PEKERJAAN
: the GARDIN
TYPE
LILAC
40 /144 STANDARD
No.
Uraian Pekerjaan
A.
Pekerjaan Persiapan
1
2
3
4
Pembersihan lahan
Pembersihan Akhir
Pekerjaan Bouwplank
Listrik & air kerja
B.
1
2
3
4
5
6
7
Galian pondasi
Urugan/Buang tanah sisa galian
Urugan pasir bawah pondasi
Urugan sirtu peninggian lantai t = 40 cm
Pondasi batu kali
Sloof 15/20
Rollag Bata Teras
C.
Pekerjaan Struktur
Spesifikasi
Satuan
Volume
Harga Satuan
Total
2,260,141
m2
m2
m1
ls
144.00
40.85
30.00
1.00
5,000
3,125
26,250
625,000
720,000
127,641
787,500
625,000
9,326,806
padat distamper
padat distamper
K-175
m3
m3
m3
m3
m3
m3
m1
11.72
1.13
14.15
7.82
1.19
4.20
22,500
43,750
150,000
90,625
531,250
2,775,000
34,375
263,689
168,975
1,282,706
4,153,711
3,313,350
144,375
17,754,786
36.27
m3
0.54
3,187,500
m3
0.10
3,187,500
302,940
m3
0.61
3,187,500
1,953,695
4
5
6
7
m3
m3
m3
m3
1.73
1.07
0.22
1.24
3,421,875
3,421,875
3,421,875
2,775,000
5,928,398
3,650,354
751,119
3,449,325
D.
ad. 1 : 3
m2
12.51
71,875
899,156
m2
134.19
66,250
8,890,298
3
4
5
6
7
8
Plaster trasram - t = 30 cm
Plaster
Aci
Dinding Batu Alam
Keramik dinding KM
Finishing 'Opening' Pintu/Jendela
ad. 1 : 3
ad. 1 : 5
ad. 1 : 5
Paras Jogja, tanpa nat, incl. Coating
ex. IKAD 25x40; DX 1282
Plester Aci
m2
m2
m2
m2
m2
m'
25.02
197.19
197.19
7.80
11.40
53.50
35,000
28,750
10,000
262,500
81,250
13,750
875,700
5,669,251
1,971,913
2,047,500
925,844
735,625
E.
Kusen P1
unit
1.00
442,500
442,500
Kusen P2
unit
3.00
375,000
1,125,000
1.00
826,875
826,875
unit
3.00
425,000
1,275,000
unit
unit
1.00
278,750
278,750
unit
3.00
639,250
1,917,750
unit
2.00
865,750
1,731,500
6
7
1,718,955
22,015,287
12,507,500
1/3
No.
Uraian Pekerjaan
Spesifikasi
Satuan
Volume
Harga Satuan
Total
unit
1.00
482,250
482,250
9
10
11
12
13
unit
unit
ps
set
unit
1.00
1.00
4.50
4.00
4.00
353,500
572,375
90,000
606,250
168,000
353,500
572,375
405,000
2,425,000
672,000
F.
1
2
3
4
5
G.
1
2
3
4
5
6
H.
Pekerjaan Plafond
1
2
3
4
Plafond Gypsum
Plafond Calsiboard
Acian plafond exposed
Shadow Line
I.
Pekerjaan Cat
1
2
3
4
5
J.
Pekerjaan Sanitary
1
2
3
4
5
6
7
8
Closet duduk
Jet washer
Dak meja dapur + kichen sink
Shower Set
Kran kitchen sink
Kran Dinding
Kran taman
Floor drain
K.
Pekerjaan Elektrikal
titik
9.00
118,750
1,068,750
titik
4.00
143,750
575,000
3
4
Saklar tunggal
Saklar double
bh
bh
3.00
3.00
21,250
26,250
63,750
78,750
Outlet TV
bh
1.00
107,500
107,500
1.28
Rangka Atap Baja Ringan, GALVALUM, C75 T=0.75
FLAT EXEL ex Monier
FLAT EXEL ex Monier
Wood Plank 2x20 cm (tumpuk)
Aquaproof
m2
m2
m1
m1
m2
51.21
65.71
6.75
29.15
9.44
21,237,514
188,750
147,500
75,000
34,375
39,375
7,338,191
ok
ad. 1 : 3 : 6
ex. ASIA 40x40, MURANO
ex. ASIA 30x30, OSCAR BLACK
ex. IKAD 25x25; SL 2250 P2
ex. ASIA 40x40, MURANO
m2
m3
m2
m2
m2
m1
9,665,519
9,691,945
506,250
1,002,100
371,700
35.39
1.77
29.12
5.42
2.23
41.50
43,750
150,000
121,250
105,000
75,000
30,313
1,548,094
265,388
3,531,103
568,575
167,063
1,257,969
7,139,096
Elepant /setara 8 mm+ rangka metal puring
Calsiboard 8 mm+ rangka metal puring
m2
m2
m2
m'
31.15
17.49
14.01
47.20
107,500
121,250
18,125
30,000
3,348,356
2,120,808
253,931
1,416,000
7,666,700
EX JOTASHIELD
EX JOTAPLAS
EX JOTAPLAS
EX JOTAPLAS
Cat Minyak
m2
m2
m2
m2
m1
82.99
114.21
45.16
17.49
29.15
27,500
23,750
23,750
23,750
40,625
2,282,124
2,712,369
1,072,491
415,416
1,184,300
3,933,750
ex. Amstad
ex. Amstad
ex.Royal + afur (1 lubang)
ex. Amstad
Kran Kitceh Zink ex. Amstad
Kran Bak Mandi ex. Amstad
Kran Taman ex. Amstad
Floor Drain Plastik
unit
unit
unit
unit
unit
unit
unit
bh
1.00
1.00
1.00
1.00
2.00
1.00
2,531,250
306,250
468,750
218,750
175,000
58,750
2,531,250
306,250
468,750
218,750
350,000
58,750
7,528,750
2/3
No.
Uraian Pekerjaan
Box Panel
7
8
9
10
L.
Pekerjaan Plumbing
1
2
3
4
5
6
7
8
M.
Pekerjaan Halaman
1
2
3
4
Spesifikasi
incl. MCB 2Ampere 3 buah+ Sikering & Grounding (daya
1300 w) ex. SUKAKU + Toevoer & Pek. Grounding
1300 watt
Satuan
Volume
Harga Satuan
Total
ls
1.00
1,468,750
1,468,750
bh
unit
unit
Ls
1.00
2.00
6.00
1.00
156,250
306,250
97,500
2,812,500
156,250
612,500
585,000
2,812,500
8,351,500
m1
m1
m1
m1
m1
bh
bh
LS
20.00
4.00
16.00
36.60
6.00
22.60
8.00
4.00
1.00
1.00
21,250
23,750
31,250
40,000
52,500
437,500
3,125,000
1,500,000
85,000
380,000
187,500
904,000
420,000
1,750,000
3,125,000
1,500,000
16,322,250
rabat beton t = 10 cm + tali air fin. Aci
pas. Bata/rolag t = .40 cm, plester aci + cat
pond bt kali + pas. bt merah + plaster aci 1 muka + finish
cat
rumput gajah mini
m2
m1
m1
ls
14.22
20.00
24.30
1.00
87,500
71,250
553,750
196,875
1,244,250
1,425,000
13,456,125
196,875
A) Total =
B) Profit ,PPh =
C) Total A + B =
D) PPn 10% =
E) Total C + D =
Dibulatkan =
143,382,269
11,470,582
154,852,851
15,485,285
170,338,136
170,338,000