A. PEKERJAAN PAGAR PEMBATAS 500.

00 M1

Analisa
No Uraian Pekerjaan Volume Harga Satuan Jumlah
NO.
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi,Pengukuran dan pemasangan Bouwplank - 1.00 Ls 10,000,000.00 10,000,000.00
2 Material Penunjang Pelaksanaan pekerjaan - 1.00 Ls 15,000,000.00 15,000,000.00
SUB JUMLAH 25,000,000.00
II. PEKERJAAN GALIAN & URUGAN
1 Pek. Galian Tanah Pondasi 1 575.00 m³ 78,750.00 45,281,250.00
2 Urugan Tanah kembali 2 230.00 m³ 26,250.00 6,037,500.00
3 Pek. Urugan Pasir 3 25.00 m³ 163,500.00 4,087,500.00
SUB JUMLAH 55,406,250.00
III. PEKERJAAN PONDASI & BETON
1 Cor beton untuk Lantai kerja bawah pondasi Tbl . 5 Cm 5 25.00 m³ 883,513.76 22,087,843.92
2 Pek. Pasangan Batu Kali 1 : 4 6 220.00 m³ 921,750.00 202,785,000.00
3 Pek. Beton Sloof 15/20 11 15.00 m³ 8,227,084.10 123,406,261.55
4 Pek. Beton Kolom Praktis 15/15 13 9.00 m³ 10,765,487.10 96,889,383.93
5 Pek. Beton Ring balak 15/15 12 11.25 m³ 6,712,414.10 75,514,658.66
SUB JUMLAH 520,683,148.05
IV. PEKERJAAN DINDING & FINISHING
1 Pek. Pasangan Trasraam Batako Camp. 1:2 14 200.00 m² 114,829.80 22,965,960.00
2 Pek. Pasangan dinding Batako Camp. 1:4 15 1,000.00 m² 105,841.47 105,841,466.67
SUB JUMLAH 128,807,426.67
SUB TOTAL - C 729,896,824.72
RENCANA ANGGARAN BIAYA

PEKERJAAN : PAGAR PEMBATAS 500 M


LOKASI : SIMPANG TIGA BENTOK
TAHUN : 2016

NO. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN GALIAN & URUGAN

III PEKERJAAN PONDASI & BETON

IV. PEKERJAAN DINDING & FINISHING

JUMLAH HARGA / UNIT

DIBULATKAN

Terbilang :

Catatan :
Total harga di atas sudah termasuk biaya persiapan,mobilisasi, demobilisasi,keuntungan dan pajak - pajak
yang berlaku termasuk biaya PPN 10 %
Banjarmasin, 20 Maret 2016
Dibuat oleh,

