PEKERJAAN
:PENYEDIAAN FASILITAS PENGOLAHAN LIMBAH B3 (
LOKASI :DESA PAPALANG, KECAMATAN MAMUJU PROVINSI S
No Uraian Pekerjaan
II. PENYEDIAAN SHELTER FASILITAS INSINERATOR KAPASITAS 150 KG/JAM
A. Pekerjaan Persiapan
1 Kantor Sementara
2 Gudang Semen dan Peralatan
3 Bedeng Pekerja
4 Listrik Kerja
5 Air Kerja
6 Dokumentasi
7 Pembersihan Lahan dan Pengukuran positioning
8 Mobilisasi dan Demobilisasi
9 Pengadaan & Pelaksanaan K3
B. Bangunan Shelter
1 Pekerjaan Struktur
a Pekerjaan Tanah
Pekerjaan Galian Tanah
Pekerjaan Urugan Kembali dan Pemadatan
Buangan Tanah di Area site
Pasir Urug Penginggian Level lantai Shelter 30 cm (dipadatkan CBR = 15%)
Pekerjaan Urugan Pasir T = 10 cm
b Pekerjaan Beton
i Bore Pile Dia. 30 cm (K-300, Slump 12 -/+ 2 cm)
ii Pekerjaan Lantai Kerja T=5 cm (Beton Rabat K-175)
iii Pekerjaan Pondasi Telapak (PLT1 1000x1000x400)
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D16-150 mm (Ulir : U-39 )
Bekisting
iv Pekerjaan Pondasi Telapak (PLT2 1500x1000x400)
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D16-150 mm (Ulir : U-39 )
Bekisting
v Pekerjaan Beton Pedestal (PD 350x400)
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi : L12D16, S 13-150mm (Ulir: U-39)
Bekisting
vi Pekerjaan Beton Sloof (SLF1 200x400)
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D10 (Polos : U-24)
Besi : D13 & D16 (Ulir: U-39)
Bekisting
viii Pekerjaan Beton Pelat T=12 cm
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D10-200 mm (Polos : U-24)
Bekisting
viii Pekerjaan Beton Pelat T=20 cm
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D13-200 mm (Ulir : U-39)
Bekisting
ix Pekerjaan Beton Pelat dinding Lubang T=12 cm
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D10-200 mm (Polos : U-24)
Bekisting
x Pekerjaan Beton Pelat Ramp T=12 cm
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D10-200 mm (Ulir : U-24)
Bekisting
xi Pekerjaan Beton Pelat Lantai Luar (Teras) T=10 cm
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D10-200 mm (Polos : U-24)
xii Pekerjaan Kolom praktis 15x15 mm
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi : L 4D12, S d10-150 (Polos : U-24)
Bekisting
c Pekerjaan Baja
WF 300 X 150 X 6.5 X 9 (Fy = 2400kg/cm2)
WF 250 X 125 X 6 X 9 (Fy = 2400kg/cm2)
WF 200 X 100 5,5 x 8 (Fy = 2400kg/cm2)
C 150 X 50 X 20 X 3.2 (purlin) (Fy = 2400kg/cm2)
C 100 X 50 X 20 X 2,3 (Rangka Cladding) (Fy = 2400kg/cm2)
Ikatan Angin D16 polos (U-24)
Sagrod D2 Polos (Atap) (U-24)
Sagrrod D12 Polos (Cladding) (U-24)
Base Plate T=20 mm (Fy = 2400kg/cm2)
Angkur dia. 19 mm (Hot Dip Galvanis, U-24)
Grouting (Fosroc/Sica Grout)
2 Pekerjaan Arsitektur
a Pekerjaan Dinding
Dinding Bata 1/2 bt (Bata Merah, 1pc : 4ps)
Acian dan Plesteran (1 pc : 4 ps)
Pengecatan Dinding Bata (plamir, cat dasar, cat penutup;ex Catylac)
c Pekerjaan Finishing
Heavy Duty Epoxy ( T=500 micron, ex propan )
Pengecatan Baja Anti Karat Hevy Duty Coating ( 3 lapis, Marine Paint )
