D Jumlah A + B + C 83.365,00
E Overhead & Profit 15% x D 12.504,75
F Harga Satuan Pekerjaan (D+E) 95.869,75
D Jumlah A + B + C 113.405,00
E Overhead & Profit 15% x D 17.010,75
F Harga Satuan Pekerjaan (D+E) 130.415,75
D Jumlah A + B + C 95.105,00
E Overhead & Profit 15% x D 14.265,75
F Harga Satuan Pekerjaan (D+E) 109.370,75
D Jumlah A + B + C 88.440,00
E Overhead & Profit 15% x D 13.266,00
F Harga Satuan Pekerjaan (D+E) 101.706,00
D Jumlah A + B + C 88.440,00
E Overhead & Profit 15% x D 13.266,00
F Harga Satuan Pekerjaan (D+E) 101.706,00
D Jumlah A + B + C 83.040,00
E Overhead & Profit 15% x D 12.456,00
F Harga Satuan Pekerjaan (D+E) 95.496,00
D Jumlah A + B + C 66.005,00
E Overhead & Profit 15% x D 9.900,75
F Harga Satuan Pekerjaan (D+E) 75.905,75
D Jumlah A + B + C 60.070,00
E Overhead & Profit 15% x D 9.010,50
F Harga Satuan Pekerjaan (D+E) 69.080,50
D Jumlah A + B + C 47.550,00
E Overhead & Profit 15% x D 7.132,50
F Harga Satuan Pekerjaan (D+E) 54.682,50
D Jumlah A + B + C 49.288,00
E Overhead & Profit 15% x D 7.393,20
F Harga Satuan Pekerjaan (D+E) 56.681,20
D Jumlah A + B + C 106.214,00
E Overhead & Profit 15% x D 15.932,10
F Harga Satuan Pekerjaan (D+E) 122.146,10
D Jumlah A + B + C 85.060,00
E Overhead & Profit 15% x D 12.759,00
F Harga Satuan Pekerjaan (D+E) 97.819,00
D Jumlah A + B + C 94.110,00
E Overhead & Profit 15% x D 14.116,50
F Harga Satuan Pekerjaan (D+E) 108.226,50
D Jumlah A + B + C 106.270,00
E Overhead & Profit 15% x D 15.940,50
F Harga Satuan Pekerjaan (D+E) 122.210,50
D Jumlah A + B + C 53.930,00
E Overhead & Profit 15% x D 8.089,50
F Harga Satuan Pekerjaan (D+E) 62.019,50
D Jumlah A + B + C 38.910,00
E Overhead & Profit 15% x D 5.836,50
F Harga Satuan Pekerjaan (D+E) 44.746,50
D Jumlah A + B + C 28.336,00
E Overhead & Profit 15% x D 4.250,40
F Harga Satuan Pekerjaan (D+E) 32.586,40
D Jumlah A + B + C 22.442,00
E Overhead & Profit 15% x D 3.366,30
F Harga Satuan Pekerjaan (D+E) 25.808,30
D Jumlah A + B + C 22.452,50
E Overhead & Profit 15% x D 3.367,88
F Harga Satuan Pekerjaan (D+E) 25.820,38
HARGA
NO URAIAN SATUAN
SATUAN EE
1 2 3 4
Tahun Pengalaman/
I UPAH TENAGA KERJA
Tk. Pendidikan;
A TENAGA AHLI/KONSULTAN S1 S2 S3
1 Tenaga Ahli
Ahli Pratama
- Gol. I-A 1 Org/Bulan 4.600.000
- Gol. I-B 2 Org/Bulan 4.900.000
- Gol. I-C 3 Org/Bulan 5.150.000
- Gol. I-D 4 Org/Bulan 5.430.000
Ahli Muda
- Gol. II-A 5 1 Org/Bulan 5.750.000
- Gol. II-B 6 2 Org/Bulan 6.310.000
- Gol. II-C 7 3 Org/Bulan 6.860.000
- Gol. II-D 8 4 Org/Bulan 7.420.000
Ahli Madya
- Gol. III-A 9 5 1 Org/Bulan 7.784.000
- Gol. III-B 10 6 2 Org/Bulan 8.370.000
- Gol. III-C 11 7 3 Org/Bulan 8.880.000
- Gol. III-D 12 8 4 Org/Bulan 9.410.000
Ahli Utama
- Gol. IV-A 13 9 5 Org/Bulan 9.300.000
- Gol. IV-B 14 10 6 Org/Bulan 10.490.000
- Gol. IV-C 15 11 7 Org/Bulan 11.040.000
- Gol. IV-D 16 12 8 Org/Bulan 11.610.000
Ahli Kepala
- Gol. ]V-A 17 13 9 Org/Bulan 12.300.000
- Gol. V-B 18 14 10 Org/Bulan 12.640.000
- Gol. V-C 19 15 11 Org/Bulan 13.070.000
- Gol. V-D 20 16 12 Org/Bulan 13.490.000
11
HARGA
NO URAIAN SATUAN
SATUAN EE
B UPAH TENAGA KERJA
1 Mandor . org/hari 80.000
2 Mekanik terlatih . org/hari 75.000
3 Kepala tukang . org/hari 80.000
4 Tukang kayu . org/hari 75.000
5 Tukang batu . org/hari 75.000
6 Tukang besi . org/hari 75.000
7 Tukang cat . org/hari 75.000
8 Tukang plitur . org/hari 75.000
9 Tukang listrik . org/hari 75.000
10 Operator terlatih . org/hari 75.000
11 Operator semi terlatih. org/hari 65.000
12 Pembantu operator. org/hari 60.000
13 Sopir. org/hari 75.000
14 Sopir angkut orang. org/hari 75.000
15 Pekerja. org/hari 60.000
16 Buruh terlatih. org/hari 60.000
17 Buruh semi terlatih. org/hari 60.000
18 Buruh tak terlatih. org/hari 60.000
19 Penganyam bronjong org/hari 75.000
20 Penjaga malam. org/hari 60.000
21 Tukang masak aspal/juru godog. org/hari 60.000
22 Tukang leideng. org/hari 75.000
23 Masinis. org/hari 75.000
24 Pembantu masinis. org/hari 60.000
II BAHAN/MATERIAL
A BAHAN BANGUNAN UMUM
1 Abu Batu M3 242.000
2 Air M3 12.000
Air Ltr 12
3 Alkali Tembok/cat dasar Kg 50.000
4 Amplas Besi Lembar 5.000
5 Amril / amplas Lembar 3.000
6 Asbes gel. Kecil 0,9 m x 2,10 m Lembar 62.000
7 Asbes gel. Kecil 0,9 m x 2,40 m Lembar 71.000
8 Asbes gel. Kecil 0,9 m x 2,90 m Lembar 86.000
9 Asbes gel. Besar 0,9 m x 2,10 m 56.000
10 Asbes gel. Besar 0,9 m x 2,40 m 63.000
11 Asbes gel. Besar 0,9 m x 2,90 m 80.000
12 Asbes gel. Kecil 1,05 m x 2,10 m Lembar 63.800
13 Asbes gel. Kecil 1,05 m x 2,40 m Lembar 71.500
14 Asbes gel. Kecil 1,05 m x 3,00 m Lembar 88.000
15 Asbes gel. Besar 1,02 m x 2,10 m Lembar 82.500
16 Asbes gel. Besar 1,02 m x 2,40 m Lembar 107.800
17 Asbes gel. Besar 1,02 m x 3,00 m Lembar 132.000
18 Asbes Kerpus Gel. 1,0 m x 1,0 m Lembar 30.500
19 Asbes Plat/ eternity 1,0 m x 1,0 m Lembar 16.500
20 Aspalt penetrasi 60/70 Kg 8.500
21 Aspalt Treated base (ATB)/ AC-BC Ton 1.100.000
22 Aspalt Treated base (ATB)/ AC-WC Ton 1.210.000
23 Aspalt Treated base (ATB)/ AC-BASE Ton 1.000.000
24 Bambu 8-10 cm p = 4 m Batang 10.000
25 Bambu 10-12 cm p = 4 m Batang 23.000
26 Bataco 40 x 20 x 10 cm Buah 3.000
27 Batang kelapa 4 m Batang 110.000
29 Batu Bata biasa Buah 800
30 Batu blondhos M3 150.000
31 Batu candi 30 x 30 M2 125.000
32 Batu koral sikat M2 58.000
34 Batu Palimanan M2 132.000
35 Batu pecah 0,5/1 (pecah mesin) ( chip ) M3 308.000
36 Batu pecah 1/2 (pecah mesin) M3 308.000
37 Batu pecah 2/3 (pecah mesin) M3 308.000
38 Batu pecah 3/5 (pecah mesin) M3 308.000
39 Batu pecah 4/6 (pecah tangan) M3 264.000
