tersebut menjadi dasar dalam they can become the basis to follow-up
menindaklanjuti keluhan yang disampaikan the submitted complaints
2012 0 4 0 0 2 5
5. Perlu memberikan pemahaman bahwa 5. It is necessary to explain that
2013 0 6 0 0 0 3 tanggung jawab pengelolaan lingkungan responsibility of environment
merupakan hal yang perlu didukung oleh management require the support of the
2014 1 8 0 1 0 4 masyarakat. whole community.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


KEMITRAAN YANG
BERKELANJUTAN
SUSTAINABLE
MEMBARA Kemitraan yang
Berkelanjutan
_Sustainable Partnership

PARTNERSHIP

B
202 agi kami, mitra kerja, baik itu
kontraktor ataupun supplier,
memiliki peran dan kontribusi
203
yang amat penting dalam
sejarah perusahaan ini. Tanpa
mereka keberlanjutan akan
sulit untuk kami wujudkan. KPC
percaya melalui kerjasama dengan
para mitra yang dibangun diatas
rasa hormat, percaya dan saling
memahami akan menghasilkan
hasil yang baik. Oleh sebab itu,
kami senantiasa menjalin hubungan
yang harmonis dengan para
mitra dengan menjunjung tinggi
prinsip keadilan, transparansi, dan
profesionalitas.

F
or KPC, each of our business
partners, whether it is a
contractor or a supplier, has
a very important role and
contribution to the history of this
company. Without them, achieving
sustainability will be difficult for us.
KPC believes that cooperation with
partners which is based on respect,
trust and mutual understanding will
bring us good results. Therefore, we
continue to establish harmonious
relationships with our partners
following the principles of fairness,
transparency, and professionalism.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
_Sustainable Partnership

KEMITRAAN YANG
K K
ami selalu berkomitmen untuk PC always commits to have
mencapai implementasi Good an effective, efficient and

BERKELANJUTAN
Mining Practice yang efektif, efisien sustainable implementation
dan berkelanjutan yang mencakup of Good Mining Practice in our
seluruh coal chain. Oleh karena itu, entire coal chain. Therefore,
keterlibatan dan dukungan dari mitra engagement and support from
usaha harus terus diperkuat sehingga business partners must continue to
dapat bermanfaat bagi kedua pihak dan be strengthened in order that they can

SUSTAINABLE PARTNERSHIP lebih jauh dapat memberikan manfaat


yang berkelanjutan bagi para pemangku
be beneficial to all parties and further
providing sustainable benefits for all
kepentingan. stakeholders.
Mitra usaha KPC dikategorikan menjadi KPC partners are categorized into
2 kelompok, yaitu pemasok barang two groups: suppliers and service
(supplier) dan pemasok jasa (kontraktor, providers (contractors for both mining
baik penambangan maupun jasa lainnya). and other services). In 2014, KPC was
Pada tahun 2014, KPC didukung oleh supported by a total 894 contractors
204 894 mitra kontraktor dan supplier, baik and suppliers from local companies
dari lokal Kutai Timur, lokal Kalimantan
Timur, lokal nasional, dan asing. [G4-EC9]
in East Kutai, in East Kalimantan,
or throughout Indonesia, as well as
205
foreign companies. [G4-EC9]

IMPLEMENTASI IMPLEMENTATION OF
GOOD MINING GOOD MINING PRACTICE
IN THE ASPECTS OF
PRACTICE DALAM PARTNERSHIP
ASPEK KEMITRAAN

K K
PC selalu berupaya untuk PC strives to constantly build strong
membangun hubungan kemitraan partnerships as we believe that
yang kuat. Kami percaya, dengan strong partnerships can allow us to
kemitraan yang kuat, keberlangsungan achieve sustainability of our Companys
aktivitas operasional perusahaan dapat operational activities. Therefore, it has
berjalan dengan baik. Merupakan bagian become a part of KPC's commitment
dari komitmen KPC untuk menerapkan to apply good mining practice in the
good mining practice dalam aspek partnerships that we build, including
kemitraan, diantaranya dengan mencapai effective, efficient and competitive
biaya produksi yang efektif, efisien dan production costs.
kompetitif.
Selain menghasilkan biaya produksi Besides having competitive production
yang kompetitif, kami juga menyadari costs, we also recognize the importance
pentingnya untuk turut melibatkan of involving national suppliers, especially
pemasok dalam negeri, terutama local suppliers, as we believe that we can
pemasok lokal. Kami yakin, bahwa kami participate and contribute in improving
akan turut serta berkontribusi dalam the domestic economy through
meningkatkan perekonomian dalam purchasing local goods and services.
negeri melalui pembelian barang dan This effort shows that as a mining
jasa lokal. Hal ini menunjukkan bahwa company KPC plays an important role in
KPC adalah perusahaan tambang yang developing the potentials and economic
berperan penting dalam meningkatkan condition of local communities in the
potensi dan perekonomian masyarakat country, especially in East Kutai. Through
dalam negeri, khususnya masyarakat this partnership, KPC incorporates social
Kutai Timur. Pada aspek ini, sisi aspects within our implementation of
kemitraan KPC telah menerapkan aspek good mining practice. [G4-EC8]
sosial kemasyarakatan terkait good
mining practice. [G4-EC8]

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


GOOD MINING PRACTICE GOOD MINING PRACTICE Kemitraan yang
DALAM ASPEK KEMITRAAN DI KPC IN KPC PARTNERSHIPS Berkelanjutan
_Sustainable Partnership
[G4-DMA] [G4-DMA]
Deskripsi Lokasi 2012 2013 2014
CONTRACTOR BUSINESS PEMASOK KOMUNIKASI CONTRACTOR BUSINESS LOCAL & COMMUNICATION Location (US Dolar) (US Dolar) (US Dolar)
SAFETY ETHICS & LOKAL & + SAFETY ETHICS & NATIONAL + DISCUSSION
Lokal Kutim
MANAGEMENT CODE OF NASIONAL MANAGEMENT CODE OF SUPPLIERS 172 174 135
DISKUSI East Kutai Local Suppliers
SYSTEM CONDUCT SYSTEM CONDUCT
Lokal Kaltim
+ + + + 256 261 224
East Kalimantan Local Suppliers
HR AUDIT GENERAL HR AUDIT GENERAL
Nasional
TERMS & TERMS & 504 536 381
National Suppliers
CONDITIONS CONDITIONS
Luar Negeri
304 317 154
International Suppliers
Pemantauan Melibatkan Berbagai Monitoring the Code of Engaging Various Jumlah
Buku 1236 1288 894
aktivitas dan forum activities and Conduct and communication Total
Panduan
dan kinerja mendukung komunikasi performance of and General supporting and discussion
Kode Etik
pemasok pemasok dan diskusi suppliers through Terms & local and forum
dan Syarat
melalui sistem lokal dan the system Conditions national Sesuai dengan komitmen kami terhadap In accordance with our commitment to
Umum
Supplier nasional of Contractor suppliers pemasok lokal dan nasional, proporsi support local and national suppliers, KPCs
Kontrak
206 Contractor Supplier and pembeli domestik KPC tahun 2014 mencapai domestic procurement in 2014 reached more
dan Contract
Management
Contract
Management
lebih dari USD 1,188 miliar atau 84% dari
total nilai pembelian tahun 2014. [G4-EC9]
than USD 1.188 billion, or 84% of the total
procurement value in 2014. [G4-EC9] 207
System (SCMS) System (SCMS)
dan Audit and Human
Sumber Daya Resources Audit Wilayah 2012 2013 2014
Manusia Location (US Dolar) (US Dolar) (US Dolar)

Lokal Kutim
63.382.786,49 45.303.502,14 35.643.076,67
East Kutai Local Suppliers

MELIBATKAN DAN
S
udah menjadi bagian dari komitmen dan upaya KPC untuk turut Lokal Kaltim
85.009.904,16 68.309.142,68 52.288.181,97
serta membantu meningkatkan kesejahteraan masyarakat lokal. East Kalimantan Local Suppliers

MENDUKUNG Dengan melibatkan pemasok lokal dan nasional sebagai mitra,


KPC berupaya untuk mengembangkan potensi masyarakat lokal.
Nasional
1.277.050.405,29 1.231.856.192,66 1.100.238.258,14
PEMASOK LOKAL
National Suppliers
KPC juga memberikan dukungan dengan berbagai pelatihan dan Impor
DAN NASIONAL sejumlah forum diskusi dua arah untuk meningkatkan keterampilan
mereka. Melalui hal ini, kami berharap KPC mampu membantu
Import
510.925.412,55 216.829.497,99 226.010.389,13

Total
mendorong pertumbuhan perekonomian daerah dimana kami
INVOLVING AND beroperasi. Untuk memenuhi komitmen kami, KPC telah melakukan Total
1.936.368.508,49 1.562.298.335,47 1.414.179.905,92

SUPPORTING LOCAL berbagai upaya dalam melibatkan dan mendukung pemasok lokal % Dalam Negeri
74% 86% 84%
AND NATIONAL dan nasional. Dua program yang kami lakukan adalah program % Local
pemasok lokal dan migrasi pembelian.
SUPPLIERS % Luar Negeri
26% 14% 16%
Secara garis besar, pemasok kami dibagi menjadi pemasok lokal % Import
[G4-EC9]
Kutai Timur, pemasok lokal Kalimantan Timur, pemasok nasional,
dan pemasok luar negeri.

