Anda di halaman 1dari 144

Tabel Volume Pekerjaan

No

Jenis pekerjaann
1 Pekerjaan Tanah
Galian Tanah Untuk Pondasi
Timbun kembali bekas galian

2 Pekerjaan Pondasi
3 Pekerjaan Dinding
4 Pekerjaan Plesteran

Volume

satuan

22.356 m3
5.589 m3

15.39 m3
20.0707 m3
0.6021 m3

5 Pekerjaan Beton
Kolom Beton
Balok beton
Sloff beton

1.8236 m3
0.8397 m3
0.54 m3

6 Pekerjaan Kayu
Kusen Pintu jendela
Daun pintu jendela
Listplang
Kuda - kuda
Rangka atap
Rangka Langit langit / Plafon

0.2747 m3
0.1525 m3
19.98 m
0.2668 m3
34.749 m2
0.4862 m3

7 Pekerjaan Atap
PasangGenteng
Pasang bubungan Nok
Talang Air

34.749 m2
6.7 m2
12.1 m

8 Pekerjaan langit langit / plafon


9 Pekerjaan Lantai
Urukan pasir di bawah lantai
Pemasangan Lantai
10 Pekerjaan Cat / melamin
kusen pintu jendela dan ventilasi
Daun pintu jendela
listplang
Dinding bagian dalam dan luar
Plafon
11 Pekerjaan kaca, engsel dan kunci
Pemasangan kaca
Engsel
Kunci
12 Pekerjaan Mekanikal / Plumbing
Mekanikal/plumbing
Instalasi air bersih pipa pvc 1/2 "

35 m2

4.9733 m3
45, 5 m2

11.862 m2
15.1944 m2
39.96 m2
40.1414 m2
35 m2

3.702 m2
15 buah
5 buah

25 m

Instalasi air kotor pipa pvc 3"


Tangki air 1000 liter ( fiber)
Pompa air
Closet jongkok
Elektrikal
Instalasi listrik penerangan + saklar
instalasi stop kontak

10 m
1 buah
1 buah
1 buah

6 ttk
4 ttk

Rencana Anggaran Biaya


No
A

Jenis pekerjaann

Volume

satuan

Harga satuan

Pekerjaan Tanah
1 Pembersihan lapangan

100

m2

2 Galian Tanah Untuk Pondasi

22.356

m3

14,300
36,080

3 Timbun kembali bekas galian

5.589

m3

17,292

15.39

m3

589,600

2 Pekerjaan Dinding 1 Pc : 4 ps
3 Pekerjaan Plesteran bagian dalam dan luar

167.256

m2

118,976

334.512

m2

41,074

4 Acian

334.512

m2

13,735

1 Kolom Beton mutu K225

1.8236

m3

1,337,985

2 Balok beton mutu K225

0.8397

m3

1,337,985

0.54

m3

1,337,985

1 Kusen Pintu jendela kayu bengkirai

0.2747

m3

12,601,600

2 Daun pintu jendela kayu jati lokal

9.7724

m2

505,296

19.98

75,548

4 Kuda - kuda kayu bengkirai

0.2668

m3

8,610,690

5 Rangka atap kayu kruing

0.8848

m3

95,590

35

m2

73,760

34.749

m2

53,845

12.1

141,702

35

m2

116,908

4.9733

m3

17,292

45.5

m2

137,583

Sub total
B

Pekerjaan pasangan
1 Pekerjaan Pondasi 1 Pc : 4 ps

Sub total
C

Pekerjaan Beton

3 Sloff beton mutu K225


Sub total
D

Pekerjaan Kayu

3 Listplang

6 Rangka Langit langit / Plafon kayu bengkirai


Sub total
E

Pekerjaan Atap
Pasang Genteng beton
Talang Air seng
Sub total

Pekerjaan langit langit / plafon


Sub total

Pekerjaan Lantai
1 Urukan pasir di bawah lantai
2 Pemasangan Lantai keramik 30x30
Sub total

Pekerjaan Cat / melamin


1 Vernis kusen pintu jendela dan ventilasi

11.862

m2

36,547

15.1944

m2

36,547

39.96

m2

41,237

334.512

m2

31,042

35

m2

41,237

3.702

m2

75,999

2 Engsel

15

buah

28,204

3 Kunci

buah

70,180

1 Instalasi air bersih pipa pvc 1/2 "

25

48,174

2 Instalasi air kotor pipa pvc 3"

10

59,966

3 Tangki air 1000 liter ( fiber)

buah

1,300,000

4 Closet jongkok

buah

574,860

5 Keran air

buah

26,523

1 Pasang Box KWH dan Meter

unit

24,000

2 MCB 10 Ampere + box

buah

30,000

8,460

2 Daun pintu jendela


3 listplang
4 Dinding bagian dalam dan luar
5 Plafon asbes 1 x 1 m
Sub total
I

Pekerjaan kaca, engsel dan kunci


1 Pemasangan kaca

Sub total
J

Pekerjaan Mekanikal / Plumbing


Mekanikal/plumbing

Sub total
K

Pekerjaan Elektrikal

3 Kabel Eterna NYM 32.5


4 Pipa PVC 1/2 "

100
25

3,250

5 Saklar Broco

buah

20,000

6 Lampu SL 23 watt philip (termasuk fitting)

buah

55,000

7 Stop kontak broco

buah

17,500

Sub total

Sub total

Jumlah
1,430,000
806,604
96,645

9,073,944
19,899,450
13,739,746
4,594,522

2,439,949
1,123,506
722,512

3,461,660
4,937,955
1,509,449
2,297,332
84,578
2,581,600

1,871,060
1,714,594

4,091,780

85,998
6,260,027

433,521
555,310
1,647,831
10,383,922
1,443,295

281,348
423,060
350,900

1,204,350
599,660
1,300,000
574,860
79,569

24,000
30,000
846,000
81,250
120,000
330,000
70,000

103,601,786

DAFTAR ANALISA SATUAN PEKERJAAN


ANALISA SATUAN PEKERJAAN
Macam Pekerjaan

No.
(1)

AK

(2)
PEKERJAAN PERSIAPAN
100.00
m2
8.0000
org
2.0000
org
0.5000
org
2.0000
org
1.0000
hr

1.0000

m2

Pekerjaan Pengukuran Gedung


Pekerja
Mandor
Pengawas
Asisten Ahli Ukur
Sewa alat ukur
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Pekerjaan Pengukuran
0.01

SNI
6.4
03-2835-2002

1.0000
0.0120
0.0200
0.0070
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
m3
org
org
org
org

Pengukuran dan pemasangan bouwplank untuk gedung dan s


Kayu meranti 5/7
Paku reng
Kayu meranti papan 3/20
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.8
03-2835-2002

1.0000
0.1000
0.0500

m2
org
org

Membersihkan lapangan dan perataan


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0350
1.4000
0.6000
1.5000
16.8000
0.0270

bh
m3
m1
kg
kg
kg
m3

Membuat Papan Nama Proyek 80x120 cm


Kayu meranti
Seng plat lebar 90 cm
Paku
Cat kayu
PC
Pasir beton

A4

0.0405
0.0175
1.0000
1.0000
2.1000
1.0050

m3
org
org
org
org
org

Kerikil beton
Tukang batu
Tukang kayu
Tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.16

1.0000
0.2750
0.0300
0.0500
1.0000
0.1000

m2
m3
m3
m3
org
org

Pembuatan jalan sementara, tebal 25 cm


Batu belah
Kerikil
Pasir
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.2
03-2835-2002

1.0000
1.2500
2.5000
1.2000
0.0050
0.0090
0.0250
0.0600
0.4000
0.2000
0.0200
0.4000
0.0200

m1
btg
kg
lbr
m3
m3
m3
kg
kg
org
org
org
org

Pembuatan pagar sementara dari seng gelombang tinggi 2 me


Dolken kayu 8 - 10/400 cm
PC
Seng gelombang 2"-5" BJLS 24
Pasir beton
Kerikil beton
Kaso 5/7 kayu meranti
Paku biasa 2" - 5"
Meni besi
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

m3
org
org

Galian tanah biasa sedalam sampai 1 meter


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

m3

Galian tanah biasa sedalam 1 - 2 meter

SNI
6.1

SNI

PEKERJAAN TANAH
1.0000
0.4000
0.0400

1.0000

6.2

0.5260
0.0526

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.3

1.0000
0.7350
0.0735

m3
org
org

Galian tanah biasa sedalam 2 - 3 meter


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.4

1.0000
0.6250
0.0620

m3
org
org

Galian tanah keras sedalam sampai 1 meter


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.5

1.0000
1.2500
0.1250

m3
org
org

Galian tanah cadas sedalam sampai 1 meter


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.6

1.0000
0.8230
0.0830

m3
org
org

Galian tanah lumpur sedalam 1 meter


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
2.0000
1.0000
0.7350
0.0735

m1
bh
org
org
org

Membuat sumur
Buis beton D. 80 cm
Tukang gali sumur
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000

m3

Mengangkut tanah sejauh 30 meter

Mod. SNI 6.3

A6

0.3300
0.0100

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.8

1.0000
0.5160
0.0500

m3
org
org

Pembuangan tanah sejauh 150 meter


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

A14

1.0000
0.2500
0.0100

m3
org
org

Membuang tanah dengan menghampar


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9

1.0000
0.1920
0.0190

m3
org
org

Urug kembali bekas galian


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.2500
0.0100

m2
org
org

Meratakan tanah ditumbuk halus


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

A18

1.0000
1.2000
0.3000
0.0100

m3
m3
org
org

Urug pasir
Pasir urug
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

MOD
A18

1.0000
1.2000

m3
m3

Urug tanah mendatangkan


Tanah urug

0.3000
0.0100

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.15

1.0000
1.2000
0.2500
0.0250

m3
m3
org
org

Urugan sirtu
Sirtu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.14

1.0000
1.2000
0.1500
0.0150

m3
m3
org
org

Pemasangan lapisan ijuk


Ijuk
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.14
03-2836-2002

1.0000
1.2000
0.3000
0.3900
0.0390
0.7800
0.0390

m3
m3
m3
org
org
org
org

Pasangan pondasi batu kosong


Batu belah 15/20 cm
Pasir urug
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9
03-2836-2002

1.0000
1.1000
0.2290
0.2290
0.5440
0.6000
0.0600
1.5000
0.0750

m3
m3
m3
m3
m3
org
org
org
org

Pasangan pondasi 1 Kp : 1 Sm : 1 Ps
Batu belah (hitam) 15/20 cm
Kapur pasang
Semen merah
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

PEKERJAAN PASANGAN

JASA 10 %
JUMLAH
DIBULATKAN
1.0000
1.2000
95.4200
0.2290
0.3820
0.6000
0.0600
1.5000
0.0750

m3
m3
kg
m3
m3
org
org
org
org

Pasangan pondasi 1 Pc : 3 Kp : 5 Ps
Batu belah (hitam) 15/20 cm
PC
Kapurr pasang
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.12
03-2835-2002

1.0000
1.1000
61.0000
0.1470
0.4920
0.6000
0.0600
1.5000
0.0750

m3
m3
kg
m3
m3
org
org
org
org

Pasangan pondasi 1 Pc : 3 Kp : 10 Ps
Batu belah (hitam) 15/20 cm
PC
Kapurr pasang
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.5
03-2836-2002

1.0000
1.1000
163.0000
0.5200
0.6000
0.0600
1.5000
0.0750

m3
m3
kg
m3
org
org
org
org

Pasangan pondasi 1 Pc : 4 Ps
Batu belah 15/20 cm
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.15
03-2837-2002

1.0000
70.0000
4.5000
0.0150

m2
bh
kg
m3

Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


Bata merah 5 x 11 x 22 cm
PC
Kapur pasang

0.0500
0.1000
0.0100
0.3200
0.0150

m3
org
org
org
org

Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.11
03-2837-2002

1.0000
70.0000
11.5000
0.0430
0.1000
0.0100
0.3200
0.0150

m2
bh
kg
m3
org
org
org
org

Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


Bata merah 5 x 11 x 22 cm
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.7
03-2837-2002

1.0000
140.0000
10.0800
0.0275
0.0925
0.2000
0.0200
0.6500
0.0300

m2
bh
kg
m3
m3
org
org
org
org

Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


Bata merah 5 x 11 x 22 cm
PC
Kapur pasang
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.4
03-2837-2002

1.0000
140.0000
26.4500
0.0980
0.2000
0.0200
0.6500
0.0300

m2
bh
kg
m3
org
org
org
org

Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps


Bata merah 5 x 11 x 22 cm
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.18

1.0000
12.5000
12.5000
0.0400
0.1000
0.0100
0.5000
0.0250

m2
bh
kg
m3
org
org
org
org

Pasangan dinding bataco


Bataco
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19

1.0000
16.0000
12.5000
0.0400
0.1000
0.0100
0.5000
0.0250

m2
bh
kg
m3
org
org
org
org

Pasangan roster 25/25 cm


Roster 25/25 cm
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

m3
kg
m3
m3
org
org
org
org

Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr


PC
Pasir beton
Kerikil beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

m3
kg
m3
m3
org
org
org
org

Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


PC
Pasir beton
Kerikil beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor

SNI
6.13

SNI
6.1

PEKERJAAN BETON
1.0000
336.0000
0.5400
0.8100
0.3500
0.0350
2.0000
0.1000

1.0000
218.0000
0.5200
0.8700
0.2500
0.0250
1.6500
0.0800

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN
AK

1.0000
0.7000
61.2500
0.4000
0.6500
1.0000
0.1000
6.0000
0.3000

m3
m3
kg
m3
m3
org
org
org
org

Beton cyclope 1pc:3ps:5kr


Batu kali (hitam)
PC
Pasir pasang
Kerikil beton
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.16

1.0000
400.0000
0.4800
0.8000
0.3500
0.0350
2.0000
1.0000

m3
kg
m3
m3
org
org
org
org

Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr


PC
Pasir beton
Kerikil beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.35

1.0000
388.0000
0.6500
0.6500
1.0000
0.1000
6.0000
0.3000

m3
kg
m3
m3
org
org
org
org

Membuat beton dengan mutu K 225


PC
Pasir beton
Kerikil beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.36

1.0000
400.0000
0.4000
0.8200
1.0000

m3
kg
m3
m3
org

Membuat beton dengan mutu K 275


PC
Pasir beton
Kerikil beton
Tukang batu

0.1000
6.0000
0.3000

org
org
org

Kepala tukang batu


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
430.0000
0.5160
0.6900
1.0000
0.1000
6.0000
0.3000

m3
kg
m3
m3
org
org
org
org

Membuat beton dengan mutu K 300


PC
Pasir beton
Kerikil beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.25

1.0000
1.0500
0.0150
0.0070
0.0007
0.0070
0.0003

kg
kg
kg
org
org
org
org

Pembesian dengan besi polos


Besi beton polos
Kawat beton
Tukang besi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.25

1.0000
1.0500
0.0150
0.0070
0.0007
0.0070
0.0003

kg
kg
kg
org
org
org
org

Pembesian dengan besi ulir


Besi beton ulir
Kawat beton
Tukang besi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

F.8

1.0000
0.0170
0.0240
0.4000
0.5000

m2
m3
m3
kg
org

Cetakan beton / begisting memakai papan


Usuk meranti
Papan cetakan
Paku
Tukang kayu

0.0500
0.2000
0.0100

org
org
org

Kep. Tk. Kayu


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

F.8

1.0000
0.0170
0.3470
0.4000
0.5000
0.0500
0.2000
0.0100

m2
m3
lbr
kg
org
org
org
org

Cetakan beton / begisting memakai multiplek


Usuk meranti
Multiplek
Paku
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

F.V

1.0000
4.0000

m3
org

Membongkar cetakan
Pekerja
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN PELESTERAN
G.50.q

1.0000
6.5110
0.0209
0.2000
0.0200
0.4000
0.0200

m2
kg
m3
org
org
org
org

Plesteran batu kali 1pc:4ps


PC
Pasir pasang
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9
03-2837-2002

1.0000
1.8400
0.0060
0.0140
0.1500
0.0150
0.2000
0.0100

m2
kg
m3
m3
org
org
org
org

Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm


PC
Kapurr pasang
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor

JUMLAH ( BELUM TERMASUK PPN )


JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.4
03-2837-2002

1.0000
5.2000
0.0200
0.1500
0.0150
0.2000
0.0100

m2
kg
m3
org
org
org
org

Plesteran 1 Pc : 4 Ps, tebal 15 mm


PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.30
03-2837-2002

1.0000
7.0700
0.0210
0.2000
0.0200
0.2600
0.0130

m2
kg
m3
org
org
org
org

Plesteran beton 1 Pc : 3 Ps, tebal 15 mm


PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.31
03-2837-2002

1.0000
0.5000
0.0020
0.0380
0.0380
0.0570
0.0020

m1
kg
m3
org
org
org
org

Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung )


PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.35
03-2837-2002

1.0000
4.3200
0.0160
0.0700
0.0070
0.1500
0.0080

m2
kg
m3
org
org
org
org

Plesteran siar adukan 1 Pc : 2 Ps


PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

JUMLAH
DIBULATKAN
SNI
6.34

1.0000
4.3200
0.0160
0.1000
0.0100
0.2500
0.0150

m2
kg
m3
org
org
org
org

Plesteran Ciprat, 1 Pc : 2 Ps
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

Analisa ZAZ

1.0000
3.5000
0.0330
0.0033
0.0700
0.0035

m2
kg
org
org
org
org

Acian dinding bata


PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.74

1.0000
1.0500
11.7500
0.0350
0.3500
0.0350
0.6500
0.0300

m2
m2
kg
m3
org
org
org
org

Pasang dinding batu hias tempel


Batu tempel hitam
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM TERMASUK PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

PEKERJAAN PASANG TEGEL


1.0000
m2
1.0000
m2
0.0160
m3
0.0320
m3
1.0000
kg
0.2500
org
0.0250
org
0.5000
org
0.0250
org

Pasang tegel abu-abu 30/30


Tegel abu-abu uk. 30/30
Kapur pasang
Pasir pasang
PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
AK

An.
G.69.c

1.0000
1.0000
0.0160
0.0320
1.0000
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
m3
kg
org
org
org
org

PEKERJAAN KERAMIK
1.0000
m2
1.0000
m2
4.6800
kg
0.0090
m3
1.0000
kg
0.5000
org
0.0500
org
0.2500
org
0.0125
org

AK

1.0000
1.0000
4.0800
0.0090
0.6000
0.5000
0.0500
0.2500
0.0125

m2
m2
kg
m3
kg
org
org
org
org

AK

1.0000
1.0000
4.0800

m2
m2
kg

Pasang tegel abu-abu 20/20


Tegel abu-abu uk. 20/20
Kapur pasang
Pasir pasang
PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

Pasang ubin porselin


Tegel porselin
PC
Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Pasang tegel keramik 20/20 dan 30/30
Tegel keramik (std)
PC
Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Pasang tegel keramik 10/20 berglasir
Tegel keramik 10/20
PC

0.0090
0.6000
0.5000
0.0500
0.2500
0.0125

m3
kg
org
org
org
org

AK

1.0000
1.0000
4.0800
0.0090
0.6000
0.5000
0.0500
0.2500
0.0125

m2
m2
kg
m3
kg
org
org
org
org

AK

1.0000
1.0000
4.0800
0.0090
0.6000
0.5000
0.0500
0.2500
0.0125

m2
m2
kg
m3
kg
org
org
org
org

SNI
6.24

1.0000
0.2300
1.2000
0.0030
0.1000
0.0300
0.0030
0.0600
0.0030

m1
m2
kg
m3
kg
org
org
org
org

Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Pasang tegel keramik 20/20 berglasir
Tegel keramik 20/20
PC
Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Pasang tegel keramik 30/30 berglasir
Tegel keramik 30/30
PC
Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Pasang plint keramik ukuran 10 x 40 cm
Keramik 40/40
PC
Pasir pasang
Semen warna
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM TERMASUK PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.25

1.0000
0.1800
1.6500
0.0032
0.1000
0.0300
0.0030
0.0600
0.0030

m1
m2
kg
m3
kg
org
org
org
org

Pasang plint keramik ukuran 10 x 30 cm


Keramik 30/30
PC
Pasir pasang
Semen warna
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM TERMASUK PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000

m2

Pasang keramik dinding 20/25

1.0000
9.3000
0.0180
1.5000
0.6500
0.0650
0.3200
0.0160

m2
kg
m3
kg
org
org
org
org

Tegel keramik 20/25


PC
Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN CONBLOCK
AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-empat abu-abu 6 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-empat abu-abu 8 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN
AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-enam abu-abu 6 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-enam abu-abu 8 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-empat warna 6 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-empat warna 8 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-enam warna 6 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang conblock tipe segi-enam warna 8 cm, K-200


Conblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang grassblock bulat tebal 10 cm


Grassblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m2
m2
m3
org
org
org
org

Pasang grassblock tebal 10 cm


Grassblock
Pasir urug
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH

DIBULATKAN

AK

1.0000
1.0000
0.1250
0.0125
0.2500

bh
bh
org
org
org

Pasang buis beton dia. 80 cm


Buis beton
Tukang batu
Kep. Tk. Batu
Pekerja
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN RANGKA ATAP


SNI
6.28
03-3434-2002

1.0000
1.1000
15.0000
0.8000
12.0000
1.2000
4.0000
0.2000

m3
m3
kg
kg
org
org
org
org

Membuat kuda-kuda kayu kamper


Kayu kamper
Besi strip
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.30
03-3434-2002

1.0000
1.1000
15.0000
0.8000
12.0000
1.2000
4.0000
0.2000

m3
m3
kg
kg
org
org
org
org

Membuat kuda-kuda kayu kruing


Kayu kruing
Besi strip
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
1.1000
15.0000
0.8000
12.0000
1.2000
4.0000
0.2000

m3
m3
kg
kg
org
org
org
org

Membuat kuda-kuda kayu bengkirai


Kayu bengkirai
Besi strip
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

03-3434-2002

JASA 10 %
JUMLAH
DIBULATKAN
SNI
03-3434-2002

1.0000
15.0000
0.8000
12.0000
1.2000
4.0000
0.2000

m3
kg
kg
org
org
org
org

Pasang kuda-kuda kayu lama


Besi strip
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
1.1000
0.8000
12.0000
1.2000
4.0000
0.2000

m3
m3
kg
org
org
org
org

Pasang Nook,Goording dan Jurai kayu bengkirai


Kayu bengkirai
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.8000
12.0000
1.2000
4.0000
0.2000

m3
kg
org
org
org
org

Pasang Goording Lama


Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

F.16

1.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
kg
kg
org
org
org
org

Pasang usuk 5/7, reng 2/3 lama


Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

F.16

1.0000
2.2000
5.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
m1
m1
kg
kg
org
org
org
org

Pasang usuk 5/7, reng 2/3 kayu jati


Usuk kayu jati 5/7
Reng jati 2/3
Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
2.2000
5.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
m1
m1
kg
kg
org
org
org
org

Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai


Usuk kayu jati 5/7
Reng kayu bengkirai 2/3
Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
2.2000
5.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
m1
m1
kg
kg
org
org
org
org

Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati


Usuk kayu bengkirai 5/7
Reng jati 2/3
Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
2.2000
5.0000
0.1500
0.1000
0.1000

m2
m1
m1
kg
kg
org

Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai


Usuk kayu bengkirai 5/7
Reng kayu bengkirai 2/3
Paku usuk
Paku reng
Tukang kayu

0.0100
0.1000
0.0025

org
org
org

Kep. Tk. Kayu


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

F.16

1.0000
2.2000
4.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
m1
m1
kg
kg
org
org
org
org

Pasang usuk 5/7, reng 3/4 kayu jati


Usuk kayu jati 5/7
Reng jati 3/4
Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
2.2000
4.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
m1
m1
kg
kg
org
org
org
org

Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal
Usuk kayu bengkirai 5/7
Reng kayu jati 3/4 lokal
Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
2.2000
4.0000
0.1500
0.1000
0.1000
0.0100
0.1000
0.0025

m2
m1
m1
kg
kg
org
org
org
org

Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai


Usuk kayu bengkirai 5/7
Reng kayu bengkirai 3/4
Paku usuk
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.1
03-3434-2002

PEKERJAAN PINTU DAN JENDELA


1.0000
m3
Membuat kusen pintu / jendela kayu jati (klas plitur)
3
1.1000
m
Kayu jati (klas plitur)
20.0000
org
Tukang kayu
2.0000
org
Kepala tukang kayu
6.0000
org
Pekerja
0.3000
org
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.1
03-3434-2002

1.0000
1.1000
20.0000
2.0000
6.0000
0.3000

m3
m3
org
org
org
org

Membuat kusen pintu / jendela kayu jati (lokal)


Kayu jati (lokal)
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.2
03-3434-2002

1.0000
1.2000
18.0000
2.0000
6.0000
0.3000

m3
m3
org
org
org
org

Membuat kusen pintu / jendela kayu kamper


Kayu kamper
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
1.2000
18.0000
2.0000
6.0000
0.3000

m3
m3
org
org
org
org

Membuat kusen pintu / jendela kayu kruing


Kayu kruing
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
18.0000
2.0000
6.0000

m3
m3
org
org
org

Membuat kusen pintu / jendela kayu bengkirai


Kayu bengkirai
Tukang kayu
Kepala tukang kayu
Pekerja

03-3434-2002

SNI
03-3434-2002

0.3000

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19
03-3434-2002

1.0000
0.0196
0.0300
0.3000
1.0000
2.0000
0.2000
0.6000
0.0300

m2
m3
kg
kg
lbr
org
org
org
org

Pasang pintu teakwood rangkap, rangka kayu jati


Papan kayu jati
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19
03-3434-2002

1.0000
0.0196
0.0300
0.3000
1.0000
2.0000
0.2000
0.6000
0.0300

m2
m3
kg
kg
lbr
org
org
org
org

Pasang pintu teakwood rangkap, rangka kayu jati lokal


Papan kayu jati lokal
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.20
03-3434-2002

1.0000
0.0196
0.0300
0.3000
1.0000
2.0000
0.2000
0.6000
0.0300

m2
m3
kg
kg
lbr
org
org
org
org

Pasang pintu teakwood rangkap, rangka kayu kamper


Papan kayu kamper
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.0196

m2
m3

Pasang pintu teakwood rangkap, rangka kayu kruing


Papan kayu kruing

03-3434-2002

0.0300
0.3000
1.0000
2.0000
0.2000
0.6000
0.0300

kg
kg
lbr
org
org
org
org

Paku biasa 1/2" - 1"


Lem kayu
Teakwood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.0196
0.0300
0.3000
1.0000
2.0000
0.2000
0.6000
0.0300

m2
m3
kg
kg
lbr
org
org
org
org

Pasang pintu teakwood rangkap, rangka kayu bengkirai


Papan kayu bengkirai
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9
03-3434-2002

1.0000
0.0350
2.0000
0.2000
0.8000
0.0400

m2
m3
org
org
org
org

Pasang pintu dan jendela kaca kayu jati


Kayu jati papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9
03-3434-2002

1.0000
0.0350
2.0000
0.2000
0.8000
0.0400

m2
m3
org
org
org
org

Pasang pintu dan jendela kaca kayu jati lokal


Papan kayu jati lokal
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
610

1.0000
0.0350

m2
m3

Pasang pintu dan jendela kaca kayu kamper


Papan kayu kamper

03-3434-2002

03-3434-2002

2.0000
0.2000
0.8000
0.0400

org
org
org
org

Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.0350
2.0000
0.2000
0.8000
0.0400

m2
m3
org
org
org
org

Pasang pintu dan jendela kaca kayu kruing


Papan kayu kruing
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0350
2.0000
0.2000
0.8000
0.0400

m2
m3
org
org
org
org

Pasang pintu dan jendela kaca kayu bengkirai


Papan kayu bengkirai
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.7
03-3434-2002

1.0000
0.0400
2.5000
0.2500
1.0000
0.0500

m2
m3
org
org
org
org

Mengerjakan daun pintu / jendela panil kayu jati


Kayu jati papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.7
03-3434-2002

1.0000
0.0400
2.5000
0.2500
1.0000
0.0500

m2
m3
org
org
org
org

Mengerjakan daun pintu / jendela panil kayu jati lokal


Kayu jati papan lokal
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

03-3434-2002

SNI
03-3434-2002

JUMLAH
DIBULATKAN
SNI
6.8
03-3434-2002

1.0000
0.0400
2.5000
0.2500
1.0000
0.0500

m2
m3
org
org
org
org

Mengerjakan daun pintu / jendela panil kayu kamper


Kayu kamper papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.0400
2.5000
0.2500
1.0000
0.0500

m2
m3
org
org
org
org

Mengerjakan daun pintu / jendela panil kayu kruing


Kayu kruing papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0400
2.5000
0.2500
1.0000
0.0500

m2
m3
org
org
org
org

Mengerjakan daun pintu / jendela panil kayu bengkirai


Kayu bengkirai papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.12
03-3434-2002

1.0000
0.0640
3.0000
0.3000
1.0000
0.3000

m2
m3
org
org
org
org

Pasang pintu dan jendela jalusi kayu jati


Kayu jati papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.12
03-3434-2002

1.0000
0.0640
3.0000

m2
m3
org

Pasang pintu dan jendela jalusi kayu jati


Kayu jati papan lokal
Tukang kayu

03-3434-2002

SNI
03-3434-2002

0.3000
1.0000
0.3000

org
org
org

Kepala tukang kayu


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.13
03-3434-2002

1.0000
0.0640
3.0000
0.3000
1.0000
0.0500

m2
m3
org
org
org
org

Pasang pintu dan jendela jalusi kayu kamper


Kayu kamper papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.0640
3.0000
0.3000
1.0000
0.0500

m2
m3
org
org
org
org

Pasang pintu dan jendela jalusi kayu kruing


Kayu kruing papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0640
3.0000
0.3000
1.0000
0.0500

m2
m3
org
org
org
org

Pasang pintu dan jendela jalusi kayu bengkirai


Kayu bengkirai papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

03-3434-2002

SNI
03-3434-2002

SNI
03-3434-2002

PEKERJAAN PLAFOND
1.0000
m2
0.1000
kg
0.2500
org
0.0250
org
0.1500
org
0.0075
org

Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama


Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

JUMLAH
DIBULATKAN

SNI
6.39
03-3434-2002

1.0000
0.0120
0.1000
0.2500
0.0250
0.1500
0.0075

m2
m3
kg
org
org
org
org

Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper


Kayu kamper balok
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI

1.0000
0.0120
0.1000
0.2500
0.0250
0.1500
0.0075

m2
m3
kg
org
org
org
org

Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing


Kayu kruing
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0120
0.1000
0.2500
0.0250
0.1500
0.0075

m2
m3
kg
org
org
org
org

Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai


Kayu bengkirai
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0130
0.1200
0.2700
0.0270
0.1700
0.0085

m2
m3
kg
org
org
org
org

Pasang rangka langit-langit (60 x 120) m, kayu kamper


Kayu kamper
Paku
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

03-3434-2002

SNI
03-3434-2002

JUMLAH
DIBULATKAN

SNI
6.1
03-2838-2002

1.0000
0.0130
0.1200
0.2700
0.0270
0.1700
0.0085

m2
m3
kg
org
org
org
org

Pasang rangka langit-langit (60 x 120) m, kayu kruing


Kayu kruing
Paku
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000

m2

Pasang rangka langit-langit (60 x 120) m, kayu bengkirai

0.0130
0.1200
0.2700
0.0270
0.1700
0.0085

m3
kg
org
org
org
org

Kayu bengkirai
Paku
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.0100
0.0700
0.0070
0.0300
0.0015

m2
lbr
kg
org
org
org
org

Langit-langit asbes (1,00 x 1,00) m tanpa plepet


Pelat asbes
Paku eternit
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
2.6000
0.0100
0.0100
0.0700
0.0070
0.0300
0.0015

m2
lbr
m1
kg
kg
org
org
org
org

Langit-langit asbes (1,00 x 1,00) m memakai plepet


Pelat asbes
Plepet kayu
Paku eternit
Paku plepet
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

JUMLAH
DIBULATKAN
SNI
03-2838-2002

SNI
03-2838-2002

SNI
03-2838-2002

SNI
03-2838-2002

1.0000
0.0120
0.0600
1.1000
0.3200
0.0320
0.1800
0.0090

m2
m3
kg
lbr
org
org
org
org

Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet


Kayu kamper balok
Paku biasa
Asbes 1,00 x 1,00 m
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0120
0.0600
1.1000
0.3200
0.0320
0.1800
0.0090

m2
m3
kg
lbr
org
org
org
org

Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet


Kayu kruing balok
Paku biasa
Asbes 1,00 x 1,00 m
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0120
0.0600
1.1000
0.3200
0.0320
0.1800
0.0090

m2
m3
kg
lbr
org
org
org
org

Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet


Kayu bengkirai balok
Paku biasa
Asbes 1,00 x 1,00 m
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0600
1.1000
2.6000
0.0100
0.0100
0.3200
0.0320

m2
kg
lbr
m1
kg
kg
org
org

Langit2 asbes (1,00 x 1,00) m, rangka kayu lama dg plepet


Paku biasa
Asbes 1,00 x 1,00 m
Plepet kayu
Paku eternit
Paku plepet
Tukang kayu
Kepala tukang kayu

SNI
03-2838-2002

SNI
03-2838-2002

SNI
03-2838-2002

0.1800
0.0090

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0120
0.0600
1.1000
2.6000
0.0100
0.0100
0.3200
0.0320
0.1800
0.0090

m2
m3
kg
lbr
m1
kg
kg
org
org
org
org

Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet


Kayu kamper balok
Paku biasa
Asbes 1,00 x 1,00 m
Plepet kayu
Paku eternit
Paku plepet
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0120
0.0600
1.1000
2.6000
0.0100
0.0100
0.3200
0.0320
0.1800
0.0090

m2
m3
kg
lbr
m1
kg
kg
org
org
org
org

Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet


Kayu kruing balok
Paku biasa
Asbes 1,00 x 1,00 m
Plepet kayu
Paku eternit
Paku plepet
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0120
0.0600
1.1000
2.6000
0.0100
0.0100
0.3200
0.0320
0.1800
0.0090

m2
m3
kg
lbr
m1
kg
kg
org
org
org
org

Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet


Kayu bengkirai balok
Paku biasa
Asbes 1,00 x 1,00 m
Plepet kayu
Paku eternit
Paku plepet
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN
6.13

1.0000
0.0130
0.3600
0.0500
0.4500
0.0030
0.0500
0.1200
0.3700
0.0370
0.2400
0.0120

m2
m3
lbr
roll
kg
kg
kg
kg
org
org
org
org

Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper


Kayu kamper
Gypsum board 9 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku gypsum
Paku usuk
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.13

1.0000
0.0130
0.3600
0.0500
0.4500
0.0030
0.0500
0.1200
0.3700
0.0370
0.2400
0.0120

m2
m3
lbr
roll
kg
kg
kg
kg
org
org
org
org

Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing


Kayu kruing
Gypsum board 9 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku gypsum
Paku usuk
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0130
0.3600
0.0500
0.4500
0.0030
0.0500
0.1200
0.3700
0.0370
0.2400

m2
m3
lbr
roll
kg
kg
kg
kg
org
org
org

Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai


Kayu bengkirai
Gypsum board 9 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku gypsum
Paku usuk
Tukang kayu
Kepala tukang kayu
Pekerja

0.0120

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
4.5000
0.3600
0.0500
0.4500
0.0030
0.1500
5.0000
0.3700
0.0370
0.2400
0.0120

m2
m1
lbr
roll
kg
kg
kg
m1
org
org
org
org

Langit-langit gypsum board tebal 9 mm, rangka hollow


Rangka hollow 4x4 cm
Gypsum board 9 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku skrup
Kawat penggantung
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.13

1.0000
0.0130
0.3600
0.0500
0.4500
0.0030
0.0500
0.1200
0.3700
0.0370
0.2400
0.0120

m2
m3
lbr
roll
kg
kg
kg
kg
org
org
org
org

Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper


Kayu kamper
Kalsiboard 3.5 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku gypsum
Paku usuk
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.13

1.0000
0.0130
0.3600
0.0500
0.4500
0.0030
0.0500
0.1200
0.3700
0.0370

m2
m3
lbr
roll
kg
kg
kg
kg
org
org

Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing


Kayu kruing
Kalsiboard 3.5 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku gypsum
Paku usuk
Tukang kayu
Kepala tukang kayu

SNI
03-3438-2002
6.18

0.2400
0.0120

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0130
0.3600
0.0500
0.4500
0.0030
0.0500
0.1200
0.3700
0.0370
0.2400
0.0120

m2
m3
lbr
roll
kg
kg
kg
kg
org
org
org
org

Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai


Kayu bengkirai
Kalsiboard 3.5 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku gypsum
Paku usuk
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
4.5000
0.3600
0.0500
0.4500
0.0030
0.1500
5.0000
0.3700
0.0370
0.2400
0.0120

m2
m1
lbr
roll
kg
kg
kg
m1
org
org
org
org

Langit-langit kalsiboard tebal 3.5 mm, rangka hollow


Rangka hollow 4x4 cm
Kalsiboard 3.5 mm
Kasa gypsum
Tepung gypsum
Alkasit
Paku skrup
Kawat penggantung
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
3.6000
0.1500
1.0000
1.5000
0.5000
0.0500
0.1500
0.0075

m2
m1
kg
bh
lbr
org
org
org
org

Langit-langit akustik 60 x 120 cm + rangka alumunium


Profil alumunium "T"
Kawat seng polos
Ramset / dina bolt
Akustic Armstrong 60 x 120 cm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19
03-2838-2002

1.0000
1.1000
0.7000
0.0035
0.0375
0.0037
0.1125
0.0065

m1
m1
kg
kg
org
org
org
org

Pasang list profil cornees gypsum lebar sampai 5 cm


List profil cornees gypsum
Tepung gypsum
Alkasit
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.8750
0.0044
0.0375
0.0037
0.1125
0.0065

m1
m1
kg
kg
org
org
org
org

Pasang list profil cornees gypsum lebar 5 - 10 cm


List profil cornees gypsum
Tepung gypsum
Alkasit
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
1.0500
0.0053
0.0400
0.0040
0.1125
0.0065

m1
m1
kg
kg
org
org
org
org

Pasang list profil cornees gypsum lebar lebih dari 10 cm


List profil cornees gypsum
Tepung gypsum
Alkasit
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.0100
0.0500
0.0050
0.0500

m1
m1
kg
org
org
org

List langit-langit kayu profil


List kayu profil
Paku
Tukang kayu
Kepala tukang kayu
Pekerja

0.0030

org

PEKERJAAN LISPLANG
1.0000
m1
0.0048
m3
0.0600
kg
0.1000
org
0.0100
org
0.1000
org
0.0050
org

SNI
03-3434-2002

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

Pasang lisplank ukuran (2 x 20) cm, kayu jati


Kayu jati papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0086
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati


Kayu jati papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0048
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal


Papan kayu jati lokal
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0048
0.0600
0.1000
0.0100
0.1000

m1
m3
kg
org
org
org

Pasang lisplank ukuran (2 x 20) cm, kayu kamper


Kayu kamper papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja

SNI
6.52
03-3434-2002

SNI
6.52
03-3434-2002

0.0050

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0086
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper


Kayu kamper papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0048
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran (2 x 20) cm, kayu kruing


Kayu kruing papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0086
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing


Kayu kruing papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0048
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai


Kayu bengkirai papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.52
03-3434-2002

1.0000
0.0086
0.0600
0.1000
0.0100
0.1000
0.0050

m1
m3
kg
org
org
org
org

Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai


Kayu bengkirai papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
0.0250
1.0000
0.3000
1.8000
0.1800
0.6000
0.0300

m2
m3
m2
kg
org
org
org
org

Membuat listplank asbes plat ram kayu kamper


Ram kayu kamper
Asbes plat
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
0.0250
1.0000
0.3000
1.8000
0.1800
0.6000
0.0300

m2
m3
m2
kg
org
org
org
org

Membuat listplank asbes plat ram kayu kruing


Ram kayu kruing
Asbes plat
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
0.0250
1.0000
0.3000
1.8000
0.1800
0.6000
0.0300

m2
m3
m2
kg
org
org
org
org

Membuat listplank asbes plat ram kayu bengkirai


Ram kayu bengkirai
Asbes plat
Paku reng
Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.18

1.0000
0.0040
0.0200
0.0800
0.0080
0.0280
0.0014

m1
m3
kg
org
org
org
org

Mengerjakan papan ruiter kayu kamper 2/20


Kayu kamper papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0040
0.0200
0.0800
0.0080
0.0280
0.0014

m1
m3
kg
org
org
org
org

Mengerjakan papan ruiter kayu kruing 2/20


Kayu kruing papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.0040
0.0200
0.0800
0.0080
0.0280
0.0014

m1
m3
kg
org
org
org
org

Mengerjakan papan ruiter kayu bengkirai 2/20


Kayu bengkirai papan
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN

m1
lbr
kg
m3
kg
org
org
org

Pasang talang datar, seng BJLS 28, papan kayu kamper


Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayu kamper papan
Flincoat
Tukang kayu
Kepala tukang kayu
Pekerja

PEKERJAAN TALANG
1.0000
0.5000
0.0150
0.0096
0.2500
0.4000
0.0250
0.1500

0.0013

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.18

1.0000
0.5000
0.0150
0.0096
0.2500
0.4000
0.0250
0.1500
0.0013

m1
lbr
kg
m3
kg
org
org
org
org

Pasang talang datar, seng BJLS 28, papan kayu kruing


Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayu kruing papan
Flincoat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.18

1.0000
0.5000
0.0150
0.0096
0.2500
0.4000
0.0250
0.1500
0.0013

m1
lbr
kg
m3
kg
org
org
org
org

Pasang talang datar, seng BJLS 28, papan kayu bengkirai


Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayui bengkirai papan
Flincoat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19

1.0000
0.5000
0.0150
0.0190
0.2500
0.4000
0.0250
0.0400
0.0013

m1
lbr
kg
m3
kg
org
org
org
org

Pasang talang miring, seng BJLS 28, papan kayu kamper


Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayu kamper papan
Flincoat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19

1.0000
0.5000

m1
lbr

Pasang talang miring, seng BJLS 28, papan kayu kruing


Seng plat 3' x 6' BJLS 28

0.0150
0.0190
0.2500
0.4000
0.0250
0.0400
0.0013

kg
m3
kg
org
org
org
org

Paku biasa 1/2" - 1"


Kayu kruing papan
Flincoat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.19

1.0000
0.5000
0.0150
0.0190
0.2500
0.4000
0.0250
0.0400
0.0013

m1
lbr
kg
m3
kg
org
org
org
org

Pasang talang miring, seng BJLS 28, papan kayu bengkirai


Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayu bengkirai papan
Flincoat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.18

10.0000
10.0000
225.0000
3.7500
0.3750
2.2500
0.1100

m1
m1
bh
org
org
org
org

Pasang talang torong


Seng BJLS 0,30 ( 60 cm )
Paku sumbat
Tukang besi
Kep. Tk. Besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
TIAP 1M1 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.20

1.0000
0.3000
0.1000
0.0190
0.5000
0.2500
0.0250
0.1500
0.0013

m1
lbr
kg
m3
kg
org
org
org
org

Pasang talang lingkaran D - 10 cm, seng BJLS 28


Seng plat 3' x 6' BJLS 28
Paku biasa 1/2" - 1"
Kayu bengkirai papan
Besi strip
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
SNI
03-3434-2002
6.56

1.0000
0.0195
0.0070
0.1000
0.5600
1.0000
0.4500
0.0450
0.1500
0.0750

m2
m3
m3
kg
kg
lbr
org
org
org
org

Pasang dinding pemisah teakwood rangkap, rangka kayu kam


Kayu kamper balok
Kayu kamper papan
Paku biasa 2" - 5"
Lem kayu
Teakwood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
03-3434-2002
6.57

1.0000
0.0195
0.0070
0.1000
0.5600
1.0000
0.6000
0.0600
0.2000
0.0100

m2
m3
m3
kg
kg
lbr
org
org
org
org

Pas. dinding pemisah plywoodwood rangkap, rangka ky kamp


Kayu kamper balok
Kayu kamper papan
Paku biasa 2" - 5"
Lem kayu
Plywood 4' x 8' x 4 mm
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
03-3434-2002
6.59

1.0000
0.4000
0.0500
0.0750
0.0075
0.0250
0.0013

m2
lbr
kg
org
org
org
org

Pasang plywood tebal 4 mm, untuk dinding


Plywood 4' x 8' x 4 mm
Paku biasa 2" - 5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

m2
org

Pasang genteng lama


Tukang batu

PEKERJAAN ATAP
1.0000
0.1000

0.0100
0.2000
0.0100

org
org
org

Kep. Tk. Batu


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.2

1.0000
25.0000
0.1000
0.0100
0.2000
0.0100

m2
bh
org
org
org
org

Pasang genteng paris


Genteng paris
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.2A

1.0000
25.0000
0.1000
0.0100
0.3000
0.0150

m2
bh
org
org
org
org

Pasang genteng paris untuk rumah tingkat


Genteng paris
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.2A

1.0000
9.0000
0.1000
0.0100
0.2000
0.0100

m2
bh
org
org
org
org

Pasang genteng beton besar Natural ( isi 9 / m2 )


Genteng beton natural
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.2A

1.0000
9.0000
0.1000
0.0100
0.3000
0.0150

m2
bh
org
org
org
org

Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat


Genteng beton natural
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

JUMLAH
DIBULATKAN
H.2A

1.0000
9.0000
0.1000
0.0100
0.2000
0.0100

m2
bh
org
org
org
org

Pasang genteng beton besar Warna ( isi 9 / m2 )


Genteng beton Warna
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.2A

1.0000
9.0000
0.1000
0.0100
0.3000
0.0150

m2
bh
org
org
org
org

Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat


Genteng beton Warna
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.6

1.0000
5.0000
0.0152
0.0152
1.5240
0.2000
0.0200
0.4000
0.0200

m1
bh
m3
m3
kg
org
org
org
org

Pasang bubungan genteng paris


Bubungan genteng paris
Kapur pasang
Pasir pasang
PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

H.6

1.0000
5.0000
0.0152
0.0152
1.5240
0.2000
0.0200
0.4000
0.0200

m1
bh
m3
m3
kg
org
org
org
org

Pasang bubungan genteng beton Natural


Bubungan genteng beton natural
Kapur pasang
Pasir pasang
PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %

JUMLAH
DIBULATKAN
H.6

1.0000
4.0000
0.0152
0.0152
1.5240
0.2000
0.0200
0.4000
0.0200

m1
bh
m3
m3
kg
org
org
org
org

Pasang bubungan genteng beton Warna


Bubungan genteng beton warna
Kapur pasang
Pasir pasang
PC
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.5000
0.1200
0.0750
0.0080
0.1400
0.0080

m2
lbr
kg
org
org
org
org

Pasang atap Asbes gelombang 150105


Asbes gelombang
Paku pancing 60 x 230
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.10
03-3436-2002

1.0000
0.6000
0.1200
0.0700
0.0070
0.1400
0.0070

m2
lbr
kg
org
org
org
org

Pasang atap asbes gelombang 180105


Asbes gelombang 180105
Paku pancing 60 x 230
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.11
03-3436-2002

1.0000
0.7500
0.1200
0.0700
0.0070
0.1400
0.0070

m2
lbr
kg
org
org
org
org

Pasang atap asbes gelombang 210105


Asbes gelombang 210105
Paku pancing 60 x 230
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

SNI
6.8
03-3436-2002

JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.12
03-3436-2002

1.0000
0.3500
0.1200
0.0700
0.0070
0.1400
0.0070

m2
lbr
kg
org
org
org
org

Pasang atap asbes gelombang 240105


Asbes gelombang 240105
Paku pancing 60 x 230
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.14
03-3436-2002

1.0000
0.4400
0.1200
0.0670
0.0070
0.1400
0.0070

m2
lbr
kg
org
org
org
org

Pasang atap asbes gelombang 270105


Asbes gelombang 270105
Paku pancing 60 x 230
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.15
03-3436-2002

1.0000
0.5100
0.1200
0.0670
0.0070
0.1400
0.0070

m2
lbr
kg
org
org
org
org

Pasang atap asbes gelombang 300105


Asbes gelombang 300105
Paku pancing 60 x 230
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.22
03-3436-2002

1.0000
2.4000
6.0000
0.1250
0.0130
0.0840
0.0040

m1
lbr
bh
org
org
org
org

Pasang bubung stel gelombang 0,92 m


Bubung stel gelombang
Paku sekrup 3,5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.23
03-3436-2002

1.0000
2.1000
6.0000
0.1250
0.0130
0.0840
0.0040

m1
lbr
bh
org
org
org
org

Pasang nok stel gelombang 1,05 m


Nok stel gelombang
Paku sekrup 3,5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.24
03-3436-2002

1.0000
2.0500
6.0000
0.1250
0.0130
0.0840
0.0040

m1
lbr
bh
org
org
org
org

Pasang nok stel gelombang 1,08 m


Nok stel gelombang
Paku sekrup 3,5"
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
03-3436-2002
6.32

1.0000
1.0200
0.2000
0.1000
0.0100
0.2000
0.0010

m2
m2
kg
org
org
org
org

Pasang atap genteng metal zinc alume type prima roof


Genteng metal
Paku anti karat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

Mod. SNI
03-3436-2002
6.32

1.0000
1.0200
4.0000
0.1000
0.0100
0.2000
0.0010

m2
m2
bh
org
org
org
org

Pasang atap metal gelombanmg


Atap metal gelombang t 3 mm
Paku/skrup atap anti karat
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH

DIBULATKAN

PEKERJAAN CAT-CATAN
SNI
6.1

1.0000
0.0500
0.1500
0.0025

m2
kg
org
org

Mengikis / mengerok permukaan cat tembok lama


Soda api
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.7

1.0000
0.1500
0.1700
0.1700
0.0750
0.0075
0.0700
0.0025

m2
kg
kg
kg
org
org
org
org

Pengecatan bidang kayu lama


Plamir
Cat dasar
Cat penutup
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.8

1.0000
0.2000
0.1500
0.1700
0.2600
0.0900
0.0060
0.0700
0.0025

m2
kg
kg
kg
kg
org
org
org
org

Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar


Cat meni
Plamir
Cat dasar
Cat penutup
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9

1.0000
0.2000
0.1500
0.1700
0.3500
0.1050
0.0040
0.0700
0.0025

m2
kg
kg
kg
kg
org
org
org
org

Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar


Cat meni
Plamir
Cat dasar
Cat penutup
Tukang cat
Kepala tukang cat
Pekerja
Mandor

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.11

1.0000
0.1500
0.3720
2.0000
0.0600
0.0160
0.0025

m2
ltr
ltr
lbr
org
org
org

Pelaburan bidang kayu dengan politur


Politur
Politur jadi
Amplas
Tukang cat
Kepala tukang cat
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.13

1.0000
0.1500
0.0500
0.1000
0.0100
0.1600
0.0160
0.1600
0.0025

m2
ltr
kg
lbr
bh
org
org
org
org

Pelaburan bidang kayu dengan vernis


Vernis
Dempul
Amplas
Kuas
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.14

1.0000
0.1000
0.1000
0.2600
0.0630
0.0063
0.0200
0.0025

m2
kg
kg
kg
org
org
org
org

Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lap


Plamir tembok
Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.15

1.0000
0.1200
0.1800
0.0420
0.0042
0.0280

m2
kg
kg
org
org
org

Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup


Cat dasar
Cat penutup 2 x
Tukang cat
Kepala tukang cat
Pekerja

0.0025

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.14

1.0000
0.1000
0.3600
0.0630
0.0063
0.0200
0.0025

m2
kg
kg
org
org
org
org

Pengecatan tembok tidak terlindung dari panas dan hujan


Cat alkali resisting primer
Cat ICI Weathershield
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.9

1.0000
0.1670
0.2000
0.1500
0.1050
0.0040
0.0700
0.0025

m2
kg
kg
ltr
org
org
org
org

Pengecatan bidang besi ( 3 x )


Cat meni besi
Cat besi
Thinner
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.20

1.0000
0.1000
0.0100
0.2000
0.0200
0.0200
0.0100

m2
kg
bh
org
org
org
org

Pengecacatan permukaan baja dengan meni besi


Meni besi sinkromat
Kuas
Tukang cat
Kepala tukang cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.21

1.0000
0.1000
0.0100
0.0020
0.2250
0.0225
0.2250

m2
kg
bh
m3
org
org
org

Pengecacatan permukaan baja dengan meni besi memakai per


Meni besi sinkromat
Kuas
Perancah kayu
Tukang cat
Kepala tukang cat
Pekerja

0.0075

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
0.3500
0.1000
0.0050

m2
kg
org
org

Pengetiran kayu ( 2 x )
Tir
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

Empiris

1.0000
0.4250
0.0570
0.1000
0.3000
0.0300
0.2000
0.0100

m2
kg
ltr
lbr
org
org
org
org

Pekerjaan cat duco 3 x


Cat duco
Thinner
Amplas
Tukang cat
Kep. Tk. Cat
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

Empiris

1.0000

m2

0.1200
0.0400
0.0040
0.0667
0.0033

kg
org
org
org
org

Mengerjakan Cat Sungging


Mengerjakan cat dasar
Cat menie kayu
Tukang cat
Kep. Tk. Cat
Pekerja
Mandor
JUMLAH ( A )

0.4250
0.1000
5.0000
0.5000
0.2000
0.0100

kg
ltr
org
org
org
org

SNI

Mengecat dan membuat gradasi tutulan berkali-kali


Cat kayu
Minyak cat
Tukang cat sungging
Kep. Tk. Cat sungging
Pekerja
Mandor
JUMLAH ( B )
JUMLAH A + B ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

31

1.0000
0.3600
0.0630
0.0063
0.0200
0.0025

m2
kg
org
org
org
org

Mengecat genteng
Cat genteng air ICI Weathershield
Tukang cat
Kep. Tk. Cat
Pekerja
Mandor
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN BONGKARAN
AK

1.0000
4.0000
0.4000

m3
org
org

Membongkar pasangan batu kali


Tukang batu
Pekerja
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
2.0000
0.1000

m3
org
org

Membongkar pasangan batu merah dan membersihkan


Tukang batu
Pekerja
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

1.0000
0.2000
8.0000
0.1000

m3
org
org
org

Membongkar beton bertulang dan membersihkan


Tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

AK

10.0000
2.0000
0.1000

m2
org
org

Pekerjaan bongkar lantai tegel untuk dipergunakan lagi


Pekerja
Mandor
JUMLAH ( BELUM PPN )
TIAP 1M2 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

I.6

10.0000
1.2500

m2
org

Mengupas plesteran lama


Pekerja

0.1250

org

Mandor
JUMLAH ( BELUM PPN )
TIAP 1M2 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

I.7

10.0000
2.0000
0.1000

m2
org
org

Membongkar genteng / sirap untuk dipergunakan lagi


Pekerja
Mandor
JUMLAH ( BELUM PPN )
TIAP 1M2 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

I.8

10.0000
0.5000
1.0000

m2
org
org

Membongkar atap seng


Tukang besi
Pekerja
JUMLAH ( BELUM PPN )
TIAP 1M2 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

I.9

10.0000
0.6000
0.0600
2.0000
0.1000

m2
org
org
org
org

Membongkar usuk / reng dipakai lagi


Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
TIAP 1M2 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

10.0000
2.0000
0.1000

m2
org
org

Membongkar usuk / reng tidak dipakai lagi


Pekerja
Mandor
JUMLAH ( BELUM PPN )
TIAP 1M2 ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

L.12

L.14

SNI
6.1

SNI
6.2

1.0000
6.0000
0.6000
4.0000
0.2000

m3
org
org
org
org

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan


Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
0.2000

m3
org
org

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
12.0000
1.2000
4.0000
0.2000

m3
org
org
org
org

Mengerjakan kembali bangunan kayu yang telah dibongkar


Tukang kayu
Kep. Tk. Kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN SANITASI
1.0000
bh
1.0000
bh
6%
x
1.1000
org
0.0010
org
3.3000
org
0.1600
org

1.0000
1.0000
6.0000
0.0100
1.5000
1.5000
1.0000
0.1600

bh
bh
kg
m3
org
org
org
org

Memasang kloset duduk/monoblock


Kloset duduk / monoblock
Harga kloset (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
Memasang kloset jongkok porselen
Kloset jongkok porselen
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.4

SNI
6.5

SNI
6.7

SNI
6.11

1.0000
1.0000
30%
6.0000
0.0100
1.0000
0.1000
1.0000
0.1000

bh
bh
x
kg
m3
org
org
org
org

Memasang urinoir
Urinoir
Harga urinoir (Perlengkapan)
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
12%
6.0000
0.0100
1.4500
0.1500
1.2000
0.1000

bh
bh
x
kg
m3
org
org
org
org

Memasang wastafel
Wastafel
Harga wastafel (Perlengkapan)
PC
Pasir pasang
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
18%
2.7000
0.5400
1.8000
0.1100

bh
bh
x
org
org
org
org

Memasang bak mandi fiberglass volume 0,30 m3


Bak fiberglass
Harga bak(Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
12%
4.5000
0.9000
3.0000

bh
bh
x
org
org
org

Memasang bak fiberglass volume 1 m3 air


Bak fiberglass
Harga bak (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja

SNI
6.14

SNI
6.15

SNI
6.16

0.9000

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
16.0000
3.9200
0.0560
0.0240
0.0700
0.0070
0.1400
0.0070

m1
bh
bh
kg
m3
m3
org
org
org
org

Memasang pipa beton, diameter 15 cm - 20 cm


Pipa beton
Batu bata
PC
Pasir pasang
Pasir urug
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
330.0000
10.3000
0.0610
0.0690
0.1900
0.0190
0.3800
0.0190

m1
bh
bh
kg
m3
m3
org
org
org
org

Memasang pipa beton, diameter 30 cm - 100 cm


Pipa beton
Batu bata
PC
Pasir pasang
Pasir urug
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
87.0000
44.0000
0.0700
0.0700
1.6000
0.0600
1.0150
0.0015
3.2000
0.0160

bh
bh
kg
m3
m3
kg
m3
org
org
org
org

Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm


Batu bata
PC
Pasir pasang
Batu kerikil
Besi beton
Pasir beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH

DIBULATKAN
SNI
6.17

SNI
6.18

SNI
6.19

SNI
6.20

1.0000
150.0000
77.0000
0.1300
0.0200
2.6000
0.0900
0.4730
0.0470
1.4200
0.0710

bh
bh
kg
m3
m3
kg
m3
org
org
org
org

Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm


Batu bata
PC
Pasir pasang
Batu kerikil
Besi beton
Pasir beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
222.0000
114.0000
0.1840
0.0330
4.8500
0.1200
0.7200
0.0720
2.1600
0.1000

bh
bh
kg
m3
m3
kg
m3
org
org
org
org

Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm


Batu bata
PC
Pasir pasang
Batu kerikil
Besi beton
Pasir beton
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0900
0.0090
0.0540
0.0270

m1
m1
x
org
org
org
org

Memasang pipa galvanis diameter 1/2"


Pipa galvanis
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0900

m1
m1
x
org

Memasang pipa galvanis diameter 3/4"


Pipa galvanis
Harga pipa (Perlengkapan)
Tukang batu

SNI
6.21

SNI
6.22

SNI
6.25

SNI
6.26

0.0090
0.0540
0.0270

org
org
org

Kepala tukang batu


Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0900
0.0090
0.0540
0.0270

m1
m1
x
org
org
org
org

Memasang pipa galvanis diameter 1"


Pipa galvanis
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.1800
0.0180
0.1080
0.0054

m1
m1
x
org
org
org
org

Memasang pipa galvanis diameter 1 1/2"


Pipa galvanis
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0600
0.0060
0.0360
0.0018

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 1/2"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0600
0.0060
0.0360

m1
m1
x
org
org
org

Memasang pipa PVC tipe AW diameter 3/4"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja

SNI
6.27

SNI
6.28

SNI
6.29

SNI
6.30

0.0018

org

Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0600
0.0060
0.0360
0.0018

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 1"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0600
0.0060
0.0360
0.0018

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 1 1/2"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0900
0.0090
0.0544
0.0027

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 2"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.0600
0.0060
0.0360
0.0018

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 2 1/2"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
SNI
6.31

SNI
6.32

SNI
6.33

SNI
6.35

1.0000
1.2000
35%
0.1350
0.0135
0.0810
0.0410

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 3"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.2000
35%
0.1350
0.0135
0.0810
0.0410

m1
m1
x
org
org
org
org

Memasang pipa PVC tipe AW diameter 4"


Pipa PVC
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
1.0000
0.3000
0.0300
0.0300
0.0015

bh
bh
set
org
org
org
org

Memasang bak cuci piring stainless steel


Bak cuci stainless steel
Water drain + asesories
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
0.0250
0.1000
0.0100
0.0100
0.0050

bh
bh
bh
org
org
org
org

Memasang kran diameter 3/4" atau 1/2"


Kran air
Seal tape
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH

DIBULATKAN
SNI
6.35

SNI
6.1

SNI

6.16

1.0000
1.0000
0.1000
0.0100
0.0100
0.0050

bh
bh
org
org
org
org

Memasang floor drain


Floor drain
Tukang batu
Kepala tukang batu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN BESI DAN ALUMUNIUM


1.0000
M
Pengelasan Single ( las listrik )
3.0000
kg
Kawat las
1.0000
hari
Peralatan las
0.5000
org
Tukang las
0.0500
org
Kepala tukang las
1.0000
Org
Pekerja
1.0000
Org
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN
1.0000
1.1000
0.0800
0.0060
0.0060
0.0600
0.0003

kg
kg
kg
org
org
org
org

Pasang rangka atap baja


Baja profil IWF
Meni besi
Tukang besi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

m3
m3
m3
kg
org
org
org
org

Pasang rangka atap genteng beton, kayu kelas II

0.0140
0.0072
0.25
0.1
0.1

0.01
0.0050

Kaso-kaso (5 x 7) cm m
Reng (3 x 4) cm
Paku 5 cm dan 10 cm
pekerja
Tukang kayu
Kepala tukang
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SNI
6.2

SNI
6.5

SNI
6.6

SNI
6.8

SNI
6.9

1.0000
1.0000
0.6500
0.0650
0.6500
0.0320

m2
m2
org
org
org
org

Pasang pintu besi baja


Pintu besi baja
Tukang besi konstruksi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
1.2000
0.1200
1.2000
0.0060

m2
m2
org
org
org
org

Pasang pintu gulung besi


Pintu gulung besi
Tukang besi konstruksi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
1.0500
0.1050
1.0500
0.0052

m2
m2
org
org
org
org

Pasang pintu lipat


Pintu lipat
Tukang besi konstruksi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
1.5000
0.1050
1.0500
0.0052

m2
m2
org
org
org
org

Pasang Rolling door


Roll door
Tukang besi konstruksi
Kepala tukang besi
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.0000
1.0500
0.1050

m2
m2
org
org

Pasang pintu alumunium


Pintu alumunium
Tukang besi konstruksi
Kepala tukang besi

SNI
6.12

SNI
6.13

SNI
6.14

SNI
6.15

1.0500
0.0052

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
11.5000
1.2000
0.0120
1.2000
0.0006

m2
m1
org
org
org
org

Pasang teralis besi


Baja strip 2 x 3
Tukang las
Kepala tukang las
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.0200
0.0018
0.1000
0.0100
0.1000
0.0005

m2
m2
kg
m3
org
org
org
org

Pasang kawat harmonika


Kawat harmonika
Paku biasa 1/2" - 1"
Kayu kamper papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.0200
0.0018
0.1000
0.0100
0.1000
0.0005

m2
m2
kg
m3
org
org
org
org

Pasang kawat nyamuk


Kawat nyamuk
Paku biasa 1/2" - 1"
Kayu kamper papan
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.0200
0.0018
0.1000
0.0100

m2
m2
kg
m3
org
org

Pasang kawat kassa


Kawat kassa
Paku biasa 1/2" - 1"
Kayu kamper papan
Tukang kayu
Kepala tukang kayu

SNI
6.17

0.1000
0.0005

org
org

Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

1.0000
1.1000
0.0200
0.0250
0.2000
0.0200
0.2000
0.0010

m2
m2
kg
m2
org
org
org
org

Pasang jendela nako & tralis


Jendela nako
Paku skrup
Besi strip
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

PEKERJAAN KUNCI DAN KACA


6.1

1.0000
1.0000
0.6000
0.0600
0.0600
0.0030

bh
bh
org
org
org
org

Pasang kunci tanam antik


Kunci tanam antik
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.2

1.0000
1.0000
0.5000
0.0100
0.0100
0.0050

bh
bh
org
org
org
org

Pasang kunci tanam biasa


Kunci tanam biasa
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.3

1.0000
1.0000
0.5000
0.0050
0.0050
0.0025

bh
bh
org
org
org
org

Pasang kunci tanam kamar mandi


Kunci tanam kamar mandi
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor

JUMLAH ( BELUM PPN )


JASA 10 %
JUMLAH
DIBULATKAN
6.4

1.0000
1.0000
0.5000
0.0050
0.0050
0.0003

bh
bh
org
org
org
org

Pasang kunci tanam silinder


Kunci silinder
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.5

1.0000
1.0000
0.1500
0.0150
0.0150
0.0008

bh
bh
org
org
org
org

Pasang engsel pintu


Engsel pintu
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.6

1.0000
1.0000
0.1000
0.0100
0.0100
0.0050

bh
bh
org
org
org
org

Pasang engsel jendela kupu-kupu


Engsel jendela
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.7

1.0000
1.0000
0.2000
0.0200
0.0200
0.0100

bh
bh
org
org
org
org

Pasang engsel angin


Engsel angin
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.8

1.0000

bh

Pasang spring knip

1.0000
0.1500
0.0150
0.0150
0.0008

bh
org
org
org
org

Spring knip
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.9

1.0000
1.0000
0.1500
0.0150
0.0150
0.0008

bh
bh
org
org
org
org

Pasang kait angin


Kait angin
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.10

1.0000
1.0000
0.5000
0.0500
0.0500
0.0025

bh
bh
org
org
org
org

Pasang door closer


Door closer
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.11

1.0000
1.0000
0.2000
0.0200
0.0200
0.0010

bh
bh
org
org
org
org

Pasang kunci selot


Kunci selot
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.12

1.0000
1.0000
0.5000
0.0500
0.0500
0.0025

bh
bh
org
org
org
org

Pasang pegangan pintu / door holder


Door holder
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )

JASA 10 %
JUMLAH
DIBULATKAN
6.13

1.0000
1.0000
0.1000
0.0100
0.0100
0.0005

bh
bh
org
org
org
org

Pasang door stop


Door stop
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.14

1.0000
1.0000
0.6000
0.0600
0.0600
0.0030

bh
bh
org
org
org
org

Pasang rel pintu dorong


Rel pintu dorong
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.15

1.0000
1.0000
0.2500
0.0250
0.0250
0.0013

bh
bh
org
org
org
org

Pasang kunci lemari


Kunci lemari
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.16

1.0000
1.1000
0.1500
0.0150
0.0150
0.0008

m2
m2
org
org
org
org

Pasang kaca, tebal 3 mm


Kaca polos
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.17

1.0000
1.1000

m2
m2

Pasang kaca, tebal 5 mm


Kaca polos

0.1500
0.0150
0.0150
0.0008

org
org
org
org

Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.20

1.0000
1.1000
0.1500
0.0150
0.0150
0.0008

m2
m2
org
org
org
org

Pasang kaca cermin, tebal 5 mm


Kaca cermin
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.24

1.0000
1.1000
0.1500
0.0150
0.0150
0.0008

m2
m2
org
org
org
org

Pasang kaca patri, tebal 5 mm


Kaca patri
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

6.17

1.0000
1.1000
15%
0.1500
0.0150
0.0150
0.0008

m1
m1
x
oh
oh
oh
oh

Pasang kusen alumunium


Kusen alumunium
Harga kusen (Perlengkapan)
Tukang alumunium
Kepala tukang
Pekerja
Mandor
JUMLAH ( BELUM PPN )
JASA 10 %
JUMLAH
DIBULATKAN

SATUAN PEKERJAAN

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00
100,000.00
100,000.00
75,000.00

1,237,500.00

ouwplank untuk gedung dan saluran


@ Rp.
2,200,000.00
@ Rp.
14,000.00
@ Rp.
2,800,000.00
@ Rp.
80,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00
@ Rp.
120,000.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

2,200,000.00

78,300
15,000.00
38,375.00
1,200.00
106,700

Upah

Bahan

Jumlah

(3)

(4)

(5)

560,000.00
240,000.00
50,000.00
200,000.00
75,000.00
1,125,000.00
112,500.00
1,237,500.00
1,237,500.00

12,375.00

1,125,000.00
112,500.00
1,237,500.00
1,237,500.00

12,375.00

26,400.00
280.00
19,600.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

7,000.00
6,000.00
13,000.00
1,300.00
14,300.00
14,300.00

46,280.00
4,628.00
50,908.00
50,908.00

77,000.00
109,620.00
9,000.00
57,562.50
20,160.00
2,880.90

62,880.00
6,288.00
69,168.00
69,168.00

13,000.00
1,300.00
14,300.00
14,300.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

220,000.00
80,000.00
80,000.00
80,000.00
70,000.00
120,000.00

79,700.00
220,000.00
120,000.00
70,000.00
120,000.00

ri seng gelombang tinggi 2 meter


@ Rp.
10,000.00
@ Rp.
1,200.00
@ Rp.
27,000.00
@ Rp.
95,000.00
@ Rp.
220,000.00
@ Rp.
2,200,000.00
@ Rp.
15,000.00
@ Rp.
17,500.00
@ Rp.
30,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00
@ Rp.
120,000.00

@ Rp.
@ Rp.

70,000.00
120,000.00

8,910.00
1,400.00
80,000.00
80,000.00
147,000.00
120,000.00
428,400.00
42,840.00
471,240.00
471,240.00

285,133.40
28,513.34
313,646.74
313,646.00

713,533.40
71,353.34
784,886.74
784,886.00

21,917.50
6,600.00
6,000.00
70,000.00
12,000.00
82,000.00
8,200.00
90,200.00
90,200.00

34,517.50
3,451.75
37,969.25
37,969.00

116,517.50
11,651.75
128,169.25
128,169.00

12,500.00
3,000.00
32,400.00
475.00
1,980.00
55,000.00
900.00
7,000.00
6,000.00
2,000.00
28,000.00
2,400.00
38,400.00
3,840.00
42,240.00
42,240.00

28,000.00
4,800.00
32,800.00
3,280.00
36,080.00
36,080.00

113,255.00
11,325.50
124,580.50
124,580.00

151,655.00
15,165.50
166,820.50
166,820.00

32,800.00
3,280.00
36,080.00
36,080.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

70,000.00
120,000.00

70,000.00
120,000.00

70,000.00
120,000.00

70,000.00
120,000.00

47,500.00
80,000.00
70,000.00
120,000.00

36,820.00
6,312.00
43,132.00
4,313.20
47,445.20
47,445.00

51,450.00
8,820.00
60,270.00
6,027.00
66,297.00
66,297.00

43,750.00
7,440.00
51,190.00
5,119.00
56,309.00
56,309.00

87,500.00
15,000.00
102,500.00
10,250.00
112,750.00
112,750.00

57,610.00
9,960.00
67,570.00
6,757.00
74,327.00
74,327.00

43,132.00
4,313.20
47,445.20
47,445.00

60,270.00
6,027.00
66,297.00
66,297.00

51,190.00
5,119.00
56,309.00
56,309.00

102,500.00
10,250.00
112,750.00
112,750.00

67,570.00
6,757.00
74,327.00
74,327.00

95,000.00
80,000.00
51,450.00
8,820.00
140,270.00
14,027.00
154,297.00
154,297.00

95,000.00
9,500.00
104,500.00
104,500.00

235,270.00
23,527.00
258,797.00
258,797.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.

70,000.00
120,000.00

70,000.00
120,000.00

70,000.00
120,000.00

70,000.00
120,000.00

70,000.00
120,000.00

90,000.00
70,000.00
120,000.00

90,000.00

23,100.00
1,200.00
24,300.00
2,430.00
26,730.00
26,730.00

36,120.00
6,000.00
42,120.00
4,212.00
46,332.00
46,332.00

24,300.00
2,430.00
26,730.00
26,730.00

42,120.00
4,212.00
46,332.00
46,332.00

17,500.00
1,200.00
18,700.00
1,870.00
20,570.00
20,570.00

18,700.00
1,870.00
20,570.00
20,570.00

13,440.00
2,280.00
15,720.00
1,572.00
17,292.00
17,292.00

15,720.00
1,572.00
17,292.00
17,292.00

17,500.00
1,200.00
18,700.00
1,870.00
20,570.00
20,570.00

18,700.00
1,870.00
20,570.00
20,570.00

108,000.00
21,000.00
1,200.00
22,200.00
2,220.00
24,420.00
24,420.00

108,000.00
10,800.00
118,800.00
118,800.00

108,000.00

130,200.00
13,020.00
143,220.00
143,220.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

135,000.00
70,000.00
120,000.00

75,000.00
70,000.00
120,000.00

100,000.00
90,000.00
80,000.00
100,000.00
70,000.00
120,000.00

100,000.00
72,500.00
80,000.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

21,000.00
1,200.00
22,200.00
2,220.00
24,420.00
24,420.00

108,000.00
10,800.00
118,800.00
118,800.00

130,200.00
13,020.00
143,220.00
143,220.00

162,000.00
17,500.00
3,000.00
20,500.00
2,050.00
22,550.00
22,550.00

162,000.00
16,200.00
178,200.00
178,200.00

182,500.00
18,250.00
200,750.00
200,750.00

90,000.00
10,500.00
1,800.00
12,300.00
1,230.00
13,530.00
13,530.00

90,000.00
9,000.00
99,000.00
99,000.00

102,300.00
10,230.00
112,530.00
112,530.00

120,000.00
27,000.00
31,200.00
3,900.00
54,600.00
4,680.00
94,380.00
9,438.00
103,818.00
103,818.00

147,000.00
14,700.00
161,700.00
161,700.00

241,380.00
24,138.00
265,518.00
265,518.00

110,000.00
16,602.50
18,320.00
65,280.00
48,000.00
6,000.00
105,000.00
9,000.00
168,000.00

210,202.50

378,202.50

16,800.00
184,800.00
184,800.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
1,200.00
72,500.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

100,000.00
1,200.00
72,500.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

100,000.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

21,020.25
231,222.75
231,222.00

120,000.00
114,504.00
16,602.50
45,840.00
48,000.00
6,000.00
105,000.00
9,000.00
168,000.00
16,800.00
184,800.00
184,800.00

296,946.50
29,694.65
326,641.15
326,641.00

800.00
1,200.00
72,500.00

464,946.50
46,494.65
511,441.15
511,441.00

110,000.00
73,200.00
10,657.50
59,040.00
48,000.00
6,000.00
105,000.00
9,000.00
168,000.00
16,800.00
184,800.00
184,800.00

252,897.50
25,289.75
278,187.25
278,187.00

420,897.50
42,089.75
462,987.25
462,987.00

110,000.00
195,600.00
62,400.00
48,000.00
6,000.00
105,000.00
9,000.00
168,000.00
16,800.00
184,800.00
184,800.00

368,000.00
36,800.00
404,800.00
404,800.00

bata, 1 Pc : 3 Kp : 10 Ps
@ Rp.
@ Rp.
@ Rp.

37,820.25
416,022.75
416,022.00

56,000.00
5,400.00
1,087.50

536,000.00
53,600.00
589,600.00
589,600.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

6,000.00
8,000.00
1,000.00
22,400.00
1,800.00
33,200.00
3,320.00
36,520.00
36,520.00

68,487.50
6,848.75
75,336.25
75,336.00

101,687.50
10,168.75
111,856.25
111,856.00

bata, 1 Pc : 4 Ps
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

800.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

56,000.00
13,800.00
5,160.00
8,000.00
1,000.00
22,400.00
1,800.00
33,200.00
3,320.00
36,520.00
36,520.00

74,960.00
7,496.00
82,456.00
82,456.00

108,160.00
10,816.00
118,976.00
118,976.00

ta, 1 Pc : 3 Kp : 10 Ps
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

800.00
1,200.00
72,500.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

112,000.00
12,096.00
1,993.75
11,100.00
16,000.00
2,000.00
45,500.00
3,600.00
67,100.00
6,710.00
73,810.00
73,810.00

137,189.75
13,718.98
150,908.73
150,908.00

204,289.75
20,428.98
224,718.73
224,718.00

ta, 1 Pc : 4 Ps
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

800.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

112,000.00
31,740.00
11,760.00
16,000.00
2,000.00
45,500.00
3,600.00
67,100.00
6,710.00
73,810.00
73,810.00

155,500.00
15,550.00
171,050.00
171,050.00

222,600.00
22,260.00
244,860.00
244,860.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,000.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,000.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
95,000.00
220,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
95,000.00
220,000.00
80,000.00
100,000.00
70,000.00
120,000.00

25,000.00
15,000.00
4,800.00
8,000.00
1,000.00
35,000.00
3,000.00
47,000.00
4,700.00
51,700.00
51,700.00

44,800.00
4,480.00
49,280.00
49,280.00

91,800.00
9,180.00
100,980.00
100,980.00

80,000.00
15,000.00
4,800.00
8,000.00
1,000.00
35,000.00
3,000.00
47,000.00
4,700.00
51,700.00
51,700.00

99,800.00
9,980.00
109,780.00
109,780.00

146,800.00
14,680.00
161,480.00
161,480.00

403,200.00
51,300.00
178,200.00
28,000.00
3,500.00
140,000.00
12,000.00
183,500.00
18,350.00
201,850.00
201,850.00

632,700.00
63,270.00
695,970.00
695,970.00

261,600.00
49,400.00
191,400.00
20,000.00
2,500.00
115,500.00
9,600.00

816,200.00
81,620.00
897,820.00
897,820.00

147,600.00
14,760.00
162,360.00
162,360.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
1,200.00
120,000.00
220,000.00
80,000.00
100,000.00
70,000.00
120,000.00

502,400.00
50,240.00
552,640.00
552,640.00

650,000.00
65,000.00
715,000.00
715,000.00

70,000.00
73,500.00
48,000.00
143,000.00
80,000.00
10,000.00
420,000.00
36,000.00
546,000.00
54,600.00
600,600.00
600,600.00

334,500.00
33,450.00
367,950.00
367,950.00

880,500.00
88,050.00
968,550.00
968,550.00

1,5 Ps : 2,5 Kr
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

1,200.00
95,000.00
220,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
95,000.00
220,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
95,000.00
220,000.00
80,000.00

480,000.00
45,600.00
176,000.00
28,000.00
3,500.00
140,000.00
120,000.00
291,500.00
29,150.00
320,650.00
320,650.00

701,600.00
70,160.00
771,760.00
771,760.00

993,100.00
99,310.00
1,092,410.00
1,092,410.00

465,600.00
61,750.00
143,000.00
80,000.00
10,000.00
420,000.00
36,000.00
546,000.00
54,600.00
600,600.00
600,600.00

670,350.00
67,035.00
737,385.00
737,385.00

480,000.00
38,000.00
180,400.00
80,000.00

1,216,350.00
121,635.00
1,337,985.00
1,337,985.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
70,000.00
120,000.00

1,200.00
95,000.00
220,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,000.00
16,250.00
80,000.00
100,000.00
70,000.00
120,000.00

9,000.00
16,250.00
80,000.00
100,000.00
70,000.00
120,000.00

2,200,000.00
1,500,000.00
15,000.00
80,000.00

10,000.00
420,000.00
36,000.00
546,000.00
54,600.00
600,600.00
600,600.00

698,400.00
69,840.00
768,240.00
768,240.00

1,244,400.00
124,440.00
1,368,840.00
1,368,840.00

516,000.00
49,020.00
151,800.00
80,000.00
10,000.00
420,000.00
36,000.00
546,000.00
54,600.00
600,600.00
600,600.00

716,820.00
71,682.00
788,502.00
788,502.00

1,262,820.00
126,282.00
1,389,102.00
1,389,102.00

5,250.00
243.75
560.00
70.00
490.00
36.00
1,156.00
115.60
1,271.60
1,271.00

5,493.75
549.38
6,043.13
6,043.00

6,649.75
664.98
7,314.73
7,314.00

9,450.00
243.75
560.00
70.00
490.00
36.00
1,156.00
115.60
1,271.60
1,271.00

9,693.75
969.38
10,663.13
10,663.00

37,400.00
36,000.00
6,000.00
40,000.00

10,849.75
1,084.98
11,934.73
11,934.00

@ Rp.
@ Rp.
@ Rp.

100,000.00
70,000.00
120,000.00

5,000.00
14,000.00
1,200.00
60,200.00
6,020.00
66,220.00
66,220.00

79,400.00
7,940.00
87,340.00
87,340.00

139,600.00
13,960.00
153,560.00
153,560.00

kai multiplek
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,200,000.00
105,000.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

70,000.00

1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
72,500.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

37,400.00
36,435.00
6,000.00
40,000.00
5,000.00
14,000.00
1,200.00
60,200.00
6,020.00
66,220.00
66,220.00

280,000.00
280,000.00
28,000.00
308,000.00
308,000.00

79,835.00
7,983.50
87,818.50
87,818.00

140,035.00
14,003.50
154,038.50
154,038.00

280,000.00
28,000.00
308,000.00
308,000.00

7,813.20
2,508.00
16,000.00
2,000.00
28,000.00
2,400.00
48,400.00
4,840.00
53,240.00
53,240.00

10,321.20
1,032.12
11,353.32
11,353.00

2,208.00
435.00
1,680.00
12,000.00
1,500.00
14,000.00
1,200.00

58,721.20
5,872.12
64,593.32
64,593.00

28,700.00
2,870.00
31,570.00
31,570.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,323.00
432.30
4,755.30
4,755.00

33,023.00
3,302.30
36,325.30
36,325.00

6,240.00
2,400.00
12,000.00
1,500.00
14,000.00
1,200.00
28,700.00
2,870.00
31,570.00
31,570.00

8,640.00
864.00
9,504.00
9,504.00

37,340.00
3,734.00
41,074.00
41,074.00

8,484.00
2,520.00
16,000.00
2,000.00
18,200.00
1,560.00
37,760.00
3,776.00
41,536.00
41,536.00

11,004.00
1,100.40
12,104.40
12,104.00

48,764.00
4,876.40
53,640.40
53,640.00

untuk gedung )
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

600.00
240.00
3,040.00
3,800.00
3,990.00
240.00
11,070.00
1,107.00
12,177.00
12,177.00

840.00
84.00
924.00
924.00

11,910.00
1,191.00
13,101.00
13,101.00

5,184.00
1,920.00
5,600.00
700.00
10,500.00
960.00
17,760.00
1,776.00

7,104.00
710.40

24,864.00
2,486.40

19,536.00
19,536.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

1,200.00
120,000.00
27,500.00
80,000.00
70,000.00
70,000.00
120,000.00

1,200.00
80,000.00
100,000.00
70,000.00
120,000.00

60,000.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

28,000.00
72,500.00
120,000.00
1,200.00
80,000.00
100,000.00
70,000.00
120,000.00

7,814.40
7,814.00

27,350.40
27,350.00

5,184.00
1,920.00
2,750.00
800.00
17,500.00
1,050.00
22,100.00
2,210.00
24,310.00
24,310.00

7,104.00
710.40
7,814.40
7,814.00

29,204.00
2,920.40
32,124.40
32,124.00

4,200.00
2,640.00
330.00
4,900.00
420.00
8,290.00
829.00
9,119.00
9,119.00

4,200.00
420.00
4,620.00
4,620.00

12,490.00
1,249.00
13,739.00
13,739.00

63,000.00
14,100.00
4,200.00
28,000.00
3,500.00
45,500.00
3,600.00
80,600.00
8,060.00
88,660.00
88,660.00

81,300.00
8,130.00
89,430.00
89,430.00

161,900.00
16,190.00
178,090.00
178,090.00

28,000.00
1,160.00
3,840.00
1,200.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00

34,200.00

94,700.00

6,050.00
66,550.00
66,550.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

20,000.00
72,500.00
120,000.00
1,200.00
80,000.00
100,000.00
70,000.00
120,000.00

40,500.00
1,200.00
120,000.00
8,500.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
1,200.00
120,000.00
8,500.00
80,000.00
100,000.00
70,000.00
120,000.00

30,000.00
1,200.00

3,420.00
37,620.00
37,620.00

9,470.00
104,170.00
104,170.00

20,000.00
1,160.00
3,840.00
1,200.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

26,200.00
2,620.00
28,820.00
28,820.00

86,700.00
8,670.00
95,370.00
95,370.00

40,500.00
5,616.00
1,080.00
8,500.00
40,000.00
5,000.00
17,500.00
1,500.00
64,000.00
6,400.00
70,400.00
70,400.00

55,696.00
5,569.60
61,265.60
61,265.00

119,696.00
11,969.60
131,665.60
131,665.00

50,000.00
4,896.00
1,080.00
5,100.00
40,000.00
5,000.00
17,500.00
1,500.00
64,000.00
6,400.00
70,400.00
70,400.00

61,076.00
6,107.60
67,183.60
67,183.00
30,000.00
4,896.00

125,076.00
12,507.60
137,583.60
137,583.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

120,000.00
8,500.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
1,200.00
120,000.00
8,500.00
80,000.00
100,000.00
70,000.00
120,000.00

32,500.00
1,200.00
120,000.00
8,500.00
80,000.00
100,000.00
70,000.00
120,000.00

40,000.00
1,200.00
120,000.00
9,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,080.00
5,100.00
40,000.00
5,000.00
17,500.00
1,500.00
64,000.00
6,400.00
70,400.00
70,400.00

41,076.00
4,107.60
45,183.60
45,183.00

105,076.00
10,507.60
115,583.60
115,583.00

50,000.00
4,896.00
1,080.00
5,100.00
40,000.00
5,000.00
17,500.00
1,500.00
64,000.00
6,400.00
70,400.00
70,400.00

61,076.00
6,107.60
67,183.60
67,183.00

125,076.00
12,507.60
137,583.60
137,583.00

32,500.00
4,896.00
1,080.00
5,100.00
40,000.00
5,000.00
17,500.00
1,500.00
64,000.00
6,400.00
70,400.00
70,400.00

43,576.00
4,357.60
47,933.60
47,933.00

107,576.00
10,757.60
118,333.60
118,333.00

9,200.00
1,440.00
360.00
900.00
2,400.00
300.00
4,200.00
360.00
7,260.00
726.00
7,986.00
7,986.00

11,900.00
1,190.00
13,090.00
13,090.00

19,160.00
1,916.00
21,076.00
21,076.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,500.00
1,200.00
120,000.00
9,000.00
80,000.00
100,000.00
70,000.00
120,000.00

37,500.00
1,200.00
120,000.00
1,312.50
80,000.00
100,000.00
70,000.00
120,000.00

5,850.00
1,980.00
384.00
900.00
2,400.00
300.00
4,200.00
360.00
7,260.00
726.00
7,986.00
7,986.00

9,114.00
911.40
10,025.40
10,025.00

16,374.00
1,637.40
18,011.40
18,011.00

37,500.00
11,160.00
2,160.00
1,968.75
52,000.00
6,500.00
22,400.00
1,920.00
82,820.00
8,282.00
91,102.00
91,102.00

52,788.75
5,278.88
58,067.63
58,067.00

135,608.75
13,560.88
149,169.63
149,169.00

at abu-abu 6 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

38,250.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

38,250.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

41,000.00
4,100.00
45,100.00
45,100.00

at abu-abu 8 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

46,700.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

46,700.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00

101,500.00
10,150.00
111,650.00
111,650.00

60,500.00
6,050.00
66,550.00
66,550.00

49,450.00
4,945.00
54,395.00
54,395.00

109,950.00
10,995.00
120,945.00
120,945.00

m abu-abu 6 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

38,100.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

38,100.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

40,850.00
4,085.00
44,935.00
44,935.00

101,350.00
10,135.00
111,485.00
111,485.00

m abu-abu 8 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

46,700.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

46,700.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

49,450.00
4,945.00
54,395.00
54,395.00

109,950.00
10,995.00
120,945.00
120,945.00

at warna 6 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

43,500.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

43,500.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

46,250.00
4,625.00
50,875.00
50,875.00

106,750.00
10,675.00
117,425.00
117,425.00

at warna 8 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

52,000.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

52,000.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00

54,750.00

115,250.00

6,050.00
66,550.00
66,550.00

5,475.00
60,225.00
60,225.00

11,525.00
126,775.00
126,775.00

m warna 6 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

43,500.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

43,500.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

46,250.00
4,625.00
50,875.00
50,875.00

106,750.00
10,675.00
117,425.00
117,425.00

m warna 8 cm, K-200


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

52,000.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

41,400.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

41,400.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

52,000.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

54,750.00
5,475.00
60,225.00
60,225.00

115,250.00
11,525.00
126,775.00
126,775.00

41,400.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00
66,550.00

44,150.00
4,415.00
48,565.00
48,565.00

104,650.00
10,465.00
115,115.00
115,115.00

41,400.00
2,750.00
20,000.00
2,500.00
35,000.00
3,000.00
60,500.00
6,050.00
66,550.00

44,150.00
4,415.00
48,565.00

104,650.00
10,465.00
115,115.00

66,550.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

32,000.00
27,500.00
30,000.00
70,000.00

4,750,000.00
7,500.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,350,000.00
7,500.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,750,000.00
7,500.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

48,565.00

115,115.00

32,000.00
3,437.50
375.00
17,500.00
21,312.50
2,131.25
23,443.75
23,443.00

32,000.00
3,200.00
35,200.00
35,200.00

53,312.50
5,331.25
58,643.75
58,643.00

5,225,000.00
112,500.00
6,400.00
960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

5,343,900.00
534,390.00
5,878,290.00
5,878,290.00

6,727,900.00
672,790.00
7,400,690.00
7,400,690.00

4,785,000.00
112,500.00
6,400.00
960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

4,903,900.00
490,390.00
5,394,290.00
5,394,290.00

6,287,900.00
628,790.00
6,916,690.00
6,916,690.00

6,325,000.00
112,500.00
6,400.00
960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00

6,443,900.00

7,827,900.00

138,400.00
1,522,400.00
1,522,400.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

7,500.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

644,390.00
7,088,290.00
7,088,290.00

782,790.00
8,610,690.00
8,610,690.00

112,500.00
6,400.00
960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

118,900.00
11,890.00
130,790.00
130,790.00

1,502,900.00
150,290.00
1,653,190.00
1,653,190.00

ai kayu bengkirai
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

6,325,000.00
6,400.00
960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

6,331,400.00
633,140.00
6,964,540.00
6,964,540.00

7,715,400.00
771,540.00
8,486,940.00
8,486,940.00

6,400.00
960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

6,400.00
640.00
7,040.00
7,040.00

1,390,400.00
139,040.00
1,529,440.00
1,529,440.00

1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

2,000.00
200.00
2,200.00
2,200.00

18,300.00
1,830.00
20,130.00
20,130.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
12,000.00
8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

154,000.00
60,000.00
1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

216,000.00
21,600.00
237,600.00
237,600.00

232,300.00
23,230.00
255,530.00
255,530.00

2/3 kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
3,450.00
8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

154,000.00
17,250.00
1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

173,250.00
17,325.00
190,575.00
190,575.00

189,550.00
18,955.00
208,505.00
208,505.00

reng 2/3 kayu jati


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

reng 2/3 kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

20,125.00
12,000.00
8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

20,125.00
3,450.00
8,000.00
8,000.00
80,000.00

44,275.00
60,000.00
1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

106,275.00
10,627.50
116,902.50
116,902.00

44,275.00
17,250.00
1,200.00
800.00
8,000.00

122,575.00
12,257.50
134,832.50
134,832.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
70,000.00
120,000.00

70,000.00
24,000.00
8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

63,525.00
6,352.50
69,877.50
69,877.00

79,825.00
7,982.50
87,807.50
87,807.00

154,000.00
96,000.00
1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

252,000.00
25,200.00
277,200.00
277,200.00

268,300.00
26,830.00
295,130.00
295,130.00

reng 3/4 kayu jati lokal


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

reng 3/4 kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

20,125.00
9,600.00
8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

20,125.00
6,900.00
8,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

44,275.00
38,400.00
1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

84,675.00
8,467.50
93,142.50
93,142.00

100,975.00
10,097.50
111,072.50
111,072.00

44,275.00
27,600.00
1,200.00
800.00
8,000.00
1,000.00
7,000.00
300.00
16,300.00
1,630.00
17,930.00
17,930.00

73,875.00
7,387.50
81,262.50
81,262.00

90,175.00
9,017.50
99,192.50
99,192.00

kayu jati (klas plitur)


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

20,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

22,000,000.00
1,600,000.00
200,000.00
420,000.00
36,000.00
2,256,000.00
225,600.00
2,481,600.00
2,481,600.00

22,000,000.00
2,200,000.00
24,200,000.00
24,200,000.00

24,256,000.00
2,425,600.00
26,681,600.00
26,681,600.00

kayu jati (lokal)


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,750,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,350,000.00
80,000.00
100,000.00
70,000.00
120,000.00

8,800,000.00
1,600,000.00
200,000.00
420,000.00
36,000.00
2,256,000.00
225,600.00
2,481,600.00
2,481,600.00

8,800,000.00
880,000.00
9,680,000.00
9,680,000.00

5,700,000.00
1,440,000.00
200,000.00
420,000.00
36,000.00
2,096,000.00
209,600.00
2,305,600.00
2,305,600.00

5,700,000.00
570,000.00
6,270,000.00
6,270,000.00

7,800,000.00
80,000.00
100,000.00
70,000.00

7,796,000.00
779,600.00
8,575,600.00
8,575,600.00

5,220,000.00
1,440,000.00
200,000.00
420,000.00
36,000.00
2,096,000.00
209,600.00
2,305,600.00
2,305,600.00

5,220,000.00
522,000.00
5,742,000.00
5,742,000.00

kayu bengkirai
@ Rp.
@ Rp.
@ Rp.
@ Rp.

11,056,000.00
1,105,600.00
12,161,600.00
12,161,600.00

9,360,000.00
1,440,000.00
200,000.00
420,000.00

7,316,000.00
731,600.00
8,047,600.00
8,047,600.00

@ Rp.

120,000.00

36,000.00
2,096,000.00
209,600.00
2,305,600.00
2,305,600.00

9,360,000.00
936,000.00
10,296,000.00
10,296,000.00

11,456,000.00
1,145,600.00
12,601,600.00
12,601,600.00

, rangka kayu jati


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

22,000,000.00
8,000.00
11,000.00
69,500.00
80,000.00
100,000.00
70,000.00
120,000.00

431,200.00
240.00
3,300.00
69,500.00
160,000.00
20,000.00
42,000.00
3,600.00
225,600.00
22,560.00
248,160.00
248,160.00

504,240.00
50,424.00
554,664.00
554,664.00

729,840.00
72,984.00
802,824.00
802,824.00

, rangka kayu jati lokal


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,200,000.00
8,000.00
11,000.00
69,500.00
80,000.00
100,000.00
70,000.00
120,000.00

160,720.00
240.00
3,300.00
69,500.00
160,000.00
20,000.00
42,000.00
3,600.00
225,600.00
22,560.00
248,160.00
248,160.00

233,760.00
23,376.00
257,136.00
257,136.00

459,360.00
45,936.00
505,296.00
505,296.00

, rangka kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,500,000.00
8,000.00
11,000.00
69,500.00
80,000.00
100,000.00
70,000.00
120,000.00

107,800.00
240.00
3,300.00
69,500.00
160,000.00
20,000.00
42,000.00
3,600.00
225,600.00
22,560.00
248,160.00
248,160.00

180,840.00
18,084.00
198,924.00
198,924.00

, rangka kayu kruing


@ Rp.

4,750,000.00

93,100.00

406,440.00
40,644.00
447,084.00
447,084.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,000.00
11,000.00
69,500.00
80,000.00
100,000.00
70,000.00
120,000.00

240.00
3,300.00
69,500.00
160,000.00
20,000.00
42,000.00
3,600.00
225,600.00
22,560.00
248,160.00
248,160.00

166,140.00
16,614.00
182,754.00
182,754.00

391,740.00
39,174.00
430,914.00
430,914.00

, rangka kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,000,000.00
8,000.00
11,000.00
69,500.00
80,000.00
100,000.00
70,000.00
120,000.00

22,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

117,600.00
240.00
3,300.00
69,500.00
160,000.00
20,000.00
42,000.00
3,600.00
225,600.00
22,560.00
248,160.00
248,160.00

190,640.00
19,064.00
209,704.00
209,704.00

416,240.00
41,624.00
457,864.00
457,864.00

770,000.00
160,000.00
20,000.00
56,000.00
4,800.00
240,800.00
24,080.00
264,880.00
264,880.00

770,000.00
77,000.00
847,000.00
847,000.00

1,010,800.00
101,080.00
1,111,880.00
1,111,880.00

ayu jati lokal


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.

8,200,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,500,000.00

287,000.00
160,000.00
20,000.00
56,000.00
4,800.00
240,800.00
24,080.00
264,880.00
264,880.00

287,000.00
28,700.00
315,700.00
315,700.00

192,500.00

527,800.00
52,780.00
580,580.00
580,580.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

80,000.00
100,000.00
70,000.00
120,000.00

4,750,000.00
80,000.00
100,000.00
70,000.00
120,000.00

160,000.00
20,000.00
56,000.00
4,800.00
240,800.00
24,080.00
264,880.00
264,880.00

192,500.00
19,250.00
211,750.00
211,750.00

433,300.00
43,330.00
476,630.00
476,630.00

166,250.00
160,000.00
20,000.00
56,000.00
4,800.00
240,800.00
24,080.00
264,880.00
264,880.00

166,250.00
16,625.00
182,875.00
182,875.00

407,050.00
40,705.00
447,755.00
447,755.00

ayu bengkirai
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

210,000.00
160,000.00
20,000.00
56,000.00
4,800.00
240,800.00
24,080.00
264,880.00
264,880.00

210,000.00
21,000.00
231,000.00
231,000.00

450,800.00
45,080.00
495,880.00
495,880.00

a panil kayu jati


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

22,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

880,000.00
200,000.00
25,000.00
70,000.00
6,000.00
301,000.00
30,100.00
331,100.00
331,100.00

880,000.00
88,000.00
968,000.00
968,000.00

1,181,000.00
118,100.00
1,299,100.00
1,299,100.00

a panil kayu jati lokal


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,200,000.00
80,000.00
100,000.00
70,000.00
120,000.00

328,000.00
200,000.00
25,000.00
70,000.00
6,000.00
301,000.00
30,100.00

328,000.00
32,800.00

629,000.00
62,900.00

331,100.00
331,100.00

360,800.00
360,800.00

691,900.00
691,900.00

a panil kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,500,000.00
80,000.00
100,000.00
70,000.00
120,000.00

220,000.00
200,000.00
25,000.00
70,000.00
6,000.00
301,000.00
30,100.00
331,100.00
331,100.00

220,000.00
22,000.00
242,000.00
242,000.00

521,000.00
52,100.00
573,100.00
573,100.00

a panil kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
80,000.00
100,000.00
70,000.00
120,000.00

190,000.00
200,000.00
25,000.00
70,000.00
6,000.00
301,000.00
30,100.00
331,100.00
331,100.00

190,000.00
19,000.00
209,000.00
209,000.00

491,000.00
49,100.00
540,100.00
540,100.00

a panil kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

6,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

22,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

8,200,000.00
80,000.00

240,000.00
200,000.00
25,000.00
70,000.00
6,000.00
301,000.00
30,100.00
331,100.00
331,100.00

240,000.00
24,000.00
264,000.00
264,000.00

541,000.00
54,100.00
595,100.00
595,100.00

1,408,000.00
240,000.00
30,000.00
70,000.00
36,000.00
376,000.00
37,600.00
413,600.00
413,600.00

1,408,000.00
140,800.00
1,548,800.00
1,548,800.00

524,800.00
240,000.00

1,784,000.00
178,400.00
1,962,400.00
1,962,400.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
70,000.00
120,000.00

5,500,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,750,000.00
80,000.00
100,000.00
70,000.00
120,000.00

30,000.00
70,000.00
36,000.00
376,000.00
37,600.00
413,600.00
413,600.00

524,800.00
52,480.00
577,280.00
577,280.00

900,800.00
90,080.00
990,880.00
990,880.00

352,000.00
240,000.00
30,000.00
70,000.00
6,000.00
346,000.00
34,600.00
380,600.00
380,600.00

352,000.00
35,200.00
387,200.00
387,200.00

698,000.00
69,800.00
767,800.00
767,800.00

304,000.00
240,000.00
30,000.00
70,000.00
6,000.00
346,000.00
34,600.00
380,600.00
380,600.00

304,000.00
30,400.00
334,400.00
334,400.00

650,000.00
65,000.00
715,000.00
715,000.00

kayu bengkirai
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,000,000.00
80,000.00
100,000.00
70,000.00
120,000.00

384,000.00
240,000.00
30,000.00
70,000.00
6,000.00
346,000.00
34,600.00
380,600.00
380,600.00

384,000.00
38,400.00
422,400.00
422,400.00

730,000.00
73,000.00
803,000.00
803,000.00

0 x 1,00) m, kayu lama


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

800.00
20,000.00
2,500.00
10,500.00
900.00
33,900.00
3,390.00

800.00
80.00

34,700.00
3,470.00

37,290.00
37,290.00

0 x 1,00) m, kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

880.00
880.00

38,170.00
38,170.00

57,000.00
800.00
20,000.00
2,500.00
10,500.00
900.00
33,900.00
3,390.00
37,290.00
37,290.00

57,800.00
5,780.00
63,580.00
63,580.00

91,700.00
9,170.00
100,870.00
100,870.00

0 x 1,00) m, kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

0 x 1,00) m, kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,350,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

52,200.00
800.00
20,000.00
2,500.00
10,500.00
900.00
33,900.00
3,390.00
37,290.00
37,290.00

53,000.00
5,300.00
58,300.00
58,300.00

86,900.00
8,690.00
95,590.00
95,590.00

69,000.00
800.00
20,000.00
2,500.00
10,500.00
900.00
33,900.00
3,390.00
37,290.00
37,290.00

69,800.00
6,980.00
76,780.00
76,780.00

103,700.00
10,370.00
114,070.00
114,070.00

x 120) m, kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

61,750.00
960.00
21,600.00
2,700.00
11,900.00
1,020.00
37,220.00
3,722.00

62,710.00
6,271.00

99,930.00
9,993.00

40,942.00
40,942.00

68,981.00
68,981.00

109,923.00
109,923.00

x 120) m, kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,350,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

56,550.00
960.00
21,600.00
2,700.00
11,900.00
1,020.00
37,220.00
3,722.00
40,942.00
40,942.00

57,510.00
5,751.00
63,261.00
63,261.00

94,730.00
9,473.00
104,203.00
104,203.00

x 120) m, kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

74,750.00
960.00
21,600.00
2,700.00
11,900.00
1,020.00
37,220.00
3,722.00
40,942.00
40,942.00

75,710.00
7,571.00
83,281.00
83,281.00

112,930.00
11,293.00
124,223.00
124,223.00

m tanpa plepet
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

10,000.00
11,500.00
80,000.00
100,000.00
70,000.00
120,000.00

11,000.00
115.00
5,600.00
700.00
2,100.00
180.00
8,580.00
858.00
9,438.00
9,438.00

11,115.00
1,111.50
12,226.50
12,226.00

19,695.00
1,969.50
21,664.50
21,664.00

m memakai plepet
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

10,000.00
2,000.00
11,500.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

11,000.00
5,200.00
115.00
100.00
5,600.00
700.00
2,100.00
180.00
8,580.00
858.00

16,415.00
1,641.50

24,995.00
2,499.50

ngka kamper tanpa plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

ngka kruing tanpa plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

ngka bengkirai tanpa plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

ngka kayu lama dg plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

9,438.00
9,438.00

4,750,000.00
10,000.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,350,000.00
10,000.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,750,000.00
10,000.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

10,000.00
10,000.00
2,000.00
11,500.00
10,000.00
80,000.00
100,000.00

18,056.50
18,056.00

27,494.50
27,494.00

57,000.00
600.00
11,000.00
25,600.00
3,200.00
12,600.00
1,080.00
42,480.00
4,248.00
46,728.00
46,728.00

68,600.00
6,860.00
75,460.00
75,460.00

111,080.00
11,108.00
122,188.00
122,188.00

52,200.00
600.00
11,000.00
25,600.00
3,200.00
12,600.00
1,080.00
42,480.00
4,248.00
46,728.00
46,728.00

63,800.00
6,380.00
70,180.00
70,180.00

106,280.00
10,628.00
116,908.00
116,908.00

69,000.00
600.00
11,000.00
25,600.00
3,200.00
12,600.00
1,080.00
42,480.00
4,248.00
46,728.00
46,728.00

80,600.00
8,060.00
88,660.00
88,660.00

600.00
11,000.00
5,200.00
115.00
100.00
25,600.00
3,200.00

123,080.00
12,308.00
135,388.00
135,388.00

@ Rp.
@ Rp.

ngka kayu kamper dg plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

ngka kayu kruing dg plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

ngka ky bengkirai dg plepet


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

4,750,000.00
10,000.00
10,000.00
2,000.00
11,500.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,350,000.00
10,000.00
10,000.00
2,000.00
11,500.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,750,000.00
10,000.00
10,000.00
2,000.00
11,500.00
10,000.00
80,000.00
100,000.00
70,000.00
120,000.00

12,600.00
1,080.00
42,480.00
4,248.00
46,728.00
46,728.00

17,015.00
1,701.50
18,716.50
18,716.00

59,495.00
5,949.50
65,444.50
65,444.00

57,000.00
600.00
11,000.00
5,200.00
115.00
100.00
25,600.00
3,200.00
12,600.00
1,080.00
42,480.00
4,248.00
46,728.00
46,728.00

74,015.00
7,401.50
81,416.50
81,416.00

116,495.00
11,649.50
128,144.50
128,144.00

52,200.00
600.00
11,000.00
5,200.00
115.00
100.00
25,600.00
3,200.00
12,600.00
1,080.00
42,480.00
4,248.00
46,728.00
46,728.00

69,215.00
6,921.50
76,136.50
76,136.00

69,000.00
600.00
11,000.00
5,200.00
115.00
100.00
25,600.00
3,200.00
12,600.00
1,080.00

111,695.00
11,169.50
122,864.50
122,864.00

42,480.00
4,248.00
46,728.00
46,728.00

86,015.00
8,601.50
94,616.50
94,616.00

128,495.00
12,849.50
141,344.50
141,344.00

a 60 x 120 kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
42,000.00
10,000.00
3,500.00
300,000.00
20,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

61,750.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
29,600.00
3,700.00
16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

81,805.00
8,180.50
89,985.50
89,985.00

133,345.00
13,334.50
146,679.50
146,679.00

a 60 x 120 kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,350,000.00
42,000.00
10,000.00
3,500.00
300,000.00
20,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

56,550.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
29,600.00
3,700.00
16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

76,605.00
7,660.50
84,265.50
84,265.00

a 60 x 120 ky bengkirai
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,750,000.00
42,000.00
10,000.00
3,500.00
300,000.00
20,000.00
8,000.00
80,000.00
100,000.00
70,000.00

74,750.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
29,600.00
3,700.00
16,800.00

128,145.00
12,814.50
140,959.50
140,959.00

@ Rp.

120,000.00

1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

94,805.00
9,480.50
104,285.50
104,285.00

146,345.00
14,634.50
160,979.50
160,979.00

l 9 mm, rangka hollow


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

ngka 60 x 120 ky kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

9,500.00
42,000.00
10,000.00
3,500.00
300,000.00
10,000.00
500.00
80,000.00
100,000.00
70,000.00
120,000.00

4,750,000.00
46,200.00
10,000.00
3,500.00
300,000.00
20,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

42,750.00
15,120.00
500.00
1,575.00
900.00
1,500.00
2,500.00
29,600.00
3,700.00
16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

64,845.00
6,484.50
71,329.50
71,329.00

61,750.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00
29,600.00
3,700.00
16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

83,317.00
8,331.70
91,648.70
91,648.00

ngka 60 x 120 ky kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,350,000.00
46,200.00
10,000.00
3,500.00
300,000.00
20,000.00
8,000.00
80,000.00
100,000.00

116,385.00
11,638.50
128,023.50
128,023.00

56,550.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00
29,600.00
3,700.00

134,857.00
13,485.70
148,342.70
148,342.00

@ Rp.
@ Rp.

ngka 60 x 120 ky bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

5,750,000.00
46,200.00
10,000.00
3,500.00
300,000.00
20,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

78,117.00
7,811.70
85,928.70
85,928.00

129,657.00
12,965.70
142,622.70
142,622.00

74,750.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00
29,600.00
3,700.00
16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

96,317.00
9,631.70
105,948.70
105,948.00

147,857.00
14,785.70
162,642.70
162,642.00

5 mm, rangka hollow


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

9,500.00
46,200.00
10,000.00
3,500.00
300,000.00
10,000.00
500.00
80,000.00
100,000.00
70,000.00
120,000.00

42,750.00
16,632.00
500.00
1,575.00
900.00
1,500.00
2,500.00
29,600.00
3,700.00
16,800.00
1,440.00
51,540.00
5,154.00
56,694.00
56,694.00

66,357.00
6,635.70
72,992.70
72,992.00

m + rangka alumunium
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

20,000.00
9,500.00
2,500.00
125,000.00
80,000.00
100,000.00
70,000.00
120,000.00

72,000.00
1,425.00
2,500.00
187,500.00
40,000.00
5,000.00
10,500.00
900.00

117,897.00
11,789.70
129,686.70
129,686.00

56,400.00
5,640.00
62,040.00
62,040.00

263,425.00
26,342.50
289,767.50
289,767.00

319,825.00
31,982.50
351,807.50
351,807.00

m lebar sampai 5 cm
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,000.00
3,500.00
300,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,400.00
2,450.00
1,050.00
3,000.00
370.00
7,875.00
780.00
12,025.00
1,202.50
13,227.50
13,227.00

7,900.00
790.00
8,690.00
8,690.00

19,925.00
1,992.50
21,917.50
21,917.00

m lebar 5 - 10 cm
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

m lebar lebih dari 10 cm


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,000.00
3,500.00
300,000.00
80,000.00
100,000.00
70,000.00
120,000.00

15,000.00
3,500.00
300,000.00
80,000.00
100,000.00
70,000.00
120,000.00

5,500.00
10,000.00
80,000.00
100,000.00
70,000.00

8,800.00
3,062.50
1,320.00
3,000.00
370.00
7,875.00
780.00
12,025.00
1,202.50
13,227.50
13,227.00

13,182.50
1,318.25
14,500.75
14,500.00

25,207.50
2,520.75
27,728.25
27,728.00

16,500.00
3,675.00
1,590.00
3,200.00
400.00
7,875.00
780.00
12,255.00
1,225.50
13,480.50
13,480.00

21,765.00
2,176.50
23,941.50
23,941.00

6,050.00
100.00
4,000.00
500.00
3,500.00

34,020.00
3,402.00
37,422.00
37,422.00

@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

120,000.00

22,000,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

360.00
8,360.00
836.00
9,196.00
9,196.00

6,150.00
615.00
6,765.00
6,765.00

14,510.00
1,451.00
15,961.00
15,961.00

105,600.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

106,080.00
10,608.00
116,688.00
116,688.00

122,680.00
12,268.00
134,948.00
134,948.00

20) cm, kayu jati


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

22,000,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

189,200.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

189,680.00
18,968.00
208,648.00
208,648.00

206,280.00
20,628.00
226,908.00
226,908.00

cm, kayu jati lokal


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,200,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

39,360.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

39,840.00
3,984.00
43,824.00
43,824.00

cm, kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,500,000.00
8,000.00
80,000.00
100,000.00
70,000.00

26,400.00
480.00
8,000.00
1,000.00
7,000.00

56,440.00
5,644.00
62,084.00
62,084.00

@ Rp.

120,000.00

600.00
16,600.00
1,660.00
18,260.00
18,260.00

26,880.00
2,688.00
29,568.00
29,568.00

43,480.00
4,348.00
47,828.00
47,828.00

20) cm, kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,500,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

47,300.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

47,780.00
4,778.00
52,558.00
52,558.00

64,380.00
6,438.00
70,818.00
70,818.00

cm, kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

22,800.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

23,280.00
2,328.00
25,608.00
25,608.00

39,880.00
3,988.00
43,868.00
43,868.00

20) cm, kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

40,850.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

41,330.00
4,133.00
45,463.00
45,463.00

57,930.00
5,793.00
63,723.00
63,723.00

cm, kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,000,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

28,800.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00

29,280.00

45,880.00

1,660.00
18,260.00
18,260.00

2,928.00
32,208.00
32,208.00

4,588.00
50,468.00
50,468.00

20) cm, kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,000,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

51,600.00
480.00
8,000.00
1,000.00
7,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

52,080.00
5,208.00
57,288.00
57,288.00

68,680.00
6,868.00
75,548.00
75,548.00

m kayu kamper
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,750,000.00
10,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

118,750.00
10,000.00
2,400.00
144,000.00
18,000.00
42,000.00
3,600.00
207,600.00
20,760.00
228,360.00
228,360.00

131,150.00
13,115.00
144,265.00
144,265.00

338,750.00
33,875.00
372,625.00
372,625.00

m kayu kruing
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,350,000.00
10,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

108,750.00
10,000.00
2,400.00
144,000.00
18,000.00
42,000.00
3,600.00
207,600.00
20,760.00
228,360.00
228,360.00

121,150.00
12,115.00
133,265.00
133,265.00

m kayu bengkirai
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,750,000.00
10,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

143,750.00
10,000.00
2,400.00
144,000.00
18,000.00
42,000.00
3,600.00

328,750.00
32,875.00
361,625.00
361,625.00

207,600.00
20,760.00
228,360.00
228,360.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

5,500,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

4,750,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

156,150.00
15,615.00
171,765.00
171,765.00

363,750.00
36,375.00
400,125.00
400,125.00

22,000.00
160.00
6,400.00
800.00
1,960.00
168.00
9,328.00
932.80
10,260.80
10,260.00

22,160.00
2,216.00
24,376.00
24,376.00

31,488.00
3,148.80
34,636.80
34,636.00

19,000.00
160.00
6,400.00
800.00
1,960.00
168.00
9,328.00
932.80
10,260.80
10,260.00

19,160.00
1,916.00
21,076.00
21,076.00

28,488.00
2,848.80
31,336.80
31,336.00

bengkirai 2/20
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

6,000,000.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

24,000.00
160.00
6,400.00
800.00
1,960.00
168.00
9,328.00
932.80
10,260.80
10,260.00

24,160.00
2,416.00
26,576.00
26,576.00

28, papan kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

44,000.00
8,000.00
5,500,000.00
35,000.00
80,000.00
100,000.00
70,000.00

22,000.00
120.00
52,800.00
8,750.00
32,000.00
2,500.00
10,500.00

33,488.00
3,348.80
36,836.80
36,836.00

@ Rp.

120,000.00

150.00
45,150.00
4,515.00
49,665.00
49,665.00

83,670.00
8,367.00
92,037.00
92,037.00

128,820.00
12,882.00
141,702.00
141,702.00

28, papan kayu kruing


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

28, papan kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

S 28, papan kayu kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

44,000.00
8,000.00
4,750,000.00
35,000.00
80,000.00
100,000.00
70,000.00
120,000.00

44,000.00
8,000.00
6,000,000.00
35,000.00
80,000.00
100,000.00
70,000.00
120,000.00

44,000.00
8,000.00
5,500,000.00
35,000.00
80,000.00
100,000.00
70,000.00
120,000.00

22,000.00
120.00
45,600.00
8,750.00
32,000.00
2,500.00
10,500.00
150.00
45,150.00
4,515.00
49,665.00
49,665.00

76,470.00
7,647.00
84,117.00
84,117.00

22,000.00
120.00
57,600.00
8,750.00
32,000.00
2,500.00
10,500.00
150.00
45,150.00
4,515.00
49,665.00
49,665.00

88,470.00
8,847.00
97,317.00
97,317.00

44,000.00

133,620.00
13,362.00
146,982.00
146,982.00

22,000.00
120.00
104,500.00
8,750.00
32,000.00
2,500.00
2,800.00
150.00
37,450.00
3,745.00
41,195.00
41,195.00

135,370.00
13,537.00
148,907.00
148,907.00

S 28, papan kayu kruing


@ Rp.

