Anda di halaman 1dari 12

Standarisasi Harga Barang dan Jasa Kab.

Tanjab Timur dipergunakan TA 2014


Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
XIX BAHAN BANGUNAN DAN UPAH KERJA
1 Bahan Pengisi
1 Tanah Urug M3 126.900 130.950 135.000
Laterit M3 137.341 141.724 146.108
Tanah Timbunan di datangkan M3 82.642 85.280 87.918
Tanah Pilihan ( Quary) M3 90.908 93.809 96.710
Galian tanah biasa (Manual) M3 82.372 85.001 87.630
Galian tanah biasa (alat ) M3 29.133 30.063 30.993
Galian tanah berbatu (manual ) M3 50.321 51.927 53.533
Galian Tanah berlumpur M3 35.316 36.443 37.571
Timbunan Sirtu M3 260.899 269.226 277.553

2 Pasir Halus M3 243.766 251.545 259.325


Kasar M3 125.000 229.458 236.555
Pasir Beton/ Pasang M3 130.000 150.000 270.000

3 Kerikil Halus M3 549.364 566.897 584.430


Kasar M3 500.000 630.000 667.920

4 Batu Kali Bulat M3 523.204 539.902 556.600


Split M3 477.424 492.661 507.898
Puru M3 327.003 337.439 347.875
Keduk M3 2.054 2.119 2.185
Belah M3 265.494 273.967 282.440

5 Batu Bata Kwalitet I Buah 750 1.339 1.380


Kwalitet II Buah 700 1.004 1.035
Kecil Buah 550 837 863
Besar Buah 1.297 1.339 1.380
Batako Semen M3 11.475 11.841 12.207
Kerikil M3 483.964 499.409 514.855
Palimanan M2 243.766 251.545 259.325

6 Agregat
- Agregat Kelas A M3 519.820 536.410 553.000
- Agregat Kelas B M3 517.000 533.500 550.000
- Agregat Kelas C M3 263.200 271.600 280.000
-Agregat Kelas C2 M3 267.900 276.450 285.000

7 Batu Pecah
- Batu Pecah ( Split ) 1 - 2 cm M3 483.964 499.409 514.855
- Batu Pecah ( Split ) 2 - 3 cm M3 568.984 587.143 605.303
- Batu Pecah ( Split ) 3- 5 cm M3 392.403 404.927 417.450
- Batu Pecah ( Split ) 5 - 7 cm M3 510.124 526.404 542.685
- Batu Belah / Kerakal M3 353.163 364.434 375.705
- Gravel M3 390.565 403.030 415.495
- Shipping M3 340.083 350.936 361.790
- Filler ( Abu Batu ) Kg 1.297 1.339 1.380
- Kapur M3 95.128 98.164 101.200
8 Semen PC Zak 70.000 75.000 98.000
9 Semen Putih Zak 90.000 95.000 128.800

10 Aspal
- Aspal Ac ( AC10, AC40, AC60 ) Kgm3/ ton 14.864 15.338 15.813
- Aspal MC ( MC800, MC6000 ) Kg 12.486 12.884 13.283
- Aspal Emulasi ( RS1, RS2, CRS1, SRS2, CRS4) Kg 28.776 29.695 30.613
- Aspal Grade PEN 60/70 ex Pertamina Kg 17.004 17.547 18.090
- Butonic Aspal Kg 15.458 15.952 16.445
- Aspal SHELL PEN 60/70 Kg 13.945 14.390 14.835
- Aspal Cement Kg 13.160 13.580 14.000

11 Lempeng Rumput M3 7.000 M2= 4500 Buah 15.134 15.617 16.100


12 BAHAN ATAP
a. Atap Genteng Vlam Buah 13.783 14.223 14.663
Kodok Buah 5.567 5.745 5.923
Munier Buah 13.783 14.223 14.663
Beton Pres Buah 12.486 12.884 13.283
Ekatana Buah 88.318 91.136 93.955
Plentong'S' Buah 26.160 26.995 27.830
Multi Color 8 Daun Keping 15.675 16.175 16.675
Sumber : Dinas Pekerjaan Umum
Multi Color
125 2 daun Keping 51.726 53.377 55.028
(Hrt)
Metal Keping 61.476 63.438 65.401
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
Keramik Buah 20.323 20.971 21.620
Mars 1 X 4 ( 38.5 X 80 ) Buah 43.132 44.508 45.885
S.Roof 1 X 4 ( 38.5 x 80 ) Buah 101.992 105.247 108.503
Mars 1 X 4 ( 38.5 X 80 ) Buah 62.752 64.755 66.758
Venus 1 X 4 Buah 39.240 40.493 41.745
Dextrabond Buah 41.240 42.556 43.873

Nok Atap Dextrabond ( Berpasir ) Keping 51.131 52.763 53.590


Nok Model U Mars Keping 32.106 33.130 54.395
Nok Model U MarsDextrabond Keping 17.674 18.238 34.155
Nok Model C Mars Keping 21.134 21.808 18.803
Nok Model C Mars Dextrabond Keping 34.754 35.863 22.483
Nok Samping Mars Keping 35.997 37.146 36.973
Nok Samping Dextrabond Keping 35.997 37.146 38.295

13 Flashing Tembok Mars Keping 3.892 4.016 4.140


Tembok Dextrabond Keping 32.700 33.744 34.788
14 Bumbungan Atap Genteng Genteng Metal U Buah 24.809 25.601 26.393
Genteng Plentong "S" Buah 6.540 6.749 6.958
Genteng Metal ( sakura Rout ) Buah 41.240 42.556 43.873
Genteng Metal Bag Samping Buah 6.540 6.749 6.958
(sakura Rout)

15 Asbes Motif Genteng Lembar 117.721 121.478 125.235


Gel Besar Lembar 104.641 107.980 111.320
Gel Kecil Lembar 105.938 109.319 112.700

16 Seng Gelombang BJLS 30 6 kaki Kodi 600.000 700.000 1.391.500


7 kaki Kodi 700.000 800.000 1.600.225
17 Seng Gelombang BJLS 20 6 kaki Kodi 500.000 540.000 1.005.675
7 kaki Kodi 590.000 630.000 1.220.725
9 kaki Kodi 790.000 840.000 1.600.225
18 Seng plat BJLS 18 Lembar 85.021 87.734 90.448
BJLS 20 Lembar 104.641 107.980 111.320

BJLS 25 Lembar 146.476 151.150 155.825


19 Seng plastik Kwalitet I Lembar 242.576 200.000 258.060
Kwalitet II Lembar 94.533 70.000 100.568
20 Ijuk Kg 60.158 62.078 63.998
382.663
21 Atap Rangka Baja Ringan Zincalum m2 359.703 371.183 382.663