WAHYU ARIADI
RENCANA ANGGARAN BIAYA

JUMLAH

25,000,000.00

55,406,250.00

520,683,148.05

128,807,426.67

Rp 729,896,824.72

Rp 729,896,000.00

termasuk biaya persiapan,mobilisasi, demobilisasi,keuntungan dan pajak - pajak

Banjarmasin, 20 Maret 2016


BACKUP PERHITUNGAN KUANTITAS

Pekerjaan : Pagar Pembatas


Tahun : 2015

NO URAIAN PEKERJAAN

I PERSIAPAN

1 Pengukuran dan Pemasangan bouwplank


Panjang Pagar = 250.00

II PEKERJAAN GALIAN & URUGAN

1 Galian tanah pondasi

Type Jumlah L B H Volume

Galain Tanah 1.00 500.00 1.00 1.15 575.00

Total Volume 575.00

2 Urugan tanah Kembali

Type Jumlah L B H Volume

Galain Tanah 1.00 500.00 0.40 1.15 230.00

Total Volume 230.00

3 Urugan Pasir

Type Jumlah L B H Volume

UP 1.00 500.00 1.00 0.10 50.00

Total Volume 50.00

III PEKERJAAN PONDASI & BETON

Lantai Kerja

Type Jumlah L B H Volume

LK 1.00 500.00 1.00 0.05 25.00


Total Volume 25.00

Pondasi Batu Gunung

Type Jumlah L B H Volume

PB 30-80 T. 80 CM 1.00 500.00 0.55 0.80 220.00

Total Volume 220.00

Balok Sloof

Type Jumlah L B H Volume

Bs - Bawah 1.00 500.00 0.15 0.20 15.00


Bs - Atas 1.00 500.00 0.15 0.15 11.25

Total Volume 26.25

Balok Kolom 15/15

Type Jumlah L B H Volume

Bk 166.67 0.15 0.15 2.40 9.00

Total Volume 9.00

IV PEKERJAAN DINDING & FINISHING

Dinding Pagar Pas Batako

Type Jumlah L B H Volume

Dd Trasraam 1.00 500.00 0.40 200.00


Dd Pas Bataco 1.00 500.00 2.00 1,000.00

Total Volume 1,200.00

Plesteran Dinding + Acian

Type Jumlah L B H Volume

Dinding 2.00 250.00 2.40 1,200.00

Total Volume 1,200.00

Dinding Pagar Pas Batako

Type Jumlah L B H Volume


Dinding 2.00 250.00 2.40 1,200.00

Total Volume 1,200.00


TAS

Volume

M3

M3

Volume

M3

M3

Volume

M3

M3

Volume

M3
M3

Volume

M3

M3

Volume

M3
M3

M3

Volume

M3

M3

Volume

M2
M2

M2

Volume

M2

M2

Volume
M2

M2
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : PAGAR PEMBATAS 500 M


LOKASI : SIMPANG TIGA BENTOK
TAHUN : SIMPANG TIGA BENTOK

NO. URAIAN PEKERJAAN HARGA SATUAN UPAH KERJA HARGA BAHAN JUMLAH
( Rp) ( Rp) ( Rp) ( Rp)

1 2 3 4 5 6

1 Menggali 1 M3 Tanah Biasa Sedalam 1 m'


0.7500 Oh Pekerja 100,000.00 75,000.00
0.0250 Oh Mandor 150,000.00 3,750.00
Jumlah 78,750.00 78,750.00

2 Mengurug Kembali 1 M3 bekas galian


0.2500 Oh Pekerja 100,000.00 25,000.00
0.0083 Oh Mandor 150,000.00 1,250.00
26,250.00 26,250.00

3 Mengurug 1 M3 Pasir dipadatkan


1.2000 M3 Pasir Urug 110,000.00 132,000.00
0.3000 Oh Pekerja 100,000.00 30,000.00
0.0100 Oh Mandor 150,000.00 1,500.00
Jumlah 31,500.00 132,000.00 163,500.00

4 Mengurug 1 M3 Tanah dipadatkan


1.2000 M3 Tanah urug pilihan 100,000.00 120,000.00
0.2500 Oh Pekerja 100,000.00 25,000.00
0.0250 Oh Mandor 150,000.00 3,750.00
Jumlah 28,750.00 120,000.00 148,750.00
5 Membuat 1 M3 Lantai kerja beton mutu f’c= 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
230.0000 Kg Semen Portland 1,700.00 391,000.00
0.6379 m3 Pasir Beton 220,000.00 140,328.57
0.7607 m3 Krikil ( Maksimum 30 mm ) 250,000.00 190,185.19
1.2000 Oh Pekerja 100,000.00 120,000.00
0.0600 Oh Mandor 150,000.00 9,000.00
0.2000 Oh Tukang batu 150,000.00 30,000.00
0.0200 Oh Kepala Tukang 150,000.00 3,000.00
Jumlah 162,000.00 721,513.76 883,513.76

6 Memasang 1 M3 Pondasi Batu belah Camp 1 Semen : 4 Pasir pasang


1.2000 M3 Batu Kali / gunung 225,000.00 270,000.00
163.0000 Kg Semen Portland 1,700.00 277,100.00
0.5200 M3 Pasir Pasang 220,000.00 114,400.00
1.5000 Oh Pekerja 100,000.00 150,000.00
0.0750 Oh Mandor 150,000.00 11,250.00
0.6000 Oh Tukang batu 150,000.00 90,000.00
0.0600 Oh Kepala Tukang 150,000.00 9,000.00
Jumlah 260,250.00 661,500.00 921,750.00

