PEKERJAAN TANAH
8 x 7 x 0.15 x 8 = 67.20 M3
8 x 2 x 0.15 x 8 = 19.20 M3
3.5 x 7 x 0.15 x 1 = 3.68 M3
3.5 x 2 x 0.15 x 1 = 1.05 M3
18 x 7 x 0.15 x 1 = 18.90 M3
18 x 2 x 0.15 x 1 = 5.40 M3
115.43 M3
PEKERJAAN PEMBETONAN
Pekerjaan Footplate 70/70
Hasil
panjang sengkang /pcs 1.72 m1
panjang total sengkang : 1851.867 m1
total berat besi sengkang : 1644.02 kg
total berat tulangan : 1644.02 kg
LEHER FOOTPLATE
Pekerjaan bekisting KOLOM
Hasil
panjang tul utama : 380 m1
panjang sengkang /pcs : 0.44 m1
panjang total sengkang 139.3333 m1
total berat besi tulangan utama : 309.83 kg
total berat besi sengkang : 54.98 kg
total berat tulangan : 364.81 kg
SLOOP 15/20
Pekerjaan bekisting Sloop
Panjang Sloop
Ruang Kelas x 8 x 8 x 2 = 128.00 M1
y 7 x 9 x 1 = 63.00 M1
Ruang WC x 3.5 x 2 x 1 = 7.00 M1
2 x 3 x 1 = 6.00 M1
y 7 x 2 x 1 = 14.00 M1
Ruang Guru x 18 x 1 x 2 = 36.00 M1
2 x 2 x 1 = 4.00 M1
4 x 1 x 1 = 4.00 M1
y 7 x 2 x 1 = 14.00 M1
3.5 x 2 x 1 = 7.00 M1
1.75 x 1 x 1 = 1.75 M1
284.75 M1
Pekerjaan bekisting Sloop
Hasil
panjang tul atas : 569.5 m1
panjang tul tengah : 0 m1
panjang tulangan bawah : 569.5 m1
panjang sengkang /pcs 0.62 m1
panjang total sengkang : 1176.967 m1
total berat besi tulangan utama : 1011.16 kg
total berat besi sengkang : 464.39 kg
total berat tulangan : 1475.55 kg
KOLOM 15/15
Pekerjaan bekisting KOLOM
Kolom Data
15/15 length : 0.15 L (m)
widht : 0.15 W (m)
height : 3.5 H(m)
overstek : 0.5 (m)
selimut beton : 20 (mm)
jumlah unit : 95 (unit)
jumlah tul. Utama : 4 btg
Dia tul. Utama : 11.5 (m)
jarak sengkang : 0.15 (m)
Dia tul. sengkang : 8 (mm)
Hasil
panjang tul utama : 1520 m1
panjang sengkang /pcs : 0.44 m1
panjang total sengkang 975.3333 m1
total berat besi tulangan utama : 1239.29 kg
total berat besi sengkang : 384.83 kg
total berat tulangan : 1624.12 kg
Ringbalk 15/20
Pekerjaan bekisting ringbalk
Ringblak TL RK 8.4
Ringblak TL RG 8.4
RB 15/15 0.3 x 16.8 x 1 = 5.04 M2
RB 15/20 0.4 x 284.75 x 1 = 113.90 M2
= 118.94 M2
Hasil
panjang tul atas : 33.6 m1
panjang tul tengah : 0 m1
panjang tulangan bawah : 33.6 m1
panjang sengkang /pcs 0.52 m1
panjang total sengkang : 58.24 m1
total berat besi tulangan utama : 41.43 kg
total berat besi sengkang : 22.98 kg
total berat tulangan : 64.41 kg
Hasil
panjang tul atas : 569.5 m1
panjang tul tengah : 0 m1
panjang tulangan bawah : 569.5 m1
panjang sengkang /pcs 0.62 m1
panjang total sengkang : 1176.967 m1
total berat besi tulangan utama : 1011.16 kg
total berat besi sengkang : 464.39 kg
total berat tulangan : 1475.55 kg
Pekerjaan Plesteran
284.75 x 3.5 x 1 = 996.63 M2
7 x 2.3 x 1 = 16.10 M2
1,012.73 M2
Luas Bata Netto Plesteran
1,012.73 - 219.15 = 793.58 M2
793.58 x 2 = 1,587.15 M2
Pekerjaan Acian
793.58 x 2 = 1,587.15 M2
Rollagh Bata
PG = 12.35 M2
PG-1 = 9.23 M2
Luas Total Partisi = 21.58 M2
Grendel Pintu
(RK) P-130 2 x 8 = 16.00 bh