USD 1,188 milyar NILAI PEMBELIAN KEPADA SUPPLIER


NASIONAL, LOKAL KALIMANTAN TIMUR

I
t is part of our commitment and efforts to participate and help in DAN LOKAL KUTAI TIMUR DI TAHUN
improving the welfare of the local communities. By involving local NILAI PEMBELIAN SUPPLIER 2014 MENCAPAI USD 1,188 MILYAR.
and national suppliers as partners, KPC seeks to develop the MEWAKILI 84% DARI TOTAL NILAI
PROCUREMENT VALUE PEMBELIAN KAMI DI TAHUN 2014
potentials of local communities. KPC also provides support through
training and a two-way discussion forum to improve people skills.
Through this effort, we expect that KPC will be able to help driving
the economic growth in the areas where we operate. To fulfill our
84% THE TOTAL PROCUREMENT VALUE
FROM NATIONAL SUPPLIERS, LOCAL
commitment, KPC has developed various efforts in engaging and EAST KALIMANTAN AND LOCAL EAST
DARI TOTAL PEMBELIAN KUTAI AREA IN 2014 REACHED USD
supporting local and national suppliers. Two programs that we have
OF THE TOTAL 1.188 BILLION REPRESENT 84% OF THE
conducted are local suppliers and purchase migration. TOTAL PROCUREMENT VALUE IN 2014
PROCUREMENT VALUE
In general, our suppliers are divided into suppliers from East Kutai,
suppliers from East Kalimantan, national suppliers and foreign
suppliers.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
PEMASOK MIGRASI PEMBELIAN _Sustainable Partnership

LOKAL BINAAN PROCUREMENT MIGRATION


ASSISTED LOCAL [G4-EC7][G4-EC9][G4-SO1]

SUPPLIERS
[G4-EC7][G4-EC9][G4-SO1]

D
alam rangka mendukung pemasok lokal
dan nasional, KPC telah menginisiasi
program Supplier dan Kontraktor
Lokal Binaan. Melalui program ini, kami
membina masyarakat setempat agar dapat
menyediakan barang dan jasa yang kami
butuhkan. Program Supplier dan Kontraktor
Lokal Binaan merupakan bentuk tanggung
jawab sosial KPC dalam mendorong
pertumbuhan usaha lokal. Dalam hal ini,
208 kami mendampingi dan membina supplier
lokal Kutai Timur melalui Departemen Jumlah
Pemasok Nilai (USD)
209
Community Empowerment dan Departemen Tahun
Year

P P
Project Management and Evaluation. Number of Value (USD) rogram migrasi pembelian merupakan rocurement migration program
Suppliers
pengalihan pengadaan barang dan is a change of goods and services
Program Supplier dan Kontraktor Lokal
jasa dari pemasok luar negeri menjadi procurement from foreign suppliers
Binaan secara konsisten telah kami 2010 38 2.031.213
pemasok nasional, serta dari pemasok to national suppliers, and from national
laksanakan sejak tahun 2007. Program
nasional menjadi pemasok lokal. Program suppliers to local suppliers. The
ini dikelola khusus oleh sub-section Local 2011 38 2.785.766 yang telah dimulai sejak tahun 2010 ini program, which began in 2010, is a
Business Development (LBD) pada divisi
merupakan perwujudan komitmen kami display of our commitment to engage
Supply Chain Division. Hingga akhir tahun 2012 34 2.935.275 dalam melibatkan dan mendukung pemasok and support local and national suppliers.
2014, terdaftar sebanyak 31 pemasok lokal
lokal dan nasional. Dengan adanya program With this program, we hope that the local
binaan KPC dengan nilai total pengadaan 2013 35 2.459.915 ini, kami berharap perekonomian masyarakat community and national economy will be
barang dan jasa oleh pemasok binaan
lokal dan nasional dapat meningkat. improved.
sebesar USD 2,86 juta. 2014 31 2.860,172
Pada tahun 2014, kami melakukan migrasi In 2014, we changed the procurement
pembelian pada 23 komoditas barang dan 6 of 23 goods and 6 services. The change

I
n order to support local and national jasa. Komoditas yang kami alihkan berbeda- in procurement of goods are including
suppliers, KPC has initiated a program beda, dimulai dari komoditas berat, seperti heavy equipment, such as equipment
called the Assisted Local Suppliers and 2,935 $3.000.000 peralatan untuk tambang, sampai dengan for mine purposes, as well as smaller
Contractors. Through this program, we 2,860 komoditas kecil, seperti alat tulis kantor, equipment and tools, such as stationery,
nurture local communities in order to be $2.900.000 kapur, percetakan formulir. chalk and form printing.
2,786
able to provide goods and services that we 40 $2.800.000 Beberapa barang seperti seragam, kapur, Some items, such as uniforms, chalk,
need. The Assisted Local Suppliers and
38
rambu lalu lintas, kain majun, bendera traffic signs, cleaning fabrics, mining
Contractors Program is an embodient of 35
$2.700.000
30 34 tambang, alat tulis kantor, dan percetakan flags, stationery, and form printing,
KPCs social responsibility in improving the 31 $2.600.000 form adalah program migrasi yang terkait are parts of migration program that is
growth of local businesses. We assist and
2,460
juga dengan program Pembinaan Usaha related to Local Business Development
mentor local suppliers of the East Kutai $2.500.000
20 Lokal. Migrasi ini dilakukan dengan program. This migration is done by
through KPCs Community Empowerment
$2.400.000 mengalihkan barang yang sebelumnya changing procurement of goods that
Department and Project Management and
disediakan oleh pemasok nasional dan were previously provided by various
Evaluation Department. 10 $2.300.000 lokal Kutai Timur menjadi disediakan oleh national and local suppliers of East Kutai
The Assisted Local Suppliers and Contractors supplier lokal binaan. Selain itu, beberapa to be provided now by the mentored
$2.200.000
has been implemented consistently since pekerjaan seperti penanaman di area local suppliers. In addition, some
2011 2012 2013 2014
2007. The program is managed exclusively by reklamasi, pembangunan mess, akomodasi works, including re-vegetation in the
a sub-section of Local Business Development dan catering mess, pemeliharaan jalan, reclamation area, housing construction,
(LBD) within the Supply Chain Division. Until pembuatan pagar pengaman, land accommodation and catering for housing
JUMLAH PENDUDUK NILAI DALAM 1,000 US$
the end of 2014, there have been a total of 31 monitoring, landscaping, animal and pest facility, road maintenance, safety fencing,
assisted local suppliers with a total value of control telah dimigrasi dan dilaksanakan land monitoring, landscaping and animal
procurement of goods and services from the oleh kontraktor lokal binaan. and pest control, are migrated and
local suppliers amounted to USD 2.86 million. provided by assisted local contractors.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
PRAKUALIFIKASI _Sustainable Partnership

PEMASOK
23 KOMODITAS BARANG TOTAL 6 KOMODITAS JASA
BERHASIL DIMIGRASI BERHASIL DIMIGRASI KE
SUPPLIERS
KE SUPPLIER NASIONAL, SUPPLIER KALIMANTAN PREQUALIFICATION
KALIMANTAN TIMUR, DAN TIMUR, DAN SUPPLIER
SUPPLIER LOKAL KUTAI LOKAL KUTAI TIMUR

23 6 D I
TIMUR BINAAN KPC BINAAN KPC alam proses pemilihan pemasok, seluruh n selecting a supplier, we always conduct
calon pemasok harus mengikuti proses pre-qualification process of prospective
TOTAL OF 23 ITEMS TOTAL OF 6 SERVICES ARE prakualifikasi. KPC selalu memastikan agar suppliers. KPC always ensures that
ARE NOW PROVIDED BY NOW PROVIDED BY EAST perusahaan yang diikutkan tender nantinya companies that are invited to a tender
NATIONAL SUPPLIERS, EAST KALIMANTAN SUPPLIERS dapat memenuhi persyaratan yang dimiliki will be able to meet KPCs requirements,
KO M O D I TA S KALIMANTAN SUPPLIERS KO M O D I TA S AND KPCS MENTORED oleh KPC, antara lain mencakup: persyaratan which cover aspects of administrative
BARANG JA S A administratif, teknis, manajemen lingkungan, requirements, technical, environmental,
AND KPCS MENTORED LOCAL SUPPLIERS FROM
LOCAL SUPPLIERS FROM EAST KUTAI keselamatan dan kesehatan kerja, praktik occupational safety and health, good
ITEMS EAST KUTAI ITEMS ketenagakerjaan yang baik, serta perlindungan employment practice, as well as
terhadap hak-hak karyawan serta hak asasi protection of employees and human rights.
manusia. Prakualifikasi ini juga berlaku bagi Prequalification process is also applicable
210 supplier lokal binaan KPC. to KPCs mentored local suppliers.

3 KOMODITAS BARANG
Selama tahun 2014, terdapat 65 pemasok In 2014, 65 domestic suppliers undertook 211
domestik yang telah mengikuti prakualifikasi pre-qualification process and have been
BERHASIL DIMIGRASI DARI
dan berhasil lolos terdaftar sebagai pemasok successfully registered as our supplier.
PEMBELIAN NASIONAL KE
kami. [G4-EN32][G4-LA14][G4-HR10] [G4-EN32][G4-LA14][G4-HR10]
PEMBELIAN KEPADA SUPPLIER
KALIMANTAN TIMUR, DAN

15 3
SUPPLIER LOKAL KUTAI TIMUR
BINAAN KPC
Kriteria Prakualifikasi
KO M O D I TA S KO M O D I TA S
3 ITEMS PREVIOUSLY PROVIDED Pemasok KPC
BY NATIONAL SUPPLIERS NOW
BARANG BARANG PROVIDED BY EAST KALIMANTAN KPCS SUPPLIER
SUPPLIERS AND KPCS PREQUALIFICATION CRITERIA
ITEMS ITEMS MENTORED LOCAL SUPPLIERS
FROM EAST KUTAI KINERJA LINGKUNGAN - Penilaian atas sistem
15 KOMODITAS BARANG kendali K3L yang diterapkan oleh Supplier
BERHASIL DIMIGRASI DARI dengan acuan OHSAS 18001 atau ISO 14001.
PEMBELIAN LUAR NEGERI KE ENVIRONMENTAL PERFORMANCE - Evaluation
PEMBELIAN KEPADA SUPPLIER on the implementation of occupational and PEMASOK BARU TAHUN 2014
NASIONAL, KALIMANTAN environmental control system by suppliers which New supplier 2014
TIMUR, DAN SUPPLIER LOKAL refer to OHSAS 18001 or ISO 14001.
KUTAI TIMUR BINAAN KPC Wilayah Pemasok Pemasok Jumlah
PRAKTIK KETENAGAKERJAAN - Pemenuhan Pemasok Barang Jasa Pemasok
kewajiban perusahaan pemasok untuk pelaporan Region Goods Services Total
tenaga kerja ke Dinas Tenaga Kerja dan pendaftaran Suppliers Suppliers Suppliers Suppliers
15 ITEMS PREVIOUSLY PROVIDED
peraturan perusahaan ke Dinas Tenaga Kerja.
BY FOREIGN SUPPLIERS NOW Pemasok Kutim
1 21 22
PROVIDED BY EAST KALIMANTAN LABOR PRACTICE - Suppliers compliance on Kutim Suppliers
SUPPLIERS AND KPCS labor data reporting and registration of company Pemasok Kaltim
MENTORED LOCAL SUPPLIERS regulation to the National Labor Office. 4 4 8
Kaltim Suppliers
FROM EAST KUTAI
HAK ASASI MANUSIA - Pemenuhan pemasok Pemasok Nasional
18 17 35
terkait adanya kontrak kerja karyawan, sistem National Suppliers
pengupahan dan jaminan kesehatan dan Pemasok Luar Negeri
keselamatan kerja karyawan. 6 17 23
International Suppliers
HUMAN RIGHTS - Suppliers compliance on the Total Pemasok Baru
29 59 88
existence of employment contract, remuneration Total New Suppliers
system, and employee health and safety
insurance.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
PEMANTAUAN AKTIVITAS DAN KINERJA _Sustainable Partnership