12
HARGA
NO URAIAN SATUAN
SATUAN EE
40 Batu pecah 5/7 (pecah tangan) M3 264.000
41 Batu belah / pecah 7/10 - 10/15 - 15/20 M3 258.000
42 Batu belah/pecah besar M3 209.000
46 Besi beton polos SNI Kg 8.800
47 Besi beton ulir SNI Kg 8.800
48 Besi Profil C Kg 9.700
49 Baja IWF Kg 9.700
50 Besi Profil Siku Kg 9.700
51 Besi sengkang (angkur, baut) Kg 19.900
52 Besi strip plat t= 2 mm Kg 9.900
54 Besi teralis/strip plat (Terpasang) M2 88.000
Bronjong fabrikasi unit/m3 275.000
55 Sesek bambu M2 10.000
56 BRC t = 120 x 240 cm Galvanis 6mm Buah 231.000
57 BRC t = 150 x 240 cm Galvanis 6mm Buah 264.000
58 BRC t = 120 x 240 cm Galvanis 8mm Buah 291.500
59 BRC t = 150 x 240 cm Galvanis 8mm Buah 357.000
60 BRC (tiang t = 120 ) Galvanis Buah 118.800
61 BRC (tiang t = 150 ) Galvanis Buah 86.500
62 Cat besi Kg. 53.900
63 Cat brom Kg. 58.000
64 Cat Kayu Kg 54.000
65 Cat Meni Kg. 23.000
66 Cat Tembok interior Kg 22.000
67 Cat Tembok exterior Kg 50.000
69 Coating batu alam Kg 54.500
70 Dempul Plamur kayu Kg 16.600
71 Elastomer Buah 615.000
75 Engsel Kupu-kupu biasa Buah 4.600
76 Engsel Nylon Pintu Buah 14.300
77 Espanyolet Buah 33.000
78 Eternit 1 x 1 m M2 20.000
79 Flinkote Kg. 19.000
80 Folding gate 0.4 M 555.000
81 Folding gate 0.8 M 625.000
82 Formica Lembar 75.000
83 Formite/spacer Buah 10.600
84 Genteng Kerpus Metal Lapis Pasir Buah 16.000
85 Genteng Kerpus Metal Polos Buah 13.900
86 Genteng Kerpus tanah (5 bh/m) ex.Kebumen Buah 4.400
87 Genteng tanah liat Kebumen (biasa) kerpus plentong Buah 11.000
88 Genteng tanah liat Kebumen (biasa) kerpus kodok Buah 11.000
89 Genteng tanah liat Lokal kerpus plentong Buah 5.500
90 Genteng tanah liat Lokal kerpus kodok Buah 4.350
91 Genteng Kerpus beton natural (3 bh/m)-Gt.9 Buah 7.400
92 Genteng Kerpus beton natural (3 bh/m)-Gt.11 Buah 7.000
93 Genteng tanah liat Jatiwangi (biasa) kerpus plentong Buah 5.400
94 Genteng tanah liat Jatiwangi (biasa) kerpus kodok Buah 5.400
95 Genteng tanah liat Jatiwangi (glasur) kerpus plentong Buah 7.000
96 Genteng tanah liat Jatiwangi (glasur) kerpus kodok Buah 5.400
97 Genteng beton natural (9bh/m2) Buah 4.800
98 Genteng beton natural (11bh/m2) Buah 7.700
99 Genteng beton cat (9bh/m2) Buah 6.500
100 Genteng beton kerpus (3bh/m2) 7.800
101 Genteng Keramik Buah 10.000
102 Genteng Metal (terpasang sekualitas Perkasa Roof) : t = 0,35 mm Buah 95.500
103 Genteng tanah liat Kebumen kodok (25 bh/m2) Buah 2.800
104 Genteng tanah liat Kebumen (biasa) plentong (25 bh/m2) Buah 2.700
105 Genteng tanah liat Kebumen (biasa) plentong (18 bh/m2) Buah 4.400
106 Genteng tanah liat Kebumen (biasa) plentong (14 bh/m2) Buah 3.900
107 Genteng tanah liat Lokal Kodok (25 bh/m2) Buah 2.000
108 Genteng tanah liat Lokal plentong (25 bh/m2) Buah 1.500
109 Genteng tanah liat Lokal plentong (18 bh/m2) Buah 1.550
110 Genteng tanah liat Lokal plentong (14 bh/m2) Buah 1.350
111 Genteng tanah liat Jatiwangi (biasa) Kodok (25 bh/m2) Buah 2.000
112 Genteng tanah liat JAtiwangi (biasa) plentong (25 bh/m2) Buah 2.800
13
HARGA
NO URAIAN SATUAN
SATUAN EE
113 Genteng tanah liat Jatiwangi (biasa) plentong (18 bh/m2) Buah 2.750
114 Genteng tanah liat Jatiwangi (biasa) plentong (14 bh/m2) Buah 2.800
115 Genteng Kaca plentong tbl. 5 mm 11.000
116 Glass Bit Kg 2.650
117 Grass block 20 x 20 Buah 20.000
118 Gorong-gorong DN 20 cm , panjang 1 meter Buah 49.500
119 Gorong-gorong DN 30 cm, panjang 1 meter Buah 71.500
120 Gorong-gorong DN 40 cm, panjang 1 meter Buah 82.500
121 Gorong-gorong DN 50 cm , panjang 1 meter Buah 110.000
122 Gorong-gorong DN 60 cm, panjang 1 meter Buah 121.000
123 Gorong-gorong DN 70 cm, panjang 0,5 meter Buah 132.000
124 Gorong-gorong DN 80 cm, panjang 0.5 meter Buah 110.000
125 Gorong-gorong DN 100 cm panjang 0.5 meter Buah 247.500
126 Got Type U - 15 cm, panjang 1 m Buah 27.500
127 Got Type U - 20 cm, panjang 1 m Buah 38.500
128 Got Type U - 30 cm, panjang 1 m Buah 44.000
129 Got Type U - 40 cm, panjang 1 m Buah 60.500
130 Grendel Biasa Buah 10.000
131 Guard Rail m/kg 775.000
132 Handle / Pegangan pintu (kecil) Buah 75.000
133 Handle / Pegangan pintu (besar) Buah 160.000
134 Hot roller sheet (HRS)-WC Ton 1.350.000
135 Ijuk Kg 6.750
136 Kaca bening 3 mm M2 82.500
137 Kaca bening 5 mm M2 93.500
138 Kaca es/dop M3 115.500
139 Kaca raindown M2 150.000
140 Kaca ryben 5 mm M2 93.500
142 Kanstein Batako 10 x 20 x 50 bh 9.500
143 Kanstein Lubang 10/12,5 x 25 x 50 bh 26.500
141 Kanstein Lubang K300 ukuran 15/20 x 30 x 50 bh 52.900
142 Kanstein Standar K300 ukuran 15/20 x 30 x 50 bh 48.500
148 Kapur pasang kg 6.600
149 Kapur pasang M3 247.500
150 Karung banjir 50 kg Buah 6.750
151 Kawat beton/Bendrat Kg 14.300
152 Kawat Bronjong Galvanis Kg 14.300
153 Kawat duri (50 m) Rol 75.800
154 Kawat harmonika 12 x 45 mm M' 63.900
155 Kawat harmonika 12 x 24 mm M' 83.300
156 Kawat harmonika 14 x 30 mm M' 54.400
157 Kawat harmonika 14 x 35 mm M' 46.700
158 Kawat harmonika 53 X 53 X 10 mm M' 93.400
159 Kawat kasa besi M' 23.100
160 Kawat kasa plastik M2 14.250
161 Kawat las listrik Kg 25.650
162 Kayu bakar M3 135.000
163 Kayu bengkirai (balok) M3 10.560.000
164 Kayu bengkirai (papan) M3 11.550.000
165 Kayu bengkirai 2/3 M3 6.800.000
166 Kayu bengkirai 3/5 M3 7.250.000
167 Kayu bengkirai 5/7 M3 8.200.000
168 Kayu cetakan M3 3.450.000
169 Kayu dolok DN / Dolken 8-10 cm Batang 21.850
170 Kayu Jati (balok) Kw.II M3 22.550.000
171 Kayu Jati papan KW II M3 25.300.000
172 Kayu Jati Kw.I M3 29.000.000
173 Kayu kamfer (balok) M3 8.500.000
