ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
TENAGA KAPASITAS HARGA UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA SEWA ALAT
ALAT ALAT ALAT ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
NO. JENIS PERALATAN KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s / d s / d + s / d ----------- Jam Kerja Jam Kerja F+G+H+I E + J
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.175 W = =
Harga Olie Rp16,825.4 Rp10,396.8
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G H I J K
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1. ASPHALT MIXING PLANT E01 220.0 50.0 T/Jam 6,500,000,000 10.0 1,000.0 6,500,000,000 650,000,000 0.23852 1,395,358.13 13,000.00 1,408,358.13 0.1250 0.0100 5,223,250.00 0.1250 812,500.00 16,825.40 31,190.48 6,083,765.87 7,492,124.00
2. ASPHALT FINISHER E02 100.0 10.0 Ton 925,000,000 5.0 2,000.0 925,000,000 92,500,000 0.33438 139,185.55 925.00 140,110.55 0.1250 0.0100 178,750.00 0.1250 57,812.50 16,825.40 10,396.83 263,784.72 403,895.27
3. ASPHALT SPRAYER E03 60.0 1,000.0 Liter 35,000,000 5.0 1,000.0 35,000,000 3,500,000 0.33438 10,532.96 70.00 10,602.96 0.1250 0.0100 107,250.00 0.1250 4,375.00 16,825.40 10,396.83 138,847.22 149,450.18
3. BULLDOZER 100-150 HP E04 120.0 - 1,050,000,000 5.0 2,000.0 1,050,000,000 105,000,000 0.33438 157,994.41 1,050.00 159,044.41 0.1250 0.0100 214,500.00 0.1250 65,625.00 16,825.40 10,396.83 307,347.22 466,391.63
4. COMPRESSOR E05 40.0 5,000.0 CPM(L/m) 35,000,000 5.0 2,000.0 35,000,000 3,500,000 0.33438 5,266.48 35.00 5,301.48 0.1250 0.0100 71,500.00 0.1250 2,187.50 16,825.40 10,396.83 100,909.72 106,211.20
5. CONCRETE MIXER E06 40.0 500.0 Liter 30,000,000 2.0 1,000.0 30,000,000 3,000,000 0.65455 17,672.73 60.00 17,732.73 0.1250 0.0100 71,500.00 0.1250 3,750.00 16,825.40 10,396.83 102,472.22 120,204.95
6. CRANE 10-15 TON E07 150.0 15.0 Ton 600,000,000 5.0 2,000.0 600,000,000 60,000,000 0.33438 90,282.52 600.00 90,882.52 0.1250 0.0100 268,125.00 0.1250 37,500.00 16,825.40 10,396.83 332,847.22 423,729.74
7. DUMP TRUCK3-4 M3 E08 100.0 3.5 Ton 165,000,000 5.0 2,000.0 165,000,000 16,500,000 0.33438 24,827.69 165.00 24,992.69 0.1250 0.0100 178,750.00 0.1250 10,312.50 14,682.54 9,968.25 213,713.29 238,705.99
8. DUMP TRUCK E09 110.0 15.0 Ton 185,000,000 5.0 2,000.0 185,000,000 18,500,000 0.33438 27,837.11 185.00 28,022.11 0.1250 0.0100 196,625.00 0.1250 11,562.50 14,682.54 9,968.25 232,838.29 260,860.40
9. EXCAVATOR 80-140 HP E10 120.0 0.8 M3 950,000,000 5.0 2,000.0 950,000,000 95,000,000 0.33438 142,947.32 950.00 143,897.32 0.1250 0.0100 214,500.00 0.1250 59,375.00 16,825.40 10,396.83 301,097.22 444,994.55
10. FLAT BED TRUCK3-4 M3 E11 100.0 20.0 Ton 165,000,000 5.0 2,000.0 165,000,000 16,500,000 0.33438 24,827.69 165.00 24,992.69 0.1250 0.0100 178,750.00 0.1250 10,312.50 14,682.54 9,968.25 213,713.29 238,705.99
11. GENERATOR SET E12 180.0 135.0 KVA 350,000,000 5.0 2,000.0 350,000,000 35,000,000 0.33438 52,664.80 350.00 53,014.80 0.1250 0.0100 321,750.00 0.1250 21,875.00 16,825.40 10,396.83 370,847.22 423,862.03
12. MOTOR GRADER E13 130.0 - 900,000,000 5.0 2,000.0 900,000,000 90,000,000 0.33438 135,423.78 900.00 136,323.78 0.1250 0.0100 232,375.00 0.1250 56,250.00 16,825.40 10,396.83 315,847.22 452,171.00
13. TRACKLOADER 75-100 HP E14 75.0 0.8 M3 925,000,000 5.0 2,000.0 925,000,000 92,500,000 0.33438 139,185.55 925.00 140,110.55 0.1250 0.0100 134,062.50 0.1250 57,812.50 16,825.40 10,396.83 219,097.22 359,207.77
14. WHEEL LOADER 1.0-1.6 M3 E15 105.0 1.5 M3 910,000,000 5.0 2,000.0 910,000,000 91,000,000 0.33438 136,928.49 910.00 137,838.49 0.1250 0.0100 187,687.50 0.1250 56,875.00 16,825.40 10,396.83 271,784.72 409,623.21
15. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 475,000,000 5.0 2,000.0 475,000,000 47,500,000 0.33438 71,473.66 475.00 71,948.66 0.1250 0.0100 98,312.50 0.1250 29,687.50 16,825.40 10,396.83 155,222.22 227,170.88
16. TANDEMROLLER E17 80.0 8.0 Ton 550,000,000 5.0 2,000.0 550,000,000 55,000,000 0.33438 82,758.98 550.00 83,308.98 0.1250 0.0100 143,000.00 0.1250 34,375.00 16,825.40 10,396.83 204,597.22 287,906.20
17. TIRE ROLLER E18 100.0 10.0 Ton 625,000,000 5.0 2,000.0 625,000,000 62,500,000 0.33438 94,044.29 625.00 94,669.29 0.1250 0.0100 178,750.00 0.1250 39,062.50 16,825.40 10,396.83 245,034.72 339,704.01
18. VIBRATORY ROLLER 5-8 T. E19 80.0 10.0 Ton 615,000,000 5.0 2,000.0 615,000,000 61,500,000 0.33438 92,539.58 615.00 93,154.58 0.1250 0.0100 143,000.00 0.1250 38,437.50 16,825.40 10,396.83 208,659.72 301,814.31
19. CONCRETE VIBRATOR E20 5.0 25.0 25.0 10,000,000 4.0 1,000.0 10,000,000 1,000,000 0.38629 3,476.60 20.00 3,496.60 0.1250 0.0100 5,812.50 0.1250 1,250.00 16,825.40 10,396.83 34,284.72 37,781.32
20. STONE CRUSHER E21 220.0 50.0 T/Jam 1,850,000,000 5.0 2,000.0 1,850,000,000 185,000,000 0.33438 278,371.10 1,850.00 280,221.10 0.1250 0.0100 393,250.00 0.1250 115,625.00 16,825.40 20,793.65 546,494.05 826,715.15
21. WATER PUMP 70-100 mm E22 5.0 - 10,000,000 2.0 2,000.0 10,000,000 1,000,000 0.65455 2,945.45 10.00 2,955.45 0.1250 0.0100 5,812.50 0.1250 625.00 16,825.40 10,396.83 33,659.72 36,615.18
22. WATER TANKER E23 100.0 4,000.0 Liter 160,000,000 5.0 2,000.0 160,000,000 16,000,000 0.33438 24,075.34 160.00 24,235.34 0.1250 0.0100 178,750.00 0.1250 10,000.00 14,682.54 9,968.25 213,400.79 237,636.13
23. PEDESTRIAN ROLLER E24 10.0 1.0 Ton 110,000,000 3.0 2,000.0 110,000,000 11,000,000 0.47473 23,498.90 110.00 23,608.90 0.1250 0.0100 17,875.00 0.1250 6,875.00 16,825.40 10,396.83 51,972.22 75,581.12
24. TAMPER E25 3.0 0.2 Ton 11,000,000 2.0 1,000.0 11,000,000 1,100,000 0.65455 6,480.00 22.00 6,502.00 0.1250 0.0100 3,487.50 0.1250 1,375.00 16,825.40 10,396.83 32,084.72 38,586.72
25. JACKHAMMER E26 0.0 - 35,000,000 5.0 2,000.0 35,000,000 3,500,000 0.33438 5,266.48 35.00 5,301.48 0.1250 0.0100 0.00 0.1250 2,187.50 16,825.40 10,396.83 29,409.72 34,711.20
26. FULVI MIXER E27 345.0 2,000.0 2,000.0 300,000,000 4.0 1,000.0 300,000,000 30,000,000 0.38629 104,298.06 600.00 104,898.06 0.1250 0.0100 616,687.50 0.1250 37,500.00 16,825.40 10,396.83 681,409.72 786,307.78
27. CONCRETE PUMP E28 100.0 8.00 M3 400,000,000 6.0 2,000.0 400,000,000 40,000,000 0.30071 54,127.03 400.00 54,527.03 0.1250 0.0100 178,750.00 0.1250 25,000.00 16,825.40 10,396.83 230,972.22 285,499.26
28. TRAILER 20 TON E29 175.0 10.00 Ton 575,000,000 5.0 2,000.0 575,000,000 57,500,000 0.33438 86,520.75 575.00 87,095.75 0.1250 0.0100 312,812.50 0.1250 35,937.50 14,682.54 9,968.25 373,400.79 460,496.54
29. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 180,000,000 5.0 2,000.0 180,000,000 18,000,000 0.33438 27,084.76 180.00 27,264.76 0.1250 0.0100 44,687.50 0.1250 11,250.00 16,825.40 10,396.83 83,159.72 110,424.48
30 CRANE ON TRACK35 TON E31 125.0 35.00 Ton 650,000,000 6.0 2,000.0 650,000,000 65,000,000 0.30071 87,956.43 650.00 88,606.43 0.1250 0.0100 223,437.50 0.1250 40,625.00 16,825.40 10,396.83 291,284.72 379,891.15