Pengecetan top coating, Heavy Duty Coating ( 3 lapis, Marine Paint )
Pintu Besi Pelat baja 2 mm rangkap, rangka siku dan CNP
C. Bangunan Kantor
1 Pekerjaan Struktur
a Pekerjaan Tanah
Pekerjaan Galian Tanah
Pekerjaan Urugan Kembali dan Pemadatan
Buangan Tanah di Area site
Pasir Urug Penginggian Level lantai Shelter 30 cm
b Pekerjaan Pondasi
Pekerjaan Aanstamping
Pekerjaan Pondasi Batu Kali (1 pc : 5 ps)
c Pekerjaan Beton
i Pekerjaan Beton Sloof 20x30
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi 4D13 (Ulir : U-39 )
Besi D10-15 (Polos : U-24)
Bekisting
ii Pekerjaan Beton Kolom 15x15
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi 4D13 (Ulir : U-39 )
Besi D10-15 (Polos : U-24)
Bekisting
iii Pekerjaan Ring Balok 15x20
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi 4D13 (Ulir : U-39 )
Besi D10-20 (Polos : U-24)
Bekisting
iv Pekerjaan Beton Pelat Atap T=12
Beton Site Mix (K-300, Slump 12 +/- 2 cm)
Besi D10-15 (Polos : U-24)
Bekisting
2 Pekerjaan Arsitektur
a Pekerjaan Dinding
Dinding Bata 1/2 bt (Bata Merah, 1pc : 4ps)
Acian dan Plesteran (1 pc : 4 ps)
Pengecatan Dinding (Plamir, cat dasar dan cat penutup; ex Metrolite)
b Pekerjaan Plafon
Pekerjaan Rangka Plafon, modul 60x120 cm (besi hollow 40x40x2mm)
Pekerjaan Plafon GRC board 4mm
Pengecatan Plafon (Plamir, cat dasar dan cat penutup; ex Catylac)
e Pekerjaan Atap
Rangka Atap Baja Ringan T=0,75
Atap spandek Zincalume (t = 0,4 mm)
Nok Zincalume
b Pekejaan Mekanikal
i Bak Air Fiber (Vol. 0,3 m3)
ii Kran Air 1/2 inch (PVC)
iii Kloset Duduk
iv Floor Drain (Stainless)
v Bak Cuci Dapur (Stainless & meja dapur beton+keramik )
vi Instalasi Air Bersih
Pipa PVC dia. 1 inch AW
Pipa PVC dia. 1/2 inch AW
vii Instalasi Air Kotor
Pipa PVC dia. 3 inch AW
Pipa PVC dia. 1 1/2 inch AW
viii Septic Tank 2 m3 (Biotank)
ix Tangki Toren Fiberglass Panel
x Saluran air Keliling bangunan buis beton 1/2 dia. 30 cm dinding bata dalam 30-45 cm
TOTAL
OLAHAN LIMBAH B3 (INSINERATOR KAPASITAS 150 KG/JAM) DAN PEMBANGUNAN SHELTER
MAMUJU PROVINSI SULAWESI BARAT
PERIODE :
BULANAN :
MINGGU IV
Progres thd Item
Volume Bobot (%)
Pek. (%)
7.69% 100.00%
9.00 0.71% 100.00%
9.00 0.60% 100.00%
16.00 1.09% 100.00%
1.00 1.33% 100.00%
1.00 0.96% 100.00%
1.00 0.40% 100.00%
1.00 0.14% 100.00%
1.00 0.30% 100.00%
1.00 2.16% 100.00%
21.93% 40.76%
0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
-
-
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
-
-
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
-
-
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
-
-
- 0.00% 0.00%
- 0.00% 0.00%
-
-
-
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
-
-
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
- 0.00% 0.00%
4.06% 90.85%
1.51% 12.46%
35.19% 35.19%
LAPORAN PROGRESS M
PEKERJAAN :PENYEDIAAN FASILITAS PENGOLAHAN LIMBAH B3 (INSINERATOR KA
150 KG/JAM) DAN PEMBANGUNAN SHELTER
LOKASI :DESA CENDANA, KECAMATAN MAMBOR, SUMBA TENGAH PROVINSINU
TENGGARA TIMUR
TAHUN ANGGARAN :2021
1,644,878,727.34 1,644,878,727.34
126,487,252.00 1,644,878,727.34
11,668,203.00 1,644,878,727.34
9,910,269.00 1,644,878,727.34
17,937,280.00 1,644,878,727.34
21,892,500.00 1,644,878,727.34
15,811,200.00 1,644,878,727.34
6,582,300.00 1,644,878,727.34
2,306,000.00 1,644,878,727.34
4,865,000.00 1,644,878,727.34
35,514,500.00 1,644,878,727.34
1,644,878,727.34
1,246,065,255.71 1,644,878,727.34
885,001,124.49 1,644,878,727.34
1,644,878,727.34
7,978,338.00 1,644,878,727.34
859,466.80 1,644,878,727.34
2,334,293.12 1,644,878,727.34
22,308,260.00 1,644,878,727.34
6,692,478.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
56,412,000.00 1,644,878,727.34
14,864,496.00 1,644,878,727.34
- 1,644,878,727.34
1,945,235.20 1,644,878,727.34
3,628,272.00 1,644,878,727.34
626,487.00 1,644,878,727.34
- 1,644,878,727.34
5,835,705.60 1,644,878,727.34
10,871,904.00 1,644,878,727.34
1,670,632.00 1,644,878,727.34
- 1,644,878,727.34
5,179,188.72 1,644,878,727.34
11,461,078.56 1,644,878,727.34
6,889,140.00 1,644,878,727.34
- 1,644,878,727.34
6,613,799.68 1,644,878,727.34
9,732,465.90 1,644,878,727.34
3,253,824.00 1,644,878,727.34
6,120,571.20 1,644,878,727.34
- 1,644,878,727.34
30,053,883.84 1,644,878,727.34
37,755,576.00 1,644,878,727.34
11,130,585.70 1,644,878,727.34
- 1,644,878,727.34
19,938,660.80 1,644,878,727.34
26,482,512.00 1,644,878,727.34
1,357,388.50 1,644,878,727.34
- 1,644,878,727.34
4,571,302.72 1,644,878,727.34
9,711,408.00 1,644,878,727.34
12,931,380.00 1,644,878,727.34
- 1,644,878,727.34
3,501,423.36 1,644,878,727.34
4,409,772.00 1,644,878,727.34
250,594.80 1,644,878,727.34
- 1,644,878,727.34
8,753,558.40 1,644,878,727.34
3,307,329.00 1,644,878,727.34
- 1,644,878,727.34
1,105,303.15 1,644,878,727.34
3,468,360.00 1,644,878,727.34
1,530,920.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
126,741,728.00 1,644,878,727.34
60,281,080.00 1,644,878,727.34
124,924,208.00 1,644,878,727.34
135,193,196.00 1,644,878,727.34
46,740,556.00 1,644,878,727.34
4,261,128.00 1,644,878,727.34
2,588,883.00 1,644,878,727.34
1,535,988.00 1,644,878,727.34
5,992,363.44 1,644,878,727.34
10,504,800.00 1,644,878,727.34
699,600.00 1,644,878,727.34
1,644,878,727.34
318,629,875.32 1,644,878,727.34
1,644,878,727.34
25,673,301.00 1,644,878,727.34
40,546,450.00 1,644,878,727.34
12,547,262.40 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
5,050,551.60 1,644,878,727.34
7,739,730.00 1,644,878,727.34
2,922,922.80 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
46,704,000.00 1,644,878,727.34
31,844,400.00 1,644,878,727.34
13,749,600.00 1,644,878,727.34
23,388,000.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
44,704,800.00 1,644,878,727.34
1,304,620.00 1,644,878,727.34
32,410,980.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
816,825.52 1,644,878,727.34
29,226,432.00 1,644,878,727.34
