Anda di halaman 1dari 50

CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS

No

Diameter

Berat Besi

mm

Kg / m1

4.0

0.13

5.0

0.12

5.5

0.19

5.7

No

BESI BETON SPIRAL

Diameter

Berat Besi

mm

Kg / m1

No.

Diameter

Berat Besi

mm

Kg / m1

11

12

0.89

10.00

0.62

12

13

1.04

13.00

1.04

13

14

1.21

16.00

1.58

0.20

14

16

1.58

19.00

2.23

6.0

0.22

15

19

2.23

22.00

2.98

6.5

0.31

16

22

2.98

25.00

3.85

8.0

0.40

17

23

3.26

29.00

5.19

9.0

0.53

18

25

3.85

32.00

6.31

10.0

0.62

19

28

4.83

36.00

7.99

10

11.0

0.75

20

31

5.93

21

32

6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


1.

Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 )

Besi 4 batang dia. 12

4 x

69,44 x 0,89 kg

Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 =


2.

313.89 kg/m3 ( A + B )

Panjang 1 m3 ukuran 15 x 15 c = ( 1 : 0.15 : 0.15 )

Besi 4 batang dia. 12

4 x

44,44 x 0,89 kg

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 =

4.

KOTA BANJAR

66.67 kg ( B )

Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm

Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg

3.

69.44 m1
247.22 kg ( A)

44.44 m1
158.22 kg ( A)
71.11 kg ( B )
229.33 kg/m3 ( A + B )

Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 c= ( 1 : 0.15 : 0.20 )

Besi 4 batang dia. 12

118.67 kg ( A)

Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x

155.56 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3

274.22 kg/m3 ( A + B )

4 x

33,33 x 0,89 kg

33.33 m1

Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 c = ( 1 : 0.20 : 0.30 )

16.67 m1

Besi 4 batang dia. 12

89.00 kg ( A)

Besi 2 batang dia. 10

= 2 x 16.67 x 0.62 kg

4 x

16,67 x 0,89 kg

0.00 kg ( B)

Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X

33.33 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3

122.33 kg/m3 ( A + B + C )

Halaman : 1+114

Lampiran 1

DAFTAR BERAT BESI KANAL " C "

NO.

UKURAN BESI KANAL " C "

BERAT 6 M1

BERAT PER 1 M1
6.00

60

30

10

1.6

mm

9.80

kg

1.63

kg

60

30

10

2.3

mm

13.90

kg

2.32

kg

75

35

15

1.6

mm

12.50

kg

2.08

kg

75

35

15

2.3

mm

17.40

kg

2.90

kg

75

45

15

1.6

mm

14.00

kg

2.33

kg

75

45

15

2.3

mm

19.00

kg

3.17

kg

100

50

20

mm

21.40

kg

3.57

kg

100

50

20

2.3

mm

24.40

kg

4.07

kg

100

50

20

3.2

mm

33.00

kg

5.50

kg

10

125

50

20

mm

23.70

kg

3.95

kg

11

125

50

20

2.3

mm

27.10

kg

4.52

kg

12

125

50

20

3.2

mm

37.00

kg

6.17

kg

13

150

50

20

mm

26.10

kg

4.35

kg

14

150

50

20

2.3

mm

29.76

kg

4.96

kg

15

150

50

20

3.2

mm

40.56

kg

6.76

kg

16

150

65

20

mm

28.92

kg

4.82

kg

17

150

65

20

2.3

mm

33.00

kg

5.50

kg

18

150

65

20

3.2

mm

45.10

kg

7.52

kg

19

200

75

20

mm

35.52

kg

5.92

kg

20

200

75

20

2.3

mm

40.62

kg

6.77

kg

21

200

75

20

3.2

mm

55.62

kg

9.27

kg

KOTA BANJAR

Halaman :2+115

Lampiran 2

DAFTAR BERAT BESI IWF


NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

UKURAN IWF
100
125
148
150
175
198
200
248
250
298
300
346
350
396
400
446
450
500
588
600
700
800
900

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

50
60
100
75
90
99
100
124
125
149
150
174
175
199
200
199
200
200
300
200
300
300
300

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

5
6
6
5
5
4.5
5.5
5
6
6
6.5
6
7
7
8
8
9
10
12
11
13
14
16

BERAT 12 M1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

7
8
9
7
8
7
8
8
9
8
9
9
11
11
13
12
14
16
20
17
24
26
28

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

112.00
158.40
253.20
168.00
217.40
218.40
256.00
308.40
355.20
384.00
440.40
497.00
595.20
679.20
792.00
794.40
912.00
1,075.00
1,812.00
1,272.00
2,220.00
2,520.00
2,916.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

BERAT PER 1 M1
9.33
13.20
21.10
14.00
18.12
18.20
21.33
25.70
29.60
32.00
36.70
41.42
49.60
56.60
66.00
66.20
76.00
89.58
151.00
106.00
185.00
210.00
243.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

DAFTAR BERAT BESI SIKU " L "


NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

KOTA BANJAR

UKURAN BESI KANAL " L "


25
30
40
40
50
50
60
60
65
70
75
75
80
90
100
100
120
120
125
130
130

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

25
30
40
40
50
50
60
60
65
70
75
75
80
90
100
100
120
120
125
130
130

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

3
3
3
4
4
5
5
6
6
7
6
8
8
9
8
10
10
12
12
9
12

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

BERAT / BATANG
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
12
12
12
12
12

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

6.72
8.16
11.00
14.50
18.50
22.60
27.30
32.52
35.46
44.28
41.22
54.18
57.96
73.20
73.20
90.60
218.40
260.00
280.00
214.20
280.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

BERAT PER 1 M1
1.12
1.36
1.83
2.42
3.08
3.77
4.55
5.42
5.91
7.38
6.87
9.03
9.66
12.20
12.20
15.10
36.40
43.33
46.67
35.70
46.67

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

Halaman : 3+116

CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3


BESI BETON POLOS

No

Diameter

Berat Besi

mm

Kg / m1

4.0

0.13

5.0

0.12

5.5

0.19

5.7

No

BESI BETON SPIRAL

Diameter

Berat Besi

mm

Kg / m1

No.

Diameter

Berat Besi

mm

Kg / m1

11

12

0.89

10.00

0.62

12

13

1.04

13.00

1.04

13

14

1.21

16.00

1.58

0.20

14

16

1.58

19.00

2.23

6.0

0.22

15

19

2.23

22.00

2.98

6.5

0.31

16

22

2.98

25.00

3.85

8.0

0.40

17

23

3.26

29.00

5.19

9.0

0.53

18

25

3.85

32.00

6.31

10.0

0.62

19

28

4.83

36.00

7.99

10

11.0

0.75

20

31

5.93

21

32

6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


VRS I SLOOF
uraian
Panjang 1 m3 ukuran 20 x 30 cm
Besi 4 batang dia. 12
Besi 2 batang dia. 10
Besi beugel dia. 8 jarak 10 - 20 cm

Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm


1
0.25
0.30 =
4
13.3333
0.62 =
0
13.3333333333
0.89 =
66.6666666667
1.1000
0.22 =

VRS II KOLOM TULANGAN 4 BUAH


uraian
Panjang 1 m3 ukuran 20 x 30 cm
Besi 4 batang dia. 12
Besi 2 batang dia. 10
Besi beugel dia. 8 jarak 15 cm

Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm


1
0.15
0.20 =
4
33.3333333333
0.62 =
0
33.3333333333
0.00 =
222.2222222222
0.7000
0.22 =

VRS III KOLOM TULANGAN 6-8-12 BUAH


uraian
Panjang 1 m3 ukuran 20 x 30 cm
Besi 4 batang dia. 12
Besi 2 batang dia. 10
Besi beugel dia. 8 jarak 15 cm

Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm


1
0.10
0.15 =
4
66.6666666667
0.00 =
0
66.6666666667
0.00 =
444.4444444444
0.5000
0.00 =

VRS IV RING BALK


uraian
Panjang 1 m3 ukuran 20 x 30 cm
Besi 4 batang dia. 12
Besi 2 batang dia. 10
Besi beugel dia. 8 jarak 15 cm

Rms tul 4 Btg 12 + 2 Btag 10 Beugel 8 Jarak 15 cm


1
0.15
0.25 =
6
26.6666666667
0.89 =
0
26.6666666667
0.00 =
177.7777777778
0.8000
0.40 =

PLAT BETON
VOLUME
1.00

LEBAR
1.00

JARAK TULANGAN
1 LAPIS 0.10
2 LAPIS 0.10

KOTA BANJAR

13.3333
33.0667
16.1333
49.2000

33.3333
82.6667
34.2222
116.8889

66.6667
-

26.6667
142.4000
56.8889
199.2889

TEBAL PANJANG
0.12
8.33
jumlah tulangan(m') melint jumlah tulangan(m') memanja diameter
11.00 11.00
84.33
84.00
0.62
11.00 11.00
84.33
84.00
0.62

volume tulangan (kg)


108.91
231.96

Halaman : 4+114

BEKISTING SLOOF
0.300

KAWAT BETON

0.300

0.600

M2
8.800

51.660

0.015

KG
0.77

0.400

0.700

M2
25.667

116.889

0.015

KG
1.75

0.300

0.500

M2
36.667

0.015

0.500

0.650

M2
19.067

209.253

0.015

KG
3.14

M3
0.18

0.396

PAKU/m2
0.300

8.800

kg
2.64

PELUMAS BEKISTING
0.100
8.000

ltr
0.80

PAKU/m2
0.400

kg
10.27

51.7
BEKISTING KOLOM
0.300

KAWAT BETON

M3
0.51

1.027

25.667

PELUMAS BEKISTING
0.200
25.667

ltr
5.13

PAKU/m2
0.400

kg
14.67

122.7
BEKISTING KOLOM
0.200

M3
0.73

1.467

KG
KAWAT BETON

36.667

PELUMAS BEKISTING
0.200
36.667

ltr
7.33

PAKU/m2
0.400

kg
7.63

BEKISTING RING BALK


0.150

KAWAT BETON

M3
0.38

0.763

19.067

PELUMAS BEKISTIN
0.200
19.067

ltr
3.81

209.3

untuk 1 lapis
bekisting papan
stootwerk jumlah total
dikalikan koef 1.05
luas
tebal
kaso 6/6 per m2 p = 3 m = 5
114.4
114.36
11.631
0.020
0.054
0.29
243.6
243.56
paku/m2
jumlah
koefisien kawat untuk 100 kg 0.15
0.400
11.631
4.65
kawat beton
jumlah

KOTA BANJAR

untuk 2 lapis
bekisting papan
stootwerk
luas
kaso
tebal 6/6 per m2 p = 3 m = 5
11.631
0.020
0.054
paku/m2
0.400
11.631
kawat beton

Halaman : 5+114

ANALISA SATUAN PEKERJAAN


NO.
1
A.01.02

URAIAN
KOEF
SAT.
2
3
4
1 M2 PEMBUATAN DIREKSI KEET DAN LOS GUDANG KERJA
BAHAN :
Kayu Albasiah
0.0800
m3
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Asbes Gelombang ( 80 x 180 cm cm )
Triplex 3 mm
PC (50 kg)
Pasir pasang
Bata merah
Jumlah Bahan
UPAH :
Ongkos Pasang
Jumlah Pekerja

A.02.01

JUMLAH
6=(3x5)

2,200,000.00

176,000.00

0.2500
0.6200
0.5000
5.0000
0.2500

kg
lbr
lbr
kg
m3

18,000.00
39,000.00
50,000.00
1,250.00
110,000.00

4,500.00
24,180.00
25,000.00
6,250.00
27,500.00

70.0000

bh

500.00

35,000.00
298,430.00

0.1500

ls

298,430.00

44,764.50
44,764.50

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan
1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER
BAHAN :

343,194.50
343,194.50
343,100.00

Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
A.02.09

HARGA SAT.
5

0.7500

Oh

65,000.00

48,750.00

0.0250

Oh

100,000.00

2,500.00
51,250.00
51,250.00
51,250.00
51,200.00

1 M3 URUGAN TANAH KEMBALI


BAHAN :
-

Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

0.2500
0.0083

Jumlah Total
Dibulatkan

Oh
Oh

65,000.00
100,000.00

16,250.00
830.00
17,080.00
17,080.00
17,080.00
17,000.00

6 dari 50

NO.
1
A.02.10

URAIAN
2

KOEF
3

SAT.
4

HARGA SAT.
5

1 M3 PEMADATAN TANAH
BAHAN :
-

Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

A.02.11

0.1920
0.0190

Oh
Oh

Jumlah Total
Dibulatkan
1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)
BAHAN :
Tanah Urug (didatangkan)
1.2000
m3
Jumlah Bahan
UPAH :
Pekerja
Mandor
Alat Bantu (sewa Stamper)