31. WELDING SET E32 40.0 250.00 Amp 35,000,000 5.0 2,000.0 35,000,000 3,500,000 0.33438 5,266.48 35.00 5,301.48 0.1250 0.0100 71,500.00 0.1250 2,187.50 16,825.40 10,396.83 100,909.72 106,211.20
32. BORE PILE MACHINE E33 150.0 2,000.0 Meter 1,600,000,000 5.0 2,000.0 1,600,000,000 160,000,000 0.33438 240,753.39 1,600.00 242,353.39 0.1250 0.0100 268,125.00 0.1250 100,000.00 16,825.40 10,396.83 395,347.22 637,700.61
33. TRONTON E 35 140.0 25.0 Ton 425,000,000 5.0 2,000.0 425,000,000 42,500,000 0.33438 63,950.12 425.00 64,375.12 0.1250 0.0100 250,250.00 0.1250 26,562.50 14,682.54 9,968.25 301,463.29 365,838.41
34. COLD MILLING MACHINE E 36 248.0 1,000.0 M 2,500,000,000 5.0 2,000.0 2,500,000,000 250,000,000 0.33438 376,177.17 2,500.00 378,677.17 0.1250 0.0100 443,300.00 0.1250 156,250.00 16,825.40 10,396.83 626,772.22 1,005,449.39
35. A. SPRAYER / DISTRIBUTOR E41 60.0 4,000.0 Liter 36,000,000 5.0 2,000.0 36,000,000 3,600,000 0.33438 5,416.95 36.00 5,452.95 0.1250 0.0100 107,250.00 0.1250 2,250.00 16,825.40 10,396.83 136,722.22 142,175.17
36. CONCRETE PAN MIXER E 43 134.0 600.0 Liter 150,000,000 10.0 1,500.0 150,000,000 15,000,000 0.23852 21,467.05 200.00 21,667.05 0.1250 0.0100 239,525.00 0.1250 12,500.00 16,825.40 10,396.83 279,247.22 300,914.27
37. TRUCKMIXER ( AGITATOR ) E 49 120.0 5.0 M3 225,000,000 5.0 2,000.0 225,000,000 22,500,000 0.33438 33,855.94 225.00 34,080.94 0.1250 0.0100 214,500.00 0.1250 14,062.50 14,682.54 9,968.25 253,213.29 287,294.24
38. BLENDING EQUIPMENT E 52 100.0 30.0 Ton / Jam 300,000,000 10.0 1,500.0 300,000,000 30,000,000 0.23852 42,934.10 400.00 43,334.10 0.1250 0.0100 178,750.00 0.1250 25,000.00 16,825.40 10,396.83 230,972.22 274,306.32
KETERANGAN : 1. Tingkat Suku Bunga = 20.00 % per-tahun
2. Upah Operator = 16,825.40 Rupiah per-orang/jam Medan , 07 Maret 2014
3. Upah Sopir 14,682.54 Rupiah per-orang/jam PT. ZHAFIRA TETAP JAYA
4. Upah Pembantu Operator = 10,396.83 Rupiah per-orang/jam
5. Upah Pembantu Sopir 9,968.25 Rupiah per-orang/jam
6. Harga Bahan Bakar Bensin = 6,500.00 Rupiah per-liter
7. Harga Bahan Bakar Solar = 11,500.00 Rupiah per-liter ( Alat Berat )
8. Harga Bahan Bakar Solar = 5,500.00 Rupiah per-liter ( Dump Truck )
9. Minyak Pelumas = 35,000.00 Rupiah per-liter SATYA ANUGRAH AKBAR
10. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Direktur Utama
11. Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom16)
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA
KET.
L
23
URAIAN ANALISA ALAT
faktor H 3.64
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT E01
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 50.0 T/Jam
4. Alat : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 6,500,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam Alat baru
c. Harga Alat (*) B' 6,500,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 650,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23852 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 1,395,358.13 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 13,000.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 1,408,358.13 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1 316,250.00 Rupiah
Bahan Bakar Pemanasan Material = 12 x 0.7Cp x Ms H2 4,830,000.00 Rupiah Khusus AMP
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 77,000.00 Rupiah
3. Perawatan dan = (12,5 % - 17,5 %) x B' K 812,500.00 Rupiah
perbaikan W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 31,190.48 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 6,083,765.87 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 7,492,124.00 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 925,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 925,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 92,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 139,185.55 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 925.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 140,110.55 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,812.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 263,784.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 403,895.27 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam Alat baru
c. Harga Alat (*) B' 35,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 3,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 10,532.96 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 70.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 10,602.96 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 86,250.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 21,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 4,375.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 138,847.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 149,450.18 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E04
2. Tenaga Pw 120.0 HP
3. Kapasitas Cp - -
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,050,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 1,050,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 105,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 157,994.41 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 1,050.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 159,044.41 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 172,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 42,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 65,625.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 307,347.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 466,391.63 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR E05
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 5,000.0 CPM (L/m)
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 35,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 3,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 5,266.48 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 35.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 5,301.48 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 57,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 14,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 2,187.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 100,909.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 106,211.20 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER E06
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 30,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 2.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam Alat baru
c. Harga Alat (*) B' 30,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 3,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.65455 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 17,672.73 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 60.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 17,732.73 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 57,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 14,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 3,750.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 102,472.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 120,204.95 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON E07
