REKAPITULASI PEKERJAAN

KEGIATAN
PEKERJAAN
LOKASI

: Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan Tahun


: BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 17)
: SDN KETINTANG IV Surabaya

NO.
A
I
II
III
IV
V
VI
VII
VIII
IX
X
XI

URAIAN PEKERJAAN

JUMLAH HARGA (Rp.)

PEKERJAAN LANTAI 1
PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH
PEKERJAAN PONDASI & BETON
PEKERJAAN PASANGAN & PLESTERAN
PEKERJAAN KERAMIK
PEKERJAAN PLAFOND
PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI
PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASAR
PEKERJAAN PENGECATAN
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN SANITAIR & INSTALASI AIR

31,389,467.14
130,750,170.20
990,903,469.35
175,879,401.02
162,052,439.52
43,342,067.02
85,114,781.84
15,935,501.79
41,088,286.72
33,436,145.40
20,525,752.65
JUMLAH A

B
I
II
III
IV
V

1,730,417,482.66

PEKERJAAN LANTAI 2
PEKERJAAN BETON
PEKERJAAN PENGECATAN
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN SANITAIR & INSTALASI AIR
PEKERJAAN LAIN-LAIN

21,937,657.24
14,093,149.58
114,189.10
3,667,378.44
1,950,000.00
JUMLAH B

41,762,374.36

JUMLAH TOTAL (A+B)

1,772,179,857.02

JUMLAH TOTAL
PPN 10%
NILAI PEKERJAAN
DIBULATKAN
Terbilang :

1,772,179,857.02
177,217,985.70
1,949,397,842.72
1,949,397,000.00

SATU MILYAR SEMBILAN RATUS EMPAT PULUH SEMBILAN JUTA TIGA RATUS SEMBILAN PULUH TUJUH RIBU
Surabaya ,
Dibuat oleh :
CV. MAKARYA ENGINEERING

SHOLEHUDDIN, ST
Direktur

RINCIAN PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI

: Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan Tahun


: BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 17)
: SDN KETINTANG IV Surabaya

NO.

URAIAN PEKERJAAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

PEKERJAAN LANTAI 1

I
1
2
3

PEKERJAAN PENDAHULUAN
Pembongkaran Ruang Kelas, R.Guru (10 ruang)
Pembongkaran Ruang Aula (1 ruang)
Uitzet dan Pemasangan bowplank

II
1
2
3
4
5

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

V
1
2
3
4
5
6

1.00
1.00
114.00

PEKERJAAN TANAH
Galian Tanah Konstruksi
Galian Pondasi Bor Pile 40cm - 12m (Alat)
Urugan Sirtu Padat
Urugan Pasir Padat Bawah Pondasi
Urugan Pasir Padat Bawah Rabat Keliling bangunan

PEKERJAAN PONDASI & BETON


Rabat Beton Tebal 5 cm Bawah Pondasi & Sloof
Rabat Beton Tebal 5 cm Bawah Lantai
Bor Pile 40cm - 12m
Poer P1
Poer P2
Poer P3
Poer P4
Sloof S1 25/50
Sloof S2 20/40
Sloof S3 20/35
Sloof S4 15/25
Kolom K1 30/40
Kolom K2 20/20
Kolom Praktis KP 12/12
Balok B1 30/60
Balok B1A 30/60
Balok B1B 30/60
Balok B2 20/40
Balok B3 20/35
Balok B4 15/25
Balok BK 25/50
Balok Latei BL 12/20
Balok Level BLV 12/20
Plat Level tebal 8 cm
Plat Lantai tebal 12 cm Type A
Plat Lantai tebal 12 cm Type B
Plat Tangga

PEKERJAAN PASANGAN & PLESTERAN


Pasangan Dinding biasa 1/2 bata (1pc : 5ps)
Pasangan Dinding Trasram 1/2 bata (1pc : 3ps)
Plesteran Halus biasa (1pc : 5ps)
Plesteran Halus trasram (1pc : 3ps)
Acian Dinding
Benangan

48.72
792.00
228.70
4.87
22.87

K175
K175
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250
K250

7.54
22.87
99.48
20.06
13.09
1.94
3.89
10.19
3.70
4.20
2.96
16.80
2.40
1.37
13.23
1.35
6.57
6.23
6.49
1.92
3.00
1.40
1.58
1.41
18.26
35.09
3.41

508.39
54.34
1,016.78
108.68
1,016.78
992.00

ls
ls
m1

m3
m1
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m2
m2
m2
m2
m2
m1

9,750,000.00
9,750,000.00
104,293.57

9,750,000.00
9,750,000.00
11,889,467.14

JUMLAH I

31,389,467.14

69,250.00
101,125.40
185,200.00
177,700.00
177,700.00

3,373,860.00
80,091,316.80
42,355,240.00
865,754.40
4,063,999.00

JUMLAH II

130,750,170.20

879,675.42
879,675.42
2,012,813.43
3,057,970.87
2,783,327.19
3,229,730.09
2,624,520.48
3,377,651.41
3,960,536.58
3,909,789.40
4,604,259.07
4,114,707.56
6,953,003.70
5,906,246.12
3,968,839.81
4,560,890.24
4,264,865.02
5,123,175.28
4,700,592.31
4,829,530.13
5,032,972.20
6,708,443.83
7,217,237.17
5,081,251.09
4,933,151.39
4,637,126.17
6,559,120.59

6,636,711.24
20,118,176.95
200,225,018.81
61,355,127.62
36,428,186.22
6,252,757.45
10,204,135.61
34,409,823.76
14,638,143.18
16,421,115.46
13,622,851.53
69,127,086.94
16,687,208.88
8,079,744.69
52,507,750.62
6,157,201.82
28,020,163.19
31,927,628.35
30,518,595.54
9,296,241.81
15,098,916.59
9,418,655.13
11,432,103.67
7,146,271.53
90,069,478.07
162,714,160.63
22,390,214.03

JUMLAH IV

990,903,469.35

109,980.60
115,890.40
54,746.28
57,976.92
33,605.00
17,676.00

55,912,861.27
6,297,484.34
55,664,747.39
6,300,931.67
34,168,784.36
17,534,592.00

JUMLAH V

175,879,401.02

NO.

URAIAN PEKERJAAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

VI
1
2
3
4
5

VII
1
2

VIII
1
3
4
6
7
8

IX
1
2

X
1
2
3
4
5
6

XI
1
2
3
4
5
6
7

XII
1
2
3
4
5
6
7
8
9
10
11

PEKERJAAN KERAMIK
Lantai keramik 40 x 40 cm
Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga)
Plint keramik 10 x 40 cm
Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM)
Keramik Dinding 30 x 60 cm (Dinding KM)

PEKERJAAN PLAFOND
Pasang Plafon Kalsiboard 4 mm rangka Hollow
Pasang List Plafond Gypsum

PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI


Pas. Kusen Type PJ1
Pas. Kusen Type PBV
Pas. Kusen Type J1
Pas. Kusen Type J2
Pas. Kusen Type P1
Pas. Kusen Type BV

PEKERJAAN SUNSCREEN, RAILLING TANGGA & SELASAR


Pas. Sunscreen
Railing Tangga Besi Hollow

PEKERJAAN PENGECATAN
Cat Dinding Tembok Interior (Enamel/spotless)
Cat Dinding Tembok Exterior (Weathershield)
Cat Plafond Interior (Enamel/spotless)
Cat Plafond Exterior (Weathershield)
Cat Besi Railing Tangga
Waterproofing Plat Level

PEKERJAAN INSTALASI LISTRIK


Instalasi Titik Lampu + fitting lampu
Instalasi Titik Stop Kontak + Stop Kontak
Pemasangan Saklar Tunggal
Pemasangan Saklar Ganda
Pemasangan Lampu TL Waterproof 2x36W
Pemasangan Lampu SL 11 Watt & Downligth 4"
Pemasangan Panel Box MCB 9 Modul

PEKERJAAN SANITAIR & INSTALASI AIR


Pemasangan Pipa Air Bersih PVC Type AW 3/4"
Pemasangan Pipa Air Bersih PVC Type AW 1"
Pemasangan Pipa Air Kotor PVC Type D 3"
Pemasangan Pipa Air Kloset PVC Type D 4"
Kloset Jongkok
Pasang Kran Air
Pasang Avour
Wastafel + Kran + Cermin
Septic Tank Beton Kap. 3 m3 eks Fabrikan
Sumur Resapan
Pompa elektric (kapasitas hisap 30m,dorong 30m )

309.44
113.04
220.18
30.07
168.20

341.63
245.72

6.00
2.00
15.00
2.00
6.00
3.00

27.03
8.28

503.00
491.02
341.63
99.20
8.28
52.32

m2
m2
m1
m2
m2

m2
m2

unit
unit
unit
unit
unit
unit

m1
m2

m2
m2
m2
m2
m2
m2

35.00 bh
23.00 bh
7.00 bh
9.00 bh
35.00 bh
10.00 bh
1.00 unit

43.70 m1
15.00 m1
73.50 m1
27.00 m1
6.00 bh
6.00 bh
8.00 bh
4.00 bh
1.00 Unit
1.00 bh
1.00 Unit

221,555.00
226,859.00
28,032.80
215,327.00
328,214.00

68,556,871.43
25,644,141.36
6,172,261.90
6,474,882.89
55,204,281.94

JUMLAH VI

162,052,439.52

112,561.69
19,891.00

38,454,450.50
4,887,616.52

JUMLAH VII

43,342,067.02

4,500,314.46
2,447,217.64
2,545,677.03
1,072,571.47
1,979,759.20
336,535.41

27,001,886.74
4,894,435.28
38,185,155.48
2,145,142.94
11,878,555.17
1,009,606.23

JUMLAH VIII

85,114,781.84

485,916.00
338,308.25

13,134,309.48
2,801,192.31

JUMLAH IX

15,935,501.79

25,481.44
29,567.50
25,481.44
29,567.50
63,214.00
30,410.00

12,817,285.42
14,518,340.29
8,705,223.53
2,933,096.00
523,411.92
1,590,929.56

JUMLAH X

41,088,286.72

215,330.00
114,189.10
32,439.10
41,539.10
592,791.00
105,291.00
871,725.50

7,536,550.00
2,626,349.30
227,073.70
373,851.90
20,747,685.00
1,052,910.00
871,725.50

JUMLAH XI

33,436,145.40

17,122.20
18,682.20
33,502.20
45,502.20
721,415.00
49,725.00
34,225.00
823,255.00
3,600,000.00
3,045,923.41
966,725.00

748,240.14
280,233.00
2,462,411.70
1,228,559.40
4,328,490.00
298,350.00
273,800.00
3,293,020.00
3,600,000.00
3,045,923.41
966,725.00

JUMLAH XII

20,525,752.65

JUMLAH A

1,730,417,482.66

NO.

URAIAN PEKERJAAN

VOLUME

HARGA SATUAN

JUMLAH HARGA

PEKERJAAN LANTAI 2

I
1
2

PEKERJAAN BETON
Kolom K1 30/40 Stek
Kolom K2 20/20 Stek

II
1

PEKERJAAN PENGECATAN
Waterproofing Plat Atap

III
1

PEKERJAAN INSTALASI LISTRIK


Instalasi Titik Stop Kontak + Stop Kontak

IV
1
2
3
4
5

PEKERJAAN SANITAIR & INSTALASI AIR


Pemasangan Pipa Air Bersih PVC Type AW 3/4"
Pemasangan Pipa Air Kotor PVC Type D 3"
Pemasangan Pipa Air Kloset PVC Type D 4"
Roof Tank 1200lt (Stainless)
Pompa Booster

V
1
2

PEKERJAAN LAIN-LAIN
Pembersihan Akhir
Pekerjaan Penutup Tangga Lt. 2 (Sementara)

K175
K175

4.37
0.62

463.44

1.00

m3
m3

4,039,775.73
6,878,071.88

17,645,740.39
4,291,916.85

JUMLAH I

21,937,657.24

30,410.00

14,093,149.58

JUMLAH II

14,093,149.58

114,189.10

114,189.10

JUMLAH III

114,189.10

17,122.20
33,502.20
45,502.20
2,350,000.00
966,725.00
JUMLAH IV

188,344.20
80,405.28
81,903.96
2,350,000.00
966,725.00
3,667,378.44

975,000.00
975,000.00
JUMLAH V

975,000.00
975,000.00
1,950,000.00

JUMLAH B

41,762,374.36

JUMLAH TOTAL (A+B)

1,772,179,857.02

m2

bh

11.00 m1
2.40 m1
1.80 m1
1.00 Unit
1.00 Unit

1.00
1.00

ls
ls

RINCIAN PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI

II

: Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan Tahun


: BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 59)
: SDN KETINTANG IV Surabaya

NO.

URAIAN PEKERJAAN

PANJANG

LEBAR

TINGGI

JUMLAH

PEKERJAAN PENDAHULUAN
Uitzet dan Pemasangan bowplank
PEKERJAAN TANAH
Galian Tanah Konstruksi
poer 1
poer 2

poer 3
poer 4
Galian Pondasi Bor Pile 40cm - 12m (Alat)
Urugan Sirtu Padat

Urugan Pasir Padat Bawah Pondasi


poer 1
poer 2

poer 3
poer 4
Urugan Pasir Padat Bawah Rabat Keliling bangunan

PEKERJAAN PONDASI & BETON


Rabat Beton Tebal 5 cm Bawah Pondasi & Sloof
Poer, P1,P2,P3,P4
S1 melintang
S1 memanjang
S2 melintang
S2 memanjang
S3 memanjang
S4 memanjang
S4 melintang

82.2

31.8

2.2
2.2
1.45

1.2
1.2
1

0.5
0.5
0.5

19
8
8

2.2
0.9

2.2
0.9

0.5
0.5

1
12
66

32.5
17

9
9.7

12
0.5
0.5

2.2
2.2
1.45

1.2
1.2
1

0.05
0.05
0.05

19
8
8

2.2
0.9

2.2
0.9

0.05
0.05

1
12

32.5
17

9
9.7

0.05
0.05

49
32.5
34
12.2
60
42.7
36.2

0.25
0.25
0.2
0.2
0.2
0.15
0.15

0.05
0.05
0.05
0.05
0.05
0.05
0.05

32.5
17

9
9.7

0.05
0.05

Rabat Beton Tebal 5 cm Bawah Lantai

Bor Pile 40cm - 12m


Poer P1
Poer P2

12
2.2
2.2
1.45

1.2
1.2
1

0.4
0.4
0.4

66
19
8
8

2.2
0.9

2.2
0.9

0.4
0.4

1
12

S1 melintang
S1 memanjang

49
32.5

0.25
0.25

0.5
0.5

S2 melintang
S2 memanjang

34
12.2

0.2
0.2

0.4
0.4

S3 memanjang

60

0.2

0.35

S4 memanjang
S4 melintang

42.7
36.2

0.15
0.15

0.25
0.25

Kolom K1 30/40
Kolom K2 20/20
Kolom Praktis KP 12/12
Balok B1 30/60
B1 Melintang
B1 Memanjang

0.4
0.2
0.12

0.3
0.2
0.12

5
5
3.8

56
17.5

0.3
0.3

0.6
0.6

Poer P3
Poer P4
Sloof S1 25/50

Sloof S2 20/40

Sloof S3 20/35
Sloof S4 15/25

Balok B1A 30/60


B1A Memanjang
Balok B1B 30/60
B1B Melintang
B1B Memanjang

7.5

0.3

0.6

14
22.5

0.3
0.3

0.6
0.6

Balok B2 20/40
B2 Memanjang
B2 Melintang

26.9
51

0.2
0.2

0.4
0.4

Balok B3 20/35
B3 Memanjang
B3 Melintang

85.75
7

0.2
0.2

0.35
0.35

Balok B4 15/25
B4 Memanjang
B4 Melintang

32.5
18.83

0.15
0.15

0.25
0.25

Balok BK 25/50
BK Memanjang
BK Melintang

6
18

0.25
0.25

0.5
0.5

Balok Latei BL 12/20


BL Memanjang
BL Melintang

32.5
26

0.12
0.12

0.2
0.2

Balok Level BLV 12/20

28
12
25

BLV Memanjang
BLV Melintang

40
26

0.12
0.12

0.2
0.2

2.3
0.8
0.8

0.6
0.6
0.6

0.08
0.08
0.08

Plat Lantai tebal 12 cm Type A


factor pengurang (voide)

17
4.25

9.5
2.2

0.12
0.12

Plat Lantai tebal 12 cm Type B


factor pengurang (shap)

32.5
0.44

9
0.2

0.12
0.12

Plat Tangga

7.75
2.05
1

1
1.6

0.12
0.12

Plat Level tebal 8 cm


J1
J3
BV

Bordes
Anak Tangga
PEKERJAAN PASANGAN & PLESTERAN
Pasangan Dinding biasa 1/2 bata (1pc : 5ps)
As 1, 2
As 6, 8, 10, 12
As 3, 4, 5
As Toilet
As A, A'
As D, G
As F
As Toilet
Factor Pengurang
PJ1
PBV

Pasangan Dinding Trasram 1/2 bata (1pc : 3ps)


As 3, 4, 5
As D, G
As Toilet
As Toilet
Factor Pengurang
P1
PBV

Plesteran Halus biasa (1pc : 5ps)


Plesteran Halus trasram (1pc : 3ps)
Acian Dinding
Benangan
As 1
As 2
As 3

22

17
7
7
4.4
7.5
32.5
9.7
1.5

4.2
4.2
2.7
1
4.2
2.7
2.7
1

1.72
0.98

J1
J3
P1
BV

11
2
3

0.6
0.5

6
2
2
15
2
8
3

1.5
1.5
1
1

3
2
2
6

1.5
1.5

6
2

4
4
4

42
40
12

0.56
0.6

0.78
0.8

7
5
4.4
1.5
0.78
0.98

2
4
3
2
2
2
1
6

1.5
1.5
4
1.5
4
4
4
4
4
4
4

As 4
As 5
As 6
As 7
As 8
As 9
As 10
As 11
As 12
PEKERJAAN KERAMIK
Lantai keramik 40 x 40 cm
Ruang Kelas
perpus
R.Komputer & kelas

21
6
17
29
17
16
17
16
17
16
17

7.35
7.35
7.35

6.85
4.85
8.35

3
1
2

Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga)


teras
32.5
17.1
Bordes
2.05
Anak Tangga
0.48

2
2
1.6
1

22

Plint keramik 10 x 40 cm
factor pengurang
Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM)

221.74
1.56

Keramik Dinding 30 x 60 cm (Dinding KM)


toilet

17.6
6.22
18.4

Factor pengurang

PEKERJAAN PLAFOND
Pasang Plafon Kalsiboard 4 mm rangka Hollow
Ruang Kelas
perpus
R.Komputer & kelas
Toilet

Pasang List Plafond Gypsum


Ruang Kelas
perpus
R.Komputer & kelas
Toilet

PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI

0.78
0.8

2.5
2.5
2.5

2.1
0.5

8
5

7.35
7.35
7.35
2.35

6.85
4.85
8.35
6.85

3
1
2
2

14.7
14.7
14.7
17.6
6.22

13.7
9.7
16.7
18.4

3
1
2
1
6

Pas. Kusen Type PJ1


Kusen 4" Horisontal
Kusen 4" Vertical
Kusen Slimar
Pintu Wpc L=90cm T=210cm
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type PJ2
Kusen 4" Horisontal
Kusen 4" Vertical
Kusen Slimar
Pintu Wpc L=90cm T=210cm
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type PBV
Kusen 4" Horisontal
Kusen 4" Vertical
Pintu Wpc L=90cm T=210cm
Kisi-Kisi
Pas. Kusen Type J1
Kusen 4" Vertical
Kusen 4" Horisontal
Kusen Slimar
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type J2
Kusen 4" Vertical
Kusen 4" Horisontal
Kusen Slimar
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type J2
Kusen 4" Vertical
Kusen 4" Horisontal
Kusen Slimar
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type P1
Kusen 4" Vertical
Kusen 4" Horisontal
Pintu WPC L=70cm T=210cm
Pas. Kusen Type BV
Kusen 4" Vertical
Kusen 4" Horisontal
Kaca Bening 5mm
Pas. Sunscreen

Railing Tangga Besi Hollow


PEKERJAAN PENGECATAN

6.44
8.4
6.4
1
1.23
1.26
7.84
8.9
6.4
2
1.58
1.26
3.47
5.94
1
0.86
6.08
6.78
9.6
1.13
1.89
4.56
4.56
6.4
0.76
1.26
3.04
2.34
3.2
0.39
0.63
4.2
0.78
1
1
1.6
0.4
3.55
2.8
2.7
3.3
1.7
9.2

0.85
0.85
0.85
0.85
0.85

6
1
1
1
1
0.9

Cat Dinding Tembok Interior (Enamel/spotless)


Ruang Kelas
perpus
R.Komputer & kelas
Factor Pengurang
PJ1
J1
J3

7.35
7.35
7.35

6.85
4.85
8.35

3.4
3.4
3.4

3
1
2
6
15
2

Cat Dinding Tembok Exterior (Weathershield)


79
51.2
1.2

Kolom K2
Factor Pengurang
PJ1
J1
J3
BV
PBV

0.8
1.72
0.98

Cat Plafond Exterior (Weathershield)


Plafond Interior
Plafond Exterior

32.5
17.1

2
2

7
2.26
0.8
0.8

5
0.6
0.6
0.6

PEKERJAAN INSTALASI LISTRIK


Instalasi Titik Lampu + fitting lampu
Instalasi Titik Stop Kontak + Stop Kontak
Pemasangan Saklar Tunggal
Pemasangan Saklar Ganda
Pemasangan Lampu TL Waterproof 2x36W
Pemasangan Lampu SL 11 Watt & Downligth 4"
Pemasangan Panel Box MCB 9 Modul
PEKERJAAN SANITAIR & INSTALASI AIR
Pemasangan Pipa Air Bersih PVC Type AW 3/4"
Up
Down
Pemasangan Pipa Air Bersih PVC Type AW 1"
Pemasangan Pipa Air Kotor PVC Type D 3"

12

0.5
0.56
2.1

6
15
2
3
1
1

341.63
teras

Cat Besi Railing Tangga


Waterproofing Plat Level
Area Toilet
Canoipy J1
Canoipy J3
Canopy BV

4
4
4

11
2
3

35
23
7
9
35
10
1

11.2
32.5
15
49.5
24

Pemasangan Pipa Air Kloset PVC Type D 4"


Kloset Jongkok
Pasang Kran Air
Pasang Avour
Wastafel + Kran + Cermin
Urinoir + Sekat
Septic Tank Beton Kap. 3 m3 eks Fabrikan
Sumur Resapan
Pompa elektric (kapasitas hisap 30m,dorong 30m )
PEKERJAAN LANTAI 2
PEKERJAAN BETON
Kolom K1 30/40 Stek
Kolom K2 20/20 Stek
Kolom Praktis KP 12/12

Kolom K2 20/20 Stek


Kolom Praktis KP 12/12
Balok B2 20/40
Balok B3 20/35
Balok B4 15/25
Balok RB1 25/50
Balok BK 25/50
Balok Latei BL 12/20
Balok Level BLV 12/20
Plat Level tebal 8 cm
Plat Lantai tebal 12 cm

27

0.4
0.2
0.12

0.3
0.2
0.12

4
5
3.8

28
12
25

LUAS

TOTAL

VOLUME

9
114

114

25.08
10.56
5.8
16.36

25.08

2.42
4.86

2.42
4.86
48.72
792

792
146.25
82.45
228.7
2.508
1.056
0.58
1.636
0.242
0.486
14.625
8.245
22.87

16.36

228.7
2.508

1.636
0.242
0.486
4.872

22.87

4.872
0.6125
0.40625
0.34
0.122
0.6
0.32025
0.2715
7.5445
14.625
8.245
22.87

22.87

38
24
4
66

0.1256

99.4752
20.064
8.448
4.64
13.088
1.936
3.888

6.125
4.0625
10.1875
2.72
0.976
3.696
4.2

99.4752
20.064

13.088
1.936
3.888

10.1875

3.696
4.2

1.60125
1.3575
2.95875
16.8
2.4
1.368

2.95875
16.8
2.4
1.368

10.08
3.15
13.23

13.23

1.35

1.35

2.52
4.05
6.57

6.57

2.152
4.08
6.232

6.232

6.0025
0.49
6.4925

6.4925

1.21875
0.706125
1.924875

1.924875

0.75
2.25
3

0.78
0.624
1.404

1.404

0.96
0.624
1.584

0.095

4.876

3.4352
1.1856
3.744
1.2

1.2144
0.0768
0.1152
1.4064
19.38
1.122
18.258
35.1
0.01056
35.08944
0.93
0.3936
2.09
3.4136

1.584

1.4064

18.258

35.08944

3.4136

142.8
117.6
56.7
8.8
63
175.5
26.19
9
599.59
29.256
1.9264
1.176
51.528
2.3712
3.744
1.2
91.2016
508.3884

7.02
2.94

31.5
15
8.8
9
64.3
7.02
2.94
9.96
1016.7768
108.68
1016.7768
168
160
48

54.34
1016.7768
108.68
1016.7768

161.5
9.35
0
292.5
0.088
463.438

-18.258

14.82
15.25

31.5
9
68
43.5
68
64
68
64
68
64
68
992

992

151.0425
35.6475
122.745
Err:522

Err:522

65
34.2
3.28
10.56
113.04

113.04

220.18

220.18

30.07

30.07

44
93.3
46
183.3
13.104
2
15.104
168.196

151.0425
35.6475
122.745
32.195
341.63

341.63

85.2
24.4
62.8
36
37.32
245.72

245.72

18.105
2.38
2.295
2.805
1.445
27.03
8.28

27.03
8.28

4.876
3.4352
1.1856

289.68
82.96
213.52
586.16
29.256
51.528
2.3712
83.1552
503.0048
316
204.8
57.6
578.4

4.876
3.4352
1.1856

29.256
51.528
2.3712
1.2
0.9632
2.058
87.3764
491.0236
341.63

341.63

65
34.2
99.2
8.28

99.2
8.28

35
14.916
0.96
1.44
52.316

52.316

11.2
32.5
43.7
15
49.5
24

43.7
15

73.5
27
6
6
8
4
1
1
1

73.5
27
6
6
8
4
0
1
1
1

13.44
2.4
1.368

13.44
2.4
1.368

RINCIAN PEKERJAAN
KEGIATAN
PEKERJAAN
LOKASI

: Pembangunan/Rehabilitasi Fasilitas Gedung Pendidikan Dasar Sembilan Tahun


: BIAYA PERENCANAAN NILAI PEKERJAAN 1M - 2M (PAKET 59)
: SDN KETINTANG IV Surabaya

NO.

