CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3

1. Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 ) = 69.44 m1
Besi 4 batang dia. 12 = 4 x 69,44 x 0,89 kg = 247.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg = 66.67 kg ( B )

BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 = 313.89 kg/m3 ( A + B )

2. Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 cm
= ( 1 : 0.15 : 0.15 ) = 44.44 m1
Besi 4 batang dia. 12 = 4 x 44,44 x 0,89 kg = 158.22 kg ( A)
Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg = 71.11 kg ( B )

BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 229.33 kg/m3 ( A + B )

3. Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 c= ( 1 : 0.15 : 0.20 ) = 33.33 m1
Besi 4 batang dia. 12 = 4 x 33,33 x 0,89 kg = 118.67 kg ( A)
Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x = 155.56 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3 = 274.22 kg/m3 ( A + B )

4. Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm
= ( 1 : 0.20 : 0.30 ) = 16.67 m1
Besi 4 batang dia. 12 = 4 x 16,67 x 0,89 kg = 89.00 kg ( A)
Besi 2 batang dia. 10 = 2 x 16.67 x 0.62 kg = 0.00 kg ( B)
Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X = 33.33 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3 = 122.33 kg/m3 ( A + B + C )

KOTA BANJAR Halaman : 1+114


Lampiran 1
DAFTAR BERAT BESI KANAL " C "

UKURAN BESI KANAL " C " BERAT 6 M1 BERAT PER 1 M1


NO.
6.00
1 60 x 30 x 10 x 1.6 x 6 mm 9.80 kg 1.63 kg
2 60 x 30 x 10 x 2.3 x 6 mm 13.90 kg 2.32 kg
3 75 x 35 x 15 x 1.6 x 6 mm 12.50 kg 2.08 kg
4 75 x 35 x 15 x 2.3 x 6 mm 17.40 kg 2.90 kg
5 75 x 45 x 15 x 1.6 x 6 mm 14.00 kg 2.33 kg
6 75 x 45 x 15 x 2.3 x 6 mm 19.00 kg 3.17 kg
7 100 x 50 x 20 x 2 x 6 mm 21.40 kg 3.57 kg
8 100 x 50 x 20 x 2.3 x 6 mm 24.40 kg 4.07 kg
9 100 x 50 x 20 x 3.2 x 6 mm 33.00 kg 5.50 kg
10 125 x 50 x 20 x 2 x 6 mm 23.70 kg 3.95 kg
11 125 x 50 x 20 x 2.3 x 6 mm 27.10 kg 4.52 kg
12 125 x 50 x 20 x 3.2 x 6 mm 37.00 kg 6.17 kg
13 150 x 50 x 20 x 2 x 6 mm 26.10 kg 4.35 kg
14 150 x 50 x 20 x 2.3 x 6 mm 29.76 kg 4.96 kg
15 150 x 50 x 20 x 3.2 x 6 mm 40.56 kg 6.76 kg
16 150 x 65 x 20 x 2 x 6 mm 28.92 kg 4.82 kg
17 150 x 65 x 20 x 2.3 x 6 mm 33.00 kg 5.50 kg
18 150 x 65 x 20 x 3.2 x 6 mm 45.10 kg 7.52 kg
19 200 x 75 x 20 x 2 x 6 mm 35.52 kg 5.92 kg
20 200 x 75 x 20 x 2.3 x 6 mm 40.62 kg 6.77 kg
21 200 x 75 x 20 x 3.2 x 6 mm 55.62 kg 9.27 kg

KOTA BANJAR Halaman :2+115


Lampiran 2
DAFTAR BERAT BESI IWF

UKURAN IWF BERAT 12 M1 BERAT PER 1 M1


NO.
1 100 x 50 x 5 x 7 mm 112.00 kg 9.33 kg
2 125 x 60 x 6 x 8 mm 158.40 kg 13.20 kg
3 148 x 100 x 6 x 9 mm 253.20 kg 21.10 kg
4 150 x 75 x 5 x 7 mm 168.00 kg 14.00 kg
5 175 x 90 x 5 x 8 mm 217.40 kg 18.12 kg
6 198 x 99 x 4.5 x 7 mm 218.40 kg 18.20 kg
7 200 x 100 x 5.5 x 8 mm 256.00 kg 21.33 kg
8 248 x 124 x 5 x 8 mm 308.40 kg 25.70 kg
9 250 x 125 x 6 x 9 mm 355.20 kg 29.60 kg
10 298 x 149 x 6 x 8 mm 384.00 kg 32.00 kg
11 300 x 150 x 6.5 x 9 mm 440.40 kg 36.70 kg
12 346 x 174 x 6 x 9 mm 497.00 kg 41.42 kg
13 350 x 175 x 7 x 11 mm 595.20 kg 49.60 kg
14 396 x 199 x 7 x 11 mm 679.20 kg 56.60 kg
15 400 x 200 x 8 x 13 mm 792.00 kg 66.00 kg
16 446 x 199 x 8 x 12 mm 794.40 kg 66.20 kg
17 450 x 200 x 9 x 14 mm 912.00 kg 76.00 kg
18 500 x 200 x 10 x 16 mm 1,075.00 kg 89.58 kg
19 588 x 300 x 12 x 20 mm 1,812.00 kg 151.00 kg
20 600 x 200 x 11 x 17 mm 1,272.00 kg 106.00 kg
21 700 x 300 x 13 x 24 mm 2,220.00 kg 185.00 kg
22 800 x 300 x 14 x 26 mm 2,520.00 kg 210.00 kg
23 900 x 300 x 16 x 28 mm 2,916.00 kg 243.00 kg

DAFTAR BERAT BESI SIKU " L "

UKURAN BESI KANAL " L " BERAT / BATANG BERAT PER 1 M1


NO.
1 25 x 25 x 3 x 6 mm 6.72 kg 1.12 kg
2 30 x 30 x 3 x 6 mm 8.16 kg 1.36 kg
3 40 x 40 x 3 x 6 mm 11.00 kg 1.83 kg
4 40 x 40 x 4 x 6 mm 14.50 kg 2.42 kg
5 50 x 50 x 4 x 6 mm 18.50 kg 3.08 kg
6 50 x 50 x 5 x 6 mm 22.60 kg 3.77 kg
7 60 x 60 x 5 x 6 mm 27.30 kg 4.55 kg
8 60 x 60 x 6 x 6 mm 32.52 kg 5.42 kg
9 65 x 65 x 6 x 6 mm 35.46 kg 5.91 kg
10 70 x 70 x 7 x 6 mm 44.28 kg 7.38 kg
11 75 x 75 x 6 x 6 mm 41.22 kg 6.87 kg
12 75 x 75 x 8 x 6 mm 54.18 kg 9.03 kg
13 80 x 80 x 8 x 6 mm 57.96 kg 9.66 kg
14 90 x 90 x 9 x 6 mm 73.20 kg 12.20 kg
15 100 x 100 x 8 x 6 mm 73.20 kg 12.20 kg
16 100 x 100 x 10 x 6 mm 90.60 kg 15.10 kg
17 120 x 120 x 10 x 12 mm 218.40 kg 36.40 kg
18 120 x 120 x 12 x 12 mm 260.00 kg 43.33 kg
19 125 x 125 x 12 x 12 mm 280.00 kg 46.67 kg
20 130 x 130 x 9 x 12 mm 214.20 kg 35.70 kg
21 130 x 130 x 12 x 12 mm 280.00 kg 46.67 kg

KOTA BANJAR Halaman : 3+116


CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi
mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.13 11 12 0.89 1 10.00 0.62


2 5.0 0.12 12 13 1.04 2 13.00 1.04
3 5.5 0.19 13 14 1.21 3 16.00 1.58
4 5.7 0.20 14 16 1.58 4 19.00 2.23
5 6.0 0.22 15 19 2.23 5 22.00 2.98
6 6.5 0.31 16 22 2.98 6 25.00 3.85
7 8.0 0.40 17 23 3.26 7 29.00 5.19
8 9.0 0.53 18 25 3.85 8 32.00 6.31
9 10.0 0.62 19 28 4.83 9 36.00 7.99
10 11.0 0.75 20 31 5.93
21 32 6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


VRS I SLOOF
uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.25 0.30 = 13.3333
Besi 4 batang dia. 12 4 13.3333 0.62 = 33.0667
Besi 2 batang dia. 10 0 13.3333333333333 0.89 = -
Besi beugel dia. 8 jarak 10 - 20 cm 66.66666666667 1.1000 0.22 = 16.1333
49.2000

VRS II KOLOM TULANGAN 4 BUAH


uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.15 0.20 = 33.3333
Besi 4 batang dia. 12 4 33.3333333333333 0.62 = 82.6667
Besi 2 batang dia. 10 0 33.3333333333333 0.00 = -
Besi beugel dia. 8 jarak 15 cm 222.2222222222 0.7000 0.22 = 34.2222
116.8889

VRS III KOLOM TULANGAN 6-8-12 BUAH


uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.10 0.15 = 66.6667
Besi 4 batang dia. 12 4 66.6666666666667 0.00 = -
Besi 2 batang dia. 10 0 66.6666666666667 0.00 = -
Besi beugel dia. 8 jarak 15 cm 444.4444444444 0.5000 0.00 = -
-

VRS IV RING BALK


uraian Rms tul 4 Btg ¢ 12 + 2 Btag ¢ 10 Beugel ¢ 8 Jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm 1 0.15 0.25 = 26.6667
Besi 4 batang dia. 12 6 26.6666666666667 0.89 = 142.4000
Besi 2 batang dia. 10 0 26.6666666666667 0.00 = -
Besi beugel dia. 8 jarak 15 cm 177.7777777778 0.8000 0.40 = 56.8889
199.2889

PLAT BETON
VOLUME LEBAR TEBAL PANJANG
1.00 1.00 0.12 8.33

JARAK TULANGAN jumlah tulangan(m') melint jumlah tulangan(m') memanjandiameter volume tulangan (kg)
1 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 108.91
2 LAPIS 0.10 11.00 11.00 84.33 84.00 0.62 231.96

KOTA BANJAR Halaman : 4+114


BEKISTING SLOOF M2 M3 PAKU/m2 kg
0.300 0.300 0.600 8.800 0.18 0.396 0.300 8.800 2.64

KG PELUMAS BEKISTING ltr


KAWAT BETON 51.660 0.015 0.77 0.100 8.000 0.80
51.7

BEKISTING KOLOM M2 M3 PAKU/m2 kg


0.300 0.400 0.700 25.667 0.51 1.027 0.400 25.667 10.27

KG PELUMAS BEKISTING ltr


KAWAT BETON 116.889 0.015 1.75 0.200 25.667 5.13
122.7

BEKISTING KOLOM M2 M3 PAKU/m2 kg


0.200 0.300 0.500 36.667 0.73 1.467 0.400 36.667 14.67

KG PELUMAS BEKISTING ltr


KAWAT BETON - 0.015 - 0.200 36.667 7.33
-

BEKISTING RING BALK M2 M3 PAKU/m2 kg


0.150 0.500 0.650 19.067 0.38 0.763 0.400 19.067 7.63

KG PELUMAS BEKISTING ltr


KAWAT BETON 209.253 0.015 3.14 0.200 19.067 3.81
209.3

untuk 1 lapis untuk 2 lapis


bekisting papan stootwerk jumlah total bekisting papan stootwerk
dikalikan koef 1.05 luas tebal
kaso 6/6 per m2 p = 3 m = 5 luas kaso
tebal 6/6 per m2 p = 3 m = 5
114.4 114.36 11.631 0.020 0.054 0.29 11.631 0.020 0.054
243.6 243.56
paku/m2 jumlah paku/m2
koefisien kawat untuk 100 kg 0.15 0.400 11.631 4.65 0.400 11.631
kawat beton jumlah kawat beton

KOTA BANJAR Halaman : 5+114


DAFTAR SATUAN UPAH PEKERJA

HARGA UPAH
NO JENIS PEKERJA BANGUNAN SATUAN WAKTU
( Rp. )

A. UPAH TENAGA KERJA


1 Mandor Lapangan 85,000 1 ORANG/ HR/ 8 JAM
2 Mekanik 75,000 1 ORANG/ HR/ 8 JAM
3 Mekanil Pembantu 70,000 1 ORANG/ HR/ 8 JAM
4 Kepala Tukang 100,000 1 ORANG/ HR/ 8 JAM
5 Tukang 85,000 1 ORANG/ HR/ 8 JAM
6 Operator 80,000 1 ORANG/ HR/ 8 JAM
7 Operator Kurang Terlatih 75,000 1 ORANG/ HR/ 8 JAM
8 Pembantu Operator 70,000 1 ORANG/ HR/ 8 JAM
9 Supir Material/Truck 80,000 1 ORANG/ HR/ 8 JAM
10 Supir Personil 75,000 1 ORANG/ HR/ 8 JAM
11 Pembantu Supir/Kenek 70,000 1 ORANG/ HR/ 8 JAM
12 Pekerja 70,000 1 ORANG/ HR/ 8 JAM
13 Operator Mekanik 75,000 1 ORANG/ HR/ 8 JAM
14 Pembantu Operatot / Mekanik 70,000 1 ORANG/ HR/ 8 JAM
15 Operator Alat Berat Terlatih 80,000 1 ORANG/ HR/ 8 JAM
16 Supir Truk 80,000 1 ORANG/ HR/ 8 JAM
17 Kenek Truk 75,000 1 ORANG/ HR/ 8 JAM
18 Penjaga Malam 70,000 1 ORANG/ HR/ 8 JAM
19 Tukang Aspal 75,000 1 ORANG/ HR/ 8 JAM
20 Tukang Las 75,000 1 ORANG/ HR/ 8 JAM
HARGA DASAR SATUAN BAHAN BANGUNAN

NO. NAMA BARANG SATUAN HARGA


1 2 3 4
Bahan Agregat Kasar, Bahan Perekat & Bahan Jadinya :
1 Pasir Urug m3 118,000.00
2 Pasir Pasang m3 188,000.00
3 Pasir Beton m3 188,000.00
4 Bahan Timbunan Pilihan m3 142,000.00
5 Aspal kg 10,000.00
6 Hotmix Ton 2,005,000.00
7 Aspal Emulsi Ltr 9,500.00
8 Kayu Bakar m3 86,700.00
9 Kapur Sirih Kg 16,050.00
10 Batu Apung kg 64,600.00
11 Batu Pecah 1/2 m3 251,000.00
12 Batu Pecah 2/3 m3 285,000.00
13 Batu Pecah 3/5 m3 269,800.00
14 Batu Pecah 5/7 m3 248,000.00
15 Batu Pecah 7/10 m3 208,000.00
16 Batu Belah Pondasi 15/20 m3 177,000.00
17 Screen m3 246,000.00
18 Minyak Tanah Ltr 12,000.00
19 Solar Ltr 8,500.00
20 Batu Tempel Hitam m 2
125,000.00
21 Batu Pahat/Candi m3 322,000.00
22 Abu Batu m3 224,700.00
23 Batu Putih Porselin m3 163,000.00
24 Cabluk m3 55,000.00
25 Batu Bronjong m3 102,000.00
26 Batu Koral m3 208,000.00
27 Batu Tempel m2 149,800.00
28 Sirtu m3 142,000.00
29 Bata Merah Bakar bh 750.00
30 Bata Merah Oven bh 920.00
31 Bata Pelapis Klinker bh 2,900.00
32 Batako kecil 8 x 10 x 20 bh 2,700.00
33 Batako Besar 8 x 20 x 30 bh 3,200.00
34 Paving Block Natural ( press manual ) bh 1,000.00
35 Paving Block Natural ( press mesin ) bh 2,200.00
36 Paving Block Warna ( press manual ) bh 1,100.00
37 Paving Block Warna ( press mesin ) bh 2,800.00
38 Paving Block Natural ( press manual ) m2 50,000.00
39 Paving Block Natural ( press mesin ) m2 110,000.00
40 Paving Block Warna ( press manual ) m2 55,000.00
41 Paving Block Warna ( press mesin ) m2 140,000.00
42 Tanah Urug (dilokasi) m³ 35,000.00
43 Semen PC kg 1,200.00
44 Semen PC zak 60,000.00
45 Semen Abu-Abu kg 4,200.00
46 Semen Warna kg 16,000.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
47 Tali Ijuk kg 86,500.00
48 Loster Beton 20x20 cm bh 8,000.00

Bahan Logam berikut bahan jadinya :


1 Besi Beton U 24 kg 10,500.00
2 Besi Beton U 39 kg 11,000.00
3 Besi Beton U 40 kg 16,700.00
4 Kawat Harmonika 4 cm m 2
21,400.00
5 Kawat Harmonika 2 cm m2 21,400.00
6 Ram Nyamuk Hijau m2 16,000.00
7 Kawat Kasa 1 x 1 cm ( Putih ) m2 21,400.00
8 Besi BRC lengkap tiang m2 208,000.00
9 Kawat Beton kg 19,500.00
10 Kawat Bronjong 4 mm kg 19,700.00
11 Kawat Bronjong 3 mm kg 18,700.00
12 Ram Kawat 1 x 1 cm m2 24,600.00
13 Baja Siku/Profil DN kg 19,300.00
14 Baja IWF DN SII kg 21,400.00
15 Baja IWF Jepang kg 32,100.00
16 Baja Ringan tebal 0,83 mm profil UK-75 m' 33,300.00
17 Baja Ringan tebal 0,53 mm profil UK-75 m' 23,500.00
18 Baja Ringan tebal 0,48 mm profil GD-B m' 11,900.00
19 Komponen Jembatan Rangka kg 32,100.00
20 Besi PS-30 ( Ikatan angin ) m' 1,600.00
21 Besi TS-2 ( Tensioner ) Bh 5,900.00
22 Plat Sepatu tebal 1,5 mm Bh 8,200.00
23 Plat Sepatu tebal 1,2 mm Bh 7,000.00
24 Plat Diafragma Bh 1,400.00
25 Dynabolt Bh 950.00
26 Self Drilling Screw dia. 8-18 x 13 Bh 100.00
27 Self Drilling Screw dia. 12-24 x 16 Bh 150.00
28 Hollow 2 x 4 cm m' 16,000.00
29 Hollow 2 x 2 cm m' 12,000.00
30 Dropceiling m' 60,000.00

Bahan Kayu berikut bahan jadinya:


1 Bambu bt 9,000.00
2 Kayu Papan Jati m3 15,515,000.00
3 Kayu Papan Kamper m3 10,004,500.00
4 Kayu Papan Kruing m3 6,848,000.00
5 Kayu Papan Borneo m3 5,885,000.00
6 Kayu Papan Lokal Kls. II m3 2,568,000.00
7 Kayu Papan Albasiah m3 1,926,000.00
8 Kayu Balok Jati m3 13,910,000.00
9 Kayu Balok Kamper m3 7,490,000.00
10 Kayu Balok Kruing m3 6,634,000.00
11 Kayu Balok Borneo m3 508,500.00
12 Kayu Balok Lokal Kls. II m3 2,407,500.00
13 Kayu Balok Albasiah m3 1,819,000.00
14 List Profil Kamper 1 cm m1 8,500.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
15 List Profil Kamper 2 cm m1 10,700.00
16 List Profil Kamper 3 cm m1 10,700.00
17 List Profil Kamper 4 cm m1 16,000.00
18 List Profil Kamper 5 cm m1 42,800.00
19 List Profil Kamper 10 cm m1 32,100.00
20 List profil Kayu Lokal KLs II 4 cm m1 3,000.00
21 Pegangan Tangga Profil Jati m1 149,800.00
22 Pegangan Tangga Profil Kamper m1 28,200.00
23 Kayu Reng 2/3 Borneo m1 3,700.00
24 Kayu Reng 2/3 Kamper m1 5,350.00
25 Kayu Reng 3/4 Kamper m1 9,700.00
26 Kayu Reng 3/4 Kayu Lokal Kls II m1 2,500.00
27 Dolken 8 s/d 10 uk.4m' bt 93,000.00

Bahan Penutup Rangka Plafond


1 Hardpleks 5 mm 120 x 240 cm lbr 160,500.00
2 Gypsum 120 x 240 cm t = 9 mm lbr 75,000.00
3 GRC 120 x 240 lbr 70,000.00
4 Listplank GRC m1 36,000.00
5 List Plafond Gypsum ( Terpasang ) m' 23,000.00

BAHAN KAYU LAPIS


1 Akustik lbr 57,500.00
2 Bilik Bambu tanpa kulit m2 21,400.00
3 Bilk Bambu dengan kulit m2 20,500.00
4 Bilik Bambu Hitam variasi m2 18,000.00
5 Tripleks 3 mm 120 x 240 lbr 22,500.00
6 Tripleks 4 mm 120 x 240 lbr 85,600.00
7 Tripleks 4 mm Ukuran Pintu lbr 96,300.00
8 Teak Wood 4 mm lbr 160,500.00
9 Multipleks 9 mm 120 x 240 lbr 149,800.00
10 Multipleks 12 mm 120 x 240 lbr 221,500.00
11 Multipleks 18 mm 120 x 240 lbr 331,700.00
12 Plywood 18 mm 120 x 240 lbr 279,000.00
13 Plywood 4 mm 120 x 240 lbr 85,600.00
14 Plywood 3 mm 120 x 240 lbr 69,500.00
15 Plywood 3 mm ukuran pintu lbr 101,700.00
16 Plywood 4 mm ukuran pintu lbr 123,000.00
17 Melamin 4 mm 120 x 240 lbr 91,000.00
18 melamin TIK 4 mm lbr 149,800.00
19 Formika 120 x 240 lbr 181,900.00
20 Formika Ukuran pintu lbr 171,200.00
21 Pelat Asbes tebal 4 mm ( eternit ) Lbr 21,400.00
22 Plastik lembaran tebal m2 5,000.00