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 600,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 60,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 90,282.52 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 600.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 90,882.52 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 215,625.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 52,500.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 37,500.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 332,847.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 423,729.74 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3-4 M3 E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 165,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 165,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 16,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 24,827.69 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 165.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 24,992.69 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah 178,750.00
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 10,312.50 Rupiah
perbaikan = W'
4. Supir = ( 1 Orang / Jam ) x U1 L 14,682.54 Rupiah
5. Pembantu Supir = ( 1 Orang / Jam ) x U2 M 9,968.25 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 213,713.29 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 238,705.99 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 14,682.54 Rp./Jam
3. Upah Pembantu Sopir U2 9,968.25 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK E09
2. Tenaga Pw 110.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 185,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 185,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 18,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 27,837.11 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 185.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 28,022.11 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 158,125.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 38,500.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 11,562.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 14,682.54 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 9,968.25 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 232,838.29 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 260,860.40 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 14,682.54 Rp./Jam
3. Upah Pembantu Sopir U2 9,968.25 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E10
2. Tenaga Pw 120.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 950,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 950,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 95,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 142,947.32 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 950.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 143,897.32 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 172,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 42,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 59,375.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 301,097.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 444,994.55 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 20.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 165,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 165,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 16,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 24,827.69 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 165.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 24,992.69 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 10,312.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 14,682.54 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 9,968.25 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 213,713.29 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 238,705.99 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 14,682.54 Rp./Jam
3. Upah Pembantu Sopir U2 9,968.25 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 350,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 350,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 35,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 52,664.80 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 350.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 53,014.80 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 258,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 63,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 21,875.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 370,847.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 423,862.03 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER E13
2. Tenaga Pw 130.0 HP
3. Kapasitas Cp - -
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 900,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 900,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 90,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 135,423.78 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 900.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 136,323.78 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 186,875.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 45,500.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 56,250.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 315,847.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 452,171.00 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP E14
2. Tenaga Pw 75.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 925,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 925,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 92,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 139,185.55 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 925.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 140,110.55 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 107,812.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 26,250.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 57,812.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 219,097.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 359,207.77 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 105.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 910,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 910,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 91,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 136,928.49 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 910.