174 Kayu Kamfer (papan) M3 10.000.000
175 Kayu kamfer 2/3 M3 6.000.000
176 Kayu kamfer 3/5 M3 6.000.000
177 Kayu kamfer 5/7 M3 7.150.000
178 Kayu Kruing (Balok) M3 6.000.000
179 Kayu Kruing (papan) M3 6.820.000
180 Kayu Kruing 2/3 M3 6.325.000
181 Kayu Kruing 3/5 M3 6.325.000
14
HARGA
NO URAIAN SATUAN
SATUAN EE
182 Kayu Kruing 5/7 M3 6.600.000
183 Kayu Meranti (Balok) M3 5.100.000
184 Kayu Meranti (papan) M3 6.000.000
185 Kayu Meranti 2/3 M3 5.600.800
186 Kayu Meranti 3/5 M3 5.600.800
187 Kayu Meranti 5/7 M3 5.600.800
188 Kayu Lanan/Tahun papan M3 4.097.000
189 Kayu Lanan/Tahun Balok 8/12 M3 4.097.000
190 Kayu Lanan/Tahun Balok 6/12 M3 3.605.000
191 Kayu Lanan/Tahun Usuk 5/7 M3 2.993.000
192 Kayu Lanan/Tahun Usuk 4/6 M3 2.993.000
193 Kayu Lanan/Tahun Reng 3/5 M3 1.093.000
194 Kayu Lanan/Tahun Reng 2/3 M3 1.093.000
195 Kayu Sengon Balok 8/12 M3 3.450.000
196 Kayu Sengon Balok 6/12 M3 3.450.000
197 Kayu Sengon Usuk 5/7 M3 2.370.200
198 Kayu Sengon Usuk 4/6 M3 2.370.200
199 Kayu Sengon Reng 3/5 M3 2.000.000
200 Kayu Sengon Reng 2/3 M3 1.200.000
201 Kayu Sengon Papan M3 2.000.000
203 Kerb sudut Taman 30x20x50 m' 44.000
204 Kerb Taman 25x16x21 m' 6.500
205 Kerb Taman 30x20x50 m' 44.000
206 Kerb Taman 20/40 x 30 x 25 m' 45.100
207 Kloset duduk lengkap Buah 1.500.000
208 Kloset jongkok Buah 185.000
209 Kuas cat Buah 7.000
210 Rol cat Buah 17.700
211 Kunci tanam 2x Slog (kecil) Buah 121.000
212 Kunci tanam 2x Slog (besar) Buah 152.000
213 Kunci tanam 2x Slog sekualitas Nanking Buah 86.900
214 Kunci Tanam putar Kamar mandi Buah 73.000
215 Kusen aluminium 3" hitam 0.40 mm M' 75.000
216 Kusen aluminium 3" silver 0.40 mm M' 71.500
217 Kusen aluminium 4" coklat 0.40 mm M' 93.500
218 Kusen aluminium 4" silver 0.40 mm M' 118.000
219 Kusen aluminium 4" hitam 0.40 mm M' 93.500
220 Kusen dan daun pintu KM PVC komplit kunci Buah 300.000
221 Latasir Ton 1.320.000
222 Lem kayu Kg 98.000
223 Lem kuning AICA AIBON Kg 47.700
224 Lem Pralon 0.5 liter / kaleng Liter 32.000
225 Lis Gipsum 12 cm m' 16.400
226 Lis Gipsum 7 cm m' 11.300
227 Lis Gipsum 9 cm m' 12.400
228 Lis kayu profil M' 6.800
231 LPA M3 275.000
232 LPB M3 270.000
236 Minyak cat/super tiner Liter 13.000
237 Minyak Oli/Pelumas Liter 28.000
239 Multiplek 120 x 240 x 9 mm Lembar 140.000
240 Multipleks tb.12mm Lembar 167.000
241 Multipleks tb.6mm Lembar 80.750
242 Mur/baut untuk jembatan baja kg 25.650
243 Nok kerpus tanah liat Buah 6.500
244 Nok steel gelombang besar 108 cm Buah 46.500
245 Nok steel gelombang kecil 105 cm Buah 30.500
246 Paku Kg 13.800
247 Paku asbes Buah 8.300
248 Paku crampon Buah 10.750
249 Paku kait lengkap Buah 3.200
251 Paku payung Kg 22.000
252 Paku sekrup Kg 11.800
253 Partisi Gipsum Metal Furring M2 112.000
254 Partisi Gipsum rangka Galvanis M2 104.000
255 Partisi Gipsum rangka Hollow 2 swisi M2 150.000
15
HARGA
NO URAIAN SATUAN
SATUAN EE
256 Paser Slot jendela Buah 11.500
257 Pasir beton M3 302.500
258 Pasir pasang muntilan M3 -
259 Pasir urug M3 130.000
260 Paving 6 cm,29 bh/M(Hexagonal Kecil) K.135 Ukuran 11,5x6 m2 60.000
261 Paving 6 cm,29 bh/M(Hexagonal Kecil) K.225 Ukuran 11,5x6 m2 67.500
262 Paving 8 cm,29 bh/M(Hexagonal Kecil) K.180 Ukuran 11,5x8 m2 67.500
263 Paving 8 cm,29 bh/M(Hexagonal Kecil) K.225 Ukuran 11,5x8 m2 78.000
264 Paving block natural 8cm M2 47.000
265 Paving block warna 6cm M2 35.000
266 Paving Hexagonal Besar 17,5x6 m2 72.500
267 Paving Hexagonal Besar 17,5x8 m2 96.000
268 Paving Hexagonal L 10x6 m2 96.750
269 Paving Hexagonal L 10x8 m2 96.750
270 Paving Hexagonal S 10x6 m2 72.500
271 Paving Holland 10,5x21x6 m2 70.000
272 Paving Holland 10,5x21x8 m2 95.000
273 Paving Holland 10,5x21x10 m2 123.000
274 Paving L Blok 10,5x15,75x6 m2 73.000
275 Paving L Blok 10,5x15,75x8 m2 73.000
276 Paving Oktagonal 17,5x6 m2 75.000
277 Paving Square 10x10x6 m2 73.000
278 Paving Square 10,5x10,5x6 m2 84.500
279 Paving Square 12x12x6 m2 84.500
280 Paving Square 12x12X8 m2 97.000
281 Paving Square 16x16x6 m2 85.000
282 Paving Square 16x16x8 m2 97.000
283 Paving Std Grass Block (lubang bulat) 48x10 m2 89.000
284 Paving Std Grass Block (lubang kotak) 40x10 m2 86.500
285 Paving Topi uskup, 67 bh/M M2 116.000
286 Paving Trapez 17,5x8 m2 100.000
287 Paving Trapez 17,5x10 m2 100.000
288 PC / Cement (40 Kg) Zak 55.000
PC / Cement Kg 1.375
289 PC / Semen putih (40 kg) Zak 88.000
PC / Semen warna Kg 11.550
290 Plafon Gipsum Furring per m2 terpasang M2 76.300
291 Plafon Gipsum rangka Galvanis per m2 terpasang M2 74.500
292 Plafon Gipsum rangka Hollow per m2 terpasang M2 75.000
293 Plafond Metal Furing m2 81.500
294 Plafond Rangka Galvanis m2 75.000
295 Plafond Rangka Hollow m2 27.300
296 Plamir tembok Kg 20.000
297 Plat Baja Eser Kg 13.500
298 Plitur Liter 44.000
299 Plywood tb.9mm Lembar 126.500
300 Recorder peper bh 24.000
301 Reel pintu dorong ( Terpasang ) Buah 105.000
303 Roll cat bh 21.000
304 Rolling door (terpasang) M 105.000
305 Rooster 10 x 20 cm (PC) Buah 7.200
300 Rooster 15 x 25 cm (PC) Buah 8.300
301 Rooster 15 x 30 cm (PC) Buah 8.300
302 Rooster 20 x 20 cm (PC) Buah 7.700
303 Rooster 25 x 25 cm (PC) Buah 9.400
304 Rooster 30 x 30 cm (PC) Buah 13.400
305 Seng gelombang BJLS 20, panjang 180 cm x 85 cm lembar 48.400
306 Seng gelombang BJLS 20, panjang 210 cm x 85 cm lembar 50.000
307 Seng gelombang BJLS 20, panjang 240 cm x 85 cm lembar 56.000
308 Seng gelombang BJLS 20, panjang 300 cm x 85 cm lembar 68.000
309 Seng plat BJLS 20 x 90 cm m' 24.800
310 Seng plat BJLS 30 x 60 cm m' 22.000
311 sidik Jendela bh 10.000
312 Sidik pintu bh 10.000
313 Sirlak Kg. 9.500
314 Sirtu M3 242.000
16
HARGA
NO URAIAN SATUAN
SATUAN EE
315 Soda Api kg 11.000
316 Solar Liter 5.950
317 Spiritus Liter 12.000
318 Taek wood 90 x 210 x 4 mm Lembar 72.500
319 Taek wood 90 x 210 x 9 mm Lembar 115.000
320 Tali Ijuk Kg 11.000
321 Tanah Lempung M3 49.500
322 Tanah Padas M3 77.000
323 Tanah urug M3 71.500
330 Triplek 120 x 240 x 5 mm Lembar 82.500
331 Triplek 120 x 240 x 9 mm Lembar 126.500
332 Triplek 120 x 240 x 18 mm Lembar 236.500
333 Teakblock 120 x 240 x 18 mm Lembar 295.000
334 Keramik dinding 10 x 20 M 57.700
335 Keramik dinding 20 x 25 M 58.900
336 Keramik dinding 25 x 40 M 77.000
337 Ubin keramik 6 X 20 (lis keramik) buah 4.500
338 Ubin keramik 10 x 20 (polos) M 37.500
339 Ubin keramik 10 x 20 (motif) M 38.200
340 Ubin keramik 20 x 20 (polos) M 57.300
341 Ubin keramik 20 x 20 (motif) M 54.500
342 Ubin keramik 30 x 30 (polos) M 46.300
343 Ubin keramik 30 x 30 (motif) M 52.500
344 Ubin keramik 40 x 40 (polos) M 51.800
345 Ubin keramik 40 x 40 (motif) M 60.000
346 Ubin keramik 60 x 60 (motif) M 121.700
347 Ubin Granit 60 x 60 (polos) M 245.000
348 Wastafel INA bh 190.000
349 Wood tiller ex.IMPRA kg 33.000
350 Zinc washbak bh 206.000
351 U-ditch Uk. 60x100x120 cm unit 1.287.000
352 Cover HD Uk. 74 x 120 cm, tbl. 15 cm unit 522.000
353 U-ditch Uk. 80x100x120 cm unit 1.342.000
354 Cover HD Uk. 94 x 120 cm, tbl. 15 cm unit 660.000
355 Box Culvert Uk. 80 x 80 x 120 cm, tbl. 15 cm unit 3.547.000
BAHAN LAIN-LAIN
1 Alumunium composit Panel ( terpasang ) tbl panel 4 mm ,alumunium = 0.3 m2 665.500
2 Atap Onduline m2 165.000
3 Atap Galvalume warna natural m2 63.200
4 Atap Galvalume fin. Warna m2 43.400
5 Besi hollow 40.40.4 (2 mm) Batang 33.000
6 Besi hollow 30.30.3 (2 mm) Batang 30.300
7 Besi hollo 20.40.4 (2 mm) Batang 27.500
8 Bata Ringan ex Hebbel Uk. 10 x 20 x 60 cm (isi 83 buah/m3) m3 913.000
9 Bondex M10 uk. 2,1 x 5,4 x 0,75 lembar 42.900
10 Fiberglass septictank ex Biofill kpasitas 1000 lt bh 4.400.000
11 Fiberglass septictank ex Biofill kpasitas 1850 lt bh 4.730.000
12 Pagar panel precast ex Arcon t=2m ( terpasang ) m' 495.000
13 Usuk dan reng baja ringan t = 0,75 mm (terpasang) m2 85.200
14 Usuk dan reng baja ringan t = 1 mm (terpasang) m2 115.500
15 wiremesh M6 Uk. 2,1x5,4 lembar 412.500
16 wiremesh M7 Uk. 2,1x5,4 lembar 522.500
17 wiremesh M8 Uk. 2,1x5,4 lembar 632.500
18 wiremesh M10 Uk. 2,1x5,4 lembar 962.500
19 Pengecatan Epoxy
Epoxy coating tebal 200 mikron 132.000
Epoxy coating tebal 300 mikron 165.000
Epoxy coating tebal 500 mikron 209.000
Epoxy coating tebal 1000 mikron 275.000
18
HARGA
NO URAIAN SATUAN
SATUAN EE
7 Pintu air jenis sorong baja dengan roda gigi (stang ganda) B = 1,2 m; H=1,2 unit 43.650.000
8 Pintu air jenis sorong baja dengan roda gigi (stang ganda) B = 1,5 m; H=1, unit 45.450.000
20
HARGA
NO URAIAN SATUAN
SATUAN EE
13 PIPA STEEL SCHEDULE 20 DN.
DN. 12" m' 906.800
DN. 10." m' 764.800
DN. 8" m' 546.300
DN. 6." m' 371.500
DN. 5" m' 273.300
DN. 4" m' 150.200
DN. 2" m' 111.600
ACCESSORIES PIPA
1 Air valve DN 1/2" Buah 153.000
2 Bellmouth bh 54.600
3 Bend GIP DN 1 1/2" Buah 49.100
4 Bend GIP DN 1" Buah 43.700
7 Bend GIP DN 2"-45 Buah 59.000
8 Bend GIP DN 2"-90 Buah 71.000
9 Bend All Flange CI Dn. 2" - 90 o Buah 221.300
10 Bend All Flange CI Dn. 3" - 90 o Buah 498.700
11 Bend All Flange CI Dn. 4" - 45 o Buah 584.200
12 Bend All Flange CI Dn. 4" - 90 o Buah 584.200
13 Bend All Flange CI.Dn. 2" - 45 Buah 221.300
14 Bend All Flange CI.Dn. 3" - 45 o Buah 498.600
15 Bend All Flange GIP DN 4" - 45o Buah 273.100
16 Bend All Flange GIP DN 3" - 45o Buah 262.200
17 Bend All Flange GIP DN 3" - 90o Buah 273.100
18 Bend All Flange GIP DN 4" - 90o Buah 300.400
19 Bend PVC SC SNI DN 2"-45 Buah 27.300
20 Bend PVC SC SNI DN 2"-90 Buah 32.800
21 Bend PVC SNI RRJ DN 3"-90 Buah 109.300
22 Bend Socket Spigot PVC. SNI. DN. 2" - 45 o Buah 12.400
23 Bend Socket Spigot PVC. SNI. DN. 2" - 90 o Buah 39.000
24 Bend Socket Spigot PVC. SNI. DN. 3" - 90 o Buah 45.600
25 Bentonite Kg 9.800
26 Bok Meter Set. 43.700
27 Cap PVC SC DN 1 1/2" Buah 23.100
28 Cap PVC SC DN 1" Buah 8.700
29 Cap PVC SC DN 1/2" Buah 2.200
30 Chek Valve DN 1 1/2" Buah 92.800
21
HARGA
NO URAIAN SATUAN
SATUAN EE
31 Chek Valve DN 2" Buah 218.500
32 Clamp Sadle PVC DN 1 1/2 x 1/2" Buah 53.600
33 Clamp Sadle PVC DN 1 1/2 x 3/4" Buah 53.600
34 Clamp Sadle PVC DN 2 x 1/2" Buah 68.400
35 Clamp Sadle PVC DN 3 x 1" Buah 68.400
36 Coupling DN 1/2" Buah 21.900
37 Coupling DN 3/4" Buah 27.300
38 Double Niple DN 1 1/2" Buah 10.900
39 Double Niple DN 2" Buah 16.300
40 Double Niple DN 3/4" Buah 8.200
41 Flange all threaded GI DN 1,5 Buah 38.200
42 Flange Steele Sambungan Las K.10 Dn. 2" Buah 27.300
43 Flange Steele Sambungan Las K.10 Dn. 3" Buah 54.600
44 Flange Steele Sambungan Las K.10 Dn. 4" buah 109.300
45 Floating Valve DN 3/4" Buah 81.900
46 Foucet Socket PVC DN 1 1/2" Buah 11.200
47 Gate Valve All Flange Dn. 3" Buah 1.763.300
48 Gate Valve All Flange Dn. 4" Buah 1.308.300
49 Gate Valve All Flange Dn. 2" Buah 511.300
50 Gibboult Joint CI. Dn. 2" Buah 89.100
51 Gibboult Joint CI. Dn. 3" Buah 101.300
52 Gibboult Joint CI. Dn. 4" Buah 235.300
53 Knie GIP DN 1,5" Buah 27.300
54 Knie GI DN 1/2" Buah 8.700
55 Knie GI DN 2" Buah 39.300
56 Knie GIP DN 3/4" Buah 9.800
57 Knie PVC SC DN 1 1/2" Buah 8.600
58 Knie PVC SC DN 1" Buah 3.900
59 Knie PVC SC DN 1/2" Buah 2.200
60 Knie PVC SC DN 2" Buah 22.600
61 Kran air DN 1/2" (besi) Buah 27.300
