BERDASARKAN SNI
TAHUN ANGGARAN 2011
KOTA PROBOLINGGO
IV PEKERJAAN PLESTERAN
1 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm
- Semen Portland 10.224 Kg 1,200.00 12,268.80
- Pasir Pasang 0.020 M3 125,000.00 2,500.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.150 Oh 85,000.00 12,750.00
~ Kepala Tukang 0.015 Oh 95,000.00 1,425.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 52,943.80
2 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm
- Semen Portland 7.776 Kg 1,200.00 9,331.20
- Pasir Pasang 0.023 M3 125,000.00 2,875.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.150 Oh 85,000.00 12,750.00
~ Kepala Tukang 0.015 Oh 95,000.00 1,425.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 50,381.20
3 1 m2 Plesteran Halus 1 Pc : 5 Ps, tebal 15 mm
- Semen Portland 5.184 Kg 1,200.00 6,220.80
- Pasir Pasang 0.026 M3 125,000.00 3,250.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.150 Oh 85,000.00 12,750.00
~ Kepala Tukang 0.015 Oh 95,000.00 1,425.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 47,645.80
4 1 m2 Plesteran Halus 1 Pc : 6 Ps, tebal 15 mm
- Semen Portland 4.416 Kg 1,200.00 5,299.20
- Pasir Pasang 0.027 M3 125,000.00 3,375.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.150 Oh 85,000.00 12,750.00
~ Kepala Tukang 0.015 Oh 95,000.00 1,425.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 46,849.20
5 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm
1 2 3 4 5 6 7
- Semen Portland 3.456 Kg 1,200.00 4,147.20
- Pasir Pasang 0.029 M3 125,000.00 3,625.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.150 Oh 85,000.00 12,750.00
~ Kepala Tukang 0.015 Oh 95,000.00 1,425.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 45,947.20
6 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm
- Semen Portland 13.632 Kg 1,200.00 16,358.40
- Pasir Pasang 0.027 M3 125,000.00 3,375.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Batu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.0220 Oh 100,000.00 2,200.00 70,833.40
1 2 3 4 5 6 7
7 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm
- Semen Portland 10.368 Kg 1,200.00 12,441.60
- Pasir Pasang 0.031 M3 125,000.00 3,875.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Batu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.0220 Oh 100,000.00 2,200.00 67,416.60
8 1 m2 Plesteran Halus 1 Pc : 5 Ps, tebal 20 mm
- Semen Portland 6.912 Kg 1,200.00 8,294.40
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Batu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.022 Oh 100,000.00 2,200.00 63,769.40
9 1 m2 Plesteran Ciprat 1 Pc : 2 Ps
- Semen Portland 4.320 Kg 1,200.00 5,184.00
- Pasir Pasang 0.006 M3 125,000.00 750.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 39,384.00
10 1 m2 Finishing Siar Pas. Dinding
- Semen Portland 3.108 Kg 1,200.00 3,729.60
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Batu 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.008 Oh 95,000.00 760.00
~ Mandor 0.008 Oh 100,000.00 800.00 22,914.60
11 1 m2 Finishing Siar 1 Pc : 2 Ps, Pas. Batu Kali
- Semen Portland 6.340 Kg 1,200.00 7,608.00
- Pasir Pasang 0.012 M3 125,000.00 1,500.00
- Upah Pekerjaan
~ Pekerja 0.300 Oh 75,000.00 22,500.00
~ Tukang Batu 0.150 Oh 85,000.00 12,750.00
~ Kepala Tukang 0.015 Oh 95,000.00 1,425.00
~ Mandor 0.015 Oh 100,000.00 1,500.00 47,283.00
12 1 m2 Acian
- Semen Portland 3.250 Kg 1,200.00 3,900.00
- Upah Pekerjaan
~ Pekerja 0.200 Oh 75,000.00 15,000.00
~ Tukang Batu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.010 Oh 100,000.00 1,000.00 29,350.00
13 1 m1 Benangan
- Semen Portland 1.440 Kg 1,200.00 1,728.00
- Pasir Pasang 0.010 M3 125,000.00 1,250.00
- Upah Pekerjaan
~ Pekerja 0.105 Oh 75,000.00 7,875.00
~ Tukang Batu 0.049 Oh 85,000.00 4,165.00
~ Kepala Tukang 0.005 Oh 95,000.00 465.50
~ Mandor 0.006 Oh 100,000.00 560.00 16,043.50
14 1 m1 Tali air
- Semen Portland 0.600 Kg 1,200.00 720.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Batu 0.033 Oh 85,000.00 2,776.67
~ Kepala Tukang 0.003 Oh 95,000.00 310.33
~ Mandor 0.004 Oh 100,000.00 373.33 9,430.33
V PEKERJAAN LANTAI
1 2 3 4 5 6 7
1 1 m2 Pasang Lantai Keramik 30 X 30 cm Putih KW I
- Keramik 30 x 30 cm 1.080 M2 36,300.00 39,204.00
- Semen Portland 10.000 Kg 1,200.00 12,000.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.018 Oh 100,000.00 1,750.00 119,366.50
1 2 3 4 5 6 7
2 1 m2 Pasang Lantai Keramik 40 x 40 cm putih KW I
- Keramik 40 x 40 cm 1.105 M2 45,500.00 50,277.50
- Semen Portland 9.800 Kg 1,200.00 11,760.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 1.300 Kg 12,000.00 15,600.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.018 Oh 100,000.00 1,750.00 127,800.00
3 1 m2 Pasang Lantai Keramik Warna KM/WC 20 x 20 cm
- Keramik 20 x 20 cm 1.060 M2 50,000.00 53,000.00
- Semen Portland 10.400 Kg 1,200.00 12,480.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.018 Oh 100,000.00 1,750.00 133,642.50
4 1 m2 Pasang Lantai Keramik 30 x 30 cm Warna KW I
- Keramik 30 x 30 cm 1.080 M2 40,000.00 43,200.00
- Semen Portland 10.000 Kg 1,200.00 12,000.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.018 Oh 100,000.00 1,750.00 123,362.50
5 1 m2 Pasang Lantai Keramik 30 x 30 cm Motif Kasar KW1
- Keramik 30 x 30 cm Kasar 1.080 M2 36,000.00 38,880.00
- Semen Portland 10.000 Kg 1,200.00 12,000.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.018 Oh 100,000.00 1,750.00 119,042.50
6 1 m2 Pasang Lantai Keramik 40 x 40 cm warna KW I
- Keramik 40 x 40 cm 1.105 M2 65,000.00 71,825.00
- Semen Portland 9.800 Kg 1,200.00 11,760.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 1.300 Kg 12,000.00 15,600.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.018 Oh 100,000.00 1,750.00 149,347.50
7 1 m2 Pasang Keramik Dinding 20 x 25 cm putih KW I
- Keramik 20 x 25 cm 1.060 M2 50,000.00 53,000.00
- Semen Portland 9.300 Kg 1,200.00 11,160.00
- Pasir Pasang 0.018 M3 125,000.00 2,250.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.450 Oh 75,000.00 33,750.00
~ Tukang Batu 0.225 Oh 85,000.00 19,125.00
~ Kepala Tukang 0.023 Oh 95,000.00 2,137.50
~ Mandor 0.023 Oh 100,000.00 2,250.00 141,672.50
8 1 m2 Pasang Keramik Dinding 20 x 25 cm warna KW I
- Keramik 20 x 25 cm 1.060 M2 55,000.00 58,300.00
- Semen Portland 9.300 Kg 1,200.00 11,160.00
1 2 3 4 5 6 7
- Pasir Pasang 0.018 M3 125,000.00 2,250.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.450 Oh 75,000.00 33,750.00
~ Tukang Batu 0.225 Oh 85,000.00 19,125.00
~ Kepala Tukang 0.023 Oh 95,000.00 2,137.50
~ Mandor 0.023 Oh 100,000.00 2,250.00 146,972.50
9 1 m1 Pasang List Keramik Dinding 5 x 20 cm warna KW I
- List Keramik 5 x 20 cm 5.300 bh 5,000.00 26,500.00
- Semen Portland 0.493 Kg 1,200.00 591.48
- Pasir Pasang 0.0010 M3 125,000.00 125.00
- Semen Warna 1.500 Kg 12,000.00 18,000.00
- Upah Pekerjaan
~ Pekerja 0.048 Oh 75,000.00 3,577.50
~ Tukang Batu 0.024 Oh 85,000.00 2,023.00
~ Kepala Tukang 0.002 Oh 95,000.00 228.00
~ Mandor 0.0024 Oh 100,000.00 240.00 51,284.98
1 2 3 4 5 6 7
10 1 m2 Pasang Lantai Tegel Abu-abu
- Tegel Abu-abu 1.060 M2 140,000.00 148,400.00
- Semen Portland 10.400 Kg 1,200.00 12,480.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Upah Pekerjaan
~ Pekerja 0.270 Oh 75,000.00 20,250.00
~ Tukang Batu 0.135 Oh 85,000.00 11,475.00
~ Kepala Tukang 0.014 Oh 95,000.00 1,330.00
~ Mandor 0.0140 Oh 100,000.00 1,400.00 200,960.00
11 1 m2 Pasang Batu Alam Candi
- Batu Alam Candi 1.100 M2 115,000.00 126,500.00
- Semen Portland 11.750 kg 1,200.00 14,100.00
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.0175 Oh 100,000.00 1,750.00 189,512.50
12 1 m2 Pasang Batu Alam Garis
- Batu Alam Garis 1.100 M2 43,000.00 47,300.00
- Semen Portland 11.750 kg 1,200.00 14,100.00
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.0175 Oh 100,000.00 1,750.00 110,312.50
13 1 m2 Pasang Batu Alam Koral/Ampyang
- Batu Alam Koral/Ampyang 1.100 M2 50,000.00 55,000.00
- Semen Portland 11.750 kg 1,200.00 14,100.00
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.0175 Oh 100,000.00 1,750.00 118,012.50
14 1 m2 Pasang Batu Alam Palimanan, Sukabumi, Lempeng 10/10
- Batu Alam Palimanan 1.100 M2 85,000.00 93,500.00
- Semen Portland 11.750 kg 1,200.00 14,100.00
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.0175 Oh 100,000.00 1,750.00 156,512.50
15 1 m2 Pasang Batu Alam Lempeng/Piring
- Batu Alam Lempeng 1.100 M2 38,600.00 42,460.00
- Semen Portland 11.750 kg 1,200.00 14,100.00
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.018 Oh 95,000.00 1,662.50
~ Mandor 0.0175 Oh 100,000.00 1,750.00 105,472.50
16 1 Bh Pasang Glass Block
- Glass Block 1.000 Bh 21,000.00 21,000.00
- Semen Portland 0.150 kg 1,200.00 180.00
- Upah Pekerjaan 1.000 ls 3,000.00 3,000.00 24,180.00
17 1 m2 Pasang Wall covering lebar 50 cm
- Vinyl wall covering, lebar 50 cm 2.200 M 70,000.00 154,000.00
- Lem 0.250 Kg 11,750.00 2,937.50
- Upah Pekerjaan
~ Pekerja 0.350 Oh 75,000.00 26,250.00
1 2 3 4 5 6 7
~ Tukang Batu 0.175 Oh 85,000.00 14,875.00
~ Kepala Tukang 0.170 Oh 95,000.00 16,150.00
~ Mandor 0.0200 Oh 100,000.00 2,000.00 216,212.50
VI PEKERJAAN ATAP
1 1 m3 Pasang Konstruksi Kuda-kuda Ekspose Kayu Jati ( Klas I)
- Kayu Jati, balok 1.200 M3 9,200,000.00 11,040,000.00
- Besi Strip 15.00 Kg 6,666.00 99,990.00
- Paku Biasa 2" - 5" 5.60 Kg 12,500.00 70,000.00
- Upah Pekerjaan
~ Pekerja 6.700 Oh 75,000.00 502,500.00
~ Tukang Kayu 20.100 Oh 85,000.00 1,708,500.00
~ Kepala Tukang 2.010 Oh 95,000.00 190,950.00
~ Mandor 0.335 Oh 100,000.00 33,500.00 13,645,440.00
1 2 3 4 5 6 7
2 1 m3 Pasang Konstruksi Kuda-kuda Kayu Jati ( Klas I)
- Kayu Jati, balok 1.100 M3 9,200,000.00 10,120,000.00
- Besi Strip 15.00 Kg 6,666.00 99,990.00
- Paku Biasa 2" - 5" 5.60 Kg 12,500.00 70,000.00
- Upah Pekerjaan
~ Pekerja 4.000 Oh 75,000.00 300,000.00
~ Tukang Kayu 12.000 Oh 85,000.00 1,020,000.00
~ Kepala Tukang 1.200 Oh 95,000.00 114,000.00
~ Mandor 0.200 Oh 100,000.00 20,000.00 11,743,990.00
4 1 m3 Pasang Konstruksi Kuda-kuda Kayu Meranti Asli (MA)
- Kayu Meranti Asli, balok 1.100 M3 5,200,000.00 5,720,000.00
- Besi Strip 15.00 Kg 6,666.00 99,990.00
- Paku Biasa 2" - 5" 5.60 Kg 12,500.00 70,000.00
- Upah Pekerjaan
~ Pekerja 4.000 Oh 75,000.00 300,000.00
~ Tukang Kayu 12.000 Oh 85,000.00 1,020,000.00
~ Kepala Tukang 1.200 Oh 95,000.00 114,000.00
~ Mandor 0.200 Oh 100,000.00 20,000.00 7,343,990.00
5 1 m3 Pasang Konstruksi Kuda-kuda Kayu Kruing
- Kayu Kruing, balok 1.100 M3 5,250,000.00 5,775,000.00
- Besi Strip 15.00 Kg 6,666.00 99,990.00
- Paku Biasa 2" - 5" 5.60 Kg 12,500.00 70,000.00
- Upah Pekerjaan
~ Pekerja 4.000 Oh 75,000.00 300,000.00
~ Tukang Kayu 12.000 Oh 85,000.00 1,020,000.00
~ Kepala Tukang 1.200 Oh 95,000.00 114,000.00
~ Mandor 0.200 Oh 100,000.00 20,000.00 7,398,990.00
6 1 m3 Pasang Konstruksi Gording Kayu Kruing
- Kayu Kruing, balok 1.100 M3 5,250,000.00 5,775,000.00
- Besi Strip 15.00 Kg 6,666.00 99,990.00
- Paku Biasa 2" - 5" 3.00 Kg 12,500.00 37,500.00
- Upah Pekerjaan
~ Pekerja 2.400 Oh 75,000.00 180,000.00
~ Tukang Kayu 7.200 Oh 85,000.00 612,000.00
~ Kepala Tukang 0.720 Oh 95,000.00 68,400.00
~ Mandor 0.120 Oh 100,000.00 12,000.00 6,784,890.00
7 1 m3 Pasang Konstruksi Gording Kayu Meranti Asli (MA)
- Kayu Meranti Asli, balok 1.100 M3 5,200,000.00 5,720,000.00
- Besi Strip 15.00 Kg 6,666.00 99,990.00
- Paku Biasa 2" - 5" 3.00 Kg 12,500.00 37,500.00
- Upah Pekerjaan
~ Pekerja 2.400 Oh 75,000.00 180,000.00
~ Tukang Kayu 7.200 Oh 85,000.00 612,000.00
~ Kepala Tukang 0.720 Oh 95,000.00 68,400.00
~ Mandor 0.120 Oh 100,000.00 12,000.00 6,729,890.00
8 1 m2 Pasang Kaso (5/7) + Reng (2/3) Kayu Kruing
- Kayu Kruing, balok 0.010 M3 5,250,000.00 52,500.00
- Kayu Kruing, balok 0.004 M3 5,250,000.00 21,000.00
- Paku 5cm dan 10 cm 0.250 Kg 12,500.00 3,125.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.005 Oh 100,000.00 500.00 94,075.00
9 1 m2 Pasang Kaso (5/7) + Reng (2/3) Kayu Meranti (MA)
- Kayu Meranti. Balok 0.010 M3 5,200,000.00 52,000.00
- Kayu Meranti, balok 0.004 M3 5,200,000.00 20,800.00
- Paku 5cm dan 10 cm 0.250 Kg 12,500.00 3,125.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.005 Oh 100,000.00 500.00 93,375.00
1 2 3 4 5 6 7
10 1 m2 Pasang Kaso (5/7) Kruing + Reng (2/3) Kayu Meranti MA
- Kayu Kruing, balok 0.010 M3 5,250,000.00 52,500.00
- Kayu Meranti, balok 0.004 M3 5,200,000.00 20,800.00
- Paku 5cm dan 10 cm 0.250 Kg 12,500.00 3,125.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.005 Oh 100,000.00 500.00 93,875.00
11 1 m2 Pasang Kaso (5/7) Kayu Kruing
- Kayu Meranti, balok 0.0100 M3 5,250,000.00 52,500.00
- Paku Biasa 2" - 5" 0.125 Kg 12,500.00 1,562.50
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.050 Oh 85,000.00 4,250.00
~ Kepala Tukang 0.005 Oh 95,000.00 475.00
~ Mandor 0.0025 Oh 100,000.00 250.00 62,787.50
1 2 3 4 5 6 7
12 1 m2 Pasang Kaso (5/7) Kayu Meranti MA
- Kayu Meranti, balok 0.0100 M3 5,200,000.00 52,000.00
- Paku Biasa 2" - 5" 0.125 Kg 12,500.00 1,562.50
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.050 Oh 85,000.00 4,250.00
~ Kepala Tukang 0.005 Oh 95,000.00 475.00
~ Mandor 0.0025 Oh 100,000.00 250.00 62,287.50
13 1 m2 Reng (2/3) Kayu Meranti MA
- Kayu Meranti, balok 0.004 M3 5,200,000.00 18,720.00
- Paku Biasa 2" - 5" 0.125 Kg 12,500.00 1,562.50
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.050 Oh 85,000.00 4,250.00
~ Kepala Tukang 0.005 Oh 95,000.00 475.00
~ Mandor 0.0025 Oh 100,000.00 250.00 29,007.50
14 1 m2 Reng (3/5) Kayu Meranti MA
- Kayu Meranti, balok MA 0.008 M3 5,200,000.00 41,600.00
- Paku Biasa 2" - 5" 0.125 Kg 12,500.00 1,562.50
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.050 Oh 85,000.00 4,250.00
~ Kepala Tukang 0.005 Oh 95,000.00 475.00
~ Mandor 0.0025 Oh 100,000.00 250.00 51,887.50
15 1 m2 Reng (2/3) Kayu Meranti MC
- Kayu Meranti, balok 0.004 M3 4,700,000.00 16,920.00
- Paku Biasa 2" - 5" 0.125 Kg 12,500.00 1,562.50
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.050 Oh 85,000.00 4,250.00
~ Kepala Tukang 0.005 Oh 95,000.00 475.00
~ Mandor 0.0025 Oh 100,000.00 250.00 27,207.50
16 1 m2 Reng (3/5) Kayu Meranti MC
- Kayu Meranti, balok MC 0.008 M3 4,700,000.00 37,600.00
- Paku Biasa 2" - 5" 0.125 Kg 12,500.00 1,562.50
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.050 Oh 85,000.00 4,250.00
~ Kepala Tukang 0.005 Oh 95,000.00 475.00
~ Mandor 0.0025 Oh 100,000.00 250.00 47,887.50
17 1 m2 Pasang Atap Genteng Karang Pilang besar
- Genteng Karang Pilang 13.500 Bh 4,700.00 63,450.00
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Kayu 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.008 Oh 100,000.00 800.00 81,170.00
18 1 m2 Pasang Atap Genteng Model Karang Pilang (ex Ambulu)
- Genteng model Karang Pilang 25.000 Bh 7,500.00 187,500.00
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Kayu 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.008 Oh 95,000.00 760.00
~ Mandor 0.008 Oh 100,000.00 800.00 206,685.00
19 1 m2 Pasang Atap Genteng Pres Kedung Bajul (biasa)
- Genteng Pres Kedung Bajul 25.000 Bh 1,600.00 40,000.00
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Kayu 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.008 Oh 95,000.00 760.00
~ Mandor 0.008 Oh 100,000.00 800.00 59,185.00
20 1 m2 Pasang Atap Genteng Beton
- Genteng Beton 11.000 Bh 4,500.00 49,500.00
1 2 3 4 5 6 7
- Paku 0.030 Kg 12,500.00 375.00
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Kayu 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.008 Oh 100,000.00 800.00 67,595.00
21 1 m Pasang Bubung Genteng Karang Pilang
- Genteng bubung karang pilang 5.000 Bh 17,000.00 85,000.00
- Semen Portland 8.000 Kg 1,200.00 9,600.00
- Pasir Pasang 0.032 M3 125,000.00 4,000.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.002 Oh 100,000.00 200.00 147,700.00
1 2 3 4 5 6 7
22 1 m Pasang Bubung Genteng Model Karang Pilang
- Genteng bubung model karang pilang 5.000 Bh 7,500.00 37,500.00
- Semen Portland 8.000 Kg 1,200.00 9,600.00
- Pasir Pasang 0.032 M3 125,000.00 4,000.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.002 Oh 100,000.00 200.00 100,200.00
23 1 m Pasang Bubung Pres Kedung Bajul
- Genteng Bubung pres kedung bajul 5.000 Bh 6,000.00 30,000.00
- Semen Portland 8.000 Kg 1,200.00 9,600.00
- Pasir Pasang 0.032 M3 125,000.00 4,000.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.002 Oh 100,000.00 200.00 92,700.00
24 1 m Pasang Bubung Pres Beton
- Genteng Bubung beton 4.000 Bh 9,000.00 36,000.00
- Semen Portland 8.000 Kg 1,200.00 9,600.00
- Pasir Pasang 0.032 M3 125,000.00 4,000.00
- Upah Pekerjaan
~ Pekerja 0.400 Oh 75,000.00 30,000.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.002 Oh 100,000.00 200.00 98,700.00
25 1 m Pasang Bubung Asbes Gelombang kecil
- Asbes Bubung Gelombang 1.000 m 27,000.00 27,000.00
- Paku Sekrup 2.000 bj 15,000.00 30,000.00
- Upah Pekerjaan
~ Pekerja 0.084 Oh 75,000.00 6,300.00
~ Tukang Kayu 0.125 Oh 85,000.00 10,625.00
~ Kepala Tukang 0.013 Oh 95,000.00 1,235.00
~ Mandor 0.004 Oh 100,000.00 400.00 75,560.00
1 m Pasang Bubung Asbes Gelombang besar
- Asbes Bubung Gelombang 1.000 m 55,000.00 55,000.00
- Paku Sekrup 2.000 bj 15,000.00 30,000.00
- Upah Pekerjaan
~ Pekerja 0.084 Oh 75,000.00 6,300.00
~ Tukang Kayu 0.125 Oh 85,000.00 10,625.00
~ Kepala Tukang 0.013 Oh 95,000.00 1,235.00
~ Mandor 0.004 Oh 100,000.00 400.00 103,560.00
26 1 m2 Pasang Atap Asbes Gelombang 4 mm (Kecil)
- Asbes Gelombang kecil 0.750 Lbr 90,000.00 67,500.00
- Paku Pancing 0.120 Kg 26,000.00 3,120.00
- Upah Pekerjaan
~ Pekerja 0.140 Oh 75,000.00 10,500.00
~ Tukang Kayu 0.070 Oh 85,000.00 5,950.00
~ Kepala Tukang 0.007 Oh 95,000.00 665.00
~ Mandor 0.007 Oh 100,000.00 700.00 88,435.00
27 1 m2 Pasang Atap Asbes Gelombang 6 mm (Besar)
- Asbes Gelombang besar 0.570 Lbr 124,000.00 70,680.00
- Paku Pancing 0.120 Kg 26,000.00 3,120.00
- Upah Pekerjaan
~ Pekerja 0.140 Oh 75,000.00 10,500.00
~ Tukang Kayu 0.067 Oh 85,000.00 5,695.00
~ Kepala Tukang 0.007 Oh 95,000.00 665.00
~ Mandor 0.007 Oh 100,000.00 700.00 91,360.00
28 1 m2 Pasang Atap Seng Gelombang BJLS 30
- Seng Gelombang 0.700 Lbr 80,000.00 56,000.00
- Paku Pancing 0.020 Kg 26,000.00 520.00
- Upah Pekerjaan
1 2 3 4 5 6 7
~ Pekerja 0.120 Oh 75,000.00 9,000.00
~ Tukang Kayu 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.006 Oh 100,000.00 600.00 71,790.00
29 1 m2 Pasang Atap Nok Seng
- Seng Plat BJLS 30 3x6 0.300 Lbr 34,000.00 10,200.00
- Paku Biasa 0.040 Kg 26,000.00 1,040.00
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Kayu 0.070 Oh 85,000.00 5,950.00
~ Kepala Tukang 0.008 Oh 95,000.00 760.00
~ Mandor 0.006 Oh 100,000.00 600.00 29,800.00
1 2 3 4 5 6 7
30 1 m2 Pasang Fiberglass Gelombang
- Fiberglass Gelombang 1.100 M2 25,000.00 27,500.00
- Paku 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.140 Oh 75,000.00 10,500.00
~ Tukang Kayu 0.067 Oh 85,000.00 5,695.00
~ Kepala Tukang 0.007 Oh 95,000.00 665.00
~ Mandor 0.007 Oh 100,000.00 700.00 45,685.00
31 1 m2 Pasang Fiberglass datar
- Fiberglass datar 1.100 M2 37,500.00 41,250.00
- Paku 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.140 Oh 75,000.00 10,500.00
~ Tukang Kayu 0.067 Oh 85,000.00 5,695.00
~ Kepala Tukang 0.007 Oh 95,000.00 665.00
~ Mandor 0.007 Oh 100,000.00 700.00 59,435.00
30 1 Kg Pasang rangka atap baja WF
- Besi Profil WF 1.150 Kg 9,600.00 11,040.00
- Upah Pekerjaan
~ Pekerja 0.060 Oh 75,000.00 4,500.00
~ Tukang Las 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.003 Oh 100,000.00 300.00 21,510.00
31 1 Kg Pasang Cannal C baja
- Besi Profil Cannal C 1.150 Kg 8,797.00 10,116.55
- Upah Pekerjaan
~ Pekerja 0.060 Oh 75,000.00 4,500.00
~ Tukang Las 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.003 Oh 100,000.00 300.00 20,586.55
32 1 Kg Pasang Siku L baja
- Besi Profil Siku L 1.150 Kg 9,500.00 10,925.00
- Upah Pekerjaan
~ Pekerja 0.060 Oh 75,000.00 4,500.00
~ Tukang Las 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.003 Oh 100,000.00 300.00 21,395.00
33 100 Kg Pekerjaan Perakitan
- Solar 1.000 Ltr #REF! #REF!
- Minyak Pelumas 0.100 Ltr #REF! #REF!
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Las 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.001 Oh 95,000.00 95.00
~ Mandor 0.005 Oh 100,000.00 500.00
- Alat
~ Mesin Las 0.8 Jam 56,230.00 44,984.00 #REF!
34 10 cm Pekerjaan Pengelasan
- Kawat Las Listrik 0.400 Kg 30,000.00 12,000.00
- Solar 0.300 Ltr #REF! #REF!
- Minyak Pelumas 0.040 Ltr #REF! #REF!
- Upah Pekerjaan
~ Pekerja 0.040 Oh 75,000.00 3,000.00
~ Tukang Las 0.020 Oh 85,000.00 1,700.00
~ Kepala Tukang 0.002 Oh 95,000.00 190.00
~ Mandor 0.002 Oh 100,000.00 200.00
- Alat
~ Mesin Las 0.170 Jam 56,230.00 9,559.10 #REF!
35 1 Kg Pasang Plat Ezyer baja Tebal 8 s/d 22 mm
- Besi Plat Ezyer 1.000 Kg 9,500.00 9,500.00
- Kawat las/Electroda (Perlengkapan) 0.020 Kg 30,000.00 600.00
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
1 2 3 4 5 6 7
~ Fitter/Tukang Stel 0.050 Oh 85,000.00 4,250.00
~ Tukang Las / welder 0.050 Oh 85,000.00 4,250.00
- Alat
~ Mesin Las 0.01 Jam 56,230.00 562.30
~ Genset 0.01 Jam 81,000.00 810.00 23,722.30
1 2 3 4 5 6 7
36 1 Bh Pasang Trektank (Jarum keras)
- Treaktank 1.000 Bh 24,000.00 24,000.00
- Perlengkapan 10.000 % 2,400.00 24,000.00
- Upah Pekerjaan
~ Fitter/Tukang Stel 0.050 Oh 85,000.00 4,250.00
~ Mandor 0.050 Oh 85,000.00 4,250.00 56,500.00
37 1 Kg Pasang Beton Ezyer Regel
- Besi Beton Ezyer 1.000 Kg 7,612.00 7,612.00
- Kawat las/Electroda (Perlengkapan) 0.100 Kg 30,000.00 3,000.00
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Fitter/Tukang Stel 0.050 Oh 85,000.00 4,250.00
~ Tukang Las / welder 0.050 Oh 85,000.00 4,250.00
- Alat
~ Mesin Las 0.01 Jam 56,230.00 562.30
~ Genset 0.01 Jam 81,000.00 810.00 24,234.30
38 1 m' Pasang Lisplank ukuran (3x20) cm, Kayu jati
- Kayu Jati, Papan 0.0108 M3 9,200,000.00 99,360.00
- Paku Biasa 2" - 5" 0.100 Kg 12,500.00 1,250.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.005 Oh 100,000.00 500.00 127,510.00
39 1 m' Pasang Lisplank ukuran (3x20) cm, Kayu Kamper
- Kayu Kamper, Papan 0.0108 M3 #REF! #REF!
- Paku Biasa 2" - 5" 0.100 Kg 12,500.00 1,250.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.005 Oh 100,000.00 500.00 #REF!
40 1 m' Pasang Lisplank ukuran (3x30) cm, Kayu Jati
- Kayu Jati, Papan 0.011 M3 9,200,000.00 101,200.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.005 Oh 100,000.00 500.00 128,725.00
41 1 m' Pasang Lisplank ukuran (3x30) cm, Kayu Kamper
- Kayu Kamper, Papan 0.011 M3 #REF! #REF!
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.005 Oh 100,000.00 500.00 #REF!
42 1 m' Pasang Lisplank ukuran (3x30) cm, Kayu Meranti (MA)
- Kayu Meranti, Papan 0.011 M3 6,250,000.00 68,750.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.005 Oh 100,000.00 500.00 96,275.00
43 1 m' Pasang Lisplank ukuran 2x(3x20) cm, Kayu Kamper (Atas bawah)
- Kayu Kamper, Papan 0.0145 M3 #REF! #REF!
- Paku Biasa 2" - 5" 0.060 Kg 12,500.00 750.00
- Upah Pekerjaan
~ Pekerja 0.150 Oh 75,000.00 11,250.00
~ Tukang Kayu 0.450 Oh 85,000.00 38,250.00
~ Kepala Tukang 0.045 Oh 95,000.00 4,275.00
1 2 3 4 5 6 7
~ Mandor 0.075 Oh 100,000.00 7,500.00 #REF!