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 137,838.49 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 150,937.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 36,750.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 56,875.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 271,784.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 409,623.21 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 475,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 475,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 47,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 71,473.66 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 475.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 71,948.66 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 79,062.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 19,250.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 29,687.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 155,222.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 227,170.88 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER E17
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 550,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 550,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 55,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 82,758.98 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 550.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 83,308.98 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 115,000.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 28,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 34,375.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 204,597.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 287,906.20 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER E18
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 625,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 625,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 62,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 94,044.29 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 625.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 94,669.29 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 39,062.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 245,034.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 339,704.01 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 615,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 615,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 61,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 92,539.58 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 615.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 93,154.58 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 115,000.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 28,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 38,437.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 208,659.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 301,814.31 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR E20
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 25.0 -
4. Alat : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 10,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam Alat baru
c. Harga Alat (*) B' 10,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 1,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 3,476.60 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 20.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 3,496.60 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 4,062.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,750.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,250.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 34,284.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 37,781.32 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E21
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 50.0 T/Jam
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,850,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 1,850,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 185,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 278,371.10 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 1,850.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 280,221.10 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 316,250.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 77,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 115,625.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 2 Orang / Jam ) x U2 M 20,793.65 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 546,494.05 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 826,715.15 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E22
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp - -
4. Alat : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 10,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 2.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 10,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 1,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.65455 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 2,945.45 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 10.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 2,955.45 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 4,062.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,750.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 625.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 33,659.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 36,615.18 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 160,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 160,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 16,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 24,075.34 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 160.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 24,235.34 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 10,000.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 14,682.54 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 9,968.25 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 213,400.79 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 237,636.13 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 14,682.54 Rp./Jam
3. Upah Pembantu Sopir U2 9,968.25 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER E24
2. Tenaga Pw 10.0 HP
3. Kapasitas Cp 0.980 Ton