7 Membuat 1 M3 Beton Mutu K - 225, Slump (12±2) Cm, W/C = 0.58


371.0000 Kg Semen Portland 1,700.00 630,700.00
0.4986 m3 Pasir Beton / Pasang 220,000.00 109,685.71
0.7756 m3 Kerikil / Koral beton 250,000.00 193,888.89
1.8500 Oh Pekerja 100,000.00 185,000.00
0.0830 Oh Mandor 150,000.00 12,450.00
0.2750 Oh Tukang Batu 150,000.00 41,250.00
0.0280 Oh Kepala Tukang 150,000.00 4,200.00
Jumlah 242,900.00 934,274.60 1,177,174.60

8 Mengerjakan 1 Kg Pembesian dengan besi polos


1.0500 Kg Besi Beton polos 14,500.00 15,225.00
0.0150 Kg Kawat Beton 18,000.00 270.00
NO. URAIAN PEKERJAAN HARGA SATUAN UPAH KERJA HARGA BAHAN JUMLAH
( Rp) ( Rp) ( Rp) ( Rp)

1 2 3 4 5 6

0.0070 Oh Pekerja 100,000.00 700.00


0.0004 Oh Mandor 150,000.00 60.00
0.0070 Oh Tukang besi 150,000.00 1,050.00
0.0007 Oh Kepala Tukang 150,000.00 105.00
Jumlah 1,915.00 15,495.00 17,410.00

9 Memasang 1 M2 bekisting untuk sloof


0.0450 M3 Kayu bekisting 1,250,000.00 56,250.00
0.3000 Kg Paku 5 - 10 Cm 18,000.00 5,400.00
0.2000 Ltr Minyak bekisting 7,000.00 1,400.00
0.5200 Oh Pekerja 100,000.00 52,000.00
0.0260 Oh Mandor 150,000.00 3,900.00
0.2600 Oh Tukang kayu 150,000.00 39,000.00
0.0260 Oh Kepala Tukang 150,000.00 3,900.00
Jumlah 98,800.00 63,050.00 161,850.00
NO. URAIAN PEKERJAAN HARGA SATUAN UPAH KERJA HARGA BAHAN JUMLAH
( Rp) ( Rp) ( Rp) ( Rp)

1 2 3 4 5 6

10 Memasang 1 M2 bekisting untuk Neut / Kolom


0.0550 M3 Balaok dan Papan Kayu bekisting 1,250,000.00 68,750.00
0.4000 Kg Paku 5 - 12 Cm 18,000.00 7,200.00
0.2000 Ltr Minyak bekisting 7,000.00 1,400.00
6.0000 Btg Dolken Ky.Galam dia.4-6 Cm - 3 m 6,000.00 36,000.00
0.6600 Oh Pekerja 100,000.00 66,000.00
0.3300 Oh Mandor 150,000.00 49,500.00
0.0330 Oh Tukang kayu 150,000.00 4,950.00
0.0330 Oh Kepala Tukang 150,000.00 4,950.00
Jumlah 125,400.00 113,350.00 238,750.00

11 Membuat 1 M3 Sloof (15 x 20 Cm) 157 Kg besi + bekisting


1.0000 M3 Beton Mutu K- 225 1,177,174.60 1,177,174.60
157.00 Kg Tulangan Besi 17,410.00 2,733,370.00
26.6700 M2 Bekisting Sloof 161,850.00 4,316,539.50
Jumlah 8,227,084.10

12 Membuat 1 M3 Sloof (15 x 15 Cm) 70 Kg besi + bekisting


1.0000 M3 Beton Mutu K- 225 1,177,174.60 1,177,174.60
70.00 Kg Tulangan Besi 17,410.00 1,218,700.00
26.6700 M2 Bekisting Sloof 161,850.00 4,316,539.50
Jumlah 6,712,414.10

