HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SAT. SATUAN HARGA
(Rp.) (Rp.)
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 175,000.00 175,000.00
2 Penyediaan Air dan Listrik Kerja 1.00 ls 300,000.00 300,000.00
3 Pasangan Bouplank/Pengukuran 50.00 m' 58,627.00 2,931,350.00
Pembersihan lahan pekerjaan ls 500,000.00 -
4 Pengadaan Los Kerja/Gudang 6.00 m2 846,827.20 5,080,963.20
5 Biaya Pelaporan, administrasi, dokumentasi dan IMB. 1.00 ls 4,000,000.00 4,000,000.00
Jumlah 12,487,313.20
IX PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu 3 x Setara glotek 36.03 m2 55,023.87 1,982,510.04
2 Pengecatan plafond dgn cat tembok 3 x Setara metrolite 133.20 m2 54,774.50 7,295,963.40
3 Pengecatan dinding dgn cat tembok 3 x Setara metrolite 317.55 m2 53,927.50 17,124,677.63
Pengecatan folding gate Setara glotek m2 55,023.87 -
Jumlah 26,403,151.06
Serang, 2013
DIPERIKSA / MENYETUJUI : KONSULTAN PERENCANA
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) PT. JASA BINA SARI MUSTIKA
DINAS PENDIDIKAN KOTA SERANG
MENGETAHUI / MENYETUJUI :
KEPALA DINAS PENDIDIKAN
KOTA SERANG
Serang, 2013
DIPERIKSA KONSULTAN PERENCANA
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) PT. JASA BINA SARI MUSTIKA
DINAS PENDIDIKAN KOTA SERANG
MENGETAHUI MENYETUJUI
KEPALA DINAS PENDIDIKAN PEJABAT PEMBUAT KOMITMEN (PPK)
KOTA SERANG DINAS PENDIDIKAN KOTA SERANG
DIAT HERMAWAN. S, ST
Nip. 19760426 200112 1 002
(62,578,000.00)
16.67 5.33
- 4,376,277.63 KM
13.33 13.47
- 5,267,098.12
20.00 14.00
- 4,837,416.35 TERAS
21.67 8.23
- 4,531,177.65
24.33 16.67
6,074,210.13 BALK 15/20
- 10.00
P
5.00
4.70 2.3495
(62,578,000.00)
m2
m2
244,333,333.33
171,819,012.74
(62,578,000.00)
189,000,000.00
DIPERIKSA / MENYETUJUI :
KEPALA BIDANG CIPTA KARYA
DPU KOTA SERANG
DIAT HERMAWAN. S, ST
Nip. 19760426 200112 1 002
DAK BETON 10 CM
P L T Jumlah
0.25
BALK 15/20 -
L T Jumlah
0.15 0.20 0.15 m3
DAUN JENDELA
P L BH Jumlah
1.10 0.55 8.00 4.84 m2
PENGECATAN LISPLANK
P L Jumlah
38.00 0.28 10.64 m2
RENCANA ANGGARAN BIAYA
Kegiatan : PEMELIHARAAN GEDUNG PUSKESMAS
Pekerjaan : PEMBANGUNAN GEDUNG UNIT GAWAT DARURAT (UGD)
Lokasi : UPT PUSKESMAS CIPOCOK JAYA KOTA SERANG
Tahun Anggaran :2017
HARGA JUMLAH
NO URAIAN PEKERJAAN SPESIFIKASI VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan pasangan bouwplank 1.00 ls 500,000.00 500,000.00
2 Pembuatan Papan nama proyek 1.00 ls 150,000.00 150,000.00
3 Penyediaan Air dan listrik kerja 1.00 ls 2,000,000.00 2,000,000.00
4 Biaya Pelaporan, administrasi dan dokumentasi 1.00 ls 2,500,000.00 2,500,000.00
Jumlah 5,150,000.00
D PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 1,500,000.00 1,500,000.00
Jumlah 1,500,000.00
REKAPITULASI ANGGARAN BIAYA
Terbilang : ( TUJUH RATUS TIGA PULUH JUTA ENAM RATUS ENAM PULUH SATU RIBU RUPIAH )
Serang, 2017
KEPALA DINAS KESEHATAN KOTA SERANG DINAS KESEHATAN KOTA SERANG
PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN
HARGA
NO KODE URAIAN PEKERJAAN SATUAN
(Rp.)