(RG) P-130 2 x 2 = 4.00 bh
PG 2 x 10 = 20.00 bh
PG-1 2 x 8 = 16.00 bh
56.00 bh
Grendel Jendela
(RG) PJ2 Jendela 1 x 2 x 1 = 2.00 bh
(RG) PJ Jendela 1 x 2 x 1 = 2.00 bh
(RG) J.K2 Jendela 2 x 2 x 8 = 32.00 bh
36.00 bh
Kunci Tanam
(RK) P-130 1 x 8 = 8.00 bh
(RG) P-130 1 x 2 = 2.00 bh
(RK-WC) P-80 1 x 4 = 4.00 bh
(RG-WC) P-80 1 x 2 = 2.00 bh
(RG) P-105 1 x 1 = 1.00 bh
17.00 bh
Engsel Pintu
(RK) P-130 6 x 8 = 48.00 bh
(RG) P-130 6 x 2 = 12.00 bh
(RK-WC) P-80 3 x 4 = 12.00 bh
(RG-WC) P-80 3 x 2 = 6.00 bh
(RG) P-105 3 x 1 = 3.00 bh
81.00 bh
Engsel Jendela
(RG) PJ2 Jendela 1 x 2 x 2 = 4.00 bh
(RG) PJ Jendela 1 x 2 x 1 = 2.00 bh
(RG) J.K2 Jendela 2 x 2 x 8 = 32.00 bh
PG 5 x 3 x 2 = 30.00 bh
PG-1 4 x 3 x 2 = 24.00 bh
92.00 bh
Handle Jendela
(RG) PJ2 Jendela 1 x 1 x 2 = 2.00 bh
(RG) PJ Jendela 1 x 1 x 1 = 1.00 bh
(RG) J.K2 Jendela 2 x 1 x 8 = 16.00 bh
19.00 bh
Pekerjaan Atap
Luas Atap
Pasang Listplang
Long 89.5 x 2 = 179.00 M1
Cross 11.77 x 4 = 47.08 M1
226.08 M1
180.86 M2
Pasang Bubungan
89.5 x 1 = 89.50 M1
Pekerjaan Plafond
Luas Plafond
RK 67.5 x 7 = 472.50 M2
RG 18 x 7 = 126.00 M2
Depan, Belakang 85.5 x 3.01 = 257.36 M2
Samping 11.77 x 4 = 47.08 M2
902.94 M2
Pekerjaan Lantai
Cor Beton Tumbuk Lantai
Program : ###
Kegiatan : ###
Pekerjaan : ###
Lokasi : ###
Tahun Anggaran : 2018
a b c
I PEKERJAAN PENDAHULUAN Rp 21,843,431.25
II PEKERJAAN TANAH Rp 22,291,703.50
III PEKERJAAN PEMBETONAN Rp 222,821,917.70
IV PEKERJAAN DINDING Rp 312,487,118.77
V PEKERJAAN PINTU DAN JENDELA Rp 134,547,153.49
VI PEKERJAAN ATAP Rp 393,461,033.00
VII PEKERJAAN PLAFOND Rp 147,038,541.62
VIII PEKERJAAN LANTAI Rp 217,948,731.07
IX PEKERJAAN PENGECATAN Rp 76,665,012.28
X PEKERJAAN INSTALASI LISTRIK Rp 15,898,325.00
XI PEKERJAAN INSTALASI SANITASI Rp 20,946,655.44
JUMLAH Rp 1,585,949,623.13
I PEKERJAAN PENDAHULUAN
1 Pekerjaan pembersihan lokasi Awal dan Akhir A. 2.2.1.9. 598.50 M2 22,712.50 13,593,431.25
2 Pekerjaan Pengukuran dan Pasang Bowplank Ls 215.00 M' 20,000.00 4,300,000.00
3 Pek. Pembuatan plank informasi proyek Ls 1.00 Unit 350,000.00 350,000.00
4 Pembuatan Gudang Alat dan Bahan LS 12.00 M2 300,000.00 3,600,000.00
Jumlah I 21,843,431.25
II PEKERJAAN TANAH
1 Pekerjaan galian tanah pondasi FOOTPELAT A.2.3.1.1. 45.60 M3 83,806.25 3,821,565.00
2 Galian Tanah utk Pondasi Rolagh A.2.3.1.1. 5.37 M3 83,806.25 450,039.56
3 Pekerjaan urugan kembali bekas galian A.2.3.1.9. 16.99 M3 64,112.50 1,089,271.38
6 Urugan Pasir Dibawah Lantai 1 t = 15 cm A.2.3.1.11. 115.43 M3 146,682.50 16,930,827.56
Jumlah II 22,291,703.50
Jumlah IV 312,487,118.77
Jumlah V 134,547,153.49
VI PEKERJAAN ATAP
1 Pek. Rangka Baja Ringan A.4.2.1.22. 1,053.42 M2 261,608.54 275,582,359.34
2 Pas. Atap Spandek A.4.5.2.32. 1,053.42 M2 100,671.00 106,048,341.47
3 Pas. Bubungan Genteng metal A.4.5.2.36. 89.50 M' 68,678.00 6,146,681.00