13 Membuat 1 M3 Kolom (15 x 15 Cm) 185 Kg besi + bekisting


1.0000 M3 Beton Mutu K- 225 1,177,174.60 1,177,174.60
185.00 Kg Tulangan Besi 17,410.00 3,220,850.00
26.6700 M2 Bekisting Neut / Kolom 238,750.00 6,367,462.50
Jumlah 10,765,487.10

14 Memasang 1 M2 Dinding Batako Camp. 1 : 2


15.0000 Bh Batako 3,000.00 45,000.00
7.8500 kg Semen Portland 1,700.00 13,345.00
0.0130 M3 Pasir Pasang 220,000.00 2,860.00
0.2800 Kg Besi Angkur Dia 8 Mm 17,410.00 4,874.80
0.3000 Oh Pekerja 100,000.00 30,000.00
0.0150 Oh Mandor 150,000.00 2,250.00
0.1000 Oh Tukang Batu 150,000.00 15,000.00
0.0100 Oh Kepala Tukang 150,000.00 1,500.00
Jumlah 48,750.00 66,079.80 114,829.80

15 Memasang 1 M2 Dinding Batako Camp. 1 : 4


13.0000 Bh Batako 3,000.00 39,000.00
5.8333 kg Semen Portland 1,700.00 9,916.67
0.0150 M3 Pasir Pasang 220,000.00 3,300.00
0.2800 Kg Besi Angkur Dia 8 Mm 17,410.00 4,874.80
0.3000 Oh Pekerja 100,000.00 30,000.00
0.0150 Oh Mandor 150,000.00 2,250.00
0.1000 Oh Tukang Batu 150,000.00 15,000.00
0.0100 Oh Kepala Tukang 150,000.00 1,500.00
Jumlah 48,750.00 57,091.47 105,841.47
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN : REHAB PAGAR SELUAS 2891 M2 = 1 (SATU) PAKET
LOKASI : KANTOR BALAI LATIHAN TRANSMIGRASI UPT.P BANJARMASIN
SATUAN KERJA : BALAI LATIHAN TRANSMIGRASI PROVINSI KALIMANTAN SELATAN
TAHUN : 2014

HARGA
NO. JENIS UPAH SATUAN SATUAN KETERANGAN
(Rp.)

1 Pekerja OH 100,000.00
2 Mandor OH 150,000.00
3 Tukang OH 150,000.00
4 Kepala Tukang OH 150,000.00

HARGA
NO. JENIS BAHAN SATUAN SATUAN KETERANGAN
(Rp.)

A. BAHAN GALIAN Harga sudah dilokasi


1 Pasir urug M3 150,000.00
2 Tanah urug pilihan M3 100,000.00
3 Pasir pasang / beton M3 220,000.00
4 Kerikil cor / koral beton M3 250,000.00
5 Batu Gunung M3 225,000.00
6 Semen PC Kg 1,700.00
7 Batako Bh 3,000.00
8 Balok / Papan kayu beksiting M3 1,250,000.00
9 Balok / Papan Bouplang kayu MC M3 2,000,000.00
10 Plywood / Triplek T. 6 Mm Lbr 90,000.00
11 Kawar Bindrat Kg 18,000.00
12 Besi beton Kg 14,500.00
13 Paku kayu Kg 18,000.00
14 Plamir / dempul Kg 25,000.00
15 Cat tembok Exterior setara Jotatough Kg 40,000.00
16 Minyak Bekisting Ltr 7,000.00
17 Dolken Ky.Galam dia.4-6 Cm - 3 m Btang 6,000.00
KOLOM

Type Jumlah B L H

P1 85.00 0.15 0.15 2.40

Total Volume

1 Kolom P 1 B L H
15 15 240.00 cm

Volume beton 0.054 m3


Selimut beton 2.5 cm
Ø Tul. utama 10 mm 0,62 kg/m
Ø Tul. bagi mm kg
Ø Beugel 8 mm 0,393 kg
Jarak begel 15 cm
Angker 60 cm
Hak begel 2.5 cm