44 1 m' Pasang Lisplank ukuran (2x20) cm, Kayu Meranti (MA)
- Kayu Meranti, Papan 0.0040 M3 6,250,000.00 25,000.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.025 Oh 95,000.00 2,375.00
~ Mandor 0.005 Oh 100,000.00 500.00 53,000.00
1 2 3 4 5 6 7
45 1 m' Pasang Lisplank ukuran (2x20) cm, Kayu Meranti (MC)
- Kayu Meranti, Papan 0.0040 M3 4,400,000.00 17,600.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang Kayu 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.025 Oh 95,000.00 2,375.00
~ Mandor 0.005 Oh 100,000.00 500.00 45,600.00
46 1 m' Pasang Lisplank Kalsium ukuran 20 cm tebal 8 mm
- Kalsium Plank 1.000 M1 18,500.00 18,500.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Kayu Meranti 3/5 0.004 M3 4,700,000.00 18,330.00
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.013 Oh 95,000.00 1,187.50
~ Mandor 0.003 Oh 100,000.00 250.00 51,142.50
47 1 m' Pasang Lisplank Kalsium ukuran 30 cm tebal 8 mm
- Kalsium Plank 1.000 M1 35,000.00 35,000.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
- Kayu Meranti 3/5 0.005 M3 4,700,000.00 21,150.00
- Upah Pekerjaan
~ Pekerja 0.050 Oh 75,000.00 3,750.00
~ Tukang Kayu 0.100 Oh 85,000.00 8,500.00
~ Kepala Tukang 0.013 Oh 95,000.00 1,187.50
~ Mandor 0.003 Oh 100,000.00 250.00 70,462.50
48 1 M' Pasang talang datar, seng BJLS 30
- Seng Plat BJLS 30 (90 cm) 1.050 M1 34,000.00 35,700.00
- Paku biasa 0.015 Kg 12,500.00 187.50
- Kayu Meranti (MA), papan 0.0096 M3 6,250,000.00 60,000.00
- Upah Pekerjaan
~ Pekerja 0.200 Oh 75,000.00 15,000.00
~ Tukang Kayu 0.400 Oh 85,000.00 34,000.00
~ Kepala Tukang 0.025 Oh 95,000.00 2,375.00
~ Mandor 0.01 Oh 100,000.00 1,000.00 148,262.50
49 1 M' Pasang talang U PVC 15 x 15
- Talang U PVC 15 1.050 M1 26,250.00 27,562.50
- Plat Strip 0.146 kg 6,666.00 974.30
- Paku 0.015 Kg 12,500.00 187.50
- Upah Pekerjaan
~ Pekerja 0.200 Oh 75,000.00 15,000.00
~ Tukang Besi 0.400 Oh 85,000.00 34,000.00
~ Kepala Tukang 0.025 Oh 95,000.00 2,375.00
~ Mandor 0.01 Oh 100,000.00 1,000.00 81,099.30
50 1 m2 Pasang Atap Polycarbonat
- Polycarbonat KW 1 1.100 m2 102,900.00 113,190.00
- Perlengkapan 1.000 ls 5,000.00 5,000.00
- Upah Pekerjaan 1.000 ls 30,000.00 30,000.00 148,190.00
51 1 m2 Pasang Atap Polycarbonat rangka pipa gas/besi kotak
- Polycarbonat KW 1 1.100 m2 102,900.00 113,190.00
- Rangka Pipa Gas + Pengecatan 1.000 ls 240,000.00 240,000.00
- Upah Pekerjaan 1.000 ls 70,000.00 70,000.00 423,190.00
52 1 m2 Pasang Atap Polycarbonat rangka pipa air
- Polycarbonat KW 1 1.100 m2 102,900.00 113,190.00
- Rangka Pipa Air + Pengecatan 1.000 ls 276,000.00 276,000.00
- Upah Pekerjaan 1.000 ls 70,000.00 70,000.00 459,190.00
53 1 m2 Pasang Atap Polycarbonat rangka pipa stainless
- Polycarbonat KW 1 1.100 m2 102,900.00 113,190.00
- Rangka Pipa Stainless 1.000 ls 396,000.00 396,000.00
- Upah Pekerjaan 1.000 ls 70,000.00 70,000.00 579,190.00
54 1 m' Papan Roiter 2/20
- Kayu meranti, papan 0.004 M3 5,400,000.00 21,600.00
- Paku 0.050 Kg 12,500.00 625.00
1 2 3 4 5 6 7
- Upah Pekerjaan 1.000 Ls 10,000.00 10,000.00 32,225.00
55 1 m' Papan Kompres kayu Meranti (MA)
- Kayu Meranti, papan 0.003 M3 5,400,000.00 16,200.00
- Seng BJLS 30 0.250 m2 26,250.00 6,562.50
- Paku 0.100 Kg 23,000.00 2,300.00
- Upah Pekerjaan 1.000 Ls 12,500.00 12,500.00 37,562.50
56 1 m' Papan Kompres kayu Meranti (MC)
- Kayu Meranti, papan 0.003 M3 5,400,000.00 16,200.00
- Seng BJLS 30 0.250 m2 26,250.00 6,562.50
- Paku 0.100 Kg 23,000.00 2,300.00
- Upah Pekerjaan 1.000 Ls 12,500.00 12,500.00 37,562.50
PEKERJAAN
X PENGECATAN
1 1 m2 mendempul dan menggosok kayu
- Plamir Kayu 0.080 Kg 20,250.00 1,620.00
- Minyak Cat 0.020 kg 10,000.00 200.00
- Kertas gosok 0.010 Lbr 4,000.00 40.00
- Upah Pekerjaan
~ Pekerja 0.040 Oh 75,000.00 3,000.00
~ Tukang Cat 0.040 Oh 85,000.00 3,400.00
~ Kepala Tukang 0.004 Oh 95,000.00 380.00
~ Mandor 0.0025 Oh 100,000.00 250.00 8,890.00
2 1 m2 Pengecatan bidang kayu lama
- Cat Kayu 0.142 Kg 66,250.00 9,407.50
- Minyak cat 0.019 Lt 10,000.00 190.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Cat 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.0075 Oh 95,000.00 712.50
~ Mandor 0.0025 Oh 100,000.00 250.00 22,185.00
3 1 m2 Pengecatan bidang kayu baru
- Cat Kayu 0.260 Kg 66,250.00 17,225.00
- Plamir 0.150 Kg 20,250.00 3,037.50
- Cat Meni 0.200 Kg 26,000.00 5,200.00
- Kertas gosok 0.010 Lbr 4,000.00 40.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Cat 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.0075 Oh 95,000.00 712.50
~ Mandor 0.0025 Oh 100,000.00 250.00 38,090.00
4 1 m2 Pengecatan besi baru
- Cat besi Emco 0.260 Kg 66,250.00 17,225.00
- Cat Meni 0.200 Kg 32,250.00 6,450.00
- Kertas gosok 0.010 Lbr 4,000.00 40.00
- Plamir 0.150 Kg 20,250.00 3,037.50
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Cat 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.0075 Oh 95,000.00 712.50
~ Mandor 0.0025 Oh 100,000.00 250.00 39,340.00
1 2 3 4 5 6 7
5 1 m2 Pengecatan besi Finishing baru (Tanpa Cat dasar)
- Cat besi Emco Finishing ( 3 Lapis ) 0.260 Kg 66,250.00 17,225.00
- Upah Pekerjaan
~ Pekerja 0.035 Oh 75,000.00 2,625.00
~ Tukang Cat 0.053 Oh 85,000.00 4,505.00
~ Kepala Tukang 0.0020 Oh 95,000.00 190.00
~ Mandor 0.0013 Oh 100,000.00 130.00 24,675.00
1 2 3 4 5 6 7
6 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
- Residu atau Ter 0.350 Ltr 17,500.00 6,125.00
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Mandor 0.006 Oh 100,000.00 600.00 14,225.00
7 1 m2 Pelaburan Bidang Kayu dengan Politur
- Politur 0.372 Ltr 70,000.00 26,040.00
- Ampelas 2.000 Lbr 4,000.00 8,000.00
- Upah Pekerjaan
~ Tukang Cat 0.060 Oh 85,000.00 5,100.00
~ Kepala Tukang 0.016 Oh 95,000.00 1,520.00
~ Mandor 0.0025 Oh 100,000.00 250.00 40,910.00
8 1 m2 Pelaburan Bidang Kayu dengan Vernis
- Vernis 0.150 Ltr 26,000.00 3,900.00
- Dempul 0.050 Kg 20,250.00 1,012.50
- Ampelas 0.100 Lbr 4,000.00 400.00
- Kuas 0.010 Bh 19,000.00 190.00
- Upah Pekerjaan
~ Pekerja 0.160 Oh 75,000.00 12,000.00
~ Tukang Cat 0.160 Oh 85,000.00 13,600.00
~ Kepala Tukang 0.016 Oh 95,000.00 1,520.00
~ Mandor 0.0025 Oh 100,000.00 250.00 32,872.50
9 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis cat Penutup)
- Plamir 0.100 Kg 13,250.00 1,325.00
- Cat Dasar 0.100 Kg 19,400.00 1,940.00
- Cat Penutup 2x 0.260 Kg 19,400.00 5,044.00
- Upah Pekerjaan
~ Pekerja 0.020 Oh 75,000.00 1,500.00
~ Tukang Cat 0.063 Oh 85,000.00 5,355.00
~ Kepala Tukang 0.0063 Oh 95,000.00 598.50
~ Mandor 0.0025 Oh 100,000.00 250.00 16,012.50
10 1 m2 Pengecatan Tembok Lama ( 1 Lapis Cat Dasar, 2 x pengecatan)
- Cat Dasar 0.120 Kg 19,400.00 2,328.00
- Cat Penutup 2x 0.180 Kg 19,400.00 3,492.00
- Upah Pekerjaan
~ Pekerja 0.028 Oh 75,000.00 2,100.00
~ Tukang Cat 0.042 Oh 85,000.00 3,570.00
~ Kepala Tukang 0.0042 Oh 95,000.00 399.00
~ Mandor 0.0025 Oh 100,000.00 250.00 12,139.00
11 1 m2 Pengecatan permukaan baja dengan meni besi
- Meni Besi 0.100 Kg 32,250.00 3,225.00
- Kuas 0.010 Bh 19,000.00 190.00
- Upah Pekerjaan
~ Pekerja 0.020 Oh 75,000.00 1,500.00
~ Tukang Cat 0.200 Oh 85,000.00 17,000.00
~ Kepala Tukang 0.020 Oh 95,000.00 1,900.00
~ Mandor 0.010 Oh 100,000.00 1,000.00 24,815.00
12 1 m2 Pengecatan Genteng Baru
- Cat 0.300 Kg 32,000.00 9,600.00
- Kuas 0.100 Bh 19,000.00 1,900.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Cat 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.0075 Oh 95,000.00 712.50
~ Mandor 0.0025 Oh 100,000.00 250.00 24,087.50
13 1 m2 Coating transparan (doff) untuk batu alam
- Coating 0.2000 Ltr 45,000.00 9,000.00
- Kuas 0.0100 Bh 19,000.00 190.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Cat 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.0075 Oh 95,000.00 712.50
~ Mandor 0.0025 Oh 100,000.00 250.00 21,777.50
1 2 3 4 5 6 7
14 1 m2 Coating Waterproffing
- Waterproffing 0.6000 Kg 47,000.00 28,200.00
- Serabut Kasa 1.0000 m2 2,500.00 2,500.00
- Upah Pekerjaan
~ Pekerja 0.1200 Oh 75,000.00 9,000.00
~ Tukang Cat 0.0800 Oh 85,000.00 6,800.00
~ Kepala Tukang 0.0070 Oh 95,000.00 665.00
~ Mandor 0.0800 Oh 100,000.00 8,000.00 55,165.00
15 1 m2 Coating Waterproffing tanpa serabut kasa
- Waterproffing 0.3000 Kg 47,000.00 14,100.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Cat 0.075 Oh 85,000.00 6,375.00
~ Kepala Tukang 0.0075 Oh 95,000.00 712.50
~ Mandor 0.0025 Oh 100,000.00 250.00 26,687.50
1 2 3 4 5 6 7
16 1 m2. Lapis melamin duco (2x lapis sampai rata)
- Cat Titan lux 0.500 kg 89,050.00 44,525.00
- Kertas gosok no. 150 1.000 lbr 4,000.00 4,000.00
- Clear 0.200 kg 65,000.00 13,000.00
- Thinner A 0.837 ltr 10,000.00 8,370.00
- Alat
- Sewa alat bantu @ 3 alat 1.00 set 10,000.00 10,000.00
- Sewa compresor 0.625 jam 157,780.00 98,612.50
- Upah Pekerjaan
- Pekerja Terampil 0.075 Oh 75,000.00 5,625.00
- Tukang cat 0.9 Oh 85,000.00 76,500.00
- Kepala tukang cat 0.09 Oh 95,000.00 8,550.00
- Mandor 0.0025 Oh 100,000.00 250.00 269,432.50
17 1 m2 Pengecatan Weathershield
- Plamir 0.100 Kg 13,250.00 1,325.00
- Cat Weathershield 0.100 Kg 115,000.00 11,500.00
- Cat Penutup 2x 0.260 Kg 115,000.00 29,900.00
- Upah Pekerjaan
~ Pekerja 0.020 Oh 75,000.00 1,500.00
~ Tukang Cat 0.063 Oh 85,000.00 5,355.00
~ Kepala Tukang 0.0063 Oh 95,000.00 598.50
~ Mandor 0.0025 Oh 100,000.00 250.00 50,428.50
XI PEKERJAAN SANITAIR
1 Memasang 1 buah kloset duduk / monoblok
- Kloset duduk / monoblok 1.000 Bh 1,450,000.00 1,450,000.00
- Perlengkapan 0.060 hrg 1,450,000.00 87,000.00
- Upah Pekerjaan
~ Pekerja 3.300 Oh 75,000.00 247,500.00
~ Tukang Batu 1.100 Oh 45,000.00 49,500.00
~ Kepala Tukang 0.001 Oh 95,000.00 95.00
~ Mandor 0.160 Oh 100,000.00 16,000.00 1,850,095.00
2 Memasang 1 buah kloset jongkok porselen
- Kloset jongkok porselen 1.000 Bh 175,000.00 175,000.00
- Semen portland 6.000 Kg 1,397.50 8,385.00
- Pasir pasang 0.010 M3 125,000.00 1,250.00
- Upah Pekerjaan
~ Pekerja 1.000 Oh 75,000.00 75,000.00
~ Tukang Batu 1.500 Oh 45,000.00 67,500.00
~ Kepala Tukang 1.500 Oh 95,000.00 142,500.00
~ Mandor 0.160 Oh 100,000.00 16,000.00 485,635.00
3 Memasang 1 buah urinoir
- Urinoir 1.000 Bh 1,300,000.00 1,300,000.00
- Perlengkapan 0.300 hrg 1,300,000.00 390,000.00
- Semen portland 6.000 Kg 1,397.50 8,385.00
- Pasir pasang 0.010 M3 125,000.00 1,250.00
- Upah Pekerjaan
~ Pekerja 1.000 Oh 75,000.00 75,000.00
~ Tukang Batu 1.000 Oh 45,000.00 45,000.00
~ Kepala Tukang 0.100 Oh 95,000.00 9,500.00
~ Mandor 0.100 Oh 100,000.00 10,000.00 1,839,135.00
4 Memasang 1 buah wastafel
- Wastafel 1.000 Bh 275,000.00 275,000.00
- Perlengkapan 0.120 hrg 275,000.00 33,000.00
- Semen portland 6.000 Kg 1,397.50 8,385.00
- Pasir pasang 0.010 M3 125,000.00 1,250.00
- Upah Pekerjaan
~ Pekerja 1.200 Oh 75,000.00 90,000.00
~ Tukang Batu 1.450 Oh 45,000.00 65,250.00
~ Kepala Tukang 0.150 Oh 95,000.00 14,250.00
~ Mandor 0.010 Oh 100,000.00 1,000.00 488,135.00
5 Memasang 1 buah bak cuci stainless
- Bak cuci stainless 1.000 Bh 175,000.00 175,000.00
- Water drain dan accessories 1.000 set 40,000.00 40,000.00
1 2 3 4 5 6 7
- Upah Pekerjaan
~ Pekerja 0.030 Oh 75,000.00 2,250.00
~ Tukang Batu 0.300 Oh 45,000.00 13,500.00
~ Kepala Tukang 0.030 Oh 95,000.00 2,850.00
~ Mandor 0.0015 Oh 100,000.00 150.00 233,750.00
6 Memasang 1 buah bak mandi fiber glass
- Bak fiberglass 1.000 Bh 230,000.00 230,000.00
- Perlengkapan 0.180 hrg 230,000.00 41,400.00
- Upah Pekerjaan
~ Pekerja 1.800 Oh 75,000.00 135,000.00
~ Tukang Batu 2.700 Oh 45,000.00 121,500.00
~ Kepala Tukang 0.540 Oh 95,000.00 51,300.00
~ Mandor 0.1100 Oh 100,000.00 11,000.00 590,200.00
1 2 3 4 5 6 7
7 Memasang 1 pintu KM PVC
- Pintu PVC 1.000 Bh 200,000.00 200,000.00
- Upah Pekerjaan
~ Pekerja 1.800 Oh 75,000.00 135,000.00
~ Tukang Batu 2.700 Oh 45,000.00 121,500.00
~ Kepala Tukang 0.540 Oh 95,000.00 51,300.00
~ Mandor 0.1100 Oh 100,000.00 11,000.00 518,800.00
8 Pasang Buis Beton U 20
- Buis Beton 1.000 M 30,000.00 30,000.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Batu 0.035 Oh 45,000.00 1,575.00
~ Kepala Tukang 0.0035 Oh 95,000.00 332.50
~ Mandor 0.0035 Oh 100,000.00 350.00 37,507.50
9 Pasang Buis Beton U 30
- Buis Beton 1.000 M 35,000.00 35,000.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Batu 0.035 Oh 45,000.00 1,575.00
~ Kepala Tukang 0.0035 Oh 95,000.00 332.50
~ Mandor 0.004 Oh 100,000.00 350.00 42,507.50
10 Pasang Buis Beton O 20
- Buis Beton 1.000 M 42,250.00 42,250.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Batu 0.035 Oh 45,000.00 1,575.00
~ Kepala Tukang 0.0035 Oh 95,000.00 332.50
~ Mandor 0.004 Oh 100,000.00 350.00 49,757.50
11 Pasang Buis Beton O 30
- Buis Beton 1.000 M 47,250.00 47,250.00
- Upah Pekerjaan
~ Pekerja 0.070 Oh 75,000.00 5,250.00
~ Tukang Batu 0.035 Oh 45,000.00 1,575.00
~ Kepala Tukang 0.0035 Oh 95,000.00 332.50
~ Mandor 0.004 Oh 100,000.00 350.00 54,757.50
12 Memasang 1 buah kran diameter 3/4" atau 1/2"
- Kran air 1.000 Bh 25,000.00 25,000.00
- Seal Tape 0.025 Bh 3,000.00 75.00
- Upah Pekerjaan
~ Pekerja 0.010 Oh 75,000.00 750.00
~ Tukang Batu 0.100 Oh 45,000.00 4,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.005 Oh 100,000.00 500.00 31,775.00
13 Memasang 1 m' pipa PVC diameter 0,5" (AW)
- Pipa PVC 1.000 M' 6,625.00 6,625.00
- Perlengkapan 0.350 Hrg 6,625.00 2,318.75
- Upah Pekerjaan
~ Pekerja 0.036 Oh 75,000.00 2,700.00
~ Tukang Batu 0.060 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0018 Oh 100,000.00 180.00 15,093.75
14 Memasang 1 m' pipa PVC diameter 3/4" (AW)
- Pipa PVC 1.000 M' 7,812.50 7,812.50
- Perlengkapan 0.350 Hrg 7,812.50 2,734.38
- Upah Pekerjaan
~ Pekerja 0.036 Oh 75,000.00 2,700.00
~ Tukang Batu 0.060 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0018 Oh 100,000.00 180.00 16,696.88
15 Memasang 1 m' pipa PVC diameter 1" (AW)
- Pipa PVC 1.000 M' 9,812.50 9,812.50
- Perlengkapan 0.350 Hrg 9,812.50 3,434.38
- Upah Pekerjaan
1 2 3 4 5 6 7
~ Pekerja 0.036 Oh 75,000.00 2,700.00
~ Tukang Batu 0.060 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0018 Oh 100,000.00 180.00 19,396.88
1 2 3 4 5 6 7
16 Memasang 1 m' pipa PVC diameter 2" (AW)
- Pipa PVC 1.000 M' 26,000.00 26,000.00
- Perlengkapan 0.350 Hrg 26,000.00 9,100.00
- Upah Pekerjaan
~ Pekerja 0.054 Oh 75,000.00 4,050.00
~ Tukang Batu 0.090 Oh 45,000.00 4,050.00
~ Kepala Tukang 0.0090 Oh 95,000.00 855.00
~ Mandor 0.0027 Oh 100,000.00 270.00 44,325.00
17 Memasang 1 m' pipa PVC diameter 3" (AW)
- Pipa PVC 1.000 M' 48,125.00 48,125.00
- Perlengkapan 0.350 Hrg 48,125.00 16,843.75
- Upah Pekerjaan
~ Pekerja 0.081 Oh 75,000.00 6,075.00
~ Tukang Batu 0.135 Oh 45,000.00 6,075.00
~ Kepala Tukang 0.0135 Oh 95,000.00 1,282.50
~ Mandor 0.0041 Oh 100,000.00 410.00 78,811.25
18 Memasang 1 m' pipa PVC diameter 4" (AW)
- Pipa PVC 1.000 M' 69,375.00 69,375.00
- Perlengkapan 0.350 Hrg 69,375.00 24,281.25
- Upah Pekerjaan
~ Pekerja 0.081 Oh 75,000.00 6,075.00
~ Tukang Batu 0.135 Oh 45,000.00 6,075.00
~ Kepala Tukang 0.0135 Oh 95,000.00 1,282.50
~ Mandor 0.0041 Oh 100,000.00 410.00 107,498.75
19 Memasang 1 m' pipa PVC diameter 2" (D)
- Pipa PVC 1.000 M' 12,833.33 12,833.33
- Perlengkapan 0.350 Hrg 12,833.33 4,491.67
- Upah Pekerjaan
~ Pekerja 0.054 Oh 75,000.00 4,050.00
~ Tukang Batu 0.090 Oh 45,000.00 4,050.00
~ Kepala Tukang 0.0090 Oh 95,000.00 855.00
~ Mandor 0.0027 Oh 100,000.00 270.00 26,550.00
20 Memasang 1 m' pipa PVC diameter 3" (D)
- Pipa PVC 1.000 M' 26,875.00 26,875.00
- Perlengkapan 0.350 Hrg 26,875.00 9,406.25
- Upah Pekerjaan
~ Pekerja 0.081 Oh 75,000.00 6,075.00
~ Tukang Batu 0.135 Oh 45,000.00 6,075.00
~ Kepala Tukang 0.0135 Oh 95,000.00 1,282.50
~ Mandor 0.0041 Oh 100,000.00 410.00 50,123.75
21 Memasang 1 m' pipa PVC diameter 4" (D)
- Pipa PVC 1.000 M' 38,375.00 38,375.00
- Perlengkapan 0.350 Hrg 38,375.00 13,431.25
- Upah Pekerjaan
~ Pekerja 0.081 Oh 75,000.00 6,075.00
~ Tukang Batu 0.135 Oh 45,000.00 6,075.00
~ Kepala Tukang 0.0135 Oh 95,000.00 1,282.50
~ Mandor 0.0041 Oh 100,000.00 410.00 65,648.75
22 Memasang 1 m' pipa galvanis diameter 1/2"
- Pipa Galvanis 1.000 M' 19,500.00 19,500.00
- Perlengkapan 0.350 Hrg 19,500.00 6,825.00
- Upah Pekerjaan
~ Pekerja 0.054 Oh 75,000.00 4,050.00
~ Tukang Batu 0.090 Oh 45,000.00 4,050.00
~ Kepala Tukang 0.0090 Oh 95,000.00 855.00
~ Mandor 0.0270 Oh 100,000.00 2,700.00 37,980.00
23 Memasang 1 m' pipa Galvanis diameter 3/4"
- Pipa Galvanis 1.000 M' 25,000.00 25,000.00
- Perlengkapan 0.350 Hrg 25,000.00 8,750.00
- Upah Pekerjaan
~ Pekerja 0.054 Oh 75,000.00 4,050.00
~ Tukang Batu 0.090 Oh 45,000.00 4,050.00
~ Kepala Tukang 0.0090 Oh 95,000.00 855.00
1 2 3 4 5 6 7
~ Mandor 0.0270 Oh 100,000.00 2,700.00 45,405.00
24 Memasang 1 m' pipa Galvanis diameter 1"
- Pipa Galvanis 1.000 M' 38,333.33 38,333.33
- Perlengkapan 0.350 Hrg 38,333.33 13,416.67
- Upah Pekerjaan
~ Pekerja 0.054 Oh 75,000.00 4,050.00
~ Tukang Batu 0.090 Oh 45,000.00 4,050.00
~ Kepala Tukang 0.0090 Oh 95,000.00 855.00
~ Mandor 0.0270 Oh 100,000.00 2,700.00 63,405.00
1 2 3 4 5 6 7
25 Memasang 1 m' pipa Galvanis diameter 1 1/2"
- Pipa Galvanis medium 1.000 M' 58,333.33 58,333.33
- Perlengkapan 0.350 Hrg 58,333.33 20,416.67
- Upah Pekerjaan
~ Pekerja 0.108 Oh 75,000.00 8,100.00
~ Tukang Batu 0.180 Oh 45,000.00 8,100.00
~ Kepala Tukang 0.0180 Oh 95,000.00 1,710.00
~ Mandor 0.0054 Oh 100,000.00 540.00 97,200.00
26 Memasang 1 m' pipa Galvanis diameter 2"
- Pipa Galvanis Medium 1.000 M' 79,333.33 79,333.33
- Perlengkapan 0.350 Hrg 79,333.33 27,766.67
- Upah Pekerjaan
~ Pekerja 0.108 Oh 75,000.00 8,100.00
~ Tukang Batu 0.180 Oh 45,000.00 8,100.00
~ Kepala Tukang 0.0180 Oh 95,000.00 1,710.00
~ Mandor 0.0054 Oh 100,000.00 540.00 125,550.00
27 Memasang 1 m' pipa Galvanis diameter 2 1/2"
- Pipa Galvanis tebal 1.000 M' 101,166.67 101,166.67
- Perlengkapan 0.350 Hrg 101,166.67 35,408.33
- Upah Pekerjaan
~ Pekerja 0.108 Oh 75,000.00 8,100.00
~ Tukang Batu 0.180 Oh 45,000.00 8,100.00
~ Kepala Tukang 0.0180 Oh 95,000.00 1,710.00
~ Mandor 0.0054 Oh 100,000.00 540.00 155,025.00
28 Memasang 1 m' pipa Galvanis diameter 3"
- Pipa Galvanis tebal 1.000 M' 130,833.33 130,833.33
- Perlengkapan 0.350 Hrg 130,833.33 45,791.67
- Upah Pekerjaan
~ Pekerja 0.108 Oh 75,000.00 8,100.00
~ Tukang Batu 0.180 Oh 45,000.00 8,100.00
~ Kepala Tukang 0.0180 Oh 95,000.00 1,710.00
~ Mandor 0.0054 Oh 100,000.00 540.00 195,075.00
29 Memasang 1 m' pipa Galvanis diameter 4"
- Pipa Galvanis tebal 1.000 M' 163,333.33 163,333.33
- Perlengkapan 0.350 Hrg 163,333.33 57,166.67
- Upah Pekerjaan
~ Pekerja 0.135 Oh 75,000.00 10,125.00
~ Tukang Batu 0.225 Oh 45,000.00 10,125.00
~ Kepala Tukang 0.0225 Oh 95,000.00 2,137.50
~ Mandor 0.0068 Oh 100,000.00 680.00 243,567.50
30 1 Unit Septictank ( h = 1,7 m , L = 1,3 m , P = 2,15 m )
- Galian Tanah 4.752 m3 72,000.00 342,144.00
- Pas. batu bata tebal 1/2 bata, 1 : 3 12.105 m2 99,444.00 1,203,769.62
- Plesteran t = 15 mm, 1Pc : 3Ps 14.005 m2 50,381.20 705,588.71
- Pas. Pipa Pembuangan gas PVC 2" 1.000 m1 44,325.00 44,325.00
- Pek. Beton Bertulang K 175 0.309 m3 #VALUE! #VALUE! #VALUE!
31 1 Unit Resapan ( h = 2,1 m diameter 1,9 m)
- Galian Tanah 3.990 m3 72,000.00 287,280.00
- Pas. batu bata kosong tebal 1 bata 4.396 m2 120,950.00 531,696.20
- Pas. batu bata tebal 1 bata, 1 : 5 1.884 m2 193,790.00 365,100.36
- Plesteran t = 15 mm, 1Pc : 3Ps 1.884 m2 50,381.20 94,918.18
- Pas. Pipa Pembuangan gas PVC 2" 1.000 m1 44,325.00 44,325.00
- Pek. Beton Bertulang K 175 0.118 m3 #VALUE! #VALUE!
- Kerikil Bulat 2 - 3 cm 0.200 m3 125,000.00 25,000.00
- Ijuk 5.000 kg 13,000.00 65,000.00 #VALUE!
32 Memasang 1 bh Floor drain
- Floor drain 1.000 Bh 60,000.00 60,000.00
- Upah Pekerjaan
~ Pekerja 0.010 Oh 75,000.00 750.00
~ Tukang Batu 0.100 Oh 45,000.00 4,500.00
~ Kepala Tukang 0.0100 Oh 95,000.00 950.00
~ Mandor 0.0050 Oh 100,000.00 500.00 66,700.00
1 2 3 4 5 6 7
XII PEKERJAAN PAVING
1 1 m2 Pasang Paving K 300 abu-abu
- Paving stone K 300 abu-abu 1.000 M2 66,500.00 66,500.00
- Pasir Garuk 0.100 M3 100,000.00 10,000.00
- Pasir Lumajang 0.0075 M3 350,000.00 2,625.00
- Upah Pekerjaan
~ Pekerja 0.500 Oh 75,000.00 37,500.00
~ Mandor 0.050 Oh 100,000.00 5,000.00 121,625.00
2 1 m2 Pasang Paving K 300 warna
- Paving stone K 300 warna 1.000 M2 73,500.00 73,500.00
- Pasir Garuk 0.100 M3 100,000.00 10,000.00
- Pasir Lumajang 0.0075 M3 350,000.00 2,625.00
- Upah Pekerjaan
~ Pekerja 0.500 Oh 75,000.00 37,500.00
~ Mandor 0.050 Oh 100,000.00 5,000.00 128,625.00
1 2 3 4 5 6 7
3 1 m2 Pasang Paving K 200 abu-abu
- Paving stone K 200 abu-abu 1.000 M2 47,500.00 47,500.00
- Pasir Garuk 0.100 M3 100,000.00 10,000.00
- Pasir Lumajang 0.0075 M3 350,000.00 2,625.00
- Upah Pekerjaan
~ Pekerja 0.500 Oh 75,000.00 37,500.00
~ Mandor 0.050 Oh 100,000.00 5,000.00 102,625.00
4 1 m2 Pasang Paving K 200 warna
- Paving stone K 200 warna 1.000 M2 55,000.00 55,000.00
- Pasir Garuk 0.100 M3 100,000.00 10,000.00
- Pasir Lumajang 0.0075 M3 350,000.00 2,625.00
- Upah Pekerjaan
~ Pekerja 0.500 Oh 75,000.00 37,500.00
~ Mandor 0.050 Oh 100,000.00 5,000.00 110,125.00
5 1 m2 Pasang Paving K 100 abu-abu
- Paving stone K 100 abu-abu 1.000 M2 #REF! #REF!
- Pasir Garuk 0.100 M3 100,000.00 10,000.00
- Pasir Lumajang 0.0075 M3 350,000.00 2,625.00
- Upah Pekerjaan
~ Pekerja 0.500 Oh 75,000.00 37,500.00
~ Mandor 0.050 Oh 100,000.00 5,000.00 #REF!
6 1 m2 Pasang Paving K 100 warna
- Paving stone K 100 warna 1.000 M2 #REF! #REF!
- Pasir Garuk 0.100 M3 100,000.00 10,000.00
- Pasir Lumajang 0.0075 M3 350,000.00 2,625.00
- Upah Pekerjaan
~ Pekerja 0.500 Oh 75,000.00 37,500.00
~ Mandor 0.050 Oh 100,000.00 5,000.00 #REF!
7 1 m1 Pasang Kanstin 10,20,50
- Kanstin 2.000 Bh #REF! #REF!
- Semen Portland 0.154 kg 1,200.00 184.80
- Pasir Pasang 0.0387 M3 125,000.00 4,837.50
- Upah Pekerjaan
~ Pekerja 0.2332 Oh 75,000.00 17,490.00
~ Tukang Batu 0.06 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0228 Oh 100,000.00 2,280.00 #REF!
8 1 m1 Pasang Kanstin 10,30,50
- Kanstin 2.000 Bh #REF! #REF!
- Semen Portland 0.154 kg 1,200.00 184.80
- Pasir Pasang 0.0387 M3 125,000.00 4,837.50
- Upah Pekerjaan
~ Pekerja 0.2332 Oh 75,000.00 17,490.00
~ Tukang Batu 0.06 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0228 Oh 100,000.00 2,280.00 #REF!
9 1 m1 Pasang Kanstin 15,20,50 (ex pandaan)
- Kanstin 2.000 Bh 0.00 0.00
- Semen Portland 0.154 kg 1,200.00 184.80
- Pasir Pasang 0.0387 M3 125,000.00 4,837.50
- Upah Pekerjaan
~ Pekerja 0.2332 Oh 75,000.00 17,490.00
~ Tukang Batu 0.06 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0228 Oh 100,000.00 2,280.00 28,062.30
10 1 m1 Pasang Kanstin 15,30,50 (ex pandaan)
- Kanstin 2.000 Bh #REF! #REF!
- Semen Portland 0.154 kg 1,200.00 184.80
- Pasir Pasang 0.0387 M3 125,000.00 4,837.50
- Upah Pekerjaan
~ Pekerja 0.2332 Oh 75,000.00 17,490.00
~ Tukang Batu 0.06 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
1 2 3 4 5 6 7
~ Mandor 0.0228 Oh 100,000.00 2,280.00 #REF!
11 1 m1 Pasang Kanstin 15,25,40 (ex pandaan)
- Kanstin 2.500 Bh 53,000.00 132,500.00
- Semen Portland 0.154 kg 1,200.00 184.80
- Pasir Pasang 0.0387 M3 125,000.00 4,837.50
- Upah Pekerjaan
~ Pekerja 0.2332 Oh 75,000.00 17,490.00
~ Tukang Batu 0.06 Oh 45,000.00 2,700.00
~ Kepala Tukang 0.006 Oh 95,000.00 570.00
~ Mandor 0.0228 Oh 100,000.00 2,280.00 160,562.30
1 2 3 4 5 6 7
XIII PEKERJAAN PAGAR BESI
1 1 M1 Pasang Pagar BRC tinggi 90 cm
- Kawat BRC t=90 cm 1.000 M1 290,000.00 290,000.00
- Kawat Las RB 0.200 kg 30,000.00 6,000.00
- Upah Pekerjaan 1.000 Org 50,000.00 50,000.00 346,000.00
2 1 M1 Pasang Pagar BRC tinggi 120 cm
- Kawat BRC t=120 cm 1.000 M1 377,000.00 377,000.00
- Kawat Las RB 0.200 kg 30,000.00 6,000.00
- Upah Pekerjaan 1.000 Org 50,000.00 50,000.00 433,000.00
3 1 m2 Pasang pintu besi plat baja tebal 2 mm, rangka baja siku
- Besi siku L 30.30.3 15.000 Kg 9,500.00 142,500.00
- Besi plat baja 32.800 Kg 6,666.00 218,644.80
- Kawat las 0.050 Kg 30,000.00 1,500.00
- Upah Pekerjaan
~ Pekerja 1.050 Oh 75,000.00 78,750.00
~ Tukang besi konstruksi 1.050 Oh 85,000.00 89,250.00
~ Kepala Tukang 0.105 Oh 95,000.00 9,975.00
~ Mandor 0.052 Oh 100,000.00 5,200.00 545,819.80
4 1 m2 Pasang Pagar besi
- Pagar besi 1.000 M2 450,000.00 450,000.00
- Upah Pekerjaan
~ Pekerja 1.050 Oh 75,000.00 78,750.00
~ Tukang besi konstruksi 1.050 Oh 85,000.00 89,250.00
~ Kepala Tukang 0.105 Oh 95,000.00 9,975.00
~ Mandor 0.00525 Oh 100,000.00 525.00 628,500.00
5 1 m2 Pasang Pintu Harmonika
- Pintu harmonika 1.000 M2 1,035,000.00 1,035,000.00
- Upah Pekerjaan
~ Pekerja 1.050 Oh 75,000.00 78,750.00
~ Tukang besi konstruksi 1.050 Oh 85,000.00 89,250.00
~ Kepala Tukang 0.105 Oh 95,000.00 9,975.00
~ Mandor 0.00525 Oh 100,000.00 525.00 1,213,500.00
6 1 m2 Pasang Teralis besi strip (2 x 3) mm
- Besi Plat Strip 6.177 Kg 6,666.00 41,175.88
- Pengelasan 27.080 cm #REF! #REF!
- Upah Pekerjaan
~ Pekerja 1.670 Oh 75,000.00 125,250.00
~ Tukang besi konstruksi 1.670 Oh 85,000.00 141,950.00
~ Kepala Tukang 0.167 Oh 95,000.00 15,865.00
~ Mandor 0.08300 Oh 100,000.00 8,300.00 #REF!
7 1 m2 Pasang kawat harmonika
- Kawat harmonika 1.100 M2 24,000.00 26,400.00
- Pengelasan 11.110 Cm #REF! #REF!
- Baja Strip (0,2x2) cm 1.7160 Kg 6,666.00 11,438.86
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang besi konstruksi 0.100 Oh 45,000.00 4,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.0005 Oh 100,000.00 50.00 #REF!
8 1 m2 Pasang kawat nyamuk kassa
- Kawat nyamuk kassa alumunium 1.100 M2 15,000.00 16,500.00
- Pengelasan 11.110 Cm #REF! #REF!
- Baja Strip (0,2x2) cm 1.7160 Kg 6,666.00 11,438.86
- Upah Pekerjaan
~ Pekerja 0.100 Oh 75,000.00 7,500.00
~ Tukang besi konstruksi 0.100 Oh 45,000.00 4,500.00
~ Kepala Tukang 0.010 Oh 95,000.00 950.00
~ Mandor 0.0005 Oh 100,000.00 50.00 #REF!