URAIAN PEKERJAAN

PANJANG

LEBAR

TINGGI

JUMLAH

PEKERJAAN LANTAI 2
PEKERJAAN BETON
Kolom K1 30/40
Kolom K2 20/20
Kolom Praktis KP 12/12
Balok B1 30/60
B1 Melintang
B1 Memanjang

0.4
0.2
0.12

0.3
0.2
0.12

1.3
1.3
3.8

56
17.5

0.3
0.3

0.6
0.6

Balok B1A 30/60


B1A Memanjang
Balok B1B 30/60
B1B Melintang
B1B Memanjang

7.5

0.3

0.6

14
22.5

0.3
0.3

0.6
0.6

Balok B2 20/40
B2 Memanjang
B2 Melintang

26.9
51

0.2
0.2

0.4
0.4

Balok B3 20/35
B3 Memanjang
B3 Melintang

85.75
7

0.2
0.2

0.35
0.35

Balok B4 15/25
B4 Memanjang
B4 Melintang

32.5
18.83

0.15
0.15

0.25
0.25

Balok BK 25/50
BK Memanjang
BK Melintang

6
18

0.25
0.25

0.5
0.5

Balok Latei BL 12/20


BL Memanjang
BL Melintang

32.5
26

0.12
0.12

0.2
0.2

Balok Level BLV 12/20


BLV Memanjang
BLV Melintang

40
26

0.12
0.12

0.2
0.2

Plat Level tebal 8 cm


J1
J3
BV

2.3
0.8
0.8

0.6
0.6
0.6

0.08
0.08
0.08

28
12
25

11
2
3

Plat Lantai tebal 12 cm Type A


factor pengurang (voide)

17
4.25

9.5
2.2

0.12
0.12

Plat Lantai tebal 12 cm Type B


factor pengurang (shap)

32.5
0.44

9
0.2

0.12
0.12

Plat Tangga

7.75
2.05
1

1
1.6

0.12
0.12

Bordes
Anak Tangga
PEKERJAAN PASANGAN & PLESTERAN
Pasangan Dinding biasa 1/2 bata (1pc : 5ps)
As 1, 2
As 6, 8, 10, 12
As 3, 4, 5
As Toilet
As A, A'
As D, G
As F
As Toilet
Factor Pengurang
PJ1
PBV

17
7
7
4.4
7.5
32.5
9.7
1.5

4.2
4.2
2.7
1
4.2
2.7
2.7
1

1.72
0.98

0.56
0.6

J1
J3
P1
BV

Pasangan Dinding Trasram 1/2 bata (1pc : 3ps)


As 3, 4, 5
As D, G
As Toilet
As Toilet
Factor Pengurang
P1
PBV

Plesteran Halus biasa (1pc : 5ps)


Plesteran Halus trasram (1pc : 3ps)
Acian Dinding
Benangan
As 1
As 2
As 3
As 4
As 5
As 6
As 7
As 8

22

0.78
0.8

7
5
4.4
1.5
0.78
0.98

2
4
3
2
2
2
1
6

0.6
0.5

6
2
2
15
2
8
3

1.5
1.5
1
1

3
2
2
6

1.5
1.5

6
2

4
4
4
1.5
1.5
4
1.5
4
4
4

42
40
12
21
6
17
29
17
16
17

As 9
As 10
As 11
As 12
PEKERJAAN KERAMIK
Lantai keramik 40 x 40 cm
Ruang Kelas
perpus
R.Komputer & kelas

4
4
4
4

16
17
16
17

7.35
7.35
7.35

6.85
4.85
8.35

3
1
2

Lantai keramik 40 x 40 cm Tekstur Kasar (Lantai Trap Teras & Tangga)


teras
32.5
17.1
Bordes
2.05
Anak Tangga
0.48

2
2
1.6
1

22

Plint keramik 10 x 40 cm
factor pengurang
Lantai keramik 30 x 30 cm Tekstur Kasar (Lantai KM)

221.74
1.56

Keramik Dinding 30 x 60 cm (Dinding KM)


toilet

17.6
6.22
18.4

Factor pengurang

PEKERJAAN PLAFOND
Pasang Plafon Kalsiboard 4 mm rangka Hollow
Ruang Kelas
perpus
R.Komputer & kelas
Toilet

Pasang List Plafond Gypsum


Ruang Kelas
perpus
R.Komputer & kelas
Toilet

PEKERJAAN PINTU DAN JENDELA DAN PENGUNCI


Pas. Kusen Type PJ1
Kusen 4" Horisontal
Kusen 4" Vertical
Kusen Slimar
Pintu Wpc L=90cm T=210cm
Kisi-Kisi
Kaca Bening 5mm

0.78
0.8

2.5
2.5
2.5

2.1
0.5

8
5

7.35
7.35
7.35
2.35

6.85
4.85
8.35
6.85

3
1
2
2

14.7
14.7
14.7
17.6
6.22

13.7
9.7
16.7
18.4

3
1
2
1
6

6.44
8.4
6.4
1
1.23
1.26

Pas. Kusen Type PJ2


Kusen 4" Horisontal
Kusen 4" Vertical
Kusen Slimar
Pintu Wpc L=90cm T=210cm
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type PBV
Kusen 4" Horisontal
Kusen 4" Vertical
Pintu Wpc L=90cm T=210cm
Kisi-Kisi
Pas. Kusen Type J1
Kusen 4" Vertical
Kusen 4" Horisontal
Kusen Slimar
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type J2
Kusen 4" Vertical
Kusen 4" Horisontal
Kusen Slimar
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type J2
Kusen 4" Vertical
Kusen 4" Horisontal
Kusen Slimar
Kisi-Kisi
Kaca Bening 5mm
Pas. Kusen Type P1
Kusen 4" Vertical
Kusen 4" Horisontal
Pintu WPC L=70cm T=210cm
Pas. Kusen Type BV
Kusen 4" Vertical
Kusen 4" Horisontal
Kaca Bening 5mm
Pas. Sunscreen

Railing Tangga Besi Hollow


PEKERJAAN PENGECATAN
Cat Dinding Tembok Interior (Enamel/spotless)
Ruang Kelas
perpus
R.Komputer & kelas
Factor Pengurang
PJ1
J1

7.84
8.9
6.4
2
1.58
1.26
3.47
5.94
1
0.86
6.08
6.78
9.6
1.13
1.89
4.56
4.56
6.4
0.76
1.26
3.04
2.34
3.2
0.39
0.63
4.2
0.78
1
1
1.6
0.4
3.55
2.8
2.7
3.3
1.7

0.85
0.85
0.85
0.85
0.85

9.2

7.35
7.35
7.35

6
1
1
1
1
0.9

6.85
4.85
8.35

3.4
3.4
3.4

3
1
2
6
15

J3

Cat Dinding Tembok Exterior (Weathershield)


79
51.2
1.2

Kolom K2
Factor Pengurang
PJ1
J1
J3
BV
PBV

0.8
1.72
0.98

Cat Plafond Exterior (Weathershield)


Plafond Interior
Plafond Exterior

12

0.5
0.56
2.1

6
15
2
3
1
1

0
teras

Cat Besi Railing Tangga


Waterproofing Plat Level
Area Toilet
Canoipy J1
Canoipy J3
Canopy BV

4
4
4

32.5
17.1

2
2

7
2.26
0.8
0.8

5
0.6
0.6
0.6

PEKERJAAN INSTALASI LISTRIK


Instalasi Titik Lampu + fitting lampu
Instalasi Titik Stop Kontak + Stop Kontak
Pemasangan Saklar Tunggal
Pemasangan Saklar Ganda
Pemasangan Lampu TL Waterproof 2x36W
Pemasangan Lampu SL 11 Watt & Downligth 4"
Pemasangan Panel Box MCB 9 Modul

11
2
3

35
19
7
9
35
10
1

PEKERJAAN SANITAIR & INSTALASI AIR


Pemasangan Pipa Air Bersih PVC Type AW 3/4"
Up
Down

5.5
5.5

Pemasangan Pipa Air Bersih PVC Type AW 1"


Pemasangan Pipa Air Kotor PVC Type D 3"

15
2.4

Pemasangan Pipa Air Kloset PVC Type D 4"


Kloset Jongkok
Pasang Kran Air
Pasang Avour
Wastafel + Kran + Cermin
Urinoir + Sekat

1.8

Septic Tank Beton Kap. 3 m3 eks Fabrikan


Sumur Resapan
Roof Tank 1200lt (Stainless)
Pompa Booster
0
0

LUAS

TOTAL

VOLUME

4.368
0.624
1.368
10.08
3.15
13.23
1.35
2.52
4.05
6.57
2.152
4.08
6.232
6.0025
0.49
6.4925
1.21875
0.706125
1.924875
0.75
2.25
3
0.78
0.624
1.404
0.96
0.624
1.584
1.2144
0.0768
0.1152

4.368
0.624

0.095

4.876

3.4352
1.1856
3.744
1.2

7.02
2.94

1.4064
19.38
1.122
18.258
35.1
0.01056
35.08944
0.93
0.3936
2.09
3.4136

142.8
117.6
56.7
8.8
63
175.5
26.19
9
599.59
29.256
1.9264
1.176
51.528
2.3712
3.744
1.2
91.2016

31.5
15
8.8
9
64.3
7.02
2.94
9.96
0
0
0
168
160
48
31.5
9
68
43.5
68
64
68

-18.258

64
68
64
68
992

151.0425
35.6475
122.745
Err:522
65
34.2
3.28
10.56
113.04
220.18
14.82
15.25

30.07
44
93.3
46
183.3
13.104
2
15.104

151.0425
35.6475
122.745
32.195
341.63
85.2
24.4
62.8
36
37.32
245.72

18.105
2.38
2.295
2.805
1.445
27.03
8.28

4.876
3.4352

289.68
82.96
213.52
586.16
29.256
51.528

1.1856

2.3712
83.1552

316
204.8
57.6
578.4
4.876
3.4352
1.1856

29.256
51.528
2.3712
1.2
0.9632
2.058
87.3764

0
65
34.2
99.2
8.28
35
14.916
0.96
1.44
52.316

5.5
5.5
11
15
2.4
0
2.4
1.8
6
6
8
4

11

2.4
1.8

1
1
1

1
1

DAFTAR STANDAR HARGA SATUAN DASAR(SHSD)


No

Namadan Spesifikasi

Satuan

Harga(Rp)

Keterangan

I
1

MATERIAL.
Air (Biaya air tawar)

ltr

Rp

30.00

2
3

Aluminium 4" (silver)


Aluminium 4" (dark brown)

M1
M1

Rp
Rp

90,000.00
90,000.00

YKK
YKK

4
5

Aluminium 4" (brown)


Aluminium 4" (powder coating)

M1
M2

Rp
Rp

90,000.00
100,000.00

YKK
YKK

6
7
8

Aluminium 3" (silver)


Aluminium 3" (dark brown)
Aluminium 3" (brown)

M1
M1
M1

Rp
Rp
Rp

90,000.00
90,000.00
90,000.00

YKK
YKK
YKK

9
10

Aluminium 3" (powder coating)


Aluminium Composite Panel 1,22x2,44 (0.21PVDV)

M2
lembar

Rp
Rp

100,000.00
192,000.00

YKK
goldstar

11
12

Aluminium Composite Panel 1,22x2,44 (0.21PVDV)


Aluminium Composite Panel 1,22x2,44 (0.21 PE)

lembar
lembar

Rp
Rp

192,000.00
204,000.00

alumebond
Alustar

13
14

Aluminium Composite Panel 1,22x2,44 (0.3 PVDV)


Aluminium Composite Panel 1,22x2,44 (0.21 PE)

lembar
lembar

Rp
Rp

264,000.00
204,000.00

Alustar
seven

15
16

Aluminium Composite Panel 1,22x2,44 (0.3 PVDV)


Aluminium Composite Panel 1,22x2,44 (0.5 PVDV)

lembar
lembar

Rp
Rp

264,000.00
324,000.00

seven
seven

17
18

Aluminium Composite Panel 1,22x2,44 (0.21 PE)


Aluminium Composite Panel 1,22x2,44 (0.21PVDV)

lembar
lembar

Rp
Rp

264,000.00
312,000.00

New Alucopan
New Alucopan

19
20

Aluminium Composite Panel 1,22x2,44 (0.5 PVDV)


Aluminium Composite Panel 1,22x2,44 (0.3 PVDV)

lembar
lembar

Rp
Rp

384,000.00
570,000.00

Alcopla
Alucobond

21
22

Aluminium Composite Panel 1,22x2,44 (0.5 PVDV)


Aluminium Composite Panel 1,22x2,44 (0.21PVDV)

lembar
lembar

Rp
Rp

636,000.00
192,000.00

Alucobond
marks

23
24

Kisi-kisi Aluminium Profil Z


Asbes datar Tb. 4 mm (1x1m)

m1
Lembar

Rp
Rp

13,500.00
16,000.00

Djabesment

25
26

Asbes gelombang besar


Asbes gelombang kecil (150x108x0,5 cm)

M2
M2

Rp
Rp

35,000.00
35,371.43

Djabesment
Djabesment

27
28

Asbes gelombang kecil (180x108x0,5 cm)


Asbes gelombang kecil (210x108x0,5 cm)

M2
M2

Rp
Rp

36,352.94
33,375.00

Djabesment
Djabesment

29
30

Asbes gelombang kecil (150x108x0,4 cm)


Asbes gelombang kecil (180x108x0,4 cm)

M2
M2

Rp
Rp

27,714.29
27,364.71

Djabesment
Djabesment

31
32
33

Asbes gelombang kecil (210x108x0,4 cm)


Aqua Proof
Angkur dia 12mm

M2
kg
kg

Rp
Rp
Rp

27,000.00
45,500.00
14,000.00

Djabesment
No drop
Hi Steel

34
35

Avour
Wuwung asbes gelombang besar

bh
m1

Rp
Rp

17,500.00
55,000.00

axel
Djabesment

36
37

Wuwung asbes gelombang kecil


Batu ampyang

m1
m2

Rp
Rp

29,500.00
29,300.00

Djabesment
Rockindo

38
39

Batu alam
Batu bobos uk10x20x1,5cm

m2
m2

Rp
Rp

32,100.00
123,500.00

Rockindo
Rockindo

40
41

Batu Gilang ex jember uk.20x20cm


Batu Gilang ex jember

m2
m2

Rp
Rp

76,500.00
72,000.00

Rockindo
Rockindo

42
43

Batu Gilang ex Cirebon uk. 20x20


Batu Gilang ex Cirebon

m2
m2

Rp
Rp

103,600.00
60,700.00

Rockindo
Rockindo

44
45

Batu hias
Batu kali pecah15/20

m2
m3

Rp
Rp

80,300.00
140,200.00

Rockindo
Ex. UD. Hartono

46
47

Batu pecah mesin 1/2


Batu pecah mesin 2/3

m3
m3

Rp
Rp

250,000.00
150,000.00

Ex. UD. Hartono


Ex. UD. Hartono

48
49

Batu Kali Pecah 5/7


Batu Kerikil

M3
M3

Rp
Rp

215,000.00
150,000.00

Ex. UD. Hartono


Ex. UD. Hartono

50
51

Bataco t =10 cm
Bata merah (kelas 1)

Bh
Bh

Rp
Rp

4,600.00
730.00

Ex. UD. Hartono


MRH

52
53

Bata Berongga Expose


Bata ringan

Bh
m3

Rp
Rp

4,200.00
830,000.00

Ex. UD. Hartono


citicon

54

Batu Klinker

Bh

Rp

28,700.00

Ex. UD. Hartono

55
56
57

Baut HTB 16 mm
Angkur dia 19mm
Besi beton polos/ulir

bh
bh
Kg

Rp
Rp
Rp

3,000.00
30,000.00
9,200.00

Setia Agung Jaya

58
59

Besi Wiremesh
Besi plat strip + baut mur

Kg
Kg

Rp
Rp

18,714.04
16,309.70

CV. Sembilan perkasa


Abadi metal utama

60
61

Besi plat strip


Besi plat tebal 1cm

Kg
Kg

Rp
Rp

13,059.70
26,000.00

Abadi metal utama


Abadi metal utama

62
63

Besi profil (baja konstruksi)


Besi profil siku 50x50x6

Kg
Kg

Rp
Rp

18,200.00
7,300.00

Abadi metal utama


Abadi metal utama

64
65

Batu gilang ex cirebon(110x20x1,5)


Bambu Bongkotan d 8-12 cm pj 3m

Kg
btg

Rp
Rp

5,200.00
22,000.00

Rockindo

66
67

Bambu Bongkotan d 8-12 cm pj 4m


Bambu Ori 10-12Cm P j 3.00 Mt

btg
btg

Rp
Rp

27,000.00
31,000.00

68
69

Besi Profil C100-150mm


Besi Profil WF

Kg
Kg

Rp
Rp

12,500.00
12,500.00

Abadi metal utama

70
71

Besi Profil (Baja Konstruksi)


Besi Plat Bordes 4\"x8\"Tebal 3 mm

Kg
kg

Rp
Rp

12,500.00
12,500.00

Abadi metal utama


Abadi metal utama

72
73

Besi Plat Bordes 4\"x8\"Tebal 2 mm


Besi Plat landas tb12mm

kg
kg

Rp
Rp

12,500.00
12,500.00

Abadi metal utama


Abadi metal utama

74
75

Besi Plat Strip Pj6,00m3x30mm


Blank Flanged 100

kg
kg

Rp
Rp

12,500.00
84,200.00

Abadi metal utama


Global Exporter

76
77

Box Bak Kontrol


Bondek 1mmx1000mm

m3
m2

Rp
Rp

1,801,200.00
150,000.00

Ex. UD. Hartono


Bluescope

78
79
80

Buis beton bulat uk. 100x50 cm


Cat Alkali Resisting Primer
Cat Emco

bh
kg
kg

Rp
Rp
Rp

70,000.00
25,000.00
45,700.00

Ex. UD. Hartono


Jotun, dulux
Emco

81
82

Cat Genteng
Cat tembok luar (5kg)

kg
Kaleng

Rp
Rp

58,400.00
Avian Paint
300,000.00jotashiled, dulux weatershield

83
84

Cat tembok dalam (5kg)


Cat tembok dalam spotless (2,5 ltr) kebutuhan 3,74 ltr

Kaleng
Kaleng

Rp
Rp

215,000.00jotun majestic, dulux pentalite


221,408.00
Nipo Paint

85
86

Cat dasar (dempul tembok)


Cat dasar/primer (2,5 ltr)_kebutuhan 3,74 ltr (5kg)

Kg
Kg

Rp
Rp

15,000.00
24,600.00

gm2
dulux

87
88

Cat Meni Besi


Cat Meni Kayu

Kg
Kg

Rp
Rp

32,000.00
46,000.00

emco
emco

89
90

Cat Kayu
Cat Penutup Kayu

Kg
Kg

Rp
Rp

43,000.00
20,950.00

emco
emco

91
92

Cerlak
Clear doof

kg
kg

Rp
Rp

11,500.00
46,000.00

multi jaya
Suzuka

93
94

Closed Jongkok Porselain


Closed Duduk Porselain

bh
bh

Rp
Rp

300,000.00
2,000,000.00

95
96

Closed Duduk Porselain tanpa reservoir


Coating

bh
kg

Rp
Rp

700,000.00
5,000.00

Toto C50
kyoto

97
98

Coumpond
Daun pintu PVC

kg
bh

Rp
Rp

19,000.00
195,000.00

Blinken
varian

99
100

Daun Pintu WPC + Kaca + Finishing Politur (92x210)


Daun Pintu WPC + Finishing Politur (82x210)

bh
bh

Rp
Rp

1,350,000.00
1,200,000.00

101
102

Daun Pintu WPC + Finishing Politur (72x210)


Engsel Kuningan ARCH u Pintu

bh
Stel

Rp
Rp

1,130,000.00
26,000.00

103
104
105

Engsel H
Engsel Kuningan ARCH u Jendela
Engsel Casement u Jendela

Stel
Stel
Stel

Rp
Rp
Rp

10,000.00
13,500.00
40,000.00

Solid
Solid

106
107

Elektroda las
Elektroda baja(20%)

Kg
Kg

Rp
Rp

29,200.00
30,000.00

Badak Steel
Badak Steel

108
109

Elektroda baja
FBBT 100

Kg
Bh

Rp
Rp

49,325.00
412,000.00

Badak Steel
Maspion

110
111

Friction Stay 16"


Friction Stay 12"

Bh
Bh

Rp
Rp

68,000.00
52,000.00

112
113

Fitting Plafond
Fiber Glass

Bh
m2

Rp
Rp

42,500.00
33,500.00

Broco
Sunloid

114

Fitrase

m2

Rp

325,600.00

Bekron

Toto CE6
Toto CW661jt1

Solid

115
116
117

Foam Lapisan Karet


Gedeg Guling
Glangsing 25 kg (isi 150 kg sedimen)

m2
m2
Lembar

Rp
Rp
Rp

49,200.00
38,750.00
1,500.00

Utama Berdikari

118
119

Genteng flam pres jawa


Genteng Kaca

Bh
Bh

Rp
Rp

1,750.00
22,000.00

PG. Genteng Press


M Class

120
121

Genteng karang Pilang / Wisma


Genteng Keramik

Bh
Bh

Rp
Rp

4,000.00
8,500.00

Karang Pilang
M class

122
123

Genteng Galvalume
Genteng Wuwung Jawa

lbr
bh

Rp
Rp

49,200.00
4,000.00

Profile Asia
PG. Genteng Press

124
125

Genteng wuwung karang Pilang / Wisma


Genteng wuwung Keramik

Bh
Bh

Rp
Rp

12,300.00
83,600.00

Karang Pilang
M class

126
127

Genteng Wuwung Asbes Gelombang Kecil


GentengWuwung Galvalume

bh
bh

Rp
Rp

29,000.00
67,525.00

Djabesment
Profile Asia

128
129

Glass Blok
Gorden Ekksklusif

bh
bh

Rp
Rp

16,500.00
42,000.00

Mulia
Famili Gorden

130
131

Grendel Panjang
Grendel Biasa Kecil

bh
bh

Rp
Rp

20,000.00
12,500.00

Solid
Solid

132
133

Grendel Biasa Besar


Grendel Tanam

bh
bh

Rp
Rp

17,000.00
102,000.00

Solid
Solid

134
135

Grendel Ekspanyolet
Gym Floor

bh
m2

Rp
Rp

69,300.00
270,000.00

Solid
Connor Sport.