Pembesian Tul utama Tul bagi


jml tul 4.00 bh -
pjg 2.60 m 2.40
tot pjg 11.60 m -
kg #VALUE! kg -
tot kg
kg/m3

Bekisting kanan 0.72 m2


kiri 0.72 m2
m2
m2
tot 1.44 m2
bekisting/m3 26.67 m2

BALOK SLOOF

Type Jlh L B H
BS1 1.00 250.00 0.15 0.20

Total Volume

1 BS1 B L H
15.00 20.00 25,000.00 cm
Volume beton 7.5 m3
Selimut beton 2.5 cm
Ø Tul. utama 10 mm 0,62 kg/m
Ø Tul. puntir 10 mm 0,62 kg
Ø Beugel 8 mm 0,393 kg
Hak + Sambungan tul. 20 cm
Hak Begel 2.5 cm
Jarak begel
tumpuan 10 cm
lapangan 15 cm
rata-rata 12.5 cm

Pembesian Tul utama Tul puntir


jml tul 4.00 bh 1.00
pjg 250.00 m 250.00
tot pjg 1,016.67 m 254.17
kg #VALUE! kg #VALUE!
tot kg
kg/m3

Bekisting kanan 100.00 m2


kiri 100.00 m2
atas - m2
bawah - m2
tot 200.00 m2
bekisting/m3 26.67 m2

2 RING BALK B H L
15.00 15.00 25,000.00 cm

Volume beton 5.625 m3


Selimut beton 2.5 cm
Ø Tul. utama 8 mm 0,393 kg/m
Ø Tul. puntir
Ø Beugel 6 mm 0,222 kg
Hak begel 2.5 cm
Jarak begel
tumpuan 10 cm
lapangan 15 cm
rata-rata 12.5 cm

Pembesian Tul utama Tul puntir


jml tul 4.00 bh -
pjg 250.00 m -
tot pjg 1,000.00 m -
kg 393,000.00 kg -
tot kg
kg/m3

Bekisting kanan 75.00 m2


kiri 75.00 m2
atas - m2
bawah - m2
tot 150.00 m2
bekisting/m3 26.67 m2
40
Volume

4.59 M3

4.59 M3

Jumlah
4 bh
bh
H

L
Tul bagi begel B
bh 16.00 bh
m 0.45 m
m 7.20 m
kg 2,829.60 kg
#VALUE! kg
#VALUE! kg/m3

Volume
7.50 M3

7.50 M3
Jumlah
4 bh
1 bh

H L

Tul puntir Begel


bh 2,000.00 bh
m 0.50 m
m 1,000.00 m
kg 393,000.00 kg
#VALUE! kg
#VALUE! kg/m3

Jumlah
4 bh

H L

Tul puntir Begel


bh 12.50 bh
m 0.45 m
m 5.63 m
kg 1,248.75 kg
394,248.75 kg
70,088.67 kg/m3
H

L
B
H L

B
KALAU MAU MENGCOPY HARUS KE BAWAH
* ************
. #REF! ************ Model (1-3): 1
. ************ ************ ************ ************
#REF!
************ ****************************** ************ ************ ************ ************
************ satu dua tiga empat lima enam tujuh delapan se ***
************ ribu juta milyar ***
************ #REF! ***
************ ****************************** ************ ************ ************ ************
************ #REF! 1 ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! ***
************ ***
************ ***
************ #REF! 2 ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! ***
************ ***
************ ***
************ #REF! 3 ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! ***
************ ***
************ ***
************ #REF! 4 ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! ***
************ ***
************ #REF! 1 ***
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! #REF! ****
************ #REF! #REF! ***
************ #REF! #REF! ***
************ #REF! ***
************ #REF! #REF! #REF! #REF! ***
************ #REF! #REF! ************ ************ ************
#REF! #REF! #REF! #REF!
************ #REF! #REF! * #REF!
************ #REF! #REF! * #REF!
1 #REF!
2 #REF!
3 #REF!
************ ****************************** ************ ************ ************ ************

Anda mungkin juga menyukai