4. Alat : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 110,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 110,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 11,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.47473 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 23,498.90 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 110.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 23,608.90 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 14,375.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 3,500.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 6,875.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 51,972.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 75,581.12 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER E25
2. Tenaga Pw 3.0 HP
3. Kapasitas Cp 0.200 Ton
4. Alat : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 11,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 2.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam Alat baru
c. Harga Alat (*) B' 11,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 1,100,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.65455 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 6,480.00 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 22.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 6,502.00 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 2,437.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 1,050.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 1,375.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 32,084.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 38,586.72 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER E26
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp - -
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 35,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 3,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 5,266.48 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 35.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 5,301.48 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 0.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 0.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 2,187.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 29,409.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 34,711.20 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER E27
2. Tenaga Pw 345.0 HP
3. Kapasitas Cp 2,000.00 -
4. Alat : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 300,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam
c. Harga Alat (*) B' 300,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 30,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.38629 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 104,298.06 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 600.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 104,898.06 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 495,937.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 120,750.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 37,500.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 681,409.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 786,307.78 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP E28
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 M3
4. Alat : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 400,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 400,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 40,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.30071 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 54,127.03 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 400.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 54,527.03 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 25,000.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 230,972.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 285,499.26 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON E29
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 10.00 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 575,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 575,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 57,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 86,520.75 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 575.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 87,095.75 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 120,312.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 61,250.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 35,937.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 244,722.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 331,817.97 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 16,825.40 Rp./Jam
3. Upah Pembantu Sopir U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 5,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER E30
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 180,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 180,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 18,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 27,084.76 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 180.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 27,264.76 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 35,937.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 8,750.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 11,250.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 83,159.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 110,424.48 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON E31
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 650,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 6.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 650,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 65,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.30071 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 87,956.43 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 650.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 88,606.43 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 179,687.50 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 43,750.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 40,625.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 291,284.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 379,891.15 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET E32
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 250.00 Amp
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 35,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 35,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 3,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 5,266.48 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 35.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 5,301.48 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 57,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 14,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 2,187.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 100,909.72 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 106,211.20 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E33