4 Pas. Lisplank Fiber Semen 2/20 cm Ls 226.08 M' 25,140.00 5,683,651.20
Jumlah VI 393,461,033.00
Jumlah IX 76,665,012.28
Jumlah X 15,898,325.00
IX PEKERJAAN INSTALASI SANITASI
1 Pek. Pasang Pipa PVC 3/4" Air Bersik A.5.1.1 26. 32.00 M' 24,711.50 790,768.00
2 Pek. Pasang Pipa PVC 2" Air Kotor A.5.1.1 29. 26.30 M' 47,919.06 1,260,271.34
3 Pek. Pasang Pipa PVC 4" Closed A.5.1.1 32. 22.30 M' 120,796.00 2,693,750.80
4 Pek. Pasang Kran 3/4" A.5.1.1 19. 6.00 Bh 85,818.75 514,912.50
5 Pek. Pasang Toilet Jongkok A.5.1.1 2. 6.00 Bh 756,528.80 4,539,172.80
6 Pek. Pasang Bak Mandi Fiber 60/60 A.5.1.17. 6.00 Bh 388,757.50 2,332,545.00
7 Pek. Pasang Floordrain A.5.1.1 14. 6.00 Bh 58,272.50 349,635.00
8 Pek. Pasang Tempat Sabun Ls 6.00 Bh 77,600.00 465,600.00
9 Pek. Pembuat Septicktank Ls 2.00 Unit 4,000,000.00 8,000,000.00
Jumlah XI 20,946,655.44
A.2.3.1.1.
No
D
E
F
A.2.3.1.9.
No
D
E
F
A.2.3.1.11.
No
D
E
F
TENAGA
Pekerja
Mandor
BAHAN
PERALATAN
Jumlah (A+B+C)
Overhead & Profit
BAHAN
PERALATAN
Jumlah (A+B+C)
ANALISIS HARGA SATUAN PEKERJAAN
Uraian
(PERMEN PU NO 11/PRT/M/2013)
TENAGA
Pekerja
Mandor
BAHAN
Pasir urug
PERALATAN
Jumlah (A+B+C)
Uraian
L.01
L.04
TENAGA
Pekerja
Mandor
Uraian Kode
L.01
L.04
Kode
L.01
L.04
Satuan
OH
OH
Satuan
OH
OH
Satuan
OH
OH
Koefisien
15% x D
0.750
0.025
JUMLAH TENAGA KERJA
15% x D
Koefisien
0.500
0.050
JUMLAH TENAGA KERJA
Koefisien
15% x D
0.300
0.010
1.200
Harga Satuan
(Rp)
90,000.00
215,000.00
Harga Satuan
(Rp)
90,000.00
215,000.00
Harga Satuan
(Rp)
90,000.00
215,000.00
82,000.00
Jumlah
Harga
(Rp)
67,500.00
5,375.00
72,875.00
72,875.00
10,931.25
83,806.25
Jumlah
Harga
(Rp)
45,000.00
10,750.00
55,750.00
(Rp)
-
-
-
-
55,750.00
Jumlah
Harga
8,362.50
64,112.50
27,000.00
2,150.00
98,400.00
-
127,550.00
19,132.50
146,682.50
0
0
A.2.3.1.11a. Pengurugan 1 m3 dengan Tanah urug
C PERALATAN
-
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c =0,87
A TENAGA
Pekerja L.01 OH 1.600 90,000.00 144,000.000
Tukang Batu L.02 OH 0.250 120,000.00 30,000.000
Kepala Tukang L.03 OH 0.028 170,000.00 4,760.000
Mandor L.04 OH 0.063 215,000.00 13,545.000
JUMLAH TENAGA KERJA 192,305.000
B BAHAN
Semen Porland Kg 230.000 1,325.000 304,750.000
Pasir beton Kg 893.000 155.00 138,415.000
Kerikil (Maks 30mm) Kg 1,027.000 450.00 462,150.000
Air Liter - - -
JUMLAH HARGA BAHAN 905,315.000
C PERALATAN
C PERALATAN
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40,2mm, modul 60 x 120 cm, plapon
A TENAGA
Pekerja L.01 OH 0.350 85,000.000 29,750.000
Tukang besi L.02 OH 0.350 100,000.000 35,000.000
Kepala Tukang L.03 OH 0.035 170,000.000 5,950.000
Mandor L.04 OH 0.018 215,000.000 3,870.000
JUMLAH TENAGA KERJA 74,570.000
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.000 7,455.00 29,820.000
Assesoris (perkuatan, las dll) Ls 100%xrangka 29,820.000
D 59,720.00
Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D 8,958.00
F Harga Satuan Pekerjaan (D+E) 68,678.00
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.000
Tukang kayu L.03 OH 3.000 120,000.00 360,000.000
Kepala Tukang L. 03 OH 0.300 170,000.00 51,000.000
Mandor L. 04 OH 0.050 215,000.00 10,750.000
JUMLAH TENAGA KERJA 501,750.000
B BAHAN
Papan kayu M3 0.040 4,566,700.00 182,668.000
Paku 5- 7 cm Kg 0.500 30,000.00 15,000.000
JUMLAH HARGA BAHAN 197,668.000
C PERALATAN
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.000
Tukang Kayu L.02 OH 0.2000 120,000.00 24,000.000
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.000
Mandor L.04 OH 0.0050 215,000.00 1,075.000
JUMLAH TENAGA KERJA 36,475.000
B BAHAN
Papan kayu m3 0.0108 4,566,700.00 49,320.360
paku 5 cm dan 7 cm kg 0.1000 30,000.00 3,000.000
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.000
Tukang Kayu L.02 OH 0.200 120,000.00 24,000.000
Kepala Tukang L.03 OH 0.020 170,000.00 3,400.000
Mandor L.04 OH 0.001 215,000.00 215.000
JUMLAH TENAGA KERJA 29,215.00
B BAHAN
kunci slot Bh 1.000 9,800.00 9,800.000
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 3.30 80,000 264,000.000
tukang batu L.02 1.10 120,000 132,000.000
kepala tukang L.03 0.01 170,000 1,700.000
mandor L.04 OH 0.16 215,000 34,400.000
JUMLAH TENAGA KERJA 432,100.000
B BAHAN
kloset duduk unit 1 2,506,300 2,506,300.000
perlengkapan Ls 6% x unit 150,378.000
A TENAGA
Pekerja L.01 OH 0.010 80,000 800.000
tukang batu L.02 OH 0.100 120,000 12,000.000
kepala tukang L.03 OH 0.010 170,000 1,700.000
mandor L.04 OH 0.005 215,000 1,075.000
JUMLAH TENAGA KERJA 15,575.000
B BAHAN
Floordrain unit 1.000 37,400 37,400.000
A TENAGA
Pekerja L.01 OH 0.25 80,000 20,000.00
tukang batu L.02 0.25 120,000 30,000.00
kepala tukang L.03 0.05 170,000 8,500.00
mandor L.04 OH 0.05 215,000 10,750.00
JUMLAH TENAGA KERJA 69,250.00
B BAHAN
bak fibreglass unit 1 240,000 240,000.00
perlengkapan Ls 12% x bak 28,800.00
A TENAGA
Pekerja L.01 OH 0.300 90,000.00 27,000.000
Tukang batu L.02 OH 0.100 120,000.00 12,000.000
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.000
Mandor L.04 OH 0.015 215,000.00 3,225.000
JUMLAH TENAGA KERJA 43,925.000
B BAHAN
Bata Merah Bh 70.000 770.00 53,900.000
Semen porlan Kg 26.550 1,325.00 35,178.750
Pasir Pasang m3 0.093 113,000.00 10,509.000
A TENAGA
Pekerja L.01 OH 0.300 90,000 27,000.000
Tukang batu L.02 OH 0.150 120,000 18,000.000
Kepala Tukang L.03 OH 0.015 170,000.000 2,550.000
Mandor L.04 OH 0.018 215,000.000 3,870.000
JUMLAH TENAGA KERJA 51,420.000
B BAHAN
Batako M2 12.50000 2,500.00 31,250.000
Semen porlan Kg 26.55000 1,325.00 35,178.750
Pasir Pasang m3 0.09300 113,000.00 10,509.000
A TENAGA
Pekerja L.01 OH 0.300 90,000 27,000.000
Tukang Batu L.02 OH 0.150 120,000 18,000.000
Kepala Tukang L.03 OH 0.015 170,000.000 2,550.000