121,620.00
12,162.00
133,782.00
133,782.00

22,000.00

172,820.00
17,282.00
190,102.00
190,102.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

S 28, papan kayu bengkirai


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

8,000.00
4,750,000.00
35,000.00
80,000.00
100,000.00
70,000.00
120,000.00

44,000.00
8,000.00
6,000,000.00
35,000.00
80,000.00
100,000.00
70,000.00
120,000.00

20,000.00
400.00
80,000.00
100,000.00
70,000.00
120,000.00

120.00
90,250.00
8,750.00
32,000.00
2,500.00
2,800.00
150.00
37,450.00
3,745.00
41,195.00
41,195.00

121,120.00
12,112.00
133,232.00
133,232.00

158,570.00
15,857.00
174,427.00
174,427.00

22,000.00
120.00
114,000.00
8,750.00
32,000.00
2,500.00
2,800.00
150.00
37,450.00
3,745.00
41,195.00
41,195.00

144,870.00
14,487.00
159,357.00
159,357.00

182,320.00
18,232.00
200,552.00
200,552.00

200,000.00
90,000.00
300,000.00
37,500.00
157,500.00
13,200.00
508,200.00

290,000.00

798,200.00

50,820.00
5,082.00
55,902.00
55,902.00

29,000.00
2,900.00
31,900.00
31,900.00

79,820.00
7,982.00
87,802.00
87,802.00

0 cm, seng BJLS 28


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

44,000.00
8,000.00
6,000,000.00
8,800.00
80,000.00
100,000.00
70,000.00
120,000.00

13,200.00
800.00
114,000.00
4,400.00
20,000.00
2,500.00
10,500.00
150.00
33,150.00

132,400.00

165,550.00

3,315.00
36,465.00
36,465.00

od rangkap, rangka kayu kamper


@ Rp.
4,750,000.00
@ Rp.
5,500,000.00
@ Rp.
8,000.00
@ Rp.
11,000.00
@ Rp.
69,500.00
@ Rp.
80,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00
@ Rp.
120,000.00

ood rangkap, rangka ky kamper


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.

4,750,000.00
5,500,000.00
8,000.00
11,000.00
41,250.00
80,000.00
100,000.00
70,000.00
120,000.00

41,250.00
8,000.00
80,000.00
100,000.00
70,000.00
120,000.00

80,000.00

13,240.00
145,640.00
145,640.00

16,555.00
182,105.00
182,105.00

92,625.00
38,500.00
800.00
6,160.00
36,000.00
4,500.00
10,500.00
9,000.00
60,000.00
6,000.00
66,000.00
66,000.00

138,085.00
13,808.50
151,893.50
151,893.00

198,085.00
19,808.50
217,893.50
217,893.00

92,625.00
38,500.00
800.00
6,160.00
41,250.00
48,000.00
6,000.00
14,000.00
1,200.00
69,200.00
6,920.00
76,120.00
76,120.00

179,335.00
17,933.50
197,268.50
197,268.00

248,535.00
24,853.50
273,388.50
273,388.00

16,500.00
400.00
6,000.00
750.00
1,750.00
156.00
8,656.00
865.60
9,521.60
9,521.00

8,000.00

16,900.00
1,690.00
18,590.00
18,590.00

25,556.00
2,555.60
28,111.60
28,111.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
70,000.00
120,000.00

600.00
80,000.00
100,000.00
70,000.00
120,000.00

600.00
80,000.00
100,000.00
70,000.00
120,000.00

1,000.00
14,000.00
1,200.00
24,200.00
2,420.00
26,620.00
26,620.00

24,200.00
2,420.00
26,620.00
26,620.00

15,000.00
8,000.00
1,000.00
14,000.00
1,200.00
24,200.00
2,420.00
26,620.00
26,620.00

15,000.00
1,500.00
16,500.00
16,500.00

39,200.00
3,920.00
43,120.00
43,120.00

15,000.00
8,000.00
1,000.00
21,000.00
1,800.00
31,800.00
3,180.00
34,980.00
34,980.00

15,000.00
1,500.00
16,500.00
16,500.00

46,800.00
4,680.00
51,480.00
51,480.00

tural ( isi 9 / m2 )
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

al ( isi 9 / m2 ) untuk r. tingkat


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,750.00
80,000.00
100,000.00
70,000.00
120,000.00

2,750.00
80,000.00
100,000.00
70,000.00
120,000.00

24,750.00
8,000.00
1,000.00
14,000.00
1,200.00
24,200.00
2,420.00
26,620.00
26,620.00

24,750.00
2,475.00
27,225.00
27,225.00

48,950.00
4,895.00
53,845.00
53,845.00

24,750.00
8,000.00
1,000.00
21,000.00
1,800.00
31,800.00
3,180.00

24,750.00
2,475.00

56,550.00
5,655.00

34,980.00
34,980.00

27,225.00
27,225.00

62,205.00
62,205.00

rna ( isi 9 / m2 )
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

( isi 9 / m2 ) untuk r. tingkat


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,500.00
80,000.00
100,000.00
70,000.00
120,000.00

4,500.00
80,000.00
100,000.00
70,000.00
120,000.00

1,700.00
72,500.00
120,000.00
1,200.00
27,500.00
30,000.00
20,000.00
120,000.00

2,500.00
72,500.00
120,000.00
1,200.00
27,500.00
30,000.00
20,000.00
120,000.00

40,500.00
8,000.00
1,000.00
14,000.00
1,200.00
24,200.00
2,420.00
26,620.00
26,620.00

40,500.00
4,050.00
44,550.00
44,550.00

64,700.00
6,470.00
71,170.00
71,170.00

40,500.00
8,000.00
1,000.00
21,000.00
1,800.00
31,800.00
3,180.00
34,980.00
34,980.00

40,500.00
4,050.00
44,550.00
44,550.00

72,300.00
7,230.00
79,530.00
79,530.00

8,500.00
1,102.00
1,824.00
1,828.80
5,500.00
600.00
8,000.00
2,400.00
16,500.00
1,650.00
18,150.00
18,150.00

13,254.80
1,325.48
14,580.28
14,580.00

29,754.80
2,975.48
32,730.28
32,730.00

12,500.00
1,102.00
1,824.00
1,828.80
5,500.00
600.00
8,000.00
2,400.00
16,500.00
1,650.00

17,254.80
1,725.48

33,754.80
3,375.48

18,150.00
18,150.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

4,500.00
72,500.00
120,000.00
1,200.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

55,000.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

60,000.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

18,980.28
18,980.00

37,130.28
37,130.00

18,000.00
1,102.00
1,824.00
1,828.80
16,000.00
2,000.00
28,000.00
2,400.00
48,400.00
4,840.00
53,240.00
53,240.00

22,754.80
2,275.48
25,030.28
25,030.00

71,154.80
7,115.48
78,270.28
78,270.00

25,000.00
1,800.00
6,000.00
800.00
9,800.00
960.00
17,560.00
1,756.00
19,316.00
19,316.00

26,800.00
2,680.00
29,480.00
29,480.00

44,360.00
4,436.00
48,796.00
48,796.00

33,000.00
1,800.00
5,600.00
700.00
9,800.00
840.00
16,940.00
1,694.00
18,634.00
18,634.00

34,800.00
3,480.00
38,280.00
38,280.00

51,740.00
5,174.00
56,914.00
56,914.00

45,000.00
1,800.00
5,600.00
700.00
9,800.00
840.00
16,940.00

46,800.00

63,740.00

1,694.00
18,634.00
18,634.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

65,500.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

70,000.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

75,000.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

29,000.00
750.00
80,000.00
100,000.00
70,000.00
120,000.00

4,680.00
51,480.00
51,480.00

6,374.00
70,114.00
70,114.00

22,925.00
1,800.00
5,600.00
700.00
9,800.00
840.00
16,940.00
1,694.00
18,634.00
18,634.00

24,725.00
2,472.50
27,197.50
27,197.00

41,665.00
4,166.50
45,831.50
45,831.00

30,800.00
1,800.00
5,360.00
700.00
9,800.00
840.00
16,700.00
1,670.00
18,370.00
18,370.00

32,600.00
3,260.00
35,860.00
35,860.00

49,300.00
4,930.00
54,230.00
54,230.00

38,250.00
1,800.00
5,360.00
700.00
9,800.00
840.00
16,700.00
1,670.00
18,370.00
18,370.00

40,050.00
4,005.00
44,055.00
44,055.00

56,750.00
5,675.00
62,425.00
62,425.00

69,600.00
4,500.00
10,000.00
1,300.00
5,880.00
480.00
17,660.00

74,100.00

91,760.00

1,766.00
19,426.00
19,426.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

29,000.00
750.00
80,000.00
100,000.00
70,000.00
120,000.00

29,000.00
750.00
80,000.00
100,000.00
70,000.00
120,000.00

7,410.00
81,510.00
81,510.00

9,176.00
100,936.00
100,936.00

60,900.00
4,500.00
10,000.00
1,300.00
5,880.00
480.00
17,660.00
1,766.00
19,426.00
19,426.00

65,400.00
6,540.00
71,940.00
71,940.00

83,060.00
8,306.00
91,366.00
91,366.00

59,450.00
4,500.00
10,000.00
1,300.00
5,880.00
480.00
17,660.00
1,766.00
19,426.00
19,426.00

63,950.00
6,395.00
70,345.00
70,345.00

81,610.00
8,161.00
89,771.00
89,771.00

alume type prima roof


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

40,000.00
25,000.00
80,000.00
100,000.00
70,000.00
120,000.00

47,500.00
1,200.00
80,000.00
100,000.00
70,000.00
120,000.00

40,800.00
5,000.00
8,000.00
1,000.00
14,000.00
120.00
23,120.00
2,312.00
25,432.00
25,432.00

45,800.00
4,580.00
50,380.00
50,380.00

68,920.00
6,892.00
75,812.00
75,812.00

48,450.00
4,800.00
8,000.00
1,000.00
14,000.00
120.00
23,120.00
2,312.00
25,432.00

53,250.00
5,325.00
58,575.00

76,370.00
7,637.00
84,007.00

25,432.00

58,575.00

84,007.00

cat tembok lama


@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

22,500.00
70,000.00
120,000.00

22,750.00
18,500.00
38,375.00
80,000.00
100,000.00
70,000.00
120,000.00

lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup


@ Rp.
17,500.00
@ Rp.
22,750.00
@ Rp.
18,500.00
@ Rp.
38,375.00
@ Rp.
80,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00
@ Rp.
120,000.00

lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup


@ Rp.
17,500.00
@ Rp.
22,750.00
@ Rp.
18,500.00
@ Rp.
38,375.00
@ Rp.
80,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00
@ Rp.
120,000.00

1,125.00
10,500.00
300.00
10,800.00
1,080.00
11,880.00
11,880.00

1,125.00
112.50
1,237.50
1,237.00

11,925.00
1,192.50
13,117.50
13,117.00

3,412.50
3,145.00
6,523.75
6,000.00
750.00
4,900.00
300.00
11,950.00
1,195.00
13,145.00
13,145.00

13,081.25
1,308.13
14,389.38
14,389.00

25,031.25
2,503.13
27,534.38
27,534.00

3,500.00
3,412.50
3,145.00
9,977.50
7,200.00
600.00
4,900.00
300.00
13,000.00
1,300.00
14,300.00
14,300.00

20,035.00
2,003.50
22,038.50
22,038.00

3,500.00
3,412.50
3,145.00
13,431.25
8,400.00
400.00
4,900.00
300.00

33,035.00
3,303.50
36,338.50
36,338.00

14,000.00
1,400.00
15,400.00
15,400.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

36,500.00
36,500.00
3,500.00
80,000.00
100,000.00
120,000.00

36,000.00
28,500.00
3,500.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

s plamir, 1 lapis cat dasar, 2 lapis cat penutup)


@ Rp.
9,500.00
@ Rp.
17,000.00
@ Rp.
70,000.00
@ Rp.
80,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00
@ Rp.
120,000.00

s cat dasar, 2 lapis cat penutup)


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,000.00
70,000.00
80,000.00
100,000.00
70,000.00

23,488.75
2,348.88
25,837.63
25,837.00

37,488.75
3,748.88
41,237.63
41,237.00

5,475.00
13,578.00
7,000.00
4,800.00
1,600.00
300.00
6,700.00
670.00
7,370.00
7,370.00

26,053.00
2,605.30
28,658.30
28,658.00

32,753.00
3,275.30
36,028.30
36,028.00

5,400.00
1,425.00
350.00
150.00
12,800.00
1,600.00
11,200.00
300.00
25,900.00
2,590.00
28,490.00
28,490.00

7,325.00
732.50
8,057.50
8,057.00

33,225.00
3,322.50
36,547.50
36,547.00

950.00
1,700.00
18,200.00
5,040.00
630.00
1,400.00
300.00
7,370.00
737.00
8,107.00
8,107.00

20,850.00
2,085.00
22,935.00
22,935.00

2,040.00
12,600.00
3,360.00
420.00
1,960.00

28,220.00
2,822.00
31,042.00
31,042.00

@ Rp.

ung dari panas dan hujan


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

120,000.00

42,000.00
21,250.00
80,000.00
100,000.00
70,000.00
120,000.00

17,500.00
39,500.00
14,000.00
80,000.00
100,000.00
70,000.00
120,000.00

300.00
6,040.00
604.00
6,644.00
6,644.00

14,640.00
1,464.00
16,104.00
16,104.00

20,680.00
2,068.00
22,748.00
22,748.00

4,200.00
7,650.00
5,040.00
630.00
1,400.00
300.00
7,370.00
737.00
8,107.00
8,107.00

11,850.00
1,185.00
13,035.00
13,035.00

19,220.00
1,922.00
21,142.00
21,142.00

2,922.50
7,900.00
2,100.00
8,400.00
400.00
4,900.00
300.00
14,000.00
1,400.00
15,400.00
15,400.00

12,922.50
1,292.25
14,214.75
14,214.00

26,922.50
2,692.25
29,614.75
29,614.00

dengan meni besi


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

17,500.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

dengan meni besi memakai perancah


@ Rp.
17,500.00
@ Rp.
15,000.00
@ Rp.
1,000,000.00
@ Rp.
80,000.00
@ Rp.
100,000.00
@ Rp.
70,000.00

1,750.00
150.00
16,000.00
2,000.00
1,400.00
1,200.00
20,600.00
2,060.00
22,660.00
22,660.00

1,900.00
190.00
2,090.00
2,090.00

1,750.00
150.00
2,000.00
18,000.00
2,250.00
15,750.00

22,500.00
2,250.00
24,750.00
24,750.00

@ Rp.

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

120,000.00

10,400.00
70,000.00
120,000.00

60,000.00
14,000.00
3,500.00
80,000.00
100,000.00
70,000.00
120,000.00

14,000.00
80,000.00
100,000.00
70,000.00
120,000.00

900.00
36,900.00
3,690.00
40,590.00
40,590.00

3,900.00
390.00
4,290.00
4,290.00

40,800.00
4,080.00
44,880.00
44,880.00

3,640.00
7,000.00
600.00
7,600.00
760.00
8,360.00
8,360.00

3,640.00
364.00
4,004.00
4,004.00

11,240.00
1,124.00
12,364.00
12,364.00

25,500.00
798.00
350.00
24,000.00
3,000.00
14,000.00
1,200.00
42,550.00
4,255.00
46,805.00
46,805.00

26,298.00
2,629.80
28,927.80
28,927.00

68,848.00
6,884.80
75,732.80
75,732.00

1,680.00
3,200.00
400.00
4,669.00
396.00
8,665.00

1,680.00

10,345.00

tulan berkali-kali
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

38,375.00
15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

16,309.38
1,500.00
400,000.00
50,000.00
14,000.00
1,200.00
465,200.00
473,865.00
47,386.50
521,251.50
521,251.00

17,809.38
19,489.38
1,948.94
21,438.31
21,438.00

483,009.38
493,354.38
49,335.44
542,689.81
542,689.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

21,250.00
80,000.00
100,000.00
70,000.00
120,000.00

80,000.00
70,000.00

7,650.00
5,040.00
630.00
1,400.00
300.00
7,370.00
737.00
8,107.00
8,107.00

7,650.00
765.00
8,415.00
8,415.00

15,020.00
1,502.00
16,522.00
16,522.00

320,000.00
28,000.00
348,000.00
34,800.00
382,800.00
382,800.00

348,000.00
34,800.00
382,800.00
382,800.00

160,000.00
7,000.00
167,000.00
16,700.00
183,700.00
183,700.00

167,000.00
16,700.00
183,700.00
183,700.00

16,000.00
560,000.00
12,000.00
588,000.00
58,800.00
646,800.00
646,800.00

588,000.00
58,800.00
646,800.00
646,800.00

140,000.00
12,000.00
152,000.00

152,000.00

15,200.00
1,520.00
16,720.00
16,720.00

rah dan membersihkan


@ Rp.
@ Rp.

80,000.00
70,000.00

n membersihkan
@ Rp.
@ Rp.
@ Rp.

80,000.00
70,000.00
120,000.00

ntuk dipergunakan lagi


@ Rp.
@ Rp.

@ Rp.

70,000.00
120,000.00

70,000.00

87,500.00

15,200.00
1,520.00
16,720.00
16,720.00

@ Rp.

120,000.00

15,000.00
102,500.00

102,500.00

10,250.00
1,025.00
11,275.00
11,275.00

10,250.00
1,025.00
11,275.00
11,275.00

140,000.00
12,000.00
152,000.00

152,000.00

uk dipergunakan lagi
@ Rp.
@ Rp.

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.