Bahan Lantai dan Pelapis Dinding :


1 Tegel PC 20 x 20 bh 3,200.00
2 Plint Tegel PC 10 x 30 bh 2,700.00
3 Tegel PC 30 x 30 bh 5,350.00
4 Plint Ubin 15x20 cm bh 6,500.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
5 Tegel Warna 20 x 20 bh 4,300.00
6 Plint Tegel Warna 10 x 20 bh 8,000.00
7 Tegel Warna 30 x 30 bh 6,900.00
8 Plint Tegel Warna 10 x 30 bh 6,900.00
9 Keramik 10 x 20 dan 20 x 20 KW 1 Putih/Polos bh 3,800.00
10 Keramik 10 x 20 KW 1 DN Corak/Warna/Anti Slip bh 3,800.00
11 Keramik 10 x 30 dan 20 x 20 KW 1 Putih/Polos bh 3,200.00
12 Keramik 20 x 20 (WC) KW 1 DN Corak/Warna/Anti Slip bh 2,200.00
13 Keramik 20 x 20 KW 1 DN Putih/Polos bh 3,700.00
14 Keramik 20 x 25 Dinding WC KW 1 DN Corak bh 3,200.00
15 Keramik 30 x 30 KW I DN Putih Polos bh 3,500.00
16 Keramik 30 x 30 KW 1 DN Warna/Corak/Anti Slip bh 4,300.00
17 Keramik 40 x 40 Polos m2 95,000.00
18 Keramik 40 x 40 polis m2 240,750.00
19 Marmer Alam Citatah Ukuran Besar(60x90 cm) m2 224,700.00
20 Marmer Alam Citatah Ukuran Kecil (60 x 60) m2 114,500.00
21 Keramik uk. 60 x 60 Polis m2 223,900.00
22 Keramik uk. 60 x 60 Unpolis m2 165,800.00
22 Keramik uk. 5 x 20 Border m1 12,500.00
23 Vinyl Lantai standar m2 20,800.00
24 Lem Vinyl kg 32,100.00
25 Karpet m2 267,500.00
26 Wall Paper m2 267,500.00

Bahan Finishing, Laburan, Pengisi dan Alatnya :


1 Plamir Tembok kg 28,000.00
2 Cat Tembok sekualitas ICI Eksterior kg 319,900.00
3 Cat Tembok sekualitas ICI Interior (Plafond dan Dinding) kg 319,900.00
4 Cat Tembok sekualitas Vinilex kg 104,500.00
5 Cat Tembok sekualitas Sanlex kg 18,000.00
6 Cat Tahan Asam kg 30,000.00
7 Cat Marka/Spotlight kg 78,000.00
8 Water Profing Emulsion kg 64,200.00
9 Water Profing Membrance ml 53,500.00
10 Rool Cat Tembok bh 21,400.00
11 Kape Tembok bh 10,700.00
12 Kape Kayu bh 8,000.00
13 Solignum 1 blek 5 lt 42,800.00
14 Plincote kg 32,000.00
15 Kwas 3'' bh 13,000.00
16 Dempul Halus/Impra (Wood Filler) kg 31,000.00
17 Terpentin lt 10,700.00
18 Soda Api Kg 12,000.00
19 Sabun kg 14,000.00
20 Tiner lt 19,000.00
21 Spirtus lt 11,000.00
22 Kumpon kg 37,000.00
23 Ampelas lbr 4,800.00
24 Dempul Kayu kg 26,000.00
25 Meni Kayu/Besi kg 18,000.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
26 Meni Zincromate kg 34,000.00
27 Cat Kayu Sekualitas Seiv kg 45,500.00
28 Cat Besi Sekualitas Seiv kg 48,000.00
29 Cat Duco Sekualitas Danagloss/ICI kg 42,800.00
30 Cat Brom kg 44,900.00
31 Oker kg 37,500.00
32 Teak Oil Ltr 26,700.00
33 Vernis kg 71,000.00
34 Melamik kg 44,000.00
35 Lem Kayu kg 40,000.00
36 Bahan Plitur Kripik ( Sirlak India ) kg 80,000.00
37 Politur kg 48,000.00
38 Pelumas Bekisting/ Oli Bekas Ltr 3,500.00

Bahan Penutup Atap :


1 Asbes Gelombang 3 mm 80 x 180 lbr 26,700.00
2 RoofLight Fibreglass 80 x 180 lbr 69,500.00
3 Asbes Gelombang 4 mm 80 x 180 lbr 29,900.00
4 Asbes Gelombang 5 mm 80 x 180 lbr 37,000.00
5 Asbes Gelombang 6 mm 80 x 180 lbr 40,000.00
6 Seng Plat 30 Lebar 60 m' 26,000.00
7 Seng Plat 30 Lebar 90 m' 42,800.00
8 Seng Gelombang 30 Lebar 60 m' 80,200.00
9 Seng Gelombang 30 Lebar 90 m' 101,600.00
10 Seng Alumunium Gelombang t = 0,55 m2 58,800.00
11 Genteng Palentong pres Bakar KW 1 bh 1,600.00
12 Genteng Palentong pres Molen Oven KW1 bh 2,600.00
13 Genteng FLam pres Molen Oven Jatiwangi bh 1,700.00
14 Atap Genteng Kodok/Glazur bh 4,800.00
15 Genteng Beton Warna 14,5/m2 bh 4,400.00
16 Genteng Beton Natural bh 4,200.00
17 Genteng Morando natural 18 bh/m2 bh 3,700.00
18 Genteng Morando Glasur 18 bh/m2 bh 4,800.00
19 Genteng Keramik bh 6,700.00
20 Genteng Metal ( Rainbow Roof ) m2 133,700.00
21 Genteng Decra Bond Bh 80,000.00
22 Sirap Kelas I ( 80 / m2 ) bh 800.00
23 Bubungan Genteng genteng metal m1 95,000.00
24 Bubungan Genteng Palentong bh 4,000.00
25 Bubungan Genteng Beton bh 9,600.00
26 Bubungan Asbes bh 21,400.00
27 Sirap m2 13,900.00
28 Nok Genteng Beton Bh 11,000.00

Bahan Kaca :
1 Kaca 2 mm m2 42,800.00
2 Kaca 3 mm m2 48,000.00
3 Kaca 5 mm m2 64,000.00
4 Kaca Rayband 12 mm ( ASAHI ) m 2
347,000.00
5 Kaca Tebal 8 mm m2 133,000.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
6 Kaca Patri Lokal Terpasang ( ASAHI ) m2 642,000.00
7 Kaca Patri Ex Luar negeri terpasang m2 1,605,000.00
8 Glass Block 20 x 20 bh 21,900.00
9 Pas. Pintu Kaca Tempered unit 12,350,000.00

Bahan Paku dan Mur Baut :


1 Paku 1 cm sd 3 cm kg 19,000.00
2 Paku 4 cm sd 7 cm kg 16,000.00
3 Paku 8 cm sd 12 cm kg 16,000.00
4 Paku Beton 2 cm sd 5 cm kg 101,600.00
5 Paku Keling kg 26,700.00
6 Paku Sekrup kg 18,700.00
7 Besi Plat penguat kuda-kuda kg 34,700.00
8 Besi Angker kg 26,800.00
9 Mur Baut diameter 19 panjang 60 cm kg 26,700.00
10 Mur Baut diameter 19 panjang 5 cm kg 27,900.00

Bahan Saluran Air Kotor/Bersih :


1 Buis Beton diameter 20 cm bh 34,000.00
2 Buis Beton diameter 30 cm bh 69,500.00
3 Buis Beton diameter 40 cm bh 90,900.00
4 Buis Beton diameter 50 cm bh 101,600.00
5 Buis Beton diameter 60 cm bh 117,700.00
6 Buis Beton diameter 100 cm bh 160,500.00
7 Gravel 1/2 diameter 20 cm bh 32,100.00
8 Gravel 1/2 diameter 30 cm bh 37,400.00
9 Gravel 1/2 diameter 40 cm bh 48,100.00
10 Pipa PVC SC S.10 diameter 1/2" lt 9,600.00
11 Pipa PVC SC S.10 diameter 3/4" lt 12,800.00
12 Pipa PVC SC S.10 diameter 1" lt 16,000.00
13 Pipa PVC RRJ S.12,5 diameter 2'' lt 25,600.00
14 Pipa PVC RRJ S.12,5 diameter 3" lt 48,100.00
15 Pipa PVC RRJ S.12,5 diameter 4" lt 69,500.00
16 Pipa PVC RRJ S. 12,5 diameter 6" lt 149,800.00
17 Pipa PVC AW diameter 1/2" lt 11,700.00
18 Pipa PVC AW diameter 3/4" lt 16,000.00
19 Pipa PVC AW diameter 1" lt 27,300.00
20 Pipa PVC AW diameter 1,5" lt 32,100.00
21 Pipa PVC AW diameter 2" lt 57,700.00
22 Pipa PVC AW diameter 2,5" lt 21,400.00
23 Pipa PVC AW diameter 3" lt 37,400.00
24 Pipa PVC AW diameter 4" lt 73,800.00
25 Pipa PVC 4" berlobang jenis AW m1 55,000.00
26 Knee PVC diameter 1/2 '' bh 4,000.00
27 Knee PVC diameter 3/4 '' bh 4,800.00
28 Knee PVC diameter 1 '' bh 5,300.00
29 Knee PVC diameter 2 '' bh 37,000.00
30 Knee PVC diameter 3 '' bh 86,000.00
31 Knee PVC diamater 4 '' bh 146,000.00
32 Tee PVC AW diameter 1/2" bh 6,900.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
33 Tee PVC AW diameter 3/4" bh 8,000.00
34 Tee PVC AW diameter 1" bh 10,000.00
35 Gate Valve diameter 3 '' bh 1,870,000.00
36 Gate Valve diamater 4'' bh 2,086,500.00
37 Pelampung 3/4 " bh 107,000.00
38 Pelampung 1" bh 139,100.00
39 Kran 1/2" bh 24,000.00
40 Kran 3/4" bh 27,800.00
41 Stop Kran 3/4" bh 75,000.00
42 Kran Angsa Diameter 0,5" bh 65,000.00
43 Jerigen Kapasitas 20 ltr bh 37,400.00
44 Jerigen Kapasitas 10 ltr bh 18,700.00
45 Seltip rol 7,400.00
46 Lem PVC kg 16,900.00
47 Lem PVC tube 6,900.00
48 Closet Jongkok Teraso bh 96,300.00
49 Closet Duduk Porselin INA bh 909,500.00
50 Closet Jongkok Porselin INA bh 165,800.00
51 Bak Mandi Teraso bh 107,000.00
52 Bak Mandi Fiberglass bh 195,000.00
53 Bak Cuci Stainless Steel bh 256,800.00
54 Wastafel INA (lengkap) bh 454,000.00
55 Bak Cuci Teraso bh 155,000.00
56 Water drain + Asesories bh 160,000.00
57 Floor Drain bh 19,000.00
58 Urinoar Lengkap TOTO Warna Standard lengkap unit 973,700.00
59 Pompa Kodok bh 134,000.00
60 Pompa Dragon bh 283,000.00
61 Pompa Air 100 w SANYO bh 909,000.00
62 Pompa Air 150 w SANYO bh 1,337,000.00
63 Zetpump 250 w SANYO bh 4,556,000.00
64 Zetpump 450 w SANYO bh 5,395,000.00
65 Ijuk kg 20,000.00
66 Tali Ijuk kg 28,000.00
67 Roof Drain 4" bh 150,000.00
68 Pek. Pengeboran diameter 4" kedalaman (termasuk casing) m1 250,000.00
69 Pas. Pompa Air + Asesoris unit 450,000.00

Bahan Elektrikal :
1 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 120,000.00
2 Lampu Pijar 25 watt sd. 100 watt bh 26,000.00
3 Lampu SL 18 watt + Fitting Plafond bh 105,000.00
4 Lampu Neon TL Sekualitas Philips 20 w bh 41,000.00
5 Lampu NeonTL Sekualitas Philips 40 w bh 85,000.00
6 RMI 2 X 36 W Lengkap SET 375,000.00
7 Lampu SL Philip 25 W + Fiting plafond bh 83,000.00
8 Down light + SL Philip 25 W bh 270,000.00
9 Lampu Merkuri 80 W bh 101,000.00
10 Kabel Tembaga kg 165,000.00
11 MCB bh 53,000.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
12 Saklar Tunggal bh 16,000.00
13 Saklar Ganda bh 16,000.00
14 Stop Kontak bh 16,000.00
15 Stop Kontak Putar bh 26,000.00
16 Stop Kontak AC bh 65,000.00
17 Box Sekering bh 32,000.00
18 Pipa Penangkal Petir bh 48,050.00
19 Kabel Penangkal Petir kg 37,000.00
20 Exaust Fan 40 x 40 Sek Maspion bh 375,000.00
21 Ammeter bh 118,000.00
22 Busbar 50 A bh 180,000.00
23 Busbar 100 A bh 300,000.00
24 Busbar 125 A bh 405,000.00
25 Bonding bh 9,600.00
26 CT 5/50 bh 90,000.00
27 CT 5/100 bh 210,000.00
28 CT 5/125 bh 295,000.00
29 Fuse 4 A bh 18,000.00
30 Kabel NYY 4x25mm² m 138,000.00
31 Kabel NYY 4x16mm² m 87,000.00
32 Kabel NYM 2x2,5 mm² sekualitas m 9,900.00
33 Kabel NYM 3x2,5 mm² sekualitas m 11,700.00
34 Kabel NYM 4x2,5 mm² sekualitas m 15,500.00
35 Kabel NYM 4x4 mm² sekualitas m 19,700.00
36 Klem Kawat BC 25mm m 6,400.00
37 Voltmeter bh 118,000.00
38 Conduit 5/8" m 2,400.00
39 Lampu indikator bh 18,000.00
40 MCB 16 A 1 fasa bh 64,000.00
41 MCB 20 A 1 fasa bh 64,000.00
42 MCB 25 A 1 fasa bh 72,600.00
43 MCB 32 A 1 fasa bh 75,300.00
44 MCB 10 A 1 fasa bh 64,000.00
45 MCCB 50 A 3 Fasa bh 874,000.00
46 MCCB 80 A 3 Fasa bh 1,025,000.00
47 MCCB 125 A 3 Fasa bh 1,550,000.00
48 saklar tunggal bh 21,500.00
49 saklar seri bh 23,700.00
50 Saklar Putar bh 27,000.00
51 stopkontak bh 21,500.00
52 stopkontak AC bh 46,500.00
53 Lampu RMI 2x36W bh 375,000.00
54 Lampu DL "4 bh 123,000.00
55 Lampu TL 36 W bh 150,000.00
56 Lampu SL Philip 25 W + Fiting plafond bh 83,000.00
57 Lampu Gantung Hias bh 5,950,000.00
58 Selector bh 118,000.00
59 Panel 120x80x30 cm set 1,585,000.00
60 Panel 80x40x25 cm set 1,105,000.00
61 Panel 60x40x25 cm set 851,500.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
62 Spitzen set 360,000.00
63 Earhting rood set 840,000.00
64 Kawat BC 25mm m' 37,700.00
65 pipa conduit 3/4" m' 4,550.00
66 Kabel Bc 35 mm2 kg 105,000.00
67 Klem bh 7,500.00
68 Set Finial ( Penangkal Petir ) set 320,000.00
69 Elektrode Pentanahan Behel Ø 12 mm2 unt 385,000.00
70 KWH Meter 450 Watt unt 1,200,000.00

Bahan Penggantung Kunci :


1 Engsel Pintu bh 26,000.00
2 Engsel Jendela bh 16,000.00
3 Kunci Tanam 1 Slaag sekualitas Royal bh 85,000.00
4 Kunci Tanam 1 Slaag Sekualitas Ancor bh 90,900.00
5 Kunci Tanam 2 Slaag Standar bh 176,500.00
6 Kunci 2 Slaag Bulat Utama Standar bh 235,400.00
7 Kunci 2 Slaag Sekualitas Kuda Terbang bh 101,600.00
8 Kunci Tanam Antik bh 160,500.00
9 Kunci Lemari bh 80,200.00
10 Hak Angin Jendela Biasa bh 10,700.00
11 Hak Angin Jendela Antik bh 26,700.00
12 Hak Angin Jendela Kuningan bh 26,700.00
13 Hak Angin Kait Jendela Biasa ps 13,300.00
14 Kunci jendela bh 29,900.00
15 Kunci Tanam KM Bulat Alfa bh 48,000.00
16 Kunci Gembok bh 18,000.00
17 Espagnolet bh 160,000.00
18 Grendel bh 80,000.00
19 Door Closer Kelas Standard (Kelas Sedang) unt 267,000.00
20 Door Closer Kelas Standard (Kelas Baik) unt 428,000.00
21 Door Closer Kelas Rendah unt 188,000.00
22 Door Holder bh 155,000.00
23 Door Stop bh 69,000.00
24 Rel Pintu Dorong bh 188,000.00
25 Railling tangga m' 750,000.00

Bahan Logam Terpasang :


1 Pas.Rangka Atap dll Baja Ringan m2 150,000.00
2 Pas. Bubblealum /Peredam Panas (Terpasang) m2 60,000.00
3 Pas.Atap Metal Roof m2 125,000.00
4 Pas.Bubung Metal Roof m' 78,000.00
110 Pas. Kusen Aluminium C 4" m' 102,000.00
111 Pas. Kusen Aluminium C 4" (warna sek. Alexindo) m' 156,000.00
112 Pintu Kaca Alumunium unt 1,350,000.00
113 Pintu Spandrill Alumunium unt 1,425,000.00
114 Pintu Frameless unt 7,500,000.00
115 Daun Pintu Alumunium (kaca es) unt 1,500,000.00
116 Daun Pintu Alumunium Spandril 60 x 200 unt 1,100,000.00
117 Daun Jendela Alumunium Eng. Casement unt 600,000.00
NO. NAMA BARANG SATUAN HARGA
1 2 3 4
118 Pas. Rangka Wall Composite Phanel m2 120,000.00
119 Pas. Pasang Penutup Wall Composite Phanel m2 340,000.00
15 Pas. Kusen dan Daun Pintu KM PVC unt 300,000.00
ESTIMATE ENGINEERING (EE)
REKAPITULASI TOTAL

KEGIATAN : REHABILITASI SEDANG DAN BERAT BANGUNAN PUSKESMAS


PEKERJAAN : PEMBANGUNAN PUSKESMAS PARIGI
LOKASI : KABUPATEN PANGANDARAN
TAHUN : 2016
NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

1 2 3

I. PEK. PERSIAPAN 57,617,600.00


II. PEKERJAAN TANAH DAN PONDASI 86,324,525.67
III. PEKERJAAN STRUKTUR ( PEK. BETON ) 774,499,073.14
IV. PEKERJAAN DINDING 58,602,174.00
V. PEK. KUSEN PINTU DAN JENDELA 154,618,760.00
VI. PEK. LANTAI 198,618,210.00
VII. PEK. PLAFOND 137,387,923.00
VIII. PEK. PENGECATAN 31,759,554.00
IX. PEK. ALAT PENGGANTUNG 5,250,000.00
X. PEKERJAAN ATAP 81,936,109.24
XI. PEK. INSTALASI LISTRIK 53,615,300.00
XII. PEK. INSTALASI AIR 39,604,900.00

I. PEKERJAAAN STRUKTUR LANTAI DUA 286,535,733.94


II. PEK. DINDING DAN PLESTERAN 115,119,632.00
III. PEK. KUSEN PINTU DAN JENDELA 46,917,120.00
IV. PEK. LANTAI 93,904,554.00
V. PEK. PLAFOND 85,604,012.00
VI. PEK. PENGECATAN 35,258,048.00
VII. PEKERJAAN ATAP 98,240,956.72
VIII. PEK. INSTALASI LISTRIK 24,323,500.00
IX. PEK. INSTALASI AIR 11,481,200.00

PEK. RUMAH GENSET 3 X 4 M


I. PEKERJAAN TANAH DAN PONDASI 4,186,975.20
II. PEKERJAAN STRUKTUR ( PEK. BETON ) 50,051,344.18
III. PEK. DINDING DAN PLESTERAN 15,645,448.00
IV. PEK. PENGECATAN 3,266,675.00
V. PEK. LANTAI 3,942,582.00

JUMLAH REAL COST 2,554,311,910.09


PPN 10% 255,431,191.01
JUMLAH COST 2,809,743,101.10
DIBULATKAN 2,809,743,000.00
###
TERBILANG : DUA MILYAR TUJUH RATUS JUTA RUPIAH