22 Steel Deck Tebal 3 mm Kg 12.220 12.610 13.000

23 Kerosen / Minyak Tanah Liter 11.280 11.640 12.000

24 Kawat Beton Kg 17.390 17.945 18.500

25 Kawat Bronjong Kg 16.920 17.460 18.000

26 Sirtu M3 300.800 310.400 320.000

27 Geotextile M2 300.800 310.400 320.000

28 Gebalan Rumput M2 15.040 15.520 16.000

29 Baja Tulangan (polos) U24 Kg 12.690 13.095 13.500


Baja Tulangan (Ulir) D32 Kg 19.740 20.370 21.000

30 Kapur M3 158.860 163.930 169.000

31 Chipping M3 423.000 436.500 450.000


Kg 217 224 231
32 Cerucuk Kayu Dolken Btg 8.460 8.730 9.000
33 Pipa Baja Bergelombang Kg 39.010 40.255 41.500
34 Tiang Pancang Baja Dia.8 Inci L:4 Meter M; 3.995.000 4.122.500 4.250.000
35 Tiang Pancang Beton Pratekan M3 3.572.000 3.686.000 3.800.000
36 Kawat Las Dos 120.320 124.160 128.000
37 Minyak Fluks Liter 1.739.000 1.794.500 1.850.000
38 Bunker Oil Liter 1.786 1.843 1.900
Sumber : Dinas Pekerjaan Umum
39
(Hrt)
Asbuton Halus 126 Ton 508.540 524.770 541.000
40 Baja Prategang Kg 17.390 17.945 18.500
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
41 Greser Kg 23.500 24.250 25.000
42 Pemancangan M 150.400 155.200 160.000

2 Bahan Cetak Buah 27.944 28.836 29.728


1 Roster 20 x 20 cm Buah 48.375 49.919 51.463
2 Conblok 20 x 30 cm Buah 14.269 14.725 15.180
3 Batako Buah 11.296 11.657 12.018
4 Glassblok Buah 62.428 64.420 66.413
5 Ventilasi 1/2 Ling Buah 227.118 234.367 241.615
6 Tiang tears Ukur Buah 1.210.504 1.249.137 1.287.770
7 Astrod 65 cm Buah 49.942 51.536 53.130
8 Patok Tanah Besar Panjang 1.5 M, Lebar 18cm x 18 cm Buah 399.970 412.735 425.500

3 Bahan Lantai/Lapisan Dinding


1 Ubin PC Abu - abu M2 94.155 97.160 100.165
Warna M2 85.021 87.734 90.448
Badak M2 223.659 230.797 237.935
2 Tegel Teraso 30 x 30 cm M2 66.698 68.826 70.955
30 x 20 cm M2 159.556 164.648 169.740
20 x 20 cm 4.162 4.295 4.428
3 Tegel 10 x 20 cm 4.162 4.295 4.428
4 Tegel Plin 40 x 60 cm ( mar - mar ) 71.346 73.623 75.900
10 x 10 Cm ( teraso ) 5.946 6.135 6.325
5 Tegel Porselin 11 x 11 cm 2.973 3.068 3.163
6 Keramik Masterina Kw I 30 x 30 cm M2 178.365 184.058 189.750

Masterina Kw II 30 x 30 cm M2 118.315 122.091 125.868


Keramik 30/30 cm ( garuda) M2 74.535 76.914 79.293
40/40 cm ( mulia) M2 92.263 95.208 98.153
20 x 20 Cm (roman ) M2 68.698 70.890 73.083
20 x 20 Cm (garuda ) M2 63.455 65.480 67.505
Lantai biasa 30 x 30 M2 89.615 92.475 95.335
Lantai biasa 20 x 25 M2 41.240 42.556 43.873
Cincin keramik M' 49.077 50.644 52.210
7 Porselin Putih 10 x 10 cm M2 79.778 82.324 84.870
11 x 11 cm M2 89.615 92.475 95.335
15 x 15 cm M2 106.641 110.044 113.448
90.448
8 Porselin Warna 10 x 10 cm M2 103.290 106.586 109.883
11 x 11 cm M2 103.290 106.586 109.883
15 x 15 cm M2 62.158 64.141 66.125

9 Marmer 30 x 20 cm M2 62.158 64.141 66.125


30 x 30 cm M2 226.902 234.143 241.385
40 x 60 cm M2 329.597 340.116 350.635
Ezenza 30 x 30 cm M2 529.150 546.037 562.925
Ezenza 40 x 40 cm M2 336.840 347.590 358.340
Ezenza 60 x 60 cm M2 254.467 262.589 270.710

4 Bahan Langit-langit
1 Eternit 100 x 100 cm Lembar 100.155 103.351 106.548
Kembang Lembar 37.295 38.485 39.675
2 Triplek 3 mm Lembar 82.372 85.001 87.630
4 mm Lembar 107.235 110.658 114.080
9 mm Lembar 178.581 184.281 189.980
4 Takwod 3 mm Lembar 164.798 170.058 175.318
5 Formika 3 x 56 Ft Lembar 8.540 8.812 9.085
6 Lis Profil M 27.457 28.334 29.210
7 Lambro Siring Remin 1 x 9 cm M 45.186 46.628 48.070

5 Bahan Besi
1 Besi Beton Polos 4 mm x 6 m Batang 20.000 80.006 24.495
6 mm x 12 m Batang 35.000 45.000 68.943
8 mm x 12 m Batang 136.747 60.000 145.475
2 Besi Beton Polos 10 mm x 12 m Batang 158.258 70.000 168.360
4 mm x 12 m Batang 44.699 46.126 47.553
6 mm x 12 m Batang 64.806 66.874 68.943
9 mm x 12 m Batang 129.979 134.128 138.276
10 mm x 12 m Batang 143.989 148.585 153.180
Ikat beton Kg 33.295 34.357 35.420
Sumber : Dinas Pekerjaan Umum Duri Rol 53.131 54.827 56.523
(Hrt) Nyamuk127 M 55.455 57.225 58.995
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
Ayakan Pasir M 198.255 204.583 210.910
Kawat Ayam M 21.296 17.000 22.655
Harmonika M 44.537 45.959 47.380
Bronjong ø 3 mm Kg 18.269 18.852 19.435
Bronjong ø 4 mm Kg 18.269 18.852 19.435
Las Dos 9.134 9.426 9.718
3 Gerobak Dorong Dinding besi buah 450.000 570.000 953.178
Dinding plastik buah 470.000 540.000 802.873
4 Beton K - 250 M3 1.874.239 1.934.055 1.993.871
K - 225 M3 1.454.864 1.501.296 1.547.728
K - 175 M3 1.254.688 1.294.731 1.334.775
K - 125 M3 1.180.962 1.218.653 1.256.343
K - 350 M3 1.454.864 1.501.296 1.547.728
K - 400 M3 2.068.000 2.134.000 2.200.000
K - 300 M3 1.880.000 1.940.000 2.000.000
5 Mobilisasi Alat Drumix M3 29.728 30.676 31.625

6 Bahan Pipa
1 Pipa GIP
Pipa GIP Diameter 12,5 mm m1 14.864 15.338 15.813
Pipa GIP Diameter 20 mm m1 20.809 21.473 22.138
Pipa GIP Diameter 25 mm m1 29.728 30.676 31.625
Pipa GIP Diameter 40 mm m1 41.619 42.947 44.275
Pipa GIP Diameter 50 mm m1 59.455 61.353 63.250
Pipa GIP Diameter 63 mm m1 59.455 61.353 63.250
Pipa GIP Diameter 75 mm m1 65.401 67.488 69.575
Pipa GIP Diameter 100 mm m1 107.019 110.435 113.850
Pipa GIP Diameter 150 mm m1 225.929 233.140 240.350
Pipa GIP Diameter 200 mm m1 321.057 331.304 341.550
Pipa GIP Diameter 250 mm m1 481.586 496.955 512.325
Pipa GIP Diameter 300 mm m1 722.378 745.433 768.488
Pipa GIP Diameter 350 mm m1 1.308.010 1.349.755 1.391.500
Pipa GIP Diameter 400 mm m1 1.902.560 1.963.280 2.024.000

2 Pipa HDPE PE. 100 PN 10


Pipa HDPE Dia 20 mm m1 8.378 8.645 8.913
Pipa HDPE Dia 25 mm m1 11.945 12.326 12.708
Pipa HDPE Dia 32 mm m1 16.647 17.179 17.710
Pipa HDPE Dia 40 mm m1 34.538 35.640 36.743
Pipa HDPE Dia 50 mm m1 44.862 46.293 47.725
Pipa HDPE Dia 63 mm m1 56.915 58.731 60.548
Pipa HDPE Dia 75 mm m1 80.102 82.659 85.215
Pipa HDPE Dia 90 mm m1 113.883 117.518 121.153
Pipa HDPE Dia 100 mm m1 95.939 99.001 102.063
Pipa HDPE Dia 110 mm m1 170.312 175.747 181.183
Pipa HDPE Dia 125 mm m1 216.038 222.933 229.828
Pipa HDPE Dia 140 mm m1 271.709 280.381 289.053
Pipa HDPE Dia 150 mm m1 305.653 315.408 325.163
Pipa HDPE Dia 160 mm m1 356.460 367.836 379.213
Pipa HDPE Dia 180 mm m1 449.804 464.160 478.515
Pipa HDPE Dia 200 mm m1 555.202 572.921 590.640
Pipa HDPE Dia 225 mm m1 701.839 724.238 746.638
Pipa HDPE Dia 250 mm m1 862.692 890.225 917.758
Pipa HDPE Dia 280 mm m1 1.083.000 1.117.564 1.152.128
Pipa HDPE Dia 300 mm m1 1.244.177 1.283.885 1.323.593
Pipa HDPE Dia 315 mm m1 1.371.249 1.415.012 1.458.775
Pipa HDPE Dia 350 mm m1 1.492.591 1.540.227 1.587.863
Pipa HDPE Dia 355 mm m1 1.740.626 1.796.178 1.851.730
Pipa HDPE Dia 400 mm m1 2.203.727 2.274.058 2.344.390
Pipa HDPE Dia 450 mm m1 2.721.796 2.808.662 2.895.528
Pipa HDPE Dia 500 mm m1 3.367.693 3.475.173 3.582.653
Pipa HDPE Dia 560 mm m1 4.221.197 4.355.916 4.490.635
Pipa HDPE Dia 630 mm m1 5.343.761 5.514.307 5.684.853
Pipa HDPE Dia 710 mm m1 6.781.762 6.998.201 7.214.640
Pipa HDPE Dia 800 mm m1 8.604.003 8.878.599 9.153.195

3 Aksesoris Pipa HDPE


Coupling Dia 20 mm, HDPE Buah 49.186 50.755 52.325
Coupling Dia 25 mm, HDPE Buah 59.455 61.353 63.250
Coupling Dia 32 mm, HDPE Buah 75.940 78.364 80.788
End Cap Dia 20 mm, HDPE Buah 25.944 26.772 27.600
Sumber : Dinas Pekerjaan Umum
(Hrt) End Cap Dia 25 mm, HDPE 128 Buah 35.133 36.254 37.375
End Cap Dia 50 mm, HDPE Buah 111.884 115.454 119.025
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
End Cap Dia 75 mm, HDPE Buah 360.622 372.131 383.640
End Cap Dia 100 mm, HDPE Buah 758.213 782.412 806.610
End Cap Dia 150 mm, HDPE Buah 834.046 860.664 887.283
End Cap Dia 200 mm, HDPE Buah 875.772 903.722 931.673
End Cap Dia 250 mm, HDPE Buah 919.553 948.900 978.248
Dop/Cap Dia 400 mm (HDPE) Buah 1.149.427 1.186.111 1.222.795
Stub End Dia 50 mm, HDPE Buah 21.242 21.920 22.598
Stub End Dia 75 mm, HDPE Buah 95.669 98.722 101.775
Stub End Dia 100 mm, HDPE Buah 104.425 107.757 111.090
Stub End Dia 150 mm, HDPE Buah 164.420 169.668 174.915
Stub End Dia 200 mm, HDPE Buah 358.946 370.402 381.858
Stub End Dia 250 mm, HDPE Buah 517.799 534.325 550.850
Stub End Dia 300 mm, HDPE Buah 1.006.357 1.038.475 1.070.593
Stub End Dia 350 mm, HDPE Buah 1.725.222 1.780.282 1.835.343
Stub End Dia 400 mm, HDPE Buah 1.725.222 1.780.282 1.835.343
Bend 90, Dia 50 mm, HDPE Buah 104.749 108.092 111.435
Bend 90, Dia 75 mm, HDPE Buah 155.556 160.520 165.485
Bend 90, Dia 100 mm, HDPE Buah 392.727 405.261 417.795
Bend 90, Dia 150 mm, HDPE Buah 1.006.249 1.038.363 1.070.478
Bend 90, Dia 200 mm, HDPE Buah 1.426.812 1.472.348 1.517.885
Bend 90, Dia 250 mm, HDPE Buah 2.586.238 2.668.778 2.751.318
Bend 90, Dia 300 mm, HDPE Buah 4.778.615 4.931.124 5.083.633
Bend 90, Dia 400 mm, HDPE Buah 5.067.782 5.229.520 5.391.258
Bend 45, Dia 50 mm, HDPE Buah 95.939 99.001 102.063
Bend 45, Dia 75 mm, HDPE Buah 139.071 143.509 147.948
Bend 45, Dia 100 mm, HDPE Buah 331.381 341.957 352.533
Bend 45, Dia 150 mm, HDPE Buah 796.643 822.068 847.493
Bend 45, Dia 200 mm, HDPE Buah 1.362.384 1.405.865 1.449.345
Bend 45, Dia 250 mm, HDPE Buah 2.090.546 2.157.265 2.223.985
Bend 45, Dia 300 mm, HDPE Buah 3.820.200 3.942.121 4.064.043
Tee 400 x 200 mm (HDPE) Buah 5.798.430 5.983.486 6.168.543
Tee 250 x 250 mm (HDPE) Buah 2.616.128 2.699.622 2.783.115
Tee 250 x 200 mm (HDPE) Buah 3.424.013 3.533.290 3.642.568
Tee 250 x 150 mm (HDPE) Buah 3.424.013 3.533.290 3.642.568
Tee 200 x 200 mm (HDPE) Buah 1.375.518 1.419.418 1.463.318
Tee 200 x 150 mm (HDPE) Buah 1.789.704 1.846.822 1.903.940
Tee 200 x 100 mm (HDPE) Buah 829.602 856.079 882.556
Tee 150 x 150 mm (HDPE) Buah 1.046.949 1.080.362 1.113.775
Tee 150 x 100 mm (HDPE) Buah 1.028.139 1.060.952 1.093.765
Tee 150 x 75 mm (HDPE) Buah 1.028.139 1.060.952 1.093.765
Tee 100 x 100 mm (HDPE) Buah 359.541 371.015 382.490
Tee 100 x 75 mm (HDPE) Buah 455.155 469.681 484.208
Tee 100 x 50 mm (HDPE) Buah 439.913 453.953 467.993
Tee 75 x 75 mm (HDPE) Buah 157.177 162.194 167.210
Tee 75 x 50 mm (HDPE) Buah 286.843 295.998 305.153
Tee 50 x 50 mm (HDPE) Buah 110.100 113.614 117.128
Reducer Dia 400 x 300 mm (HDPE) Buah 2.639.748 2.723.995 2.808.243
Reducer Dia 250 x 200 mm (HDPE) Buah 844.639 871.596 898.553
Reducer Dia 250 x 150 mm (HDPE) Buah 844.639 871.596 898.553
Reducer Dia 200 x 150 mm (HDPE) Buah 433.049 446.869 460.690
Reducer Dia 200 x 100 mm (HDPE) Buah 433.049 446.869 460.690
Reducer Dia 150 x 100 mm (HDPE) Buah 227.226 234.478 241.730
Reducer Dia 150 x 75 mm (HDPE) Buah 207.660 214.288 220.915
Reducer Dia 100 x 75 mm (HDPE) Buah 99.884 103.072 106.260
Reducer Dia 100 x 50 mm (HDPE) Buah 83.994 86.674 89.355
Reducer Dia 75 x 50 mm (HDPE) Buah 60.644 62.580 64.515