62 Kran air DN 3/4" (Besi) Buah 32.800
65 Manometer DN 1/2" - 25 Kg/cm2 Buah 136.500
66 Pipa Udara /Air Vent DN. 2". unit 109.300
67 Plug Kran DN 3/4" Buah 38.500
68 Reducer all drad GI Dn 2 x 1 1/2" ( VS.d ) Buah 21.900
69 Reducer all drad GI Dn 3 x 2" ( VS.d ) Buah 81.900
70 Reducer all drad GI Dn 4 x 2" ( VS.d ) Buah 163.900
71 Reducer all Flange CI Dn 2 x 1 1/2" Buah 218.500
72 Reducer all Flange CI Dn 3 x 2" Buah 327.800
73 Reducer all Flange CI Dn 3 x 2" Buah 327.800
74 Reducer GI DN 1 1/2" x 1" Buah 16.300
75 Reducer GI DN 150 x 100 Buah 191.900
76 Reducer GI DN 2 x 1,5" Buah 82.700
77 Reducer GI DN 2" x 1 " Buah 72.200
78 Reducer PVC SNI SC DN 2 x 1 1/2" Buah 9.500
79 Reducer PVC SNI SC DN 2 x 1" Buah 12.100
80 Reducer PVC SNI SC DN 1 1/2 x 1" Buah 7.900
81 Seal tape Buah 1.600
82 Shock ND 1,5" Buah 8.600
83 Shock ND 2" Buah 29.500
84 Shock ND 3/4" Buah 3.300
85 Stop Kran KITZ DN 1" Buah 60.600
86 Stop Kran KITZ DN 1 1/2" Buah 112.000
87 Stop Kran KITZ DN 2" Buah 511.300
88 Stop Kran KITZ DN 3/4" Buah 47.200
89 Strainer / Screener DN 2" Buah 147.400
90 Strainer / Screener DN 3" Buah 174.800
91 Strainer / Screener DN 4" Buah 218.500
92 Street box DN 100" ( 4" ) Buah 26.500
93 Tangki Fibre Glass 2 m3 Buah 2.156.400
94 Tee All Flange CI. Dn. 2 x 1 1/2" Buah 4.800
95 Tee All Flange CI. Dn. 2 x 2" Buah 10.600
96 Tee All Flange CI. Dn. 3 x 2" Buah 8.900
97 Tee All Flange CI. Dn. 3 x 3" Buah 5.400
98 Tee All Flange CI. Dn. 4 x 2" Buah 25.700
22
HARGA
NO URAIAN SATUAN
SATUAN EE
99 Tee All Flange CI. Dn. 4 x 3" Buah 39.700
100 Tee All Flange CI. Dn. 4 x 4" Buah 119.500
101 Tee All Flange DN 2 X 2" Buah 59.800
102 Tee Drat GIP DN 1 1/2 X 1 1/2" Buah 15.500
103 Tee Drat GIP DN 2 X 2" Buah 52.400
104 Tee PVC SC DN 1 1/2 x 1 1/2" Buah 12.200
105 Tee PVC SC DN 1 1/2 x 1" Buah 16.200
106 Tee PVC SC DN 1 x 1" Buah 2.400
107 Tee PVC SC DN 1 x 1/2" Buah 4.200
108 Tee PVC SC DN 2 x 2" Buah 23.500
109 Tee PVC SC DN 3 x 2" Buah 185.300
110 Tee PVC SC DN 4 x 2" Buah 228.900
111 Valve Socket PVC DN 1 1/2" Buah 10.300
112 Valve Socket PVC DN 1" Buah 2.000
113 Valve Socket PVC DN 2" Buah 16.200
114 Valve Socket PVC DN 3" Buah 38.000
115 Wall Cuver Dn. 2 X 2" Buah 116.600
116 Wall Cuver Dn. 6 X 2" Buah 175.100
117 Wall Cuver Dn. 6X3" Buah 175.100
118 Wall Cuver GI. Dn 4 x 1 1/2 " buah 109.300
119 Wall Cuver GI. Dn 4 x 2 " buah 109.300
120 Wall Cuver GI. Dn 5 x 1 1/2 " buah 136.500
121 Wall Cuver GI. Dn 5 x 2 " buah 136.500
122 Wall Cuver GI. Dn 6 x 1 1/2 " buah 163.900
123 Wall Cuver GI. Dn 6 x 2 " buah 163.900
124 Wall Cuver GI. Dn 8 x 2 " buah 218.500
125 Wall Pipa All Flange Dn. 3" Buah 273.100
126 Wall Pipa All Flange Dn. 4" Buah 327.800
127 Wall Pipa Galvanis DN. 1 1/2" L. 0,5 m' Buah 136.500
128 Wall Pipa Galvanis DN. 2" L. 0.5 m' Buah 163.900
129 Wall Pipa Galvanis DN. 3" L. 0.5 m' Buah 245.800
130 Water Meter All Flane DN 3" Buah 1.651.900
131 Water Meter All Flnge DN 2" Buah 1.225.800
132 Water Meter DN 1 1/2" Buah 1.092.500
133 Water Meter DN 1" Buah 544.100
134 Water Meter DN 3/4" Buah 357.900
135 Water Moor DN 1,5" Buah 43.700
136 Water Moor DN 2" Buah 59.000
137 Water Moor DN 3/4" Buah 14.200
PENGEBORAN
1 Centraliser Bh 200.000
2 Depresiasi alat redeplopping unit 2.391.000
3 Depresiasi mixer unit 120.000
4 Depresiasi Peralatan logging unit 962.000
5 Depresiasi Peralatan mesin unit 722.000
6 Depresiasi Peralatan pengeboran unit 1.082.000
7 Depresiasi Pompa injeksi unit 481.000
8 Grevel M3 276.000
9 Kawat Las. RB. 26 kg 24.700
10 Kawat Las. RB. 32 kg 22.800
11 Liquid Oil Grundfose liter 289.500
12 Panel Pompa Unit 5.215.500
13 Tiang Kabel bh 840.750
23
HARGA
NO URAIAN SATUAN
SATUAN EE
POMPA AIR UNTUK PENYEDIAAN AIR BERSIH
POMPA SUBMERSIBLE MOTOR CELUP SETARA
GRUNDFOS, RITCH.LOARA DLL
1 MOTOR POMPA 1 PHASE./ 1 X 220 Tot.head
Kapasitas 3 m3/jam 52 m unit 17.791.500
Kapasitas 3 m3/jam 61 m unit 20.084.000
Kapasitas 3 m3/jam 78 m unit 20.688.000
Kapasitas 3 m3/jam 96 m unit 23.104.000
Kapasitas 3 m3/jam 108 m unit 23.735.500
Kapasitas 3 m3/jam 128.m unit 37.738.000
Kapasitas 3 m3/jam 144. unit 39.454.000
24
HARGA
NO URAIAN SATUAN
SATUAN EE
C. BAHAN PEMELIHARAAN SARANA DAN PRASARANA KEBERSIHAN & TAMAN
I PERALATAN
1 Bendo bh 66.000
2 Cangkul garpu buah 38.500
3 Cangkul garuk buah 38.500
4 Cangkul Komplit buah 77.000
5 Cetok buah 27.500
6 Dandang Komplit buah 27.500
7 Deklit m 11.000
8 Engkrak bambu/seng buah 10.500
9 Ganco Komplit buah 93.500
10 Gembor buah 93.500
11 Gerobak sampah buah 4.566.700
12 Golok buah 55.000
13 Grendo ukuran besar buah 110.000
14 Grendo ukuran sedang buah 22.000
15 Gunting Pangkas buah 110.000
16 Gunting potong buah 66.000
17 Gunting Stek buah 55.000
18 Jaring/tutup dump truk buah 55.000
19 Jas hujan buah 62.000
20 Kampak ukuran 2 1/2 buah 82.000
21 Kaos tangan buah 8.000
22 Keranjang sampah buah 33.000
23 Kontainer plat besi buah 49.500.000
24 Kontainer plat kayu buah 55.000.000
25 Koret buah 16.500
26 Kuas buah 16.500
27 Laker roda gerobak buah 273.500
28 Linggis 7/8 bh 60.500
29 Linggis 50 cm bh 88.000
30 Linggis 100cm bh 137.500
31 Martil 5 kg (besar) bh 165.000
32 Masker buah 2.800
33 Pakaian kerja stel 165.000
34 Rafia Besar stel 22.000
35 Sabun detergent stel 13.500
36 Sabit kg 27.500
37 Sapu Lidi Besar kg 9.800
38 Sarangan bh 13.500
39 Sarung Tangan bh 12.900
40 Sekop buah 82.000
41 Sekop komplit psg 82.000
42 Sepatu kerja buah 98.500
43 Skrap bh 11.000
44 Tambang Besar pasang 92.000
45 Topi bh 42.500
IV TANAMAN PENEDUH