1,644,878,727.34
42,434,255.90 1,644,878,727.34
- 1,644,878,727.34
8,026,500.00 1,644,878,727.34
909,700.00 1,644,878,727.34
198,400.00 1,644,878,727.34
4,220,569.50 1,644,878,727.34
4,541,826.90 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
6,032,600.00 1,644,878,727.34
486,500.00 1,644,878,727.34
12,765,000.00 1,644,878,727.34
3,230,347.50 1,644,878,727.34
417,412.00 1,644,878,727.34
1,605,400.00 1,644,878,727.34
- 1,644,878,727.34
272,326,219.63 1,644,878,727.34
73,478,111.81 1,644,878,727.34
1,644,878,727.34
3,430,420.40 1,644,878,727.34
1,014,060.40 1,644,878,727.34
886,426.24 1,644,878,727.34
3,706,603.20 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
5,070,346.73 1,644,878,727.34
19,143,722.67 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
4,121,467.08 1,644,878,727.34
3,040,388.64 1,644,878,727.34
2,157,319.92 1,644,878,727.34
3,814,105.95 1,644,878,727.34
- 1,644,878,727.34
1,981,708.36 1,644,878,727.34
3,906,654.72 1,644,878,727.34
3,747,810.72 1,644,878,727.34
2,778,619.80 1,644,878,727.34
- 1,644,878,727.34
2,066,812.40 1,644,878,727.34
3,040,388.64 1,644,878,727.34
1,510,099.17 1,644,878,727.34
5,045,657.17 1,644,878,727.34
- 1,644,878,727.34
729,463.20 1,644,878,727.34
1,018,211.40 1,644,878,727.34
1,267,825.00 1,644,878,727.34
- 1,644,878,727.34
145,933,233.82 1,644,878,727.34
- 1,644,878,727.34
17,782,174.35 1,644,878,727.34
14,041,903.75 1,644,878,727.34
4,345,323.72 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
12,918,976.00 1,644,878,727.34
5,501,104.00 1,644,878,727.34
3,062,976.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
20,513,014.00 1,644,878,727.34
1,162,650.00 1,644,878,727.34
4,911,942.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
9,640,000.00 1,644,878,727.34
2,335,200.00 1,644,878,727.34
14,850,000.00 1,644,878,727.34
1,362,000.00 1,644,878,727.34
3,240,000.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
17,640,000.00 1,644,878,727.34
11,735,010.00 1,644,878,727.34
890,960.00 1,644,878,727.34
- 1,644,878,727.34
52,914,874.00 1,644,878,727.34
1,644,878,727.34
1,264,800.00 1,644,878,727.34
413,500.00 1,644,878,727.34
128,400.00 1,644,878,727.34
1,075,100.00 1,644,878,727.34
598,000.00 1,644,878,727.34
385,200.00 1,644,878,727.34
2,669,535.00 1,644,878,727.34
4,888,485.00 1,644,878,727.34
2,432,500.00 1,644,878,727.34
- 1,644,878,727.34
- 1,644,878,727.34
834,276.00 1,644,878,727.34
305,172.00 1,644,878,727.34
3,038,330.00 1,644,878,727.34
311,200.00 1,644,878,727.34
1,946,000.00 1,644,878,727.34
- 1,644,878,727.34
802,206.00 1,644,878,727.34
170,202.00 1,644,878,727.34
- 1,644,878,727.34
4,390,248.00 1,644,878,727.34
4,390,248.00 1,644,878,727.34
10,703,000.00 1,644,878,727.34
7,297,400.00 1,644,878,727.34
4,871,072.00 1,644,878,727.34
1,644,878,727.34
#REF! 1,644,878,727.34
RAN PROGRESS MINGGUAN
B3 (INSINERATOR KAPASITAS
PERIODE : 15-Jun S/D 21-Jun
TENGAH PROVINSINUSA
MINGGU : 1