Dibuat Oleh :
Menyetujui : Konsultan Perencana
KUASA PENGGUNA ANGGARAN CV. ARCHINDO MEDIA KARYA
SELAKU PEJABAT PEMBUAT KOMITMEN

Drs. H. YADI SETIADI BUDI NURCAHYADI, ST


NIP. 19670313 199303 1 002 Direktur Utama

Mengetahui : Mengetahui/Menyutujui:
Kepala Dinas Pekerjaan Umum PENGGUNA ANGGARAN
Perhubungan, Komunikasi Dan Informatika
Kabupaten Pangandaran

Drs. H. DADANG DIMYATI H. DEDE SAEFUL UYUN, S.KM, M.KES


NIP. 19630125 198503 1 005 NIP. 19650300 198603 1 008

RINCIAN RENCANA ANGGARAN BIAYA

KEGIATAN : REHABILITASI SEDANG DAN BERAT BANGUNAN PUSKESMAS


PEKERJAAN : PEMBANGUNAN PUSKESMAS PARIGI
LOKASI : KABUPATEN PANGANDARAN
TAHUN : 2016

JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT. VOLUME KODE ANALISA HARGA SAT. ( Rp. ) ( Rp. )
1 2 3 4 5 6 7=4x6
`
I. PEK. PERSIAPAN
1 Pek. Papan Nama Proyek (Banner) ls 1.00 ls 200,000.00 200,000.00
2 Pek. Bongkaran Existing dan Buangan ls 1.00 ls 20,000,000.00 20,000,000.00
3 Pas. Bouwplank & Pengukuran m' 128.00 A.01.01 57,800.00 7,398,400.00
4 Pek. Pengadaan Direksikeet ls 1.00 ls 3,000,000.00 3,000,000.00
5 Pengadaan listrik dan air kerja ls 1.00 ls 1,000,000.00 1,000,000.00
6 Pek. Pagar Pengaman m' 144.00 Pgr. S. 104,300.00 15,019,200.00
7 Uji Lab Matrial untuk Mix Desain ls 1.00 ls 2,000,000.00 2,000,000.00
8 Uji Lab Mutu Kubus Beton ( Hasil Pekerjaan Beton ) ls 1.00 ls 2,000,000.00 2,000,000.00
9 Pembersihan Lokasi Sebelum & Setelah Pekerjaan ls 1.00 ls 1,000,000.00 1,000,000.00
10 Administrasi & Dokumentasi ls 1.00 ls 6,000,000.00 6,000,000.00
Jumlah I 57,617,600.00
II. PEKERJAAN TANAH DAN PONDASI
1 Pek. galian tanah pondasi footplat m3 114.75 A.02.02 73,500.00 8,434,125.00
2 Pek. galian tanah pondasi lajur m3 105.79 A.02.01 60,000.00 6,347,400.00
3 Pek. urugan pasir bawah pondasi footplat m3 3.38 A.02.12 179,700.00 607,386.00
4 Pek. urugan pasir bawah pondasi lajur, t.5cm m3 8.14 A.02.12 179,700.00 1,462,758.00
5 Pek. urugan pasir bawah lantai, t.5cm m3 25.93 A.02.12 179,700.00 4,659,621.00
6 Pek. urugan tanah pondasi footplat m3 60.50 A.02.09 20,000.00 1,210,000.00
7 Pek. urugan tanah pondasi lajur m3 35.26 A.02.09 20,000.00 705,266.67
8 Pek. urugan tanah peninggian lantai m3 107.00 A.02.11 119,500.00 12,786,500.00
9 Pek. lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr, dibawah po m3 3.38 A.04.14 828,600.00 2,800,668.00
10 Pek. Aanstamping Batu Belah m3 24.41 A.03.01 394,100.00 9,619,981.00
11 Pek. Pasangan pondasi batu belah 1PC : 5PP m3 51.88 A.03.04 726,500.00 37,690,820.00
Jumlah II 86,324,525.67
III. PEKERJAAN STRUKTUR ( PEK. BETON )
1 Pek. Pondasi Footplat
a. Pek. Pondasi Footplat (1.30x1.30) cm
‐ Pek. Beton K225 m3 15.60 A.04.10 1,456,700.00 22,724,520.00
‐ Pek. Pembesian U-32 kg 1,262.44 A.04.01.a 14,300.00 18,052,887.27
‐ Pek. Bekisting P2A m2 26.82 A.04.02 160,000.00 4,290,644.63
2 Pek. Sloof
a. Pek. Beton Sloof Tipe, SL2 20/30 cm
‐ Pek. Beton K225 m3 9.11 A.04.10 1,456,700.00 13,270,537.00
‐ Pek. PembesianU 32 kg 857.49 A.04.01.a 14,300.00 12,262,128.51
‐ Pek. PembesianU 24 kg 290.18 A.04.01 13,700.00 3,975,452.41
‐ Pek. Bekisting m2 121.47 A.04.03 122,900.00 14,928,253.33
b. Pek. Beton Sloof Tipe, SL3 15/20 cm
‐ Pek. Beton K225 m3 6.10 A.04.10 1,456,700.00 8,885,870.00
‐ Pek. PembesianU 32 kg 744.71 A.04.01.a 14,300.00 10,649,410.58
‐ Pek. PembesianU 24 kg 217.29 A.04.01 13,700.00 2,976,855.33
‐ Pek. Bekisting m2 111.83 A.04.03 122,900.00 13,744,316.67
3 Pek. Kolom
a. Pek. Kolom Tipe, K.1 30/30 cm
‐ Pek. Beton K225 m3 14.88 A.04.10 1,456,700.00 21,675,696.00
‐ Pek. PembesianU 32 kg 2,473.76 A.04.01.a 14,300.00 35,374,800.95
‐ Pek. PembesianU 24 kg 391.21 A.04.01 13,700.00 5,359,618.87
‐ Pek. Bekisting m2 218.24 A.04.04.a 188,100.00 41,050,944.00
b. Pek. Kolom Tipe, K.2 20/40 cm
‐ Pek. Beton K225 m3 3.34 A.04.10 1,456,700.00 4,865,378.00
‐ Pek. PembesianU 32 kg 291.78 A.04.01.a 14,300.00 4,172,488.32
‐ Pek. PembesianU 24 kg 98.79 A.04.01 13,700.00 1,353,411.82
‐ Pek. Bekisting m2 55.11 A.04.04.a 188,100.00 10,366,191.00
c. Pek. Kolom Praktis (KP) 12/12 cm
‐ Pek. Beton K175 m3 5.22 A.04.10.1 956,900.00 4,995,018.00
‐ Pek. Pembesian U-24 kg 1,557.47 A.04.01 13,700.00 21,337,276.20
‐ Pek. Bekisting KP m2 87.00 A.04.04.a 188,100.00 16,364,700.00
4 Pek. Balok
a. Pek. Balok Tipe, B.1 20/40 cm
‐ Pek. Beton K225 m3 10.34 A.04.10 1,456,700.00 15,062,278.00
‐ Pek. PembesianU 32 kg 1,344.20 A.04.01.a 14,300.00 19,222,060.00
‐ Pek. PembesianU 24 kg 288.68 A.04.01 13,700.00 3,954,893.04
‐ Pek. Bekisting m2 95.13 A.04.05.a 238,500.00 22,688,028.00
b. Pek. Balok Tipe, B.2 20/35 cm
‐ Pek. Beton K225 m3 6.72 A.04.10 1,456,700.00 9,789,024.00
‐ Pek. PembesianU 32 kg 797.44 A.04.01.a 14,300.00 11,403,392.00
‐ Pek. PembesianU 24 kg 290.71 A.04.01 13,700.00 3,982,725.47
‐ Pek. Bekisting m2 76.16 A.04.05.a 238,500.00 18,164,160.00
c. Pek. Balok Tipe, B.5 15/30 cm
‐ Pek. Beton K225 m3 2.14 A.04.10 1,456,700.00 3,117,338.00
‐ Pek. PembesianU 32 kg 270.06 A.04.01.a 14,300.00 3,861,852.03
‐ Pek. PembesianU 24 kg 107.35 A.04.01 13,700.00 1,470,737.47
‐ Pek. Bekisting m2 27.11 A.04.05.a 238,500.00 6,464,940.00
d. Pek. Balok Tipe, B.3 15/25 cm
‐ Pek. Beton K225 m3 1.61 A.04.10 1,456,700.00 2,345,287.00
‐ Pek. PembesianU 32 kg 181.14 A.04.01.a 14,300.00 2,590,240.99
‐ Pek. PembesianU 24 kg 85.22 A.04.01 13,700.00 1,167,477.01
‐ Pek. Bekisting m2 20.18 A.04.05.a 238,500.00 4,812,612.00
1 2 3 4 5 6 7=4x6
e. Pek. Balok Tipe, B.4 (Ring Balok) 15/20 cm
‐ Pek. Beton K175 m3 4.45 A.04.10.1 956,900.00 4,258,205.00
‐ Pek. PembesianU 24 kg 839.37 A.04.01 13,700.00 11,499,304.46
‐ Pek. Bekisting m2 63.04 A.04.05.a 238,500.00 15,035,437.50
f. Pek. Balok lintel, (BL) 12/15 cm
‐ Pek. Beton K175 m3 2.23 A.04.10.1 1,456,700.00 3,248,441.00
‐ Pek. PembesianU 32 kg 312.97 A.04.01.a 14,300.00 4,475,435.91
‐ Pek. PembesianU 24 kg 136.39 A.04.01 13,700.00 1,868,499.16
‐ Pek. Bekisting m2 66.90 A.04.05.a 238,500.00 15,955,650.00
5 Pek. Beton Plat lantai, t=12cm
‐ Pek. Beton K225 m3 36.68 A.04.10 1,456,700.00 53,431,756.00
‐ Pek. PembesianU 24 kg 6,522.48 A.04.01 13,700.00 89,358,030.98
‐ Pek. Bekisting m2 405.19 A.04.06.a 266,000.00 107,779,488.37
6 Pek. Beton Plat Dak Selasar, t=10cm
‐ Pek. Beton K225 m3 4.37 A.04.10 1,456,700.00 6,365,779.00
‐ Pek. PembesianU 24 kg 270.05 A.04.01 13,700.00 3,699,704.15
‐ Pek. Bekisting m2 43.70 A.04.06.a 266,000.00 11,624,200.00
7 Pek. Listplank beton
‐ Pek. Beton K225 m3 2.55 A.04.10 1,456,700.00 3,714,585.00
‐ Pek. PembesianU 24 kg 232.90 A.04.01 13,700.00 3,190,768.51
‐ Pek. Bekisting m2 36.43 A.04.06.a 266,000.00 9,690,000.00
8 Pek. Tangga
‐ Pek. Beton K225 m3 1.18 A.04.10 1,456,700.00 1,718,906.00
‐ Pek. PembesianU 24 kg 231.25 A.04.01 13,700.00 3,168,091.54
‐ Pek. Bekisting m2 7.87 A.04.08.a 208,900.00 1,643,346.67
Jumlah III 774,499,073.14
IV. PEKERJAAN DINDING
1 Pek. Pas. Dinding 1/2 Bata ad. 1 : 5 m2 249.58 A.05.05 114,700.00 28,626,826.00
2 Pek. Pas. Plesteran ad. 1 : 5 + Acian m2 499.16 A.06.04 52,300.00 26,106,068.00
3 Pek. Pas. Acian Beton m2 85.20 A.06.20 31,000.00 2,641,200.00
4 Pek. Pas. Skoneng timbul m1 23.80 A.06.17 51,600.00 1,228,080.00
Jumlah IV 58,602,174.00
V. PEK. KUSEN PINTU DAN JENDELA
1 Pas. Kusen Aluminium 4" CA (Warna Sek. Alexindo) m1 392.07 Upah Bahan 156,000.00 61,162,920.00
2 Pas. Daun Pintu Frameless unit 2.00 Upah Bahan 7,500,000.00 15,000,000.00
3 Pas. Daun Pintu Kaca Es Bingkai Alumunium unit 44.00 Upah Bahan 1,500,000.00 66,000,000.00
4 Pas. Daun Pintu Alumunium ( KM/WC ) unit 3.00 Upah Bahan 1,100,000.00 3,300,000.00
5 Pas. Daun Jendela Alumunium unit 12.00 Upah Bahan 600,000.00 7,200,000.00
6 Pas. Kaca 5 mm m1 30.56 Upah Bahan 64,000.00 1,955,840.00
Jumlah V 154,618,760.00
VI. PEK. LANTAI
1 Pek. Urugan Pasir Alas Lantai T = 5 cm m3 25.93 A.02.12 179,700.00 4,659,621.00
2 Pek. Lantai Kerja Beton Tumbuk Bawah Keramik T = 5 cm m3 25.93 A.04.14 828,600.00 21,485,598.00
3 Pas. Keramik Lantai 60 x 60 cm m2 492.20 A.10.09 a 279,300.00 137,471,460.00
4 Pas. Keramik Tangga 60 x 60 cm m2 15.62 A.10.09 a 279,300.00 4,362,666.00
5 Pas. Keramik 20 x 20 cm Anti Slip m2 26.35 A.10.03 211,800.00 5,580,930.00
6 Pas. Keramik 20 x 25 cm Dinding T = 1.5 m m2 66.15 A.10.19.a 241,000.00 15,942,150.00
7 Pas. Keramik Border m' 44.10 upah bahan 12,500.00 551,250.00
8 Pas. Paving Block Warna (entrance dan drop off) m2 59.85 A.10.23 143,100.00 8,564,535.00
Jumlah VI 198,618,210.00
VII. PEK. PLAFOND
1 Pek. Rangka Plafond Hollow m2 640.63 A.09.05 141,500.00 90,649,145.00
2 Pek. Plafond Gypsum m2 640.63 A.09.07 45,600.00 29,212,728.00
3 Pek. Dropceiling m1 19.80 upah bahan 60,000.00 1,188,000.00
4 List Plafond Gypsum m2 710.35 upah bahan 23,000.00 16,338,050.00
Jumlah VII 137,387,923.00
VIII. PEK. PENGECATAN
1 Cat Dinding m2 499.16 A.16.05 22,300.00 11,131,268.00
2 Cat Plafond m2 640.63 A.16.07 32,200.00 20,628,286.00
Jumlah VIII 31,759,554.00
IX. PEK. ALAT PENGGANTUNG
1 Pas. Railling Tangga Stainlles m1 7.00 upah bahan 750,000.00 5,250,000.00
Jumlah IX 5,250,000.00
X. PEKERJAAN ATAP
1 Pek. Rangka atap baja ringan m2 270.52 upah+bahan 150,000.00 40,578,000.00
2 Pek. Listplank (Kalsiplank) m1 39.90 A.08.30.a 73,500.00 2,932,650.00
3 Pek. Penutup Atap Genteng Metal m2 273.23 upah+bahan 133,700.00 36,530,209.24
4 Pek. Bubungan Atap Metal Roof m1 19.95 upah+bahan 95,000.00 1,895,250.00
Jumlah X 81,936,109.24
XI. PEK. INSTALASI LISTRIK
1 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 98.00 Upah Bahan 120,000.00 11,760,000.00
2 Lampu SL 18 Watt ( termasuk fiting lampu ) bh 8.00 Upah Bahan 105,000.00 840,000.00
3 Lampu RMI 2 x 36 Watt bh 38.00 Upah Bahan 375,000.00 14,250,000.00
4 Exaustfan 40 x 40 cm unit 12.00 Upah Bahan 375,000.00 4,500,000.00
5 KK AC bh 15.00 Upah Bahan 46,500.00 697,500.00
6 KK biasa tunggal bh 37.00 Upah Bahan 21,500.00 795,500.00
7 Saklar Tunggal bh 26.00 Upah Bahan 21,500.00 559,000.00
8 Saklar Ganda bh 9.00 Upah Bahan 23,700.00 213,300.00
9 Biaya Penambahan daya 23.000 VA Ls 1.00 Ls 20,000,000.00 20,000,000.00
Jumlah XI 53,615,300.00
XII. PEK. INSTALASI AIR
1 Pas. Bak Mandi Fibre bh 7.00 A.11.06 713,800.00 4,996,600.00
2 Pas. Koset Jongkok bh 4.00 A.11.02 589,500.00 2,358,000.00
3 Pas. Koset Duduk bh 3.00 A.11.01 1,432,400.00 4,297,200.00
1 2 3 4 5 6 7=4x6
4 Pas. Kran Air 1/2" bh 7.00 A.12.16 42,000.00 294,000.00
5 Pas. Floor Drain bh 7.00 A.12.17 32,100.00 224,700.00
6 Pas. Pipa PVC 1/2" m' 125.00 A.12.07 14,100.00 1,762,500.00
7 Pas. Pipa PVC 3" m' 42.00 A.12.13 36,600.00 1,537,200.00
8 Pas. Pipa PVC 4" ( KM/WC ) m' 42.00 A.12.14 52,100.00 2,188,200.00
9 Pas. Pipa PVC 4" Saluran Pembuang Air Hujan m' 81.00 A.12.14 52,100.00 4,220,100.00
10 Pas. Septicktank + Rembesan unit 3.00 A.13.03 4,262,600.00 12,787,800.00
11 Pas. Wastafel unit 6.00 A.11.04 823,100.00 4,938,600.00
Jumlah XII 39,604,900.00