1 Akasia lokal (tinggi btg 2m) Batang 275.000
2 Akasia golden (tinggi btg 2m) Batang 275.000
3 Angsana (tinggi btg 2m) Batang 275.000
4 Batavia (tinggi btg 1m) Batang 275.000
5 Bintaro (tinggi btg 2m) Batang 82.500
6 Bintaro (tinggi btg 3m) Batang 165.000
7 Flamboyan (tinggi btg 2m) Batang 82.300
8 Glodogan lokal (tinggi btg 2m) Batang 110.000
9 Glodogan rebak/pecut (tinggi btg 2m) Batang 110.000
10 Ketapang (tinggi btg 2m) Batang 82.500
11 Ketapang Kencana (tinggi btg 2m) Batang 287.500
12 Kupu-kupu (tinggi btg 2m) Batang 110.000
13 Palem ekor tupai (tinggi btg 2m) Batang 440.000
14 Palem putri (tinggi btg 2m) Batang 330.000
15 Palem raja (tinggi btg 1m) Batang 220.000
16 Pandan bali (tinggi btg 2m) Batang 220.000
17 Spatudea Campanulata (tinggi btg 2m) Batang 110.000
18 Tabebuya/Semarangan (tinggi btg 2m) Batang 165.000
19 Tanjung (tinggi btg 2m) Batang 165.000
20 Cemara udang (tinggi btg 1 m) Batang 1.092.500
21 Pupus merah (tinggi btg 1 m) Batang 80.500
22 Palem ponik Kecil Batang 129.300
23 Ponik Batang 186.800
24 Kamboja bali (tinggi btg 1 m ) Batang 165.000
V PUPUK
1 Bokashi kg 5.000
2 NPK kg 13.200
3 Pupuk daun hyponek liter 16.000
4 Pupuk atonik botol 30.000
5 Pupuk gandasil bungkus 71.800
6 Pupuk kandang kg 6.600
7 Pupuk majemuk / NPK kg 20.000
8 Pupuk majemuk lengkap tablet kg 40.000
9 Pupuk pelengkap air kg 71.000
10 SP 36 kg 8.500
11 Urea kg 8.800
12 Roung up botol 98.700
VI POT
1 Pot bulat keci l 50 cm bh 230.000
2 Pot bulat sedang 65 cm bh 385.000
3 Pot bulat besar 80 cm bh 517.600
4 Pot kotak kecil bh 172.500
5 Pot kotak panjang bh 352.000
VII PLASTIK
30
HARGA
NO URAIAN SATUAN
SATUAN EE
1 Polybag (18x20) kg 35.000
2 Plastik Gelar HDPE m 30.000
3 Plastik Gelar LDPE m 15.000
35
HARGA
NO URAIAN SATUAN
SATUAN EE
36 ROCK DRILL BREAKER - - Jam 350.900,00
37 COLD MILLING - - Jam 43.500,00
38 GEO LISTRIK Hari 2.500.000,00
39 BOREHOLE Meter 822.300,00
40 TEMPORARY CASSING (ID) Meter 464.200,00
41 DRILLING RIG +PERLENGKAPAN (PEMASANGAN PIPA) Meter 834.200,00
42 DRILLING RIG +PERLENGKAPAN (PENCUCIAN SUMUR) M3 746.500,00
43 DRILLING RIG +PERLENGKAPAN (UJI PEMPOMPAAN) M3 242.300,00
36
A. 3.2.1. HARGA SATUAN PEKERJAAN PONDASI
A. 3.2.1. 1. Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 3PP 1.026.159,38
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 1,500 60.000,00 90.000,00
Tukang Batu L.02 OH 0,750 75.000,00 56.250,00
Kepala Tukang L.03 OH 0,075 80.000,00 6.000,00
Mandor L.04 OH 0,075 80.000,00 6.000,00
JUMLAH TENAGA KERJA 158.250,00
B BAHAN
Batu Belah 15/20 m3 1,200 258.000,00 309.600,00
Semen Kg 202,000 1.375,00 277.750,00
Pasir Pasang m3 0,485 302.500,00 146.712,50
JUMLAH HARGA BAHAN 734.062,50
C PERALATAN
D Jumlah A + B + C 849.275,00
E Overhead & Profit 15% x D 127.391,25
F Harga Satuan Pekerjaan (D+E) 976.666,25
D Jumlah A + B + C 819.410,00
E Overhead & Profit 15% x D 122.911,50
F Harga Satuan Pekerjaan (D+E) 942.321,50
D Jumlah A + B + C 798.427,50
E Overhead & Profit 15% x D 119.764,13
F Harga Satuan Pekerjaan (D+E) 918.191,63
D Jumlah A + B + C 769.635,00
E Overhead & Profit 15% x D 115.445,25
F Harga Satuan Pekerjaan (D+E) 885.080,25
A. 3.2.1. 6. Pemasangan 1 m3 Pondasi Batu Belah Campuran 1SP : 1KP : 2PP 742.325,00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,500 60.000,00 90.000,00
Tukang Batu L.02 OH 0,750 75.000,00 56.250,00
Kepala Tukang L.03 OH 0,075 80.000,00 6.000,00
Mandor L.04 OH 0,075 80.000,00 6.000,00
JUMLAH TENAGA KERJA 158.250,00
B BAHAN
Batu Belah 15/20 m3 1,200 258.000,00 309.600,00
Kapur Pasang (KP) m3 0,170 247.500,00 42.075,00
Semen Merah (SM) Kg 0,170 192.500,00 32.725,00
Pasir Pasang m3 0,340 302.500,00 102.850,00
JUMLAH HARGA BAHAN 487.250,00
C PERALATAN
D Jumlah A + B + C 645.500,00
E Overhead & Profit 15% x D 96.825,00
F Harga Satuan Pekerjaan (D+E) 742.325,00
D Jumlah A + B + C 736.937,50
E Overhead & Profit 15% x D 110.540,63
F Harga Satuan Pekerjaan (D+E) 847.478,13
D Jumlah A + B + C 714.855,00
E Overhead & Profit 15% x D 107.228,25
F Harga Satuan Pekerjaan (D+E) 822.083,25
D Jumlah A + B + C 448.050,00
E Overhead & Profit 15% x D 67.207,50
F Harga Satuan Pekerjaan (D+E) 515.257,50
3
A. 3.2.1. 10. Pemasangan 1 m Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR dan 2.273.731,70
40% Batu Belah
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A. TENAGA
Pekerja L.01 OH 3,400 60.000,00 204.000,00
Tukang Batu L.02 OH 0,850 75.000,00 63.750,00
Kepala Tukang L.03 OH 0,085 80.000,00 6.800,00
Mandor L.04 OH 0,170 80.000,00 13.600,00
JUMLAH TENAGA KERJA 288.150,00
B BAHAN
Batu Belah 15/20 cm m3 0,480 258.000,00 123.840,00
Besi Beton Kg 126,000 8.800,00 1.108.800,00
Semen Kg 194,000 1.375,00 266.750,00
Pasir Beton m3 0,312 302.500,00 94.380,00
Koral Beton m3 0,468 148.500,00 69.498,00
Kawat Beton Kg 1,800 14.300,00 25.740,00
JUMLAH HARGA BAHAN 1.689.008,00
C PERALATAN
D Jumlah A + B + C 1.977.158,00
E Overhead & Profit 15% x D 296.573,70
F Harga Satuan Pekerjaan (D+E) 2.273.731,70
D Jumlah A + B + C 766.648,00
E Overhead & Profit 15% x D 114.997,20
F Harga Satuan Pekerjaan (D+E) 881.645,20
A 4.1.1. 1 Membuat 1 m3 Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87 1.019.355,48
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,650 60.000,00 99.000,00
Tukang Batu L.02 OH 0,275 75.000,00 20.625,00
Kepala Tukang L.03 OH 0,028 80.000,00 2.240,00
Mandor L.04 OH 0,083 80.000,00 6.640,00
JUMLAH TENAGA KERJA 128.505,00
B BAHAN
Semen Kg 247,000 1.375,00 339.625,00
Pasir Beton Kg 869,000 216,07 187.766,07