A.02.12

JUMLAH
6=(3x5)

65,000.00
100,000.00

12,480.00
1,900.00
14,380.00
14,380.00
14,380.00
14,300.00

25,000.00

30,000.00
30,000.00

0.4500
0.0450
0.1250

Oh
Oh
Oh

65,000.00
100,000.00
200,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M3 URUGAN PASIR

29,250.00
4,500.00
25,000.00
58,750.00
88,750.00
88,750.00
88,700.00

BAHAN :
Pasir Urug
Jumlah Bahan
UPAH :
Pekerja
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan

7 dari 50

1.2000

m3

0.3000
0.0100

80,000.00

96,000.00
96,000.00

Oh

65,000.00

19,500.00

Oh

100,000.00

1,000.00
20,500.00
116,500.00
116,500.00
116,500.00

NO.
1

URAIAN
2

KOEF
3

A.03.01

1 M3 PASANG AANSTAMPING BATU KOSONG


BAHAN :
Batu Belah 15/20
Pasir Urug
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

A.03.04

1.2000
0.4320

m3
m3

110,000.00
80,000.00

132,000.00
34,560.00
166,560.00

0.7800
0.3900
0.0390
0.0390

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

50,700.00
33,150.00
3,510.00
3,900.00

1.2000
136.0000
0.5440

m3
kg
m3

110,000.00
1,250.00
110,000.00

132,000.00
170,000.00
59,840.00
361,840.00

1.5000
0.7500
0.0750
0.0750

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

97,500.00
63,750.00
6,750.00
7,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland
Pasir Beton
Batu Pecah Mesin 2/3
Jumlah Bahan

175,500.00
537,340.00
537,340.00
537,300.00

218.0000
0.5200
0.8700

kg
m
m

1,250.00
130,000.00
160,000.00

272,500.00
67,600.00
139,200.00
479,300.00

1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

107,250.00
21,250.00
2,250.00
8,000.00

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting)

138,750.00
618,050.00
618,050.00
618,000.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


BAHAN :
Bekisting Albasiah
0.2700
m
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
4.0000
kg
Minyak Bekisting
1.3300
ltr
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Batu Pecah 2/3

JUMLAH
6=(3x5)

91,260.00
257,820.00
257,820.00
257,800.00

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

A.04.21

HARGA SAT.
5

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M3 PASANG PONDASI BATU BELAH 1 Pc : 5 Ps
BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang
Jumlah Bahan

A.04.14

SAT.
4

117.6000
1.7600
323.0000
0.5200
0.7800
8 dari 50

kg
kg
kg
m
m

2,200,000.00
18,000.00
27,000.00

594,000.00
72,000.00
35,910.00

11,000.00
21,000.00
1,250.00
130,000.00
160,000.00

1,293,600.00
36,960.00
403,750.00
67,600.00
124,800.00

NO.
1

URAIAN
2

KOEF
3

Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Tukang Kayu

SAT.
4

HARGA SAT.
5

JUMLAH
6=(3x5)
2,628,620.00

Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah
Dibulatkan

3.0000
0.3500
1.0400

Oh
Oh
Oh

65,000.00
85,000.00
85,000.00

195,000.00
29,750.00
88,400.00

1.0500
0.2450
0.1225

Oh
Oh
Oh

85,000.00
90,000.00
100,000.00

89,250.00
22,050.00
12,250.00
436,700.00
3,065,320.00
3,065,320.00
3,065,300.00

9 dari 50

NO.
1
A.04.25

URAIAN
2

SAT.
4

1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah
0.3700
m
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
6.6600
kg
Minyak Bekisting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton

A.04.29

KOEF
3

HARGA SAT.
5

JUMLAH
6=(3x5)

2,200,000.00
18,000.00

814,000.00
119,880.00

3.3200
211.2900
3.1700
323.0000
0.5200

ltr
kg
kg
kg
m

27,000.00
11,000.00
21,000.00
1,250.00
130,000.00

89,640.00
2,324,190.00
66,570.00
403,750.00
67,600.00

Batu Pecah 2/3


Jumlah Bahan
UPAH :
Pekerja
Tukang Batu

0.7800

160,000.00

124,800.00
4,010,430.00

3.0000
0.3500

Oh
Oh

65,000.00
85,000.00

195,000.00
29,750.00

Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja

1.0400
1.0500
0.2450
0.1225

Oh
Oh
Oh
Oh

85,000.00
85,000.00
90,000.00
100,000.00

88,400.00
89,250.00
22,050.00
12,250.00
436,700.00

Jumlah Bahan + Pekerja


Jumlah
Dibulatkan
1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Minyak Bekisting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Batu Pecah 2/3
Jumlah Bahan

4,447,130.00
4,447,130.00
4,447,100.00

0.4600
9.3300
4.6600
117.5900

m
kg
ltr
kg

2,200,000.00
18,000.00
27,000.00
11,000.00

1,012,000.00
167,940.00
125,820.00
1,293,490.00

1.6800
323.0000
0.5200
0.7800

kg
kg
m
m

21,000.00
1,250.00
130,000.00
160,000.00

35,280.00
403,750.00
67,600.00
124,800.00
3,230,680.00

3.0000
0.3500
1.0400
1.0500

Oh
Oh
Oh
Oh

65,000.00
85,000.00
85,000.00
85,000.00

195,000.00
29,750.00
88,400.00
89,250.00

0.2450
0.1225

Oh
Oh

90,000.00
100,000.00

22,050.00
12,250.00
436,700.00
3,667,380.00
3,667,380.00

UPAH :
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah
Dibulatkan

3,667,300.00

10 dari 50

NO.
1
A.04.32

URAIAN
2

SAT.
4

1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.4000
m
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
8.0000
kg
Minyak Bekisting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton

A.04.39

KOEF
3

HARGA SAT.
5

JUMLAH
6=(3x5)

2,200,000.00
18,000.00

880,000.00
144,000.00

4.0000
92.0500
1.3800
323.0000
0.5200

ltr
kg
kg
kg
m

27,000.00
11,000.00
21,000.00
1,250.00
130,000.00

108,000.00
1,012,550.00
28,980.00
403,750.00
67,600.00

Batu Pecah 2/3


Jumlah Bahan
UPAH :
Pekerja
Tukang Batu

0.7800

160,000.00

124,800.00
2,769,680.00

3.0000
0.3500

Oh
Oh

65,000.00
85,000.00

195,000.00
29,750.00

Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja

1.0400
1.0500
0.2450
0.1225

Oh
Oh
Oh
Oh

85,000.00
85,000.00
90,000.00
100,000.00

88,400.00
89,250.00
22,050.00
12,250.00
436,700.00

Jumlah Bahan + Pekerja


Jumlah
Dibulatkan
1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Minyak Bekisting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Batu Pecah 2/3
Jumlah Bahan

3,206,380.00
3,206,380.00
3,206,300.00

0.4700
9.3300
4.6700
172.9000

m
kg
ltr
kg

2,200,000.00
18,000.00
27,000.00
11,000.00

1,034,000.00
167,940.00
126,090.00
1,901,900.00

2.5900
323.0000
0.5200
0.7800

kg
kg
m
m

21,000.00
1,250.00
130,000.00
160,000.00

54,390.00
403,750.00
67,600.00
124,800.00
3,880,470.00

3.0000
0.3500
1.0400
1.0500

Oh
Oh
Oh
Oh

65,000.00
85,000.00
85,000.00
85,000.00

195,000.00
29,750.00
88,400.00
89,250.00

0.2450
0.1225

Oh
Oh

90,000.00
100,000.00

22,050.00
12,250.00
436,700.00
4,317,170.00
4,317,170.00

UPAH :
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah
Dibulatkan

4,317,100.00

11 dari 50

NO.
1
A.04.42

URAIAN
2

SAT.
4

1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah
0.3700
m
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
7.3300
kg
Minyak Bekisting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton

A.04.45

KOEF
3

HARGA SAT.
5

JUMLAH
6=(3x5)

2,200,000.00
18,000.00

814,000.00
131,940.00

3.6700
117.6000
1.7600
323.0000
0.5200

ltr
kg
kg
kg
m

27,000.00
11,000.00
21,000.00
1,250.00
130,000.00

99,090.00
1,293,600.00
36,960.00
403,750.00
67,600.00

Batu Pecah 2/3


Jumlah Bahan
UPAH :
Pekerja
Tukang Batu

0.7800

160,000.00

124,800.00
2,971,740.00

3.0000
0.3500

Oh
Oh

65,000.00
85,000.00

195,000.00
29,750.00

Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja

1.0400
1.0500
0.2450
0.1225

Oh
Oh
Oh
Oh

85,000.00
85,000.00
90,000.00
100,000.00

88,400.00
89,250.00
22,050.00
12,250.00
436,700.00

Jumlah Bahan + Pekerja


Jumlah
Dibulatkan
1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Minyak Bekisting
Besi Beton Polos U 24
Kawat Beton
Semen Portland
Pasir Beton
Batu Pecah 2/3
Jumlah Bahan

3,408,440.00
3,408,440.00
3,408,400.00

0.3500
6.9300
3.4700
151.9500

m
kg
ltr
kg

2,200,000.00
18,000.00
27,000.00
11,000.00

770,000.00
124,740.00
93,690.00
1,671,450.00

2.2800
323.0000
0.5200
0.7800

kg
kg
m
m

21,000.00
1,250.00
130,000.00
160,000.00

47,880.00
403,750.00
67,600.00
124,800.00
3,303,910.00

3.0000
0.3500
1.0400
1.0500

Oh
Oh
Oh
Oh

65,000.00
85,000.00
85,000.00
85,000.00

195,000.00
29,750.00
88,400.00
89,250.00

0.2450
0.1225

Oh
Oh

90,000.00
100,000.00

22,050.00
12,250.00
436,700.00
3,740,610.00
3,740,610.00

UPAH :
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah
Dibulatkan

3,740,600.00

12 dari 50

NO.
1
A.04.48

URAIAN
2

KOEF
3

HARGA SAT.
5

JUMLAH
6=(3x5)

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm


BAHAN :
Semen Portland
323.0000
kg
1,250.00
Pasir Beton
0.5200
m
130,000.00
Batu Pecah Mesin 2/3
0.7800
m
160,000.00
Besi Beton (Polos / ulir)
Kawat Beton
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Minyak Bekisting
Bekisting Albasiah

108.3700
1.6300
5.8600
2.9300
0.3200

Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Tukang Kayu

kg
kg
kg
ltr
m

11,000.00
21,000.00
18,000.00
27,000.00
2,200,000.00

403,750.00
67,600.00
124,800.00
1,192,070.00
34,230.00
105,480.00
79,110.00
704,000.00
2,711,040.00

Tukang Besi
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

A.04.50

SAT.
4

6.4697
0.2500
4.0260

Oh
Oh
Oh

65,000.00
85,000.00
85,000.00

420,533.10
21,250.00
342,210.00

1.0073
0.5192
0.1924

Oh
Oh
Oh

85,000.00
90,000.00
100,000.00

85,621.69
46,725.66
19,244.60
935,585.05
3,646,625.05

Jumlah Total
3,646,625.05
Dibulatkan
3,646,600.00
1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm
BAHAN :
Semen Portland
323.0000
kg
1,250.00
403,750.00
Pasir Beton
Batu Pecah Mesin 2/3
Besi Beton (Polos / ulir)
Kawat Beton
Paku 5 cm s/d 7 cm / Paku Reng - Usuk

0.5200
0.7800
192.9900
2.8900
4.8800

m
m
kg
kg
kg

130,000.00
160,000.00
11,000.00
21,000.00
18,000.00

67,600.00
124,800.00
2,122,890.00
60,690.00
87,840.00

Minyak Bekisting
Bekisting Albasiah
Jumlah Bahan
UPAH :
Pekerja

2.4400
0.2700

ltr
m

27,000.00
2,200,000.00

65,880.00
594,000.00
3,527,450.00

6.4697

Oh

65,000.00

420,533.10

Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2500
4.0260
1.0073
0.5192
0.1924

Oh
Oh
Oh
Oh
Oh

85,000.00
85,000.00
85,000.00
90,000.00
100,000.00

21,250.00
342,210.00
85,621.69
46,725.66
19,244.60

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan

935,585.05
4,463,035.05
4,463,035.05
4,463,000.00

13 dari 50

NO.
1
A.05.05

URAIAN
2

KOEF
3

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm
70.0000
Semen Portland
9.6800
Pasir Pasang
0.0450
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang

bh
kg
m

500.00
1,250.00
110,000.00

JUMLAH
6=(3x5)

35,000.00
12,100.00
4,950.00

0.3000
0.1000
0.0100

Oh
Oh
Oh

65,000.00
85,000.00
90,000.00

19,500.00
8,500.00
900.00

0.0150

Oh

100,000.00

1,500.00
30,400.00
82,450.00
82,450.00
82,400.00

1,250.00
110,000.00

6,480.00
2,860.00
9,340.00

65,000.00
85,000.00
90,000.00
100,000.00

19,500.00
12,750.00
1,350.00
1,500.00

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland
5.1840
kg
Pasir Pasang
0.0260
m
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

A.07.09

HARGA SAT.
5

52,050.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
A.06.04

SAT.
4

0.3000
0.1500
0.0150
0.0150

Oh
Oh
Oh
Oh

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II
BAHAN :
Kayu KAYU LOKAL KLS II , Balok
Paku 8 cm s/d 12 cm
Lem Kayu
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan

35,100.00
44,440.00
44,440.00
44,400.00

1.2000
1.2500
1.0000

m
kg
kg

2,750,000.00
18,000.00
16,000.00

3,300,000.00
22,500.00
16,000.00
3,338,500.00

6.0000
18.0000
1.8000
0.3000

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

390,000.00
1,530,000.00
162,000.00
30,000.00
2,112,000.00
5,450,500.00
5,450,500.00
5,450,500.00

14 dari 50

NO.
1
A.07.14

URAIAN
2

KOEF
3

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II , Papan
0.0400
Lem Kayu
0.5000
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

A.07.18

1.0000
3.0000
0.3000
0.0500

HARGA SAT.
5

Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja

3,000,000.00
16,000.00

120,000.00
8,000.00
128,000.00

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

65,000.00
255,000.00
27,000.00
5,000.00
352,000.00
480,000.00
480,000.00
480,000.00

0.0240
0.3000

m
kg

3,000,000.00
16,000.00

72,000.00
4,800.00
76,800.00

0.8000
2.4000
0.2400
0.0400

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

52,000.00
204,000.00
21,600.00
4,000.00
281,600.00

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan
1 M2 PASANG ATAP GENTENG PALENTONG
BAHAN :
Genteng Palentong
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan

JUMLAH
6=(3x5)

m
kg

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II
BAHAN :
Kayu KAYU LOKAL KLS II , Papan
Lem Kayu
Jumlah Bahan
UPAH :

A.08.15

SAT.
4

358,400.00
358,400.00
358,400.00

25.0000

buah

1,500.00

37,500.00
37,500.00

0.1500
0.0750

Oh
Oh

65,000.00
85,000.00

9,750.00
6,375.00

0.0080
0.0080

Oh
Oh

90,000.00
100,000.00

720.00
800.00
17,645.00
55,145.00
55,145.00
55,100.00

15 dari 50

NO.
1
A.08.18

URAIAN
2

KOEF
3

1 M1 PASANG BUBUNG GENTENG PALENTONG


BAHAN :
Genteng Bubung Palentong
Semen Portland
Pasir Pasang
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang

3,000.00
1,250.00
110,000.00

JUMLAH
6=(3x5)

15,000.00
10,000.00
3,520.00

0.4000
0.2000
0.0200

Oh
Oh
Oh

65,000.00
85,000.00
90,000.00

26,000.00
17,000.00
1,800.00

0.0020

Oh

100,000.00

200.00
45,000.00
73,520.00
73,520.00
73,500.00

3,000,000.00
18,000.00

32,400.00
1,800.00
34,200.00

65,000.00
85,000.00
90,000.00
100,000.00

6,500.00
17,000.00
1,800.00
500.00

1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II, Papan
0.0108
m
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
0.1000
kg
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

A.08.34

buah
kg
m3

HARGA SAT.
5

28,520.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
A.08.26

5.0000
8.0000
0.0320

SAT.
4

0.1000
0.2000
0.0200
0.0050

Oh
Oh
Oh
Oh

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M1 PASANG TALANG DATAR/JURAI SENG BJLS
BAHAN :
Seng Plat BJLS, L = 90 cm
Paku 3 cm
Kayu KAYU LOKAL KLS II, papan
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan

25,800.00
60,000.00
60,000.00
60,000.00

1.0500
0.0150
0.0190

m1

0.2000
0.4000
0.0250
0.01000

kg
m

35,000.00
18,000.00
3,000,000.00

36,750.00
270.00
57,000.00
94,020.00

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

13,000.00
34,000.00
2,250.00
1,000.00
50,250.00
144,270.00
144,270.00
144,200.00

16 dari 50

NO.
1
A.09.03

A.09.06

URAIAN
2

KOEF
3

HARGA SAT.
5

JUMLAH
6=(3x5)

1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Lokal Klas II, Balok
0.0154
m
2,750,000.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
0.2000
kg
18,000.00
Jumlah Bahan

42,350.00
3,600.00
45,950.00

UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

9,750.00
25,500.00
2,700.00
7,500.00

0.1500
0.3000
0.0300
0.0750

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm
BAHAN :
Eternit
Paku 3 cm
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja

A.09.09

SAT.
4

45,450.00
91,400.00
91,400.00
91,400.00

1.1000
0.0100

m2
kg

10,000.00
18,000.00

11,000.00
180.00
11,180.00

0.0300
0.0700
0.0070
0.0040

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

1,950.00
5,950.00
630.00
400.00
8,930.00

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan
1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4
BAHAN :

20,110.00
20,110.00
20,100.00

Kayu Profil
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Jumlah Bahan
UPAH :
Pekerja

1.0500
0.0100

m'
kg

3,000.00
18,000.00

3,150.00
180.00
3,330.00

0.0500

Oh

65,000.00

3,250.00

Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

0.0500
0.0050
0.0030

Oh
Oh
Oh

85,000.00
90,000.00
100,000.00

4,250.00
450.00
300.00
8,250.00
11,580.00

Jumlah Total
Dibulatkan

11,580.00
11,500.00

17 dari 50

NO.
1
A.10.03

A.10.09

A.10.19

URAIAN
2

KOEF
3

1 M2 PASANG LANTAI KERAMIK WARNA 20 X 20 CM


BAHAN :
Ubin Keramik 20 x 20 cm
1.1000
Semen Portland
10.4000
Pasir Pasang
0.0450

SAT.
4

HARGA SAT.
5

JUMLAH
6=(3x5)

m2
kg
m3

50,000.00
1,250.00
110,000.00

55,000.00
13,000.00
4,950.00

Semen Warna
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu

1.6200

kg

7,000.00

11,340.00
84,290.00

0.7000
0.3500

Oh
Oh

65,000.00
85,000.00

45,500.00
29,750.00

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total

0.0350
0.0350

Oh
Oh

90,000.00
100,000.00

3,150.00
3,500.00
81,900.00
166,190.00
166,190.00

Dibulatkan
1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Ubin Keramik 40 x 40 cm
Semen Portland

166,100.00

1.1000
9.8000

m2
kg

65,000.00
1,250.00

71,500.00
12,250.00

Pasir Pasang
Semen Warna
Jumlah Bahan
UPAH :
Pekerja

0.0450
1.3000

m3
kg

110,000.00
7,000.00

4,950.00
9,100.00
97,800.00

0.2500

Oh

65,000.00

16,250.00

Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

0.1250
0.0130
0.0130

Oh
Oh
Oh

85,000.00
90,000.00
100,000.00

10,625.00
1,170.00
1,300.00
29,345.00
127,145.00

Jumlah Total
Dibulatkan
1 M2 PASANG DINDING KERAMIK 20 X 25 CM
BAHAN :
Keramik 20 x 25 cm

127,145.00
127,100.00

1.1000

m2

50,000.00

55,000.00

Semen Abu-abu
Pasir Pasang
Semen Warna
Jumlah Bahan
UPAH :

9.3000
0.0180
1.9400

kg
m3
kg

1,250.00
110,000.00
7,000.00

11,625.00
1,980.00
13,580.00
82,185.00

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja

0.9000
0.4500
0.0450
0.0450

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

58,500.00
38,250.00
4,050.00
4,500.00
105,300.00

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan

187,485.00
187,485.00
187,400.00

18 dari 50

NO.
1
A.11.02

URAIAN
2

KOEF
3

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN


BAHAN :
Kloset Jongkok porselen
1.0000
Semen Portland
6.0000
Pasir Pasang
0.0100
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang

160,000.00
1,250.00
110,000.00

JUMLAH
6=(3x5)

160,000.00
7,500.00
1,100.00

1.0000
1.5000
1.5000

Oh
Oh
Oh

65,000.00
85,000.00
90,000.00

65,000.00
127,500.00
135,000.00

0.1600

Oh

100,000.00

16,000.00
343,500.00
512,100.00
512,100.00
512,100.00

200,000.00
200,000.00

200,000.00
36,000.00
236,000.00

65,000.00
85,000.00
90,000.00
100,000.00

117,000.00
229,500.00
48,600.00
11,000.00

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3


BAHAN :
Bak Fibreglass
1.0000
bh
Perlengkapan
0.1800 hrg bak
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

A.12.08

bh
kg
m

HARGA SAT.
5

168,600.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
A.11.06

SAT.
4

1.8000
2.7000
0.5400
0.1100

Oh
Oh
Oh
Oh

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"
BAHAN :
Pipa PVC
Perlengkapan
Jumlah Bahan
UPAH :

406,100.00
642,100.00
642,100.00
642,100.00

1.2000
m'
0.3500 hrg pipa

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja

0.0360
0.0600
0.0060
0.0018

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan

Oh
Oh
Oh
Oh

9,500.00
9,500.00

11,400.00
3,325.00
14,725.00

65,000.00
85,000.00
90,000.00
100,000.00

2,340.00
5,100.00
540.00
180.00
8,160.00
22,885.00
22,885.00
22,800.00

19 dari 50

NO.
1
A.12.13

URAIAN
2

KOEF
3

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"


BAHAN :
Pipa PVC
1.2000
m'
Perlengkapan
0.3500 hrg pipa
Jumlah Bahan
UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

A.12.14

0.0810
0.1350
0.0135
0.0041

Oh
Oh
Oh
Oh

HARGA SAT.
5

75,000.00
21,875.00
96,875.00

65,000.00
85,000.00
90,000.00
100,000.00

5,265.00
11,475.00
1,215.00
410.00
18,365.00
115,240.00
115,240.00
115,200.00

1.2000
m'
0.3500 hrg pipa

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja

JUMLAH
6=(3x5)

62,500.00
62,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"
BAHAN :
Pipa PVC
Perlengkapan
Jumlah Bahan
UPAH :

A.12.16

SAT.
4

0.0810
0.1350
0.0135
0.0041

Oh
Oh
Oh
Oh

87,500.00
87,500.00

105,000.00
30,625.00
135,625.00

65,000.00
85,000.00
90,000.00
100,000.00

5,265.00
11,475.00
1,215.00
410.00
18,365.00

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan
MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"
BAHAN :

153,990.00
153,990.00
153,900.00

Kran Air
Seal tape
Jumlah Bahan
UPAH :
Pekerja

1.0000
0.0250

bh
bh

30,000.00
3,000.00

30,000.00
75.00
30,075.00

0.0100

Oh

65,000.00

650.00

Tukang Batu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

0.1000
0.0100
0.0005

Oh
Oh
Oh

85,000.00
90,000.00
100,000.00

8,500.00
900.00
50.00
10,100.00
40,175.00

Jumlah Total
Dibulatkan

40,175.00
40,100.00

20 dari 50

NO.
1
A.12.17

URAIAN
2

KOEF
3

MEMASANG 1 BH FLOOR DRAIN


BAHAN :
Floordrain

1.0000

SAT.
4

bh

HARGA SAT.
5

28,000.00

Jumlah Bahan

A.14.01

28,000.00
28,000.00

UPAH :
Pekerja
Tukang Batu
Kepala Tukang
Mandor

A.13.03

JUMLAH
6=(3x5)