4 Aksesoris PIPA
Gate Valve 50 mm Buah 1.970.717 2.033.612 2.096.508
Gate Valve 75 mm Buah 2.746.821 2.834.486 2.922.150
Gate Valve 100 mm Buah 3.470.388 3.581.145 3.691.903
Gate Valve 150 mm Buah 5.998.739 6.190.188 6.381.638
Gate Valve 200 mm Buah 9.262.008 9.557.604 9.853.200
Gate Valve 250 mm Buah 11.577.510 11.947.005 12.316.500
Gate Valve 300 mm Buah 19.000.737 19.607.144 20.213.550
Gate Valve 350 mm Buah 23.018.814 23.753.457 24.488.100
Gate Valve 400 mm Buah 28.773.518 29.691.821 30.610.125
Water Meter Dia 25 mm Buah 504.773 520.883 536.993
Water Meter Dia 50 mm Buah 757.186 781.352 805.518
Water Meter Dia 75 mm Buah 4.389.509 4.529.599 4.669.690
Water Meter Dia 100 mm Buah 5.852.696 6.039.484 6.226.273
Sumber : Dinas Pekerjaan Umum
Water Meter Dia 150 mm 129 Buah 14.008.030 14.455.095 14.902.160
(Hrt)
Water Meter Dia 200 mm Buah 15.528.565 16.024.158 16.519.750
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
Water Meter Dia 250 mm Buah 22.159.419 22.866.635 23.573.850
Water Meter Dia 300 mm Buah 41.118.375 42.430.664 43.742.953
Water Meter Dia 350 mm Buah 46.770.384 48.263.056 49.755.728
Water Meter Dia 400 mm Buah 56.193.461 57.986.869 59.780.278
Air Valve Double Dia 150 mm Buah 10.882.859 11.230.185 11.577.510
Air Valve Double Dia 100 mm Buah 7.899.948 8.152.074 8.404.200
Air Valve Double Dia 75 mm Buah 6.878.403 7.097.927 7.317.450
Air Valve Double Dia 50 mm Buah 5.243.931 5.411.291 5.578.650
Air Valve Singel Dia 150 mm Buah 10.215.450 10.541.475 10.867.500
Air Valve Singel Dia 100 mm Buah 5.788.755 5.973.503 6.158.250
Air Valve Singel Dia 75 mm Buah 3.153.169 3.253.802 3.354.435
Air Valve Singel Dia 50 mm Buah 2.982.911 3.078.111 3.173.310
Air Valve Singel Dia 25 mm Buah 1.342.170 1.385.005 1.427.840
Check Valve Dia 350 mm Buah 38.975.347 40.219.241 41.463.135
Check Valve Dia 300 mm Buah 21.954.137 22.654.801 23.355.465
Check Valve Dia 250 mm Buah 17.284.541 17.836.176 18.387.810
Check Valve Dia 200 mm Buah 8.853.390 9.135.945 9.418.500
Check Valve Dia 150 mm Buah 5.334.735 5.504.993 5.675.250
Check Valve Dia 100 mm Buah 3.178.140 3.279.570 3.381.000
Check Valve Dia 75 mm Buah 1.668.524 1.721.774 1.775.025
Check Valve Dia 50 mm Buah 1.191.803 1.229.839 1.267.875
Gibolt Joint 350 mm Buah 3.200.841 3.302.996 3.405.150
Giboult Joint 300 mm Buah 2.684.393 2.770.065 2.855.738
Giboult Joint 250 mm Buah 1.708.250 1.762.769 1.817.288
Giboult Joint 200 mm Buah 1.317.793 1.359.850 1.401.908
Giboultt Joint 150 mm Buah 442.670 456.797 470.925
Giboult Joint 100 mm Buah 160.691 165.819 170.948
Giboult Joint 75 mm Buah 133.449 137.708 141.968
Giboult Joint 50 mm Buah 115.775 119.470 123.165
Check Valve Dia 200 mm Buah 8.853.390 9.135.945 9.418.500
Check Valve Dia 150 mm Buah 5.334.735 5.504.993 5.675.250
Check Valve Dia 100 mm Buah 3.178.140 3.279.570 3.381.000
Check Valve Dia 75 mm Buah 1.668.524 1.721.774 1.775.025
Check Valve Dia 50 mm Buah 1.191.803 1.229.839 1.267.875
Gibolt Joint 350 mm Buah 3.200.841 3.302.996 3.405.150
Giboult Joint 300 mm Buah 2.684.393 2.770.065 2.855.738
Giboult Joint 250 mm Buah 1.708.250 1.762.769 1.817.288
Giboult Joint 200 mm Buah 1.317.793 1.359.850 1.401.908
Giboultt Joint 150 mm Buah 442.670 456.797 470.925
Giboult Joint 100 mm Buah 160.691 165.819 170.948
Giboult Joint 75 mm Buah 133.449 137.708 141.968
Giboult Joint 50 mm Buah 115.775 119.470 123.165
Blind Flange Dia 50 mm Buah 210.255 216.965 223.675
Blind Flange Dia 75 mm Buah 355.325 366.665 378.005
Blind Flange Dia 100 mm Buah 457.155 471.745 486.335
Blind Flange Dia 150 mm Buah 1.033.382 1.066.362 1.099.343
Blind Flange Dia 200 mm Buah 1.359.790 1.403.187 1.446.585
Blind Flange Dia 250 mm Buah 1.740.410 1.795.955 1.851.500
Blind Flange Dia 300 mm Buah 2.846.327 2.937.167 3.028.008
Blind Flange Dia 400 mm Buah 3.130.954 3.230.878 3.330.803
All Flange Dia 50 mm (GIP/Steel) Buah 221.335 228.399 235.463
All Flange Dia 75 mm (GIP/Steel) Buah 359.324 370.792 382.260
All Flange Dia 100 mm (GIP/Steel) Buah 433.000 446.819 460.638
Tee All Flange Dia 250 x 100 mm Buah 1.608.690 1.660.031 1.711.373
Tee All Flange Dia 200 x 100 mm Buah 795.562 820.952 846.343
Tee All Flange Dia 150 x 75 mm Buah 528.717 545.591 562.465
Tee All Flange Dia 100 x 50 mm Buah 335.867 346.586 357.305
Tee All Flange Dia 75 x 50 mm Buah 251.873 259.912 267.950
Bend All Flange 450 Dia 200 mm (GIP/Steel) Buah 2.634.721 2.718.808 2.802.895
Bend All Flange 450 Dia 150 mm (GIP/Steel) Buah 1.658.578 1.711.512 1.764.445
Bend All Flange 450 Dia 100 mm (GIP/Steel) Buah 926.471 956.039 985.608
Bend All Flange 450 Dia 75 mm (GIP/Steel) Buah 732.107 755.472 778.838
Bend All Flange 450 Dia 50 mm (GIP/Steel) Buah 488.072 503.648 519.225
Loose Flange Dia 300 mm Buah 542.122 559.423 576.725
Loose Flange Dia 250 mm Buah 403.754 416.639 429.525
Loose Flange Dia 150 mm Buah 373.431 385.349 397.268
Loose Flange Dia 100 mm Buah 262.737 271.122 279.508
Screen ND 200 mm Buah 85.129 87.846 90.563
Screen ND 150 mm Buah 64.103 66.149 68.195
Screen ND 100 mm Buah 51.077 52.707 54.338
Sumber : Dinas Pekerjaan
Pressure Gauge DiaUmum
150 mm Buah 170.258 175.691 181.125
(Hrt) 130
Pressure Gauge Dia 200 mm Buah 255.386 263.537 271.688
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
Pressure Gauge Dia 250 mm Buah 278.087 286.962 295.838
Fiet Kran Diameter 0,5" Buah 53.888 55.608 57.328
Fiet Kran Diameter 0,75" Buah 112.370 115.956 119.543
Fiet Kran Diameter 1" Buah 40.592 41.887 43.183
Fiet Kran Diameter 2" Buah 56.753 58.564 60.375
Fiet Kran Diameter 3" Buah 90.804 93.702 96.600
Fiet Kran Diameter 4" Buah 113.505 117.128 120.750
Lem Paralon Buah 312.139 322.101 332.063
sealtape Kaleng 159.718 164.815 169.913
Double Nipple ND. /4" Buah 7.351 7.585 7.820
Tee GI ND. 3/4" x 3/4" Buah 9.080 9.370 9.660
Bend ND. 3/4" F - F Buah 5.675 5.856 6.038
Conn S Elbow PE ND. 3/4" F - M Buah 55.617 57.392 59.168
Knie Screw (GI) dia. 3/4" Buah 53.888 55.608 57.328
Feet Kran ND. 3/4" Buah 54.482 56.221 57.960
Dop drat dalam ND. 3/4" Buah 14.161 14.613 15.065
Meter air ND. 1/2", Slumberger / Unit 510.773 527.074 543.375
( termasuk capnuts tail peces ) Buah 6.810 7.028 7.245
Clamp sadle ND. 2" x 1/2" Buah 7.945 8.199 8.453
Box meter (plate) termasuk kunci Buah 113.505 117.128 120.750

5 Aksesoris Pipa PVC


Flange Socket Dia 200 mm (PVC) Buah 1.318.982 1.361.077 1.403.173
Flange Socket Dia 150 mm (PVC) Buah 835.451 862.114 888.778
Flange Socket Dia 100 mm (PVC) Buah 513.421 529.807 546.193
Flange Socket Dia 75 mm (PVC) Buah 351.974 363.207 374.440
Flange Socket Dia 50 mm (PVC) Buah 226.091 233.307 240.523
Flange Spigot Dia 200 mm (PVC) Buah 1.236.772 1.276.244 1.315.715
Flange Spigot Dia 150 mm (PVC) Buah 775.942 800.706 825.470
Flange Spigot Dia 100 mm (PVC) Buah 488.288 503.871 519.455
Flange Spigot Dia 75 mm (PVC) Buah 333.164 343.797 354.430
Flange Spigot Dia 50 mm (PVC) Buah 213.173 219.977 226.780
Bend 90 Dia 200 mm (PVC) Buah 1.280.282 1.321.142 1.362.003
Bend 90 Dia 150 mm (PVC) Buah 629.953 650.058 670.163
Bend 90 Dia 100 mm (PVC) Buah 271.980 280.660 289.340
Bend 90 Dia 75 mm (PVC) Buah 144.638 149.254 153.870
Bend 90 Dia 50 mm (PVC) Buah 73.508 75.854 78.200

6 Mur/Baut Perlengkapan Pipa


Mur/Baut dan Ring Dia 50 mm (GIP/Steel) Buah 29.619 30.565 31.510
Mur/Baut dan Ring Dia 75 mm (GIP/Steel) Buah 29.619 30.565 31.510
Mur/Baut dan Ring Dia 100 mm (GIP/Steel) Buah 59.455 61.353 63.250
Mur/Baut dan Ring Dia 150 mm (GIP/Steel) Buah 65.617 67.711 69.805
Mur/Baut dan Ring Dia 200 mm (GIP/Steel) Buah 235.982 243.514 251.045
Mur/Baut dan Ring Dia 250 mm (GIP/Steel) Buah 354.028 365.326 376.625
Mur/Baut dan Ring Dia 400 mm (GIP/Steel) Buah 442.129 456.240 470.350

7 Pipa Steel
Pipa Steel Dia 50 mm m' 123.180 127.111 131.043
Pipa Steel Dia 75 mm m' 205.228 211.778 218.328
Pipa Steel Dia 100 mm m' 580.821 599.358 617.895
Pipa Steel Dia 150 mm m' 609.900 629.365 648.830
Pipa Steel Dia 200 mm m' 626.548 646.544 666.540
Pipa Steel Dia 250 mm m' 789.400 814.594 839.788
Pipa Steel Dia 300 mm m' 907.824 936.797 965.770
Reducer All Flange 200 x 150 mm m' 363.973 375.589 387.205
Reducer All Flange 200 x 100 mm m' 343.920 354.896 365.873
Reducer All Flange 200 x 75 mm m' 325.867 336.267 346.668
Reducer All Flange150 x 100 mm m' 330.191 340.729 351.268
Reducer All Flange 150 x 75 mm m' 330.894 341.455 352.015

8 Pengadaan street Box


Street Box 100 mm Unit 343.650 354.617 365.585
Street Box 75 mm Unit 256.413 264.597 272.780
Street Box 50 mm Unit 248.792 256.732 264.673

9 Mur/baut/Ring untuk koneksi Pipa


Dia 50 mm Unit 32.646 33.688 34.730
Dia 75 mm Unit 65.130 67.209 69.288
Dia 100 mm Unit 218.578 225.554 232.530
Dia 150 mm Unit 251.495 259.521 267.548
Sumber : Dinas Pekerjaan Umum
(Hrt)
Dia 200 mm 131 Unit 276.736 285.568 294.400
Dia 250 mm Unit 386.620 398.959 411.298
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
Dia 300 mm Unit 502.665 518.708 534.750
Dia 400 mm Unit 655.518 676.439 697.360

10 Pipa PVC Tekanan 8 kg/cm2


Pipa PVC, dia 2" panjang 4 m Batang 93.939 96.937 99.935
Pipa PVC, dia 3" panjang 4 m Batang 104.857 108.204 111.550
Pipa PVC, dia 4" panjang 4 m Batang 199.769 206.144 212.520
Pipa PVC, dia 6" panjang 4 m Batang 574.335 592.665 610.995
Pipa PVC, dia 8" panjang 4 m Batang 923.931 953.418 982.905
Ljoint PVC, dia 1/2 " Buah 6.864 7.083 7.303
Ljoint PVC, dia 3/4 " Buah 6.864 7.083 7.303
Ljoint PVC, dia 1" Buah 6.864 7.083 7.303
Ljoint PVC, dia 1 1/4" Buah 9.999 10.318 10.638
Ljoint PVC, dia 1 1/2" Buah 12.486 12.884 13.283
Ljoint PVC, dia 2" Buah 18.755 19.354 19.953
Ljoint PVC, dia 3" Buah 47.402 48.915 50.428
Ljoint PVC, dia 4" Buah 78.643 81.153 83.663
Ljoint PVC, dia 6" Buah 174.798 180.376 185.955
Ljoint PVC, dia 8" Buah 449.480 463.825 478.170
Ljoint PVC, dia 1/2 " Buah 14.972 15.450 15.928
Ljoint PVC, dia 3/4 " Buah 16.215 16.733 17.250
Ljoint PVC, dia 2 " Buah 22.431 23.147 23.863
Ljoint PVC, dia 3 " Buah 27.457 28.334 29.210
Ljoint PVC, dia 4 " Buah 62.428 64.420 66.413
Ljoint PVC, dia 6 " Buah 89.885 92.754 95.623
Ljoint PVC, dia 8 " Buah 169.771 175.189 180.608

11 Pipa PVC Tekanan 5 kg/cm2


Pipa, PVC Dia. 1 1/4", Panjang 4 M Batang 31.673 32.684 33.695
Pipa, PVC Dia. 1 1/2" Panjang 4 m Batang 59.996 61.910 63.825
Pipa, PVC Dia. 2", panjang 4 m Batang 65.346 67.432 69.518
Pipa, PVC Dia. 2 1/2 ", panjang 4 m Batang 103.560 106.865 110.170
Pipa, PVC Dia. 3 ", panjang 4 m Batang 144.962 149.589 154.215
Pipa, PVC Dia. 4 ", panjang 4 m Batang 217.659 224.606 231.553
Pipa, PVC Dia. 5 ", panjang 4 m Batang 342.839 353.781 364.723
Pipa, PVC Dia. 6 ", panjang 4 m Batang 492.882 508.612 524.343
Pipa, PVC Dia. 8 ", panjang 4 m Batang 822.425 848.672 874.920
Pipa, PVC Dia. 10 ", panjang 4 m Batang 1.217.963 1.256.834 1.295.705
Pipa, PVC Dia. 12 ", panjang 4 m Batang 1.710.250 1.764.833 1.819.415

12 Pipa PVC Tekanan 10 kg/cm2


Pipa, PVC Dia. 1/2 ", panjang 4 m Batang 32.106 33.130 34.155
Pipa, PVC Dia. 3/4 ", panjang 4 m Batang 64.320 66.372 68.425
Pipa, PVC Dia. 1", panjang 4 m Batang 56.212 58.006 59.800
Pipa, PVC Dia. 1 1/4 ", panjang 4 m Batang 75.940 78.364 80.788
Pipa, PVC Dia. 1 1/2 ", panjang 4 m Batang 98.966 102.124 105.283
Pipa, PVC Dia. 2 ", panjang 4 m Batang 140.584 145.071 149.558
Pipa, PVC Dia. 2 1/2", panjang 4 m Batang 181.068 186.846 192.625
Pipa, PVC Dia. 3 ", panjang 4 m Batang 275.925 284.731 293.538
Pipa, PVC Dia. 4 ", panjang 4 m Batang 426.617 440.232 453.848
Pipa, PVC Dia. 5 ", panjang 4 m Batang 558.445 576.267 594.090
Pipa, PVC Dia. 6 ", panjang 4 m Batang 838.532 865.293 892.055
Pipa, PVC Dia. 8 ", panjang 4 m Batang 1.268.175 1.308.649 1.349.123
Pipa, PVC Dia. 10 ", panjang 4 m Batang 1.932.342 1.994.012 2.055.683
Pipa, PVC Dia. 12 ", panjang 4 m Batang 2.741.427 2.828.919 2.916.412

13 Pipa Galvanis
(1) pipa galvanis dia 1/2 M 84.750 87.455 90.160
(2) pipa galvanis dia 3/4 M 82.048 84.666 87.285
(3) pipa galvanis dia 1" M 170.906 176.361 181.815
(3) pipa galvanis dia 2" M 239.279 246.916 254.553
(4) pipa galvanis dia 3" M 460.739 475.444 490.148
(4) pipa galvanis dia 4" M 787.446 812.577 837.708
(5) pipa galvanis dia 6" M 1.572.585 1.622.774 1.672.963

14 Pipa Ssumur Bor


(1) Pipa sumur black steel dia 4 " M 580.821 599.358 617.895
(2) Pipa sumur black steel dia 8 " M 626.548 646.544 666.540
(3) Pipa sumur black steel dia 11 " M 848.423 875.500 902.578
(4) Pipa sumur black steel dia 12 " M 1.383.626 1.427.784 1.471.943
(5) Pipa screen low cabon dia 3" ( schedule ) M 827.560 853.971 880.383
Sumber : Dinas Pekerjaan Umum
(Hrt) (6) Pipa screen low cabon dia 4" ( schedule ) 132 M 1.018.140 1.050.634 1.083.128
(7) Pipa sumur black steel dia 6 " ( schedule) M 1.592.475 1.643.299 1.694.123
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
(8) Pipa sumur black steel dia 3 " ( schedule) M 1.213.909 1.252.651 1.291.393
(9) Pipa sumur black steel dia 4 " ( medium) M 1.631.607 1.683.680 1.735.753
(10) Pipa sumur black steel dia 6 " ( medium) M 1.827.431 1.885.753 1.944.075
(11) Reduser dia 12 " - 6" Buah 522.123 538.787 555.450
(12) Reduser dia 10 " - 6" Buah 391.592 404.090 416.588
(13) Reduser dia 6 " - 4" Buah 314.517 324.555 334.593
(14) Reduser dia 6" - 3" Buah 300.842 310.444 320.045
(15) Centralizer Buah 7.179.191 7.408.314 7.637.438
(16) Centralizer Pack m3 6.983.422 7.206.297 7.429.173
(17) Pengadaan bottom plug Buah 3.915.923 4.040.899 4.165.875
(18)Tutup sumur + kunci Buah 652.654 673.483 694.313

15 Pipa Baja
(1) Pipa Baja klas Api OD 207 ID 200 M 535.149 552.228 569.308
(2) Pipa Baja klas Api OD 156 ID 150 M 378.512 390.592 402.673
(3) Pipa Screen Stenless Stell OD 156 ID 150 M 2.284.261 2.357.163 2.430.065

16 Pipa-pipa Lainnya
(1) Pipa leiding (dia 1/2) Batang 28.701 29.617 30.533
(2) Pipa leiding (dia 3/4) Batang 35.889 37.035 38.180
(3) Saringan /screen PVC 4 " Batang 14.972 15.450 15.928
(4) Paralon ø 1/2', panjang 4 m Batang 37.835 39.043 40.250
(5) Paralon ø 3/4', panjang 4 m Batang 46.321 47.799 49.278
(6) Paralon ø 1, panjang 4 m Batang 52.861 54.548 56.235
(7) Paralon ø 2', panjang 4 m Batang 53.510 55.217 56.925
(8) Paralon ø 3', panjang 4 m Batang 96.587 99.670 102.753
(9) Paralon ø 4', panjang 4 m Batang 177.500 183.165 188.830
(10) Pipa Tembaga Kg 208.849 215.515 222.180
(11) Pipa Paracous Kg 43.024 44.397 45.770
(12) Pipa Baja Kg 8.432 8.701 8.970
(13) Pipa Baja Bergelombang Kg 18.918 19.521 20.125

7 Bahan Penggantung
Kunci Tanam ( DM) Double siagg Buah 253.711 261.808 269.905
Tunggal Buah 101.992 105.247 108.503
Kunci Tanam (LN) Buah 239.333 246.972 254.610
Engsel Kuningan 5 - 10 cm Buah 36.592 37.760 38.928
Engsel Pintu Ring ilon 5 - 10 cm Buah 33.997 35.082 36.168
Engsel Pintu kupu - kupu 5 - 10 cm Buah 30.052 31.011 31.970
5 - 10 cm Buah 41.835 43.170 44.505
Engsel Pintu 4" H Nilon 5 - 10 cm Buah 20.917 21.585 22.253
Engsel Pintu 3" H Nilon Buah 19.620 20.246 20.873
Grendel
Grendel 2' Buah 8.864 9.147 9.430
Grendel 3' Buah 9.783 10.095 10.408
Grendel 4' Buah 11.459 11.824 12.190
Grendel 5 ' Buah 15.026 15.505 15.985
Grendel Pintu Buah 33.997 35.082 36.168
Grendel Jendela Buah 20.269 20.916 21.563
Tarikan Jendela Buah 16.323 16.844 17.365
Handle pintu Buah 253.711 261.808 269.905
Hak Angin Biasa Kg 22.215 22.924 23.633
Paku Kecil Kg 40.538 41.831 43.125
Paku Seng Besar Kg 20.269 20.916 21.563
Paku Putih persegi / Bulian Kg 62.103 64.085 66.068
Paku Asbes Kg 43.781 45.178 46.575
Paku Beton Kg 61.455 63.416 65.378
Baut 16 mm Buah 11.080 11.434 11.788
Besi Baut angker Buah 27.457 28.334 29.210
Mur/Baut 12 mm Buah 24.166 24.937 25.708
Baut ø 1/2 + Palt = 3 mm Buah 27.457 28.334 29.210
Baut ø 1/2 Buah 11.729 12.103 12.478
Baut ø 1/4 Buah 11.080 11.434 11.788
Baut ø 1 Buah 4.540 4.685 4.830
Baut ø 1,2 Buah 5.232 5.399 5.566

8 Bahan Sant Air


1 Closet Jongkok Keramik Buah 410.240 423.332 436.425
Toto Buah 293.978 303.360 312.743
Teraso Buah 307.653 317.471 327.290
2Sumber
Closet Duduk
: Dinas Pekerjaan Umum Komplet Buah 1.230.719 1.269.997 1.309.275
(Hrt) Jongkok133 Buah 211.930 218.694 225.458
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
Jongko (keramik KIA) Buah 293.978 303.360 312.743
Jaongko ( TOTO ) Buah 410.240 423.332 436.425
Jongkok 9Amerika Sytandar) Buah 341.866 352.777 363.688

3 Wastafel KIA Buah 540.122 557.360 574.598


Toto Buah 717.892 740.804 763.715
Amerika standar 9lengkap) Buah 2.598.184 2.681.104 2.764.025

4 Urinair KIA Buah 1.572.585 1.622.774 1.672.963


Toto Buah 1.299.092 1.340.552 1.382.013
5 Bak Cuci Logam Plat Buah 615.359 634.998 654.638
Keramik Buah 683.733 705.554 727.375
6 Tempat Sabu Keramik Buah 94.317 97.327 100.338
7 Bak Mandi Komplet dengan shouver Lux Buah 6.540.050 6.748.775 6.957.500
8 Tempat air fiber glass Kaps 500 liter Buah 1.268.770 1.309.262 1.349.755
Kaps 1000 Liter Buah 1.765.814 1.822.169 1.878.525
Kaps 2000 Liter Buah 3.466.227 3.576.851 3.687.475
9 Bahan Finising
1 Amplas Besi Lembar 10.432 10.765 11.098
Kayu Lembar 16.323 16.844 17.365
2 Cat Mini Kg 16.323 16.844 17.365
3 Spritus Botol 129.450 133.581 137.713
4 Thiner Botol 14.100 14.550 15.000
5 Fitur Botol 32.700 33.744 34.788
6 Sirlak Kg 135.990 140.330 144.670
7 Dempul Kg 39.240 40.493 41.745
8 Cat Mengkilat Clotek Kg 62.103 64.085 66.068
Platono Kg 64.049 66.093 68.138
9 Cat Tembok Vinilex Galon 177.879 183.556 189.233
Metrolit /5 lietr Galon 327.003 337.439 347.875
10 Cat Marka (Non Thermoplas) Kg 27.260 28.130 29.000
11 Cat Marka (Thermoplastic) Kg 65.330 67.415 69.500
11 Thiner Khusus marka Liter 26.160 26.995 27.830

10 Kaca
1 Kaca Polos 3 MM M2 170.041 175.468 180.895
5 MM M2 222.362 229.458 236.555
2 Kaca Rybend 3 MM M2 198.796 205.140 211.485
5 MM M2 234.091 241.562 249.033
10 MM M2 357.054 368.450 379.845

11 Galian dengan Ekcavator


1 Excavator Semi Long Arm Ukuran Kecil M3 M3 28.538 29.449 30.360
2 Excavator Semi Long Arm Ukuran Menengah M3 M3 30.809 31.792 32.775
3 Excavator Semi Long Arm Ukuran Panjang M3 M3 34.268 35.361 36.455
4 Excavator Semi Long Arm Super Long M3 M3 36.376 37.537 38.698

12 Rehabilitasi Jaringan Air


1 Kategori Ringan Ha 2.711.148 2.797.674 2.884.200
2 Kategori Sedang Ha 2.711.148 2.797.674 2.884.200
3 Kategori Berat Ha 7.277.292 7.509.546 7.741.800
4 Kategori Sedang A (Kurang dari 2000 Ha) Ha 12.778.069 13.185.879 13.593.690
5 Pembangunan Tanggul Type Standar (3mx5m) Km 159.800 164.900 170.000

13 Pengeboran Tanah/Sumur Uji (Termasuk


Penelitian)
1 Paket Sondir Titik 1.123.700 1.159.562 1.195.425
2 Paket Geosismik m 1.123.700 1.159.562 1.195.425
3 Paket Geoteknik m 1.273.526 1.314.171 1.354.815
4 Paket Boring 1.273.526 1.314.171 1.354.815

14 Pemberuntukan Hasil Galian


1 Type 4 m' M' 7.513 7.753 7.993
2 Type 3 m' M' 6.270 6.470 6.670
3 Type 2 m' M' 4.270 4.406 4.543
4 Type 1 m' M' 2.811 2.900 2.990