Kerikil (maksimum 30 mm) Kg 999,000 228,15 227.920,00
Air ltr 215,000 12,00 2.580,00
JUMLAH HARGA BAHAN 757.891,07
C PERALATAN
D Jumlah A + B + C 886.396,07
E Overhead & Profit 15% x D 132.959,41
F Harga Satuan Pekerjaan (D+E) 1.019.355,48
A 4.1.1. 2 Membuat 1 m3 Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78 1.058.434,78
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,650 60.000,00 99.000,00
Tukang Batu L.02 OH 0,275 75.000,00 20.625,00
Kepala Tukang L.03 OH 0,028 80.000,00 2.240,00
Mandor L.04 OH 0,083 80.000,00 6.640,00
JUMLAH TENAGA KERJA 128.505,00
B BAHAN
Semen Kg 276,000 1.375,00 379.500,00
Pasir Beton kg 828,000 216,07 178.907,14
Kerikil (maksimum 30 mm) kg 1.012,000 228,15 230.885,93
Air ltr 215,000 12,00 2.580,00
JUMLAH HARGA BAHAN 791.873,07
C PERALATAN
D Jumlah A + B + C 920.378,07
E Overhead & Profit 15% x D 138.056,71
F Harga Satuan Pekerjaan (D+E) 1.058.434,78
D Jumlah A + B + C 946.877,74
E Overhead & Profit 15% x D 142.031,66
F Harga Satuan Pekerjaan (D+E) 1.088.909,40
A 4.1.1. 4 Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0 965.206,42
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,200 60.000,00 72.000,00
Tukang Batu L.02 OH 0,200 75.000,00 15.000,00
Kepala Tukang L.03 OH 0,020 80.000,00 1.600,00
Mandor L.04 OH 0,060 80.000,00 4.800,00
JUMLAH TENAGA KERJA 93.400,00
B BAHAN
Semen Kg 230,000 1.375,00 316.250,00
Pasir Beton kg 893,000 216,07 192.951,79
Kerikil (maksimum 30 mm) kg 1.027,000 228,15 234.308,15
Air ltr 200,000 12,00 2.400,00
JUMLAH HARGA BAHAN 745.909,93
C PERALATAN
D Jumlah A + B + C 839.309,93
E Overhead & Profit 15% x D 125.896,49
F Harga Satuan Pekerjaan (D+E) 965.206,42
D Jumlah A + B + C 978.313,73
E Overhead & Profit 15% x D 146.747,06
F Harga Satuan Pekerjaan (D+E) 1.125.060,79
A 4.1.1. 6 Membuat 1 m3 Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61 1.159.492,05
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,650 60.000,00 99.000,00
Tukang Batu L.02 OH 0,275 75.000,00 20.625,00
Kepala Tukang L.03 OH 0,028 80.000,00 2.240,00
Mandor L.04 OH 0,083 80.000,00 6.640,00
JUMLAH TENAGA KERJA 128.505,00
B BAHAN
Semen Kg 352,000 1.375,00 484.000,00
Pasir Beton Kg 731,000 216,07 157.948,21
Kerikil (maksimum 30 mm) Kg 1.031,000 228,15 235.220,74
Air ltr 215,000 12,00 2.580,00
JUMLAH HARGA BAHAN 879.748,96
C PERALATAN
D Jumlah A + B + C 1.008.253,96
E Overhead & Profit 15% x D 151.238,09
F Harga Satuan Pekerjaan (D+E) 1.159.492,05
D Jumlah A + B + C 1.030.898,97
E Overhead & Profit 15% x D 154.634,85
F Harga Satuan Pekerjaan (D+E) 1.185.533,81
A 4.1.1. 8 Membuat 1 m3 Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56 1.202.500,21
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,650 60.000,00 99.000,00
Tukang Batu L.02 OH 0,275 75.000,00 20.625,00
Kepala Tukang L.03 OH 0,028 80.000,00 2.240,00
Mandor L.04 OH 0,083 80.000,00 6.640,00
JUMLAH TENAGA KERJA 128.505,00
B BAHAN
Semen Kg 384,000 1.375,00 528.000,00
Pasir Beton Kg 692,000 216,07 149.521,43
Kerikil (maksimum 30 mm) Kg 1.039,000 228,15 237.045,93
Air ltr 215,000 12,00 2.580,00
JUMLAH HARGA BAHAN 917.147,35
C PERALATAN
D Jumlah A + B + C 1.045.652,35
E Overhead & Profit 15% x D 156.847,85
F Harga Satuan Pekerjaan (D+E) 1.202.500,21
D Jumlah A + B + C 1.071.207,86
E Overhead & Profit 15% x D 160.681,18
F Harga Satuan Pekerjaan (D+E) 1.231.889,04
A 4.1.1. 10 Membuat 1 m3 Beton mutu f'c=26,4 MPa (K300), slum (122)cm, w/c = 0,52 1.240.900,49
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1,650 60.000,00 99.000,00
Tukang Batu L.02 OH 0,275 75.000,00 20.625,00
Kepala Tukang L.03 OH 0,028 80.000,00 2.240,00
Mandor L.04 OH 0,083 80.000,00 6.640,00
JUMLAH TENAGA KERJA 128.505,00
B BAHAN
Semen Kg 413,000 1.375,00 567.875,00
Pasir Beton Kg 681,000 216,07 147.144,64
Kerikil (maksimum 30 mm) Kg 1.021,000 228,15 232.939,26
Air ltr 215,000 12,00 2.580,00
JUMLAH HARGA BAHAN 950.538,90
C PERALATAN
D Jumlah A + B + C 1.079.043,90
E Overhead & Profit 15% x D 161.856,59
F Harga Satuan Pekerjaan (D+E) 1.240.900,49
D Jumlah A + B + C 1.143.939,89
E Overhead & Profit 15% x D 171.590,98
F Harga Satuan Pekerjaan (D+E) 1.315.530,88
A 4.1.1. 12 Membuat 1 m3 Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48 1.327.442,46
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 2,100 60.000,00 126.000,00
Tukang Batu L.02 OH 0,350 75.000,00 26.250,00
Kepala Tukang L.03 OH 0,035 80.000,00 2.800,00
Mandor L.04 OH 0,105 80.000,00 8.400,00
JUMLAH TENAGA KERJA 163.450,00
B BAHAN
Semen Kg 448,000 1.375,00 616.000,00
Pasir Beton Kg 667,000 216,07 144.119,64
Kerikil (maksimum 30 mm) Kg 1.000,000 228,15 228.148,15
Air ltr 215,000 12,00 2.580,00
JUMLAH HARGA BAHAN 990.847,79
C PERALATAN
D Jumlah A + B + C 1.154.297,79
E Overhead & Profit 15% x D 173.144,67
F Harga Satuan Pekerjaan (D+E) 1.327.442,46
D Jumlah A + B + C 104.875,00
E Overhead & Profit 15% x D 15.731,25
F Harga Satuan Pekerjaan (D+E) 120.606,25
D Jumlah A + B + C 150.190,00
E Overhead & Profit 15% x D 22.528,50
F Harga Satuan Pekerjaan (D+E) 172.718,50
D Jumlah A + B + C 204.200,00
E Overhead & Profit 15% x D 30.630,00
F Harga Satuan Pekerjaan (D+E) 234.830,00
D Jumlah A + B + C 222.225,00
E Overhead & Profit 15% x D 33.333,75
F Harga Satuan Pekerjaan (D+E) 255.558,75
D Jumlah A + B + C 368.125,00
E Overhead & Profit 15% x D 55.218,75
F Harga Satuan Pekerjaan (D+E) 423.343,75
D Jumlah A + B + C 378.940,00
E Overhead & Profit 15% x D 56.841,00
F Harga Satuan Pekerjaan (D+E) 435.781,00
D Jumlah A + B + C 455.525,00