1 2 3 4
1 150.01 1 M2 PEK. PERATAAN TANAH 20,680.00
2 150.02 1 M3 PEK. GALIAN TANAH BIASA KEDALAMAN 1 M' 61,462.50
3 150.06 1 M3 URUGAN KEMBALI PONDASI DIHITUNG 1/4 DARI GALIAN 15,909.85
4 150.07 1 M3 PEMADATAN TANAH ( TIAP 20 CM) TANAH DARI LUAR 108,130.00
5 150.09 1 M3 URUGAN PASIR URUG 248,985.00
6 200.01 1 M3 LANTAI KERJA / BETON TUMBUK 1 PC : 3 PS : 5 KRL 855,233.50
7 200.05 1 M3 PAS. BATU KALI 1:4 879,791.00
8 200.07 1 M2 BATU TEMPEL + SIARAN 178,790.00
9 250.03 1 M2 PAS. BATA MERAH TEBAL 1/2 BATA 1:4 106,865.00
10 250.07 1 M2 PLESTERAN DINDING 1:5 TEBAL 15 MM 54,911.65
11 300.02 1 M2 LANTAI KERAMIK 40x40 DN PUTIH KW I (Granito) 252,027.60
11 1 M2 DINDING KERAMIK 20X20 BERCORAK/BERWARNA KW I 195,666.00
12 300.03 1 M2 DINDING KERAMIK 20X25 BERCORAK/BERWARNA KW I 215,232.60
13 300.06 1 M2 ACIAN 32,164.00
14 350.06 1 M2 BEKISTINK UNTUK KOLOM 394,465.50
15 350.07 1 M2 BEKISTINK UNTUK BALOK 404,811.00
16 350.10 1 M3 COR BETON SITE MIX K.175 1,027,391.01
17 350.11 1 M3 COR BETON SITE MIX K. 225 1,096,017.91
18 350.12 1 KG PEMBESIAN DNG BESI POLOS / BESI ULIR 17,294.75
19 350.09 I KG BESI BETON TERPASANG U. 39 18,572.95
20 400.01 1 M3 PASANG KONSTRUKSI KUDA2 KAYU KLAS II 5,337,970.00
21 1 M3 PASANG KONSTRUKSI GORDING KAYU KLAS II 4,293,000.00
22 400.02 1 M2 PASANG KONSOL / OVERSTEEK KAYU KLAS II 5,166,200.00
23 400.03 1 M2 PEK. KONST. BAJA RINGAN ZINCALLUM G.550 162,140.00
24 400.06 1 M1 PEKERJAAN LISPLANK GRC 49,830.00
25 400.08 1 M3 KUSEN KAYU KLAS II 6,485,187.50
26 400.10 1 M2 DAUN PINTU PANIL KAYU KLAS II 568,700.00
27 400.15 1 M2 DAUN JENDELA KACA (TANPA KACA) 414,920.00
28 450.06 1 M2 PASANG RANGKA LANGIT-LANGIT (50 x 100) cm, KAYU TERENTANG 86,482.00
29 450.07 1 M2 PASANG RANGKA LANGIT-LANGIT BESI HOLLOW 71,850.24
30 450.12 1 M2 LANGIT-LANGIT GYPSUM BOARD UKURAN (1200 x 2400 x 9 ) MM 57,556.62
31 450.13 1 M2 LANGIT-LANGIT GRC UKURAN (1200 x 2400 x 9 ) MM 44,143.22
32 500.12 1 M' PAANG LIST GYPSUM PROFIL 40,705.50
33 600.01 1 M2 PENGECATAN DINDING DG METROLITE ( 3X) 53,927.50
34 600.02 1 M2 PENGECATAN PLAFOND DG METROLITE ( 3X) 54,774.50
35 600.07 1 M2 PENGECATAN KAYU (3X) BERIKUT MENI 55,023.87
36 600.08 1 M2 CAT BESI (3X) 59,804.50
37 650.01 1 BH PASANG KUNCI TANAM 178,953.50
38 650.02 1 BH PASANG ENGSEL PINTU 25,540.63
39 650.03 1 BH PASANGAN GRENDEL 28,913.50
40 650.04 1 BH PASANG ENGSEL JENDELA 16,263.50
HARGA
NO KODE URAIAN PEKERJAAN SATUAN
(Rp.)