PEMASOK MELALUI SUPPLIER AND


Melalui sistem ini, seluruh kontraktor yang berada di Through this system, performance of all
CONTRACTOR MANAGEMENT SYSTEM bawah pengawasan SCMS akan dievaluasi kinerjanya contractors under SCMS will be evaluated

(SCMS) DAN AUDIT SUMBER DAYA dengan merujuk pada KPI (Key Performance
Indictor) yang telah ditentukan. Berdasarkan hasil
according to KPI (Key Performance
Indicator) that have been determined. From
MANUSIA (SDM) evaluasi yang kami peroleh, nilai CPE pada tahun
2014 yaitu 80,02%, menunjukan peningkatan cukup
evaluation results we obtained, the score
of CPE in 2014 was 80.02%, a significant
signifikan dibandingkan dengan nilai CPE pada tahun improvement compared to CPE score in the
MONITORING SUPPLIER ACTIVITIES AND sebelumnya. previous year.
PERFORMANCE THROUGH SUPPLIER AND Selain itu, kami juga sudah menerapkan audit terkait In addition, we have also implemented audit
CONTRACTOR MANAGEMENT SYSTEM (SCMS) dengan aspek sumber daya manusia (HR Audit). HR related to human resources (HR Audit). HR
Audit merupakan salah satu klausul dalam SCMS Audit is one of the clauses in SCMS which
AND HUMAN RESOURCES (HR) AUDIT yang bertujuan untuk memastikan para mitra usaha aims to ensure that KPC business partners
[G4-EN32][G4-LA14][G4-HR10] KPC mematuhi prinsip-prinsip yang dipersyaratkan will comply with the specific principles
dalam kontrak, khususnya dalam bidang required in the contract in the areas of
ketenagakerjaan, hak asasi manusia, keselamatan employment, human rights, occupational

K K
PC senantiasa bertanggung jawab untuk PC is always responsible in ensuring dan kesehatan kerja dan pemenuhan kewajiban health and safety and the fulfillment of
212 memastikan efektivitas kinerja seluruh effective performance of our contractors. perusahaan kepada karyawan. company obligations to their employees.
kontraktor. Oleh sebab itu, KPC dalam hal ini
turut serta berperan dalam memperhatikan risiko
Therefore, KPC also gives attention on
potential risks that might present from Beberapa aspek yang menjadi fokus HR audit Some aspects which become the focus 213
komersial, teknis, lingkungan dan Kesehatan commercial, technical, Health Safety and pada tahun 2014, antara lain mengenai kewajiban of HR audit in 2014 are obligations of our
Keselamatan Kerja (K3) para supplier dan environmental (HSE) aspects of our suppliers perusahaan kontraktor dan supplier kami dalam contractors and suppliers in salary payment,
kontraktor. and contractors. pembayaran upah, pemenuhan hak-hak dan fulfillment of employees rights and taxation,

P
perpajakan karyawan, kepatuhan pada persyaratan compliance with administrative requirements
ada tahun 2013, kami telah meningkatkan In 2013, we have upgraded our Contractor administrasi, dan pelaporan dalam rangka and reporting activities to meet government
sistem CMS (Contractor Management System) Management System (CMS) into Supplier and memenuhi peraturan pemerintah. Pada tahun 2014, regulations, among others. In 2014, HR audit
perusahaan menjadi SCMS (Supplier and Contractor Management System (SCMS). This HR audit dilaksanakan dengan tingkat pencapaian result scored 79.35%.
Contractor Management System). Sistem ini system aims to ensure that all procurement 79,35 %
bertujuan untuk memastikan bahwa semua of goods and services under KPCs contract
pengadaan barang dan jasa yang terikat kontrak will be carried out by competent suppliers and Pada tahun 2014, sebagai rencana perbaikan In 2014, as a plan for continuous improvement
dengan KPC dikerjakan oleh supplier dan kontraktor contractor, according to specifications, within berkesinambungan terkait pelaksanaan dan tindak on the implementation and follow-up of HR
yang kompeten, sesuai spesifikasi, sesuai anggaran budget and without incidents, as well as in lanjut HR Audit, KPC telah melakukan pengkategorian Audit, KPC has categorized audit findings
dan tanpa insiden, serta sesuai dengan persyaratan accordance with specific KPC requirements, terkait temuan, yaitu major level 1, major level 2, into major level 1, major level 2 and minor,
KPC, termasuk persyaratan terkait pengendalian including requirements related to control dan minor sebagai antisipasi bagi kontraktor yang in anticipation for contractors committing
dampak lingkungan, K3, teknis dan komersial. on environmental impacts, SHE, technical melakukan pelanggaran, dimana untuk: violations. Categorization is made for:
Seluruh supplier dan kontraktor KPC wajib and commercial. All KPC suppliers and MAJOR LEVEL 1 Kontraktor/supplier terkait MAJOR LEVEL 1 The contractor/supplier
memenuhi persyaratan yang tertuang dalam SCMS contractors shall meet the requirements akan diberikan waktu 1 bulan untuk melakukan will be given one month time to make
tanpa terkecuali. stated in SCMS without exception. tindakan perbaikan yang dilanjutkan dengan corrective actions, followed by suspension
Kami juga selalu mengadakan safetytalk rutin We also conduct regular safety talk as a form penangguhan CMS-ToW untuk peringatan of CMS-ToW for second warning (with
sebagai bentuk dukungan kami kepada supplier of support to our suppliers and contractors kedua (dengan masa perbaikan 2 minggu), dan a 2-week correction period), and then
dan kontraktor untuk meningkatkan kinerja to improve their safety performance. Safety pembatalan CMS-ToW atau pembatalan kontrak cancellation of CMS-ToW or cancellation
keselamatan kerja (safety). Safetytalk ini berguna talk also functions to provide information untuk peringatan ketiga (final). of contract for third warning (final).
untuk mensosialisasikan SCMS, serta sarana on SCMS, as well as to prevent accidents on MAJOR LEVEL 2 Kontraktor/supplier terkait MAJOR LEVEL 2 The contractor/supplier
untuk mencegah terjadinya kecelakaan kerja pada ongoing projects. akan diberikan peringatan pertama dengan will be given first warning and one month
proyek-proyek yang sedang berjalan. durasi 1 bulan untuk tindakan perbaikan period to make corrective actions, followed
In addition, SCMS also stated and imposes
Di samping itu, SCMS turut memuat dan requirements relating to aspects of protection dilanjutkan dengan penangguhan CMS-ToW by suspension of CMS-ToW Contractor. For
memberlakukan persyaratan yang berhubungan of human rights, namely labor agreement Kontraktor. Untuk peringatan kedua, kontraktor second warning, contractor and supplier
dengan aspek perlindungan terhadap hak asasi for each contractor employee, membership dan supplier akan diberikan masa perbaikan will be given a period of 2 weeks to make
manusia, yaitu perjanjian kerja setiap karyawan of every contractor employees in the dengan jangka waktu 2 minggu. Bilamana corrective actions. If HR audit findings have
kontraktor, terdaftarnya karyawan kontraktor social security system, and a statement temuan audit HR belum diperbaiki sampai not been corrected until the issuance of third
dalam keanggotaan Jamsostek, dan pernyataan gaji of employees minimum salary and salary dengan peringatan ketiga (final), KPC akan warning (final), KPC will cancel CMS-ToW or
minimum karyawan beserta komponen gaji. components. membatalkan CMS-ToW atau kontrak dengan terminate the contract with that particular
kontraktor/supplier terkait. contractor/supplier.
Pemantauan implementasi dan pemenuhan Upon implementation and compliance with the
persyaratan SCMS oleh para supplier dan requirements of SCMS by KPC suppliers and MINOR Kontraktor/supplier diwajibkan untuk MINOR The contractor/supplier is
kontraktor KPC kami pantau secara rutin melalui contractors, KPC performs routine monitoring melakukan tindakan perbaikan dalam jangka required to make corrective actions
2 macam audit berkala, yakni Contract Performance through two periodic audits, namely Contract waktu yang disepakati oleh KPC dan pihak within a period agreed by KPC and the
Evaluation (CPE) dan Human Resources (HR) Audit. Performance Evaluation (CPE) and Human kontraktor/supplier. contractor/supplier.
Resources (HR).

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
INDRA CAHYO Direktur / Director _Sustainable Partnership
SAPUTRA PT. TUNGGAL IKA SAKTI

S C
aat ini, perusahaan kami bergerak di bidang urrently, PT Tisa is engaged in the
reklamasi dan supplier di KPC. Dengan jumlah reclamation and suppliers in KPC. With a
karyawan yang semakin banyak, telah banyak growing number of employees, we have
pula perubahan dan perkembangan yang kami undergone many changes and developments
alami sejak awal berdiri hingga sekarang. Secara since the beginning of our establishment
kualitas, saat ini pekerjaan kami menjadi semakin until now. In quality, our work is now getting