E Overhead & Profit 15% x D 68.328,75
F Harga Satuan Pekerjaan (D+E) 523.853,75
D Jumlah A + B + C 414.350,00
E Overhead & Profit 15% x D 62.152,50
F Harga Satuan Pekerjaan (D+E) 476.502,50
D Jumlah A + B + C 331.575,00
E Overhead & Profit 15% x D 49.736,25
F Harga Satuan Pekerjaan (D+E) 381.311,25
D Jumlah A + B + C 128.167,00
E Overhead & Profit 15% x D 19.225,05
F Harga Satuan Pekerjaan (D+E) 147.392,05
D Jumlah A + B + C 3.595.740,00
E Overhead & Profit 15% x D 539.361,00
F Harga Satuan Pekerjaan (D+E) 4.135.101,00
D Jumlah A + B + C 4.402.785,00
E Overhead & Profit 15% x D 660.417,75
F Harga Satuan Pekerjaan (D+E) 5.063.202,75
A 4.1.1. 30. Membuat 1 m3 Kolom Beton Bertulang (300 kg Besi + Bekisting) 8.603.707,75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
AHSP_ CK 2016 SMSTR 1 54 / 58 4.1.1 Pek Beton
A TENAGA
Pekerja L.01 OH 7,050 60.000,00 423.000,00
Tukang batu L.02 OH 0,275 75.000,00 20.625,00
Tukang Kayu L.02 OH 1,650 75.000,00 123.750,00
Tukang Besi L.02 OH 2,100 75.000,00 157.500,00
Kepala Tukang L.03 OH 0,403 80.000,00 32.240,00
Mandor L.04 OH 0,353 80.000,00 28.240,00
JUMLAH TENAGA KERJA 785.355,00
B BAHAN
Kayu Klas III (Terentang) m3 0,400 3.605.000,00 1.442.000,00
Paku Biasa 2" - 5" Kg 4,000 13.800,00 55.200,00
Minyak Bekisting Ltr 2,000 10.000,00 20.000,00
Besi Beton Polos kg 315,000 8.800,00 2.772.000,00
Kawat Beton kg 4,500 14.300,00 64.350,00
Semen Kg 336,000 1.375,00 462.000,00
Pasir Beton m3 0,540 302.500,00 163.350,00
Kerikil Beton m3 0,810 308.000,00 249.480,00
Kayu Klas III Balok m3 0,150 3.605.000,00 540.750,00
Plywood 9 mm Lbr 3,500 140.000,00 490.000,00
Dolken diameter 8 / 4rm Btg 20,000 21.850,00 437.000,00
JUMLAH HARGA BAHAN 6.696.130,00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 7.481.485,00
E Overhead & Profit 15% x D 1.122.222,75
F Harga Satuan Pekerjaan (D+E) 8.603.707,75
A 4.1.1. 31. Membuat 1 m3 Balok Beton Bertulang (200 kg Besi + Bekisting) 6.794.481,75
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6,350 60.000,00 381.000,00
Tukang batu L.02 OH 0,275 75.000,00 20.625,00
Tukang Kayu L.02 OH 1,650 75.000,00 123.750,00
Tukang Besi L.02 OH 1,400 75.000,00 105.000,00
Kepala Tukang L.03 OH 0,333 80.000,00 26.640,00
Mandor L.04 OH 0,318 80.000,00 25.440,00
JUMLAH TENAGA KERJA 682.455,00
B BAHAN
Kayu Klas III (Terentang) m3 0,320 3.605.000,00 1.153.600,00
Paku Biasa 2" - 5" Kg 3,200 13.800,00 44.160,00
Minyak Bekisting Ltr 1,600 10.000,00 16.000,00
Besi Beton Polos Kg 210,000 8.800,00 1.848.000,00
Kawat Beton Kg 3,000 14.300,00 42.900,00
Semen Kg 336,000 1.375,00 462.000,00
Pasir Beton m3 0,540 302.500,00 163.350,00
Kerikil Beton m3 0,810 308.000,00 249.480,00
Kayu Klas III Balok m3 0,140 3.605.000,00 504.700,00
Plywood 9 mm Lbr 2,800 140.000,00 392.000,00
Dolken diameter 8 / 4rm Btg 16,000 21.850,00 349.600,00
JUMLAH HARGA BAHAN 5.225.790,00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 5.908.245,00
E Overhead & Profit 15% x D 886.236,75
F Harga Satuan Pekerjaan (D+E) 6.794.481,75
A 4.1.1. 32. Membuat 1 m3 Balok Beton Bertulang (150 kg Besi + Bekisting) 6.426.016,00
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 5,300 60.000,00 318.000,00
Tukang batu L.02 OH 0,275 75.000,00 20.625,00
D Jumlah A + B + C 5.587.840,00
E Overhead & Profit 15% x D 838.176,00
F Harga Satuan Pekerjaan (D+E) 6.426.016,00
A 4.1.1. 33. Membuat 1 m3 Dinding Beton Bertulang (150 kg Besi + Bekisting) 6.058.890,00
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 5,300 60.000,00 318.000,00
Tukang batu L.02 OH 0,275 75.000,00 20.625,00
Tukang Kayu L.02 OH 1,300 75.000,00 97.500,00
Tukang Besi L.02 OH 1,050 75.000,00 78.750,00
Kepala Tukang L.03 OH 0,262 80.000,00 20.960,00
Mandor L.04 OH 0,265 80.000,00 21.200,00
JUMLAH TENAGA KERJA 557.035,00
B BAHAN
Kayu Klas III (Terentang) m3 0,240 3.605.000,00 865.200,00
Paku Biasa 2" - 5" Kg 3,200 13.800,00 44.160,00
Minyak Bekisting Ltr 1,600 10.000,00 16.000,00
Besi Beton Polos Kg 157,500 8.800,00 1.386.000,00
Kawat Beton Kg 2,250 14.300,00 32.175,00
Semen Kg 336,000 1.375,00 462.000,00
Pasir Beton m3 0,540 302.500,00 163.350,00
Kerikil Beton m3 0,810 308.000,00 249.480,00
Kayu Klas III Balok m3 0,160 3.605.000,00 576.800,00
Plywood 9 mm Lbr 2,800 140.000,00 392.000,00
Dolken diameter 8 / 4rm Btg 24,000 21.850,00 524.400,00
JUMLAH HARGA BAHAN 4.711.565,00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 5.268.600,00
E Overhead & Profit 15% x D 790.290,00
F Harga Satuan Pekerjaan (D+E) 6.058.890,00
A 4.1.1. 35 Membuat 1 m' Kolom Penguat Beton Bertulang (11 x 11) cm 70.125,28
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0,180 60.000,00 10.800,00
Tukang batu L.02 OH 0,020 75.000,00 1.500,00
Tukang Kayu L.02 OH 0,020 75.000,00 1.500,00
Tukang Besi L.02 OH 0,020 75.000,00 1.500,00
Kepala Tukang L.03 OH 0,006 80.000,00 480,00
Mandor L.04 OH 0,009 80.000,00 720,00
JUMLAH TENAGA KERJA 16.500,00
B BAHAN
Kayu Klas III (Terentang) m3 0,002 3.605.000,00 7.210,00
Paku Biasa 2" - 5" Kg 0,010 13.800,00 138,00
Besi Beton Polos Kg 3,000 8.800,00 26.400,00
Kawat Beton Kg 0,045 14.300,00 643,50
Semen Kg 4,000 1.375,00 5.500,00
Pasir Beton m3 0,006 302.500,00 1.815,00
Kerikil Beton m3 0,009 308.000,00 2.772,00
JUMLAH HARGA BAHAN 44.478,50
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah A + B + C 60.978,50
E Overhead & Profit 15% x D 9.146,78
F Harga Satuan Pekerjaan (D+E) 70.125,28
D Jumlah A + B + C 85.636,00
E Overhead & Profit 15% x D 12.845,40
F Harga Satuan Pekerjaan (D+E) 98.481,40