0.0100
0.1000
0.0100
0.0005

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)

650.00
8,500.00
900.00
50.00
10,100.00
38,100.00
38,100.00
38,100.00

Galian tanah
Pasir urug
Lantai kerja
Pas. bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok

2.2500
0.1071
1.1250
7.5000
0.1500

m
m
m
m
m

63,000.00
116,500.00
618,050.00
143,347.50
3,800,825.05

141,750.00
12,477.15
695,306.25
1,075,106.25
570,123.76

Pipa PVC 4" jenis AW + sambungan


Pipa GIP1/2"
Galian tanah untuk rembesan
Pas. injuk
Urugan kerikil 3,5 cm

9.0000
0.6000
1.6875
2.7000
0.5250

m1
btg
m
kg
m

50,000.00
15,000.00
63,000.00
17,500.00
150,000.00

450,000.00
9,000.00
106,312.50
47,250.00
78,750.00

Pipa PVC 4" berlobang jenis AW


Urugan kembali perataan tanah
Jumlah
Jumlah
Dibulatkan

9.0000
0.5625

m1
m

50,000.00
17,080.00

450,000.00
9,607.50
3,645,683.41
3,645,683.41
3,645,600.00

1.0000

bh

90,000.00

90,000.00
90,000.00

0.0100
0.5000
0.0100
0.0050

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

650.00
42,500.00
900.00
500.00
44,550.00

1 BUAH PASANG KUNCI TANAM BIASA


BAHAN :
Kunci Tanam biasa
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan

134,550.00
134,550.00
134,500.00

21 dari 50

NO.
1
A.14.04

URAIAN
2

KOEF
3

1 BUAH PASANG ENGSEL PINTU


BAHAN :
Engsel pIntu
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja

A.14.05

Dibulatkan
1 BUAH PASANG KAIT ANGIN
BAHAN :
Kait Angin
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1.0000

bh

18,000.00

18,000.00
18,000.00

0.0150
0.1500
0.0150
0.00075

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

975.00
12,750.00
1,350.00
75.00
15,150.00

1.0000

bh

11,000.00

11,000.00
11,000.00

0.0100
0.1000

Oh
Oh

65,000.00
85,000.00

650.00
8,500.00

0.0100
0.00050

Oh
Oh

90,000.00
100,000.00

900.00
50.00
10,100.00
21,100.00
21,100.00
21,100.00

1.0000

ps

10,000.00

10,000.00
10,000.00

0.0200
0.2000
0.0200
0.01000

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

1,300.00
17,000.00
1,800.00
1,000.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total
Dibulatkan
1 BUAH PASANG KUNCI SELOT

21,100.00
31,100.00
31,100.00
31,100.00

BAHAN :
Kunci Selot
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

JUMLAH
6=(3x5)

33,150.00
33,150.00
33,100.00

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total

A.14.08

HARGA SAT.
5

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan
1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
BAHAN :
Engsel Jendela
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu

A.14.06

SAT.
4

1.0000

bh

15,000.00

0.0200

Oh

65,000.00

1,300.00

0.2000
0.0200
0.00100

Oh
Oh
Oh

85,000.00
90,000.00
100,000.00

17,000.00
1,800.00
100.00
20,200.00
35,200.00

Jumlah Total
Dibulatkan

15,000.00
15,000.00

35,200.00
35,200.00

22 dari 50

NO.
1
A.14.09

URAIAN
2
1 BUAH PASANG TARIKAN PINTU
BAHAN :
Tarikan Pintu
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah Pekerja

A.15.02

KOEF
3

HARGA SAT.
5

bh

30,000.00

30,000.00
30,000.00

0.0500
0.5000
0.0500
0.00250

Oh
Oh
Oh
Oh

65,000.00
85,000.00
90,000.00
100,000.00

3,250.00
42,500.00
4,500.00
250.00
50,500.00

Jumlah Bahan + Pekerja


Jumlah Total
Dibulatkan
1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah Total

JUMLAH
6=(3x5)

1.0000

80,500.00
80,500.00
80,500.00

Kaca
Jumlah Bahan
UPAH :
Pekerja
Tukang Kayu

A.16.05

SAT.
4

1.1000

m2

60,000.00

66,000.00
66,000.00

0.0150
0.1500

Oh
Oh

65,000.00
85,000.00

975.00
12,750.00

0.0150
0.00075

Oh
Oh

90,000.00
100,000.00

1,350.00
75.00
15,150.00
81,150.00
81,150.00

Dibulatkan
1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)
BAHAN :
Cat tembok Sanlex / Sekelas Sanlex
0.1750
Plamir tembok
0.1600

81,100.00

kg
kg

11,000.00
14,000.00

1,925.00
2,240.00

Rol cat
Ampelas
Jumlah Bahan
UPAH :
Pekerja

0.0100
0.5000

bh
lbr

22,000.00
2,500.00

220.00
1,250.00
5,635.00

0.1040

org

65,000.00

6,760.00

Tk. cat
Kep. tukang cat
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

0.0182
0.0090
0.0045

org
org
org

85,000.00
90,000.00
100,000.00

1,547.00
810.00
450.00
9,567.00
15,202.00

Jumlah
Dibulatkan

15,202.00
15,200.00

23 dari 50

NO.
1
A.16.07

A.16.08

URAIAN
2

KOEF
3

1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)


BAHAN :
Cat tembok Sanlex / Sekelas Sanlex
0.2000
Plamir tembok
0.1600
Rol cat
0.0100

SAT.
4

HARGA SAT.
5

JUMLAH
6=(3x5)

kg
kg
bh

11,000.00
14,000.00
22,000.00

2,200.00
2,240.00
220.00

Ampelas
Jumlah Bahan
UPAH :
Pekerja
Tk. cat

0.5000

lbr

2,500.00

1,250.00
5,910.00

0.2000
0.0280

org
org

65,000.00
85,000.00

13,000.00
2,380.00

Kep. tukang cat


Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah

0.0150
0.0090

org
org

90,000.00
100,000.00

1,350.00
900.00
17,630.00
23,540.00
23,540.00

Dibulatkan
1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu
0.1670
Plamir kayu
0.0830
Cat kayu sekelas SEIV
Amplas kayu
Minyak cat terpentin
Kwas 3"
Jumlah Bahan
UPAH :
Pekerja
Tk. Cat
Kep. tukang cat
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Jumlah
Dibulatkan

23,500.00

kg
kg

22,000.00
15,000.00

3,674.00
1,245.00

0.2000
0.4000
0.1500
0.0500

kg
lbr
ltr
bh

65,000.00
2,500.00
9,000.00
10,000.00

13,000.00
1,000.00
1,350.00
500.00
20,769.00

0.2000
0.0600
0.0300
0.0100

org
org
org
org

65,000.00
85,000.00
90,000.00
100,000.00

13,000.00
5,100.00
2,700.00
1,000.00
21,800.00
42,569.00
42,569.00
42,500.00

24 dari 50

DAFTAR SATUAN HARGA BAHAN

NO

A
1
2
3
4

JENIS BAHAN BANGUNAN

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


Pasir Urug
Sirtu
Pasir Pasang Kali
Pasir Beton

SAT

Harga Satuan
Rp.

m
m
m
m

80,000.00
90,000.00
110,000.00
130,000.00

m
kg
m

105,000.00
14,000.00
130,000.00

Batu belah 15-20


Kerikil Sungai Ayak Tanpa Pasir
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah 10 - 15 cm

m
m
m
m
m
m
m

110,000.00
100,000.00
170,000.00
160,000.00
150,000.00
140,000.00
115,000.00

20 Batu Belah 7 - 10 cm
21 Batu Bronjol ( Untuk Bronjong )
22 Batu Tempel Hitam

m
m
m

125,000.00
110,000.00
160,000.00

23 Batu Pinggir Beton 10 x 20 x 35


24 Batu Pinggir Beton 15 x 35 x 50 ( K -225 )

bh
bh

17,000.00
42,000.00

25 Batu Telor
26 Batako kecil 8 x 10 x 20
27 Batako Besar 8 x 20 x 30

m
bh
bh

140,000.00
1,300.00
4,000.00

28
29
30
31
32
33
34

bh
bh
bh
bh
bh
bh
bh

3,000.00
750.00
500.00
2,500.00
4,000.00
7,000.00
20,000.00

35 Grass Blok 30 x 30
36 Paving Blok Natural
37 Paving Blok Warna

bh
bh
bh

25,000.00
1,300.00
1,500.00

38
39
40
41
42
43
44

m
m
m
m
bh
bh
bh

38,000.00
42,500.00
45,000.00
50,000.00
1,300.00
1,200.00
1,200.00

5 Abu Batu / Screen


6 Batu Gosok ( Apung )
8 Screen
9
14
15
16
17
18
19

Con Blok 8 x 20 x 40 (Holowblock)


Bata Merah Bakar Kelas I
Bata Merah Bakar Kelas II
Bata Merah Oven
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20

Paving Blok Natural 6 cm


Paving Blok Warna 6 cm
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
a. Bentuk Hexagonal (1m2 = 27 bh)
b. Bentuk Tiga Berlian (1m2 = 50 bh)
c. Bentuk Segi Panjang (1m2 = 50 bh)

25 dari 50

NO

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.
1,200.00
45,000.00
62,500.00
1,250.00
90,000.00
37,000.00
22,500.00
50,000.00
1,000,000.00
975,000.00
950,000.00
900,000.00
60,000.00
1,500.00
7,000.00
37,000.00

45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Paving Blok Biasa


Kanstin Paving Blok
Semen PC / 50 kg *M080
Semen PC
Semen Putih
Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 50 cm
Kanstin Jalan ukuran 1 bh = 50 cm, tinggi 20 cm
Kanstin Jalan ukuran Besar ( bina Marga K - 300 ) 1 bh = 50 cm
Readymix Beton K 350, tanpa pompa ( selang )
Readymix Beton K 300, tanpa pompa ( selang )
Readymix Beton K 225, tanpa pompa ( selang )
Readymix Beton K 175, tanpa pompa ( selang )
Kapur Pasang/ kapur tembok
Kapur Sirih
Semen Warna
Tanah Liat

bh
bh
zak
Kg
zak
bh
bh
bh

61
62
63
64
65
66
67
68
69
70

Tanah Urug (dilokasi)


Rumput
Rumput Gajah Kerdil
Rumput Jepang
Pohon Cemara Udang T= 2 m'
Pohon Cemara Lilin
Bunga Teh-tehan bulat daun hujau
Bunga Kriminil
Bunga Hiris
Pohon Palm Raja

m
m
m
m
btg
btg
plbk
plbk
plbk
btg

25,000.00
45,000.00
23,500.00
23,500.00
325,000.00
175,000.00
30,000.00
10,000.00
7,500.00
500,000.00

71
72
73
74
75
76
77
78
79
80

Pohon Palm Botol Besar


Teh-tehan daun kuning
Bunga Coleus Hibrida ( beragam jenis )
Pupuk Kompos
Hollow Block 20
Hollow Block 15
Hollow Block 10
Roster Terawang Keramik
Batu Candi
Batu Sikat 0,5 / 2 cm

btg
plbk
plbk
kg
bh
bh
bh
bh
m2
m2

750,000.00
30,000.00
50,000.00
1,500.00
3,000.00
2,400.00
1,900.00
30,000.00
95,000.00
100,000.00

26 dari 50

m
m
m
m
kg
kg
m

NO
B

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
Plamir Tembok
Cat Tembok ICI Eksterior ( BETON )
Cat Tembok Kelas II
Cat Tembok ICI Interior ( PLAFOND DAN DINDING )
Cat Tembok Vinilex
Cat Dasar ICI untuk Interior ( 2 Pelapis )
Cat Tembok Sanlex
Cat Genteng
Cat Tahan Asam
Cat Berkilat/Cat kayu
Plamir Kayu
Rool Cat Tembok
Kape Tembok
Kape Kayu

kg
kg
kg
lt
kg
lt
kg
kg
kg
kg
kg
bh
bh
bh

14,000.00
40,000.00
10,000.00
30,000.00
15,000.00
95,000.00
11,000.00
25,000.00
50,000.00
55,000.00
15,000.00
22,000.00
9,000.00
7,000.00

15
16
17
18
19
20
21
22
23
24

Soligneum 1 blek
Plincote
Pengawetan Kayu
Pengopenan Kayu
Kwas 3"
Kwas 2'
Oker
Oyan
Oten (Pewarna Plitur )
Spirtus