136
137

Gypsumt =9mm
Gypsumt =12 mm

lbr
lbr

Rp
Rp

53,500.00
72,500.00

Jayaboard
Jayaboard

138
139
140

Kalsiboard EG Uk. 240 x 120 x 9mm


Kalsiboard EG Uk. 240 x 120 x 4mm
Kalsiboard EG Uk. 240 x 120 x 6mm

Lembar
Lembar
Lembar

Rp
Rp
Rp

146,500.00
72,890.00
106,750.00

Kalsiboard
Kalsiboard
Kalsiboard

141
142

Kalsiplank polos Uk. 30 x 300 x 8mm


Kalsiplank polos Uk. 20 x 300 x 8mm

Lembar
Lembar

Rp
Rp

52,000.00
34,000.00

143
144

Hakangin sikutan (biasa)


Hakangin sikutan (kuningan)

bh
Stel

Rp
Rp

9,500.00
11,200.00

solid
solid

145
146

Hakangin Lurus
Hakangin Lurus kuningan bisa disetel maju/mundur

bh
bh

Rp
Rp

27,200.00
16,500.00

solid
solid

147
148

Handle + Kunci Tanam besar 2x putar kuningan


Head Penangkal Petir

bh
bh

Rp
Rp

125,000.00
4,720,000.00

kurn 150

149
150

Isolator
Ijuk

Bh
Kg

Rp
Rp

30,200.00
10,250.00

Vickers
UD lestari

151
152

Wuwung Genteng karangPilang/Wisma


Kaca Cermin t=5mm

Bh
m2

Rp
Rp

8,200.00
182,000.00

Karang Pilang
Assahimass

153
154

Kanstin BDCM 21,5 m


KanstinTrap. Uk.15.25.40

m
m

Rp
Rp

65,700.00
55,650.00

Kanstin
Kanstin

155
156

Kapur pasang
Kapur Gamping

m3
m3

Rp
Rp

60,000.00
67,200.00

157
158

Karpet Wold Cels


Kawat Bendrat

m2
Kg

Rp
Rp

292,500.00
14,500.00

Hi Steel

159
160

Kawat Baja Hitam 10mm


Kawat Duri Pagar

Kg
Kg

Rp
Rp

14,000.00
61,000.00

Hi Steel
Hi Steel

161
162

Kawat Harmonika lebar 90cm


Kawat Nyamuk kasa Plastik Lebar 90 cm

m2
m2

Rp
Rp

16,100.00
19,000.00

Hi Steel
Hi Steel

163
164
165

Kawat Nyamuk kasa Aluminium Lebar 90 cm


Kawat Ikat
Kawat Beton Diameter 30 cm

m2
m2
Kg

Rp
Rp
Rp

29,500.00
12,300.00
14,500.00

Hi Steel
Hi Steel
Hi Steel

166
167

Kayu jati reng


Dolken Kayu Gelam 8-10cm p=4m

m3
btg

Rp
Rp

4,820,000.00
6,800.00

168
169

Kayu Jati papan klas II


Kayu Jati Balok (8/12)

m3
m3

Rp
Rp

14,900,000.00
14,584,000.00

170
171

Kayu Jati Balok (6/15)


Kayu Jati usuk (5/7)

m3
m3

Rp
Rp

4,822,000.00
14,584,000.00

172
173

Kayu Kamper Balok (6/15)


Kayu Kamper balok 8/12

m3
m3

Rp
Rp

9,027,777.78
6,500,000.00

174

Kayu Kamper 2/20 cm

m3

Rp

4,875,000.00

welttech

175
176
177

Kayu Kamper 3/30 cm


Kayu Kamper 1/3cm
Kayu Kamper 1/5cm

m3
m3
m3

Rp
Rp
Rp

8,190,277.78
6,250,000.00
4,300,000.00

178
179

Kayu kamper (slimar)


Kayu Kamper Usuk

m3
m3

Rp
Rp

5,150,000.00
3,300,000.00

180
181

Kayu Kamper reng (balok 3/5)


Kayu Meranti 3/5

m3
m3

Rp
Rp

4,816,666.67
4,816,666.67

182
183

Kayu Meranti Balok 8/12


Kayu Meranti Usuk 4/6

m3
m3

Rp
Rp

5,333,333.33
4,166,666.67

184
185

Kayu Meranti Usuk balok 5/7


Kayu Meranti (Papan 2/20)

m3
m3

Rp
Rp

4,160,714.29
5,000,000.00

186
187

Kayu Meranti Bekisting


Kayu Meranti papan 3/30

m3
m3

Rp
Rp

3,500,000.00
6,162,500.00

188
189

Kayu usuk meranti (SKUR)


Keramik 20x20cm (motif/warna)

m3
m2

Rp
Rp

3,854,166.67
47,000.00

Asia / Roman

190
191

Keramik 30x 30putihpolos


Keramik 30x 30cm (motif/warna)

m2
m2

Rp
Rp

47,500.00
70,000.00

Asia / Roman
Asia / Roman

192
193

Keramik 40x 40cm putih polos


Keramik 40x 40cm (motif/warna)

m2
m2

Rp
Rp

70,000.00
80,000.00

Platinum / Roman
Platinum / Roman

194
195

Keramik 40x40cm Tekstur Kasar


Keramik 50x 50cm putih polos

m2
m2

Rp
Rp

85,000.00
82,500.00

Platinum / Roman

196
197

Keramik 50x 50cm (motif/warna)


Keramik 60x 60cm (motif/warna)

m2
m2

Rp
Rp

86,000.00
140,000.00

Platinum / Roman
Platinum / Roman

198
199
200

Keramik 20x 33cm putih polos


Keramik 20x 33cm (motif/warna)
Keramik 20x 50cm putih polos

m2
m2
m2

Rp
Rp
Rp

80,000.00
65,000.00
90,000.00

Platinum / Roman
Platinum / Roman
Platinum / Roman

201
202

Keramik 20x 50cm (motif/warna)


Keramik 30x 60cm (motif/warna)

m2
m2

Rp
Rp

85,000.00
152,500.00

Platinum / Roman
Platinum / Roman

203
204

Keramik tegel plint warna/motif 7,5x20


Keramik tegel plint warna/motif 7,5x21

bh
bh

Rp
Rp

7,200.00
7,200.00

Platinum / Roman
Platinum / Roman

205
206

Keramik Tegel Porselain11x11


Keramik step nosing 8x30 cm

m2
bh

Rp
Rp

89,700.00
11,000.00

Mulia
Platinum / Roman

207
208

Keramik lantai marmer


Kuku Macan

m2
bh

Rp
Rp

427,000.00
1,000.00

ex. Tulung Agung


Mulia

209
210

Granite Tile 30x30


Granite Tile 15x60

m2
m2

Rp
Rp

245,000.00
270,000.00

Roman
Roman

211
212

Granite Tile 20x60


Granite Tile 30x60

m2
m2

Rp
Rp

270,000.00
295,000.00

Roman
Roman

213
214

Granite Tile 60x60


Granite Tile 15x90

m2
m2

Rp
Rp

270,000.00
420,000.00

Roman
Roman

215
216

Granite Tile 30x90


Keramik tegel trotoar

m2
m2

Rp
Rp

420,000.00
47,000.00

Roman
Asia tile

217
218

Kertas gosok No. 150


Kertas gosok No. 280

Lbr
Lbr

Rp
Rp

8,750.00
10,250.00

Taiyo
Taiyo

219
220

Kran air1/2\"sun'i
Kran air Ex Import

Bh
Bh

Rp
Rp

57,000.00
22,300.00

sun'i
Onda

221
222

Krepyak Nako
Kuas

bh
Bh

Rp
Rp

9,750.00
8,500.00

Esia
Eterna

223
224
225

Kunci Tanam besar 2x putar kuningan


Kunci Tanam Kecil
Kaca Polost =5mm

Bh
Bh
m2

Rp
Rp
Rp

97,000.00
75,000.00
90,000.00

solid
solid
Assahimass

226
227

Kaca Polost =3mm


Kaca Reyben t = 5 mm

m2
m2

Rp
Rp

55,000.00
97,200.00

Assahimass
Assahimass

228
229

Kaca Gravier
Kaca Stainglass

m2
m2

Rp
Rp

273,000.00
296,000.00

Assahimass
Assahimass

230
231

Kabel NYA 1x1,5


Kabel NYA 1x2.5

m
m

Rp
Rp

1,450.00
2,300.00

Eterna
Eterna

232
233

Kabel NYA 1x4


Kabel NYA 1x6

m
m

Rp
Rp

3,600.00
5,300.00

Eterna
Eterna

234

Kabel NYA 1x10

Rp

8,770.00

Eterna

235
236
237

Kabel NYA 500 volt 2 x 2,5 mm2


Kabel NYM 3X1,5
Kabel NYM 3X2,5

m
m
m

Rp
Rp
Rp

6,500.00
5,860.00
8,340.00

Eterna
Eterna
Eterna

238
239

Kabel NYM 2X1,5


Kabel NYM 2X2,5

m
m

Rp
Rp

4,580.00
6,560.00

Eterna
Eterna

240
241

Kabel NYM 3X4


Kabel NYM 4X2,5

m
m

Rp
Rp

13,740.00
10,700.00

Eterna
Eterna

242
243

Kabel NYM 4X4


Kabel NYM 4X6

m
m

Rp
Rp

17,700.00
24,900.00

Eterna
Eterna

244
245

Kabel NYM 4X10


Kabel NYY 2X1,5

m
m

Rp
Rp

40,540.00
6,440.00

Eterna
Eterna

246
247

Kabel NYY 2X2,5


Kabel NYY 3X1,5

m
m

Rp
Rp

8,680.00
7,960.00

Eterna
Eterna

248
249

Kabel NYY 3X2,5


Kabel NYY 3X4

m
m

Rp
Rp

10,700.00
16,600.00

Eterna
Eterna

250
251

Kabel NYY 3X6


Kabel NYY 4X2,5

m
m

Rp
Rp

22,000.00
12,960.00

Eterna
Eterna

252
253

Kabel NYY 4X4


Kabel NYY 4X6

m
m

Rp
Rp

20,200.00
26,200.00

Eterna
Eterna

254
255

Kabel NYY 4X10


Kabel NYY 4 x 16 mm2

m
m1

Rp
Rp

44,400.00
95,000.00

Eterna

256
257

Kabel BC 50 mm
Las Doof

m1
bh

Rp
Rp

40,000.00
750.00

Shukaku

258
259
260

Lampu TL 18 Watt
Lampu SL 5 Watt
Lampu SL 8 Watt

bh
bh
bh

Rp
Rp
Rp

9,500.00
21,000.00
21,000.00

Phillips
Phillips
Phillips

261
262

Lampu SL 11 Watt
Lampu SL 14 Watt

bh
bh

Rp
Rp

26,000.00
27,000.00

Phillips
Phillips

263
264

Lampu SL 18 Watt
Lampu SL 23 Watt

bh
bh

Rp
Rp

29,000.00
35,000.00

Phillips
Phillips

265
266

Lampu SL 35 Watt
Lampu SL 50 Watt

bh
bh

Rp
Rp

87,000.00
120,000.00

Phillips
Phillips

267
268

Lampu SL 70 Watt
Lampu LED 5 Watt

bh
bh

Rp
Rp

140,000.00
65,000.00

Phillips
Phillips

269
270

Lampu LED 10 Watt


Lampu TL waterproof 2x36watt

bh
bh

Rp
Rp

80,000.00
590,000.00

Phillips
Phillips

271
272

Lampu Tempel hias SL 18 Watt


Downligth 4"

bh
bh

Rp
Rp

96,000.00
22,500.00

Phillips
Vacolux

273
274

Lapis triplek 0,4cm


Lem kayu

lbr
kg

Rp
Rp

58,250.00
7,800.00

Cooltech
rajawali

275
276

Lem PVC
Lem Wall Paper

bh
kg

Rp
Rp

7,200.00
43,200.00

masplast
wallpac

277
278

Lem Epoxi
Lem Gypsum

kg
kg

Rp
Rp

133,000.00
14,000.00

avian

279
280

List plafond Gypsum


List Kayu 1/4

bh
m1

Rp
Rp

9,300.00
10,000.00

jayaboard

281
282

L PVC 100x90
L PVC 100x45

bh
bh

Rp
Rp

256,325.00
256,325.00

Maspion
Maspion

283
284
285

Eternit gresik
Minyak Cat (Afdunner)
Minyak Bekisting

lbr
Ltr
Ltr

Rp
Rp
Rp

31,200.00
6,300.00
8,500.00

jayaboard
Asoka
Robinair

286
287

Minyak pelumas
Metal stud

Ltr
m3

Rp
Rp

22,900.00
3,750,000.00

288
289

MCB
Panel Box MCB

bh
bh

Rp
Rp

40,250.00
675,000.00

schneider

290
291

Paku kayu
Paku reng

Kg
Kg

Rp
Rp

13,850.00
12,750.00

Hi Steel
Hi Steel

292
293

Paku usuk
Panel lantai

Kg
m3

Rp
Rp

13,850.00
2,350,000.00

Hi Steel
citicon

294

skrup

Bh

Rp

150.00

Hi Steel

Mesran
Kalsi

295
296
297

Paku Seng Payung


Paku triplek
Paku triplek/eternit

kg
Kg
Kg

Rp
Rp
Rp

19,000.00
12,500.00
16,000.00

Hi Steel
Hi Steel
Hi Steel

298
299

Paku Asbes
Pasir Cor

Kg
m3

Rp
Rp

37,500.00
187,500.00

Hi Steel

300
301

Paku Klem (No.4)


Paku Klem (No.4)

kg
doz

Rp
Rp

13,850.00
20,000.00

Hi Steel
Hi Steel

302
303

Paku Biasa 2"-5"


Paras

kg
m3

Rp
Rp

12,750.00
90,000.00

Hi Steel

304
305

Pasir Pasang
Pasir Urug

m3
m3

Rp
Rp

150,000.00
125,000.00

306
307

Pipa paralon 5/8\"


Profil hollow 2x4

m
m

Rp
Rp

5,000.00
19,000.00

maspion
Hi Steel

308
309

Pewarna
Kran Pelampung

sct
Set

Rp
Rp

700.00
19,750.00

merak
onda

310
311

Pagar BRC/pmg A (uk. 1,2x2,4)


Pagar BRC/pmg

unit
unit

Rp
Rp

297,500.00
297,500.00

Hi Steel
Hi Steel

312
313

Pintu swing ganda BRC / PMG uk. 1,2x3m


Pintu dorong ganda BRC / PMG uk. 1,2x3m

unit
unit

Rp
Rp

398,750.00
398,750.00

Hi Steel
Hi Steel

314
315

Pintu pagar besi komplit dengan asesoris


Penambahan daya listrik

m2
ls

Rp
Rp

625,000.00
2,200,000.00

Hi Steel

316
317

Pipa Pipa Galvanis medium 1/2"


Pipa Pipa Galvanis medium 3/4"

m1
m1

Rp
Rp

19,600.00
24,166.67

Hi Steel
Hi Steel

318
319
320

Pipa Pipa Galvanis medium 1"


Pipa Pipa Galvanis medium 2"
Pipa Pipa Galvanis medium 2 1/2"

m1
m1
m1

Rp
Rp
Rp

36,083.33
71,125.00
90,250.00

Hi Steel
Hi Steel
Hi Steel

321
322

Pipa Pipa Galvanis medium 3"


Pipa Pipa Galvanis medium 4"

m1
m1

Rp
Rp

115,416.67
167,166.67

Hi Steel
Hi Steel

323
324

Pipa Pipa Galvanis medium 5"


Pipa Pipa Galvanis medium 1 1/4"

m1
m1

Rp
Rp

169,666.67
46,416.67

Hi Steel
Hi Steel

325
326

Pipa Pipa Galvanis medium 8"


Pipa Pipa Galvanis medium 6"

m1
m1

Rp
Rp

131,250.00
1,701,666.67

Hi Steel
Hi Steel

327
328

Pipa Galvanis 1,5"


Pipa Galvanis 2"

m1
m1

Rp
Rp

39,916.67
53,416.67

Hi Steel
Hi Steel

329
330

Pipa Galvanis 2,5"


Pipa Galvanis 3"

m1
m1

Rp
Rp

70,583.33
82,833.33

Hi Steel
Hi Steel

331
332

Pipa PVC 1/2\ "Type AW


Pipa PVC 3/4\ "Type AW

batang
batang

Rp
Rp

20,000.00
25,400.00

Wavin
Wavin

333
334

Pipa PVC 1\ "Type AW


Pipa PVC 11/2\ "Type AW

batang
batang

Rp
Rp

30,600.00
46,500.00

Wavin
Wavin

335
336

Pipa PVC 3\ "AW panjang 4 mtr


Pipa PVC 3\ "AW panjang 6 mtr

ljr
ljr

Rp
Rp

127,500.00
707,500.00

Wavin
Wavin

337
338

Pipa PVC 4\ "AW panjang 4 mtr


Pipa PVC 4\ "AW panjang 6 mtr

ljr
ljr

Rp
Rp

227,500.00
335,200.00

Wavin
Wavin

339
340

Pipa PVC 5\ "AW panjang 4 mtr


Pipa PVC 11/2\"C

ljr
ljr

Rp
Rp

352,500.00
14,200.00

Wavin
maspion

341
342

Pipa PVC 2\"C


Pipa PVC 4\"C

m
batang

Rp
Rp

33,500.00
63,450.00

maspion
maspion

343
344
345

Pipa PVC 3\"C


Pipa PVC 5\"C
Pipa PVC 6\"C

batang
batang
ljr

Rp
Rp
Rp

49,300.00
96,200.00
125,200.00

maspion
maspion
maspion

346
347

Pipa PVC D 5 (@4 meter)


Pipa PVC D 4 (@4 meter)

batang
batang

Rp
Rp

160,000.00
120,000.00

maspion
maspion

348
349

Pipa PVC D 3 (@4 meter)


Pipa PVC 110

batang
m

Rp
Rp

80,000.00
20,100.00

maspion
maspion

350
351

Pipa PVC 160


Pipa Cooker 150

m
m

Rp
Rp

73,750.00
156,900.00

maspion
maspion

352
353

Pipa baja (Hitam) 2\"medium


Pipa baja (Hitam) 3\"medium

m
m

Rp
Rp

11,000.00
13,000.00

Wavin
Wavin

354

Pipa baja (Hitam) 4\"medium

Rp

15,000.00

Wavin

355
356
357

Pipa baja (Hitam) 5\"medium


Pipa pe 12 mm
Pipa stainless steel SCH 40 welded 1"

m
m
m

Rp
Rp
Rp

17,200.00
23,750.00
96,725.00

Wavin
Wavin
Wavin

358
359

Pipa stainless steel SCH 40 welded 2"


Plamur Tembok

m
kg

Rp
Rp

97,200.00
46,000.00

Wavin
Big lion

360
361

Plamur Kayu
Profil tank 650 litter

kg
kg

Rp
Rp

23,000.00
719,200.00

Emco
Cipta Proma perkasa

362
363

Profil tank 800 litter


Profil tank 1100 litter

kg
kg

Rp
Rp

818,400.00
1,054,000.00

Cipta Proma perkasa


Cipta Proma perkasa

364
365

Profil tank 550 litter steinless


Profil tank 700 litter steinless

kg
kg

Rp
Rp

1,229,000.00
1,521,000.00

Cipta Proma perkasa


Cipta Proma perkasa

366
367

Profil tank 1100 litter steinless


Klem PVC

kg
Bh

Rp
Rp

2,383,000.00
1,925.00

Cipta Proma perkasa


maspion

368
369

Plywood Tegofilm tebal 9mm


Plywood tebal 9mm

lbr
lbr

Rp
Rp

300,000.00
82,600.00

Parindo

370
371

Profil Alumunium putih uk. 4x10, profil 4"


Precast Pagar Panil/Pabrikasi

m1
m1

Rp
Rp

33,200.00
40,000.00

Hi Steel
Lisa

372
373

Saklar Tunggal
Saklar Ganda

Bh
Bh

Rp
Rp

8,500.00
17,600.00

Broco
Broco

374
375

Shanding
Ramset / dynabolt

kg
buah

Rp
Rp

50,500.00
2,500.00

Peacock
Ramset TM

376
377

Rol (Tba)
Rangka Galvalume uk 0.8 mm

Roll
m2

Rp
Rp

3,000.00
237,600.00

Fukuda
Hi Steel

378
379
380

Rangka Galvalume uk 0.5 mm


Rangka Galvalume Campuran
Usuk Galvalum 5/7cm tebal 0,55mm

m2
m2
m1

Rp
Rp
Rp

186,500.00
205,200.00
25,000.00

Hi Steel
Hi Steel

381
382

Reng Galvalum tebal 0,45mm


Skrup + Plat Galvalum

m1
kg

Rp
Rp

18,500.00
20,000.00

383
384

Roof Drain
Metal furing 2/4 cm ex. Sakura trust, bluscoopsteel

bh

Rp

45,000.00

m1

Rp

13,500.00

385
386

Semen Pc 50kg
Semen Pc 40kg

Zak
Zak

Rp
Rp

71,000.00
57,000.00

Gresik / Holcim
Gresik / Holcim

387
388

Semen Grouting 25kg


Semen berwarna yiyitan

Zak
kg

Rp
Rp

160,000.00
11,200.00

sikagrout
MU

389
390

Seng Gelombang BJLS 30uk(08x1.5)


Seng Gelombang BJLS 40uk(08x1.5)

m2
m2

Rp
Rp

56,200.00
49,700.00

Hi Steel
Hi Steel

391
392

Seng Gelombang BJLS 30uk(08x1.5)L=60cm


Seng Gelombang BJLS 30uk(80x180 cm)

m2
lembar

Rp
Rp

23,000.00
55,650.00

Hi Steel
Hi Steel

393
394

Seng Gelombang BJLS 30uk(80x150 cm)


Seng BJLS 30L=90cm

lembar
ml

Rp
Rp

51,200.00
27,940.00

Hi Steel
Hi Steel

395
396

Seng BJLS 30L=60cm


Seng BJLS 40L=60cm

ml
ml

Rp
Rp

23,500.00
22,250.00

Hi Steel
Hi Steel

397
398

Seng BJLS 40L=90cm


Seng datar BJLS 40

ml
ml

Rp
Rp

42,500.00
39,200.00

Hi Steel
Hi Steel

399
400

Serat fiber
Sifon Wasser

m2
m2

Rp
Rp

4,500.00
12,000.00

serat mat
onda

401
402

Sirap Asbes 4mm


Sirtu

lbr
m3

Rp
Rp

17,250.00
115,000.00

Djabesment

403
404
405

Slang spiral
Slimar Alumunium3/8"
Sealent

Set
m1
tube

Rp
Rp
Rp

23,200.00
62,375.00
26,800.00

Raja Selang
YKK
Shirikon

406
407

Solar
Spritus

ltr
Ltr

Rp
Rp

5,500.00
12,500.00

Pertamina
Naga

408
409

Stop Kontak Broco


Stopper uskup tbl.6cm

Bh
Bh

Rp
Rp

18,500.00
7,200.00

Broco
conblock

410
411

Sun Screen
Tanah katel

m2
m3

Rp
Rp

96,750.00
109,200.00

Alexindo

412
413

Tempat sabun
T doos PVC

bh
Bh

Rp
Rp

18,500.00
1,750.00

Krisbow
Maspion

414

Teak wood t= 4mm

Lbr

Rp

61,000.00

Parindo

415
416
417

Teak wood uk. 122x244 t=3mm


Tee 150x150
Tee 100x100

Lbr
bh
bh

Rp
Rp
Rp

65,300.00
563,200.00
295,600.00

Parindo
Hi Steel
Hi Steel

418
419

Triplek uk. 110x244 t=3 mm meranti


Triplek uk. 110x244 t=4mm meranti

Lbr
Lbr

Rp
Rp

43,000.00
53,000.00

Parindo
Parindo

420
421

Triplek uk. 110x244 t=8 mm meranti


Triplek uk. 110x244 t=9 mm meranti

Lbr
Lbr

Rp
Rp

86,000.00
93,500.00

Parindo
Parindo

422
423

Triplek uk. 110x244 t=12 mm meranti


Triplek uk. 110x244 t=15 mm meranti

Lbr
Lbr

Rp
Rp

150,000.00
180,000.00

Parindo
Parindo

424
425

Triplek uk. 110x244 t=18 mm meranti


Triplek uk. 110x244 t=3 mm meranti

Lbr
Lbr

Rp
Rp

225,000.00
66,500.00

Parindo
Parindo

426
427

Triplek uk. 110x244 t=3 mm meranti


Triplek uk. 110x244 t=12 mm film satu muka

Lbr
Lbr

Rp
Rp

66,500.00
110,000.00

Parindo
Parindo

428
429

Triplek uk. 110x244 t=15 mm film satu muka


Triplek uk. 110x244 t=12 mm film dua muka

Lbr
Lbr

Rp
Rp

225,000.00
205,000.00

Parindo
Parindo

430
431

Triplek uk. 110x244 t=15 mm film dua muka


Triplek uk. 110x244 t=18 mm film dua muka

Lbr
Lbr

Rp
Rp

245,000.00
275,000.00

Parindo
Parindo

432
433

Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm

Teer

Lbr
Kg

Rp
Rp

210,000.00
5,750.00

Teer

434
435

Tanah Urug
Thinner A

m3
ltr

Rp
Rp

115,000.00
24,000.00

Thinner

436
437

Tiang Pancang 20/20


Tiang Pancang 25/25

m
m

Rp
Rp

137,500.00
189,200.00

metro pile
metro pile

438
439
440

Tiang Pancang 30/30


U Gutter U1000/1000-2400 (K 350 Besi 130 kg) (Fabrikasi)
Urinoir

m
bh
bh

Rp
Rp
Rp

223,000.00
2,426,500.00
450,000.00

metro pile

441
442

Cover 1000x1000x2400 (K 350; besi 160 kg ) (Fabrikasi)


Vertical Blind

bh
m2

Rp
Rp

2,426,500.00
182,100.00

Ellite

443
444

Valve 100
Valve 150

bh
bh

Rp
Rp

1,019,300.00
2,096,500.00

maspion
maspion

445
446

Wall Paper
Wastafel Besar Warna

m2
bh

Rp
Rp

96,000.00
327,000.00

Ellite
Toto L38V1

447
448

Waterproofing
Wood filler

kg
kg

Rp
Rp

38,750.00
27,500.00

No drop
Emco

449
450

Wood plank + pemasangan


Walter Moer

m1
bh

Rp
Rp

62,000.00
15,200.00

Elephant
onda

451
452

Besi Hollow 4/4


Besi Hollow 4/4

m1
m1

Rp
Rp

21,000.00
21,000.00

Hi Steel
Hi Steel

453
454

Besi Hollow 5/5


Besi Hollow 2/4

m1
m1

Rp
Rp

45,000.00
19,500.00

Hi Steel
Hi Steel

455
456

Got talang R25 (Segmen)


Got talang R15 (Segmen)

bh
bh

Rp
Rp

26,750.00
18,700.00

Ex. UD. Hartono


Ex. UD. Hartono

457
458

Got talang R10 (Segmen)


Got talang R25 (1/2 lingkaran)

bh
bh

Rp
Rp

17,000.00
24,000.00

Ex. UD. Hartono


Ex. UD. Hartono

459
460

Got talang R15 (1/2 lingkaran)


Got talang R10 (1/2 lingkaran)

bh
bh

Rp
Rp

16,000.00
25,000.00

Ex. UD. Hartono


Ex. UD. Hartono

461
462

Paving abu-abu tbl. 6 cm (4 persegi pj )


Paving abu-abu tbl. 8 cm (4 persegi pj )

bh
bh

Rp
Rp

1,500.00
1,800.00

conblock
conblock

463
464
465

Paving stone merah tbl. 8 cm (4 persegi pj )


Paving stone full warna tbl. 6 cm (4 persegi pj )
Paving stone motif warna abu abu tbl. 6 cm (4 persegi pj )

bh
bh
bh

Rp
Rp
Rp

2,500.00
1,800.00
1,800.00

conblock
conblock
conblock

466
467

Paving Cassada abu-abu T=8mm


Paving Cassada warna T=8mm

m2
m2

Rp
Rp

90,000.00
120,000.00

Alexis
Alexis

468
469

GRC Board 4 mm
cross runner 50x25

Rp
Rp

54,000.00
27,000.00

grc
Kalsi

470
471

main runner 38x13


root hanger 8mm

Lembar
m'
m'

Rp
Rp

22,500.00
11,000.00

Kalsi
Kalsi

472
473

Beton ready mix k-175


Beton ready mix k-250

Rp
Rp

879,675.42
954,607.25

jaya mix
jaya mix

474

Beton ready mix k-300

Rp

685,000.00

jaya mix

m'
m'
m'
m'

475
476
477

Beton ready mix k-350


Perlengkapan Penangkal Petir
Pasang Head splitz petir CU 3/4" dengan pipa GIP D 1"

m'

Rp

735,000.00

Bh
m1

Rp

250,000.00

478
479

Kabel BC dia 50 mm2


Isolator pipa PVC AW D 3/4" + klem plat

Rp
Rp

40,000.00
27,000.00

480
481

Pentanahan grounding Kabel BC 50 mm2


Bak kontrol grounding

Rp
Rp

350,000.00
45,000.00

482
483

Box test line


Kabel Schoon

Rp
Rp

250,000.00
7,500.00

484
485

Connector
Peralatan Bantu

8,500.00
1,000.00

Testing dan Commissioning termasuk ijin-ijin penangkal petir


Tandon Air Beton Kap. 4 m3 eks Fabrikan + pasang

Jam
Ls
bh

Rp
Rp

486
487

Rp
Rp

500,000.00
5,400,000.00

488
489

Septic tank Kap 3 m3 eks fabrikan + pasang


Profil tank kapasitas 1,1 m3 (stenlessteel)

bh
Unit

Rp
Rp

3,600,000.00
2,350,000.00

490
491

Pompa elektric (kapasitas hisap 30m,dorong 30m )


Plastik

unit
m2

Rp
Rp

950,000.00
2,000.00

m1
Unit
Unit
Set
Set
Set

II

TENAGA

1
1

Mandor
Surveyor Geodesi

hr
hr

Rp
Rp

97,000.00
97,000.00

2
3

Kepala Tukang Batu


Kepala Tukang Besi

hr
hr

Rp
Rp

95,000.00
95,000.00

4
5
6

Kepala Tukang Cat


Kepala Tukang Kayu
Kepala Tukang Listrik

hr
hr
hr

Rp
Rp
Rp

95,000.00
95,000.00
95,000.00

7
8

Kepala Tukang Pipa


Tukang Batu

hr
hr

Rp
Rp

95,000.00
92,500.00

9
10

Tukang Besi
Tukang Cat

hr
hr

Rp
Rp

92,500.00
92,500.00

11
12

Tukang Kayu
Tukang Las

hr
hr

Rp
Rp

92,500.00
92,500.00

13
14

Tukang Listrik
Tukang Pipa

hr
hr

Rp
Rp

92,500.00
92,500.00

15
16

Pekerja Terampil
Pekerja / Buruh Tak Terampil

hr
hr

Rp
Rp

89,100.00
89,100.00

17

Petugas Survey

hr

Rp

97,000.00

III.
1

PERALATAN
Sewa Compresor

Jam

Rp

33,250.00

2
3

Sewa Concreate Mixer m3 (min 3jam)


Sewa Concreate Pump (min 3 jam )

Jam
Jam

Rp
Rp

61,750.00
61,750.00

4
5

Sewa Concreate vibrator


Sewa Crane 30ton-min8jam (termasuk mob/demob.