M
baik. Pengetahuan dan implementasi kami terkait better. Our knowledge and the implementation eskipun baru sekitar 7 bulan menjalin kerjasama dengan
keselamatan kerja juga semakin meningkat. Di of safety related work is also increasing. In KPC, kami mengucapkan terima kasih kepada External Dept.
samping itu, kami dapat merekrut lebih banyak addition, we were able to recruit more people PT. KPC atas kesempatan yang telah diberikan dalam rangka
orang yang tersisihkan dalam masyarakat yang are marginalized in our society then coached memberdayakan SDM serta menumbuhkan ekonomi lokal. Sebagai
kemudian kami bina menjadi lebih baik. Jumlah for the better. The number of employees we perusahaan lokal, kami telah mendapatkan bimbingan yang
karyawan kami yang awalnya hanya 12 orang, were originally only 12 people, has risen to 65 maksimal berkat kerjasama yang baik serta hubungan yang sangat
telah meningkat menjadi 65 orang. Hal tersebut people. It also provides a positive economic harmonis antara KPC dan PT. Roliz Jaya Utama. Komitmen KPC
juga memberikan dampak positif secara ekonomi impact for the environment surrounding our selama ini dalam aspek sosial, lingkungan, dan hubungan dengan
bagi lingkungan sekitar perusahaan kami. Kami company. We have worked with KPC for more pemangku kepentingan, khususnya mitra kerja, kami lihat sangat baik
214 telah bekerjasama dengan KPC selama lebih dari than 8 years. During that time we see KPC's HARUN ROSYID dikarenakan KPC selalu memberikan bimbingan dan dorongan bagi
8 tahun. Selama itu kami melihat komitmen KPC commitment to the partner in particular kami untuk berkembang. Sebagai perusahaan lokal, kami juga sangat 215
terhadap mitra kerja khususnya sudah cukup has been good, but there are still some terdorong untuk berkomitmen menciptakan lingkungan yang indah
baik, namun masih ada beberapa area yang dapat areas that could be improved for the quality dan menggerakan ekonomi lokal menuju masyarakat yang madani.
ditingkatkan kualitas implementasinya, antara of its implementation, including: fairness Ke depan, kami berharap KPC dapat meningkatkan kerjasama
lain: fairness dalam pelaksanaan penilaian kinerja in implementing partner performance dengan perusahaan lokal mengingat masih banyak SDM lokal dan
mitra, dukungan terhadap mitra kerja lokal dan assessment, support for local partners perusahaan lokal yang mempunyai kompetensi yang cukup untuk
penggunaan produk dalam negeri. Harapan kami, and the use of domestic products. Our diajak bekerjasama, agar tercipta ekonomi lokal yang mandiri. Kami
agar KPC tetap terus berkomitmen memelihara, expectation that KPC still remains committed juga mengharapkan kerjasama yang berkelanjutan dan pembinaan
bekerjasama dan melakukan pembinaan yang to nurturing, cooperating, and fostering yang terus menerus baik di bidang SDM maupun penambahan
lebih baik. Keberpihakan terhadap mitra lokal better. The support for the local partners is lowongan pekerjaan agar dapat menyerap tenaga lokal yang lebih
juga perlu ditingkatkan, mengingat untuk also needed to be improved, given to certain banyak serta mengurangi pengangguran.
kegiatan-kegiatan tertentu mitra lokal secara activities of local partners in quality is not
kualitas tidak kalah dengan mitra non lokal. inferior to non-local partners.

A
lthough only about 7 months we are cooperating with KPC, we
Manajer / thank the External Dept. PT. KPC for the opportunity that has
Manager been given in order to empower human resources and grow the

S S
ejak menjalin kerjasama pada 2006, KPC ince cooperating in 2006, KPC always local economy. As a local company, we have obtained the maximum
PT. ROLIZ
senantiasa peduli terhadap lingkungannya. care about the environment. During guidance for the good cooperation and a very harmonious relationship
JAYA UTAMA
Selama 9 tahun bekerjasama dengan 9 years of cooperating with KPC, we between KPC and PT. Roliz Jaya Utama. KPC's commitment for the
KPC, kami melihat adanya komitmen yang see a strong commitment from KPC to social aspects, the environment and relations with stakeholders,
tinggi dari KPC terhadap aspek sosial dan the social and environmental aspects, particularly local partners, we see it has implemented very well
lingkungan, khususnya bagi pengembangan in particular for the development because the company always provides guidance and encouragement
dan pembinaan kontraktor lokal sebagai and fostering of local contractors as for us to develop. As a local company, we are also very encouraged
mitra kerja. Di saat yang sama, kami juga partners. At the same time, we also to commit to creating a beautiful environment and supporting the
selalu mendukung adanya komitmen always supported the existence of that local economy towards civil society. In the future, we expect KPC can
tersebut. Oleh karena itu, ke depan, commitment. Therefore, in the future, improve cooperation with local companies because there are many
kami harapkan KPC dapat lebih we expect KPC can increase the local human resources and local companies that have sufficient
meningkatkan perhatiannya attention to the local community competence to work with, in order to create an independent local
terhadap masyarakat lokal through the Development economy. We also expect ongoing collaboration and continuous
melalui Committee Development Committee. We always hope that development both in the field of human resources and additional jobs
yang dimiliki. Kami selalu guidance to local contractors in order to absorb more local power and reduce unemployment.
berharap agar pembinaan can be improved, as well
terhadap kontraktor lokal as the payment of
dapat lebih ditingkatkan, the invoice can be
serta pembayaran terhadap accelerated.
invoice dapat dipercepat.

Direktur / Director
JUNAIDI
CV. SEMOGA DARMA JAYA

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
_Sustainable Partnership
Manajer / Manager
HERLI TAUFIK RAHMAN PT ARIF PUTRA PRATAMA (APP)

K
ami telah bekerjasama dengan KPC dan kerjasama kami, melaksanakan hubungan

S S
erjasama kami dengan KPC dimulai pada 2002 ur partnership with the KPC started in 2002 sejak 10 tahun yang lalu. Kami melihat, vertikal dan horizontal antara manajemen dan
untuk project CSR di Desa Sekerat. Selama menjalin for CSR project in Desa Sekerat. During apa yang dibangun dan dijalankan aspek sosial dengan baik, dan selalu memotivasi
kerjasama, KPC selalu mendorong profesionalitas. the cooperation, KPC always encourage selama ini sudah sangat baik, sehingga serta membina kami dalam hal keselamatan
KPC mendorong kami untuk terus berkembang sebagai professionalism. KPC encouraged us to continue penting untuk dapat ditingkatkan dan kerja terhadap karyawan kami secara intens. Di
kontraktor lokal. Kami melihat komitmen yang baik dari to grow as local contractors. We see the high dikembangkan dengan maksimal. samping itu, KPC juga senantiasa menyelesaikan
KPC dalam dalam aspek sosial, lingkungan, dan hubungan commitment of KPC in the social, environmental, Ketersediaan Sumber Daya Manusia permasalahan dengan perusahaan lain melalui
dengan pemangku kepentingan, khususnya mitra kerja. and relationships with stakeholders, particularly yang masih minim di perusahaan kami, musyawarah tanpa merugikan salah satu pihak,
Hal tersebut terbukti dengan banyaknya penghargaan local partner. This can be seen by the number of menyebabkan perusahaan yang bergerak di memberikan bantuan permodalan tanpa bunga,
yang diterima selama ini. Hubungan dengan kontraktor awards received over the years. Relations with barang dan jasa ini sering kali menghadapi serta membangun sarana dan prasarana umum
lokal juga berjalan dengan baik. KPC selalu proaktif the local contractors are also going well. KPC hambatan. Disamping itu, faktor alam juga di sekitar usaha di setiap tahunnya. Dari aspek
dalam melakukan pembinaan. Sebagai kontraktor lokal, has always been proactive in fostering. As a local kerap kali menjadi salah satu penghambat. lingkungan, perusahaan kami saat ini sudah mulai
kami merasakan kepuasaan atas pendampingan yang contractor, we feel satisfaction over the assistance Oleh sebab itu, kami berharap KPC dapat menyadari hal-hal terkait pembersihan limbah
diberikan KPC. APP telah mendapatkan CMS pertama provided by KPC. APP has gained the first CMS turut serta membantu kinerja perusahaan dan pemanfaatnya, pentingnya pelestarian hutan,
216 pada tahun 2004. Kemudian kami juga mendapatkan in 2004. Then we also get a project for Bengalon kami dalam beberapa aspek seperti serta pengurangan penggunaan radiasi kimia yang
project untuk area Bengalon. Pada 2007, kami mendapat
kontrak yang pertama dengan KPC. Bersama KPC,
area. In 2007, we got the first contract with KPC.
Together, we are always encouraged to have a
finansial, modal, serta pemikiran sehingga
perusahaan kami dapat setara dengan
berdampak negatif terhadap lingkungan. Ke depan,
kami berharap KPC dapat meningkatkan komitmen 217
kami selalu terdorong untuk memiliki dan menjalani commitment of corporate responsibility and will kontraktor lain di luar daerah yang saat terkait pemanfaatan hutan, SDM, untuk kepentingan
komitmen tanggungjawab perusahaan akan keberlanjutan undergo environmental sustainability, social and ini lebih maju. Bagi kami, KPC memiliki bersama. Di samping itu, KPC juga mampu
lingkungan, sosial dan ekonomi sekitar, khususnya economic around, especially in environmental komitmen yang kuat antara lain: dalam membangun informasi dan komunikasi bisnis yang
ekonomi di lingkungan Bengalon, dengan merekrut economics in Bengalon, by hiring local employees memberikan terobosan-terobosan baru lebih maju, meningkatkan mutu pelayanan, serta
karyawan lokal Bengalon. Komitmen terhadap lingkungan Bengalon. Our commitment to the environment di sektor penjualan ekonomi tambahan, saling meningkatkan kepercayaan antara kedua
juga kami lakukan dengan mengikuti standar KPC dalam is also done by following the KPC standard in mengantisipasi kendala-kendala yang belah pihak. Kami berharap, kelak kami dapat
setiap pekerjaan. Harapan kami, PT. APP dapat menjadi every job. Our hope, PT.APP can be an example mungkin terjadi di sektor internal dan melakukan ekspansi usaha bidang yang lain sesuai
contoh bagi kontraktor lokal lain untuk terus maju dan for other local contractors to go ahead and still be ataupun global yang dapat merusak usaha kapabilitas yang kami miliki.
tetap dipercaya untuk berkarya bersama KPC. trusted to work together with KPC.

Direktur Utama / President Director


HAMKA DARASA PT HIKMAH BAMBAPUANG

W
e have worked with KPC since 10 in terms of safety for our
General Manager / General Manager years ago. We see KPC has built employees. In addition,
NIKO WINATA and run a good business, so it is KPC also continues
PT TRIWISNNA
important to be improved and developed to solve the problems
to the maximum. Availability of Human through consultation with
Resources are still minimal in our other companies without