I. PEKERJAAAN STRUKTUR LANTAI DUA


1 Pek. Kolom
a. Pek. Kolom Tipe, K.1 30/30 cm
‐ Pek. Beton K225 m3 8.22 A.04.10 1,456,700.00 11,974,074.00
‐ Pek. PembesianU 32 kg 1,366.55 A.04.01.a 14,300.00 19,541,724.72
‐ Pek. PembesianU 24 kg 216.11 A.04.01 13,700.00 2,960,757.20
‐ Pek. Bekisting m2 120.56 A.04.04.a 188,100.00 22,677,336.00
b. Pek. Kolom Praktis (KP) 12/12 cm
‐ Pek. Beton K175 m3 2.48 A.04.10.1 956,900.00 2,373,112.00
‐ Pek. Pembesian U-24 kg 739.95 A.04.01 13,700.00 10,137,250.00
‐ Pek. Bekisting KP m2 41.33 A.04.04.a 188,100.00 7,774,800.00
2 Pek. Balok
a. Pek. Balok, Tipe B.4 15/20 cm
‐ Pek. Beton K225 m3 2.31 A.04.10 1,456,700.00 3,364,977.00
‐ Pek. PembesianU 32 kg 280.78 A.04.01.a 14,300.00 4,015,169.96
‐ Pek. PembesianU 24 kg 152.38 A.04.01 13,700.00 2,087,594.35
‐ Pek. Bekisting m2 33.11 A.04.05.a 238,500.00 7,896,735.00
b. Pek. Balok Tipe, B.5 15/30 cm
‐ Pek. Beton K225 m3 6.92 A.04.10 1,456,700.00 10,080,364.00
‐ Pek. PembesianU 32 kg 727.73 A.04.01.a 14,300.00 10,406,548.31
‐ Pek. PembesianU 24 kg 306.14 A.04.01 13,700.00 4,194,128.96
‐ Pek. Bekisting m2 87.65 A.04.05.a 238,500.00 20,905,320.00
c. Pek. Balok lintel, (BL) 12/15 cm
‐ Pek. Beton K175 m3 0.96 A.04.10.1 956,900.00 918,624.00
‐ Pek. PembesianU 24 kg 193.44 A.04.01 13,700.00 2,650,183.12
‐ Pek. Bekisting m2 28.80 A.04.05.a 238,500.00 6,868,800.00
3 Pek. Beton Plat dak, t=10cm
‐ Pek. Beton K225 m3 21.35 A.04.10 1,456,700.00 31,100,545.00
‐ Pek. PembesianU 24 kg 1,319.36 A.04.01 13,700.00 18,075,213.64
‐ Pek. Bekisting m2 213.50 A.04.06.a 266,000.00 56,791,000.00
4 Pek. Listplank beton
‐ Pek. Beton K225 m3 4.57 A.04.10 1,456,700.00 6,657,119.00
‐ Pek. Pembesian U 24 kg 417.40 A.04.01 13,700.00 5,718,357.69
‐ Pek. Bekisting m2 65.29 A.04.06.a 266,000.00 17,366,000.00
Jumlah I 286,535,733.94
II. PEK. DINDING DAN PLESTERAN
1 Pek. Pas. Dinding 1/2 Bata ad. 1 : 5 m2 504.84 A.05.05 114,700.00 57,905,148.00
2 Pek. Pas. Plesteran ad. 1 : 5 + Acian m2 1,009.68 A.06.04 52,300.00 52,806,264.00
3 Pek. Pas. Acian Beton m2 65.30 A.06.20 31,000.00 2,024,300.00
4 Pek. Pas. Skoneng timbul m1 46.20 A.06.17 51,600.00 2,383,920.00
Jumlah II 115,119,632.00
III. PEK. KUSEN PINTU DAN JENDELA
1 Pas. Kusen Aluminium 4" CA (Warna Sek. Alexindo) m1 147.40 Upah Bahan 156,000.00 22,994,400.00
2 Pas. Daun Pintu Kaca Es Bingkai Alumunium unit 10.00 Upah Bahan 1,500,000.00 15,000,000.00
3 Pas. Daun Pintu Alumunium ( KM/WC ) unit 3.00 Upah Bahan 1,100,000.00 3,300,000.00
4 Pas. Daun Jendela Alumunium unit 9.00 Upah Bahan 600,000.00 5,400,000.00
5 Pas. Kaca 5 mm m1 3.48 Upah Bahan 64,000.00 222,720.00
Jumlah III 46,917,120.00
IV. PEK. LANTAI
1 Pek. Urugan Pasir Alas Lantai T = 5 cm m3 15.28 A.02.12 179,700.00 2,745,816.00
2 Pas. Keramik Lantai 60 x 60 cm m2 296.66 A.10.09 a 279,300.00 82,857,138.00
3 Pas. Keramik 20 x 20 cm Anti Slip m2 9.00 A.10.03 211,800.00 1,906,200.00
4 Pas. Keramik 20 x 25 cm Dinding T = 1.5 m m2 25.65 A.10.19.a 241,000.00 6,181,650.00
5 Pas. Keramik Border m' 17.10 upah bahan 12,500.00 213,750.00
Jumlah IV 93,904,554.00
V. PEK. PLAFOND
1 Pek. Rangka Plafond Hollow m2 395.72 A.09.05 141,500.00 55,994,380.00
2 Pek. Plafond Gypsum m2 395.72 A.09.07 45,600.00 18,044,832.00
3 Pek. Dropceiling m1 27.53 upah bahan 60,000.00 1,651,800.00
4 List Plafond Gypsum m2 431.00 upah bahan 23,000.00 9,913,000.00
Jumlah V 85,604,012.00
VI. PEK. PENGECATAN
1 Cat Dinding m2 1,009.68 A.16.05 22,300.00 22,515,864.00
2 Cat Plafond m2 395.72 A.16.07 32,200.00 12,742,184.00
Jumlah VI 35,258,048.00
VII. PEKERJAAN ATAP ###
1 Pek. Rangka atap baja ringan m2 303.56 upah+bahan 150,000.00 45,534,000.00
2 Pek. Listplank (Kalsiplank) m1 85.25 A.08.30.a 73,500.00 6,265,875.00
3 Pek. Penutup Atap Genteng Metal m2 306.60 upah+bahan 133,700.00 40,991,831.72
4 Pek. Bubungan Atap Metal Roof m1 47.02 upah+bahan 95,000.00 4,466,900.00
5 Pek. Talang Jurai seng BJLS m1 9.25 A.08.34 106,200.00 982,350.00
Jumlah VII 98,240,956.72
1 2 3 4 5 6 7=4x6
VIII. PEK. INSTALASI LISTRIK
1 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 49.00 Upah Bahan 120,000.00 5,880,000.00
2 Lampu SL 18 Watt ( termasuk fiting lampu ) bh 3.00 Upah Bahan 105,000.00 315,000.00
3 Lampu RMI 2 x 36 Watt bh 20.00 Upah Bahan 375,000.00 7,500,000.00
4 Exaustfan 40 x 40 cm unit 10.00 Upah Bahan 375,000.00 3,750,000.00
5 KK AC bh 10.00 Upah Bahan 46,500.00 465,000.00
6 KK biasa tunggal bh 16.00 Upah Bahan 21,500.00 344,000.00
7 Saklar Tunggal bh 5.00 Upah Bahan 21,500.00 107,500.00
8 Saklar Ganda bh 10.00 Upah Bahan 23,700.00 237,000.00
9 Box Panel Ls 1.00 Ls 450,000.00 450,000.00
10 Kabel Bc 35 mm2 kg 25.00 Upah Bahan 105,000.00 2,625,000.00
11 Klem bh 80.00 Upah Bahan 7,500.00 600,000.00
12 Set Finial ( Penangkal Petir ) set 4.00 Upah Bahan 320,000.00 1,280,000.00
13 Elektrode Pentanahan Behel Ø 12 mm2 unt 2.00 Upah Bahan 385,000.00 770,000.00
Jumlah VIII 24,323,500.00

IX. PEK. INSTALASI AIR


1 Pas. Bak Mandi Fibre bh 1.00 A.11.06 713,800.00 713,800.00
2 Pas. Koset Jongkok bh 2.00 A.11.02 589,500.00 1,179,000.00
3 Pas. Koset Duduk bh 1.00 A.11.01 1,432,400.00 1,432,400.00
4 Pas. Kran Air 1/2" bh 3.00 A.12.16 42,000.00 126,000.00
5 Pas. Floor Drain bh 3.00 A.12.17 32,100.00 96,300.00
6 Pas. Pipa PVC 1/2" m' 130.00 A.12.07 14,100.00 1,833,000.00
7 Pas. Pipa PVC 3" m' 35.00 A.12.13 36,600.00 1,281,000.00
8 Pas. Pipa PVC 4" ( KM/WC ) m' 35.00 A.12.14 52,100.00 1,823,500.00
9 Pas. Wastafel unit 2.00 A.11.04 823,100.00 1,646,200.00
10 Pas. Roof drain 4" bh 9.00 ls 150,000.00 1,350,000.00
Jumlah IX 11,481,200.00

PEK. RUMAH GENSET 3 X 4 M

I. PEKERJAAN TANAH DAN PONDASI


1 Pek. galian tanah pondasi footplat m3 2.56 A.02.02 73,500.00 188,160.00
2 Pek. galian tanah pondasi lajur m3 9.92 A.02.01 60,000.00 595,200.00
3 Pek. urugan pasir bawah pondasi footplat m3 0.13 A.02.12 179,700.00 23,361.00
4 Pek. urugan pasir bawah pondasi lajur, t.5cm m3 2.98 A.02.12 179,700.00 534,787.20
5 Pek. urugan pasir bawah lantai, t.5cm m3 0.13 A.02.12 179,700.00 23,361.00
6 Pek. urugan tanah pondasi footplat m3 1.02 A.02.09 20,000.00 20,480.00
7 Pek. urugan tanah pondasi lajur m3 2.98 A.02.09 20,000.00 59,520.00
9 Pek. lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr, dibawah po m3 0.13 A.04.14 828,600.00 107,718.00
10 Pek. Aanstamping Batu Belah m3 0.38 A.03.01 394,100.00 149,758.00
11 Pek. Pasangan pondasi batu belah 1PC : 5PP m3 3.42 A.03.04 726,500.00 2,484,630.00
Jumlah I 4,186,975.20

II. PEKERJAAN STRUKTUR ( PEK. BETON )


1 Pek. Pondasi Footplat
a. Pek. Pondasi Footplat (0.80x0.80) cm
‐ Pek. Beton K225 m3 0.83 A.04.10 1,456,700.00 1,209,061.00
‐ Pek. Pembesian U-32 kg 67.17 A.04.01.a 14,300.00 960,506.18
‐ Pek. Bekisting P2A m2 1.43 A.04.02 160,000.00 228,284.30
2 Pek. Sloof
a. Pek. Beton Sloof Tipe, SL3 15/20 cm
‐ Pek. Beton K225 m3 0.42 A.04.10 1,456,700.00 611,814.00
‐ Pek. PembesianU 32 kg 51.28 A.04.01.a 14,300.00 733,238.11
‐ Pek. PembesianU 24 kg 14.96 A.04.01 13,700.00 204,963.81
‐ Pek. Bekisting m2 7.70 A.04.03 122,900.00 946,330.00
3 Pek. Kolom
a. Pek. Kolom Tipe, K.2 20/40 cm
‐ Pek. Beton K225 m3 1.79 A.04.10 1,456,700.00 2,607,493.00
‐ Pek. PembesianU 32 kg 156.37 A.04.01.a 14,300.00 2,236,153.92
‐ Pek. PembesianU 24 kg 52.94 A.04.01 13,700.00 725,331.48
‐ Pek. Bekisting m2 29.54 A.04.04.a 188,100.00 5,555,533.50
b. Pek. Kolom Praktis (KP) 12/12 cm
‐ Pek. Beton K175 m3 0.06 A.04.10.1 956,900.00 57,414.00
‐ Pek. Pembesian U-24 kg 17.90 A.04.01 13,700.00 245,256.05
‐ Pek. Bekisting KP m2 1.00 A.04.04.a 188,100.00 188,100.00
4 Pek. Balok
a. Pek. Balok Tipe, B.2 20/35 cm
‐ Pek. Beton K225 m3 1.75 A.04.10 1,456,700.00 2,549,225.00
‐ Pek. PembesianU 32 kg 165.33 A.04.01.a 14,300.00 2,364,219.00
‐ Pek. PembesianU 24 kg 56.68 A.04.01 13,700.00 776,550.25
‐ Pek. Bekisting m2 18.00 A.04.05.a 238,500.00 4,293,000.00
5 Pek. Beton Plat lantai, t=12cm
‐ Pek. Beton K225 m3 3.09 A.04.10 1,456,700.00 4,501,203.00
‐ Pek. PembesianU 24 kg 549.47 A.04.01 13,700.00 7,527,707.63
‐ Pek. Bekisting m2 34.13 A.04.06.a 266,000.00 9,079,569.77
6 Pek. Beton Plat Lisplank, t=8cm
‐ Pek. Beton K225 m3 0.34 A.04.10 1,456,700.00 495,278.00
‐ Pek. PembesianU 24 kg 44.44 A.04.01 13,700.00 608,848.19
‐ Pek. Bekisting m2 5.06 A.04.06.a 266,000.00 1,346,264.00
Jumlah II 50,051,344.18

III. PEK. DINDING DAN PLESTERAN


1 Pek. Pas. Dinding 1/2 Bata ad. 1 : 5 m2 45.36 A.05.05 114,700.00 5,202,792.00
1 2 3 4 5 6 7=4x6
2 Pek. Pas. Plesteran ad. 1 : 5 + Acian m2 90.72 A.06.04 52,300.00 4,744,656.00
3 Pek. Pas. Acian Beton m2 20.00 A.06.20 31,000.00 620,000.00
4 Pek. Ventilasi Besi m2 1.12 ls 450,000.00 504,000.00
5 Pek. Pas. Pintu Besi Gerbang (lengkap) m2 4.52 ls 850,000.00 3,842,000.00
6 Pek. Pas. Pipa Air Hujan 3" m1 20.00 A.12.13 36,600.00 732,000.00
Jumlah III 15,645,448.00

IV. PEK. PENGECATAN


1 Cat Dinding m2 110.75 A.16.05 22,300.00 2,469,725.00
2 Cat Dinding (Plafond ) m2 24.75 A.16.07 32,200.00 796,950.00
Jumlah IV 3,266,675.00

V. PEK. LANTAI
1 Pek. Rabat Beton tumbuk t=15 cm m3 1.80 A.04.10 1,456,700.00 2,622,060.00
2 Pek. Rabat Beton tumbuk t=10 cm m2 1.38 A.04.10.1 956,900.00 1,320,522.00
Jumlah V 3,942,582.00
Page 86

ANALISA SATUAN PEKERJAAN

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH


1 2 3 4 5 6=(3x5)
A.01.01 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu 5/7 Albasiah 0.0120 m2 1,819,000.00 21,828.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0200 kg 16,000.00 320.00
Kayu Papan 3/20 Kayu Albasiah 0.0070 m 3
1,926,000.00 13,482.00
Jumlah Bahan 35,630.00
UPAH :
Pekerja 0.1000 Oh 70,000.00 7,000.00
Tukang Kayu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 100,000.00 1,000.00
Mandor 0.0050 Oh 85,000.00 425.00
Jumlah Pekerja 16,925.00
Jumlah Bahan + Pekerja 52,555.00
Keuntungan Max. 10 % 5,255.50
Jumlah Total 57,810.50
Dibulatkan 57,800.00
A.01.06 1 M3 BONGKARAN BETON BERTULANG
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 6.0000 Oh 70,000.00 420,000.00
Mandor 0.0600 Oh 85,000.00 5,100.00
Jumlah Pekerja 425,100.00
Jumlah Bahan + Pekerja 425,100.00
Keuntungan Max. 10 % 42,510.00
Jumlah Total 467,610.00
Dibulatkan 467,600.00
A.01.07 1 M2 BONGKARAN DINDING TEMBOK BATA MERAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.6667 Oh 70,000.00 46,669.00
Mandor 0.0330 Oh 85,000.00 2,805.00
Jumlah Pekerja 49,474.00
Jumlah Bahan + Pekerja 49,474.00
Keuntungan Max. 10 % 4,947.40
Jumlah Total 54,421.40
Dibulatkan 54,400.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER
BAHAN :
Page 87

-
-
Jumlah Bahan -
UPAH :
Pekerja 0.7500 Oh 70,000.00 52,500.00
Mandor 0.0250 Oh 85,000.00 2,125.00
Jumlah Pekerja 54,625.00
Jumlah Bahan + Pekerja 54,625.00
Keuntungan Max. 10 % 5,462.50
Jumlah Total 60,087.50
Dibulatkan 60,000.00
A.02.09 1 M3 URUGAN TANAH KEMBALI
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 70,000.00 17,500.00
Mandor 0.0083 Oh 85,000.00 705.50
Jumlah Pekerja 18,205.50
Jumlah Bahan + Pekerja 18,205.50
Keuntungan Max. 10 % 1,820.55
Jumlah Total 20,026.05
Dibulatkan 20,000.00
A.02.12 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m3 118,000.00 141,600.00

Jumlah Bahan 141,600.00


UPAH :
Pekerja 0.3000 Oh 70,000.00 21,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 21,850.00
Jumlah Bahan + Pekerja 163,450.00
Keuntungan Max. 10 % 16,345.00
Jumlah Total 179,795.00
Dibulatkan 179,700.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland 218.0000 kg 1,200.00 261,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.8700 m³ 285,000.00 247,950.00
Jumlah Bahan 607,310.00
UPAH :
Pekerja 1.6500 Oh 70,000.00 115,500.00
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Kepala Tukang 0.0250 Oh 100,000.00 2,500.00
Mandor 0.0800 Oh 85,000.00 6,800.00
Page 88

Jumlah Pekerja 146,050.00


Jumlah Bahan + Pekerja 753,360.00
Keuntungan Max. 10 % 75,336.00
Jumlah Total 828,696.00
Dibulatkan 828,600.00
A.04.17.P1 1 M3 MEMBUAT PONDASI BETON BERTULANG 1.25 x 1.25 CM 55,1269 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0419 m³ 1,926,000.00 80,627.94
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 16,000.00 24,000.00
Minyak Bekisting ( Oli Bekas ) 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 55.1269 kg 10,500.00 578,832.53
Kawat Beton 2.3000 kg 19,500.00 44,850.00
Semen Portland 336.0000 kg 1,200.00 403,200.00
Pasir Beton 0.5400 m³ 188,000.00 101,520.00
Batu Pecah Mesin 2/3 0.8100 m³ 285,000.00 230,850.00
Jumlah Bahan 1,465,280.47
UPAH :
Pekerja 5.3000 Oh 70,000.00 371,000.00
Tukang Batu 0.2750 Oh 85,000.00 23,375.00
Tukang Kayu 1.3000 Oh 85,000.00 110,500.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2620 Oh 100,000.00 26,200.00
Mandor 0.2650 Oh 85,000.00 22,525.00
Jumlah Pekerja 642,850.00
Jumlah Bahan + Pekerja 2,108,130.47
Keuntungan Max. 10 % 210,813.05
Jumlah Total 2,318,943.52
Dibulatkan 2,318,900.00
A.04.24 1 M3 MEMBUAT SLOOF 20/30 (124.9500 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK15 CM
BAHAN :
Bekesting Albasiah 0.2000 m³ 1,926,000.00 385,200.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 3.0000 kg 16,000.00 48,000.00
Minyak Bekisting 1.0000 ltr 3,500.00 3,500.00
Besi Beton Polos U 24 124.9500 kg 10,500.00 1,311,975.00
Kawat Beton 1.8700 kg 19,500.00 36,465.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 2,492,800.00
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Page 89

Jumlah Bahan + Pekerja 2,945,112.50


Keuntungan Max. 10 % 294,511.25
Jumlah 3,239,623.75
Dibulatkan 3,239,600.00
A.04.37 1 M3 MEMBUAT RING BALK 10/15 (197,7445 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3200 m³ 1,200.00 384.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 10.6700 kg 16,000.00 170,720.00
Minyak Bekisting 5.3300 ltr 3,500.00 18,655.00
Besi Beton Polos U 24 197.7445 kg 10,500.00 2,076,317.60
Kawat Beton 3.0700 kg 19,500.00 59,865.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,033,601.60
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,485,914.10
Keuntungan Max. 10 % 348,591.41
Jumlah 3,834,505.51
Dibulatkan 3,834,500.00
A.04.35.a 1 M3 MEMBUAT KOLOM 30/30 (136,9915 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,926,000.00 770,400.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 16,000.00 85,280.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 136.9915 kg 10,500.00 1,438,410.87
Kawat Beton 1.6200 kg 19,500.00 31,590.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,042,685.87
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Page 90

Jumlah Bahan + Pekerja 3,494,998.37


Keuntungan Max. 10 % 349,499.84
Jumlah 3,844,498.20
Dibulatkan 3,844,400.00
A.04.43 1 M3 MEMBUAT RING BALK 15/20 (180,6000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3700 m³ 1,926,000.00 712,620.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 7.3300 kg 16,000.00 117,280.00
Minyak Bekisting ( Oli Bekas ) 3.6700 ltr 3,500.00 12,845.00
Besi Beton Polos U 24 180.6000 kg 10,500.00 1,896,300.00
Kawat Beton 2.7100 kg 19,500.00 52,845.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,499,550.00
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,951,862.50
Keuntungan Max. 10 % 395,186.25
Jumlah 4,347,048.75
Dibulatkan 4,347,000.00
A.04.45.BL a 1 M3 MEMBUAT BALK 15/25 (175,8089 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2960 m³ 1,926,000.00 570,096.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 175.8089 kg 10,500.00 1,845,993.80
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,291,234.80
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Page 91

Jumlah Bahan + Pekerja 3,743,547.30


Keuntungan Max. 10 % 374,354.73
Jumlah 4,117,902.03
Dibulatkan 4,117,900.00
A.04.45.BL b 1 M3 MEMBUAT BALK 15/30 (161,9271 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3400 m³ 1,926,000.00 654,840.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 161.9271 kg 10,500.00 1,700,234.20
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,230,219.20
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,682,531.70
Keuntungan Max. 10 % 368,253.17
Jumlah 4,050,784.87
Dibulatkan 4,050,700.00
A.04.45.BL c 1 M3 MEMBUAT BALK 20/30 (125,8298 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,926,000.00 770,400.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 136.8298 kg 10,500.00 1,436,712.90
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,082,257.90
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Page 92

Jumlah Bahan + Pekerja 3,534,570.40


Keuntungan Max. 10 % 353,457.04
Jumlah 3,888,027.44
Dibulatkan 3,888,000.00
A.04.45.BL d 1 M3 MEMBUAT BALK 20/40 (161,9668 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2700 m³ 1,926,000.00 520,020.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 161.9668 kg 10,500.00 1,700,651.40
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,095,816.40
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,548,128.90
Keuntungan Max. 10 % 354,812.89
Jumlah 3,902,941.79
Dibulatkan 3,902,900.00
A.04.45.BL e 1 M3 MEMBUAT BALK 20/50 (157,9186 Kg Besi + Bekesting)
DENGAN TULANGAN 13 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2760 m³ 1,926,000.00 531,576.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 157.9186 kg 10,500.00 1,658,145.30
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,064,866.30
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Page 93

Jumlah Bahan + Pekerja 3,517,178.80


Keuntungan Max. 10 % 351,717.88
Jumlah 3,868,896.68
Dibulatkan 3,868,800.00
A.04.45.BL f 1 M3 MEMBUAT BALK 25/60 (161,2487Kg Besi + Bekesting)
DENGAN TULANGAN 11 BATANG DIA 16 dan 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2340 m³ 1,926,000.00 450,684.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 161.2487 kg 10,500.00 1,693,111.70
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,018,940.70
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,471,253.20
Keuntungan Max. 10 % 347,125.32
Jumlah 3,818,378.52
Dibulatkan 3,818,300.00
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 12,5 cm TEBAL 8 cm
BAHAN :
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.7800 m³ 285,000.00 222,300.00
Besi Beton (Polos / ulir) 98.6000 kg 10,500.00 1,035,300.00
Kawat Beton 1.6300 kg 19,500.00 31,785.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 16,000.00 93,760.00
Minyak Bekisting ( Oli Bekas ) 2.9300 ltr 3,500.00 10,255.00
Bekisting Albasiah 0.3200 m³ 1,926,000.00 616,320.00
Jumlah Bahan 2,495,080.00
UPAH :
Pekerja 6.4697 Oh 70,000.00 452,881.80
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 100,000.00 51,917.40
Mandor 0.1924 Oh 85,000.00 16,357.91
Jumlah Pekerja 970,238.80
Jumlah Bahan + Pekerja 3,465,318.80
Page 94

Keuntungan Max. 10 % 346,531.88


Jumlah Total 3,811,850.68
Dibulatkan 3,811,800.00
A.04.49.a 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 12,5 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.7800 m³ 285,000.00 222,300.00
Besi Beton (Polos / ulir) 98.6400 kg 10,500.00 1,035,720.00
Kawat Beton 2.0200 kg 19,500.00 39,390.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 16,000.00 78,080.00
Minyak Bekisting ( Oli Bekas ) 2.4400 ltr 3,500.00 8,540.00
Bekisting Albasiah 0.2700 m³ 1,926,000.00 520,020.00
Jumlah Bahan 2,389,410.00
UPAH :
Pekerja 6.4697 Oh 70,000.00 452,881.80
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 100,000.00 51,917.40
Mandor 0.1924 Oh 85,000.00 16,357.91
Jumlah Pekerja 970,238.80
Jumlah Bahan + Pekerja 3,359,648.80
Keuntungan Max. 10 % 335,964.88
Jumlah Total 3,695,613.68
Dibulatkan 3,695,600.00
A.04.51.a 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.10 JARAK 12.5 cm TEBAL 12 cm
BAHAN :
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.7800 m³ 285,000.00 222,300.00
Besi Beton (Polos / ulir) 164.4000 kg 10,500.00 1,726,200.00
Kawat Beton 2.4100 kg 19,500.00 46,995.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.2300 kg 16,000.00 67,680.00
Minyak Bekisting ( Oli Bekas ) 2.1100 ltr 3,500.00 7,385.00
Bekesting Albasiah 0.2500 m³ 1,926,000.00 481,500.00
Jumlah Bahan 3,037,420.00
UPAH :
Pekerja 6.4697 Oh 70,000.00 452,881.80
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 100,000.00 51,917.40
Mandor 0.1924 Oh 85,000.00 16,357.91
Jumlah Pekerja 970,238.80
Jumlah Bahan + Pekerja 4,007,658.80
Keuntungan Max. 10 % 400,765.88
Jumlah Total 4,408,424.68
Page 95

Dibulatkan 4,408,400.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 750.00 52,500.00
Semen Portland 9.6800 kg 1,200.00 11,616.00
Pasir Pasang 0.0450 m³ 188,000.00 8,460.00
Jumlah Bahan 72,576.00
UPAH :
Pekerja 0.3000 Oh 70,000.00 21,000.00
Tukang Batu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 100,000.00 1,000.00
Mandor 0.0150 Oh 85,000.00 1,275.00
Jumlah Pekerja 31,775.00
Jumlah Bahan + Pekerja 104,351.00
Keuntungan Max. 10 % 10,435.10
Jumlah Total 114,786.10
Dibulatkan 114,700.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 5.1840 kg 1,200.00 6,220.80
Pasir Pasang 0.0260 m³ 188,000.00 4,888.00
Jumlah Bahan 11,108.80
UPAH :
Pekerja 0.3000 Oh 70,000.00 21,000.00
Tukang Batu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 100,000.00 1,500.00
Mandor 0.0150 Oh 85,000.00 1,275.00
Jumlah Pekerja 36,525.00
Jumlah Bahan + Pekerja 47,633.80
Keuntungan Max. 10 % 4,763.38
Jumlah Total 52,397.18
Dibulatkan 52,300.00
A.06.20 1 M2 ACIAN PC
BAHAN :
Semen Portland 3.2500 kg 1,200.00 3,900.00
Jumlah Bahan 3,900.00
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tukang Batu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 100,000.00 1,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 24,350.00
Jumlah Bahan + Pekerja 28,250.00
Keuntungan Max. 10 % 2,825.00
Jumlah 31,075.00
Dibulatkan 31,000.00
A.08.30.a 1 M1 PASANG KALSIPLANK UKURAN (0.8 x 30) cm
BAHAN :
Page 96

Kalsiplank 1.1000 m' 36,000.00 39,600.00


Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0500 kg 16,000.00 800.00
Jumlah Bahan 40,400.00
UPAH :
Pekerja 0.1000 Oh 70,000.00 7,000.00
Tukang Kayu 0.2000 Oh 85,000.00 17,000.00
Kepala Tukang 0.0200 Oh 100,000.00 2,000.00
Mandor 0.0050 Oh 85,000.00 425.00
Jumlah Pekerja 26,425.00
Jumlah Bahan + Pekerja 66,825.00
Keuntungan Max. 10 % 6,682.50
Jumlah Total 73,507.50
Dibulatkan 73,500.00
A.09.05 1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Lokal Kls II, Balok 0.0163 m³ 2,407,500.00 39,242.25
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.2500 kg 16,000.00 4,000.00
Jumlah Bahan 43,242.25
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tukang Kayu 0.3000 Oh 85,000.00 25,500.00
Kepala Tukang 0.0300 Oh 100,000.00 3,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 43,350.00
Jumlah Bahan + Pekerja 86,592.25
Keuntungan Max. 10 % 8,659.23
Jumlah Total 95,251.48
Dibulatkan 95,200.00
A.09.07,a 1 M2 LANGIT - LANGIT GRC, TEBAL 4 mm
BAHAN :
GRC (120 x 240 x4) mm 0.3640 lbr 70,000.00 25,480.00
Paku Sekrup 0.1100 kg 18,700.00 2,057.00
Jumlah Bahan 27,537.00
UPAH :
Pekerja 0.1000 Oh 70,000.00 7,000.00
Tukang Kayu 0.0500 Oh 85,000.00 4,250.00
Kepala Tukang 0.0050 Oh 100,000.00 500.00
Mandor 0.0050 Oh 85,000.00 425.00
Jumlah Pekerja 12,175.00
Jumlah Bahan + Pekerja 39,712.00
Keuntungan Max. 10 % 3,971.20
Jumlah Total 43,683.20
Dibulatkan 43,600.00
A.09.09 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4
BAHAN :
Kayu Profil 1.0500 m' 3,000.00 3,150.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0100 kg 16,000.00 160.00
Jumlah Bahan 3,310.00
Page 97

UPAH :
Pekerja 0.0500 Oh 70,000.00 3,500.00
Tukang Kayu 0.0500 Oh 85,000.00 4,250.00
Kepala Tukang 0.0050 Oh 100,000.00 500.00
Mandor 0.0030 Oh 85,000.00 255.00
Jumlah Pekerja 8,505.00
Jumlah Bahan + Pekerja 11,815.00
Keuntungan Max. 10 % 1,181.50
Jumlah Total 12,996.50
Dibulatkan 12,900.00
A.10.09 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Ubin Keramik 40 x 40 cm 1.1000 m2 95,000.00 104,500.00
Semen Portland 9.8000 kg 1,200.00 11,760.00
Pasir Pasang 0.0450 m3 188,000.00 8,460.00
Semen Warna 1.3000 kg 16,000.00 20,800.00
Jumlah Bahan 145,520.00
UPAH :
Pekerja 0.2500 Oh 70,000.00 17,500.00
Tukang Batu 0.1250 Oh 85,000.00 10,625.00
Kepala Tukang 0.0130 Oh 100,000.00 1,300.00
Mandor 0.0130 Oh 85,000.00 1,105.00
Jumlah Pekerja 30,530.00
Jumlah Bahan + Pekerja 176,050.00
Keuntungan Max. 10 % 17,605.00
Jumlah Total 193,655.00
Dibulatkan 193,600.00
A.15.02 1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :
Kaca 1.1000 m2 64,000.00 70,400.00
Jumlah Bahan 70,400.00
UPAH :
Pekerja 0.0150 Oh 70,000.00 1,050.00
Tukang Kayu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 100,000.00 1,500.00
Mandor 0.00075 Oh 85,000.00 63.75
Jumlah Pekerja 15,363.75
Jumlah Bahan + Pekerja 85,763.75
Keuntungan Max. 10 % 8,576.38
Jumlah Total 94,340.13
Dibulatkan 94,300.00
A.16.04 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)
BAHAN :
Cat tembok Vinilex / Sekelas Vinilex 0.1750 kg 104,500.00 18,287.50
Plamir tembok 0.1600 kg 28,000.00 4,480.00
Rol cat 0.0100 bh 21,400.00 214.00
Ampelas 0.5000 lbr 4,800.00 2,400.00
Jumlah Bahan 25,381.50
Page 98

UPAH :
Pekerja 0.1040 Oh 70,000.00 7,280.00
Tk. cat 0.0182 Oh 85,000.00 1,547.00
Kep. tukang cat 0.0090 Oh 100,000.00 900.00
Mandor 0.0045 Oh 85,000.00 382.50
Jumlah Pekerja 10,109.50
Jumlah Bahan + Pekerja 35,491.00
Keuntungan Max. 10 % 3,549.10
Jumlah 39,040.10
Dibulatkan 39,000.00
A.16.06 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)
BAHAN :
Cat tembok Vinilex / Sekelas Vinilex 0.2000 kg 104,500.00 20,900.00
Plamir tembok 0.1600 kg 28,000.00 4,480.00
Rol cat 0.0100 bh 21,400.00 214.00
Ampelas 0.5000 lbr 4,800.00 2,400.00
Jumlah Bahan 27,994.00
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tk. cat 0.0280 Oh 85,000.00 2,380.00
Kep. tukang cat 0.0150 Oh 100,000.00 1,500.00
Mandor 0.0090 Oh 85,000.00 765.00
Jumlah Pekerja 18,645.00
Jumlah Bahan + Pekerja 46,639.00
Keuntungan Max. 10 % 4,663.90
Jumlah 51,302.90
Dibulatkan 51,300.00
A.16.08 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu 0.1670 kg 18,000.00 3,006.00
Plamir kayu 0.0830 kg 26,000.00 2,158.00
Cat kayu sekelas SEIV 0.2000 kg 45,500.00 9,100.00
Amplas kayu 0.4000 lbr 4,800.00 1,920.00
Minyak cat terpentin 0.1500 ltr 10,700.00 1,605.00
Kwas 3" 0.0500 bh 13,000.00 650.00
Jumlah Bahan 18,439.00
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tk. Cat 0.0600 Oh 85,000.00 5,100.00
Kep. tukang cat 0.0300 Oh 100,000.00 3,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 22,950.00
Jumlah Bahan + Pekerja 41,389.00
Keuntungan Max. 10 % 4,138.90
Jumlah 45,527.90
Dibulatkan 45,500.00
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI SEDANG / BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS SDN 4 WONOHARJO
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

A. PEK. REHAB KELAS


I. PEK. PERSIAPAN 2,612,400.00
II. PEKERJAAN TANAH DAN PONDASI 5,298,705.00
III. PEKERJAAN DINDING 818,495.00
IV. PEKERJAAN KACA 278,826.24
V. PEKERJAAN PLAFOND 22,845,840.00
VI. PEKERJAAN ALAT PENGGANTUNG 12,420,000.00
VII. PEKERJAAN LANTAI DAN KRAMIK 944,000.00
VIII. PEKERJAAN PENGECATAN 47,935,230.00
IX. PEKERJAAN LISTRIK 13,733,000.00

B. PEK. GAZEBO
I. PEKERJAAN TANAH DAN PONDASI 4,562,530.00
II. PEKERJAAN DINDING DAN PLESTERAN 6,049,080.00
III. PEKERJAAN BETON 9,803,829.60
IV. PEKERJAAN ATAP DAN PLAFOND 33,598,200.00
V. PEKERJAAN LANTAI DAN KRAMIK 5,632,800.00
VI. PEKERJAAN PENGECATAN 2,645,360.00
VII. PEKERJAAN LISTRIK 493,000.00

JUMLAH REAL COST 169,671,295.84


PPN 10 % 16,967,129.58
JUMLAH TOTAL 186,638,425.42
DIBULATKAN 186,638,000.00
Terbilang :
#NAME?

MENGETAHUI : DIPERIKSA :
DIBUAT:
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan
Konsultan Perencana
Selaku Pejabat Pembuat Komitment ( PPTK )
CV. SAVANA INDO MEDIA
( PPK )

DODI DJUBARDI, S.Pd H. SOLEH, S.Pd, M.Pd


Nip : 19680404 199508 1 001 NIP : 19690810 199512 1 003

HERYANTO
Direktur

MENGETAHUI / MENYUTUJUI : MENGETAHUI :


Kepala Dinas Pendidikan, Pemuda dan Olah Raga Kepala Dinas Pekerjaan Umum, Tataruang
Kabupaten Pangandaran Perumahan Rakyat dan Kawasan Permukiman
Kabupaten Pangandaran

Drs. H. SURMAN, M.Pd JAJA NURULHUDA, ST, M.Dev. Plg


Nip : 19610204 198204 1 005 Nip : 19720106 199803 1 002
ENGINEER ESTIMATE ( EE )
RINCIAN RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI SEDANG / BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS SDN 4 WONOHARJO
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA SATUAN
ANALIS
Rp. Rp.

A. PEK. REHAB KELAS


I. PEK. PERSIAPAN
1 Pasangan Papan Nama Proyek ls bh 1.00 150,000.00 150,000.00
2 Pasangan Bouplank A.01.01 m1 8.00 57,800.00 462,400.00
3 Pengadaan Direksikeet ( sewa ) ls bh 1.00 1,000,000.00 1,000,000.00
4 Administrasi Dan Dokumentasi ls bh 1.00 1,000,000.00 1,000,000.00
Jumlah 2,612,400.00
II. PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah A.02.01 m3 4.38 60,000.00 262,800.00
2 Pek. Urugan Tanah A.02.11 m3 15.33 119,500.00 1,831,935.00
3 Urugan Tanah Kembali A.02.09 m3 1.10 20,000.00 21,900.00
4 Pas. Pondasi Batu Belah ( Rabat ) A.03.04 m3 4.38 726,500.00 3,182,070.00
Jumlah 5,298,705.00
III. PEKERJAAN DINDING
1 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 15.65 52,300.00 818,495.00
Jumlah 818,495.00
IV. PEKERJAAN KACA
1 Pas. Kaca polos 5 mm A.15.02 m2 2.96 94,300.00 278,826.24
Jumlah 278,826.24
V. PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Kayu Albasiah A.09.04 m2 100.80 84,200.00 8,487,360.00
2 Pas. Plafond GRC A.09.07,a m2 100.80 43,600.00 4,394,880.00
3 Pas. List plafond Gifsum upah-bahan m1 433.20 23,000.00 9,963,600.00
Jumlah 22,845,840.00
VI. PEKERJAAN ALAT PENGGANTUNG
1 Pas. Kunci pintu double slagg A.14.01 bh 12.00 142,500.00 1,710,000.00
2 Pas. Engsel pintu A.14.04 bh 36.00 45,500.00 1,638,000.00
3 Pas. Engsel jendela A.14.04,a bh 96.00 28,800.00 2,764,800.00
4 Pas. Slot jendela A.14.08 bh 48.00 55,400.00 2,659,200.00
5 Pas. Hak angin A.14.06 bh 96.00 38,000.00 3,648,000.00
Jumlah 12,420,000.00
VII. PEKERJAAN LANTAI DAN KRAMIK
1 Pas. Kramik 30x30 A.10.05 m2 5.00 188,800.00 944,000.00
Jumlah 944,000.00
VIII. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 873.25 22,300.00 19,473,475.00
2 Cat Plafond A.16.07 m2 691.35 32,200.00 22,261,470.00
3 Cat Kayu A.16.08 m2 136.27 45,500.00 6,200,285.00
Jumlah 47,935,230.00
IX. PEKERJAAN LISTRIK
1 Pas.Instalasi Titik Cahaya upah-bahan titik 41.00 120,000.00 4,920,000.00
2 Pas.Instalasi Titik Stop Kontak upah-bahan titik 12.00 120,000.00 1,440,000.00
3 Pas.Instalasi Titik Stop Kontak AC upah-bahan titik 14.00 144,000.00 2,016,000.00
4 Pas.Lampu SL 18 watt upah-bahan bh 41.00 105,000.00 4,305,000.00
5 Pas.Stop Kontak upah-bahan bh 7.00 16,000.00 112,000.00
6 Pas.Stop Kontak AC upah-bahan bh 12.00 65,000.00 780,000.00
7 Pas.Saklar Ganda upah-bahan bh 10.00 16,000.00 160,000.00
Jumlah 13,733,000.00
B. PEK. GAZEBO
I. PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah A.02.01 m3 4.80 60,000.00 288,000.00
2 Pasangan Bouplank A.01.01 m1 8.00 57,800.00 462,400.00
3 Pek. Urugan Tanah Peninggian Lantai A.02.11 m3 5.40 119,500.00 645,300.00
4 Urugan Tanah Kembali A.02.09 m3 3.60 20,000.00 72,000.00
5 Urugan Pasir A.02.12 m3 0.32 179,700.00 57,504.00
6 Pas. Pondasi Batu Belah A.03.04 m3 2.16 726,500.00 1,569,240.00
7 Pas. Anstanping / Batu kosong A.03.01 m3 0.96 394,100.00 378,336.00
8 Pas. Pondasi Rabat ( Pas Batu Belah ) A.03.04 m3 1.50 726,500.00 1,089,750.00
Jumlah 4,562,530.00
II. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 A.05.05 m2 14.40 114,700.00 1,651,680.00
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 28.80 52,300.00 1,506,240.00
3 Pas. Batu Templek ( dinding ) A.10.28 m2 10.80 267,700.00 2,891,160.00
Jumlah 6,049,080.00
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA SATUAN
ANALIS
Rp. Rp.
III. PEKERJAAN BETON
1 Sloof 15/20 A.04.22 m3 0.36 4,067,500.00 1,464,300.00
2 Kolom 20/20 A.04.33 m3 1.31 3,970,800.00 5,209,689.60
3 Ring Balok 15/20 A.04.43 m3 0.72 4,347,000.00 3,129,840.00
Jumlah 9,803,829.60
IV. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Kuda kuda dan Rangka Atap Bajaringan upah-bahan m2 75.82 150,000.00 11,372,400.00
2 Pas. Atap Genteng Metal upah-bahan m2 75.82 125,000.00 9,477,000.00
3 Pas. Bubung Genteng Metal upah-bahan m1 28.08 95,000.00 2,667,600.00
4 Pas. Lisplank Kayu Lokal Kls II A.08.26 m1 43.20 73,500.00 3,175,200.00
5 Pas. Rangka Plafond Kayu Albasiah A.09.04 m2 50.00 84,200.00 4,210,000.00
6 Pas. Plafond GRC A.09.07,a m2 50.00 43,600.00 2,180,000.00
7 Pas. List plafond Gifsum upah-bahan m1 40.00 12,900.00 516,000.00
Jumlah 33,598,200.00
V. PEKERJAAN LANTAI DAN KRAMIK
1 Pas. Keramik lantai 30 x 30 cm A.10.06 m2 21.60 199,400.00 4,307,040.00
2 Pas. Rabat Beton Tumbuk A.04.14 m3 1.60 828,600.00 1,325,760.00
Jumlah 5,632,800.00
VI. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 28.80 22,300.00 642,240.00
2 Cat Plafond A.16.07 m2 50.00 32,200.00 1,610,000.00
3 Cat Kayu A.16.08 m2 8.64 45,500.00 393,120.00
Jumlah 2,645,360.00
VII. PEKERJAAN LISTRIK
1 Pas.Instalasi Titik Cahaya ls titik 2.00 120,000.00 240,000.00
2 Pas.Lampu SL 18 watt ls bh 2.00 105,000.00 210,000.00
3 Pas.Saklar Tunggal ls bh 2.00 21,500.00 43,000.00
Jumlah 493,000.00
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : PENATAAN HALAMAN SEKOLAH
PEKERJAAN : PENATAAN HALAMAN SDN 4 WONOHARJO
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

A HALAMAN
I. PEK. PERSIAPAN 2,447,092.00
II. PEKERJAAN TANAH 72,765,517.28

B PEKERJAAN WC UMUM
I. PEK. PERSIAPAN 369,920.00
II. PEKERJAAN TANAH DAN PONDASI 12,864,323.25
III. PEKERJAAN DINDING DAN PLESTERAN 12,838,218.30
IV. PEKERJAAN BETON 6,840,771.73
V. PEKERJAAN KUSEN,PINTU DAN JENDELA 6,600,000.00
VI. PEKERJAAN ATAP DAN PLAFOND 33,667,790.50
VII. PEKERJAAN LANTAI DAN KRAMIK 12,494,394.90
VIII. PEKERJAAN PENGECATAN 4,385,121.10
IX. PEKERJAAN LISTRIK 2,341,000.00
X. PEK. SANITASI 14,493,400.00

JUMLAH REAL COST 182,107,549.06


PPN 10 % 18,210,754.91
JUMLAH TOTAL 200,318,303.96
DIBULATKAN 200,318,000.00
Terbilang :
#NAME?

