DESAIN PONDASI
Panjang Tiang = 10 m
Diameter Tiang = 1600 mm =
Luas Penampang Tiang = 2.0096 m2
PILES GROUPING
Beban Bangunan Q (Ton) n(Jumlah Tiang) η (Efisiensi) Qu (Ton)
BEBAN PADA KOLOM KOTAK A 824.78 4 0.8 462.7984
BEBAN PADA KOLOM KOTAK B 1164.44 4 0.8 462.7984
BEBAN PADA KOLOM BULAT 1115.25 4 0.8 462.7984
Kontrol Qup>Q
1.6 m
ϕ (˚) ϕ' (˚) 3/4ϕ (˚) Nq 15D qe (kN/m2) qe' (kN/m2) qe/2 (kN/m2)
32.80073 29.80073 22.35055 18 24 297.454804 637.4031506107 318.7015753053
462.7984 Ton
Qup (Ton)
1480.955
1480.955
1480.955
Qe (kN)
11528.32834
PERHITUNGAN PENURUNAN (BORED PILE - CAST IN SITU)
Data:
Qe = 4611.331337 kN
Qs = 0 kN
L = 10 m
D = 1.6 m
A = 2.0096 m2
E = 21000000 kN/m2
ᶓ = 0.67
Cp = 0.02
Cs = 0.0266
qp = 4611.331337 kN
B1 (Lebar Group Piles Kolom Kotak A) = 8.8 m
B2 (Lebar Group Piles Kolom Kotak B) = 8.8 m
B3 (Lebar Group Piles Kolom Bulat) = 8.8 m