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,600,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 1,600,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 160,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 240,753.39 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 1,600.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 242,353.39 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 215,625.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 52,500.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 100,000.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 395,347.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 637,700.61 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON E 35
2. Tenaga Pw 140.0 HP
3. Kapasitas Cp 25.00 Ton
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 425,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 425,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 42,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 63,950.12 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 425.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 64,375.12 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 201,250.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 49,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 26,562.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 14,682.54 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 9,968.25 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 301,463.29 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 365,838.41 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 14,682.54 Rp./Jam
3. Upah Pembantu Sopir U2 9,968.25 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE E 36
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000.00 M
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,500,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 2,500,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 250,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 376,177.17 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 2,500.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 378,677.17 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 356,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 86,800.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 156,250.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 626,772.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,005,449.39 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 16,825.40 Rp./Jam
3. Upah Pembantu Sopir U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR E41
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 36,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 36,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 3,600,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 5,416.95 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 36.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 5,452.95 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 86,250.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 21,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 2,250.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 136,722.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 142,175.17 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER E 43
2. Tenaga Pw 134.0 HP
3. Kapasitas Cp 600.0 Liter
4. Alat : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 150,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat baru
c. Harga Alat (*) B' 150,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 15,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23852 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 21,467.05 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 200.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 21,667.05 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 192,625.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 46,900.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 12,500.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 279,247.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 300,914.27 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator U1 16,825.40 Rp./Jam
3. Upah Pembantu Operator U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan TRUCK MIXER ( AGITATOR ) E 49
2. Tenaga Pw 120.0 HP
3. Kapasitas Cp 5.0 M3
4. Alat : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 225,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat baru
c. Harga Alat (*) B' 225,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 22,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 33,855.94 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 225.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 34,080.94 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 172,500.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 42,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 14,062.50 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 14,682.54 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 9,968.25 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 253,213.29 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 287,294.24 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 14,682.54 Rp./Jam
3. Upah Pembantu Sopir U2 9,968.25 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
No. U R A I A N KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E 52
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 30.0 Ton / Jam
4. Alat : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 300,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun Alat baru
b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat baru
c. Harga Alat (*) B' 300,000,000 Rupiah Alat baru
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 30,000,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23852 -
(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 42,934.10 Rupiah
W'
b. Asuransi, dll = 0.002 x B' F 400.00 Rupiah
W'
Biaya Pasti per Jam = ( E + F ) G 43,334.10 Rupiah
C. BIAYA OPERASI PER JAM KERJA
1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 143,750.00 Rupiah
2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 35,000.00 Rupiah
3. Perawatan dan (12,5 % - 17,5 %) x B' K 25,000.00 Rupiah
perbaikan = W'
4. Operator = ( 1 Orang / Jam ) x U1 L 16,825.40 Rupiah
5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 10,396.83 Rupiah
Biaya Operasi per Jam = (H+I+K+L+M) P 230,972.22 Rupiah
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 274,306.32 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Sopir U1 16,825.40 Rp./Jam
3. Upah Pembantu Sopir U2 10,396.83 Rp./Jam
4. Bahan Bakar Bensin Mb 6,500.00 Liter
5. Bahan Bakar Solar Ms 11,500.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi