Potongan Memanjang
Potongan Memanjang
+ 487.50
PERENCANAAN SALURAN DRAINASE
DAERAH PERUMAHAN ARAYA
+ 487.25 KOTA MALANG
PERGURUAN TINGGI
+ 487.00
+ 486.75
MATA KULIAH
+ 486.25
DRAINASE PERKOTAAN
+ 486.00
REVISI
+ 485.75
+ 485.50
+ 485.25
+ 484.75
POTONGAN MEMANJANG SEMUA RUAS
+ 484.50 SALURAN
1 : 1000
NO. SALURAN 1 3 4 5
138 35 5.95
STA & JARAK
0+032 0+170 0+205 DIGAMBAR DIPERIKSA
485.200
485.200
485.170
487.200
485.400
485.400
ELEVASI TANAH ASLI
ALVIRA PERMATA
485.200
485.090
485.060
487.200
485.400
485.400
SARI
1531310006
ELEVASI ATAS SALURAN 3 KBS 2 / 01 197703062002122001
487.083
485.083
485.011
484.981
485.283
485.283
ELEVASI MUKA AIR HARI/TANGGAL KETERANGAN
486.733
484.733
484.604
484.574
484.933
484.933
ELEVASI DASAR SALURAN ELEVASI TANAH ASLI
SEJAJAR DENGAN
JUMAT, JANUARI 2018
GORONG-GORONG ELEVASI ATAS
b = 0.35 m, h = 0.35 m, SALURAN
D=0.5m,
KETERANGAN b = 0.35 m, h = 0.35 m, Q= 0.073 m3/s, V =1.1091 m/s, s = 0.013 Q=0.079 m3/s, V =0.7688 h=0.41m,
m/s, s = 0.006 Q=0.157m3/s,
V=1.1157m/s,
NO.TUGAS NO.GAMBAR JML. GAMBAR
s=0.01
POT MEMANJANG 1-3-4-5
03 02 02