Mandor L.04 OH 0.015 215,000.000 3,225.000
JUMLAH TENAGA KERJA 50,775.000
B BAHAN
1. PC Kg 10.22400 1,325.00 13,546.800
1.PP m3 0.02000 113,000.00 2,260.000
JUMLAH HARGA BAHAN 15,806.800
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Batu L.02 OH 0.125 120,000.00 15,000.00
Kepala Tukang L.03 OH 0.013 170,000.00 2,125.00
Mandor L.04 OH 0.013 215,000.00 2,687.50
JUMLAH TENAGA KERJA 37,812.50
B BAHAN
1. PC Kg 5.750 1,325.00 7,618.75
1.PP m3 0.020 113,000.00 2,260.00
A TENAGA
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 170,000.00 1,700.00
Mandor L.04 OH 0.010 215,000.00 2,150.00
JUMLAH TENAGA KERJA 33,850.00
B BAHAN
PC Kg 2.575 1,325.00 3,411.88
A TENAGA
Pekerja L.01 OH 0.081 90,000.00 7,290.00
Tukang Batu L.02 OH 0.135 120,000.00 16,200.00
Kepala Tukang L.03 OH 0.014 170,000.00 2,295.00
Mandor L.04 OH 0.004 215,000.00 860.00
JUMLAH TENAGA KERJA 26,645.00
B BAHAN
Pipa PVC 4" M 1.200 204,400.00 245,280.00
Perlengkapan % 35.000 71,540.00 71,540.00
A TENAGA
Pekerja L.01 OH 0.054 90,000.00 4,860.00
Tukang Batu L.02 OH 0.090 120,000.00 10,800.00
Kepala Tukang L.03 OH 0.009 170,000.00 1,530.00
Mandor L.04 OH 0.003 215,000.00 645.00
JUMLAH TENAGA KERJA 17,835.00
B BAHAN
Pipa PVC 2" M 1.200 15,725.00 18,870.00
Perlengkapan % 35.000 5,503.75 5,503.75
A TENAGA
Pekerja L.01 OH 0.036 90,000.00 3,240.00
Tukang Batu L.02 OH 0.060 120,000.00 7,200.00
Kepala Tukang L.03 OH 0.006 170,000.00 1,020.00
Mandor L.04 OH 0.002 215,000.00 430.00
JUMLAH TENAGA KERJA 11,890.00
B BAHAN
Pipa PVC 3/4" M 1.200 6,750.00 8,100.00
Perlengkapan % 35.000 2,362.50 2,362.50
JUMLAH HARGA BAHAN 10,462.50
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.734 90,000.00 66,060.00
Tukang besi L.02 OH 0.734 120,000.00 88,080.00
Kepala tukang L.03 OH 0.073 170,000.00 12,410.00
Mandor L.04 OH 0.035 215,000.00 7,525.00
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canal dingin C75 kg 3.055 15,784.31 48,221.08
Sekrup Bh 10.500 35.00 367.50
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10 4,822.11
JUMLAH HARGA ALAT
A Pekerjaan Persiapan
1 Pek. Bongkaran Atap,Dinding Dan Daun Pintu/ jendela
B Pekerjaan Pondasi
1 Pek urugan pasir padat
2 Pasangan batu belah, Camp 1 : 5
C Pekerjaan dinding
2 Pasangan bata Dinding camp = 1 : 4
3 Pasangan plesteran, camp 1 : 4
4 Pek. Rangka Dinding Besi Hollow
5 Pek. Dinding Partisi Kalciboard
E Pekerjaan Kayu
1 Kusen Pintu Jendela , kayu klas I
2 Pek. Daun Pintu kayu Panel
3 Pek. Daun Pintu Kaca
4 Pek. Membuat daun jendela kaca,
5 Lisplank, 3/20, papan kayu klas II, kamper
6 Arsicraft
F Pekerjaan Atap
1 Penutup Atap Multi Sirap
2 Bubungan Atap
3 Rangka Atap Baja Ringan
G Pekerjaan Langit-langit
1 Pek. Rangka langit-langit besi hollow
2 Pek. Plafond + Ornamen
3 Pek. List langit-langit profil gypsum 10 cm
K Pekerjaan Sanitasi
1 Pasang Bahtub
3 Pasang Duduk Toto Setara