MENGETAHUI : DIPERIKSA : DIBUAT:


Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana
Selaku Pejabat Pembuat Komitment ( PPTK ) CV. SAVANA INDO MEDIA
( PPK )

DODI DJUBARDI, S.Pd H. SOLEH, S.Pd, M.Pd


Nip : 19680404 199508 1 001 NIP : 19690810 199512 1 003

HERYANTO
Direktur

MENGETAHUI / MENYUTUJUI : MENGETAHUI :


Kepala Dinas Pendidikan, Pemuda dan Olah Raga Kepala Dinas Pekerjaan Umum, Tataruang
Kabupaten Pangandaran Perumahan Rakyat dan Kawasan Permukiman
Kabupaten Pangandaran

Drs. H. SURMAN, M.Pd JAJA NURULHUDA, ST, M.Dev. Plg


Nip : 19610204 198204 1 005 Nip : 19720106 199803 1 002

ENGINEER ESTIMATE ( EE )
RINCIAN RENCANA ANGGARAN BIAYA
KEGIATAN : PENATAAN HALAMAN SEKOLAH
PEKERJAAN : PENATAAN HALAMAN SDN 4 WONOHARJO
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA SATUAN
ANALIS
Rp. Rp.

A HALAMAN
I. PEK. PERSIAPAN
1 Pasangan Papan Nama Proyek ls bh 1.00 150,000.00 150,000.00
2 Pasangan Bouplank A.01.01 m1 5.14 57,800.00 297,092.00
3 Pengadaan Direksikeet ( sewa ) ls bh 1.00 1,000,000.00 1,000,000.00
4 Administrasi Dan Dokumentasi ls bh 1.00 1,000,000.00 1,000,000.00
Jumlah 2,447,092.00
II. PEKERJAAN TANAH
1 Pas. Paving Blok A.10.22 m2 462.84 137,500.00 63,641,122.88
2 Pas. Dinding bata 1:5 A.05.05 m2 61.80 114,700.00 7,088,460.00
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 38.93 52,300.00 2,035,934.40
Jumlah 72,765,517.28

B PEKERJAAN WC UMUM
I. PEK. PERSIAPAN
1 Pasangan Bouplank A.01.01 m1 6.40 57,800.00 369,920.00
Jumlah 369,920.00
II. PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah A.10.22 m3 19.50 137,500.00 2,681,250.00
2 Pek. Urugan Tanah Peninggian Lantai A.02.11 m3 8.10 119,500.00 967,950.00
2 Urugan Tanah Kembali A.02.09 m3 14.63 20,000.00 292,500.00
3 Urugan Pasir A.02.12 m3 1.30 179,700.00 233,610.00
4 Pas. Pondasi Batu Belah A.03.04 m3 7.31 726,500.00 5,312,531.25
5 Pas. Anstanping / Batu kosong A.03.01 m3 3.90 394,100.00 1,536,990.00
6 Pas. Pondasi Rabat ( Pas Batu Belah ) A.04.14 m3 2.22 828,600.00 1,839,492.00
Jumlah 12,864,323.25
III. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 A.05.05 m2 69.38 114,700.00 7,958,000.70
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 93.31 52,300.00 4,880,217.60
Jumlah 12,838,218.30
IV. PEKERJAAN BETON
1 Sloof 15/20 A.04.21 m3 0.49 3,319,500.00 1,618,256.25
2 Kolom 12/12 A.04.25 m3 0.81 4,698,200.00 3,788,628.48
3 Ring Balok 15/20 A.04.42 m3 0.35 3,599,000.00 1,241,655.00
4 Balok 15/15 A.04.41 m3 0.04 4,805,800.00 192,232.00
Jumlah 6,840,771.73
V. PEKERJAAN KUSEN,PINTU DAN JENDELA
1 Pas. Kusen Bouvenlih lengkap upah-bahan unit 4.00 200,000.00 800,000.00
2 Pas. Kusen & Daun Pintu KM ( allumunium ) upah-bahan unit 4.00 1,450,000.00 5,800,000.00
Jumlah 6,600,000.00
VI. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Kuda kuda dan Rangka Atap Bajaringan upah-bahan m2 77.05 150,000.00 11,557,500.00
2 Pas. Atap Genteng Metal upah-bahan m2 77.05 125,000.00 9,631,250.00
3 Pas. Bubung Genteng Metal upah-bahan m1 19.90 95,000.00 1,890,500.00
4 Pas. Lisplank Kayu Lokal Kls II A.08.26 m1 31.00 61,300.00 1,900,300.00
5 Pas. Rangka Plafond Kayu Albasiah A.09.04 m2 54.20 84,200.00 4,563,429.50
6 Pas. Plafond GRC A.09.07,a m2 54.20 43,600.00 2,363,011.00
7 Pas. List plafond Gifsum upah-bahan m1 76.60 23,000.00 1,761,800.00
Jumlah 33,667,790.50
VII. PEKERJAAN LANTAI DAN KRAMIK
1 Pas. Kramik 20x20 Anti Slip A.10.07 m2 18.00 202,800.00 3,650,400.00
2 Pas. Kramik 20x25 A.10.19.a m2 34.09 241,000.00 8,215,087.50
3 Pas. Rabat Beton Tumbuk A.04.14 m3 0.76 828,600.00 628,907.40
Jumlah 12,494,394.90
VIII. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 93.31 22,300.00 2,080,857.60
2 Cat Plafond A.16.07 m2 54.20 32,200.00 1,745,159.50
3 Cat Kayu A.16.08 m2 12.29 45,500.00 559,104.00
Jumlah 4,385,121.10
IX. PEKERJAAN LISTRIK
1 Pas.Instalasi Titik Cahaya ls titik 10.00 120,000.00 1,200,000.00
2 Pas.Lampu SL 18 watt ls bh 10.00 105,000.00 1,050,000.00
3 Pas.Saklar Ganda ls bh 3.00 16,000.00 48,000.00
4 Pas.Saklar Tunggal ls bh 2.00 21,500.00 43,000.00
Jumlah 2,341,000.00
X. PEK. SANITASI
1 Pas. Closet Jongkok A.11.02 bh 4.00 589,500.00 2,358,000.00
2 Pas. Wastafel A.11.04 bh 2.00 823,100.00 1,646,200.00
3 Pas. Kran Dinding A.12.16 bh 12.00 42,000.00 504,000.00
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA SATUAN
ANALIS
Rp. Rp.
4 Pas. Ploor Drain A.12.17 bh 6.00 32,100.00 192,600.00
5 Pas. Pipa pvc dia 4" A.12.14 m1 12.00 52,100.00 625,200.00
6 Pas. Pipa pvc dia 3" A.12.13 m1 12.00 36,600.00 439,200.00
7 Pas. Pipa pvc dia 3/4" A.12.08 m1 24.00 16,000.00 384,000.00
8 Pas. Pipa pvc dia 1/2" A.12.07 m1 12.00 14,100.00 169,200.00
9 Pas. Sepictank A.13.02 unit 1.00 7,725,000.00 7,725,000.00
10 Pas. Pompa Air + Asesoris ls unit 1.00 450,000.00 450,000.00
Jumlah 14,493,400.00
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN RUANG KELAS BARU
LEMBAGA : MDA NURUL IMAN
LOKASI : DUSUN CIAWITALI RT 003 RW 004 PAMOTAN
TAHUN ANGGARAN : 2021
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

I. PEKEKERJAAN PERSIAPAN 8,300,000.00


II. PEKERJAAN DINDING DAN PLESTERAN 66,933,400.00
III. PEKERJAAN BETON 37,665,484.00
IV. PEKERJAAN KUSEN,PINTU DAN JENDELA 85,663,860.00
V. PEKERJAAN ATAP DAN PLAFOND 147,852,197.40
VI. PEKERJAAN LANTAI DAN KERAMIK 29,040,000.00
VII. PEKERJAAN PENGECATAN 31,468,230.00
VIII. PEKERJAAN LISTRIK 7,416,000.00

JUMLAH REAL COST 414,339,171.40


JUMLAH TOTAL 414,339,171.40
DIBULATKAN 414,339,000.00
Terbilang :
Empat ratus empat belas juta tiga ratus tiga puluh sembilan ribu rupiah

Pamotan, 01 Januari 2023

DIBUAT:
Kepala Sekolah

NONO SUPRIATNO
KEGIATAN : PEMBANGUNAN RUANG KELAS BARU
LEMBAGA : MDA NURUL IMAN
LOKASI : DUSUN CIAWITALI RT 003 RW 004 PAMOTAN
TAHUN ANGGARAN : 2021
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN SAT. VOLUME SATUAN HARGA SATUAN
ANALIS
Rp. Rp.

I. PEKEKERJAAN PERSIAPAN
1 Pasangan Papan Nama Proyek ls bh 2.00 150,000.00 300,000.00
2 Pengadaan Direksikeet ( sewa ) ls bh 2.00 1,000,000.00 2,000,000.00
3 Administrasi Dan Dokumentasi ls bh 2.00 3,000,000.00 6,000,000.00

Jumlah 8,300,000.00
II. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 A.05.05 m2 320.00 114,700.00 36,704,000.00
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 578.00 52,300.00 30,229,400.00

Jumlah 66,933,400.00
III. PEKERJAAN BETON
1 Kolom 20/20 A.04.35.a m3 4.48 3,844,400.00 17,222,912.00
2 Balok 10/15 A.04.37 m3 1.20 3,834,500.00 4,601,400.00
3 Balok 15/25 A.04.45.BL a m3 0.68 4,117,900.00 2,800,172.00
4 Ring Balok 15/20 A.04.43 m3 3.00 4,347,000.00 13,041,000.00

Jumlah 37,665,484.00
IV. PEKERJAAN KUSEN,PINTU DAN JENDELA
1 Pas. Kusen Pintu dan Jendela Alumunium ls m1 222.00 102,000.00 22,644,000.00
2 Pas. Daun Pintu Alumunium ls unit 12.00 1,100,000.00 13,200,000.00
3 Pas. Daun Jendela Alumunium ls unit 72.00 600,000.00 43,200,000.00
4 Pas. Kaca polos 5 mm A.15.02 m2 70.20 94,300.00 6,619,860.00

Jumlah 85,663,860.00
V. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Kuda kuda dan Rangka Atap Bajaringan upah-bahan m2 289.00 150,000.00 43,350,000.00
2 Pas. Atap Genteng Metal upah-bahan m2 289.00 125,000.00 36,125,000.00
3 Pas. Bubung Genteng Metal upah-bahan m1 34.00 95,000.00 3,230,000.00
4 Pas. Listplank Kasiplang 0,8x30 cm A.08.30.a m1 92.00 73,500.00 6,762,000.00
5 Pas. Rangka Plafond Kayu Albasiah A.09.04 m2 150.00 84,200.00 12,630,000.00
6 Pas. Plafond GRC A.09.07,a m2 150.00 43,600.00 6,540,000.00
7 Pas. List plafond Kayu A.09.09 m1 120.00 12,900.00 1,548,000.00
8 Upah Kerja upah-kerja - - - 37,667,197.40

Jumlah 147,852,197.40
VI. PEKERJAAN LANTAI DAN KERAMIK
1 Pas. Keramik lantai 40 x 40 cm A.10.09 m2 150.00 193,600.00 29,040,000.00

Jumlah 29,040,000.00
VII. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.04 m2 578.00 39,000.00 22,542,000.00
2 Cat Plafond A.16.06 m2 150.00 51,300.00 7,695,000.00
3 Cat Kayu A.16.08 m2 27.06 45,500.00 1,231,230.00
Jumlah 31,468,230.00

VIII. PEKERJAAN LISTRIK


1 Pas.Instalasi Titik Cahaya upah-bahan titik 24.00 120,000.00 2,880,000.00
2 Pas.Instalasi Titik Stop Kontak upah-bahan titik 12.00 120,000.00 1,440,000.00
3 Pas.Lampu SL 18 watt upah-bahan bh 24.00 105,000.00 2,520,000.00
4 Pas.Stop Kontak upah-bahan bh 12.00 16,000.00 192,000.00
5 Pas.Saklar Ganda upah-bahan bh 12.00 16,000.00 192,000.00
6 Pas.Saklar Tunggal upah-bahan bh 12.00 16,000.00 192,000.00
Jumlah 7,416,000.00

JUMLAH TOTAL (I+II+III+IV+V+VI+VII+VIII) JUMLAH REAL COST 414,339,171.40


JUMLAH TOTAL 414,339,171.40
DIBULATKAN 414,339,000.00

Pamotan, 01 Januari 2023

DIBUAT:
Kepala Sekolah

NONO SUPRIATNO
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBUATAN PASAD SD CIKEMBULAN 2
PEKERJAAN : PEMBUATAN PASAD SD CIKEMBULAN 2
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2016
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

I. PEK. PERSIAPAN 6,296,800.00

II. PEKERJAAN TANAH DAN PONDASI 15,579,312.40

III. PEKERJAAN DINDING PASAD 154,025,450.00

JUMLAH REAL COST 175,901,562.40


PPN 10 % 17,590,156.24
JUMLAH TOTAL 193,491,718.64
DIBULATKAN 193,491,000.00
Terbilang :
#NAME?

Mengetahui : Dibuat :
Kepala Bidang Ciptakarya

ADE KUSWAYA, ST NANO SUPRIATNA, ST


NIP. 19691103 200212 1 003 NIP. 19871020 201503 1 001
Mengetahui / Menyetujui : Mengetahui / Menyetujui :
Kepala Dinas Pendidikan, Kebudayaan Kepala Dinas Pekerjaan Umum, Perhubungan
Pemuda Dan Olahraga
Komunikasi Dan Informatika
Kabupaten Pangandaran
Kabupaten Pangandaran

Drs. SOBAR SUGEMA, M.Pd


NIP. 19610222 198303 1 012
Drs. H. DADANG DIMYATI
NIP. 19630125 198503 1 005

ENGINEER ESTIMATE ( EE )
RINCIAN RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBUATAN PASAD SD CIKEMBULAN 2
PEKERJAAN : PEMBUATAN PASAD SD CIKEMBULAN 2
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2016
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN ANALIS SAT. VOLUME SATUAN HARGA SATUAN
Rp. Rp.
I. PEK. PERSIAPAN
1 Pasangan Papan Nama Proyek bh 1.00 150,000.00 150,000.00
2 Pasangan Bouplank A.01.01 m1 6.00 57,800.00 346,800.00
3 Pengadaan Direksikeet ( sewa ) bh 1.00 300,000.00 300,000.00
4 Bongkaran ls 1.00 1,500,000.00 1,500,000.00
5 Steger Werk ls 1.00 3,500,000.00 3,500,000.00
6 Administrasi Dan Dokumentasi bh 1.00 500,000.00 500,000.00
Jumlah 6,296,800.00
II. PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian Tanah A.02.01 m3 23.10 60,000.00 1,386,000.00
2 Urugan Tanah Kembali A.02.09 m3 16.16 20,000.00 323,100.00
3 Urugan Pasir A.02.12 m3 0.55 179,700.00 98,835.00
4 Pas. Pondasi Beton A.04.17.P1 m3 4.40 2,318,900.00 10,203,160.00
5 Pas.Kolom Beton 20/20 cm A.04.33,a m3 0.73 4,914,900.00 3,568,217.40
Jumlah 15,579,312.40
III. PEKERJAAN DINDING PASAD
1 Pas. Tiang Dan Balok Utama IWF 125 kg 2,371.75 21,400.00 50,755,450.00
2 Pas. Rangka Wall Composite Phanel m2 224.50 120,000.00 26,940,000.00
3 Pas. Pasang Penutup Wall Composite Phanel m2 224.50 340,000.00 76,330,000.00
Jumlah 154,025,450.00
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI ASRAMA SISWA PUTRA ( PONDOK PESANTREN BANI HUSEIN )
PEKERJAAN : HIBAH BANGUNAN UNTUK ASRAMA SISWA PUTRA ( PONDOK PESANTREN BANI HUSEIN )
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

A. PEK. PERSIAPAN 2,150,000.00


B. PEKERJAAN ASRAMA
I. PEKERJAAN ALAT PENGGANTUNG 3,855,000.00
II. PEKERJAAN LANTAI DAN KRAMIK 25,729,440.00
III. PEKERJAAN PENGECATAN 16,482,216.80
IV. PEKERJAAN LISTRIK 7,256,000.00
C. PEKERJAAN WC UMUM
I. PEKERJAAN TANAH DAN PONDASI 13,234,243.25
II. PEKERJAAN DINDING DAN PLESTERAN 12,838,218.30
III. PEKERJAAN BETON 26,715,137.49
IV. PEKERJAAN KUSEN,PINTU DAN JENDELA 6,600,000.00
V. PEKERJAAN PLAFOND 2,363,011.00
VI. PEKERJAAN LANTAI DAN KRAMIK 12,494,394.90
VII. PEKERJAAN PENGECATAN 3,826,017.10
VIII. PEKERJAAN LISTRIK 2,394,000.00
IX. PEK. SANITASI 19,993,400.00
D. PEKERJAAN PAGAR
I. PEKERJAAN DINDING DAN PLESTERAN 3,747,372.00

JUMLAH REAL COST 159,678,450.84


PPN 10 % 15,967,845.08
JUMLAH TOTAL 175,646,295.92
DIBULATKAN 175,646,000.00
Terbilang :
#NAME?

MENGETAHUI : DIPERIKSA :
DIBUAT:
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan
Konsultan Perencana
Selaku Pejabat Pembuat Komitment ( PPTK )
CV. SAVANA INDO MEDIA
( PPK )

Dra. Hj. ATIN KURNIASIH, M.Pd UNDANG SUHENDAR, S.Pd., MM


Nip : 19630707 199003 2 004 NIP. 19710908 200604 1 015

HERYANTO
Direktur

MENGETAHUI / MENYUTUJUI : MENGETAHUI :


Kepala Dinas Pendidikan, Pemuda dan Olah Raga Kepala Dinas Pekerjaan Umum, Tataruang
Kabupaten Pangandaran Perumahan Rakyat dan Kawasan Permukiman
Kabupaten Pangandaran

Drs. H. SURMAN, M.Pd JAJA NURULHUDA, ST, M.Dev. Plg


Nip : 19610204 198204 1 005 Nip : 19720106 199803 1 002

ENGINEER ESTIMATE ( EE )
RINCIAN RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI ASRAMA SISWA PUTRA ( PONDOK PESANTREN BANI HUSEIN )
PEKERJAAN : HIBAH BANGUNAN UNTUK ASRAMA SISWA PUTRA ( PONDOK PESANTREN BANI HUSEIN )
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN ANALIS SAT. VOLUME SATUAN HARGA SATUAN
Rp. Rp.

A. PEK. PERSIAPAN
1 Pasangan Papan Nama Proyek ls bh 1.00 150,000.00 150,000.00
2 Pengadaan Direksikeet ( sewa ) ls bh 1.00 1,000,000.00 1,000,000.00
3 Administrasi Dan Dokumentasi ls bh 1.00 1,000,000.00 1,000,000.00
Jumlah 2,150,000.00

B. PEKERJAAN ASRAMA
I. PEKERJAAN ALAT PENGGANTUNG
1 Pas. Kunci pintu double slagg A.14.01 bh 2.00 142,500.00 285,000.00
2 Pas. Engsel pintu A.14.04 bh 12.00 45,500.00 546,000.00
3 Pas. Engsel jendela A.14.04,a bh 32.00 28,800.00 921,600.00
4 Pas. Slot jendela A.14.08 bh 16.00 55,400.00 886,400.00
5 Pas. Hak angin A.14.06 bh 32.00 38,000.00 1,216,000.00
Jumlah 3,855,000.00
II. PEKERJAAN LANTAI DAN KRAMIK
1 Pas. Keramik lantai 40 x 40 cm polos A.10.09 m2 18.00 193,600.00 3,484,800.00
2 Pas. Paving Block A.10.24 m2 153.20 145,200.00 22,244,640.00
Jumlah 25,729,440.00
III. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 300.30 22,300.00 6,696,690.00
2 Cat Plafond A.16.07 m2 212.54 32,200.00 6,843,788.00
3 Cat Kayu A.16.08 m2 64.65 45,500.00 2,941,738.80
Jumlah 16,482,216.80
IV. PEKERJAAN LISTRIK
1 Penambahan Daya ls unit 1.00 2,500,000.00 2,500,000.00
2 Pas.Instalasi Titik Cahaya upah-bahan titik 16.00 120,000.00 1,920,000.00
3 Pas.Instalasi Titik Stop Kontak upah-bahan titik 2.00 120,000.00 240,000.00
4 Pas.Instalasi Titik Stop Kontak AC upah-bahan titik 4.00 144,000.00 576,000.00
5 Pas.Lampu SL 18 watt upah-bahan bh 16.00 105,000.00 1,680,000.00
6 Pas.Stop Kontak upah-bahan bh 2.00 16,000.00 32,000.00
7 Pas.Stop Kontak AC upah-bahan bh 4.00 65,000.00 260,000.00
8 Pas.Saklar Ganda upah-bahan bh 3.00 16,000.00 48,000.00
Jumlah 7,256,000.00

C. PEKERJAAN WC UMUM
I. PEKERJAAN TANAH DAN PONDASI
1 Pasangan Bouplank A.01.01 m1 6.40 57,800.00 369,920.00
2 Pek. Galian Tanah A.10.22 m3 19.50 137,500.00 2,681,250.00
3 Pek. Urugan Tanah Peninggian Lantai A.02.11 m3 8.10 119,500.00 967,950.00
4 Urugan Tanah Kembali A.02.09 m3 14.63 20,000.00 292,500.00
5 Urugan Pasir A.02.12 m3 1.30 179,700.00 233,610.00
6 Pas. Pondasi Batu Belah A.03.04 m3 7.31 726,500.00 5,312,531.25
7 Pas. Anstanping / Batu kosong A.03.01 m3 3.90 394,100.00 1,536,990.00
8 Pas. Pondasi Rabat ( Pas Batu Belah ) A.04.14 m3 2.22 828,600.00 1,839,492.00
Jumlah 13,234,243.25
II. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 A.05.05 m2 69.38 114,700.00 7,958,000.70
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 93.31 52,300.00 4,880,217.60
Jumlah 12,838,218.30
III. PEKERJAAN BETON
1 Sloof 15/20 A.04.21 m3 0.49 3,319,500.00 1,618,256.25
2 Kolom 15/15 A.04.28 m3 0.81 4,445,200.00 3,584,609.28
3 Ring Balok 15/20 A.04.42 m3 0.35 3,599,000.00 1,241,655.00
4 Balok 15/15 A.04.41 m3 0.04 4,805,800.00 192,232.00
5 Plat Dak T=10 cm A.04.49.a m3 4.66 3,695,600.00 17,234,208.86
6 Plat Lisplank T=8 cm A.04.48 m3 0.75 3,811,800.00 2,844,176.09
Jumlah 26,715,137.49
IV. PEKERJAAN KUSEN,PINTU DAN JENDELA
1 Pas. Kusen Bouvenlih lengkap upah-bahan unit 4.00 200,000.00 800,000.00
2 Pas. Kusen & Daun Pintu KM ( allumunium ) upah-bahan unit 4.00 1,450,000.00 5,800,000.00
Jumlah 6,600,000.00
V. PEKERJAAN PLAFOND
1 Pas. Plafond GRC A.09.07,a m2 54.20 43,600.00 2,363,011.00
Jumlah 2,363,011.00
VI. PEKERJAAN LANTAI DAN KRAMIK
1 Pas. Kramik 20x20 Anti Slip A.10.07 m2 18.00 202,800.00 3,650,400.00
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN ANALIS SAT. VOLUME SATUAN HARGA SATUAN
Rp. Rp.
2 Pas. Kramik 20x25 A.10.19.a m2 34.09 241,000.00 8,215,087.50
3 Pas. Rabat Beton Tumbuk A.04.14 m3 0.76 828,600.00 628,907.40
Jumlah 12,494,394.90
VII. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 93.31 22,300.00 2,080,857.60
2 Cat Plafond A.16.07 m2 54.20 32,200.00 1,745,159.50
Jumlah 3,826,017.10
VIII. PEKERJAAN LISTRIK
1 Pas.Instalasi Titik Cahaya upah-bahan titik 10.00 120,000.00 1,200,000.00
2 Pas.Lampu SL 18 watt upah-bahan bh 10.00 105,000.00 1,050,000.00
3 Pas.Saklar Ganda upah-bahan bh 3.00 16,000.00 48,000.00
4 Pas.Saklar Tunggal upah-bahan bh 6.00 16,000.00 96,000.00
Jumlah 2,394,000.00
IX. PEK. SANITASI
1 Pas. Closet Jongkok A.11.02 bh 4.00 589,500.00 2,358,000.00
2 Pas. Wastafel A.11.04 bh 2.00 823,100.00 1,646,200.00
3 Pas. Kran Dinding A.12.16 bh 12.00 42,000.00 504,000.00
4 Pas. Ploor Drain A.12.17 bh 6.00 32,100.00 192,600.00
5 Pas. Pipa pvc dia 4" A.12.14 m1 12.00 52,100.00 625,200.00
6 Pas. Pipa pvc dia 3" A.12.13 m1 12.00 36,600.00 439,200.00
7 Pas. Pipa pvc dia 3/4" A.12.08 m1 24.00 16,000.00 384,000.00
8 Pas. Pipa pvc dia 1/2" A.12.07 m1 12.00 14,100.00 169,200.00
9 Pas. Sepictank A.13.02 unit 1.00 7,725,000.00 7,725,000.00
10 Pas. Pompa Air + Asesoris ls unit 1.00 450,000.00 450,000.00
11 Pas. Menara Air Besi Siku ( lengkap ) ls unit 1.00 5,500,000.00 5,500,000.00
Jumlah 19,993,400.00

D. PEKERJAAN PAGAR
I. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 A.05.05 m2 18.40 114,700.00 2,110,480.00
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 18.40 52,300.00 962,320.00
3 Pas. Loster 20 x 20 cm upah-bahan bh 24.00 8,000.00 192,000.00
4 Pengecatan Dinding A.16.05 m2 21.64 22,300.00 482,572.00
Jumlah 3,747,372.00
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI ASRAMA SISWA PUTRI ( PONDOK PESANTREN BANI HUSEIN )
PEKERJAAN : HIBAH BANGUNAN UNTUK ASRAMA SISWA PUTRI ( PONDOK PESANTREN BANI HUSEIN )
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

A. PEK. PERSIAPAN 2,150,000.00


B. PEKERJAAN ASRAMA
I. PEKERJAAN DINDING DAN PLESTERAN 3,384,856.00
II. PEKERJAAN KUSEN, PINTU DAN JENDELA 7,323,739.20
III. PEKERJAAN KUDA KUDA, ATAP DAN PLAFOND 24,586,080.00
IV. PEKERJAAN ALAT PENGGANTUNG 3,855,000.00
V. PEKERJAAN LANTAI DAN KRAMIK 37,542,445.50
VI. PEKERJAAN PENGECATAN 16,766,545.60
VII. PEKERJAAN LISTRIK 7,078,000.00

JUMLAH REAL COST 102,686,666.30


PPN 10 % 10,268,666.63
JUMLAH TOTAL 112,955,332.93
DIBULATKAN 112,955,000.00
Terbilang :
#NAME?

MENGETAHUI : DIPERIKSA :
DIBUAT:
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan
Konsultan Perencana
Selaku Pejabat Pembuat Komitment ( PPTK )
CV. SAVANA INDO MEDIA
( PPK )

Dra. Hj. ATIN KURNIASIH, M.Pd UNDANG SUHENDAR, S.Pd., MM


Nip : 19630707 199003 2 004 NIP. 19710908 200604 1 015

HERYANTO
Direktur

MENGETAHUI / MENYUTUJUI : MENGETAHUI :


Kepala Dinas Pendidikan, Pemuda dan Olah Raga Kepala Dinas Pekerjaan Umum, Tataruang
Kabupaten Pangandaran Perumahan Rakyat dan Kawasan Permukiman
Kabupaten Pangandaran

Drs. H. SURMAN, M.Pd JAJA NURULHUDA, ST, M.Dev. Plg


Nip : 19610204 198204 1 005 Nip : 19720106 199803 1 002

ENGINEER ESTIMATE ( EE )
RINCIAN RENCANA ANGGARAN BIAYA
KEGIATAN : REHABILITASI ASRAMA SISWA PUTRI ( PONDOK PESANTREN BANI HUSEIN )
PEKERJAAN : HIBAH BANGUNAN UNTUK ASRAMA SISWA PUTRI ( PONDOK PESANTREN BANI HUSEIN )
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2018
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN ANALIS SAT. VOLUME SATUAN HARGA SATUAN
Rp. Rp.

A. PEK. PERSIAPAN
1 Pasangan Papan Nama Proyek ls bh 1.00 150,000.00 150,000.00
2 Pengadaan Direksikeet ( sewa ) ls bh 1.00 1,000,000.00 1,000,000.00
3 Administrasi Dan Dokumentasi ls bh 1.00 1,000,000.00 1,000,000.00
Jumlah 2,150,000.00

B. PEKERJAAN ASRAMA
I. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Plesteran 1 : 5 + Acian ( Dinding ) A.06.04 n2 64.72 52,300.00 3,384,856.00
Jumlah 3,384,856.00
II. PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pas. Daun Pintu Panel A.07.14 m2 5.84 530,100.00 3,095,784.00
2 Pas. Daun Jendela A.07.18 m2 8.29 397,100.00 3,293,706.24
3 Pas. Kaca polos 5 mm A.15.02 m2 9.91 94,300.00 934,248.96
Jumlah 7,323,739.20
III. PEKERJAAN KUDA KUDA, ATAP DAN PLAFOND
1 Pas. Rangka Plafond Kayu Albasiah A.09.04 165.60 84,200.00 13,943,520.00
2 Pas. Plafond GRC A.09.07,a 165.60 43,600.00 7,220,160.00
3 Pas. List Gypsum upah-bahan 148.80 23,000.00 3,422,400.00
Jumlah 24,586,080.00
IV. PEKERJAAN ALAT PENGGANTUNG
1 Pas. Kunci pintu double slagg A.14.01 bh 2.00 142,500.00 285,000.00
2 Pas. Engsel pintu A.14.04 bh 12.00 45,500.00 546,000.00
3 Pas. Engsel jendela A.14.04,a bh 32.00 28,800.00 921,600.00
4 Pas. Slot jendela A.14.08 bh 16.00 55,400.00 886,400.00
5 Pas. Hak angin A.14.06 bh 32.00 38,000.00 1,216,000.00
Jumlah 3,855,000.00
V. PEKERJAAN LANTAI DAN KRAMIK
1 Urugan Pasir Bawah Lantai A.02.12 m3 8.96 179,700.00 1,609,213.50
2 Pas. Keramik lantai 40 x 40 cm polos A.10.09 m2 179.10 193,600.00 34,673,760.00
3 Pas. Rabat Beton Tumbuk A.04.14 m3 1.52 828,600.00 1,259,472.00
Jumlah 37,542,445.50
VI. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 404.60 22,300.00 9,022,580.00
2 Cat Plafond A.16.07 m2 165.60 32,200.00 5,332,320.00
3 Cat Kayu A.16.08 m2 53.00 45,500.00 2,411,645.60
Jumlah 16,766,545.60
VII. PEKERJAAN LISTRIK
1 Pemasangan KWH Baru ls unit 1.00 2,500,000.00 2,500,000.00
2 Pas.Instalasi Titik Cahaya upah-bahan titik 14.00 120,000.00 1,680,000.00
3 Pas.Instalasi Titik Stop Kontak upah-bahan titik 4.00 120,000.00 480,000.00
4 Pas.Instalasi Titik Stop Kontak AC upah-bahan titik 4.00 144,000.00 576,000.00
5 Pas.Lampu SL 18 watt upah-bahan bh 14.00 105,000.00 1,470,000.00
6 Pas.Stop Kontak upah-bahan bh 4.00 16,000.00 64,000.00
7 Pas.Stop Kontak AC upah-bahan bh 4.00 65,000.00 260,000.00
8 Pas.Saklar Ganda upah-bahan bh 3.00 16,000.00 48,000.00
Jumlah 7,078,000.00
ENGINEER ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN WC ASRAMA PUTRI PONDOK PESANTREN BANI HUSEIN
PEKERJAAN : HIBAH BANGUNAN UNTUK ASRAMA SISWA PUTRI ( PONDOK PESANTREN BANI HUSEIN )
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2017
JUMLAH
No. URAIAN PEKERJAAN HARGA
Rp.

A. PEK. PERSIAPAN 2,150,000.00


B. PEKERJAAN WC UMUM
I. PEKERJAAN TANAH DAN PONDASI 11,672,761.73
II. PEKERJAAN DINDING DAN PLESTERAN 17,770,298.10
III. PEKERJAAN BETON 19,282,391.89
IV. PEKERJAAN KUSEN,PINTU DAN JENDELA 10,374,000.00
V. PEKERJAAN ATAP DAN PLAFOND 18,910,473.50
VI. PEKERJAAN LANTAI DAN KRAMIK 12,414,908.25
VII. PEKERJAAN PENGECATAN 3,591,755.30
VIII. PEKERJAAN LISTRIK 2,329,000.00
IX. PEK. SANITASI 23,564,400.00

JUMLAH REAL COST 122,059,988.76


PPN 10 % 12,205,998.88
JUMLAH TOTAL 134,265,987.64
DIBULATKAN 134,265,000.00
Terbilang :
#NAME?

MENGETAHUI : DIPERIKSA :
DIBUAT:
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan
Konsultan Perencana
Selaku Pejabat Pembuat Komitment ( PPTK )
CV. SAVANA INDO MEDIA
( PPK )

Dra. Hj. ATIN KURNIASIH, M.Pd UNDANG SUHENDAR, S.Pd., MM


Nip : 19630707 199003 2 004 NIP. 19710908 200604 1 015

HERYANTO
Direktur

MENGETAHUI / MENYUTUJUI : MENGETAHUI :


Kepala Dinas Pendidikan, Pemuda dan Olah Raga Kepala Dinas Pekerjaan Umum, Tataruang
Kabupaten Pangandaran Perumahan Rakyat dan Kawasan Permukiman
Kabupaten Pangandaran

Drs. H. SURMAN, M.Pd JAJA NURULHUDA, ST, M.Dev. Plg


Nip : 19610204 198204 1 005 Nip : 19720106 199803 1 002

ENGINEER ESTIMATE ( EE )
RINCIAN RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN WC ASRAMA PUTRI PONDOK PESANTREN BANI HUSEIN
PEKERJAAN : HIBAH BANGUNAN UNTUK ASRAMA SISWA PUTRI ( PONDOK PESANTREN BANI HUSEIN )
LOKASI : KECAMATAN PANGANDARAN KAB. PANGANDARAN
TAHUN ANGGARAN : 2017
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN ANALIS SAT. VOLUME SATUAN HARGA SATUAN
Rp. Rp.

A. PEK. PERSIAPAN
1 Pasangan Papan Nama Proyek ls bh 1.00 150,000.00 150,000.00
2 Pengadaan Direksikeet ( sewa ) ls bh 1.00 1,000,000.00 1,000,000.00
3 Administrasi Dan Dokumentasi ls bh 1.00 1,000,000.00 1,000,000.00
Jumlah 2,150,000.00
B. PEKERJAAN WC UMUM
I. PEKERJAAN TANAH DAN PONDASI
1 Pasangan Bouplank A.01.01 m1 14.50 57,800.00 838,100.00
2 Pek. Galian Tanah A.10.22 m3 17.06 137,500.00 2,345,200.00
3 Pek. Urugan Tanah Peninggian Lantai A.02.11 m3 7.67 119,500.00 916,191.56
4 Urugan Tanah Kembali A.02.09 m3 9.23 20,000.00 184,500.00
5 Urugan Pasir A.02.12 m3 3.98 179,700.00 714,599.51
6 Pas. Pondasi Batu Belah A.03.04 m3 7.32 726,500.00 5,316,890.25
7 Pas. Anstanping / Batu kosong A.03.01 m3 3.44 394,100.00 1,357,280.40
Jumlah 11,672,761.73
II. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 A.05.05 m2 101.92 114,700.00 11,690,109.30
2 Pas. Plesteran 1 : 5 + Acian A.06.04 m2 116.26 52,300.00 6,080,188.80
Jumlah 17,770,298.10
III. PEKERJAAN BETON
1 Sloof 15/20 A.04.21 m3 0.86 3,319,500.00 2,858,089.50
2 Kolom 12/12 A.04.25 m3 2.84 4,698,200.00 13,325,563.39
3 Ring Balok 15/20 A.04.42 m3 0.86 3,599,000.00 3,098,739.00
Jumlah 19,282,391.89
IV. PEKERJAAN KUSEN,PINTU DAN JENDELA
1 Pas. Loster Beton 20x20 cm upah-bahan bh 28.00 8,000.00 224,000.00
2 Pas. Kusen & Daun Pintu KM ( allumunium ) upah-bahan unit 7.00 1,450,000.00 10,150,000.00
Jumlah 10,374,000.00
V. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Kuda kuda dan Rangka Atap Bajaringan upah-bahan m2 46.97 150,000.00 7,046,160.00
2 Pas. Atap Genteng Metal upah-bahan m2 46.97 125,000.00 5,871,800.00
3 Pas. Bubung Genteng Metal upah-bahan m1 6.10 95,000.00 579,500.00
4 Pas. Lisplank Kayu Lokal Kls II A.08.26 m1 25.30 61,300.00 1,550,890.00
5 Pas. Rangka Plafond Kayu Albasiah A.09.04 m2 23.88 84,200.00 2,010,906.50
6 Pas. Plafond GRC A.09.07,a m2 23.88 43,600.00 1,041,277.00
7 Pas. List plafond Kayu A.09.09 m1 21.60 12,900.00 278,640.00
8 Pas. List plafond Gifsum upah-bahan m1 23.10 23,000.00 531,300.00
Jumlah 18,910,473.50
VI. PEKERJAAN LANTAI DAN KRAMIK
1 Pas. Kramik 20x20 Anti Slip A.10.07 m2 12.94 202,800.00 2,624,865.75
2 Pas. Kramik 20x25 A.10.19.a m2 37.01 241,000.00 8,920,012.50
3 Pas. Rabat Beton Tumbuk A.04.14 m3 1.05 828,600.00 870,030.00
Jumlah 12,414,908.25
VII. PEKERJAAN PENGECATAN
1 Cat Dinding A.16.05 m2 116.26 22,300.00 2,592,508.80
2 Cat Plafond A.16.07 m2 23.88 32,200.00 769,016.50
3 Cat Kayu A.16.08 m2 5.06 45,500.00 230,230.00
Jumlah 3,591,755.30
VIII. PEKERJAAN LISTRIK
1 Pas.Instalasi Titik Cahaya upah-bahan titik 11.00 120,000.00 1,320,000.00
2 Pas.Lampu SL 18 watt upah-bahan bh 9.00 105,000.00 945,000.00
3 Pas.Saklar Ganda upah-bahan bh 4.00 16,000.00 64,000.00
Jumlah 2,329,000.00
IX. PEK. SANITASI
1 Pas. Closet Jongkok A.11.02 bh 7.00 589,500.00 4,126,500.00
2 Pas. Kran Dinding A.12.16 bh 7.00 42,000.00 294,000.00
3 Pas. Ploor Drain A.12.17 bh 7.00 32,100.00 224,700.00
4 Pas. Pipa pvc dia 4" A.12.14 m1 50.00 52,100.00 2,605,000.00
HARGA JUMLAH
KODE
No. URAIAN PEKERJAAN ANALIS SAT. VOLUME SATUAN HARGA SATUAN
Rp. Rp.
5 Pas. Pipa pvc dia 3" A.12.13 m1 50.00 36,600.00 1,830,000.00
6 Pas. Pipa pvc dia 3/4" A.12.08 m1 40.00 16,000.00 640,000.00
7 Pas. Pipa pvc dia 1/2" A.12.07 m1 12.00 14,100.00 169,200.00
8 Pas. Sepictank A.13.02 unit 1.00 7,725,000.00 7,725,000.00
9 Pas. Pompa Air + Asesoris ls unit 1.00 450,000.00 450,000.00
10 Pas. Menara Air Besi Siku ( lengkap ) ls unit 1.00 5,500,000.00 5,500,000.00
Jumlah 23,564,400.00
ANALISA SATUAN PEKERJAAN

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH


1 2 3 4 5 6=(3x5)
A.01.01 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK
BAHAN :
Kayu 5/7 Albasiah 0.0120 m2 1,819,000.00 21,828.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0200 kg 16,000.00 320.00
Kayu Papan 3/20 Kayu Albasiah 0.0070 m3 1,926,000.00 13,482.00
Jumlah Bahan 35,630.00
UPAH :
Pekerja 0.1000 Oh 70,000.00 7,000.00
Tukang Kayu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 100,000.00 1,000.00
Mandor 0.0050 Oh 85,000.00 425.00
Jumlah Pekerja 16,925.00
Jumlah Bahan + Pekerja 52,555.00
Keuntungan Max. 10 % 5,255.50
Jumlah Total 57,810.50
Dibulatkan 57,800.00
A.01.06 1 M3 BONGKARAN BETON BERTULANG
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 6.0000 Oh 70,000.00 420,000.00
Mandor 0.0600 Oh 85,000.00 5,100.00
Jumlah Pekerja 425,100.00
Jumlah Bahan + Pekerja 425,100.00
Keuntungan Max. 10 % 42,510.00
Jumlah Total 467,610.00
Dibulatkan 467,600.00
A.01.07 1 M2 BONGKARAN DINDING TEMBOK BATA MERAH
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.6667 Oh 70,000.00 46,669.00
Mandor 0.0330 Oh 85,000.00 2,805.00
Jumlah Pekerja 49,474.00
Jumlah Bahan + Pekerja 49,474.00
Keuntungan Max. 10 % 4,947.40
Jumlah Total 54,421.40
Dibulatkan 54,400.00
A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN 1 METER
BAHAN :
-
-
Jumlah Bahan -
UPAH :
Pekerja 0.7500 Oh 70,000.00 52,500.00
Mandor 0.0250 Oh 85,000.00 2,125.00
Jumlah Pekerja 54,625.00
Jumlah Bahan + Pekerja 54,625.00
Keuntungan Max. 10 % 5,462.50
Jumlah Total 60,087.50
Dibulatkan 60,000.00
A.02.09 1 M3 URUGAN TANAH KEMBALI
BAHAN :
-
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
-
Jumlah Bahan -
UPAH :
Pekerja 0.2500 Oh 70,000.00 17,500.00
Mandor 0.0083 Oh 85,000.00 705.50
Jumlah Pekerja 18,205.50
Jumlah Bahan + Pekerja 18,205.50
Keuntungan Max. 10 % 1,820.55
Jumlah Total 20,026.05
Dibulatkan 20,000.00
A.02.12 1 M3 URUGAN PASIR
BAHAN :
Pasir Urug 1.2000 m3 118,000.00 141,600.00