BIDANG PENGAIRAN
HARGA SATUAN JUMLAH HSPK 2011
NO JENIS PEKERJAAN KOEF. STN
(Rp) (Rp) (Rp)
1 2 3 4 5 6 7
I KEGIATAN PENGUKURAN
1 Pengukuran Bendung untuk MC. 1.000 bh
TENAGA
1. Juru ukur 1.500 Org/hr 60,000.00 90,000.00
2. Pekerja 4.500 Org/hr 37,000.00 166,500.00
BAHAN
1. Patok kayu uk. 4 x 6 x 50 cm 0.012 m3 2,400,000.00 28,800.00
2. Cat meni 0.120 kg 22,800.00 2,736.00
3. Paku payung 0.050 kg 23,000.00 1,150.00
ALAT
1. Pesawat ukur 1.000 unit 150,000.00 150,000.00
2. Meteran 0.030 bh 14,000.00 420.00
3. Palu 0.060 bh 35,000.00 2,100.00 441,706.00
2 Pengukuran Saluran Untuk MC. 1.000 bh
TENAGA
1. Juru ukur 2.000 Org/hr 60,000.00 120,000.00
2. Pekerja 6.000 Org/hr 37,000.00 222,000.00
BAHAN
1. Patok kayu uk. 4 x 6 x 50 cm 0.012 m3 2,400,000.00 28,800.00
2. Cat meni 0.120 kg 22,800.00 2,736.00
3. Paku payung 0.050 kg 23,000.00 1,150.00
ALAT
1. Pesawat ukur 2.000 unit 150,000.00 300,000.00
2. Meteran 0.045 bh 14,000.00 630.00
3. Palu 0.090 bh 35,000.00 3,150.00
678,466.00
3 Pengukuran Bangunan untuk MC. 1.000 bh
TENAGA
1. Juru ukur 0.250 Org/hr 60,000.00 15,000.00
2. Pekerja 0.750 Org/hr 37,000.00 27,750.00
BAHAN
1. Patok kayu uk. 4 x 6 x 50 cm 0.002 m3 2,400,000.00 4,800.00
2. Cat meni 0.020 kg 22,800.00 456.00
3. Paku payung 0.010 kg 23,000.00 230.00
ALAT
1. Pesawat ukur 0.250 unit 150,000.00 37,500.00
2. Meteran 0.020 bh 14,000.00 280.00
3. Palu 0.030 bh 35,000.00 1,050.00 87,066.00
II KEGIATAN PERSIAPAN
1 Pembuatan bouwplank Pertitik 1.000 m
TENAGA
1. Kep. Tukang Kayu 0.010 Org/hr 50,000.00 500.00
2. Tukang Kayu 0.100 Org/hr 85,000.00 8,500.00
3. Pekerja 0.100 Org/hr 37,000.00 3,700.00
4. Mandor 0.005 Org/hr 55,000.00 275.00
BAHAN
1. Kayu perancah 5/7 0.012 m3 2,200,000.00 26,400.00
3. Paku usuk 0.020 kg 15,000.00 300.00 39,675.00
III PEMBERSIHAN:
1 Pembersihan saluran 1.000 m2
TENAGA
1. Mandor 0.008 Org/hr 55,000.00 440.00
2. Pekerja 0.050 Org/hr 37,000.00 1,850.00 2,290.00
2 Angkutan Pembersihan Saluran 1.000 m3
TENAGA
1. Mandor 0.002 Org/hr 55,000.00 110.00
2. Pekerja Terampil 0.050 Org/hr 37,000.00 1,850.00
ALAT
1 2 3 4 5 6 7
1. Sewa Truck (min 5 jam) 0.020 Jam 151,646.00 3,032.92 4,992.92
IV KEGIATAN PENGGALIAN
1 Menggali Tanah Dengan Alat Berat 1.000 m3
TENAGA
1. Pekerja 0.226 Jam 37,000.00 8,362.00
2. Mandor 0.007 Jam 55,000.00 385.00
ALAT
1. Sewa Excavator 0.076 Jam 297,651.00 22,621.48
2. Sewa Truck (min 5 jam) 0.074 Jam 151,646.00 11,221.80 42,590.28
1 2 3 4 5 6 7
2 Bongkaran Pas. Batu Kali dan dibersihkan 1.000 m3
TENAGA
1. Mandor 0.205 Org/hr 55,000.00 11,275.00
2. Pekerja 2.048 Org/hr 37,000.00 75,776.00
ALAT
1. Bodem 0.010 unit 135,000.00 1,350.00
2. Keranjang 0.083 bh 11,500.00 954.50 89,355.50
3 Bongkaran beton bertulang (mesin) 1.000 m3
TENAGA
Pekerja 1.000 Org/hr 37,000.00 37,000.00
Mandor 0.050 Org/hr 55,000.00 2,750.00
BAHAN .
1. Solar 2.000 Ltr 4,500.00 9,000.00
ALAT
1. Jack hammer 4.000 Jam 24,680.00 98,720.00 147,470.00
V KEGIATAN PENDONGKELAN
1 Pendongkelan rumpun bambu dan menimbun kembali 1.000 m2 0.90
bekas dongkelan
TENAGA
1. Mandor 0.054 Org/hr 55,000.00 2,970.00
2. Pekerja 1.575 Org/hr 37,000.00 58,275.00
BAHAN
1. Tanah urug 0.900 m3 58,500.00 52,650.00
ALAT
1. Ganco 0.050 bh 60,000.00 3,000.00
2. Keranjang 0.225 bh 11,500.00 2,587.50
3. Kereta dorong / alat angkut 0.042 bh 200,000.00 8,400.00
4. Pemadat timbunan (Vibro roller/stamper) 0.900 Jam 38,020.00 34,218.00 162,100.50
2 Pendongkelan rumpun bambu 1.000 m2
TENAGA
1. Mandor 0.045 Org/hr 55,000.00 2,475.00
2. Pekerja 1.327 Org/hr 37,000.00 49,099.00
ALAT
1. Ganco 0.050 bh 60,000.00 3,000.00
2. Keranjang 0.225 bh 11,500.00 2,587.50 57,161.50
3 Pendongkelan pohon keliling >0.75 m 1.000 btg
TENAGA
1. Mandor 0.400 Org/hr 55,000.00 22,000.00
2. Pekerja 3.000 Org/hr 37,000.00 111,000.00
ALAT
1. Gergaji 0.034 bh 90,000.00 3,060.00
2. Ganco 0.050 bh 60,000.00 3,000.00
3. Sabit besar 0.040 bh 460,000.00 18,400.00 157,460.00
4 Pendongkelan pohon keliling >0.75 m dan menimbun 1.000 btg
kembali bekas dongkelan
TENAGA
1. Mandor 0.412 Org/hr 55,000.00 22,660.00
2. Pekerja 3.330 Org/hr 37,000.00 123,210.00
BAHAN
1. Tanah urug 1.200 m3 58,500.00 70,200.00
ALAT
1. Gergaji 0.034 bh 90,000.00 3,060.00
2. Ganco 0.050 bh 60,000.00 3,000.00
3. Sabit besar 0.040 bh 460,000.00 18,400.00
4. Pemadat timbunan (Vibro roller/stamper) 1.200 Jam 38,020.00 45,624.00
5. Kereta dorong / alat angkut 0.042 bh 200,000.00 8,400.00 294,554.00
5 Kosrekan tanah setebal 15 cm dan dibuang keluar 1.000 m2
TENAGA
1. Mandor 0.019 Org/hr 55,000.00 1,045.00
2. Pekerja 0.156 Org/hr 37,000.00 5,772.00
ALAT
1. Keranjang 0.083 bh 11,500.00 954.50 7,771.50
6 Pengeringan / Pompa Air 1.000 Jam
TENAGA
1 2 3 4 5 6 7
1. Operator 0.042 Org/hr 175,000.00 7,350.00
2. Mekanik 0.042 Org/hr 75,000.00 3,150.00
BAHAN
1. Solar 1.500 ltr #REF! #REF!
ALAT
1. Pompa Air 0.042 unit 50,000.00 2,100.00 #REF!
IX KEGIATAN PERKAWATAN
1 Bronjong kawat galvanis d = 4mm 1.000 m3
TENAGA
1. Mandor pengisi 0.024 Org/hr 55,000.00 1,320.00
2. Penganyam 0.704 Org/hr 55,000.00 38,720.00
3. Mandor penganyam 0.026 Org/hr 55,000.00 1,430.00
4. Pekerja pengisi 1.382 Org/hr 37,000.00 51,134.00
5. Pekerja penganyam 0.567 Org/hr 37,000.00 20,979.00
BAHAN
1. Batu kali 1.100 m3 220,000.00 242,000.00
2. Kawat galvanize 15.000 kg 20,000.00 300,000.00
ALAT
1. Tang pemotong kawat 0.010 bh 20,000.00 200.00
2. Palu 0.010 bh 25,000.00 250.00 656,033.00
XI PENGANGKUTAN TANAH:
1 Pengangkutan tanah sejauh 30m 1.000 m3
TENAGA
1. Pekerja 0.330 Org/hr 75,000.00 24,750.00
2. Mandor 0.010 Org/hr 100,000.00 1,000.00 25,750.00
2 Mengangkut tanah dari lubang galian dalamnya lebih 1.000 m3
dari 1 m
TENAGA
1. Pekerja 0.150 Org/hr 75,000.00 11,250.00
2. Mandor 0.008 Org/hr 100,000.00 800.00 12,050.00
3 Mengangkut lumpur dari lubang galian dalamnya lebih 1.000 m3
dari 1 m
TENAGA
1. Pekerja 0.250 Org/hr 75,000.00 18,750.00
2. Mandor 0.010 Org/hr 100,000.00 1,000.00 19,750.00
4 Mengangkut lumpur Pada lokasi yang sulit 1.000 m3
TENAGA
1. Pekerja 1.400 Org/hr 75,000.00 105,000.00
2. Mandor 0.024 Org/hr 100,000.00 2,400.00 107,400.00
5 Angkutan Tanah Keluar Proyek 1.000 m3
TENAGA
1. Pekerja 0.250 Org/hr 75,000.00 18,750.00
ALAT
1. Sewa Truck (min 5 jam) 0.250 Jam 263,180.00 65,795.00 84,545.00
6 Pengerukan lumpur Pada lokasi sulit (Gorong-2) 1.000 m3
TENAGA
1. Mandor 0.024 Org/hr 100,000.00 2,400.00
2. Pekerja 1.400 Org/hr 75,000.00 105,000.00 107,400.00
7 BIAYA LANGSIRAN >50 m' s/d 100 m' 1.000 m3
Upah Pekerjaan
- Pekerja 0.450 Org/hr 75,000.00 33,750.00 33,750.00
8 BIAYA LANGSIRAN s/d 200 m' 1.000 m3
Upah Pekerjaan
- Pekerja 0.545 Org/hr 75,000.00 40,875.00 40,875.00
1 2 3 4 5 6 7
9 BIAYA LANGSIRAN s/d 300 m' 1.000 m3
Upah Pekerjaan
- Pekerja 0.725 Org/hr 75,000.00 54,375.00 54,375.00
10 BIAYA LANGSIRAN s/d 400 m' 1.000 m3
Upah Pekerjaan
- Pekerja 0.909 Org/hr 75,000.00 68,175.00 68,175.00
11 BIAYA LANGSIRAN s/d 500 m' 1.000 m3
Upah Pekerjaan
- Pekerja 1.090 Org/hr 75,000.00 81,750.00 81,750.00
12 BIAYA LANGSIRAN >700 m' 1.000 m3
Upah Pekerjaan
- Pekerja 1.452 Org/hr 75,000.00 108,900.00 108,900.00
13 Gebalan rumput 1.000 m2
TENAGA
1. Mandor 0.010 Org/hr 100,000.00 1,000.00
2. Pekerja 0.144 Org/hr 75,000.00 10,800.00
BAHAN
1. Gebalan rumput 1.000 m2 18,000.00 18,000.00 29,800.00
14 Pasang Lubang Drainase 1.000 bh
TENAGA
1. Mandor 0.020 Org/hr 100,000.00 2,000.00
2. Kepala Tukang Batu 0.001 Org/hr 95,000.00 95.00
3. Tukang Batu 0.010 Org/hr 85,000.00 850.00
4. Pekerja 0.001 Org/hr 75,000.00 75.00
BAHAN
1. Pipa PVC diameter 1,25" 0.500 m' - -
2. Ijuk 0.050 kg 13,000.00 650.00 3,670.00
5123 BAJA
TENAGA
Tukang
Mandor
BAHAN
Besi
Kawat TULANG
PekerjaBetonPolosPOLOS
Beton
PERALATAN
Alat Bantu 1 Kg
0.1050
0.0350
1.1000
0.0100
1.0000 Jam
Kg
M3
Ls 9,375.00
10,625.00
12,500.00
7,612.00
13,750.00
53.81 10,358.26
984.38
371.88
437.50
8,373.20
137.50
53.81
5 BAJA TULANG POLOS 1 Kg 9,415.35
BAHAN
1 Besi beton (polos) 1.0500 Kg 7,612.00 7,992.60
2 Kawat beton 0.0150 Kg 13,750.00 206.25
TENAGA
1 Pekerja 0.0070 Oh 75,000.00 525.00
Koefisien/ HARGA SATUAN
NO Uraian Kegiatan Satuan HSPK 2011
Volume (RP.)
(Rp.)
2 Tukang Besi 0.0070 Oh 85,000.00 595.00
3 Kepala Tukang 0.0007 Oh 95,000.00 66.50
4 Mandor 0.0003 Oh 100,000.00 30.00
HARGA AHSP
KOEF. SATUAN JUMLAH 2016
NO JENIS PEKERJAAN STN ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 1 m Pengukuran dan Pemasangan Bouwplank
A TENAGA
- Pekerja 0.100 Oh 75,000.00 7,500.00
- Tukang Kayu 0.100 Oh 85,000.00 8,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.005 Oh 100,000.00 500.00
B BAHAN
- Patok Kayu 0.012 M3 2,000,000.00 24,000.00
- Paku 0.020 Kg 12,500.00 250.00
- Kayu Papan 3/20 0.007 M3 3,600,000.00 25,200.00
C PERALATAN
D Jumlah (A+B+C) 66,900.00
E Overhead & Profit (15%) 10,035.00
F Harga Satuan Pekerjaan (D+E) 76,935.00
II PEKERJAAN TANAH
1 1 m3 Galian Tanah biasa sedalam 1 meter
A TENAGA
- Pekerja 0.750 Oh 75,000.00 56,250.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
C PERALATAN
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
92
1 2 3 4 5 6 7
D Jumlah (A+B+C) 58,750.00
E Overhead & Profit (15%) 8,812.50
F Harga Satuan Pekerjaan (D+E) 67,562.50
6 1 m3 Urugan kembali
A TENAGA
- Pekerja 0.250 Oh 75,000.00 18,750.00
- Mandor 0.008 Oh 100,000.00 833.33
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 19,583.33
E Overhead & Profit (15%) 2,937.50
F Harga Satuan Pekerjaan (D+E) 22,520.83
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
93
1 2 3 4 5 6 7
8 1 m3 Urugan Pasir
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Mandor 0.010 Oh 100,000.00 1,000.00
B BAHAN
- Pasir Urug 1.200 M3 100,000.00 120,000.00
C PERALATAN
D Jumlah (A+B+C) 143,500.00
E Overhead & Profit (15%) 21,525.00
F Harga Satuan Pekerjaan (D+E) 165,025.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
94
1 2 3 4 5 6 7
B BAHAN
- Sirtu 1.200 M3 100,000.00 120,000.00
C PERALATAN
D Jumlah (A+B+C) 141,250.00
E Overhead & Profit (15%) 21,187.50
F Harga Satuan Pekerjaan (D+E) 162,437.50
10 1 m3 Urugan Sirdas
A TENAGA
- Pekerja 0.250 Oh 75,000.00 18,750.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Tanah urug 1.200 M3 70,000.00 84,000.00
C PERALATAN
D Jumlah (A+B+C) 105,250.00
E Overhead & Profit (15%) 15,787.50
F Harga Satuan Pekerjaan (D+E) 121,037.50
IV PEKERJAAN BETON
1 1 M3 Membuat Beton Mutu f'c = 7,4 Mpa (K 100)
A TENAGA
- Pekerja 1.650 Oh 75,000.00 123,750.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
95
1 2 3 4 5 6 7
- Tukang Batu 0.275 Oh 85,000.00 23,375.00
- Kepala Tukang 0.028 Oh 95,000.00 2,660.00
- Mandor 0.083 Oh 100,000.00 8,300.00
B BAHAN
- Semen Portland 247.000 Kg 1,200.00 296,400.00
- Pasir Beton 869.000 Kg 250.00 217,250.00
- Batu Pecah Mesin 2/3 999.000 Kg 231.48 231,250.00
- Air 215.000 Ltr 25.00 5,375.00
C PERALATAN
D Jumlah (A+B+C) 908,360.00
E Overhead & Profit (15%) 136,254.00
F Harga Satuan Pekerjaan (D+E) 1,044,614.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
96
1 2 3 4 5 6 7
- Bata Merah 5 x 11 x 22 cm 140.000 Bh 625.00 87,500.00
- Semen Portland 26.550 Kg 1,200.00 31,860.00
- Pasir Pasang 0.093 M3 125,000.00 11,625.00
C PERALATAN
D Jumlah (A+B+C) 197,885.00
E Overhead & Profit (15%) 29,682.75
F Harga Satuan Pekerjaan (D+E) 227,567.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
97
1 2 3 4 5 6 7
4 1 m2 Pasangan Bata Merah tebal 1/2 Bata, 1 Pc : 3 Ps
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Tukang Batu 0.100 Oh 85,000.00 8,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.015 Oh 100,000.00 1,500.00
B BAHAN
- Bata Merah 5 x 11 x 22 cm 70.000 Bh 625.00 43,750.00
- Semen Portland 14.370 Kg 1,200.00 17,244.00
- Pasir Pasang 0.040 M3 125,000.00 5,000.00
C PERALATAN
D Jumlah (A+B+C) 99,444.00
E Overhead & Profit (15%) 14,916.60
F Harga Satuan Pekerjaan (D+E) 114,360.60
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
98
1 2 3 4 5 6 7
- Pasir Pasang 0.023 M3 125,000.00 2,875.00
C PERALATAN
D Jumlah (A+B+C) 50,381.20
E Overhead & Profit (15%) 7,557.18
F Harga Satuan Pekerjaan (D+E) 57,938.38
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
99
1 2 3 4 5 6 7
B BAHAN
- Semen Portland 6.240 Kg 1,200.00 7,488.00
- Pasir Pasang 0.024 M3 125,000.00 3,000.00
C PERALATAN
D Jumlah (A+B+C) 48,663.00
E Overhead & Profit (15%) 7,299.45
F Harga Satuan Pekerjaan (D+E) 55,962.45
5 1 m1 Benangan
A TENAGA
- Tukang Batu 0.050 Oh 85,000.00 4,250.00
- Mandor 0.005 Oh 100,000.00 500.00
B BAHAN
- Semen Portland 1.620 Kg 1,200.00 1,944.00
- Pasir Pasang 0.005 M3 125,000.00 653.13
C PERALATAN
D Jumlah (A+B+C) 7,347.13
E Overhead & Profit (15%) 1,102.07
F Harga Satuan Pekerjaan (D+E) 8,449.19
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
100
1 2 3 4 5 6 7
- Tukang Batu 0.035 Oh 85,000.00 2,975.00
- Kepala Tukang 0.0035 Oh 95,000.00 332.50
- Mandor 0.004 Oh 100,000.00 350.00
B BAHAN
- Buis Beton 1.000 M 35,000.00 35,000.00
C PERALATAN
D Jumlah (A+B+C) 43,907.50
E Overhead & Profit (15%) 6,586.13
F Harga Satuan Pekerjaan (D+E) 50,493.63
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
101
1 2 3 4 5 6 7
3 Pasang 1 m Buis Beton O 20
A TENAGA
- Pekerja 0.070 Oh 75,000.00 5,250.00
- Tukang Batu 0.035 Oh 85,000.00 2,975.00
- Kepala Tukang 0.0035 Oh 95,000.00 332.50
- Mandor 0.004 Oh 100,000.00 350.00
B BAHAN
- Buis Beton 1.000 M 42,250.00 42,250.00
C PERALATAN
D Jumlah (A+B+C) 51,157.50
E Overhead & Profit (15%) 7,673.63
F Harga Satuan Pekerjaan (D+E) 58,831.13
XV PEKERJAAN PAVING
1 1 m2 Pasang Paving K 400 abu-abu tebal 6 cm
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.030 Oh 95,000.00 2,850.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Paving stone K 400 abu-abu 1.000 M2 81,000.00 81,000.00
C PERALATAN
D Jumlah (A+B+C) 118,350.00
E Overhead & Profit (15%) 17,752.50
F Harga Satuan Pekerjaan (D+E) 136,102.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
102
1 2 3 4 5 6 7
3 1 m2 Pasang Paving K 300 warna tebal 6 cm
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.030 Oh 95,000.00 2,850.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Paving stone K 300 warna 1.000 M2 73,500.00 73,500.00
C PERALATAN
D Jumlah (A+B+C) 110,850.00
E Overhead & Profit (15%) 16,627.50
F Harga Satuan Pekerjaan (D+E) 127,477.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
103
1 2 3 4 5 6 7
4 1 m2 Pasang Paving K 300 abu-abu tebal 8 cm
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.030 Oh 95,000.00 2,850.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Paving stone K 300 abu-abu 1.000 M2 92,500.00 92,500.00
C PERALATAN
D Jumlah (A+B+C) 129,850.00
E Overhead & Profit (15%) 19,477.50
F Harga Satuan Pekerjaan (D+E) 149,327.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
104
1 2 3 4 5 6 7
XVI PEKERJAAN LAIN-LAIN
1 1 bh Pasang Cover Precast 600x70x600
A TENAGA
- Pekerja 0.0700 Org/hr 75,000.00 5,250.00
- Mandor 0.0035 Org/hr 100,000.00 350.00
B BAHAN
- Cover 600X70X600 1.0000 bh 120,025.00 120,025.00
C PERALATAN
D Jumlah (A+B+C) 125,625.00
E Overhead & Profit (15%) 18,843.75
F Harga Satuan Pekerjaan (D+E) 144,468.75
Pasuruan, 2016
Disusun Oleh,
#REF!
#REF!
Direktur
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate
105
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TRIWULAN I TAHUN 2017
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KOTA PASURUAN
Harga Satuan
No. BAHAN Sat.
2017
1 2 3 4
I JENIS BAHAN BANGUNAN BAHAN
PENUTUP ATAP & PLAFON
1 Asbes datar tebal 4 mm (60 x 180) Lbr
2 Asbes gelombang besar tebal 5 mm (180x100) Lbr
3 Asbes gelombang kecil tebal 4 mm (180x100) Lbr
4 Asbes bubung gelombang kecil (105) M1
5 Asbes bubung gelombang besar (102) M1
6 Aluminium (0,90 x 2,10) Lbr
7 Aluminium Foil single m2
8 Almunium Profil T M1
9 Genteng flam pres jawa / lokal Bj
10 Genteng Ambulu Model Karang Pilang Bj
11 Genteng Metal 1x5 Lbr
12 Genteng Palentong besar/Karang Pilang Besar Bj
13 Genteng bubung karang pilang besar Bj
14 Genteng wuwung jawa / lokal Bj
15 Genteng wuwung model karang pilang Bj
16 Genteng wuwung pres beton Bj
17 Genteng wuwung nglayur Bj
18 Genteng Wuwung Keramik (Tengah) Bj
19 Genteng Wuwung Keramik (Tepi) Bj
20 Genteng Beton Bj
21 Genteng Nglayur Bj
22 Genteng Keramik glazurr Bj
23 Genteng kaca Bj
24 Nok genteng Beton Bj
25 Seng Datar BJLS 030 x 90 M1
26 Seng Gelombang BJLS 030 3x6 Lbr
27 Teak wood tebal 3 mm (1.22 x 2.44) Lbr
28 Teak wood tebal 3 mm (0,9 x 2.10) Lbr
29 Plywood tebal 4 mm (1.22 x 2.44) Lbr
30 Plywood tebal 4 mm (0,9 x 2,1) Lbr
31 Plywood tebal 9 mm (1.22 x 2.44) Lbr
32 Triplek lapis almunium (0.90 x 2.10) Lbr
33 Triplek tebal 4 mm (0.90 x 2.10) Lbr
34 Triplek tebal 4 mm (1.22 x 2.44) Lbr
35 Multiplek 9 mm (1.22 x 2.44) Lbr
36 Multiplek 12 mm (1.22 x 2.44) Lbr
37 Multiplek 15 mm (1.22 x 2.44) Lbr
38 Akustik tebal 9 mm 60 x 120 Lbr
39 Calsiboard ex Gresik (6 mm) 1,2 x 2,4 Lbr
40 Calsiboard ex Gresik (3,5 mm) Lbr
41 Eternit kerang bh
42 Fiber Plastic datar M2
43 Fiber Plastic gelombang M2
1 2 3 4
44 Gypsum list profil 15 cm M 1
Harga Satuan
NO TENAGA KERJA Sat.
(Rp)
Harga Satuan
NO PERALATAN Sat.
(Rp)
1 Meteran 5 M Bh 15,000.00
2 Palu Bh 35,000.00
3 Ganco Bh 65,000.00
4 Bodem Bh 135,000.00
5 Keranjang Bh 11,500.00
6 Kereta Dorong / (Whell Borrow) Bh 460,000.00
7 Betel Bh 35,000.00
8 Sabit besar Bh 40,000.00
9 Ember / Timba Bh 10,000.00
10 Kotak Adukan Bh 40,000.00
11 Cetok Bh 20,000.00
12 Kasut Kayu Bh 17,000.00
13 Tang Pemotong Kawat Bh 40,000.00
14 Gunting Pemotong Baja Bh 35,000.00
15 Kunci Pembengkok Tulangan Bh 20,000.00
16 Linggis Bh 75,000.00
17 Kayu Pemikul dan tampar Unit 12,500.00
18 Tusuk bambu Bh 1,200.00
19 Gergaji Besi Bh 35,000.00
20 Gergaji Kayu Bh 97,700.00
21 Bor besi Bh 42,000.00
22 Pisau Besar Bh 25,000.00
23 Pompa Air Diesel 3" Unit 15,000,000.00
24 Pompa Air Diesel 4" Unit 20,000,000.00
25 Pompa Air Kecil 500 watt, kap. 100 lt/menit, total head 100 m Unit 4,000,000.00
26 Pompa Air Kecil 250 watt, kap. 75 lt/menit, total head 60 m Unit 2,250,000.00
27 Pompa Air kecil 250 watt, kap. 40 lt/menit, total head 40 m Unit 650,000.00
28 Pompa Air Tangan Bh 600,000.00
29 Gembok kecil bh 30,000.00
DAFTAR SATUAN SEWA PERALATAN PER JAM KERJA
HARGA
No. Peralatan Kode Satuan SATUAN
(Rp.)
1 Asphal Mixing Plant E 01 Jam 5,866,889.96
2 Asphal Finisher E 02 Jam 302,178.67
3 Asphal Sprayer E 03 Jam 81,688.63
4 Buldozer E 04 Jam 496,690.51
5 Compresor 4000-6500 L/M E 06 Jam 157,777.76
6 Concrete Mixer 0.3-0.6 M3 E 07 Jam 59,753.04
7 Crane 10 - 15 Ton E 05 Jam 388,889.51
8 Dump Truck 3-4 M3 E 09 Jam 263,179.96
9 Dump Truck 8-10 M3 E 10 Jam 357,311.47
10 Excavator E 08 Jam 458,345.78
11 Flat Bed Truck 3-4 M3 E 11 Jam 252,229.92
12 Generator Set E 12 Jam 558,787.33
13 Motor Grader E 13 Jam 531,005.87
14 Track Loader 75-100 HP E 14 Jam 421,575.54
15 Wheel Loader E 15 Jam 435,431.59
16 Three wheel Roller 6-8 Ton E 16 Jam 189,932.00
17 Tandem Roller 6-8 Ton E 17 Jam 234,960.22
18 Pneumatic Tyre Roller 8-10 Ton E 18 Jam 297,983.73
19 Vibrator roller 5-8 Ton E 19 Jam 301,442.03
20 Concrete Vibrator E 20 Jam 40,527.04
21 Stone Cruiser E 21 Jam 729,546.32
22 Water Pump 70-100 mm E 23 Jam 48,153.88
23 Water Tanker 3000-4500 L E 22 Jam 229,777.76
24 Pedestrian Roller E 24 Jam 72,026.89
25 Stamper E 25 Jam 38,018.25
26 Jack Hammer E 26 Jam 24,679.26
27 Vulvi Mixer E 27 Jam 178,770.24
28 Concrete Pump E 28 Jam 249,819.92
29 Trailer 20 ton E 29 Jam 461,478.79
30 Pile Driver E 30 Jam 258,146.02
31 Crane On Truck E 31 Jam 452,973.08
32 Mesin Las E 32 Jam 56,228.24
33 Bore Pile Machine E 33 Jam 299,499
34 Pick Up Truck E 34 Jam 46,490.82
35 Batching Plant E 35 Jam 353,426.84
36 Cold Milling Machine E 36 Jam 1,549,900.00
37 Genset Penerangan E 37 Jam 81,000.00
38 Chainsaw E 38 Unit/hari 100,000.00
39 Tripod E 39 Unit/hari 200,000.00
40 Alat pancang hammer E 40 Unit/hari 250,000.00
41 Theodholit E 41 Unit/hari 250,000.00
42 Waterpass E 42 Unit/hari 200,000.00
43 Pompa Air E 43 Unit/hari 50,000.00
1 M3 PEMERATAAN DAN PEMADATAN TANAH URUG (per-20cm) MENGGUNAKAN ALAT
Bulldozer 0.012 jam Rp 496,700.00
Vibrator Roller 5- 8 Ton 0.012 jam Rp 301,450.00
Water Tank 0.012 jam Rp 229,780.00
Air 6.000 ltr Rp 25.00
Solar 0.750 ltr #REF!
Upah Kerja
Operator 0.100 oh Rp 175,000.00
Pembantu Operator 0.050 oh Rp 70,000.00
Mandor 0.005 oh Rp 100,000.00
Dibulatkan
( EMPIRIS )
Rp 5,960.40
Rp 3,617.40
Rp 2,757.36
Rp 150.00
#REF!
Rp 17,500.00
Rp 3,500.00
Rp 500.00
#REF!
#REF!
Kelompok Pekerjaan Jalan : KEGIATAN PERPONDASIAN
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
KELOMPOK PEKERJAAN JALAN : KEGIATAN PENGASPALAN
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
PROPINSI
KOTA
TAHUN
JENIS
SATUAN
NO21 Mandor
A.
B. PEKERJAAN
TENAGA
PekerjaPEMBAYARAN KOMPONEN ANALISA JawaHARGA
ATBL
:M10
Ton
L01
L03 Timur
Probolinggo
2010 ( LASTON SATUAN
SATUAN
Jam
Jumlah harga PEKERJAAN
ATAS LEVELLING
PERKIRAAN
KUANTITAS
Tenaga )
0.1205
0.0241 HARGA
SATUAN
(Rp.)
4,625.00
6,875.00
D. 765432154321 BAHAN
C.
E
Catatan Agregat
Filler
Aspal
PERALATAN
Wheel
AMP
Dump
Asphalt
Tandem
P.Tyre
Alat
JUMLAH
HARGA
Satuan
atau
pekerjaan
Biaya
termasuk
Harga
kasar
halus
Curah
loader
Truck
Finisher
Roller
Roller
:Bantu HARGA
SATUAN
dapat
ukuran
Kuantitas
satuan
Ppn
satuan TENAGA,
PEKERJAAN
berdasarkan
berat
sataun
dan sudah
yang
kolomuntuk
adalah
nomor
untuk BAHAN
atas
kuantitas
5mata
termasuk
dibayar
adalah jam
bahan-bahan DAN
DIBULATKAN
operasi
setiap
pembayaran.
peralatan sudah
pengeluaran
dari kontrak
adalah harga untuk
)komponen
termasuk
M01
M04
M05
E15
E01
E08
E02
E17
-E18
PERALATAN
bahan
untuk
dan biaya
satuan tenaga
-untuk
bakar,
seluruh
biaya
dasar
M3
Kg
Jam
Ls
Jumlah
(A+B+C)
kerja dan
bahan
pajak harga bahan
Peralatan
Peralatan,
menyelesaikan
danhabis
yang
lainnya.
(HSD) satu volume
satuan
dipakai
berkaiatan
keuntungan
0.3929
0.3064
49.5
68
0.0161
0.0241
0.2710
0.0301
0.0317
0.0252
dan/
dan operator
(tetapi tidak1- -
500.00
9,250.00
342,582.00
3,722,032.00
151,646.00
199,718.00
167,376.00
171,201.00
56,250.00
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
KELOMPOK PEKERJAAN JALAN : KEGIATAN PEMASANGAN PENUNJUK JALAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
ANALISA HARGA SATUAN PEKERJAAN
PERKIRAAN HARGA
NO KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga sataun kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
JUMLAH
HARGA
(Rp.)
60.00
20.00
80.00
955.82
482.32
2,895.23
2.40
4,335.77
4,415.77
4,416
JUMLAH
HARGA
(Rp.)
2,063.44
392.50
2,455.94
240,000.00
240,000.00
13,672.82
59,136.46
4,885.29
2,411.60
3,426.89
8,800.57
73.68
92,407.31
334,863.24
334,863
JUMLAH
HARGA
(Rp.)
2,063.44
392.50
2,455.94
222,000.00
222,000.00
13,672.82
59,136.46
4,885.29
2,411.60
3,426.89
8,800.57
73.68
92,407.31
316,863.24
316,863
JUMLAH
HARGA
(Rp.)
2,625.00
500.00
3,125.00
55,680.00
55,680.00
17,635.32
56,099.24
4,248.08
2,411.60
3,426.89
4,848.36
93.75
88,763.23
147,568.23
147,568
JUMLAH
HARGA
(Rp.)
10,937.81
-
728.75
11,666.56
#REF!
22,906.25
19,687.50
#REF!
740.77
350.00
1,090.76
#REF!
#REF!
JUMLAH
HARGA
(Rp.)
197.81
37.50
235.31
#REF!
27,720.63
#REF!
245.07
457.56
789.54
1,492.17
#REF!
#REF!
JUMLAH
HARGA
(Rp.)
197.81
37.50
235.31
#REF!
14,390.46
#REF!
245.07
994.01
789.54
2,028.62
#REF!
#REF!
JUMLAH
HARGA
(Rp.)
282.19
-
37.50
319.69
#REF!
2,971.08
#REF!
245.07
362.89
789.54
1,397.50
#REF!
#REF!
JUMLAH
HARGA
(Rp.)
430.31
28.75
459.06
4,718.75
4,718.75
87.09
1,500.74
685.38
13.77
2,286.98
7,464.79
7,465
JUMLAH
HARGA
(Rp.)
1,129.69
301.25
1,430.94
85,937.50
124,000.00
#REF!
#REF!
#REF!
6,967.04
141,392.05
-
-
-
-
42.93
148,402.02
#REF!
#REF!
JUMLAH
HARGA PERKIRAAN
(Rp.) NO KOMPONEN SATUAN KUANTITAS
A. TENAGA
1,129.69
301.25 1 Pekerja L01 Jam 0.1687
2 Mandor L03 Jam 0.0241
1,430.94
Jumlah harga Tenaga
B. BAHAN
122,781.25
95,750.00 1 Agregat kasar M01 M3 0.3929
#REF! 2 Agregat halus M04 M3 0.3064
#REF! 3 Filler M05 Kg 49.500
4 Aspal M10 Kg 68.250
#REF!
Jumlah harga bahan
C. PERALATAN
141,370.84 0.0240963855
- 0.0686813187 1 Wheel loader E15 Jam 0.0161
- 0.0723065799 2 AMP E01 Jam 0.0241
- 0.0573723465 3 Dump Truck E08 Jam 0.0254
7,031.16 0.016147263 4 Asphalt Finisher E02 Jam 0.0028
- 0.6172839506 5 Tandem Roller E17 Jam 0.0029
42.93 1 6 P.Tyre Roller E18 Jam 0.0023
7 Alat Bantu - Ls 1
148,444.94
Jumlah harga Peralatan
#REF!
#REF! D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A+B+C)
F HARGA SATUAN PEKERJAAN DIBULATKAN
Catatan :
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan Peralatan, volume dan/
atau ukuran berat untuk bahan-bahan
2 Kuantitas sataun adalah kuantitas setiap komponen untuk menyelesaikan satu satuan
pekerjaan dan nomor mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaiatan (tetapi tidak -
termasuk Ppn yang dibayar dari kontrak ) dan biaya - biaya lainnya.
5 Harga satuan kolom 5 adalah adalah harga satuan dasar (HSD) dan keuntungan
JUMLAH
HARGA
(Rp.)631,312.50
557.23
165.66
722.89
-
24,750.00
656,062.50
5,515.57 Wheel
AMP E15
E01 0.0381
89,700.97
41,096.48
6,015.60
5,306.79
4,308.03
56,250.00
208,193.43
864,978.82
864,979.00 Geset
P.Tyre
Alat E28
AsphalE02
Tandem E17
B -E18 Jam
Ls 0.0554
0.0767
0.043
0.0321
JUMLAH
HARGA
(Rp.)
1,129.69
301.25
1,430.94
118,593.75
107,312.50
#REF!
#REF!
#REF!
7,054.13
141,392.05
-
-
-
-
42.93
148,489.11
#REF!
#REF!
JUMLAH
HARGA
(Rp.)
14,458.13
1,927.50
16,385.63
306,442.50
122,781.25
77,000.00
#REF!
#REF!
13,542.18
67,569.21
14,644.37
13,677.74
491.57
109,925.08
#REF!
#REF!
JUMLAH
HARGA
(Rp.)