B F
agi kami, KPC adalah perusahaan tambang kelas or us, KPC is a world class mining company company, causing our company engaged harming either party,
dunia yang memiliki manajemen profesional dan which has a professional management in goods and services often face obstacles. provide capital assistance
dijalankan dengan prinsip-prinsip usaha yang jelas, and run the business principles are clear, In addition, natural factors also often without interest, and to
terarah dan berkesinambungan. Selama kurang lebih 10 focused and sustainable. For approximately be one of the obstacles. Therefore, we build public facilities
tahun bekerjasama dengan KPC, kami melihat komitmen 10 years in collaboration with KPC, we see expect the KPC can participate and help and infrastructure around business annually.
yang kuat dari KPC untuk memenuhi kewajiban- a strong commitment from the KPC to meet our company performance in several From the aspect of environment, our company is
kewajiban sosial, lingkungan, masyarakat, serta mitra social obligations, environmental, community aspects such as financial, capital, and now beginning to realize related matters waste
kerja. Mitra kerja diberikan kesempatan untuk tumbuh and business partners. Partners are given the ideas so that our company can be on par cleanup and beneficiaries, the importance of forest
dan berkembang bersama-sama. Di saat yang sama, opportunity to grow and develop together. At the with other contractors outside the area conservation, and reduced use of chemical radiation
kami juga berkomitmen untuk memiliki tanggung jawab same time, we are also committed to having which today is more advanced. For us, that have a negative impact on the environment.
akan keberlanjutan lingkungan, sosial, dan ekonomi responsibility for environmental sustainability, KPC has a strong commitment to provide Going forward, we expect KPC can increase the
sekitar sebagai misi perusahaan yang didukung penuh social, and economic around a corporate mission new breakthroughs in the sector of the utilization of forest-related commitments, human
oleh manajemen kami. Kami berharap kerjasama yang supported by our management. We hope the sale of additional economic, anticipating resources for the common good. In addition, KPC is
terjalin ini dapat terus berlangsung dan Triwisnna dapat cooperation can continue and Triwisnna can obstacles that may occur in the sector of also able to build information and communication
memberikan kontribusi bagi KPC dengan memperoleh contribute to KPC to obtain another job more internal and globally that could damage more advanced business, improve service quality,
pekerjaan lain yang lebih menantang. challenging. efforts and our cooperation, implementing and increase mutual trust between the two sides.
the relationship vertically and horizontally We hope that someday we can work in the other
between management and social aspects areas for our business expansion related to our
well, and always motivate and nurture us capabilities.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
BUKU PANDUAN KODE ETIK Berkelanjutan
_Sustainable Partnership
DAN SYARAT UMUM KONTRAK
CODE OF CONDUCT AND
GENERAL TERMS AND CONDITIONS Supplier Safety Meeting Supplier Safety Meeting
Sejak tahun 2012 melalui Supply Department, kami Since 2012, through Supply Department, we

B T
uku Panduan Kode Etik dan Syarat Umum Kontrak he Code of Conduct and General Terms and telah melakukan supplier safety meeting secara rutin have been conducting regular supplier safety
diterbitkan oleh KPC sebagai komitmen kami Conditions is issued by KPC as a commitment yang bertujuan untuk meningkatkan kesadaran meeting that aims to increase awareness of
untuk selalu menjunjung tinggi prinsip saling to always uphold the principle of mutual trust supplier akan K3. Pada tahun 2014, kami kembali supplier on SHE. In 2014, we held Supplier
percaya dengan seluruh pemasok. Semua pemasok with all suppliers. All KPC suppliers are obliged to mengadakan supplier safety meeting. Supplier Safety Safety Awareness Meeting on December 11,
KPC berkewajiban untuk menandatangani Buku sign the Code of Conduct and General Terms and Awareness Meeting 2014 dilakukan pada tanggal 11 2014, which was attended by 34 Suppliers
Panduan Kode Etik dan Syarat Umum Kontrak Conditions, which include a clause on human rights Desember 2014, yang dihadiri oleh 34 Supplier dan and SCD Management. The purpose of 2014
ini, termasuk klausul hak asasi manusia, yang that will be signed by the companys top leader and Manajemen SCD. Tujuan pelaksanaan Supplier Safety Supplier Safety Awareness Meeting are to
ditandatangani oleh pimpinan tertinggi Perusahaan their employees. Until the end of 2014, all of our Awareness Meeting 2014, yaitu: raise awareness on the following aspects:
dan karyawan yang bersangkutan. Hingga akhir tahun suppliers, including the new ones, had signed the
1. Operasi bebas insiden fatality 1. Zero fatalities operation
2014, seluruh pemasok kami termasuk pemasok baru Code of Conduct and General Terms and Conditions.
sudah menandatangani Buku Panduan Kode Etik dan 2. Penurunan Tingkat kekerapan 2. Decrease in the frequency rate
Syarat Umum Kontrak. incident dan kerugian of incidents and losses
218 3. Peningkatan kompetensi dan
kesadaran terkait K3L
3. Increased competence and
awareness on SHE
219
FORUM KOMUNIKASI DAN DISKUSI 4. Mencegah pencemaran lingkungan 4. Preventing environmental pollution

COMMUNICATION AND DISCUSSION FORUM Supplier Award Supplier Award


Supplier Award merupakan ajang apresiasi para Supplier Award is a form of appreciation
mitra usaha kami atas dukungan, kerjasama, dan to our business partners for their support,

U T
ntuk menjaga dan mempererat hubungan yang o maintain and strengthen the harmonious unjuk kinerja mereka yang sangat baik. Ajang yang cooperation, and their excellent performance.
lebih baik dan harmonis antara KPC dan para relationship between KPC and suppliers, we have diinisiasikan KPC pada tahun 2012 ini dilaksanakan KPC initiated the event in 2012 and is held
supplier, kami telah membentuk beberapa forum established some communication and discussion setiap 2 tahun sekali. Aspek-aspek yang dinilai every two years. Aspects of suppliers and
komunikasi dan diskusi. forum. dalam ajang ini adalah unjuk kinerja para supplier contractors performances that are assessed
dan kontraktor, antara lain tapi tidak terbatas pada in this event are including, but is not
Supplier Communication Meeting Supplier Communication Meeting unjuk kerja pengiriman atau unjuk kerja penyediaan, limited to, the performance of the delivery
KPC menggelar Supplier Communication Meeting KPC holds Supplier Communication Meeting once akurasi dalam penyediaan barang atau jasa, total or performance of the provision, accuracy
setiap dua tahun sekali. Pertemuan ini bertujuan every two years. This meeting aims to gather belanja, evaluasi teknis, evaluasi komersial, dan in the provision of goods or services,
untuk menggali informasi dan mendapatkan umpan information and get feedback from our suppliers. In komunikasi. total expenditure, technical evaluation,
balik dari pihak supplier. Dalam pertemuan ini, KPC this meeting, KPC provides latest information about commercial evaluation, and communication.
memberikan informasi mengenai perkembangan the Company, including short-term and long-term
perusahaan termasuk rencana kegiatan jangka action plans to all contractors and suppliers. In
pendek dan jangka panjang perusahaan kepada order to support the performance of suppliers and
seluruh kontraktor dan supplier. Dalam rangka untuk contractors, KPC holds Supplier Award event during
mendukung kinerja para Pemasok (supplier dan Supplier Communication Meeting that will be given
kontraktor), salah satu upaya KPC adalah dengan to Suppliers with good performances.
menambahkan sesi Supplier Award pada Supplier
Communication Meeting yang diberikan kepada
Pemasok yang memiliki performa yang baik.

Supplier Visit & One-on One Meeting Supplier Visit & One-on-One Meeting
Supplier visit secara rutin kami lakukan dengan tujuan We routinely visit our suppliers to have discussions
untuk mendiskusikan service level, performance, on service level, performance, and supply chain.
dan supply chain. Disamping itu, kami juga rutin In addition, we regularly maintain communication
menjaga komunikasi dengan seluruh kontraktor with all contractors and suppliers through One-on-
dan supplier melalui One-on-One Meeting. Dengan One Meeting. By establishing good communication
menjalin komunikasi yang baik antara kami dan pihak between us and the supplier, we hope to be
pemasok, kami berharap dapat bersikap proaktif dalam proactive in accommodating any complaints and
menampung berbagai keluhan dan saran sebagai suggestions, as a part of future improvements.
bagian dari upaya perbaikan di masa mendatang.

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Kemitraan yang
Berkelanjutan
_Sustainable Partnership

SUPPLIER AWARD 2014


SUPPLIER AWARD 2014

P I
ada September 2014, KPC kembali n September 2014, KPC held Supplier Award,
menyelenggarakan Supplier Award, yang which was a part of a series of events Supplier
merupakan bagian dari rangkaian acara Supplier Communication Meeting that was attended
Communication Meeting. Sebanyak 108 supplier dan by a total of 108 suppliers and contractors. The
kontraktor turut ambil bagian dalam pertemuan yang Supplier Communication Meeting, a regular
digelar secara berkala tiap dua tahun sekali ini, di event every two years, was held at the Aston
Hotel Aston Balikpapan. Balikpapan Hotel.
Supplier Award merupakan bentuk apresiasi KPC Supplier Award is KPCs appreciation
kepada para supplier dan kontraktor yang telah to suppliers and contractors that have
menunjukkan performance terbaik mereka. Dengan demonstrated their best performances. By
adanya penghargaan ini, KPC berharap dapat terus presenting the award, KPC expects to continue
220 memotivasi para supplier dan kontraktor untuk terus motivating the suppliers and contractors to
berkembang bersama KPC. continue growing together with KPC. 221
Supplier Award sendiri dibagi menjadi empat Supplier Award is divided into four categories
kategori, yaitu supplier dan kontraktor untuk skala of suppliers and contractors: East Kutai,
Kutai Timur, Kalimantan Timur, Nasional, serta East Kalimantan, National, and International. PROSES PENGADAAN FAIR AND
Internasional. Terkait dengan penghargaan untuk
kategori kontraktor Kutai Timur yang berhasil
Regarding winning an award in East Kutai
category, which was won by PT TRISWISNA,
BARANG & JASA TRANSPARENT
PROCUREMENT
dimenangkan oleh PT TRISWISNA, Simon Winata, Simon Winata, the Director of PT TRIWISNA, YANG ADIL PROCESS OF GOODS
selaku Direktur PT TRIWISNNA mengungkapkan rasa
syukur atas penghargaan yang telah diberikan serta
expressed his gratitude for the award that was
given and thanked KPC for the opportunity and DAN TRANSPARAN & SERVICES
mengucapkan terima kasih atas kesempatan dan ongoing support given by KPC. According to
dukungan KPC selama ini. Menurut Simon Winata, PT Simon Winata, PT TRISWISNA always commits
TRISWISNA selalu berkomitmen untuk meningkatkan to improve their company performance
kinerja dan daya saing perusahaan, terutama dalam and competitiveness, particularly in the
penerapan K3L dan kualitas pekerjaan secara implementation of SHE and improvement of