Jumlah Bahan 141,600.00


UPAH :
Pekerja 0.3000 Oh 70,000.00 21,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 21,850.00
Jumlah Bahan + Pekerja 163,450.00
Keuntungan Max. 10 % 16,345.00
Jumlah Total 179,795.00
Dibulatkan 179,700.00
A.04.14 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
BAHAN :
Semen Portland 218.0000 kg 1,200.00 261,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.8700 m³ 285,000.00 247,950.00
Jumlah Bahan 607,310.00
UPAH :
Pekerja 1.6500 Oh 70,000.00 115,500.00
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Kepala Tukang 0.0250 Oh 100,000.00 2,500.00
Mandor 0.0800 Oh 85,000.00 6,800.00
Jumlah Pekerja 146,050.00
Jumlah Bahan + Pekerja 753,360.00
Keuntungan Max. 10 % 75,336.00
Jumlah Total 828,696.00
Dibulatkan 828,600.00
A.04.17.P1 1 M3 MEMBUAT PONDASI BETON BERTULANG 1.25 x 1.25 CM 55,1269 kg BESI + BEKISTNG)
BAHAN :
Kayu Terentang Albasiah, Papan 0.0419 m³ 1,926,000.00 80,627.94
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 1.5000 kg 16,000.00 24,000.00
Minyak Bekisting ( Oli Bekas ) 0.4000 ltr 3,500.00 1,400.00
Besi Beton Polos 55.1269 kg 10,500.00 578,832.53
Kawat Beton 2.3000 kg 19,500.00 44,850.00
Semen Portland 336.0000 kg 1,200.00 403,200.00
Pasir Beton 0.5400 m³ 188,000.00 101,520.00
Batu Pecah Mesin 2/3 0.8100 m³ 285,000.00 230,850.00
Jumlah Bahan 1,465,280.47
UPAH :
Pekerja 5.3000 Oh 70,000.00 371,000.00
Tukang Batu 0.2750 Oh 85,000.00 23,375.00
Tukang Kayu 1.3000 Oh 85,000.00 110,500.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2620 Oh 100,000.00 26,200.00
Mandor 0.2650 Oh 85,000.00 22,525.00
Jumlah Pekerja 642,850.00
Jumlah Bahan + Pekerja 2,108,130.47
Keuntungan Max. 10 % 210,813.05
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Jumlah Total 2,318,943.52
Dibulatkan 2,318,900.00
A.04.24 1 M3 MEMBUAT SLOOF 20/30 (124.9500 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK15 CM
BAHAN :
Bekesting Albasiah 0.2000 m³ 1,926,000.00 385,200.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 3.0000 kg 16,000.00 48,000.00
Minyak Bekisting 1.0000 ltr 3,500.00 3,500.00
Besi Beton Polos U 24 124.9500 kg 10,500.00 1,311,975.00
Kawat Beton 1.8700 kg 19,500.00 36,465.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 2,492,800.00
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 2,945,112.50
Keuntungan Max. 10 % 294,511.25
Jumlah 3,239,623.75
Dibulatkan 3,239,600.00
A.04.37 1 M3 MEMBUAT RING BALK 10/15 (204.4000 Kg Besi + Bekesting)
DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah 0.3200 m³ 1,200.00 384.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 10.6700 kg 16,000.00 170,720.00
Minyak Bekisting 5.3300 ltr 3,500.00 18,655.00
Besi Beton Polos U 24 197.7445 kg 10,500.00 2,076,317.60
Kawat Beton 3.0700 kg 19,500.00 59,865.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,033,601.60
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,485,914.10
Keuntungan Max. 10 % 348,591.41
Jumlah 3,834,505.51
Dibulatkan 3,834,500.00
A.04.35.a 1 M3 MEMBUAT KOLOM 30/30 (136,9915 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,926,000.00 770,400.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.3300 kg 16,000.00 85,280.00
Minyak Bekisting 2.6700 ltr 3,500.00 9,345.00
Besi Beton Polos U 24 136.9915 kg 10,500.00 1,438,410.87
Kawat Beton 1.6200 kg 19,500.00 31,590.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,042,685.87
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,494,998.37
Keuntungan Max. 10 % 349,499.84
Jumlah 3,844,498.20
Dibulatkan 3,844,400.00
A.04.45.BL a 1 M3 MEMBUAT BALK 15/25 (175,8089 Kg Besi + Bekesting)
DENGAN TULANGAN 5 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.30 m³ 1,926,000.00 570,096.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.93 kg 16,000.00 110,880.00
Minyak Bekisting 3.47 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 175.81 kg 10,500.00 1,845,993.80
Kawat Beton 2.28 kg 19,500.00 44,460.00
Semen Portland 323.00 kg 1,200.00 387,600.00
Pasir Beton 0.52 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.78 m³ 285,000.00 222,300.00
Jumlah Bahan 3,291,234.80
UPAH :
Pekerja 3.00 Oh 70,000.00 210,000.00
Tukang Batu 0.35 Oh 85,000.00 29,750.00
Tukang Kayu 1.04 Oh 85,000.00 88,400.00
Tukang Besi 1.05 Oh 85,000.00 89,250.00
Kepala Tukang 0.25 Oh 100,000.00 24,500.00
Mandor 0.12 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,743,547.30
Keuntungan Max. 10 % 374,354.73
Jumlah 4,117,902.03
Dibulatkan 4,117,900.00
A.04.45.BL b 1 M3 MEMBUAT BALK 15/30 (161,9271 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.3400 m³ 1,926,000.00 654,840.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 161.9271 kg 10,500.00 1,700,234.20
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,230,219.20
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,682,531.70
Keuntungan Max. 10 % 368,253.17
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Jumlah 4,050,784.87
Dibulatkan 4,050,700.00
A.04.45.BL c 1 M3 MEMBUAT BALK 20/30 (136,8298 Kg Besi + Bekesting)
DENGAN TULANGAN 6 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.4000 m³ 1,926,000.00 770,400.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 136.8298 kg 10,500.00 1,436,712.90
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,082,257.90
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,534,570.40
Keuntungan Max. 10 % 353,457.04
Jumlah 3,888,027.44
Dibulatkan 3,888,000.00
A.04.45.BL d 1 M3 MEMBUAT BALK 20/40 (161,9668 Kg Besi + Bekesting)
DENGAN TULANGAN 10 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2700 m³ 1,926,000.00 520,020.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 161.9668 kg 10,500.00 1,700,651.40
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,095,816.40
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,548,128.90
Keuntungan Max. 10 % 354,812.89
Jumlah 3,902,941.79
Dibulatkan 3,902,900.00
A.04.45.BL e 1 M3 MEMBUAT BALK 20/50 (157,9186 Kg Besi + Bekesting)
DENGAN TULANGAN 13 BATANG DIA 13 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2760 m³ 1,926,000.00 531,576.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 157.9186 kg 10,500.00 1,658,145.30
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,064,866.30
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,517,178.80
Keuntungan Max. 10 % 351,717.88
Jumlah 3,868,896.68
Dibulatkan 3,868,800.00
A.04.45.BL f 1 M3 MEMBUAT BALK 25/60 (161,2487Kg Besi + Bekesting)
DENGAN TULANGAN 11 BATANG DIA 16 dan 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah 0.2340 m³ 1,926,000.00 450,684.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 6.9300 kg 16,000.00 110,880.00
Minyak Bekisting 3.4700 ltr 3,500.00 12,145.00
Besi Beton Polos U 24 161.2487 kg 10,500.00 1,693,111.70
Kawat Beton 2.2800 kg 19,500.00 44,460.00
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah 2/3 0.7800 m³ 285,000.00 222,300.00
Jumlah Bahan 3,018,940.70
UPAH :
Pekerja 3.0000 Oh 70,000.00 210,000.00
Tukang Batu 0.3500 Oh 85,000.00 29,750.00
Tukang Kayu 1.0400 Oh 85,000.00 88,400.00
Tukang Besi 1.0500 Oh 85,000.00 89,250.00
Kepala Tukang 0.2450 Oh 100,000.00 24,500.00
Mandor 0.1225 Oh 85,000.00 10,412.50
Jumlah Pekerja 452,312.50
Jumlah Bahan + Pekerja 3,471,253.20
Keuntungan Max. 10 % 347,125.32
Jumlah 3,818,378.52
Dibulatkan 3,818,300.00
A.04.48 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA. 8 JARAK 12,5 cm TEBAL 8 cm
BAHAN :
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.7800 m³ 285,000.00 222,300.00
Besi Beton (Polos / ulir) 98.6000 kg 10,500.00 1,035,300.00
Kawat Beton 1.6300 kg 19,500.00 31,785.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 5.8600 kg 16,000.00 93,760.00
Minyak Bekisting ( Oli Bekas ) 2.9300 ltr 3,500.00 10,255.00
Bekisting Albasiah 0.3200 m³ 1,926,000.00 616,320.00
Jumlah Bahan 2,495,080.00
UPAH :
Pekerja 6.4697 Oh 70,000.00 452,881.80
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 100,000.00 51,917.40
Mandor 0.1924 Oh 85,000.00 16,357.91
Jumlah Pekerja 970,238.80
Jumlah Bahan + Pekerja 3,465,318.80
Keuntungan Max. 10 % 346,531.88
Jumlah Total 3,811,850.68
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Dibulatkan 3,811,800.00
A.04.49.a 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 12,5 cm TEBAL 10 cm
BAHAN :
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.7800 m³ 285,000.00 222,300.00
Besi Beton (Polos / ulir) 98.6400 kg 10,500.00 1,035,720.00
Kawat Beton 2.0200 kg 19,500.00 39,390.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.8800 kg 16,000.00 78,080.00
Minyak Bekisting ( Oli Bekas ) 2.4400 ltr 3,500.00 8,540.00
Bekisting Albasiah 0.2700 m³ 1,926,000.00 520,020.00
Jumlah Bahan 2,389,410.00
UPAH :
Pekerja 6.4697 Oh 70,000.00 452,881.80
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 100,000.00 51,917.40
Mandor 0.1924 Oh 85,000.00 16,357.91
Jumlah Pekerja 970,238.80
Jumlah Bahan + Pekerja 3,359,648.80
Keuntungan Max. 10 % 335,964.88
Jumlah Total 3,695,613.68
Dibulatkan 3,695,600.00
A.04.51.a 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.10 JARAK 12.5 cm TEBAL 12 cm
BAHAN :
Semen Portland 323.0000 kg 1,200.00 387,600.00
Pasir Beton 0.5200 m³ 188,000.00 97,760.00
Batu Pecah Mesin 2/3 0.7800 m³ 285,000.00 222,300.00
Besi Beton (Polos / ulir) 164.4000 kg 10,500.00 1,726,200.00
Kawat Beton 2.4100 kg 19,500.00 46,995.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 4.2300 kg 16,000.00 67,680.00
Minyak Bekisting ( Oli Bekas ) 2.1100 ltr 3,500.00 7,385.00
Bekesting Albasiah 0.2500 m³ 1,926,000.00 481,500.00
Jumlah Bahan 3,037,420.00
UPAH :
Pekerja 6.4697 Oh 70,000.00 452,881.80
Tukang Batu 0.2500 Oh 85,000.00 21,250.00
Tukang Kayu 4.0260 Oh 85,000.00 342,210.00
Tukang Besi 1.0073 Oh 85,000.00 85,621.69
Kepala Tukang 0.5192 Oh 100,000.00 51,917.40
Mandor 0.1924 Oh 85,000.00 16,357.91
Jumlah Pekerja 970,238.80
Jumlah Bahan + Pekerja 4,007,658.80
Keuntungan Max. 10 % 400,765.88
Jumlah Total 4,408,424.68
Dibulatkan 4,408,400.00
A.05.05 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps
BAHAN :
Bata Merah 5 x 11 x 22 cm 70.0000 bh 750.00 52,500.00
Semen Portland 9.6800 kg 1,200.00 11,616.00
Pasir Pasang 0.0450 m³ 188,000.00 8,460.00
Jumlah Bahan 72,576.00
UPAH :
Pekerja 0.3000 Oh 70,000.00 21,000.00
Tukang Batu 0.1000 Oh 85,000.00 8,500.00
Kepala Tukang 0.0100 Oh 100,000.00 1,000.00
Mandor 0.0150 Oh 85,000.00 1,275.00
Jumlah Pekerja 31,775.00
Jumlah Bahan + Pekerja 104,351.00
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Keuntungan Max. 10 % 10,435.10
Jumlah Total 114,786.10
Dibulatkan 114,700.00
A.06.04 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN
BAHAN :
Semen Portland 5.1840 kg 1,200.00 6,220.80
Pasir Pasang 0.0260 m³ 188,000.00 4,888.00
Jumlah Bahan 11,108.80
UPAH :
Pekerja 0.3000 Oh 70,000.00 21,000.00
Tukang Batu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 100,000.00 1,500.00
Mandor 0.0150 Oh 85,000.00 1,275.00
Jumlah Pekerja 36,525.00
Jumlah Bahan + Pekerja 47,633.80
Keuntungan Max. 10 % 4,763.38
Jumlah Total 52,397.18
Dibulatkan 52,300.00
A.08.30.a 1 M1 PASANG KALSIPLANK UKURAN (0.8 x 30) cm
BAHAN :
Kalsiplank 1.1000 m' 36,000.00 39,600.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0500 kg 16,000.00 800.00
Jumlah Bahan 40,400.00
UPAH :
Pekerja 0.1000 Oh 70,000.00 7,000.00
Tukang Kayu 0.2000 Oh 85,000.00 17,000.00
Kepala Tukang 0.0200 Oh 100,000.00 2,000.00
Mandor 0.0050 Oh 85,000.00 425.00
Jumlah Pekerja 26,425.00
Jumlah Bahan + Pekerja 66,825.00
Keuntungan Max. 10 % 6,682.50
Jumlah Total 73,507.50
Dibulatkan 73,500.00
A.09.05 1 M2 PASANG RANGKA LANGIT - LANGIT (60 x 60) cm, KAYU LOKAL KLS II
BAHAN :
Kayu Lokal Kls II, Balok 0.0163 m³ 2,407,500.00 39,242.25
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.2500 kg 16,000.00 4,000.00
Jumlah Bahan 43,242.25
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tukang Kayu 0.3000 Oh 85,000.00 25,500.00
Kepala Tukang 0.0300 Oh 100,000.00 3,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 43,350.00
Jumlah Bahan + Pekerja 86,592.25
Keuntungan Max. 10 % 8,659.23
Jumlah Total 95,251.48
Dibulatkan 95,200.00
A.09.07,a 1 M2 LANGIT - LANGIT GRC, TEBAL 4 mm
BAHAN :
GRC (120 x 240 x4) mm 0.3640 lbr 70,000.00 25,480.00
Paku Sekrup 0.1100 kg 18,700.00 2,057.00
Jumlah Bahan 27,537.00
UPAH :
Pekerja 0.1000 Oh 70,000.00 7,000.00
Tukang Kayu 0.0500 Oh 85,000.00 4,250.00
Kepala Tukang 0.0050 Oh 100,000.00 500.00
Mandor 0.0050 Oh 85,000.00 425.00
Jumlah Pekerja 12,175.00
Jumlah Bahan + Pekerja 39,712.00
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Keuntungan Max. 10 % 3,971.20
Jumlah Total 43,683.20
Dibulatkan 43,600.00
A.09.09 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4
BAHAN :
Kayu Profil 1.0500 m' 3,000.00 3,150.00
Paku 5 cm s/d 7 cm / Paku Reng - Usuk 0.0100 kg 16,000.00 160.00
Jumlah Bahan 3,310.00
UPAH :
Pekerja 0.0500 Oh 70,000.00 3,500.00
Tukang Kayu 0.0500 Oh 85,000.00 4,250.00
Kepala Tukang 0.0050 Oh 100,000.00 500.00
Mandor 0.0030 Oh 85,000.00 255.00
Jumlah Pekerja 8,505.00
Jumlah Bahan + Pekerja 11,815.00
Keuntungan Max. 10 % 1,181.50
Jumlah Total 12,996.50
Dibulatkan 12,900.00
A.10.09 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM
BAHAN :
Ubin Keramik 40 x 40 cm 1.1000 m2 95,000.00 104,500.00
Semen Portland 9.8000 kg 1,200.00 11,760.00
Pasir Pasang 0.0450 m3 188,000.00 8,460.00
Semen Warna 1.3000 kg 16,000.00 20,800.00
Jumlah Bahan 145,520.00
UPAH :
Pekerja 0.2500 Oh 70,000.00 17,500.00
Tukang Batu 0.1250 Oh 85,000.00 10,625.00
Kepala Tukang 0.0130 Oh 100,000.00 1,300.00
Mandor 0.0130 Oh 85,000.00 1,105.00
Jumlah Pekerja 30,530.00
Jumlah Bahan + Pekerja 176,050.00
Keuntungan Max. 10 % 17,605.00
Jumlah Total 193,655.00
Dibulatkan 193,600.00
A.15.02 1 M2 PASANG KACA, TEBAL 5 MM
BAHAN :
Kaca 1.1000 m2 64,000.00 70,400.00
Jumlah Bahan 70,400.00
UPAH :
Pekerja 0.0150 Oh 70,000.00 1,050.00
Tukang Kayu 0.1500 Oh 85,000.00 12,750.00
Kepala Tukang 0.0150 Oh 100,000.00 1,500.00
Mandor 0.00075 Oh 85,000.00 63.75
Jumlah Pekerja 15,363.75
Jumlah Bahan + Pekerja 85,763.75
Keuntungan Max. 10 % 8,576.38
Jumlah Total 94,340.13
Dibulatkan 94,300.00
A.16.04 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)
BAHAN :
Cat tembok Vinilex / Sekelas Vinilex 0.1750 kg 104,500.00 18,287.50
Plamir tembok 0.1600 kg 28,000.00 4,480.00
Rol cat 0.0100 bh 21,400.00 214.00
Ampelas 0.5000 lbr 4,800.00 2,400.00
Jumlah Bahan 25,381.50
UPAH :
Pekerja 0.1040 Oh 70,000.00 7,280.00
Tk. cat 0.0182 Oh 85,000.00 1,547.00
Kep. tukang cat 0.0090 Oh 100,000.00 900.00
NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH
1 2 3 4 5 6=(3x5)
Mandor 0.0045 Oh 85,000.00 382.50
Jumlah Pekerja 10,109.50
Jumlah Bahan + Pekerja 35,491.00
Keuntungan Max. 10 % 3,549.10
Jumlah 39,040.10
Dibulatkan 39,000.00
A.16.06 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)
BAHAN :
Cat tembok Vinilex / Sekelas Vinilex 0.2000 kg 104,500.00 20,900.00
Plamir tembok 0.1600 kg 28,000.00 4,480.00
Rol cat 0.0100 bh 21,400.00 214.00
Ampelas 0.5000 lbr 4,800.00 2,400.00
Jumlah Bahan 27,994.00
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tk. cat 0.0280 Oh 85,000.00 2,380.00
Kep. tukang cat 0.0150 Oh 100,000.00 1,500.00
Mandor 0.0090 Oh 85,000.00 765.00
Jumlah Pekerja 18,645.00
Jumlah Bahan + Pekerja 46,639.00
Keuntungan Max. 10 % 4,663.90
Jumlah 51,302.90
Dibulatkan 51,300.00
A.16.08 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI
BAHAN :
Meni kayu 0.1670 kg 18,000.00 3,006.00
Plamir kayu 0.0830 kg 26,000.00 2,158.00
Cat kayu sekelas SEIV 0.2000 kg 45,500.00 9,100.00
Amplas kayu 0.4000 lbr 4,800.00 1,920.00
Minyak cat terpentin 0.1500 ltr 10,700.00 1,605.00
Kwas 3" 0.0500 bh 13,000.00 650.00
Jumlah Bahan 18,439.00
UPAH :
Pekerja 0.2000 Oh 70,000.00 14,000.00
Tk. Cat 0.0600 Oh 85,000.00 5,100.00
Kep. tukang cat 0.0300 Oh 100,000.00 3,000.00
Mandor 0.0100 Oh 85,000.00 850.00
Jumlah Pekerja 22,950.00
Jumlah Bahan + Pekerja 41,389.00
Keuntungan Max. 10 % 4,138.90
Jumlah 45,527.90
Dibulatkan 45,500.00