70,000.00
120,000.00

80,000.00
70,000.00

80,000.00
100,000.00
70,000.00
120,000.00

70,000.00
120,000.00

15,200.00
1,520.00
16,720.00
16,720.00

15,200.00
1,520.00
16,720.00
16,720.00

40,000.00
70,000.00
110,000.00

110,000.00

11,000.00
1,100.00
12,100.00
12,100.00

11,000.00
1,100.00
12,100.00
12,100.00

48,000.00
6,000.00
140,000.00
12,000.00
206,000.00

206,000.00

20,600.00
2,060.00
22,660.00
22,660.00

20,600.00
2,060.00
22,660.00
22,660.00

140,000.00
12,000.00
152,000.00

152,000.00

15,200.00
1,520.00
16,720.00
16,720.00

15,200.00
1,520.00
16,720.00
16,720.00

kuda-kuda, dlurung, jembatan untuk digunakan lagi


@ Rp.
80,000.00
480,000.00
@ Rp.
100,000.00
60,000.00
@ Rp.
70,000.00
280,000.00
@ Rp.
120,000.00
24,000.00
844,000.00
84,400.00
928,400.00
928,400.00

kuda-kuda, dlurung, jembatan tidak digunakan lagi


@ Rp.
70,000.00
@ Rp.
120,000.00

kayu yang telah dibongkar


@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

80,000.00
100,000.00
70,000.00
120,000.00

1,425,000.00
1,425,000.00
80,000.00
100,000.00
70,000.00
120,000.00

155,000.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

844,000.00
84,400.00
928,400.00
928,400.00

70,000.00
24,000.00
94,000.00
9,400.00
103,400.00
103,400.00

94,000.00
9,400.00
103,400.00
103,400.00

960,000.00
120,000.00
280,000.00
24,000.00
1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

1,384,000.00
138,400.00
1,522,400.00
1,522,400.00

1,425,000.00
85,500.00
88,000.00
100.00
231,000.00
19,200.00
338,300.00
33,830.00
372,130.00
372,130.00

1,510,500.00
151,050.00
1,661,550.00
1,661,550.00

1,848,800.00
184,880.00
2,033,680.00
2,033,680.00

155,000.00
7,200.00
1,200.00
120,000.00
150,000.00
70,000.00
19,200.00
359,200.00

163,400.00

522,600.00

35,920.00
395,120.00
395,120.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

785,000.00
785,000.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

487,500.00
487,500.00
1,200.00
120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

16,340.00
179,740.00
179,740.00

52,260.00
574,860.00
574,860.00

785,000.00
235,500.00
7,200.00
1,200.00
80,000.00
10,000.00
70,000.00
12,000.00
172,000.00
17,200.00
189,200.00
189,200.00

1,028,900.00
102,890.00
1,131,790.00
1,131,790.00

1,200,900.00
120,090.00
1,320,990.00
1,320,990.00

487,500.00
58,500.00
7,200.00
1,200.00
116,000.00
15,000.00
84,000.00
12,000.00
227,000.00
22,700.00
249,700.00
249,700.00

554,400.00
55,440.00
609,840.00
609,840.00

781,400.00
78,140.00
859,540.00
859,540.00

volume 0,30 m3
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

285,000.00
285,000.00
80,000.00
100,000.00
70,000.00
120,000.00

1,300,000.00
1,300,000.00
80,000.00
100,000.00
70,000.00

285,000.00
51,300.00
216,000.00
54,000.00
126,000.00
13,200.00
409,200.00
40,920.00
450,120.00
450,120.00

336,300.00
33,630.00
369,930.00
369,930.00

1,300,000.00
156,000.00
360,000.00
90,000.00
210,000.00

745,500.00
74,550.00
820,050.00
820,050.00

@ Rp.

120,000.00

108,000.00
768,000.00
76,800.00
844,800.00
844,800.00

1,456,000.00
145,600.00
1,601,600.00
1,601,600.00

2,224,000.00
222,400.00
2,446,400.00
2,446,400.00

15 cm - 20 cm
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

24,000.00
800.00
1,200.00
120,000.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

26,400.00
12,800.00
4,704.00
6,720.00
1,320.00
5,600.00
700.00
9,800.00
840.00
16,940.00
1,694.00
18,634.00
18,634.00

51,944.00
5,194.40
57,138.40
57,138.00

68,884.00
6,888.40
75,772.40
75,772.00

30 cm - 100 cm
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

(30 x 30) cm, tinggi 35 cm


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

25,000.00
800.00
1,200.00
120,000.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

800.00
1,200.00
120,000.00
220,000.00
5,000.00
95,000.00
80,000.00
100,000.00
70,000.00
120,000.00

27,500.00
264,000.00
12,360.00
7,320.00
3,795.00
15,200.00
1,900.00
26,600.00
2,280.00
45,980.00
4,598.00
50,578.00
50,578.00

314,975.00
31,497.50
346,472.50
346,472.00

360,955.00
36,095.50
397,050.50
397,050.00

69,600.00
52,800.00
8,400.00
15,400.00
8,000.00
5,700.00
81,200.00
150.00
224,000.00
1,920.00
307,270.00
30,727.00
337,997.00

159,900.00
15,990.00
175,890.00

467,170.00
46,717.00
513,887.00

337,997.00
(45 x 45) cm, tinggi 50 cm
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

(60 x 60) cm, tingg 65 cm


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

800.00
1,200.00
120,000.00
220,000.00
5,000.00
95,000.00
80,000.00
100,000.00
70,000.00
120,000.00

800.00
1,200.00
120,000.00
220,000.00
5,000.00
95,000.00
80,000.00
100,000.00
70,000.00
120,000.00

18,500.00
18,500.00
80,000.00
100,000.00
70,000.00
120,000.00

25,500.00
25,500.00
80,000.00

175,890.00

513,887.00

120,000.00
92,400.00
15,600.00
4,400.00
13,000.00
8,550.00
37,840.00
4,700.00
99,400.00
8,520.00
150,460.00
15,046.00
165,506.00
165,506.00

253,950.00
25,395.00
279,345.00
279,345.00

404,410.00
40,441.00
444,851.00
444,851.00

177,600.00
136,800.00
22,080.00
7,260.00
24,250.00
11,400.00
57,600.00
7,200.00
151,200.00
12,000.00
228,000.00
22,800.00
250,800.00
250,800.00

379,390.00
37,939.00
417,329.00
417,329.00

607,390.00
60,739.00
668,129.00
668,129.00

22,200.00
6,475.00
7,200.00
900.00
3,780.00
3,240.00
15,120.00
1,512.00
16,632.00
16,632.00

28,675.00
2,867.50
31,542.50
31,542.00

30,600.00
8,925.00
7,200.00

43,795.00
4,379.50
48,174.50
48,174.00

@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

100,000.00
70,000.00
120,000.00

31,250.00
31,250.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
50,000.00
80,000.00
100,000.00
70,000.00
120,000.00

3,750.00
3,750.00
80,000.00
100,000.00
70,000.00
120,000.00

5,000.00
5,000.00
80,000.00
100,000.00
70,000.00

900.00
3,780.00
3,240.00
15,120.00
1,512.00
16,632.00
16,632.00

39,525.00
3,952.50
43,477.50
43,477.00

54,645.00
5,464.50
60,109.50
60,109.00

37,500.00
10,937.50
7,200.00
900.00
3,780.00
3,240.00
15,120.00
1,512.00
16,632.00
16,632.00

48,437.50
4,843.75
53,281.25
53,281.00

63,557.50
6,355.75
69,913.25
69,913.00

60,000.00
17,500.00
14,400.00
1,800.00
7,560.00
648.00
24,408.00
2,440.80
26,848.80
26,848.00

77,500.00
7,750.00
85,250.00
85,250.00

101,908.00
10,190.80
112,098.80
112,098.00

4,500.00
1,312.50
4,800.00
600.00
2,520.00
216.00
8,136.00
813.60
8,949.60
8,949.00

5,812.50
581.25
6,393.75
6,393.00

6,000.00
1,750.00
4,800.00
600.00
2,520.00

13,948.50
1,394.85
15,343.35
15,343.00

@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

120,000.00

7,000.00
7,000.00
80,000.00
100,000.00
70,000.00
120,000.00

11,250.00
11,250.00
80,000.00
100,000.00
70,000.00
120,000.00

9,750.00
9,750.00
80,000.00
100,000.00
70,000.00
120,000.00

20,500.00
20,500.00
80,000.00
100,000.00
70,000.00
120,000.00

216.00
8,136.00
813.60
8,949.60
8,949.00

7,750.00
775.00
8,525.00
8,525.00

15,886.00
1,588.60
17,474.60
17,474.00

8,400.00
2,450.00
4,800.00
600.00
2,520.00
216.00
8,136.00
813.60
8,949.60
8,949.00

10,850.00
1,085.00
11,935.00
11,935.00

18,986.00
1,898.60
20,884.60
20,884.00

13,500.00
3,937.50
4,800.00
600.00
2,520.00
216.00
8,136.00
813.60
8,949.60
8,949.00

17,437.50
1,743.75
19,181.25
19,181.00

25,573.50
2,557.35
28,130.85
28,130.00

11,700.00
3,412.50
7,200.00
900.00
3,808.00
324.00
12,232.00
1,223.20
13,455.20
13,455.00

15,112.50
1,511.25
16,623.75
16,623.00

27,344.50
2,734.45
30,078.95
30,078.00

24,600.00
7,175.00
4,800.00
600.00
2,520.00
216.00
8,136.00

31,775.00

39,911.00

813.60
8,949.60
8,949.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

20,500.00
20,500.00
80,000.00
100,000.00
70,000.00
120,000.00

33,750.00
33,750.00
80,000.00
100,000.00
70,000.00
120,000.00

250,000.00
75,000.00
80,000.00
100,000.00
70,000.00
120,000.00

13,750.00
2,500.00
80,000.00
100,000.00
70,000.00
120,000.00

3,177.50
34,952.50
34,952.00

3,991.10
43,902.10
43,902.00

24,600.00
7,175.00
10,800.00
1,350.00
5,670.00
4,920.00
22,740.00
2,274.00
25,014.00
25,014.00

31,775.00
3,177.50
34,952.50
34,952.00

54,515.00
5,451.50
59,966.50
59,966.00

40,500.00
11,812.50
10,800.00
1,350.00
5,670.00
4,920.00
22,740.00
2,274.00
25,014.00
25,014.00

52,312.50
5,231.25
57,543.75
57,543.00

75,052.50
7,505.25
82,557.75
82,557.00

250,000.00
75,000.00
24,000.00
3,000.00
2,100.00
180.00
29,280.00
2,928.00
32,208.00
32,208.00

325,000.00
32,500.00
357,500.00
357,500.00

354,280.00
35,428.00
389,708.00
389,708.00

13,750.00
62.50
8,000.00
1,000.00
700.00
600.00
10,300.00
1,030.00
11,330.00

13,812.50
1,381.25
15,193.75

24,112.50
2,411.25
26,523.75

11,330.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

30,000.00
75,000.00
80,000.00
100,000.00
70,000.00
120,000.00

8,800.00
22,500.00
80,000.00
100,000.00
70,000.00
120,000.00

15,193.00

26,523.00

55,000.00
8,000.00
1,000.00
700.00
600.00
10,300.00
1,030.00
11,330.00
11,330.00

55,000.00
5,500.00
60,500.00
60,500.00

65,300.00
6,530.00
71,830.00
71,830.00

90,000.00
75,000.00
40,000.00
5,000.00
70,000.00
120,000.00
235,000.00
23,500.00
258,500.00
258,500.00

165,000.00
16,500.00
181,500.00
181,500.00

400,000.00
40,000.00
440,000.00
440,000.00

9,680.00
1,800.00
480.00
600.00
4,200.00
36.00
5,316.00
531.60
5,847.60
5,847.00

11,480.00
1,148.00
12,628.00
12,628.00

16,796.00
1,679.60
18,475.60
18,475.00

ton, kayu kelas II


@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

2,200,000.00
2,200,000.00
15,000.00
70,000.00
80,000.00
100,000.00
120,000.00

30,800.00
15,840.00
3,750.00
7,000.00
8,000.00
1,000.00
600.00
16,600.00
1,660.00
18,260.00
18,260.00

50,390.00
5,039.00
55,429.00
55,500.00

66,990.00
6,699.00
73,689.00
73,760.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.

750,000.00
80,000.00
100,000.00
70,000.00
120,000.00

250,000.00
80,000.00
100,000.00
70,000.00
120,000.00

500,000.00
80,000.00
100,000.00
70,000.00
120,000.00

200,000.00
80,000.00
100,000.00
70,000.00
120,000.00

400,000.00
80,000.00
100,000.00

750,000.00
52,000.00
6,500.00
45,500.00
3,840.00
16,600.00
1,660.00
18,260.00
18,260.00

750,000.00
75,000.00
825,000.00
825,000.00

766,600.00
76,660.00
843,260.00
843,260.00

250,000.00
96,000.00
12,000.00
84,000.00
720.00
192,720.00
19,272.00
211,992.00
211,992.00

250,000.00
25,000.00
275,000.00
275,000.00

442,720.00
44,272.00
486,992.00
486,992.00

500,000.00
84,000.00
10,500.00
73,500.00
624.00
168,624.00
16,862.40
185,486.40
185,486.00

500,000.00
50,000.00
550,000.00
550,000.00

668,624.00
66,862.40
735,486.40
735,486.00

200,000.00
120,000.00
10,500.00
73,500.00
624.00
204,624.00
20,462.40
225,086.40
225,086.00

200,000.00
20,000.00
220,000.00
220,000.00

400,000.00
84,000.00
10,500.00

404,624.00
40,462.40
445,086.40
445,086.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

8,800.00
80,000.00
100,000.00
70,000.00
120,000.00

25,000.00
10,000.00
5,500,000.00
80,000.00
100,000.00
70,000.00
120,000.00

8,250.00
10,000.00
5,500,000.00
80,000.00
100,000.00
70,000.00
120,000.00

10,000.00
10,000.00
5,500,000.00
80,000.00
100,000.00

73,500.00
624.00
168,624.00
16,862.40
185,486.40
185,486.00

400,000.00
40,000.00
440,000.00
440,000.00

568,624.00
56,862.40
625,486.40
625,486.00

101,200.00
96,000.00
1,200.00
84,000.00
72.00
181,272.00
18,127.20
199,399.20
199,399.00

101,200.00
10,120.00
111,320.00
111,320.00

282,472.00
28,247.20
310,719.20
310,719.00

27,500.00
200.00
9,900.00
8,000.00
1,000.00
7,000.00
60.00
16,060.00
1,606.00
17,666.00
17,666.00

37,600.00
3,760.00
41,360.00
41,360.00

53,660.00
5,366.00
59,026.00
59,026.00

9,075.00
200.00
9,900.00
8,000.00
1,000.00
7,000.00
60.00
16,060.00
1,606.00
17,666.00
17,666.00

19,175.00
1,917.50
21,092.50
21,092.00

11,000.00
200.00
9,900.00
8,000.00
1,000.00

35,235.00
3,523.50
38,758.50
38,758.00

@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

70,000.00
120,000.00

20,000.00
10,000.00
7,500.00
80,000.00
100,000.00
70,000.00
120,000.00

250,000.00
80,000.00
100,000.00
70,000.00
120,000.00

125,000.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
80,000.00
100,000.00
70,000.00
120,000.00

7,000.00
60.00
16,060.00
1,606.00
17,666.00
17,666.00

21,100.00
2,110.00
23,210.00
23,210.00

37,160.00
3,716.00
40,876.00
40,876.00

22,000.00
200.00
187.50
16,000.00
2,000.00
14,000.00
120.00
32,120.00
3,212.00
35,332.00
35,332.00

22,387.50
2,238.75
24,626.25
24,626.00

54,507.50
5,450.75
59,958.25
59,958.00

250,000.00
48,000.00
6,000.00
4,200.00
360.00
58,560.00
5,856.00
64,416.00
64,416.00

250,000.00
25,000.00
275,000.00
275,000.00

308,560.00
30,856.00
339,416.00
339,416.00

125,000.00
40,000.00
1,000.00
700.00
600.00
42,300.00
4,230.00
46,530.00
46,530.00

125,000.00
12,500.00
137,500.00
137,500.00

50,000.00
40,000.00
500.00
350.00
300.00

167,300.00
16,730.00
184,030.00
184,030.00

41,150.00
4,115.00
45,265.00
45,265.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

75,000.00
80,000.00
100,000.00
70,000.00
120,000.00

11,000.00
80,000.00
100,000.00
70,000.00
120,000.00

7,500.00
80,000.00
100,000.00
70,000.00
120,000.00

3,000.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
5,000.00
55,000.00
55,000.00

91,150.00
9,115.00
100,265.00
100,265.00

75,000.00
40,000.00
500.00
350.00
30.00
40,880.00
4,088.00
44,968.00
44,968.00

75,000.00
7,500.00
82,500.00
82,500.00

115,880.00
11,588.00
127,468.00
127,468.00

11,000.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

11,000.00
1,100.00
12,100.00
12,100.00

25,640.00
2,564.00
28,204.00
28,204.00

7,500.00
8,000.00
1,000.00
700.00
600.00
10,300.00
1,030.00
11,330.00
11,330.00

7,500.00
750.00
8,250.00
8,250.00

17,800.00
1,780.00
19,580.00
19,580.00

3,000.00
16,000.00
2,000.00
1,400.00
1,200.00
20,600.00
2,060.00
22,660.00
22,660.00

3,000.00
300.00
3,300.00
3,300.00

23,600.00
2,360.00
25,960.00
25,960.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

7,500.00
80,000.00
100,000.00
70,000.00
120,000.00

3,000.00
80,000.00
100,000.00
70,000.00
120,000.00

150,000.00
80,000.00
100,000.00
70,000.00
120,000.00

50,000.00
80,000.00
100,000.00
70,000.00
120,000.00

15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

7,500.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

7,500.00
750.00
8,250.00
8,250.00

22,140.00
2,214.00
24,354.00
24,354.00

3,000.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

3,000.00
300.00
3,300.00
3,300.00

17,640.00
1,764.00
19,404.00
19,404.00

150,000.00
40,000.00
5,000.00
3,500.00
300.00
48,800.00
4,880.00
53,680.00
53,680.00

150,000.00
15,000.00
165,000.00
165,000.00

198,800.00
19,880.00
218,680.00
218,680.00

50,000.00
16,000.00
2,000.00
1,400.00
120.00
19,520.00
1,952.00
21,472.00
21,472.00

50,000.00
5,000.00
55,000.00
55,000.00

69,520.00
6,952.00
76,472.00
76,472.00

15,000.00
40,000.00
5,000.00
3,500.00
300.00
48,800.00

15,000.00

63,800.00

4,880.00
53,680.00
53,680.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.

15,000.00
80,000.00
100,000.00
70,000.00
120,000.00

200,000.00
80,000.00
100,000.00
70,000.00
120,000.00

12,000.00
80,000.00
100,000.00
70,000.00
120,000.00

49,500.00
80,000.00
100,000.00
70,000.00
120,000.00

60,500.00

1,500.00
16,500.00
16,500.00

6,380.00
70,180.00
70,180.00

15,000.00
8,000.00
1,000.00
700.00
60.00
9,760.00
976.00
10,736.00
10,736.00

15,000.00
1,500.00
16,500.00
16,500.00

24,760.00
2,476.00
27,236.00
27,236.00

200,000.00
48,000.00
6,000.00
4,200.00
360.00
58,560.00
5,856.00
64,416.00
64,416.00

200,000.00
20,000.00
220,000.00
220,000.00

258,560.00
25,856.00
284,416.00
284,416.00

12,000.00
20,000.00
2,500.00
1,750.00
150.00
24,400.00
2,440.00
26,840.00
26,840.00

12,000.00
1,200.00
13,200.00
13,200.00

36,400.00
3,640.00
40,040.00
40,040.00

54,450.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

54,450.00
5,445.00
59,895.00
59,895.00

66,550.00

69,090.00
6,909.00
75,999.00
75,999.00

@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.

80,000.00
100,000.00
70,000.00
120,000.00

120,000.00
80,000.00
100,000.00
70,000.00
120,000.00

300,000.00
80,000.00
100,000.00
70,000.00
120,000.00

55,000.00
55,000.00
80,000.00
100,000.00
70,000.00
120,000.00

12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

66,550.00
6,655.00
73,205.00
73,205.00

81,190.00
8,119.00
89,309.00
89,309.00

132,000.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

132,000.00
13,200.00
145,200.00
145,200.00

146,640.00
14,664.00
161,304.00
161,304.00

330,000.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

330,000.00
33,000.00
363,000.00
363,000.00

344,640.00
34,464.00
379,104.00
379,104.00

60,500.00
8,250.00
12,000.00
1,500.00
1,050.00
90.00
14,640.00
1,464.00
16,104.00
16,104.00

68,750.00
6,875.00
68,750.00
68,750.00

83,390.00
8,339.00
84,854.00
84,854.00

Anda mungkin juga menyukai