5 lt
kg
m
m
bh
bh
kg
bks
bks
lt

63,000.00
30,000.00
45,000.00
650,000.00
10,000.00
7,000.00
40,000.00
4,500.00
4,500.00
11,000.00

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Bahan Plitur Kripik ( Sirlak India )


Dempul Lilin
Dempul Plitur
Dempul Halus / Imfra ( Wood Filler )
Terpentin
Tiner A
Tiner B
Kumpon
Melamik
Impra
Dempul Plastik
Dempul Duco
Ampelas
Dempul Kayu Cap Kucing
Meni Kayu / Besi

kg
kg
kg
kg
lt
lt
lt
kg
kg
kg
kg
kg
lbr
kg
kg

24,000.00
23,000.00
3,500.00
45,000.00
9,000.00
16,000.00
25,000.00
24,000.00
45,000.00
40,000.00
35,000.00
36,000.00
2,500.00
28,000.00
22,000.00

40 Meni Sincromat
41 Cat Kayu Sieve
42 Cat Besi Sieve

kg
kg
kg

25,000.00
65,000.00
65,000.00

43 Cat Besi Duco Danaglos/ICI


44 Cat Bron

kg
kg

75,000.00
65,000.00

27 dari 50

NO
45
46
C
1
2
3
4
5
6
7
8
9
10
11
12
13

JENIS BAHAN BANGUNAN

SAT

Sirlak
Lem Fox
BAHAN KAYU BERIKUT BAHAN JADINYA
Bambu Biasa
Bambu 5 s.d 7
Bambu 7 s.d 10
Bambu Gombong
Rucuk Bambu
Kayu untuk Perancah
Kayu untuk Kontruksi Jembatan
Kayu Kamper Singkil / Kapur (K. Samarinda Klas II)
Kayu Balok Lokal Kelas II
Kayu Papan Lokal Kelas II
Kayu Balok Kamper
Kayu Papan Kamper
Kayu Balok Borneo Super

bt
bt
bt
bt
bt
m
m
m
m
m
m
m
m

7,000.00
9,000.00
10,000.00
33,000.00
3,500.00
1,750,000.00

14
15
16
17
18
19
20
21
22
23

Kayu Papan Borneo Super


Kayu Balok Kruing
Kayu Balok Kamper Medan
Kayu Papan Kamper Medan
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Balok Rasamala
Kayu Hutan Kelas I ( Segeng, Mahoni, Laban )

m
m
m
m
m
m
m
m
m
m

5,000,000.00
4,000,000.00
6,000,000.00
6,500,000.00
6,500,000.00
7,000,000.00
7,500,000.00
8,000,000.00
4,800,000.00
3,000,000.00

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Kayu Balok Albasiah


Kayu Papan Albasia
Kayu Kruing
Kayu Papan Borneo
Dolken 8 s/d 10 uk.4m'
Dolken 7 s/d 10
List profil kamper 1 cm
List profil kamper 2 cm
List profil kamper 4 cm
List profil kamper 5 cm
List profil kamper 10 cm
Pegangan Tangga profil Jati
Pegangan Tangga profil Kamper
Kayu Reng 2/3 Borneo
Kayu Reng 2/3 Kamper Banjar

m
m
m
m
bt
bt
m1
m1
m1
m1
m1
m1
m1
m1
m1

2,200,000.00
2,200,000.00
3,500,000.00
4,500,000.00
75,000.00
75,000.00
3,000.00
3,500.00
4,000.00
6,000.00
36,000.00
300,000.00
130,000.00
1,800.00
3,000.00

39 Kayu Reng 3/4 Kamper Banjar


40 Reng Kayu Kls II
41 List profil Kayu Lokal KLs II 4 cm

m1
m1
m1

4,800.00
1,400.00
3,000.00

28 dari 50

kg
bh

Harga Satuan
Rp.
70,000.00
16,000.00

8,000,000.00
2,750,000.00
3,000,000.00
7,500,000.00
8,000,000.00
4,500,000.00

NO
D

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
4
5
6
7

BAHAN PENUTUP RANGKA PLAFOND


Bahan plafond Enternit 4 mm
Bahan plafond hardpleks 5 mm 120 x 240
Bahan plafond Asbes Semen 5 mm
Gypsum 120 x 240 t = 9 mm ex DN
Gypsum 120 x 240 t = 9 mm ex Luar
Acustik Amstrong 60 x 120
GRC 120 x 240

m
lbr
m
lbr
lbr
lbr
lbr

10,000.00
120,000.00
9,000.00
70,000.00
85,000.00
130,000.00
55,000.00

1
2
3
4
5
6

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 4 mm Ukuran Pintu
Triplek 6 mm 120 x 240
Jabar Wood 4 mm
Plywood 18 mm 120 x 240

lbr
lbr
lbr
lbr
lbr
lbr

50,000.00
60,000.00
40,000.00
90,000.00
75,000.00
290,000.00

7
8
9
10
11
12
13
14
15
16

Plywood 4 mm 120 x 240


Plywood 3 mm 120 x 240
Plywood 3 mm ukuran Pintu
Plywood 4 mm ukuran Pintu
Bilik Bambu ( tanpa kulit )
Bilik Bambu ( dengan kulit )
Bilik Bambu Hitam Variasi
Wall Paper ( kls menengah )
Multiplek 9 mm 120 x 240
Multiplek 12 mm 120 x 240

lbr
lbr
lbr
lbr
m
m
m
m
lbr
lbr

120,000.00
72,000.00
65,000.00
80,000.00
6,000.00
14,000.00
20,000.00
50,000.00
120,000.00
160,000.00

17
18
19
20
21
22
23
24
25
26
27

Multiplek 18 mm 120 x 240


Teak Wood 3 mm 120 x 240
Teak Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240 Ukuran Pintu
Teak Wood ukuran Pintu 4 mm
Tacon ( tahan bakar )
Supercon
Melamin 4 mm 120 x 240
Melamin TIK 4 mm
Formika 120 x 240
Formika Ukuran Pintu

lbr
lbr
lbr
lbr
lbr
m
m
lbr
lbr
lbr
lbr

230,000.00
120,000.00
135,000.00
80,000.00
100,000.00
125,000.00
65,000.00
150,000.00
220,000.00
200,000.00
130,000.00

29 dari 50

NO
F

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
4
5
6
7
8
9
14
15
16
17
18
19

BAHAN LANTAI DAN PELAPIS DINDING


Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna Khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos
Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip
Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip
Keramik 20 x 20 (KM) KWI DN Putih Polos
Keramik 20 x 25 Dinding KM KWI DN Corak
Keramik 30 x 30 KW I DN putih polos
Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip
Keramik 40 x 40 cm
Keramik 60 x 60 cm
Keramik Mozaik 30 x 30 cm
Vinyl Lantai standar
Stairnosing keramik 10/20
Stairnosing fiber

m
m
m
m
m
m
m
m
m
dus
dus
dus
m
bh
m'

50,000.00
55,000.00
45,000.00
50,000.00
50,000.00
45,000.00
50,000.00
45,000.00
55,000.00
65,000.00
80,000.00
75,000.00
30,000.00
10,000.00
24,000.00

20
21
31
32
33
34
35
36
37

Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Bata Karawang
Campuran untuk Kedap Air (AM)
Lantai Parket
Stepnozing
Plint Keramik 5/20
Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm
Keramik Lantai sekualitas Romance KW I Warna 33x33 cm

m
bh
bh
ltr
m
m'
bh
m2
m2

35,000.00
7,000.00
6,500.00
35,000.00
450,000.00
17,000.00
6,000.00
75,000.00
70,000.00

BAHAN SALURAN AIR KOTOR / BERSIH


Grafel 1/2 d.20 cm
Grafel 1/2 d.30 cm
Grafel 1/2 d.40 cm
Buis Beton 20 cm ( 1 m' )
Buis Beton 30 cm ( 1 m' )
Buis Beton 40 cm ( 1 m' )
Buis Beton 50 cm ( 1 m' )
Buis Beton 60 cm ( 1 m' ) *M031
Buis Beton 100 cm ( 0.50 m ) *M035
Buis Beton 80 cm ( 0.50 m ) *M033
Buis Tanah 10 cm ( 0.50 m )
Buis Tanah 15 cm ( 0.50 m )
Buis Tanah 20 cm ( 0.50 m )
Buis Tanah 25 cm ( 0.50 m )

m1
m1
m1
m1
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

21,000.00
28,000.00
50,000.00
40,000.00
55,000.00
75,000.00
115,000.00
150,000.00
200,000.00
135,000.00
12,000.00
14,000.00
20,000.00
22,000.00

kg

17,500.00

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14

15 Injuk

30 dari 50

NO
H

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata - Rata *M167' < 22 mm
Besi Beton U-24 Rata - Rata *M167' > 22 mm
Besi Beton U-39 / U-32 Rata - Rata *M167
Pagar BRC
Pintu Pagar BRC Swing Tunggal/Ganda EP
Tiang Pagar Dia. 2" ( Tanpa Pondasi ) + Tutup
Mur-Baut
U-Clip/Klem
Bondek
Ongkos Galfanis Besi
Kawat Duri
Kawat Pengikat
Kawat Tembaga
Baja Siku / Profil DN
Baja IWF DN SII

kg
kg
kg
m
m
bh
bh
bh
m
kg
m1
m1
kg
kg
kg

11,000.00
11,000.00
12,000.00
135,000.00
275,000.00
115,000.00
1,500.00
750.00
150,000.00
7,000.00
2,400.00
21,000.00
6,000.00
13,000.00
14,000.00

18
19
20
21
22
23
24
25
26
27

Baja IWF Jepang


Kawat Beton *M168
Kawat Bronjong 4 mm *M162
Besi Galvanisir * M164
Baja Tralis *M161
Ram Nyamuk Hijau
Ram Kawat 1 x 1 cm
Ram Ayam
Kawat Kasa 1 x 1 cm ( Putih )
Kawat Harmonika 4 cm

kg
kg
kg
kg
kg
m
m
m
m
m

15,000.00
21,000.00
13,000.00
38,000.00
17,000.00
12,000.00
12,000.00
15,000.00
13,500.00
25,000.00

28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Kawat Harmonika 2 cm
Kawat Las Listrik
Wiremesh M8
Wiremesh M6
Plat Srip 2 x 30 mm ( 6 m1)
Plat Srip 3 x 30 mm ( 6 m1)
Plat Alumunium 0.1 mm
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " )
Kusen Alumunium 4" CA

m
kg
m
m
bt
bt
m
m
m
m
m
m
m1
m1
m1

30,000.00
30,000.00
50,000.00
40,000.00
40,000.00
75,000.00
50,000.00
85,000.00
120,000.00
135,000.00
160,000.00
180,000.00
150,000.00
190,000.00
85,000.00

bh
ps
m1

95,000.00
95,000.00
4,000.00

43 Handle Alumunium ( Tarikan Pintu Alumunium )


44 Kait Angin alumunium
45 Karet Asisoris Kusen / Pintu Alumunium

31 dari 50

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Seng Plat BJLS dia. 60 cm ( 100 m1 )


Seng Plat BJLS dia. 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mm s/d 10 mm
Plat Besi 10 mm Ke atas
Lem Kuning (aibond)
Lem Fox
Rolling door Besi
Pintu Aluminium
Pintu Swing 5 mm
Pintu Swing 8 mm
Teralis Besi strip
Besi Teralis

m1
m1
kg
kg
kg
kg
kg
kg
kg
m2
m2
unt
unt
m2
m2

Harga Satuan
Rp.
28,000.00
35,000.00
13,000.00
13,000.00
13,000.00
13,000.00
13,000.00
50,000.00
15,000.00
550,000.00
210,000.00
1,100,000.00
1,800,000.00
125,000.00
550,000.00

BAHAN KACA
Kaca Polos 2 mm
Kaca Polos 3 mm
Kaca Polos 5 mm
Kaca Polos Tebal 8 mm
Kaca Polos Tebal 12 mm
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca Patri Lokal Terpasang ( ASAHI )

m
m
m
m
m
m
m
m
m

45,000.00
50,000.00
60,000.00
180,000.00
250,000.00
65,000.00
600,000.00
900,000.00
365,000.00