K K
konsisten dan berkesinambungan. work quality, consistently and continuously. PC senantiasa melakukan proses PC continues to conduct a fair
pengadaan barang dan jasa and transparent procurement
yang adil dan transparan. Kami process of goods and services.
mengundang beberapa kontraktor We invite several contractors
SUPPLIER KUTAI TIMUR : CV. RAMAYANA SARI JAYA dan supplier untuk mengikuti proses and suppliers to participate in
PEMENANG Kutai Timur Supplier tender atau pemilihan rekanan. Dengan a tender or selection process of
SUPPLIER AWARD
diadakannya proses tender, maka a partner. By ongoing through a
TAHUN 2014 YAITU: SUPPLIER KALIMANTAN TIMUR : CV. BATUBARA MAS ABADI
Kalimantan Timur Supplier kredibilitas, kewajaran, keadilan, serta tender, credibility, fairness, justice,
2014 SUPPLIER kepercayaan para pemasok terhadap and trust of our suppliers can
AWARD WINNERS SUPPLIER NASIONAL
: PT. KALTIM NITRATE INDONESIA kami dapat diterapkan. Proses tender be shown. Our tender process is
ARE: National Supplier kami laksanakan sesuai dengan SOP carried out in accordance with
SUPPLIER LUAR NEGERI yang ditentukan oleh Departemen Supply the applicable SOP, which is
: MITSUI & CO., LTD. dan
International Supplier KPC. Jika terjadi suatu kondisi di mana determined by Supply Department
BRIDGESTONE CORPORATION
terdapat keperluan yang sangat penting of KPC. If there is a very important
KONTRAKTOR KUTAI TIMUR atau mendesak, maka pihak end user or urgent condition, an end user
: PT. TRIWISNNA
Kutai Timur Contractor dapat menunjuk langsung mitra supplier can directly appoint a supplier
KONTRAKTOR KALIMANTAN TIMUR atau kontraktor dengan melengkapi or contractor partner by filing
: PT. BUDHI WIGUNA PRIMA
Kalimantan Timur Contractor Waive To Tender Document. Penunjukan a Waive To Tender Document.
sendiri harus dilakukan dengan The appointment itself had to be
KONTRAKTOR NASIONAL persetujuan dari manajemen KPC yang done with the approval of the KPC
: PT. BUKIT MAKMUR MANDIRI UTAMA
Nasional Contractor berwenang. management

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Struktur Organisasi
_Organization Structure

STRUKTUR ORGANISASI BOARD OF


COMMISSIONERS
ORGANIZATION STRUCTURE G4-34
BOARD OF AUDIT
DIRECTORS COMMITTEE

CHIEF
EXECUTIVE
OFFICER
SECRETARY
TO CEO ENDANG
RUCHIJAT
MEYANTI
DJOKO

CHIEF CHIEF
OPERATING FINANCIAL
OFFICER OFFICER
M. RUDY ASHOK
MITRA

GENERAL GENERAL GENERAL GENERAL GENERAL GENERAL GENERAL


MANAGER GENERAL GENERAL GENERAL GENERAL GENERAL HEAD OF GENERAL HEAD OF
MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER PROJECT MANAGER MANAGER INTERNAL
MINING MANAGER CONTRACT
MANAGER COAL
MANAGER
LEGAL HUMAN EXTERNAL MARKETING
HEALTH, SAFETY,
MINING MINING PROCESSING & EXPANSION SUPPLY FINANCE AUDIT
DEVELOPMENT AFFAIRS & MINING ENVIRONMENTAL BUSINESS CHAIN
RESOURCES & SECURITY OPERATIONS SUPPORT HANDLING TEAM IMPROVEMENT
ADRI KURNIA SHANE SUSTAINABLE DEV. (ACTING) LUFTI
HERLAN RIO SUPIN
BENNETT KHUDORI HUSEIN AKMA SIAGIAN (ADE IMANUEL HENDRO UNTUNG ASMIT BARTLEY HENDRAWAN PRATIKTO JULIAN
SYARIFUDIN) MANEGE ICHWANTO PRIHARDIYANTO ABDULLAH HOPKINS

MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER


MANAGER CONTRACT MANAGER MANAGER MANAGER MANAGER MANAGER
LEGAL GEOLOGY COMPENSATION MANAGER MINING HEAVY MANAGER MANAGER BUSINESS INTERNAL
COMMUNITY MARKETING MINING ENVIRONMENT MARINE
INFRASTRUCTURE LOGISTICS TREASURY
& BENEFIT (ACTING) OPERATIONS EQUIPMENT SUPPORT BUSINESS ANALYST AUDIT
EMPOWERMENT (PT DH- MAINTENANCE IMPROVEMENT
(VACANT) ARYO BENGALON) PROJECT AGUNG WIWIN
SUSATYONO TULUS DARWIN AGUS LAWRENCE WANDI IFFAN
SIREGAR NURUL (KRIS PADINANUNG (VACANT) PRIBADI ANTARINI
M. KARIM MANURUNG RENGGANA TAUFIQ RUPA MAHA KAMAJAYA FANANI
ARMSTRONG PRANOTO)
UROHMAN
TOBING

ADVISOR MANAGER
SOCIO MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER
LEARNING & SALES CONTRACT OCCUPATIONAL, MANAGER COAL HANDLING MANAGER RISK & ASSET CORPORATE
POLITICAL MINE LAND PIT BINTANG HAUL TRUCK PROCUREMENT BUSINESS RISK & AUDIT
DEVELOPMENT MANAGEMENT OPERATIONS MINING TCI HEALTH & & TERMINAL EXPANSION IMPROVEMENT SUPPLY MANAGEMENT
AFFAIR PLANNING MAINTENANCE
MAINTENANCE
SAFETY PROJECT
SUMARYANTO POSMAN SELSUS GEDE NGURAH HARLYN (RAMA
ARIF RUSMIN BAMBANG TINA M. BINA SUSILO ARI DIDIK ARDI INDRAYANA)
SIRAIT SEMBIRING HARYADI WAHYUDI ANTON AMBARA MARGUSUNO SIANTURI
S. SAKTI SIRAIT SUHARDI
WARDONO SUPRAJOGI

MANAGER MANAGER MANAGER MANAGER MANAGER


EXTERNAL MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER
MANAGER COAL
ACCOUNTING
EXTERNAL CONTRACT PROCESSING COAL STORES &
REPORTING STRATEGIC INDUSTRIAL COAL SECURITY PIT HATARI EXCAVATOR INVENTORY & TAX (ACTING)
PLANNING RELATIONS RELATIONS MINING PMA PLANT HANDLING
TECHNOLOGY MAINTENANCE CONTROL
RACHMAD RICHARD OPERATION FACILITIES
ZAINURI (EKO
D. FAJAR (VACANT) M. NISPALAH ADE LUBIS SITOHANG WIWIN FITRIANDRI)
HASRUL SANI SYARIFUDIN HERU SUPRIS SYAHRINIL
(VACANT) SUJATI RUDIANTO
PRAPTONO RIZAL

MANAGER MANAGER MANAGER MANAGER MANAGER MANAGER


PROJECT CONTRACT MANAGER MANAGER POWER
HSES PIT JUPITER MAINTENANCE COAL PROCESSING COST
MANAGEMENT MINING ISSUES SYSTEMS PLANT ELECTRICAL CONTROL
& EVALUATION & ANALYSIS SYSTEM SUPPORT
ALOYSUS MAINTENANCE
LOUISE HANDI GUNAWAN M. PRANANTO AZNITA S. WANMING
WILASARI EDY SANYOTO EKO HADI CHEN
PESSIRERON SUHADI CAHYONO

MANAGER MANAGER MANAGER


BENGALON MANAGER
COAL MINING MAINTENANCE OVERLAND
COMMUNITY SERVICES CONVEYOR
RELS & DEV. EVAN
& COAL TERMINAL

WAWAN SALEHUDIN ARIS RIZA POLTAK


SETIAWAN SINAGA

MANAGER MANAGER MANAGER


GOVERNMENT MINE MAINTENANCE
RELATIONS OPTIMISATION SUPPORT
(ACTING)
IQBAL
GESANG MUZAMMIL
BUDIARSO (ROFIQ
AL IKHSANI)

MANAGER
DRILL &
BLAST
YULI
PRIHARTONO

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Laporan GRI G4 Core Check Indeks Referensi Silang GRI G4 - CORE
_GRI G4 CORE Check statement _GRI G4 CORE Cross Reference Index

INDEKS REFERENSI INDEKS REFERENSI SILANG UNITED


NATIONS GLOBAL COMPACT (UNGC)
ISO 26000 & UNITED UNGC Cross Reference Index
NATION GLOBAL COMPACT Prinsip UNGC Bab
UNGC Principles Chapter Covering
ISO 26000 & UNITED HUMAN RIGHTS:
NATION GLOBAL COMPACT Principle Businesses
REFERENCE INDEX 1 should support
and respect the N

Indeks Referensi Silang ISO 26000 protection W E

ISO 26000 Cross Reference Index of internationally S

Laporan Pengecekan Statement GRI G4 Core proclaimed human


rights
INDEKS REFERENSI SILANG ISO 26000
Sesuai GRI G4 Core In Accordance Check ISO 26000 Cross Reference Index
Principle Make sure that
2 they are not
complicit in human
Pasal Topik Bab
National Center for Sustainability The National Center for Sustainability Clauses Topic Chapter Covering LABOUR:
Reporting (NCSR) telah melakukan Reporting (NCSR) has conducted Principle Businesses
224 pengecekan sesuai GRI G4 Core a GRI G4 Core in Accordance 3
Understanding
Social 3 should uphold
the freedom of 225
Responsibility
atas Laporan Keberlanjutan PT Check on the PT Kaltim Prima association
Principles of Social
N
and the effective
Kaltim Prima Coal 2014 (Laporan). Coal Sustainability Report 2014 4 W E
recognition of the
Responsibility
Pengecekan dilakukan untuk (Report). The check communicates
S

right to collective
Recognizing Social
memberikan gambaran tentang the extent to which the GRI G4 Core Responsibility
Principle The elimination of
4 all forms of forced
sejauh mana kriteria GRI G4 Core criteria has been applied in the 5 and Stakeholder and compulsory
Identification & labor
telah diterapkan dalam Laporan Report. The check does not provide Engagement
tersebut. Pengecekan ini bukan an opinion on the sustainability Principle The effective
SOCIAL RESPONSIBILITY CORE SUBJECTS 5 abolition of child
merupakan opini atas kinerja performance of the reporter or the labor
Organizational N

keberlanjutan maupun kualitas quality of the information provided in 6.2


Governance
W

S
E
Principle The elimination
of discrimination
informasi yang dimuat dalam the report. 6
in respect of
Laporan tersebut.
N

6.3 Human Rights W E employment and


occupation
S

Kami menyimpulkan bahwa Laporan We conclude that this Report has 6.4 Labor Practice ENVIRONMENT:

ini telah menyajikan pengungkapan- presented disclosures, either fully or Principle The effective
7 abolition of child
pengungkapan, baik sepenuhnya partially, in accordance with GRI G4 6.5 Environment labor
maupun sebagian, sesuai dengan Core criteria. Principle The effective
kriteria GRI G4 Core. 6.6
Fair Operating N
8 abolition of child
Practices
W

S
E
labor
Principle Encourage the
9 development and
National Center for Sustainability Reporting 6.7 Consumer Issues
diffusion of
environmentally
Community friendly
6.8 Development & technologies
Involvement
ANTI-CORRUPTION:
Principle Businesses should
Elmar Bouma Keselamatan, Kesehatan
work against
dan Keamanan Kerja 10
Director Semangat Membara N