1 2 3 4
41 650.05 I BH PASANG KAIT ANGIN 15,668.75
42 650.07 1 M2 PASANG KACA POLOS TEBAL 5 MM 154,735.63
43 700.01 1 M1 SALURAN PASANGAN BATA AD. 1:4 99,118.47
44 750.01 MEMASANG 1 BH WASTAFEL 1,189,550.00
45 750.02 MEMASANG 1 BH KLOSET JONGKOK 468,070.00
46 750.03 MEMASANG 1 BH KLOSET DUDUK 2,564,705.00
47 750.04 1 M' MEMASANG PIPA PVC TIPE AW DIA. 1/2" 14,956.25
48 750.05 1 M' MEMASANG PIPA PVC TIPE AW DIA. 3/4" 17,668.75
49 750.06 1 M' MEMASANG PIPA PVC TIPE AW DIA. 1" 20,381.25
50 750.07 1 M' MEMASANG PIPA PVC TIPE AW DIA. 1 1/2" 28,712.50
51 750.08 1 M' MEMASANG PIPA PVC TIPE AW DIA. 2" 37,478.40
52 750.09 1 M' MEMASANG PIPA PVC TIPE AW DIA. 3" 70,711.00
53 750.10 1 M' MEMASANG PIPA PVC TIPE AW DIA. 4" 103,648.50
54 750.11 MEMASANG 1 BH KRAN AIR DIA. 3/4" ATAU 1/2" 76,385.00
55 750.12 MEMASANG 1 BH FLOOR DRAIN 60,285.00
56 750.13 MASANG 1 BH BAK MANDI FIBERGLASS volume 0,30 m3 566,520.00
57 750.14 MEMBUAT 1 BH BAK MANDI BATU BATA VOL 0,3 M3 1,344,900.00
58 800.01 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA 6,913,947.49
59 800.10 1 M' PASANG NOK GENTENG METAL RAIN BOW (pasir) 74,497.50
60 800.11 1 M2 PASANG ATAP GENTENG METAL 109,939.50
GALIAN PONDASI MEMANJANG
P L T Jumlah
132.00 0.60 0.80 63.36 m3
PAS. PONDASI
P L Atas L Bawah T Jumlah
132.00 0.35 0.60 0.75 47.03 m3
FOOT PLAT 80
TULANGAN Jmh Foot Plat Bending Jmh besi bending Panjang Total Jumlah Btng Berat/btng Berat total BERAT
D 12 - 15 - 2.25 12.00 27.00 2.25 10.70 24.08
- Kg
SLOOF 15/20
TULANGAN Panjang Bending Jumlah besi Panjang Total Jumlah Btng Berat/btng Berat total BERAT
D 10 132.00 4.00 528.00 44.00 7.4 325.60
D 8 -15 132.00 0.60 880.00 528.00 44.00 4.7 206.80 532.40 Kg
KOLOM 30/30
TULANGAN Tinggi Bending Jumlah besi Unit Panjang Total Jumlah Btng Berat/btng Berat total BERAT
D 12 3.00 8.00 12.00 288.00 24.00 10.70 256.80
D 16 3.00 4.00 12.00 144.00 12.00 19.00 228.00
D 8 -15 3.00 1.00 15.00 180.00 15.00 4.7 70.50 555.30 Kg
KOLOM 20/20
TULANGAN Panjang Bending Jumlah besi Unit Panjang Total Jumlah Btng Berat/btng Berat total BERAT
D 12 3.00 10.00 30.00 900.00 75.00 10.70 802.50
D 8 -15 3.00 0.70 20.00 420.00 35.00 4.7 164.50 967.00 Kg
KOLOM 15/15
TULANGAN Panjang Bending Jumlah besi Unit Panjang Total Jumlah Btng Berat/btng Berat total BERAT
D 10 3.00 4.00 4.00 48.00 4.00 7.4 29.60
D 8 -15 3.00 0.42 20.00 33.60 2.80 4.7 13.16 42.76 Kg
BETON+BEKISTING Tinggi lebar panjang Unit volume
Beton K. 175 3.00 0.15 0.15 4.00 0.27 M3
Bekesting 0.15 0.15 3.60 M2 13.333333333 3.60
507.00
DINDING BATA
P Tinggi kolom lobang kusen Jumlah -
120.00 3.00 2.08 61.52 298.49 0.90
AMPIK 7.00 2.00 - TAMBAHAN
PAGAR - 298.49 596.97 29.85 36.00 2.15
596.97 65.85 -
PLESTERAN /PENGECATAN
P Tinggi Kolom Lobang kusen Sisia Jumlah Total
120.00 3.00 61.52 2.00 298.49 596.97
AMPIK 3.50 1.00 -
PAGAR -
596.97 596.97
LOBANG KUSEN
P L BH
P1 2.45 1.50 3.00 11.03
P2 2.45 0.90 6.00 13.23 1.25
PVC 2.00 0.90 2.00 3.60
J1 1.80 1.70 11.00 33.66
J2 - - -
BV -
61.52 m2