10 Kaca Patri EX Luar negeri terpasang


11 Glass Block DN 20 x 20
12 Glass Block 20 x 20 Ex LN

m
bh
bh

1,500,000.00
25,000.00
80,000.00

kg
kg
kg
kg
kg
kg
bh
kg
kg
kg

18,000.00
18,000.00
18,000.00
18,000.00
18,000.00
24,000.00
1,000.00
18,000.00
20,000.00
9,000.00

11 Besi Beugel kuda - kuda


12 Duk Angker
13 Angker Mur Baut dia.19 / panjang 60 cm

kg
kg
bh

14,000.00
14,000.00
18,000.00

14 Mur Baut HTB dia. 19 s/d 16 (5 cm)


15 Mur Baut Biasa dia.19 s/d 16 (5 cm)

bh
bh

6,000.00
4,000.00

NO

1
2
3
4
5
6
7
8
9

J
1
2
3
4
5
6
7
8
9
10

JENIS BAHAN BANGUNAN

BAHAN PAKU DAN MUR BAUT


Paku 3 cm
Paku 5 cm s/d 7 cm / Paku Reng - Usuk
Paku 8 cm s/d 12 cm
Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik
Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil
Paku Beton 2 cm s/d 5 cm
Paku Kait Lengkap
Paku Cacing
Paku Seng Glb. / Paku Asbes Glb.
Paku Skrup

32 dari 50

SAT

bh

Harga Satuan
Rp.
3,000.00

1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN PERPIPAAN
Besi Pipa untuk Hydrant BSP 1"
Besi Pipa untuk Hydrant BSP 1,25"
Besi Pipa untuk Hydrant BSP 1,5"
Besi Pipa untuk Hydrant BSP 2"
Besi Pipa untuk Hydrant BSP 2,5"
Besi Pipa untuk Hydrant BSP 3"
Besi Pipa untuk Hydrant BSP 4"
Besi Pipa untuk Hydrant BSP 6"
Hydrant
Besi Pipa Hitam 1" t=2 mm
Besi Pipa Hitam 2" t=2 mm
Besi Pipa Hitam 3" t=2 mm
Besi Pipa Hitam 4" t=2 mm

bt
bt
bt
bt
bt
bt
bt
bt
bh
bt
bt
bt
bt

100,000.00
115,000.00
130,000.00
150,000.00
440,000.00
600,000.00
850,000.00
1,500,000.00
270,000.00
90,000.00
180,000.00
320,000.00
400,000.00

14
15
16
17
18
19
20
21
22
23

Besi Pipa Hitam 6" t=2 mm


Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4"( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt

550,000.00
90,000.00
105,000.00
160,000.00
200,000.00
240,000.00
300,000.00
360,000.00
500,000.00
600,000.00

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

Pipa GIP Medium A 4" ( 6 m1 )


Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"
Macam2 Sambungan GIP 1"
Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 1 1/2"
Macam2 Sambungan GIP 1 3/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 1"
Pipa PVC RUCIKA type AW 1 1/4"

bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt

800,000.00
4,000.00
7,000.00
10,000.00
13,000.00
14,000.00
22,000.00
30,000.00
42,000.00
55,000.00
60,000.00
25,000.00
38,000.00
48,000.00
65,000.00

NO

JENIS BAHAN BANGUNAN

16 Piser dia. 12 s/d 20 cm


K

SAT

39 Pipa PVC RUCIKA type AW


40 Pipa PVC RUCIKA type AW
41 Pipa PVC RUCIKA type AW

1 1/2"
2"
2 1/2"

bt
bt
bt

85,000.00
135,000.00
160,000.00

42 Pipa PVC RUCIKA type AW


43 Pipa PVC RUCIKA type AW

3"
4"

bt
bt

250,000.00
350,000.00

33 dari 50

NO

JENIS BAHAN BANGUNAN

44 Pipa PVC RUCIKA type AW


45 Pipa PVC RUCIKA type AW

6"
8"

SAT
bt
bt

34 dari 50

Harga Satuan
Rp.
700,000.00
1,000,000.00

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Pipa PVC MASPION ABU 1/2" (AW)


Pipa PVC MASPION ABU 3/4" (AW)
Pipa PVC MASPION ABU 1" (AW)
Pipa PVC MASPION ABU 1 1/4" (AW)
Pipa PVC MASPION ABU 1 1/2" (AW)
Pipa PVC MASPION ABU 2" (AW)
Pipa PVC MASPION ABU 2 1/2" (AW)
Pipa PVC MASPION ABU 3" (AW)
Pipa PVC MASPION ABU 4" (AW)
Pipa PVC MASPION ABU 6" (AW)
Knie PVC Diameter 0,5"
Knie PVC Diameter 0,75"
Knie PVC Diameter 1"
Knie PVC Diameter 2"
Knie PVC Diameter 3"
Knie PVC Diameter 4"

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh

Harga Satuan
Rp.
16,000.00
22,000.00
27,000.00
38,000.00
48,000.00
85,000.00
105,000.00
160,000.00
200,000.00
620,000.00
2,000.00
2,000.00
4,000.00
15,000.00
20,000.00
55,000.00

62
63
64
65
66
67
68
69
70
71

Tee PVC Diameter 0,5"


Tee PVC Diameter 0,75"
Tee PVC Diameter 1"
Tee PVC Diameter 2"
Tee PVC Diameter 3"
Tee PVC Diameter 4"
Kran Diameter 0,5"
Fiet Kran Diameter 0,5"
Fiet Kran Diameter 0,75"
Fiet Kran Diameter 1"

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

2,000.00
2,000.00
4,000.00
6,000.00
8,000.00
14,000.00
30,000.00
45,000.00
75,000.00
120,000.00

72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

Fiet Kran Diameter 2"


Fiet Kran Diameter 3"
Fiet Kran Diameter 4"
Macam2 Sambungan Paralon 1/2"
Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Samb. Paralon 2 1/2"
Macam2 Samb. Paralon 3"
Macam2 Samb. Paralon 4"
Sambungan Pipa PVC Jenis AW 4 " TY
Lem Paralon

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

430,000.00
890,000.00
1,890,000.00
5,000.00
5,000.00
18,000.00
20,000.00
20,000.00
20,000.00
20,000.00
20,000.00
50,000.00
60,000.00
35,000.00
7,000.00

gl
m1

3,000.00
50,000.00

NO

JENIS BAHAN BANGUNAN

87 Solatip Leideng
88 Pipa PVC 4" berlobang jenis AW

35 dari 50

SAT

NO
L

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BAHAN SANITAIR
Stop Kran 1/2 " KIT
Stop Kran 3/4 " KIT
Stop Kran 1 " KIT
Stop Kran 1 1/2 " KIT
Stop Kran 2 " KIT
Stop Kran 2 1/2" KIT
Stop Kran 3 " KIT
Fiet kran 3/4"
Fiet kran 1"
Fiet kran 2"
Fiet kran 3"
Fiet kran 4"
Saringan Air Lt KM Stainless Steel
Apooer Bath Tube
Kran stain less Lokal Kait

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

35,000.00
40,000.00
240,000.00
320,000.00
800,000.00
900,000.00
1,300,000.00
75,000.00
90,000.00
250,000.00
560,000.00
900,000.00
48,000.00
280,000.00
60,000.00

16
17
18
19
20
21
22
23
24
25

Shower Dengan Tiang


Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2 "
Kran Tembok ITAP dia. 1/2 "
Kran Bebek Sun Eui 1/2 "
Kran Bebek ITAP 1/2 "
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230

bh
bh
bh
bh
bh
bh
bh
unit
bh
unit

300,000.00
140,000.00
105,000.00
42,000.00
180,000.00
65,000.00
240,000.00
2,350,000.00
52,000.00
1,400,000.00

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Wastafel Lengkap INA


Wastafel Bulat Warna Standard Lengkap
Closet Duduk Poslin (INA) Lengkap
Closet Jongkok Poslin (INA)
Closet Jongkok Teraso
Closet Jongkok Poslin warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Closet Duduk Warna Standard lengkap INA
Urinoar Lengkap TOTO Warna Standard lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )

unit
unit
set
bh
bh
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh

750,000.00
1,600,000.00
1,900,000.00
160,000.00
95,000.00
450,000.00
220,000.00
2,250,000.00
2,400,000.00
1,500,000.00
1,750,000.00
450,000.00
200,000.00
150,000.00
320,000.00

41 Bak Mandi Teraso


42 Bak Mandi Fiber Glass 60 x 60 cm
43 Floordrain stainless

bh
bh
bh

280,000.00
200,000.00
28,000.00

44 Pintu Fiber

bh

425,000.00

36 dari 50

NO
K

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180
Atap Fiber Glass Tipis 80 x 180 (gelombang)
Atap Fiber Glass Tebal 80 x 180 (gelombang)
Atap Aluminium Natural USR 26 ( JAINDO )
Atap Aluminium Warna USR 26 ( JAINDO )
Atap Seng Gelombang BJLS 80 x 180
Atap Asbes Gel. Kecil 4 mm 80 x 180
Bubung Asbes
Atap Asbes Gel. 4 mm 90 x 180
Atap Asbes Gel. 5 mm 90 x 180
Atap Asbes Gel. Besar 4 mm 90 x 240
Atap Asbes Gel. Besar 5 mm 90 x 240
Atap Genteng Plentong pres Bakar KW 1
Atap Genteng Plentong pres Molen Oven KW1
Atap Genteng Flam pres Molen Oven Jatiwangi

lbr
lbr
lbr
m
m
lbr
lbr
lbr
lbr
lbr
lbr
lbr
bh
bh
bh

26,000.00
48,000.00
90,000.00
160,000.00
195,000.00
40,000.00
39,000.00
28,000.00
50,000.00
60,000.00
70,000.00
80,000.00
1,500.00
1,800.00
1,300.00

16
17
18
19
20
21
22
23
24
25

Genting Morando
Bubung Genteng pres Bulat Ex Jatiwangi
Genteng Bubungan Ex Jatiwangi Segi Tiga
Genteng Bubungan Beton
Genteng Beton Warna 14,5/m2
Genteng Beton Natural
Atap Genteng Beton Warna 14,5/m2
Genteng Beton Natural
Sirap Kelas I ( 80 / m2 )
Sirap

bh
bh
bh
bh
bh
bh
m
m
bh
m

3,000.00
5,500.00
4,000.00
5,000.00
9,000.00
6,000.00
95,000.00
65,000.00
22,000.00
105,000.00

26
27
28
29
30
31
32
33
34
35
36
37
38
39

Genteng Keramik
Genteng Keramik Natural Intan 14,5 / m2
Genteng Keramik Glasur Standard 14,5 / m2
Genteng Keramik Glasur Special 14,5 / m2
Genteng Keramik Glasur Premium 14,5 / m2
Genteng Murando Natural 1m2 = 18 bh
Genteng Murando Glasur 1m2 = 20 bh
Genting Magas
Bubung Murando Natural
Bubung Murando Glasur
Bubungan Genteng Keramik
Bubungan Genteng Palentong
Bubungan Genting Flam
Bubungan Genting Magas eks banjar

bh
m
m
m
m
bh
bh
bh
bh
bh
bh
bh
bh
bh

9,000.00
84,000.00
130,000.00
150,000.00
155,000.00
3,000.00
6,000.00
2,000.00
5,000.00
9,000.00
9,000.00
3,000.00
3,000.00
4,000.00

37 dari 50

NO
L

JENIS BAHAN BANGUNAN

SAT

Harga Satuan
Rp.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BAHAN ELEKTRIKAL
Kabel Twist (2x16 mm)
Kabel Twist (4x16 mm)
Kabel Twist (2x10 mm)
Kabel NYA (1.5 mm)
Kabel NYA (2.5 mm)
Kabel NYM (2x1.5 mm)
Kabel NYM (2x2.5 mm)
Kabel NYM (3x1.5 mm)
Kabel NYM (3x2.5 mm)
Kabel NYM (3x4 mm)
Kabel NYY (1x35 mm)
Kabel NYY (2x16 mm)
Kabel NYY (2x10 mm)
Kabel NYFGBY (4x6 mm)
Kabel NYFGBY (4x16 mm)

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

15,000.00
20,000.00
14,000.00
3,000.00
5,000.00
9,000.00
11,000.00
13,000.00
12,000.00
16,000.00
100,000.00
65,000.00
60,000.00
90,000.00
185,000.00

16
17
18
19
20
21
22
23
24
25

Kabel NYFGBY (4x25 mm)