5,625.00
3,187.50
1,250.00
10,062.50
103,887.00
8,694.00
112,581.00
15,778.00
301.88
16,079.88
138,723.38
138,723
JUMLAH
HARGA
(Rp.)
9,049.69
5,128.69
1,508.75
15,687.13
34,149.32
43,702.55
63,750.00
141,601.87
43,128.52
470.61
43,599.14
200,888.14
200,888
JUMLAH
HARGA
(Rp.)
12,093.75
6,853.13
1,612.50
20,559.38
28,390.41
36,418.10
63,750.00
128,558.52
46,094.28
616.78
46,711.06
195,828.95
195,829
JUMLAH
HARGA
(Rp.)
14,875.31
8,428.81
2,478.75
25,782.88
159,127.77
203,942.81
63,750.00
426,820.58
70,856.56
773.49
71,630.04
524,233.50
524,233
JUMLAH
HARGA
(Rp.)
67,770.94
15,361.63
6,023.75
89,156.31
535,500.00
166,320.00
315,218.75
1,017,038.75
28,798.34
13,235.33
19,531.41
2,674.69
64,239.77
1,170,434.83
1,170,435.00
JUMLAH
HARGA
(Rp.)
67,770.94
15,361.63
6,023.75
89,156.31
504,000.00
168,455.00
319,187.50
991,642.50
28,798.34
12,454.08
19,531.41
2,674.69
63,458.52
1,144,257.33
1,144,258.00
JUMLAH
HARGA
(Rp.)
67,770.94
15,361.63
6,023.75
89,156.31
472,500.00
170,555.00
323,187.50
966,242.50
28,798.34
11,672.82
19,531.41
2,674.69
62,677.26
1,118,076.08
1,118,077.00
JUMLAH
HARGA
(Rp.)
67,770.94
15,361.63
6,023.75
89,156.31
409,500.00
172,655.00
331,156.25
913,311.25
28,798.34
11,236.24
19,531.41
2,674.69
62,240.68
1,064,708.24
1,064,708.00
JUMLAH
HARGA
(Rp.)
984.38
371.88
437.50
1,793.75
8,373.20
137.50
8,510.70
53.81
53.81
10,358.26
10,359.00
JUMLAH
HARGA
(Rp.)
67,770.94
15,361.63
6,023.75
89,156.31
340,200.00
179,375.00
339,937.50
859,512.50
28,798.34
10,661.79
19,531.41
2,674.69
61,666.23
1,010,335.04
1,010,335
JUMLAH
HARGA
(Rp.)
67,770.94
15,361.63
6,023.75
89,156.31
277,200.00
183,610.00
347,937.50
808,747.50
28,798.34
9,145.24
19,531.41
2,674.69
60,149.68
958,053.50
958,053
ATUAN PEKERJAAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
9,375.00 1,581.56
12,500.00 301.25
1,882.81
312,500.00 122,781.25
312,500.00 95,750.00
#REF! #REF!
#REF! #REF!
#REF!
5,866,890.00 94,456.93
302,180.00 7,282.54
234,970.00 5,968.24
297,990.00 834.37
435,440.00 1,262.78
263,180.00 605.31
- -
110,410.17
#REF!
#REF!
A. TENAGA
1 Pekerja L01 JAM 9,375.00
2 Tukang (Tk. Batu,Kayu, besi,dsb) L02 JAM 10,625.00
3 Mandor L03 JAM 12,500.00
4 Operator L04 JAM 21,875.00
5 Pembantu operator L05 JAM 8,750.00
6 Sopir L06 JAM 8,125.00
7 Pembantu Sopir L07 JAM 8,750.00
8 Mekanik L08 JAM 8,125.00
9 Pembantu Mekanik L09 JAM 8,750.00
B. BAHAN
1 Agregat Kasar Pecah Mesin M01 M3 312,500.00
2 Agregat Halus Pecah Mesin M02 M3 312,500.00
3 Filler M03 Kg #REF!
4 Batu Belah 15/20 M16 M3 #REF!
5 Batu Kali M07 M3 220,000.00
6 Aspal Curah M17 Kg #REF!
7 Aspal Drum M17 Kg #REF!
8 Kerosine (minyak Tanah) M23 Liter 56,700.00
9 Semen PC 40 kg M12 Kg 1,200.00
Zak 48,000.00
10 Besi Beton Polos M13 Kg 7,612.00
11 Kawat ikat Beton/bendrat M14 Kg 13,750.00
12 Agregat Base Klas A M26 M3 200,000.00
13 Agregat Base Klas B M27 M3 185,000.00
14 Agregat Base Klas C M28 M3 46,400.00
15 Sirtu tersaring M29 M3 100,000.00
16 Pasir Pasang Lokal (Bedali) M11 M3 125,000.00
17 Pasir Lumajang (agregrat penutup) M12 M3 350,000.00
18 Glass bead M54 Kg 18,400.00
19 Batu Pecah mesin 1-2 (agregrat pengunci) M14 M3 312,500.00
20 Batu Pecah mesin 2-3 (agregrat Pengunci) M14 M3 312,500.00
21 Batu Pecah mesin 3-5 ( agregrat pokok ) M15 M3 325,000.00
22 Batu Pecah mesin 0,5 - 1 cm (agregrat pengunci) M50 M3 312,500.00
23 Thermoplastic M53 Kg 38,800.00
24 Cat & material lainnya M72 Kg 63,750.00
25 Batu Pecah 4/6; 5/7 lokal M15 M3 312,500.00
26 Kayu Bakar M3 350,000.00
27 Kanstin 10.20.40 Bh 22,500.00
28 Kanstin 15.25.40 Bh 53,000.00
29 Kanstin 15.20.50 Bh -
30 Kanstin 15.30.50 Bh -
31 Kanstin 15.30.50 lubang grill Bh -
32 Kanstin 15.40.50 Bh -
33 Kanstin 15.40.50 lubang grill Bh -
34 Kanstin Median 15.40.50 Bh -
35 Gorong-gorong beton D=60cm M' 120,025.00
36 Gorong-gorong beton D=80cm M' 108,625.00
37 Wire Mesh dia 6 uk. 5,4 x 2,1 Lbr 350,000.00
38 Wire Mesh dia 10 uk. 5,4 x 2,1 Lbr 1,012,000.00
39 Batu Alam Ampyang Kg 2,500.00
40 Pigmen/pewarna Kg 63,750.00
DAFTAR HARGA UPAH PEKERJA
TAHUN 2014
KOTA PROBOLINGGO
Harga Satuan
NO TENAGA KERJA Sat.
(Rp.)
1 2 3
I JENIS BAHAN BANGUNAN BAHAN
PENUTUP ATAP & PLAFON
1 Asbes datar tebal 4 mm (60 x 180) Lbr
2 Asbes gelombang besar tebal 5 mm (180x100) Lbr 124,000.00
3 Asbes gelombang kecil tebal 4 mm (180x100) Lbr 90,000.00
4 Asbes bubung gelombang kecil (105) M 1
1 2 3
49 Zincalum / Galvalum 0,5mm TCT (lbr eff 750mm;5 gelmbng) M2 70,000.00
50 Rangka Atap Baja Ringan M 2
150,000.00
51 Rangka Atap Baja Ringan Smarttruss Blue Scope M 2
56 Ramset bh
57 Regel Lisplank Galvalum M1
58 Kalsium plank 30 M1
59 Kalsium plank 20 M1
17 Kayu Bakar M3
18 Bambu panjang 6 m Ljr 6,000.00
19 Patok Kayu 5/7 M 3
30,000.00
20 Kayu Mahoni (klas awet 3, klas kuat 2,3) M 3
3,500,000.00
21 Kayu Mahoni Papan (klas awet 3, klas kuat 2,3) M 3
3,500,000.00
22 Kayu Gemalina M 3
3,200,000.00
23 Kayu kamper (balok) - 4m M3 7,500,000.00
24 Kayu kamper (papan) - 4m M 3
7,500,000.00
1 2 3
38 Jarum Keras 16 Bh
39 Jarum Keras 22 Bh
40 Jarum Keras 32 Bh
41 Anker 16 mm P=40CM (3BH/KG) Bh
42 Baut 16 mm P=5CM Bh
43 Baut 12 mm Bh
44 Baut 10 mm Bh
45 Pintu lipat tebal 1mm M2
46 Pintu KM Almunium t = 1mm lengkap kusen 3" unit 800,000.00
47 Rolling Door tebal 1,2 mm silver M 2
900,000.00
48 Rolling Door tebal 1,2 mm coklat M 2
1,000,000.00
49 Kusen Almunium 3" Silver M 1
83 Cetakan Semen M2
85 Roster batu alam 20/20 bh
87 Roster batu alam 25/25 bh
89 Roster batu alam 30/30 bh
91 Roster batu alam 40/40 bh
93 Roster batu alam 30/60 bh
1 2 3
VIII BAHAN UNTUK KM/WC/URINOIR
1 Pipa / slang spiral saluran kran Bh
2 Closet duduk lengkap tangki dengan eco washer (TOTO) Bh 2,500,000.00
3 Closet duduk lengkap tangki Bh 1,750,000.00
4 Closet duduk lengkap tangki (TOTO putih) Bh 2,100,000.00
5 Closet duduk biasa lengkap+tutup Set 650,000.00
6 Closet jongkok Bh 120,000.00
7 Closet jongkok teraso Bh
8 Bak cuci piring stainless steel 1 bak Bh 250,000.00
9 Bak cuci + meja beton teraso Bh
10 Bak mandi fiberglass Bh
11 Wastafel kecil Bh 125,000.00
12 Wastafel besar Bh 150,000.00
13 Kran air washtafel Bh 75,000.00
14 Kran air Angsa Bh 50,000.00
15 Kran air biasa 1/2" Bh 15,000.00
16 Kran air plastik 1/2" (3/4") Bh 7,000.00
17 Jet Spray stainless Bh
18 Jet Spray (TOTO) Bh
19 Hand Shower set 250,000.00
20 Shower head set
21 Tempat sabun besar Bh
22 Tempat sabun kecil Bh 25,000.00
23 Urinoir lengkap asesoris Bh
24 Instalasi Kran Air Ttk
25 Avuur Lantai (Stainless) Bh 25,000.00
26 Avuur Bak (Stainless) Bh 15,000.00
27 Avuur Lantai (plastik) Bh 10,000.00
28 Avuur Bak (plastik) Bh 7,500.00
29 Pintu KM Almunium t = 1mm lengkap kusen 3" unit 800,000.00
30 Pintu PVC Polos Lengkap Kusen Set 195,000.00
31 Pintu PVC Artistik Kaca Lengkap Kusen Set
32 Tandon Air Stainless Steel 1000 liter Bh 2,500,000.00
33 Tandon Air Fiber 1000 liter Bh
34 Septictank BIOFILTER kapasitas 1000 liter Bh
XI BAHAN PLASTIK
1 Keni PVC 1/2" AW Bh
2 Keni PVC 3/4" AW Bh
3 Keni PVC 1" AW Bh
4 Keni PVC 1 1/4" AW Bh
5 Keni PVC 1 1/2" AW Bh
6 Keni PVC 2" AW Bh
7 Keni PVC 2,5" AW Bh
8 Keni PVC 3" AW Bh
9 Keni PVC 4" AW Bh
10 Keni PVC 3" D Bh
11 Keni PVC 4" D Bh
12 Shock 1/2" AW Bh
13 Shock 3/4" AW Bh
14 Shock 1"AW Bh
15 Shock 1 1/4" AW Bh
16 Shock 1 1/2" AW Bh
17 Shock 2" AW Bh
18 Shock 2,5" AW Bh
19 Shock 3" AW Bh
20 Shock 4" AW Bh
21 Shock drat luar 1" Bh
22 Stop Kran 1" besi Bh
23 Stop Kran 3/4" besi Bh
24 Tee 1/2" Bh
25 Tee 3/4" Bh
26 Tee 1" Bh
27 Tee 1 1/4" Bh
28 Tee 1 1/2" Bh
29 Tee 2" Bh
30 Tee 3" Bh
31 Tee 4" Bh
1 2 3
32 Tee Verloop PVC 1" x 3/4" Bh
33 Keni Verloop PVC 1" x 3/4" Bh
34 Keni Drat 3/4" x 1/2" Bh
35 Keni Galvanis 1/2" Bh
36 Seal Tape Bh
37 Lem PVC Tube
38 Pelampung Otomatis Bh
39 Klem Pipa Bh
40 Filter Pipa /kleb pipa Bh
41 Corong W Bh
42 Corong U Bh
43 Pipa paralon 5/8" panjang 4 Ljr
44 Pipa PVC 1/2" (AW) Ljr
45 Pipa PVC 3/4" (AW) Ljr
46 Pipa PVC 1" (AW) Ljr
47 Pipa PVC 1 1/4" (AW) Ljr
48 Pipa PVC 1 1/2" (AW) Ljr
49 Pipa PVC 2" (AW) Ljr
50 Pipa PVC 2,5" (AW) Ljr
51 Pipa PVC 3" (AW) Ljr
52 Pipa PVC 4" (AW) Ljr
53 Pipa PVC 6" (AW) Ljr
54 Pipa PVC 8" (AW) Ljr
55 PVC 1" D Ljr
56 PVC 1,25" D Ljr
57 PVC 1,5" D Ljr
58 PVC 2" D Ljr
59 PVC 3" D Ljr
60 PVC 4" D Ljr
61 PVC 5" D Ljr
62 PVC 6" D Ljr
63 PVC U 15 Ljr
XV LAIN-LAIN
1 Karung Plastik Bh
2 Ijuk Kg
3 Gabalan Rumput M2
4 Tali rapia M
5 Karung terpal bh
6 Sealant kg
7 Pintu Panel WPC ukuran 82x210, t = 0,5cm termasuk insert besi unit
8 Pintu Panel WPC ukuran 82x240, t = 0,5cm termasuk insert besi unit
9 Pintu Panel WPC ukuran 92x240, t = 0,5cm termasuk insert besi unit
10 Pintu Panel WPC + kaca ukuran 82x210, t = 0,5cm (insert besi) unit
11 Pintu Panel WPC + kaca ukuran 82x240, t = 0,5cm (insert besi) unit
12 Pintu Panel WPC + kaca ukuran 92x240, t = 0,5cm (insert besi) unit
1 Mandor Org/hari
2 Kepala Tukang Kayu Org/hari
3 Kepala Tukang Batu Org/hari
4 Kepala Tukang Cat Org/hari
5 Kepala Tukang Las Org/hari
6 Kepala Tukang Besi Org/hari
7 Tukang Kayu Org/hari
8 Tukang Batu Org/hari
9 Tukang Cat Org/hari
10 Tukang Besi Org/hari
11 Tukang Las Org/hari
12 Pembantu Tukang / Pekerja Org/hari
13 Penjaga Org/hari
14 Juru Ukur Org/hari
15 Pembantu Juru Ukur Org/hari
16 Operator Org/hari
17 Operator Pompa Org/hari
18 Mekanik Pompa Org/hari
19 Operator Alat Berat Org/hari
20 Pembantu Operator Alat Berat Org/hari
NO PERALATAN Sat.
1 Meteran 5 M Bh
2 Palu Bh
3 Ganco Bh
4 Bodem Bh
5 Keranjang Bh
6 Kereta Dorong / (Whell Borrow) Bh
7 Betel Bh
8 Sabit besar Bh
9 Ember / Timba Bh
10 Kotak Adukan Bh
11 Cetok Bh
12 Kasut Kayu Bh
13 Tang Pemotong Kawat Bh
14 Gunting Pemotong Baja Bh
15 Kunci Pembengkok Tulangan Bh
16 Linggis Bh
17 Kayu Pemikul dan tampar Unit
18 Tusuk bambu Bh
19 Gergaji Besi Bh
20 Gergaji Kayu Bh
21 Bor besi Bh
22 Pisau Besar Bh
23 Pompa Air Diesel 3" Unit
24 Pompa Air Diesel 4" Unit
25 Pompa Air Kecil 500 watt, kap. 100 lt/menit, total head 100 m Unit
26 Pompa Air Kecil 250 watt, kap. 75 lt/menit, total head 60 m Unit
27 Pompa Air kecil 250 watt, kap. 40 lt/menit, total head 40 m Unit
28 Pompa Air Tangan Bh
29 Gembok kecil bh
DAF
UD.WILDAN JAYA SINAR MULYA ABADI BAGAS JAYA CIPTA INDAH PRATAMA MERANTI
70,000.00
54,000.00
27,000.00
52,000.00
12,000.00
37,000.00 25,000.00
110,000.00
10,500.00 11,000.00
74,000.00
52,000.00
HKTI DPK
6,250,000.00
4,687,500.00
5,381,944.44
6,250,000.00
3,906,250.00
4,166,666.67
4,166,666.67
7,500,000.00
8,000,000.00
270,000.00 275,000.00
200,000.00 260,000.00
125,000.00 175,000.00
100,000.00
100,000.00
13,000.00
55,000.00 55,000.00 57,000.00
3,000.00 2,500.00
1,150,000.00
100,000.00
142,857.14
207,142.86
16000/LJR
73000/LJR
13,000.00
23,000.00
21,000.00
290,000.00
377,500.00
17,000.00
8,000.00
27,000.00
165000/DOS 100,000.00
40,000.00 37,500.00
42,000.00 37,500.00
55,000.00 48,000.00
47,000.00 43,500.00
50,000.00 45,000.00
65,000.00 60,000.00
125,000.00 80,000.00
165,000.00 100,000.00
48,000.00 48,000.00
55,000.00 55,000.00
72,000.00
53,000.00 48,000.00
53,000.00 45,000.00
65,000.00 60,000.00
72,000.00
97,000.00
3,000.00
4,500.00 2,500.00
7,500.00 10,000.00
10,000.00 15,000.00 10,000.00
70,000.00 67,000.00
65,000.00 55,000.00
40,000.00
30,000.00
29,000.00 1,500.00
29,000.00
29,000.00
30,000.00
45,000.00 13,000.00
25,000.00 25,000.00
8,500.00
150000/GALON 32,000.00
43,000.00
42,000.00
3000/BJ
25,000.00 30,000.00
9,000.00
16,000.00
15,000.00 35,000.00
25,000.00 70,000.00
17,000.00 35,000.00
20,000.00 15,000.00
12,000.00
6,000.00
30,000.00 30,000.00
50,000.00
110,000.00
45,000.00
170,000.00
15,000.00
25,000.00
90,000.00 95,000.00
125,000.00 125,000.00
55,000.00
2,700,000.00 2,050,000.00
1,250,000.00 1,400,000.00 850,000.00 900,000.00
2,400,000.00 1,500,000.00
450,000.00 450,000.00 400,000.00
110,000.00 150,000.00 135,000.00 120,000.00
175,000.00
150,000.00 170,000.00 185,000.00
260,000.00 285,000.00
185,000.00 205,000.00 300,000.00 170,000.00
195,000.00 240,000.00 300,000.00 200,000.00
45,000.00 125,000.00 75,000.00
160,000.00 125,000.00 75,000.00
20,000.00 15,000.00 40,000.00 10,000.00
15,000.00 10,000.00 15,000.00 15,000.00
105,000.00
285,000.00
125,000.00 125,000.00
45,000.00 45,000.00
15,000.00 75,000.00
5,000.00 6,500.00
5,000.00 3,000.00
205,000.00 1,500,000.00 850,000.00
175,000.00 165,000.00
245,000.00 300,000.00 235,000.00
2,100,000.00 2,500,000.00 2,500,000.00
1,550,000.00 1,500,000.00 1,800,000.00
21,000.00
2,000.00 2,500.00
3,000.00 2,500.00
4,000.00 3,000.00
4,500.00 5,500.00
5,000.00 7,500.00
6,000.00 12,000.00
7,000.00 18,500.00
8,000.00 29,000.00
16,000.00 59,000.00 8,000.00
7,000.00 18,000.00
13,000.00 25,000.00
2,000.00 2,500.00
3,000.00 2,500.00
4,000.00 3,000.00
4,500.00 5,000.00
5,000.00 6,000.00
9,000.00 10,000.00
6,500.00 16,000.00
7,000.00 25,000.00
9,000.00 45,000.00
5,000.00 2,500.00
650,000.00
600,000.00
2,500.00 2,500.00
2,500.00 3,500.00
4,500.00 5,500.00
5,000.00 8,500.00
5,500.00 11,000.00
6,000.00 17,500.00
10,000.00 38,000.00
15,000.00 75,000.00 8,000.00
7,000.00
7,000.00
5,000.00 4,000.00
7,000.00 6,000.00
21,000.00 20,000.00 20,000.00
23,000.00 27,000.00
37,000.00 36,000.00
52,000.00 55,000.00
58,000.00 62,000.00
71,000.00 80,000.00
103,000.00 115,000.00
140,000.00 152,000.00
235,000.00 250,000.00
520,000.00 580,000.00
885,000.00 980,000.00
28,000.00 20,000.00
35,000.00 32,000.00 28,000.00
40,000.00 38,000.00 45,000.00
47,000.00 49,000.00 60,000.00
76,000.00 85,000.00
118,000.00 135,000.00 140,000.00
187,000.00 210,000.00
253,000.00 275,000.00
20,000.00 15,000.00
60,000.00
18,000.00 11,000.00
20,000.00 15,000.00
15,000.00
40,000.00 50,000.00
2,500.00 175,000.00
3,000.00 275,000.00
8,000.00 600,000.00
10,000.00 700,000.00
900,000.00
1,100,000.00
1,500,000.00
5,000.00
50,000.00
30,000.00
6,000.00
150,000.00
250,000.00
225,000.00
350,000.00
80,000.00
100,000.00
125,000.00
200,000.00
25,000.00
35,000.00
40,000.00
2,500,000.00
150,000.00
400,000.00
600,000.00
100,000.00
60,000.00
50,000.00
50,000.00
60,000.00
60,000.00
30,000.00
800,000.00
12,000.00 10,000.00
450,000.00
20,000.00
500,000.00
1,200,000.00
25,000.00
10,000.00
1,450,000.00
1,000,000.00 1,550,000.00
12,000.00
12,000.00
45,000.00
PT WONOJOYO PERKASA
92,857.14
325,000.00
48,571.43
SBC HARGA DASAR +0% eskalasi harga HARGA SATUAN Harga Satuan
EE 100% 2016 3WLN IV 2015
4.00
- 86,500.00 86,500.00
- 70,700.00 70,700.00
50,000.00 50,000.00 50,000.00 64,800.00
- 65,150.00 65,150.00
- 59,500.00 59,500.00
- 62,300.00 62,300.00
- 7,000.00 7,000.00
- 6,900.00 6,900.00
- 6,400.00 6,400.00
- 4,000.00 4,000.00
- 4,900.00 4,900.00
- 6,050.00 6,050.00
30,000.00 30,000.00 16,000.00 16,000.00
- 22,000.00 22,000.00
- 49,000.00 49,000.00
- 52,500.00 52,500.00
- 52,500.00 52,500.00
- 62,000.00 62,000.00
- 62,000.00 62,000.00
- 62,000.00 62,000.00
4.00
- 207,000.00 207,000.00
175,000.00 175,000.00 175,000.00 245,000.00
- 140,000.00 140,000.00
42,000.00 42,000.00 42,000.00 45,000.00
43,000.00 43,000.00 43,000.00 50,000.00
55,000.00 55,000.00 55,000.00 55,000.00
47,000.00 47,000.00 47,000.00 50,000.00
50,000.00 50,000.00 50,000.00 55,000.00
65,000.00 65,000.00 65,000.00 67,000.00
125,000.00 125,000.00 85,000.00 85,000.00
165,000.00 165,000.00 125,000.00 125,000.00
48,000.00 48,000.00 48,000.00 54,000.00
55,000.00 55,000.00 55,000.00 59,000.00
72,000.00 72,000.00 72,000.00 96,000.00
53,000.00 53,000.00 53,000.00 55,000.00
53,000.00 53,000.00 53,000.00 60,000.00
75,000.00 75,000.00 67,000.00 67,000.00
72,000.00 72,000.00 72,000.00 77,000.00
97,000.00 97,000.00 97,000.00 175,000.00
3,000.00 3,000.00 3,000.00 13,000.00
4,500.00 4,500.00 4,500.00 5,000.00
7,500.00 7,500.00 7,500.00 10,000.00
15,000.00 15,000.00 8,200.00 8,200.00
95,000.00 95,000.00 85,000.00 85,000.00
120,000.00 120,000.00 120,000.00 120,000.00
90,000.00 90,000.00 90,000.00 110,000.00
50,000.00 50,000.00 50,000.00 60,000.00
90,000.00 90,000.00 90,000.00 95,000.00
- 50,000.00 50,000.00
- 100,000.00 100,000.00
125,000.00 125,000.00 125,000.00 125,000.00
135,000.00 135,000.00 135,000.00 145,000.00
- 90,000.00 90,000.00
- 3,500.00 3,500.00
- 60,000.00 60,000.00
- 50,000.00 50,000.00
- 35,000.00 35,000.00
- 40,000.00 40,000.00
- 45,000.00 45,000.00
- 51,000.00 51,000.00
- 135,000.00 135,000.00
- -
- -
55,000.00 55,000.00 55,000.00 57,500.00
55,000.00 55,000.00 55,000.00 57,500.00
- 45,000.00 45,000.00
32,000.00 32,000.00 28,000.00 28,000.00
32,000.00 32,000.00 32,000.00 42,000.00
30,000.00 30,000.00 28,000.00 28,000.00
30,000.00 30,000.00 25,000.00 25,000.00
- 60,000.00 60,000.00
- 90,000.00 90,000.00
70,000.00 70,000.00 70,000.00 70,000.00
65,000.00 65,000.00 65,000.00 67,000.00
40,000.00 40,000.00 40,000.00 57,500.00
30,000.00 30,000.00 30,000.00 35,000.00
- 23,000.00 23,000.00
4,000.00 4,000.00 4,000.00 4,500.00
- 4.00
29,000.00 29,000.00 17,850.00 17,850.00
29,000.00 29,000.00 28,000.00 28,000.00
29,000.00 29,000.00 29,000.00 40,000.00
30,000.00 30,000.00 20,000.00 20,000.00
13,000.00 13,000.00 13,000.00 15,000.00
25,000.00 25,000.00 25,000.00 25,000.00
8,500.00 8,500.00 8,500.00 28,000.00
- 10,000.00 10,000.00
32,000.00 32,000.00 32,000.00 35,700.00
- 69,000.00 69,000.00
60,000.00 60,000.00 60,000.00 68,400.00
- 56,000.00 56,000.00
120,000.00 120,000.00 100,000.00 100,000.00
- 42,000.00 42,000.00
- 41,250.00 41,250.00
- 47,500.00 47,500.00
- 66,000.00 66,000.00
20,000.00 20,000.00 20,000.00 20,000.00
- 38,800.00 38,800.00
- 18,400.00 18,400.00
22,000.00 22,000.00 22,000.00 30,000.00
97,500.00 97,500.00 95,000.00 95,000.00
71,500.00 71,500.00 70,000.00 70,000.00
- 40,000.00 40,000.00
-
-
35,000.00 35,000.00 15,000.00 15,000.00
25,000.00 25,000.00 25,000.00 45,000.00
35,000.00 35,000.00 25,000.00 25,000.00
25,000.00 25,000.00 25,000.00 45,000.00
17,000.00 17,000.00 17,000.00 25,000.00
20,000.00 20,000.00 20,000.00 70,000.00
- 30,000.00 30,000.00
- 1,500.00 1,500.00
12,000.00 12,000.00 12,000.00 20,000.00
6,000.00 6,000.00 6,000.00 10,000.00
30,000.00 30,000.00 30,000.00 130,000.00
50,000.00 50,000.00 50,000.00 150,000.00
170,000.00 170,000.00 170,000.00 200,000.00
110,000.00 110,000.00 110,000.00 170,000.00
45,000.00 45,000.00 45,000.00 150,000.00
90,000.00 90,000.00 90,000.00 95,000.00
25,000.00 25,000.00 25,000.00 28,000.00
25,000.00 25,000.00 25,000.00 20,000.00
95,000.00 95,000.00 85,000.00 85,000.00
125,000.00 125,000.00 125,000.00 150,000.00
- 280,000.00 280,000.00
- 75,000.00 75,000.00
- 15,000.00 15,000.00
- 1,430,000.00 1,430,000.00
- 412,000.00 412,000.00
200,000.00 200,000.00 200,000.00 385,000.00
- 412,000.00 412,000.00
- 825,000.00 825,000.00
-
-
- 4.00
-
55,000.00 55,000.00 40,000.00 40,000.00
2,050,000.00 2,050,000.00 2,050,000.00 2,200,000.00
1,750,000.00 1,750,000.00 1,450,000.00 1,450,000.00
2,400,000.00 2,400,000.00 1,750,000.00 1,750,000.00
450,000.00 450,000.00 450,000.00 500,000.00
150,000.00 150,000.00 150,000.00 160,000.00
175,000.00 175,000.00 100,000.00 100,000.00
250,000.00 250,000.00 210,000.00 210,000.00
- 180,000.00 180,000.00
285,000.00 285,000.00 280,000.00 280,000.00
205,000.00 205,000.00 205,000.00 300,000.00
300,000.00 300,000.00 300,000.00 550,000.00
125,000.00 125,000.00 75,000.00 75,000.00
160,000.00 160,000.00 125,000.00 125,000.00
40,000.00 40,000.00 35,000.00 35,000.00
15,000.00 15,000.00 15,000.00 15,000.00
- 130,000.00 130,000.00
285,000.00 285,000.00 250,000.00 250,000.00
250,000.00 250,000.00 250,000.00 250,000.00
- 220,000.00 220,000.00
55,000.00 55,000.00 40,000.00 40,000.00
25,000.00 25,000.00 25,000.00 25,000.00
1,150,000.00 1,150,000.00 985,000.00 985,000.00
- 120,000.00 120,000.00
45,000.00 45,000.00 45,000.00 85,000.00
75,000.00 75,000.00 17,500.00 17,500.00
10,000.00 10,000.00 10,000.00 15,000.00
7,500.00 7,500.00 5,000.00 5,000.00
1,500,000.00 1,500,000.00 1,500,000.00 1,500,000.00
195,000.00 195,000.00 195,000.00 250,000.00
300,000.00 300,000.00 300,000.00 750,000.00
2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00
1,800,000.00 1,800,000.00 1,600,000.00 1,600,000.00
- 5,500,000.00 5,500,000.00
- -
- -
22,807.02 22,807.02 22,807.02 22,900.00 75,000.00
33,625.73 33,625.73 33,625.73 33,700.00 85,000.00
37,950.14 37,950.14 37,950.14 38,000.00 120,000.00
63,157.89 63,157.89 63,157.89 63,200.00 220,000.00
193,333.33 193,333.33 193,333.33 193,400.00 250,000.00
212,380.95 212,380.95 212,380.95 212,400.00 350,000.00
261,904.76 261,904.76 261,904.76 262,000.00 300,000.00
- 470,000.00 470,000.00
144,444.44 144,444.44 144,444.44 100,000.00 100,000.00
177,777.78 177,777.78 177,777.78 125,000.00 125,000.00
96,666.67 96,666.67 96,666.67 95,000.00 95,000.00
116,666.67 116,666.67 116,666.67 116,700.00 150,000.00
333,333.33 333,333.33 333,333.33 333,400.00 547,000.00
378,888.89 378,888.89 378,888.89 378,900.00 725,000.00
455,555.56 455,555.56 455,555.56 455,600.00 815,000.00
- 822,000.00 822,000.00
- 1,077,000.00 1,077,000.00
- 1,662,000.00 1,662,000.00
- 892,000.00 892,000.00
- 1,079,000.00 1,079,000.00
- 1,387,000.00 1,387,000.00
21,000.00 21,000.00 21,000.00 21,000.00
- -
- -
50,000.00 50,000.00 40,000.00 40,000.00
100,000.00 100,000.00 56,000.00 56,000.00
125,000.00 125,000.00 75,000.00 75,000.00
150,000.00 150,000.00 90,000.00 90,000.00
- 25,000.00 25,000.00
- 33,000.00 33,000.00
- 43,000.00 43,000.00
- 100,000.00 100,000.00
- 150,000.00 150,000.00
- 250,000.00 250,000.00
- 362,400.00 362,400.00
- 399,050.00 399,050.00
- 506,000.00 506,000.00
- 548,550.00 548,550.00
- 657,800.00 657,800.00
- 740,600.00 740,600.00
- 846,400.00 846,400.00
- 897,000.00 897,000.00
- 990,150.00 990,150.00
- 1,216,700.00 1,216,700.00
- 911,950.00 911,950.00
- 1,214,400.00 1,214,400.00
- 1,578,950.00 1,578,950.00
- 1,683,600.00 1,683,600.00
- 2,058,500.00 2,058,500.00
- 3,198,150.00 3,198,150.00
- 166,750.00 166,750.00
- 212,750.00 212,750.00
- 310,500.00 310,500.00
- 363,400.00 363,400.00
- 562,350.00 562,350.00
- 1,588,150.00 1,588,150.00
- 2,022,850.00 2,022,850.00
- 88,550.00 88,550.00
- 151,800.00 151,800.00
- 230,000.00 230,000.00
- 266,800.00 266,800.00
- 358,800.00 358,800.00
- 1,016,600.00 1,016,600.00
- 1,299,500.00 1,299,500.00
- 4,328,600.00 4,328,600.00
- 5,902,950.00 5,902,950.00
- 10,571,950.00 10,571,950.00
- -
- -
2,500.00 2,500.00 2,500.00 3,000.00
3,000.00 3,000.00 3,000.00 4,000.00
4,000.00 4,000.00 4,000.00 5,000.00
5,500.00 5,500.00 6,000.00 6,000.00
7,500.00 7,500.00 7,000.00 7,000.00
12,000.00 12,000.00 10,300.00 10,300.00
18,500.00 18,500.00 15,500.00 15,500.00
29,000.00 29,000.00 25,900.00 25,900.00
59,000.00 59,000.00 53,000.00 53,000.00
18,000.00 18,000.00 10,000.00 10,000.00
25,000.00 25,000.00 20,000.00 20,000.00
2,500.00 2,500.00 2,500.00 3,000.00
3,000.00 3,000.00 3,000.00 4,000.00
4,000.00 4,000.00 4,000.00 5,000.00
5,000.00 5,000.00 5,000.00 6,000.00
6,000.00 6,000.00 6,000.00 7,000.00
10,000.00 10,000.00 8,500.00 8,500.00
16,000.00 16,000.00 10,000.00 10,000.00
25,000.00 25,000.00 13,000.00 13,000.00
45,000.00 45,000.00 15,000.00 15,000.00
5,000.00 5,000.00 2,500.00 2,500.00
650,000.00 650,000.00 130,000.00 130,000.00
600,000.00 600,000.00 100,000.00 100,000.00
2,500.00 2,500.00 2,500.00 3,000.00
3,500.00 3,500.00 3,500.00 3,500.00
5,500.00 5,500.00 4,000.00 4,000.00
8,500.00 8,500.00 6,500.00 6,500.00
11,000.00 11,000.00 8,600.00 8,600.00
17,500.00 17,500.00 15,000.00 15,000.00
38,000.00 38,000.00 32,100.00 32,100.00
75,000.00 75,000.00 64,200.00 64,200.00
- 4.00
7,000.00 7,000.00 5,000.00 5,000.00
7,000.00 7,000.00 8,000.00 8,000.00
5,000.00 5,000.00 5,000.00 10,000.00
- 6,500.00 6,500.00
3,000.00 3,000.00 3,000.00 5,000.00
8,000.00 8,000.00 8,000.00 8,500.00
160,000.00 160,000.00 130,000.00 130,000.00
3,000.00 3,000.00 3,000.00 4,000.00
- 7,500.00 7,500.00
- 22,000.00 22,000.00
- 24,000.00 24,000.00
7,000.00 7,000.00 7,000.00 8,000.00
21,000.00 21,000.00 20,000.00 20,000.00
27,000.00 27,000.00 26,000.00 26,000.00
37,000.00 37,000.00 35,000.00 35,000.00
55,000.00 55,000.00 55,000.00 55,000.00
62,000.00 62,000.00 61,000.00 61,000.00
80,000.00 80,000.00 78,000.00 78,000.00
115,000.00 115,000.00 115,000.00 135,000.00
152,000.00 152,000.00 152,000.00 154,000.00
250,000.00 250,000.00 250,000.00 256,000.00
580,000.00 580,000.00 515,000.00 515,000.00
980,000.00 980,000.00 850,000.00 850,000.00
28,000.00 28,000.00 28,000.00 30,000.00
32,000.00 32,000.00 32,000.00 35,000.00
45,000.00 45,000.00 38,000.00 38,000.00
60,000.00 60,000.00 48,500.00 48,500.00
85,000.00 85,000.00 83,500.00 83,500.00
140,000.00 140,000.00 120,000.00 120,000.00
210,000.00 210,000.00 210,000.00 211,000.00
275,000.00 275,000.00 275,000.00 280,000.00
- 105,000.00 105,000.00
- -
- -
14,000.00 14,000.00 14,000.00 15,000.00
550.00 550.00 600.00 1,000.00
19,000.00 19,000.00 19,000.00 30,000.00
26,000.00 26,000.00 26,000.00 26,000.00
15,000.00 15,000.00 15,000.00 15,000.00
- -
- -
50,000.00 50,000.00 17,500.00 17,500.00
60,000.00 60,000.00 57,500.00 57,500.00
18,000.00 18,000.00 16,100.00 16,100.00
20,000.00 20,000.00 20,000.00 27,000.00
15,000.00 15,000.00 15,000.00 30,000.00
- 218,000.00 218,000.00
50,000.00 50,000.00 50,000.00 50,000.00
- 180,000.00 180,000.00
1,750.00 1,750.00 1,800.00 2,300.00
2,750.00 2,750.00 2,800.00 4,000.00
6,000.00 6,000.00 6,000.00 7,600.00
7,000.00 7,000.00 7,000.00 11,500.00
9,000.00 9,000.00 9,000.00 11,500.00
11,000.00 11,000.00 11,000.00 23,000.00
15,000.00 15,000.00 15,000.00 28,750.00
5,000.00 5,000.00 4,600.00 4,600.00
50,000.00 50,000.00 40,250.00 40,250.00
30,000.00 30,000.00 28,750.00 28,750.00
- 4.00
6,000.00 6,000.00 6,000.00 8,000.00
- 5,750.00 5,750.00
150,000.00 150,000.00 150,000.00 250,000.00
250,000.00 250,000.00 250,000.00 276,000.00
225,000.00 225,000.00 225,000.00 274,000.00
350,000.00 350,000.00 350,000.00 422,600.00
80,000.00 80,000.00 80,000.00 184,000.00
100,000.00 100,000.00 100,000.00 253,000.00
125,000.00 125,000.00 125,000.00 251,000.00
200,000.00 200,000.00 200,000.00 297,000.00
- 400,000.00 400,000.00
25,000.00 25,000.00 25,000.00 33,000.00
35,000.00 35,000.00 35,000.00 46,000.00
40,000.00 40,000.00 40,000.00 260,000.00
2,500,000.00 2,500,000.00 2,200,000.00 2,200,000.00
- 3,500,000.00 3,500,000.00
150,000.00 150,000.00 150,000.00 440,000.00
400,000.00 400,000.00 400,000.00 440,000.00
600,000.00 600,000.00 600,000.00 875,000.00
- 535,000.00 535,000.00
- 845,000.00 845,000.00
100,000.00 100,000.00 100,000.00 125,000.00
60,000.00 60,000.00 60,000.00 46,000.00
50,000.00 50,000.00 46,000.00 46,000.00
50,000.00 50,000.00 46,000.00 46,000.00
60,000.00 60,000.00 57,500.00 57,500.00
60,000.00 60,000.00 60,000.00 69,000.00
30,000.00 30,000.00 30,000.00 200,000.00
- 460,000.00 460,000.00
800,000.00 800,000.00 800,000.00 4,000,000.00
10,000.00 10,000.00 10,000.00 11,500.00
- 1,850,000.00 1,850,000.00
- 2,550,000.00 2,550,000.00
- 4,200,000.00 4,200,000.00
- 5,760,000.00 5,760,000.00
- 8,280,000.00 8,280,000.00
- 8,640,000.00 8,640,000.00
- 3,700,000.00 3,700,000.00
- 4,500,000.00 4,500,000.00
450,000.00 450,000.00 450,000.00 715,000.00
20,000.00 20,000.00 20,000.00 28,750.00
500,000.00 500,000.00 488,750.00 488,750.00
1,200,000.00 1,200,000.00 750,000.00 750,000.00
25,000.00 25,000.00 17,250.00 17,250.00
10,000.00 10,000.00 9,200.00 9,200.00
- -
- -
8,330.00 8,330.00 8,400.00 10,800.00
- 10,000.00 10,000.00
1,450,000.00 1,450,000.00 1,450,000.00 1,600,000.00
1,550,000.00 1,550,000.00 1,550,000.00 1,700,000.00
12,000.00 12,000.00 12,000.00
12,000.00 12,000.00 12,000.00
- 7,400.00 7,400.00
- 6,900.00 6,900.00
- 550.00 550.00
- 11,000.00 11,000.00
- 51,800.00 51,800.00
- 5,200.00 5,200.00
- -
- -
- 4,200.00 4,200.00
- 13,000.00 13,000.00
- 18,000.00 18,000.00
- 100.00 100.00
- 1,000.00 1,000.00
- 250,000.00 250,000.00
- 1,210,000.00 1,210,000.00
- 1,375,000.00 1,375,000.00
- 1,540,000.00 1,540,000.00
- 1,485,000.00 1,485,000.00
- 1,650,000.00 1,650,000.00
- 1,815,000.00 1,815,000.00
Harga Satuan
(Rp)
80,000.00 95,000.00
75,000.00 90,000.00
75,000.00 90,000.00
75,000.00 90,000.00
75,000.00 90,000.00
75,000.00 90,000.00
70,000.00 80,000.00
70,000.00 80,000.00
70,000.00 80,000.00
70,000.00 80,000.00
70,000.00 80,000.00
50,000.00 65,000.00
40,000.00 40,000.00
75,000.00 75,000.00
50,000.00 50,000.00
175,000.00 175,000.00
75,000.00 75,000.00
75,000.00 75,000.00
175,000.00 175,000.00
70,000.00 70,000.00
Harga Satuan
(Rp)
15,000.00 15,000.00
35,000.00 35,000.00
65,000.00 65,000.00
135,000.00 135,000.00
11,500.00 11,500.00
460,000.00 460,000.00
35,000.00 35,000.00
40,000.00 40,000.00
10,000.00 10,000.00
40,000.00 40,000.00
20,000.00 20,000.00
17,000.00 17,000.00
40,000.00 40,000.00
35,000.00 35,000.00
20,000.00 20,000.00
75,000.00 75,000.00
12,500.00 12,500.00
1,200.00 1,200.00
35,000.00 35,000.00
97,700.00 97,700.00
42,000.00 42,000.00
25,000.00 25,000.00
15,000,000.00 15,000,000.00
20,000,000.00 20,000,000.00
4,000,000.00 4,000,000.00
2,250,000.00 2,250,000.00
650,000.00 650,000.00
600,000.00 600,000.00
30,000.00 30,000.00
HARGA
SATUAN
(Rp.)
5,866,890.00 5,866,889.96
302,180.00 302,178.67
81,690.00 81,688.63
496,700.00 496,690.51
157,780.00 157,777.76
59,760.00 59,753.04
388,890.00 388,889.51
263,180.00 263,179.96
357,320.00 357,311.47
458,350.00 458,345.78
252,230.00 252,229.92
558,790.00 558,787.33
531,010.00 531,005.87
421,580.00 421,575.54
435,440.00 435,431.59
189,940.00 189,932.00
234,970.00 234,960.22
297,990.00 297,983.73
301,450.00 301,442.03
40,530.00 40,527.04
729,550.00 729,546.32
48,160.00 48,153.88
229,780.00 229,777.76
72,030.00 72,026.89
38,020.00 38,018.25
24,680.00 24,679.26
178,780.00 178,770.24
249,820.00 249,819.92
461,480.00 461,478.79
258,150.00 258,146.02
452,980.00 452,973.08
56,230.00 56,228.24
299,500.00 299,498.67
46,500.00 46,490.82
353,430.00 353,426.84
1,549,900.00 1,549,900.00
81,000.00 81,000.00
100,000.00 100,000.00
200,000.00 200,000.00
250,000.00 250,000.00
250,000.00 250,000.00
200,000.00 200,000.00
50,000.00 50,000.00
BIDANG BINA MARGA
2 Lapisan ag 1 m3
A TENAGA
- Pekerja 0.2201 Jam 9,375.00 2,063.44
- Mandor 0.0314 Jam 12,500.00 392.50
B BAHAN
- Agregat Base Klas A 1.2000 M3 200,000.00 240,000.00
C PERALATAN
- Wheel Loader 0.0314 Jam 435,440.00 13,672.82
- Dump Truck 8-10 M3 0.1655 Jam 357,320.00 59,136.46
- Motor Grader 0.0092 Jam 531,010.00 4,885.29
- Vibro Roller 0.0080 Jam 301,450.00 2,411.60
- P. Tyre Roller 0.0115 Jam 297,990.00 3,426.89
- Water Tanker 0.0383 Jam 229,780.00 8,800.57
- Alat Bantu 1.0000 Ls 73.68 73.68
D Jumlah (A+B+C) 334,863.24
E Overhead & Profit (12%) 40,183.59
F Harga Satuan Pekerjaan (D+E) 375,046.83
3 Lapisan a 1 m3
A TENAGA
- Pekerja 0.2201 Jam 9,375.00 2,063.44
- Mandor 0.0314 Jam 12,500.00 392.50
B BAHAN
- Agregat Base Klas B 1.2000 M3 185,000.00 222,000.00
C PERALATAN
1 - Wheel Loader 0.0314 Jam 435,440.00 13,672.82
2 - Dump Truck 8-10M3 0.1655 Jam 357,320.00 59,136.46
3 - Motor Grader 0.0092 Jam 531,010.00 4,885.29
4 - Vibro Roller 0.0080 Jam 301,450.00 2,411.60
5 - P. Tyre Roller 0.0115 297,990.00 3,426.89
6 - Water Tanker 0.0383 Jam 229,780.00 8,800.57
7 - Alat Bantu 1.0000 Ls 73.68 73.68
D Jumlah (A+B+C) 316,863.24
E Overhead & Profit (12%) 38,023.59
F Harga Satuan Pekerjaan (D+E) 354,886.83
4 Lapisan Ag 1 m3
A TENAGA
- Pekerja 0.2800 Jam 9,375.00 2,625.00
- Mandor 0.0400 Jam 12,500.00 500.00
B BAHAN
- Agregat Base kelas C 1.2000 M3 46,400.00 55,680.00
C PERALATAN
- Whell loader 0.0405 Jam 435,440.00 17,635.32
- Dump Truck 0.1570 Jam 357,320.00 56,099.24
- Motor Grader 0.0080 Jam 531,010.00 4,248.08
- Vibro roller 0.0080 Jam 301,450.00 2,411.60
- P.Tyer roller 0.0115 Jam 297,990.00 3,426.89
- Water Tanker 0.0211 Jam 229,780.00 4,848.36
- Alat Bantu 1.0000 Ls 93.75 93.75
D Jumlah (A+B+C) 147,568.23
E Overhead & Profit (12%) 17,708.19
F Harga Satuan Pekerjaan (D+E) 165,276.42
Analisa Harga Satuan Pekerjaan 2016 Bidang Bina Marga - Enginner Estimate 257
1 2 3 4 5 6 7
5 Macadam Te 1 m2
A TENAGA
- Pekerja 1.1667 Jam 9,375.00 10,937.81
- Mandor 0.0583 Jam 12,500.00 728.75
B BAHAN
- Batu Belah 0.2400 M3 220,000.00 52,800.00
- Batu Pecah 0.0733 M3 312,500.00 22,906.25
- Pasir 0.1575 M3 125,000.00 19,687.50
C PERALATAN
- Three Wheel 0.0039 Jam 189,940.00 740.77
- Alat Bantu 1.0000 Ls 350.00 350.00
D Jumlah (A+B+C) 108,151.08
E Overhead & Profit (12%) 12,978.13
F Harga Satuan Pekerjaan (D+E) 121,129.20
6 Macadam Te 1 m3
A TENAGA
- Pekerja 5.8335 Jam 9,375.00 54,689.06
- Mandor 0.2915 Jam 12,500.00 3,643.75
B BAHAN
- Batu Belah 1.2000 M3 220,000.00 264,000.00
- Batu Pecah 0.3665 M3 312,500.00 114,531.25
- Pasir 0.7875 M3 125,000.00 98,437.50
C PERALATAN
- Three Wheel 0.0195 Jam 189,940.00 3,703.83
- Alat Bantu 1.0000 Ls 1,749.98 1,749.98
D Jumlah (A+B+C) 540,755.38
E Overhead & Profit (12%) 64,890.65
F Harga Satuan Pekerjaan (D+E) 605,646.02
2 Lapis Pere 1 Lt
A TENAGA
- Pekerja 0.0211 Jam 9,375.00 197.81
- Mandor 0.0030 Jam 12,500.00 37.50
B BAHAN
- Aspal Curah 0.8715 Kg #REF! #REF!
- Kerosene 0.2538 Lt 56,700.00 14,390.46
C PERALATAN
- Asphal Spra 0.0030 Jam 81,690.00 245.07
- Compressor 0.0063 Jam 157,780.00 994.01
- Dump Truck 0.0030 Jam 263,180.00 789.54
D Jumlah (A+B+C) #REF!
E Overhead & Profit (12%) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
3 Aspal untu 1 Lt
A TENAGA
- Pekerja 0.0301 Jam 9,375.00 282.19
- Mandor 0.0030 Jam 12,500.00 37.50
B BAHAN
- Aspal Curah 1.0790 Kg #REF! #REF!
- Kerosene 0.0524 Lt 56,700.00 2,971.08
C PERALATAN
- Asphal Spra 0.0030 Jam 81,690.00 245.07
- Compressor 0.0023 Jam 157,780.00 362.89
- Dump Truck 0.0030 Jam 263,180.00 789.54
D Jumlah (A+B+C) #REF!
E Overhead & Profit (12%) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Analisa Harga Satuan Pekerjaan 2016 Bidang Bina Marga - Enginner Estimate 258
1 2 3 4 5 6 7
4 Agregat pe 1 m2
A TENAGA
- Pekerja 0.0459 Jam 9,375.00 430.31
- Mandor 0.0023 Jam 12,500.00 28.75
B BAHAN
- Agregat burt 0.0151 m3 312,500.00 4,718.75
C PERALATAN
- Wheel Load 0.0002 Jam 435,440.00 87.09
- Dump Truck 0.0042 Jam 357,320.00 1,500.74
- P.Tyre Rolle 0.0023 Jam 297,990.00 685.38
- Alat Bantu 1.0000 Ls 13.77 13.77
D Jumlah (A+B+C) 7,464.79
E Overhead & Profit (12%) 895.78
F Harga Satuan Pekerjaan (D+E) 8,360.57
5 Penetrasi 1 m3
A TENAGA
- Pekerja 23.0400 Jam 9,375.00 216,000.00
- Tukang Mas 9.6000 Jam 10,625.00 102,000.00
- Mandor 1.1200 Jam 12,500.00 14,000.00
B BAHAN
- Aggregat Po 0.6800 M3 325,000.00 221,000.00
- Agregat Peng 0.6360 M3 312,500.00 198,750.00
- Agregat Pen 0.0800 M3 350,000.00 28,000.00
- Aspal Drum 100.0000 Kg #REF! #REF!
C PERALATAN
- Three Wheel 0.0771 Jam 189,940.00 14,644.37
- Alat Bantu 1.0000 Ls 9,960.00 9,960.00
D Jumlah (A+B+C) #REF!
E Overhead & Profit (12%) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
6 Penetrasi 1 m2
A TENAGA
- Pekerja 1.1520 Jam 9,375.00 10,800.00
- Tukang Mas 0.4800 Jam 10,625.00 5,100.00
- Mandor 0.0560 Jam 12,500.00 700.00
B BAHAN
- Agregat Peng 0.0318 M3 312,500.00 9,937.50
- Agregat Pen 0.0040 M3 350,000.00 1,400.00
- Aspal Drum 4.5000 Kg #REF! #REF!
C PERALATAN
- Three Wheel 0.0030 Jam 189,940.00 569.82
- Alat Bantu 1.0000 Ls 498.00 498.00
D Jumlah (A+B+C) #REF!
E Overhead & Profit (12%) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
7 Pelapisan 1 m2
A TENAGA
- Pekerja 0.602 Jam 9,375.00 5,647.12
- Tukang Mas 0.280 Jam 10,625.00 2,975.00
- Mandor 0.033 Jam 12,500.00 408.33
B BAHAN
- Aspal AC 3.0000 Kg #REF! #REF!
- Batu pecah 0.0140 M3 312,500.00 4,375.00
- Batu Pecah 0.0120 M3 312,500.00 3,750.00
- Pasir Lumaj 0.0040 M3 350,000.00 1,400.00
- Kayu Bakar 0.0027 M3 350,000.00 933.33
ALAT
- Three Whell 0.0020 Jam 189,940.00 379.88
- Alat Bantu 1.0000 Ls 270.91 270.91
D Jumlah (A+B+C) #REF!
E Overhead & Profit (12%) #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Analisa Harga Satuan Pekerjaan 2016 Bidang Bina Marga - Enginner Estimate 259
1 2 3 4 5 6 7
KELOMPOK PEKERJAAN JALAN : PEKERJAAN PENUNJUK JALAN
1 Marka Jala 1 m'
A TENAGA
- Pekerja 0.6000 Jam 9,375.00 5,625.00
- Tukang 0.3000 Jam 10,625.00 3,187.50
- Mandor 0.1000 Jam 12,500.00 1,250.00
B BAHAN
- Thermoplast 2.6775 Kg 38,800.00 103,887.00
- Glass Bead 0.4725 Kg 18,400.00 8,694.00
C PERALATAN
- Compresor 0.1000 Jam 157,780.00 15,778.00
- Alat Bantu 1.0000 Ls 301.88 301.88
D Jumlah (A+B+C) 138,723.38
E Overhead & Profit (12%) 16,646.81
F Harga Satuan Pekerjaan (D+E) 155,370.18
Analisa Harga Satuan Pekerjaan 2016 Bidang Bina Marga - Enginner Estimate 260
1 2 3 4 5 6 7
KELOMPOK PEKERJAAN JALAN : KANSTEEN (BETON K-175)
1 Kansteen U 1 M'
A TENAGA
- Pekerja 0.2332 OH 75,000.00 17,490.00
- Tukang Bat 0.06 OH 85,000.00 5,100.00
- Kepala Tuk 0.006 OH 95,000.00 570.00
- Mandor 0.0228 OH 100,000.00 2,280.00
B BAHAN
- Kansteen Uk 2.0000 Buah - -
- Semen 0.1540 Kg 1,200.00 184.80
- Pasir Pasan 0.0387 M3 125,000.00 4,837.50
C PERALATAN
D Jumlah (A+B+C) 30,462.30
E Overhead & Profit (12%) 3,655.48
F Harga Satuan Pekerjaan (D+E) 34,117.78
2 Kansteen U 1 M'
A TENAGA
- Pekerja 0.2332 OH 75,000.00 17,490.00
- Tukang Bat 0.06 OH 85,000.00 5,100.00
- Kepala Tuk 0.006 OH 95,000.00 570.00
- Mandor 0.0228 OH 100,000.00 2,280.00
B BAHAN
- Kansteen Uk 2.0000 Buah - -
- Semen 0.1540 Kg 1,200.00 184.80
- Pasir Pasan 0.0387 M3 125,000.00 4,837.50
C PERALATAN
D Jumlah (A+B+C) 30,462.30
E Overhead & Profit (12%) 3,655.48
F Harga Satuan Pekerjaan (D+E) 34,117.78
7 Pemasanga 1.0000 m2
A TENAGA
- Pekerja 0.6000 OH 75,000.00 45,000.00
BIDANG PENGAIRAN
HARGA JUMLAH AHSP
NO JENIS PEKERJAAN KOEF. STN SATUAN 2016
(Rp) (Rp) (Rp)
1 2 3.000 4 5 6 7
I PEKERJAAN PENGUKURAN
1 Pengukuran Bendung untuk MC. 1.000 bh
A TENAGA
1. Pekerja 4.500 OH 75,000.00 337,500.00
2. Juru ukur 1.500 OH 85,000.00 127,500.00
B BAHAN
1. Patok kayu uk. 4 x 6 x 50 cm 0.012 m3 2,000,000.00 24,000.00
2. Cat meni 0.120 kg 26,000.00 3,120.00
3. Paku payung 0.050 kg 26,000.00 1,300.00
C PERALATAN
1. Pesawat ukur 1.000 unit 200,000.00 200,000.00
2. Meteran 0.030 bh 15,000.00 450.00
3. Palu 0.060 bh 25,000.00 1,500.00
D Jumlah (A+B+C) 695,370.00
E Overhead & Profit (12%) 12% 83,444.40
F Harga Satuan Pekerjaan (D+E) 778,814.40
II PEKERJAAN PERSIAPAN
1 Pasang 1 m profil melintang galian tanah
A TENAGA
- Pekerja 0.060 OH 75,000.00 4,500.00
- Tukang kayu 0.020 OH 85,000.00 1,700.00
- Mandor 0.006 OH 100,000.00 600.00
- Juru ukur 0.020 OH 85,000.00 1,700.00
- Pembantu juru ukur 0.020 OH 70,000.00 1,400.00
B BAHAN
- Kaso 4/6 cm 0.002 m 2,000,000.00 4,600.00
- Papan 2/20 0.004 m 3,600,000.00 15,120.00
- Paku 0.200 kg 12,500.00 2,500.00
C PERALATAN
- Waterpass 0.004 Sewa/hr 200,000.00 800.00
D Jumlah (A+B+C) 32,920.00
E Overhead & Profit (12%) 3,950.40
F Harga Satuan Pekerjaan (D+E) 36,870.40
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 262
1 2 3.000 4 5 6 7
2 Pembuatan bouwplank per titik 1.000 titik
A TENAGA
- Pekerja 0.100 OH 75,000.00 7,500.00
- Tukang kayu 0.100 OH 85,000.00 8,500.00
- Kepala Tukang 0.010 OH 95,000.00 950.00
- Mandor 0.005 OH 100,000.00 500.00
B BAHAN
- Kayu perancah 5/7 0.012 m3 3,600,000.00 43,200.00
- Paku usuk 0.020 kg 12,500.00 250.00
D Jumlah (A+B+C) 60,900.00
E Overhead & Profit (12%) 7,308.00
F Harga Satuan Pekerjaan (D+E) 68,208.00
IV KEGIATAN PENGGALIAN
1 Menggali Tanah Dengan Alat Berat 1.000 m3
A TENAGA
- Pekerja 0.226 Jam 9,375.00 2,118.75
- Mandor 0.007 Jam 12,500.00 87.50
B BAHAN
C PERALATAN
- Sewa Excavator 0.076 Jam 458,350.00 34,834.60
- Sewa Truck (min 5 jam) 0.074 Jam 263,180.00 19,475.32
D Jumlah (A+B+C) 56,516.17
E Overhead & Profit (12%) 6,781.94
F Harga Satuan Pekerjaan (D+E) 63,298.11
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 263
1 2 3.000 4 5 6 7
4 Galian tanah berbatu sedalam < 1 m 1.000 m3
A TENAGA
- Pekerja 1.3510 OH 75,000.00 101,325.00
- Mandor 0.1351 OH 100,000.00 13,510.00
B BAHAN .
C PERALATAN
- Jackhammer 0.1500 sewa/hr 197,440.00 29,616.00
D Jumlah (A+B+C) 144,451.00
E Overhead & Profit (12%) 17,334.12
F Harga Satuan Pekerjaan (D+E) 161,785.12
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 264
1 2 3.000 4 5 6 7
11 Galian lumpur sedalam s.d 2 m 1.000 m3
A TENAGA
- Pekerja 1.2200 OH 75,000.00 91,500.00
- Mandor 0.1220 OH 100,000.00 12,200.00
B BAHAN .
C PERALATAN
D Jumlah (A+B+C) 103,700.00
E Overhead & Profit (12%) 12,444.00
F Harga Satuan Pekerjaan (D+E) 116,144.00
IV PEKERJAAN PENDONGKELAN
1 Tebas tebang berupa memotong dan membersihka 1.000 m2
i dari tanaman/tumbuhan dia <15 cm
A TENAGA
- Pekerja 0.075 OH 75,000.00 5,625.00
- Mandor 0.008 OH 100,000.00 750.00
B BAHAN
- Minyak tanah 0.010 ltr 56,700.00 567.00
C PERALATAN
D Jumlah (A+B+C) 6,942.00
E Overhead & Profit (12%) 833.04
F Harga Satuan Pekerjaan (D+E) 7,775.04
2 Cabut satu tunggal pohon tanaman keras dia > 1 1.000 btg
dan membuang sisa tunggul kayu dan akar-akarnya
A TENAGA
- Pekerja 0.200 OH 75,000.00 15,000.00
- Mandor 0.020 OH 100,000.00 2,000.00
B BAHAN
C PERALATAN
- Chainsaw 0.100 Sewa/hari 100,000.00 10,000.00
D Jumlah (A+B+C) 27,000.00
E Overhead & Profit (12%) 3,240.00
F Harga Satuan Pekerjaan (D+E) 30,240.00
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 265
1 2 3.000 4 5 6 7
V PEKERJAAN PENIMBUNAN & PERATAAN TANAH
1 Meratakan Tanah 1.000 m3
A TENAGA
- Pekerja 0.250 OH 75,000.00 18,750.00
- Mandor 0.013 OH 100,000.00 1,300.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 20,050.00
E Overhead & Profit (12%) 2,406.00
F Harga Satuan Pekerjaan (D+E) 22,456.00
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 266
1 2 3.000 4 5 6 7
VIII PEKERJAAN PERKAWATAN
1 Bronjong kawat L:3, 0 m x B:1,0 m x T:0,5 m 1.000 bh
Kawat bronjong galvanis dengan kawat
anyaman tiga lilitan ukuran 4.0 mm,
lubang heksanogal 100x120 mm
A TENAGA
- Pekerja penganyam 3.390 OH 75,000.00 254,250.00
- Tukang penganyam 1.130 OH 95,000.00 107,350.00
- Pekerja pengisi batu 1.050 OH 75,000.00 78,750.00
- Mandor 0.440 OH 100,000.00 44,000.00
B BAHAN
- Batu kali/belah 2.100 m3 220,000.00 462,000.00
- Kawat Bronjong dia 4 mm 22.644 kg 20,000.00 452,880.00
C PERALATAN
D Jumlah (A+B+C) 1,399,230.00
E Overhead & Profit (12%) 167,907.60
F Harga Satuan Pekerjaan (D+E) 1,567,137.60
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 267
1 2 3.000 4 5 6 7
Pagar kawat berduri tinggi 2,50 m jarak tinggi <
5 1.000 m'
=3m
A TENAGA
- Pekerja 0.110 Org/hr 75,000.00 8,250.00
- Tukang 0.110 Org/hr 85,000.00 9,350.00
- Mandor 0.020 Org/hr 100,000.00 2,000.00
B BAHAN
- Kawat Duri 1.000 m 65,000.00 65,000.00
- Besi L 60.60.6 5.240 kg 9,500.00 49,780.00
C PERALATAN
- Tang 0.010 unit 20,000.00 200.00
- Bor besi 0.440 bh 35,000.00 15,400.00
D Jumlah (A+B+C) 149,980.00
E Overhead & Profit (12%) 17,997.60
F Harga Satuan Pekerjaan (D+E) 167,977.60
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 268
1 2 3.000 4 5 6 7
2 Pasang pintu sorong kayu roda gigi (Stang drat tunggal) B : 600 mm,H: 1000 mm H1: 1800 mm dan TR: 2600 mm
A TENAGA
- Pekerja 7.000 OH 75,000.00 525,000.00
- Tukang 3.500 OH 85,000.00 297,500.00
- Kapala Tukang 0.350 OH 95,000.00 33,250.00
- Mandor 0.700 OH 100,000.00 70,000.00
B BAHAN
- Besi pengaku 21.000 kg 8,797.00 184,737.00
- Kawat las listrik 4.670 kg 30,000.00 140,100.00
- Campuran beton K225 0.140 m3 1,179,349.28 165,108.90
- Pasangan bata 1PC:4PP 0.280 m3 236,112.25 66,111.43
C PERALATAN
- Tackle/Tripod tinggi 4-5 m 1.050 sewa/hr 200,000.00 210,000.00
- Mesin las listrik 250A diesel 1.050 sewa/hr 449,840.00 472,332.00
D Jumlah (A+B+C) 2,164,139.33
E Overhead & Profit (12%) 259,696.72
F Harga Satuan Pekerjaan (D+E) 2,423,836.05
3 Pasang pintu sorong kayu roda gigi (stang drat ganda) B :1500 mm,H: 1500 mm H1: 3000 mm dan TR: 3800 mm
A TENAGA
- Pekerja 15.400 OH 75,000.00 1,155,000.00
- Tukang 7.700 OH 85,000.00 654,500.00
- Kapala Tukang 0.770 OH 95,000.00 73,150.00
- Mandor 1.540 OH 100,000.00 154,000.00
B BAHAN -
- Besi pengaku 1.860 kg 8,797.00 16,362.42
- Kawat las listrik 10.270 kg 30,000.00 308,100.00
- Campuran beton K225 0.310 m3 1,179,349.28 365,598.28
- Pasangan bata 1PC:4PP 0.620 m3 236,112.25 146,389.60
C PERALATAN
- Tackle/Tripod tinggi 4-5 m 2.310 sewa/hr 200,000.00 462,000.00
- Mesin las listrik 250A diesel 2.310 sewa/hr 449,840.00 1,039,130.40
D Jumlah (A+B+C) 4,374,230.69
E Overhead & Profit (12%) 524,907.68
F Harga Satuan Pekerjaan (D+E) 4,899,138.37
4 Pasang pintu sorong baja roda gigi (stang tunggal) B :1000 mm,H: 800 mm H1: 1400 mm dan TR: 2200 mm
A TENAGA
- Pekerja 2.300 OH 75,000.00 172,500.00
- Tukang 1.150 OH 85,000.00 97,750.00
- Kapala Tukang 0.115 OH 95,000.00 10,925.00
- Mandor 0.230 OH 100,000.00 23,000.00
B BAHAN
- Besi pengaku 6.900 kg 8,797.00 60,699.30
- Kawat las listrik 1.530 kg 30,000.00 45,900.00
- Campuran beton K225 0.069 m3 1,179,349.28 81,375.10
- Pasangan bata 1PC:4PP 0.138 m3 236,112.25 32,583.49
C PERALATAN
- Tackle/Tripod tinggi 4-5 m 0.345 sewa/hr 200,000.00 69,000.00
- Mesin las listrik 250A diesel 0.345 sewa/hr 449,840.00 155,194.80
D Jumlah (A+B+C) 748,927.69
E Overhead & Profit (12%) 89,871.32
F Harga Satuan Pekerjaan (D+E) 838,799.01
5 Pasang pintu sorong baja roda gigi (stang double) B :500 mm,H: 500 mm H1: 1000 mm dan TR: 1900 mm
A TENAGA
- Pekerja 2.940 OH 75,000.00 220,500.00
- Tukang 1.470 OH 85,000.00 124,950.00
- Kapala Tukang 0.147 OH 95,000.00 13,965.00
- Mandor 0.294 OH 100,000.00 29,400.00
B BAHAN
- Besi pengaku 8.820 kg 8,797.00 77,589.54
- Kawat las listrik 1.960 kg 30,000.00 58,800.00
- Campuran beton K225 0.088 m3 1,179,349.28 103,782.74
- Pasangan bata 1PC:4PP 0.176 m3 236,112.25 41,555.76
C PERALATAN
- Tackle/Tripod tinggi 4-5 m 0.441 sewa/hr 200,000.00 88,200.00
- Mesin las listrik 250A diesel 0.441 sewa/hr 449,840.00 198,379.44
D Jumlah (A+B+C) 957,122.47
E Overhead & Profit (12%) 114,854.70
F Harga Satuan Pekerjaan (D+E) 1,071,977.17
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 269
1 2 3.000 4 5 6 7
X PEKERJAAN PASANGAN GORONG-GORONG
1 Pasang Gorong-2 buis beton O 30 1.0000 m'
A TENAGA
- Pekerja 0.0700 Org/hr 75,000.00 5,250.00
- Tukang batu 0.0350 Org/hr 85,000.00 2,975.00
- Kepala tukang batu 0.0035 Org/hr 95,000.00 332.50
- Mandor 0.0035 Org/hr 100,000.00 350.00
B BAHAN
- Buis beton 1.0000 M' 47,250.00 47,250.00
C PERALATAN
D Jumlah (A+B+C) 56,157.50
E Overhead & Profit (12%) 6,738.90
F Harga Satuan Pekerjaan (D+E) 62,896.40
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 270
1 2 3.000 4 5 6 7
7 Pasang Cover U-Heavy 800/150 Fabrikasi (termasuk Penurunan dan Pemasangan)
A TENAGA
- Pekerja 0.1571 Org/hr 75,000.00 11,782.50
- Operator 0.4340 Org/hr 175,000.00 75,950.00
- Mandor 0.0306 Org/hr 100,000.00 3,060.00
B BAHAN
- Cover U-Heavy 800/150/600 1.0000 bh 326,500.00 326,500.00
C PERALATAN
- Sewa Crane 30t - min 8 jam(termasuk mob/demob, 0.4340 jam 388,890.00 168,778.26
D Jumlah (A+B+C) 586,070.76
E Overhead & Profit (12%) 70,328.49
F Harga Satuan Pekerjaan (D+E) 656,399.25
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 272
1 2 3.000 4 5 6 7
7 Mengangkut Material atau hasil galian dengan ja 1.000 m3
angkut 500 m
A TENAGA
- Pekerja 1.9500 OH 75,000.00 146,250.00
- Mandor 0.0975 OH 100,000.00 9,750.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 156,000.00
E Overhead & Profit (12%) 18,720.00
F Harga Satuan Pekerjaan (D+E) 174,720.00
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 273
1 2 3.000 4 5 6 7
9 Mengangkut lumpur Pada lokasi yang sulit 1.000 m3
A TENAGA
- Pekerja 1.400 Org/hr 75,000.00 105,000.00
- Mandor 0.024 Org/hr 100,000.00 2,400.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 107,400.00
E Overhead & Profit (12%) 12,888.00
F Harga Satuan Pekerjaan (D+E) 120,288.00
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 274
1 2 3.000 4 5 6 7
XII PEMASANGAN TRUCUK & PERANCAK:
1 Pasang cerucuk kayu/dolken diameter 8 -10 cm 1.000 m
A TENAGA
- Pekerja 0.030 OH 75,000.00 2,250.00
- Mandor 0.003 OH 100,000.00 300.00
- Operator Tripod/Crane 0.005 OH 70,000.00 350.00
B BAHAN
- Kayu Galam dia 8-10 cm 1.050 m 2,300.00 2,415.00
C PERALATAN
- Tripod tinggi 5 m 0.025 Sewa/hr 200,000.00 5,000.00
- Alat pancang hammer 0,5 ton 0.013 Sewa/hr 250,000.00 3,250.00
D Jumlah (A+B+C) 13,565.00
E Overhead & Profit (12%) 1,627.80
F Harga Satuan Pekerjaan (D+E) 15,192.80
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 275
1 2 3.000 4 5 6 7
3 Kistdam pasir/tanah dibungkus karung plastik bag 1.000 bh
atau terpal uk. 45 cm x 120 cm
A TENAGA
- Pekerja 0.100 OH 75,000.00 7,500.00
- Tukang jahit 0.025 OH 85,000.00 2,125.00
- Mandor 0.010 OH 100,000.00 1,000.00
B BAHAN
- Karung terpal 1.300 m 1,000.00 1,300.00
- Tali /benang geotektil (pengikat) 2.000 m 100.00 200.00
- Pasir/tanah urug 0.030 m 100,000.00 3,000.00
C PERALATAN
D Jumlah (A+B+C) 15,125.00
E Overhead & Profit (12%) 1,815.00
F Harga Satuan Pekerjaan (D+E) 16,940.00
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 276
1 2 3.000 4 5 6 7
8 Pembuatan Kisdam Tinggi 2.50 m tebal 0,60 m 1.000 m
A TENAGA
- Pekerja 0.225 OH 75,000.00 16,875.00
- Tukang Kayu 0.120 OH 85,000.00 10,200.00
- Kepala Tukang Kayu 0.050 OH 95,000.00 4,750.00
- Mandor 0.023 OH 100,000.00 2,300.00
B BAHAN
- Kawat Ikat 5.500 m2 20,000.00 110,000.00
- Gedeg Guling 6.000 m2 55,000.00 330,000.00
- Bongkotan Bambu dia. 10-12 cm panjang 3m 0.500 Btg 6,900.00 3,450.00
C PERALATAN
D Jumlah (A+B+C) 477,575.00
E Overhead & Profit (12%) 57,309.00
F Harga Satuan Pekerjaan (D+E) 534,884.00
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 277
1 2 3.000 4 5 6 7
Analisa Harga Satuan Pekerjaan Bidang Pengairan 2016 - Enginner Estimate 278
DAFTAR HARGA SATUAN BAHAN BANGUNAN
TRIWULAN I TAHUN 2017
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG ( CIPTA KARYA )
1 2 3 4
I JENIS BAHAN BANGUNAN BAHAN
PENUTUP ATAP & PLAFON
1 Asbes datar tebal 4 mm (60 x 180) Lbr 28,000.00
2 Asbes gelombang besar tebal 5 mm (300x1.10) Lbr 124,000.00
3 Asbes gelombang kecil tebal 4 mm (300x100) Lbr 90,000.00
4 Asbes bubung gelombang kecil (105) M1 27,000.00
5 Asbes bubung gelombang besar (102) M 1
55,000.00
6 Aluminium (0,90 x 2,10) Lbr 125,000.00
7 Aluminium Foil single m2 4,500.00
8 Genteng flam pres jawa / lokal Bj 1,600.00
9 Genteng Morando Bj 7,500.00
10 Genteng Beton Bj 4,500.00
11 Genteng Karang pilang Nglayur Bj 2,000.00
12 Genteng Kamuri glazurr Bj 10,500.00
13 Genteng kamuri natural Bj 9,500.00
14 Genteng Metal (2x5 Genteng uk 0.77x1.00) Lbr 80,000.00
15 Genteng Ex Karang Pilang Bambe Bj 4,700.00
16 Genteng bubung karang pilang bambe Bj 17,000.00
17 Genteng bubung jawa / lokal Bj 6,000.00
18 Genteng bubung model karang pilang / Layur Bj 7,500.00
19 Genteng kaca Bj 12,000.00
20 Genteng bubung pres beton Bj 9,000.00
21 Genteng bubung Morando Bj 17,000.00
22 Genteng bubung Keramik (Tengah) Bj 25,000.00
23 Genteng bubung Keramik (Tepi) Bj 17,500.00
24 Nok genteng Beton Bj 12,000.00
25 Seng Datar BJLS 028 x 90 M 1
34,000.00
26 Seng Gelombang BJLS 030 80x300 Lbr 80,000.00
27 Teak wood tebal 3 mm (1.22 x 2.44) Lbr 85,000.00
28 Teak wood tebal 3 mm (0,9 x 2.10) Lbr 78,000.00
29 Plywood tebal 4 mm (1.22 x 2.44) Lbr 62,000.00
30 Plywood tebal 4 mm (0,9 x 2,1) Lbr 50,000.00
31 Plywood tebal 9 mm (1.22 x 2.44) Lbr 115,000.00
32 Triplek lapis almunium (0.90 x 2.10) Lbr 111,000.00
33 Triplek tebal 3 mm (0.90 x 2.10) Lbr 54,000.00
34 Triplek tebal 3 mm (1.22 x 2.44) Lbr 57,000.00
35 Triplek tebal 9 mm (1.22 x 2.44) Lbr 95,000.00
36 Triplek MDF (1.22 x 2.44) Lbr 225,000.00
37 Cutting Laser Triplek MDF m2 150,000.00
38 Multiplek 9 mm (1.22 x 2.44) Lbr 128,000.00
39 Multiplek 12 mm (1.22 x 2.44) Lbr 162,000.00
40 Multiplek 15 mm (1.22 x 2.44) Lbr 200,000.00
41 Multiplek 18 mm (1.22 x 2.44) Lbr 275,000.00
42 HPL M2 325,000.00
43 Akustik tebal 9 mm 60 x 120 Lbr 42,000.00
44 Calsiboard ex Gresik (6 mm) 1,2 x 2,4 Lbr 106,000.00
45 Calsiboard ex Gresik (3,5 mm) Lbr 58,000.00
46 Eternit kerang bh 10,500.00
47 Asbes Fiber Plastic datar M 2
37,500.00
48 Asbes Fiber Plastic gelombang M 2
25,000.00
49 Gypsum list profil 15 cm M 1
18,000.00
50 Gypsum list profil 6 cm M 1
10,000.00
51 Gypsum Board 9 (122x244) lbr 61,000.00
52 GRC Board 9 (120x244) lbr 60,000.00
53 Polycarbonate (2.1 x 11.8 m) KW 1 setara XLite M 2
102,900.00
54 Atap Zincalum / Galvalum 0,25 mm M 1
35,000.00
55 Atap Zincalum 0,35 mm (Lengkung) M 2
62,000.00
56 Atap Zincalum 0,30 mm M1 45,000.00
57 Baja ringan, C.75.0,7 Btg 80,000.00
58 Baja ringan, reng 30.0,4 Btg 45,000.00
59 Talang Galvalum M 1
40,000.00
60 Almunium Profil T M 1
10,000.00
61 Ramset bh 750.00
62 Regel Lisplank Galvalum M 1
50,000.00
63 Kalsium plank 30 M 1
35,000.00
64 Kalsium plank 20 M 1
18,500.00
65 Lem Kayu Kg 11,500.00
66 Gyboard 1.2x2.4x9 mm lbr 61,000.00
XI BAHAN PLASTIK
1 Keni PVC 1/2" AW Bh 1,625.00
2 Keni PVC 3/4" AW Bh 2,000.00
3 Keni PVC 1" AW Bh 2,750.00
4 Keni PVC 1 1/4" AW Bh 3,500.00
5 Keni PVC 1 1/2" AW Bh 4,250.00
6 Keni PVC 2" AW Bh 5,750.00
7 Keni PVC 2,5" AW Bh 15,500.00
8 Keni PVC 3" AW Bh 14,000.00
9 Keni PVC 4" AW Bh 30,500.00
9 Keni PVC 6" AW Bh 121,250.00
10 Keni PVC 3" D Bh 10,000.00
11 Keni PVC 4" D Bh 20,000.00
12 Shock 1/2" AW Bh 2,500.00
13 Shock 3/4" AW Bh 3,000.00
14 Shock 1"AW Bh 4,000.00
15 Shock 1 1/4" AW Bh 5,000.00
16 Shock 1 1/2" AW Bh 6,000.00
17 Shock 2" AW Bh 8,500.00
18 Shock 2,5" AW Bh 10,000.00
19 Shock 3" AW Bh 13,000.00
20 Shock 4" AW Bh 15,000.00
21 Shock drat luar 1" Bh 2,500.00
22 Stop Kran 1/2" PVC Bh 15,000.00
23 Stop Kran 3/4" PVC Bh 25,000.00
24 Stop Kran 1" PVC Bh 30,000.00
25 Stop Kran 1,1/4" PVC Bh 45,000.00
26 Stop Kran 1,1/2" PVC Bh 55,000.00
27 Stop Kran 2" PVC Bh 80,000.00
28 Stop Kran 1" besi Bh 70,000.00
29 Stop Kran 3/4" besi Bh 60,000.00
30 Tee 1/2" Bh 2,500.00
31 Tee 3/4" Bh 3,500.00
32 Tee 1" Bh 4,000.00
33 Tee 1 1/4" Bh 6,500.00
34 Tee 1 1/2" Bh 8,600.00
35 Tee 2" Bh 15,000.00
36 Tee 3" Bh 32,100.00
37 Tee 4" Bh 64,200.00
38 Tee Verloop PVC 1" x 3/4" Bh 5,000.00
39 Keni Verloop PVC 1" x 3/4" Bh 8,000.00
40 Keni Drat 3/4" x 1/2" Bh 5,000.00
41 Keni Galvanis 1/2" Bh 6,500.00
42 Seal Tape Bh 3,000.00
43 Lem PVC 400 gr kg 40,000.00
44 Pelampung Otomatis Bh 130,000.00
45 Klem Pipa Bh 3,000.00
46 Filter Pipa /kleb pipa Bh 7,500.00
47 Corong W Bh 22,000.00
48 Corong U Bh 24,000.00
49 Pipa paralon 5/8" panjang 4 Ljr 7,000.00
50 Pipa PVC 1/2" (AW) Ljr 26,500.00
51 Pipa PVC 3/4" (AW) Ljr 31,250.00
52 Pipa PVC 1" (AW) Ljr 39,250.00
53 Pipa PVC 1 1/4" (AW) Ljr 57,500.00
54 Pipa PVC 1 1/2" (AW) Ljr 72,250.00
55 Pipa PVC 2" (AW) Ljr 104,000.00
56 Pipa PVC 2,5" (AW) Ljr 132,500.00
57 Pipa PVC 3" (AW) Ljr 192,500.00
58 Pipa PVC 4" (AW) Ljr 277,500.00
59 Pipa PVC 5" (AW) Ljr 430,000.00
60 Pipa PVC 6" (AW) Ljr 585,000.00
61 Pipa PVC 8" (AW) Ljr 915,000.00
62 PVC 1" D Ljr 37,000.00
63 PVC 1,25" D Ljr ###
64 PVC 1 1/2" D Ljr 41,750.00
65 PVC 2" D Ljr 51,333.33
66 PVC 3" D Ljr 107,500.00
67 PVC 4" D Ljr 153,500.00
68 PVC 5" D Ljr 230,000.00
69 PVC 6" D Ljr 275,000.00
70 PVC U 15 Ljr 105,000.00
71 Dop PVC MOOF 2" Bh 3,500.00
72 Dop PVC MOOF 3" Bh 4,500.00
73 Dop PVC MOOF 4" Bh 5,500.00
74 Dop PVC MOOF 6" Bh 22,000.00
XII BAHAN JENIS PAKU
1 Paku Biasa/ usuk Kg 12,500.00
2 Paku Beton Kg 15,000.00
3 Paku reng Kg 12,750.00
4 Paku seng Kg 24,000.00
5 Paku triplek Kg 13,500.00
6 Paku asbes bh 15,000.00
7 Mur, Baut Kg 19,000.00
8 Paku Payung Kg 26,000.00
9 Paku Sekrup pak 45,000.00
Harga Satuan
NO TENAGA KERJA Sat.
(Rp)
Harga Satuan
NO PERALATAN Sat.
(Rp)
1 Meteran 5 M Bh 15,000.00
2 Palu Bh 25,000.00
3 Ganco Bh 57,500.00
4 Bodem Bh 35,000.00
5 Keranjang Bh 65,000.00
6 Kereta Dorong / (Whell Borrow) Bh 455,000.00
7 Betel Bh 11,500.00
8 Sabit besar Bh 460,000.00
9 Ember / Timba Bh 7,000.00
10 Kotak Adukan Bh 40,000.00
11 Cetok Bh 10,000.00
12 Kasut Kayu Bh 40,000.00
13 Tang Pemotong Kawat Bh 20,000.00
14 Gunting Pemotong Baja Bh 17,000.00
15 Kunci Pembengkok Tulangan Bh 40,000.00
16 Linggis Bh 35,000.00
17 Kayu Pemikul dan tampar Unit 20,000.00
18 Tusuk bambu Bh 75,000.00
19 Gergaji Besi Bh 12,500.00
20 Gergaji Kayu Bh 90,000.00
21 Bor besi Bh 35,000.00
22 Pisau Besar Bh 97,700.00
23 Pompa Air Diesel 3" Unit 42,000.00
24 Pompa Air Diesel 4" Unit 25,000.00
25 Pompa Air Kecil 500 watt, kap. 100 lt/menit, total head 100 m Unit 15,000,000.00
26 Pompa Air Kecil 250 watt, kap. 75 lt/menit, total head 60 m Unit 20,000,000.00
27 Pompa Air kecil 250 watt, kap. 40 lt/menit, total head 40 m Unit 4,000,000.00
28 Pompa Air Tangan Bh 2,250,000.00
29 Gembok kecil bh 650,000.00
30 Gagang Cangkul Bh 12,500.00
31 Gunting seng Bh 55,000.00
32 Sekrop Bh 45,000.00
DAFTAR SATUAN SEWA PERALATAN PER JAM KERJA
HARGA
No. Peralatan Kode Satuan SATUAN
(Rp.)
1 Asphal Mixing Plant E 01 Jam 5,866,890.00
2 Asphal Finisher E 02 Jam 302,180.00
3 Asphal Sprayer E 03 Jam 81,690.00
4 Buldozer E 04 Jam 496,700.00
5 Compresor 4000-6500 L/M E 06 Jam 157,780.00
6 Concrete Mixer 0.3-0.6 M3 E 07 Jam 59,760.00
7 Crane 10 - 15 Ton E 05 Jam 388,890.00
8 Dump Truck 3-4 M3 E 09 Jam 263,180.00
9 Dump Truck 8-10 M3 E 10 Jam 357,320.00
10 Excavator E 08 Jam 458,350.00
11 Flat Bed Truck 3-4 M3 E 11 Jam 252,230.00
12 Generator Set E 12 Jam 558,790.00
13 Motor Grader E 13 Jam 531,010.00
14 Track Loader 75-100 HP E 14 Jam 421,580.00
15 Wheel Loader E 15 Jam 435,440.00
16 Three wheel Roller 6-8 Ton E 16 Jam 189,940.00
17 Tandem Roller 6-8 Ton E 17 Jam 234,970.00
18 Pneumatic Tyre Roller 8-10 Ton E 18 Jam 297,990.00
19 Vibrator roller 5-8 Ton E 19 Jam 301,450.00
20 Concrete Vibrator E 20 Jam 40,530.00
21 Stone Cruiser E 21 Jam 729,550.00
22 Water Pump 70-100 mm E 23 Jam 48,160.00
23 Water Tanker 3000-4500 L E 22 Jam 229,780.00
24 Pedestrian Roller E 24 Jam 72,030.00
25 Stamper E 25 Jam 38,020.00
26 Jack Hammer E 26 Jam 24,680.00
27 Vulvi Mixer E 27 Jam 178,780.00
28 Concrete Pump E 28 Jam 249,820.00
29 Trailer 20 ton E 29 Jam 461,480.00
30 Pile Driver E 30 Jam 258,150.00
31 Crane On Truck E 31 Jam 452,980.00
32 Mesin Las E 32 Jam 56,230.00
33 Bore Pile Machine E 33 Jam 299,500.00
34 Pick Up Truck E 34 Jam 46,500.00
35 Batching Plant E 35 Jam 353,430.00
36 Cold Milling Machine E 36 Jam 1,549,900.00
37 Genset Penerangan E 37 Jam 81,000.00
38 Chainsaw E 38 Unit/hari 100,000.00
39 Tripod E 39 Unit/hari 200,000.00
40 Alat pancang hammer E 40 Unit/hari 250,000.00
41 Theodholit E 41 Unit/hari 250,000.00
42 Waterpass E 42 Unit/hari 200,000.00
43 Alat Bantu Cat Duco E 43 Unit/hari 10,000.00
44 Pompa Air E 43 Unit/hari 50,000.00
ANALISA HARGA SATUAN PEKERJAAN
HARGA AHSP
JUMLAH
NO JENIS PEKERJAAN KOEF. STN SATUAN 2016
( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 1 m' Pagar sementara dari seng gelombang tinggi 2 m
A TENAGA
- Pekerja 0.400 Oh 75,000.00 30,000.00
- Tukang Kayu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.020 Oh 95,000.00 1,900.00
- Mandor 0.020 Oh 100,000.00 2,000.00
B BAHAN
- Dolken kayu dia.8-10/400 1.250 Btg 6,900.00 8,625.00
- Semen Portland 2.500 Kg 1,200.00 3,000.00
- Seng Gelombang BJLS 30 1.200 Lbr 80,000.00 96,000.00
- Pasir beton 0.005 M3 350,000.00 1,750.00
- Koral Beton 0.009 M3 312,500.00 2,812.50
- Kayu 5/7 0.072 M3 3,600,000.00 259,200.00
- Paku 0.060 Kg 12,500.00 750.00
C PERALATAN
D Jumlah (A+B+C) 423,037.50
E Overhead & Profit (15%) 15% 63,455.63
F Harga Satuan Pekerjaan (D+E) 486,493.13
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 300
1 2 3 4 5 6 7
4 1 m2 Pembuatan rumah jaga/konstruksi kayu
A TENAGA
- Pekerja 1.000 Oh 75,000.00 75,000.00
- Tukang Kayu 1.500 Oh 85,000.00 127,500.00
- Kepala Tukang 0.150 Oh 95,000.00 14,250.00
- Mandor 0.050 Oh 100,000.00 5,000.00
B BAHAN
- Dolken kayu dia.8-10/400 3.000 Btg 6,900.00 20,700.00
- Kayu 0.276 M3 3,600,000.00 993,600.00
- Paku 0.700 Kg 12,500.00 8,750.00
- Seng Gelombang BJLS 30 1.500 Lbr 80,000.00 120,000.00
C PERALATAN
D Jumlah (A+B+C) 1,364,800.00
E Overhead & Profit (15%) 204,720.00
F Harga Satuan Pekerjaan (D+E) 1,569,520.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 301
1 2 3 4 5 6 7
2 1 m2 Bongkar Paving K 300 abu-abu tebal 6 cm
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.030 Oh 95,000.00 2,850.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) x 40 % 14,940.00
E Overhead & Profit (15%) 2,241.00
F Harga Satuan Pekerjaan (D+E) 17,181.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 302
1 2 3 4 5 6 7
E Overhead & Profit (15%) 1,875.00
F Harga Satuan Pekerjaan (D+E) 14,375.00
II PEKERJAAN TANAH
1 1 m3 Galian Tanah biasa sedalam 1 meter
A TENAGA
- Pekerja 0.750 Oh 75,000.00 56,250.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 58,750.00
E Overhead & Profit (15%) 8,812.50
F Harga Satuan Pekerjaan (D+E) 67,562.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 303
1 2 3 4 5 6 7
E Overhead & Profit (15%) 17,775.00
F Harga Satuan Pekerjaan (D+E) 136,275.00
9 1 m3 Urugan kembali
A TENAGA
- Pekerja 0.500 Oh 75,000.00 37,500.00
- Mandor 0.050 Oh 100,000.00 5,000.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) 42,500.00
E Overhead & Profit (15%) 6,375.00
F Harga Satuan Pekerjaan (D+E) 48,875.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 304
1 2 3 4 5 6 7
11 1 m3 Urugan Pasir
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Mandor 0.010 Oh 100,000.00 1,000.00
B BAHAN
- Pasir Urug 1.200 M3 100,000.00 120,000.00
C PERALATAN
D Jumlah (A+B+C) 143,500.00
E Overhead & Profit (15%) 21,525.00
F Harga Satuan Pekerjaan (D+E) 165,025.00
11 1 m3 Urugan Kerikil
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Mandor 0.010 Oh 100,000.00 1,000.00
B BAHAN
- Pasir Urug 1.200 M3 125,000.00 150,000.00
C PERALATAN
D Jumlah (A+B+C) 173,500.00
E Overhead & Profit (15%) 26,025.00
F Harga Satuan Pekerjaan (D+E) 199,525.00
13 1 m3 Urugan Sirdas
A TENAGA
- Pekerja 0.250 Oh 75,000.00 18,750.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Tanah urug 1.200 M3 70,000.00 84,000.00
C PERALATAN
D Jumlah (A+B+C) 105,250.00
E Overhead & Profit (15%) 15,787.50
F Harga Satuan Pekerjaan (D+E) 121,037.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 305
1 2 3 4 5 6 7
2 1 m3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps
A TENAGA ###
- Pekerja 1.500 Oh 75,000.00 112,500.00 ###
- Tukang Batu 0.750 Oh 85,000.00 63,750.00
- Kepala Tukang 0.075 Oh 95,000.00 7,125.00
- Mandor 0.075 Oh 100,000.00 7,500.00
B BAHAN
- Batu Kali 1.200 M3 220,000.00 264,000.00
- Semen Portland 163.000 Kg 1,200.00 195,600.00
- Pasir Pasang 0.520 M3 125,000.00 65,000.00
C PERALATAN
D Jumlah (A+B+C) 715,475.00
E Overhead & Profit (15%) 107,321.25
F Harga Satuan Pekerjaan (D+E) 822,796.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 306
1 2 3 4 5 6 7
- Tukang Batu 0.750 Oh 85,000.00 63,750.00
- Kepala Tukang 0.075 Oh 95,000.00 7,125.00
- Mandor 0.075 Oh 100,000.00 7,500.00
B BAHAN
- Batu Kali 1.200 M3 220,000.00 264,000.00
- Semen Portland 163.000 Kg 1,200.00 195,600.00
- Pasir Hitam 0.520 M3 350,000.00 182,000.00
C PERALATAN
D Jumlah (A+B+C) 832,475.00
E Overhead & Profit (15%) 124,871.25
F Harga Satuan Pekerjaan (D+E) 957,346.25
IV PEKERJAAN BETON
1 1 M3 Membuat Beton Mutu f'c = 7,4 Mpa (K 100)
A TENAGA
- Pekerja 1.650 Oh 75,000.00 123,750.00
- Tukang Batu 0.275 Oh 85,000.00 23,375.00
- Kepala Tukang 0.028 Oh 95,000.00 2,660.00
- Mandor 0.083 Oh 100,000.00 8,300.00
B BAHAN
- Semen Portland 247.000 Kg 1,200.00 296,400.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 307
1 2 3 4 5 6 7
- Pasir Beton 869.000 Kg 250.00 217,250.00
- Batu Pecah Mesin 2/3 999.000 Kg 231.48 231,250.00
- Air 215.000 Ltr 25.00 5,375.00
C PERALATAN
D Jumlah (A+B+C) 908,360.00
E Overhead & Profit (15%) 136,254.00
F Harga Satuan Pekerjaan (D+E) 1,044,614.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 308
1 2 3 4 5 6 7
F Harga Satuan Pekerjaan (D+E) 1,179,349.28
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 309
1 2 3 4 5 6 7
B BAHAN
- Besi beton (ulir) 1.050 Kg 7,700.00 8,085.00
- Kawat beton 0.015 Kg 13,750.00 206.25 ###
C PERALATAN ###
D Jumlah (A+B+C) 9,517.75 ###
E Overhead & Profit (15%) 1,427.66 ###
F Harga Satuan Pekerjaan (D+E) 10,945.41
###
9 1 m2 Pasang Bekisting untuk pondasi ###
A TENAGA ###
- Pekerja 0.520 Oh 75,000.00 39,000.00 ###
- Tukang Kayu 0.260 Oh 85,000.00 22,100.00 ###
- Kepala Tukang 0.026 Oh 95,000.00 2,470.00 ###
- Mandor 0.026 Oh 100,000.00 2,600.00
B BAHAN
- Kayu Cetakan 0.040 M3 3,600,000.00 144,000.00
- Paku Biasa 2 ' - 5' 0.300 Kg 12,500.00 3,750.00
- Minyak Bekisting 0.100 Liter 5,200.00 520.00
C PERALATAN
D Jumlah (A+B+C) 214,440.00
E Overhead & Profit (15%) 32,166.00 ###
F Harga Satuan Pekerjaan (D+E) 246,606.00
###
10 1 m2 Pasang Bekisting untuk sloof ###
A TENAGA
- Pekerja 0.520 Oh 75,000.00 39,000.00 ###
- Tukang Kayu 0.260 Oh 85,000.00 22,100.00 ###
- Kepala Tukang 0.026 Oh 95,000.00 2,470.00 ###
- Mandor 0.026 Oh 100,000.00 2,600.00 ###
B BAHAN ###
- Kayu Cetakan 0.045 M3 3,600,000.00 162,000.00 ###
- Paku Biasa 2 ' - 5' 0.300 Kg 12,500.00 3,750.00
- Minyak Bekisting 0.100 Liter 5,200.00 520.00
C PERALATAN
D Jumlah (A+B+C) 232,440.00 ###
E Overhead & Profit (15%) 34,866.00 ###
F Harga Satuan Pekerjaan (D+E) 267,306.00
###
11 1 m2 Pasang Bekisting untuk kolom bebas
A TENAGA
- Pekerja 0.660 Oh 75,000.00 49,500.00
- Tukang Kayu 0.330 Oh 85,000.00 28,050.00
- Kepala Tukang 0.033 Oh 95,000.00 3,135.00
- Mandor 0.033 Oh 100,000.00 3,300.00 ###
B BAHAN ###
- Kayu Cetakan 0.040 M3 3,600,000.00 144,000.00 ###
- Paku Biasa 2 ' - 5' 0.400 Kg 12,500.00 5,000.00 ###
- Minyak Bekisting 0.200 Liter 5,200.00 1,040.00 ###
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 310
1 2 3 4 5 6 7
- Balok kayu 0.015 M3 3,600,000.00 54,000.00 ###
- Plywood tebal 9 mm 0.350 Lbr 115,000.00 40,250.00
- Dolken Kayu galam 2.000 btg 6,900.00 13,800.00
C PERALATAN
D Jumlah (A+B+C) 342,075.00
E Overhead & Profit (15%) 51,311.25
F Harga Satuan Pekerjaan (D+E) 393,386.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 311
1 2 3 4 5 6 7
- Minyak Bekisting 0.200 Liter 5,200.00 1,040.00
- Balok kayu 0.020 M3 3,600,000.00 72,000.00
- Plywood tebal 9 mm 0.350 Lbr 115,000.00 40,250.00
- Dolken Kayu galam 3.000 btg 6,900.00 20,700.00
C PERALATAN
D Jumlah (A+B+C) 330,975.00 ###
E Overhead & Profit (15%) 49,646.25
F Harga Satuan Pekerjaan (D+E) 380,621.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 312
1 2 3 4 5 6 7
17 1 m3 Membuat sloof BETON BERTULANG (200 kg besi + bekisting) ###
A TENAGA ###
- Pekerja 5.650 Oh 75,000.00 423,750.00 ###
- Tukang Batu 0.275 Oh 85,000.00 23,375.00 ###
- Tukang Kayu 1.560 Oh 85,000.00 132,600.00 ###
- Tukang Besi 1.400 Oh 85,000.00 119,000.00 ###
- Kepala Tukang 0.323 Oh 95,000.00 30,685.00 ###
- Mandor 0.283 Oh 100,000.00 28,300.00 ###
B BAHAN ###
- Kayu Cetakan 0.270 M3 3,600,000.00 972,000.00 ###
- Paku Biasa 2 ' - 5' 2.000 Kg 12,500.00 25,000.00 ###
- Minyak Bekisting 0.600 Liter 5,200.00 3,120.00
- Besi beton (polos) 210.000 Kg 7,612.00 1,598,520.00
- Kawat beton 3.000 Kg 13,750.00 41,250.00
- Semen Portland 336.000 Kg 1,200.00 403,200.00
- Pasir Beton 0.540 M3 350,000.00 189,000.00
- Batu Pecah Mesin 2/3 0.810 M3 312,500.00 253,125.00
C PERALATAN
D Jumlah (A+B+C) 4,242,925.00
E Overhead & Profit (15%) 636,438.75
F Harga Satuan Pekerjaan (D+E) 4,879,363.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 313
1 2 3 4 5 6 7
- Kepala Tukang 0.265 Oh 95,000.00 25,175.00
- Mandor 0.265 Oh 100,000.00 26,500.00
B BAHAN
- Kayu Cetakan 0.320 M3 3,600,000.00 1,152,000.00
- Paku Biasa 2 ' - 5' 3.200 Kg 12,500.00 40,000.00
- Minyak Bekisting 1.600 Liter 5,200.00 8,320.00
- Besi beton (polos) 173.281 Kg 7,612.00 1,319,014.97
- Kawat beton 2.250 Kg 13,750.00 30,937.50
- Semen Portland 336.000 Kg 1,200.00 403,200.00 ###
- Pasir Beton (Lumajang) 0.540 M3 350,000.00 189,000.00 ###
- Batu Pecah Mesin 2/3 0.810 M3 312,500.00 253,125.00
- Balok kayu 0.120 M3 3,600,000.00 432,000.00
- Plywood tebal 9 mm 2.800 Lbr 115,000.00 322,000.00
- Dolken Kayu galam 32.000 btg 6,900.00 220,800.00
C PERALATAN
D Jumlah (A+B+C) 5,042,697.47
E Overhead & Profit (15%) 756,404.62
F Harga Satuan Pekerjaan (D+E) 5,799,102.09
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 314
1 2 3 4 5 6 7
B BAHAN
- Kayu Cetakan 0.320 M3 3,600,000.00 1,152,000.00
- Paku Biasa 2 ' - 5' 3.200 Kg 12,500.00 40,000.00
- Minyak Bekisting 1.600 Liter 5,200.00 8,320.00
- Besi beton (polos) 157.500 Kg 7,612.00 1,198,890.00
- Kawat beton 2.250 Kg 13,750.00 30,937.50
- Semen Portland 336.000 Kg 1,200.00 403,200.00
- Pasir Beton (Lumajang) 0.540 M3 350,000.00 189,000.00
- Batu Pecah Mesin 2/3 0.810 M3 312,500.00 253,125.00
- Balok kayu 0.120 M3 3,600,000.00 432,000.00
- Plywood tebal 9 mm 2.800 Lbr 115,000.00 322,000.00
- Dolken Kayu galam 32.000 btg 6,900.00 220,800.00
C PERALATAN
D Jumlah (A+B+C) 4,922,572.50
E Overhead & Profit (15%) 738,385.88
F Harga Satuan Pekerjaan (D+E) 5,660,958.38
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 315
1 2 3 4 5 6 7
E Overhead & Profit (15%) 9,919.65
F Harga Satuan Pekerjaan (D+E) 76,050.65
B Jumlah ( A) 2,822,760.42
C Overhead & Profit (15%) 423,414.06
D Harga Satuan Pekerjaan (B+C) 3,246,174.48
B Jumlah ( A) 5,121,096.64
C Overhead & Profit (15%) 768,164.50
D Harga Satuan Pekerjaan (B+C) 5,889,261.13
B Jumlah ( A) 5,088,589.61
C Overhead & Profit (15%) 763,288.44
D Harga Satuan Pekerjaan (B+C) 5,851,878.05
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 316
1 2 3 4 5 6 7
Beton Mutu f'c = 19,3 Mpa (K 225) 1.0000 M3 1,025,521.11 1,025,521.11
Pembesian besi polos 143.8892 Kg 9,425.35 1,356,206.07
Bekisting ( 1 kali pakai ) 5.0000 m2 425,126.25 2,125,631.25
B Jumlah ( A) 4,507,358.43
C Overhead & Profit (15%) 676,103.76
D Harga Satuan Pekerjaan (B+C) 5,183,462.20
B Jumlah ( A) 2,479,517.03
C Overhead & Profit (15%) 371,927.55
D Harga Satuan Pekerjaan (B+C) 2,851,444.58
30 1 M3 Pondasi FootPlat
A PEKERJA + BAHAN
Beton Mutu f'c = 19,3 Mpa (K 225) 1.0000 M3 1,025,521.11 1,025,521.11
Pembesian besi Ulir 149.8000 Kg 9,517.75 1,425,758.95
Bekisting ( 1 kali pakai ) 0.9600 m2 246,606.00 236,741.76
B Jumlah ( A) 2,688,021.82
C Overhead & Profit (15%) 403,203.27
D Harga Satuan Pekerjaan (B+C) 3,091,225.09
B Jumlah ( A) 5,998,566.27
C Overhead & Profit (15%) 899,784.94
D Harga Satuan Pekerjaan (B+C) 6,898,351.21
B Jumlah ( A) 5,456,168.52
C Overhead & Profit (15%) 818,425.28
D Harga Satuan Pekerjaan (B+C) 6,274,593.80
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 317
1 2 3 4 5 6 7
B Jumlah ( A) 4,936,466.05
C Overhead & Profit (15%) 740,469.91
D Harga Satuan Pekerjaan (B+C) 5,676,935.96
B Jumlah ( A) 5,561,800.32
C Overhead & Profit (15%) 834,270.05
D Harga Satuan Pekerjaan (B+C) 6,396,070.37
B Jumlah ( A) 5,824,767.47
C Overhead & Profit (15%) 873,715.12
D Harga Satuan Pekerjaan (B+C) 6,698,482.59
B Jumlah ( A) 4,054,166.89
C Overhead & Profit (15%) 608,125.03
D Harga Satuan Pekerjaan (B+C) 4,662,291.92
B Jumlah ( A) 3,917,105.15
C Overhead & Profit (15%) 587,565.77
D Harga Satuan Pekerjaan (B+C) 4,504,670.92
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 318
1 2 3 4 5 6 7
- Kayu Kelas lll 0.2400 m3 3,600,000.00 864,000.00
- Paku 5 cm - 12 cm 3.2000 Kg 12,500.00 40,000.00
- Minyak Bekisting 1.6000 Liter 75,000.00 120,000.00
- Besi Beton Polos 157.5000 kg 7,612.00 1,198,890.00
- Kawat Beton 2.2500 kg 13,750.00 30,937.50
- Semen Portland 336.0000 kg 1,200.00 403,200.00
- Pasir Beton 0.5400 m3 350,000.00 189,000.00
- Kerikil 0.8100 m3 125,000.00 101,250.00
- Kayu Kelas ll Balok 0.1600 m3 3,600,000.00 576,000.00
- Plywood 9 mm 2.8000 Lembar 115,000.00 322,000.00
- Dolken Kayu dia (8-10) cm Panjang 4 m 24.0000 Batang 6,900.00 165,600.00
C PERALATAN
Jumlah ( A+B+C)
Overhead & Profit (15%)
Harga Satuan Pekerjaan (B+C)
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 319
1 2 3 4 5 6 7
Pembesian besi polos 203.0030 Kg 9,425.35 1,913,374.33
Bekisting ( 2 kali pakai ) 9.1667 m2 352,875.00 3,234,687.50
B Jumlah ( A) 6,173,582.94
C Overhead & Profit (15%) 926,037.44
D Harga Satuan Pekerjaan (B+C) 7,099,620.38
B Jumlah ( A) 5,717,005.18
C Overhead & Profit (15%) 857,550.78
D Harga Satuan Pekerjaan (B+C) 6,574,555.96
B Jumlah ( A) 5,254,516.05
C Overhead & Profit (15%) 788,177.41
D Harga Satuan Pekerjaan (B+C) 6,042,693.46
B Jumlah ( A) 5,136,525.38
C Overhead & Profit (15%) 770,478.81
D Harga Satuan Pekerjaan (B+C) 5,907,004.19
B Jumlah ( A) 4,594,850.38
C Overhead & Profit (15%) 689,227.56
D Harga Satuan Pekerjaan (B+C) 5,284,077.94
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 320
1 2 3 4 5 6 7
B Jumlah ( A) 4,292,647.60
C Overhead & Profit (15%) 643,897.14
D Harga Satuan Pekerjaan (B+C) 4,936,544.73
B Jumlah ( A) 3,897,090.33
C Overhead & Profit (15%) 584,563.55
D Harga Satuan Pekerjaan (B+C) 4,481,653.88
B Jumlah ( A) 3,633,322.59
C Overhead & Profit (15%) 544,998.39
D Harga Satuan Pekerjaan (B+C) 4,178,320.98
B Jumlah ( A) 3,520,597.92
C Overhead & Profit (15%) 528,089.69
D Harga Satuan Pekerjaan (B+C) 4,048,687.61
50 1 M3 Grouting Beton
A TENAGA
- Pekerja 1.650 Oh 75,000.00 123,750.00
- Tukang Batu 0.275 Oh 85,000.00 23,375.00
- Kepala Tukang 0.028 Oh 95,000.00 2,660.00
- Mandor 0.083 Oh 100,000.00 8,300.00
B BAHAN
- Semen Grouting 1992.000 Kg 8,500.00 16,932,000.00
- Air 215.000 Ltr 25.00 5,375.00
C PERALATAN
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 321
1 2 3 4 5 6 7
D Jumlah (A+B+C) 17,095,460.00
E Overhead & Profit (15%) 2,564,319.00
F Harga Satuan Pekerjaan (D+E) 19,659,779.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 322
1 2 3 4 5 6 7
V PEKERJAAN BESI DAN ALMUNIUM
1 1 Kg Pasang Besi Profil Cannal C dan Siku L baja
A TENAGA
- Pekerja 0.060 Oh 75,000.00 4,500.00
- Tukang Las 0.060 Oh 85,000.00 5,100.00
- Kepala Tukang 0.006 Oh 95,000.00 570.00
- Mandor 0.003 Oh 100,000.00 300.00
B BAHAN
- Besi Profil Cannal C 1.150 Kg 8,797.00 10,116.55
C PERALATAN
D Jumlah (A+B+C) 20,586.55
E Overhead & Profit (15%) 3,087.98
F Harga Satuan Pekerjaan (D+E) 23,674.53
4 1 m2 Pasang pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A TENAGA
- Pekerja 1.050 Oh 75,000.00 78,750.00
- Tukang Besi 1.050 Oh 85,000.00 89,250.00
- Kepala Tukang 0.105 Oh 95,000.00 9,975.00
- Mandor 0.052 Oh 100,000.00 5,200.00
B BAHAN
- Besi siku L 30.30.3 15.000 Kg 9,500.00 142,500.00
- Besi plat baja 32.800 Kg 6,661.00 218,480.80
- Kawat las 0.050 Kg 30,000.00 1,500.00
C PERALATAN
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 323
1 2 3 4 5 6 7
D Jumlah (A+B+C) 466,905.80
E Overhead & Profit (15%) 70,035.87
F Harga Satuan Pekerjaan (D+E) 536,941.67
5 10 cm Pekerjaan Pengelasan
A TENAGA
- Pekerja 0.040 Oh 75,000.00 3,000.00
- Tukang Las 0.020 Oh 85,000.00 1,700.00
- Kepala Tukang 0.002 Oh 95,000.00 190.00
- Mandor 0.002 Oh 100,000.00 200.00
B BAHAN
- Kawat Las Listrik 0.400 Kg 30,000.00 12,000.00
- Solar 0.300 Ltr 6,900.00 2,070.00
- Minyak Pelumas 0.040 Ltr 68,000.00 2,720.00
C PERALATAN
- Mesin Las 0.170 Jam 56,230.00 9,559.10
D Jumlah (A+B+C) 31,439.10
E Overhead & Profit (15%) 4,715.87
F Harga Satuan Pekerjaan (D+E) 36,154.97
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 324
1 2 3 4 5 6 7
- Kusen Almunium 4" 1.100 M' 80,000.00 88,000.00
- Skrup fixer 2.000 Buah 300.00 600.00
- Sealant 0.060 Tube 65,000.00 3,900.00
C PERALATAN
D Jumlah (A+B+C) 99,998.50
E Overhead & Profit (15%) 14,999.78
F Harga Satuan Pekerjaan (D+E) 114,998.28
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 325
1 2 3 4 5 6 7
C PERALATAN
D Jumlah (A+B+C) 11,960.00
E Overhead & Profit (15%) 1,794.00
F Harga Satuan Pekerjaan (D+E) 13,754.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 326
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 327
1 2 3 4 5 6 7
18 1 M' Pasang talang datar, seng BJLS 28
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Kayu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.020 Oh 95,000.00 1,900.00
- Mandor 0.01 Oh 100,000.00 1,000.00
B BAHAN
- Seng Plat BJLS 28 (90 cm) 1.050 M1 34,000.00 35,700.00
- Paku biasa 0.015 Kg 12,500.00 187.50
- Kayu Meranti , papan 0.0096 M3 5,400,000.00 51,840.00
C PERALATAN
D Jumlah (A+B+C) 122,627.50
E Overhead & Profit (15%) 18,394.13
F Harga Satuan Pekerjaan (D+E) 141,021.63
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 328
1 2 3 4 5 6 7
22 1 m2 Pasang rangka besi hollow 4040 + dinding partisi Gypsumboard 9 mm
A TENAGA
- Pekerja 0.250 Oh 75,000.00 18,750.00
- Tukang Besi 0.250 Oh 85,000.00 21,250.00
- Kepala Tukang 0.025 Oh 95,000.00 2,375.00
- Mandor 0.01300 Oh 100,000.00 1,300.00
B BAHAN
- Rangka hollow 4x4 + doubel board 9 mm 1.000 M2 125,000.00 125,000.00
- Accsories (perkuatan, las, dll) 1.000 Ls 0.00 0.00
C PERALATAN
D Jumlah (A+B+C) 168,675.00
E Overhead & Profit (15%) 25,301.25
F Harga Satuan Pekerjaan (D+E) 193,976.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 330
1 2 3 4 5 6 7
25 1 m2 Pasang Atap Usuk Reng Baja Ringan ###
A TENAGA
- Pekerja 0.1000 Oh 75,000.00 7,500.00
- Tukang Besi 0.2833 Oh 85,000.00 24,083.33
- Kepala Tukang 0.0067 Oh 95,000.00 633.33
- Mandor 0.0267 Oh 100,000.00 2,666.67
B BAHAN
- Baja ringan,C.75.0,7 0.667 btg 80,000.00 53,360.00
- Baja ringan, reng 30.0,4 0.900 btg 45,000.00 40,500.00
- Baut (screw driver) 0.076 pak 45,000.00 3,420.00
C PERALATAN
D Jumlah (A+B+C) 132,163.33
E Overhead & Profit (15%) 19,824.50
F Harga Satuan Pekerjaan (D+E) 151,987.83
###
26 1 m1 Pasang Trektank
A TENAGA
- Pekerja 0.030 Oh 75,000.00 2,250.00
- Tukang besi 0.030 Oh 85,000.00 2,550.00
- Kepala tukang 0.003 Oh 95,000.00 285.00
- Mandor 0.002 Oh 100,000.00 200.00
B BAHAN
- Besi beton dia 10 0.670 kg 7,612.00 5,100.04
- Baut 2.000 bh 1,800.00 3,600.00
C PERALATAN
D Jumlah (A+B+C) 13,985.04
E Overhead & Profit (15%) 2,097.76
F Harga Satuan Pekerjaan (D+E) 16,082.80
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 331
1 2 3 4 5 6 7
E Overhead & Profit (15%) 28,317.50
F Harga Satuan Pekerjaan (D+E) 217,100.83
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 334
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 335
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 336
1 2 3 4 5 6 7
2 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Tukang Batu 0.150 Oh 85,000.00 12,750.00
- Kepala Tukang 0.015 Oh 95,000.00 1,425.00
- Mandor 0.015 Oh 100,000.00 1,500.00
B BAHAN
- Semen Portland 7.776 Kg 1,200.00 9,331.20
- Pasir Pasang 0.023 M3 125,000.00 2,875.00
C PERALATAN
D Jumlah (A+B+C) 50,381.20
E Overhead & Profit (15%) 7,557.18
F Harga Satuan Pekerjaan (D+E) 57,938.38
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 337
1 2 3 4 5 6 7
6 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm
A TENAGA
- Pekerja 0.400 Oh 75,000.00 30,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.020 Oh 95,000.00 1,900.00
- Mandor 0.0220 Oh 100,000.00 2,200.00
B BAHAN
- Semen Portland 13.632 Kg 1,200.00 16,358.40
- Pasir Pasang 0.027 M3 125,000.00 3,375.00
C PERALATAN
D Jumlah (A+B+C) 70,833.40