KUSEN P L T BH Jumlah
P1 7.00 0.140 0.05 1.00 0.05
P2 8.30 0.140 0.05 1.00 0.06
J1 11.40 0.140 0.05 7.00 0.56
J2 -
BV 0.140 0.05 -
0.666 m3
PINTU P L BH JUMLAH
P1 2.00 0.90 1.00 1.80
P2 2.00 1.20 1.00 2.40
4.20 m2
DAUN JENDELA
P L BH Jumlah
J1 0.70 0.60 14.00 5.88
J2 -
5.88 m2
KACA P L BH Jumlah
PJ Bawah -
PJ Atas - P L BH Jumlah
PINTU 0.35 0.14 - Jalusi 0.30 0.55 22.00 3.63
J1 Jendela 0.57 0.47 14.00 3.75
Mati 0.70 0.60 7.00 2.94
J2 Jendela 0.62 0.57 -
JALUSI Mati 0.40 0.60 24.00 5.76
12.45 m2
ATAP OK - BAJA
P L BH Jumlah P L BH
9.20 5.10 1.00 46.92 109.94 10.80 6.33 9.00 5.00 1.00
9.20 6.85 1.00 63.02 m2 14.00 9.00 6.75 1.00
1.00 - 1.00
15.00
PLAFOND OK 45.00
P L BH Jumlah 4.5
I 6.85 11.85 2.00 162.35 121.00
II 1.00 -
III 1.00 -
IV 1.00 -
TERAS DALAM 1.00 -
TERAS DALAM 1.00 -
TANGGA 1.00 -
SELASAR DEPAN 1.40 12.00 1.00 16.80
SELASAR BLK 0.90 45.00 1.00 40.50
AMPIG 11.75 0.60 -
2.00 -
219.65 m2 187.00 (32.65)
PENGECATAN KUSEN OK
P L BH Jumlah
P1 7.00 0.24 1.00 1.68
P2 8.30 0.24 1.00 1.99
J1 11.40 0.24 5.00 13.68
J2 - 0.24 - -
BV - 0.24 1.00 -
17.35 m2
PENGECATAN PINTU OK
P L BH SISI
P1 2.00 - - - -
P2 2.10 1.40 2.00 2.00 11.76 2.94 5.88 11.76
11.76 m2
PENGECATAN LISPLANK OK
P L Jumlah
74.00 0.20 14.80 m2 58.8 19.2
PENGECATAN JALUSI
P L BH
P1 1.00 - - -
P2 1.40 0.60 2.00 1.68
J1 1.40 0.60 4.00 3.36
J2 1.40 0.60 4.00 3.36
BV 1.40 0.60 2.00 1.68
10.08 m2
JUMLAH PENGECATAN
KUSEN 17.35
PINTU 11.76
JENDELA 5.88
LISPLANK 14.80
JALUSI 3.63
53.42 M2
KOLOM 15/20
TULANGAN Panjang Bending Jumlah besi Unit Panjang Total Jumlah Btng Berat/btng Berat total BERAT
D 10 2.00 4.00 4.00 32.00 2.67 7.4 19.73
6.4
-
11.1
12.74
24
9
4
49.74
Jumlah
-
-
-
-
3.84
-
3.84 m2
m2
Jumlah
45.00 105.75
60.75
-
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
300.06 1 M2 ACIAN
PC Kg 3.2500 1,520.00 - 4,940.00
Pekerja Org 0.2000 71,000.00 14,200.00 -
Tukang batu Org 0.1000 81,000.00 8,100.00 -
Kep. Tukang batu Org 0.0100 95,000.00 950.00 -
Mandor Org 0.0100 105,000.00 1,050.00 -
Total 24,300.00 4,940.00
Keuntungan Max 2,430.00 494.00
Total Harga 26,730.00 5,434.00 32,164.00
350.01 1 M2 BEKISTING DENGAN PAPAN
Papan terentang (dihitung 2 x pakai ) 75% M3 0.0240 1,925,000.00 - 34,650.00
Kaso 5/7 kls II (dihitung 2 x pakai ) 50% M3 0.0170 3,135,000.00 - 26,647.50
Paku Kg 0.4000 16,500.00 - 6,600.00
Pekerja Org 0.1200 71,000.00 8,520.00 -
Tukang kayu Org 0.2700 81,000.00 21,870.00 -
Kepala Tukang Kayu Org 0.1500 95,000.00 14,250.00 -
Mandor Org 0.0500 105,000.00 5,250.00 -
Total 49,890.00 67,897.50
Keuntungan Max 4,989.00 6,789.75
Total Harga 54,879.00 74,687.25 129,566.25
HARGA
NO URAIAN PEKERJA SATUAN UPAH
Rp.
1 2 3 4
HARGA
NO JENIS BAHAN SATUAN BAHAN
Rp.
1 2 3 4
BAHAN ELEKTRIKAL
1 Saklar Broco tunggal standar bh 20,500.00
2 Saklar Broco seri standar bh 25,500.00
3 Stop kontak Broco standar bh 18,500.00
4 Instalasi titik lampu/stop kontak bh 150,000.00
5 Lampu SL philip 20 Watt (downlight) bh 75,000.00
6 MCB + Box bh 500,000.00