Jam

Rp

14,250.00

6
7

Opertor, BBM)
Sewa Hammer tiang pancang-min8jam Hidrolis (termasuk

Jam

Rp

130,625.00

8
9

mob/demob,operator, BBM)
Sewa Bucket dan crane/draglin scraper

Jam
Jam

Rp
Rp

175,750.00
76,000.00

10
11
12

Sewa Motor Grader125-140Pk (min5jam)


Sewa PhenumaticTire Roller (min5jam)
SewaTruck Tangki Air (min 5 jam)

Jam
Jam
Jam

Rp
Rp
Rp

261,250.00
209,000.00
470,250.00

13
13

Sewa Truk Kelas 3 Dalam kota


Sewa Vibrator Roller (min 5 jam)

Jam
Jam

Rp
Rp

727,500.00
128,250.00

14
15

Sewa Excavator 6m
SewaTheodolit

Jam
set

Rp
Rp

123,500.00
329,175.00

16
17

Sewa Welding Set (min 5 jam)


Sewa Alat Bantu (1 set@3alat )

hari
jam

Rp
Rp

28,500.00
950.00

18
19

Sewa Dump truck 6T min(5jam)


Sewa Dump truck 5T min(5jam)

jam
jam

Rp
Rp

65,000.00
61,750.00

17

Sewa Dump truck 3,5T min(5jam)

jam

Rp

61,750.00

jaya mix

18
19

Sewa alat bantu boor pile


Sewa Stampper

jam
jam

Rp
Rp

275,000.00
150,000.00

DAFTAR HARGA SATUAN POKOK KEGIATAN


BANGUNAN GEDUNG
Pekerjaan Persiapan & Tanah
Pembuatan Bouwplank (UITZET)
Upah:
Kepala Tukang Kayu
Tukang Kayu
Pekerja

0.0100
0.1000
0.1000

O.H
O.H
O.H

95,000.00
92,500.00
89,100.00
Jumlah:

950.00
9,250.00
8,910.00
19,110.00

Bahan/Material:
Kayu Meranti (Papan 2/20)
Kayu Meranti (Usuk 5/7)
Paku biasa 2" - 5"

0.0070
0.0120
0.0200

m3
m3
Kg

5,000,000.00
4,160,714.29
12,750.00
Jumlah:
Nilai HSPK :

35,000.00
49,928.57
255.00
85,183.57
104,293.57

m1

Pengangkutan Tanah keluar Proyek


Upah:
Pekerja

m3
0.2500

O.H

89,100.00
Jumlah:

22,275.00
22,275.00

Sewa Peralatan:
Sewa Dump Truck 5 T (min 5 jam)

0.2500

Jam

61,750.00
Jumlah:

15,437.50
15,437.50
37,712.50

97,000.00
89,100.00
Jumlah:

2,425.00
66,825.00
69,250.00
69,250.00

97,000.00
89,100.00
Jumlah:

808.33
22,275.00
23,083.33
23,083.33

Nilai HSPK :
Penggalian Tanah untuk Konstruksi
Upah:
Mandor
Pekerja

m3
0.0250
0.7500

O.H
O.H
Nilai HSPK :

Pengurugan Tanah Kembali untuk Konstruksi


Upah:
Mandor
Pekerja

m3
0.0083
0.2500

O.H
O.H
Nilai HSPK :

Pengurugan Pasir (PADAT)


Upah:
Mandor
Pekerja

m3
0.0100
0.3000

O.H
O.H

97,000.00
89,100.00
Jumlah:

970.00
26,730.00
27,700.00

Bahan:
Pasir Urug

1.2000

m3

125,000.00
Jumlah:

150,000.00
150,000.00
177,700.00

Nilai HSPK :
Pengurugan Sirtu (PADAT)
Upah:
Mandor
Pekerja

m3
0.0250
0.2500

O.H
O.H

97,000.00
89,100.00
Jumlah:

2,425.00
22,275.00
24,700.00

Bahan:
Tasirtu/ Sirtu
Sewa Stampper

1.2000
0.1500

m3
jam

115,000.00
150,000.00
Jumlah:

138,000.00
22,500.00
160,500.00
185,200.00

Nilai HSPK :
Pemasangan Batu Kali Belah Kosongan (aanstamping)

m3

Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

0.0390
0.0390
0.3900
0.7800

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,783.00
3,705.00
36,075.00
69,498.00
113,061.00

Bahan:
Batu Kali Belah 15/20 cm
Pasir Urug

1.2000
0.4320

m3
m3

140,200.00
125,000.00
Jumlah:

168,240.00
54,000.00
222,240.00
335,301.00

Nilai HSPK :
Pekerjaan Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 4 Ps)

m3

Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

0.0750
0.0750
0.7500
1.5000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

7,275.00
7,125.00
69,375.00
133,650.00
217,425.00

Bahan:
Semen portland (50kg)
Pasir Pasang
Batu Kali Belah 15/20 cm

3.2600
0.5200
1.2000

Zak
m3
m3

71,000.00
150,000.00
140,200.00
Jumlah:

231,460.00
78,000.00
168,240.00
477,700.00
695,125.00

Nilai HSPK :

Pemasangan Dinding Batu Merah 1 Pc : 3 Pp tebal 1/2 bata


Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Batu Bata Merah uk 22 x 11 x 4.5 cm

m2
0.0150
0.0100
0.1000
0.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

1,455.00
950.00
9,250.00
26,730.00
38,385.00

0.2874
0.0400
70.0000

Zak
m3
Buah

71,000.00
150,000.00
730.00
Jumlah:

20,405.40
6,000.00
51,100.00
77,505.40
115,890.40

Nilai HSPK :
Pemasangan Dinding Batu Merah 1 Pc : 5 Pp tebal 1/2 bata
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Batu Bata Merah uk 22 x 11 x 4.5 cm

m2
0.0150
0.0100
0.1000
0.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

1,455.00
950.00
9,250.00
26,730.00
38,385.00

0.1936
0.0450
70.0000

Zak
m3
Buah

71,000.00
150,000.00
730.00
Jumlah:

13,745.60
6,750.00
51,100.00
71,595.60
109,980.60

Nilai HSPK :
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

m2
0.0150
0.0150
0.1500
0.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

1,455.00
1,425.00
13,875.00
26,730.00
43,485.00

Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang

0.1555
0.0230

Zak
m3

71,000.00
150,000.00
Jumlah:

11,041.92
3,450.00
14,491.92
57,976.92

Nilai HSPK :
Plesteran Halus 1 Pc : 5 Ps tebal 1.5 cm
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

m2
0.0150
0.0150
0.1500
0.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

1,455.00
1,425.00
13,875.00
26,730.00
43,485.00

Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang

0.1037
0.0260

Zak
m3

71,000.00
150,000.00
Jumlah:

7,361.28
3,900.00
11,261.28
54,746.28

Nilai HSPK :
Pasang Benangan 1 Pc: 2Ps
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

m
0.0040
0.0400
0.0400
0.0800

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

388.00
3,800.00
3,700.00
7,128.00
15,016.00

Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang

0.0100
0.0130

Zak
m3

71,000.00
150,000.00
Jumlah:

710.00
1,950.00
2,660.00
17,676.00

Nilai HSPK :
m2

Pekerjaan Acian
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

0.0100
0.0100
0.1000
0.2000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

970.00
950.00
9,250.00
17,820.00
28,990.00

Bahan:
Semen portland (50 kg)

0.0650

Zak

71,000.00
Jumlah:

4,615.00
4,615.00
33,605.00

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

97.00
285.00
2,775.00
1,782.00
4,939.00

Nilai HSPK :
Plamur Tembok
Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0010
0.0030
0.0300
0.0200

O.H
O.H
O.H
O.H

Bahan:
Plamur Tembok
Kertas Gosok no 150

0.1000
0.5000

Kg
Lembar

46,000.00
8,750.00
Jumlah:

4,600.00
4,375.00
8,975.00
13,914.00

Nilai HSPK :
Pemasangan Tegel Keramik 30x30 cm tekstur kasar
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

m2
0.0350
0.0350
0.3500
0.7000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,395.00
3,325.00
32,375.00
62,370.00
101,465.00

Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
Pasir Pasang
Tegel Keramik 30 x 30 Cm tekstur kasar

0.2080
1.6200
0.0450
1.0600

Zak
Kg
m3
m2

71,000.00
11,200.00
150,000.00
70,000.00
Jumlah:

14,768.00
18,144.00
6,750.00
74,200.00
113,862.00
215,327.00

Nilai HSPK :
Pemasangan Tegel Keramik 40x40 cm

m2

Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

0.0350
0.0350
0.3500
0.7000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,395.00
3,325.00
32,375.00
62,370.00
101,465.00

Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
Pasir Pasang
Tegel Keramik 40x40

0.1960
1.3000
0.0450
1.0608

Zak
Kg
m3
m2

71,000.00
11,200.00
150,000.00
80,000.00
Jumlah:

13,916.00
14,560.00
6,750.00
84,864.00
120,090.00
221,555.00

Nilai HSPK :
Pemasangan Tegel Keramik 40x40 cm Tekstur Kasar

m2

Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

0.0350
0.0350
0.3500
0.7000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,395.00
3,325.00
32,375.00
62,370.00
101,465.00

Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
Pasir Pasang
Tegel Keramik 40x40 tekstur kasar

0.1960
1.3000
0.0450
1.0608

Zak
Kg
m3
m2

71,000.00
11,200.00
150,000.00
85,000.00
Jumlah:

13,916.00
14,560.00
6,750.00
90,168.00
125,394.00
226,859.00

Nilai HSPK :
Pemasangan Plint keramik 10x40 cm

m1

Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

0.0050
0.0090
0.0900
0.0900

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

485.00
855.00
8,325.00
8,019.00
17,684.00

Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
Pasir Pasang
Tegel Keramik 10x40

0.0228
0.0250
0.0030
0.1000

Zak
Kg
m3
m2

71,000.00
11,200.00
150,000.00
80,000.00
Jumlah:

1,618.80
280.00
450.00
8,000.00
10,348.80
28,032.80

Nilai HSPK :
Pemasangan Tegel Keramik 30x60 cm (Dinding)
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja
Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
Pasir Pasang
Tegel Keramik 30 x 60 Cm (dinding)

m2

0.045
0.045
0.45
0.9

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

4,365.00
4,275.00
41,625.00
80,190.00
130,455.00

0.1860
1.9400
0.0180
1.0500

Zak
Kg
m3
m2

71,000.00
11,200.00
150,000.00
152,500.00
Jumlah:

13,206.00
21,728.00
2,700.00
160,125.00
197,759.00
328,214.00

Nilai HSPK :

Pemasangan Tegel Step Nosing


Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

m'
0.0050
0.0090
0.0900
0.0900

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

485.00
855.00
8,325.00
8,019.00
17,684.00

Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
Pasir Pasang
Stop Nosing

0.0228
0.0250
0.0030
5.3000

Zak
Kg
m3
Buah

71,000.00
11,200.00
150,000.00
11,000.00
Jumlah:

1,618.80
280.00
450.00
58,300.00
60,648.80
78,332.80

Nilai HSPK :
Pemasangan Paving Stone persegi panjang t. 6cm
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja
Bahan:
Paving Stone persegi panjang t. 6cm

m'
0.0250
0.0250
0.0500
0.0500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

2,425.00
2,375.00
4,625.00
4,455.00
13,880.00

44.0000

bh

1,500.00
Jumlah:

66,000.00
66,000.00
79,880.00

Nilai HSPK :
Pemasangan Kaca Polos tebal 5 mm
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja
Bahan:
Kaca Polos Tebal 5 mm
Karet sealent

m2
0.00075
0.0150
0.1500
0.0150

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

72.75
1,425.00
13,875.00
1,336.50
16,709.25

1.1000
0.2700

m2
tube

90,000.00
26,800.00
Jumlah:

99,000.00
7,236.00
106,236.00
122,945.25

Nilai HSPK :
Pemasangan Kunci Tanam Besar 2x Putar kuningan
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja

Buah
0.0050
0.0100
0.5000
0.0100

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

485.00
950.00
46,250.00
891.00
48,576.00

Bahan:
Kunci Tanam Besar 2x Putar (kuningan)

1.0000

Buah

97,000.00
Jumlah:

97,000.00
97,000.00
145,576.00

Nilai HSPK :
Pemasangan Engsel Casement Untuk Jendela
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja

Stel
0.0005
0.0100
0.1000
0.0100

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

48.50
950.00
9,250.00
891.00
11,139.50

Bahan:
Engsel Casement

1.0000

stel

40,000.00
Jumlah:

40,000.00
40,000.00
51,139.50

Nilai HSPK :
Pemasangan Engsel Kuningan Untuk Pintu
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja
Bahan:
Engsel Kuningan (untuk Pintu)

Stel
0.00075
0.0150
0.1500
0.0150

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

72.75
1,425.00
13,875.00
1,336.50
16,709.25

1.0000

stel

26,000.00
Jumlah:

26,000.00
26,000.00
42,709.25

Nilai HSPK :
Pemasangan Grendel Jendela
Upah:
Tukang Kayu
Pekerja

Buah
0.1200
0.0600

O.H
O.H

92,500.00
89,100.00
Jumlah:

11,100.00
5,346.00
16,446.00

Bahan:
Grendel biasa

1.0000

Buah

12,500.00
Jumlah:

12,500.00
12,500.00
28,946.00

Nilai HSPK :

Pemasangan Kusen Alumunium Profil 4"


Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja

m1
0.0021
0.0043
0.0430
0.0430

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

203.70
408.50
3,977.50
3,831.30
8,421.00

Bahan:
Aluminium Profil 4" Dark brown
Skrup/Ripet
Sealent

1.1000
2.0000
0.0600

m1
Buah
tube

90,000.00
150.00
26,800.00
Jumlah:

99,000.00
300.00
1,608.00
100,908.00
109,329.00

Nilai HSPK :
Pemasangan Slimar Alumunium Daun Jendela Profil 3/8
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja

m1
0.0022
0.0043
0.0430
0.0430

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

214.37
408.50
3,977.50
3,831.30
8,431.67

Bahan:
Slimar Alumunium 3/8
Sealent
Skrup/Ripet

1.1000
0.0600
2.0000

m1
tube
Buah

62,375.00
26,800.00
150.00
Jumlah:

68,612.50
1,608.00
300.00
70,520.50
78,952.17

Nilai HSPK :
Daun Pintu Slimar Kayu Kamper isian Plywood 12 mm dilapis teakwood 4mm
Bagian dalam dilapis formika
Upah:
Mandor
0.0500
Kepala Tukang Kayu
0.3000
Tukang Kayu
3.0000
Pekerja
1.0000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

4,850.00
28,500.00
277,500.00
89,100.00
399,950.00

Bahan:
Kayu Kamper
Plywood 12 mm
Teakwood 4mm
Skrup

m3
m2
m2
Buah

4,875,000.00
82,600.00
61,000.00
150.00
Jumlah:
Nilai HSPK :

97,500.00
49,560.00
36,600.00
1,500.00
185,160.00
585,110.00

0.0200
0.6000
0.6000
10.0000

m2

Pasang Daun Pintu WPC finish politur


Ukuran 92 x 210 cm
Upah:
Kepala Tukang Kayu
Pekerja

unit

0.0800
0.0800

O.H
O.H

95,000.00
89,100.00
Jumlah:

7,600.00
7,128.00
14,728.00

Bahan:
Daun Pintu WPC finish politur (92x210)

1.0000

unit

1,350,000.00
Jumlah:
Nilai HSPK :

1,350,000.00
1,350,000.00
1,364,728.00

Pasang Daun Pintu WPC finish politur


Ukuran 82 x 210 cm
Upah:
Kepala Tukang Kayu
Pekerja

unit

0.0800
0.0800

O.H
O.H

95,000.00
89,100.00
Jumlah:

7,600.00
7,128.00
14,728.00

Bahan:
Daun Pintu WPC + kaca + finish politur (82x210)

1.0000

unit

1,200,000.00
Jumlah:
Nilai HSPK :

1,200,000.00
1,200,000.00
1,214,728.00

Pasang Daun Pintu WPC finish politur


Ukuran 72 x 210 cm
Upah:
Kepala Tukang Kayu
Pekerja

unit

0.0800
0.0800

O.H
O.H

95,000.00
89,100.00
Jumlah:

7,600.00
7,128.00
14,728.00

Bahan:
Daun Pintu WPC finish politur (72x210)

1.0000

unit

1,130,000.00
Jumlah:
Nilai HSPK :

1,130,000.00
1,130,000.00
1,144,728.00

Pemasangan pintu type PJ


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Daun Pintu WPC + Finish ukuran 92 x 210 cm
Pemasangan Selimar Aluminium Daun Jendela
Pemasangan Kaca Bening
Pemasangan Engsl Pintu
Pemasangan casement
Pemasangan Handle + Kunci pintu
Friction Stay 16"
Friction Stay 12"

15.14
1.00
8.32
2.35
1.50
3.00
1.00
1.00
2.00

m1
unit
m1
m2
bh
bh
bh
bh
bh

109,329.00
1,364,728.00
78,952.17
122,945.25
42,709.25
51,139.50
145,576.00
68,000.00
52,000.00

1,655,241.06
1,364,728.00
656,882.05
288,404.97
64,063.88
153,418.50
145,576.00
68,000.00
104,000.00
4,500,314.46

Pekerjaan Kusen Pintu Type P2


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Daun Pintu WPC + Finish ukuran 82 x 210 cm
Pemasangan Engsl Pintu
Pemasangan Handle + Kunci

5.08
1.00
1.50
1.00

m1
unit
bh
bh

109,329.00
1,214,728.00
42,709.25
145,576.00

555,391.32
1,214,728.00
64,063.88
145,576.00
1,979,759.20

Pekerjaan Kusen Pintu Type P3


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Daun Pintu WPC + Finish ukuran 72 x 210 cm
Pemasangan Engsl Pintu
Pemasangan Handle + Kunci

4.98
1.00
1.50
1.00

m1
unit
bh
bh

109,329.00
1,144,728.00
42,709.25
145,576.00

544,458.42
1,144,728.00
64,063.88
145,576.00
1,898,826.30

Pekerjaan Kusen Pintu Type P3


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Daun Pintu WPC + Finish ukuran 92 x 210 cm
Pemasangan Engsl Pintu
Pemasangan Handle + Kunci

5.18
1.00
1.50
1.00

m1
unit
bh
bh

109,329.00
1,364,728.00
42,709.25
145,576.00

566,324.22
1,364,728.00
64,063.88
145,576.00
2,140,692.10

Pekerjaan Kusen Jendela Type J1


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Selimar Aluminium Daun Jendela
Pemasangan Kaca Bening
Pemasangan casement
Friction Stay 16"
Friction Stay 12"

13.00
4.80
2.45
4.00
2.00
2.00

m1
m1
m2
bh
bh
bh

109,329.00
78,952.17
122,945.25
51,139.50
68,000.00
52,000.00

1,421,277.00
378,970.42
300,871.62
204,558.00
136,000.00
104,000.00
2,545,677.03

Pekerjaan Kusen Jendela Type J2


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Selimar Aluminium Daun Jendela
Pemasangan Kaca Bening
Pemasangan Engsl Jendela casement
Pemasangan Grendel Jendela

5.38
3.20
0.63
2.00
1.00

m1
m1
m2
bh
bh

109,329.00
78,952.17
122,945.25
51,139.50
52,000.00

588,190.02
252,646.94
77,455.51
102,279.00
52,000.00
1,072,571.47

Pas. Kusen Type BV


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Kaca Bening

2.56
0.46

m1
m2

109,329.00
122,945.25

279,882.24
56,653.17
336,535.41

Pekerjaan Kusen Jendela Type BV1


Pemasangan Kusen Alumunium Profil 4"
Pemasangan Kaca Bening

2.50
0.38

m1
m2

109,329.00
122,945.25

273,322.50
46,719.20
320,041.70

9,283.25
90,250.00
71,125.00

11,139.90
90,250.00
14,225.00
115,614.90
115,614.00

Pekerjaan Pagar Selasar


Ongkos Pemasangan Pipa Galvanis termasuk Elektrode
Pipa Galvanis Med Diameter 2,5"
Pipa Galvanis Med Diameter 2"

m1
1.2000 m
1.0000 m
0.2000 m
Jumlah:
Nilai HSPK :

Pemasangan Sunscreen Rangka Aluminium 4" Isian Aluminium Profil Z


Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja
Bahan:
Aluminium Coklat , Profil 4"
Kisi-kisi Aluminium profil Z
Skrup/Ripet

m1
0.0021
0.0043
0.0430
0.0430

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

203.70
408.50
3,977.50
3,831.30
8,421.00

3.3000
12.8700
45.0000

m1
m1
Buah

90,000.00
13,500.00
150.00
Jumlah:

297,000.00
173,745.00
6,750.00
477,495.00
485,916.00

Nilai HSPK :

m1

Pemasangan Pipa Galvanis Termasuk Elektrode


Upah:
Mandor
Tukang Besi
Pekerja

0.0020
0.0600
0.0280

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00

194.00
5,700.00
2,494.80

Bahan:
Elektroda Baja

0.0060

kg

49,325.00

295.95

Sewa Peralatan:
Sewa Welding Set (min 5 jam)

0.0210

Hari

28,500.00
Jumlah:

598.50
9,283.25
9,283.25

9,283.25
90,250.00
71,125.00
Jumlah:

11,139.90
90,250.00
14,225.00
115,614.90

Nilai HSPK :

115,614.90

9,283.25
7,300.00
Jumlah:

11,139.90
269,370.00
280,509.90

Nilai HSPK :

280,509.90

Nilai HSPK :
Pekerjaan Pagar Selasar
Ongkos Pemasangan Pipa Galvanis termasuk Elektrode
Pipa Galvanis Med Diameter 2,5"
Pipa Galvanis Med Diameter 2"

m1
1.2000
1.0000
0.2000

m1

Pemasangan Gril Penutup Saluran


Ongkos Pemasangan termasuk Elektrode
Besi siku 50.50.5

m
m
m

1.2000
36.9000

m
kg

Pemasangan Plafond Rangka Hollow Galvalum


Upah:
Mandor
Kepala Tukang Besi
Pekerja
Tukang Besi

m2
0.0750
0.0250
0.2500
0.1500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
92,500.00
Jumlah:

7,275.00
2,375.00
22,275.00
13,875.00
45,800.00

Bahan:
Metal furing 2/4 cm ex. Sakura trust, bluscoopsteel
Kalsiboard Uk.240 x 120 x 4 mm
Pku Skrup

2.7500
0.3819
12.0000

m'
Lembar
Buah

13,500.00
72,890.00
150.00
Jumlah:

37,125.00
27,836.69
1,800.00
66,761.69
112,561.69

Nilai HSPK :
Pemasangan List Plafond Gypsum
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja

m1
0.0030
0.0050
0.0500
0.0500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
475.00
4,625.00
4,455.00
9,846.00

Bahan:
List Gypsum
Lem

1.0500
0.0200

m1
Buah

9,300.00
14,000.00
Jumlah:

9,765.00
280.00
10,045.00
19,891.00

Nilai HSPK :
Pemasangan List Plafond Kayu 1/4
Upah:
Mandor
Kepala Tukang Kayu
Tukang Kayu
Pekerja

m1
0.0030
0.0050
0.0500
0.0500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
475.00
4,625.00
4,455.00
9,846.00

Bahan:
List kayu 1/4
Paku

1.0500
0.0324

m1
kg

10,000.00
12,500.00
Jumlah:

10,500.00
405.00
10,905.00
20,751.00

Nilai HSPK :
Plamur Tembok
Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0010
0.0030
0.0300
0.0200

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

97.00
285.00
2,775.00
1,782.00
4,939.00

Bahan:
Plamur Tembok
Kertas Gosok no 150

0.1000
0.5000

Kg
Lembar

46,000.00
8,750.00
Jumlah:

4,600.00
4,375.00
8,975.00
13,914.00

Nilai HSPK :

Pengecatan Dinding Interior (Enamel/Spotless)


Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0025
0.0042
0.0420
0.0280

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

242.50
399.00
3,885.00
2,494.80
7,021.30

Bahan:
Cat Dinding Enamel/Spotless
Cat Dasar
Plamur Tembok

0.0360
0.1200
1.0000

kaleng
kg
m2

44,281.60
24,600.00
13,914.00
Jumlah:

1,594.14
2,952.00
13,914.00
18,460.14
25,481.44

Nilai HSPK :
Pengecatan Dinding Exterior (Weathershield)
Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0025
0.0075
0.0750
0.0500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

242.50
712.50
6,937.50
4,455.00
12,347.50

Bahan:
Cat Alkali
Cat Weathershield

0.0840
0.2520

kg
kg

25,000.00
60,000.00
Jumlah:

2,100.00
15,120.00
17,220.00
29,567.50

Nilai HSPK :
Pengecatan Besi
Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0200
0.0400
0.4000
0.0400

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

1,940.00
3,800.00
37,000.00
3,564.00
46,304.00

Bahan:
Cat Meni (besi)
Cat Besi doff

0.1000
0.3000

Kg
Kg

32,000.00
45,700.00
Jumlah:

3,200.00
13,710.00
16,910.00
63,214.00

Nilai HSPK :
Pengecatan Menie Besi
Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0050
0.0100
0.1000
0.0100

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

485.00
950.00
9,250.00
891.00
11,576.00

Bahan:
Cat Meni (besi)

0.1000

Kg

32,000.00
Jumlah:

3,200.00
3,200.00
14,776.00

Nilai HSPK :
Pelapisan Waterproofing
Upah:
Mandor
Kepala Tukang Cat
Tukang Cat
Pekerja

m2
0.0025
0.0075
0.0750
0.0500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

242.50
712.50
6,937.50
4,455.00
12,347.50

Bahan:
Waterproofing
Serat Fiber

0.3500
1.0000

Kg
m2

38,750.00
4,500.00
Jumlah:

13,562.50
4,500.00
18,062.50
30,410.00

Nilai HSPK :
Pemasangan Titik Stop Kontak Gedung
Upah:
Kepala Tukang Listrik
Tukang Listrik
Pekerja
Bahan
Stop Kontak
Kabel NYA 500 Volt 2 x 2,5 mm2
Pipa Pralon 5/8
T Doos Pvc

Titik
0.0500
0.2000
0.0010

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
Jumlah:

4,850.00
19,000.00
89.10
23,939.10

1.0000
10.0000
1.0000
1.0000

Buah
m1
Lonjor
Buah

18,500.00
6,500.00
5,000.00
1,750.00
Jumlah:

18,500.00
65,000.00
5,000.00
1,750.00
90,250.00
114,189.10

Nilai HSPK :

Pemasangan Titik Lampu Gedung


Upah:
Kepala Tukang Listrik
Tukang Listrik
Pekerja
Bahan
Isolator
Kabel NYA 500 Volt 2 x 2,5 mm2
Pipa Pralon 5/8
T Doos Pvc
Fiting Plafon

Titik
0.0500
0.5000
0.3000

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
Jumlah:

4,850.00
47,500.00
26,730.00
79,080.00

4.0000
10.0000
1.0000
1.0000
1.0000

Buah
m1
Lonjor
Buah
Buah

5,500.00
6,500.00
5,000.00
1,750.00
42,500.00

22,000.00
65,000.00
5,000.00
1,750.00
42,500.00

Jumlah:

136,250.00
215,330.00

Nilai HSPK :
Pemasangan Saklar Tunggal
Upah:
Kepala Tukang Listrik
Tukang Listrik
Pekerja

Titik
0.0500
0.2000
0.0010

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
Jumlah:

4,850.00
19,000.00
89.10
23,939.10

Bahan
Saklar Tunggal

1.0000

Buah

8,500.00
Jumlah:

8,500.00
8,500.00
32,439.10
32,439.10

Nilai HSPK :
Pemasangan Saklar Ganda
Upah:
Kepala Tukang Listrik
Tukang Listrik
Pekerja

Titik
0.0500
0.2000
0.0010

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
Jumlah:

4,850.00
19,000.00
89.10
23,939.10

Bahan
Saklar Ganda

1.0000

Buah

17,600.00
Jumlah:

17,600.00
17,600.00
41,539.10

Nilai HSPK :
Pemasangan Lampu TL Waterproof 2x36W
Upah :
Tukang Listrik
Pekerja Terampil

0.0200
0.0100

O.H
O.H

95,000.00
89,100.00
Jumlah:

1,900.00
891.00
2,791.00

Bahan :
lampu TL waterproof 2x36watt

1.0000

Buah

590,000.00
Jumlah:

590,000.00
590,000.00
592,791.00

Nilai HSPK :
Pemasangan Lampu LED 5 Watt
Upah:
Tukang Listrik
Pekerja

Titik
0.0200
0.0100

O.H
O.H

95,000.00
89,100.00
Jumlah:

1,900.00
891.00
2,791.00

Bahan
Lampu LED 5 Watt

1.0000

Buah

65,000.00
Jumlah:

65,000.00
65,000.00
67,791.00

Nilai HSPK :
Pemasangan Lampu LED 10 Watt
Upah:
Tukang Listrik
Pekerja

Titik
0.0200
0.0100

O.H
O.H

95,000.00
89,100.00
Jumlah:

1,900.00
891.00
2,791.00

Bahan
Downligth 4"
Lampu LED 10 Watt

1.0000
1.0000

Buah
Buah

22,500.00
80,000.00
Jumlah:

22,500.00
80,000.00
102,500.00
105,291.00

Nilai HSPK :
Pemasangan Panel Box MCB 9 Modul
Upah:
Mandor
Kepala Tukang Listrik
Tukang Listrik
Pekerja

Unit
0.0800
0.0800
0.8000
1.2050

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

7,760.00
7,600.00
74,000.00
107,365.50
196,725.50

Bahan
Panel Box 9 Modul + Lamp

1.0000

Buah

675,000.00
Jumlah:

675,000.00
675,000.00
871,725.50

Nilai HSPK :

Pemasangan Kabel NYY 4 x 16 mm2


Upah:
Mandor
Tukang Listrik

m
0.0060
0.0640

O.H
O.H

97,000.00
92,500.00
Jumlah:

582.00
5,920.00
6,502.00

Bahan
Kabel NYY 4 x 16 mm2

1.0000

95,000.00
Jumlah:

95,000.00
95,000.00
101,502.00

Nilai HSPK :
Pemasangan Kabel NYA 10 mm2
Upah:
Mandor
Tukang Listrik

m
0.0060
0.0640

O.H
O.H

97,000.00
92,500.00
Jumlah:

582.00
5,920.00
6,502.00

Bahan
Kabel NYA 10 mm2

1.0000

Buah

8,770.00
Jumlah:

8,770.00
8,770.00
15,272.00

Nilai HSPK :
Pemasangan MCCB 20 A
Upah:
Mandor
Tukang Listrik

buah
0.0300
0.3400

O.H
O.H

97,000.00
92,500.00
Jumlah:

2,910.00
31,450.00
34,360.00

Bahan
MCCB 20 A

1.0000

Buah

40,250.00
Jumlah:

40,250.00
40,250.00
74,610.00

Nilai HSPK :
Kloset Duduk Porselen
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

Buah
0.1600
0.0010
1.1000
3.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

15,520.00
95.00
101,750.00
294,030.00
411,395.00

Bahan:
Closet Duduk Porselen
Perlengkapan 6% harga closet

1.0000
0.0600

Buah
Buah

2,000,000.00
2,000,000.00
Jumlah:
Nilai HSPK :

2,000,000.00
120,000.00
2,120,000.00
2,531,395.00

Kloset Duduk Porselen tanpa reservoir


Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

Buah
0.1600
0.0010
1.1000
3.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

15,520.00
95.00
101,750.00
294,030.00
411,395.00

Bahan:
Closet Duduk Porselen tanpa reservoir
Perlengkapan 6% harga closet

1.0000
0.0600

Buah
Buah

700,000.00
700,000.00
Jumlah:

700,000.00
42,000.00
742,000.00
1,153,395.00

Nilai HSPK :
Kloset Jongkok
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

Buah
0.1600
0.0010
1.1000
3.3000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

15,520.00
95.00
101,750.00
294,030.00
411,395.00

Bahan:
Closet jongkok
Semen PC (50kg)
Pasir Pasang

1.0000
0.1200
0.0100

Buah
zak
m3

300,000.00
71,000.00
150,000.00
Jumlah:

300,000.00
8,520.00
1,500.00
310,020.00
721,415.00

Nilai HSPK :
Pemasangan Wastafel
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

Buah
0.1000
0.1500
1.4500
1.2000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

9,700.00
14,250.00
134,125.00
106,920.00
264,995.00

Bahan:
Wastafel
Perlengkapan 12 % harga wastafel
Cermin 50x70 cm
Semen portland (50kg)
Pasir Pasang

1.0000
0.1200
1.0000
0.1200
0.0100

Buah
Buah
Buah
Zak
m3

327,000.00
327,000.00
182,000.00
71,000.00
150,000.00
Jumlah:

327,000.00
39,240.00
182,000.00
8,520.00
1,500.00
558,260.00
823,255.00

Nilai HSPK :

Pemasangan Urinoir
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja

Buah
0.1000
0.1500
1.4500
1.2000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

9,700.00
14,250.00
134,125.00
106,920.00
264,995.00

Bahan:
Urinoir
Perlengkapan 12 % harga wastafel
Semen portland (50kg)
Pasir Pasang

1.0000
0.1200
0.1200
0.0100

Buah
Buah
Zak
m3

450,000.00
450,000.00
71,000.00
150,000.00
Jumlah:

450,000.00
54,000.00
8,520.00
1,500.00
514,020.00
779,015.00

Nilai HSPK :
Pemasangan Avour
Upah:
Kepala Tukang Pipa
Tukang Pipa

Buah
0.0300
0.1500

O.H
O.H

95,000.00
92,500.00
Jumlah:

2,850.00
13,875.00
16,725.00

Bahan:
Avour

1.0000

Buah

17,500.00
Jumlah:

17,500.00
17,500.00
34,225.00

Nilai HSPK :
Pemasangan Kran Air
Upah:
Kepala Tukang Pipa
Tukang Pipa

Buah
0.0300
0.1500

O.H
O.H

95,000.00
92,500.00
Jumlah:

2,850.00
13,875.00
16,725.00

Bahan:
Kran Air
Rol TBA

1.0000
1.0000

Buah
Buah

30,000.00
3,000.00
Jumlah:

30,000.00
3,000.00
33,000.00
49,725.00

Nilai HSPK :
Pasang Pipa PVC D 4"
Upah:
Mandor
Kepala Tukang
Tukang Pipa
Pekerja

m1
0.0018
0.0060
0.0600
0.0360

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

174.60
570.00
5,550.00
3,207.60
9,502.20

Bahan:
Pipa PVC 4'' type D Panjang 4 m

0.3000

btg

120,000.00
Jumlah:

36,000.00
36,000.00
45,502.20

Nilai HSPK :
Pasang Pipa PVC D 3"
Upah:
Mandor
Kepala Tukang
Tukang Pipa
Pekerja

m1
0.0018
0.0060
0.0600
0.0360

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

174.60
570.00
5,550.00
3,207.60
9,502.20

Bahan:
Pipa PVC 3'' type D Panjang 4 m

0.3000

btg

80,000.00
Jumlah:

24,000.00
24,000.00
33,502.20

Nilai HSPK :
Pasang Pipa PVC AW 1"
Upah:
Mandor
Kepala Tukang
Tukang Pipa
Pekerja

m1
0.0018
0.0060
0.0600
0.0360

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

174.60
570.00
5,550.00
3,207.60
9,502.20

Bahan:
Pipa PVC 1'' type AW Panjang 4 m

0.3000

btg

30,600.00
Jumlah:

9,180.00
9,180.00
18,682.20

Nilai HSPK :
Pasang Pipa PVC AW 3/4"
Upah:
Mandor
Kepala Tukang
Tukang Pipa
Pekerja

m1
0.0018
0.0060
0.0600
0.0360

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

174.60
570.00
5,550.00
3,207.60
9,502.20

Bahan:
Pipa PVC 3/4'' type AW Panjang 4 m

0.3000

btg

25,400.00
Jumlah:

7,620.00
7,620.00
17,122.20

Nilai HSPK :

Pekerjaan Sumur Resapan


Galian tanah
Urug pasir
Pasangan batu bata 1 PC : 5 PS
Pasangan bata trasram
Plesteran 1 PC : 3 PS
Tutup Plat beton t. 10 cm
Pipa ventilasi galvanis O 2 "
Lapisan ijuk
Lapisan kerikil
Pasangan bata tanpa spesi

unit
5.34114
0.50868
0.62172
0.67824
1.256
0.11304
1
11.304
0.471
1.0362

m3
m3
m3
m3
m2
m3
unit
kg
m3
m3

69,250.00
177,700.00
916,138.40
965,367.03
57,976.92
5,352,184.34
25,000.00
15,000.00
105,000.00
400,000.00
Jumlah:
Nilai HSPK :

369,873.95
90,392.44
569,581.56
654,750.54
72,819.01
605,010.92
25,000.00
169,560.00
49,455.00
414,480.00
3,020,923.41
3,045,923.41

unit
Upah:
Kepala Tukang Pipa
Tukang Pipa

0.0300
0.1500

O.H
O.H

95,000.00
92,500.00
Jumlah:

2,850.00
13,875.00
16,725.00

Bahan:
Pompa elektric (kapasitas hisap 30m,dorong 30m )
Rol TBA

1.0000
1.0000

unit
Buah

950,000.00
3,000.00
Jumlah:

950,000.00
3,000.00
950,000.00
966,725.00

Nilai HSPK :
Pemasangan Pipa Pagar Hollow
Upah:
Mandor
Tukang Besi
Pekerja

0.002
0.06
0.028

O.H
O.H
O.H

Bahan:
Elektroda Baja
Hollow 20x40
Hollow 50x50

97,000.00
92,500.00
89,100.00
Jumlah:

194.00
5,550.00
2,494.80
8,238.80

0.006
7.65
4

kg
m'
m'

49,325.00
19,500.00
45,000.00
Jumlah:

295.95
149,175.00
180,000.00
329,470.95

Sewa Peralatan:
Sewa Welding Set (min 5 jam)

0.021

Hari

28,500.00
Jumlah:
-

598.50
598.50
338,308.25

PEKERJAAN BETON
Lantai Kerja K-175
Upah:
Mandor
Kepala Tukang Batu
Tukang batu
Pekerja
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Air (biaya air tawar)

Pekerjaan Beton K-250


Upah:
Mandor
Kepala Tukang Batu
Tukang batu
Pekerja
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Air (biaya air tawar)

m3

SNI 7394:2008 (6.4)

0.08
0.03
0.28
1.65

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

8,051.00
2,660.00
25,437.50
147,015.00
183,163.50

8.15
0.48
0.54
215.00

Zak
m3
m3
Liter

57,000.00
187,500.00
250,000.00
30.00
Jumlah:

464,550.00
90,117.19
135,394.74
6,450.00
696,511.92
879,675.42

Nilai HSPK :
m3

SNI 7394:2008 (6.7)

0.08
0.03
0.28
1.65

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

8,051.00
2,660.00
25,437.50
147,015.00
183,163.50

9.60
0.43
0.55
215.00

Zak
m3
m3
Liter

57,000.00
187,500.00
250,000.00
30.00
Jumlah:

547,200.00
81,093.75
136,700.00
6,450.00
771,443.75
954,607.25

Nilai HSPK :
Pekerjaan Lubang Bored Pile 40 cm
Upah:
Mandor
Pekerja

SNI 7394:2008 (6.7)

0.06
0.30

O.H
O.H

97,000.00
89,100.00
Jumlah:

5,645.40
26,730.00
32,375.40

Bahan:
Sewa Alat Bantu Bor Strouss (Alat)

0.25

jam

275,000.00

68,750.00
68,750.00
101,125.40

Jumlah:
Nilai HSPK :
Pekerjaan Beton Lunak
Upah:
Mandor
Kepala Tukang Batu
Tukang batu
Pekerja
Bahan:
Semen portland (40kg)
Pasir Beton
Air (biaya air tawar)

m3

SNI 7394:2008 (6.7)

0.03
0.01
0.10
0.40

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

2,910.00
950.00
9,250.00
35,640.00
48,750.00

1.00
0.90
215.00

Zak
m3
Liter

57,000.00
187,500.00
30.00
Jumlah:

57,000.00
168,750.00
6,450.00
232,200.00
280,950.00

Nilai HSPK :
Pekerjaan Pembesian dengan besi beton
(polos/ulir)
Upah:
Mandor
Kepala Tukang Besi
Tukang Besi
Pekerja

0.00
0.00
0.01
0.01

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

38.80
66.50
647.50
623.70
1,376.50

Bahan:
Besi Beton (polos)
Kawat Beton

1.05
0.02

Kg
Kg

9,200.00
14,500.00
Jumlah:

9,660.00
217.50
9,877.50
11,254.00

kg

SNI 7394:2008 (6.17)

Nilai HSPK :
Pekerjaan Bekisting Sloof
Upah:
Mandor
Kepala Tukang kayu
Tukang Kayu
Pekerja

m2

SNI 7394:2008 (6.21)

0.03
0.03
0.26
0.52

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

2,522.00
2,470.00
24,050.00
46,332.00
75,374.00

Bahan:
Kayu meranti bekisting
Paku Usuk
Minyak Bekisting

0.05
0.30
0.10

m3
Kg
ltr

3,500,000.00
13,850.00
8,500.00
Jumlah:

157,500.00
4,155.00
850.00
162,505.00

Asumsi Pemakaian Bahan 2 x Pakai


Tenaga
Bahan

1.50
1.00

x
x

75,374.00
162,505.00

113,061.00
162,505.00
275,566.00
275,566.00

Nilai HSPK :

Pekerjaan Bekisting Kolom


Upah:
Mandor
Kepala Tukang kayu
Tukang Kayu
Pekerja

m2

SNI 7394:2008 (6.22)

0.03
0.03
0.33
0.66

O.H
O.H
O.H
O.H

Bahan:
Kayu meranti bekisting
Paku Usuk
Minyak Bekisting
Kayu Meranti balok 3/5
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm
Dolken kayu gelam dia 8-10 cm, panjang 4m

0.04
0.40
0.20
0.02
0.35
2.00

m3
Kg
ltr
m3
lembar
btg

Asumsi Pemakaian Bahan 2 x Pakai


Tenaga
Bahan

1.50
1.00

x
x

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,201.00
3,135.00
30,525.00
58,806.00
95,667.00

3,500,000.00
13,850.00
8,500.00
4,816,666.67
210,000.00
6,800.00
Jumlah:

140,000.00
5,540.00
1,700.00
72,250.00
73,500.00
13,600.00
306,590.00

95,667.00
306,590.00

143,500.50
306,590.00
450,090.50
450,090.50

Nilai HSPK :
SNI 7394:2008 (6.23)

Pekerjaan Bekisting Balok


Upah:
Mandor
Kepala Tukang kayu
Tukang Kayu
Pekerja

m2
0.03
0.03
0.33
0.66

O.H
O.H
O.H
O.H

Bahan:
Kayu meranti bekisting
Paku Usuk
Minyak Bekisting
Kayu Meranti balok 3/5
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm
Dolken kayu gelam dia 8-10 cm, panjang 4m

0.04
0.40
0.20
0.02
0.35
2.00

m3
Kg
ltr
m3
lembar
btg

Asumsi Pemakaian Bahan 2 x Pakai


Tenaga
Bahan

1.50
1.00

x
x

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,201.00
3,135.00
30,525.00
58,806.00
95,667.00

3,500,000.00
13,850.00
8,500.00
4,816,666.67
210,000.00
6,800.00
Jumlah:

140,000.00
5,540.00
1,700.00
86,700.00
73,500.00
13,600.00
321,040.00

95,667.00
321,040.00

143,500.50
321,040.00
464,540.50
464,540.50

Nilai HSPK :
SNI 7394:2008 (6.24)

Pekerjaan Bekisting Lantai


Upah:
Mandor
Kepala Tukang kayu
Tukang Kayu
Pekerja

m2
0.03
0.03
0.33
0.66

O.H
O.H
O.H
O.H

Bahan:
Kayu meranti bekisting
Paku Usuk
Minyak Bekisting
Kayu Meranti balok 3/5
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm
Dolken kayu gelam dia 8-10 cm, panjang 4m

0.04
0.40
0.20
0.02
0.35
6.00

m3
Kg
ltr
m3
lembar
btg

Asumsi Pemakaian Bahan 2 x Pakai


Tenaga
Bahan

1.50
1.00

x
x

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,201.00
3,135.00
30,525.00
58,806.00
95,667.00

3,500,000.00
13,850.00
8,500.00
4,816,666.67
210,000.00
6,800.00
Jumlah:

140,000.00
5,540.00
1,700.00
72,250.00
73,500.00
40,800.00
333,790.00

95,667.00
333,790.00

143,500.50
333,790.00
477,290.50
477,290.50

Nilai HSPK :
SNI 7394:2008 (6.26)

Pekerjaan Bekisting Tangga


Upah:
Mandor
Kepala Tukang kayu
Tukang Kayu
Pekerja

m2
0.03
0.03
0.33
0.66

O.H
O.H
O.H
O.H

Bahan:
Kayu meranti bekisting
Paku Usuk
Minyak Bekisting
Kayu Meranti balok 3/5
Triplek Phenolic 1 sisi 12 mm uk. 122 x 244 cm
Dolken kayu gelam dia 8-10 cm, panjang 4m

0.03
0.40
0.15
0.02
0.35
2.00

m3
Kg
ltr
m3
lembar
btg

Asumsi Pemakaian Bahan 2 x Pakai


Tenaga
Bahan

1.50
1.00

x
x

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

3,201.00
3,135.00
30,525.00
58,806.00
95,667.00

3,500,000.00
13,850.00
8,500.00
4,816,666.67
210,000.00
6,800.00
Jumlah:

105,000.00
5,540.00
1,275.00
72,250.00
73,500.00
13,600.00
271,165.00

95,667.00
271,165.00

143,500.50
271,165.00
414,665.50
414,665.50

97,000.00
89,100.00
Jumlah:

2,425.00
4,455.00
6,880.00
6,880.00

Nilai HSPK :
Pembongkaran Cetakan
Upah:
Mandor
Pekerja

m2
0.03
0.05

O.H
O.H
Nilai HSPK :

m1

Pemancangan Tiang Pancang m1 ( 200m)


Upah:
Mandor

0.13

O.H

97,000.00
Jumlah:

12,125.00
12,125.00

Bahan:
Tiang Pancang 2525 cm

1.00

189,200.00
Jumlah:

189,200.00
189,200.00

0.22

Jam

130,625.00

28,476.25

0.22

Jam

175,750.00

38,313.50

Jumlah:

66,789.75
268,114.75

954,607.25
11,254.00
11,254.00
Jumlah:

954,607.25
404,721.98
653,484.21
2,012,813.43
2,012,813.43

954,607.25
11,254.00
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
355,230.26
938,029.90
1,102,264.00
27,520.00
3,377,651.41
3,377,651.41

954,607.25
11,254.00
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
588,667.29
1,005,032.04
1,377,830.00
34,400.00
3,960,536.58
3,960,536.58

954,607.25
11,254.00
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
537,920.11
1,005,032.04
1,377,830.00
34,400.00
3,909,789.40
3,909,789.40

954,607.25
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
1,766,678.49
1,837,106.67
45,866.67
4,604,259.07
4,604,259.07

954,607.25
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
1,757,649.72
337,292.78
8,421.12
3,057,970.87
3,057,970.87

954,607.25
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
1,194,192.63
619,071.08
15,456.22
2,783,327.19
2,783,327.19

954,607.25
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
2,018,353.75
250,514.55
6,254.55
3,229,730.09
3,229,730.09

954,607.25
11,254.00
275,566.00
6,880.00
Jumlah:

954,607.25
1,042,255.45
612,368.89
15,288.89
2,624,520.48
2,624,520.48

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
601,301.22
781,691.59
1,750,351.94
26,755.56
4,114,707.56
4,114,707.56

Sewa Peralatan:
Sewa Crane 30 ton - min. 8 jam (termasuk
mob/demob, operator, BBM)
Sewa Hammer tiang pancang - min. 8 jam(termasuk
mob/demob, operator, BBM)

Nilai HSPK :
Pekerrjaan Bor Pile 40cm
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir

m3
m3
Kg
Kg

1.00
35.96
58.07

Nilai HSPK :
Pekerjaan Sloof S1
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Sloof
Pembongkaran Cetakan

m3
1.00
31.56
83.35
4.00
4.00

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan Sloof S2
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Sloof
Pembongkaran Cetakan

m3
1.00
52.31
89.30
5.00
5.00

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan Sloof S3
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Sloof
Pembongkaran Cetakan

m3
1.00
47.80
89.30
5.00
5.00

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan Sloof S4
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Sloof
Pembongkaran Cetakan

m3
1.00
156.98
6.67
6.67

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Poer P1
Pekerjaan Beton Berstruktur K-250
Pembesian dengan besi Ulir
Bekisting Poer
Pembongkaran Cetakan

m3
1.00
156.18
1.22
1.22

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Poer P2
Pekerjaan Beton Berstruktur K-250
Pembesian dengan besi Ulir
Bekisting Poer
Pembongkaran Cetakan

m3
1.00
106.11
2.25
2.25

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Poer P3
Pekerjaan Beton Berstruktur K-250
Pembesian dengan besi Ulir
Bekisting Poer
Pembongkaran Cetakan

m3
1.00
179.35
0.91
0.91

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Poer P4
Pekerjaan Beton Berstruktur K-250
Pembesian dengan besi Ulir
Bekisting Poer
Pembongkaran Cetakan

m3
1.00
92.61
2.22
2.22

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Kolom K1 30/40


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Kolom
Pembongkaran Cetakan

m3
1.00
53.43
69.46
3.89
3.89

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan Kolom K1 30/40 (Stek Lt.2)


Pekerjaan Beton Berstruktur K-175
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Kolom
Pembongkaran Cetakan

m3
1.00
53.43
69.46
3.89
3.89

m3
Kg
Kg
m2
m2

879,675.42
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

879,675.42
601,301.22
781,691.59
1,750,351.94
26,755.56
4,039,775.73
4,039,775.73

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
606,851.69
2,345,074.76
3,000,603.33
45,866.67
6,953,003.70
6,953,003.70

879,675.42
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

879,675.42
606,851.69
2,345,074.76
3,000,603.33
45,866.67
6,878,071.88
6,878,071.88

954,607.25
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
2,412,913.87
2,500,502.78
38,222.22
5,906,246.12
5,906,246.12

954,607.25
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
1,766,277.79
1,200,241.33
18,346.67
3,939,473.04
3,939,473.04

280,950.00
11,254.00
450,090.50
6,880.00
Jumlah:

280,950.00
781,691.59
875,175.97
13,377.78
1,951,195.34
1,951,195.34

280,950.00
11,254.00
450,090.50
6,880.00
Jumlah:

280,950.00
2,345,074.76
2,250,452.50
34,400.00
4,910,877.26
4,910,877.26

11,254.00
Jumlah:

27,774.87
27,774.87
27,774.87

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
374,436.66
888,075.65
1,725,346.92
26,373.33
3,968,839.81
3,968,839.81

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
374,436.66
1,480,126.08
1,725,346.92
26,373.33
4,560,890.24
4,560,890.24

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00

954,607.25
374,436.66
1,184,100.86
1,725,346.92
26,373.33

Nilai HSPK :
Pekerjaan Kolom K2 20/20
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian Besi Beton Ulir
Bekisting Kolom
Pembongkaran Cetakan

m3
1.00
53.92
208.38
6.67
6.67

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan Kolom K2 20/20


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian Besi Beton Ulir
Bekisting Kolom
Pembongkaran Cetakan

m3
1.00
53.92
208.38
6.67
6.67

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan Kolom KP 12/12


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Kolom (3 x pakai)
Pembongkaran Cetakan

m3
1.00
214.41
5.56
5.56

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Kolom KP2 12/25


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Kolom (3 x pakai)
Pembongkaran Cetakan

m3
1.00
156.95
2.67
2.67

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Stekan Kolom K1 40/40 + Beton Lunak


Pekerjaan Beton Lunak
Pembesian dengan besi Ulir
Bekisting Kolom
Pembongkaran Cetakan

m3
1.00
69.46
1.94
1.94

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Stekan Kolom K2 30/30 + Beton Lunak


Pekerjaan Beton Lunak
Pembesian dengan besi Ulir
Bekisting Kolom
Pembongkaran Cetakan

m3
1.00
208.38
5.00
5.00

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Stekan Kolom KP


Pembesian Besi Beton Polos

ttk
2.47

Kg
Nilai HSPK :

Pekerjaan Balok B1 30/60


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Balok
Pembongkaran Cetakan

m3
1.00
33.27
78.91
3.83
3.83

m3
Kg
Kg
m2
m2
Nilai HSPK :

Balok B1A 30/60


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Balok
Pembongkaran Cetakan

m3
1.00
33.27
131.52
3.83
3.83

m3
Kg
Kg
m2
m2
Nilai HSPK :

Balok B1B 30/60


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Balok
Pembongkaran Cetakan

m3
1.00
33.27
105.22
3.83
3.83

m3
Kg
Kg
m2
m2

Jumlah:

4,264,865.02
4,264,865.02

m3
Kg
Kg
m2
m2

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
545,135.72
1,110,094.56
2,475,497.75
37,840.00
5,123,175.28

m3
Kg
Kg
m2
m2

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
362,479.86
837,526.70
2,507,647.07
38,331.43
4,700,592.31
4,700,592.31

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
473,640.35
1,248,443.73
2,120,426.36
32,412.44
4,829,530.13
4,829,530.13

954,607.25
11,254.00
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
508,037.71
1,504,820.57
2,034,409.06
31,097.60
5,032,972.20
5,032,972.20

954,607.25
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
1,945,749.08
3,750,754.17
57,333.33
6,708,443.83
6,708,443.83

954,607.25
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
2,454,542.42
3,750,754.17
57,333.33
7,217,237.17
7,217,237.17

954,607.25
11,254.00
477,290.50
6,880.00
Jumlah:

954,607.25
1,554,488.06
2,535,605.78
36,550.00
5,081,251.09
5,081,251.09

954,607.25
11,254.00
477,290.50
6,880.00
Jumlah:

954,607.25
1,961,167.06
1,988,710.42
28,666.67
4,933,151.39
4,933,151.39

954,607.25
11,254.00
477,290.50
6,880.00
Jumlah:

954,607.25
1,665,141.84
1,988,710.42
28,666.67
4,637,126.17
4,637,126.17

954,607.25
11,254.00
450,090.50
6,880.00
Jumlah:

954,607.25
2,431,107.09
3,125,628.47
47,777.78
6,559,120.59
6,559,120.59

11,254.00
Jumlah:

210,674.88
210,674.88
210,674.88

954,607.25
11,254.00
477,290.50
6,880.00
Jumlah:

954,607.25
1,976,724.59
2,386,452.50
34,400.00
5,352,184.34
5,352,184.34

Nilai HSPK :
Balok B2 20/40
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Balok
Pembongkaran Cetakan

1.00
48.44
98.64
5.50
5.50

m3

Balok B3 20/35
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Balok
Pembongkaran Cetakan

1.00
32.21
74.42
5.57
5.57

m3

Nilai HSPK :
Balok B4 15/25
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian Besi Beton Polos
Bekisting Balok
Pembongkaran Cetakan

m3
1.00
42.09
110.93
4.71
4.71

m3
Kg
Kg
m2
m2
Nilai HSPK :

Balok BK 25/50
Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Pembesian dengan besi Ulir
Bekisting Balok
Pembongkaran Cetakan

m3
1.00
45.14
133.71
4.52
4.52

m3
Kg
Kg
m2
m2
Nilai HSPK :

Pekerjaan BALOK LATEI 12/20


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Balok (2xpakai)
Pembongkaran Cetakan

m3
1.00
172.89
8.33
8.33

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan BALOK LEVEL BLV 12/20


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Balok
Pembongkaran Cetakan

m3
1.00
218.10
8.33
8.33

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan PLAT LEVEL TEBAL 8CM


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Plat
Pembongkaran Cetakan

m3
1.00
138.13
5.31
5.31

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Plat Lantai Tebal 12 cm Type A


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Plat
Pembongkaran Cetakan

m3
1.00
174.26
4.17
4.17

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Plat Lantai Tebal 12 cm Type B


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Plat
Pembongkaran Cetakan

m3
1.00
147.96
4.17
4.17

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Plat Tangga


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton
Bekisting Tangga
Pembongkaran Cetakan

m3
1.00
216.02
6.94
6.94

m3
Kg
m2
m2
Nilai HSPK :

Pekerjaan Stekan Plat Tangga


Pembesian Besi Beton

unit
18.72

Kg
Nilai HSPK :

Pekerjaan Tutup Plat Beton Tebal 10 cm


Pekerjaan Beton Berstruktur K-250
Pembesian Besi Beton Polos
Bekisting Plat
Pembongkaran Cetakan

m3
1.00
175.65
5.00
5.00

m3
Kg
m2
m2
Nilai HSPK :

PEKERJAAN BETON / M3
BOR PILE 40 cm
TULANGAN
LUAS =

Jarak

BESI D13
PJG=
Panjang/m3

PJG SATUAN

JML

BERAT/M

JML BERAT (KG)

7.9617834395

1.0419

58.0668

1.099

53.0785562633

0.6165

35.9625

0.1256
12
7.961783

BESI 10

0.15

94.0293
POER P1
TULANGAN
PJG =

1.2

LBR =

1.2

TGGI=

0.4

volume

PJG SATUAN

JML

BERAT/M

JML BERAT (KG)

BESI D16

1.58

33.1430

BESI D16

12

1.58

56.8166

Jumlah Berat tulangan per poer

89.9597

Jumlah Berat tulangan per m3

156.1800

0.576 m3

bekisting per poer

1.92 m2

bekisting per m3

1.728 m2

POER P2
TULANGAN
PJG =
LBR =
TGGI=
volume

2.2
1.2
0.4

PJG SATUAN

JML

BERAT/M

JML BERAT (KG)

BESI D16

1.58

BESI D16

12

1.58

55.2384
56.8166

Jumlah Berat tulangan per poer

112.0550

Jumlah Berat tulangan per m3

106.1127

1.056 m3

bekisting per poer


bekisting per m3

2.72 m2
2.448 m2

POER P3
TULANGAN
PJG =
LBR =
TGGI=

2.2
1.2
0.5

PJG =
LBR =
TGGI=

1.7
1
0.5

volume

PJG SATUAN

JML

BESI D16

5.2

BERAT/M
1.58

JML BERAT (KG)

BESI D16

3.2

15

1.58

BESI D16

4.2

1.58

BESI D16

2.8

10

1.58

46.4003
44.1907

Jumlah Berat tulangan per poer

232.0013

Jumlah Berat tulangan per m3

133.6413

65.6548
75.7555

1.736 m3

bekisting per poer


bekisting per m3

7.8 m2
4.493087558 m2

POER P3
TULANGAN
PJG =
LBR =
TGGI=
volume

2.2
2.2
0.4

PJG SATUAN

JML

BERAT/M

JML BERAT (KG)

BESI D16

22

1.58

BESI D16

22

1.58

173.6064
173.6064

Jumlah Berat tulangan per poer

347.2128

Jumlah Berat tulangan per m3

179.3455

1.936 m3

bekisting per poer


bekisting per m3

3.52 m2
1.818181818 m2

POER P4
TULANGAN
PJG =
LBR =
TGGI=
volume

0.9
0.9
0.4

PJG SATUAN

JML

BESI D13

2.4

BERAT/M
1.04

JML BERAT (KG)

BESI D13

2.4

1.04

15.0031
15.0031

Jumlah Berat tulangan per poer

30.0063

Jumlah Berat tulangan per m3

92.6120

0.324 m3

bekisting per poer


bekisting per m3

1.44 m2
4.444444444 m2

SLOOF S1 25/50
TULANGAN
PJG =
LBR =
Panjang/m3
BKSTG=

0.25
0.5
8

JML

PANJANG/M3

6
4

8
8

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.15

1.5

53.3333333333

BESI D13
BESI D13

BERAT/M
1.04
1.04

JML BERAT (KG)


50.0105
33.3403
83.3508

8 m2
BERAT/M
0.3946

JML BERAT (KG)


31.5648
31.5648

SLOOF S2 20/35

TULANGAN
PJG =
LBR =
Panjang/m3
BKSTG=

0.2
0.35
14.28571

JML

PANJANG/M3

14.285714286

JRK

PJG SATUAN

JML

BESI 8

0.125

1.16

114.285714286

TULANGAN

JML

PANJANG/M3

BERAT/M

14.285714286

JRK

PJG SATUAN

JML

BESI 8

0.125

1.06

114.285714286

TULANGAN

JML

PANJANG/M3

BERAT/M

26.666666667

BESI D13

BERAT/M
1.04

JML BERAT (KG)


89.3044

10 m2
BEGEL

BERAT/M
0.3946

JML BERAT (KG)


52.3074

SLOOF S3 20/35
PJG =
LBR =
Panjang/m3
BKSTG=

0.2
0.35
14.28571

BESI D13

1.04

JML BERAT (KG)


89.3044

10 m2
BEGEL

BERAT/M
0.3946

JML BERAT (KG)


47.7981

SLOOF S4 15/25
PJG =
LBR =
Panjang/m3

0.15
0.25
26.66667

BKSTG=

13.33333 m2

BESI 12

BEGEL

0.89

JRK

PJG SATUAN

JML

BESI 8

0.125

0.74

213.333333333

TULANGAN

JML

PANJANG/M3

BERAT/M

8.3333333333

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.125

1.3

66.6666666667

TULANGAN

JML

PANJANG/M3

BERAT/M

25

JML BERAT (KG)


94.6944

BERAT/M
0.3946

JML BERAT (KG)


62.2879

KOLOM K1 30/40
PJG =
LBR =
Panjang/m3

0.3
0.4
8.333333

BKSTG=

11.66667 m2

BESI D16

1.04

JML BERAT (KG)

69.4590

BERAT/M
0.6165

JML BERAT (KG)


53.4300

KOLOM K2 20/20
PJG =
LBR =
Panjang/m3

0.2
0.2
25

BKSTG=

20 m2

BESI D13

BEGEL

1.04

JRK

PJG SATUAN

JML

BESI 8

0.15

0.82

166.666666667

TULANGAN

JML

TINGGI/M3

BERAT/M

69.444444444

JRK

PJG SATUAN

JML

BESI 6

0.15

0.42

462.962962963

TULANGAN

JML

TINGGI/M3

BERAT/M

6
3

5.5555555556
5.5555555556

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.175

1.7

31.746031746

TULANGAN

JML

TINGGI/M3

BERAT/M

JML BERAT (KG)

208.3770

BERAT/M
0.3946

JML BERAT (KG)


53.9232

KOLOM KP 12/12
PJG =
LBR =
Panjang/m3

0.12
0.12
69.44444

BKSTG=

16.66667 m2

BESI 10

BEGEL

0.62

JML BERAT (KG)

171.2500

BERAT/M
0.2219

JML BERAT (KG)


43.1550

BALOK B1 30/60
PJG =
LBR =
TGGI=

0.6
0.3
5.555556

BKSTG=

7.666667 m2

BESI D16
BESI D16

1.58
1.58

JML BERAT (KG)


52.6080
26.3040
78.9120
BERAT/M
0.62

Balok B1A 30/60


PJG =

0.6

JML BERAT (KG)

JML BERAT (KG)


33.2714

LBR =
TGGI=

0.3
5.555556

BKSTG=

7.666667 m2

BESI D16
BESI D16

10
5

5.5555555556
5.5555555556

1.58
1.58

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.175

1.7

31.746031746

TULANGAN

JML

TINGGI/M3

BERAT/M

8
4

5.5555555556
5.5555555556

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.175

1.7

31.746031746

87.6800
43.8400
131.5200
BERAT/M
0.62

JML BERAT (KG)


33.2714

Balok B1B 30/60


PJG =
LBR =
TGGI=

0.6
0.3
5.555556

BKSTG=

7.666667 m2

BESI D16
BESI D16

1.58
1.58

JML BERAT (KG)


70.1440
35.0720
105.2160
BERAT/M
0.62

JML BERAT (KG)


33.2714

Balok B2 20/40
TULANGAN
PJG =
LBR =
TGGI=

0.4
0.2
12.5

BKSTG=

JML

TINGGI/M3

3
2

12.5
12.5

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.175

1.1

71.4285714286

TULANGAN

JML

TINGGI/M3

BERAT/M

3
2

14.285714286
14.285714286

JRK

PJG SATUAN

JML

BESI 8

0.175

81.6326530612

TULANGAN

JML

TINGGI/M3

BERAT/M

2
2

26.666666667
26.666666667

1.04
1.04

BESI D16
BESI D16

BERAT/M
1.58
1.58

JML BERAT (KG)


59.1840
39.4560
98.6400

11 m2
BERAT/M
0.62

JML BERAT (KG)


48.4393

Balok B3 20/35
PJG =
LBR =
TGGI=

0.35
0.2
14.28571

BKSTG=

11.14286 m2

BESI D13
BESI D13

BEGEL

1.04
1.04

JML BERAT (KG)


44.6522
29.7681
74.4204
BERAT/M
0.39

JML BERAT (KG)


32.2090

Balok B4 15/25
PJG =
LBR =
TGGI=

0.25
0.15
26.66667

BKSTG=

14.13333 m2

BESI 12
BESI 12

BEGEL

JML BERAT (KG)


55.4667
55.4667
110.9333

JRK

PJG SATUAN

JML

BESI 8

0.175

0.7

152.380952381

BERAT/M

TULANGAN

JML

TINGGI/M3

BERAT/M

4
2

8
8

BEGEL

JRK

PJG SATUAN

JML

BESI 10

0.175

1.4

45.7142857143

TULANGAN

JML

TINGGI/M3

BERAT/M

14.285714286

1.04

JRK

PJG SATUAN

JML

BESI 8

0.125

114.285714286

TULANGAN

JML

TINGGI/M3

BERAT/M

33.333333333

0.888

0.3946

JML BERAT (KG)


42.0864

Balok BK 25/50
PJG =
LBR =
TGGI=

0.5
0.25
8

BKSTG=

9.04 m2

BESI D16
BESI D16

1.58
1.58

JML BERAT (KG)


50.5037
25.2518
75.7555
BERAT/M
0.62

JML BERAT (KG)


39.4560

BALOK BK 20/40 - 20/30


PJG =
LBR =
TGGI=

0.2
0.35
14.28571

BKSTG=

BESI D13

JML BERAT (KG)


133.7143

9 m2
BEGEL

BERAT/M
0.3950

JML BERAT (KG)


45.1429

BALOK BLP 15/20


PJG =
LBR =
TGGI=

0.2
0.15
33.33333

BKSTG=

6.666667 m2

BESI 12

JRK

PJG SATUAN

JML

BESI 8

BEGEL

0.15

0.64

222.222222222

TULANGAN

JML

TINGGI/M3

BERAT/M

41.666666667

JRK

PJG SATUAN

JML

BESI 8

0.15

0.64

277.777777778

TULANGAN

JML

TINGGI/M3

BERAT/M

41.666666667

JRK

PJG SATUAN

JML BERAT (KG)


118.4000

BERAT/M
0.3950

JML BERAT (KG)


56.1778

BALOK Latei BL 12/20


PJG =
LBR =
TGGI=

0.12
0.2
41.66667

BKSTG=

16.66667 m2

BESI 10

BEGEL

0.62

JML BERAT (KG)


102.7500

BERAT/M
0.3946

JML BERAT (KG)


70.1440

BALOK LEVEL 12/20


PJG =
LBR =
TGGI=

0.12
0.2
41.66667

BKSTG=

16.66667 m2

BESI 12

BEGEL

0.89

JML

JML BERAT (KG)


147.9600

BERAT/M

JML BERAT (KG)

BESI 8

0.15

0.64

277.777777778

0.3946

70.1440

TULANGAN

JML

TINGGI/M3

BERAT/M

BESI 110

9.5238095238

JRK

PJG SATUAN

JML

BESI 6

0.15

1.24

63.4920634921

TULANGAN

JML

PJG/M3

BERAT/M

4
3

15.625
15.625

TULANGAN

JRK

PJG SATUAN

JML

BERAT/M

BESI 10

0.15

1.1

104.166666667

0.617

TULANGAN

JML

PJG/M3

BERAT/M

JML BERAT (KG)

66.666666667

0.617

TULANGAN

JRK

PJG SATUAN

JML

BERAT/M

BESI 10

0.15

0.5

444.444444444

0.617

TULANGAN

JRK

PJG SATUAN

JML

BERAT/M

0.25
0.25
0.15
0.15

1
1
1
1

4
4
7
7

0.62
0.62
0.39
0.39

2.4660
2.4660
2.7619
2.7619

0.25
0.25
0.15
0.15

1
1
1
1

4
4
7
7

0.62
0.62
0.39
0.39

2.4660
2.4660
2.7619
2.7619

BALOK JENDELA JD 30/35


PJG =
LBR =
TGGI=
BKSTG=

0.3
0.35
9.52381

0.62

JML BERAT (KG)


46.9714

9.047619 m2
BEGEL

BERAT/M
0.2220

JML BERAT (KG)


17.4781

PLAT LEVEL TEBAL 8CM


PJG =
TBL =
PJG=

0.8
0.08
15.625

BKSTG=

10.625 m2

BESI 10
BESI 10

0.62
0.62

JML BERAT (KG)


38.5313
28.8984
67.4297
JML BERAT (KG)
70.6979

PLAT LISPLANK TEBAL 5CM


TGG =
TBL =
PJG=

0.3
0.05
66.66667

BKSTG=

36.66667 m2

PLAT LANTAI TYPE A TEBAL 12CM


asumsi:
LBR =
1
PJG =
1
VOLUME

BESI 10

ARAH PJG
BESI 10

0.12 M3
BESI 8

ARAH LBR
BESI 10
BESI 8

123.4000

137.1111

JUMLAH

TULANGAN
ARAH PJG
BESI 10

0.12 M3
BESI 8

ARAH LBR
BESI 10
BESI 8

JRK

PJG SATUAN

JML

BERAT/M

0.3
0.3
0.2
0.2

1
1
1
1

4
4
5
5

0.62
0.62
0.39
0.39

2.4660
2.4660
1.9728
1.9728

0.3
0.3
0.2
0.2

1
1
1
1

4
4
5
5

0.62
0.62
0.39
0.39

2.4660
2.4660
1.9728
1.9728

JUMLAH
JUMLAH DALAM M3
BKSTG=

174.2640

8.333333 m2

PLAT LANTAI TYPE B TEBAL 12CM


asumsi:
LBR =
1
PJG =
1
VOLUME

JML BERAT (KG)

20.9117

JUMLAH DALAM M3
BKSTG=

JML BERAT (KG)

8.333333 m2

JML BERAT (KG)

17.7552
147.9600

DAFTAR HARGA SATUAN POKOK KEGIATAN

PEKERJAAN BESI DAN BAJA


Pemasangan Besi Profil (Baja Konstruksi)
Upah:
Kepala Tukang
Tukang Las
Pekerja

0.0060
0.0600
0.0600

O.H
O.H
O.H

95,000.00
92,500.00
89,100.00
Jumlah:

570.00
5,550.00
5,346.00
11,466.00

Bahan:
Besi Profil WF
Elektroda Baja
Sewa Welding Set

1.1500
0.0200
0.0140

kg
kg
Hari

12,500.00
29,200.00
28,500.00
Jumlah:

14,375.00
584.00
399.00
15,358.00
26,824.00

kg

Nilai HSPK :
Pemasangan Besi Profil C 100 mm s/d 150 mm
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Profil C
Elektroda Baja
Sewa Welding Set

1.1500
0.0200
0.0140

kg
kg
Hari

12,500.00
29,200.00
28,500.00
Jumlah:

14,375.00
584.00
399.00
15,358.00
27,115.00

Nilai HSPK :
Pemasangan Rangka Atap Galvalume (Reng +
Usuk)
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

0.0050
0.0100
0.1000
0.4000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

485.00
950.00
9,250.00
35,640.00
46,325.00

Bahan:
Usuk galvalum 5/7 cm tebal 0,55 mm
Reng galvalum tebal 0,45 mm
Skrup + plat

1.5625
4.0000
0.2500

m
m
kg

25,000.00
18,500.00
20,000.00
Jumlah:

39,062.50
74,000.00
5,000.00
118,062.50
164,387.50

ok

m2

Nilai HSPK :
Pemasangan Besi Plat Rib
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Plat tebal 8mm
Elektroda Baja
Sewa Welding Set

1.1500
0.0200
0.0140

kg
kg
Hari

12,500.00
29,200.00
28,500.00
Jumlah:

14,375.00
584.00
399.00
15,358.00
27,115.00

kg

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Nilai HSPK :
Pemasangan Besi Siku
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

ok

kg

kg
0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

ok

Bahan:
Besi Profil siku
Elektroda Baja
Sewa Welding Set

1.1500
0.0200
0.0140

kg
kg
Hari

7,300.00
29,200.00
28,500.00
Jumlah:

8,395.00
584.00
399.00
9,378.00
21,135.00

Nilai HSPK :
Pemasangan Besi Plat Flenders
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

kg
0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Plat tebal 12mm

1.1500

kg

12,500.00

14,375.00

Elektroda Baja
Sewa Welding Set

0.0200
0.0140

kg
Hari

29,200.00
28,500.00
Jumlah:

584.00
399.00
15,358.00
27,115.00

Nilai HSPK :
Pemasangan Besi Plat Simpul
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

kg
0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Plat tebal 12mm

1.1500

kg

12,500.00

14,375.00

Elektroda Baja
Sewa Welding Set

0.0200
0.0140

kg
Hari

29,200.00
28,500.00
Jumlah:

584.00
399.00
15,358.00
27,115.00

Nilai HSPK :
Pemasangan Besi Penggantung Gording dia
8mm
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Polos dia 8mm

1.1500

kg

9,200.00
Jumlah:

10,580.00
10,580.00
22,337.00

kg

Nilai HSPK :
Pemasangan Besi Ikatan Angin dia 12 mm
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

kg
0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Polos dia 12mm

1.1500

kg

9,200.00
Jumlah:

10,580.00
10,580.00
22,337.00

Nilai HSPK :
Pemasangan Besi Track Stank dia 16 mm
Upah:
Mandor
Kepala Tukang
Tukang Las
Pekerja

kg
0.0030
0.0060
0.0600
0.0600

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
89,100.00
Jumlah:

291.00
570.00
5,550.00
5,346.00
11,757.00

Bahan:
Besi Polos dia 16mm

1.1500

kg

9,200.00
Jumlah:

10,580.00
10,580.00
22,337.00

Nilai HSPK :
Pemasangan Ankur Bolt dia 19 mm
Upah:
Mandor
Kepala Tukang
Pekerja

buah
0.0030
0.0060
0.0600

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
Jumlah:

291.00
570.00
5,346.00
6,207.00

Bahan:
Ankur Bolt dia 19 mm

1.0000

buah

30,000.00
Jumlah:

30,000.00
30,000.00
36,207.00

Nilai HSPK :

Pemasangan Mur Baut HTB 16 mm


Upah:
Mandor
Kepala Tukang
Pekerja

buah
0.0030
0.0060
0.0060

O.H
O.H
O.H

97,000.00
95,000.00
89,100.00
Jumlah:

291.00
570.00
534.60
1,395.60

Bahan:
Mur Baut HTB 16 mm

1.0000

buah

3,000.00
Jumlah:

3,000.00
3,000.00
4,395.60

Nilai HSPK :
Pemasangan Penutup Atap Genteng
Upah:
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

m2
0.0080
0.0080
0.0750
0.1500

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:

776.00
760.00
6,937.50
14,550.00
23,023.50

Bahan:
Genteng Karang Pilang / Wisma

25.0000

buah

4,000.00
Jumlah:

100,000.00
100,000.00
123,023.50

Nilai HSPK :
Pemasangan Wuwung Genteng
Upah:
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

m1
0.0020
0.0200
0.2000
0.4000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:

194.00
1,900.00
18,500.00
38,800.00
59,394.00

Bahan:
Wuwung Genteng Karang Pilang / Wisma
Semen PC @50kg
Pasir Pasang

5.0000
0.1600
0.0323

buah
zak
m3

12,300.00
71,000.00
150,000.00
Jumlah:

61,500.00
11,360.00
4,845.00
77,705.00
137,099.00

Nilai HSPK :
Pemasangan Listplank Fiber/Kalsiplank 2x30
6mm
Upah:
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

0.0050
0.0200
0.2000
0.1000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:

485.00
1,900.00
18,500.00
9,700.00
30,585.00

Bahan:
Metal furing 2/4 cm ex. Sakura trust, bluscoopsteel
Listplank Fiber/Kalsiplank 2x30 6mm
Sekrup

3.0000
0.0099
12.0000

m1
Lembar
Bh

13,500.00
34,000.00
150.00
Jumlah:

40,500.00
336.60
1,800.00
42,636.60
73,221.60

m1

Nilai HSPK :
Pemasangan Papan Kompres Fiber/Kalsiplank 15
cm
Upah:
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

0.0050
0.0200
0.2000
0.1000

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:

485.00
1,900.00
18,500.00
9,700.00
30,585.00

Bahan:
Fiber/Kalsiplank 15 cm
Sekrup

0.0033
4.0000

Lembar
Bh

34,000.00
150.00
Jumlah:

112.20
600.00
712.20
31,297.20

m1

Nilai HSPK :
Pemasangan Penangkal Petir Konvensional
Upah:
Mandor
Kepala Tukang Listrik
Tukang Listrik
Pekerja

Bahan:
Runcingan Penangkal Petir/Sliter 1"
Kabel BC dia 50 mm2
Isolator pipa PVC AW D 3/4" + klem plat
Pentanahan grounding Kabel BC 50 mm2
Bak Kontrol
Box test line
Kabel Schoon
Connector
Peralatan Bantu
Testing dan Commissioning termasuk ijin-ijin
penangkal petir

unit
0.0250
0.0250
0.0090
0.0750

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:
x Panjang kabel

2,425.00
2,375.00
832.50
7,275.00
12,907.50
765,801.98

4.0000
59.3300
59.3300
1.0000
1.0000
1.0000
1.0000
10.0000
3.0000

Bh
m1
m1
Unit
Unit
Set
Set
Set
Jam

108,000.00
20,765,500.00
2,669,850.00
250,000.00
7,500.00
8,500.00
1,000.00
5,000,000.00
0.00

1.0000

Ls

27,000.00
350,000.00
45,000.00
250,000.00
7,500.00
8,500.00
1,000.00
500,000.00
Jumlah:

28,810,350.00
29,576,151.98

Nilai HSPK :
Pasang Talang Pembuluh Pipa PVC 3"

m1

0.00

Upah:
Mandor
Kepala Tukang
Tukang Pipa
Pekerja

0.0018
0.0060
0.0600
0.0360

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:

174.60
570.00
5,550.00
3,492.00
9,786.60

Bahan:
Pipa PVC 3'' type D Panjang 4 m
Perlengkapan 35% harga pipa

0.3000
0.3500

btg
bh

80,000.00
24,000.00
Jumlah:

24,000.00
8,400.00
32,400.00
42,186.60

Nilai HSPK :
Pasang Roof Drain
Upah:
Mandor
Kepala Tukang
Tukang Pipa
Pekerja

bh
0.0018
0.0060
0.0600
0.0360

O.H
O.H
O.H
O.H

97,000.00
95,000.00
92,500.00
97,000.00
Jumlah:

174.60
570.00
5,550.00
3,492.00
9,786.60

Bahan:
Roof Drain

1.0000

bh

45,000.00
Jumlah:

45,000.00
45,000.00
54,786.60

Nilai HSPK :

TAB E L T E R B I LAN G
OWNER ESTIMATE
Asus:
1,949,397,000
0
MASUKKAN NILAI
TOTAL
0
0

NOL

RATUS

NOL

PULUH

NOL

SE

NOL

RATUS

NOL

PULUH

SATU

SE

19

SEMBILAN

BELAS

TRILYUN
SATU
SEBELAS

BELAS

SEBELAS

SATU MILYAR

MILYAR

RATUS SEMBILAN RATUS


SEMBILAN RATUS

SEMBILAN RATUS EMPAT PULUH SEM SEMBILAN RATUS EMPAT PULUH SEMBILAN
SEMBILAN RATUS SEMBILAN BELAS SEMBILAN RATUS EMPAT PULUH SEMBILAN JUTA

194

EMPAT

PULUH

1949

SEMBILAN

SE

19493

TIGA

RATUS

194939

SEMBILAN

EMPAT PULUH
BELAS SEMBILAN BELAS JUTA
TIGA RATUS TIGA RATUS

TIGA RATUS SEMBILAN PULUH TUJU TIGA RATUS SEMBILAN PULUH TUJUH

PULUH SEMBILAN PULUH

1949397

TUJUH

SE

19493970

NOL

RATUS

194939700

NOL

PULUH

1949397000

NOL

SE

BELAS

TUJUH BELAS

TIGA RATUS TUJUH BELAS


RIBU

BELAS

SATU MILYAR SEMBILAN RATUS EMPAT PULUH SEMBILAN JUTA TIGA RATUS SEMBILAN PULUH TUJUH RIBU
RUPIAH
Satu Milyar Sembilan Ratus Empat Puluh Sembilan Juta Tiga Ratus Sembilan Puluh Tujuh Ribu Rupiah
96.00
48.00
51.00
Satu Milyar Sembilan Ratus Empat Puluh Sembilan Jut

Satu Milyar Sembilan Ratus Empat Puluh Sembilan Juta Tiga Ratus Sembilan Puluh Tujuh Ribu Rupiah (Termasuk Ppn 10 %)
Satu Milyar Sembilan Ratus Empat Puluh Sembilan Juta Tiga Ratus Sembilan Puluh Tujuh Ribu Rupiah

SATU

TIGA RATUS SEMBILAN PULUH TUJUH RIBU

TAB E L T E R B I LAN G
PENAWARAN

175,000,000

0
0

NOL

RATUS

NOL

PULUH

NOL

SE

NOL

RATUS

NOL

PULUH

NOL

SATU

BELAS

TRILYUN

SE

BELAS

MILYAR

RATUS

SERATUS

17

TUJUH

175

LIMA

SE

1750

NOL

RATUS

17500

NOL

PULUH

PULUH TUJUH PULUH

175000

NOL

SE

1750000

NOL

RATUS

17500000

NOL

PULUH

175000000

NOL

SE

SERATUS TUJUH PULUH LIMA JUTA


RUPIAH
Seratus Tujuh Puluh Lima Juta Rupiah
36.00
18.00
51.00
Seratus Tujuh Puluh Lima Juta Rupiah

Seratus Tujuh Puluh Lima Juta Rupiah (Termasuk Ppn 10 %)


Seratus Tujuh Puluh Lima Juta Rupiah

SERATUS

BELAS

BELAS

BELAS

LIMA BELAS

JUTA

RIBU

SERATUS TUJUH PULUH LIMA

SERATUS TUJUH PULUH LIMA

SERATUS LIMA BELAS

SERATUS TUJUH PULUH LIMA JUTA

TAB E L T E R B I LAN G
NEGOSIASI

987,757,000.00

0
0

NOL

RATUS

NOL

PULUH

NOL

SE

NOL

RATUS

NOL

PULUH

NOL

SE

SEMBILAN

RATUS SEMBILAN RATUS


SEMBILAN RATUS
PULUH DELAPAN PULUH

BELAS

TRILYUN

BELAS

MILYAR

98

DELAPAN

987

TUJUH

SE

9877

TUJUH

RATUS

98775

LIMA

PULUH

LIMA PULUH
BELAS

987757

TUJUH

SE

9877570

NOL

RATUS

98775700

NOL

PULUH

987757000

NOL

SE

BELAS

TUJUH BELAS

SEMBILAN RATUS DELAPAN PULUH T SEMBILAN RATUS DELAPAN PULUH TUJUH

TUJUH RATUSTUJUH RATUS

TUJUH BELAS

SEMBILAN RATUS TUJUH BELAS

SEMBILAN RATUS DELAPAN PULUH TUJUH JUTA

TUJUH RATUS LIMA PULUH TUJUH

TUJUH RATUS LIMA PULUH TUJUH

TUJUH RATUS TUJUH BELAS

TUJUH RATUS LIMA PULUH TUJUH RIBU

JUTA

RIBU

BELAS

SEMBILAN RATUS DELAPAN PULUH TUJUH JUTA TUJUH RATUS LIMA PULUH TUJUH RIBU
RUPIAH
Sembilan Ratus Delapan Puluh Tujuh Juta Tujuh Ratus Lima Puluh Tujuh Ribu Rupiah
80.00
40.00
51.00
Sembilan Ratus Delapan Puluh Tujuh Juta Tujuh Ratus

Sembilan Ratus Delapan Puluh Tujuh Juta Tujuh Ratus Lima Puluh Tujuh Ribu Rupiah (Termasuk Ppn 10 %)
Sembilan Ratus Delapan Puluh Tujuh Juta Tujuh Ratus Lima Puluh Tujuh Ribu Rupiah

KOLOM K1 40/40
TULANGAN
PJG =

0.4

LBR =

0.4

Panjang/m3
BKSTG=

6.25

JML

BESI D16

12

BEGEL

JRK

BESI 10

0.15

10 m2

Bekisting 3x pakai

3.3333333

Tonase besi

156.9305

PANJANG/M3

6.25

BERAT/M

1.58

JML BERAT (KG)

118.3680

PJG SATUAN

JML

BERAT/M

1.5

41.66666667

0.617

JML BERAT (KG)


38.5625

BESI
Diameter
6
8
9
10
12
13
14
16
19
22
23
25
28
31
32

0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165
0.006165

12 M
2.66
4.73
6.0
7.4
10.7
12.5
14.5
19
26.7
35.8
39.1
46.2
58.0
71.1
75.8

1 M
0.22
0.39
0.50
0.62
0.89
1.04
1.21
1.58
2.23
2.98
3.26
3.85
4.83
5.92
6.31

HITUNGAN VOLUME
I.
1.

PEKERJAAN PERSIAPAN
Pengukuran dan Bowplank
=

2.

II.
1.

44.00

11.00 x

2.00 =

110.00 m1

Pekerjaan pembongkaran Bangunan eksisting


kelas depan
=
rumah penjaga
=
km/wc
=
km/wc
=
ruang guru
=

7.15
7.00
4.50
3.65
3.00

x
x
x
x
x

27.35
15.00
6.00
6.00
15.00

x
x
x
x
x

1.00
1.00
1.00
1.00
1.00

=
=
=
=
=

195.55
105.00
27.00
21.90
45.00
394.45

m2
m2
m2
m2
m2
m2

PEKERJAAN GALIAN TANAH DAN URUGAN


Galian Tanah :
Pek Galian tanah bor pile 40 cm
pc 1 =
pc 2 =
pc 3 =
p4 4 =

0.13
0.13
0.13
0.13

x
x
x
x

10.00
20.00
30.00
40.00

x
x
x
x

4.00
20.00
4.00
8.00

=
=
=
=

5.03
50.28
15.08
40.22
110.62

m3
m3
m3
m3
m3

=
=
=
=

1.44
2.64
4.84
4.84

x
x
x
x

0.45
0.55
0.65
0.65

x
x
x
x

4.00
20.00
4.00
8.00

=
=
=
=

2.59
29.04
12.58
25.17
69.38

m3
m3
m3
m3
m3

m3
1.20

1.30 x

Pengurugan :
Urugan pasir bawah poer, t=10 cm
pc 1 =
pc 2 =
pc 3 =
p4 4 =

m3
1.44
2.64
4.84
4.84

x
x
x
x

0.10
0.10
0.10
0.10

x
x
x
x

4.00
20.00
4.00
8.00

=
=
=
=

0.58
5.28
1.94
3.87
11.66

m3
m3
m3
m3
m3

Urugan pasir bawah sloof, t=5cm


s2 =
=
=
s1 =

m3
0.01
0.01
0.01
0.02

x
x
x
x

43.00
4.00
2.50
7.00

x
x
x
x

3.00
5.00
3.00
8.00

=
=
=
=

1.61
0.25
0.09
0.84
2.80

m3
m3
m3
m3
m3

Urugan pasir pondasi tangga, t=5cm


=

m3
1.20

0.05 x

1.70 =

0.10 m3

Urugan pasir bawah lantai t = 5 cm


=
=

m3
15.00
11.00

x
x

9.50 x
28.00 x

0.05 =
0.05 =

7.13 m3
15.40 m3
22.53 m3

Urugan sirtu bawah lantai t = 45 cm

m3

Galian tanah u. Poer


pc 1
pc 2
pc 3
p4 4
Galian Pondasi u. tangga

2.

1.70 =

2.65 m3

Urugan tanah kembali


pondasi poer & tangga

=
=

15.00
11.00

x
x

9.50 x
28.00 x

1.35 =
1.35 =

192.38 m3
415.80 m3
608.18 m3

m3
69.38

2.65 x

0.30 =

21.61 m3

110.62

m3

III.
A
1.

PEKERJAAN STRUKTUR
LANTAI 1
Beton bor pile 40 cm

2.

Beton lantai kerja t = 5 cm (1pc : 3ps : 6kr)


pc 1 =
pc 2 =
pc 3 =
p4 4 =

3.

4.

5.

m3
1.44
2.64
4.84
4.84

x
x
x
x

0.05
0.05
0.05
0.05

Beton Rabat Bawah Lantai t = 5 cm (1pc : 3ps : m3


=
15.00
=
11.00

x
x

9.50 x
28.00 x

0.05 =
0.05 =

7.13 m3
15.40 m3
22.53 m3

Beton Poer
PC1 120x120x40 K-250

1.44

0.40 x

4.00 =

2.30 m3

PC2 120x220x40 K-250

2.64

0.40 x

20.00 =

21.12 m3

PC3 220x220x50 K-250

2.14

0.50 x

20.00 =

21.40 m3

PC4 220x220x50 K-250

2.64

0.50 x

20.00 =

26.40 m3

m3
0.13

7.00 x

8.00 =

7.00 m3

=
=
=

m3
0.06
0.06
0.06

x
x
x

43.00 x
4.00 x
2.50 x

3.00 =
5.00 =
3.00 =

7.74
1.20
0.45
9.39

=
=

0.06
0.06

x
x

3.50 x
3.50 x

6.00 =
11.00 =

=
=
=
=
=

0.03
0.03
0.03
0.03
0.03

x
x
x
x
x

0.16

Beton Sloof
Beton Sloof S1 25/50 K-250

Beton Sloof S2 20/35 K-250

x
x
x
x

4.00
20.00
4.00
8.00

=
=
=
=

0.29
2.64
0.97
1.94
5.83

m3
m3
m3
m3
m3

m3
m3
m3
m3

Beton Sloof S3 20/30 K-250

Beton Sloof Sp 15/20 K-250

6.

11.00
9.50
43.00
7.00
3.00

x
x
x
x
x

8.00
4.00
3.00
4.00
1.00

=
=
=
=
=
=

1.26 m3
2.31 m3
3.57 m3
2.64
1.14
3.87
0.84
0.09
8.58

m3
m3
m3
m3
m3
m3

Beton Kolom
K1 40/40 K-250
5.50 x

32.00 =

28.16 m3

K2 20/20 K-250
=

0.04

5.50 x

4.00 =

0.88 m3

0.01

5.10 x

24.00 =

1.76 m3

=
=

15.00
11.00

x
x

9.50 x
28.00 x

0.10 =
0.10 =

14.25 m3
30.80 m3
45.05 m3

24.00
15.00
16.00
8.00
8.45
6.80

1.00
1.00
1.00
1.00
1.00
1.00

KP 12/12

7.

Beton plat lantai 10 cm, tul. Wiremesh M4

8.

Beton Balok Latai 15/20

=
=
=
=
=
=

0.03
0.03
0.03
0.03
0.03
0.03

x
x
x
x
x
x

9.

Balok kanopi beton 20/30

=
=

0.06
0.06

x
x

3.60 x
3.20 x

9.00 =
2.00 =

1.94 m3
0.38 m3
2.33 m3

10.

Plat kanopi beton, t = 8 cm

=
=
=
=

2.16
1.92
2.16
0.84

x
x
x
x

0.08
0.08
0.08
0.08

9.00
2.00
8.00
2.00

1.56
0.31
1.38
0.13
3.38

11.

Beton pondasi tangga

=
=

0.30
0.26

x
x

1.70 x
1.30 x

12.

Beton tangga lantai 1


Beton plat tangga t = 15 cm
Anak tangga
Bordes
Balok bordes

=
=
=
=

0.20
0.03
3.50
0.50

x
x
x
x

7.40
1.70
3.50
3.40

LANTAI 2
Beton Kolom
K1 40/40 K-250
K2 20/20 K-250

=
=

0.16
0.04

x
x

0.50 x
0.50 x

32.00 =
4.00 =

2.56 m3
0.08 m3

Beton Balok
B1 25/50 K-250

0.13

6.60 x

12.00 =

9.90 m3

B2 20/35 K-250

=
=
=
=

0.07
0.07
0.07
0.07

x
x
x
x

3.60
3.60
2.15
3.25

36.00
8.00
4.00
12.00

B3 20/30 K-250

0.06

4.96 x

1.00 =

0.30 m3

=
=

12.21
14.44

x
x

0.12 x
0.12 x

16.00 =
7.00 =

23.44 m3
12.13 m3

B
1.

2.

3.

x
x
x
x
x
x

x
x
x
x

x
x
x
x

x
x
x
x

=
=
=
=
=
=

=
=
=
=

1.00 =
1.00 =

1.00
22.00
0.12
1.00

=
=
=
=

=
=
=
=

0.72
0.45
0.48
0.24
0.25
0.20
2.35

m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

0.51 m3
0.33 m3
0.84 m3
1.51
1.12
1.47
1.70

9.07
2.02
0.60
2.73
14.42

m3
m3
m3
m3

m3
m3
m3
m3
m3

Beton plat deck lantai 2, t = 12 cm K-250

=
=
=
=

7.33
21.45
8.74
3.80

x
x
x
x

0.12
0.12
0.12
0.12

x
x
x
x

2.00
4.00
2.00
1.00

=
=
=
=

1.76
10.30
2.10
0.46
50.18

m3
m3
m3
m3
m3

m2
1.80
1.50
6.60
3.60
2.15

x
x
x
x
x

0.80
0.80
0.80
0.80
0.80

x
x
x
x
x

27.00
6.00
14.00
8.00
4.00

=
=
=
=
=

38.88
7.20
73.92
23.04
6.88
149.92

m2
m2
m2
m2
m2
m2

=
=
=

19.80
3.50
2.97

+
+
+

6.60 +
6.08 +
3.10 +

52.60

2.00 x

5.55 =
3.60 =
1.40 =
=
1.00 =

31.95
13.18
7.47
52.60
105.20

m1
m1
m1
m1
m2

=
=
=

0.78
0.98
0.78

x
x
x

2.14 x
2.14 x
1.28 x

5.00 =
2.00 =
1.00 =

8.35
4.19
1.00
13.54

m2
m2
m2
m2

105.20

13.54 =

91.66 m2

149.92

91.66 =

241.58 m2

=
=
=

m2
3.60
1.48
0.58

x
x
x

3.60 x
2.36 x
0.78 x

90.72
20.96
0.90
21.86

m2
m2
m2
m2

90.72

21.86 =

7.00 =
6.00 =
2.00 =
=
68.86 m2

=
=
=
=

3.60
1.48
0.98
1.48

x
x
x
x

3.60
2.36
2.74
1.58

77.76
10.48
8.06
7.02
25.55

m2
m2
m2
m2
m2

=
=
=

77.76
6.60
52.60

x
x

25.55 =
3.60 x
1.60 x

=
=
=
=
=
52.21 m2
4.00 =
1.00 =

=
=

68.86
300.27

+
m2

52.21 +

95.04 +

84.16

m2
9.10
4.10
8.00
19.40
11.40

x
x
x
x
x

0.60
0.60
0.60
0.60
0.60

2.00
2.00
2.00
2.00
2.00

10.92
4.92
9.60
23.28
13.68
62.40

IV.
1.
A

PEKERJAAN ARSITEKTUR
LANTAI 1
PEKERJAAN PASANGAN PLESTERAN

1.

Pasangan batu bata merah trasram 1Pc : 2Ps


bata Bawah sloof
=
=
=
=
=

km/wc

kusen

jumlah
2.

Pasangan batu merah biasa 1Pc : 4Ps


sisi belakang
lubang kusen

sisi depan
lubang kusen

samping
km/wc
jumlah

3.

Pasangan batu merah (pot dan trap) 1Pc : 2Ps


pot
=
=
=
=
=

x
x
x
x

x
x
x
x
x

6.00
3.00
3.00
3.00

=
=
=
=
=

95.04 m2
84.16 m2

m2
m2
m2
m2
m2
m2

trap

4.

5.

=
=
=

3.70
12.60
12.60

+
x
x

1.65 +
0.35 x
0.50 x

7.25 =
1.00 =
2.00 =

62.40

17.01 =

79.41 m2

Plesteran dinding 1Pc : 2Ps (trasram) tebal 1,5cm


=
3.10
=
6.60
=
6.60

+
+
+

m2
1.70 +
3.10 +
0.00 +

3.10 =
3.10 =
0.00 =

7.90
12.80
6.60
27.30
94.73

m1
m1
m1
m1
m2

27.30

3.47

1.00 =

Plesteran dinding 1Pc : 4Ps tebal 1,5cm


sisi belakang
=
bingkai kusen
=

3.60
7.68

x
x
=

m2
3.60 x
0.15 x
98.78 x

7.00 =
7.00 =
2.00 =

90.72 m2
8.06 m2
197.57 m2

=
=

1.48
0.58

x
x

2.36 x
0.78 x

20.96 m2
0.90 m2
21.86 m2

197.57

21.86 =

6.00 =
2.00 =
=
175.71 m2

=
=
=
=

3.60
7.68
7.44
6.12

x
x
x
x

3.60
0.15
0.15
0.15

87.32 x

2.00 =
3.00 =
3.00 =
3.00 =
=
149.09 m2
8.00 =
2.00 =

sisi depan
bingkai kusen

lubang kusen

x
x
x
x

=
=
=

1.48
0.98
1.48

x
x
x

2.36 x
2.74 x
1.58 x

=
=
=

174.64
6.60
17.01

x
x

25.55 =
3.60 x
1.60 x

=
=
Plesteran Beton Kolom 1Pc : 2Ps tebal 1,5cm
kolom 40x40
=
=
kolom 30x30
=

175.71
569.31

+
m2
m2
x
x
x

Acian dinding
Benangan
kolom 40x40

569.31

samping
km/wc
jumlah

7.
8.

m1
m2
m2
m2

lubang kusen

6.