15 Pintu Air
1 Pintu Air 1,5 m x 2,5 x 3 m Unit 45.661.440 47.118.720 48.576.000
2SumberPintu Air Pekerjaan
: Dinas 1,3 m x 1,5 x3m
Umum Unit 42.807.600 44.173.800 45.540.000
3(Hrt) Pintu Air 1,0 m x 1,5 x 2,85 m 134 Unit 39.953.760 41.228.880 42.504.000
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
4 Pintu Air 1,0 m x 1,2 x 3 m Unit 38.526.840 39.756.420 40.986.000
5 Pintu Air 0,6 m x 0,6 x 3 m Unit 34.246.080 35.339.040 36.432.000
6 Pintu Air Tersier Unit 28.538.400 29.449.200 30.360.000

16 Pintu Flap
1 L.0.55 m X T.0.6 m Ha 39.953.760 41.228.880 42.504.000
2 L.20 m X T.1.0 m Ha 52.082.580 53.744.790 55.407.000
3 L.2.00 m X T.0.6 m Ha 57.790.260 59.634.630 61.479.000

17 Pemancangan Tiang Pancang


1 Pemancangan Tiang Pancang Baja M' 1.384.112 1.428.286 1.472.460
2 Pemancangan Tiang Pancang Beton Pratekan M3 642.114 662.607 683.100
3 Pemancangan Tiang Pancang Dolken Batang 99.884 103.072 106.260

18 Gorong-Gorong
1 Pengadaan dan Pemasangan Gorong2 ( 0,40 m) m 224.740 231.912 239.085
2 Pengadaan dan Pemasangan Gorong2 ( 0,60 m) m 277.493 286.349 295.205
3 Pengadaan dan Pemasangan Gorong2 ( 0,80 m) m 296.789 306.261 315.733
4 Pengadaan dan Pemasangan Gorong2 ( 1,00 m) m 297.491 306.986 316.480
5 Pengadaan dan Pemasangan Gorong2 ( 1,20 m) m 749.133 773.042 796.950

19 Upah
1 Crew Jam 14.161 14.613 15.065
2 Kepala Tukang Batu O-H 113.559 117.183 120.808
Jam 14.161 14.613 15.065
3 Kepala Tukang Besi O-H 113.559 117.183 120.808
Jam 14.161 14.613 15.065
4 Kepala Tukang Kayu O-H 113.559 117.183 120.808
Jam 14.161 14.613 15.065
5 Mandor O-H 90.642 93.535 96.428
Jam 11.296 11.657 12.018
6 Pekerja O-H 74.319 76.691 79.063
Jam 9.243 9.538 9.833
7 Pekerja terlatih ( Skil Labour ) O-H 74.319 76.691 79.063
8 Pekerja terlatih ( Superintendent ) O-H 71.076 73.344 75.613
9 Mekanik O-H 120.099 123.932 127.765
Jam 14.972 15.450 15.928
10 Pembantu Mekanik O-H 87.399 90.188 92.978
Jam 10.918 11.267 11.615
11 Pembantu Sopir O-H 74.319 76.691 79.063
Jam 11.280 11.640 12.000
12 Sopir O-H 76.913 79.368 81.823
13 Tukang anyaman O-H 93.939 96.937 99.935
14 Tukang Batu O-H 93.939 96.937 99.935
15 Tukang Besi O-H 93.939 96.937 99.935
16 Tukang Cat O-H 93.939 96.937 99.935
17 Tukang Gali O-H 93.939 96.937 99.935
18 Tukang Kayu Konstruksi O-H 93.939 96.937 99.935
19 Tukang Las O-H 120.099 123.932 127.765
20 Tukang Listrik O-H 113.559 117.183 120.808
Jam 14.161 14.613 15.065
21 Tukang mentagetereksi O-H 101.344 104.578 107.813
22 Tukang Pancang O-H 74.319 76.691 79.063
23 Tukang Pipa O-H 103.722 107.032 110.343
24 Tukang Tebas/Rintis O/M 21.620 22.310 23.000
25 Biaya Pengangkutan dan Pasang Panjang 1.5 M Lebar 20 Cm O/Patok 162.150 167.325 172.500
Patok Tanah
26 Operator Jam 12.220 12.610 13.000
27 Pembantu Operator Jam 11.280 11.640 12.000

Sumber : Dinas Pekerjaan Umum


(Hrt) 135
Standarisasi Harga Barang dan Jasa Kab.Tanjab Timur dipergunakan TA 2014
Bahan Bangunan dan Upah Kerja

PAGU DANA
NO URAIAN BARANG SPESIFIKASI SATUAN
ZONA 1 ZONA 2 ZONA 3
1 2 3 4 5
20 Pekerjaan Pemboran Tanah
1 Assisten Driller O-H 71.022 73.288 75.555
2 Driver /Operator O-H 219.984 227.004 234.025
3 Helper /Pitter lokal O-H 114.856 118.522 122.188
4 Penangung Jawab pemopaan Uji O-H 125.288 129.286 133.285
5 Tool Pusher O-H 74.319 76.691 79.063
6 Watchman/ Penjaga Malam O-H 66.427 68.547 70.668

Keterangan:
NO ZONA WILAYAH (DESA)
1 ZONA 1 (Tidak Terpencil) Kec. Ma Sabak Barat, Kuala Jambi, Geragai, Dendang, Ma. Sabak Timur

Kel. Mendahara Ilir-Sinar Kalimantan (Kec. Mendahara), Lagan Ulu (Kec.


Geragai), Kuala Lagan- Manunggal Makmur (Kuala Jambi),Kuala Dendang-Jati
Mulyo-Catur Rahayu-Kota Kandis (Kec. Dendang), Lambur-Kota Harapan - Siau
2 ZONA 2 (Terpencil) Dalam-Simbur Naik-Kuala Simbur-Kota Raja-Alang-alang (Kec. Ma. Sabak Timur),
Sei. Tering-Bunga Tanjung (Kec. Nipah Panjang), Rantau Jaya-Marga Mulyo-Tri
Mulyo-Pematang Mayan-Sungai Dusun-Rantau Rasau II-Harapan Makmur-
Bangun Karya (Kec Rantau Rasau), Desa Mencolok (Kec. Mendahara Ulu).

Lagan Tengah (kec. Geragai), Koto Kandis (Kec. Dendang),Sei Ular (Kec. Ma.
Sabak Timur), Pemusiran-Teluk Kijing-Sungai Raya-Simpang Jelita-Simpang
Datuk-Sungai Jeruk (Kec. Nipah Panjang), Sungai Beras-Sinar Wajo (Kec.
3 ZONA 3 (Sangat Terpencil)
Mendahara Ulu), Sei Tawar-Mendahara Tengah-Merbau-Bakti Idaman-Pangkal
Duri-Pangkal Duri Ilir (Kec. Mendahara), Lagan Ilir (Kec. geragai), Labuhan Pering-
Sungai Benu-Desa Baku Tuo-Sei. Jambat-Air Hitam Laut (Kec. Sadu)

Muara Sabak, 3 September 2014


Dibuat oleh, Mengetahui oleh,
Sekretaris Dinas Pekerjaan Umum

FIRMAWATI, S.T Drs. ALI FAHRUDDIN,


NIP. 19840922201101 2 011 NIP. 19761113199511 1 011

Sumber : Dinas Pekerjaan Umum