Kabel Tembaga
Kabel Tik 2 10 mm
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm (kosong)
Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
MCB Mercury

m'
Kg
m'
bh
bh
unt
unt
unt
unt
bh

240,000.00
42,000.00
5,000.00
649,000.00
1,678,000.00
87,000.00
132,000.00
167,000.00
351,000.00
68,000.00

26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

MCB 1 PAS
MCB 3 PAS
MCB (15 Ampere)
MCB (25 Ampere)
MCB (2 Ampere)
MCB (6 Ampere)
Tahanan 50 A Merk Fuji
Saklar Tunggal Biasa
Saklar Ganda Biasa
Saklar Magnet 25 PK
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Saklar Engkel Outbow
Saklar Engkel Outbow (Persegi Cream)
Saklar Engkel Outbow (Persegi mahagony)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

39,000.00
66,000.00
50,000.00
160,000.00
60,000.00
170,000.00
395,000.00
4,000.00
7,000.00
993,000.00
12,000.00
18,000.00
16,000.00
33,000.00
33,000.00

bh
bh
bh

28,000.00
38,000.00
42,000.00

41 Saklar Engkel 1 B
42 Saklar Engkel Hotel New Gee Urea
43 Saklar Engkel 1 B (Radium)

38 dari 50

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

Saklar Engkel New Gee (Urea)


Saklar Engkel New Gee (Urea Mahagony)
Saklar Engkel New Gee (Urea Brasil)
Saklar Engkel New Gee (Urea Grey)
Saklar Seri 1 B
Saklar Seri 1 B (Radium)
Saklar Seri New Gee Urea
Saklar Seri New Gee Urea (Urea Mahagony)
Saklar Seri New Gee Urea (Urea Brasil)
Saklar Seri New Gee Urea (Urea Grey)
Saklar Seri Outbow
Saklar Seri Outbow (Persegi Cream)
Saklar Seri Outbow (Persegi Mahagony)
Saklar Triple 1 B
Saklar Triple 1 B (Radium)
Steker Arde Baru

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Harga Satuan
Rp.
33,000.00
38,000.00
38,000.00
38,000.00
33,000.00
47,000.00
45,000.00
50,000.00
50,000.00
50,000.00
22,000.00
45,000.00
50,000.00
55,000.00
80,000.00
30,000.00

60
61
62
63
64
65
66
67
68
69

Steker Arde New Gee (Cream)


Steker Biasa
Steker T (Arde Persegi)
Steker T (Putih)
Steker T (Hitam)
Steker T (Arde)
Stop Kontak Biasa
Stop Kontak Putar
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase ( Out Bow )

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

30,000.00
4,500.00
70,000.00
6,000.00
6,000.00
45,000.00
7,000.00
24,000.00
18,000.00
68,000.00

70
71
72
73
74
75
76
77
78
79
80
81
82
83
84

Stop Kontak Broko 3 Phase ( In Bow )


Stop Kontak Handle 3 Phase
Stop Kontak AC Arde 1B
Stop Kontak Arde 1B
Stop Kontak Arde 1B Tutup
Stop Kontak Arde 1B New Gee (Urea)
Stop Kontak Arde 1B New Gee (Urea Mahagony)
Stop Kontak Arde 1B New Gee (Urea Brasil)
Stop Kontak Arde 1B New Gee (Urea Grey)
Stop Kontak Arde Outbow (Putih)
Stop Kontak Arde Outbow (Hitam)
Stop Kontak Arde Outbow (Persegi Cream)
Stop Kontak Arde Outbow (Persegi Mahagony)
Stop Kontak Arde Putar (NG Cream)
Stop Kontak Arde Putar (NG Cream Mahagony)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

116,000.00
71,000.00
185,000.00
30,000.00
90,000.00
34,000.00
40,000.00
40,000.00
40,000.00
18,000.00
15,000.00
35,000.00
40,000.00
60,000.00
70,000.00

85 Stop Kontak Arde Putar (NG Grey)


86 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )

bh
ttk

70,000.00
93,000.00

NO

JENIS BAHAN BANGUNAN

39 dari 50

SAT

87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102

Lampu pijar 25 Watt s/d 100 Watt


Lampu Neon TL Philip 20 W
Lampu Neon TL Philip 40 W
Lampu TL 2 x 36 w Type TKI (Lengkap)
Lampu Down Light E 27 PLC-E 11 W (Lengkap)
Trapo TL 20 W ( Philip )
Trapo TL 40 W ( Philip )
Trapo TL 20 W ( Sinar )
Trapo TL 40 W ( Sinar )
Trapo Ballas
Stater Neon Philip
Stater Neon Biasa
Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )
Down Light + SL 25 W
Lampu SL Philip 25 W
Lampu Sirkel TL 20 W Lengkap

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Harga Satuan
Rp.
6,000.00
14,000.00
19,000.00
350,000.00
225.00
25,000.00
28,000.00
27,000.00
25,000.00
300,000.00
4,000.00
2,000.00
88,000.00
231,000.00
83,000.00
53,000.00

103
104
105
106
107
108
109
110
111
112

Lampu Mercuri 80 W
Lampu Mercuri 250 W
Lampu Son 150 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W lengkap
Pentanahan Penangkal Petir
Pentanahan Panel
Pipa Penangkal Petir
Box Sekering

bh
bh
bh
bh
bh
bh
ttk
ttk
bh
set

195,000.00
203,775.00
198,000.00
602,000.00
81,000.00
18,000.00
340,000.00
148,000.00
27,000.00
101,000.00

113
114
115
116
117

Box Lampu Mercury


Terminal Kabel
Box Panel KWH (1 Phase)
Box Panel KWH (3 Phase)
Box Sikring (lengkap)

bh
bh
bh
bh
set

920,000.00
22,000.00
300,000.00
500,000.00
135,000.00

BAHAN ALAT PENGANTUNG DAN KUNCI


Kunci Silinder ALFA untuk Pintu Alumunium
Tarikan Pintu
Kunci 2 Slaag ROYAL
Rel Henderson Lengkap
Rel Maraton I Pintu
Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO

bh
bh
bh
bh
unt
bh
bh
bh

275,000.00
30,000.00
90,000.00
850,000.00
90,000.00
260,000.00
125,000.00
135,000.00

bh
bh
bh

55,000.00
35,000.00
230,000.00

NO

1
2
3
4
5
6
7
8

JENIS BAHAN BANGUNAN

9 Kunci KM Bulat Kualitas Biasa


10 Kunci KM Bulat Sekwalitas ALFA
11 Kunci 2 Slaag Silinder Utama Standard

40 dari 50

SAT

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Kunci Gembok
Kunci tanam Slaag Royal
Kunci tanam Slaag Ancor
Kunci 2 Slaag Kuda Terbang
Kunci Jendela
Espangolet
Grendel Hitam Biasa 15 cm
Grendel 15 cm
Grendel 5 cm biasa
Hak Angin Kait Jendela Biasa
Hak Angin Jendela Antik
Hak Angin Sendok Stainless / Kuningan
Sloot Pintu berikut Rantai
Sloot Jendela Tunggal
Engsel Pintu Biasa
Engsel Pintu Unilon Standard

bh
bh
bh
bh
bh
ps
bh
bh
bh
ps
ps
bh
bh
bh
bh
ps

Harga Satuan
Rp.
13,000.00
120,000.00
90,000.00
90,000.00
10,000.00
75,000.00
10,000.00
15,000.00
4,000.00
10,000.00
25,000.00
25,000.00
35,000.00
13,000.00
18,000.00
28,000.00

28
29
30
31
32

Engsel Jendela Biasa


Engsel Jendela Unilon
Engsel Patrun
Engsel Harmonika
Engsel Floring

bh
ps
ps
m1
unit

11,000.00
13,000.00
8,000.00
15,000.00
600,000.00

hari

200,000.00

lt
m
m
lt
lt
lt
lt

11,000.00
120,000.00
65,000.00
2,000.00
4,500.00
4,500.00
27,000.00

NO

JENIS BAHAN BANGUNAN

STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
1 Stamper 8 Jam

N
1
2
3
2
3
4
5

BAHAN BAKAR DAN PELUMAS


Minyak Tanah
Kapur Bakar *M081
Kayu Bakar *M070
Bahan Residu
Minyak Solar
Bensin Premium
Minyak Pelumas

41 dari 50

SAT

HARGA SATUAN PEKERJAAN


NO.

URAIAN

JUMLAH

A.01.02

1 M2 PEMBUATAN DIREKSI KEET DAN LOS GUDANG KERJA

A.02.01

1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER

343,100.00
51,200.00

A.02.09

1 M3 URUGAN TANAH KEMBALI

17,000.00

A.02.10

1 M3 PEMADATAN TANAH

14,300.00

A.02.11

1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)

A.02.12

1 M3 URUGAN PASIR

116,500.00

88,700.00

A.03.01

1 M3 PASANG AANSTAMPING BATU KOSONG

257,800.00

A.03.04

1 M3 PASANG PONDASI BATU BELAH 1 Pc : 5 Ps

537,300.00

A.04.14

1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr

618,000.00

A.04.21

1 M3 MEMBUAT SLOOF 15/20 (117.6000 Kg Besi + Bekesting)

3,065,300.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.04.25

1 M3 MEMBUAT KOLOM 12/12 (211.2900 Kg Besi + Bekesting)

4,447,100.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.04.29

1 M3 MEMBUAT KOLOM 15/20 (117.5900 Kg Besi + Bekesting)

3,667,300.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.04.32

1 M3 MEMBUAT KOLOM 20/20 (92.0500 Kg Besi + Bekesting)

3,206,300.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.04.39

1 M3 MEMBUAT RING BALK 12/15 (172.9000 Kg Besi + Bekesting)

4,317,100.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.04.42

1 M3 MEMBUAT RING BALK 15/20 (117,6000 Kg Besi + Bekesting)

3,408,400.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.04.45

1 M3 MEMBUAT RING BALK 15/25 (151,9500 Kg Besi + Bekesting)

3,740,600.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.04.48

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 10 cm TEBAL 8 cm

3,646,600.00

A.04.50

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm

4,463,000.00

A.05.05

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps

A.06.04

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN

A.07.09

1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II

A.07.14

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II

480,000.00

A.07.18

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II

358,400.00

A.08.15

1 M2 PASANG ATAP GENTENG PALENTONG

55,100.00

A.08.18

1 M1 PASANG BUBUNG GENTENG PALENTONG

73,500.00

A.08.26

1 M1 PASANG LISPLANK UKURAN (3 x 20) cm, KAYU LOKAL KLS II

60,000.00

A.08.34

1 M1 PASANG TALANG DATAR/JURAI SENG BJLS

A.09.03

1 M2 PASANG RANGKA LANGIT - LANGIT (50 x 100) cm, KAYU LOKAL KLS II

91,400.00

A.09.06

1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm

20,100.00

A.09.09

1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4

11,500.00

A.10.03

1 M2 PASANG LANTAI KERAMIK WARNA 20 X 20 CM

166,100.00

A.10.09

1 M2 PASANG LANTAI KERAMIK 40 X 40 CM

127,100.00

A.10.19

1 M2 PASANG DINDING KERAMIK 20 X 25 CM

187,400.00

42 dari 50

82,400.00
44,400.00
5,450,500.00

144,200.00

NO.