E Overhead & Profit (15%) 10,625.01
F Harga Satuan Pekerjaan (D+E) 81,458.41
9 1 m2 Plesteran Ciprat 1 Pc : 2 Ps
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Tukang Batu 0.100 Oh 85,000.00 8,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.015 Oh 100,000.00 1,500.00
B BAHAN
- Semen Portland 4.320 Kg 1,200.00 5,184.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 338
1 2 3 4 5 6 7
- Pasir Pasang 0.006 M3 125,000.00 750.00
C PERALATAN
D Jumlah (A+B+C) 39,384.00
E Overhead & Profit (15%) 5,907.60
F Harga Satuan Pekerjaan (D+E) 45,291.60
12 1 m2 Acian
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.100 Oh 85,000.00 8,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.010 Oh 100,000.00 1,000.00
B BAHAN
- Semen Portland 3.250 Kg 1,200.00 3,900.00
C PERALATAN
D Jumlah (A+B+C) 29,350.00
E Overhead & Profit (15%) 4,402.50
F Harga Satuan Pekerjaan (D+E) 33,752.50
###
13 1 m1 Benangan
A TENAGA
- Pekerja 0.105 Oh 75,000.00
- Tukang Batu 0.050 Oh 85,000.00 4,250.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 339
1 2 3 4 5 6 7
- Kepala Tukang 0.005 Oh 95,000.00
- Mandor 0.005 Oh 100,000.00 500.00
B BAHAN
- Semen Portland 1.620 Kg 1,200.00 1,944.00
- Pasir Pasang 0.005 M3 125,000.00 653.13
C PERALATAN
D Jumlah (A+B+C) 7,347.13
E Overhead & Profit (15%) 1,102.07
F Harga Satuan Pekerjaan (D+E) 8,449.19
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 340
1 2 3 4 5 6 7
- Keramik 20 x 20 cm 1.060 M2 50,000.00 53,000.00
- Semen Portland 10.400 Kg 1,200.00 12,480.00
- Pasir Pasang 0.045 M3 125,000.00 5,625.00
- Semen Warna 0.150 Kg 12,000.00 1,800.00
C PERALATAN
D Jumlah (A+B+C) 161,980.00
E Overhead & Profit (15%) 24,297.00 ###
F Harga Satuan Pekerjaan (D+E) 186,277.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 341
1 2 3 4 5 6 7
E Overhead & Profit (15%) 26,976.75
F Harga Satuan Pekerjaan (D+E) 206,821.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 342
1 2 3 4 5 6 7
- Semen Portland 9.300 Kg 1,200.00 11,160.00
- Pasir Pasang 0.018 M3 125,000.00 2,250.00
- Semen Warna 0.194 Kg 12,000.00 2,328.00
C PERALATAN
D Jumlah (A+B+C) 326,363.00
E Overhead & Profit (15%) 48,954.45
F Harga Satuan Pekerjaan (D+E) 375,317.45
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 343
1 2 3 4 5 6 7
11 1 m2 Pasang Dinding Bata Pelapis 3 cmx7cm x24 cm
A TENAGA
- Pekerja 0.500 Oh 75,000.00 37,500.00
- Tukang Batu 0.250 Oh 85,000.00 21,250.00
- Kepala Tukang 0.025 Oh 95,000.00 2,375.00
- Mandor 0.0250 Oh 100,000.00 2,500.00
B BAHAN
- Bata Pelapis 63.000 bh 625.00 39,375.00
- Semen Portland 12.440 Kg 1,200.00 14,928.00
- Pasir Pasang 0.025 M3 125,000.00 3,125.00
C PERALATAN
D Jumlah (A+B+C) 121,053.00
E Overhead & Profit (15%) 18,157.95
F Harga Satuan Pekerjaan (D+E) 139,210.95
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 344
1 2 3 4 5 6 7
- Pekerja 0.700 Oh 75,000.00 52,500.00
- Tukang Batu 0.350 Oh 85,000.00 29,750.00
- Kepala Tukang 0.035 Oh 95,000.00 3,325.00
- Mandor 0.035 Oh 100,000.00 3,500.00
B BAHAN
- Batu Alam Palimanan 1.100 M2 85,000.00 93,500.00
- Semen Portland 11.750 kg 1,200.00 14,100.00
- Pasir Pasang 0.035 M3 125,000.00 4,375.00
C PERALATAN
D Jumlah (A+B+C) 201,050.00
E Overhead & Profit (15%) 30,157.50
F Harga Satuan Pekerjaan (D+E) 231,207.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 345
1 2 3 4 5 6 7
- Wall paper, lebar 50 cm 2.200 M 125,000.00 275,000.00
- Lem 0.250 Kg 11,750.00 2,937.50
C PERALATAN
D Jumlah (A+B+C) 320,877.50
E Overhead & Profit (15%) 48,131.63
F Harga Satuan Pekerjaan (D+E) 369,009.13
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 346
1 2 3 4 5 6 7
A TENAGA
- Pekerja 0.250 Oh 75,000.00 18,750.00
- Tukang Besi 0.250 Oh 85,000.00 21,250.00
- Kepala Tukang 0.025 Oh 95,000.00 2,375.00
- Mandor 0.01300 Oh 100,000.00 1,300.00
B BAHAN
- Rangka metal hollow 40.40 galvanis 1.500 M' 8,125.00 12,187.50
- Rangka metal hollow 20.40 galvanis 2.500 M' 6,750.00 16,875.00
- Accesories (perkuatan,las dll) 0.300 Ls 29,062.50 8,718.75
C PERALATAN
D Jumlah (A+B+C) 81,456.25
E Overhead & Profit (15%) 12,218.44
F Harga Satuan Pekerjaan (D+E) 93,674.69
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 347
1 2 3 4 5 6 7
C PERALATAN
D Jumlah (A+B+C) 129,680.00
E Overhead & Profit (15%) 19,452.00
F Harga Satuan Pekerjaan (D+E) 149,132.00
9 1 m2 Pasang Eternit
A TENAGA
- Pekerja 0.030 Oh 75,000.00 2,250.00
- Tukang Kayu 0.070 Oh 85,000.00 5,950.00
- Kepala Tukang 0.007 Oh 95,000.00 665.00
- Mandor 0.004 Oh 100,000.00 400.00
B BAHAN
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 348
1 2 3 4 5 6 7
- Eternit 1.100 M2 10,500.00 11,550.00
- Paku 0.010 Kg 12,500.00 125.00
C PERALATAN
D Jumlah (A+B+C) 20,940.00
E Overhead & Profit (15%) 3,141.00
F Harga Satuan Pekerjaan (D+E) 24,081.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 349
1 2 3 4 5 6 7
E Overhead & Profit (15%) 5,281.80
F Harga Satuan Pekerjaan (D+E) 40,493.80
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 350
1 2 3 4 5 6 7
16 1 m' Pasang list plafond gypsum lebar 15 cm
A TENAGA
- Pekerja 0.060 Oh 75,000.00 4,500.00
- Tukang Kayu 0.060 Oh 85,000.00 5,100.00
- Kepala Tukang 0.006 Oh 95,000.00 570.00
- Mandor 0.003 Oh 100,000.00 300.00
B BAHAN
- Gypsum list profil lebar 15 cm 1.050 M' 18,000.00 18,900.00
- Paku 0.010 Kg 12,500.00 125.00
C PERALATAN
D Jumlah (A+B+C) 29,495.00
E Overhead & Profit (15%) 4,424.25
F Harga Satuan Pekerjaan (D+E) 33,919.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 351
1 2 3 4 5 6 7
C PERALATAN
D Jumlah (A+B+C) 69,185.00
E Overhead & Profit (15%) 10,377.75
F Harga Satuan Pekerjaan (D+E) 79,562.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 352
1 2 3 4 5 6 7
- Pekerja 0.400 Oh 75,000.00 30,000.00
- Tukang Kayu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.020 Oh 95,000.00 1,900.00
- Mandor 0.002 Oh 100,000.00 200.00
B BAHAN
- Genteng bubung model karang pilang 5.000 Bh 7,500.00 37,500.00
- Semen Portland 8.000 Kg 1,200.00 9,600.00
- Pasir Pasang 0.032 M3 125,000.00 4,000.00
C PERALATAN
D Jumlah (A+B+C) 100,200.00
E Overhead & Profit (15%) 15,030.00
F Harga Satuan Pekerjaan (D+E) 115,230.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 353
1 2 3 4 5 6 7
9 1 m2 Pasang Atap Asbes Gelombang 4 mm (Kecil)
A TENAGA
- Pekerja 0.140 Oh 75,000.00 10,500.00
- Tukang Kayu 0.070 Oh 85,000.00 5,950.00
- Kepala Tukang 0.007 Oh 95,000.00 665.00
- Mandor 0.007 Oh 100,000.00 700.00
B BAHAN
- Asbes Gelombang kecil 0.350 Lbr 90,000.00 31,500.00
- Paku Pancing 0.120 Kg 26,000.00 3,120.00
C PERALATAN
D Jumlah (A+B+C) 52,435.00
E Overhead & Profit (15%) 7,865.25
F Harga Satuan Pekerjaan (D+E) 60,300.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 354
1 2 3 4 5 6 7
C PERALATAN
D Jumlah (A+B+C) 135,560.00
E Overhead & Profit (15%) 20,334.00
F Harga Satuan Pekerjaan (D+E) 155,894.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 355
1 2 3 4 5 6 7
- Pekerja 0.140 Oh 75,000.00 10,500.00
- Tukang Kayu 0.067 Oh 85,000.00 5,695.00
- Kepala Tukang 0.007 Oh 95,000.00 665.00
- Mandor 0.007 Oh 100,000.00 700.00
B BAHAN
- Fiberglass Gelombang 1.100 M2 25,000.00 27,500.00
- Paku 0.050 Kg 12,500.00 625.00
C PERALATAN
D Jumlah (A+B+C) 45,685.00
E Overhead & Profit (15%) 6,852.75
F Harga Satuan Pekerjaan (D+E) 52,537.75
XI PEKERJAAN KAYU
1 1 m3 Pasang Kusen Pintu dan Jendela Kayu Jati
A TENAGA
- Pekerja 7.000 Oh 75,000.00 525,000.00
- Tukang Kayu 21.000 Oh 85,000.00 1,785,000.00
- Kepala Tukang 2.100 Oh 95,000.00 199,500.00
- Mandor 0.350 Oh 100,000.00 35,000.00
B BAHAN
- Kayu Jati, balok 1.100 M3 9,200,000.00 10,120,000.00
- Paku 10cm 1.250 kg 12,500.00 15,625.00
- Lem Kayu 1.000 kg 11,750.00 11,750.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 356
1 2 3 4 5 6 7
C PERALATAN
D Jumlah (A+B+C) 12,691,875.00
E Overhead & Profit (15%) 1,903,781.25
F Harga Satuan Pekerjaan (D+E) 14,595,656.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 357
1 2 3 4 5 6 7
5 1 m2 Pasang Pintu Panel Kayu Kamper
A TENAGA
- Pekerja 1.000 Oh 75,000.00 75,000.00
- Tukang Kayu 3.000 Oh 85,000.00 255,000.00
- Kepala Tukang 0.300 Oh 95,000.00 28,500.00
- Mandor 0.050 Oh 100,000.00 5,000.00
B BAHAN
- Kayu Kamper, papan 0.040 M3 7,250,000.00 290,000.00
- Lem Kayu 0.500 Kg 11,750.00 5,875.00
C PERALATAN
D Jumlah (A+B+C) 659,375.00
E Overhead & Profit (15%) 98,906.25
F Harga Satuan Pekerjaan (D+E) 758,281.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 359
1 2 3 4 5 6 7
9 1 m2 Pasang Rangka Pintu / jendela Tanpa Kaca Kayu Meranti A
A TENAGA
- Pekerja 0.800 Oh 75,000.00 60,000.00
- Tukang Kayu 2.400 Oh 85,000.00 204,000.00
- Kepala Tukang 0.240 Oh 95,000.00 22,800.00
- Mandor 0.040 Oh 100,000.00 4,000.00
B BAHAN
- Kayu Meranti, Papan 0.0240 M3 5,400,000.00 129,600.00
- Lem Kayu 0.300 kg 11,750.00 3,525.00
C PERALATAN
D Jumlah (A+B+C) 423,925.00
E Overhead & Profit (15%) 63,588.75
F Harga Satuan Pekerjaan (D+E) 487,513.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 360
1 2 3 4 5 6 7
D Jumlah (A+B+C) 445,700.00
E Overhead & Profit (15%) 66,855.00
F Harga Satuan Pekerjaan (D+E) 512,555.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 361
1 2 3 4 5 6 7
- Paku Biasa 2" - 5" 5.60 Kg 12,500.00 70,000.00
C PERALATAN
D Jumlah (A+B+C) 13,645,440.00
E Overhead & Profit (15%) 2,046,816.00
F Harga Satuan Pekerjaan (D+E) 15,692,256.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 362
1 2 3 4 5 6 7
D Jumlah (A+B+C) 6,729,890.00
E Overhead & Profit (15%) 1,009,483.50
F Harga Satuan Pekerjaan (D+E) 7,739,373.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 363
1 2 3 4 5 6 7
B BAHAN
- Kaso-kaso (5 X 7 ) cm 0.014 M3 5,250,000.00 73,500.00 ###
- Reng ( 3 X 4 ) cm 0.0072 M3 5,250,000.00 37,800.00 ###
- Paku 5cm dan 10 cm 0.250 Kg 12,500.00 3,125.00 ###
C PERALATAN
D Jumlah (A+B+C) 131,875.00
E Overhead & Profit (15%) 19,781.25
F Harga Satuan Pekerjaan (D+E) 151,656.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 364
1 2 3 4 5 6 7
F Harga Satuan Pekerjaan (D+E) 54,886.63
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 365
1 2 3 4 5 6 7
B BAHAN
- Kayu Meranti A, Papan 0.011 M3 5,400,000.00 59,400.00
- Paku Biasa 2" - 5" 0.050 Kg 12,500.00 625.00
C PERALATAN
D Jumlah (A+B+C) 86,925.00
E Overhead & Profit (15%) 13,038.75
F Harga Satuan Pekerjaan (D+E) 99,963.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 366
1 2 3 4 5 6 7
B BAHAN
- Kayu Meranti C, papan 0.004 M3 5,400,000.00 21,600.00
- Seng BJLS 30 0.250 m1 34,000.00 8,500.00
- Paku Payung 0.150 Kg 26,000.00 3,900.00
C PERALATAN
D Jumlah (A+B+C) 44,470.00
E Overhead & Profit (15%) 6,670.50
F Harga Satuan Pekerjaan (D+E) 51,140.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 368
1 2 3 4 5 6 7
- Kepala Tukang 0.060 Oh 95,000.00 5,700.00
- Mandor 0.003 Oh 100,000.00 300.00
B BAHAN
- Kunci tanam 1.000 Bh 70,000.00 70,000.00
- Pegangan pintu hias 1.000 Stl 125,000.00 125,000.00
C PERALATAN
D Jumlah (A+B+C) 256,500.00
E Overhead & Profit (15%) 38,475.00
F Harga Satuan Pekerjaan (D+E) 294,975.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 369
1 2 3 4 5 6 7
5 1 set Pasang engsel pintu kecil
A TENAGA
- Pekerja 0.015 Oh 75,000.00 1,125.00
- Tukang Kayu 0.150 Oh 85,000.00 12,750.00
- Kepala Tukang 0.015 Oh 95,000.00 1,425.00
- Mandor 0.00075 Oh 100,000.00 75.00
B BAHAN
- Engsel pintu kecil 1.000 Set 35,000.00 35,000.00
C PERALATAN
D Jumlah (A+B+C) 50,375.00
E Overhead & Profit (15%) 7,556.25
F Harga Satuan Pekerjaan (D+E) 57,931.25
11 1 bh Pasang Grendel
A TENAGA
- Pekerja 0.010 Oh 75,000.00 750.00
- Tukang Kayu 0.100 Oh 85,000.00 8,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.00050 Oh 100,000.00 50.00
B BAHAN
- Grendel pintu besar 1.000 Bh 13,500.00 13,500.00
C PERALATAN
D Jumlah (A+B+C) 23,750.00
E Overhead & Profit (15%) 3,562.50
F Harga Satuan Pekerjaan (D+E) 27,312.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 371
1 2 3 4 5 6 7
~ Tukang Besi 0.500 Oh 85,000.00 42,500.00
~ Kepala Tukang 0.050 Oh 95,000.00 4,750.00
~ Mandor 0.003 Oh 100,000.00 250.00
B BAHAN
- Door Closer 1.000 Bh 250,000.00 250,000.00
C PERALATAN
D Jumlah (A+B+C) 301,250.00
E Overhead & Profit (15%) 45,187.50
F Harga Satuan Pekerjaan (D+E) 346,437.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 372
1 2 3 4 5 6 7
D Jumlah (A+B+C) 101,125.00
E Overhead & Profit (15%) 15,168.75
F Harga Satuan Pekerjaan (D+E) 116,293.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 373
1 2 3 4 5 6 7
XII PEKERJAAN PENGECATAN
1 1 m2 Pengikisan /pengerokan permukaan cat lama
A TENAGA
- Pekerja 0.150 Oh 75,000.00 11,250.00
- Mandor 0.0030 Oh 100,000.00 300.00
B BAHAN
- Soda Api 0.050 Kg 8,500.00 425.00
C PERALATAN
D Jumlah (A+B+C) 11,975.00
E Overhead & Profit (15%) 1,796.25
F Harga Satuan Pekerjaan (D+E) 13,771.25
3 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
- Pekerja 0.070 Oh 75,000.00 5,250.00
- Tukang Cat 0.009 Oh 85,000.00 765.00
- Kepala Tukang 0.006 Oh 95,000.00 570.00
- Mandor 0.003 Oh 100,000.00 300.00
B BAHAN
- Cat Meni 0.200 Kg 26,000.00 5,200.00
- Plamir 0.150 Kg 20,250.00 3,037.50
- Cat Dasar 0.170 Kg 66,250.00 11,262.50
- Cat Penutup 0.260 Kg 66,250.00 17,225.00
- Kuas 0.010 Bh 19,000.00 190.00
- Thinner 0.030 Ltr 17,750.00 532.50
- Kertas gosok 0.200 Lbr 4,000.00 800.00
C PERALATAN
D Jumlah (A+B+C) 45,132.50
E Overhead & Profit (15%) 6,769.88
F Harga Satuan Pekerjaan (D+E) 51,902.38
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 374
1 2 3 4 5 6 7
- Minyak cat 0.019 Lt 17,750.00 337.25
C PERALATAN
D Jumlah (A+B+C) 30,007.25
E Overhead & Profit (15%) 4,501.09
F Harga Satuan Pekerjaan (D+E) 34,508.34
C PERALATAN
D Jumlah (A+B+C) 32,920.00
E Overhead & Profit (15%) 4,938.00
F Harga Satuan Pekerjaan (D+E) 37,858.00
8 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis cat Penutup)
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 375
1 2 3 4 5 6 7
A TENAGA
- Pekerja 0.020 Oh 75,000.00 1,500.00
- Tukang Cat 0.063 Oh 85,000.00 5,355.00
- Kepala Tukang 0.0063 Oh 95,000.00 598.50
- Mandor 0.0025 Oh 100,000.00 250.00
B BAHAN
- Plamir 0.100 Kg 13,250.00 1,325.00
- Cat Dasar 0.100 Kg 19,400.00 1,940.00
- Cat Penutup 2x 0.260 Kg 19,400.00 5,044.00
C PERALATAN
D Jumlah (A+B+C) 16,012.50
E Overhead & Profit (15%) 2,401.88
F Harga Satuan Pekerjaan (D+E) 18,414.38
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 376
1 2 3 4 5 6 7
- Mandor 0.0013 Oh 100,000.00 130.00
B BAHAN
- Cat Meni 0.100 Kg 32,250.00 3,225.00
- Cat 0.080 Kg 63,750.00 5,100.00
- Kuas 0.010 Bh 19,000.00 190.00
- Thinner 0.010 Ltr 17,750.00 177.50
C PERALATAN
D Jumlah (A+B+C) 51,197.50
E Overhead & Profit (15%) 7,679.63
F Harga Satuan Pekerjaan (D+E) 58,877.13
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 377
1 2 3 4 5 6 7
C PERALATAN
D Jumlah (A+B+C) 55,165.00
E Overhead & Profit (15%) 8,274.75
F Harga Satuan Pekerjaan (D+E) 63,439.75
16 1 m2 Pengecatan Weathershield
A TENAGA
- Pekerja 0.020 Oh 75,000.00 1,500.00
- Tukang Cat 0.063 Oh 85,000.00 5,355.00
- Kepala Tukang 0.0063 Oh 95,000.00 598.50
- Mandor 0.0025 Oh 100,000.00 250.00
B BAHAN
- Cat Dasar (sealer) 0.100 Lt 42,000.00 4,200.00
- Cat Weathershield 2x 0.260 Lt 115,000.00 29,900.00
C PERALATAN
D Jumlah (A+B+C) 41,803.50
E Overhead & Profit (15%) 6,270.53
F Harga Satuan Pekerjaan (D+E) 48,074.03
17 1 m2 Coating Beton
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 378
1 2 3 4 5 6 7
A TENAGA
- Pekerja 0.070 Oh 75,000.00 5,250.00
- Tukang Cat 0.075 Oh 85,000.00 6,375.00
- Kepala Tukang 0.0075 Oh 95,000.00 712.50
- Mandor 0.0025 Oh 100,000.00 250.00
B BAHAN
- Coating Beton (setara SIKA Top 107) 1.500 kg 41,250.00 61,875.00
C PERALATAN
D Jumlah (A+B+C) 74,462.50
E Overhead & Profit (15%) 11,169.38
F Harga Satuan Pekerjaan (D+E) 85,631.88
C PERALATAN
D Jumlah (A+B+C) *40% 5,035.00
E Overhead & Profit (15%) 755.25
F Harga Satuan Pekerjaan (D+E) 5,790.25
2 Memasang 1 buah Toilet Duduk tipe CW705ENJ/TV150NSV7J (komplit Flushing) ex. TOTO
A TENAGA
- Pekerja 3.300 Oh 75,000.00 247,500.00
- Tukang Batu 1.100 Oh 85,000.00 93,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.160 Oh 100,000.00 16,000.00
B BAHAN
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 380
1 2 3 4 5 6 7
- Toilet Duduk tipe CW705ENJ/TV150NSV7J (komplit Flushi 1.000 set 5,100,000.00 5,100,000.00
- Perlengkapan 0.060 hrg 5,100,000.00 306,000.00
C PERALATAN
D Jumlah (A+B+C) 5,763,950.00
E Overhead & Profit (15%) 864,592.50
F Harga Satuan Pekerjaan (D+E) 6,628,542.50
3 Memasang 1 buah Toilet Duduk tipe CW705ELNJ/TV150NSV7J (komplit Flushing) ex. TOTO untuk disabled user
TENAGA
- Pekerja 3.300 Oh 75,000.00 247,500.00
- Tukang Batu 1.100 Oh 85,000.00 93,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.160 Oh 100,000.00 16,000.00
BAHAN
- Toilet Duduk tipe CW705ELNJ/TV150NSV7J (komplit Flush 1.000 set 5,270,000.00 5,270,000.00
- Perlengkapan 0.060 hrg 5,270,000.00 316,200.00
PERALATAN
Jumlah (A+B+C) 5,944,150.00
Overhead & Profit (15%) 891,622.50
Harga Satuan Pekerjaan (D+E) 6,835,772.50
5 Memasang 1 buah Toilet Jongkok tipe CE9/TV150NWV12J (komplit Flushing) ex. TOTO
A TENAGA
- Pekerja 1.000 Oh 75,000.00 75,000.00
- Tukang Batu 1.500 Oh 85,000.00 127,500.00
- Kepala Tukang 0.150 Oh 95,000.00 14,250.00
- Mandor 0.160 Oh 100,000.00 16,000.00
B BAHAN
- Toilet Jongkok tipe CE9/TV150NWV12J (komplit Flushing) 1.000 set 3,540,000.00 3,540,000.00
- Semen portland 6.000 Kg 1,200.00 7,200.00
- Pasir pasang 0.010 M3 125,000.00 1,250.00
C PERALATAN
D Jumlah (A+B+C) 3,781,200.00
E Overhead & Profit (15%) 567,180.00
F Harga Satuan Pekerjaan (D+E) 4,348,380.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 381
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 382
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 383
1 2 3 4 5 6 7
12 Memasang 1 buah bak mandi fiber glass
A TENAGA
- Pekerja 0.300 Oh 75,000.00 22,500.00
- Tukang Batu 0.450 Oh 85,000.00 38,250.00
- Kepala Tukang 0.045 Oh 95,000.00 4,275.00
- Mandor 0.0150 Oh 100,000.00 1,500.00
B BAHAN
- Bak fiberglass 1.000 Bh 230,000.00 230,000.00
- Perlengkapan 0.120 hrg 230,000.00 27,600.00
C PERALATAN
D Jumlah (A+B+C) 324,125.00
E Overhead & Profit (15%) 48,618.75
F Harga Satuan Pekerjaan (D+E) 372,743.75
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 384
1 2 3 4 5 6 7
- Avuur Lantai Stainless tipe TX1AN ex. TOTO 1.000 Bh 377,000.00 377,000.00
C PERALATAN
D Jumlah (A+B+C) 387,700.00
E Overhead & Profit (15%) 58,155.00
F Harga Satuan Pekerjaan (D+E) 445,855.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 385
1 2 3 4 5 6 7
19 Memasang 1 BH Kran air dinding+jet shower tipe TX423ST1 ex. TOTO
A TENAGA
- Pekerja 0.010 Oh 75,000.00 750.00
- Tukang Batu 0.100 Oh 85,000.00 8,500.00
- Kepala Tukang 0.010 Oh 95,000.00 950.00
- Mandor 0.005 Oh 100,000.00 500.00
B BAHAN
- Kran air dinding+jet shower tipe TX423ST1 ex. TOTO 1.000 Bh 597,000.00 597,000.00
- Seal Tape 0.025 Bh 3,000.00 75.00
C PERALATAN
D Jumlah (A+B+C) 607,775.00
E Overhead & Profit (15%) 91,166.25
F Harga Satuan Pekerjaan (D+E) 698,941.25
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 386
1 2 3 4 5 6 7
22 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A TENAGA
- Pekerja 2.160 Oh 75,000.00 162,000.00
- Tukang Batu 0.720 Oh 85,000.00 61,200.00
- Kepala Tukang 0.072 Oh 95,000.00 6,840.00
- Mandor 0.011 Oh 100,000.00 1,100.00
B BAHAN
- Bata Merah 40.000 bh 625.00 25,000.00
- Semen portland 44.000 kg 1,200.00 52,800.00
- Pasir Pasang 0.070 m3 125,000.00 8,750.00
- Pasir Beton 0.060 m3 350,000.00 21,000.00
- Kerikil 0.070 m3 312,500.00 21,875.00
- Besi Tulangan 1.600 kg 7,612.00 12,179.20
C PERALATAN
D Jumlah (A+B+C) 372,744.20
E Overhead & Profit (15%) 55,911.63
F Harga Satuan Pekerjaan (D+E) 428,655.83
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 387
1 2 3 4 5 6 7
- Semen portland 114.000 Kg 1,200.00 136,800.00
- Pasir Pasang 0.184 M3 125,000.00 23,000.00
- Pasir Beton 0.120 M3 350,000.00 42,000.00
- Kerikil 0.033 M3 312,500.00 10,312.50
- Besi Tulangan 4.850 Kg 7,612.00 36,918.20
C PERALATAN
D Jumlah (A+B+C) 666,300.70
E Overhead & Profit (15%) 99,945.11
F Harga Satuan Pekerjaan (D+E) 766,245.81
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 388
1 2 3 4 5 6 7
- Pipa PVC 1.200 M' 9,812.50 11,775.00
- Perlengkapan 0.350 Hrg 9,812.50 3,434.38
C PERALATAN
D Jumlah (A+B+C) 23,759.38
E Overhead & Profit (15%) 3,563.91
F Harga Satuan Pekerjaan (D+E) 27,323.28
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 389
1 2 3 4 5 6 7
31 Memasang 1 m' pipa PVC diameter 2" (D)
A TENAGA
- Pekerja 0.054 Oh 75,000.00 4,050.00
- Tukang Batu 0.090 Oh 85,000.00 7,650.00
- Kepala Tukang 0.0090 Oh 95,000.00 855.00
- Mandor 0.0027 Oh 100,000.00 270.00
B BAHAN
- Pipa PVC 1.200 M' 12,833.33 15,400.00
- Perlengkapan 0.350 Hrg 12,833.33 4,491.67
C PERALATAN
D Jumlah (A+B+C) 32,716.67
E Overhead & Profit (15%) 4,907.50
F Harga Satuan Pekerjaan (D+E) 37,624.17
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 390
1 2 3 4 5 6 7
B BAHAN
- Pipa Galvanis 1.200 M' 19,500.00 23,400.00
- Perlengkapan 0.350 Hrg 19,500.00 6,825.00
C PERALATAN
D Jumlah (A+B+C) 45,480.00
E Overhead & Profit (15%) 6,822.00
F Harga Satuan Pekerjaan (D+E) 52,302.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 391
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 392
1 2 3 4 5 6 7
B BAHAN -
- Pipa Galvanis tebal 1.200 M' 91,666.67 110,000.00
- Perlengkapan 0.350 Hrg 91,666.67 32,083.33
C PERALATAN
D Jumlah (A+B+C) 174,150.83
E Overhead & Profit (15%) 26,122.63
F Harga Satuan Pekerjaan (D+E) 200,273.46
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 393
1 2 3 4 5 6 7
- Semen 6.048 zak 48,000.00 290,304.00
- Air 20.250 liter 25.00 506.25
- Besi Beton 15.509 kg 7,612.00 118,054.51
- Bendrat 0.222 kg 13,750.00 3,052.50
- Paku 0.196 kg 12,500.00 2,450.00
- Minyak Bekisting 0.400 ltr 56,700.00 22,680.00
- Perancah 0.016 m3 3,600,000.00 57,600.00
- Plywood 0.275 lbr 115,000.00 31,625.00
- Ijuk 37.680 kg 13,000.00 489,840.00
C PERALATAN
D Jumlah (A+B+C) 2,256,179.76
E Overhead & Profit (15%) 338,426.96
F Harga Satuan Pekerjaan (D+E) 2,594,606.72
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 394
1 2 3 4 5 6 7
47 Pasang 1 m Buis Beton O 30
A TENAGA
- Pekerja 0.070 Oh 75,000.00 5,250.00
- Tukang Batu 0.035 Oh 85,000.00 2,975.00
- Kepala Tukang 0.0035 Oh 95,000.00 332.50
- Mandor 0.004 Oh 100,000.00 350.00
B BAHAN
- Buis Beton 1.000 M 47,250.00 47,250.00
C PERALATAN
D Jumlah (A+B+C) 56,157.50
E Overhead & Profit (15%) 8,423.63
F Harga Satuan Pekerjaan (D+E) 64,581.13
XV PEKERJAAN PAVING
1 1 m2 Pasang Paving K 400 abu-abu tebal 6 cm
A TENAGA
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.030 Oh 95,000.00 2,850.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Paving stone K 400 abu-abu 1.000 M2 81,000.00 81,000.00
C PERALATAN
D Jumlah (A+B+C) 118,350.00
E Overhead & Profit (15%) 17,752.50
F Harga Satuan Pekerjaan (D+E) 136,102.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 396
1 2 3 4 5 6 7
- Pekerja 0.200 Oh 75,000.00 15,000.00
- Tukang Batu 0.200 Oh 85,000.00 17,000.00
- Kepala Tukang 0.030 Oh 95,000.00 2,850.00
- Mandor 0.025 Oh 100,000.00 2,500.00
B BAHAN
- Paving stone K 300 abu-abu 1.000 M2 92,500.00 92,500.00
C PERALATAN
D Jumlah (A+B+C) 129,850.00
E Overhead & Profit (15%) 19,477.50
F Harga Satuan Pekerjaan (D+E) 149,327.50
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 398
1 2 3 4 5 6 7
10 1 m1 Pasang Paving Pengunci (Uskup) K500
A TENAGA
- Pekerja 0.06 Oh 75,000.00 4,500.00
- Tukang Batu 0.02 Oh 85,000.00 1,700.00
- Kepala Tukang 0.002 Oh 95,000.00 190.00
- Mandor 0.003 Oh 100,000.00 300.00
B BAHAN
- Paving Pengunci K500 tebal 10 3.200 Bh 0.00 0.00
C PERALATAN
D Jumlah (A+B+C) 6,690.00
E Overhead & Profit (15%) 1,003.50
F Harga Satuan Pekerjaan (D+E) 7,693.50
C PERALATAN
D Jumlah (A+B+C) 250,000.00
E Overhead & Profit (15%) 37,500.00
F Harga Satuan Pekerjaan (D+E) 287,500.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 400
1 2 3 4 5 6 7
6 1 BH Pasang Lampu SL 18 Watt
A TENAGA DAN BAHAN
- Lampu SL 18 watt 1.0000 bh 48,000.00 48,000.00
C PERALATAN
D Jumlah (A+B+C) 48,000.00
E Overhead & Profit (15%) 7,200.00
F Harga Satuan Pekerjaan (D+E) 55,200.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 401
1 2 3 4 5 6 7
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 402
1 2 3 4 5 6 7
19 1 M2 Pas. Rangka Atap Galvalum C.100 t. 1.00 mm
A TENAGA DAN BAHAN
- Rangka atap galvalum type Channel C100 t.1,00 tan 1.0000 m2 160,000.00 160,000.00
C PERALATAN
D Jumlah (A+B+C) 160,000.00
E Overhead & Profit (15%) 24,000.00
F Harga Satuan Pekerjaan (D+E) 184,000.00
Analisa Harga Satuan Pekerjaan 2016 Bidang Cipta Karya - Enginner Estimate 404
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN (AHSP) TAHUN 2017
BIDANG CIPTA KARYA
NO PEKERJAAN AHSP
(Rp.)