Safety, Health and Security corruption in all its


Membara Spirit
W E

Insan KPC forms, including S


N
Tata Kelola yang Baik extortion and
W E
Our People
S Good Corporate Governance bribery
Maju Bersama Masyarakat
Peningkatan Kinerja
Moving Forward with the
Performance Improvement Communities
Melestarikan Lingkungan Kemitraan yang Berkelanjutan
Environment Preservation Sustainable Partnership

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Formulir Tanggapan Indeks GRI
_Feedback Form _GRI Index

INDEKS GRI
SAYA BERASAL DARI KELOMPOK PEMANGKU KEPENTINGAN:
IM REPRESENTING: GRI INDEX [G4-32]
[ ] Pemegang Saham [Shareholder] REPORTED REPORTED ON
MATERIAL INDEX REMARKS PAGE
[ ] Karyawan / Kontraktor [Employee/Contractor] ASPECTS
ASPEK MATERIAL INDEKS YANG KETERANGAN DILAPORKAN
[ ] Penduduk/ Komunitas [Local Resident] DILAPORKAN PADA HALAMAN

[ ] Pelanggan [Customer] GENERAL STANDARD DISCLOSURE

FORMULIR [ ] Industri [Industry ]


Strategy And Analysis
Statement From The Highest Governance Body Regarding Short Term
And Long Term Strategy In Implementing Sustainability
TANGGAPAN
G4-1 28-31
[ ] Analis Keuangan [Financial Analyst] Strategi Dan Analisa Pernyataan Dari Manajemen Tertinggi Mengenai Strategi Jangka
Pendek Dan Panjang Terkait Implementasi Keberlanjutan
[ ] Jurnalis/ Media [Journalist / Media]
FEEDBACK FORM G4-3
Organization Name
Nama Organisasi
32
[ ] Siswa / Akademisi [Educator / Student]
Primary Brands, Products And Services
[ ] Regulator [Regulatory Body] G4-4
Merek, Produk Dan Jasa Utama
34

[ ] Pemasok [Supplier] Organization Headquarters


G4-5 33
Kantor Pusat
.................... Lainnya (mohon sebutkan) [Other (Please specify)]
226 G4-6
Operational Regions
Wilayah Operasional
33

BAGAIMANA MENURUT ANDA LAPORAN KEBERLANJUTAN KAMI TAHUN INI: Ownership And Legal Form
G4-7 35
HOW DO YOU RATE OUR SUSTAINABILITY REPORT: Kepemilikan Dan Badan Hukum
Markets Served, Sectors Served, Customer Types
Apakah informasi dalam laporan ini G4-8 34,79
Pasar Yang Dilayani, Sektor Yang Dilayani, Jenis Pelanggan
memenuhi harapan dan kebutuhan anda? [ ] [ ] [ ] [ ]
Organization Scale
G4-9 33,34
Does the report meet your information Buruk Rata-Rata Baik Sangat Baik Organizational Profile Skala Organisasi
requirements? Poor Average Good Excellent Profile Of Employees
Profil Organisasi G4-10 34,140
Profil Karyawan
Apakah laporan ini mudah dipahami? [ ] [ ] [ ] [ ]
Collective Bargaining Agreements
Buruk Rata-Rata Baik Sangat Baik G4-11 152,154
Do you find the report easy to understand? Penjanjian Kerja Bersama
Poor Average Good Excellent
Supply Chain
G4-12 34
Apakah informasi yang dicantumkan [ ] [ ] [ ] [ ] Rantai Pasok
dalam laporan ini bermanfaat?
Buruk Rata-Rata Baik Sangat Baik Changes During The Reporting Period
G4-13 35
Does the report have useful information? Poor Average Good Excellent Perubahan Selama Periode Pelaporan
Menurut anda, bagaimanakah kinerja kami Precautionary Approached And Risk Management
G4-14 54,55,56
Prinsip Kehati-Hatian Dan Manajemen Resiko
di bidang lingkungan? [ ] [ ] [ ] [ ]
List Of External Chartered Supported And Addressed
How would you rate our environmental Buruk Rata-Rata Baik Sangat Baik G4-15 59
Daftar Piagam Eksternal Yang Didukung Dan Diadopsi
performance? Poor Average Good Excellent
Memberships In Associations
Menurut anda, bagaimanakah kinerja kami G4-16 16,62
Keanggotaan Dalam Asosiasi
di bidang ekonomi & keuangan? [ ] [ ] [ ] [ ] Material Aspect
How would you rate our economic and Buruk Rata-Rata Baik Sangat Baik Indentification And List Of All Organizational Entities And Reporting Scope
Boundary G4-17 Daftar Seluruh Badan Organisasi Dan Skala Pelaporan 18,27
financial performance? Poor Average Good Excellent
Identifikasi Aspek
Menurut anda, bagaimanakah hubungan kami Material Dan Batasan
dengan pekerja & komunitas masyarakat? [ ] [ ] [ ] [ ] Defining Report Content And Boundary Aspect
G4-18 18,19,25
How would you rate our employee engagement Buruk Rata-Rata Baik Sangat Baik Menentukan Isi Laporan Dan Cakupan Pelaporan
and community involvement? Poor Average Good Excellent
List Of Material Aspect Identified
G4-19 27
Daftar Aspek Material Yang Diindentifikasi
INFORMASI YANG ANDA INGIN KAMI CANTUMKAN DALAM LAPORAN BERIKUTNYA: Internal Aspect Boundary For Each Material Aspects
INFORMATIONS THAT YOU WOULD LIKE US TO DISCUSS FURTHER IN THE NEXT REPORT ARE: G4-20 27
Batasan Aspek Internal Untuk Setiap Aspek Material

External Aspect Boundary For Each Material Aspects


G4-21 27
Batasan Aspek Eksternal Untuk Setiap Aspek Material

Restatement From Previous Reports


G4-22 17
Pernyataan Ulang Dari Laporan Tahun Sebelumnya

Significant Changed From Previous Reporting


G4-23 17
Perubahan Yang Signifikan Dari Laporan Tahun Sebelumnya

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Indeks GRI Indeks GRI
_GRI Index _GRI Index

INDEKS GRI INDEKS GRI


GRI INDEX [G4-32] GRI INDEX [G4-32]
REPORTED REPORTED ON REPORTED REPORTED ON
MATERIAL INDEX REMARKS PAGE MATERIAL INDEX REMARKS PAGE
ASPECTS ASPECTS
ASPEK MATERIAL INDEKS YANG KETERANGAN DILAPORKAN ASPEK MATERIAL INDEKS YANG KETERANGAN DILAPORKAN
DILAPORKAN PADA HALAMAN DILAPORKAN PADA HALAMAN
GENERAL STANDARD DISCLOSURE ENVIRONMENT / LINGKUNGAN
List Of Stakeholder Groups Disclosure of management approach for energy management
G4-24 21,22, 23 G4-DMA 82, 85
Stakeholder Daftar Kelompok Pemangku Kepentingan pengungkapan pendekatan manajemen untuk pengelolaan energi
Engagement Basis For Identification And Selection Of Stakeholder Energy consumption
G4-EN3 107
G4-25 Dasar Yang Digunakan Dalam Mengidentifikasi Dan Memilh 11,20 konsumsi energi
Pemangku Kepentingan Energy
Keterlibatan G4-EN5 73,74,76
Pemangku Energi
Stakeholder Engagement Approach
Kepentingan G4-26 21, 22,23
Pendekatan Keterlibatan Pemangku Kepentingan Reduction in energy consumption efforts and achievement
G4-EN6 76, 108,109,112
Pengurangan usaha pemakaian energi dan pencapaian
Stakeholder Concern Or Key Topics
G4-27 22 - 23
Topik yang Menjadi Perhatian Pemangku Kepentingan G4-EN7 73,74,76
Reporting Period Total water withdrawal by source
G4-28 16 Water G4-EN8 107
Periode Pelaporan Total konsumsi air
Air
Date Of Most Recent Previous Report Water sources significantly affected by withdrawal of water
G4-29 16 G4-EN9 106
Tanggal Dari Laporan Tahun Sebelumnya Sumber air yang terdampak akibat konsumsi air organisasi

Report Profile Reporting Cycle Biodiversity


G4-30 16 Habitats protected or restored
Siklus Pelaporan Keanekaragaman G4-EN13 99,100,101,104
Profil Laporan Habitat yang dilindungi atau dilestarikan
Contact Point Regarding Report Content Hayati
G4-31 19
Alamat Kontak Terkait Isi Laporan Direct greenhouse gas (ghg) emissions
G4-EN15 96,97
GRI Core Index Emisi gas rumah kaca
G4-32 16 Emission
GRI Core Index Reduction of ghg emission
Emisi G4-EN19 95,109,110
External Assurance Pengurangan emisi gas rumah kaca
G4-33 17
Verifikasi Eksternal Nox, sox, and other significant air emissions
G4-EN21 94-95
Governance Governance Structure Of The Organization Emisi nox, sox, dan polutan lain
G4-34 54
Tata Kelola Struktur Tata Kelola Organisasi
Total weight of waste by type and disposal method
Effluent & Waste G4-EN23 87,88,89,90,91,93
Ethics And Integrity Organizations Values, Principles, Standard, Norms Of Behavior Total jumlah limbah berdasarkan tipe dan penanganan
G4-56 38,39,46,49,52 Tumpahan dan
Etika Dan Integritas Norma Perilaku, Standar, Prinsip Dan Nilai-Nilai Organisasi Total number and volume of significant spills
Limbah G4-EN24 94
ECONOMIC / EKONOMI Total tumpahan signifikan
Disclosure Of Management Approach For Direct Economic Impact Extent of impact mitigation of environment impact
Product & Services
G4-DMA 46,49, G4-EN27 of product and service 110,111,113
Pengungkapan Pendekatan Manajemen Untuk Dampak Ekonomi Produk & Jasa
Economic Langsung Dampak mitigasi terhadap dampak lingkungan produk dan jasa
Performance
Direct Economic Value Generated And Distributed Compliance Monetary value of significant fines and total number of non-monetary
Kinerja Ekonomi G4-EC1 35 G4-EN29 sanctions for non-compliance with environmental 84
Perolehan Dan Distribusi Nilai Ekonomi Langsung Kepatuhan aws and regulations
Coverage Of The Organizationss Defined Benefit Plan Obligations
G4-EC3 157 Total environmental protection expenditures and
Jaminan Kewajiban Organisasi Terhadap Program Imbalan Pasti G4-EN31 investments by type 112
Disclosure Of Management Approach For Indirect Economic Impact Overall Total dana pengelolaan lingkungan
G4-DMA Pengungkapan Pendekatan Manajemen Untuk Dampak Ekonomi 46,49 Keseluruhan Percentage of new suppliers that were screened
Tidak Langsung G4-EN32 using environmental criteria 211,210,211,212
Ratios of entry level wage compared to applicable local standard Pemasok baru yang dievaluasi dengan kriteria lingkungan
minimum wage at operational areas
G4-EC5 159 LABOR PRACTICE AND DECENT WORK / PRAKTIK KETENAGAKERJAAN
Rasio upah minimum yang diberikan dibandingkan dengan standar
Indirect Economic upah minimum yang berlaku di wilayah operasional Disclosure Of Management Approach For Labor Practice
Impact 118
Development And Impact Of Infrastructure Investment And Service G4-DMA Pengungkapan Pendekatan Manajemen Untuk Praktik
,120,122,124,138
Dampak Ekonomi Supported 167,169,170, Ketenagakerjaan
Tidak Langsung G4-EC7 172,173, 177,
Pembangunan Dan Dampak Dari Investasi Infrastruktur Serta Jasa ,190,208,209 Total Number And Rates Of New Employee Hires
Employment
Yang Didukung G4-LA1 And Employee Turnover 142
Ketenagakerjaan
Indirect Economic Impact Jumlah Dan Tingkat Perputaran Karyawan
G4-EC8
Dampak Ekonomi Tidak Langsung Benefits Provided To Full-Time Employees That
Are Not Provided To Temporary Or Part-Time Employees
Proportion of spending on local suppliers at significant locations of 66,165,169, G4-LA2 156
operation Manfaat Yang Disediakan Bagi Karyawan Tetap (Purna Waktu) Yang
G4-EC9 170,172,173,177
Tidak Disediakan Bagi Karyawan Tidak Tetap (Paruh Waktu)
Proporsi pembelian lokal kepada supplier lokal ,190,208