URAIAN

JUMLAH

A.11.02

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN

512,100.00
642,100.00

A.11.06

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3

A.12.08

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"

A.12.13

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"

115,200.00

A.12.14

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"

153,900.00

A.12.16

MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"

40,100.00

A.12.17

MEMASANG 1 BH FLOOR DRAIN

38,100.00

A.13.03

1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)

A.14.01

1 BUAH PASANG KUNCI TANAM BIASA

A.14.04

1 BUAH PASANG ENGSEL PINTU

33,100.00

A.14.05

1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU

21,100.00

A.14.06

1 BUAH PASANG KAIT ANGIN

31,100.00

A.14.08

1 BUAH PASANG KUNCI SELOT

35,200.00

A.14.09

1 BUAH PASANG TARIKAN PINTU

80,500.00

A.15.02

1 M2 PASANG KACA, TEBAL 5 MM

81,100.00

A.16.05

1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)

15,200.00

A.16.07

1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)

23,500.00

A.16.08

1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI

42,500.00

22,800.00

3,645,600.00
134,500.00

43 dari 50

DAFTAR SATUAN UPAH PEKERJA

NO

JENIS PEKERJA BANGUNAN

HARGA UPAH
( Rp. )

SATUAN WAKTU

1
2

PEKERJA
PEKERJA TERAMPIL

65,000
85,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

TUKANG GALI

80,000

1 ORANG/ HR/ 8 JAM

4
5

TUKANG BATU TERAMPIL


KEPALA TUKANG BATU

85,000
90,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

6
7

TUKANG KAYU TERAMPIL


KEPALA TUKANG KAYU

85,000
90,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

TUKANG CAT / PELITUR TERAMPIL

85,000

1 ORANG/ HR/ 8 JAM

9
10

KEPALA TUKANG CAT / PELITUR


TUKANG BESI BETON TERAMPIL

90,000
85,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

11
12

KEPALA TUKANG BESI BETON


TUKANG BESI PROFIL TERAMPIL

90,000
85,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM

13
14
15

KEPALA TUKANG BESI PROFIL


MANDOR
OPERATOR MEKANIK

90,000
100,000
75,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

16
17
18
19
20

PEMBANTU OPERATOR / MEKANIK


OPERATOR ALAT BERAT TERLATIH
SUPIR TRUK
KENEK TRUK
PENJAGA MALAM

60,000
75,000
75,000
60,000
60,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

21
22
23
24
25

TUKANG ASPAL
BURUH LAPANGAN TAK TERLATIH
BURUH LAPANGAN KURANG TERLATIH
BURUH LAPANGAN TERLATIH
TUKANG LAS

60,000
50,000
60,000
75,000
70,000

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

44 dari 50

REKAPITULASI RENCANA ANGGARA BIAYA


PEMBANGUNAN RUMAH TINGGAL SEDERHANA

NO.

JUMLAH
(RP)

URAIAN PEKERJAAN

I.

PEKERJAAN PERSIAPAN

II.

PEKERJAAN PENGUKURAN DAN BOUWLANK

III

PEKERJAAN TANAH DAN PONDASI


PEKERJAAN BETON
PEKERJAAN DINDING DAN LANTAI
PEKERJAAN KUSEN DAN PLAFOND
PEKERJAAN P
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK
PEKERJAAN PENGUKURAN DAN BOUWLANK

JUMLAH
PPN 10%
JUMLAH TERMASUK PPN
Diperiksa :
PEJABAT PELAKSANA TEKNIS
KEGIATAN
TERBILANG :

DIBULATKAN

Dibuat
oleh ::
Menyetujui
KONSULTAN
PERENCANA
PEJABAT PEMBUAT
CV. ARCHINDO
MEDIA KARYA
KOMITMEN

SUSPENDI, SH
NIP. 196105161983031009

BUDI NURCAHYADI, S.T., IAI


Utama
MUJJADIDirektur
ADI NUGROHO,
A. Ks
NIP. 197111141994031002

Page 45 of 50

SUSPENDI, SH RENCANA ANGGARAN


NIP. 196105161983031009

Dibuat
oleh ::
Menyetujui
KONSULTAN
PERENCANA
PEJABAT PEMBUAT
BIAYA
CV. ARCHINDO
MEDIA KARYA
KOMITMEN

PEMBANGUNAN RUMAH TINGGAL SEDERHANA

NO.
I.

KODE
ANALISA

URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN

1 Pengadaan Listrik dan Air Kerja


2 Pengukuran & Pas. Bowplank
3 Pek. Direksikeet/Gudang Kerja

ls
ls
A.01.02

4 Pek. Pembersihan setelah Pembangunan

ls

VOLUME
HARGA SAT.
BUDI NURCAHYADI,
SATUAN
( Rp. ) S.T., IAI
Utama
MUJJADIDirektur
ADI NUGROHO,
A. Ks
NIP. 197111141994031002
Unit
M
m
343,100.00
112.000 Unit
JUMLAH : I

II.

PEKERJAAN KONTRUKSI :

A. PEKERJAAN TANAH & PASIR


1 Pek. Galian Tanah Pondasi
2 Pek. Urugan Kembali Bekas Galian

A.02.01
A.02.09

3 Pek. Urugan Tanah Peninggian Lantai (tanah dari


luar)

A.02.11

4 Pek. Urugan Pasir Bawah Pondasi


5 Pek. Urugan Pasir Bawah Lantai

A.02.12
A.02.12

64.175
21.390

3.400
3.000

m
m

51,200.00
17,000.00

88,700.00

m
m

116,500.00
116,500.00
JUMLAH : A

1
2
3
4
5

B. PEK. PASANGAN, DINDING DAN PLESTERAN


Pas. Aanstamping Batu Kali
Pas. Pondasi Batu Kali (1 Pc : 5 Ps)
Pas. Dinding Bata (1 Pc : 5 Ps)
Pas. Plesteran Dinding + Acian (1 Pc : 5 Ps)
Pas. Ban Plesteran

A.03.01
A.03.04
A.05.05
A.06.04
A.06.04

10.190
25.110
426.540

m
m
m
m
m

257,800.00
537,300.00
82,400.00
44,400.00
44,400.00
JUMLAH : B

1
2
3
4
5

C. PEKERJAAN STRUKTUR BETON


Pek. Sloof Beton Bertulang 15/20
Pek. Kolom Beton Bertulang 15/15
Pek. Ring Balok Bertulang 15/20
Pek. Balok Oversteak 12/15
Pek. Plat Oversteak t = 7 cm

A.04.29
A.04.32
A.04.25
A.04.48
A.04.39

2.300
1.440

m
m
m
m
m

3,667,300.00
3,206,300.00
4,447,100.00
3,646,600.00
4,317,100.00
JUMLAH : C

1
2
3
4
5
6
7
8
9
10
11
12

D. PEK. KUSEN, PINTU DAN JENDELA


Pek. Kusen Kayu Lokal Kls II
Pek. Daun Pintu Panil Kayu Lokal Kls II
Pek. Daun Jendela Panil Kayu Lokal Kls II
Pas. Kunci Pintu Tanam
Pas. Engsel Pintu
Pas. Engsel Jendela
Pas. Slot Pintu
Pas. Slot Jendela
Pas. Hak Angin
Pas. Pegangan Pintu
Pas. Kaca Polos 5 mm
Pek. Pintu Fibre

A.07.09
A.07.14
A.07.18
A.14.01
A.14.04
A.14.05
A.14.08
A.14.08
A.14.06
A.14.09
A.15.02
ls

m
m
Bh
Bh
Bh
Bh
bh
bh
bh
bh
bh
bh

5,450,500.00
480,000.00
358,400.00
134,500.00
33,100.00
21,100.00
35,200.00
35,200.00
31,100.00
80,500.00
81,100.00
JUMLAH : D

Page 46 of 50

CV. ARCHINDO
MEDIA KARYA
KOMITMEN

NO.

KODE
ANALISA

URAIAN PEKERJAAN

E. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Enternit Kayu Lokal Kls II

A.09.03

2 Pek. Penutup Plafond Enternit


3 Pek. List Plafond Kayu Lokal Kls II

A.09.06
A.09.09

VOLUME
HARGA SAT.
BUDI NURCAHYADI,
SATUAN
( Rp. ) S.T., IAI
Utama
MUJJADIDirektur
ADI NUGROHO,
A. Ks
NIP. 197111141994031002
m
91,400.00
m
m'

20,100.00
11,500.00
JUMLAH : E

F. PEKERJAAN ATAP
1

Pas. Kuda & Rangka Atap (Baja Ringan Lengkap)


Kualitas Galvalum (Zinc - Alumunium) Coating

ls

2 Pas. Penutup Atap Genteng Palentong


3 Pas. Talang lipatan atap seng BJLS
4 Pas. Listplank Kayu Lokal Kls II

A.08.15
A.08.34
A.08.26

5 Pas. Bubungan Genteng Palentong

A.08.18

m
m'
m'

55,100.00
144,200.00
60,000.00

m'

73,500.00
JUMLAH :F

G. PEKERJAAN LANTAI
1 Pas. Lantai Kramik (40x40)
2 Pas. Keramik WC/K.MANDI (20x20) antislip
3 Pas. Keramik Dinding WC/K.MANDI (20x25)

A.10.09
A.10.03
A.10.19

4 Pas. Rabat Beton Tumbuk 1:3:5

A.04.14

58.750
2.700
55.250

m
m
m

127,100.00
166,100.00
187,400.00

618,000.00
JUMLAH : G

H. PEKERJAAN PENGECETAN
1 Pek. Cat Dinding Bangunan
2 Pek. Cat Plafond
3 Pek. Cat Permukaan Kayu

A.16.05
A.16.07
A.16.08

456.540
64.600

m
m
m

15,200.00
23,500.00
42,500.00
JUMLAH : H

1
2
3
4
5
6
7
8
9

I. PEKERJAAN INSTALASI LISTRIK


Biaya Pemasangan Listrik (2200 Watt)
Pas. Panel (lengkap)
Pas. Instalasi Titik Lampu
Pas. Instalasi Stop Kontak
Pas. Lampu TL 2 x 36 w Type TKI (Lengkap)
Pas. Lampu SL Philip 12 W
Pas. Saklar Tunggal sekualitas Broco
Pas. Saklar Seri sekualitas Broco
Pas. Stop Kontak Broco

Dihitung
ls
ls
ls
ls
ls
ls
ls
ls

1.000
1.000
21.000
11.000
8.000
13.000
5.000
5.000
9.000

unt
unt
ttk
ttk
bh
bh
bh
bh
bh
JUMLAH : I

J. PEKERJAAN INSTALASI AIR BERSIH


1 Pas. Pipa PVC 3/4" (air bersih)
2 Pas. Washtafel + Kaca Cermin
3 Pas. Kran Air Bersih

A.12.08
ls
A.12.16

1.000
3.000

m'
bh
bh

22,800.00
40,100.00
JUMLAH : J

1
2
3
4
5
6

K. PEKERJAAN INSTALASI AIR KOTOR


Pas. Pipa PVC 4" Air Kotor
Pas. Pipa PVC 3" Air Kotor
Pas. Bak mandi Fibreglass
Pas. Kloset Jongkok Porselen
Pas. Floor Drain
Pek. Septictank & Rembesan (Type Kecil)

A.12.14
A.12.13
A.11.06
A.11.02
A.12.17
A.13.03

2.000
2.000
3.000
1.000

m'
m'
bh
bh
bh
unt

153,900.00
115,200.00
642,100.00
512,100.00
38,100.00
3,645,600.00
JUMLAH : K

Page 47 of 50

TULASI RENCANA ANGGARA BIAYA


UNAN RUMAH TINGGAL SEDERHANA

JUMLAH
(RP)
-

4,394,990.00
35,056,961.00
13,051,862.00
18,269,445.00
8,457,508.00
120,300.00
6,068,300.00

85,419,366.00
8,541,936.60
93,961,302.60
93,961,000.00

Dibuat
oleh ::
Menyetujui
KONSULTAN
PERENCANA
PEJABAT PEMBUAT
CV. ARCHINDO
MEDIA KARYA
KOMITMEN

BUDI NURCAHYADI, S.T., IAI


Utama
MUJJADIDirektur
ADI NUGROHO,
A. Ks
NIP. 197111141994031002

Page 48 of 50

Dibuat
oleh ::
Menyetujui
KONSULTAN
PERENCANA
PEJABAT PEMBUAT
BIAYA
CV. ARCHINDO
MEDIA KARYA
KOMITMEN

RENCANA ANGGARAN
UNAN RUMAH TINGGAL SEDERHANA

JUMLAH HARGA
BUDI NURCAHYADI, S.T., IAI
( Rp. )
Utama
MUJJADIDirektur
ADI NUGROHO,
A. Ks
NIP. 197111141994031002
-

3,285,760.00
363,630.00
396,100.00
349,500.00
4,394,990.00
2,626,982.00
13,491,603.00
18,938,376.00
35,056,961.00
8,434,790.00
4,617,072.00
13,051,862.00
-

Page 49 of 50

CV. ARCHINDO
MEDIA KARYA
KOMITMEN

JUMLAH HARGA
BUDI NURCAHYADI, S.T., IAI
( Rp. )
Utama
MUJJADIDirektur
ADI NUGROHO,
A. Ks
NIP. 197111141994031002
-

7,467,125.00
448,470.00
10,353,850.00
18,269,445.00
6,939,408.00
1,518,100.00
8,457,508.00
120,300.00
120,300.00
1,284,200.00
1,024,200.00
114,300.00
3,645,600.00
6,068,300.00

Page 50 of 50

Anda mungkin juga menyukai