I PEKERJAAN PERSIAPAN
1 1 m' Pagar sementara dari seng gelombang tinggi 2 m 486,493.13
2 1 m Pengukuran dan Pemasangan Bouwplank 76,935.00
3 1 m2 Pembuatan gudang semen dan alat-alat 1,388,860.75
4 1 m2 Pembuatan rumah jaga/konstruksi kayu 1,569,520.00
5 1 m2 Pembuatan Stegger dari bambu 333,693.20
6 1 m3 Bongkaran Beton Bertulang 1,226,647.50
7 1 m3 Bongkaran Dinding tembok bata merah 613,323.75
8 1 m2 Membersihkan lapangan dan perataan 14,375.00
II PEKERJAAN TANAH
1 1 m3 Galian Tanah biasa sedalam 1 meter 67,562.50
2 1 m3 Galian Tanah biasa 2 meter 82,800.00
3 1 m3 Galian Tanah biasa 3 meter 98,267.50
4 1 m3 Galian Tanah keras 1 meter 89,930.00
5 1 m3 Galian cadas Keras 1 meter 136,275.00
6 1 m3 Galian Lumpur sedalam 1 meter 108,675.00
7 1 m' Galian bor Strouze (Dia =30 cm ) 93,351.25
8 1 m' Pembuangan Tanah Sejauh 30 meter 29,612.50
9 1 m3 Urugan kembali 48,875.00
10 1 m3 Pemadatan tanah ( per 20 cm ) 48,875.00
11 1 m3 Urugan Pasir 165,025.00
12 1 m3 Urugan Sirtu Padat 162,437.50
13 1 m3 Urugan Sirdas 121,037.50
IV PEKERJAAN BETON
1 1 M3 Membuat Beton Mutu f'c = 7,4 Mpa (K 100) 1,044,614.00
2 1 M3 Membuat Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K 100) 985,413.70
3 1 M3 Membuat Beton Mutu f'c = 14,5 Mpa (K 175) 1,130,282.61
4 1 M3 Membuat Beton Mutu f'c = 19,3 Mpa (K 225) 1,179,349.28
5 1 M3 Membuat Beton Mutu f'c = 26,4 Mpa (K 300) 1,225,500.48
6 1 M3 Membuat Beton Mutu f'c = 31,2 Mpa (K 350) 1,313,623.70
7 1 Kg Pembesian dengan besi polos 10,839.15
1 Kg Pembesian dengan besi polos ulir 10,945.41
8 1 m2 Pasang Bekisting untuk pondasi 246,606.00
9 1 m2 Pasang Bekisting untuk sloof 267,306.00
10 1 m2 Pasang Bekisting untuk kolom bebas 393,386.25
11 1 m2 Pasang Bekisting untuk balok 405,806.25
12 1 m2 Pasang Bekisting untuk plat lantai 425,126.25
13 1 m2 Pasang Bekisting untuk dinding 380,621.25
14 1 m2 Pasang Bekisting untuk tangga 351,687.25
15 1 m3 Membuat sloof BETON BERTULANG (200 kg besi + bekisting) 4,879,363.75
16 1 m' Membuat kolom praktis beton bertulang (11 x 11) cm 76,050.65
17 1 m' Membuat ring balok beton bertulang (10 x 15) cm 99,725.93
18 1 M3 Pekerjaan kolom beton 15/20 6,898,351.21
19 1 M3 Pekerjaan kolom beton 15/25 6,274,593.80
20 1 M3 Pekerjaan kolom beton 15/30 5,676,935.96
21 1 M3 Pekerjaan kolom beton 20/20 6,396,070.37
23 1 M3 Pekerjaan kolom beton 30/30 bwh 4,662,291.92
24 1 M3 Pekerjaan kolom beton 30/30 atas 4,504,670.92
26 1 M3 Pekerjaan balok beton 15/20 7,099,620.38
27 1 M3 Pekerjaan balok beton 15/25 6,574,555.96
28 1 M3 Pekerjaan balok beton 15/30 6,042,693.46
29 1 M3 Pekerjaan balok beton 20/30 5,907,004.19
30 1 M3 Pekerjaan balok beton 20/40 5,284,077.94
31 1 M3 Pekerjaan balok beton 30/40 4,936,544.73
32 1 M3 Pekerjaan balok beton 30/50 4,481,653.88
33 1 M3 Pekerjaan balok beton 30/60 4,178,320.98
34 1 M3 Pekerjaan sloof beton 15/20 4,048,687.61
35 1 M3 Pekerjaan sloof beton 20/30 4,031,175.15
XI PEKERJAAN KAYU
1 1 m3 Pasang Kusen Pintu dan Jendela Kayu Jati 14,595,656.25
2 1 m3 Pasang Kusen Pintu dan Jendela Kayu Kamper 11,394,631.25
3 1 m3 Pasang Kusen Pintu dan Jendela Kayu Maeranti A 9,715,631.25
4 1 m2 Pasang Pintu Panel Kayu Jati kelas I 847,981.25
5 1 m2 Pasang Pintu Panel Kayu Kamper 758,281.25
6 1 m2 Pasang Pintu Panel Kayu Meranti A 673,181.25
7 1 m2 Pasang Pintu dan Jendela Jalusi Kayu Jati Kelas II 958,381.25
8 1 m2 Pasang Rangka Pintu / jendela Tanpa Kaca Kayu Kamper 538,573.75
9 1 m2 Pasang Rangka Pintu / jendela Tanpa Kaca Kayu Meranti A 487,513.75
10 1 m2 Pasang jalusi Kusen Kayu Jati Kelas I 950,618.75
11 1 m2 Pasang jalusi Kusen Kayu Kamper 816,068.75
12 1 m2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kamper 612,547.50
13 1 m2 Pasang Pintu Doubel Teakwood, Rangka Kayu Meranti 597,942.50
14 1 m2 Pasang Pintu Doubel Teakwood Lapis Almunium, Rangka Kayu Meranti 732,578.75
15 1 m3 Pasang Konstruksi Kuda-kuda Ekspose Kayu Jati Kelas Kuat I 15,692,256.00
16 1 m3 Pasang Konstruksi Kuda-kuda kayu Kruing 8,508,838.50
17 1 m3 Pasang Konstruksi Kuda-kuda Kayu Meranti A 8,445,588.50
18 1 m3 Pasang Konstruksi Kuda-kuda lama 916,550.00
19 1 m3 Pasang Konstruksi Gording Kayu Meranti A 7,739,373.50
20 1 m3 Pasang Konstruksi Gording Lama 544,755.00
21 1 m2 Pasang rangka atap genteng kayu Meranti A 127,926.00
22 1 m2 Pasang rangka atap genteng kayu kruing 128,938.00
23 1 m2 Pasang rangka atap genteng beton kayu kruing 151,656.25
24 1 m2 Pasang Kaso (5/7) Kayu Meranti A 95,550.63
25 1 m2 Reng (2/3) Kayu Meranti A 33,358.63
26 1 m2 Reng (3/5) Kayu Meranti A 54,886.63
27 1 m' Pasang Lisplank ukuran (3x20) cm, Kayu Kamper 125,522.50
28 1 m' Pasang Lisplank ukuran (3x20) cm, Kayu Meranti A 99,440.50
29 1 m' Pasang Lisplank ukuran (3x30) cm, Kayu Kamper 126,528.75
30 1 m' Pasang Lisplank ukuran (3x30) cm, Kayu Meranti A 99,963.75
31 1 m' Pasang Lisplank Kalsium ukuran 20 cm tebal 8 mm 77,147.75
32 1 m' Pasang Lisplank Kalsium ukuran 30 cm tebal 8 mm 99,848.75
33 1 m' Papan Kompres kayu Meranti 51,140.50
34 1 m2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Meranti (MA) 323,989.50
35 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu meranti 310,218.25
XV PEKERJAAN PAVING
1 1 m2 Pasang Paving K 400 abu-abu tebal 6 cm 136,102.50
2 1 m2 Pasang Paving K 300 abu-abu tebal 6 cm 119,427.50
3 1 m2 Pasang Paving K 300 warna tebal 6 cm 127,477.50
4 1 m2 Pasang Paving K 300 abu-abu tebal 8 cm 149,327.50
5 1 m2 Pasang Paving K 400 polos t. 8 cm 157,952.50
6 1 m1 Pasang Kanstin 10,20,40 84,496.25
7 1 m1 Pasang Paving Pengunci (Uskup) K300 28,566.00
8 1 m1 Pasang Kanstin 15,30,50 144,670.00
B PEKERJAAN TANAH
1 Galian Tanah Semi IPAL (>2 meter) 2.30 4.80
2 Galian Tanah Bak Kontrol(<1 meter) 0.60 0.60
3 Galian Tanah Selokan (<1 meter) 61.00 0.50
4 Galian Tanah Perpipaan (<1 meter) 93.00 0.40
5 Galian Tanah Pondasi Shaft (<1 meter) 0.85 0.80
6 Urugan Pasir Bawah Semi IPAL 2.30 4.80
7 Urugan Pasir Bawah Bak Kontrol 0.60 0.60
8 Urugan Pasir Bawah Selokan 61.00 0.50
9 Urugan Pasir Bawah Pondasi Shaft 0.85 0.80
10 Urugan Tanah Kembali
11 Pembuangan Tanah
C PEKERJAAN LANTAI
1 Pasang Paving Lama
2 Pasang Lantai Keramik Warna Uk. 20 x 20 cm
3 Waterproofing Lantai KM/WC
D PEKERJAAN DINDING
1 Keramik Dinding Warna Uk.20x25cm KW I 7.00 2.95
24.50 2.95
8.00 2.95
29.00 2.95
23.00 2.95
2 Pasangan 1/2 Bata 1 Pc : 3 Ps 0.78 2.00
3 List Keramik Dinding Uk. 5 x 20 cm KW I 6.30
22.25
7.30
24.80
19.50
4 Waterproofing dinding KM/WC
5 Meja Wastafel Baru Plat Beton Tebal 7 cm 3.50 0.60
6 Pasang Keramik Warna Uk. 20 x 20 cm Untuk Meja Wastafel 3.50 0.12
E PEKERJAAN PLAFON
1 Rangka Plafon KM/WC Lt-1 dan Lt.2
2 Plafon Gypsum Board KM/WC Lt 1 dan 2
3 List Plafon Gypsum
F PEKERJAAN PENGECATAN
1 Pengecatan dinding luar KM/WC 6.25 3.75
4.00 3.75
7.25 3.75
5.25 3.75
3.50 3.75
2 Pengikisan dan Pengerokan Bidang Cat Lama
3 Pencucian dinding yang pernah di cat
4 Pengecatan Plafon KM/WC
5 Pengecatan List Plafon Plafon KM/WC 225.50 0.08
H PEKERJAAN SANITASI
1 Pasang Kloset Duduk/ monoblock
2 Pasang Wastafel
3 Bak air fiber uk. 66x66x70 Ivory ex Gator
4 Pasang Floordrain Baru
5 Kran dinding diameter 1/2" tipe TX 609 K
6 Pasang Tempat Sabun Cair Baru
10 Shaft
-Lantai Kerja beton K-100 0.85 0.80
-Kolom 15/15 5.50 0.15
-Balok 15/20 2.10 0.15
-Pondasi Pelat Beton K-225 0.85 0.80
- Pelat Atap Beton K-225 0.50 0.55
-Pas. 1/2 Bata 1 Pc : 3 Ps 0.50 0.55
-Plesteran 1 Pc : 3 Ps
-Acian
-Pengecatan Shaft Baru
-Pintu besi tebal 2 mm 1.00 0.32
-Kusen Aluminium
-Engsel
-Kunci Pintu
K PEKERJAAN LISTRIK
1 Instalasi listrik exhaust fan lt 1, 2
2 Exhaust fan ex. Panasonic
L PEKERJAAN LAIN-LAIN
1 Pembersihan Sisa pembangunan
PEKERJAAN BETON
1 Sloof 15/20 9.43 0.20
2 Pelat lantai kolam tebal 10 cm 7.07 0.20
3 Balok 15/20 9.43 0.20
PEKERJAAN PONDASI
1 Pas. Batu Kali 1 Pc : 4 Ps 9.43 0.35
PEKERJAAN KERAMIK
1 Pasang Granit 60 x 60 CM Untuk Dinding Recepsionist 7.50 3.50
PEKERJAAN PENGECATAN
1 Pengecatan plafon 14.50 8.50
7.50 1.00
2 Pasang Wallpaper Dinding 50.00 1.50
12.50 2.00
3 Coating Batu Alam
4 Coating Waterproofing tanpa serabut
PEKERJAAN LAIN-LAIN
1 Pasang Kembali Meja Resepsionis
2 Pasang Instalasi Kolam lobby
PEKERJAAN TANAH
1 Galian Tanah 140.00 0.60
15.00 3.00
2 Pasir Urug 140.00 0.60
15.00 3.00
3 Urugan Kembali
4 Pembuangan Tanah
PEKERJAAN PONDASI
1 Pas. Batu Kali 1 Pc : 4 Ps 140.00 0.35
33.00 0.50
PEKERJAAN BETON
1 Sloof 15/20 36.00 0.20
2 Beton Rabat K-100 26.00 1.00
3.00 3.00
PEKERJAAN PENGECATAN
1 Coating Batu Alam
PEKERJAAN KERAMIK
1 Keramik Jalan dan Tempat Bendera 3.00 3.00
2.50 9.00
3.00 0.40
26.00 1.00
PEKERJAAN TAMAN
1 Pohon Ketapang Mini
2 Tabebuya Pink
3 Pucuk Merah
934.50 m2
27.00 m
1.00 ls
5.00 2.00 10.50 m3
1.00 112.59 m2
1.00
1.00
1.00 12.00 m2
2.00 99.06 m2
4.00
4.00
1.00
1.00
99.06 m2
1.00 452.40 m2
1.00
4.00
4.00
2.00
0.70 8.00 1.09 m3
1.00 Ls
1.00 Ls
1.00 Ls
112.59 m2
99.06 m2
99.06 m2
99.06 m2
99.06 m2
225.50 m
2.00 248.44 m2
4.00
4.00
1.00
1.00
248.44 m2
248.44 m2
99.06 m2
1.00 18.04 m2
10.00 47.00 m
10.00 14.00 m2
10.00 10.00 bh
10.00 10.00 set
11.00 29.70 m
11.00 7.70 m2
22.00 22.00 set
14.00 50.40 m
28.00 9.24 m2
6.00 12.00 m
6.00 1.98 m2
4.00 1.50 m2
1.00 2.31 m2
6.00 bh
4.00 bh
16.00 bh
18.00 bh
20.00 bh
23.00 bh
281.50 m
92.00 m
3.00 bh
3.00 bh
6.00 bh
6.00 bh
49.00 bh
21.00 bh
20.00 bh
88.00 bh
48.00 bh
1.00 ls
126.39 m
135.46 m
10.98 m
50.00 bh
13.00 bh
26.00 bh
20.00 bh
5.00 ttk
5.00 bh
1.00 Ls
4.00 11.64 m2
2.00 9.60 m2
2.00 5.45 m2
2.00 5.45 m2
4.00 2.80 m2
2.00 0.80 m
4.00 bh
4.00 set
4.00 5.76 m2
4.00 5.48 m2
4.00 5.48 m2
1.00 1.60 m2
1.00 bh
2.00 set
4.00 6.00 m2
4.00 11.00 m2
4.00 12.98 m2
1.00
8.00 bh
2.00 set
1.00 ls
1.00 ls
1.00 9.00 m2
1.00 ls
100.00 m2
0.50 1.00 2.36 m3
0.50 1.00 4.50 m3
0.59 m3
1.77 m3
1.00 7.07 m2
1.00 3.30 m2
1.00 3.30 m2
2.00 7.54 m2
1.00 26.25 m2
1.00 130.75 m2
1.00
1.00 100.00 m2
1.00
7.54 m2
7.54 m2
1.00 Ls
1.00 Ls
1.00 770.00 m2
0.15 4.00 17.40 m3
0.15 4.00
1.00 69.00 m2
2.00
1.00 36.20 m2
1.00
72.40 m2
2.00 139.59 m2
36.20 m2
1.00 88.30 m2
1.00
4.00
2.00
8.00 bh
8.00 bh
8.00 bh
60.00 bh
60.00 bh
60.00 bh
1.00 set
1.00 set
1.00 set
1.00 set
REKAPITULASI VOLUME
NO PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Peratan
2 Uitzet dan Pengukuran
3 Pembuatan Direksi Keet
4 Bongkar Shaft Lama
5 Bongkar Paving
6 Bongkar Keramik Luar
7 Bongkar Plafon KM/WC
8 Bongkar Keramik Lantai KM/WC
9 Bongkar Keramik Dinding KM/WC
10 Bongkar Bak Mandi Lama
11 Bongkar Peralatan Sanitari
12 Bongkar Pintu dan Jendela Lama
13 Mobilisasi dan Demobilisasi
B PEKERJAAN TANAH
1 Galian Tanah Semi IPAL (>2 meter)
2 Galian Tanah Bak Kontrol(<1 meter)
3 Galian Tanah Selokan (<1 meter)
4 Galian Tanah Perpipaan (<1 meter)
5 Galian Tanah Pondasi Shaft (<1 meter)
6 Urugan Pasir Bawah Semi IPAL
7 Urugan Pasir Bawah Bak Kontrol
8 Urugan Pasir Bawah Selokan
9 Urugan Pasir Bawah Pondasi Shaft
10 Urugan Tanah Kembali
11 Pembuangan Tanah
C PEKERJAAN LANTAI
1 Pasang Paving Lama
2 Pasang Lantai Keramik Warna Uk. 20 x 20 cm
3 Waterproofing Lantai KM/WC
D PEKERJAAN DINDING
1 Keramik Dinding Warna Uk.20x25cm KW I
2 Pasangan 1/2 Bata 1 Pc : 3 Ps
3 List Keramik Dinding Uk. 5 x 20 cm KW I
4 Waterproofing dinding KM/WC
5 Meja Wastafel Baru Plat Beton Tebal 7 cm
6 Pasang Keramik Warna Uk. 20 x 20 cm Untuk Meja Wastafel
E PEKERJAAN PLAFON
1 Rangka Plafon KM/WC Lt-1 dan Lt.2
2 Plafon Gypsum Board KM/WC Lt 1 dan 2
3 List Plafon Gypsum
F PEKERJAAN PENGECATAN
1 Pengecatan dinding luar KM/WC
2 Pengikisan dan Pengerokan Bidang Cat Lama
3 Pencucian dinding yang pernah di cat
4 Pengecatan Plafon KM/WC
5 Pengecatan List Plafon Plafon KM/WC
H PEKERJAAN SANITASI
1 Pasang Kloset Duduk/ monoblock
2 Pasang Wastafel
3 Bak air fiber uk. 66x66x70 Ivory ex Gator
4 Pasang Floordrain Baru
5 Kran dinding diameter 1/2" tipe TX 609 K
6 Pasang Tempat Sabun Cair Baru
10 Shaft
-Lantai Kerja beton K-100
-Kolom 15/15
-Balok 15/20
-Pondasi Pelat Beton K-225
- Pelat Atap Beton K-225
-Pas. 1/2 Bata 1 Pc : 3 Ps
-Plesteran 1 Pc : 3 Ps
-Acian
-Pengecatan Shaft Baru
-Pintu besi tebal 2 mm
-Kusen Aluminium
-Engsel
-Kunci Pintu
K PEKERJAAN LISTRIK
1 Instalasi listrik exhaust fan lt 1, 2
2 Exhaust fan ex. Panasonic
L PEKERJAAN LAIN-LAIN
1 Pembersihan Sisa pembangunan
PEKERJAAN TANAH
1 Galian Tanah Kolam
2 Pasir urug
3 Urugan Tanah Kembali
4 Pembuangan Tanah
PEKERJAAN BETON
1 Sloof 15/20
2 Pelat lantai kolam tebal 10 cm
3 Balok 15/20
PEKERJAAN PONDASI
1 Pas. Batu Kali 1 Pc : 4 Ps
PEKERJAAN KERAMIK
1 Pasang Granit 60 x 60 CM Untuk Dinding Recepsionist
PEKERJAAN PENGECATAN
1 Pengecatan plafon
2 Pasang Wallpaper Dinding
3 Coating Batu Alam
4 Coating Waterproofing tanpa serabut
PEKERJAAN LAIN-LAIN
1 Pasang Kembali Meja Resepsionis
2 Pasang Instalasi Kolam lobby
PEKERJAAN TANAH
1 Galian Tanah
2 Pasir Urug
3 Urugan Kembali
4 Pembuangan Tanah
PEKERJAAN PONDASI
1 Pas. Batu Kali 1 Pc : 4 Ps
PEKERJAAN BETON
1 Sloof 15/20
2 Beton Rabat
PEKERJAAN PENGECATAN
1 Coating Batu Alam
PEKERJAAN KERAMIK
1 Keramik Jalan dan Tempat Bendera
PEKERJAAN TAMAN
1 Pohon Ketapang Mini
2 Tabebuya Pink
3 Pucuk Merah
934.50 m2
27.00 m
1.00 ls
10.50 m3
112.59 m2
12.00 m2
99.06 m2
99.06 m2
452.40 m2
1.09 m3
1.00 Ls
1.00 Ls
1.00 Ls
28.70 m3
4.10 m3
289.75 m3
14.88 m3
3.26 m3
0.55 m3
0.34 m3
28.98 m3
0.20 m3
113.57 m3
227.13 m3
112.59 m2
99.06 m2
99.06 m2
608.88 m2
1.56 m2
195.95 m
608.88 m2
0.22 m3
2.28 m2
99.06 m2
99.06 m2
225.50 m
248.44 m2
248.44 m2
248.44 m2
99.06 m2
18.04 m2
47.00 m
14.00 m2
10.00 bh
10.00 set
29.70 m
7.70 m2
22.00 set
50.40 m
9.24 m2
12.00 m
1.98 m2
1.50 m2
2.31 m2
6.00 bh
4.00 bh
16.00 bh
18.00 bh
20.00 bh
23.00 bh
281.50 m
92.00 m
3.00 bh
3.00 bh
6.00 bh
6.00 bh
49.00 bh
21.00 bh
20.00 bh
88.00 bh
48.00 bh
126.39 m
135.46 m
10.98 m
50.00 bh
13.00 bh
26.00 bh
20.00 bh
0.34 m3
1.90 m3
6.84 m2
51.00 bh
330.05 kg
0.55 m3
1.66 m3
1.66 m3
4.21 m3
0.79 m3
0.36 m3
0.69 m3
3.80 m2
7.59 m2
7.59 m2
0.98 m2
80.74 m2
17.98 m
5.75 m3
0.20 m3
2.97 m3
1.51 m3
0.82 m3
0.17 m3
59.16 m2
118.32 m2
59.16 m2
59.16 m2
3.84 m2
31.68 m
12.00 set
12.00 bh
5.00 ttk
5.00 bh
1.00 Ls
11.64 m2
9.60 m2
5.45 m2
5.45 m2
2.80 m2
0.80 m
4.00 bh
4.00 set
5.76 m2
5.48 m2
5.48 m2
1.60 m2
1.00 bh
2.00 set
6.00 m2
11.00 m2
12.98 m2
8.00 bh
2.00 set
1.00 ls
1.00 ls
9.00 m2
1.00 ls
100.00 m2
2.36 m3
4.50 m3
0.59 m3
1.77 m3
7.07 m2
3.30 m2
3.30 m2
7.54 m2
0.28 m3
0.21 m3
0.28 m3
0.99 m3
26.25 m2
130.75 m2
100.00 m2
7.54 m2
7.54 m2
1.00 Ls
1.00 Ls
770.00 m2
17.40 m3
69.00 m2
73.20 m3
8.70 m3
18.30 m3
54.90 m3
31.20 m3
2.16 m3
3.05 m3
36.20 m2
72.40 m2
139.59 m2
36.20 m2
88.30 m2
8.00 bh
8.00 bh
8.00 bh
60.00 bh
60.00 bh
60.00 bh
1.00 set
1.00 set
1.00 set
1.00 set
RENCANA ANGGARAN BIAYA
NO PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Peratan
2 Uitzet dan Pengukuran
3 Pembuatan Direksi Keet
5 Bongkar Shaft Lama
6 Bongkar Paving
7 Bongkar Keramik Luar
8 Bongkar Plafon KM/WC
9 Bongkar Keramik Lantai KM/WC
10 Bongkar Keramik Dinding KM/WC
11 Bongkar Bak Mandi Lama
12 Bongkar Peralatan Sanitari
13 Bongkar Pintu dan Jendela Lama
14 Mobilisasi dan Demobilisasi
B PEKERJAAN TANAH
1 Galian Tanah Semi IPAL (>2 meter)
2 Galian Tanah Bak Kontrol(<1 meter)
3 Galian Tanah Selokan (<1 meter)
4 Galian Tanah Perpipaan (<1 meter)
5 Galian Tanah Pondasi Shaft (<1 meter)
6 Urugan Pasir Bawah Semi IPAL
7 Urugan Pasir Bawah Bak Kontrol
8 Urugan Pasir Bawah Selokan
9 Urugan Pasir Bawah Pondasi Shaft
10 Urugan Tanah Kembali
11 Pembuangan Tanah
C PEKERJAAN LANTAI
1 Pasang Paving Lama
2 Pasang Lantai Keramik Warna Uk. 20 x 20 cm
3 Waterproofing Lantai KM/WC
D PEKERJAAN DINDING
1 Keramik Dinding Warna Uk.20x25cm KW I
2 Pasangan 1/2 Bata 1 Pc : 3 Ps
3 List Keramik Dinding Uk. 5 x 20 cm KW I
4 Waterproofing dinding KM/WC
5 Meja Wastafel Baru Plat Beton Tebal 7 cm
6 Pasang Keramik Warna Uk. 20 x 20 cm Untuk Meja Wastafel
E PEKERJAAN PLAFON
1 Rangka Plafon KM/WC Lt-1 dan Lt.2
2 Plafon Gypsum Board KM/WC Lt 1 dan 2
3 List Plafon Gypsum
F PEKERJAAN PENGECATAN
1 Pengecatan dinding luar KM/WC
2 Pengikisan dan Pengerokan Bidang Cat Lama
3 Pencucian dinding yang pernah di cat
4 Pengecatan Plafon KM/WC
5 Pengecatan List Plafon Plafon KM/WC
H PEKERJAAN SANITASI
1 Pasang Kloset Duduk/ monoblock
2 Pasang Wastafel
3 Bak air fiber uk. 66x66x70 Ivory ex Gator
4 Pasang Floordrain Baru
5 Kran dinding diameter 1/2"
6 Pasang Tempat Sabun Cair Baru
10 Shaft
-Lantai Kerja beton K-100
-Kolom 15/15
-Balok 15/20
-Pondasi Pelat Beton K-225
- Pelat Atap Beton K-225
-Pas. 1/2 Bata 1 Pc : 3 Ps
-Plesteran 1 Pc : 3 Ps
-Acian
-Pengecatan Shaft Baru
-Pintu besi tebal 2 mm
-Kusen Aluminium
-Engsel
-Kunci Pintu
K PEKERJAAN LISTRIK
1 Instalasi listrik exhaust fan lt 1, 2
2 Exhaust fan ex. Panasonic
L PEKERJAAN LAIN-LAIN
1 Pembersihan Sisa pembangunan
PEKERJAAN TANAH
1 Galian Tanah Kolam
2 Pasir urug
3 Urugan Tanah Kembali
4 Pembuangan Tanah
PEKERJAAN BETON
1 Sloof 15/20
2 Pelat lantai kolam tebal 10 cm
3 Balok 15/20
PEKERJAAN PONDASI
1 Pas. Batu Kali 1 Pc : 4 Ps
PEKERJAAN KERAMIK
1 Pasang Granit 60 x 60 CM Untuk Dinding Recepsionist
PEKERJAAN PENGECATAN
1 Pengecatan plafon
2 Penggantian Wallpaper Dinding
4 Coating Batu Alam
5 Coating Waterproofing tanpa serabut
PEKERJAAN LAIN-LAIN
1 Pasang Kembali Meja Resepsionis Dan Tulisan
2 Pasang Instalasi Kolam lobby
PEKERJAAN TANAH
1 Galian Tanah
2 Pasir Urug
3 Urugan Kembali
4 Pembuangan Tanah
PEKERJAAN PONDASI
1 Pas. Batu Kali 1 Pc : 4 Ps
PEKERJAAN BETON
1 Sloof 15/20
2 Beton Rabat
PEKERJAAN PENGECATAN
1 Coating Batu Alam
PEKERJAAN KERAMIK
1 Keramik Jalan dan Tempat Bendera
PEKERJAAN TAMAN
1 Pohon Ketapang Mini
2 Tabebuya Pink
3 Pucuk Merah
TOTAL J Rp 201,344,910.92
NO PEKERJAAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN LANTAI
D PEKERJAAN DINDING
E PEKERJAAN PLAFON
F PEKERJAAN PENGECATAN
H PEKERJAAN SANITASI
K PEKERJAAN LISTRIK
L PEKERJAAN LAIN-LAIN
Q RENOVASI TAMAN
I TOTAL BIAYA
II PPN 10 %
III TOTAL I+II
IV DIBULATKAN
BIAYA
Rp 40,527,857.39
Rp 41,139,460.75
Rp 26,329,377.33
Rp 162,233,195.03
Rp 18,967,383.50
Rp 20,963,777.51
Rp 51,936,167.36
Rp 26,212,640.00
Rp 49,393,459.29
Rp 201,344,910.92
Rp 17,825,000.00
Rp 1,500,000.00
Rp 29,387,862.62
Rp 14,435,998.35
Rp 23,330,790.37
Rp 47,287,303.80
Rp 414,927,064.71
Rp 1,187,742,248.93
Rp 118,774,224.89
Rp 1,306,516,473.82
Rp 1,306,500,000.00 Rp -