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Indeks GRI Indeks GRI
_GRI Index _GRI Index

INDEKS GRI INDEKS GRI


GRI INDEX [G4-32] GRI INDEX [G4-32]
REPORTED REPORTED ON REPORTED REPORTED ON
MATERIAL INDEX REMARKS PAGE MATERIAL INDEX REMARKS PAGE
ASPECTS ASPECTS
ASPEK MATERIAL INDEKS YANG KETERANGAN DILAPORKAN ASPEK MATERIAL INDEKS YANG KETERANGAN DILAPORKAN
DILAPORKAN PADA HALAMAN DILAPORKAN PADA HALAMAN
LABOR PRACTICE AND DECENT WORK / PRAKTIK KETENAGAKERJAAN MINING & METAL SECTOR SPECIFIC INDICATOR
Types and ratio of injury, occupational diseases, lost days, Land Owned, Disturbed and Rehabilitated Luas Lahan Pengelolaan,
MM1 94
absenteeism and the total number of work-related fatalities. Lahan Terganggu & Lahan Reklamasi
G4-LA6 121,153
Jenis dan angka ratio kecelakaan kerja, sakit akibat kerja, hilangnya Number and Percentage of Area with Biodiversity Plans Jumlah dan
hari kerja, absen, dan fatalitas terkait kerja lainnya. MM2 Persentase Area dengan Rencana Manajemen Keanekaragaman 84,98
Occupational Hayati
Health & Safety Workers with high risk of occupational accidents and/or diseases
G4-LA7 Pekerja dengan risiko kecelakaan dan/atau kesehatan kerja tinggi 118 Total amounts of overburden, rock, tailings, and sludge and their
K3
yang terkait dengan pekerjaan MM3 associated risks. Total Overburden dan Batuan Asam serta Risiko 84,85
Terkait
Health And Safety Topics Covered In Formal Agreements
Mining & Metal
With Trade Unions Sites where resettlements took place, the number of households
G4-LA8 118,120,125 Sector Specific
Aspek Kesehatan Dan Keselamatan Yang Tercakup resettled in each, and how their livelihoods were affected in the
Indicator MM9 193
Dalam Perjanjian Dengan Serikat Karyawan process. Lokasi dimana terjadi pemindahan tempat tinggal, jumlah
keluarga, dan bagaimana pengaruhnya dengan kehidupan mereka.
Average Hours Of Training Per Year Per Employee
G4-LA9 152
Training & Education Pelatihan & Pendidikan
Pelatihan & MM10 Mining Closure Plan Rencana Penutupan Tambang 164,165,167,170
Percentage Of Employee Receiving Regular Performance
Pendidikan And Career Development Reviews
G4-LA11 143
Persentase Karyawan Yang Menerima Peninjauan Kinerja
Program & Progress Relating to Material Stewardship Program
Dan Pengembangan Karir Secara Periodik MM11 40-41, 85
Progress dan Program Terkait Tanggung Jawab Produk
Supplier Labor
Practice Assessment
Evakuasi New Suppliers Screened Using Labor Practice Criteria
G4-LA14 211, 210,211,212
Kinerja Praktek Pemasok Baru Yang Dievaluasi Dengan Kriteria Praktek Kerja
Ketenagakerjaan
Pemasok
HUMAN RIGHTS / HAK ASASI MANUSIA
Supplier Human
Rights Assessment New Suppliers Screened Using Human Rights Criteria Pemasok
G4-HR10 206,209,211,212
Penilaian Kinerja Baru Yang Dievaluasi Dengan Kriteria Hak Asasi Manusia
Hak Asasi Pemasok
PRODUCT RESPONSIBILITY / TANGGUNG JAWAB PRODUK
Disclosure Of Management Approach For Customer Health, Safety
Customer Health
G4-DMA and Product Quality Pengungkapan Pendekatan Manajemen Untuk 76,206,
and Safety
Kesehatan dan Keamanan Pelanggan serta Mutu Produk
Monetary value of significant fines for non compliance with laws and
Compliance G4-PR9 78
regulation concerning the provision and use of products and services
SOCIETY / MASYARAKAT
Disclosure Of Management Approach For Local Community
G4-DMA 167 - 169
Pengungkapan Pendekatan Manejemen Untuk Masyarakat Lokal
Local Community Percentage Of Operation With Implemented Local Community 169, 170, 172, 173,
Masyarakat Lokal Engagement, Impact Assessments, And Development Programs. 177, 208, 209 169,
G4-SO1
Kegiatan Keterlibatan Masyarakat Lokal, Penilaian Dampak, Dan 170, 172, 173, 177,
Program Pengembangan 208, 209
Assessment Toward Risk Of Corruption And Other Identified Risk In
G4-SO3 The Organization Penilaian Terhadap Resiko Korupsi Dan Resiko Lain 53,55,57
Anti-Corruption Dalam Organisasi
Anti Korupsi Communication And Training On Anti-Corruption Policies And
G4-SO4 Procedures Penyuluhan Dan Pelatihan Dalam Prosedur Dan 53,57
Kebijakan Anti Korupsi

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT


Tim Laporan Keberlanjutan 2014
_2014 Sustainability Report Team

TIM LAPORAN Pemimpin Redaksi


Report Chief Editors
Saptari Hoedaja Chief Executive Officer
Muhammad Rudy Chief Operation Officer

KEBERLANJUTAN
Ashok Mitra Chief Financial Officer

2014 Tim Kontributor Ardi Margusano


Jimmy Ariesta
SCD
SCD
Manager Supply
Purchasing Supt.Mining, Coal Convey & Support
Contributor Team Lina Widiyanti SCD SCMS Coordinator
2014 SUSTAINABILITY Femmilia SCD Supv.Purchasing
REPORT TEAM Wandi Kamajaya BA Manager Business Analyst
Yulia Rusmawaty BA Senior Business Analyst
Aden Wijaya Herman Accounting & Tax Supt.External Reporting
Juli Transtuti Accounting & Tax Supt.Management Accounting
Badaruddin Wettoeng HR Supt. Employee Communication
Achmad Muluk HR Supt. Benefits
Erwin Susanto HR Supt. Salaries & Wages
Novinda Riski HR Specialist Employee Development
Eddy W.Tarigan HR Senior Specialist Organization Development
Bangun Nuswanto HR Supt. Organizational Development
Djoko Soelistiono Marketing Supt. Marketing
Tina Sirait Marketing Manager Sales Operations
Elistyandari Environment Supt. Environmental Permit & Reporting
Ike Yulyanti Environment Specialist Environmental
Wahyu Wardana Environment Supv. Rehabilitation Monitoring
Kris Pranoto Environment Act. Manager Environment
Ricky Manurung OHS Specialist Safety Training & Statistics
Nurwahidin Hasan OHS Supt.OHS Information & Management System
Haryadi Wardono OHS Manager Occupational Safety & Health
Gunawan Muhammad HSES System Manager HSES System
Shauman Shaladin Mine Optimization Supt. MC & Dispatch
Welen Mine Optimization Supt. Reporting & Analysis
Tanzilullah Mine Optimization Supt.Coordination & Cost Control
Meiliza Mine Optimization Senior Engineer Reporting & Analysis
Louise G. Pessireron ESD Manager Project Management & Evaluation
Nurul Karim ESD Manager Community Empowerment
Wawan Setiawan ESD Manager Bengalon Community Relation & Development
Yuliana Datu Bua ESD Supt. Community Health & Education
Genta Gantina ESD Supt. Local Business Development
Sugeng Wiyatno ESD Supt. Conservation&Agribusiness
Nadira Defy ESD Supv. Project Administration
Andriyanto Soehadji ESD Supt. Project Monitoring & Control
Gaga Nugraha ESD Supt. Program Planning & Evaluation
Kusuma Sari ESD Supt. Technical & Support
Beryanti Putri ESD Specialist External Liaison
Ricky Santana ESD Specialist Reporting & Data Management
Mohammad Yusuf ESD Supv. Program Planning & Evaluation
Denny Riezki Pratama ESD Supt.Community Development
Rusdiansyah ESD Field Officer
Zulfatun Mahmudah ESD Supv. Media & Public Communication
Silvester Pantur ESD Supv. Media Publication
Gede Ngurah Ambara BPID Manager Business & Performance Improvement
Anton Suprajogi EPD Manager Procurement Expansion Project
Aznita Susi Wilasari MSD Manager Maintenance System
Agus Mulyadi MSD Supt. Maintenance Planning

Tim Redaksi KPC Click Club Conceptual Photography


Editors Team KPC Documentation Stock Photos and Event Documentation
Larismaniez Brand Strategist Copywriting, Design and Production

LAPORAN KEBERLANJUTAN 2014 2014 SUSTAINABILITY REPORT

Anda mungkin juga menyukai