4 Pipa Air Bersih PVC tipe AW, Diameter 1/2"
5 Wastafel Toto atau setara
6 Shower
7 Pasang floor drain
8 Pasang Kran air Toto Atau Setara
M Pekerjaan Lain-lain
1 Pembersihan lapangan
REKAPITULASI
PROGRAM : PENGEMBANGAN WILAYAH STRATEGIS DAN CEPAT TUMBUH
KEGIATAN : PEMBANGUNAN/PENINGKATAN INFRASTRUKTUR
PEKERJAAN : REHAB RUMAH JABATAN BUPATI (LANJUTAN)
LOKASI : KUALA KAPUAS
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH
C PEKERJAAN DINDING
D PEKERJAAN BETON BERTULANG
E PEKERJAAN KAYU
F PEKERJAAN PENUTUP ATAP
G PEKERJAAN LANGIT-LANGIT
H PEKERJAAN KACA/KUNCI/ALAT GANTUNG
I PEKERJAAN PENGECATAN
J PEKERJAAN LANTAI
K PEKERJAAN SANITASI
L PEKERJAAN INSTALASI LISTRIK
M PEKERJAAN LAIN-LAIN
SUB TOTAL ( A )
PAJAK PPn 10% X (A )
TOTAL
DIBULATKAN
TERBILANG :
CANA ANGGARAN BIAYA
DAN CEPAT TUMBUH
TRUKTUR
Jumlah 2,500,000.00
1 Ls 2,500,000.00 2,500,000.00
Jumlah 2,601,914.31
0.7 M3 146,682.50 102,677.75
2.625 M3 952,090.12 2,499,236.56
Jumlah 9,005,905.21
11.5 M2 165,039.66 1,897,956.12
23 M2 54,844.94 1,261,433.56
30.845 M2 104,545.00 3,224,690.53
30.845 M2 85,000.00 2,621,825.00
Jumlah 7,359,736.18
0.3 M3 4,059,540.94 1,217,862.28
1.575 M3 1,399,440.75 2,204,119.18
0.28 M' 4,059,540.94 1,136,671.46
0.69 M 4,059,540.94 2,801,083.25
-
Jumlah 30,077,593.39
0.06 M3 11,489,839.75 716,966.00
3.36 M2 804,330.70 2,702,551.15
15.12 M2 590,554.10 8,929,177.92
27.6 M2 590,554.10 16,299,293.02
14 M' 102,114.66 1,429,605.30
187.2 M' 75,000.00 14,040,000.00
Jumlah 15,889,977.30
31.5 M2 220,112.20 6,933,534.30
6 M' 68,678.00 412,068.00
31.5 M2 271,250.00 8,544,375.00
Jumlah 85,468,300.00
200 M2 154,341.50 30,868,300.00
200 M2 195,000.00 39,000,000.00
200 M 78,000.00 15,600,000.00
Jumlah 11,238,020.50
8 Bh 237,645.00 1,901,160.00
2 Bh 121,091.00 242,182.00
27 Bh 55,740.50 1,504,993.50
60 Bh 39,416.25 2,364,975.00
10 Bh 44,867.25 448,672.50
30 Bh 44,867.25 1,346,017.50
60 Bh 57,167.00 3,430,020.00
-
Jumlah 8,981,290.72
45.5 M2 50,770.89 2,310,075.50
200 M2 23,966.00 4,793,200.00
18.48 M2 50,770.89 938,246.05
18.51 M2 50,770.89 939,769.17
-
Jumlah 316,978,301.87
15.75 M2 271,991.04 4,283,858.94
9 M2 1,746,316.09 15,716,844.84
52.5 M2 1,787,224.49 93,829,285.59
350 M2 164,423.75 57,548,312.50
200 M2 650,000.00 130,000,000.00
200 M' 78,000.00 15,600,000.00
-
Jumlah Err:509
2 Bh Err:509 Err:509
2 Bh 3,552,094.70 7,104,189.40
20 M' 13,634.71 272,694.13
2 Bh 1,500,000.00 3,000,000.00
2 Bh 750,000.00 1,500,000.00
2 Bh 58,272.50 116,545.00
2 Bh 150,000.00 300,000.00
Jumlah 32,896,842.76
41 Ttk 296,436.36 12,153,890.76
10 Ttk 142,795.20 1,427,952.00
11 Ttk 25,000.00 275,000.00
24 ttk 125,000.00 3,000,000.00
1 ttk 15,000,000.00 15,000,000.00
16 ttk 65,000.00 1,040,000.00
-
Jumlah 2,500,000.00
1 1.00 2,500,000.00 2,500,000.00
REKAPITULASI
DAN CEPAT TUMBUH
TRUKTUR
Rp 2,500,000.00
Rp 2,601,914.31
Rp 9,005,905.21
Rp 7,359,736.18
Rp 30,077,593.39
Rp 15,889,977.30
Rp 85,468,300.00
Rp 11,238,020.50
Rp 8,981,290.72
Rp 316,978,301.87
Err:509
Rp 32,896,842.76
Rp 2,500,000.00
Err:509
Err:509
Err:509
Err:509
RENCANA ANGGARAN BIAYA
PROGRAM : PENGEMBANGAN WILAYAH STRATEGIS DAN CEPAT TUMBUH
KEGIATAN : PEMBANGUNAN/PENINGKATAN INFRASTRUKTUR
PEKERJAAN : REHAB RUMAH JABATAN BUPATI (LANJUTAN)
LOKASI : KUALA KAPUAS
B R. KELUARGA
1 Sofa 3 seater 2300 x 900 x 450/950 1 pcs
2 Sofa 2 seater 1700 x 900 x 450/950 1 pcs
3 Corner Table 500 x 500 x 500 1 pcs
4 Console 1000 x 400 x 1000 1 pcs
5 Almari TV 2600 x 400 x 2400 1 pcs
6 Almari Hias + Background 3000 x 400 x 2400 1 pcs
C R. TIDUR UTAMA
1 Bed 200 x 200 + Kasur King Koil + Nakas 1 set
2 Meja Rias + Kursi 1300 x 500 x 730 1 pcs
3 Puff 1200 x 500 x 450 1 pcs
4 Meja Kerja 1800 x 800 x 750 1 pcs
5 Dressoire TV 1800 x 520 x 550 1 pcs
6 Almari Kristal 850 x 520 x 1670 1 pcs
7 Meja Konsul 1100 x 400 x 850 1 pcs
8 Sofa 1 seater 1100 x 900 x 450/900 2 pcs
9 Meja Center Ø = 600 t = 700 1 pcs
10 Wardrobe 350 x 520 x 2400 3 pcs
11 Komode 1300 x 630 x 750 1 pcs
12 Komode 1500 x 630 x 750 1 pcs
13 Mirror 1000 x 40 x 1000 2 pcs
REKAPITULASI
SUB TOTAL
PAJAK PPn 10% X (A )
JUMLAH
Terbilang : Enam Ratus Enam Belas Juta Tujuh Ratus Lima BelasTOTAL
Ribu Ru
Harga Jumlah
Satuan Harga
14,300,000 14,300,000
7,150,000 21,450,000
2,275,000 2,275,000
1,300,000 1,300,000
4,875,000 4,875,000
44,200,000
14,300,000 14,300,000
10,400,000 10,400,000
2,275,000 2,275,000
2,275,000 2,275,000
19,500,000 19,500,000
16,250,000 16,250,000
65,000,000
52,000,000 52,000,000
7,150,000 7,150,000
3,250,000 3,250,000
19,500,000 19,500,000
9,750,000 9,750,000
5,850,000 5,850,000
4,875,000 4,875,000
2,925,000 5,850,000
2,275,000 2,275,000
9,750,000 29,250,000
5,850,000 5,850,000
7,150,000 7,150,000
1,950,000 3,900,000
156,650,000
32,500,000 32,500,000
7,150,000 7,150,000
3,900,000 7,800,000
15,600,000 15,600,000
8,450,000 8,450,000
71,500,000
52,000,000 52,000,000
19,500,000 40,000,000
26,000,000
& AKOMODASI 66,000,000
Page 45
73 Kaca Rayband 3mm M2 Rp 80,000.00
74 Kaca Rayband 5mm M2 Rp 100,000.00
75 Kaca Cermin 3 mm M2 Rp 93,720.00
76 Kaca Warna/Motif M2 Rp 562,320.00
78 Plywood 4mm lbr Rp 77,787.60
80 Kalciboard 3.5 mm Lbr Rp 56,700.00
81 Gipsum Lbr Rp 82,500.00
82 teakwood lbr Rp 91,283.28
83 Plywood 9 mm Lbr Rp 149,526.00
84 List Gypsum M Rp 72,000.00
87 Kuda - kuda baja ringan M2 Rp 73,000.00
89 Seng gelombang Lbr Rp 44,000.00
90 Atap Metal Zincalume Lbr Rp 41,000.00
91 bubungan Atap zincalume lbr Rp 12,500.00
92 Mega roof 0.8x0.9m, 0.3 mm lbr Rp 53,931.60
93 Multi Sirap m2 Rp 68,790.48
94 multi roof 0.8x0.m, 0.3 mm m2 Rp 80,500.00
95 sakura roof 0.8x0.9,0.3mm lbr Rp 38,000.00
96 sakura roof 0.8x0.9,0.2mm lbr Rp 28,000.00
97 seng alumuniun 0.2 mm lbr Rp 47,797.20
98 seng plat untuk bubungan/talang m Rp 14,058.00
99 Atap Spandek lbr Rp 50,000.00
100 Rangka Plafond Holow 40.40.2 Btg Rp 30,000.00
101 Bubungan Genteng Beton lbr Rp 10,500.00
102 plastik talang lbr Rp 58,575.00
103 seng gelombang lbr Rp 44,235.84
105 Menie Besi Kg Rp 18,603.42
106 Ampelas lbr Rp 7,242.00
107 aqua proof klg Rp 45,700.00
108 cat Kilap Glotrex klg Rp 48,800.00
109 cat Kilap Platon klg Rp 50,500.00
110 Cat meni Kg Rp 42,174.00
111 cat dasar klg Rp 38,500.00
112 cat tembok matex 5 kg Klg Rp 52,800.00
113 dempul kayu klg Rp 35,700.00
114 fernis klg Rp 46,860.00
115 cat jotun 2.5 liter klg Rp 238,986.00
116 plamur tembok kg Rp 57,400.00
117 minyak cat btl Rp 15,762.00
118 tinner biasa ltr Rp 24,000.00
120 shower Bh Rp 447,300.00
121 bak mandi fiber Bh Rp 240,000.00
122 kloset duduk Bh Rp 890,340.00
123 kloset duduk toto atau setara bh Rp 2,506,300.00
124 kloset jongkok bh Rp 330,000.00
125 Bak Cuci Piring bh Rp 161,282.75
126 urinoir set Rp 950,000.00
127 floor drain Bh Rp 37,400.00
128 Tanki Air 1200 ltr Bh Rp 1,487,500.00
130 Bolam lampu 65 watt (Philips) Bh Rp 210,870.00
131 Bolam Hemat 18 watt philips Bh Rp 46,860.00
132 box kwh meter Bh Rp 1,640,100.00
133 Lampu Downlight bh Rp 117,150.00
134 Lampu Tl Philips 14 watt bh Rp 28,116.00
135 instalasi stop kontak untuk kayu bh Rp 70,383.72
136 instalasi stop kontak untuk Beton set Rp 142,795.20
137 instalasi titik lampu untuk Kayu Bh Rp 296,436.36
138 instalasi titik lampu untuk Beton Bh Rp 161,709.60
139 1 set sekring/MCB sekring 2 group Bh Rp 64,666.80
140 List Plank beton ringan lebar 60 cm M' Rp 234,300.00
141 Batu alam adhesif M2 Rp 208,740.00
142 Minyak residu/teeer Liter Rp 24,452.40
143 Hollow 40.40.2 mm Batang Rp 7,455.00
144 Kuas Bh Rp 17,040.00
145 Pek. Pasang septictank kapasitas 3000 liter Bh Rp 20,350,000.00
146 Pek. Pasang septictank kapasitas 1000 liter Bh Rp 8,250,000.00
147 Pintu Tempered kaca tebal 12 mm lengkap terpasang Unit Rp 8,800,000.00
Page 46
DAFTAR HARGA SATUAN UPAH
Page 47
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp.)
A TENAGA
Pekerja L.01 OH 0.175 85,000.00
Tukang Besi L.02 OH 0.175 100,000.00
Kepala Tukang L.03 OH 0.035 170,000.00
Mandor L.04 OH 0.018 215,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal hollow M' 4.500 7,500.00
40.40.2 mm
Assesoris Ls 10%xrangka
(perkuatan, las dll)
A TENAGA
Pekerja L.01 OH 0.400 90,000
Tukang batu L.02 OH 0.200 120,000
Kepala Tukang L.03 OH 0.020 170,000
Mandor L.04 OH 0.020 215,000
JUMLAH TENAGA KERJA
B BAHAN
Bata Ringan Bh 8.50000 11,000.00
Semen porlan Kg 10.00000 1,325.00
Pasir Pasang m3 0.01330 113,000.00
14,875.00
17,500.00
5,950.00
3,870.00
33,750.00
8,437.50
84,382.50
12,657.38
97,039.88
36,000.000
24,000.000
3,400.000
4,300.000
67,700.000
93,500.000
13,250.000
1,502.900
8.333333
108,252.900
0
175,952.90
26,392.94
202,345.84