12.60
4.41
12.60
17.01

kolom 30x30

kusen belakang
kusen depan

1.60
1.30
1.20

=
=
=

4.00
4.00
4.00

m2
m1
x
x
x

=
=
=
=

7.68
7.68
7.40
6.12

x
x
x
x

6.00
3.00
3.00
3.00

=
=
=
=

77.76
3.46
3.35
2.75
87.32
174.64

m2
m2
m2
m2
m2
m2

10.48
8.06
7.02
25.55

m2
m2
m2
m2

190.08 m2
54.43 m2

149.09 +

190.08 +

54.43

4x
4x
4x

12.00 =
20.00 =
4.00 =

76.80
104.00
19.20
200.00

m2
m2
m2
m2

12 x
20 x
4x

1.00 =
1.00 =
1.00 =

48.00
80.00
16.00
144.00

m1
m1
m1
m2

7.00
3.00
3.00
3.00

107.52
46.08
44.40
36.72

m1
m1
m1
m1

2.00
2.00
2.00
2.00

x
x
x
x

=
=
=
=

234.72 m1

9.

pot

=
=
=
=
=

9.10
4.10
8.00
19.40
11.40

x
x
x
x
x

jumlah

144.00

234.72 +

104.00 =

15.00

14.00 +

8.00

14.00 +

7.00 =
=
7.00 =

36.00
108.00
29.00
137.00

m1
m1
m1
m1

x
x
x

7.88 x
43.00 x
3.88 x

3.00 =
1.00 =
1.00 =

162.64
108.36
26.69
297.70

m2
m2
m2
m2

8.00 x

1.00 =

88.00 m3

x
x
x
x
x
x
x

3.30
4.00
3.30
1.80
1.80
0.80
2.00

x
x
x
x
x
x
x

1.00
1.00
1.00
1.00
1.00
1.00
1.00

=
=
=
=
=
=
=

4.29
5.60
5.28
3.24
3.06
1.28
0.30
23.05

m2
m2
m2
m2
m2
m2
m2
m2

x
x
x
x
x

1.00
1.00
2.00
1.00
1.00

=
=
=
=
=

6.44
3.23
5.76
1.28
2.56
19.27

m2
m2
m2
m2
m2
m2

Kolkolan lantai

2
2
2
2
2

=
=
=
=
=

18.20
8.20
16.00
38.80
22.80
104.00

x3

1.

2.
3.

PEKERJAAN LANTAI
Keramik lantai ruang & selasar Uk. 40 x 40 cm
=
=
=

Keramik lantai t.parkir Uk. 40 x 40 cm motif kasar


=
11.00
Keramik lantai KM/WC Uk. 40 x 40 cm Motif/warna
pria
=
1.30
=
1.40
=
1.60
=
1.80
=
1.70
meja
=
1.60
=
0.15

wanita

4.

m2
6.88
2.52
6.88

m1
m1
m1
m1
m1
m1
482.72 m1

guru

=
=
=
=
=

4.60
1.70
1.60
1.60
1.60

x
x
x
x
x

1.40
1.90
1.80
0.80
1.60

total

23.05

19.27 +

m2
3.30
1.60
0.90
1.80
3.60

+
+
+
+
+

5.90
2.00
2.00
1.80
1.70

=
atas pintu =

34.15
4.40

X
x

2.70 X
0.70 x

1.00 =
1.00

92.21 m2
3.08 m2
95.29 m2

=
=
=

4.60
2.00
3.60

+
+
+

1.40 +
1.70 +
1.60 +

1.00 =
2.50 =
0.80 =

7.00 m1
6.20 m1
6.00 m1

Keramik dinding KM/WC Uk. 25 x 40 cm Motif/


pria
=
L =
L =
D=
D=

wanita
L
D

+
+
+
+
+

0.00 =

42.32 m2

3.30
1.35
1.30
2.60
1.00

12.50
4.95
4.20
6.20
6.30
34.15

=
=
=
=
=

m1
m1
m1
m1
m2

=
=

3.60
4.80

+
+

1.60 +
0.80 +

0.80 =
0.00 =

6.00 m1
5.60 m2
30.80

=
atas pintu =

30.80
5.20

X
x

2.70 X
0.70 x

1.00 =
1.00

83.16 m2
3.64 m2
86.80 m2

95.29

86.80 +

0.00 =

182.09 m2

1.70

22.00 x

1.00 =

37.40 m1

7.00 -

0.93 =

48.07 m2

total
5.

Keramik stepnozing tangga 10x40 cm

PEKERJAAN PLAFOND
Plafond Kalsiboard+rangka hollow (area toilet)
=

m2
7.00

2.

Acian plafond ekspose

m2

3.

List Gypsum

1.

1.

km pria

=
=
=
=

1.50
3.50
3.80
3.80

+
+
+
+

3.50
1.70
2.00
4.00

+
+
+
+

7.00
2.00
4.00
3.80

=
=
=
=

12.00
7.20
9.80
11.60
40.60

m1
m1
m1
m1
m1

km wanita guru

=
=
=
=

4.70
2.00
4.00
3.40

+
+
+
+

3.50
2.80
3.40
3.40

+
+
+
+

1.90
1.50
4.00
3.40

=
=
=
=

10.10
6.30
11.40
10.20
38.00

m1
m1
m1
m1
m1

total

40.60

38.00 =

78.60 m1

unit
+
+
+

2.74 +
2.56 +
0.00 +

1.48 =
2.56 =
0.00 =
=

6.96
6.60
1.58
15.14

m1
m1
m1
m1

PEKERJAAN KUSEN PINTU DAN JENDELA DLL


Pemasangan pintu type PJ
=
3.00
Kusen Aluminium 4" =
2.74
=
1.48
=
1.58

Slimar jendela =
=
=
=

0.90
0.70
0.50
0.86

+
+
+
+

0.90
0.50
0.50
0.70

+
+
+
+

0.70
0.50
0.86
0.70

=
=
=
=
=

2.50
1.70
1.86
2.26
8.32

m1
m1
m1
m1
m1

Kaca 5 mm =
=
=
=
=
=

0.20
0.78
0.82
0.58
0.74
0.82

x
x
x
x
x
x

1.00
0.38
0.52
0.38
0.65
0.88

x
x
x
x
x
x

1.00
1.00
1.00
1.00
1.00
1.00

=
=
=
=
=
=
=

0.20
0.30
0.43
0.22
0.48
0.72
2.35

m2
m2
m2
m2
m2
m2
m2

Pas. Daun Pintu Wood Plastic Composite =


Kunci Tanam 2x putar =
engsel pintu =

0.90
1.00
1.50

x
set
stel

2.10 x

1.00 =

1.89 m2

Friction Stay 16" =


Friction Stay 12" =
Handle Cassement =
2.

1.00
2.00
3.00

set
set
bh

Pemasangan pintu type P2


Kusen Aluminium 4"
Pas. Daun Pintu Wood Plastic Composite
Kunci Tanam 2x putar
engsel pintu

=
=
=
=
=

2.00
2.14
0.80
1.00
1.50

unit
+
x
set
stel

Pemasangan pintu type P3


Kusen Aluminium 4"
Pas. Daun Pintu Wood Plastic Composite
Kunci Tanam 2x putar
engsel pintu

=
=
=
=
=

3.00
2.14
0.70
1.00
1.50

unit
+
x
set
stel

Pemasangan pintu type P4


Kusen Aluminium 4"
Pas. Daun Pintu Wood Plastic Composite
Kunci Tanam 2x putar
engsel pintu

=
=
=
=
=

2.00
2.14
0.90
1.00
1.50

unit
+
x
set
stel

Pemasangan jendela type J


=
Kusen Aluminium 4" =
=
=

9.00
1.48
1.48
2.36

Slimar jendela =
=
=

0.80 +
2.10 x

2.14 =
1.00 =

5.08 m1
1.68 m2

0.70 +
2.10 x

2.14 =
1.00 =

4.98 m1
1.47 m2

0.90 +
2.10 x

2.14 =
1.00 =

5.18 m1
1.89 m2

unit
+
+
+

1.48 +
2.36 +
0.00 +

1.48 =
2.36 =
0.00 =
=

4.44
6.20
2.36
13.00

m1
m1
m1
m1

0.70
0.50
0.70

+
+
+

0.50 +
0.70 +
0.50 +

0.70 =
0.50 =
0.00 =
=

1.90
1.70
1.20
4.80

m1
m1
m1
m1

Kaca 5 mm =
=
=
=
=
=

0.58
0.74
0.82
0.82
0.58
0.58

x
x
x
x
x
x

0.38
0.58
0.52
0.88
0.38
0.74

1.00
1.00
1.00
1.00
1.00
1.00

0.22
0.43
0.43
0.72
0.22
0.43
2.45

m2
m2
m2
m2
m2
m2
m2

Friction Stay 16" =


Friction Stay 12" =
Handle Cassement =

2.00
2.00
4.00

set
set
bh

Pemasangan jendela type BV


=
Kusen Aluminium 4" =
Kaca Es 5 mm =

2.00
0.58
0.72

unit
+
x

0.70 x
0.32 x

2.00 =
2.00 =

2.56 m1
0.46 m2

7.

Pemasangan handrailing tangga

4.20

+
=

3.20 +
7.60 x

0.20 =
0.80 =

7.60 m1
6.08 m2

PEKERJAAN PENGECATAN
Pengecatan Dinding bag. Dalam
=
=
=

m2
8.37
7.11
4.11

x
x
x

4.00 x
4.00 x
4.00 x

6.00 =
8.00 =
1.00 =
=

3.

4.

5.

6.

1.

x
x
x
x
x
x

=
=
=
=
=
=
=

200.88
227.52
16.44
444.84

m2
m2
m2
m2

2.

lubang kusen bekalang

=
=

1.48
0.58

x
x

2.36 x
0.78 x

21.86 +
444.84 -

6.00 =
2.00 =
=
3.00 =
3.00 =
3.00 =
=
25.55 =
47.41 =

20.96
0.90
21.86
10.48
8.06
7.02
25.55
47.41
397.43

m2
m2
m2
m2
m2
m2
m2
m2
m2

lubang kusen

=
=
=

1.48
0.98
1.48

x
x
x

2.36 x
2.74 x
1.58 x

=
=

4.00
4.00
4.00
4.00
12
20
4
63

6.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00

204.48
58.08
17.04
29.04
19.20
32.00
4.80
25.20
389.84

m2
m2
m2
m2
m2
m2
m2
m2
m2

308.00
135.00
59.40
3.46
7.42
11.04
9.89
534.21

m2
m2
m2
m2
m2
m2
m2
m2

97.00
27.00
124.00
24.80

m1
m1
m1
m2

264.00
20.00
142.50
426.50

m2
m2
m2
m2

Pengecatan Dinding bag. Luar


=
=
=
=
=
=
=
=

8.52
7.26
4.26
7.26
1.60
1.60
1.20
0.40

x
x
x
x

389.84

25.55 =

=
=
=
=
=
=
=

m2
11.00
9.00
6.60
2.15
2.15
24.00
43.00

x
x
x
x
x
x
x

28.00
15.00
0.50
0.23
0.23
0.23
0.23

4.
5.

Pengecatan Melamin / Duco daun pintu


Pengecatan Kolkolan
=

m2
137.00

0.10 =

2.
A

LANTAI 2
PEKERJAAN PASANGAN PLESTERAN

1.

Pasangan batu bata merah trasram 1Pc : 2Ps


=
=

43.00
11.00

+
+

11.00 +
12.00 +

43.00 =
4.00 =

124.00 x

0.20 =

24.00 x
4.00 x
15.00 x

1.00 =
1.00 =
1.00 =

kolom 40x40
kolom 30x30
balok

3.

Pengecatan Plafond

balok

2.

Pelapisan waterproofing deck

V.
1.
1.
2.
3.
4.
5.

PEKERJAAN INSTALASI LISTRIK

LANTAI 1
Penarikan jalur
Pas. Box MCB + panel
Pasang titik Lampu
Pasang titik stop kontak
Pasang saklar ganda

x
x
x
x

=
=
=

11.00
5.00
9.50

x
x
x

=
=
=
=
=

1.000
Ls
1.000 unit
38.000 titik
7.000
titik
7.000 buah

x
x
x
x
x
x
x
x

x
x
x
x
x
x
x

=
=
=
=
=
=
=
=

364.29 m2

1.00
1.00
18.00
7.00
15.00
2.00
1.00

=
=
=
=
=
=
=

13.70 m2

6.
7.
8.

Pasang saklar tunggal


Pasang lampu led 5 Watt
Pasang lampu led 10 Watt

=
=
=

VI.
1.

PEKERJAAN INSTALASI AIR BERSIH, AIR BEKAS DAN AIR KOTOR

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

LANTAI 1
Tandon Air Kapasitas 1100 ltr+Asessories =
Tandon air beton bawah kapasitas 4 m3 =
Mesin Pompa air
=
Kloset jongkok porselin
=
Kloset duduk porselin komplit
=
Wastafel tanam komplit
=
Urinoir komplit
=
Floor drain stainlees
=
Kran air 1/2"
=
Pas Floor Clean Out 3"
=
Pas Floor Clean Out 4"
=
Pas. pipa PVC type AW 1/2"
=
Pas. pipa PVC type AW 3/4"
=
Pas. pipa PVC type AW 1" outlet
=
Pas. pipa PVC type AW 1" intlet
=
Pas. pipa air kotor PVC type D 3"
=
Pas. pipa air kotor PVC type D 4"
=
Septiktank kapasitas 6 m3
=
Sumur Resapan
=

VII.
1.
2.

PEKERJAAN LAIN - LAIN


Pengadaan Air kerja
Pembersihan akhir

=
=

4.000 buah
27.000 buah
16.000 buah

1.000
1.000
1.000
2.000
3.000
2.000
3.000
8.000
7.000
2.000
2.000

1.000
1.000

unit
unit
unit
buah
buah
unit
unit
buah
buah
buah
buah
m1
m1
m1
m1
m1
m1
unit
unit

1.000
1.000

Ls
Ls

RENCANA ANGGARAN BIAYA


NAMA KEGIATAN : PEMBANGUNAN / REHABILITASI FASILITAS GEDUNG PENDIDIKAN
NAMA PEKERJAAN
LOKASI
NO.

URAIAN PEKERJAAN

VOL

SAT

I.
1.
2.

PEKERJAAN PERSIAPAN
Pengukuran dan Bowplank
Pekerjaan pembongkaran Bangunan eksisting

II.
1.

PEKERJAAN GALIAN TANAH DAN URUGAN


Galian Tanah :
Pek Galian tanah bor pile 40 cm
Galian tanah u. Poer
Galian Pondasi u. tangga
Pengurugan :
Urugan pasir bawah poer, t=10 cm
Urugan pasir bawah sloof, t=5cm
Urugan pasir pondasi tangga, t=5cm
Urugan pasir bawah lantai t = 5 cm
Urugan sirtu bawah lantai t = 45 cm
Urugan tanah kembali

110.00
394.45

m1
m2

HARGA SAT
(Rp)
5

104,293.57
Sub. Total

2.

III.
A
1.
2.
3.
4.

5.

6.

7.
8.
9.
10.
11.
12.

PEKERJAAN STRUKTUR
LANTAI 1
Beton bor pile 40 cm
Beton lantai kerja t = 5 cm (1pc : 3ps : 6kr)
Beton Rabat Bawah Lantai t = 5 cm (1pc : 3ps : 6kr)
Beton Poer
PC1 120x120x40 K-250
PC2 120x220x40 K-250
PC3 220x220x50 K-250
PC4 220x220x50 K-250
Beton Sloof
Beton Sloof S1 25/50 K-250
Beton Sloof S2 20/35 K-250
Beton Sloof S3 20/30 K-250
Beton Sloof Sp 15/20 K-250
Beton Kolom
K1 40/40 K-250
K2 20/20 K-250
KP 12/12
Beton plat lantai 10 cm, tul. Wiremesh M4
Beton Balok Latai 15/20
Balok kanopi beton 20/30
Plat kanopi beton, t = 8 cm
Beton pondasi tangga
Beton tangga lantai 1
Beton plat tangga t = 15 cm

JML HARGA
(Rp)
6

11,472,292.86
11,472,292.86

69.38
2.65

m3
m3

69,250.00
69,250.00

4,804,565.00
183,512.50

11.66
2.80
0.10
22.53
608.18
21.61

m3
m3
m3
m3
m3
m3

177,700.00
177,700.00
177,700.00
177,700.00
185,200.00
23,083.33
Sub. Total

2,071,982.00
497,560.00
17,770.00
4,003,581.00
112,634,936.00
498,830.83
124,712,737.33

110.62
5.83
22.53

m3
m3
m3

2,012,813.43
879,675.42
879,675.42

222,649,370.71
5,128,507.72
19,819,087.31

2.30
21.12
21.40
26.40

m3
m3
m3
m3

3,057,970.87
2,783,327.19

7,033,333.01
58,783,870.19
-

7.00
9.39
3.57
8.58

m3
m3
m3
m3

3,377,651.41

23,643,559.89
-

28.16
0.88
1.76
45.05
2.35
2.33
3.38
0.84

m3
m3
m3
m3
m3
m3
m3
m3

1.51

m3

Anak tangga
Bordes
Balok bordes

1.12
1.47
1.70

m3
m3
m3
Sub. Total

B
1.

3.

LANTAI 2
Beton Kolom
K1 40/40 K-250
K2 20/20 K-250
Beton Balok
B1 25/50 K-250
B2 20/35 K-250
B3 20/30 K-250
Beton plat deck lantai 2, t = 12 cm K-250

IV.
1.
A

PEKERJAAN ARSITEKTUR
LANTAI 1
PEKERJAAN PASANGAN PLESTERAN

1.
2.
3.
4.
5.
6.
7.
8.
9.

Pasangan batu bata merah trasram 1Pc : 2Ps


Pasangan batu merah biasa 1Pc : 4Ps
Pasangan batu merah (pot dan trap) 1Pc : 2Ps
Plesteran dinding 1Pc : 2Ps (trasram) tebal 1,5cm
Plesteran dinding 1Pc : 4Ps tebal 1,5cm
Plesteran Beton Kolom 1Pc : 2Ps tebal 1,5cm
Acian dinding
Benangan
Kolkolan lantai

241.58
300.27
79.41
94.73
569.31
200.00
569.31
482.72
137.00

m2
m2
m2
m2
m2
m2
m2
m1
m1

PEKERJAAN LANTAI
Keramik lantai ruang & selasar Uk. 40 x 40 cm
Keramik lantai t.parkir Uk. 40 x 40 cm motif kasar
Keramik lantai KM/WC Uk. 40 x 40 cm Motif/warna
Keramik dinding KM/WC Uk. 25 x 40 cm Motif/warna
Keramik stepnozing tangga 10x40 cm

297.70
88.00
42.32
182.09
37.40

m2
m3
m2
m2
m1

48.07
0.00
78.60

m2
m2
m1

3.00
2.00
3.00
2.00
9.00
2.00
6.08

unit
unit
unit
unit
unit
unit
m2

2.

2.56
0.08

m3
m3

9.90
14.42
0.30
50.18

m3
m3
m3
m3

Sub. Total

1.
2.
3.
4.
5.
C

1.
2.
3.
D

1.
2.
3.
4.
5.
6.
7.

PEKERJAAN PLAFOND
Plafond Kalsiboard+rangka hollow (area toilet)
Acian plafond ekspose
List Gypsum
PEKERJAAN KUSEN PINTU DAN JENDELA DLL
Pemasangan pintu type PJ
Pemasangan pintu type P2
Pemasangan pintu type P3
Pemasangan pintu type P4
Pemasangan jendela type J
Pemasangan jendela type BV
Pemasangan handrailing tangga

115,890.40
109,980.60
115,890.40
57,976.92
54,746.28
33,605.00
17,676.00
28,032.80
Sub. Total
221,555.00
226,859.00
226,859.00
28,032.80
Sub. Total
112,561.69
19,891.00
Sub. Total
4,500,314.46
1,979,759.20
1,898,826.30
1,898,826.30
2,545,677.03
336,535.41
Sub. Total

1.
2.
3.
4.

PEKERJAAN PENGECATAN
Pengecatan Dinding bag. Dalam
Pengecatan Dinding bag. Luar
Pengecatan Plafond
Pengecatan Melamin / Duco daun pintu

114,408,358.12

397.43
364.29
534.21
0.00

m2
m2
m2
m2

25,481.44
29,567.50
25,481.44

27,996,802.83
33,023,874.76
9,202,856.66
5,492,153.63
31,167,604.67
19,131,662.55
8,532,558.72
3,840,493.60
138,388,007.43
65,956,923.50
19,963,592.00
9,600,672.88
1,048,426.72
96,569,615.10
5,410,840.49
1,563,432.60
6,974,273.09
13,500,943.37
3,959,518.39
5,696,478.89
3,797,652.59
22,911,093.29
673,070.82
50,538,757.34
10,127,087.75
10,771,144.58
13,612,438.78
-

5.

Pengecatan Kolkolan

2.
A

LANTAI 2
PEKERJAAN PASANGAN PLESTERAN

1.
2.

Pasangan batu bata merah trasram 1Pc : 2Ps


Pelapisan waterproofing deck

V.
1.
2.
3.
4.
5.
6.
7.
8.

PEKERJAAN INSTALASI LISTRIK

VI.

PEKERJAAN INSTALASI AIR BERSIH, AIR BEKAS DAN AIR KOTOR

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.

Tandon Air Kapasitas 1100 ltr+Asessories Stenlees


Tandon air beton bawah kapasitas 4 m3
Mesin Pompa air
Kloset jongkok porselin
Kloset duduk porselin komplit
Wastafel tanam komplit
Urinoir komplit
Floor drain stainlees
Kran air 1/2"
Pas Floor Clean Out 3"
Pas Floor Clean Out 4"
Pas. pipa PVC type AW 1/2"
Pas. pipa PVC type AW 3/4"
Pas. pipa PVC type AW 1" outlet
Pas. pipa PVC type AW 1" intlet
Pas. pipa air kotor PVC type D 3"
Pas. pipa air kotor PVC type D 4"
Septiktank kapasitas 6 m3
Sumur Resapan

VII.
1.
2.

PEKERJAAN LAIN - LAIN


Pengadaan Air kerja
Pembersihan akhir

Penarikan jalur
Pas. Box MCB + panel
Pasang titik Lampu
Pasang titik stop kontak
Pasang saklar ganda
Pasang saklar tunggal
Pasang lampu led 5 Watt
Pasang lampu led 10 Watt

13.70

m2
Sub. Total

34,510,671.10

24.80
426.50

m2
m2

115,890.40
30,410.00
Sub. Total

2,874,081.92
12,969,865.00
12,969,865.00

1.00
1.00
38.00
7.00
7.00
4.00
27.00
16.00

Ls
unit
titik
titik
buah
buah
buah
buah

2,500,000.00
871,725.50
215,330.00
114,189.10
41,539.10
32,439.10
67,791.00
105,291.00
Sub. Total

2,500,000.00
871,725.50
8,182,540.00
799,323.70
290,773.70
129,756.40
1,830,357.00
1,684,656.00
16,289,132.30

1.00
1.00
1.00
2.00
3.00
2.00
3.00
8.00
7.00
2.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00

unit
unit
unit
buah
buah
unit
unit
buah
buah
buah
buah
m1
m1
m1
m1
m1
m1
unit
unit

2,383,000.00
5,400,000.00
950,000.00
721,415.00
2,531,395.00
823,255.00
779,015.00
34,225.00
49,725.00

17,122.20
18,682.20
18,682.20
33,502.20
45,502.20
3,600,000.00
3,045,923.41
Sub. Total

2,383,000.00
5,400,000.00
950,000.00
1,442,830.00
7,594,185.00
1,646,510.00
2,337,045.00
273,800.00
348,075.00
3,600,000.00
3,045,923.41
29,021,368.41

1.00
1.00

Ls
Ls

1,000,000.00
1,500,000.00
Sub. Total

1,000,000.00
1,500,000.00
2,500,000.00

SUB TOTAL
PPN 10%
TOTAL
DIBULATKAN

751,116,804.39
75,111,680.44
826,228,484.83
826,228,000.00

REKAPITULASI
NAMA KEGIAT : PEMBANGUNAN / REHABILITASI FASILITAS GEDUNG PENDIDIKAN
NAMA PEKERJ
0
LOKASI
0
PAGU ANGGARAN Rp
895,155,000.00
NO.
I.
II.
III.

IV.

V.
VI.
VII.

URAIAN PEKERJAAN

JUMLAH HARGA

PEKERJAAN PERSIAPAN
PEKERJAAN GALIAN TANAH DAN URUGAN
PEKERJAAN STRUKTUR
A
LANTAI 1
B
LANTAI 2
PEKERJAAN ARSITEKTUR
1
LANTAI 1
A
PEKERJAAN PASANGAN PLESTERAN
B
PEKERJAAN LANTAI
C
PEKERJAAN PLAFOND
D PEKERJAAN KUSEN PINTU DAN JENDELA DLL
E
PEKERJAAN PENGECATAN
2
LANTAI 2
A
PEKERJAAN PASANGAN PLESTERAN
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN INSTALASI AIR BERSIH, AIR BEKAS DAN AIR
PEKERJAAN LAIN - LAIN
SUB TOTAL
PPN 10%
TOTAL
DIBULATKAN

Rp
Rp

11,472,292.86
124,712,737.33

Rp
Rp

114,408,358.12
-

Rp
Rp
Rp
Rp
Rp

138,388,007.43
96,569,615.10
6,974,273.09
50,538,757.34
34,510,671.10

Rp

12,969,865.00

Rp
Rp
Rp

16,289,132.30
29,021,368.41
2,500,000.00

Rp
Rp
Rp
Rp

638,355,078.08
63,835,507.81
702,190,585.88
702,190,000.00

Terbilang :